Fury Gold Mines Ltd 40-F, filed Mar 20, 2020: Managements Discussion and Analysis
Exhibit
99.3

(An exploration stage company)
MANAGEMENT’S DISCUSSION AND ANALYSIS
OF AURYN RESOURCES INC.
FOR THE YEAR ENDED DECEMBER 31, 2019
Dated:
March 19, 2020
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
TABLE OF CONTENTS
|
HIGHLIGHTS FOR THE YEAR ENDED DECEMBER 31, 2019 AND THE PERIOD UP
TO MARCH 19, 2020
|
3
|
|
|
1.1
|
Date and forward-looking statements
|
6
|
|
1.1.1
|
Forward-looking statements and risk factors
|
6
|
|
1.2.1
|
Description of business
|
7
|
|
1.2.2
|
Peruvian projects
|
8
|
|
|
Sombrero
|
8
|
|
|
Curibaya
|
14
|
|
|
Huilacollo
|
17
|
|
|
Baños del Indio
|
18
|
|
1.2.3
|
Committee Bay and Gibson MacQuoid projects
|
18
|
|
|
Committee Bay
|
18
|
|
|
Gibson MacQuoid
|
21
|
|
1.2.4
|
Homestake Ridge project
|
21
|
|
1.2.5
|
Qualified persons and technical disclosures
|
22
|
|
1.3
|
Selected annual financial information
|
24
|
|
1.4
|
Discussion of operations
|
25
|
|
1.5
|
Summary of quarterly results
|
27
|
|
1.6/1.7
|
Financial position and liquidity and capital resources
|
28
|
|
1.8
|
Off-balance sheet arrangements
|
33
|
|
1.9
|
Transactions with related parties
|
34
|
|
1.10
|
Subsequent events
|
34
|
|
1.11
|
Proposed transactions
|
35
|
|
1.12
|
Critical accounting estimates
|
35
|
|
1.13
|
Changes in accounting policies including initial
adoption
|
37
|
|
1.14
|
Financial instruments and other instruments
|
37
|
|
1.15
|
Other requirements
|
38
|
2
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
HIGHLIGHTS FOR THE YEAR ENDED DECEMBER 31, 2019 AND THE PERIOD UP
TO MARCH 19, 2020
Corporate highlights
●
On March 18, 2020,
Auryn Resources Inc. (the “Company” or
“Auryn”) provided a corporate update and discussed its
response to concerns surrounding the COVID-19 pandemic, and the
potential impact on the Company’s business. The Company
advised that all of its office employees had been given the option
to work from home, while personnel in Peru had been recalled from
the field due to a 15 day government imposed lockdown in the
country. The Company also announced its plans to release an initial
PEA on the Homestake Ridge project and revised targets for its
Committee Bay project in the coming weeks.
●
On February 27,
2020, Auryn completed a non-brokered private placement, which
closed in two tranches, for gross proceeds of $15,000, by issuing
9,375,000 common shares priced at $1.60 (the “2020
Offering”). A total of $59,000 was paid in commissions.
Proceeds from the 2020 Offering will be used to fund continued
surface exploration at its Sombrero and Curibaya projects located
in southern Peru and for general working capital (see press release
dated February 27, 2020).
●
On February 6,
2020, concurrent with the closing of the first tranche of the 2020
Offering, the Company completed an amendment to the September 2019
bridge loan (the “Loan Amendment”) to provide certain
conversion rights to both the lender and the Company, as well as
reducing the interest rate to 5% from the date of the Loan
Amendment (see press release dated February 6, 2020).
●
On December 17,
2019, the Company announced the appointment of Christian Rios as
Vice President of South America. Mr. Rios is a professional
geologist (P.Geo.) with a Masters in Economic Geology from the
University of Arizona and brings nineteen years of experience in
exploration, mining development and operations, specializing in
Peru. Mr. Rios will be responsible for leading the operations of
Auryn’s exploration activities in Peru.
●
On September 12,
2019, Auryn closed a secured bridge loan facility (the
“Bridge Loan”) for up to $6,000, of which $3,000 was
drawn.
●
On July 11, 2019,
the Company closed a non-brokered flow-through private placement of
633,334 flow-through common shares (the “2019 FT
Shares”) at a price of CAD$3.00 per 2019 FT Share for gross
proceeds of $1,900 (the “July 2019 Offering”). The
purpose of the July 2019 Offering was to fund the Company’s
2019 exploration program at its Committee Bay project.
●
On March 27, 2019,
Auryn completed a non-brokered private placement for gross proceeds
of $5,255. The placement consisted of 3,284,375 common shares (the
“Shares”) priced at CAD$1.60 per Share (the
“March 2019 Offering”).
●
On March 26, 2019,
the Company announced the appointment of Stacy Rowa as Chief
Financial Officer, effective April 1, 2019, upon the resignation of
Peter Rees as Chief Financial Officer and Corporate Secretary to
pursue a new opportunity.
●
On February 15,
2019 the Company announced that Jeffrey Mason, CPA, CA, was
appointed to its Board of Directors. Mr. Mason is a corporate and
financial professional with over 25 years of experience serving
public companies in the mining and mineral exploration
industry.
Operational highlights
●
On February 28,
2020, November 14 and October 28, 2019 the Company announced
results from its initial surface programs at the Curibaya project
in southern Peru. The work included a rock sampling program
completed in Q4 2019 followed up by a geological mapping and
sampling program completed in early 2020. Through geological
mapping, a series of rhyolite to dacite flow dome complexes have
been identified. Auryn’s technical team believes these domes
are the source for the widespread, high-grade precious metal veins
sampled to-date across a 4 x 4 kilometer alteration system.
Highlights from the 2019 sampling include up to 7,990 g/t silver,
17.65 g/t gold and 6.97% copper.
3
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
Operational
highlights (continued)
●
On February 10,
2020 Auryn received its environmental permit, the Declaración
de Impacto Ambiental (“DIA”), from the Peruvian
Ministry of Energy and Mines for its Sombrero copper-gold project
in Southern Peru. The DIA covers an area of 1,031 hectares and
allows the Company to drill up to 33 holes from 23 platforms on the
Ccascabamba Sombrero Main target area, where Auryn has completed
the majority of its work to-date within the 130,000 hectare land
package.
●
On January 17, 2020
the Company confirmed the age of the intrusives directly associated
with mineralization at the Sombero copper – gold skarn
project in Southern Peru. Based on results from five uranium
– lead samples obtained from diorite sills at the Ccascabamba
and Nioc targets, ages range from 38.85 to 40.47 million years.
This places the mineralization within the same Eocene-aged
metallogenic event that produced several world-class deposits in
the Andahuaylas-Yauri belt.
●
On October 25,
2019, the Company announced results from its 2019 Committee Bay
drill program which comprised 2,700 meters of diamond drilling in
seven holes. A new gold-bearing hydrothermal system was identified
through drilling at the Shamrock occurrence. Additionally, the
Company’s technical team advanced its understanding of
geophysical responses associated with high-grade gold
mineralization at Committee Bay which will be used for targeting
future programs.
●
On October 17,
2019, Auryn announced that it has expanded its land position in
southern Peru by staking 8,500 additional hectares adjacent to its
Milpoc target in the Sombrero North project area. The newly
acquired Macha Machay claims were part of the 7,000 square
kilometer area screened by Auryn during a regional exploration
program and contain the highest copper values in stream sediments
sampled by Auryn to date.
●
On September 30,
2019, the Company announced results from a rock sampling program at
the Ccello prospect within the southern portion of the Sombrero
district in southern Peru. Highlights from the rock sampling
program include silver values of 981 g/t, 72.1 g/t, 64.4 g/t, 40.6
g/t, 26.6 g/t and 20.5 g/t. The project is defined by a
2-kilometer-by-1.5-kilometer high sulphidation alteration
system.
●
On August 7, 2019,
Auryn announced that it had acquired a 100% interest, subject to
certain NSR royalties, in the Sambalay and Salvador concessions
which are adjacent to its wholly owned Curibaya property in
southern Peru for US $250,000.
●
On June 13, 2019
the Company announced results from 8 historical drill holes,
totalling 998 meters of drilling, from the Fierrazo target at its
Sombrero project. Highlights included 116 meters of 0.58%
CuEq1
(0.42% Cu and 0.24 g/t Au), 90.4 meters of 0.51% CuEq (0.48% Cu and
0.05 g/t Au) and 51 meters of 0.53% CuEq (0.43% Cu and 0.16 g/t
Au). The historical drill holes had been drilled in 2013 by
Corporacion Aceros Arequipa S.A. (“Aceros”) targeting
iron skarn mineralization. The results confirmed the copper-gold
sulphide mineralization extends to depth underneath the area where
surface channel sampling was conducted earlier in 2019 (see below
for summary of press releases dated March 12 and April 3,
2019).
●
On June 4, 2019,
Auryn announced that two new regional targets had been identified
at its Homestake Ridge gold project in the Golden Triangle in BC,
Canada, following a full review of the historical datasets,
geological mapping, stream sediment and rock chip sampling. The
2019 exploration program, which was completed during Q3 2019,
included additional geological and geophysical work at these newly
defined targets. The results from the 2019 surface program are
currently being interpreted by the technical team.
●
Effective May 20,
2019, the Company declared force majeure under its Mollecruz option
agreement in one of the areas at its Sombrero project where it has
not yet commenced work. The Company, to date, has been unable to
obtain a community agreement allowing access to the concession to
commence its work program. The Company continues to negotiate in
good faith with the community to resolve this matter.
Metal
price used for 2019 copper and gold equivalent (CuEq and AuEq)
calculations: Au $1300/oz and Cu $3.00/lb, no adjustments for
metallurgical recoveries have been made.
4
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
Operational
highlights (continued)
●
On April 3 and
March 12, 2019 the Company released results from its initial
surface program at the Fierrazo area within the Sombrero project.
Highlights from the continuous channel sampling at the Fierrazo
target include a combined width of mineralization of 232 meters of
0.55% copper equivalent (0.47% copper and 0.13 g/t gold) with
a higher-grade internal interval of 40 meters of 1.26% copper
equivalent (1.23% copper and 0.05 g/t gold). The sampling
helped further validate the potential 7.5 kilometers of strike
length of high-grade exoskarn targets at the Sombrero Main area,
which will be the focus of Auryn’s first drill program at the
project.
●
On February 19,
2019 the Company announced the results of applying machine learning
to its geological datasets to aid in the targeting process at its
Committee Bay project. Highlights included the generation of 12 new
targets and the identification of an additional parallel shear zone
located to the north of the Aiviq structure.
●
On January 7, 2019
the Company announced the identification of significant copper
mineralization at Milpoc. Select grab sample results ranged from
0.1 – 8.45% copper and 0.06 – 101 g/t
silver.
< Refer to the page 6 for cautionary wording concerning
forward-looking information>
5
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.1 Date and forward-looking statements
This
Management Discussion and Analysis (“MD&A”) of
Auryn has been prepared by management to assist the reader to
assess material changes in the consolidated financial condition and
results of operations of the Company as at December 31, 2019 and
for the year then ended. This MD&A should be read in
conjunction with the consolidated financial statements of the
Company and related notes thereto as at and for the years ended
December 31, 2019 and 2018 which have been prepared in accordance
with International Financial Reporting Standards
(“IFRS” or “GAAP”) as issued by the
International Accounting Standards Board (“IASB”) and
Interpretations issued by the International Financial Reporting
Interpretations Committee (“IFRIC”). All dollar amounts
presented are Canadian dollars unless otherwise
stated.
The
effective date of this MD&A is March 19, 2020.
1.1.1
Forward-looking
statements and risk factors
This
MD&A may contain “forward-looking statements” which
reflect the Company’s current expectations regarding the
future results of operations, performance and achievements of the
Company, including but not limited to statements with respect to
the Company’s plans or future financial or operating
performance, the estimation of mineral reserves and resources,
conclusions of economic assessments of projects, the timing and
amount of estimated future production, costs of future production,
future capital expenditures, costs and timing of the development of
deposits, success of exploration activities, permitting time lines,
requirements for additional capital, sources and timing of
additional financing, realization of unused tax benefits and future
outcome of legal and tax matters.
The
Company has tried, wherever possible, to identify these
forward-looking statements by, among other things, using words such
as “anticipate”, “believe”,
“estimate”, “expect”, “budget”,
or variations of such words and phrases or state that certain
actions, events or results “may”, “could”,
“would”, “might” or “will be
taken”, “occur” or “be
achieved”.
The
statements reflect the current beliefs of the management of the
Company and are based on currently available information.
Accordingly, these statements are subject to known and unknown
risks, uncertainties and other factors, which could cause the
actual results, performance, or achievements of the Company to
differ materially from those expressed in, or implied by, these
statements. These uncertainties are factors that include but are
not limited to risks related to international operations; risks
related to general economic conditions; actual results of current
exploration activities and unanticipated reclamation expenses;
fluctuations in prices of gold and other commodities; fluctuations
in foreign currency exchange rates; increases in market prices of
mining consumables; possible variations in mineral resources, grade
or recovery rates; accidents, labour disputes, title disputes,
claims and limitations on insurance coverage and other risks of the
mining industry; delays in obtaining governmental approvals or
financing or in the completion of development or construction
activities; changes in national and local government regulation of
mining operations, tax rules and regulations, and political and
economic developments in countries in which the Company operates;
as well as other factors. Additional information relating to the
Company and its operations is available on SEDAR at www.sedar.com
and on the Company’s web site at
www.aurynresources.com.
The
Company’s management periodically reviews information
reflected in forward-looking statements. The Company has and
continues to disclose in its MD&A and other publicly filed
documents, changes to material factors or assumptions underlying
the forward-looking statements and to the validity of the
statements themselves, in the period the changes occur. Historical
results of operations and trends that may be inferred from the
following discussions and analysis may not necessarily indicate
future results from operations.
6
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.1.1
Forward-looking statements and risk factors
(continued)
The
operations of the Company are speculative due to the high-risk
nature of its business which is the exploration of mining
properties. For a comprehensive list of the risks and uncertainties
facing the Company, please see “Risk Factors” in the
Company’s most recent annual information form
(“AIF”). These are not the only risks and uncertainties
that Auryn faces. Additional risks and uncertainties not presently
known to the Company or that the Company currently considers
immaterial may also impair its business operations. These risk
factors could materially affect the Company's future operating
results and could cause actual events to differ materially from
those described in forward-looking statements relating to the
Company. Readers should refer to the risks discussed in the
Company’s AIF and MD&A for the year ended December 31,
2019 and subsequent continuous disclosure filings with the Canadian
Securities Administrators available at www.sedar.com and the
Company’s registration statement on Form 40-F filed with the
United States Securities and Exchange Commission and available at
www.sec.gov.
These documents are for information purposes only and not
incorporated by reference in this MD&A.
1.2.1
Description of business
Auryn Resources is a technically-driven,
junior exploration company focused on finding and advancing
globally significant precious and base metal deposits.
The Company has a portfolio approach to asset acquisition and
has seven projects, including two flagships: the Committee Bay
high-grade gold project in Nunavut, Canada and the Sombrero
copper-gold project in southern Peru.
Auryn’s technical and management teams have an impressive
track record of successfully monetizing assets for all stakeholders
and local communities in which it operates. Auryn conducts itself
to the highest standards of corporate governance and social
responsibility.
The Company was incorporated under the British Columbia Business
Corporations Act on June 9, 2008 under the name Georgetown Capital
Corp. Subsequently on October 15, 2013, the Company changed its
name to Auryn Resources Inc. and is a reporting issuer in the
provinces of British Columbia, Ontario and Alberta. The Company is
listed on the Toronto Stock Exchange under the symbol AUG and
effective July 17, 2017, the Company’s common shares
commenced trading on the NYSE American under the US symbol
AUG.
The Company’s principal business activities include the
acquisition, exploration and development of resource properties.
The head office and principal address of the Company are located at
1199 West Hastings Street, Suite 600, Vancouver, British Columbia,
V6E 3T5.
Effective April 1, 2019, Mr. Rees resigned as Chief Financial
Officer to pursue a new opportunity and the Company appointed Ms.
Rowa. Ms. Rowa is a Canadian CPA, CA who has worked with Canadian
and US publicly listed resource companies for the past 10 years,
including the last 3 years with Auryn.
7
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian
projects
Sombrero

Figure 1 - Illustrates
the Sombrero North and Sombrero South project areas within the
western extension of the Andahuaylas-Yauri Belt of southern
Peru
The Sombrero Project is located 340 kilometers SE of Lima in
southern Peru and is hosted in the interpreted western extension of
the Andahuaylas-Yauri belt. The project is located on the western
margins of this Eocene-Oligocene aged copper-gold porphyry and
skarn belt that hosts the Las Bambas, Haquira, Los Chancas,
Cotambambas, Constancia, Antapaccay and Tintaya deposits. The
project is characterized by a strong structural control and
significant copper and gold values from surface sampling. The
principal targets at Sombrero are copper-gold skarn and porphyry
systems and precious metal epithermal deposits.
The current project consists of approximately 130,000 hectares of
mineral claims covering a number of coincident gold and copper
geochemical anomalies. Figure 1 above illustrates the Sombrero
project area, which consists of the Sombrero North and Sombrero
South areas. The main project area, where the Company has focused
the majority of its exploration work, has been Sombrero North which is comprised of
75,036.7 net hectares; while the Sombrero South concession blocks
lie within approximately 80 km south and east of this main project
area. The land package was assembled through three separate option
agreements, detailed below, and a series of staking campaigns, with
the Company most recently adding 8,500 hectares to the Sombrero
North area in September 2019 (Figure 1) (see full press release
dated October 17, 2019).
8
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Sombrero (continued)
The
Company is currently in the process of renewing the surface rights
agreement it has in place with the local community which covers the
Sombrero Main target area for a two year period and is actively
working towards securing agreements with other local communities in
order to expand its access to other parts of the project
area.
Alturas Option
On June 28, 2016, the Company entered into an option with Alturas
Minerals Corp. whereby Auryn was granted the option to earn up to a
100% interest in the central area of the project referred to as
Sombrero Main. Under the terms of this option, the Company may earn
a 100% interest in the 6 mineral claims by making option payments
of US$0.2 million, completing US$2.1 million in work expenditures
within a five-year period and by making a final payment of US$5.0
million. As at December 31, 2019, the Company has satisfied the
option payment requirements of the agreement and has incurred
approximately US$1.7 million in exploration work on the
project.
Mollecruz Option
On June 22, 2018, the Company acquired the rights to the Mollecruz
concessions located north of Sombrero Main, which is host to the
Good Lucky prospect. Under the terms of the Mollecruz Option, the
Company may acquire a 100% interest in the concessions by
completing US$3.0 million in work expenditures and by making
payments totaling US$1.6 million to the underlying owner over a
five-year period. At signing, Auryn paid US$50,000 and upon
exercise of the option, the underlying owner will retain 0.5% NSR
royalty with an advance annual royalty payment of
US$50,000.
Effective May 20, 2019, the Company formally declared the existence
of a force majeure event under the Mollecruz Option as the Company
has been unable to reach an access agreement with the local
community in order to commence work in the region. The declaration
of force majeure has deferred the Company’s obligation to
make the June 22, 2019 property payment and any subsequent property
payments and work expenditures for a maximum of 24 months from the
declaration date. The Company has continued to have active and open
communications with the community in an effort to better inform
community members about work plans and address those concerns that
may be hindering the Company from obtaining access in this
particular area.
Aceros Option
On December 13, 2018, the Company entered into a series of
agreements with Corporacion Aceros Arequipa S.A.
(“Aceros”) to acquire the
rights to three key inlier mineral concessions, which include
Fierrazo and Nioc. If the Aceros Option is fully exercised,
a joint venture would be formed in which the Company would hold an
80% interest (Aceros – 20%). The joint venture would combine
the 530 hectare Aceros concessions plus 4,600 hectares of
Auryn’s Sombrero land position. The Company is required to
make a series of option payments totalling US$800,000, of which
US$200,000 has been paid, as well as completing US$5.15 million in
work expenditures over a five-year period, of which US$0.3 million
has been spent to date.
9
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Sombrero (continued)
Exploration

Figure 2 - Illustrates the primary Sombrero project area and the
various Copper-Gold Skarn, Porphyry & Epithermal
Targets
Since obtaining community access in early 2018, the Company has
aggressively conducted surface geochemical and geophysical surveys
across the southern portions of Sombrero Main in anticipation of an
initial drill campaign. Work conducted to date in this area
included 3,814 m of continuous channel samples, 913 rock samples,
261 soil samples and 13,156 XRF samples as well as 87 line-km of IP
and 282 line-km of Mag. The results of this work have further
indicated that Sombrero is host to a significant copper-gold system
which contains porphyry, epithermal and skarn type mineralization.
Auryn geologists completed grade control mapping throughout the
Sombrero Main area with the goal of characterizing the controls on
mineralization throughout the project area. The interpretation of
this work is ongoing and constantly evolving.
In Q1 2019, the surface work was expanded into the newly acquired
Fierrazo area and included continuous channel sampling which
resulted in the extension of the mineralization to a potential 7.5
km target area over the Sombrero Main and Fierrazo areas. The
identified contact zone between the Ferrobamba limestone and the
Cascabamba intrusive body hosting high-grade copper and gold
mineralization will continue to be the primary area of
focus. Highlights from the continuous channel sampling at
the Fierrazo include a combined width of mineralization of 232
meters of 0.55% copper equivalent (0.47% copper and 0.13 g/t
gold) with a higher-grade internal interval of 40 meters of 1.26%
copper equivalent (1.23% copper and 0.05 g/t gold) (Figure 4)
(full results can be found in the Company’s press releases
dated March 12 and April 3, 2019).
10
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Sombrero (continued)
The Company has also had the opportunity to make use of past
workings by Aceros including collecting 37 representative grab
samples from the waste dumps and ore stockpiles left at the
formerly producing Fierrazo iron mine. The results of the samples
indicate copper and gold mineralization within the
hematite-magnetite exoskarn mineralization. The average
values of the samples were 0.91% Cu and 0.36 g/t Au. Complete
results of this sampling can be found in the Company’s April
3, 2019 news release.
As announced April 29, 2019 the Company gained access to 988 meters
of historical drill core from drilling conducted by Aceros (Figures
3 and 4). The previous sampling of the core by Aceros was
considered incomplete as only partial sections were sampled
targeting iron skarn mineralization. Additionally, historic
analytical results did not include analysis for gold. On June 13,
2019 Auryn released the results of its sampling of the core.
Highlights included 116 meters of 0.58% CuEq (0.42% Cu and 0.24 g/t
Au), 90.4 meters of 0.51% CuEq (0.48% Cu and 0.05 g/t Au) and 51
meters of 0.53% CuEq (0.43% Cu and 0.16 g/t Au) (Figure 3). These
results confirmed that the copper-gold sulfide mineralization
extends to depth below where the Company had completed its channel
sampling as discussed above (Figure 4). Collectively, the
historical drill holes define a mineralized body totaling 300
meters of strike length with an average width of approximately 150
– 200 meters that is open both to the north and to the
south.

Figure 3 - Illustrates the drill intercepts from the historical
core at the Fierrazo exoskarn target.
11
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Sombrero (continued)

Figure 4 - illustrates the location of the 8 historical drill holes
at the Fierrazo target in relation to the surface work Auryn has
completed to date.
The Company’s initial permit application for drilling at
Sombrero Main was submitted in June 2019. The Company recently
received its environmental permit, or DIA, as announced February
10, 2020, which covers an area of 1,031 hectares. The DIA allows
the Company to drill up to 33 holes from 23 platforms on the
Ccascabamba Sombrero Main target area, where the majority of work
to-date has been completed (Figure 5). The next step required in
the permitting process is to obtain the authorization for Inicio de
Actividades (“Start of Activities”), which was filed
with the Peruvian authorities in February 2020 and includes the
Consulta Previa (“Social Consultation”), which will be
the government authority’s confirmation that the community
supports the upcoming drill program as well as future exploration
activities. Auryn has prioritized efforts to achieve excellent
relations within the Huanca Sancos community through a number of
beneficial social programs and is concurrently working through the
renewal of the community access agreement which will grant the
Company access for another two-year period.
Both the completion of the drill permit and the renewal and
securing of key community access agreements, will continue to be
the Company’s main focus in the coming months.
12
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Sombrero (continued)

Figure 5: Illustrates the proposed drill plan on the Sombrero Main
target area. The DIA allows Auryn to drill up to 33 holes from 23
platforms.
While the Company’s primary focus has been advancing the
Sombrero Main target to a drill ready state, it has continued to
conduct exploration work across its full land package to identify
other areas of interest. The Good Lucky and Nioc target areas,
which are situated adjacent to and show similar geological and
geophysical signatures as Sombrero Main, are additional prospects
which have produced highly anomalous results and warrant additional
follow-up. The Good Lucky prospect, contained within the Mollecruz
concessions, represents an outcropping copper-gold skarn system
exposed over 600 meters where sampling has returned up to 5.12 g/t
Au and 4.29% Cu. Rock samples from Nioc, contained within the
Aceros option, have returned assays of up to 5.88 g/t Au and 9.09%
Cu. The Company plans to expand its surface program into the Good
Lucky and Nioc target areas once community agreements are obtained
and the Company thereby gains access to the land.
13
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Sombrero (continued)
In the meantime, surface work programs such as rock sampling, BLEG
surveys and BLEG follow up continue to screen the overall land
package in order to highlight additional mineralized centers. The
Company recently conducted first-pass reconnaissance at the Ccello
project in Sombrero South, which consisted of mapping and rock
sampling to follow up on anomalous stream sediment samples from
previously completed screening efforts. The program, which yielded
silver values of up to 981 g/t (see full press release dated
September 30, 2019), identified a previously unrecognized 2 x 1.5
km high sulphidation alteration system.
As announced in a press release dated October 17, 2019, the Company
has also staked the Macha Machay claims as a result of its
previously completed regional exploration program. The new claims,
which contained the highest copper values in stream sediments
observed through the regional program, are located adjacent to the
Company’s Milpoc target and are within the land area where
the Company has an existing community agreement.
See the press releases dated June 19, September 5, September 26,
October 15, November 26, 2018 and January 7, March 12, April 3,
September 30, and October 17, 2019 for complete results from the
Company’s geophysical and geochemical surface programs at
Sombrero.
Curibaya

Figure 6: Illustrates the position of the Curibaya Project with
respect to the large copper porphyry mines in southern
Peru.
14
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Curibaya (continued)
On August 2, 2019, the Company acquired the rights to the Sambalay
and Salvador concessions adjacent to the wholly owned Curibaya
porphyry property in southern Peru, which was staked by the Company
in 2016. Under the terms of the mining concession transfer
agreement with Wild Acre Metals (Peru) S.A.C., the Company paid
US$250,000 on transfer of the concessions in favour of Corisur. The
Sambalay concessions are subject to a combined 3% NSR royalty, 0.5%
of which is buyable for US$1.0 million. The Salvador concessions
are subject to a 2% NSR royalty and a US$2.0 million production
payment, payable at the time a production decision is made, and to
secure payment of such consideration a legal mortgage is recorded
in the registry files of the Salvador concessions.
The Sambalay and Salvador concessions together represent a 4 by 4
kilometer alteration system that shows affinities to precious metal
low to intermediate sulphidation systems. Historical high-grade
sampling includes up to 13.50% copper, 23.6 g/t gold and 14,180 g/t
silver (Figure 6), however despite these results, Auryn is unaware
of any historical systematic exploration or drilling on the
properties.
Collectively, the Curibaya project now covers approximately 11,000
hectares and is located 53 km from the provincial capital, Tacna,
and is accessible by road in 2 hours. The project lies 11 km south
of the Incapuquio regional fault, which is viewed as a major
control on the emplacement of mineralized porphyries in the region.
The concessions are outside the 50km border zone and therefore do
not require the Peruvian government to approve the acquisition by
Auryn.

Figure 7: Illustrates the locations of the newly acquired Sambalay
and Salvador concessions in relation to the Curibaya concessions
and other projects in the region.
15
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Curibaya (continued)
2019/2020 Curibaya Exploration
Since acquiring the Sambalay and Salvador concessions in August
2019, the Company completed a first-pass reconnaissance rock
sampling program in Q4 2019 which sampled high-grade mineralization
throughout a 1.5 km by 4.5 km quartz – sericite –
pyrite alteration system, which was followed up with geological
mapping and additional rock and channel sampling in early 2020. In
total, 481 rock samples, 87 channel samples and 9 stream sediment
samples have been taken with the aim of better understanding the
spatial distribution of high-grade mineralization throughout the
alteration system as well as confirming results from historical
rock samples. Highlights from the 2019 and 2020 sampling include up
to 7,990 g/t silver, 17.65 g/t gold and 6.97%
copper.
The Company’s ongoing follow up program selectively sampled
veins in previously unsampled areas and in doing so identified a
new zone of mineralization approximately one kilometer to the
northeast of the Company’s previous sampling thereby
extending the alteration system to a 4 km by 4 km area. Through
geological mapping a series of rhyolite to dacite flow dome
complexes have been identified which the Company believes may be
the sources of the widespread, high-grade precious metal veins
sampled to date. In addition, a float sample 800 meters to the
northeast returned grades of up to 9,180g/t silver and 42.6g/t gold
(Figures 8 and 9) and will be followed up on in the next round of
field work. See press releases dated February 28, 2020, November 14
and October 28, 2019 for full results from the Company’s
surface programs at Curibaya.
With the goal of applying for an FTA drill permit that will allow
for up to 20 drill pads, the Company plans to develop drill targets
in the coming months through continued geological and alteration
mineral mapping, targeted rock sampling along the margins of the
dome complexes and ground based and airborne geophysical
surveys.

Figure 8: Illustrates additional silver values from vein samples
taken across the project area and the new north-south trending
corridor of veins over approximately 400 meters that have been
identified.
16
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Curibaya (continued)
2019/2020 Curibaya Exploration

Figure 9: Illustrates additional gold values from vein samples
taken across the project area and the new north-south trending
corridor of veins over approximately 400 meters that have been
identified.
Huilacollo
The Huilacollo property, located in the Tacna province of southern
Peru, comprises 2,000 hectares of intense hydrothermal alteration
over a 4 by 6 km area that is consistent with epithermal Au/Ag
mineralization. Historic drilling has identified a continuously
mineralized gold/silver zone open in all directions. Contained
within this area, there appears to be higher grade mineralization
focused along well-defined feeder structures as highlighted by
trench intercepts up to 38m at 6.7 g/t Au and drill holes including
34m at 2.14 g/t. The Company acquired the rights to Huilacollo
through an option agreement with a local Peruvian company,
Inversiones Sol S.A.C., under which the Company may acquire a 100%
interest, subject to an NSR, through a combination of work
expenditures and cash payments totaling US$7.0 million and US$8.75
million respectively. As of May 11, 2019, the Company had spent
US$4.5 million at the Huilacollo project and did not satisfy the accumulated work expenditure
requirement of US$5.0 million at that date. Under the terms of the
Huilacollo option, the Company elected instead to make a cash
payment of US$258,000 equal to 50% of the shortfall at the due date
to keep the option in good standing.
Huilacollo Exploration
During 2017 and 2018 the Company completed its initial drill
program, comprising five holes, at Huilacollo. Drilling
successfully expanded mineralization to the northwest by 100 meters
with drill hole 17-HUI-002 intersecting 62 meters of 0.45 g/t
Au (including 22 meters of 0.71g/t Au) oxide mineralization from
surface and drill hole 17-HUI-004 intersecting 22 meters of
0.2 g/t Au 100 meters to the southwest from hole 17-HUI-002.
Additional drilling would target
further extensions of mineralization as well as surface
mineralization discovered at the Tacora prospect. The Company is
currently determining its future exploration programs for
Huilacollo.
17
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.2
Peruvian projects (continued)
Baños
del Indio
The Baños del Indio property is comprised of 5,000 hectares of
well-developed high-level steam heated epithermal style alteration
and was held through an option whereby the Company could acquire a
100% interest, subject to a 3.0% NSR, through a combination of work
expenditures and cash payments. Despite the Company acting in good faith in its
negotiations with the community, the Company was unable to reach an access
agreement in order to initiate its exploration program on the
Baños properties and as such the Company chose to terminate
the Baños del Indio option in accordance with the agreement.
On February 7, 2020, the Company formally gave notice to the option
holder that it was terminating the agreement effective March 8,
2020. The Company had previously incurred a total of $337
(US$256,000) in option fees and other acquisition costs in relation
to the Baños del Indio property, all of which were impaired as
at December 31, 2019.
1.2.3
Committee
Bay and Gibson MacQuoid projects

Figure 10 – regional map showing the locations of the
Committee Bay and Gibson MacQuoid projects
Committee
Bay
The Committee Bay Project is comprised of approximately 280,000
hectares situated along the Committee Bay Greenstone Belt
approximately 180 km northeast of the Meadowbank mine operated by
Agnico Eagle Mines Limited.
The Committee Bay belt comprises one of a number of Archean aged
greenstone belts occurring within the larger Western Churchill
province of north-eastern Canada. The character and history of rock
packages, and the timing and nature of mineralization occurring
within the belt is considered to be equivalent to that of other
significant gold bearing Archean greenstones within the Western
Churchill Province, which hosts deposits such as Meadowbank,
Meliadine and Amaruq.
Ownership
The Committee Bay project is held 100% by Auryn subject to a 1% Net
Smelter Royalty (“NSR”) on the entire project, and an
additional 1.5% NSR payable on only 7,596 hectares which is buyable
within two years of the commencement of commercial production for
$2,000 for each one-third (0.5%) of the NSR.
18
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.3
Committee Bay and Gibson MacQuoid projects (continued)
Committee Bay Mineral resources
High-grade gold occurrences are found throughout the 300 km strike
length of the Committee Bay project with the most advanced being
the Three Bluffs deposit that contains the mineral resource as
listed in the table below: *(refer to NI43-101 report dated May 31,
2017 as amended October 23, 2017 filed under Auryn’s profile
at www.sedar.com).
|
Class
|
|
Cut off grade
|
Tonnes
|
Gold grade
|
Contained Au
|
|
|
|
(g/t Au)
|
(t)
|
(g/t Au)
|
(oz)
|
|
Indicated
|
Near
Surface
|
3
|
1760000
|
7.72
|
437000
|
|
|
Underground
|
4
|
310000
|
8.57
|
86000
|
|
|
|
2070000
|
7.85
|
524000
|
|
|
Inferred
|
Near
Surface
|
3
|
590000
|
7.56
|
144000
|
|
|
Underground
|
4
|
2340000
|
7.65
|
576000
|
|
|
|
2930000
|
7.64
|
720000
|
|
Table 1:
Three Bluffs indicated and inferred resource. See section
1.2.6 for cautionary language concerning mineral
resources.
The
Three Bluffs deposit remains open along strike and at depth. Future
programs will aim to significantly expand upon the current
resource.
Committee Bay 2019 Exploration
Targeting and Machine Learning at Committee Bay
As a follow up to the results from the 2018 drill program, the
Company engaged Computational Geosciences Inc. to implement machine
learning technologies to assist in the targeting of high-grade gold
mineralization at the Committee Bay project. The machine learning
targeting processed the vast amount of historic and modern surface
geochemical, geological, geophysical and drill data across the
project to derive non-biased correlations within the dataset. The
machine learning results, as press released February 19, 2019,
generated a total of twelve new targets which included two targets
overlapping with Auryn’s geologist derived targets adjacent
to the Aiviq and Kalulik discoveries.
2019 Exploration Program
During Q3 2019 the Company completed a 2,700 meter diamond drill
program at Committee Bay which targeted a combination of both
machine learning and traditional geologist generated targets. To
aid in the 2019 targeting along the Aiviq-Shamrock corridor, a 27
line – kilometer induced polarization survey was conducted to
identify both chargeability and conductivity targets.
In addition to drilling a new gold-bearing hydrothermal system
along the regional fault zone that hosts the Aiviq and Kalulik
systems, the program, through the use of geophysics, helped the
Company advance its understanding of how to target high-grade
mineralization. Going forward, conductivity and chargeability
couplets, generated through the use of ground-based geophysical IP
surveys and existing airborne geophysical data, will be used to
produce drill targets. These targets will be delineated in areas
where high conductivity responses, high chargeability responses and
gold-in-till anomalies coincide.
19
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.3
Committee Bay and Gibson MacQuoid projects (continued)
The 2019 program also gave the Company the opportunity to test the
machine learning platform. Three of the seven holes drilled were
based on machine learning derived targets and the findings as well
as additional data collected will be used as the Company continues
to work with Computational Geosciences to refine the
technology.
At the Shamrock target Auryn intersected 30 meters of
0.67 g/t gold, including 1.5 m of 5.03 g/t
gold, which is
characterized by quartz veining within gabbroic rocks (Figure 11).
The Shamrock target is located 2.5 kilometers to the southwest of
the Aiviq target where the Company drilled 10.5 meters of
1.22 g/t gold this
summer (Figure 11).

Figure 11
- Illustrates the 15
kilometers of strike length where three gold bearing hydrothermal
systems have been drilled at the Kalulik, Shamrock and Aiviq
targets along the regional shear zone.
2020 Plans
The Company is still in the process of analyzing the data from the
2019 drill program together with the advancements made by the
Company’s technical team in their understanding of how to use
the geophysical responses to target high-grade gold mineralization
on the expansive belt. Sufficient fuel remains on site to complete
a modest program and therefore a spring mobilization program is not
necessary. The Company’s 2020 exploration plans will be
decided based on the results of the targeting efforts that are
currently underway.
20
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.3
Committee Bay and Gibson MacQuoid projects (continued)
Gibson
MacQuoid
The Gibson MacQuoid project is an early stage gold exploration
project situated between the Meliadine deposit and Meadowbank mine
in Nunavut, Canada. The 66 mineral claims that make up the project
encompass approximately 120 km of strike length of the prospective
greenstone belt and total 74,000 hectares
collectively.
The Gibson MacQuoid Greenstone belt is one of a number of Archean
aged greenstone belts located in the Western Churchill province of
north-eastern Canada. These gold bearing Archean greenstone belts
host deposits such as the Three Bluffs, Meadowbank, Amaruq, and
Meliadine deposits. In particular, the highly magnetic signature of
the Gibson MacQuoid Belt is consistent with the other productive
greenstone belts in the eastern Arctic that host large-scale gold
deposits.
2019 Staking Program
In June 2019, the Company completed a small staking program in
which 36 claims, totalling 42,640.7 hectares, were staked and have since been
filed and approved. The staking of these claims, which overlap with
the Company’s prospecting permits that expired in February
2020, was completed in order to maintain a contiguous land package over the current areas of
interest as identified in the previous years’ work
programs.
1.2.4
Homestake
Ridge project
The Homestake Ridge project is located in the Skeena mining
division in north-western British Columbia and covers approximately
7,500 hectares. The project is host to a high-grade gold, silver,
copper, lead resource which remains open at depth and along strike
in several zones.
|
|
Tonnage
|
Gold
|
Gold
|
Silver
|
Silver
|
Copper
|
Copper
|
|
|
(Mt)
|
(g/t)
|
(oz)
|
(g/t)
|
(Moz)
|
(%)
|
(Mlb)
|
|
Indicated
|
0.624
|
6.25
|
125,000
|
47.9
|
1.0
|
0.18
|
2.4
|
|
Inferred
|
7.245
|
4.00
|
932,000
|
90.9
|
21.2
|
0.11
|
16.9
|
Table 2: Combined Main Homestake, Homestake Silver and South Reef
Resources at a 2 g/t AuEq cut-offs. See section 1.2.6 for
cautionary language concerning mineral resources and refer to
technical report dated September 29, 2017 as amended October 23,
2017 filed under the Company’s SEDAR profile
at www.sedar.com.
2019 Exploration and 2020 Plans
In July
2019, the Company completed a 558 ln-km Versatile Time Domain
(VTEM) magnetic and electromagnetic survey flown by Geotech
Airborne Geophysical Surveys. The survey was flown over two
distinct blocks covering the newly identified Bria target area (see
press release dated June 4, 2019) as well as the southern KN HSR 1
mineral claim.
The
remainder of the 2019 exploration program at Homestake Ridge was
focused on the newly identified mineralized zones outboard of the
known resource area, namely Kombi and Bria. The work was guided by
recently completed inversions of historical airborne geophysical
data sets over the southern portion of the claims at Kombi as well
as the VTEM data over the Bria target. Field work comprised
detailed soil and rock chip sampling across Bria and Kombi. Results
from the 2019 sampling program are currently being interpreted by
the technical team to derive targets for further follow up
programs.
The
2019 exploration program fully utilized the BC flow-through funds
that were remaining at the beginning of the year. Further work at
Homestake in 2020 will be subject to the conclusions and
recommendations of the preliminary economic assessment which is
currently underway.
21
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.5
Qualified
persons and technical disclosures
Michael Henrichsen, P. Geo., Chief Operating Officer of Auryn, is
the Qualified Person with respect to the technical disclosures in
this MD&A.
Channel Sampling 2018/2019 (Sombrero, Peru)
Analytical samples were taken from each 1 meter (channels 18SRT-04
through 18SRT-09) or 2 meter (channels 18SRT-10 – 18SRT-20)
interval of channel floor resulting in approximately 2-3kg of rock
chips material per sample. Collected samples were sent to ALS Lab
in Lima, Peru for preparation and analysis. All samples are assayed
using 30g nominal weight fire assay with atomic absorption finish
(Au-AA25) and multi-element four acid digest ICP-AES/ICP-MS method
(ME-MS61). Where MS61 results were greater or near 10,000 ppm Cu,
Zn or Pb the assays were repeated with ore grade four acid digest
method (OG62). QA/QC programs for 2018/2019 channel grab samples
using internal standard and blank samples; field and lab duplicates
indicate good overall accuracy and precision.
Intervals were calculated using a minimum of a 0.1% Cu cut-off at
beginning and end of the interval and allowing for no more than six
consecutive meters of less than 0.1% Cu with a minimum length of
the resulting composite of 5m. Copper and gold equivalent grades (CuEq and AuEq)
were calculated for 2018 using gold price of US$1300/oz and copper
price of US$3.28/lb and for 2019 using gold price of US$1300/oz and
copper price of US$3.00/lb.
Historical Fierrazo Diamond Drill Hole (DDH) Re-Sampling 2019
(Sombrero)
Sample intervals averaged 2 meters where historical sample
intervals taken and otherwise were 2 meters. Where at least half of
HQ diameter core was present it was sawed into equal parts on site.
Otherwise historical crush rejects were used in lieu of the core.
In total 481 quarter core, 20 half core, and 10 crush rejects,
approximately 3-5kg each, were sent to ALS Lab in Lima, Peru for
preparation and analysis. All samples were assayed using 30g
nominal weight fire assay with atomic absorption finish (Au-AA25)
and multi-element four acid digest ICP-AES/ICP-MS method (ME-MS61).
Where MS61 results were near or greater than 10,000 ppm Cu the
assays were repeated with ore grade four acid digest method (OG62).
QA/QC programs using internal standard samples, field and lab
duplicates and blanks indicate good accuracy and precision in a
large majority of standards assayed.
Intervals were calculated using a minimum of a 0.1% Cu cut-off at
beginning and end of the interval and allowing for no more than six
consecutive meters of less than 0.1% Cu with a minimum length of
the resulting composite of 5 meters.
Rocks 2019/2020 (Sombrero & Curibaya, Peru)
Approximately 2-3kg of material was collected for analysis and sent
to ALS Lab in Lima, Peru for preparation and analysis. All samples
are assayed using 30g nominal weight fire assay with ICP finish
(Au-ICP21) and multi-element four acid digest ICP-AES/ICP-MS method
(ME-MS61). Where ICP21 results were > 3 g/t Au the assay
were repeated with 30g nominal weight fire assay with gravimetric
finish (Au-GRA21). Where MS61 results were greater or near 10000
ppm Cu, 10000ppm Pb or 100ppm Ag the assay were repeated with ore
grade four acid digest method (OG62). Where OG62 results were
greater or near 1500ppm Ag the assays were repeated with 30g
nominal weight fire assay with gravimetric finish (Ag-GRA21). QA/QC
programs for 2019/2020 rock samples using company and lab
duplicates, standards and blanks indicate good accuracy and
precision in a large majority of standards assayed. These samples
were collected in a non-representative manner. The mineralization
may not be reflective of the underlying system.
22
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.5
Qualified persons and technical disclosures
(continued)
Historical Grab Samples – Sambalay and Salvador
The historical grab samples on Sambalay and Salvador were collected
by Teck (2010-2011), Compania de Exploraciones Orion SAC
(2010-2011) and Wild Acre Metals (2012-2013). Auryn has not
conducted any due diligence on whether appropriate QA/QC protocols
were followed in the collection of these samples, nor can it
confirm their accuracy or repeatability.
Channel Sampling 2020 – Curibaya
Analytical samples were taken from each 1-meter interval of trench
floor resulting in approximately 2-3kg of rock chips material per
sample. Collected samples were sent to ALS Lab in Arequipa, Peru
for preparation and then to Lima, Peru for analysis. All samples
are assayed using 30g nominal weight fire assay with atomic
absorption finish (Au-AA25) and multi-element four acid digest
ICP-AES/ICP-MS method (ME-MS61). Where MS61 results were greater or
near 10000 ppm Cu, 10000ppm Pb or 100ppm Ag the assay were repeated
with ore grade four acid digest method (Cu,Pb,Ag-OG62). Where OG62
results were greater or near 1500ppm Ag the assay were repeated
with 30g nominal weight fire assay with gravimetric finish
(Ag-GRA21). QA/QC programs for 2020 channel samples using internal
standard and blank samples; field and lab duplicates indicate good
overall accuracy and precision.
DDH 2019 (Committee Bay)
Intercepts were calculated using a minimum of a 0.25 g/t Au cut off
at beginning and end of the intercept and allowing for no more than
six consecutive meters of less than 0.25 g/t Au.
Analytical samples were taken by sawing NQ diameter core into equal
halves on site and sending one of the halves to ALS Lab in
Yellowknife, NWT for preparation and then to ALS Lab in Vancouver,
BC for analysis. All samples are assayed using 50g nominal weight
fire assay with atomic absorption finish (Au-AA26) and
multi-element four acid digest ICP-AES/ICP-MS method (ME-MS61).
QA/QC programs using internal standard samples, field and lab
duplicates and blanks indicate good accuracy. Due to the nuggety
nature of mineralization encountered, the Company will be running
additional analysis on duplicate samples to better understand the
analytical precision.
True widths of mineralization are unknown based on current
geometric understanding of the mineralized intervals.
Grabs 2019 (Committee Bay)
Approximately 1-2kg of material was collected for analysis and sent
to ALS Lab in Vancouver, BC for preparation and analysis. All
samples are assayed using 50g nominal weight fire assay with atomic
absorption finish (Au-AA26) and multi-element four acid digest
ICP-AES/ICP-MS method (ME-MS61). QA/QC programs for rock grab
samples using internal standard samples, lab duplicates, standards
and blanks indicate good accuracy and precision in a large majority
of standards assayed. Grab samples are selective in nature and
cannot be considered as representative of the underlying
mineralization.
Cautionary Note to United States Investors concerning Estimates of
Measured, Indicated and Inferred Resource Estimates
This disclosure has been prepared in accordance with the
requirements of Canadian provincial securities laws which differ
from the requirements of U.S. securities laws. Unless otherwise
indicated, all mineral resource estimates included in this
disclosure have been prepared in accordance with Canadian National
Instrument 43-101 Standards of Disclosure for Mineral Projects
(“NI 43-101”) and the Canadian Institute of Mining,
Metallurgy and Petroleum classification systems. NI 43-101 is a
rule developed by the Canadian Securities Administrators that
establishes standards for all public disclosure an issuer makes of
scientific and technical information concerning mineral projects.
These standards differ significantly from the requirements of the
United States Securities and Exchange Commission (the
“SEC”), and resource estimates disclosed may not be
comparable to similar information disclosed by U.S.
companies.
23
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.2.5
Qualified persons and technical disclosures
(continued)
Cautionary Note to United States Investors concerning Estimates of
Measured, Indicated and Inferred Resource Estimates
(continued)
In addition, this disclosure uses the terms “measured and
indicated resources” and “inferred resources” to
comply with the reporting standards in Canada. The Company advises
United States investors that while those terms are recognized and
required by Canadian regulations, the SEC does not recognize them.
United States investors are cautioned not to assume that any part
of the mineral deposits in these categories will ever be converted
into mineral reserves. Further, “inferred resources”
have a great amount of uncertainty as to their existence and as to
whether they can be mined legally or economically. Therefore,
United States investors are cautioned not to assume that all or any
part of the “inferred resources” exist. In accordance
with Canadian securities laws, estimates of “inferred
resources” cannot form the basis of feasibility or other
economic studies. It cannot be assumed that all or any part of
“measured and indicated resources” or “inferred
resources” will ever be upgraded to a higher category or are
economically or legally mineable.
Three Bluffs resource estimations were completed by Roscoe Postle
Associates Inc. (“RPA”) (see the Technical Report on
the Three Bluffs Project, Nunavut Territory, Canada filed on the
SEDAR on May 31, 2017 as amended October 23, 2017). The Homestake
Ridge resource estimate was prepared by RPA (see Technical Report
on the Homestake Ridge Project, Skeena Mining Division,
Northwestern British Columbia, September 29, 2017 as amended
October 23, 2017 filed under the Company’s SEDAR profile
at www.sedar.com).
Peruvian interests within a special economic zone
- Auryn holds certain interests in
Peru through Corisur Peru SAC, which controls (among other) certain
licenses (including the Huilacollo project) that are located within
a special legal zone which runs 50km back from the Peruvian border.
As a non-Peruvian company, Auryn’s right to ultimately
acquire title over the shares issued by Corisur Peru SAC and to own
and/or exploit these licenses requires approval from the Peruvian
government. While Auryn is in the process of submitting its
applications and does not foresee any legal reason why it would be
denied the approval, some risk of denial or delay should be assumed
to exist.
1.3
Selected
annual financial information
|
|
Year
ended
|
Year
ended
|
Year
ended
|
|
|
December
31, 2019
|
December
31, 2018
|
December
31, 2017
|
|
|
|
|
(Restated1)
|
|
Comprehensive loss
for the period
|
$14,136
|
$17,389
|
$36,578
|
|
Net loss for the
period
|
$13,933
|
$17,674
|
$36,500
|
|
Basic and diluted
loss per share
|
$0.15
|
$0.21
|
$0.48
|
|
Total
assets
|
$42,962
|
$43,523
|
$43,759
|
|
Total long-term
liabilities
|
$2,134
|
$1,891
|
$1,662
|
1 Restated for change in
accounting policy as disclosed in note 4 of the
Company’s audited annual consolidated financial
statements for the year ended December 31, 2018.
The Company generated no revenues from operations during the above
periods.
24
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.4 Discussion of operations
Three months ended December 31, 2019 and 2018 (Q4 2019 vs. Q4
2018)
During the three months ended December 31, 2019, the Company
reported a loss of $2,990 and loss per share of $0.03, compared to
a loss of $2,351 and loss per share of $0.03 for the same period in
2018. Significant variances within operating expenses and other
expenses, which in combination resulted in the $639 increase in the
current period’s loss, are discussed as follows:
Operating expenses
(1)
Exploration and
evaluation costs in Q4 2019 were $1,161 compared to $1,269 in Q4
2018, a decrease of
$108,
driven by the following:
a.
Committee Bay
decrease of $284 in Q4 2019 compared to the prior year period as
less geological salaries and consulting time was allocated to the
project in Q4 after ending the program earlier than in the prior
year. Further to that, in Q4 2018 the Company wrote off $116 which
related to a drill deposit that was unused in the 2018 program and
could not be carried forward.
b.
Homestake increase
of $128 in the current period related to work being done on the
updated resource model and preliminary economic
assessment.
(2)
Fees, salaries and
other employee benefits in Q4 2019 were $708, including share-based
compensation of $312, compared to $491 in Q4 2018, including
share-based compensation of $146. The higher share-based
compensation in the current quarter was driven by the timing and
size of the grant, as well as the calculated fair value of the
options.
Other expenses and income:
(3)
Finance expense of
$124 was recorded in the three months ended December 31, 2019 in
relation to the bridge loan that was entered in September 2019.
There was no such expense reported in Q4 2018.
(4)
During Q4 2019, the
Company recorded other income of $23 related to the amortization of
the flow-through share premium liability compared to $111 for the
comparable period in 2018. The liability is amortized as
flow-through eligible Canadian exploration and evaluation
expenditures are incurred in the period, which, for the current
quarter, totaled $82 compared to $489 for the same period in the
previous year.
(5)
For the three
months ended December 31, 2019 the Company recorded a gain of $120
on its investment in marketable securities compared to a gain of
$14 in Q4 2018, which is driven by the market price of the
marketable securities at each period end.
(6)
The loss for the
current period included an impairment charge of $337 relating to
the acquisition costs that had been recorded by the Company in
previous years in relation to its interest in the Baños del
Indio property which was written off as at December 31,
2019.
Year ended December 31, 2019 and 2018 (YTD 2019 vs. YTD
2018)
During the year ended December 31, 2019, the Company reported a
loss of $13,933 and loss per share of $0.15 compared to a loss of
$17,674 and loss per share of $0.21 for the 2018 year. The $3,741
decrease in loss in the current period is driven by a decrease in
the current year exploration expenditures, offset by an increase in
fees, salaries and employee benefits and the decrease in the
amortization of flow-through share premium as further discussed
below:
1)
Lower
exploration and evaluation costs in the current year of $7,696
compared to $14,653 in 2018. The main driver for this decrease is
the significantly smaller scale Canadian exploration programs
completed in 2018 which together cost $4,222 in 2019 compared to
$10,588 in 2018. Peru work was also limited in the current year
while the Company focused its efforts on community relations and
obtaining its drill permit at Sombrero;
25
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.4
Discussion of operations (continued)
Year ended December 31, 2019 and 2018 (YTD 2019 vs. YTD 2018)
(continued)
2)
Increase
in fees, salaries and other employee benefits of $1,560 in the
current year over 2018 relates entirely to the higher share-based
compensation resulting from a larger option grant and higher fair
value per option calculated in 2019; and
3)
A
reduction in other income related to the amortization of the
flow-through liability which is driven by the lower flow-through
eligible expenditures incurred in the current year, $3,046,
compared to $9,416 in the prior year.
Summary of Project Costs
During the year ended December 31, 2019, the Company incurred $960
in mineral property acquisition costs and $7,696
in exploration and evaluation costs on
its projects. As at December 31, 2019 the Company wrote off $337 of
costs that had been previously capitalized in relation to
the Baños del Indio property after making the decision
in early 2020 not to proceed any further with the
project.
|
|
Committee Bay & Gibson MacQuoid
|
Homestake Ridge
|
Peru
|
Total
|
|
Acquisition costs
|
|
|
|
|
|
Balance
as at December 31, 2018
|
$18,871
|
$16,060
|
$4,141
|
$39,072
|
|
Additions
|
11
|
-
|
949
|
960
|
|
Write
off mineral property interests
|
-
|
-
|
(337)
|
(337)
|
|
Change
in estimate of provision for site reclamation and
closure
|
203
|
-
|
-
|
203
|
|
Currency
translation adjustment
|
-
|
-
|
(184)
|
(184)
|
|
Balance as at December 31, 2019
|
$19,085
|
$16,060
|
$4,569
|
$39,714
|
|
|
Committee Bay & Gibson MacQuoid
|
Homestake Ridge
|
Peru
|
Total
|
|
Exploration and evaluation costs
|
|
|
|
|
|
Assaying
|
$163
|
$72
|
$76
|
$311
|
|
Exploration
Drilling
|
378
|
-
|
-
|
378
|
|
Camp
cost, equipment and field supplies
|
336
|
149
|
278
|
763
|
|
Geological
consulting services
|
145
|
200
|
568
|
913
|
|
Geophysical
analysis
|
143
|
169
|
-
|
312
|
|
Permitting,
environmental and community costs
|
189
|
61
|
1,182
|
1,432
|
|
Expediting
and mobilization
|
102
|
26
|
27
|
155
|
|
Salaries
and wages
|
614
|
174
|
427
|
1,215
|
|
Fuel
and consumables
|
36
|
40
|
23
|
99
|
|
Aircraft
and travel
|
703
|
187
|
110
|
1,000
|
|
Share
based compensation
|
218
|
117
|
783
|
1,118
|
|
Total for the year ended December 31, 2019
|
$3,027
|
$1,195
|
$3,474
|
$7,696
|
26
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.4
Discussion of operations (continued)
Future operations and 2020 expenditure forecast
The Company’s business objectives for the next twelve to
eighteen months are outlined below:
➢
Sombero:
During the 2020 year the Company will continue to work towards
completing its drill permit in order to commence drilling at the
Sombrero main target. Working with local communities to obtain
additional access agreements will also remain a focus for the
Company in order to initiate its surface work programs at the Nioc
and Good Lucky targets, and to complete screening work across other
parts of its expansive land package.
➢
Curibaya:
The focus for 2020 will be to advance the Curibaya project to
drill-ready stage through additional mapping, sampling and the
completion of both ground-based and airborne geophysical surveys.
Once the targeting is complete, the Company will apply for an FTA
drill permit at Curibaya which will allow for up to 20 drill
pads.
➢
Committee
Bay: Desktop targeting is currently underway to identify areas for
future ground based IP surveying. A small field program may be
completed in June in order to ground truth the preliminary targets
identified from the desktop study.
➢
Homestake
Ridge: The Company’s current focus is on the completion of a
NI 43-101 preliminary economic assessment which will include an
updated resource estimate. Further work at Homestake in 2020 will
be subject to the conclusions and recommendations of the
preliminary economic assessment.
The Company’s 2020 budget reflects total expenditures of
$12.5 million, which include expenditures to execute the 2020
exploration programs as outlined above, with the exception of
drilling at Sombrero Main and completion of surface programs in
areas to which the Company does not currently have access which
have been excluded. Once the Company is able to proceed with such
programs the 2020 forecast will be adjusted accordingly. Further to
that, budgets for the Canadian project programs will be determined
in the first half of 2020 once the results of the 2019 programs
have been fully processed.
1.5 Summary of quarterly results
|
Three
months ended
|
Interest
income
|
Net
loss
|
Comprehensive
loss
|
Loss
per share
|
|
In
thousands of Canadian dollars except per share amounts
|
||||
|
|
$
|
$
|
$
|
$
|
|
December 31,
2019
|
10
|
2,990
|
3,072
|
0.03
|
|
September 30,
2019
|
14
|
3,918
|
3,871
|
0.04
|
|
June 30,
2019
|
19
|
5,045
|
5,139
|
0.05
|
|
March 31,
2019
|
1
|
1,926
|
2,000
|
0.02
|
|
December 31,
2018
|
33
|
2,351
|
2,166
|
0.03
|
|
September 30,
2018
|
31
|
7,488
|
7,545
|
0.08
|
|
June 30,
2018
|
34
|
4,372
|
4,281
|
0.05
|
|
March 31,
2018
|
12
|
3,463
|
3,397
|
0.04
|
|
|
|
|
|
|
During the last eight quarters, the Company’s net loss has
ranged between $7,488 and $1,926. In the time period reflected, the
largest losses are generally recorded in the second and third
quarters each year due to the timing of option grants, which
typically occur in the second quarter, and the Company’s
summer exploration programs at its Canadian projects, which occur
during the third quarter. A comparatively high loss was also
reported for Q1 2018 which is when the Company completed its
initial drill program at its Huilacollo project in
Peru.
27
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.6/1.7 Financial position and liquidity and capital
resources
|
|
December
31, 2019
|
December
31, 2018
|
|
Cash and restricted
cash and cash equivalents
|
$775
|
$1,768
|
|
Mineral property
interests
|
$39,714
|
$39,072
|
|
Current
liabilities
|
$4,005
|
$1,153
|
|
Non-current
liabilities
|
$2,134
|
$1,891
|
As at
December 31, 2019, the Company had unrestricted cash of $660
(December 31, 2018 - $1,653) and a working capital deficit of
$2,293 (December 31, 2018 working capital - $1,460) which is
primarily related to the requirement to repay the first tranche of
the Bridge Loan by September 12, 2020. Contractual obligations as
at December 31, 2019 are reflected in the table below and include
accounts payable and accrued liabilities of $1,067 and the Bridge
Loan payable, including interest accrued-to-date. There is also a
minimal amount, $24, of flow-through funds that remain to be spent
on exploration at the Committee Bay project in 2020.
|
Contractual
Obligations as of December 31, 2019
|
Payment
terms
|
Amount
|
|
Accounts payable
and accrued liabilities
|
Immediately
|
$1,067
|
|
Committee Bay
flow-through expenditure requirements
|
By Dec 31,
2020
|
24
|
|
Bridge loan and
interest payable as at September 30, 2019
|
By Sep 12,
2020
|
3,093
|
|
Total
|
|
$4,184
|
During
the year ended December 31, 2019, the Company used net cash of
$10,597 in operating activities compared to $17,844 in the prior
year. As discussed in detail above, the primary driver for the
decrease in the current periods is in relation to smaller scale
Canadian exploration programs in 2019.
Cash
used in investing activities during the year ended December 31,
2019 was $917 and $1,438 for 2018. The outflow of cash for all
periods was primarily related to the acquisition of mineral
properties in Peru.
During
the year ended December 31, 2019, the Company generated cash from
financing activities of $10,526 through the issuance of common
shares and from the advancement of the first $3,000 tranche of the
Bridge Loan. Net proceeds of $18,439 during the year ended December
31, 2018 were generated from financing activities through the
issuance of common shares.
Although
the Company ended 2019 with a working capital deficit of $2,293, in
February 2020 the Company completed a private placement for gross
proceeds of $15,000 by issuing 9,375,000 shares at a price of $1.60
per share. Concurrent with the 2020 Offering, the Bridge Loan was
amended to add certain conversion rights which allow the lender to
convert the $3 million of principal that has been advanced to-date,
and $123,334 of interest, into common shares at the placement price
of $1.60, allowing for the issuance of up to 1,952,084 common
shares on conversion. The Loan Amendment also gives the Company the
right to require conversion if the Company’s common shares
trade on the TSX at a price of $2.50 or more for any five
consecutive trading days prior to the loan’s maturity date.
The interest rate from the date of the Loan Amendment, being
February 6, 2020, has also been reduced from 10% to
5%.
The
2020 Offering has allowed the Company to meet its short term
liquidity needs (see contractual obligations above), and leaves
sufficient funds to continue with its exploration plans in 2020 and
to repay the Bridge Loan in full, if the Lender does not exercise
the conversion option. Despite the cash injection from the 2020
Offering, the Company’s ability to continue as a going
concern remains dependent upon its ability to obtain the necessary
financing going forward and while the Company has been successful
at raising capital in the past, there can be no assurance that the
Company will have sufficient financing to meet its future capital
requirements or that additional financing will be available on
terms acceptable to the Company in the future.
28
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.6/1.7 Financial position and liquidity and capital
resources
Capital Resources
Bridge Loan
On
September 12, 2019 the Company entered the Bridge Loan facility for
up to $6,000 with a private lender. The Bridge Loan consists of two
tranches of $3,000, with the first having been received and the
second being conditional upon the mutual agreement of the parties.
The Bridge Loan bears interest at 10%, payable annually or on
repayment of the principal, and has a term of one year from the
date of advancement (the “Maturity Date”), however, can
be repaid without penalty at any time after 90 days of advancement
at the discretion of the Company. The Bridge Loan is secured by a
first charge general security agreement over all of the
Company’s present and future assets.
In
connection with the Bridge Loan, the Company issued 500,000 bonus
warrants to the lender which have a term of three years from the
date of issue. Each warrant is exercisable into one common share of
the Company at a price of $2.00 per common share but cannot be
exercised until after the Maturity Date.
The
following table reflects the carrying values of the liability and
equity components on initial recognition.
|
|
Liability Component
|
Equity Component
|
Total
|
|
|
|
|
|
|
Loan
advance received
|
$2,801
|
$199
|
$3,000
|
|
Transaction
costs
|
(20)
|
(1)
|
(21)
|
|
Deferred
tax impact
|
-
|
(54)
|
(54)
|
|
Impact
on statement of financial position
|
$2,781
|
$144
|
$2,925
|
As at
December 31, 2019, $636 from the first Bridge Loan advancement are
remaining on hand. As discussed above, the terms of the Bridge Loan
were revised by way of the Loan Amendment on February 6,
2020.
July 2019 Private Placement
On July
11, 2019 the Company announced that it had completed a $1,900
non-brokered flow-through private placement. The placement
consisted of 633,334 flow-through common shares priced at CAD$3.00
per flow-through share.
The
purpose of the financing was to fund the Company’s summer
exploration program at its Committee Bay gold project in Nunavut,
Canada. As at December 31, 2019, the Company has $24 remaining from
this flow-through funding to be incurred in 2020.Share issue costs
related to the July 2019 Offering totalled $44. A reconciliation of
the impact of the July 2019 Offering on share capital is as
follows:
|
|
Number
of common shares
|
Impact
on
share
capital
|
|
Common shares
issued at $3.00 per share
|
633,334
|
$1,900
|
|
Cash share issue
costs
|
-
|
(44)
|
|
Proceeds net of
share issue costs
|
633,334
|
$1,856
|
|
Flow-through share
premium liability
|
-
|
(557)
|
|
|
633,334
|
$1,299
|
29
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.6/1.7
Financial position and liquidity and capital resources
(continued)
March 2019 Private Placement
On
March 27, 2019, the Company completed a non-brokered private
placement for gross proceeds of $5,255 million. The placement
consisted of 3,284,375 common shares priced at CAD$1.60 per
Share.
The net
proceeds from the March 2019 Offering have funded continued surface
exploration and permitting work at its Sombrero copper-gold project
located in Ayacucho, Peru and general working capital and a nominal
amount remains at September 30, 2019. Share issue costs related to
the March 2019 Offering totalled $186, which included $110 in
commissions, and $76 in other issuance costs. A reconciliation of
the impact of the March 2019 Offering on share capital is as
follows:
|
|
Number
of common shares
|
Impact
on
share
capital
|
|
Common shares
issued at $1.60 per share
|
3,284,375
|
$5,255
|
|
Cash share issue
costs
|
-
|
(186)
|
|
Proceeds net of
share issue costs
|
3,284,375
|
$5,069
|
August 2018 Flow-Through Funding
On
August 16, 2018 the Company closed its previously announced
non-brokered flow-through private placement for gross proceeds of
$7,331. The placement consisted of approximately 2.1 million
flow-through common shares priced at CAD$1.60 per flow-through
share and approximately 2.2 million charity flow-through shares
priced at an average of CAD$ 1.80 per charity flow-through share.
Goldcorp Inc. (“Goldcorp”) maintained its pro-rata
interest in Auryn (approximately 12.4%) by acquiring 490,000 common
shares from the purchasers of the charity flow-through
shares.
Share
issue costs related to the August 2018 Offering totalled $400,
which included $350 in commissions, and $50 in other issuance
costs. The gross proceeds from the August 2018 Offering were also
offset by $1,742, an amount related to the flow-through share
premium liability. A reconciliation of the impact of the August
2018 Offering on share capital is as follows:
|
Number
of
common
shares
|
Impact
on
share
capital
|
|
|
Flow-through
shares issued at $1.60 per share
|
2,084,375
|
$3,335
|
|
Flow-through shares
issued at $1.75 per share
|
1,215,000
|
2,126
|
|
Flow-through shares
issued at $1.87 per share
|
1,000,000
|
1,870
|
|
Cash share issue
costs
|
-
|
(400)
|
|
Proceeds net of
share issue costs
|
4,299,375
|
6,931
|
|
Flow-through share
premium liability
|
-
|
(1,742)
|
|
|
4,299,375
|
$5,189
|
All of
the funds have been fully utilized, of which $5,205 and $2,126 was
spent on flow-through eligible expenditures at Committee Bay and
Homestake, respectively, during the 2018 and 2019 exploration
programs. Due to the fact that only flow-through funds were raised
in the August 2018 Offering, funds from the March 2018 Offering
were used to cover the cash share issuance costs of
$400.
30
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.6/1.7
Financial position and liquidity and capital resources
(continued)
March 2018 Offering
On
March 23, 2018 the Company closed the March 2018 Offering by
issuing a total of 6,015,385 common shares of the Company at a
price of US$1.30 per share for gross proceeds of US$7.8 million.
The 2018 Offering was completed pursuant to an underwriting
agreement dated March 13, 2018 among the Company and Cantor
Fitzgerald Canada Corporation and a syndicate of underwriters. The
Company paid a 6% commission to the Underwriters.
In
addition, the Company completed a concurrent private placement
financing involving the sale of 1,091,826 flow-through common
shares of the Company (the “March 2018 Flow-Through
Shares”) at a price equal to the Canadian dollar equivalent
of US$1.82 per share, for gross proceeds of US$2.0 million. The
2018 Flow-Through Shares formed part of a donation arrangement and
were ultimately purchased by Goldcorp and enabled Goldcorp to
maintain its 12.5% interest in the Company. The proceeds from the
sale of the 2018 Flow-Through Shares were used exclusively for
exploration on the Company’s Committee Bay
project.
A
reconciliation of the impact of the March 2018 Offering on share
capital is as follows:
|
|
Number
of
common
shares
|
Impact
on
share
capital
|
|
Common shares
issued at US$1.30 per share
|
6,015,385
|
$10,054
|
|
Flow-through shares
issued at US$1.82 per share
|
1,091,826
|
2,561
|
|
Cash share issue
costs
|
-
|
(1,340)
|
|
Proceeds net of
share issue costs
|
7,107,211
|
11,275
|
|
Flow-through share
premium liability
|
-
|
(737)
|
|
|
7,107,211
|
$10,538
|
31
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.6/1.7
Financial position and liquidity and capital resources
(continued)
A
summary of the intended use of the net cash proceeds of $11,280 is
presented as follows:
|
|
Use of Proceeds: Proposed
|
Intended Use of Proceeds
|
Actual activities
|
Actual Use of Proceeds of the Offering
|
(Over)/under expenditure
|
|
Committee
Bay & Gibson MacQuoid
|
Flow-through
eligible funds
● 2018 drill and
exploration programs
Non-flow -through
funds
● Technical studies,
permitting and other non-flow-through eligible exploration costs to
be incurred in connection with its 2018 exploration
program
|
$
2,561
1,928
|
● flow through
E&E
● other
E&E
|
$
2,561
213
|
$
0
1,715
|
|
Homestake
|
Non-flow -through
funds
● Technical studies,
permitting and other non-flow-through eligible exploration costs to
be incurred in connection with its 2018 exploration
program
|
1,286
|
● other
E&E
|
131
|
1,155
|
|
Peru
|
Non-flow -through
funds
● Exploration
expenditures in Peru including the continuation of the
Company’s drill program at the Huilacollo project and initial
surface work at it Sombrero project
|
2,571
|
● Acquisition
costs
● E&E
|
1,382
3,167
|
(1,978)
|
|
Other
|
General
working capital
|
2,934
|
|
3,826
|
(892)
|
|
|
Total
|
$ 11,280
|
|
$ 11,280
|
$ -
|
|
Explanation
of variances and the impact of variances on the ability of the
Company to achieve its business objectives and
milestones.
|
The
financing was completed on March 23, 2018 and the funds have been
fully expended and included both flow-through funds expended on the
2018 Committee Bay mobilization as well as non-flow through funds
spent on mineral property acquisitions and exploration in
Peru.
|
||||
32
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.6/1.7
Financial position and liquidity and capital resources
(continued)
Exercise of Share Options
During
the year ended December 31, 2019, 926,250 shares were issued as a
result of share options being exercised with a weighted average
exercise price of approximately $0.62 for gross proceeds of $572.
Attributed to these share options, fair value of $489 was
transferred from the equity reserves and recorded against share
capital.
Other sources of funds
As at
December 31, 2019, the other sources of funds potentially available
to the Company are through the exercise of outstanding stock
options and share purchase warrants with terms as
follows:
Stock
options
|
|
Outstanding
|
Exercisable
|
||||
|
Expiry
date
|
Number of
options
|
Exercise
price
|
Remaining contractual
life (years)
|
Number of
options
|
Exercise
price
|
Remaining contractual
life (years)
|
|
Aug 17,
2020
|
915,000
|
$1.30
|
0.63
|
915,000
|
$1.30
|
0.63
|
|
June 20,
2021
|
2,085,000
|
2.63
|
1.47
|
2,085,000
|
2.63
|
1.47
|
|
Jan 10,
2022
|
440,000
|
3.22
|
2.03
|
440,000
|
3.22
|
2.03
|
|
June 20,
2023
|
726,875
|
1.42
|
3.47
|
726,875
|
1.42
|
3.47
|
|
June 26,
2023
|
900,000
|
1.42
|
3.49
|
900,000
|
1.42
|
3.49
|
|
Feb 7,
2024
|
200,625
|
1.36
|
4.11
|
121,875
|
1.36
|
4.11
|
|
Apr 9,
2024
|
2,785,000
|
1.96
|
4.28
|
1,407,500
|
1.96
|
4.28
|
|
Aug 21,
2024
|
70,000
|
1.82
|
4.64
|
26,250
|
1.82
|
4.64
|
|
Nov 20,
2024
|
170,000
|
1.82
|
4.89
|
42,500
|
1.82
|
4.89
|
|
|
8,292,500
|
$2.00
|
2.91
|
6,665,000
|
$2.02
|
2.56
|
|
Expiry
date
|
Number of
warrants
|
Exercise
price
|
Remaining contractual
life (years)
|
|
September 12,
2022
|
500,000*
|
$2.00
|
2.70
|
*The
warrants have a term of three years from the date of issue however
they do not become exercisable until one year after the advancement
of the Bridge Loan.
1.8
Off-balance sheet arrangements
The Company does not utilize off-balance sheet
arrangements.
33
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.9
Transactions with related parties
All
transactions with related parties have occurred in the normal
course of operations. All amounts are unsecured, non-interest
bearing and have no specific terms of settlement, unless otherwise
noted.
|
|
Year ended December 31,
|
|
|
|
2019
|
2018
|
|
Universal Mineral Services Ltd. 1
|
|
|
|
Exploration
and evaluation costs:
|
|
|
|
Committee
Bay and Gibson MacQuoid
|
$301
|
$510
|
|
Homestake
|
154
|
136
|
|
Peru
|
221
|
179
|
|
Fees,
salaries and other employee benefits
|
346
|
462
|
|
Insurance
|
3
|
1
|
|
Legal
and professional fees
|
2
|
9
|
|
Marketing
and investor relations
|
85
|
70
|
|
Office
and administration
|
327
|
344
|
|
Project
investigation costs
|
44
|
6
|
|
Total
transactions for the periods
|
$1,483
|
$1,717
|
1.
Universal Mineral
Services Ltd., (“UMS”) is a private company with
certain directors and officers in common. Pursuant to an agreement
dated March 30, 2012 and as amended on December 30, 2015, UMS
provides geological, financial and transactional advisory services
as well as administrative services to the Company on an ongoing,
cost recovery basis. Having these services available through UMS,
on an as needed basis, allows the Company to maintain a more
efficient and cost-effective corporate overhead structure by hiring
fewer full time employees and engaging outside professional
advisory firms less frequently.
The
outstanding balance owing at December
31, 2019 was $235 (December 31, 2018 – $262). In
addition, the Company had $150 on deposit with UMS as at
December 31, 2019 (December 31,
2018 - $150).
1.10
Subsequent
events
Private
Placement and Loan Amendment
In February 2020, the Company closed a non-brokered private
placement for gross proceeds of $15,000 which was closed in two
tranches and consisted of 9,375,000 common shares (the “2020
Shares”) priced at CAD$1.60 per 2020 Share, and total insider
participation of 271,875 Shares for proceeds of
$435,000.
The Company intends to use the net proceeds from the 2020 Offering
to fund continued surface exploration at its Sombrero and Curibaya
projects located in southern Peru and for general working
capital.
The 2020 Shares are subject to a four-month hold period and will
not be registered in the United States. A total of $59,000 was paid
in commissions for the 2020 Offering.
Concurrent with the closing of the first tranche of the 2020
Offering, on February 6, 2020, the Company entered the Loan
Amendment which provides mutual conversion rights to the lender and
the Company, and also reduces the annual interest rate from 10% to
5% from the date of amendment. Under the terms of the Loan
Amendment, the lender has the right to convert the $3 million of
principal that has been advanced to-date, and $123,334 of interest
that has accrued to-date, into common shares at the price of $1.60,
while the Company has the right to require conversion if the
Company’s common shares trade on the TSX at a price of $2.50
or more for any five consecutive trading days prior to the
loan’s maturity date.
34
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.10
Subsequent
events (continued)
Temporary
Suspension of Peru Operations and Other Impacts of
COVID-19
On
March 15, 2020 the Peruvian government mandated a 15 day lockdown
of the country, including prohibiting movements within the country,
in response to the COVID-19 pandemic. As a result, the Company has
recalled all personnel from the field and will only restart
operations once permitted by the government and once the Company is
confident that it is safe for its employees to do so.
In
addition to the suspension of Peruvian operations, the Company has
given all office employees the option to work from home consistent
with current government recommendations. As the situation
surrounding COVID-19 is developing daily, the Company expects such
disruptions, mainly its current inability to conduct field
programs, to result in some delay in the Company’s business.
At this time, delays are not expected to be long term however the
Company will continue to monitor the situation
closely.
1.11
Proposed
transactions
None
1.12
Critical
accounting estimates
The
preparation of the financial statements in conformity with IFRS
requires management to select accounting policies and make
estimates and judgments that may have a significant impact on the
consolidated financial statements. Estimates are continuously
evaluated and are based on management’s experience and
expectations of future events that are believed to be reasonable
under the circumstances.
Key
sources of estimation uncertainty that have a significant risk of
causing a material adjustment to the carrying amounts of assets and
liabilities are:
i.
Provisions
Provisions
recognized in the financial statements involve judgments on the
occurrence of future events, which could result in a material
outlay for the Company. In determining whether an outlay will be
material, the Company considers the expected future cash flows
based on facts, historical experience and probabilities associated
with such future events. Uncertainties exist with respect to
estimates made by management and as a result, the actual
expenditure may differ from amounts currently
reported.
The
Company does not have any provisions recorded as at December 31,
2019 and 2018, other than that related to the reclamation
obligations which are discussed below.
ii.
Reclamation
obligations
Management assesses
its reclamation obligations annually and when circumstances suggest
that a material change to the obligations have occurred.
Significant estimates and assumptions are made in determining the
provision for rehabilitation and site restoration, as there are
numerous factors that will affect the ultimate liability payable.
These factors include estimates of the extent, the timing and the
cost of reclamation activities, regulatory change, cost increases,
and changes in discount rates. Those uncertainties may result in
actual expenditure differing from the amounts currently provided.
The provision at the reporting date represents management’s
best estimate of the present value of the future reclamation costs
required. Changes to estimated future costs are recognized in the
statement of financial position by adjusting the reclamation asset
and liability.
The key
assumptions on which the present value of the future estimated cash
flows is based are:
● Undiscounted cash
flow for site reclamation of $2,658 (December 31, 2018 -
$2,545)
● Expected timing of
future cash flows is based on mining leases expiration, which is
between 2026 - 2035
● Annual inflation
rate 2% (December 31, 2018 - 2%)
● Risk-free interest
rate 1.76% (December 31, 2018 - 2.41%)
35
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.12
Critical
accounting estimates (continued)
iii.
Financial
instruments
Financial
instruments are assessed upon initial recognition to determine
whether they meet the definition of a financial asset, financial
liability or equity instrument depending on the substance of the
contractual arrangement. Judgement is required in making this
determination as the substance of a transaction may differ from its
legal form. Once a determination is made, IFRS requires that
financial instruments be measured at fair value on initial
recognition. For financial instruments that do not have quoted
market prices or observable inputs, judgements are made in
determining what are appropriate inputs and assumptions to use in
calculating the fair value.
Upon
initial recognition of the Bridge Loan, management had to estimate
the Company’s effective interest rate which was needed in
order to fair value the debt component and determine the residual
amount to be allocated to the warrants.
iv.
Share-based
compensation
The
Company determines the fair value of stock options granted using
the Black‐Scholes option pricing
model. This option pricing model requires the development of
market-based subjective inputs, including the risk-free interest
rate, expected price volatility and expected life of the option.
Changes in these inputs and the underlying assumption used to
develop them can materially affect the fair value
estimate.
The
fair value of the share-based options granted during year ended
December 31, 2019 were estimated using the Black-Scholes option
valuation model with the following weighted average
assumptions:
|
|
Years
ended December 31,
|
|
|
|
2019
|
2018
|
|
Risk-free interest
rate
|
1.59%
|
1.97%
|
|
Expected dividend
yield
|
Nil
|
Nil
|
|
Share price
volatility
|
62%
|
67%
|
|
Expected forfeiture
rate
|
0%
|
0%
|
|
Expected life in
years
|
4.33
|
4.36
|
v.
Deferred tax assets
and liabilities
Management judgment
and estimates are required in assessing whether deferred tax assets
and deferred tax liabilities are recognized in the consolidated
statements of financial position. Judgments are made as to whether
future taxable profits will be available in order to recognize
deferred tax assets. Assumptions about the generation of future
taxable profits depend on management’s estimates of future
cash flows. These depend on estimates of future production and
sales volumes, commodity prices, reserves, operating costs, and
other capital management transactions. These judgments and
assumptions are subject to risk and uncertainty and changes in
circumstances may alter expectations, which may impact the amount
of deferred tax assets and deferred tax liabilities recognized on
the consolidated statements of financial position and the benefit
of other tax losses and temporary differences not yet
recognized.
The
Company’s deferred tax assets and liabilities were determined
using a future income tax rate of 27% in Canada and 29.5% in
Peru.
36
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.13
Changes
in accounting policies including initial adoption
The
Company has adopted the following new accounting standards and
policies effective January 1, 2019:
Leases
In
January 2016, the IASB published a new accounting standard, IFRS 16
- Leases ("IFRS 16") which supersedes IAS 17 - Leases. IFRS 16
applies a control model to the identification of leases,
distinguishing between a lease and a service contract on the basis
of whether the customer controls the asset. Control is considered
to exist if the customer has the right to obtain substantially all
of the economic benefits from the use of an identified asset and
the right to direct the use of that asset during the term of the
lease. For those assets determined to meet the definition of a
lease, IFRS 16 introduces significant changes to the accounting by
lessees, introducing a single, on balance sheet accounting model
that is similar to the current finance lease accounting, with
limited exceptions for short-term leases or leases of low value
assets.
The
Company has made the following elections under IFRS
16:
●
to apply the
available exemptions as permitted by IFRS 16 to recognize a lease
expense on a straight-line basis for short term leases (lease term
of 12 months or less) and low value assets; and
●
to apply the
practical expedient whereby leases whose term ends within 12 months
of the date of initial application would be accounted for in the
same way as short-term leases.
The
adoption of IFRS 16 did not have a material impact on the
Company’s financial statements. Due to the seasonality of the
Company’s exploration programs, its exploration and other
contracts are short-term in nature and therefore are exempt from
the recognition provisions of IFRS 16.
New and
amended accounting standards not yet effective for the year ended
December 31, 2019
In
October 2018 the IASB issued narrow-scope amendments to IFRS 3 to
help entities determine whether an acquired set of activities and
assets is a business or not.
The
amendments, which are effective for annual reporting periods
beginning on or after January 1, 2020, clarify the minimum
requirements to be a business, remove the assessment of a market
participant’s ability to replace missing elements, narrow the
definition of outputs, add guidance to assess whether an acquired
process is substantive and introduce an optional concentration test
to permit a simplified assessment.
The
adoption of the amended standard will not have an immediate impact
on the Company’s consolidated financial statements but will
be applied in assessing any future business combination and asset
acquisition scenarios.
1.14
Financial
instruments and other instruments
As at
December 31, 2019, the Company’s financial instruments
consist of cash, marketable securities, amounts receivable,
deposits, accounts payables and accrued liabilities and the Bridge
Loan. The fair values of these financial instruments, other than
the marketable securities and the Bridge Loan, approximate their
carrying values due to their short term to maturity. The
Company’s marketable securities, which were classified under
level 1 of the fair value hierarchy, are measured at fair value
using their quoted market price at period end. The Bridge Loan, on
initial recognition, was measured at fair value under level 2 of
the fair value hierarchy and was subsequently measured at amortized
cost.
The
Company’s financial instruments are exposed to certain
financial risks including, credit risk, currency risks, liquidity
risk, interest rate risk and capital risk. Details of the primary
risks that the Company is exposed to are laid out in the notes to
the Company’s consolidated financial statements.
37
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.15
Other
requirements
Capital structure
Authorized: Unlimited number of common
shares
Number
of common shares issued and outstanding as at March 19, 2020:
104,681,775
Number
of common shares issued and outstanding as at December 31, 2019:
95,231,775
Share
based options as at March 19, 2020:
|
|
Outstanding
|
Exercisable
|
||||
|
Expiry
date
|
Number of
options
|
Exercise
price
|
Remaining contractual
life (years)
|
Number of
options
|
Exercise
price
|
Remaining contractual
life (years)
|
|
Aug 17,
2020
|
915,000
|
$1.30
|
0.41
|
915,000
|
$1.30
|
0.41
|
|
June 20,
2021
|
2,085,000
|
2.63
|
1.25
|
2,085,000
|
2.63
|
1.25
|
|
Jan 10,
2022
|
440,000
|
3.22
|
1.81
|
440,000
|
3.22
|
1.81
|
|
June 20,
2023
|
651,875
|
1.42
|
3.25
|
651,875
|
1.42
|
3.25
|
|
June 26,
2023
|
900,000
|
1.42
|
3.27
|
900,000
|
1.42
|
3.27
|
|
Feb 7,
2024
|
200,625
|
1.36
|
3.89
|
148,125
|
1.36
|
3.89
|
|
April 9,
2024
|
2,755,000
|
1.96
|
4.06
|
1,721,875
|
1.96
|
4.06
|
|
Aug 21,
2024
|
70,000
|
1.82
|
4.43
|
35,000
|
1.82
|
4.43
|
|
Nov 20,
2024
|
170,000
|
1.82
|
4.68
|
63,750
|
1.82
|
4.68
|
|
|
8,187,500
|
$2.00
|
2.68
|
6,960,625
|
$2.02
|
2.42
|
The Company has 200,000 share purchase warrants outstanding
as at March 19, 2020 as reflected in Section 1.6/1.7.
Controls and procedures
Disclosure
controls and procedures (“DC&P”) are designed to
provide reasonable assurance that material information related to
the Company, including its consolidated subsidiaries, is made known
to the Company’s certifying officers. The Company’s
Chief Executive Officer (“CEO”) and Chief Financial
Officer (“CFO”) are responsible for establishing and
maintaining adequate DC&P and have concluded that the DC&P
the Company have in place are effective in providing reasonable
assurance that information required to be disclosed under
applicable securities regulations is recorded, processed,
summarized and reported within the time periods
specified.
The
Company’s management, with the involvement of the CEO and
CFO, performs regular reviews of its DC&P to ensure they are
designed and operating effectively. As there are inherent
limitations in all control systems, any economically feasible
control system can only provide reasonable, not absolute, assurance
that the control system will prevent or detect all misstatements
due to error or fraud.
Management’s
most recent evaluation of the DC&P was conducted for the year
ended December 31, 2019 from which management concluded that the
Company’s DC&P are effective as at December 31, 2019 in
providing reasonable assurance that information required to be
disclosed under applicable securities regulations is recorded,
processed, summarized and reported within the required time
periods.
38
AURYN RESOURCES INC.
Management’s
Discussion and Analysis of Financial Condition and
Results
of Operations for the year ended December 31, 2019
(In
thousands of Canadian dollars, unless otherwise noted)
1.15
Other requirements (continued)
Internal control over financial reporting
Internal
control over financial reporting (“ICFR”) includes
those policies and procedures that:
●
pertain to the
maintenance of records that in reasonable detail accurately and
fairly reflect the transactions and dispositions of the assets of
the Company;
●
provide reasonable
assurance that transactions are recorded as necessary to permit
preparation of consolidated financial statements in accordance with
IFRS, and that receipts and expenditures of the Company are being
made only in accordance with authorizations of management and
directors of the Company; and
●
provide reasonable
assurance regarding prevention or timely detection of unauthorized
acquisition, use or disposition of the Company assets or incurring
liabilities or other obligations that could have a material effect
on the consolidated financial statements.
It is
management’s responsibility to establish and maintain
adequate ICFR to provide reasonable assurance regarding the
reliability of financial reporting and the preparation of
consolidated financial statements for external purposes in
accordance with IFRS.
As part
of its annual evaluation process, management engaged a third party
consultant to perform testing over the design and effectiveness of
ICFR as at December 31, 2019. This testing was done under the
supervision of the CEO and CFO to support management’s
evaluation of the key controls based on the framework in Internal
Control - Integrated Framework (2013) issued by the Committee of
Sponsoring Organizations of the Treadway Commission
(“COSO”). Management concluded that the Company’s
ICFR was effective as of that date.
Additional
disclosures pertaining to the Company’s management
information circulars, material change reports, press releases and
other information are available on the SEDAR website at
www.sedar.com.
On behalf of the Board of Directors,
“Shawn
Wallace”
Shawn Wallace
President and Chief Executive Officer
March 19, 2020
39