Fury Gold Mines Ltd 40-F, filed Mar 20, 2020: Annual Information Form
Exhibit
99.1
|
|
|
|
|
|
Auryn resources inc.
ANNUAL INFORMATION FORM
FOR THE FINANCIAL YEAR ENDED DECEMBER 31, 2019
DATED AS OF MARCH 19, 2020
600 – 1199 WEST HASTINGS STREET
VANCOUVER, BRITISH COLUMBIA
V6E 3T5
|
|
|
|
|
|
TABLE OF CONTENTS
|
PRELIMINARY
NOTES
|
4
|
|
CAUTIONARY
NOTE REGARDING FORWARD-LOOKING STATEMENTS
|
4
|
|
MATERIAL
RISKS AND ASSUMPTIONS:
|
5
|
|
RESOURCE
CATEGORY (CLASSIFICATION) DEFINITIONS
|
6
|
|
CORPORATE
STRUCTURE
|
8
|
|
NAME,
ADDRESS AND INCORPORATION
|
8
|
|
GENERAL
DEVELOPMENT OF THE BUSINESS
|
9
|
|
THREE
YEAR HISTORY
|
9
|
|
BUSINESS
DESCRIPTION
|
12
|
|
GENERAL
|
12
|
|
RISK
FACTORS
|
13
|
|
COMMITTEE
BAY PROJECT
|
20
|
|
AMENDED
AND RESTATED TECHNICAL REPORT
|
20
|
|
PROJECT
DESCRIPTION AND LOCATION
|
21
|
|
LAND
TENURE
|
21
|
|
ACCESSIBILITY
|
21
|
|
CLIMATE
|
22
|
|
LOCAL
RESOURCES
|
22
|
|
EXISTING
INFRASTRUCTURE
|
22
|
|
HISTORY
|
22
|
|
PAST
PRODUCTION
|
23
|
|
GEOLOGY
AND MINERALIZATION
|
23
|
|
EXPLORATION
STATUS
|
24
|
|
COMMITTEE
BAY ROTARY AIR BLAST (“RAB”) DRILLING QA/QC
DISCLOSURE
|
25
|
|
COMMITTEE
BAY DIAMOND DRILLING QA/QC DISCLOSURE
|
25
|
|
MINERAL
RESOURCES
|
26
|
|
MINERAL
RESERVES
|
26
|
|
ADJACENT
PROPERTIES
|
26
|
|
CONCLUSIONS
|
26
|
|
RECOMMENDATIONS
|
27
|
|
HOMESTAKE
RIDGE PROJECT
|
29
|
|
TECHNICAL
REPORT
|
29
|
|
PROJECT
DESCRIPTION AND LOCATION
|
29
|
|
LAND
TENURE
|
29
|
|
ACCESSIBILITY
|
30
|
|
CLIMATE
|
30
|
|
LOCAL
RESOURCES
|
30
|
|
EXISTING
INFRASTRUCTURE
|
30
|
|
HISTORY
|
30
|
|
PAST
PRODUCTION
|
32
|
|
GEOLOGY
AND MINERALIZATION
|
32
|
|
EXPLORATION
STATUS
|
33
|
|
HOMESTAKE
RIDGE DRILLING QA/QC DISCLOSURE
|
33
|
|
MINERAL
RESOURCES
|
34
|
|
MINERAL
RESERVES
|
34
|
|
ADJACENT
PROPERTIES
|
34
|
|
CONCLUSIONS
|
35
|
|
RECOMMENDATIONS
|
35
|
|
PERUVIAN
EXPLORATION PORTFOLIO – SOMBRERO PROJECT
|
37
|
|
TECHNICAL
REPORT
|
37
|
|
PROJECT
DESCRIPTION, LOCATION AND MINERAL TENURE
|
37
|
|
ACCESSIBILITY,
CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND
PHYSIOGRAPHY
|
40
|
|
HISTORICAL
EXPLORATION COMPLETED BY PREVIOUS COMPANIES
|
40
|
1
|
GEOLOGICAL
SETTING
|
41
|
|
MINERALIZATION
|
41
|
|
EXPLORATION
|
42
|
|
SAMPLE
PREPARATION, ANALYSES AND SECURITY
|
43
|
|
SOIL
SAMPLING
|
43
|
|
ROCK
(GRAB) SAMPLING
|
44
|
|
TRENCH
SAMPLING
|
44
|
|
DATA
VERIFICATION
|
44
|
|
NON-ANALYTICAL
DATA VERIFICATION
|
44
|
|
ANALYTICAL
DATA VERIFICATION
|
44
|
|
QUALITY
ASSURANCE AND QUALITY CONTROL
|
44
|
|
MINERAL
PROCESSING AND METALLURGICAL TESTING
|
45
|
|
MINERAL
RESOURCE ESTIMATES
|
45
|
|
ADJACENT
PROPERTIES
|
45
|
|
CONCLUSION
AND RECOMMENDATIONS
|
45
|
|
PERUVIAN
EXPLORATION PORTFOLIO – HUILACOLLO PROPERTY
|
46
|
|
PROJECT
DESCRIPTION, LOCATION AND MINERAL TENURE
|
46
|
|
EXPLORATION
|
47
|
|
ADJACENT
PROPERTIES
|
48
|
|
PERUVIAN
EXPLORATION PORTFOLIO – CURIBAYA PROJECT
|
48
|
|
PROJECT
DESCRIPTION, LOCATION AND MINERAL TENURE
|
48
|
|
EXPLORATION
|
49
|
|
PERUVIAN
EXPLORATION PORTFOLIO - BAÑOS DEL INDIO
|
49
|
|
PROJECT
DESCRIPTION, LOCATION AND MINERAL TENURE
|
49
|
|
DESCRIPTION
OF CAPITAL STRUCTURE
|
50
|
|
COMMON
SHARES
|
50
|
|
PREFERRED
SHARES
|
50
|
|
STOCK
OPTIONS
|
50
|
|
COMMON
SHARE PURCHASE WARRANTS
|
51
|
|
MARKET
FOR SECURITIES
|
51
|
|
TRADING
PRICE AND VOLUME
|
51
|
|
PRIOR
SALES
|
51
|
|
DIRECTORS
AND EXECUTIVE OFFICERS
|
52
|
|
NAME,
OCCUPATION AND SECURITY HOLDING
|
52
|
|
CEASE
TRADE ORDERS, BANKRUPTCIES, PENALTIES OR SANCTIONS
|
55
|
|
CONFLICTS
OF INTEREST
|
56
|
|
LEGAL
PROCEEDINGS AND REGULATORY ACTIONS
|
56
|
|
INTEREST
OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS
|
56
|
|
TRANSFER
AGENT AND REGISTRAR
|
57
|
|
AUDITOR
|
57
|
|
MATERIAL
CONTRACTS
|
57
|
|
INTERESTS
OF EXPERTS
|
57
|
|
AMENDED
AND RESTATED COMMITTEE BAY TECHNICAL REPORT
|
57
|
|
AMENDED
AND RESTATED HOMESTAKE RIDGE TECHNICAL REPORT
|
57
|
|
SOMBRERO
TECHNICAL REPORT
|
57
|
|
INDEPENDENT
AUDITOR
|
58
|
|
AUDIT
COMMITTEE INFORMATION
|
58
|
|
AUDIT
COMMITTEE CHARTER
|
58
|
|
COMPOSITION
OF THE AUDIT COMMITTEE
|
58
|
|
RELEVANT
EDUCATION AND EXPERIENCE
|
58
|
|
PRE-APPROVAL
POLICIES AND PROCEDURES
|
59
|
|
EXTERNAL
AUDITOR SERVICE FEES
|
59
|
|
ADDITIONAL
INFORMATION
|
60
|
2
|
TABLE 1
|
Proposed
Budget – Phase 1 (Committee Bay Project)
|
28
|
|
|
|
|
|
TABLE 2
|
Proposed
Budget – Phase 2 (Committee Bay Project)
|
28
|
|
|
|
|
|
TABLE 3
|
Mineral
Resource Statement as at Sept. 1, 2017 (Homestake Ridge
Project)
|
34
|
|
|
|
|
|
TABLE 4
|
Proposed
Budget – Phase 1 (Homestake Ridge Project)
|
36
|
|
|
|
|
|
TABLE 5
|
Proposed
Budget – Phase 2 (Homestake Ridge Project)
|
37
|
|
|
|
|
|
TABLE 6
|
Sombrero
Property Mineral Concessions Summary
|
39
|
|
|
|
|
|
TABLE 7
|
Estimated
Expenditure Requirements for Recommended Exploration
Work
|
46
|
|
|
|
|
|
TABLE 8
|
Huilacollo
Option Expenditures and Cash Payments
|
48
|
|
|
|
|
|
TABLE 9
|
Outstanding Stock Options
|
51
|
|
|
|
|
|
TABLE 10
|
Trading Price and Volume on TSX
|
52
|
|
|
|
|
|
TABLE 11
|
Directors and Executive Officers
|
53
|
|
|
|
|
|
TABLE 12
|
Audit Fees
|
59
|
FIGURES
|
FIGURE 1
|
Consolidated
Organizational Chart
|
9
|
|
|
|
|
|
FIGURE 2
|
Sombrero
Property Mining Concessions
|
39
|
3
PRELIMINARY NOTES
In this
Annual Information Form (the “AIF”) Auryn Resources Inc. is
referred to as the “Company” or “Auryn”. All information in this
AIF is as at March 19, 2020, unless otherwise
indicated.
All
dollar amounts are expressed in thousands of Canadian dollars
unless otherwise indicated.
Common
shares of the Company are referred to as “Common Shares”, the
“Shares” or
“Auryn
Shares”.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
Auryn cautions readers regarding forward-looking statements found
in this document and in any other statement made by, or on the
behalf of the Company. Such statements may constitute
“forward-looking information” within the meaning of
applicable Canadian securities legislation. Forward-looking
information involves statements that are not based on historical
information but rather relate to future operations, strategies,
financial results or other developments. Forward-looking
information is necessarily based upon estimates and assumptions,
which are inherently subject to significant business, economic and
competitive uncertainties and contingencies, many of which are
beyond Auryn’s control and many of which, regarding future
business decisions, are subject to change. These uncertainties and
contingencies can affect actual results and could cause actual
results to differ materially from those expressed in any
forward-looking statements made by or on the Company’s
behalf. Although Auryn has attempted to identify important factors
that could cause actual actions, events or results to differ
materially from those described in forward-looking information,
there may be other factors that cause actions, events or results to
differ from those anticipated, estimated or intended. All factors
should be considered carefully and readers should not place undue
reliance on Auryn’s forward-looking information. Examples of
such forward-looking information within this AIF include statements
relating to: the future price of minerals, future capital
expenditures, success of exploration activities, mining or
processing issues, government regulation of mining operations and
environmental risks. Generally, forward-looking information can be
identified by the use of forward-looking terminology such as
“expects”, “estimates”,
“anticipates”, or variations of such words and phrases
(including negative and grammatical variations) or statements that
certain actions, events or results “may”,
“could”, “might” or “occur”.
Forward-looking information is made based on management’s
beliefs, estimates and opinions and are given only as of the date
of this AIF. The Company undertakes no obligation to update
forward-looking information if these beliefs, estimates and
opinions or other circumstances should change, except as may be
required by applicable law.
Forward-looking
information reflects Auryn’s current views with respect to
expectations, beliefs, assumptions, estimates and forecasts about
the Company’s business and the industry and markets in which
the Company operates. Forward-looking statements are not guarantees
of future performance and involve risks, uncertainties and
assumptions, which are difficult to predict. Assumptions underlying
the Company’s expectations regarding forward-looking
statements or information contained in this AIF include, among
others, the Company’s ability to comply with applicable
governmental regulations and standards, the Company’s success
in implementing its strategies, achieving the Company’s
business objectives, the Company’s ability to raise
sufficient funds from equity financings in the future to support
its operations, and general business and economic conditions.
The foregoing list of assumptions is
not exhaustive.
Persons reading this AIF are cautioned that forward-looking
statements are only predictions, and that the Company’s
actual future results or performance are subject to certain risks
and uncertainties including:
●
the
estimation of Mineral Reserves (as defined below) and Mineral
Resources (as defined below);
●
the
realization of Mineral Reserve estimates;
●
risks
related to the Company’s mineral properties being subject to
prior unregistered agreements, transfers or claims and other
defects in title;
4
●
risks
related to the Company’s history of losses, which may
continue in the future;
●
risks
related to increased competition and uncertainty related to
additional financing that could adversely affect the
Company’s ability to attract necessary capital funding or
obtain suitable properties for mineral exploration in the
future;
●
risks
related to the Company’s officers and directors becoming
associated with other natural resource companies, which may give
rise to conflicts of interest;
●
uncertainty
and volatility related to stock market prices and
conditions;
●
further
equity financing(s), which may substantially dilute the interests
of the Company’s shareholders;
●
risks
relating to our exploration operations In Peru;
●
dependence
on general economic, market or business conditions;
●
changes
in business strategies;
●
environmental
risks and remediation measures
●
changes
in laws and regulations; and
●
other
factors described under the heading “Risk Factors” in
this AIF.
Material Risks and Assumptions:
The
forward-looking information in this AIF reflects our current views
with respect to future events and are necessarily based upon a
number of assumptions and estimates that, while considered
reasonable by us, are inherently subject to significant business,
economic, competitive, political and social uncertainties and
contingencies. Many factors, both known and unknown, could cause
actual results, performance or achievements to be materially
different from the results, performance or achievements that are or
may be expressed or implied by such forward-looking information
contained in this AIF and documents incorporated by reference, and
we have made assumptions based on or related to many of these
factors.
Such
factors include, without limitation:
●
fluctuations in
spot and forward markets for silver, gold, base metals and certain
other commodities (such as natural gas, fuel oil and
electricity)
●
restrictions on
mining in the jurisdictions in which we operate;
●
laws and
regulations governing our operation, exploration and development
activities;
●
our ability to
obtain or renew the licenses and permits necessary for the
operation and expansion of our existing operations and for the
development, construction and commencement of new
operations;
●
risks and hazards
associated with the business of mineral exploration, development
and mining (including environmental hazards, potential unintended
releases of contaminants, industrial accidents, unusual or
unexpected geological or structural formations, pressures, cave-ins
and flooding);
●
inherent risks
associated with tailings facilities and heap leach operations,
including failure or leakages;
●
the speculative
nature of mineral exploration and development;
●
the inability to
determine, with certainty, production and cost
estimates;
5
●
inadequate or
unreliable infrastructure (such as roads, bridges, power sources
and water supplies);
●
environmental
regulations and legislation;
●
the effects of
climate change, extreme weather events, water scarcity, and seismic
events, and the effectiveness of strategies to deal with these
issues;
●
risks relating to
our exploration operations in Peru;
●
fluctuations in
currency markets (such as the Peruvian nuevo sol versus the
Canadian dollar);
●
the volatility of
the metals markets, and its potential to impact our ability to meet
our financial obligations;
●
our ability to
recruit and retain qualified personnel;
●
employee
relations;
●
disputes as to the
validity of mining or exploration titles or claims or rights, which
constitute most of our property holdings;
●
our ability to
complete and successfully integrate acquisitions;
●
increased
competition in the mining industry for properties and
equipment;
●
limited supply of
materials and supply chain disruptions;
●
relations with and
claims by indigenous populations;
●
relations with and
claims by local communities and non-governmental
organizations;
●
the effectiveness
of our internal control over financial reporting;
●
claims and legal
proceedings arising in the ordinary course of business activities;
and
●
those factors
identified under the caption “Risk Factors” in this AIF
and the documents incorporated by reference herein, if
any.
You
should not attribute undue certainty to forward-looking
information. Although we have attempted to identify important
factors that could cause actual results to differ materially, there
may be other factors that cause results not to be as described. We
do not intend to update forward-looking information to reflect
changes in assumptions or changes in circumstances or any other
events affecting such information, other than as required by
applicable law.
RESOURCE CATEGORY (CLASSIFICATION) DEFINITIONS
The discussion of mineral deposit classifications in this AIF
adheres to the mineral resource and mineral reserve definitions and
classification criteria developed by the Canadian Institute of
Mining, Metallurgy and Petroleum ("CIM") 2014. Estimated mineral resources fall into two
broad categories dependent on whether the economic viability of
them has been established and these are namely "resources"
(potential for economic viability) and ore "reserves" (viable
economic production is feasible). Resources are sub-divided into
categories depending on the confidence level of the estimate based
on level of detail of sampling and geological understanding of the
deposit. The categories, from lowest confidence to highest
confidence, are inferred mineral resource, indicated mineral
resource and measured mineral resource. Reserves are similarly
sub-divided by order of confidence into probable (lowest) and
proven (highest). The Company at this time has not classified any
of its mineral deposits as Mineral Reserves. These classifications
can be more particularly described as follows:
6
A "Mineral
Resource" is a concentration or
occurrence of solid material of economic interest in or on the
Earth’s crust in such form, grade or quality and quantity
that there are reasonable prospects for eventual economic
extraction. The location, quantity, grade or quality, continuity
and other geological characteristics of a Mineral Resource are
known, estimated or interpreted from specific geological evidence
and knowledge, including sampling.
An "Inferred
Mineral Resource" is that part
of a Mineral Resource for which quantity and grade or quality are
estimated on the basis of limited geological evidence and sampling.
Geological evidence is sufficient to imply but not verify
geological and grade or quality continuity. It has a lower level of
confidence than that applying to an Indicated Mineral Resource and
must not be converted to a Mineral Reserve. It is reasonably
expected that the majority of Inferred Mineral Resources could be
upgraded to Indicated Mineral Resources with continued
exploration.
An "Indicated Mineral
Resource" is that part of a
Mineral Resource for which quantity, grade or quality, densities,
shape and physical characteristics are estimated with sufficient
confidence to allow the application of modifying factors in
sufficient detail to support mine planning and evaluation of the
economic viability of the deposit. Geological evidence is derived
from adequately detailed and reliable exploration, sampling and
testing and is sufficient to assume geological and grade or quality
continuity between points of observation. It has a lower level of
confidence than that applying to a Measured Mineral Resource and
may only be converted to a Probable Mineral
Reserve.
A "Measured
Mineral Resource" is that part
of a Mineral Resource for which quantity, grade or quality,
densities, shape, and physical characteristics are estimated with
confidence sufficient to allow the application of modifying factors
to support detailed mine planning and final evaluation of the
economic viability of the deposit. Geological evidence is derived
from detailed and reliable exploration, sampling and testing and is
sufficient to confirm geological and grade or quality continuity
between points of observation. It has a higher level of confidence
than that applying to either an Indicated Mineral Resource or an
Inferred Mineral Resource. It may be converted to a Proven Mineral
Reserve or to a Probable Mineral Reserve.
A "Mineral
Reserve" is the economically
mineable part of a Measured and/or Indicated Mineral Resource. It
includes diluting materials and allowances for losses, which may
occur when the material is mined or extracted and is defined by
studies at Pre-Feasibility or Feasibility level as appropriate that
include application of modifying factors, which are considerations
used to convert Mineral Resources to Mineral Reserves and include,
but are not restricted to, mining, processing, metallurgical,
infrastructure, economic, marketing, legal, environmental, social
and governmental factors. Such studies demonstrate that, at the
time of reporting, extraction could reasonably be justified. The
reference point at which Mineral Reserves are defined, usually the
point where the ore is delivered to the processing plant, must be
stated. It is important that, in all situations where the reference
point is different, such as for a saleable product, a clarifying
statement is included to ensure that the reader is fully informed
as to what is being reported. The public disclosure of a Mineral
Reserve must be demonstrated by a Pre-Feasibility Study
or
Feasibility Study.
A "Probable
Mineral Reserve" is the
economically mineable part of an Indicated, and in some
circumstances, a Measured Mineral Resource. The confidence in the
modifying factors applying to a Probable Mineral Reserve is lower
than that applying to a Proven Mineral Reserve.
A "Proven
Mineral Reserve" is the
economically mineable part of a Measured Mineral Resource. A Proven
Mineral Reserve implies a high degree of confidence in the
modifying factors.
7
CORPORATE STRUCTURE
Name, Address and Incorporation
Auryn was incorporated under the name “Georgetown Capital
Corp.” under the Business Corporations
Act (British Columbia) (the
“BCBCA”) on June 9, 2008. The Company was a
Capital Pool Company under the policies of the TSX Venture Exchange
(the “TSXV”). Auryn completed a qualifying transaction
with Full Metal Minerals USA Inc. in February 2011. On
October 15, 2013, the Company changed its name to “Auryn
Resources Inc.” Auryn’s registered and records office
is located at Suite 1500 Royal Centre, 1055 West Georgia
Street, P.O. Box 11117, Vancouver, British Columbia,
V6E 4N7. Auryn’s head office is located at
Suite 600-1199 West Hastings Street, Vancouver, British
Columbia, V6E 3T5. Auryn is a reporting issuer in the
provinces of British Columbia, Alberta and
Ontario.
Effective October 31, 2016, the Company’s Common Shares
ceased trading on the TSXV, and effective November 1, 2016, the
Common Shares commenced trading on the Toronto Stock Exchange (the
“TSX”) under the symbol “AUG”. As a
result, the Company ceased to be a “venture issuer” as
defined under National Instrument 51-102 Continuous Disclosure
Requirements on November 1,
2016.
Effective
July 17, 2017, the Common Shares commenced trading on the NYSE
American under the US symbol “AUG”.
Inter-corporate
Relationships
Auryn has the following wholly-owned subsidiaries:
|
Subsidiary
|
Place
of incorporation
|
Functional
Currency
|
Beneficial
Interest
|
|
North Country Gold
Corp. (“North
Country”)
|
BC,
Canada
|
CAD
|
100%
|
|
Homestake Resource
Corporation (“Homestake”)
|
BC,
Canada
|
CAD
|
100%
|
|
Corisur Peru,
S.A.C. (“Corisur”)
|
Peru
|
USD
|
100%
|
|
Sombrero Minerales,
S.A.C. (“Sombrero
MInerales”)
|
Peru
|
USD
|
100%
|
|
Magma Minerals
S.A.C. (“Magma”)
|
Peru
|
USD
|
100%
|
|
Homestake Royalty
Corporation (inactive)
|
BC,
Canada
|
CAD
|
100%
|
Notes:
(i)
The
Company holds its 100% interest in Corisur through an option
agreement with a private Peruvian individual. This option can be
exercised upon Corisur receiving the required authorization from
the Peruvian government to allow foreign ownership within the
special economic border zone.
(ii)
The
Magma entity was incorporated on January 31, 2020. The Company is
currently in the process of transferring the concessions that make
up the Curibaya Project (as hereinafter defined) from Corisur into
Magma.
8
Intercompany relationships are described as follows:
Figure 1 – Consolidated Organizational Chart

Note:
See each Project Section contained within the Description of
Business for complete details with respect to each project’s
ownership.
GENERAL DEVELOPMENT OF THE BUSINESS
Three Year History
2017 Equity Offering
On January 24, 2017, the Company closed a brokered private
placement offering for gross proceeds of $41,172 (the
“2017
Offering”). Under the
terms of the 2017 Offering, the Company issued an aggregate of
4,590,818 flow-through shares at a price of $5.01 per flow-through
share and 4,951,584 Common Shares at a price of $3.67 per Common
Share. Offering costs related to the 2017 Offering totalled $2,261,
which included $2,022 in commissions, and $239 in other offering
costs. The gross proceeds from the 2017 Offering were also offset
by $6,151, an amount related to the flow-through share premium
liability. A reconciliation of the impact of the 2017 Offering on
share capital is as follows:
|
|
Number of common
shares
|
Impact
on
share
capital
|
|
Common shares
issued at $3.67 per Common Share
|
4,951,584
|
$18,172
|
|
Flow-through shares
issued at $5.01 per share
|
4,590,818
|
23,000
|
|
Cash offering
costs
|
-
|
(2,261)
|
|
Proceeds net of
share issue costs
|
9,542,402
|
38,911
|
|
Flow-through share
premium liability
|
-
|
(6,151)
|
|
|
9,542,402
|
$32,760
|
9
2018 Equity Offerings
On March 23, 2018 the Company closed a bought deal short form
prospectus financing (the “March 2018
Offering”) by issuing a
total of 6,015,385 Common Shares at a price of US$1.30 per Common
Share for gross proceeds of US$7.8 million. The March 2018
Offering was completed pursuant to an underwriting agreement dated
March 13, 2018 among the Company and Cantor Fitzgerald Canada
Corporation and a syndicate of underwriters. Concurrently with the
March 2018 Offering, the Company completed a private placement of
1,091,826 flow-through common shares at the price of US$1.82 per
share for gross proceeds of US$2,000, which proceeds were used
exclusively for exploration on the Company’s Committee Bay
Project (as hereinafter defined).
Offering costs related to the March 2018 Offering totalled $1,340,
which included $756 in commissions, and $584 in other offering
costs. A reconciliation of the impact of the March 2018 Offering on
share capital is as follows:
|
|
Number
of
common
shares
|
Impact
on
share
capital
|
|
Common shares
issued at US$1.30 per Common Share
|
6,015,385
|
$10,054
|
|
Flow-through shares
issued at US$1.82 per share
|
1,091,826
|
2,561
|
|
Share offering
costs
|
-
|
(1,340)
|
|
Proceeds net of
share issue costs
|
7,107,211
|
11,275
|
|
Flow-through share
premium liability
|
-
|
(737)
|
|
|
7,107,211
|
$10,538
|
On August 16, 2018 the Company completed a non-brokered private
placement (the “August 2018
Offering”) of
flow-through shares for gross proceeds of $7,331. The
proceeds from the August 2018 Offering were used exclusively for
exploration on the Company’s Committee Bay, Gibson MacQuoid
and Homestake Ridge projects.
Offering costs related to the August 2018 Offering totalled $400,
which included $350 in commissions, and $50 in other issuance
costs. A reconciliation of the impact of the August 2018 Offering
on share capital is as follows:
|
|
Number
of
common
shares
|
Impact
on
share
capital
|
|
Nunavut
flow-through shares issued at $1.60 per Common Share
|
2,084,375
|
$3,335
|
|
Nunavut charity
flow-through shares issued at $1.75 per share
|
1,215,000
|
2,126
|
|
BC charity
flow-through shares issued at $1.87 per share
|
1,000,000
|
1,870
|
|
Share offering
costs
|
-
|
(400)
|
|
Proceeds net of
share issue costs
|
4,299,375
|
6,931
|
|
Flow-through share
premium liability
|
-
|
(1,742)
|
|
|
4,299,375
|
$5,189
|
2019 Equity Offerings
On March 27, 2019, the Company completed a non-brokered private
placement for gross proceeds of $5,255. The placement consisted of
3,284,375 Common Shares priced at $1.60 per Common Share (the
“March
2019 Offering”).
Offering costs related to the March 2019 Offering totaled $186,
which included $110 in commissions, and $76 in other issuance
costs. A reconciliation of the impact of the March 2019 Offering on
share capital is as follows:
10
|
|
Number of common
shares
|
Impact
on
share
capital
|
|
Common shares
issued at $1.60 per share
|
3,284,375
|
$5,255
|
|
Cash share issue
costs
|
-
|
(186)
|
|
Proceeds net of
share issue costs
|
3,284,375
|
$5,069
|
On July 11, 2019, the Company completed a non-brokered flow-through
private placement (the “July 2019 Flow-Through
Offering”). The placement
consisted of 633,334 flow-through common shares priced at $3.00 per
flow-through share for gross proceeds of $1,900 which were to be
used exclusively for exploration on the Committee Bay
Project.
Offering costs related to the July 2019 Flow-Through Offering
totaled $44. No commissions were paid. A reconciliation of the
impact of the July 2019 Flow-Through Offering on share capital is
as follows:
|
|
Number of common
shares
|
Impact
on
share
capital
|
|
Flow-through shares
issued at $3.00 per share
|
633,334
|
$1,900
|
|
Cash share issue
costs
|
-
|
(44)
|
|
Proceeds net of
share issue costs
|
633,334
|
1,856
|
|
Flow-through share
premium liability
|
-
|
(557)
|
|
|
633,334
|
$1,299
|
2019 Bridge Loan
On
September 12, 2019, the Company entered a bridge loan facility (the
“Bridge Loan”)
for up to $6,000 with a private lender (the “Lender”). The Bridge Loan consists
of two tranches of $3,000, with the first having been received and
the second being conditional upon the mutual agreement of the
parties. The Bridge Loan bears interest at 10%, payable annually or
on repayment of the principal, and has a term of one year from the
date of advancement; however, the Bridge Loan can be repaid without
penalty at any time after 90 days of advancement at the discretion
of the Company. The Bridge Loan is secured by a first charge
general security agreement over all of the Company’s present
and future assets.
In
connection with the Bridge Loan, the Company issued 500,000 common
share purchase warrants to the Lender. Each warrant is exercisable
into one Common Share at a price of $2.00 per Common Share between
September 12, 2020 and September 12, 2022.
|
|
Total
|
|
Loan
advance received
|
$3,000
|
|
Transaction
costs
|
(21)
|
|
Net
proceeds from loan
|
$2,979
|
The
following table reflects the proceeds from the Bridge Loan, net of
transaction costs of $21:
2020 Equity Offerings
In
February 2020, the Company closed a non-brokered private placement
for gross proceeds of $15,000 which was closed in two tranches and
consisted of 9,375,000 Common Shares priced at $1.60 per Common
Share (the “2020
Offering”).
The
Company intends to use the net proceeds from the 2020 Offering to
fund continued surface exploration at its Sombrero Project and
Curibaya Project located in southern Peru and for general working
capital.
11
A total
of $59 was paid in commissions for the 2020 Offering.
Concurrent
with the closing of the first tranche of the 2020 Offering, on
February 6, 2020, the Company amended the Bridge Loan to provide
for mutual conversion rights to the Lender and the Company, and
also reduced the annual interest rate from 10% to 5% from the date
of amendment. Under the terms of the loan amendment, the Lender has
the right to convert the $3,000 of principal that had been advanced
to-date, and $123.334 of interest that had accrued to-date, into
Common Shares at the price of $1.60 per Common Share, while the
Company has the right to require conversion if the Common Shares
trade on the TSX at a price of $2.50 or more for any five
consecutive trading days prior to the Bridge Loan’s maturity
date.
Peru Portfolio
Since 2016, Auryn has acquired the rights, through a series of
transactions and staking efforts, to a portfolio of mineral
projects located in Southern Peru. These projects include the
Sombrero Project (as hereinafter defined), the Huilacollo Property
(as hereinafter defined) and the Curibaya Project.
See the Peru
Exploration Portfolio sections
for further details on the properties and their
acquisitions.
Gibson MacQuoid Project
In 2017, the Company acquired a number of prospecting permits and
mineral claims along the Gibson MacQuoid greenstone belt in
Nunavut, Canada. In 2019, the Company staked 36 additional claims,
which overlapped the Company’s prospecting claims that
expired in February 2020, to maintain a contiguous land package
over the Company’s current areas of interest. The project
currently comprises 66 mineral claims, which are located between
the Meliadine deposit and Meadowbank mine, covering approximately
120 km of strike length of the prospective greenstone belt and
total 74,000 hectares collectively.
BUSINESS DESCRIPTION
General
Auryn is a technically-driven, junior exploration company
focused on finding and advancing globally significant precious and
base metal deposits. The Company has a portfolio approach to
asset acquisition and has six projects, including two flagships:
the Committee Bay high-grade gold project located in Nunavut (the
“Committee Bay
Project”) and the
Sombrero copper-gold project located in Ayacucho province of
Southwestern Peru (the “Sombrero
Project”).
Auryn’s technical and management teams have a track record of
successfully monetizing assets for all stakeholders and local
communities in which it operates. Auryn conducts itself to the
highest standards of corporate governance and
sustainability.
In addition to the Company’s two flagship projects,
Auryn’s other primary mineral projects include the Homestake
Ridge project located within the Iskut-Stewart-Kitsault belt in
northwestern British Columbia the (“Homestake Ridge
Project”), the Curibaya
project located in southern Peru within a mineral trend that
hosts some of Peru’s largest porphyry deposits (“Curibaya
Project”) and the
Huilacollo Property.
Since 2016, the Company has been actively exploring its Canadian
mineral projects with the goal of identifying new areas of
significant mineralization. As discussed in Committee Bay and
Homestake Ridge sections below, the majority of this work has taken
place away from the known deposit areas in the form of regional
exploration and prospect drilling at satellite targets. Though this
work has yet to lead to the discovery of any new material mineral
deposits, it has strengthened the Company’s understanding of
the geological systems and provided new evidence with respect to
the projects continued perspectivity. The Company expects to
continue its exploration on these projects in accordance with the
plans discussed in the Company’s MD&A for the year ended
December 31, 2019.
12
In Peru, the Company’s operations have focused on early stage
projects where mineral resources have yet to be defined. In 2019,
the majority of this work related to the surface exploration of the
Sombrero Project and the Curibaya Project, since acquiring the
adjacent Sambalay and Salvador concessions in August 2019. Both
projects are discussed in detail in the section below.
As at December 31, 2019, the Company had approximately 20 full-time
employees at its office in Vancouver, British Columbia, Canada,
which included fulltime employees seconded from Universal Mineral
Services Ltd.
The Company has not yet determined whether its mineral property
interests contain economically recoverable mineral reserves. The
Company's continuing operations and the underlying value of the
Company’s mineral property interests are entirely dependent
upon the existence of economically recoverable mineral reserves,
the ability of the Company to obtain the necessary financing to
complete the exploration of its mineral property interests,
obtaining the necessary mining permits, and on future profitable
production or the proceeds from the disposition of the exploration
and evaluation assets.
Risk Factors
An
investment in securities of Auryn involves significant risks, which
should be carefully considered by prospective investors before
purchasing such securities. Management of Auryn considers the
following risks to be most significant for potential investors in
Auryn, but such risks do not necessarily comprise all those
associated with an investment in Auryn. Additional risks and
uncertainties not currently known to management of Auryn may also
have an adverse effect on Auryn’s business. If any of these
risks actually occur, Auryn’s business, financial condition,
capital resources, results of operations and/or future operations
could be materially adversely affected.
In
addition to the other information set forth elsewhere in this AIF,
the following risk factors should be carefully considered when
assessing risks related to Auryn’s business.
Coronavirus (COVID-19)
The
current outbreak of novel COVID-19 and any future emergence and
spread of similar pathogens could have an
adverse impact on global economic
conditions which may adversely impact
the Company’s operations, and the operations of its
suppliers, contractors and service providers and the ability to
obtain financing.
Global
demand decline may result, which may impact the price of gold and other commodities
with the result that Auryn may experience difficulty in achieving
further equity financing or other forms of financing necessary to
advance its projects. Travel bans may also adversely impact the
Company’s operations and the ability of the
Company to advance its
projects. Delays in travel plans and prohibitions by
governments, including the Government of Peru on mining and mining
related activities may result in the Company being required to
defer its continued exploration plans for its properties, with the
result that the Company’s ability to assess the resource
potential and potential economic viability of its mining properties
may be delayed. Sub-contractors may not be available to carry out
the company’s planned exploration activities, including its
2020 programs. Even if available, they may not be able to
access the Company’s mineral properties due to restrictions
on travel and around carrying
on commercial activity. In addition, costs may be greater
than anticipated due to health and safety precautions required to
comply with regulations and ensure health of their employees.
In addition, should any employees or
consultants of the Company become infected with Coronavirus or
similar pathogens, it could have a material negative impact on the
Company’s operations and prospects.
13
Commodity Price Fluctuations and Cycles
Resource
exploration is significantly linked to the outlook for commodities.
When the price of commodities being explored declines investor
interest subsides and capital markets become very difficult. The
price of commodities varies on a daily basis and there is no proven
methodology for determining future prices. Price volatility could
have dramatic effects on the results of operations and the ability
of Auryn to execute its business plan. The mining business is
subject to mineral price cycles. The marketability of minerals and
mineral concentrates is also affected by worldwide economic cycles.
Fluctuations in supply and demand in various regions throughout the
world are common. In recent years, mineral prices have fluctuated
widely. Moreover, it is difficult to predict future mineral prices
with any certainty. As Auryn’s business is in the exploration
stage and as Auryn does not carry on production activities, its
ability to fund ongoing exploration is affected by the availability
of financing which is, in turn, affected by the strength of the
economy and other general economic factors. Auryn’s current
projects are primarily exposed to gold and copper prices but are
also exposed to a lesser extent to silver and lead
prices.
Gold
prices specifically are historically subject to wide fluctuation
and are influenced by a number of factors beyond the control or
influence of the Company. Some factors that affect the price of
gold include: industrial and jewellery demand; central bank lending
or purchase or sales of gold bullion; forward or short sales of
gold by producers and speculators; future level of gold
productions; and rapid short-term changes in supply and demand due
to speculative or hedging activities by producers, individuals or
funds. Gold prices are also affected by macroeconomic factors
including: confidence in the global monetary system; expectations
of the future rate of inflation; the availability and
attractiveness of alternative investment vehicles; the general
level of interest rates; the strength of, and confidence in the
U.S. dollar, the currency in which the price of gold is generally
quoted, and other major currencies; global and regional political
or economic events; and costs of production of other gold producing
companies. All of the above factors can, through their interaction,
affect the price of gold by increasing or decreasing the demand for
or supply of gold.
Exploration Activities May Not be Successful
Exploration
for, and development of, mineral properties involves significant
financial risks, which even a combination of careful evaluation,
experience and knowledge may not eliminate. While the discovery of
an ore body may result in substantial rewards, few properties that
are explored are ultimately developed into producing mines. Major
expenditures may be required to establish reserves by drilling, to
complete a feasibility study and to construct mining and processing
facilities at a site for extracting gold or other metals from ore.
Auryn cannot ensure that its future exploration programs will
result in profitable commercial mining operations.
Also,
substantial expenses may be incurred on exploration projects that
are subsequently abandoned due to poor exploration results or the
inability to define reserves that can be mined economically.
Development projects have no operating history upon which to base
estimates of future cash flow. Estimates of proven and probable
reserves and cash operating costs are, to a large extent, based
upon detailed geological and engineering analysis. There have been
no feasibility studies conducted in order to derive estimates of
capital and operating costs including, among others, anticipated
tonnage and grades of ore to be mined and processed, the
configuration of the ore body, ground and mining conditions,
expected recovery rates of the gold or copper from the ore, and
anticipated environmental and regulatory compliance
costs.
It is
possible that actual costs and economic returns of future mining
operations may differ materially from Auryn’s best estimates.
It is not unusual in the mining industry for new mining operations
to experience unexpected problems during the start-up phase and to
require more capital than anticipated. These additional costs could
have an adverse impact on Auryn’s future cash flows,
earnings, results of operations and financial
condition.
14
Exploration Stage Operations
The
Company’s operations are subject to all of the risks normally
incident to the exploration for and the development and operation
of mineral properties. The Company has implemented safety and
environmental measures designed to comply with or exceed government
regulations and ensure safe, reliable and efficient operations in
all phases of its operations. The Company maintains liability and
property insurance, where reasonably available, in such amounts as
it considers prudent. The Company may become subject to liability
for hazards against which it cannot insure or which it may elect
not to insure against because of high premium costs or other
reasons.
The
mineral exploration business is very speculative. All of the
Company’s properties are at an early stage of exploration.
Mineral exploration involves a high degree of risk, which even a
combination of experience, knowledge and careful evaluation may not
be able to avoid. Few properties that are explored are ultimately
developed into producing mines. Unusual or unexpected formations,
formation pressures, fires, power outages, labour disruptions,
flooding, explosions, cave-ins, landslides and the inability to
obtain adequate machinery, equipment and/or labour are some of the
risks involved in mineral exploration activities. The Company has
relied on and may continue to rely on consultants and others for
mineral exploration expertise. Substantial expenditures are
required to establish mineral reserves and resources through
drilling, to develop metallurgical processes to extract the metal
from the material processed and to develop the mining and
processing facilities and infrastructure at any site chosen for
mining. There can be no assurance that commercial or any quantities
of ore will be discovered. There is also no assurance that even if
commercial quantities of ore are discovered, that the properties
will be brought into commercial production or that the funds
required to exploit any mineral reserves and resources discovered
by the Company will be obtained on a timely basis or at all. The
commercial viability of a mineral deposit once discovered is also
dependent on a number of factors, some of which are the particular
attributes of the deposit, such as size, grade and proximity to
infrastructure, as well as gold prices. Most of the above factors
are beyond the control of the Company. There can be no assurance
that the Company’s mineral exploration activities will be
successful. In the event that such commercial viability is never
attained, the Company may seek to transfer its property interests
or otherwise realize value or may even be required to abandon its
business and fail as a “going concern”.
Calculation of Reserves, Resources and Precious Metal
Recoveries
There
is a degree of uncertainty attributable to the calculation and
estimates of mineral reserves and mineral resources and the
corresponding metal grades to be mined and recovered. Until
reserves or resources are actually mined and processed, the
quantities of mineralization and metal grades must be considered as
estimates only. Any material change in the quantity of mineral
reserves, mineral resources, grades and recoveries may affect the
economic viability of the Company's properties. To date, the
Company has not established mineral reserves on any of its mineral
properties.
Additional Funding Requirements
As
Auryn’s business is in the exploration stage and as Auryn
does not carry on production activities, it will require additional
financing to continue its operations. Its ability to secure
additional financing and fund ongoing exploration is affected by
the strength of the economy and other general economic factors.
There can be no assurance that Auryn will be able to obtain
adequate financing in the future, or that the terms of such
financing will be favourable for further exploration and
development of its projects. Failure to obtain such additional
financing could result in delay or indefinite postponement of
further exploration. Further, revenues, financings and profits, if
any, will depend upon various factors, including the success, if
any, of exploration programs and general market conditions for
natural resources.
15
Specialized Skill and Knowledge
Various
aspects of Auryn’s business require specialized skills and
knowledge. Such skills and knowledge include the areas of
permitting, geology, drilling, metallurgy, logistical planning and
implementation of exploration programs as well as finance and
accounting. Auryn’s management team and board of directors
provide much of the specialized skill and knowledge. Auryn also
retains outside consultants as additional specialized skills and
knowledge are required. However, it is possible that delays and
increased costs may be experienced by Auryn in locating and/or
retaining skilled and knowledgeable employees and consultants in
order to proceed with its planned exploration and development at
its mineral properties.
Competitive Conditions
Auryn
competes against other companies to identify suitable exploration
properties. Competition in the mineral exploration business is
intense, and there is a high degree of competition for desirable
mineral leases, suitable prospects for drilling operations and
necessary exploration equipment, as well as for access to funds.
Auryn is competing with many other exploration companies possessing
greater financial resources and technical facilities than that
currently held by Auryn.
Environmental Protection
Auryn’s
properties are subject to stringent laws and regulations governing
environmental quality. Such laws and regulations can increase the
cost of planning, designing, installing and operating facilities on
our properties. However, it is anticipated that, absent the
occurrence of an extraordinary event, compliance with existing laws
and regulations governing the release of materials in the
environment or otherwise relating to the protection of the
environment, will not have a material effect upon Auryn’s
current operations, capital expenditures, earnings or competitive
position.
Property Commitments
Auryn’s
mineral properties and/or interests may be subject to various land
payments, royalties and/or work commitments. Failure by Auryn to
meet its payment obligations or otherwise fulfill its commitments
under these agreements could result in the loss of related property
interests.
Political, Economic and Social Risks and Uncertainties
Auryn’s
operations at the Committee Bay Project are located in Nunavut and,
as such, its operations are exposed to various levels of political,
economic and other risks and uncertainties. Risks and uncertainties
of operating in Nunavut vary from time to time, but are not limited
to a limited local workforce, poor infrastructure, a complex
regulatory regime and harsh weather.
Auryn’s
Huilacollo Property in Peru is located within a special economic
zone situated within 50km of the Peruvian border. Regardless of
Peru’s progress in recent decades in restructuring its
political institutions and revitalizing its economy, the country
has a history of political and economic instability under both
democratically elected and dictatorial governments, particularly
through the 1980’s. The Company believes that the current
conditions in Peru are stable and conducive to conducting business,
however, the Company’s current and future mineral
exploration, development and mining activities could be impacted by
adverse political, social or economic developments. Adverse
developments could include: widespread civil unrest and rebellion;
the imposition of unfavourable government regulations on foreign
investment, production and extraction, prices, exports, income
taxes, environmental compliance or worker safety; or the
expropriation of property.
16
Environmental Regulatory Risks
Auryn’s
operations are subject to environmental regulations promulgated by
government agencies from time to time. Environmental legislation
and regulation provides for restrictions and prohibitions on
spills, releases or emissions of various substances produced in
association with certain exploration industry operations, such as
from tailings disposal areas, which would result in environmental
pollution. A breach of such legislation may result in the
imposition of fines and penalties. In addition, certain types of
operations require the submission and approval of environmental
impact assessments. Environmental legislation is evolving in a
manner which means stricter standards, and enforcement, fines and
penalties for non-compliance are more stringent. Future legislation
and regulations could cause additional expenses, capital
expenditures, restrictions, liabilities and delays in exploration
of any of Auryn’s properties, the extent of which cannot be
predicted. Environmental assessments of proposed projects carry a
heightened degree of responsibility for companies and directors,
officers and employees. The cost of compliance with changes in
governmental regulations has a potential to reduce the
profitability of operations.
Climate Change
Auryn
acknowledges climate change and that the increased regulation of
greenhouse gas emissions (known as carbon taxes) may adversely
affect the Company’s operations and related legislation is
becoming more stringent. The effects of climate change or extreme
weather events may cause prolonged disruption to the delivery of
essential commodities which could negatively affect production
efficiency.
Auryn
makes efforts to mitigate climate risks by ensuring that extreme
weather conditions are included in its emergency response plans.
However, there is no assurance that the response will be effective,
and the physical risks of climate change will not have an adverse
effect on the Company’s operations and profitability. The
Company’s operations in Nunavut are particularly impacted by
extreme weather due to their remoteness.
Changes in Government Regulation
Changes
in government regulations or the application thereof and the
presence of unknown environmental hazards on any of Auryn’s
mineral properties may result in significant unanticipated
compliance and reclamation costs. Government regulations relating
to mineral rights tenure, permission to disturb areas and the right
to operate can adversely affect Auryn.
Auryn
may not be able to obtain all necessary licenses and permits that
may be required to carry out exploration on any of its projects.
Obtaining the necessary governmental permits is a complex, time
consuming and costly process. The duration and success of efforts
to obtain permits are contingent upon many variables not within our
control. Obtaining environmental permits may increase costs and
cause delays depending on the nature of the activity to be
permitted and the interpretation of applicable requirements
implemented by the permitting authority. There can be no assurance
that all necessary approvals and permits will be obtained and, if
obtained, that the costs involved will not exceed those that we
previously estimated. It is possible that the costs and delays
associated with the compliance with such standards and regulations
could become such that we would not proceed with the development or
operation.
Properties May be Subject to Defects in Title
Auryn
has investigated its rights to explore and exploit its projects
and, to the best of its knowledge, its rights are in good standing.
However, no assurance can be given that such rights will not be
revoked, or significantly altered, to Auryn’s detriment.
There can also be no assurance that Auryn’s rights will not
be challenged or impugned by third parties.
17
Some
Auryn’ mineral claims may overlap with other mineral claims
owned by third parties which may be considered senior in title to
the Auryn mineral claims. The junior claim is only invalid in the
areas where it overlaps a senior claim. Auryn has not determined
which, if any, of the Auryn mineral claims is junior to a mineral
claim held by a third party.
Although
Auryn is not aware of any existing title uncertainties with respect
to any of its projects, there is no assurance that such
uncertainties will not result in future losses or additional
expenditures, which could have an adverse impact on Auryn’s
future cash flows, earnings, results of operations and financial
condition.
Key Personnel
Auryn’s
senior officers are critical to its success. In the event of the
departure of a senior officer, Auryn believes that it will be
successful in attracting and retaining qualified successors but
there can be no assurance of such success. Recruiting qualified
personnel as Auryn grows is critical to its success. The number of
persons skilled in the acquisition, exploration of mining
properties is limited and competition for such persons is intense.
As Auryn’s business activity grows, it will require
additional key financial, administrative, mining and exploration
personnel, and potentially additional operations staff. If Auryn is
not successful in attracting and training qualified personnel, the
efficiency of its operations could be affected, which could have an
adverse impact on future cash flows, earnings, results of
operations and the financial condition of Auryn.
Legal and Litigation Risks
All
industries, including the exploration industry, are subject to
legal claims, with and without merit. Defense and settlement costs
of legal claims can be substantial, even with respect to claims
that have no merit. Due to the inherent uncertainty of the
litigation process, the resolution of any particular legal
proceeding to which Auryn may become subject could have a material
adverse effect on Auryn’s business, prospects, financial
condition, and operating results. Defense and settlement of costs
of legal claims can be substantial.
Risks Relating to Statutory and Regulatory Compliance
Auryn’s
current and future operations, from exploration through development
activities and commercial production, if any, are and will be
governed by applicable laws and regulations governing mineral
claims acquisition, prospecting, development, mining, production,
exports, taxes, labour standards, occupational health, waste
disposal, toxic substances, land use, environmental protection,
mine safety and other matters. Companies engaged in exploration
activities and in the development and operation of mines and
related facilities, generally experience increased costs and delays
in production and other schedules as a result of the need to comply
with applicable laws, regulations and permits. Auryn has received
all necessary permits for the exploration work it is presently
conducting; however, there can be no assurance that all permits
which Auryn may require for future exploration, construction of
mining facilities and conduct of mining operations, if any, will be
obtainable on reasonable terms or on a timely basis or at all, or
that such laws and regulations would not have an adverse effect on
any project which Auryn may undertake.
Failure
to comply with applicable laws, regulations and permits may result
in enforcement actions thereunder, including the forfeiture of
claims, orders issued by regulatory or judicial authorities
requiring operations to cease or be curtailed, and may include
corrective measures requiring capital expenditures, installation of
additional equipment or costly remedial actions. Auryn may be
required to compensate those suffering loss or damage by reason of
its mineral exploration activities and may have civil or criminal
fines or penalties imposed for violations of such laws, regulations
and permits. Auryn is not currently covered by any form of
environmental liability insurance. See “Risk Factor -
Insurance Risk”, below.
18
Existing
and possible future laws, regulations and permits governing
operations and activities of exploration companies, or more
stringent implementation thereof, could have a material adverse
impact on Auryn and cause increases in capital expenditures or
require abandonment or delays in exploration.
Insurance Risk
Auryn
is subject to a number of operational risks and may not be
adequately insured for certain risks, including: accidents or
spills, industrial and transportation accidents, which may involve
hazardous materials, labour disputes, catastrophic accidents,
fires, blockades or other acts of social activism, changes in the
regulatory environment, impact of non-compliance with laws and
regulations, natural phenomena such as inclement weather
conditions, floods, earthquakes, ground movements, cave-ins, and
encountering unusual or unexpected geological conditions and
technological failure of exploration methods.
There
is no assurance that the foregoing risks and hazards will not
result in damage to, or destruction of, the properties of Auryn,
personal injury or death, environmental damage or, regarding the
exploration activities of Auryn, increased costs, monetary losses
and potential legal liability and adverse governmental action, all
of which could have an adverse impact on Auryn’s future cash
flows, earnings, results of operations and financial condition. The
payment of any such liabilities would reduce the funds available to
Auryn. If Auryn is unable to fully fund the cost of remedying an
environmental problem, it might be required to suspend operations
or enter into costly interim compliance measures pending completion
of a permanent remedy.
No
assurance can be given that insurance to cover the risks to which
Auryn’s activities are subject will be available at all or at
commercially reasonable premiums. Auryn is not currently covered by
any form of environmental liability insurance, since insurance
against environmental risks (including liability for pollution) or
other hazards resulting from exploration activities is unavailable
or prohibitively expensive. This lack of environmental liability
insurance coverage could have an adverse impact on Auryn’s
future cash flows, earnings, results of operations and financial
condition.
Limited Business History and No History of Earnings
Auryn
has only recently commenced operations and has no history of
operating earnings. The likelihood of success of Auryn must be
considered in light of the problems, expenses, difficulties,
complications and delays frequently encountered in connection with
the establishment of any business. Auryn has limited financial
resources and there is no assurance that additional funding will be
available to it for further operations or to fulfill its
obligations under applicable agreements. There is no assurance that
Auryn will ultimately generate revenues, operate profitably, or
provide a return on investment, or that it will successfully
implement its plans.
In
addition, Auryn’s activities are focused primarily on the
Committee Bay Project. Any adverse changes or developments
affecting this project would have a material and adverse effect on
Auryn’s business, financial condition, results of operations
and prospects.
Claims by Investors Outside of Canada
Auryn
is incorporated under the laws of British Columbia and its head
office is located in Vancouver, British Columbia. The majority of
Auryn’s directors and officers, and some of the experts named
herein, are residents of Canada or otherwise reside outside of the
United States, and all or a substantial portion of their assets,
and a substantial portion of Auryn’s assets, are located
outside of the United States. As a result, it may be difficult for
investors in the United States or outside of Canada to bring an
action against directors, officers or experts who are not resident
in the United States. It may also be difficult for an investor to
enforce a judgment obtained in a United States court or a court of
another jurisdiction of residence predicated upon the civil
liability provisions of United States federal securities laws or
other laws of the United States or any state thereof or the
equivalent laws of other jurisdictions outside of Canada against
those persons or Auryn.
19
Changes in the Market Price of Common Shares may be Unrelated to
Auryn’s Results of Operations and could have an Adverse
Impact on Auryn
The
Auryn Shares are listed on the TSX. The price of Auryn Shares is
likely to be significantly affected by short-term changes in the
gold price or in its financial condition or results of operations
as reflected in its quarterly earnings reports. Other factors
unrelated to Auryn’s performance that may have an effect on
the price of Auryn Shares and may adversely affect an
investors’ ability to liquidate an investment and
consequently an investor’s interest in acquiring a
significant stake in Auryn include: a reduction in analytical
coverage by investment banks with research capabilities; a drop in
trading volume and general market interest in Auryn’s
securities; a failure to meet the reporting and other obligations
under relevant securities laws or imposed by applicable stock
exchanges could result in a delisting of Auryn Shares and a
substantial decline in the price of the Auryn Shares that persists
for a significant period of time.
As a
result of any of these factors, the market price of Auryn Shares at
any given point in time may not accurately reflect their long-term
value. Securities class action litigation often has been brought
against companies following periods of volatility in the market
price of their securities. Auryn may in the future be the target of
similar litigation. Securities litigation could result in
substantial costs and damages and divert management’s
attention and resources.
Price Volatility of Publicly Traded Securities
In
recent years, the securities markets in the United States and
Canada have experienced a high level of price and volume
volatility, and the market prices of securities of many companies
have experienced wide fluctuations in price which have not
necessarily been related to the operating performance, underlying
asset values or prospects of such companies. There can be no
assurance that continuing fluctuations in price will not
occur.
Future Sales May Affect the Market Price of the Auryn
Shares
In
order to finance future operations, Auryn may raise funds through
the issuance of additional Common Shares or the issuance of debt
instruments or other securities convertible into Common Shares.
Auryn cannot predict the size of future issuances of Common Shares
or the issuance of debt instruments or other securities convertible
into Common Shares or the dilutive effect, if any, that future
issuances and sales of Auryn’s securities will have on the
market price of the Common Shares.
Dividend Policy
No
dividends on the Common Shares have been paid by Auryn to date.
Payment of any future dividends, if any, will be at the discretion
of the Auryn Board of directors (the “Board”) after taking into account
many factors, including Auryn's operating results, financial
condition, and current and anticipated cash needs.
No History of Earnings
The Company has no history of earnings and there is no assurance
that its mineral properties will generate earnings, operate
profitably or provide a return on investment in the near future.
The Company has not paid dividends in the past and has no plans to
pay dividends for the foreseeable future, if ever. Any future
determination to pay dividends will be at the discretion of the
board of directors and will depend upon the capital requirements of
the Company, results of operations and such other factors as the
board of directors considers relevant.
20
The Success of the Company Depends on its Relationships with Local
Communities and Indigenous Organizations
Negative
relationships with Indigenous and local communities could result in
opposition to the Company’s projects. Such opposition could
result in material delays in attaining key operating permits or
make certain projects inaccessible to the Company’s
personnel. Auryn respects and engages meaningfully with Indigenous
and local communities at all of its operations. Auryn is committed
to working constructively with local communities, government
agencies and Indigenous groups to ensure that exploration work is
conducted in a culturally and environmentally sensitive
manner.
Risk of Foreign Operations
In
Peru, the jurisdiction in which Auryn has mineral properties, such
mineral properties are subject to various political, economic and
other uncertainties, including, among other things, the risks of
war and civil unrest, expropriation, nationalization, renegotiation
or nullification of existing concessions, licenses, permits,
approvals and contracts, taxation policies, foreign exchange and
repatriation restrictions, changing political conditions,
international monetary fluctuations, currency controls and foreign
governmental regulations that favour or require the awarding of
contracts to local contractors or require foreign contractors to
employ citizens of, or purchase supplies from, a particular
jurisdiction.
In
addition, in the event of a dispute arising from foreign
operations, Auryn may be subject to the exclusive jurisdiction of
foreign courts or may not be successful in subjecting foreign
persons to the jurisdiction of courts in the United States or
Canada. Alturas also may be hindered or prevented from enforcing
its rights with respect to a governmental instrumentality because
of the doctrine of sovereign immunity. It is not possible for Auryn
to accurately predict such developments or changes in laws or
policy or to what extent any such developments or changes may have
a material adverse effect on Auryn’s operations.
Peru is
the world’s largest producer of silver, second largest
producer of copper, third of zinc, fourth of lead and the sixth
largest producer of gold. It also has the largest reserves of
silver and the third largest copper and zinc reserves in the world.
In 2017, mining provided a significant portion of Peru’s
export revenues. Peru has enjoyed improvements in its GDP over the
past decade, in a macroeconomic context of low inflation and
declining poverty levels. On the downside, the economy is
most vulnerable in the short term to a global growth shock that
permeates through lower commodity prices.
COMMITTEE BAY PROJECT
Amended and Restated Technical Report
On June
16, 2017, the Company filed a technical report entitled
“Technical Report on the
Committee Bay Project, Nunavut Territory, Canada” with
an effective date of May 31, 2017 with respect to its Committee Bay
project (the “Original 2017
Committee Bay Technical Report”). On November 3, 2017,
the Company filed an amended and restated technical report entitled
“Technical Report on the
Committee Bay Project, Nunavut Territory, Canada”
dated October 23, 2017 with an effective date of May 31, 2017 with
respect to its Committee Bay project (the “Amended 2017 Committee Bay Technical
Report”). The Amended 2017 Committee Bay Technical
Report amended the Original 2017 Committee Bay Technical Report to
remove an incorrect reference to the previous 2013 mineral resource
estimate being current and to confirm that the current mineral
resource estimate in the Amended 2017 Committee Bay Technical
Report, which is effective May 31, 2017, reflected updated metal
price, exchange rate and operating cost assumptions.
The
following information on the Committee Bay Project is a summary of
both the Amended 2017 Committee Bay Technical Report and the
Company’s exploration completed in the 2017 and 2018
exploration seasons since the report’s publication. The
summary of the Amended 2017 Committee Bay Technical Report is
qualified by reference to the Amended 2017 Committee Bay Technical
Report in its entirety. Readers are encouraged to review the
Amended 2017 Committee Bay Technical Report which is filed on SEDAR
under the Company’s profile at www.sedar.com.
21
Project Description and Location
The
Committee Bay Project is located in the eastern part of the
Kitikmeot Region of Nunavut, approximately 430 km northwest of the
town of Rankin Inlet, Nunavut. The Committee Bay Project is only
accessible by air, either from Rankin Inlet or Yellowknife,
Northwest Territories. The Committee Bay Project is centered at
approximately 7,400,000m N and 570,000m E (NAD 83, Zone 15N) in
1:250,000 scale map sheets 56J (Walker Lake), 56K (Laughland Lake),
56O (Arrowsmith River) and 56P (Ellice Hills).
Land Tenure
As of
the effective date of the Amended 2017 Committee Bay Technical
Report, the Committee Bay Project consists of three non-contiguous
blocks totalling 44 crown leases, 274 claims and one sub-surface
exploration agreement covering IOL totalling approximately 427,978
ha. Auryn reports that the leases, claims and the sub-surface
exploration agreement are in good standing. Applications are
pending for an additional 13 leases totalling approximately
13,714.5 ha.
On
March 20, 2015, Auryn announced that it had entered into a
definitive joint venture agreement with North Country whereby it
could earn a 51% interest in North Country’s Committee Bay
Project by incurring $6 million in expenditures over a 30 month
period. Of that amount, $500 was a firm commitment to be spent
within 12 months. Auryn also agreed to buy 10 million of North
Country shares at a price of $0.05 each as part of a non-brokered
private placement.
On June
30, 2015, Auryn announced that it had entered into a letter
agreement with North Country whereby it would acquire all the North
Country shares that it did not already own in exchange for 13.8
million Common Shares of Auryn valued at approximately $20.4
million. The Auryn Shares issued as part of the agreement
constituted approximately 30.7% of Auryn’s outstanding Common
Shares. On September 25, 2015, Auryn announced that it had
completed the acquisition and that North Country had become a
subsidiary of Auryn.
Since
the release of the Amended 2017 Committee Bay Technical Report, the
Company has reduced its land position based on its evolving area of
interest based on sound exploration efforts and as of the date of
this AIF has 57 crown leases and 187 mineral claims, comprising
approximately 280,000 hectares.
Accessibility
The
Committee Bay Project is located 430 km northwest of Rankin Inlet,
Nunavut. Access to Rankin Inlet is achieved via regularly scheduled
commercial flights (Canadian North and/or First Air) from
Yellowknife, Northwest Territories; Winnipeg, Manitoba; and Ottawa,
Ontario. Rankin Inlet and Baker Lake are serviced seasonally by
barge and ship. The hamlets of Baker Lake, Naujaat (Repulse Bay),
Gjoa Haven, Taloyoak, and Kugaaruk (Pelly Bay) are accessible by
scheduled commercial flights.
At the
Three Bluffs camp site, Hayes Camp, an esker airstrip is accessible
by Twin Otter fixed-wing aircraft on oversized tires from June
through early September. Parts of the Hayes River area are
accessible to float-equipped fixed-wing aircraft by late June.
Fixed-wing and helicopter charters may be arranged either from
Rankin Inlet or from Yellowknife. In order to facilitate the
mobilization of large quantities of equipment and supplies for
exploration programs, a 5,000 ft airstrip (ice-strip) is
constructed each spring on Sandspit Lake at Hayes
Camp.
Climate
The
Committee Bay Project is located in the Wager Bay Plateau Ecoregion
of the Northern Arctic Ecozone (Marshall and Schutt, 1999). This
ecoregion is classified as having a low arctic ecoclimate. Summers
are short and cold, with mean daily temperatures above freezing
only in July and August. Snow cover usually lasts from September to
June, but it can fall during any month. Most of the lakes are
icebound until approximately mid-July.
22
Precipitation
is moderate throughout the year, but drifting of snow in the winter
can result in considerable localized accumulations, particularly on
the sides of hills. Fog is often a problem near the coast and at
higher elevations particularly during the late spring to early
summer and the fall months.
Local Resources
Most
services are available in Baker Lake, Kugaaruk, and Rankin Inlet,
including: groceries; hotel accommodations; expediting services;
and some camp supplies. Anything that is not locally available can
be shipped in via daily scheduled air services.
The
Rankin Inlet area is a hub of mining activity in the region.
Exploration and mining suppliers and contractors are available from
Manitoba and the Northwest Territories. General labour is readily
available from the local communities.
Existing Infrastructure
There
is no permanent infrastructure at the Committee Bay Project. Auryn
maintains three camps to support seasonal exploration campaigns in
various portions of the Committee Bay Project, namely the Hayes
Camp (100 person capacity), the Bullion Camp (20 to 40 person
capacity) and the Ingot Camp (10 person capacity). The Committee
Bay Project also benefits from a 914 m, graded, esker airstrip at
the Hayes Camp, a permitted, seasonally prepared 1,580 m winter ice
airstrip, which is constructed on the adjacent Sandspit Lake, and
320m tundra airstrip at the Bullion Camp. A drill water system is
maintained at the Three Bluffs site.
Since
the release of the Amended 2017 Committee Bay Technical Report, the
Company has added a fourth camp, the Crater Camp, which has a 20 to
40 person capacity.
History
Key
historical events are:
●
1961 and 1967:
Mapping done in the area by the Geological Survey of Canada
(“GSC”).
●
1970: King Resources Company conducted
reconnaissance geological mapping and sampling in the Laughland Lake and Ellice Hills
areas. Follow-up work includes geophysics and detailed mapping, trenching, and
sampling.
●
1970, 1974, and 1976: Cominco Ltd. carried out
reconnaissance and detailed geological mapping, ground geophysics, and
sampling in the Hayes River area.
●
1971: The Aquitaine Company conducted airborne
electromagnetic (EM) and magnetometer surveys.
●
1972 to 1977:
Detailed re-mapping of the area was done by the GSC.
●
1979: Urangesellschaft Canada Ltd. carried out
reconnaissance airborne radiometric surveys and prospecting for uranium in the
Laughland Lake area.
●
1986: Wollex carried out geological mapping and
rock sampling in the West Laughland Lake area.
●
1992: GSC conducted
geological re-assessment of the mineral potential of the
Prince Albert
Group.
23
●
1994: Channel sampling carried out over the Three
Bluffs area but the results were lost.
●
1996: Terraquest
Ltd. conducted a high-resolution airborne magnetometer
survey.
●
1997 to 1998: P.H. Thompson Geological Consulting
Ltd. conducted regional geological mapping in the Three Bluffs
area.
●
1999 to 2002: GSC conducted a multi-disciplinary
study of the Committee Bay Greenstone Belt (“CBGB”).
●
1992 to 2012: Apex
Geoscience Ltd. (Apex) carried out prospecting, rock sampling,
gridding, airborne and ground geophysics, geophysics, geological
mapping, and reverse circulation and diamond drilling on several of
the gold targets including Three Bluffs, Three Bluffs West, West
Plains, Anuri, Inuk, Antler, and Hayes.
●
2015 and 2016,
Auryn completed a total of 95 RAB holes for approximately 13,045 m
and seven diamond drill holes for approximately 3,715 m on the
Committee Bay Project.
Past Production
There
has been no previous production from the Committee Bay
Project.
Geology and Mineralization
The
Committee Bay area, situated in the Churchill Structural Province,
is underlain by Archean and Proterozoic rocks and extensively
covered by Quaternary glacial drift. It comprises three distinct
Archean sub-domains (Prince Albert Group, Northern Migmatite, and
Walker Lake Intrusive Complex).
The
CBGB, which hosts the gold occurrences discussed in the Amended
2017 Committee Bay Technical Report, is composed of Prince Albert
Group rocks. These are bounded by the wide, northeast-striking
Slave-Chantrey mylonite belt to the northwest and by the Amer and
Wager Bay shear zones to the south. Two major fault systems, the
northeast-striking Kellet fault and the northwest-striking Hayes
River fault, intersect the central portion of the CBGB and cut the
Prince Albert Group rocks. Gold occurrences in the CBGB appear to
be spatially related to the major shear systems and their
sub-structures indicating the potential for the re-mobilization of
mineral-bearing fluids along these structures.
The
regional strike of rock units in the West Laughland Lake area is
generally north but shows a degree of variability. Units, generally
vertically dipping in much of the CBGB, have a more moderate to
shallow dip at Four Hills. Rocks generally strike northeast from
Four Hills east to Committee Bay. In the Hayes River area, the
east-striking Walker Lake shear zone is the dominant structure.
Dips in the Hayes River area are generally sub-vertical and there
is evidence of flexural shear and silicification along lithological
contacts between iron formation and talc-actinolite schist
(meta-komatiite). Rocks of the Curtis River area, approximately 120
km northeast of the Hayes River area, strike northeast and dip
sub-vertically.
The
iron formations that host the Three Bluffs, Antler, Hayes, and
Ledge gold occurrences have unique lithological associations with
their contact rocks and do not appear to be stratigraphically
equivalent.
Three
low, rounded, rusty outcrops, called West, Central, and East,
comprise the Three Bluffs gold occurrence. Gold mineralization is
hosted in gossanous, predominantly oxide, silicate, and sulphide
facies iron formations. Iron formation thicknesses range from 25 m
to 30 m at the West Bluff to 55 m at the Central Bluff. The Three
Bluffs iron formation maintains a thickness of 10 m for a minimum
strike length of 1.8 km and is at least 55 m thick for 700 m. The
iron formations are poorly banded to massive with locally shared,
quartz-veined intervals of up to three metres near lithological
contacts. Chlorite and epidote alteration indicates either lower
amphibolite grade metamorphism (epidote-amphibolite facies) or the
result of retrograde greenschist facies metamorphism associated
with gold deposition. Local mineralization, composed of
disseminated pyrite and pyrrhotite, can occupy up to 50% of the
rock volume.
24
Exploration Status
2017
Exploration
The
Three Bluffs deposit is at the Mineral Resource development stage.
The remainder of the Committee Bay Project is at the early
exploration stage.
During
2017, the Company announced the results from its Rotary Air Blast
(“RAB”) drill
program. The results received represent approximately 30,000 meters
across approximately 150 drill holes targeting areas away from the
existing Three Bluffs deposit. Highlights from the drilling are as
follows:
●
Aiviq prospect -
12.2 meters of 4.7g/t Au (including 3.05 meters of 18.09 g/t Au)
intersected in an interpreted silicified shear zone;
●
Aarluk prospect -
4.57 meters of 2.52 g/t gold was intersected in banded iron
formation;
●
West Plains
prospect - 9.15 meters of 3.48g/t Au (including 6.1 meters of 4.93
g/t Au), 9.15 meters of 2.89g/t Au and 6.10 meters of 2.54g/t Au
(including 1.53 meters of 7.48 g/t Au) all intersected in banded
iron formation; and
●
Inuk prospect - 25
meters of 1.15g/t Au (including 3.05 meters of 4.13g/t Au) 400
meters away from the historic intercept of 12.6 meters of 16.04 g/t
Au within sulphidized banded iron formation.
2018
Exploration
During
2018, the Company drilled approximately 10,000 meters across
several targets in the vicinity of the Three Bluffs deposit but
away from known mineralization. Summarized results from this
program are highlighted as follows:
●
Aiviq – 16
core and 7 RAB holes - The majority of the core drill holes
intersected 20 - 40 meter widths of intense quartz veining and
sulphidized banded iron formations. Results from the Aiviq core
drill program include highlights of 13.5 meters of 1.54 g/t
gold (including 6 meters of 3.3 g/t gold) 4.5 meters of 2.93/t
Au, and 1.5 meters of 8.95/t Au;
●
Kalulik – 8
RAB holes - The 2018 drill program at Kalulik identified two
separate gold-bearing hydrothermal systems, four kilometers apart,
that intersected broad zones of low-grade mineralization over 10 -
20 meter widths within sulphidized banded iron formations and
associated quartz veining. These results include 21.34 meters at
0.4 g/t gold and 16.76 meters at 0.45 g/t gold;
and,
●
Aarluk – 7
RAB holes - At the Aarluk prospect the best intercept was 3.05
meters of 3.39 g/t gold, which was encountered in a weakly
sulphidized banded iron formation.
2019
Exploration
During
2019, the Company followed up on the results from its 2018 program
by completing the following:
●
Machine Learning -
A total of twelve new targets were generated through unbiased
processing of existing exploration data. Two of the targets
overlapped with Auryn’s geologist derived targets adjacent to
the Aiviq and Kalulik discoveries;
25
●
Drill Program
– A 2,700 meter diamond drill program at the Committee Bay
Project targeted a combination of both machine learning and
traditional geologist generated targets and drilled a new
gold-bearing system along the regional fault zone that hosts the
Aiviq and Kalulik systems. These results include 30 meters of 0.67
g/t gold, including 1.5 m of 5.03 g/t gold; and
●
IP Survey - A 27
line – kilometer induced polarization survey was conducted to
identify both chargeability and conductivity targets along the
Aiviq-Shamrock corridor.
Committee Bay Rotary Air Blast (“RAB”) Drilling QA/QC
Disclosure
Intercepts
were calculated using a minimum of a 0.25 g/t Au cut off at
beginning and end of the intercept and allowing for no more than
four consecutive samples (six meters) of less than 0.25 g/t
Au.
Analytical
samples were taken using 1/8 of each 5ft (1.52m) interval material
(chips) and sent to ALS Lab in Yellowknife, Northwest Territories
and Vancouver, BC for preparation and then to ALS Lab in Vancouver,
British Columbia for analysis. All samples are assayed using 30g
nominal weight fire assay with atomic absorption finish (Au-AA25)
and multi-element four acid digest ICP-AES/ICP-MS method (ME-MS61).
Quality Assurance/Quality Control (“QA/QC”) programs using internal
standard samples, field and lab duplicates and blanks indicate good
accuracy and precision in a large majority of standards
assayed.
Committee Bay Diamond Drilling QA/QC Disclosure
Intercepts
were calculated using a minimum of a 0.25 g/t Au cut off at
beginning and end of the intercept and allowing for no more than
six consecutive meters of less than 0.25 g/t Au.
Analytical
samples were taken by sawing NQ diameter core into equal halves on
site and sent one of the halves to ALS Lab in Yellowknife, NWT for
preparation and then to ALS Lab in Vancouver, BC for analysis. All
samples are assayed using 50g nominal weight fire assay with atomic
absorption finish (Au-AA26) and multi-element four acid digest
ICP-AES/ICP-MS method (ME-MS61). QA/QC programs using internal
standard samples, field and lab duplicates and blanks indicate good
accuracy. Due to the nuggety nature of mineralization encountered,
the Company will be running additional analysis on duplicate
samples to better understand the analytical precision.
True
widths of mineralization are unknown based on current geometric
understanding of the mineralized intervals.
Committee Bay Grabs QA/QC Disclosure:
Approximately
1-2kg of material was collected for analysis and sent to ALS Lab in
Vancouver, BC for preparation and analysis. All samples are assayed
using 50g nominal weight fire assay with atomic absorption finish
(Au-AA26) and multi-element four acid digest ICP-AES/ICP-MS method
(ME-MS61). QA/QC programs for 2018 rock grab samples using internal
standard samples, lab duplicates, standards and blanks indicate
good accuracy and precision in a large majority of standards
assayed. Grab samples are selective in nature and cannot be
consider as representative of the underlying
mineralization.
Mineral Resources
The
Mineral Resources at the Committee Bay Project are estimated to be
approximately 2.07 million tonnes of Indicated Mineral Resources
grading 7.85 g/t Au, containing 524,000 ounces of gold, and 2.93
million tonnes of Inferred Mineral Resources grading 7.64 g/t Au,
containing 720,000 ounces of gold. Compared to the previous Mineral
Resource estimate prepared by RPA in 2013, the tonnage has
decreased and the grades have increased due to a higher cut-off
grade based on the current metal price, exchange rate, and
operating cost assumptions.
26
The
estimate was carried out using a block model method constrained by
wireframe grade shell models, with Inverse Distance Cubed (ID3)
weighting. Two sets of wireframes and block models were employed:
one contemplated open pit mining and the other, underground mining.
A lower set of cut-off criteria were used for the open pit versus
the underground to reflect the lower costs that should be incurred
by mining from surface. To fulfil the resource criteria of
“reasonable prospects for eventual economic
extraction”, a preliminary pit shell was generated from the
open pit model. Blocks from the open pit model captured within this
shell were considered eligible for reporting as open pit resources.
The same pit shell was applied to the underground model, except
that blocks from this model were included in the resource only if
they were outside of the shell.
Mineral Reserves
There
are no mineral reserves on the Committee Bay Project.
Adjacent Properties
The
Committee Bay Project is contiguous with claims held by various
companies and individuals. None of the adjacent claims are known to
host mineralized zones comparable to the Three Bluffs deposit. No
reliance was placed on any information from adjacent properties in
the estimation and preparation of the Mineral Resources reported in
the Amended 2017 Committee Bay Technical Report. Adjacent
properties are therefore not deemed material.
Conclusions
The
Committee Bay Project is located within the granite-greenstone
rocks of the Archean Prince Albert group, a component of the Rae
Domain within the Western Churchill Province. The Three Bluffs gold
deposit is characterized by a thick interval of iron formation that
appears to form the nose of an upright isoclinal antiform. The
majority of the gold mineralization is hosted in silicate, oxide,
and/or sulphide facies iron formation. Gold mineralization has also
been identified in shear hosted quartz veins in sedimentary and
volcanic rocks.
Drilling
has outlined mineralization with three-dimensional continuity, and
size and grades that can potentially be extracted economically.
Project geologists have a good understanding of the regional,
local, and deposit geology and controls on mineralization. The
geological models are reasonable and plausible interpretations of
the drill results.
Exploration
protocols for drilling, sampling, analysis, security, and database
management meet industry standard practices. The drill hole
database was verified by RPA and is suitable for Mineral Resource
estimation work.
The
previous resource model prepared by RPA in April 2013 remains
representative of the mineralization. There has been no new
drilling in the immediate area of those resources. The cut-off
grades were adjusted based on an updated metal price, exchange
rate, and operating cost assumptions and the updated Mineral
Resource was assigned a new effective date of May 31,
2017.
Mineral
Resources for the Three Bluffs deposit were estimated assuming
combined open pit and underground mining methods. At cut-off grades
of 3.0 g/t Au for open pit and 4.0 g/t Au for underground,
Indicated Mineral Resources are estimated to total 2.07 Mt at an
average grade of 7.85 g/t Au containing 524,000 ounces gold. At the
same cut-off grades, Inferred Mineral Resources are estimated to
total 2.93 Mt at an average grade of 7.64 g/t Au containing 720,000
ounces gold. The open pit Mineral Resources were constrained by a
preliminary pit shell generated in Whittle software. Underground
Mineral Resources are reported at the high cut-off grade outside of
the pit shell.
27
The
limited metallurgical testwork conducted so far suggests that the
gold can be recovered by conventional means, such as a combination
of gravity and flotation followed by cyanide leaching of the
concentrate. In RPA’s opinion, however, additional
metallurgical testwork is warranted.
The
Committee Bay Project covers virtually all of the Committee Bay
supracrustal belt which hosts a regionally significant and highly
prospective corridor for gold. Previous exploration on the
Committee Bay Project did not effectively screen the large property
holdings. Auryn’s exploration strategy is both successful and
cost effective. Auryn’s work in 2015 and 2016, which covered
approximately 85% of the current property holdings, was able to
highlight 17 significant gold in till anomalies, several of which
are located away from any previously known gold occurrences. There
is good potential to discover additional mineralization and to add
to the resource base on the property.
Recommendations
RPA has
reviewed and concurs with Auryn’s proposed exploration
programs and budgets. Phase 1 of the recommended work program will
include a desktop review of the 2015 and 2016 exploration results
in an effort to define the most effective exploration program to
determine the source of the recently identified 17 gold in till
anomalies. The field portion of Phase 1 will consist of boulder
mapping, detailed infill till sampling, and ground magnetics to
identify the highest probability targets which will be immediately
drill tested. In addition to the target follow-up, Phase 1
exploration should include the completion of the regional till
sampling and drone programs over the remaining 15% of the
CBGB.
The
Phase 1 program is anticipated to include collection of 17,000
detailed infill till samples and 2,350 regional till samples and
completion of 1,200 km2 of drone coverage and 25,000 m of RAB
drilling. The Phase 1 program is estimated to cost approximately
$20 million. Details of the recommended Phase I program can be
found in Table 1
below.
Table 1 – Proposed Budget – Phase 1
Auryn Resources Inc. – Committee Bay
Project
|
Item
|
$
|
|
PHASE
1
|
|
|
Head Office
Expenses
|
228,000
|
|
Project
Management/Staff Cost
|
2,462,000
|
|
Expense
Account/Staff Travel
|
1,771,000
|
|
Lease
Payments
|
157,000
|
|
Till
Sampling
|
685,000
|
|
Ground
Magnetics
|
200,000
|
|
Drone
Surveying
|
93,000
|
|
RAB
Drilling
|
4,863,000
|
|
Assaying/Analyses
|
1,084,000
|
|
Camp
Costs
|
650,000
|
|
Air
Support
|
5,936,000
|
|
Subtotal
|
18,129,000
|
|
Contingency
|
1,813,000
|
|
TOTAL
|
19,942,000
|
A Phase
2 exploration program, contingent on the results of Phase 1, will
mainly consist of drilling. Initially, all of the Three Bluffs
drill core should be re-logged so that controls on mineralization
can be better understood. Following that, 5,000 m to 10,000 m of
exploration diamond drilling is proposed at Three Bluffs to test
for the continuity of high grade mineralization at depth and along
strike from the current deposit. In addition to the focused work at
Three Bluffs, it is recommended that any significant RAB drill
intersections from the Phase 1 program be followed up with
additional RAB drilling and focused diamond drilling. It is also
anticipated that additional targets will be identified during the
completion of the regional program and these will have to be
targeted using a systematic approach, which includes boulder
mapping, detailed infill till sampling, and ground
magnetics.
28
The
Phase 2 exploration program is anticipated to include the
completion of both diamond and RAB drilling, along with the
collection of surface samples. The recommended Phase 2 program is
estimated to cost between $20 million and $25 million. Details of
the recommended Phase 2 program can be found in Table 2 below.
Table 2 – Proposed Budget – Phase 2
Auryn Resources Inc. – Committee Bay
Project
|
Item
|
$
|
|
PHASE
2
|
|
|
Head Office
Expenses
|
250,000
|
|
Project
Management/Staff Cost
|
2,500,000
|
|
Expense
Account/Staff Travel
|
1,800,000
|
|
Lease
Payments
|
157,000
|
|
Till
Sampling
|
500,000
|
|
RAB
Drilling
|
2,000,000
|
|
Diamond
Drilling
|
6,000,000
|
|
Assaying/Analyses
|
1,000,000
|
|
Resource Estimate
Update
|
65,000
|
|
Metallurgical Test
Work
|
100,000
|
|
Air
Support
|
6,000,000
|
|
Camp
Costs
|
700,000
|
|
Subtotal
|
21,172,000
|
|
Contingency
|
2,117,000
|
|
TOTAL
|
23,289,000
|
Since
the publication of the Amended 2017 Committee Bay Technical Report,
the Company has expended approximately $29 million on exploration
costs under these recommendations (as discussed above). This work
included an extensive regional and infill till geochemical
campaign, an aerial imagery drone survey and over 40,000 meters of
drilling discussed above. The Company views that the results from
this exploration further support conclusions drawn in the Amended
2017 Committee Bay Technical Report and do not represent a material
change to Committee Bay. The Company intends to continue its
exploration in accordance with these recommendations with the
continued testing of regional drill targets with the RAB drill and
expansion drilling at the Three Bluffs deposit.
HOMESTAKE RIDGE PROJECT
Technical Report
On
October 12, 2017, the Company filed a technical report entitled
“Technical Report on the Homestake Ridge Project, Skeena
Mining Division, Northwestern British Columbia” dated
September 29, 2017 with an effective date of September 1, 2017 (the
“Original 2017 Homestake
Ridge Technical Report”) with respect to the Homestake
Ridge Project located in the Skeena Mining Division, northwestern
British Columbia, Canada. On November 3, 2017, the Company filed an
amended and restated technical report with respect to its Homestake
Ridge Project entitled “Technical Report on the Homestake
Ridge Project, Skeena Mining Division, Northwestern British
Columbia” dated October 23, 2017 with an effective date of
September 1, 2017 prepared by David A. Ross, M.Sc., P.Geo. and Paul
Chamois, M.Sc.(A), P.Geo. of RPA (the “Amended 2017 Homestake Ridge Technical
Report”). The Amended 2017 Homestake Ridge Technical
Report amended Section 6 of the Original 2017 Homestake Ridge
Technical Report in order to clarify that (i) certain resources
originally referred to as “Historical Estimates” had
been reported in prior NI 43-101 technical reports, and accordingly
were not “Historical Estimates” within the meaning of
NI 43-101, and (ii) to remove reference to the previous historical
2013 resource estimate remaining current, given that the Original
2017 Homestake Ridge Technical Report and the Amended 2017
Homestake Ridge Technical Report provided an updated resource
estimate with an effective date of September 1, 2017.
29
The
purpose of the Original 2017 Homestake Ridge Technical Report and
Amended 2017 Homestake Ridge Technical Report was to support the
disclosure of an updated Mineral Resource estimate. RPA visited the
property from August 26 to 28, 2017. The effective date of the
updated Mineral Resource estimate is September 1,
2017.
The
following information on the Homestake Ridge Project is a summary
of both the Amended 2017 Homestake Ridge Technical Report and the
Company’s exploration completed in the 2017 and 2018
exploration seasons since the report’s publication. The
summary of the Amended 2017 Homestake Ridge Technical Report is
qualified by reference to the Amended 2017 Homestake Ridge
Technical Report in its entirety. Readers are encouraged to review
the Amended 2017 Homestake Ridge Technical Report on SEDAR under
the Company’s profile at www.sedar.com.
Project Description and Location
The
Homestake Ridge Project covers 7,547.15 ha and is located
approximately 32 km southeast of Stewart, British Columbia, and
approximately 32 km north-northwest of the tidewater communities of
Alice Arm and Kitsault, BC. The property is located within NTS
1:50,000 scale topographic map 102/P13. It is centred at
approximately 55° 45' 12.6" N latitude and 129° 34' 39.8"
W longitude on Terrain Resource Integrated Management (TRIM) maps
103P072 and 103P073 and lies within Zone 9 of the UTM projection
using the NAD83 datum.
Land Tenure
The
Homestake Ridge Project comprises four non-contiguous blocks
consisting of seven crown grants and 36 mineral claims covering a
total area of 7,547.15 ha in the Skeena Mining Division. The crown
grants include surface rights, while the mineral claims do not
include surface rights.
On June
14, 2016, Auryn announced that it had entered into a binding letter
agreement whereby it would acquire all the issued and outstanding
common shares of Homestake Resource Corporation. On September 8,
2016, Auryn announced that it had completed a plan of arrangement
and that Homestake had become a wholly-owned subsidiary of Auryn.
Homestake holds a 100% interest in the Homestake Ridge Project,
subject to various royalty interests on certain claims held by
vendors, with some claims requiring annual royalty
payments.
Accessibility
The
Homestake Ridge Project is located 32 km southeast of Stewart, BC,
at the southern extent of the Cambria ice field. Access to the
Homestake Ridge Project from the town of Kitsault is by boat/barge
to the community of Alice Arm. From there, an upgraded tractor
trail follows an old railway bed for a distance of 32 km into the
area of the past producing Dolly Varden silver mine, approximately
four kilometres from the southern boundary of the Homestake Ridge
Project. From there, overgrown mule trails lead to the historic
workings of the Vanguard and Homestake areas of the Homestake Ridge
Project. Helicopters are available for charter from either Prince
Rupert, Terrace, or Stewart.
Climate
Climate
in the area is classified as Oceanic or Marine West Coast and is
characterized by moderately cool summers and mild winters with a
narrower annual range of temperatures compared to sites of similar
latitude. Climate data derived from the closest monitoring station
(Nass Camp) indicates that temperatures range from an average low
of -6.6°C in January to an average high of 21.6°C in
July. The mean temperature for the year is 5.3°C.
The
area receives 1,065 mm of precipitation each year (expressed in mm
of water). Rainfall peaks in October with 165 mm. Snowfall is
highest in December and January when accumulations are 92 cm and 91
cm respectively. The property is reported to be covered in snow
from late September to late June. Precipitation and heavy fog often
impact airborne access to the Homestake Ridge Project.
30
Local Resources
The
Homestake Ridge Project is located north of the historic mining
towns of Kitsault and Alice Arm. Both towns are located at Alice
Arm, a branch of the Observatory Inlet and part of the Portland
inlet system which hosts Canada’s most northerly, ice-free,
deep sea port at Stewart.
Sprott
Power Corp. (Sprott Power) initiated development of six
hydroelectric projects in the Upper Kitsault Valley. To facilitate
the construction, roads and bridges are being upgraded in that
area. Sprott Power is also redeveloping shutdown hydroelectric
utilities in the area including the Kitsault dam and powerhouse.
The Government of British Columbia has announced the resurfacing of
18 km of Highway 113, which will improve access to Kitsault from
Terrace.
Labour
and supplies for the Homestake Ridge Project can be brought in from
Terrace, which lies 185 km to the south, along Highway 113. Terrace
has a population of 12,109 (2001 census) and hosts wide range of
supplies, services, and trained labour. Terrace is serviced by
three air carriers with daily scheduled flights.
Existing Infrastructure
There
is no permanent infrastructure at the Homestake Ridge Project. A
temporary camp capable of housing 40 people was established at
55°44.406’ N and 129°35.128’ W for the
duration of the 2017 exploration program.
History
The
Homestake Ridge Project comprises two areas of historic
exploration. The Homestake and the Vanguard groups have been tested
by past explorers starting in the early 1900s after the discoveries
at Anyox and in the Stewart region. Claims were first staked at the
Homestake group between 1914 and 1917. In 1925, the original claims
were given “Crown Grant” status.
In
1939, the property was optioned by British Lion Mines Ltd. British
Lion Mines Ltd. conducted extensive trenching and excavated two
(Smith and Myberg) adits, shipping eight tonnes of selected ore
that returned 1,120 g Au, 1,617 g Ag, 63.5 kg Pb, 303 kg Zn and 599
kg Cu from the Homestake group of claims. This is the only known
production from the property.
In
1947, a cross-cut adit was begun on the Nero claim (operator
unknown) that formed part of the Vanguard group. Work continued
until the early 1950s when the claims were abandoned.
In
1964, Dwight Collison of Alice Arm staked the area, conducted
surface trenching, limited underground work, and drilled seven
holes for an aggregate of 58.2 m, on the Lucky Strike and Cascade
claims which make up part of the Homestake group. In 1966, Canex
Aerial Exploration Ltd. undertook an exploration program and in
1967, Amax Exploration conducted and extended examination of the
Vanguard group.
In
1979, Newmont Exploration of Canada Ltd. optioned part of the
property, which excluded the original Homestake and Vanguard claims
and targeted near surface massive sulphides. Newmont Exploration of
Canada Ltd. terminated the option in late 1980. Caulfield Resources
Ltd. explored the Vanguard group in 1981, but no subsequent work
was done.
Homeridge
Resources Ltd. optioned the property in 1984, but no work was done.
The claims were allowed to lapse in 1986, were re-staked and
optioned to Cambria Resources Ltd., which completed geological
mapping, lithogeochemical sampling, trenching and 4.3 line km of IP
and resistivity surveys.
The
ground was optioned to Noranda Exploration Company Limited. Between
1989 and 1991, Noranda Exploration Company Limited consolidated
ground by optioning more area including the Cambria, Homestake, and
Vanguard claims. Geological mapping and geophysical surveys were
conducted and twelve diamond drill holes were cored for a total of
1,450.05 m.
31
Teck
Resources Limited acquired the current Homestake Ridge property in
2000 via option agreements and staking. From 2000 to 2002, Teck
Resources Limited conducted geochemical and geological surveys,
trenching, and drilling for volcanogenic massive sulphide (VMS)
deposits.
Homestake
(formally Bravo Venture Group) optioned the property from Teck
Resources Limited in 2003. Homestake’s work, prior to 2009,
consisted of the compilation of historic data, the performance of
geochemical and geophysical surveys, geological mapping, and the
drilling of 27,289 m in 120 NQ2 and BTW diamond drill holes. In
2007, Homestake released a NI 43-101 compliant Mineral Resource
estimate at a 0.5 g/t AuEq cut-off grade which totalled 11.9 Mt in
the Inferred category grading 2.36 g/t Au, 15.0 g/t Ag, and 0.11%
Cu.
From
2008 to 2009, Homestake resumed diamond drilling and was successful
in confirming the known mineralized zones as well as discovering
the Homestake Silver Zone located approximately 700 m to the
southeast of the Main Homestake deposit.
In
2010, Scott Wilson RPA prepared an updated NI 43-101 compliant
Mineral Resource estimate for the Homestake Ridge Project at a 3
g/t AuEq cut-off grade which totalled 888,000 t in the indicated
category grading 6.69 g/t Au, 47.2 g/t Ag and 0.15% Cu and 2.34 Mt
in the inferred category grading 4.62 g/t Au, 106 g/t Ag and 0.13%
Cu.
From
2010 to 2012, Homestake completed additional surface exploration
including further mapping, soil and rock sampling, 13.54 line km of
IP surveying, and diamond drilling resulting in the identification
of new exploration targets and the significant expansion of Mineral
Resources estimate on the Homestake Ridge Project.
In
April of 2011, Homestake announced the results of an updated
Mineral Resource estimate at the Homestake Silver Zone by RPA,
which resulted in a significant increase in the inferred resources
of the previous estimate. The reported resource at a 3.0 g/t AuEq
cut-off grade totalled 888,000 t in the indicated category grading
6.69 g/t Au, 47.2 g/t Ag and 4.1 Mt in the inferred category
grading 4.62 g/t Au, 103 g/t Ag.
In 2011
a new discovery was made 800 m to the southwest of, and parallel
to, the Main Homestake and Homestake Silver deposits. This area,
known as the South Reef target was tested by three holes with all
three intersecting +30 g/t Au mineralization.
During
2012, Homestake completed two phases of drilling focused on the
delineation and extension of the South Reef target. The second
phase of drilling was funded by Agnico Eagle Mines Limited as part
of an option agreement (see below). The 2012 drilling was
successful in identifying an approximate 250 m strike by 250 m down
dip before ending in, or being offset by, a major fault structure.
Mineralization is open along the strike to the northwest. Other
targets remain on the property.
Agnico
Eagle Mines Limited optioned the property from Homestake in 2012.
From 2013 to 2014, Agnico Eagle Mines Limited completed exploration
consisting of prospecting, reconnaissance geological mapping, soil
sampling, a limited amount of ground geophysical (magnetics and IP)
surveying and diamond drilling consisting of 16 holes totalling
approximately 6,525 m. The drilling suggested that the Slide Zone
is concordant with the Homestake Main and Homestake Silver zones
and trends north northwesterly and dips steeply to the northeast.
The option was subsequently terminated.
Past Production
In
1939, British Lion Mines Ltd. shipped eight tonnes of selected ore
that returned 1,120 g Au, 1,617 g Ag, 63.5 kg Pb, 303 kg Zn, and
599 kg Cu from the Homestake group of claims. This is the only
known production from the Homestake Ridge Project.
32
Geology and Mineralization
The
Homestake Ridge Project is located within a lobe of Upper Triassic
to Middle Jurassic strata exposed along the western edge of the
Bowser Basin within the Stikinia Terrane of the Intermontane Belt.
Stikinia formed in the Pacific Ocean during Carboniferous to Early
Jurassic (320 Ma to 190 Ma) and collided with North America during
the Middle Jurassic.
The
Homestake Ridge Project occurs within the metallogenic region known
as the Stewart Complex. Described as the contact of the eastern
Coast Plutonic Complex with the west-central margin of the
successor Bowser Basin, the Stewart Complex ranges from Middle
Triassic to Quaternary in age and is comprised of sedimentary,
volcanic and metamorphic rocks.
The
Homestake Ridge Project covers the transition between the
sedimentary and volcanic rocks of the Upper Triassic to Lower
Jurassic Stuhini Group, a complex sequence of Lower to Middle
Jurassic sedimentary, volcanic and intrusive rocks of the Hazelton
Group and sedimentary rocks of the Upper to Middle Jurassic Bowser
Lake Group.
The
Lower Hazelton rocks comprise fine-grained to feldspar-hornblende
phyric volcanic and volcaniclastic rocks of andesite to
latite/trachyte composition and may include some phases of
hypabyssal monzonite. This lower stratigraphy of the Hazelton Group
extends along the length of the Homestake Ridge from the Main
Homestake Zone to the Vanguard Copper showings and is the host rock
and footwall sequences to the three known mineral deposits, the
Main Homestake, Homestake Silver and South Reef zones as well as
numerous other showings.
The
cessation of Hazelton volcanism and continued sub-basin development
resulted in a rapid facies changes into calcareous sandstones,
grits, and conglomerates progressing upwards to thinly laminated
and alternating beds of black graphitic and pyritic mudstones and
light grey siltstones or very fine-grained sandstones (possible
“pyjama beds”) correlated to the Salmon River
formation.
In the
northern part of the property at the headwaters of Homestake Creek,
rhyolitic volcanic rocks occur at the base of the Salmon River
sediments.
The
eastern part of the property is dominated by the Middle to Upper
Jurassic Bowser Basin Group which conformably overlies the thin
bedded graphitic argillites of the Salmon River
formation.
Structure
on the property largely reflects northeast-southwest compression
that has continued from the Jurassic to present day. Recent
drilling and mapping suggest that the local stratigraphy has
undergone several deformation events including uplift and local
extension of the Stuhini and lower Hazelton stratigraphy. Large
northeast trending ankerite bearing faults have been mapped and
related to Tertiary east-west extension.
Exploration Status
2017
Exploration
During
2017, Auryn completed a limited amount of induced polarization
surveying, a soil sampling program and a 15,000 meter diamond drill
program. On December 12, 2017, the Company announced the results of
its 15,000-meter core drilling program at the Homestake Ridge
Project. The program targeted 2 of 7 target areas identified away
from the existing deposits and was successful in identifying the
plunge of the high-grade South Reef zone. Highlights include 30
meters of 2.00 g/t Au (including 4m @ 6.03g/t Au & 2m @ 11.80
g/t Au), 10 meters of 4.12 (including 2m @ 18.01 g/t Au), 18m of
1.29g/t Au (including 4m of 4.18g/t Au), 8m of 2.67 g/t Au
(including 2m of 7.4 g/t), and 14m of 1.23g/t Au. These results
identified the geometry of the high-grade mineralization at the
South Reef main zone that remains open to the northwest and
importantly have identified an emerging parallel high-grade
structure (Upper zone) 175 meters to the north of the main zone.
These results do not have a material impact on the Homestake Ridge
Resource statement presented in Table 3.
33
2018
Exploration
During
2018, Auryn completed a 2,500 meter diamond drill program along
strike from the South Reef deposit. Narrow zones of gold
mineralization were encountered in several holes but the results
were not deemed significant.
2019
Exploration
During
2019, the Company completed a 558 ln-km Versatile Time Domain
(“VTEM”)
magnetic and electromagnetic survey flown by Geotech Airborne
Geophysical Surveys. The survey was flown over two distinct blocks
covering the newly identified Bria target area as well as the
southern KN HSR 1 mineral claim.
The
remainder of the 2019 exploration program at the Homestake Ridge
Project was focused on the newly identified Kombi and Bria targets.
Field work comprised detailed soil and rock chip sampling. Results
from the 2019 sampling program are currently being interpreted by
the technical team to derive targets for further follow up
programs.
Homestake Ridge Drilling QA/QC Disclosure
Intercepts
were calculated using a minimum of a 0.2 g/t Au cut off at
beginning and end of the intercept and allowing for no more than
four consecutive meters of less than 0.2 g/t Au.
Analytical
samples were taken by cutting NQ diameter core into equal halves on
site and sending one of the halves to ALS Laboratories in Terrace,
BC, Vancouver, BC or Thunder Bay, ON for preparation and analysis.
All samples are assayed using 30g nominal weight fire assay with
atomic absorption finish (Au-AA23) and multi-element four acid
digest ICP-AES/ICP-MS method (ME-MS61). Where AA23 results were
> 5 g/t Au the assays were repeated with 30g nominal weight fire
assay with gravimetric finish (Au-GRA21). QA/QC programs using
internal standard samples, field and lab duplicates and blanks
indicate good accuracy and precision in a large majority of
standards assayed.
Mineral Resources
The
current Mineral Resource estimate for the Homestake Ridge Project
is summarized in Table 3
below.
Table 3 - Mineral Resource Statement as at September 1,
2017
Auryn Resources Inc. – Homestake Ridge Project
|
Classification
|
Tonnage
|
Gold
|
Gold
|
Silver
|
Silver
|
Copper
|
Copper
|
|
|
(Mt)
|
(g/t)
|
(oz)
|
(g/t)
|
(Moz)
|
(%)
|
(Mlb)
|
|
Indicated
|
0.624
|
6.25
|
125,000
|
47.9
|
1.0
|
0.18
|
2.4
|
|
Inferred
|
7.245
|
4.00
|
932,000
|
90.9
|
21.2
|
0.11
|
16.9
|
Notes:
1.
CIM Standards were
followed for Mineral Resources.
2.
Mineral Resources
are estimated at a cut-off grade of 2.0 g/t AuEq.
3.
Assumptions used to
calculate AuEq values are described in the Amended 2017 Homestake
Ridge Technical Report.
4.
Mineral Resources
are estimated using a long-term gold price of US$1,300 per ounce,
and a US$/C$ exchange rate of 1.2.
5.
A minimum
horizontal width of two metres was used.
6.
Bulk density ranges
from 2.66 t/m3 to 2.85 t/m3 depending on the domain.
34
RPA
updated the Mineral Resource estimate for the Homestake Ridge
Project at a cut-off grade of 2 g/t (AuEq). Grades for gold,
silver, copper, arsenic and antimony were estimated into the blocks
using ID3 weighting. Three block models, one for each of the three
main deposit zones, were created in 2013 using GEMS software. Block
size for all models was 5 m x 5 m x 5 m. The wireframe models were
constructed in Surpac by Homestake personnel working in
consultation with RPA. The assay data comprised drilling and trench
sampling results from programs conducted by Homestake.
The
main areas of the deposit are the Homestake Main Zone, the
Homestake Silver Zone, and the South Reef Zone. The Homestake Main
Zone is the more copper-rich of the zones, with both gold-rich and
silver-rich variants and an apparent trend of increasing copper
grade with depth. The Homestake Main Zone consists of a broad
corridor of sub-parallel anastomosing zones which strike
approximately 137° and dip steeply to moderately to the
northeast. Most of the zones dip at 75° to 80°,
flattening to 45° in the central section between elevations
750 MASL and 900 MASL. Widths range from centimetre-scale to four
metres in true thickness. Locally, the zones are observed to jog
abruptly in a left-lateral sense which is attributed to
cross-faulting. These disruptions can be 30 m or more. The
Homestake Main Zone has been traced on surface and in drill
intercepts for a strike length of 750 m, and a vertical extent of
approximately 500 m.
Mineral Reserves
There
are no Mineral Reserves at the Homestake Ridge
Project.
Adjacent Properties
The
Homestake Ridge Project is contiguous with claims held by a number
of companies and individuals:
●
Dolly Varden Resources - located
approximately 25 km north of Alice Arm, the Dolly Varden property
comprises 9,374 ha and includes two former producing silver mines -
the Dolly Varden Mine and the Torbrit Mine. The property is owned
by Dolly Varden Silver Corporation, which holds surface rights over
some of these mineral claims. The Dolly Varden property adjoins the
southern boundary of the property and is underlain by similar a
volcano-sedimentary stratigraphy belonging mostly to the lower and
middle Jurassic Hazelton Group.
●
Kinskuch Property - Homestake optioned
the claim group in March 2011. Homestake could earn an 85% interest
by making advanced minimum royalty payments totaling $580,000 and
spending $3,000,000 in work on the property over a four-year
period. The remaining 15% interest could be purchased from the
optionor for $2,000,000 and granting a 2% net smelter return
(“NSR”) royalty,
of which 1% may be purchased for $1,000,000. The vendors are an
independent group that staked and previously explored the claims.
Subsequently, Homestake let this option lapse and no longer has an
interest in the property.
●
Avanti Mining Inc. - Located at the head
of Alice Arm, the property is the host of the rehabilitated
Kitsault open pit mine. The property is 100% owned by Avanti
Kitsault Mine Ltd., a wholly owned subsidiary of Avanti Mining Inc.
A 1% NSR is held by Aluminerie Lauralco Inc. which may be purchased
for US$10 million within 90 days of the presentation of a bankable
feasibility study.
Conclusions
The
Homestake Ridge Project is located within the prolific
Iskut-Stewart-Kitsault Belt which hosts several precious and base
metal mineral deposits. Diverse mineralization styles include
stratabound sulphide zones, stratabound silica-rich zones, sulphide
veins, and disseminated or stockwork sulphides. Mineralization is
related to Early Jurassic feldspar-hornblende-phyric sub-volcanic
intrusions and felsic volcanism and commonly occurs with zones of
pyrite-sericite alteration. Numerous genetic models can be proposed
for the area and local deposits present a broad range of
characteristics.
35
Drilling
has outlined mineralization with three-dimensional continuity, and
size and grades that can potentially be extracted economically.
Project geologists have a good understanding of the regional,
local, and deposit geology and controls on mineralization. The
geological models are reasonable and plausible interpretations of
the drill results. Exploration protocols for drilling, sampling,
analysis, security, and database management meet industry standard
practices. The drill hole database was verified by RPA and is
suitable for Mineral Resource estimation work.
RPA
updated the Mineral Resource estimate for the Homestake Ridge
Project using the block model dated December 31, 2012 and an AuEq
cut-off grade based on adjusted metal price, exchange rate and
operating cost assumptions. No new drilling information has been
received within the resource area and therefore a new effective
date of September 1, 2017 was assigned to the Mineral Resource
estimate. Data from the drilling being carried out in the late
summer and fall of 2017 is expected to be received in October or
November of 2017, and the Mineral Resource model and statement will
be updated.
Mineral
Resources were estimated considering a potential underground mining
scenario. At a cut-off grade of 2 g/t AuEq, Indicated Mineral
Resources were estimated to total 0.624 Mt at average grades of
6.25 g/t Au, 47.9 g/t Ag, and 0.18% Cu. At the same cut-off grade,
Inferred Mineral Resources were estimated to total 7.245 Mt at
average grades of 4.00 g/t Au, 90.9 g/t Ag, and 0.11% Cu. There are
no Mineral Reserves estimated on the Homestake Ridge
Project.
The
wireframe models of the mineralization have done a reasonably good
job of segregating the various zones (domains) within the deposit.
The sample statistics show that there are still multiple
populations within some of the domains. In RPA’s opinion,
this may be due to higher grade zones within the relatively lower
grade wireframes. Additional interpretive work may be able to
segregate these higher grade domains, which would result in more
robust grade interpolations.
Results
from metallurgical test work suggest that the expected recoveries
from a combined gravity/flotation processing plant would be: 85% to
93% for gold; 75% to 88% for silver; 85% to 90% for
copper.
Recommendations
Exploration
work carried out at the Homestake Ridge Project by previous
operators and Auryn has identified significant gold, silver and
base metal mineralization. Previous operators focused on
stratabound mineralization models similar to that of Eskay Creek.
Homestake highlighted several key structures that appear to be the
main control on mineralization throughout the property. Work
expanded the previously known mineralization in addition to
identifying previously unknown mineralization corridors within the
Homestake Ridge Project boundaries. Following up on these
structures and structural corridors is highly recommended. A two
phase multi-year program is recommended to complete additional
exploration and resource definition drilling followed by a
preliminary economic assessment.
RPA has
reviewed and concurs with Auryn’s proposed exploration
programs and budgets. Phase 1 of the recommended work program will
build on the results of the 2017 exploration program by expanding
and infilling both newly discovered zones of mineralization as well
as known deposits with the aim of completing an updated mineral
resource estimate. To complete Phase 1, it is recommended that a
20,000 m diamond drilling program be completed. Details of the
recommended Phase I program can be found in Table 4 below.
36
Table 4 - Proposed Budget – Phase 1
Auryn Resources Inc. – Homestake Ridge Project
|
Item
|
$
|
|
PHASE
1
|
|
|
Head Office
Expenses and Property Holding Costs
|
500,000
|
|
Geologic and
Support Staff Cost
|
2,000,000
|
|
Geophysical and
Drone Surveys
|
250,000
|
|
Surface Sampling
and XRF
|
500,000
|
|
Diamond
Drilling
|
7,500,000
|
|
Assaying/Analyses
|
1,125,000
|
|
Camp
Costs
|
650,000
|
|
Helicopter
Support
|
2,500,000
|
|
Engineering and
Baseline Studies
|
500,000
|
|
Subtotal
|
15,525,000
|
|
Contingency
|
1,552,500
|
|
TOTAL
|
17,077,500
|
A Phase
2 exploration program, contingent on the results of Phase 1, will
also be diamond drill focused with the goal of determining the
extent of mineralization around the existing deposits and
increasing the confidence level in certain areas of the resource by
way of additional in-fill drilling. The goal of the Phase 2
drilling would be to bring the resource to the point that it could
support the preparation of a preliminary economic assessment in
2019. In addition to the resource targeted drilling, it is
recommended that satellite mineralized zones be investigated to
determine their significance as the Homestake Ridge Project
advances. It is recommended that the Phase 2 program consist of
20,000 m of drilling in addition to environmental, engineering and
metallurgical studies as required to support a preliminary economic
assessment. Details of the recommended Phase 2 program can be found
in Table 5
below:
Table 5 - Proposed Budget – Phase 2
Auryn Resources Inc. – Homestake Ridge Project
|
Item
|
$
|
|
PHASE
2
|
|
|
Head Office
Expenses and Property Holding Costs
|
750,000
|
|
Geologic Staff and
Support Staff Cost
|
3,000,000
|
|
Geophysical and
Drone Surveys
|
250,000
|
|
Surface Sampling
and XRF
|
350,000
|
|
Diamond
Drilling
|
7,500,000
|
|
Assaying/Analyses
|
1,125,000
|
|
Engineering and
Baseline Studies
|
1,500,000
|
|
Helicopter
Support
|
2,500,000
|
|
Camp
Costs
|
750,000
|
|
Subtotal
|
17,725,000
|
|
Contingency
|
1,772,500
|
|
TOTAL
|
19,497,500
|
37
Since
the publication of the Amended 2017 Homestake Ridge Technical
Report, the Company has expended approximately $10 million on
exploration under these recommendations. This work has included a
limited geochemical survey, approximately 16,000 meter of drilling
(discussed in the above Exploration section) as well as the VTEM
magnetic and electromagnetic survey flown in 2019. The Company
views that the results from this exploration further support
conclusions drawn in the Amended 2017 Homestake Ridge Technical
Report and do not represent a material change to Homestake Ridge
Project. The Company intends to continue its exploration of the
project through further drilling of both the satellite targets
which includes South Reef as well as further exploration drilling
at the Homestake Main and Silver deposits.
The
Company is currently in the process of preparing a NI 43-101
compliant preliminary economic assessment, which is expected to
include an updated Mineral Resource estimate. The Company
anticipates that the updated Mineral Resource estimate will not
differ materially from current Mineral Resource estimate summarized
in Table 3
above.
PERUVIAN EXPLORATION PORTFOLIO – SOMBRERO
PROJECT
Technical Report
On
March 14, 2019, the Company filed a technical report entitled
“Technical Report on the Sombrero Project, Ayacucho
Department, Peru” dated effective March 1, 2019 (the
“Sombrero Technical
Report”) with respect to the Sombrero Project located
in the Ayacucho Department, Peru prepared by Andrew J. Turner,
B.Sc., P. Geol. of APEX Geoscience Ltd (“APEX”).
The
following information on the Sombrero Project is a summary of the
Sombrero Technical Report. Readers are encouraged to review the
Sombrero Technical Report filed on SEDAR under the Company’s
profile at www.sedar.com.
Project Description, Location and Mineral Tenure
The
Sombrero Project is located in southern Peru approximately 350 km
southeast of Lima and 80 km south-southwest of the city of
Ayacucho, the capital of the Ayacucho Department. The Sombrero
Project straddles the districts of Sancos and Santiago de
Lucanamarca and the Provinces of Huanca Sancos and Victor Fajardo.
The approximate centre of the property is located at UTM
coordinates 566,500 E, 8,478,500 N, (WGS 84 zone 18S), or latitude
13.762° S, longitude 74.385° W.
The
Property comprises a total of 84 mineral concessions in 2 blocks.
Of these concessions, 70 (or approximately 83% of the concession
area) have had their title granted to their registered owner while
the remaining 14 concessions (approximately 17% of the concession
area) remain “in application”. Auryn is not aware of
any reason that would prevent the granting of the concessions
‘in application’ as their respective areas were
“open” (unclaimed) at the time of their
application.
There
are six (6) small gaps, or holes, within the main area of the
Sombrero Project that correspond to pre-existing competitor’s
claims (see Figure 2). As a
result, the net size of the Sombrero Project is approximately
65,494.7 ha.
38
Figure 2 - Sombrero Project Mining Concessions
Property
Ownership
The
Sombrero Project is held by Sombrero Minerales either through
direct ownership of the mineral concessions or through option
agreements with third parties (see Table 6).
Table 6 - Sombrero Project Mineral Concessions Summary (as of March
1, 2019)
|
OWNERSHIP DESCRIPTION
|
REGISTERED OWNER
|
NUMBER OF CLAIMS
|
HECTARES
|
|
DIRECT
|
SOMBRERO MINERALES SAC1
|
71
|
66,500
|
|
ALTURAS/ SOMBRERO OPTION
|
ALTURAS MINERALS SA
|
6
|
4,600
|
|
MOLLECRUZ OPTION
|
INGRID PRADO
|
4
|
1,300
|
|
ACEROS OPTION
|
ACEROS AREQUIPA SA
|
3
|
600
|
|
TOTAL
|
|
84
|
73,000
65,494.7
NET HA
|
1 Concession Sombrero 15 is registered under the
name of Corisur. Corisur has filed to have the concession
transferred to Sombrero. This filing is still in process at the
time of this report.
39
Subsequent
to the date of the Sombero Technical Report, the transfer of
concession Sombrero 15 from Corisur to Sombrero Minerales has been
completed and the Company has staked an additional 10 concessions
covering 8,700 hectares within the Sombrero Project
area.
The
Company’s district land package consists of 10 blocks
covering over 130,000 hectares and comprising 159 mineral
concessions. As of the date of this AIF, of the total concessions,
146 (or approximately 92% of the concession area) have had their
title granted to their registered owner while the remaining 13
concessions (approximately 8% of the concession area) remain
“in application”. Auryn is not aware of any reason that
would prevent the granting of the concessions ‘in
application’ as their respective areas were
“open” (unclaimed) at the time of their
application.
Original Alturas/ Sombrero Option
On June
28, 2016, Auryn entered into an option agreement (the
“Alturas Option
Agreement”) with respect to the Sombrero Project with
Alturas Minerals Corp. (“Alturas”) whereby Auryn was
granted the option to earn up to a 100% interest in the property.
Initially, Auryn has an option to earn an 80% interest in the
property by incurring US$2.1 million in exploration expenditures
within five years and making payments to Alturas totaling
US$200,000 within the first year of the agreement. When these
payments and work requirements are achieved by Auryn, an 80:20
joint venture will be formed with respect to further exploration
and development of the Sombrero Project with Alturas having a
carried interest for one year, during which time Auryn will have
the right to buy Alturas’ remaining 20% interest for US$5
million.
Mollecruz Option
On June
22, 2018, the Company acquired the rights to the Mollecruz
concessions covering 1,300 ha and the “Good Lucky”
prospect. Under the terms of an option agreement dated June 22,
2018, the Company may acquire a 100% interest in the Mollecruz
concessions by completing US$3,000,000 in work expenditures and by
making payments totaling US$1,600,000 to the underlying owner over
a five year period. At signing, Auryn paid US$50,000 and upon
exercise of the option, the underlying owner will retain 0.5% NSR
royalty with an advance annual royalty payment of US$50,000
commencing after completion of this option.
Aceros Option
On
December 13, 2018, Sombrero Minerales entered into a series of
agreements with Corporacion Aceros Arequipa S.A.
(“Aceros”) which
constitute an 80% option over three (3) key inlier concessions to
the Sombrero Project. Under the terms of these agreements, Sombrero
Minerales will initially option the concessions through a mining
assignment and lease agreement to ultimately earn a right to form
an 80:20 corporate joint venture after completing a series of cash
payments (US$800,000) and work commitments (US$5,150,000) over a 5
year period. The joint venture will encompass the Aceros
concessions and the Alturas/Sombrero option
concessions.
If the
option is exercised, Sombrero Minerales will hire an independent
engineer to complete two preliminary economic scoping studies over
a period of two years. These preliminary economic scoping studies
will be a study of the existing magnetite deposits and of any
identified non-ferrous (including Cu, Au, Ag, Mo) mineralization,
respectively. If it can be shown that the net present value
(“NPV”) of any
non-ferrous deposit located within the joint venture area is
greater than five times the NPV of the existing magnetite deposits
within the Aceros concessions then an 80:20 corporate joint venture
will be established using a newly-formed, jointly-owned Peruvian
corporation.
In the
event Sombrero Minerales is unable to show that the NPV of any
non-ferrous deposit is greater than five times the NPV of the
existing magnetite deposits, it can then attain an extension of up
to three years if an NPV of at least US$100 million was shown, and
Sombrero Minerales must pay Aceros an additional US$2 million for
each year of extension.
40
Formation
of the joint venture also requires that Sombrero Minerales first
exercise its existing option rights with Alturas to acquire a 100%
interest in the underlying concessions.
Once
the joint venture is established, it will be governed by a
shareholders’ agreement with specific provisions allowing for
the dilution of non-contributing parties and drag-along and first
refusal rights. In the event a non-contributing party’s
interest drops below 10% it shall convert into a 2%
NSR.
Accessibility, Climate, Local Resources, Infrastructure and
Physiography
Accessibility
The
property was accessed by the author during his site visit by
driving south from the city of Ayacucho, which is serviced daily by
commercial flights from Lima, amongst other cities. The town of
Huanca Sancos, located immediately adjacent to (east of) the main
area of interest at the Sombrero Project, was accessed by a 4 hour
drive on paved roads starting on Highway 3S from Ayacucho. Huanca
Sancos is currently being used by Auryn as their main base of
operations for the project as it offers food and basic supplies,
accommodations and a labour supply. The main Sombrero target area
is located approximately 10km west of Haunca Sancos and is
accessible via a number of gravel roads, which remain open
year-round.
Climate
Weather
in the area of the project is typical of high-altitude terrain at
this latitude, where annual temperature fluctuations are limited.
Daytime temperatures are typically cooler during the months of May
to September with a rainy season generally extending from November
to April. Temperatures vary between a few degrees centigrade (C)
below zero during the night, up to 20°C during the day in the
last months of the year. Snow is possible during the year but is
not a significant issue and would not interfere with exploration or
potential future mining activities.
Local Resources & Infrastructure
The
main area of interest, located in the southern portion of the
Sombrero Project, is located approximately 10km west-northwest of
the town of Huanca Sancos. As previously mentioned, Haunca Sancos
is the current base of operations for Auryn and offers basic
services including electricity, food markets, internet access and
accommodations. Local labour can be obtained from the villages of
Huanca Sancos or Santiago de Lucanamarca.
Physiography
The
project area expresses geographic features typical of the Altiplano
with high plateau areas with gently rolling hills cut occasionally
by relatively deeply incised, steep-walled river valleys. The
topographic relief on the Property is between ~2900m and 4700m,
with relief on the plateau areas generally more subdued ranging
between 3900m and 4100m.
Historical Exploration Completed by Previous Companies
Prior
to the date of the Alturas Option Agreement, Alturas completed
exploration work at the Sombrero Project between 2007 and 2008 that
comprised the following work items:
●
Geological mapping
(1:25,000 scale) and Rock Grab Sampling (total 96
samples);
●
Ground Magnetics
surveying (200m line spacing, covering the mapped
area);and
41
●
IP (Induced
Polarization) geophysical surveying (pole-dipole 3D
array).
In
addition, the Fierrazo iron skarn zone has seen historical and
recent iron ore production. The Fierrazo prospect is located within
the southern part of the Sombrero Project, approximately 3km to the
northeast of the Sombrero Main area. The Fierrazo prospect is
located on a ridge top within the older “Aceros HS 1”
concession and was mined recently by Aceros Arequipa. This activity
is evidenced by a number of shallow trenches and excavations and
waste rock piles. Magnetite ore was apparently the focus of the
recent small-scale production work and was trucked to Aceros
Arequipa’s smelter close to the coastal port of
Paracas.
Geological Setting
Geographically,
the Sombrero Project is located in the Andean Cordillera
(Cordillera Occidental) of south central Peru. The Sombrero Project
is located along a the Condoroma High which runs through the
central part of the Western Cordillera. The Andean Cordillera is
the result of three major orogenic cycles: Precambrian, Palaeozoic
to Early Triassic and Late Triassic to present. Although the two
earlier cycles were important as they set up the crustal
architecture of western south America, it is most recent (current)
orogenic event that has produced the most significant copper and
gold deposits found to date within the Peruvian
Cordillera.
The
Geology of the Sombrero Project includes;
●
Northwest-southeast
striking and shallow-dipping folded sequences of Jurassic to Middle
Cretaceous clastic and carbonate rocks. The oldest sedimentary
sequences correspond to the middle-late Jurassic Yura Group, which
is overlain unconformably by the middle Cretaceous Ferrobamba
Formation (Fm.). Lower Cretaceous units of the Yura Group appear to
be absent within the project area;
●
Eocene-Oligocene
intrusive stocks of the AYBatholith. Intrusive rocks in the
Property area are dominantly dioritic in composition, although in
many zones the diorite is cut by abundant stocks and dykes of more
felsic composition such as monzonite, granodiorite, aplite and
potassium-feldspar-phyric pegmatite. Intrusive contacts range
between bedding-parallel and sub-horizontal to strongly
transgressive and sub-vertical; and,
●
Shallow-dipping
volcanic rocks of the Miocene-Pliocene age Sencca Formation. This
unit also unconformably overlies all earlier units, although in
many places it is in fault contact with them.
Mineralization
Mineralization
comprises large, sub-horizontal areas of intense iron oxide
(magnetite and hematite) with amphibole-garnet developed in
metasomatized Ferrobamba Formation (Fm.) limestones (exoskarn).
Exoskarn occurs in areas immediately adjacent to the mapped extent
of intrusive rocks and within the intrusives as interpreted
possible roof pendants. Endoskarn comprises similar but narrower
zones of iron oxide-rich skarn generally developed along north
northwest-south southeast striking structures cutting through the
dioritic-monzonitic intrusive rocks. Both the endo and exoskarn
units contain varying amounts of late (?) Cu mineralization
associated with silicified breccia, which appears to be related to
increased Au grades. The Cu-Au zones were likely sulphide-bearing
but surface weathering has removed most of the sulphide minerals,
which have been replaced by often abundant Cu oxides. At the Good
Lucky prospect, where several small surface pits and tunnels have
been excavated into the mineralized zones, unoxidized skarn
comprises massive coarse iron oxides with coarse-grained
chalcopyrite.
Exploration
2016 to
2018 Exploration
42
Auryn
acquired the Sombrero Project from Alturas in 2016. Since entering
into the Alturas Option Agreement on the Sombrero Project, Auryn
has completed a large regional stream sediment sampling
(BLEG/Geochem) program, along with more focused programs on the
Sombrero Project including; mapping, soil sampling, rock grab
sampling, trenching and geophysical surveys.
Rock
sampling highlights from the Sombrero Project’s prospect
areas are as follows;
|
● Sombrero Main
– Corrales area:
|
up to
193g/t Au and 16.0% Cu.
|
|
● Good Lucky
area:
|
up to
5.12g/t Au and 4.29% Cu.
|
|
● Uchuy
area:
|
up to
0.50g/t Au and 1.39% Cu.
|
|
● Totora
area:
|
up to
5.07g/t Au and 3.14% Cu
|
|
● Milpoc
area:
|
up to
8.75% Cu and 101g/t Ag
|
Recent
continuous channel sampling in the southern portion of the Sombrero
Main area has identified significant zones of Cu-Au mineralization
(with <5m of dilution) including;
|
Trench 18-08:
|
234m of
0.28% CuEq (with some dilution) *,
|
|
Including
|
60m of
0.29% Cu Equivalent (CuEq) *
|
|
and an
additional
|
99m of
0.46% CuEq *
|
|
Trench 18-09:
|
177m of
0.23% CuEq (with some dilution),
|
|
Including
|
105m of
0.30% CuEq *
|
|
Trench 18-15:
|
22m of
0.53% CuEq and 0.92g/t Au Equivalent (AuEq)**
|
|
and an
additional
|
50m of
0.34% CuEq and 0.59g/t AuEq**
|
|
Trench 18-16:
|
64m of
0.27% CuEq and 0.46g/t AuEq**
|
|
and an
additional
|
66m of
0.28% CuEq and 0.49g/t AuEq**
|
|
Trench 18-18:
|
30m of
1.93% CuEq and 3.34g/t AuEq***
|
|
and an
additional
|
54m of
0.34% CuEq and 0.60g/t AuEq***
|
|
and an
additional
|
24m of
0.73% CuEq and 1.26g/t AuEq***
|
* see Auryn Press Release dated June 19, 2018
** see Auryn Press Release dated September 5, 2018
*** see Auryn Press Release dated September 26, 2018.
(“dilution” includes zones >5m in length averaging
< 0.1g/t Au or 0.1% Cu)
(2017 and 2018 Copper Equivalent Grades calculated using metal
prices of $1300/oz of Au and $3.28/lb of Cu)
● 3-D interpretation
of historical and recent magnetics and Induced Polarization (IP)
geophysical data indicates that (magnetic and chargeability)
anomalies extend to depth below the mineralization exposed at
surface. Additional geophysical surveying is warranted in order to
evaluate areas beneath the extensive volcanic cover across the
Property to outline possible zones of sulphide mineralization for
drill testing.
● There has been no
drilling at the Sombrero Project to date. Drill testing of
currently identified zones of mineralization and alteration is
warranted.
● The majority of the
exploration work conducted to date at the Sombrero Project has been
focused on the original Alturas claim block, which comprises a
small portion at the south end of the current Sombrero Project.
Additional exploration work comprising trenching and additional
ground geophysics is warranted at the Sombrero Main target area, as
well as at the Good Lucky prospect area, in order to properly
define targets for eventual drill testing.
43
● Stream sediment and
soil sampling, and limited prospecting/rock sampling, has
identified a number of compelling geochemical anomalies in the
southern (Milpoc), central and northern portions of the Sombrero
Project that warrant further exploration.
2019
Exploration
Highlights
from the continuous channel sampling at the Fierrazo target include
a combined width of mineralization of 232 meters of 0.55% copper
equivalent (0.47% copper and 0.13 g/t gold) with a higher-grade
internal interval of 40 meters of 1.26% copper equivalent (1.23%
copper and 0.05 g/t gold). The sampling helped further validate the
potential 7.5 kilometers of strike length of high-grade exoskarn
targets at the Sombrero Main area.
The
Company analysed drill core from 8 historical drill holes,
totalling 998 meters of drilling, from the Fierrazo target..
Highlights included 116 meters of 0.58% CuEq (0.42% Cu and 0.24 g/t
Au), 90.4 meters of 0.51% CuEq (0.48% Cu and 0.05 g/t Au) and 51
meters of 0.53% CuEq (0.43% Cu and 0.16 g/t Au).. The results
confirmed the copper-gold sulphide mineralization extends to depth
underneath the area where surface channel sampling was conducted
earlier in 2019.
Rock
sampling at the Ccello prospect within the southern portion of the
Sombrero district in southern Peru identified a
2-kilometer-by-1.5-kilometer high sulphidation alteration system.
Highlights from the rock sampling program include silver values of
981 g/t, 72.1 g/t, 64.4 g/t, 40.6 g/t, 26.6 g/t and 20.5
g/t.
(2019 Copper Equivalent Grades calculated using metal prices of
$1300/oz of Au and $3.00/lb of Cu)
Sample Preparation, Analyses and Security
The
following section describes the sampling techniques, analytical
procedures and sample security measures employed by Auryn during
the execution of recent geochemical sampling programs at the
Sombrero Project. Unless otherwise stated, all samples were
analysed at ALS Laboratories in Lima, Peru. ALS is an
internationally recognized analytical company with ISO
accreditation and is fully independent of both Auryn and APEX. All
sampling was conducted under the supervision of the Company’s
geologists.
Soil Sampling
Gold in
the 2016 soil samples was determined by an aqua regia extraction (50g sample)
followed by an ICP-MS finish (Au-TL44 method). In addition, a
multi-element ICP package (also following an aqua regia digestion) was performed on
the samples.
Auryn
utilizes digital data collection procedures that automatically
integrate GPS sample site coordinates with sample (and sample site)
descriptive information entered by the sampler. In addition, the
system allows for the scanning of sample tag bar codes and
virtually eliminates potential issues related to manual data entry.
Individual soil samples comprised the collection of approximately
1kg of soil that was placed in individual paper sample bags marked
with their respective sample numbers and into which a portion of
the sample tag was placed (see above for Auryn’s sampling
protocol). Samples were closed and secured in the field and were
later catalogued and packaged for shipping to the laboratory in
Lima in rice sacks with security seals attached. Sample shipments
were sent to ALS in Lima by commercial carriers and security seal
numbers and conditions were confirmed upon receipt of the shipments
at the laboratory.
Rock (Grab) Sampling
All of
the 2016 and 2017 rock samples were submitted to ALS Laboratories
in Lima, Peru, for analysis. Gold in the 2016-18 rock samples was
determined by a standard 30g fire assay (with an ICP finish) and a
standard. Samples of obvious mineralization were assayed by fire
assay with a gravimetric finish. The multi-element ICP geochemical
analysis for the 2016 and 2017 rock samples was completed following
aqua regia digestion
whereas the 2018 rock samples were analysed following a 4-acid
digestion.
44
Trench Sampling
The
current trench sampling database includes 2473 samples. All of the
2016 and 2018 trench samples were submitted for analysis at ALS
Laboratories in Lima, Peru. ALS is an internationally recognized
analytical company with ISO accreditation and is fully independent
of both Auryn and APEX. All of the samples were sent for gold fire
assay with an atomic absorption (AA) finish. A 50g charge was
assayed from each of the 2016 samples and a 30g charge was assayed
from each of the 2018 samples. In addition, a multi-element ICP
analysis was performed on all samples with the 2016 samples
undergoing an aqua regia
digestion and the 2018 samples undergoing a 4-acid digestion. When
the multi-element ICP results received were greater or near
10,000g/t Cu, Zn or Pb, the assay was repeated with ore grade
4-acid digestion.
Data Verification
The
following section details the QA/QC program employed by Auryn for
the exploration program completed during 2016 to 2019, as well as
the extent to which the author has verified the information with
the Auryn exploration datasets.
Non-Analytical Data Verification
For
non-analytical field data, Auryn has instituted protocols to ensure
data integrity. Auryn utilizes digital data collection procedures
that automatically integrate GPS sample site coordinates with
sample (and sample site) descriptive information entered by the
sampler. In addition, the system allows for the scanning of sample
tag bar codes and virtually eliminates potential data input errors.
The procedures employed are considered reasonable and adequate with
respect of ensuring data integrity.
Analytical Data Verification
In
reviewing the historical (pre-Auryn) and recent exploration work at
the Sombrero Project, the author was able to examine archived
analytical certificates for stream sediment, soil, rock grab and
rock channel samples. There were no significant differences with
respect to the Company’s databases and the archived
analytical certificates. In the opinion of the author of this
report, industry standard procedures have been used that are
acceptable for ensuring the accuracy of all analytical data
pertaining to exploration work conducted by Auryn.
Quality Assurance and Quality Control
Quality
assurance sampling provides evidence to demonstrate that a
project’s assay data is sufficiently precise and accurate to
allow for confidence in any subsequent use of that data, including
and especially for, resource estimation. Quality control consists
of procedures used to ensure that an adequate level of quality is
maintained in the process of collecting, describing, preparing,
assaying and documenting the exploration samples. In general, QA/QC
programs are designed to prevent or detect contamination and allow
assaying (analytical) precision (repeatability) and accuracy to be
quantified. In addition, a QA/QC program can disclose the overall
sampling-assaying variability of the sampling method
itself.
Mineral Processing and Metallurgical Testing
No
metallurgical test work has yet been conducted on materials from
the Sombrero Project.
Mineral Resource Estimates
There
are currently no mineral resource or reserve estimates for the
Sombrero Project.
45
Adjacent Properties
Although there are currently no significant mineral exploration or
development projects in the immediate vicinity of the
Sombrero Project, the three (3) most
significant mineral deposits lying within a 200 km radius of the
Sombrero property are the Los Chancas, Antilla and Trapiche
deposits located at the west end of the currently established edge
of the AY Belt;
●
The
Los Chancas copper-molybdenum project lies 145km east-southeast of
the Sombrero Project and is a Cu-Au porphyry discovered by Southern
Peru Copper Corporation. The Los Chancas project is in the
feasibility stage and has an unclassified resource of 545.2mT @
0.59% Cu, 0.04% Mo and 0.04g/t Au (BN Americas, 2018),
●
The
Antilla Cu-Mo project is located 170km east-southeast of Sombrero.
Mineralization comprises a supergene enrichment blanket underlain
by primary sulphide mineralization, both hosted in quartzite and
sandstones layers, which is associated with an Andean-type
copper-molybdenum porphyry system (Aarsen, 2018). The Antilla Cu-Mo
project is owned by Panoro Minerals Ltd.; and,
●
The Trapiche Cu-Mo project lies 180km
east-southeast of Sombrero. It is a Cu Porphyry system currently
being explored by Compañia Minera Buenaventura. The Trapiche
Cu-Mo project has an unclassified resource of 920 Mt @ 0.41% Cu
with the cut-off grade of 0.15% (Yang et al., 2015).
Conclusion and recommendations
Based
upon the author’s site visit and the results of the
exploration work discussed in the Sombrero Technical Report, it is
the opinion of the author that the Sombrero Project is a
“Property of Merit” warranting significant continued
exploration work including work at Minas Nioc, Good Lucky,
Fierrazo, Totora, Uchuy, and Milpoc. The estimated cost of the
recommended work programs at the Sombrero Project is $8.19 million,
a tabulated summary of which is provided in Table 7.
Table 7 – Estimated Expenditure Requirements for Recommended
Exploration Work
|
Additional Fieldwork
|
|
|
|
|
|
|
Drone Orthophoto & DEM Survey
|
|
|
|
|
$100,000
|
|
Soil Sampling
|
|
|
|
|
$400,000
|
|
Prospecting (Rock Sampling)
|
|
|
|
|
$100,000
|
|
Geological Mapping & Consulting
|
|
|
|
|
$100,000
|
|
Geophysical Surveying (Mag and IP) and Interpretation
|
|
|
$500,000
|
||
|
Trenching & Trench Sampling
|
|
|
|
|
$400,000
|
|
Drilling
|
|
Total (m)
|
Estimated Al-in Cost
|
|
|
|
Drilling - Sombrero Main (Corrales-Sombrero, Minas Nico,
Fierrazo)
|
|
10,000
|
$350
|
/m
|
$3,500,000
|
|
Drilling - Good Lucky prospect
|
|
2,500
|
$350
|
/m
|
$875,000
|
|
Drilling - Other Targets (Uchuy, Totora, Milpoc)
|
|
2,500
|
$350
|
/m
|
$875,000
|
|
Administrative/General
|
|
|
|
|
|
|
Administration and Project Management
|
|
|
|
|
$150,000
|
|
Bonding / Permitting / Environmental Studies
|
|
|
|
|
$150,000
|
|
Earthwork / Reclamation (access roads/drill pads)
|
|
|
|
|
$75,000
|
|
Property Maintenance & Payments
|
|
|
|
|
$208,000
|
|
|
|
|
|
|
|
|
|
|
|
|
sub-total
|
$7,433,000
|
|
|
|
|
|
Contingency
|
$754,500
|
|
|
|
|
|
|
|
|
|
|
|
|
Grand Total
|
$8,187,500
|
46
In
addition to certain general and administrative costs, such as the
required payment of approximately $219,000 in concession
maintenance fees, there are still large areas throughout the
Sombrero Project that require basic exploration work. Additional
prospecting (rock sampling) and geological mapping is required in
several areas in the northern part of the Sombrero Project.
Regional soil sampling programs are warranted to expand the
extensive sampling completed in the southern part of the Sombrero
Project, as well as extending the sampling at the Good Lucky
– Totora - Uchuy corridor and the sampling to the south, at
the Milpoc prospect.
Additional
work is also required at the known prospect areas to evaluate and
potentially expand the currently identified areas of alteration and
mineralization. Additional trenching is required at the Sombrero
Main – Corrales prospect areas, as well as at the Good-Lucky
prospect. Most importantly, a significant expansion of ground
geophysical work (magnetics and IP) is required in order to define
targets for drill testing, particularly in areas where recent
volcanic deposits cover the prospective intrusions and their host
sedimentary rocks.
The
recommended work program also includes a significant amount of
drilling at the Sombrero Main – Corrales area as well as the
Good Lucky prospect. Initial drill testing of these areas/prospects
is warranted at this time based upon current exploration results
and is not contingent upon the results of the recommended fieldwork
programs discussed above. Initial drill testing of the Sombrero
Main – Corrales area will require a program on the order of
10,000m comprising 35 holes drilled to depth of between 250-300m in
order to test the full depth extent of IP anomalies. Similarly, a
drill program on the order of 2,500m comprising 8-10 holes drilled
to depth of between 250-300m is recommended for the initial drill
testing of the Good Lucky prospect. Drilling of 8-10 holes between
250-300m at Uchuy, Totora, and Milpoc is recommended to test the
results obtained.
As
discussed above, the estimated cost of the recommended work
programs, including general and administrative items and a
contingency, is approximately $8.19 million. All of the items
discussed above and listed in Table 7, as recommended in the
Sombrero Technical Report, continue to be warranted as at the date
of AIF and none is contingent upon the results of any of the
others. As a further recommendation, it would be prudent for Auryn
to plan on second phase of work comprising additional trenching and
drilling of 20,000m – 30,000m likely to cost in excess of $9
million. However, this work would be conditional and would be based
upon the results of the first phase of work.
PERUVIAN EXPLORATION PORTFOLIO – HUILACOLLO
PROPERTY
Project Description, Location and Mineral Tenure
The
Huilacollo epithermal property (the “Huilacollo Property”) is comprised
of 2,000 hectares of intense hydrothermal alteration that is
consistent with epithermal Au/Ag mineralization over a 4 by 6 km
area located in the Tacna province of southern Peru. Historic
drilling has resulted in the identification of a continuously
mineralized gold/silver zone open in all directions. Contained
within this area, there appears to be higher grade mineralization
focused along well-defined feeder structures as highlighted by
trench intercepts up to 38m at 6.7 g/t Au and drill holes including
34m @ 2.14 g/t.
Acquisition
transactions:
●
In June 2016,
Corisur acquired the Huilacollo 1 and Huilacollo 2 concessions
(2,000 ha) through an option agreement with a local Peruvian
company, Inversiones Sol S.A.C. (the “Huilacollo Option”). Under the
Huilacollo Option, Corisur may acquire 100% interest of the
Huilacollo Property, subject to an NSR, and through a combination
of work expenditures and cash payments that total US$15.75 million,
as detailed in Table 8 below. The
Huilacollo NSR is 1.5% and 2.5% for precious metals and base
metals, which is buyable for US$2.5 million and US$7.0 million,
respectively;
47
Table 8 – Huilacollo Option Expenditures and Cash
Payments
|
Due
Dates
|
Payment
Status
|
Property
Payments
(in
‘000 US$)
|
Work
Expenditures
(in
‘000 US$)
|
|
Effective Date (May
11, 2016)
|
COMPLETED
|
250
|
-
|
|
May 11,
2018
|
COMPLETED
|
500
|
2,000
|
|
May 11,
2019
|
COMPLETED*
|
-
|
3,000
|
|
May 11,
2020
|
|
250
|
-
|
|
May 11,
2021
|
|
250
|
2,000
|
|
May 11,
2022
|
|
7,500
|
-
|
|
Total
|
|
8,750
|
7,000
|
* As of
May 11, 2019, the Company had completed US$4.5 million of work
expenditures under the Huilacollo Option and thus did not satisfy
the accumulated work expenditure requirement of US$5.0 million at
that date. As permitted by the Huilacollo Option, the Company
instead made a cash payment of US$0.3 million equal to 50% of the
shortfall at the due date to keep the option in good
standing.
●
In August 2017, Corisur acquired 3 additional
concessions (1,100 ha) through transactions with private Peruvian
owners; the concessions are known as the Tacora, Tacora Sur and
Andamarca concessions. Corisur can acquire 100% interest in the
three concessions with direct payouts, and the concessions are
subject to individual royalties:
o
Under the terms of
the Tacora acquisition agreement, the Company paid US$200,000 on
signing of the Public Deed transferring the concessions in favor of
Corisur. The Tacora concessions are subject to a 0.5% NSR, 50% of
which is buyable for US$0.5 million; and
o
Under the terms of
the Andamarca acquisition agreement, the company paid US$450,000 on
signing of the Public Deed transferring the concession in favor of
Corisur. The Andamarca concession is subject to 1.5% NSR, 50% of
which is buyable for US$2.5 million.
The
Huilacollo Property is located within a special economic zone
situated within 50km of the Peruvian border. As a non-resident
company, Auryn’s right to ultimately exploit these licenses
or register its interests require approval from the Peruvian
government in the form of a Supreme Decree. Auryn is in the process
of submitting its applications with respect the approval and
anticipates receiving the approval prior to exercising it rights to
take ownership over Corisur.
Exploration
Recent
work by Corisur has demonstrated that geophysics, specifically IP
surveys, have assisted in expanding the silicified target zones,
which are manifested as high resistivity and low to moderate
chargeability anomalies. The Cerro Andamarca target is a 700 x 700
m shallow resistivity anomaly that has to date only been explored
by drilling on its eastern margin where the mineralization outcrops
on the hill crest over an area of 400 x 200 m. The Andamarca Norte
target is a 1,100 x 350 m, shallow resistivity anomaly that again
has only been explored by widely spaced drilling on its eastern
extremity and contains widespread gold in soil, rock and talus
samples. Further sampling along with additional ground geophysical
surveys are warranted for Cerro Andamarca and Andamarca
Norte.
Extensive
soil/talus sampling by Corisur across the southern two thirds of
the Huilacollo Property area in 2016 has identified significant
precious metal geochemical anomalies at Cerro Huilacollo, Cerro
Colorado and Cerro Soroche. The soil/talus precious metal anomalies
warrant follow-up exploration including further sampling,
trenching, ground geophysical surveys followed by
drilling.
48
2018
Exploration
On
April 13, 2018, the Company announced the results from the initial
five holes of drilling at its Huilacollo Project. The highlight
from the program was hole 17HUI-002 which returned an intercept of
62 meters of 0.45 g/t Au (including 22 meters of
0.71g/t Au) 100 meters to the northwest of the previously drilled
mineralization on the project. Further drilling will expand upon
this step out and target the surface mineralization discovered on
the Tacora concession at depth.
Adjacent Properties
The
most significant nearby property of interest is the Pucamarca
Gold-Silver Mine owned by Minsur S.A., which is located 15 km
southeast of the Huilacollo Property up against the Peru-Chile
border in Tacna Province, Southern Peru. The Pucamarca Mine was put
into production in 2012 with its first gold produced in early 2013.
The initial mineable mineral resource for the project upon start-up
was listed at 34.24 million tonnes with an average grade of 0.72
g/t Au and 6.72 g/t Ag for a total of 793,000 troy ounces of gold
and 7.7 million troy ounces of silver (BNAmericas report dated
August 28, 2009). No details for the resource are
reported.
A
little more distant is the Santa Rosa and Cerro Tucari mines of
Aruntani S.A.C. located approximately 100 km to the northwest of
the Huilacollo Property. The mineralization at these two mines was
discovered in 1997 and 2000, respectively, with commencement of
production in 2002 and 2004, respectively. The two mines are still
in production and were producing in the early years at roughly
100,000 ounces per annum for Santa Rosa and 200,000 ounces per
annum for Cerro Tucari.
PERUVIAN EXPLORATION PORTFOLIO – CURIBAYA
PROJECT
Project Description, Location and Mineral Tenure
Auryn
acquired the original Curibaya concessions through a series of
staking programs in 2016. On August 2, 2019, the Company added to
the Curibaya Project by acquiring the rights to adjacent
concessions being the Sambalay and Salvador mineral
concessions.
Under
the terms of the mining concession transfer agreement with Wild
Acre Metals (Peru) S.A.C. to acquire the Sambalay and Salvador
concessions, the Company paid US$250,000 on transfer of the
concessions in favour of Corisur. The Sambalay concessions are
subject to a combined 3% NSR royalty, 0.5% of which is buyable for
US$1.0 million. The Salvador concessions are subject to a 2% NSR
royalty and a US$2.0 million production payment, payable at the
time a production decision is made, and to secure payment of such
consideration a legal mortgage is recorded in the registry files of
the Salvador concessions.
Collectively,
the Curibaya Project now covers approximately 11,000 hectares and
is located 53 km from the provincial capital, Tacna, and is
accessible by road in 2 hours. The project lies 11 km south of the
Incapuquio regional fault, which is viewed as a major control on
the emplacement of mineralized porphyries in the region and are
within a mineral trend that hosts some of Peru’s largest
porphyry deposits, including Freeport McMoRan’s Cerro Verde
deposit, Southern Copper’s Cuajone and Toquepala deposits and
Anglo American’s Quellaveco deposit.
Exploration
Since
acquiring the Sambalay and Salvador concessions in August 2019, the
Company completed a reconnaissance rock sampling program which
sampled high-grade mineralization throughout a 1.5 km by 4.5 km
quartz – sericite – pyrite alteration system. Followed
up geological mapping and additional rock and channel sampling
resulted in the collection of 481 rock samples, 87 channel samples
and 9 stream sediment samples. Highlights from the 2019 and 2020
sampling include up to 7,990 g/t silver, 17.65 g/t gold and 6.97%
copper.
49
Through
geological mapping a series of rhyolite to dacite flow dome
complexes have been identified which the Company believes may be
the sources of the widespread, high-grade precious metal veins
sampled to date.
The
Company plans to develop drill targets through continued geological
and alteration mineral mapping, targeted rock sampling along the
margins of the dome complexes and ground based and airborne
geophysical surveys.
PERUVIAN EXPLORATION PORTFOLIO - BAÑOS DEL INDIO
Project Description, Location and Mineral Tenure
On
September 26, 2016 the Company announced it had entered into an
option agreement (the “Baños Option”) with a local
Peruvian company, Exploandes S.A.C to earn a 100% interest in the
Baños del Indio gold project located in the Tacna province of
southern Peru, just 10 km to the north of Auryn’s Huilacollo
project. Under the Baños Option, the Company could acquire a
100% interest, subject to a 3.0% NSR, through a combination of work
expenditures and cash payments.
Despite
the Company acting in good faith in its negotiations with the
community, the Company was unable to reach an access agreement with
the local community in order to initiate its exploration program on
the Baños properties and as such the Company chose to
terminate the Baños Option in accordance with the agreement.
On February 7, 2020, the Company formally gave notice to the option
holder that it was terminating the agreement effective March 8,
2020.Exploration
The
Company was not able to obtain access to the property in order to
conduct any material exploration within the Baños del Indio
claims which is why the option was terminated effective March
2020.
DESCRIPTION OF CAPITAL STRUCTURE
Common Shares
Auryn’s authorized capital consists of an unlimited number of
common shares without par value. The Company is also authorized to
issue an unlimited number of preferred shares. There are no
preferred shares issued and outstanding as at the date of this
AIF.
As at the date of this AIF, there are 104,681,775 Common Shares
issued and outstanding. There are no special rights or restrictions
attached to the Common Shares. The following is a summary of the
material provisions that attach to the Common Shares:
●
Each
Common Share entitles the holder to one vote at all meetings of
Auryn’s shareholders;
●
The
holders of Common Shares are entitled to receive during each year,
as and when declared by the Board of Directors, dividends payable
in money, property or by the issue of fully-paid Common
Shares;
●
If
Auryn is dissolved, wound-up, whether voluntary or involuntary, or
there is a distribution of Auryn’s assets among shareholders
for the purpose of winding-up its affairs, the holders of Common
Shares are entitled to receive Auryn’s remaining property;
and
●
There
are no constraints imposed on the ownership of the Common
Shares.
50
Preferred Shares
There are no preferred shares issued and outstanding as at the date
of this AIF. Preferred shares may be issued from time to time in
one or more series, and the directors may fix from time to time
before such issue the number of preferred shares, the designation,
rights and privileges attached thereto including any voting rights,
dividend rights, redemption, purchase or conversion rights, sinking
fund or other provisions. Preferred shares generally rank in
priority over common shares and any other shares ranking by their
terms junior to the preferred shares as to dividends and return of
capital upon liquidation, dissolution or winding up of the Company
or any other return of capital or distribution of the assets of the
Company.
Stock Options
Auryn maintains a Rolling Stock Option Plan (the
“Option Plan”) providing for the issuance of stock
options up to 10% of the Company’s issued and outstanding
Common Shares (on an as-converted basis) at the time of the grant.
Auryn may grant stock options from time to time to its directors,
officers, employees and other service providers. The stock options
vest as to 25% on the date of the grant and 12.5% every
three months thereafter for a total vesting period of
18 months.
As at the date of this AIF, the following stock options are
outstanding under the Option Plan:
Table 9 – Outstanding Stock Options
|
Number of Options
|
Exercise Price
|
Expiry Date
|
|
915,000
|
$1.30
|
August
17, 2020
|
|
2,085,000
|
$2.63
|
June
20, 2021
|
|
440,000
|
$3.22
|
January
10, 2022
|
|
651,875
|
$1.42
|
June
20, 2023
|
|
900,000
|
$1.42
|
June
26, 2023
|
|
200,625
|
$1.36
|
Feb 7,
2024
|
|
2,755,000
|
$1.96
|
April
9, 2024
|
|
70,000
|
$1.82
|
August
21, 2024
|
|
170,000
|
$1.82
|
November
20, 2024
|
Common Share Purchase Warrants
In
connection with the Bridge Loan, the Company issued 500,000 common
share purchase warrants to the Lender. Each warrant is exercisable
into one Common Share at a price of $2.00 per Common Share between
September 12, 2020 and September 12, 2022.
MARKET FOR SECURITIES
Trading Price and Volume
The
Common Shares were listed and posted for trading on the TSXV
commencing October 17, 2008. Prior to the completion of
Auryn’s Qualifying Transaction on February 23, 2011 the
Common Shares traded on the TSXV under symbol “GET.P”.
Upon completion of the Qualifying Transaction, Auryn changed its
trading symbol to “GET”. On October 11, 2013,
Auryn changed its name to Auryn Resources Inc. and began trading
under the ticker symbol “AUG” on October 15, 2013.
Starting from November 1, 2016, the Company’s Common Shares
have been trading on the TSX under the symbol “AUG”.
The Company’s Common Shares were traded on the OTCQX
Marketplace under the symbol “GGTCF” from May 22, 2015
until its graduation to the NYSE American on July 17, 2017 trading
under the symbol “AUG”.
51
The
following table sets out the high and low sale prices and the
aggregate volume of trading of the Common Shares on the TSX for the
months indicated.
Table 10 – Trading Price and Volume on TSX
|
|
High
|
Low
|
Volume
|
|
Date
|
($)
|
($)
|
(no.
of Common Shares)
|
|
March 1 through 19,
2020
|
1.73
|
1.00
|
2,277,440
|
|
February
2020
|
1.94
|
1.51
|
2,483,790
|
|
January
2020
|
1.90
|
1.59
|
2,587,640
|
|
December
2019
|
1.96
|
1.69
|
1,958,690
|
|
November
2019
|
2.08
|
1.68
|
2,797,160
|
|
October
2019
|
2.10
|
1.46
|
3,408,520
|
|
September
2019
|
1.88
|
1.58
|
2,413,330
|
|
August
2019
|
2.20
|
1.60
|
2,588,930
|
|
July
2019
|
2.32
|
1.98
|
2,197,610
|
|
June
2019
|
2.45
|
2.02
|
2,901,510
|
|
May
2019
|
2.29
|
1.90
|
2,094,590
|
|
April
2019
|
2.34
|
1.85
|
3,750,830
|
|
March
2019
|
2.08
|
1.52
|
2,871,990
|
|
February
2019
|
1.63
|
1.30
|
2,319,370
|
|
January
2019
|
1.46
|
1.16
|
2,783,190
|
Prior Sales
In the
financial year ended December 31, 2019 and up until the date of
this AIF, Auryn issued the following securities that were not
listed or quoted on a stock exchange:
|
Date
of Issuance
|
Number
of Securities Issued
|
Issue/Exercise
Price
|
|
April 9,
2019
|
2,755,000 Stock
Options
|
$1.96
|
|
August 21,
2019
|
70,000 Stock
Options
|
$1.82
|
|
September 12,
2019
|
500,000
warrants
|
$2.00
|
|
November 20,
2019
|
170,000 Stock
Options
|
$1.82
|
DIRECTORS AND EXECUTIVE OFFICERS
Name, Occupation and Security Holding
The
following table sets out the names, province or state and country
of residence, positions with or offices held with Auryn, and
principal occupation for the past five years of each of
Auryn’s directors and executive officers, as well as the
period during which each has been a director of Auryn.
The
term of office of each director of Auryn expires at the annual
general meeting of shareholders each year.
52
Table 11 – Directors and Executive Officers
|
Name, Position and Province/State and Country of Residence
(1)
|
Principal Occupation During the Past Five Years(1)
|
Director
Since (2)
|
|
IVAN BEBEK
Executive
Chairman & Director
British
Columbia, Canada
|
Executive
Chairman & Director of Auryn;Co-Chairman & Director of Torq
Resources Inc. (“Torq”)
|
November 2,
2009
|
|
SHAWN WALLACEPresident, CEO & DirectorBritish Columbia,
Canada
|
President,
CEO & Director of Auryn; Co-Chairman & Director of Torq;
Director of Asanko Gold Inc. (“Asanko”); Past Chairman and CEO of
Asanko
|
May 7,
2013
|
|
STEVE COOK(4) (5) (6)
(8)
DirectorBritish
Columbia, Canada
|
Director
of Auryn; Director of Torq; Practicing tax partner at law firm of
Thorsteinssons LLP;Principal at SM Cook Legal Services Law
Corporation;Past Director of Cayden; Past Director of Skeena
Resources Ltd.;Past Director of SnipGold Corp.
|
October 28,
2013
|
|
GORDON J FRETWELL(3) (4) (5) (6)
(8)
DirectorBritish
Columbia, Canada
|
Lead
Director of Auryn; Solicitor of Gordon J. Fretwell Law Corporation;
Director of Asanko.; Director & Secretary of Canada Rare Earth
Corporation; Secretary of Oracle Energy Corp.; Secretary of Sokoman
Iron Corp.; Secretary of Meritus Minerals Ltd.; Secretary of Quadro
Resources Corp.; Secretary of Benton Resources Inc.; Secretary at
Bell Copper Corporation; Secretary of Organimax Nutrient Corp.;
Past Director of Coro Mining Corp; Past Director & Secretary of
Quartz Mountain Resources; Past Director of Northern Dynasty
Minerals Ltd.; Past Director of Lignol Energy
Corporation;
|
October 28,
2013
|
|
ANTONIO ARRIBAS(7)
Director
Texas,
USA
|
Director
of Auryn; Professor at the University of Texas; Past Professor at
the Graduate School of Mineral Resource Sciences of Akita
University, Japan;Adjunct Professor at the University of Michigan;
Adjunct Professor at James Cook University in Townsville,
Australia; Past Vice President Geoscience at BHP Billiton Minerals
Exploration; Past Senior Manager Geosciences at Newmont Mining
Corp.
|
August
17, 2015
|
|
MICHAEL KOSOWAN(7) (8)
Director
British
Columbia, Canada
|
Director
of Auryn; President, CEO & Director of Torq; Past Investment
Advisor of Sprott Private Wealth (Canada) and Sprott Global
Resources Inc (USA)
|
November
30, 2016
|
|
JEFFREY MASON(4) (5)
(6)
Director
British
Columbia, Canada
|
Director
of Auryn; Director of Torq; Director of Great
Panther Mining Limited; Past Director of Amarc Resources
Ltd.;Past Director of Libero Copper Corporation (Formerly Libero
Mining Corporation);Past Director of Hut 8 Mining Corp. (formerly
Oriana Resources Corporation);Past Director of Red Eagle Mining
Limited, Past Director and Chief Financial Officer of Nickel Creek
Platinum Corp.(formerly Wellgreen Platinum Ltd.); The balance
of Mr. Mason’s professional activities are spent providing
financial and operations advisory consulting/employment services
for mining, electrical power and construction.
|
February
7, 2019
|
|
STACY ROWA(9)Chief Financial
Officer
British
Columbia, Canada
|
Chief
Financial Officer of Auryn (Past Corporate Controller); Chief
Financial Officer of Torq (Past Corporate Controller)
|
N/A
|
|
MICHAEL HENRICHSEN(7)
Chief
Operating Officer
British
Columbia, Canada
|
Chief
Operating Officer and Structural Geologist of Auryn;Director,
President & Secretary of RV Mineral Exploration Consulting
Ltd.;Past Structural Geologist at Newmont Mining Corp.
|
N/A
|
|
RUSSELL STARR SVP, Corporate Finance
|
SVP,
Corporate Finance of Auryn; Director of TerraX Minerals Inc.;
Director of Canada Nickel Company Inc.; Past President of
BetterLife Pharma Inc.
|
N/A
|
|
DAVID SMITHSON
VP,
Exploration
|
VP,
Exploration of Auryn.
|
N/A
|
|
CHRISTIAN RIOS(10)
VP,
Operations South America
|
VP,
Operations South America of Auryn Resources; Past Business
Development and Geology Manager for Stellar Mining; Past Strategic
Advisor for BatteryOne Royalty
|
N/A
|
Notes:
(1)
The information as
to province of residence and principal occupation, is not within
the knowledge of Auryn, and has been individually provided by the
respective directors and officers.
(2)
Each of
Auryn’s directors were elected by Auryn’s shareholders
at the annual general meeting held on June 7, 2018 to serve until
the next annual general meeting of shareholders or until a
successor is elected or appointed. Auryn’s officers serve at
the determination of Auryn’s Board.
(3)
Gordon Fretwell was
appointed as Lead Director by the Company’s Nominating and
Governance Committee on June 21, 2019.
(4)
Member of the Audit
Committee.
(5)
Member of the
Compensation Committee.
(6)
Member of the
Nominating and Governance Committee.
(7)
Member of the
Technical Committee
(8)
Member of the
Mergers and Acquisitions Committee.
(9)
Stacy Rowa was
appointed as Chief Financial Officer effective April 1, 2019,
following the resignation of Peter Rees as Chief Financial Officer
and Corporate Secretary of the Company.
(10)
Christian Rios is
an Executive employee of Sombrero Minerales.
(11)
Daniel McCoy ceased
to be a director of Auryn on June 5, 2019.
53
As at
the date of this AIF, Auryn’s directors and executive
officers as a group, beneficially owned, directly and indirectly,
or exercised control or direction over, a total of 14,021,774
Common Shares, being approximately 13.39% of Auryn’s issued
and outstanding Common Shares.
Cease Trade Orders, Bankruptcies, Penalties or
Sanctions
As at
the date of this AIF or within the last 10 years before the
date of this AIF, no director or executive officer of Auryn was a
director, chief executive officer or chief financial officer of any
company (including Auryn), that:
(a)
was subject to a
cease trade or similar order or an order denying the relevant
company access to any exemptions under securities legislation, that
was in effect for a period of more than 30 consecutive days;
or
(b)
was subject to a
cease trade or similar order or an order denying the relevant
company access to any exemptions under securities legislation, that
was in effect for a period of more than 30 consecutive days, that
was issued after the director, chief executive officer or chief
financial officer ceased to be a director, chief executive officer
or chief financial officer, and which resulted from an event that
occurred while that person was acting in the capacity as director,
chief executive officer or chief financial officer.
Other
than as described below, no director or executive officer of Auryn,
or a shareholder holding a sufficient number of securities of Auryn
to affect materially the control of Auryn,
(a)
is, at the date of
this AIF, or has been within the 10 years before the date of this
AIF, a director or executive officer of any company (including
Auryn) that, while that person was acting in that capacity, or
within a year of that person ceasing to act in that capacity,
became bankrupt, made a proposal under any legislation relating to
bankruptcy or insolvency or was subject to or instituted any
proceedings, arrangement or compromise with creditors or had a
receiver, receiver manager or trustee appointed to hold its
assets;
(b)
has, within the 10
years before the date of this AIF, become bankrupt, made a proposal
under any legislation relating to bankruptcy or insolvency, or
become subject to or instituted any proceedings, arrangement or
compromise with creditors, or had a receiver, receiver manager or
trustee appointed to hold the assets of the director, executive
officer or shareholder; or
(c)
has been subject
to:
1)
any penalties or
sanctions imposed by a court relating to securities legislation or
by a securities regulatory authority or has entered into a
settlement agreement with a securities regulatory authority;
or
2)
any other penalties
or sanctions imposed by a court or a regulatory body that would
likely be considered important to a reasonable securityholder in
making an investment decision.
Mr. Fretwell
was a director of TSXV listed Lignol Energy Corporation
(“Lignol”) from
January 2007 to May 2015. Lignol went into receivership on August
22, 2014.
Jeffery
Mason was a director since March 2015 of the online shoe retailer
Shoes.com Technologies Inc., a private BC company, and was a
director since September 2016 of certain of its wholly-owned
private subsidiary companies, including Shoes.com, Inc., a Delaware
company, and Onlineshoes.com, Inc., a Washington company, but was
never a director of Shoeme Technologies Limited, a Canadian Federal
private company (together, Shoeme Technologies Limited, Shoes.com
Technologies Inc., Shoes.com, Inc. and Onlineshoes.com, Inc., the
“Shoes Private
Companies”). In September 2016, following the
resignation of the prior chief financial officer, Mr. Mason assumed
the role of interim chief financial officer of the Shoes Private
Companies. Due in part to an increasing competitive landscape, the
Shoes Private Companies became insolvent, and were not believed to
be financeable. The boards of directors of the Shoes Private
Companies determined that the interests of stakeholders would be
best protected by placing the Shoes Private Companies into
receivership in February 2017. Mr. Mason resigned as interim chief
financial officer and director of the Shoes Private Companies in
February 2017.
54
Mr.
Mason was a director of Red Eagle Mining Corporation
(“Red Eagle
Mining”), a TSX listed company, commencing on Jan 1,
2010 continuing to his resignation on June 22, 2018. On November 9,
2018, the secured lenders gave default notice and a demand letter
under the secured credit facility and advised of their intention to
appoint FTI Consulting as receiver over Red Eagle Mining’s
assets. Red Eagle Mining had negotiated a restructuring, announced
August 24, 2018 under which the secured lenders would write off a
significant part of their debt to enable Red Eagle Mining to
recommence operations, but the restructuring was contingent upon a
US$38 million equity financing from Annibale SAC, personally
guaranteed by its principal Fernando Palazuelo. Annibale
defaulted on that commitment and as a result, the restructuring
could not proceed.
Conflicts of Interest
Directors
and officers of Auryn are also directors, officers and/or promoters
of other reporting and non-reporting issuers which raises the
possibility of future conflicts in connection with property
opportunities which they may become aware of and have a duty to
disclose to more than the issuer on whose board they serve. This
type of conflict is common in the junior resource exploration
industry and is not considered an unusual risk. Conflicts, if any,
will be subject to the procedures and remedies provided under the
BCBCA.
LEGAL PROCEEDINGS AND REGULATORY ACTIONS
To the
best knowledge of Auryn’s management, there are no legal
proceedings involving Auryn or its properties as of the date of
this AIF and Auryn knows of no such proceedings currently
contemplated.
No
penalties or sanctions have been imposed against Auryn by a court
relating to securities legislation or by a securities regulatory
authority during Auryn’s financial year, no penalties or
sanctions have been imposed by a court or regulatory body against
Auryn that would likely be considered important to a reasonable
investor in making an investment decision and no settlement
agreements have been entered into by Auryn before a court relating
to securities legislation or with a securities regulatory authority
during the financial year.
INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL
TRANSACTIONS
To the
knowledge of the directors and executive officers of Auryn, there
were no material interests, direct or indirect, of directors or
executive officers of Auryn, any shareholder of Auryn who
beneficially owns, directly or indirectly, or exercised control or
direction over Common Shares carrying more than 10% of the voting
rights attached to all outstanding Common Shares, or any known
associate or affiliate of such persons, in any transaction during
the three most recently completed financial year of Auryn or during
the current financial year that has materially affected or is
reasonably expected to materially affect Auryn, other than as
disclosed herein.
TRANSFER AGENT AND REGISTRAR
Auryn’s
registrar and transfer agent for its Common Shares is Computershare
Investor Services Inc., 510 Burrard Street, 3rd Floor, Vancouver,
BC, V6C 3B9.
AUDITOR
Deloitte
LLP, Chartered Professional Accountants, 939 Granville St.,
Vancouver, BC, V6Z 1L3, is the current auditor of Auryn. Deloitte
LLP has been the auditor of Auryn since October 28,
2015.
55
MATERIAL CONTRACTS
Except
for contracts entered into in the ordinary course of business, no
material contracts have been entered into by the Company during the
financial year ended December 31, 2019 or before such time which
are still in effect.
INTERESTS OF EXPERTS
Michael
Henrichsen P. Geo., Chief Operating Officer of the Company is the
Qualified Person that has reviewed and approved the scientific and
technical information disclosed in this AIF.
Amended and Restated Committee Bay Technical Report
Mr. David
A. Ross, M.Sc., P.Geo., of Roscoe Postle Associates Inc., is a
person:
●
who is named in a
report described in a filing, or referred to in a filing, made
under National Instrument 51-102 Continuous Disclosure Obligations by
the Company during, or relating to, the Company’s most
recently completed financial year; and
●
whose profession or
business gives authority to the report made by him.
Amended and Restated Homestake Ridge Technical Report
Mr. David
Ross, M.Sc., P.Geo and Mr. Paul Chamois, M.Sc. (A), P.Geo., both of
Roscoe Postle Associates Inc., with respect to the Amended 2017
Homestake Ridge Technical Report, are persons:
●
who are named in a
report described in a filing, or referred to in a filing, made
under National Instrument 51-102 Continuous Disclosure Obligations by
the Company during, or relating to, the Company’s most
recently completed financial year; and
●
whose profession or
business gives authority to the report made by each of
them.
Sombrero Technical Report
Andrew
J. Turner, B.Sc., P. Geol of Apex with respect to the Sombrero
Technical Report, is a person:
●
who is named in a
report described in a filing, or referred to in a filing, made
under National Instrument 51-102 Continuous Disclosure Obligations
by the Company during, or relating to, the Company’s most
recently completed financial year; and
●
whose profession or
business gives authority to the report made by each of
them.
To
Auryn’s knowledge, none of Mr. Ross, Mr. Chamois and Mr.
Turner holds, directly or indirectly, more than 1% of Auryn’s
issued and outstanding Common Shares. Based on information provided
by each of the experts named above, other than as disclosed in this
AIF, none of Mr. Ross, Mr. Chamois and Mr. Turner, when or after
they prepared the statement, report or valuation, has received any
registered or beneficial interests, direct or indirect, in any
securities or other property of Auryn or of any associates or
affiliates of Auryn, or is or is expected to be elected, appointed
or employed as a director, officer or employee of Auryn or of any
associate or affiliate of Auryn.
Independent Auditor
Deloitte
LLP, Chartered Professional Accountants, of Vancouver, British
Columbia, has prepared the Auditor’s Report with respect to
the consolidated financial statements of Auryn for the years ended
December 31, 2019 and 2018. Deloitte is independent of the Company
within the meaning of the Rules of Professional Conduct of the
Chartered Professional Accountants of British Columbia and the
applicable rules and regulations of the United States Securities
and Exchange Commission and the Public Company Accounting Oversight
Board (United States).
56
AUDIT COMMITTEE INFORMATION
Audit Committee Charter
The
primary responsibility of the Audit Committee is that of oversight
of thefinancial reporting process on behalf of the Board. This
includes oversight responsibility for financial reporting and
continuous disclosure, oversight of external audit activities,
oversight of financial risk and financial management control, and
oversight responsibility for compliance with taxand securities laws
and regulations as well as whistle blowing procedures. The Audit
Committee is also responsible for the other matters as setout in
this charter and/or such other matters as may be directed by the
Board from time to time.The Audit Committee should exercise
continuous oversight of developments in these areas.
The
Company’s Audit Committee Charter can be viewed on the
Company’s website at https://www.aurynresources.com/corporate/corporate-governance/
.
Composition of the Audit Committee
The
current members of the Audit Committee are Steve Cook
(Chairperson), Gordon Fretwell and Jeffrey Mason. All current
members of the Audit Committee are considered to be financially
literate and all are independent.
Relevant education and Experience
Set out
below is a brief description of the education and experience of
each Audit Committee member that is relevant to the performance of
his responsibilities as an Audit Committee member.
Steve Cook is a practicing tax
partner at the law firm of Thorsteinssons LLP, Vancouver, British
Columbia. Mr. Cook received his B.Comm. and LL.B. degrees from the
University of British Columbia and was called to the British
Columbia Bar in 1982 and the Ontario Bar in 1992. Mr. Cook is a
specialist in corporate and international tax planning, offshore
structures, representation, and civil and criminal tax
litigation.
Gordon Fretwell holds a B.Comm.
degree and graduated from the University of British Columbia in
1979 with his Bachelor of Law degree. Formerly a partner in a large
Vancouver law firm, Mr. Fretwell has, since 1991, been a
self-employed solicitor (Gordon J. Fretwell Law Corporation) in
Vancouver, practicing primarily in the areas of corporate and
securities law.
Jeffrey Mason is a Chartered Professional Accountant and
holds an Institute of Corporate Directors designation. Over
the past 25 years he served on over 20 public company’s
boards. He is experienced in exploration, development,
construction and operation for silver, gold, copper, nickel, lead,
zinc, platinum group metals and diamond projects in the Americas,
Asia and Africa. In 2004 he was awarded the BC Ernst &
Young Entrepreneur of the Year Award (Natural Resources
Category). He also worked for 15 years for the Hunter
Dickinson group, where he performed a variety of roles including
Principal, Chief Financial Officer and Corporate Secretary.
Mr. Mason served as Director and Audit Chair for eight years at
Coastal Contacts Inc. (sold to Essilor International in
2014). He began his career with Deloitte LLP as a Chartered
Accountant, followed by eight years at Homestake Mining Company
(merged with Barrick Gold Corporation) and also served as Chief
Financial Officer of Wellgreen Platinum Ltd. from 2012 to
2016. Mr. Mason also sits as the Board Chairperson, Interim
President and Chief Executive Officer of Great Panther Mining
Limited and an independent board member of Torq Resources
Inc. The balance of Mr. Mason’s professional activities
is spent providing financial and operations advisory
consulting/employment services for mining, electrical power and
construction.
57
Each
member of the Audit Committee has:
●
an understanding of
the accounting principles used by the Company to prepare its
financial statements, and the ability to assess the general
application of those principles in connection with estimates,
accruals and reserves;
●
experience
preparing, auditing, auditing, analyzing or evaluating financial
statements that present a breadth and level of complexity of
accounting issues that are generally comparable to the breadth and
complexity of issues that can reasonably be expected to be raised
by the Company’s financial statements, or experience actively
supervising individuals engaged in such activities;
and
●
an understanding of
internal controls and procedures for financial
reporting.
Pre-Approval Policies and Procedures
The
Audit Committee has adopted specific policies and procedures for
the engagement of non-audit services to be provided to the Company
or any subsidiaries by the Company’s external auditor. The
Chair of the Audit Committee has the authority to pre-approve in
between regularly scheduled Audit Committee meetings any non-audit
service of less than $50, however such approval will be presented
to the Audit Committee at the next scheduled meeting for formal
approval.
External Auditor Service Fees
The
following table discloses the aggregate fees billed for each of the
last two fiscal years for professional services rendered by the
Company’s auditor for various services.
Fees
incurred with Deloitte LLP, Chartered Professional Accountants (the
“Auditor” or
“Deloitte LLP”)
for the years ended December 31, 2019 and December 31,
2018.
Table 12 – Audit Fees
|
Nature of Services
|
December 31, 2019
|
December 31, 2018
|
|
Audit
Fees
|
$132.5
|
$165.5
|
|
Audit-Related
Fees
|
Nil
|
Nil
|
|
Tax
Fees
|
Nil
|
$31.8
|
|
All
Other Fees
|
Nil
|
Nil
|
|
Total
|
$132.5
|
$197.3
|
Notes:
1)
“Audit
Fees” include fees necessary to perform the annual audit and
quarterly reviews of the Company’s consolidated financial
statements. Audit Fees also include audit or other attest services
required by legislation or regulation, such as comfort letters,
consents, reviews of securities filings and statutory audits. In
2018 and 2019, the Audit Fees included fees incurred in connection
with the certain securities filings.
2)
“Audit-Related
Fees” include services that are traditionally performed by
the auditor. These audit-related services include employee benefit
audits, due diligence assistance, accounting consultations on
proposed transactions, internal control reviews and audit or attest
services not required by legislation or regulation.
3)
“Tax
Fees” include fees for all tax services other than those
included in “Audit Fees” and “Audit-Related
Fees”. This category includes fees for tax compliance, tax
planning and tax advice. In 2018, Tax Fees included fees for
various tax advice and compliance in connection with the
Company’s operations in Peru.
4)
“All Other
Fees” include all other non-audit services.
58
ADDITIONAL INFORMATION
Additional
information relating to Auryn, including directors’ and
officers’ remuneration and indebtedness, principal holders of
Auryn’s securities, and securities authorized for issuance
under equity compensation plans, is contained in annual financial
statements, management’s discussion and analysis, proxy
circulars and interim financial statements of the Company,
available under the Company’s profile on SEDAR at
www.sedar.com.
59