FIRSTENERGY CORP 10-K, filed Mar 2, 2006: EXHIBIT 13 ANNUAL REPORT - FE
GLOSSARY
OF
TERMS
The
following
abbreviations and acronyms are used in this report to identify FirstEnergy
Corp.
and its current and former subsidiaries:
|
ATSI
|
American
Transmission Systems, Inc., owns and operates transmission
facilities
|
|
Avon
|
Avon
Energy
Partners Holdings
|
|
CEI
|
The
Cleveland
Electric Illuminating Company, an Ohio electric utility operating
subsidiary
|
|
Centerior
|
Centerior
Energy Corporation, former parent of CEI and TE, which merged with
OE to
form FirstEnergy on November 8, 1997.
|
|
CFC
|
Centerior
Funding Corporation, a wholly owned finance subsidiary of
CEI
|
|
Companies
|
OE,
CEI, TE,
Penn, JCP&L, Met-Ed and Penelec
|
|
EGSA
|
Empresa
Guaracachi S.A.
|
|
Emdersa
|
Empresa
Distribuidora Electrica Regional S.A.
|
|
FENOC
|
FirstEnergy
Nuclear Operating Company, operates nuclear generating
facilities
|
|
FES
|
FirstEnergy
Solutions Corp., provides energy-related products and
services
|
|
FESC
|
FirstEnergy
Service Company, provides legal, financial, and other corporate support
services
|
|
FGCO
|
FirstEnergy
Generation Corp., owns and operates non-nuclear generating
facilities
|
|
FirstCom
|
First
Communications, LLC, provides local and long-distance telephone
service
|
|
FirstEnergy
|
FirstEnergy
Corp., a public utility holding company
|
|
FSG
|
FirstEnergy
Facilities Services Group, LLC, the parent company of several heating,
ventilation,
air
conditioning and energy management companies
|
|
GLEP
|
Great
Lakes
Energy Partners, LLC, an oil and natural gas exploration and production
venture
|
|
GPU
|
GPU,
Inc.,
former parent of JCP&L, Met-Ed and Penelec, which merged with
FirstEnergy on
November 7,
2001
|
|
GPU
Capital
|
GPU
Capital,
Inc., owned and operated electric distribution systems in foreign
countries
|
|
GPU
Power
|
GPU
Power,
Inc., owned and operated generation facilities in foreign
countries
|
|
JCP&L
|
Jersey
Central
Power & Light Company, a New Jersey electric utility operating
subsidiary
|
|
JCP&L
Transition
|
JCP&L
Transition Funding LLC, a Delaware limited liability company and
issuer of
transition bonds
|
|
MARBEL
|
MARBEL
Energy
Corporation, previously held FirstEnergy's interest in
GLEP
|
|
Met-Ed
|
Metropolitan
Edison Company, a Pennsylvania electric utility operating
subsidiary
|
|
MYR
|
MYR
Group,
Inc., a utility infrastructure construction service
company
|
|
NEO
|
Northeast
Ohio
Natural Gas Corp., formerly a MARBEL subsidiary
|
|
NGC
|
FirstEnergy
Nuclear Generation Corp., owns nuclear generating
facilities
|
|
OE
|
Ohio
Edison
Company, an Ohio electric utility operating subsidiary
|
|
Ohio
Companies
|
CEI,
OE and
TE
|
|
Penelec
|
Pennsylvania
Electric Company, a Pennsylvania electric utility operating
subsidiary
|
|
Penn
|
Pennsylvania
Power Company, a Pennsylvania electric utility operating subsidiary
of
OE
|
|
PNBV
|
PNBV
Capital
Trust, a special purpose entity created by OE in 1996
|
|
Shippingport
|
Shippingport
Capital Trust, a special purpose entity created by CEI and TE in
1997
|
|
TE
|
The
Toledo
Edison Company, an Ohio electric utility operating
subsidiary
|
|
TEBSA
|
Termobarranquilla
S.A., Empresa de Servicios Publicos
|
|
The
following
abbreviations and acronyms are used to identify frequently used terms
in
this report:
|
|
|
AEC
|
Alternative
Energy Credit
|
|
ALJ
|
Administrative
Law Judge
|
|
AOCL
|
Accumulated
Other Comprehensive Loss
|
|
APB
|
Accounting
Principles Board
|
|
APB
25
|
APB
Opinion
No. 25, "Accounting for Stock Issued to Employees"
|
|
APB
29
|
APB
Opinion
No. 29, "Accounting for Nonmonetary Transactions"
|
|
ARB
|
Accounting
Research Bulletin
|
|
ARB
43
|
ARB
No. 43,
"Restatement and Revision of Accounting Research
Bulletins"
|
|
ARO
|
Asset
Retirement Obligation
|
|
BGS
|
Basic
Generation Service
|
|
CAIR
|
Clean
Air
Interstate Rule
|
|
CAL
|
Confirmatory
Action Letter
|
|
CAMR
|
Clean
Air
Mercury Rule
|
|
CAVR
|
Clean
Air
Visibility Rule
|
|
CAT
|
Commercial
Activity Tax
|
i
GLOSSARY
OF
TERMS, Cont'd.
|
CO2
|
Carbon
Dioxide
|
|
CTC
|
Competitive
Transition Charge
|
|
DOJ
|
United
States
Department of Justice
|
|
DRA
|
Division
of
Ratepayer Advocate
|
|
ECAR
|
East
Central
Area Reliability Coordination Agreement
|
|
EITF
|
Emerging
Issues Task Force
|
|
EITF
03-1
|
EITF
Issue No.
03-1, "The Meaning of Other-Than-Temporary and Its Application to
Certain
Investments”
|
|
EITF
04-13
|
EITF
Issue No.
04-13, “Accounting for Purchases and Sales of Inventory with the Same
Counterparty"
|
|
EITF
99-19
|
EITF
Issue No.
99-19, "Reporting Revenue Gross as a Principal versus Net as an
Agent"
|
|
EPA
|
Environmental
Protection Agency
|
|
EPACT
|
Energy
Policy
Act of 2005
|
|
ERO
|
Electric
Reliability Organization
|
|
FASB
|
Financial
Accounting Standards Board
|
|
FERC
|
Federal
Energy
Regulatory Commission
|
|
FIN
|
FASB
Interpretation
|
|
FIN
46R
|
FIN
46
(revised December 2003), "Consolidation of Variable Interest
Entities"
|
|
FIN
47
|
FIN
47,
"Accounting for Conditional Asset Retirement Obligations - an
interpretation of FASB Statement No. 143"
|
|
FMB
|
First
Mortgage
Bonds
|
|
FSP
|
FASB
Staff
Position
|
|
FSP
13-1
|
FASB
Staff
Position No. 13-1, "Accounting for Rental Costs Incurred during the
Construction Period"
|
|
FSP
106-1
|
FASB
Staff
Position No.106-1, "Accounting and Disclosure Requirements Related
to the
Medicare
Prescription
Drug, Improvement and Modernization Act of 2003"
|
|
FSP
106-2
|
FASB
Staff
Position No.106-2, "Accounting and Disclosure Requirements Related
to the
Medicare Prescription Drug, Improvement and Modernization Act of
2003"
|
|
FSP
115-1 and
FAS 124-1
|
FASB
Staff
Position No. 115-1 and FAS 124-1, "The Meaning of Other-Than-Temporary
Impairment and its Application to Certain Investments"
|
|
FSP
123(R)
|
FASB
Staff
Position No. 123(R), "Share-Based Payment"
|
|
GAAP
|
Accounting
Principles Generally Accepted in the United States
|
|
GCAF
|
Generation
Charge Adjustment Factor
|
|
GHG
|
Greenhouse
Gases
|
|
HVAC
|
Heating,
Ventilation and Air-conditioning
|
|
IRS
|
Internal
Revenue Service
|
|
KWH
|
Kilowatt-hours
|
|
LOC
|
Letter
of
Credit
|
|
Medicare
Act
|
Medicare
Prescription Drug, Improvement and Modernization Act of
2003
|
|
MEIUG
|
Met-Ed
Industrial Users Group
|
|
MISO
|
Midwest
Independent System Transmission Operator, Inc.
|
|
Moody’s
|
Moody’s
Investors Service
|
|
MOU
|
Memorandum
of
Understanding
|
|
MTC
|
Market
Transition Charge
|
|
MW
|
Megawatts
|
|
NAAQS
|
National
Ambient Air Quality Standards
|
|
NERC
|
North
American
Electric Reliability Council
|
|
NJBPU
|
New
Jersey
Board of Public Utilities
|
|
NOAC
|
Northwest
Ohio
Aggregation Coalition
|
|
NOV
|
Notices
of
Violation
|
|
NOX
|
Nitrogen
Oxide
|
|
NRC
|
Nuclear
Regulatory Commission
|
|
NUG
|
Non-Utility
Generation
|
|
NUGC
|
Non-Utility
Generation Clause
|
|
OCA
|
Office
of
Consumer Advocate
|
|
OCC
|
Office
of the
Ohio Consumers' Counsel
|
|
OCI
|
Other
Comprehensive Income
|
|
OPAE
|
Ohio
Partners
for Affordable Energy
|
|
OPEB
|
Other
Post-Employment Benefits
|
|
OSBA
|
Office
of
Small Business Advocate
|
ii
GLOSSARY
OF
TERMS, Cont'd.
|
OTS
|
Office
of
Trial Staff
|
|
PICA
|
Penelec
Industrial Customer Association
|
|
PJM
|
PJM
Interconnection L. L. C.
|
|
PLR
|
Provider
of
Last Resort
|
|
PPUC
|
Pennsylvania
Public Utility Commission
|
|
PRP
|
Potentially
Responsible Party
|
|
PUCO
|
Public
Utilities Commission of Ohio
|
|
PUHCA
|
Public
Utility
Holding Company Act of 1935
|
|
RCP
|
Rate
Certainty
Plan
|
| RFP | Request for Proposal |
|
RSP
|
Rate
Stabilization Plan
|
|
RTC
|
Regulatory
Transition Charge
|
|
RTO
|
Regional
Transmission Organization
|
|
S&P
|
Standard
&
Poor’s Ratings Service
|
|
SBC
|
Societal
Benefits Charge
|
|
SEC
|
U.S.
Securities and Exchange Commission
|
|
SFAC
|
Statement
of
Financial Accounting Concepts
|
|
SFAC
7
|
SFAC
No. 7,
"Using Cash Flow Information and Present Value in Accounting
Measurements"
|
|
SFAS
|
Statement
of
Financial Accounting Standards
|
|
SFAS
71
|
SFAS
No. 71,
"Accounting for the Effects of Certain Types of
Regulation"
|
|
SFAS
87
|
SFAS
No. 87,
"Employers' Accounting for Pensions"
|
|
SFAS
101
|
SFAS
No. 101,
"Accounting for Discontinuation of Application of SFAS
71"
|
|
SFAS
106
|
SFAS
No. 106,
"Employers' Accounting for Postretirement Benefits Other Than
Pensions"
|
|
SFAS
115
|
SFAS
No. 115,
"Accounting for Certain Investments in Debt and Equity
Securities"
|
|
SFAS
123
|
SFAS
No. 123,
"Accounting for Stock-Based Compensation"
|
|
SFAS
123(R)
|
SFAS
No.
123(R), "Share-Based Payment"
|
|
SFAS
131
|
SFAS
No. 131,
"Disclosures about Segments of an Enterprise and Related
Information"
|
|
SFAS
133
|
SFAS
No. 133,
“Accounting for Derivative Instruments and Hedging
Activities”
|
|
SFAS
140
|
SFAS
No. 140,
“Accounting for Transfers and Servicing of Financial Assets and
Extinguishment
of Liabilities”
|
|
SFAS
142
|
SFAS
No. 142,
"Goodwill and Other Intangible Assets"
|
|
SFAS
143
|
SFAS
No. 143,
"Accounting for Asset Retirement Obligations"
|
|
SFAS
144
|
SFAS
No. 144,
"Accounting for the Impairment or Disposal of Long-Lived
Assets"
|
|
SFAS
150
|
SFAS
No. 150,
"Accounting for Certain Financial Instruments with Characteristics
of Both
Liabilities
and Equity"
|
|
SFAS
151
|
SFAS
No. 151,
"Inventory Costs - an amendment of ARB No. 43, Chapter
4"
|
|
SFAS
153
|
SFAS
No. 153,
“Exchanges of Nonmonetary Assets - an amendment of APB Opinion No.
29”
|
|
SFAS
154
|
SFAS
No. 154,
“Accounting Changes and Error Corrections - a replacement of APB Opinion
No. 20 and FASB Statement No. 3”
|
| SO2 |
Sulfur
Dioxide
|
|
TBC
|
Transition
Bond Charge
|
|
TMI-1
|
Three
Mile
Island Unit 1
|
|
TMI-2
|
Three
Mile
Island Unit 2
|
|
VIE
|
Variable
Interest Entity
|
iii
MANAGEMENT
REPORTS
Management's
Responsibility for Financial Statements
The
consolidated
financial statements were prepared by management who takes responsibility for
their integrity and objectivity. The statements were prepared in conformity
with
accounting principles generally accepted in the United States and are consistent
with other financial information appearing elsewhere in this report.
PricewaterhouseCoopers LLP, an independent registered public accounting firm,
has expressed an unqualified opinion on the Company’s 2005 consolidated
financial statements.
FirstEnergy
Corp.’s
internal auditors, who are responsible to the Audit Committee of FirstEnergy’s
Board of Directors, review the results and performance of operating units within
the Company for adequacy, effectiveness and reliability of accounting and
reporting systems, as well as managerial and operating controls.
FirstEnergy’s
Audit
Committee consists of six independent directors whose duties include:
consideration of the adequacy of the internal controls of the Company and the
objectivity of financial reporting; inquiry into the number, extent, adequacy
and validity of regular and special audits conducted by independent auditors
and
the internal auditors; and reporting to the Board of Directors the Committee’s
findings and any recommendation for changes in scope, methods or procedures
of
the auditing functions. The Committee is directly responsible for appointing
the
Company’s independent registered public accounting firm and is charged with
reviewing and approving all services performed for the Company by the
independent registered public accounting firm and for reviewing and approving
the related fees. The Committee reviews the independent registered public
accounting firm's report on internal quality control and reviews all
relationships between the independent registered public accounting firm and
the
Company, in order to assess the independent registered public accounting firm's
independence. The Committee also reviews management’s programs to monitor
compliance with the Company’s policies on business ethics and risk management.
The Committee establishes procedures to receive and respond to complaints
received by the Company regarding accounting, internal accounting controls,
or
auditing matters and allows for the confidential, anonymous submission of
concerns by employees. The Audit Committee held eight meetings in
2005.
Management's
Report on Internal Control Over Financial Reporting
Management
is
responsible for establishing and maintaining adequate internal control over
financial reporting as defined in Rule 13a-15(f) of the Securities Exchange
Act of 1934. Using the criteria set forth by the Committee of Sponsoring
Organizations of the Treadway Commission in Internal
Control
- Integrated Framework,
management
conducted an evaluation of the effectiveness of the Company’s internal control
over financial reporting under the supervision of the chief executive officer
and the chief financial officer. Based on that evaluation, management concluded
that the Company’s internal control over financial reporting was effective as of
December 31, 2005.
Management’s
assessment of the effectiveness of the Company’s internal control over financial
reporting, as of December 31, 2005, has been audited by
PricewaterhouseCoopers LLP, an independent registered public accounting firm,
as
stated in their report which appears on page 2.
1
To
the Stockholders and Board of Directors of FirstEnergy Corp.:
We
have completed
integrated audits of FirstEnergy Corp.’s 2005 and 2004 consolidated financial
statements and of its internal control over financial reporting as of December
31, 2005, and an audit of its 2003 consolidated financial statements in
accordance with the standards of the Public Company Accounting Oversight Board
(United States). Our opinions, based on our audits, are presented
below.
Consolidated
financial statements and financial statement schedules
In
our opinion, the
accompanying consolidated balance sheets and the related consolidated statements
of income, capitalization, common stockholders' equity, preferred stock, cash
flows, and taxes present fairly, in all material respects, the financial
position of FirstEnergy Corp. and its subsidiaries at December 31, 2005 and
2004, and the results of their operations and their cash flows for each of
the
three years in the period ended December 31, 2005 in conformity with accounting
principles generally accepted in the United States of America. These
financial statements are the responsibility of the Company’s management.
Our responsibility is to express an opinion on these financial
statements based on our audits. We conducted our audits of these statements
in accordance with the standards of the Public Company Accounting Oversight
Board (United States). Those standards require that we plan and perform the
audit to obtain reasonable assurance about whether the financial statements
are
free of material misstatement. An audit of financial statements includes
examining, on a test basis, evidence supporting the amounts and disclosures
in
the financial statements, assessing the accounting principles used and
significant estimates made by management, and evaluating the overall
financial
statement
presentation. We believe that our audits provide a reasonable basis for our
opinion.
As
discussed in Note
2(K) and Note 12 to the consolidated financial statements, the Company changed
its method of accounting for asset retirement obligations as of January 1,
2003
and conditional asset retirement obligations as of December 31, 2005. As
discussed in Note 7 to the consolidated financial statements, the Company
changed its method of accounting for the consolidation of variable interest
entities as of December 31, 2003.
Internal
control
over financial reporting
Also,
in our
opinion, management’s assessment, included in the accompanying Management's
Report on Internal Control Over Financial Reporting, that the Company maintained
effective internal control over financial reporting as of 2005 based on criteria
established in Internal
Control
- Integrated Framework
issued by the
Committee of Sponsoring Organizations of the Treadway Commission (COSO), is
fairly stated, in all material respects, based on those criteria. Furthermore,
in our opinion, the Company maintained, in all material respects, effective
internal control over financial reporting as of December 31, 2005, based on
criteria established in Internal
Control
- Integrated Framework
issued by the COSO.
The Company’s management is responsible for maintaining effective internal
control over financial reporting and for its assessment of the effectiveness
of
internal control over financial reporting. Our responsibility is to express
opinions on management’s assessment and on the effectiveness of the Company’s
internal control over financial reporting based on our audit. We conducted
our
audit of internal control over financial reporting in accordance with the
standards of the Public Company Accounting Oversight Board (United States).
Those standards require that we plan and perform the audit to obtain reasonable
assurance about whether effective internal control over financial reporting
was
maintained in all material respects. An audit of internal control over financial
reporting includes obtaining an understanding of internal control over financial
reporting, evaluating management’s assessment, testing and evaluating the design
and operating effectiveness of internal control, and performing such other
procedures as we consider necessary in the circumstances. We believe that our
audit provides a reasonable basis for our opinions.
A
company’s internal
control over financial reporting is a process designed to provide reasonable
assurance regarding the reliability of financial reporting and the preparation
of financial statements for external purposes in accordance with generally
accepted accounting principles. A company’s internal control over financial
reporting includes those policies and procedures that (i) pertain to the
maintenance of records that, in reasonable detail, accurately and fairly reflect
the transactions and dispositions of the assets of the company;
(ii) provide reasonable assurance that transactions are recorded as
necessary to permit preparation of financial statements in accordance with
generally accepted accounting principles, and that receipts and expenditures
of
the company are being made only in accordance with authorizations of management
and directors of the company; and (iii) provide reasonable assurance
regarding prevention or timely detection of unauthorized acquisition, use,
or
disposition of the company’s assets that could have a material effect on the
financial statements.
Because
of its
inherent limitations, internal control over financial reporting may not prevent
or detect misstatements. Also, projections of any evaluation of effectiveness
to
future periods are subject to the risk that controls may become inadequate
because of changes in conditions, or that the degree of compliance with the
policies or procedures may deteriorate.
PricewaterhouseCoopers
LLP
Cleveland,
Ohio
February
27,
2006
2
The
following
selected financial data should be read in conjunction with, and is qualified
in
its entirety by reference to, the sections entitled “Management’s Discussion and
Analysis of Results of Operations and Financial Condition” and with
our
consolidated financial statements and the “Notes to Consolidated Financial
Statements.” Our Statements of Income are not necessarily indicative of future
conditions or results of operations.
|
FIRSTENERGY
CORP.
|
|||||||||||||||||||
|
SELECTED
FINANCIAL DATA
|
|||||||||||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
2002
|
2001
|
||||||||||||||
|
(In
millions, except per share amounts)
|
|||||||||||||||||||
|
Revenues
(1)
|
$
|
11,989
|
$
|
12,060
|
$
|
11,325
|
$
|
11,169
|
$
|
6,924
|
|
||||||||
|
Income
Before
Discontinued
|
|||||||||||||||||||
|
Operations
and
Cumulative Effect of
|
|||||||||||||||||||
|
Accounting
Changes
|
$
|
873
|
$
|
896
|
$
|
444
|
$
|
613
|
$
|
648
|
|
|
|||||||
|
Net
Income
|
$
|
861
|
$
|
878
|
$
|
423
|
$
|
553
|
$
|
646
|
|
|
|||||||
|
Basic
Earnings
per Share of Common Stock:
|
|||||||||||||||||||
|
Before
Discontinued Operations and
|
|||||||||||||||||||
|
Cumulative
Effect of Accounting Changes
|
$
|
2.66
|
$
|
2.74
|
$
|
1.46
|
$
|
2.09
|
$
|
2.82
|
|||||||||
|
After
Discontinued Operations and
|
|||||||||||||||||||
|
Cumulative
Effect of Accounting Changes
|
$
|
2.62
|
$
|
2.68
|
$
|
1.39
|
$
|
1.89
|
$
|
2.82
|
|||||||||
|
Diluted
Earnings per Share of Common Stock:
|
|||||||||||||||||||
|
Before
Discontinued Operations and
|
|||||||||||||||||||
|
Cumulative
Effect of Accounting Changes
|
$
|
2.65
|
$
|
2.73
|
$
|
1.46
|
$
|
2.08
|
$
|
2.81
|
|||||||||
|
After
Discontinued Operations and
|
|||||||||||||||||||
|
Cumulative
Effect of Accounting Changes
|
$
|
2.61
|
$
|
2.67
|
$
|
1.39
|
$
|
1.88
|
$
|
2.81
|
|||||||||
|
Dividends
Declared per Share of Common Stock (2)
|
$
|
1.7050
|
$
|
1.9125
|
$
|
1.50
|
$
|
1.50
|
$
|
1.50
|
|||||||||
|
Total
Assets
|
$
|
31,841
|
$
|
31,035
|
$
|
32,878
|
$
|
34,366
|
$
|
37,334
|
|||||||||
|
Capitalization
as of December 31:
|
|||||||||||||||||||
|
Common
Stockholders’ Equity
|
$
|
9,188
|
$
|
8,590
|
$
|
8,290
|
$
|
7,051
|
$
|
7,399
|
|||||||||
|
Preferred
Stock:
|
|||||||||||||||||||
|
Not
Subject to
Mandatory Redemption
|
184
|
335
|
335
|
335
|
480
|
||||||||||||||
|
Subject
to
Mandatory Redemption
|
-
|
-
|
-
|
428
|
595
|
||||||||||||||
|
Long-Term
Debt
and Other Long-Term
|
|||||||||||||||||||
|
Obligations
|
8,155
|
10,013
|
9,789
|
10,872
|
12,865
|
||||||||||||||
|
Total
Capitalization
|
$
|
17,527
|
$
|
18,938
|
$
|
18,414
|
$
|
18,686
|
$
|
21,339
|
|||||||||
|
Weighted
Average Number of Basic
|
|||||||||||||||||||
|
Shares
Outstanding
|
328
|
327
|
304
|
293
|
230
|
||||||||||||||
|
Weighted
Average Number of Diluted
|
|||||||||||||||||||
|
Shares
Outstanding
|
330
|
329
|
305
|
294
|
230
|
||||||||||||||
|
(1)
The
reduction of 2005 revenues compared to 2004 reflects a change
in reporting
methodology for PJM market transactions (see Note 2(D)) that
had no
impact
|
|||||||||||||||||||
|
on net income. Excluding that reporting change, revenues in 2005
were $997
million higher than 2004.
|
|||||||||||||||||||
|
(2)
Dividends
declared in 2005 include two quarterly payments of $0.4125 per
share in
2005, one quarterly payment of $0.43 per share in 2005 and one
quarterly
|
|||||||||||||||||||
|
payment of $0.45 per share payable in 2006, increasing the indicated
annual dividend rate from $1.72 to $1.80 per share. Dividends
declared in
2004 include four
|
|||||||||||||||||||
|
quarterly dividends of $0.375 per share paid in 2004 and a quarterly
dividend of $0.4125 per share declared in 2004 and paid March
1, 2005.
Dividends declared
|
|||||||||||||||||||
|
in 2001, 2002 and 2003 include four quarterly dividends of $0.375
per
share
|
|||||||||||||||||||
|
|
|||||||||||||||||||
PRICE
RANGE
OF COMMON STOCK
The
Common Stock of
FirstEnergy Corp. is listed on the New York Stock Exchange under the symbol
"FE"
and is traded on other registered exchanges.
|
2005
|
2004
|
||||||||||||
|
First
Quarter
High-Low
|
$
|
42.36
|
$
|
37.70
|
$
|
39.37
|
$
|
35.24
|
|||||
|
Second
Quarter
High-Low
|
$
|
48.96
|
$
|
40.75
|
$
|
39.73
|
$
|
36.73
|
|||||
|
Third
Quarter
High-Low
|
$
|
53.00
|
$
|
47.46
|
$
|
42.23
|
$
|
37.04
|
|||||
|
Fourth
Quarter
High-Low
|
$
|
53.36
|
$
|
45.78
|
$
|
43.41
|
$
|
38.35
|
|||||
|
Yearly
High-Low
|
$
|
53.36
|
$
|
37.70
|
$
|
43.41
|
$
|
35.24
|
|||||
Prices
are
from
http://finance.yahoo.com.
HOLDERS
OF
COMMON STOCK
There
were 135,261
and 134,587 holders of 329,836,276 shares of FirstEnergy's Common Stock as
of
December 31, 2005 and January 31, 2006, respectively. Information
regarding retained earnings available for payment of cash dividends is given
in
Note 11(A) to the consolidated financial statements.
3
FIRSTENERGY
CORP.
MANAGEMENT'S
DISCUSSION AND ANALYSIS OF
RESULTS
OF
OPERATIONS AND FINANCIAL CONDITION
Forward-looking
Statements. This
discussion
includes forward-looking statements based on information currently available
to
management. Such statements are subject to certain risks and uncertainties.
These statements typically contain, but are not limited to, the terms
"anticipate," "potential," "expect," "believe," "estimate" and similar words.
Actual results may differ materially due to the speed and nature of increased
competition and deregulation in the electric utility industry, economic or
weather conditions affecting future sales and margins, changes in markets for
energy services, changing energy and commodity market prices, replacement power
costs being higher than anticipated or inadequately hedged, the continued
ability of our regulated utilities to collect transition and other charges
or to
recover increased transmission costs, maintenance costs being higher than
anticipated, legislative and regulatory changes (including revised environmental
requirements), the repeal of PUHCA and the legal and regulatory changes
resulting from the implementation of the EPACT, the uncertainty of the timing
and amounts of the capital expenditures (including that such amounts could
be
higher than anticipated) or levels of emission reductions related to the
settlement agreement resolving the New Source Review litigation, adverse
regulatory or legal decisions and outcomes (including, but not limited to,
the
revocation of necessary licenses or operating permits, fines or other
enforcement actions and remedies) of governmental investigations and oversight,
including by the Securities and Exchange Commission, the United States
Attorney's Office, the Nuclear Regulatory Commission and the various state
public utility commissions as disclosed in our Securities and Exchange
Commission filings, generally, and with respect to the Davis-Besse Nuclear
Power
Station outage and heightened scrutiny at the Perry Nuclear Power Plant in
particular, the continuing availability and operation of generating units,
the
ability of our generating units to continue to operate at, or near full
capacity, our inability to accomplish or realize anticipated benefits from
strategic goals (including employee workforce factors), the anticipated benefits
from our voluntary pension plan contributions, our ability to improve electric
commodity margins and to experience growth in the distribution business, our
ability to access the public securities and other capital markets and the cost
of such capital, the outcome, cost and other effects of present and potential
legal and administrative proceedings and claims related to the August 14,
2003 regional power outage, circumstances which may lead management to seek,
or
the Board of Directors to grant, in each case in its sole discretion, authority
for the implementation of a share repurchase program in the future, the risks
and other factors discussed from time to time in our Securities and Exchange
Commission filings, and other similar factors. Dividends declared from time
to
time during any annual period may in aggregate vary from the indicated amounts
due to circumstances considered by the Board at the time of the actual
declarations. Also, a credit rating should not be viewed as a recommendation
to
buy, sell or hold securities and may be revised or withdrawn by a rating agency
at any time. We expressly disclaim any current intention to update any
forward-looking statements contained herein as a result of new information,
future events, or otherwise.
EXECUTIVE
SUMMARY
|
Non-GAAP
Reconciliation
|
2005
|
2004
|
2003
|
||||||||||||||||
|
Basic
|
Basic
|
Basic
|
|||||||||||||||||
|
After-tax
|
Earnings
|
After-tax
|
Earnings
|
After-tax
|
Earnings
|
||||||||||||||
|
Amount
|
Per
Share
|
Amount
|
Per
Share
|
Amount
|
Per
Share
|
||||||||||||||
|
(Dollars
in millions)
|
|||||||||||||||||||
|
Earnings
Before Unusual Items (Non-GAAP)
|
$
|
984
|
$
|
3.00
|
$
|
991
|
$
|
3.03
|
$
|
736
|
$
|
2.42
|
|||||||
|
Cumulative
effect of accounting changes
|
(30
|
)
|
(0.09
|
)
|
102
|
0.33
|
|||||||||||||
|
Ohio/New
Jersey income tax adjustments
|
(63
|
)
|
(0.19
|
)
|
|||||||||||||||
|
EPA
settlement
|
(14
|
)
|
(0.04
|
)
|
|||||||||||||||
|
Davis-Besse
DOJ penalty and NRC fines
|
(31
|
)
|
(0.10
|
)
|
|||||||||||||||
|
JCP&L
arbitration decision
|
(10
|
)
|
(0.03
|
)
|
|||||||||||||||
|
JCP&L
rate
settlement
|
16
|
0.05
|
|||||||||||||||||
|
Non-core
asset
sales/impairments
|
9
|
0.02
|
(60
|
)
|
(0.19
|
)
|
(125
|
)
|
(0.41
|
)
|
|||||||||
|
Davis-Besse
extended outage impacts
|
(38
|
)
|
(0.12
|
)
|
(170
|
)
|
(0.56
|
)
|
|||||||||||
|
Class-action
lawsuit settlement
|
(11
|
)
|
(0.03
|
)
|
|||||||||||||||
|
JCP&L
disallowance
|
(109
|
)
|
(0.36
|
)
|
|||||||||||||||
|
NRG
settlement
|
99
|
0.33
|
|||||||||||||||||
|
Discontinued
international operations
|
(101
|
)
|
(0.33
|
)
|
|||||||||||||||
|
Other
|
(4
|
)
|
(0.01
|
)
|
(9
|
)
|
(0.03
|
)
|
|||||||||||
|
Net
Income (GAAP)
|
$
|
861
|
$
|
2.62
|
$
|
878
|
$
|
2.68
|
$
|
423
|
$
|
1.39
|
|||||||
4
The
Non-GAAP measure
above, earnings before unusual items, is not calculated in accordance with
GAAP
because it excludes the impact of "unusual items." Unusual items reflect the
impact on earnings of events that are not routine or for which we believe the
financial impact will disappear or become immaterial within a near-term finite
period. By removing the earnings effect of such issues that have been resolved
or are expected to be resolved over the near term, our management and investors
can better measure our business and earnings potential. In particular, the
non-core asset sales item refers to a finite set of energy-related assets that
had been previously disclosed as held for sale, a substantial portion of which
has already been sold. In addition, as Davis-Besse restarted in 2004, further
impacts from its extended outage are not expected. Similarly, the DOJ penalty
and NRC fines in 2005 and further litigation settlements similar to the class
action settlements in 2004 are not reasonably expected over the near term.
Furthermore, we believe presenting normalized earnings calculated in this manner
provides useful information to investors in evaluating the ongoing results
of
our businesses over the longer term and assists investors in comparing our
operating performance to the operating performance of others in the energy
sector.
Sales
and production
- KWH sales for 2005 were higher than the previous year, driven primarily by
strong sales to residential and commercial customers. An unseasonably warmer
summer and a colder fourth quarter in 2005 led to our generating fleet producing
a record 80.2 billion KWH, compared to 76.4 billion KWH in 2004. Our
non-nuclear fleet produced record output of 51.5 billion KWH and our
nuclear fleet produced 28.7 billion KWH.
Davis-Besse
Issues -
In January 2006, FENOC announced that it had entered into a deferred prosecution
agreement with the U.S. Attorney’s Office for the Northern District of Ohio and
the Environmental Crimes Section of the Environment and Natural Resources
Division of the DOJ related to FENOC’s communications with the NRC during the
fall of 2001 in connection with the reactor head issue at the Davis-Besse
Nuclear Power Station. Under the agreement, the DOJ will refrain from seeking
an
indictment or otherwise initiating criminal prosecution of FENOC for all conduct
related to the statement of facts attached to the deferred prosecution agreement
as long as FENOC remains in compliance with the agreement.
FENOC
agreed to pay
a penalty of $28 million (which is not deductible for income tax purposes)
that reduced our earnings per share of common stock by $0.09 in 2005. As part
of
the deferred prosecution agreement entered into with the DOJ, $4.35 million
of that amount was directed to community service projects. In entering into
this
agreement, the United States acknowledged FENOC’s extensive corrective actions
at Davis-Besse, FENOC’s cooperation during investigations by the DOJ and the
NRC, FENOC’s pledge of continued cooperation in all related criminal and
administrative investigations and proceedings, FENOC’s acknowledgement of
responsibility for the behavior of its employees and its agreement to pay a
monetary penalty.
Pension
Contribution
- In December 2005, we made a voluntary $500 million contribution to our
pension plan. The impact of the pension contribution is expected to be accretive
to earnings and further increase security of future plan benefits. Since the
contribution is deductible for tax purposes, the after-tax cash impact was
approximately $341 million in 2005. We funded this payment through
available short-term credit facilities and anticipate repaying such borrowings
during 2006 through positive cash flow.
New
Jersey Rate
Matters - JCP&L filed a request in December 2005 with the NJBPU for an
increase in its NUGC, totaling $165 million, or approximately $4.08 per
month for a residential customer using 500 KWH of electricity. The proposed
6.4%
increase in JCP&L's total revenues is designed to recover above-market costs
associated with mandated long-term contracts between JCP&L and various NUGs.
Above-market NUG costs are deferred on our balance sheet as a regulatory asset.
Revenues collected through the NUGC reduce the regulatory asset and, therefore,
the $165 million annual increase will not have an effect on net income due
to deferral accounting.
Ohio
Rate Matters -
On
September 9, 2005, the Ohio Companies filed an application with the PUCO
that supplemented their existing RSP with an RCP designed to provide customers
with more certain rate levels than otherwise available under the RSP during
the
plan period. On
January 4,
2006, the PUCO approved the RCP filing with modifications. On January 10,
2006, the Ohio Companies filed a Motion for Clarification of the PUCO order
approving the RCP. On January 25, 2006, the PUCO issued an Entry on
Rehearing granting in part, and denying in part the Ohio Companies' previous
requests and clarifying related issues.
S&P
Ratings
Upgrade - In October 2005, S&P raised its corporate credit rating of
FirstEnergy and the Companies to ‘BBB’ from ‘BBB-’. At the same time,
S&P raised our senior unsecured ratings at the holding company to ‘BBB-’
from ‘BB+’ and each of the Companies by one notch above previous ratings.
S&P noted that the upgrade followed the continuation of a good operating
track record, specifically for the nuclear fleet through the third quarter
of
2005. S&P also stated that our rating reflects the benefits of supportive
regulation, our low-cost base load generation fleet, low-risk transmission
and
distribution operations and rate certainty in Ohio. Our ability to consistently
generate free cash flow, good liquidity and an improving financial profile
were
noted as strengths.
5
New
Source Review
Settlement - In March 2005,
we reached a
settlement with the EPA, the DOJ, and the States of Connecticut, New Jersey
and
New York that resolved all issues related to various parties’ actions against
our W. H. Sammis Plant in the pending New Source Review case. Under the
agreement, which is in the form of a consent decree of the U.S. District Court,
we will install environmental controls at the Sammis Plant, as well as some
of
our other power plants. We will also upgrade existing scrubber systems on
Units 1, 2 and 3 of our Bruce Mansfield Plant. Projects at the Sammis Plant
will include equipment designed to reduce 95% of SO2
emissions and 90%
of NOx
emissions on the
plant’s two largest units. Additionally, the plant’s five smaller units will be
fitted with control equipment designed to reduce at least 50% of SO2
and 70% of
NOx
emissions. In
total, additional environmental controls are expected to be installed on nearly
5,500 MW of our 7,400 MW coal-fired generating capacity. Construction began
in
2005 and is expected to be completed by 2012.
The
estimated
$1.5 billion investment in environmental improvements agreed to under the
settlement agreement is consistent with assumptions reflected in our long-term
financial planning prior to settlement. Nearly all of the expenditures are
expected to be capital additions and depreciated over a period of years.
Additionally, we paid an $8.5 million civil penalty to the DOJ and will
contribute up to $25 million over five years to support environmentally
beneficial projects as part of the settlement terms. This settlement penalty
reduced our earnings per share of common stock by $0.03 in the second quarter
of
2005.
Dividends
- The
Board of Directors increased our quarterly dividend twice during 2005,
representing a 9.1% increase over the rate in effect at the beginning of the
year. The first increase of 1.75 cents per share (a 4.2% increase) was declared
on September 20. The second increase of 2 cents per share (a 4.7% increase)
was declared on November 15 and is payable March 1, 2006. As of
December 31, 2005, our quarterly dividend rate stood at $0.45 per share of
common stock -- an annual indicated dividend rate of $1.80 per share. The amount
and timing of all dividend declarations are subject to the discretion of the
Board of Directors and its consideration of business conditions, results of
operations, financial condition and other factors.
FIRSTENERGY’S
BUSINESS
FirstEnergy
is a
public utility holding company headquartered in Akron, Ohio that operates
primarily through two core business segments (see Results of Operations -
Business Segments).
· Regulated
Services
transmits and
distributes electricity through our eight utility operating companies that
collectively comprise the nation’s fifth largest investor-owned electric system,
serving 4.5 million customers within 36,100 square miles of Ohio,
Pennsylvania and New Jersey. This business segment derives its revenue
principally from the delivery of electricity generated or purchased by our
Power
Supply Management Services segment in the states in which our utility
subsidiaries operate. The service areas of our utilities are
summarized below:
|
Company
|
Area
Served
|
Customers
Served
|
|
OE
|
Central
and
Northeastern Ohio
|
1,038,000
|
|
Penn
|
Western
Pennsylvania
|
158,000
|
|
CEI
|
Northeastern
Ohio
|
763,000
|
|
TE
|
Northwestern
Ohio
|
314,000
|
|
JCP&L
|
Northern,
Western and East
Central
New
Jersey
|
1,072,000
|
|
Met-Ed
|
Eastern
Pennsylvania
|
534,000
|
|
Penelec
|
Western
Pennsylvania
|
588,000
|
|
ATSI
|
Service
areas
of OE, Penn,
CEI
and
TE
|
· Power
Supply
Management Services
supplies all of the
electric power needs of our end-use customers through retail and wholesale
arrangements, including regulated retail sales to meet the PLR requirements
of
our Ohio and Pennsylvania companies and competitive retail sales to commercial
and industrial businesses primarily in Ohio, Pennsylvania and Michigan. This
business segment owns and operates our generating facilities and purchases
electricity from the wholesale market to meet our sales obligations (See
FirstEnergy Intra-System Generation Asset Transfers below). The segment's net
income is primarily derived from electric generation sales revenues less the
related costs of electricity generation, including purchased power, and net
transmission, congestion and ancillary costs charged by PJM and MISO to deliver
energy to retail customers.
6
Other
operating
segments provide a wide range of services, including heating, ventilation,
air-conditioning, refrigeration, electrical and facility control systems,
high-efficiency electrotechnologies and telecommunication services, and
previously included international operations that were divested in January
2004.
We are in the process of divesting our remaining non-core businesses. (See
Note 16 to the consolidated financial statements.) The assets and revenues
for the other business operations are below the quantifiable threshold for
separate disclosure as “reportable operating segments”.
We
acquired
international assets in our merger with GPU in November 2001. GPU Capital and
its subsidiaries provided electric distribution services in foreign countries
(see Results of Operations - Discontinued Operations). GPU Power and its
subsidiaries also owned and operated generation facilities in foreign countries.
As of January 30, 2004, all of our international operations had been
divested because those operations were not aligned with our
strategy.
STRATEGY
We
continue to
pursue our goal of being a leading regional supplier of energy and related
services in the northeast quadrant of the United States, where we see the best
opportunities for growth. While we continue to build a strong regional presence,
key elements of our strategy are in place and management's focus continues
to be
on execution. We intend to continue providing competitively priced, high-quality
products and value-added services - energy sales and services, energy delivery,
power supply and supplemental services related to our core
business.
Our
current focus
includes: (1) minimizing unplanned extended generation outages; (2) enhancing
our system reliability; (3) optimizing our generation portfolio; (4) effectively
managing commodity supplies and risks; (5) preserving and enhancing profit
margins; (6) preserving and enhancing our credit profile and financial
flexibility; and (7) enhancing the skills and diversity of our
workforce.
RISKS
AND
CHALLENGES
In
executing our
strategy, we face a number of industry and enterprise risks and challenges,
including:
|
·
|
Risks
arising
from the reliability of our power plants and transmission and distribution
equipment;
|
|
·
|
Changes
in
commodity prices could adversely affect our profit
margins;
|
|
·
|
Nuclear
generation involves risks that include uncertainties relating to
health
and safety, additional capital costs, the adequacy of insurance
coverage
and nuclear plant decommissioning;
|
|
·
|
Regulatory
changes in the electric industry could affect our competitive position
and
result in unrecoverable costs adversely affecting our business
and results
of operations;
|
| · |
We
are exposed
to operational, price and credit risks associated with selling
and
marketing products in the power markets that we do not always completely
hedge against;
|
|
·
|
Complex
and
changing government regulations could have a negative impact on
our
results of operations;
|
|
·
|
Costs
of
compliance with environmental laws are significant, and the cost
of
compliance with future environmental laws could adversely affect
cash flow
and profitability;
|
| · |
There
are
uncertainties relating to our participation in the PJM and MISO
Regional
Transmission Organizations;
|
|
·
|
Weather
conditions such as tornadoes, hurricanes, ice storms and droughts,
as well
as seasonal temperature variations could have a negative impact
on our
results of operations;
|
| · |
We
are subject
to financial performance risks related to the economic cycles of
the
electric utility industry;
|
| · |
The
continuing
availability and operation of generating units is dependent on
retaining
the necessary licenses, permits, and operating authority from governmental
entities, including the NRC;
|
|
·
|
We
face
certain human resource risks associated with the availability of
trained
and qualified labor to meet our future staffing
requirements;
|
7
| · |
Our
risk
management policies relating to energy and fuel prices, and counterparty
credit are by their very nature risk related, and we could suffer
economic
losses despite such policies;
|
| · |
Interest
rates
and/or a credit ratings downgrade could negatively affect our
financing
costs and our ability to access
capital;
|
| · |
We
must rely
on cash from our subsidiaries;
|
| · |
We
may
ultimately incur liability in connection with federal proceedings;
and
|
| · |
Acts
of war or
terrorism could negatively impact our
business.
|
FIRSTENERGY
INTRA-SYSTEM GENERATION ASSET TRANSFERS
On
May 13,
2005, Penn, and on May 18, 2005, our Ohio Companies entered into certain
agreements implementing a series of intra-system generation asset transfers
that
were completed in the fourth quarter of 2005. The asset transfers resulted
in
the respective undivided ownership interests of the Ohio Companies and Penn
in
our nuclear and non-nuclear generation assets being owned by NGC and FGCO,
respectively. The generating plant interests transferred do not include
leasehold interests of CEI, OE and TE in certain of the plants that are
currently subject to sale and leaseback arrangements with non-affiliates.
On
October 24,
2005, the Ohio Companies and Penn completed the intra-system transfer of
non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee
under a Master Facility Lease with the Ohio Companies and Penn, leased, operated
and maintained the non-nuclear generation assets that it now owns. The asset
transfers were consummated pursuant to FGCO's purchase option under the Master
Facility Lease.
On
December 16,
2005, the Ohio Companies and Penn completed the intra-system transfer of their
respective ownership interests in the nuclear generation assets to NGC through,
in the case of OE and Penn, an asset spin-off in the form of a dividend and,
in
the case of CEI and TE, a sale at net book value. FENOC continues to operate
and
maintain the nuclear generation assets.
These
transactions
were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans
that were approved by the PUCO and the PPUC, respectively, under applicable
Ohio
and Pennsylvania electric utility restructuring legislation. Consistent with
the
restructuring plans, generation assets that had been owned by the Ohio Companies
and Penn were required to be separated from the regulated delivery business
of
those companies through transfer or sale to a separate corporate entity. The
transactions essentially completed the divestitures of owned assets contemplated
by the restructuring plans by transferring the ownership interests to NGC and
FGCO without impacting the operation of the plants. The transfers were
intercompany transactions and, therefore, had no impact on our consolidated
results.
RECLASSIFICATIONS
As
discussed in
Notes 1 and 16 to the consolidated financial statements, certain prior year
amounts have been reclassified to conform to the current year presentation
and
to reflect certain businesses divested in 2005 that have been classified as
discontinued operations (see Note 2(J)). These reclassifications did not
change previously reported earnings for 2004 and 2003.
The
financial
results discussed below include revenues and expenses from transactions among
our business segments. A reconciliation of segment financial results is provided
in Note 16 to the consolidated financial statements. The FSG business
segment is included in “Other and Reconciling Adjustments” due to its immaterial
impact on current period financial results, but is presented separately in
segment information provided in Note 16 to the consolidated financial
statements. Net income (loss) by major business segment was as
follows:
8
|
|
|
|
|
Increase
(Decrease)
|
||||||||||||
|
|
2005
|
2004
|
2003
|
2005
vs 2004
|
2004
vs 2003
|
|||||||||||
|
|
(In
millions, except per share amounts)
|
|||||||||||||||
|
Net
Income (Loss)
|
|
|
|
|
|
|||||||||||
|
By
Business Segment:
|
|
|
|
|
|
|||||||||||
|
Regulated
services
|
$
|
1,046
|
$
|
1,015
|
$
|
1,164
|
$
|
31
|
$
|
(149
|
)
|
|||||
|
Power
supply
management services
|
14
|
104
|
(320
|
)
|
(90
|
)
|
424
|
|||||||||
|
Other
and
reconciling adjustments*
|
(199
|
)
|
(241
|
)
|
(421
|
)
|
42
|
180
|
||||||||
|
Total
|
$
|
861
|
$
|
878
|
$
|
423
|
$
|
(17
|
)
|
$
|
455
|
|||||
|
|
||||||||||||||||
|
Basic
Earnings Per Share:
|
||||||||||||||||
|
Income
before
discontinued operations and
|
||||||||||||||||
|
cumulative
effect of accounting changes
|
$
|
2.66
|
$
|
2.74
|
$
|
1.46
|
$
|
(0.08
|
)
|
$
|
1.28
|
|||||
|
Discontinued
operations
|
0.05
|
(0.06
|
)
|
(0.40
|
)
|
0.11
|
0.34
|
|||||||||
|
Cumulative
effect of accounting changes
|
(0.09
|
)
|
-
|
0.33
|
(0.09
|
)
|
(0.33
|
)
|
||||||||
|
Basic
earnings
per share
|
$
|
2.62
|
$
|
2.68
|
$
|
1.39
|
$
|
(0.06
|
)
|
$
|
1.29
|
|||||
|
|
||||||||||||||||
|
Diluted
Earnings Per Share:
|
||||||||||||||||
|
Income
before
discontinued operations and
|
||||||||||||||||
|
cumulative
effect of accounting changes
|
$
|
2.65
|
$
|
2.73
|
$
|
1.46
|
$
|
(0.08
|
)
|
$
|
1.27
|
|||||
|
Discontinued
operations
|
0.05
|
(0.06
|
)
|
(0.40
|
)
|
0.11
|
0.34
|
|||||||||
|
Cumulative
effect of accounting changes
|
(0.09
|
)
|
-
|
0.33
|
(0.09
|
)
|
(0.33
|
)
|
||||||||
|
Diluted
earnings per share
|
$
|
2.61
|
$
|
2.67
|
$
|
1.39
|
$
|
(0.06
|
)
|
$
|
1.28
|
|||||
* Represents
other
operating segments and reconciling items including interest expense on holding
company debt, corporate support services revenues and expenses and the impact
of
the new Ohio tax legislation.
Summary
of Results of Operations - 2005 Compared with 2004
Financial
results
for our reportable major business segments in 2005 and 2004 were as
follows:
|
|
|
Power
|
|
|
|||||||||
|
|
|
Supply
|
Other
and
|
|
|||||||||
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
||||||||||
|
2005
Financial Results
|
Services
|
Services
|
Adjustments
|
Consolidated
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
4,915
|
$
|
5,631
|
$
|
-
|
$
|
10,546
|
|||||
|
Other
|
568
|
108
|
767
|
1,443
|
|||||||||
|
Internal
|
270
|
-
|
(270
|
)
|
-
|
||||||||
|
Total
Revenues
|
5,753
|
5,739
|
497
|
11,989
|
|||||||||
|
Expenses:
|
|||||||||||||
|
Fuel
and
Purchased power
|
-
|
4,011
|
-
|
4,011
|
|||||||||
|
Other
operating expenses
|
1,757
|
1,479
|
489
|
3,725
|
|||||||||
|
Provision
for
depreciation
|
516
|
45
|
28
|
589
|
|||||||||
|
Amortization
of regulatory assets
|
1,281
|
-
|
-
|
1,281
|
|||||||||
|
Deferral
of
new regulatory assets
|
(405
|
)
|
-
|
-
|
(405
|
)
|
|||||||
|
Goodwill
impairment
|
-
|
-
|
9
|
9
|
|||||||||
|
General
taxes
|
602
|
91
|
20
|
713
|
|||||||||
|
Total
Expenses
|
3,751
|
5,626
|
546
|
9,923
|
|||||||||
|
Operating
Income (Loss)
|
2,002
|
113
|
(49
|
)
|
2,066
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
218
|
-
|
-
|
218
|
|||||||||
|
Interest
expense
|
(393
|
)
|
(55
|
)
|
(213
|
)
|
(661
|
)
|
|||||
|
Capitalized
interest
|
18
|
1
|
-
|
19
|
|||||||||
|
Subsidiaries'
preferred stock dividends
|
(15
|
)
|
-
|
-
|
(15
|
)
|
|||||||
|
Total
Other
Income (Expense)
|
(172
|
)
|
(54
|
)
|
(213
|
)
|
(439
|
)
|
|||||
|
Income
taxes
(benefit)
|
763
|
36
|
(45
|
)
|
754
|
||||||||
|
Income
before
discontinued operations and cumulative
effect of accounting change
|
1,067
|
23
|
(217
|
)
|
873
|
||||||||
|
Discontinued
operations
|
-
|
-
|
18
|
18
|
|||||||||
|
Cumulative
effect of accounting change
|
(21
|
)
|
(9
|
)
|
-
|
(30
|
)
|
||||||
|
Net
Income
(Loss)
|
$
|
1,046
|
$
|
14
|
$
|
(199
|
)
|
$
|
861
|
||||
9
|
|
|
Power
|
|
|
|||||||||
|
|
|
Supply
|
Other
and
|
|
|||||||||
|
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
|||||||||
|
2004
Financial Results
|
Services
|
Services
|
Adjustments
|
Consolidated
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
4,701
|
$
|
6,130
|
$
|
-
|
$
|
10,831
|
|||||
|
Other
|
490
|
74
|
665
|
1,229
|
|||||||||
|
Internal
|
318
|
-
|
(318
|
)
|
-
|
||||||||
|
Total
Revenues
|
5,509
|
6,204
|
347
|
12,060
|
|||||||||
|
|
|||||||||||||
|
Expenses:
|
|||||||||||||
|
Fuel
and
purchased power
|
-
|
4,469
|
-
|
4,469
|
|||||||||
|
Other
operating expenses
|
1,602
|
1,402
|
370
|
3,374
|
|||||||||
|
Provision
for
depreciation
|
513
|
35
|
39
|
587
|
|||||||||
|
Amortization
of regulatory assets
|
1,166
|
-
|
-
|
1,166
|
|||||||||
|
Deferral
of
new regulatory assets
|
(257
|
)
|
-
|
-
|
(257
|
)
|
|||||||
|
Goodwill
impairment
|
-
|
-
|
12
|
12
|
|||||||||
|
General
taxes
|
572
|
85
|
21
|
678
|
|||||||||
|
Total
Expenses
|
3,596
|
5,991
|
442
|
10,029
|
|||||||||
|
|
|||||||||||||
|
Operating
Income (Loss)
|
1,913
|
213
|
(95
|
)
|
2,031
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
205
|
-
|
-
|
205
|
|||||||||
|
Interest
expense
|
(361
|
)
|
(43
|
)
|
(267
|
)
|
(671
|
)
|
|||||
|
Capitalized
interest
|
19
|
6
|
-
|
25
|
|||||||||
|
Subsidiaries'
preferred stock dividends
|
(21
|
)
|
-
|
-
|
(21
|
)
|
|||||||
|
Total
Other
Income (Expense)
|
(158
|
)
|
(37
|
)
|
(267
|
)
|
(462
|
)
|
|||||
|
|
|||||||||||||
|
Income
taxes
(benefit)
|
740
|
72
|
(139
|
)
|
673
|
||||||||
|
Income
before
discontinued operations and
|
|||||||||||||
|
cumulative
effect of accounting change
|
1,015
|
104
|
(223
|
)
|
896
|
||||||||
|
Discontinued
operations
|
-
|
-
|
(18
|
)
|
(18
|
)
|
|||||||
|
Cumulative
effect of accounting change
|
-
|
-
|
-
|
-
|
|||||||||
|
Net
Income
(Loss)
|
$
|
1,015
|
$
|
104
|
$
|
(241
|
)
|
$
|
878
|
||||
10
|
Power
|
|||||||||||||
|
Change
Between 2005 and 2004
|
Supply
|
Other
and
|
|||||||||||
|
Financial
Results
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
|||||||||
|
Increase
(Decrease)
|
Services
|
Services
|
Adjustments(1)
|
Consolidated
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
214
|
$
|
(499
|
)
|
$
|
-
|
$
|
(285
|
)
|
|||
|
Other
|
78
|
34
|
102
|
214
|
|||||||||
|
Internal
|
(48
|
)
|
-
|
48
|
-
|
||||||||
|
Total
Revenues
|
244
|
(465
|
)
|
150
|
(71
|
)
|
|||||||
|
Expenses:
|
|||||||||||||
|
Fuel
and
purchased power
|
-
|
(458
|
)
|
-
|
(458
|
)
|
|||||||
|
Other
operating expenses
|
155
|
77
|
119
|
351
|
|||||||||
|
Provision
for
depreciation
|
3
|
10
|
(11
|
)
|
2
|
||||||||
|
Amortization
of regulatory assets
|
115
|
-
|
-
|
115
|
|||||||||
|
Deferral
of
new regulatory assets
|
(148
|
)
|
-
|
-
|
(148
|
)
|
|||||||
|
Goodwill
impairment
|
-
|
-
|
(3
|
)
|
(3
|
)
|
|||||||
|
General
taxes
|
30
|
6
|
(1
|
)
|
35
|
||||||||
|
Total
Expenses
|
155
|
(365
|
)
|
104
|
(106
|
)
|
|||||||
|
Operating
Income
|
89
|
(100
|
)
|
46
|
35
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
13
|
-
|
-
|
13
|
|||||||||
|
Interest
expense
|
(32
|
)
|
(12
|
)
|
54
|
10
|
|||||||
|
Capitalized interest
|
(1
|
)
|
(5
|
)
|
-
|
(6
|
)
|
||||||
|
Subsidiaries' preferred stock dividends
|
6
|
-
|
-
|
6
|
|||||||||
|
Total
Other
Income (Expense)
|
(14
|
)
|
(17
|
)
|
54
|
23
|
|||||||
|
Income
taxes
|
23
|
(36
|
)
|
94
|
81
|
||||||||
|
Income
before
discontinued operations
and
cumulative
effect of accounting
change
|
52
|
(81
|
)
|
6
|
(23
|
)
|
|||||||
|
Discontinued
operations
|
-
|
-
|
36
|
36
|
|||||||||
|
Cumulative
effect of accounting change
|
(21
|
)
|
(9
|
)
|
-
|
(30
|
)
|
||||||
|
Net
Income
|
$
|
31
|
$
|
(90
|
)
|
$
|
42
|
$
|
(17
|
)
|
|||
| (1)The impact of the new Ohio tax legislation is included with our other operating segments and reconciling adjustments | |||||||||||||
|
.
|
|||||||||||||
Regulated
Services - 2005 Compared with 2004
Net
income increased
by $31 million to $1.05 billion, a 3.1% increase in 2005, compared to
$1.02 billion in 2004, primarily as a result of increased sales to
customers.
Revenues
-
Total
revenues
increased by $244 million in 2005 compared to 2004, resulting from the
following sources:
|
Increase
|
||||||||||
|
Revenues
by Type of Service
|
2005
|
2004
|
(Decrease)
|
|||||||
|
|
(In
millions)
|
|||||||||
|
Distribution
services
|
$
|
4,915
|
$
|
4,701
|
$
|
214
|
||||
|
Transmission
services
|
415
|
333
|
82
|
|||||||
|
Lease
revenue
from affiliates
|
270
|
318
|
(48
|
)
|
||||||
|
Other
|
153
|
157
|
(4
|
)
|
||||||
|
Total
Revenues
|
$
|
5,753
|
$
|
5,509
|
$
|
244
|
||||
Increases
in
distribution deliveries by customer class are summarized in the following
table:
|
Electric
Distribution Deliveries
|
||||
|
Residential
|
7.3
|
%
|
||
|
Commercial
|
4.8
|
|||
|
Industrial
|
2.0
|
|||
|
Total
Distribution Deliveries
|
4.7
|
%
|
||
11
Increased
consumption offset in part by lower composite prices to customers resulted
in
higher distribution delivery revenue. The following table summarizes major
factors contributing to the $214 million increase in distribution service
revenue in 2005:
|
|
Increase
|
|||
|
Sources
of Change in Distribution Revenues
|
(Decrease)
|
|||
|
|
(In
millions)
|
|||
|
Changes
in
customer usage
|
$
|
264
|
||
|
Changes
in
prices:
|
||||
|
Rate
changes
--
|
||||
|
Ohio
shopping
credit incentives
|
(44
|
)
|
||
|
JCP&L
rate
settlements
|
48
|
|||
|
Billing
component reallocations
|
(54
|
)
|
||
|
Net
Increase
in Distribution Revenues
|
$
|
214
|
||
Distribution
revenues
benefited from unseasonably warmer summer temperatures in 2005, compared to
2004, which increased air-conditioning loads of residential and commercial
customers. While industrial deliveries also increased, that impact was more
than
offset by lower unit prices in that sector. Higher base rates from JCP&L's
stipulated rate settlements were more than offset by additional credits provided
to customers under the Ohio transition plan who shop for electricity from
suppliers other than their local utility. Reallocation of billing components
between distribution and generation for certain Ohio industrial customers with
special contracts also offset the higher base rates. Shopping credit incentives
do not affect current period earnings due to deferral of the incentives for
future recovery from customers.
Transmission
revenues increased $82 million in 2005 from 2004 due in part to increased
loads resulting from warmer summer weather and higher transmission usage prices.
Lease revenue from affiliates decreased $48 million due to the intra-system
generation asset transfers discussed above.
Expenses
-
Total
operating
expenses increased by $155 million in 2005 compared to the prior year due
to the following:
| · |
Other
operating expenses increased by $155 million in 2005 compared to 2004
primarily due to higher transmission expenses resulting in part
from
increased loads and higher transmission system usage
charges;
|
| · |
Additional
amortization of regulatory assets of $115 million, principally Ohio
transition costs, which was due primarily to using the interest
method to
amortize regulatory assets; and
|
| · |
General
taxes
increased by $30 million due to higher property taxes and
increased KWH deliveries which increased the Ohio KWH tax and
the Pennsylvania gross receipts
tax.
|
Partially
offsetting
these higher costs were additional deferrals of regulatory assets of
$148 million, primarily due to the PUCO-approved deferral of MISO
administrative costs, shopping incentive credits and related interest on those
deferrals.
Other
Income
-
Total
other income
(expense) decreased by $14 million in 2005 compared to 2004 due to the net
effect of the following:
|
·
|
Investment
income increased approximately $13 million in 2005 due primarily to
realized gains on nuclear decommissioning trust
investments.
|
|
·
|
Interest
expense was $32 million higher in
2005.
|
Power
Supply Management Services - 2005 Compared with 2004
Net
income for this
segment decreased $90 million resulting in net income of $14 million
for 2005 compared to net income of $104 million in 2004. Lower generation
gross margin, higher nuclear operating costs and amounts recognized for fines,
penalties and obligations associated with the proceedings involving the
W. H. Sammis Plant and the Davis-Besse Nuclear Power Station contributed to
the decrease in net income in 2005 when compared to 2004.
12
Revenues
-
A
decrease in
wholesale electric revenues and purchased power costs in 2005 compared to the
prior year primarily resulted from FES recording PJM sales and purchased power
transactions on an hourly net position basis beginning in the first quarter
of
2005 compared with recording each discrete transaction (on a gross basis) in
2004 (see PJM INTERCONNECTION TRANSACTIONS discussed later). This change had
no
impact on earnings and resulted from the dedication of our Beaver Valley Power
Station to PJM in January 2005. Wholesale electric revenues and purchased power
costs in 2004 were each $1.1 billion higher due to recording those
transactions on a gross basis.
Excluding
the effect
of the change in recording PJM wholesale transactions on a gross basis in 2004
($1.1 billion), electric generation revenues increased $569 million in
2005 compared to 2004 primarily resulting from a 3.5% increase in KWH sales
from
higher retail customer usage and a 14% average increase in unit prices in the
wholesale market. The increase in retail sales reduced energy available for
sale
to the wholesale market, resulting in a 2% reduction in wholesale sales (before
the PJM adjustment). Transmission revenues increased $26 million in 2005
compared to 2004 due primarily to higher transmission system usage.
The
change in
reported revenues resulted from the following:
|
Increase
|
||||||||||
|
Revenues
by Type of Service
|
2005
|
2004
|
(Decrease)
|
|||||||
|
(In
millions)
|
||||||||||
|
Electric
generation sales:
|
|
|
|
|||||||
|
Retail
|
$
|
4,219
|
$
|
3,795
|
$
|
424
|
||||
|
Wholesale(1)
|
1,412
|
1,267
|
145
|
|||||||
|
Total
electric
generation sales
|
5,631
|
5,062
|
569
|
|||||||
|
Transmission
|
65
|
39
|
26
|
|||||||
|
Other
|
43
|
35
|
8
|
|||||||
|
Total
|
5,739
|
5,136
|
603
|
|||||||
|
PJM
adjustment
|
-
|
1,068
|
(1,068
|
)
|
||||||
|
Total
Revenues
|
$
|
5,739
|
$
|
6,204
|
$
|
(465
|
)
|
|||
| (1) Excluding 2004 effect of recording PJM transactions on a gross basis | ||||||||||
The
following table
summarizes the price and volume factors contributing to increased sales revenue
from retail and wholesale customers:
|
Increase
|
||||
|
Source
of Change in Electric Generation Sales
|
(Decrease)
|
|||
|
(In
millions)
|
||||
|
Retail:
|
|
|||
|
Effect
of 5.2%
increase in customer usage
|
$
|
228
|
||
|
Change
in
prices
|
196
|
|||
|
|
424
|
|||
|
Wholesale:
|
||||
| Effect of 2.3% reduction in customer usage(1) | (28 | ) | ||
|
Change
in
prices
|
173
|
|||
|
|
145
|
|||
|
Net
Increase
in Electric Generation Sales
|
$
|
569
|
||
| (1)Decrease of 46.5% including the effect of the PJM adjustment. | ||||
|
|
||||
Expenses
-
Excluding
the effect
of the $1.1 billion of PJM purchased power costs recorded on a gross basis
in 2004, total operating expenses increased by $703 million in 2005
compared to 2004. Higher fuel and purchased power costs contributed
$610 million of the increase, resulting from higher fuel costs of
$308 million and increased purchased power costs of $302 million.
Factors contributing to the higher costs are summarized in the following
table:
13
|
|
Increase
|
|||
|
Source
of Change in Fuel and Purchased Power
|
(Decrease)
|
|||
|
|
(In
millions)
|
|||
|
Fuel:
|
|
|||
|
Change
due to
increased unit costs
|
$
|
254
|
||
|
Change
due to
volume consumed
|
54
|
|||
|
|
308
|
|||
|
Purchased
Power:
|
||||
|
Change
due to
increased unit costs
|
360
|
|||
|
Change
due to
volume purchased
|
(55
|
)
|
||
|
Increase
in
costs deferred
|
(3
|
)
|
||
|
|
302
|
|||
|
Total
Increase
|
610
|
|||
|
PJM
adjustment
|
(1,068
|
)
|
||
|
Net
Decrease
in Fuel and Purchased Power Costs
|
$
|
(458
|
)
|
|
Our
generation fleet
established a record output of 80.2 billion KWH in 2005. As a result,
increased coal consumption and the related cost of emission allowances combined
to increase fossil fuel expense. Higher coal costs resulted from increased
market purchases, higher contract coal prices and increased transportation
costs. Emission allowance costs increased primarily from higher prices. To
a
lesser extent, fuel expense increased due to higher costs associated with the
increase in generation from the fossil units relative to nuclear generation.
Fossil generation output increased 11% in 2005 and nuclear output decreased
by
4%, compared to 2004, due to the nuclear refueling outages discussed below.
Other
operating
costs increased $77 million in 2005 compared to 2004. Non-fuel nuclear
costs were higher in 2005 due to refueling outages at Perry Unit 1
(including an unplanned extension) and Beaver Valley Unit 2 and a scheduled
23-day mid-cycle inspection outage at the Davis-Besse Plant. There was only
one
refueling outage in 2004. Fines and penalties related to the Davis-Besse reactor
head issue (approximately $31.5 million) and the EPA settlement related to
the W. H. Sammis Plant ($18.5 million) also contributed to the higher
costs. Higher transmission costs due primarily to increased loads and higher
transmission system usage charges further increased other operating costs in
2005. The higher costs this year were partially offset by lower fossil
generation costs that resulted primarily from emission allowance transactions
and reduced maintenance outages in 2005. Also offsetting the cost increases
were
lower intersegment lease expenses due to the intra-system generation asset
transfer.
Income
taxes -
Income taxes decreased as a result of lower taxable income, partially offset
by
the impact of the $28 million penalty related to the Davis-Besse reactor head
issue that was not deductible for income tax purposes.
Other
-
2005 Compared with 2004
FirstEnergy’s
financial results from other operating segments and reconciling adjustments,
including interest expense on holding company debt, corporate support services
revenues and expenses and the impacts of the new Ohio tax legislation (discussed
below) all contributed to a $42 million increase in net income compared to
2004. The increase was partially due to the absence this year of goodwill
impairments at FSG of $25 million (included in discontinued operations in
2004) and the 2004 class action lawsuit settlement as well gains on the sale
of
assets ($17 million) in 2005 compared to net losses on the sale of assets
($6 million) in 2004, partially offset by a goodwill impairment at MYR of
$9 million in 2005 not present in 2004.
On
June 30,
2005, tax legislation was enacted in the State of Ohio that created a new CAT
tax, which is based on qualifying “taxable gross receipts” that does not
consider any expenses or costs incurred to generate such receipts, except for
items such as cash discounts, returns and allowances, and bad debts. The CAT
tax
was effective July 1, 2005, and replaces the Ohio income-based franchise
tax and the Ohio personal property tax. The CAT tax is phased-in while the
current income-based franchise tax is phased-out over a five-year period at
a
rate of 20% annually, beginning with the year ended 2005, and the personal
property tax is phased-out over a four-year period at a rate of approximately
25% annually, beginning with the year ended 2005. During the phase-out period
the Ohio income-based franchise tax will be computed consistent with the prior
law, except that the tax liability as computed will be multiplied by 80% in
2005; 60% in 2006; 40% in 2007 and 20% in 2008 to determine the actual
liability, thereby eliminating the current income-based franchise tax over
a
five-year period. As a result of the new tax structure, all net deferred tax
benefits that are not expected to reverse during the five-year phase-in period
have been written off as of June 30, 2005. The impact on income taxes
associated with the required adjustment to net deferred taxes for 2005 was
an
additional tax expense of approximately $52 million, which was partially
offset by the initial phase-out of the Ohio income-based franchise tax, which
reduced income taxes by approximately $6 million in 2005. See Note 9
to the Consolidated Financial Statements.
14
Cumulative
Effect of Accounting Change
Results
in 2005
include an after-tax charge of $30 million recorded upon the adoption of
FIN 47 in December 2005. We identified applicable legal obligations as
defined under the new standard at our active and retired generating units and
retired plants (retained by the regulated utilities), substation control rooms,
service center buildings, line shops and office buildings, identifying asbestos
as the primary conditional ARO. We recorded a conditional ARO liability of
$57 million (including accumulated accretion for the period from the date
the liability was incurred to the date of adoption), an asset retirement cost
of
$16 million (recorded as part of the carrying amount of the related
long-lived asset), and accumulated depreciation of $12 million.
We
charged regulatory liabilities for $5 million upon adoption of FIN 47
for the transition amounts related to establishing the ARO for asbestos removal
from substation control rooms and service center buildings for OE, Penn, CEI,
TE
and JCP&L. The remaining cumulative effect adjustment for unrecognized
depreciation and accretion of $48 million was charged to income
($30 million, net of tax), or $0.09 per share of common stock for the year
ended December 31, 2005. (See Note 12.)
Summary
of Results of Operations - 2004 compared with 2003
Financial
results
for our
major business segments for 2004 and
2003 were as
follows:
|
|
|
Power
|
|
|
|||||||||
|
|
|
Supply
|
Other
and
|
|
|||||||||
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
||||||||||
|
2004
Financial Results
|
Services
|
Services
|
Adjustments
|
Consolidated
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
4,701
|
$
|
6,130
|
$
|
-
|
$
|
10,831
|
|||||
|
Other
|
490
|
74
|
665
|
1,229
|
|||||||||
|
Internal
|
318
|
-
|
(318
|
)
|
-
|
||||||||
|
Total
Revenues
|
5,509
|
6,204
|
347
|
12,060
|
|||||||||
|
Expenses:
|
|
|
|
|
|||||||||
|
Fuel
and
purchased power
|
-
|
4,469
|
-
|
4,469
|
|||||||||
|
Other
operating
|
1,602
|
1,402
|
370
|
3,374
|
|||||||||
|
Provision
for
depreciation
|
513
|
35
|
39
|
587
|
|||||||||
|
Amortization
of regulatory assets
|
1,166
|
-
|
-
|
1,166
|
|||||||||
|
Deferral
of
new regulatory assets
|
(257
|
)
|
-
|
-
|
(257
|
)
|
|||||||
|
Goodwill
impairment
|
-
|
-
|
12
|
12
|
|||||||||
|
General
taxes
|
572
|
85
|
21
|
678
|
|||||||||
|
Total
Expenses
|
3,596
|
5,991
|
442
|
10,029
|
|||||||||
|
Operating
Income (Loss)
|
1,913
|
213
|
(95
|
)
|
2,031
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
205
|
-
|
-
|
205
|
|||||||||
|
Interest
expense
|
(361
|
)
|
(43
|
)
|
(267
|
)
|
(671
|
)
|
|||||
|
Capitalized
interest
|
19
|
6
|
-
|
25
|
|||||||||
|
Subsidiaries'
preferred stock dividends
|
(21
|
)
|
-
|
-
|
(21
|
)
|
|||||||
|
Total
Other
Income (Expense)
|
(158
|
)
|
(37
|
)
|
(267
|
)
|
(462
|
)
|
|||||
|
Income
taxes
(benefit)
|
740
|
72
|
(139
|
)
|
673
|
||||||||
|
Income
before
discontinued operations and
cumulative
effect of accounting change
|
1,015
|
104
|
(223
|
)
|
896
|
||||||||
|
Discontinued
operations
|
-
|
-
|
(18
|
)
|
(18
|
)
|
|||||||
|
Cumulative
effect of accounting change
|
-
|
-
|
-
|
-
|
|||||||||
|
Net
Income
(Loss)
|
$
|
1,015
|
$
|
104
|
$
|
(241
|
)
|
$
|
878
|
||||
15
|
|
|
Power
|
|
|
|||||||||
|
|
|
Supply
|
Other
and
|
|
|||||||||
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
||||||||||
|
2003
Financial Results
|
Services
|
Services
|
Adjustments
|
Consolidated
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
4,787
|
$
|
5,418
|
$
|
-
|
$
|
10,205
|
|||||
|
Other
|
281
|
69
|
770
|
1,120
|
|||||||||
|
Internal
|
319
|
-
|
(319
|
)
|
-
|
||||||||
|
Total
Revenues
|
5,387
|
5,487
|
451
|
11,325
|
|||||||||
|
|
|
|
|
||||||||||
|
Expenses:
|
|
|
|
|
|||||||||
|
Fuel
and
purchased power
|
-
|
4,159
|
-
|
4,159
|
|||||||||
|
Other
operating
|
1,442
|
1,723
|
475
|
3,640
|
|||||||||
|
Claim
settlement
|
(168
|
)
|
-
|
-
|
(168
|
)
|
|||||||
|
Provision
for
depreciation
|
538
|
29
|
37
|
604
|
|||||||||
|
Amortization
of regulatory assets
|
1,079
|
-
|
-
|
1,079
|
|||||||||
|
Deferral
of
new regulatory assets
|
(194
|
)
|
-
|
-
|
(194
|
)
|
|||||||
|
Goodwill
impairment
|
-
|
-
|
91
|
91
|
|||||||||
|
General
taxes
|
540
|
74
|
24
|
638
|
|||||||||
|
Total
Expenses
|
3,237
|
5,985
|
627
|
9,849
|
|||||||||
|
Operating
Income (Loss)
|
2,150
|
(498
|
)
|
(176
|
)
|
1,476
|
|||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
185
|
-
|
-
|
185
|
|||||||||
|
Interest
expense
|
(473
|
)
|
(51
|
)
|
(275
|
)
|
(799
|
)
|
|||||
|
Capitalized
interest
|
22
|
7
|
3
|
32
|
|||||||||
|
Subsidiaries'
preferred stock dividends
|
(42
|
)
|
-
|
-
|
(42
|
)
|
|||||||
|
Total
Other
Income (Expense)
|
(308
|
)
|
(44
|
)
|
(272
|
)
|
(624
|
)
|
|||||
|
Income
taxes
(benefit)
|
779
|
(222
|
)
|
(149
|
)
|
408
|
|||||||
|
Income
before
discontinued operations and
cumulative
effect of accounting change
|
1,063
|
(320
|
)
|
(299
|
)
|
444
|
|||||||
|
Discontinued
operations
|
-
|
-
|
(123
|
)
|
(123
|
)
|
|||||||
|
Cumulative
effect of accounting change
|
101
|
-
|
1
|
102
|
|||||||||
|
Net
Income
(Loss)
|
$
|
1,164
|
$
|
(320
|
)
|
$
|
(421
|
)
|
$
|
423
|
|||
16
|
|
Power
|
|
|
||||||||||
|
|
Supply
|
Other
and
|
|
||||||||||
|
Change
Between 2004 and 2003
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
|||||||||
|
Financial
Results
|
Services
|
Services
|
Adjustments(1)
|
Consolidated
|
|||||||||
|
Increase
(Decrease)
|
(In
millions)
|
||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
(86
|
)
|
$
|
712
|
$
|
-
|
$
|
626
|
||||
|
Other
|
209
|
5
|
(105
|
)
|
109
|
||||||||
|
Internal
|
(1
|
)
|
-
|
1
|
-
|
||||||||
|
Total
Revenues
|
122
|
717
|
(104
|
)
|
735
|
||||||||
|
|
|
|
|
||||||||||
|
Expenses:
|
|
|
|
|
|||||||||
|
Fuel
and
purchased power
|
-
|
310
|
-
|
310
|
|||||||||
|
Other
operating
|
160
|
(321
|
)
|
(105
|
)
|
(266
|
)
|
||||||
|
Claim
settlement
|
168
|
-
|
-
|
168
|
|||||||||
|
Provision
for
depreciation
|
(25
|
)
|
6
|
2
|
(17
|
)
|
|||||||
|
Amortization
of regulatory assets
|
87
|
-
|
-
|
87
|
|||||||||
|
Deferral
of
new regulatory assets
|
(63
|
)
|
-
|
-
|
(63
|
)
|
|||||||
|
Goodwill
impairment
|
-
|
-
|
(79
|
)
|
(79
|
)
|
|||||||
|
General
taxes
|
32
|
11
|
(3
|
)
|
40
|
||||||||
|
Total
Expenses
|
359
|
6
|
(185
|
)
|
180
|
||||||||
|
Operating
Income
|
(237
|
)
|
711
|
81
|
555
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
20
|
-
|
-
|
20
|
|||||||||
|
Interest
expense
|
112
|
8
|
8
|
128
|
|||||||||
|
Capitalized
interest
|
(3
|
)
|
(1
|
)
|
(3
|
)
|
(7
|
)
|
|||||
|
Subsidiaries'
preferred stock dividends
|
21
|
-
|
-
|
21
|
|||||||||
|
Total
Other
Income (Expense)
|
150
|
7
|
5
|
162
|
|||||||||
|
Income
taxes
(benefit)
|
(39
|
)
|
294
|
10
|
265
|
||||||||
|
Income
before
discontinued operations and
cumulative
effect of accounting change
|
(48
|
)
|
424
|
76
|
452
|
||||||||
|
Discontinued
operations
|
-
|
-
|
105
|
105
|
|||||||||
|
Cumulative
effect of accounting change
|
(101
|
)
|
-
|
(1
|
)
|
(102
|
)
|
||||||
|
Net
Income
|
$
|
(149
|
)
|
$
|
424
|
$
|
180
|
$
|
455
|
||||
Regulated
Services - 2004 Compared with 2003
Net
income decreased
$149 million to $1.02 billion in 2004, from $1.16 billion in
2003. Income before discontinued operations and the cumulative effect of an
accounting change decreased $48 million reflecting the absence in 2004 of
the earnings benefit of the 2003 settlement of our claim against NRG for the
terminated sale of four fossil plants (which resulted in a $168 million
gain), partially offset by lower interest charges during 2004 due to debt and
preferred stock redemption and refinancing activities.
Revenues
-
Total
revenues
increased by $122 million in 2004 compared to 2003, resulting from the
following sources:
|
Increase
|
||||||||||
|
Revenues
by Type of Service
|
2004
|
2003
|
(Decrease)
|
|||||||
|
|
(In
millions)
|
|||||||||
|
Distribution
services
|
$
|
4,701
|
$
|
4,787
|
$
|
(86
|
)
|
|||
|
Transmission
services
|
333
|
76
|
257
|
|||||||
|
Lease
revenue
from affiliates
|
318
|
319
|
(1
|
)
|
||||||
|
Other
|
157
|
205
|
(48
|
)
|
||||||
|
Total
Revenues
|
$
|
5,509
|
$
|
5,387
|
$
|
122
|
||||
Increases
in
distribution deliveries by customer class are summarized in the following
table:
|
Electric
Distribution Deliveries
|
||||
|
Residential
|
2.0
|
%
|
||
|
Commercial
|
2.6
|
|||
|
Industrial
|
0.6
|
|||
|
Total
Distribution Deliveries
|
1.6
|
%
|
||
17
Lower
prices
partially offset by higher customer consumption and increased shopping incentive
deferrals resulted in lower distribution delivery revenues. The following table
summarizes major factors contributing to the $86 million decrease in
distribution services revenue in 2004:
|
|
Increase
|
|||
|
Sources
of Change in Distribution Revenues
|
(Decrease)
|
|||
|
|
(In
millions)
|
|||
|
Changes
in
customer usage
|
$
|
82
|
||
|
Changes
in
prices:
|
||||
|
Rate
changes
-
|
||||
|
Ohio
shopping
credit incentives
|
(53
|
)
|
||
|
JCP&L
rate
increase
|
17
|
|||
|
Billing
component reallocations
|
(132
|
)
|
||
|
Net
Decrease
in Distribution Revenues
|
$
|
(86
|
)
|
|
Lower
prices
resulted from higher customer shopping credit incentives, partially offset
by
higher base rates at JCP&L. Energy demand increased in all three retail
customer groups, but the milder weather in 2004 moderated the energy needs
of
residential and commercial customers. The increased shopping incentives provided
to customers under the Ohio transition plan are deferred for future recovery
and
do not affect current period earnings.
Transmission
revenues increased by $257 million in 2004 compared to 2003 due in part to
the June 2004 amendments to power supply agreements with FES where Met-Ed and
Penelec assumed certain transmission activity from FES and the fact that 2004
revenues reflected transactions with MISO, which began operations in December
2003.
Expenses
-
Total
operating
expenses increased by $359 million in 2004 compared to 2003 due to the
following:
| · |
Other
operating expenses increased $160 million due to higher transmission
expenses of $238 million related to the assumption of additional
transmission activity from FES discussed above. These higher costs
were
partially offset by lower energy delivery expenses due to reduced
storm
restoration costs in 2004, a higher level of construction activities
in
2004 compared to a higher level of maintenance activities in the
prior
year and distribution reliability expenses incurred in the third
quarter
of 2003;
|
|
·
|
Additional
amortization of regulatory assets of $87 million, principally from
higher Ohio transition plan amortization and a change in amortization
resulting from the July 2003 JCP&L rate
decision;
|
|
·
|
An
aggregate
increase in Ohio property tax expense and other state taxes of
$32 million; and
|
| · |
The
absence in
2004 of the $168 million claim settlement of our claim against NRG
discussed above.
|
Partially
offsetting
these higher costs were additional deferrals of regulatory assets of
$63 million, due principally to Ohio shopping incentives, and lower
depreciation expense of $25 million principally due to the reduced
depreciation rates effective in August 2003 in connection with the JCP&L
rate case decision. The
$48 million
decrease in other revenue reflects lower revenues from accounts receivable
financing, JCP&L transition bond securitization and utility property
rentals.
Other
Income
-
Total
other income
(expense) increased by $150 million in 2004 compared to 2003 due to the
following:
|
·
|
Investment
income increased approximately $20 million in 2004 due primarily to
higher realized gains on nuclear decommissioning trust
investments.
|
|
·
|
Lower
interest
charges of $130 million resulted from debt and preferred stock
redemptions and refinancing activities and pollution control note
repricings.
|
Power
Supply Management Services - 2004 Compared with 2003
Net
income for this
segment increased by $424 million to $104 million in 2004 compared to
a net loss of $320 million in 2003. An improved gross generation margin and
lower nuclear and fossil operating costs contributed to this
increase.
18
Revenues
-
The
change in
reported segment revenues resulted from the following:
|
Increase
|
||||||||||
|
Revenues
by Type of Service
|
2004
|
2003
|
(Decrease)
|
|||||||
|
|
(In
millions)
|
|||||||||
|
Electric
generation sales:
|
|
|
|
|||||||
|
Retail
|
$
|
3,795
|
$
|
3,705
|
$
|
90
|
||||
|
Wholesale
|
2,335
|
1,713
|
622
|
|||||||
|
Total
Electric
Generation Sales
|
6,130
|
5,418
|
712
|
|||||||
|
Transmission
|
39
|
59
|
(20
|
)
|
||||||
|
Other
|
35
|
10
|
25
|
|||||||
|
Total
Revenues
|
$
|
6,204
|
$
|
5,487
|
$
|
717
|
||||
The
higher wholesale
revenues were due to higher unit prices and increased generation available
for
the wholesale market which was possible due in part to a 13% increase in
available generation resulting from record production from our generation fleet.
Increased retail sales reflected the effect of higher unit prices. The following
table summarizes the price and volume factors contributing to the increased
revenues from retail and wholesale customers.
|
Increase
|
|||||||
|
Source
of Change in Electric Generation Sales
|
(Decrease)
|
||||||
|
|
(In
millions)
|
||||||
|
Retail:
|
|||||||
|
Effect
of 0.6%
decrease in customer usage
|
$ |
(22
|
)
|
||||
|
Change
in
prices
|
|
112
|
|||||
|
|
|
90
|
|||||
|
Wholesale:
|
|
||||||
|
Effect
of
26.7% increase in customer usage
|
|
492
|
|||||
|
Change
in
prices
|
|
130
|
|||||
|
|
|
622
|
|||||
|
Net
Increase
in Electric Generation Sales
|
$
|
712
|
|||||
The
$20 million
decrease in transmission revenues relates
to lower PJM
network transmission system revenue, reduced financial transmission rights
(FTR)/auction revenue rights (ARR), and PJM congestion credit revenues related
to transmission transactions that Met-Ed and Penelec assumed in June 2004 due
to
their amended power supply agreement with FES.
Expenses
-
Total
operating
expenses increased by $6 million in 2004 compared to 2003. Higher costs for
fuel and purchased power, depreciation and general taxes were almost entirely
offset by lower other operating costs. Fuel
and purchased
power costs increased $310 million, resulting from higher fuel costs of
$46 million and increased purchased power costs of $264 million.
Factors contributing to the higher costs are summarized in the following
table:
|
|
Increase
|
|||
|
Source
of Change in Fuel and Purchased Power
|
(Decrease)
|
|||
|
|
(In
millions)
|
|||
|
Fuel:
|
|
|||
|
Change
due to
unit costs
|
$
|
(43
|
)
|
|
|
Change
due to
volume consumed
|
89
|
|||
|
|
46
|
|||
|
Purchased
Power:
|
||||
|
Change
due to
unit costs
|
297
|
|||
|
Change
due to
volume purchased
|
153
|
|||
|
Increase
in
deferred costs
|
(33
|
)
|
||
|
417
|
||||
|
2003
JCP&L
disallowed purchased power costs
|
(153
|
)
|
||
|
Net
Increase
in Fuel and Purchased Power Costs
|
$
|
310
|
||
Fuel
costs increased
primarily from higher nuclear generation in 2004. Excluding the unusual charge
resulting from the July 2003 JCP&L rate decision, purchased power costs
increased by $417 million.
19
Other
operating
costs decreased $321 million in 2004 compared to 2003. This decrease
principally resulted from lower non-fuel nuclear and fossil generation costs.
Nuclear operating costs decreased by $169 million resulting from one
scheduled refueling outage at Beaver Valley Unit 1 in 2004 compared to
three scheduled refueling outages in 2003 (Beaver Valley Unit 1, Beaver
Valley Unit 2 and Perry) and reduced incremental maintenance costs at the
Davis-Besse Plant related to its restart. Fossil generation expense was
$49 million lower primarily due to reduced maintenance outages in 2004
compared to the prior year. Lower transmission costs, due to the power supply
agreement amendments discussed above, and reduced employee benefit expenses
(see
POSTRETIREMENT PLANS) also contributed to the remaining $103 million
decrease in other operating costs.
Other
-
2004 Compared with 2003
FirstEnergy’s
financial results from other operating segments and reconciling adjustments
included interest expense on holding company debt, corporate support services
revenues and expenses, FSG results and results from international businesses
acquired in the 2001 merger. As of January 30, 2004, all of the
international operations were divested. The absence of the EGSA sale loss of
$33 million and the Emdersa abandonment charge of $67 million included
in the 2003 discontinued operations losses was a primary cause of the
$180 million increase in net income in 2004 compared to 2003. In addition,
an $86 million decrease in FSG goodwill impairment charges in 2004 compared
to 2003 (see Note 2(H)) was the other primary factor in the net income
increase.
Cumulative
Effect of Accounting Change
Results
in 2003
included an after-tax credit to income of $102 million recorded upon the
adoption of SFAS 143 in January 2003. We identified applicable legal
obligations as defined under SFAS 143 for nuclear power plant
decommissioning, reclamation of a sludge disposal pond at the Bruce Mansfield
Plant and two coal ash disposal sites. As a result of adopting SFAS 143 in
January 2003, asset retirement costs of $602 million were recorded as part
of the carrying amount of the related long-lived asset, offset by accumulated
depreciation of $415 million. The ARO liability at the date of adoption was
$1.11 billion, including accumulated accretion for the period from the date
the liability was incurred to the date of adoption. As of December 31,
2002, we had recorded decommissioning liabilities of $1.24 billion. We
expect substantially all of our nuclear decommissioning costs for Met-Ed,
Penelec and JCP&L to be recoverable in rates over time. Therefore, we
recognized a regulatory liability of $185 million upon adoption of
SFAS 143 for the transition amounts related to establishing the ARO for
nuclear decommissioning for those companies. The remaining cumulative effect
adjustment for unrecognized depreciation and accretion, offset by the reduction
in the existing decommissioning liabilities and the reversal of accumulated
estimated removal costs for non-regulated generation assets, was a
$175 million increase to income, or $102 million net of income taxes.
DISCONTINUED
OPERATIONS
Discontinued
operations for
2005 include the
divestiture of two FSG subsidiaries: Elliott-Lewis Corporation and L. H.
Cranston and Sons, Inc.; the divestiture of an MYR subsidiary - Power Piping
Company; and the sale of FES’ natural gas business. The operating results for
these divested businesses were adjusted in the presentation for prior
years.
In
2003, the results
of certain FSG subsidiaries (Colonial Mechanical, Webb Technologies and Ancoma,
Inc.) and MARBEL's subsidiary, which were divested in 2003, were reported as
discontinued operations. In addition, 2003 discontinued operations were
reflected for Emdersa and EGSA, as we substantially completed our exit from
foreign operations acquired through the merger with GPU in 2001.
The
following table
summarizes the sources of income (losses) from discontinued
operations:
|
Discontinued
Operations (Net of tax)
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
||||||||||
|
Emdersa
-
abandonment
|
$
|
-
|
$
|
-
|
$
|
(67
|
)
|
|||
|
EGSA
- loss on
sale
|
-
|
-
|
(33
|
)
|
||||||
|
FES
natural
gas business - gain on sale
|
5
|
-
|
-
|
|||||||
|
FSG
and MYR
subsidiaries - gain (loss) on sale
|
12
|
-
|
(3
|
)
|
||||||
|
Total
gain
(loss) on divestitures
|
$
|
17
|
-
|
(103
|
)
|
|||||
|
Reclassification
of operating income (loss)
to
discontinued operations:
|
||||||||||
|
FES
natural
gas business
|
-
|
4
|
(2
|
)
|
||||||
|
FSG
and MYR
subsidiaries
|
1
|
(22
|
)
|
(22
|
)
|
|||||
|
Emdersa,
EGSA
and NEO
|
-
|
-
|
4
|
|||||||
|
Income
(loss)
from discontinued operations
|
$
|
18
|
$
|
(18
|
)
|
$
|
(123
|
)
|
||
20
POSTRETIREMENT
PLANS
Strengthened
equity
markets, as well as a $500 million voluntary cash pension contribution made
in September 2004, contributed to a $66 million reduction of postretirement
benefits expenses in 2005 from the prior year. Improved equity markets and
amendments to our health care benefits plan in the first quarter of 2004 and
the
Medicare Act signed by President Bush in December 2003 combined to reduce
postretirement benefits expenses by $109 million in 2004 from the prior
year. The following table reflects the portion of postretirement costs that
were
charged to expense in 2005, 2004 and 2003:
|
Postretirement
Expenses
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
||||||||||
|
Pension
|
$
|
32
|
$
|
83
|
$
|
123
|
||||
|
OPEB
|
72
|
87
|
156
|
|||||||
|
Total
|
$
|
104
|
$
|
170
|
$
|
279
|
||||
Pension
and OPEB
expenses are included in various cost categories and have contributed to cost
decreases discussed above for 2005. We made an additional $500 million
voluntary contribution to our pension plan in the fourth quarter of 2005 that
is
expected to result in reduced pension costs in 2006 and 2007 compared to costs
that would have otherwise resulted without the voluntary contribution. In 2008,
we will increase retirees’ share of their coinsurance, as well as increase
retirees’ health care premiums, which will reduce OPEB costs in 2006 and 2007.
See "Critical Accounting Policies - Pension and Other Postretirement Benefits
Accounting" for a discussion of the impact of underlying assumptions on
postretirement expenses.
SUPPLY
PLAN
Our
affiliates are
obligated to provide generation service with an estimated power demand of
101.2 billion KWH for 2006. These obligations arise from customers who have
elected to continue to receive generation service from our utility
subsidiaries under regulated retail tariffs and from customers who have
selected FES as their alternate generation provider. Geographically,
approximately 65% of the total generation service obligation is for customers
located in the MISO market area and 35% for customers located in the PJM market
area. Included in the PJM market area are obligations of FES to provide power
to
electric distribution customers in the State of New Jersey, including customers
in JCP&L's service territory. FES incurred this obligation as a successful
bidder in the State of New Jersey’s auction of BGS.
Within
the franchise
territories of our utilities, alternative energy suppliers currently provide
generation service for approximately 100 MW (summer peak) of load with an
estimated energy requirement of 0.8 billion KWH. If these alternate suppliers
fail to deliver power to their customers located in the utility’s service area,
the utility must procure replacement power in the role of PLR (see
Note 10 for discussion of the auction of JCP&L's PLR obligation).
JCP&L's costs for any replacement power would be recovered under NJBPU
rules.
To
meet these
generation service obligations, our affiliates own and operate 13,427 MW of
installed generating capacity, which for 2006 is expected to provide
approximately 80% of the required power supply. The balance has been secured
through a combination of long-term purchases (contract term of greater than
one
year) and short-term purchases (contract of term of less than one year).
Additional power supply requirements will be met through spot market
transactions.
PJM
INTERCONNECTION TRANSACTIONS
FES
engages in
purchase and sale transactions in the PJM Market to support the supply of
end-use customers, including PLR requirements in Pennsylvania. In conjunction
with our dedication of the Beaver Valley Plant to PJM on January 1, 2005,
FES began accounting for purchase and sale transactions in the PJM market based
on its net hourly position - recording each hour as either an energy purchase
or
an energy sale in the Consolidated Statements of Income relating to the Power
Supply Management Services segment. Hourly energy positions are aggregated
to
recognize gross purchases and sales for the month. This revised method of
accounting, which has no impact on net income, is consistent with the practice
of other energy companies that have dedicated generating capacity in PJM and
correlates with PJM's scheduling and reporting of hourly energy transactions.
FES also applies the net hourly methodology to purchase and sale transactions
in
MISO's energy market, which became active on April 1, 2005.
CAPITAL
RESOURCES AND LIQUIDITY
Our
cash
requirements in 2005 for operating expenses, construction expenditures,
scheduled debt maturities and preferred stock redemptions were met without
increasing our net debt and preferred stock outstanding. During 2006, we expect
to meet our contractual obligations primarily with cash from operations.
Borrowing capacity under credit facilities is available to manage working
capital requirements. In subsequent years, we expect to use a combination of
cash from operations and funds from the capital markets.
21
Changes
in Cash
Position
Our
primary source
of cash required for continuing operations as a holding company is cash from
the
operations of our subsidiaries. We also have access to $2.0 billion of
short-term financing under a revolving credit facility which expires in 2010,
subject to short-term debt limitations under current regulatory approvals of
$1.5 billion and to outstanding borrowings by subsidiaries of FirstEnergy
that are also parties to such facility. In 2005, we received $1.3 billion
of cash dividends from our subsidiaries and paid $546 million in cash
dividends to our common shareholders. There are no material restrictions on
the
payment of cash dividends by our subsidiaries.
As
of
December 31, 2005, we had $64 million of cash and cash equivalents
compared with $53 million as of December 31, 2004 (each includes
$3 million restricted as an indemnity reserve). The major sources for
changes in these balances are summarized below.
Cash
Flows From
Operating Activities
Our
consolidated net
cash from operating activities is provided primarily by our regulated services
and power supply management services businesses (see Results of Operations
-
Business Segments above). Net cash provided from operating activities was
$2.2 billion in 2005, $1.9 billion in 2004 and $1.8 billion in
2003, summarized as follows:
|
Operating
Cash Flows
|
2005
|
2004
|
2003
|
|||||||
|
|
(In
millions)
|
|||||||||
|
Cash
earnings(1)
|
$
|
2,188
|
$
|
2,197
|
$
|
1,873
|
||||
|
Pension
trust
contribution(2)
|
(341
|
)
|
(300
|
)
|
-
|
|||||
|
Working
capital and other
|
373
|
(5
|
)
|
(96
|
)
|
|||||
|
Net
cash
provided from operating activities
|
$
|
2,220
|
$
|
1,892
|
$
|
1,777
|
||||
(1) Cash
earnings are a
Non-GAAP measure (see reconciliation below).
|
(2)
|
Pension
trust
contributions in 2005 and 2004 are net of $159 million and $200
million of
related current year cash income tax benefits,
respectively.
|
Cash
earnings (in
the table above) are not a measure of performance calculated in accordance
with
GAAP. We believe that cash earnings is a useful financial measure because it
provides investors and management with an additional means of evaluating our
cash-based operating performance. The following table reconciles cash earnings
with net income:
|
Reconciliation
of Cash Earnings
|
2005
|
2004
|
2003
|
|||||||||
|
(In
millions)
|
||||||||||||
|
Net
Income
(GAAP)
|
$
|
861
|
$
|
878
|
$
|
423
|
||||||
|
Non-Cash
Charges (Credits):
|
||||||||||||
|
Provision
for
depreciation
|
589
|
587
|
604
|
|||||||||
|
Amortization
of regulatory assets
|
1,281
|
1,166
|
1,079
|
|||||||||
|
Deferral
of
new regulatory assets
|
(405
|
)
|
(257
|
)
|
(194
|
)
|
||||||
|
Nuclear
fuel
and lease amortization
|
90
|
96
|
66
|
|||||||||
|
Deferred
purchased power and other costs
|
(384
|
)
|
(451
|
)
|
(459
|
)
|
||||||
|
Deferred income
taxes
and
investment
tax
credits*
|
154
|
58
|
(18
|
)
|
||||||||
|
Investment
impairments
|
15
|
30
|
135
|
|||||||||
|
Disallowed
regulatory assets
|
-
|
-
|
153
|
|||||||||
|
Cumulative
effect of accounting changes
|
30
|
-
|
(102
|
)
|
||||||||
|
Deferred
rents
and lease market valuation liability
|
(104
|
)
|
(84
|
)
|
(119
|
)
|
||||||
|
Accrued
compensation and retirement benefits
|
90
|
156
|
202
|
|||||||||
|
Amortization
of electric service program
|
(34
|
)
|
(18
|
)
|
(16
|
)
|
||||||
|
Loss
(income)
from discontinued operations
|
(18
|
)
|
18
|
123
|
||||||||
|
Other
non-cash
expenses
|
23
|
18
|
(4
|
)
|
||||||||
|
Cash
Earnings
(Non-GAAP)
|
$
|
2,188
|
$
|
2,197
|
$
|
1,873
|
||||||
* Excludes
$200
million of deferred tax benefit from pension contributions in 2004.
Net
cash provided
from operating activities increased $328 million in 2005 compared to 2004
primarily due to a $378 million increase from changes in working capital
and a $9 million decrease in cash earnings as described under "Results of
Operations". In 2005 and 2004, we made voluntary after-tax pension trust
contributions of $341 million and $300 million, respectively. The
increase from working capital resulted from increased returned cash collateral
of $259 million, decreased outflow of $143 million for payables and
$242 million of funds received in 2005 for prepaid electric service (under
a three-year Energy for Education Program with the Ohio Schools Council). These
increases were partially offset by decreases in cash provided from the
settlement of receivables of $241 million and the absence of a
$53 million NUG power contract restructuring transaction in 2005.
22
Net
cash provided
from operating activities increased $115 million in 2004 compared to 2003
due to a $324 million increase in cash earnings as described under "Results
of Operations" and a $91 million increase from changes in working capital,
partially offset by a $300 million after-tax voluntary pension trust
contribution. The increase from working capital changes resulted in part from
increases in cash provided from the settlement of receivables of
$88 million and prepayments and other current assets of $78 million,
decreased outflow of $59 million in payables and a $53 million NUG
power contract restructuring transaction, partially offset by an increased
outflow of $235 million for tax payments.
Cash
Flows From
Financing Activities
In
2005, 2004 and
2003, net cash used for financing activities was $876 million,
$1.5 billion and $1.3 billion, respectively, primarily reflecting the
redemptions of debt and preferred stock shown below:
|
Securities
Issued or Redeemed
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
||||||||||
|
New
Issues
|
||||||||||
|
Common
stock
|
$
|
-
|
$
|
-
|
$
|
934
|
||||
|
Pollution
control notes
|
721
|
261
|
-
|
|||||||
|
Senior
secured
notes
|
-
|
300
|
400
|
|||||||
|
Unsecured
notes
|
-
|
400
|
627
|
|||||||
|
$
|
721
|
$
|
961
|
$
|
1,961
|
|||||
|
Redemptions
|
||||||||||
|
FMB
|
$
|
252
|
$
|
589
|
$
|
1,483
|
||||
|
Pollution
control notes
|
555
|
80
|
238
|
|||||||
|
Senior
secured
notes
|
94
|
471
|
323
|
|||||||
|
Long-term
revolving credit
|
215
|
95
|
85
|
|||||||
|
Unsecured
notes
|
308
|
337
|
-
|
|||||||
|
Preferred
stock
|
170
|
2
|
127
|
|||||||
|
$
|
1,594
|
$
|
1,574
|
$
|
2,256
|
|||||
|
Short-term
borrowings, net
|
$
|
561
|
$
|
(351
|
)
|
$
|
(575
|
)
|
||
We
had approximately
$731 million of short-term indebtedness as of December 31, 2005
compared to approximately $170 million as of December 31, 2004. The
increase in short-term indebtedness in 2005 was due to funding the
$341 million after-tax pension trust contribution and refinancing a
$300 million senior note in the fourth quarter of 2005. In addition, an
off-balance sheet receivables financing agreement was renewed as an on-balance
sheet short-term debt financing agreement in June 2005 that had a
$140 million indebtedness balance as of December 31, 2005. Available
consolidated bank borrowing capacity as of December 31, 2005 included the
following:
|
Borrowing
Capability
|
||||
|
(In
millions)
|
||||
|
Short-term
credit facilities(1)
|
$
|
2,020
|
||
|
Accounts
receivable financing facilities
|
550
|
|||
|
Utilized
|
(718
|
)
|
||
|
Letters
of
credit
|
(101
|
)
|
||
|
Net
|
$
|
1,751
|
||
|
|
|
|||
|
(1)
A $2 billion revolving credit facility that expires in 2010 is available
in various amounts to FirstEnergy and certain of its subsidiaries.
A $20
million uncommitted line of credit facility added
in
September 2005 is available to FirstEnergy
only.
|
||||
As
of
December 31, 2005, the Ohio Companies and Penn had the aggregate capability
to issue approximately $1.2 billion of additional FMB on the basis of
property additions and retired bonds under the terms of their respective
mortgage indentures. The issuance of FMB by OE and CEI are also subject to
provisions of their senior note indentures generally limiting the incurrence
of
additional secured debt, subject to certain exceptions that would permit, among
other things, the issuance of secured debt (including FMB) (i) supporting
pollution control notes or similar obligations, or (ii) as an extension, renewal
or replacement of previously outstanding secured debt. In addition, these
provisions would permit OE and CEI to incur additional secured debt not
otherwise permitted by a specified exception of up to $651 million and
$582 million, respectively, as of December 31, 2005. Under the
provisions of its senior note indenture, JCP&L may issue additional FMB only
as collateral for senior notes. As of December 31, 2005, JCP&L had the
capability to issue $715 million of additional senior notes upon the basis
of FMB collateral.
23
Based
upon
applicable earnings coverage tests in their respective charters, OE, Penn,
TE
and JCP&L could issue a total of $5.5 billion of preferred stock (assuming
no additional debt was issued) as of December 31, 2005. CEI, Met-Ed and
Penelec do not have similar restrictions and could issue up to the number of
preferred stock shares authorized under their respective charters (see Note
11(B)).
As
of
December 31, 2005, approximately $1 billion of capacity remained
unused under an existing shelf registration statement, filed by FirstEnergy
with
the SEC in 2003, to support future securities issuances. The shelf registration
provides the flexibility to issue and sell various types of securities,
including common stock, debt securities, and share purchase contracts and
related share purchase units.
Our
working capital
and short-term borrowing needs are met principally with a $2 billion
five-year revolving credit facility (included in the table above). Borrowings
under the facility are available to each borrower separately and mature on
the
earlier of 364 days from the date of borrowing or the commitment expiration
date, June 16, 2010.
The
following table
summarizes the borrowing sub-limits for each borrower under the facility, as
well as the limitations on short-term indebtedness applicable to each borrower
under current regulatory approvals and applicable statutory and/or charter
limitations:
|
|
Revolving
|
Regulatory
and
|
|||||
|
|
Credit
Facility
|
Other
Short-Term
|
|||||
|
Borrower
|
Sub-Limit
|
Debt
Limitations1
|
|||||
|
|
(In
millions)
|
||||||
|
FirstEnergy
|
$
|
2,000
|
$
|
1,500
|
|||
|
OE
|
500
|
500
|
|||||
|
Penn
|
50
|
44
|
|||||
|
CEI
|
250
|
500
|
|||||
|
TE
|
250
|
500
|
|||||
|
JCP&L
|
425
|
412
|
|||||
|
Met-Ed
|
250
|
300
|
|||||
|
Penelec
|
250
|
300
|
|||||
|
FES
|
-2
|
n/a
|
|||||
|
ATSI
|
-2
|
26
|
|||||
|
(1)
|
As
of December
31, 2005.
|
|
(2)
|
Borrowing
sub-limits for FES and ATSI may be increased to up to $250 million
and
$100
million,
respectively,
by delivering notice to the administrative agent that either (i)
such
borrower has senior
unsecured
debt
ratings of at least BBB- by S&P and Baa3 by Moody’s or (ii)
FirstEnergy has guaranteed
the
obligations of such borrower under the
facility.
|
The
revolving credit
facility, combined with an aggregate $550 million ($270 million unused as
of December 31, 2005) of accounts receivable financing facilities for OE,
CEI, TE, Met-Ed, Penelec and Penn, are intended to provide liquidity to meet
short-term working capital requirements for FirstEnergy and its
subsidiaries.
Under
the revolving
credit facility, borrowers may request the issuance of LOCs expiring up to
one
year from the date of issuance. The stated amount of outstanding LOCs will
count
against total commitments available under the facility and against the
applicable borrower’s borrowing sub-limit. Total unused borrowing capability
under existing credit facilities and accounts receivable financing facilities
was $1.75 billion as of December 31, 2005.
The
revolving credit
facility contains financial covenants requiring each borrower to maintain a
consolidated debt to total capitalization ratio of no more than 65%, measured
at
the end of each fiscal quarter.
As
of
December 31, 2005, FirstEnergy and its subsidiaries' debt to total
capitalization ratios (as defined under the revolving credit facility) were
as
follows:
|
Borrower
|
||||
|
FirstEnergy
|
55
|
%
|
||
|
OE
|
38
|
%
|
||
|
Penn
|
42
|
%
|
||
|
CEI
|
53
|
%
|
||
|
TE
|
28
|
%
|
||
|
JCP&L
|
26
|
%
|
||
|
Met-Ed
|
39
|
%
|
||
|
Penelec
|
36
|
%
|
||
The
revolving credit
facility does not contain provisions that either restrict the ability to borrow
or accelerate repayment of outstanding advances as a result of any change in
credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds
borrowed under the facility is related to the credit ratings of the company
borrowing the funds.
24
Our
regulated
companies also have the ability to borrow from each other and the holding
company to meet their short-term working capital requirements. A similar but
separate arrangement exists among our unregulated companies. FESC administers
these two money pools and tracks surplus funds of FirstEnergy and the respective
regulated and unregulated subsidiaries, as well as proceeds available from
bank
borrowings. Companies receiving a loan under the money pool agreements must
repay the principal amount of the loan, together with accrued interest,
within 364
days of borrowing the funds. The rate of interest is the same for each company
receiving a loan from their respective pool and is based on the average cost
of
funds available through the pool. The average interest rate for borrowings
in
2005 was 3.24% for the regulated companies’ money pool and 3.22% for the
unregulated companies' money pool.
On
December 16,
2005, in conjunction with the intra-system generation asset transfers,
FirstEnergy made a $750 million cash capital contribution to NGC. NGC used
the proceeds from the capital contribution to pre-pay a portion of the
promissory notes to CEI and TE for $375 million each. (See Note
15.)
On
July 18,
2005, Moody’s revised its rating outlook on FirstEnergy and its subsidiaries to
positive from stable. Moody’s stated that the revision to FirstEnergy’s outlook
resulted from steady financial improvement and steps taken by management to
improve operations, including the stabilization of its nuclear operations.
On
October 3, 2005, S&P raised its corporate credit rating on FirstEnergy
and the Companies to 'BBB' from 'BBB-'. At the same time, S&P raised
the senior unsecured ratings at the holding company to 'BBB-' from 'BB+' and
each of the Companies by one notch above the previous rating. S&P noted
that the upgrade followed the continuation of a good operating track record,
specifically for the nuclear fleet through the third quarter of 2005.
On
December 23, 2005, Fitch revised its rating outlook on FirstEnergy and its
subsidiaries to positive from stable. Fitch stated that the revision to
FirstEnergy's outlook resulted from improved performance of the Company's
generating fleet and ongoing debt reduction.
FirstEnergy’s
access
to capital markets and costs of financing are influenced by the ratings of
its
securities. The following table displays FirstEnergy’s and the Companies'
securities ratings as of December 31, 2005. The ratings outlook from
S&P on all securities is stable. The ratings outlook from Moody's &
Fitch on all securities is positive.
|
Issuer
|
Securities
|
S&P
|
Moody’s
|
Fitch
|
||||
|
FirstEnergy
|
Senior
unsecured
|
BBB-
|
Baa3
|
BBB-
|
||||
|
OE
|
Senior
unsecured
|
BBB-
|
Baa2
|
BBB
|
||||
|
Preferred
stock
|
BB+
|
Ba1
|
BBB-
|
|||||
|
CEI
|
Senior
secured
|
BBB
|
Baa2
|
BBB-
|
||||
|
Senior
unsecured
|
BBB-
|
Baa3
|
BB+
|
|||||
|
TE
|
Senior
secured
|
BBB
|
Baa2
|
BBB-
|
||||
|
Preferred
stock
|
BB+
|
Ba2
|
BB
|
|||||
|
Penn
|
Senior
secured
|
BBB+
|
Baa1
|
BBB+
|
||||
|
Senior
unsecured (1)
|
BBB-
|
Baa2
|
BBB
|
|||||
|
Preferred
stock
|
BB+
|
Ba1
|
BBB-
|
|||||
|
JCP&L
|
Senior
secured
|
BBB+
|
Baa1
|
BBB+
|
||||
|
Preferred
stock
|
BB+
|
Ba1
|
BBB-
|
|||||
|
Met-Ed
|
Senior
secured
|
BBB+
|
Baa1
|
BBB+
|
||||
|
Senior
unsecured
|
BBB
|
Baa2
|
BBB
|
|||||
|
Penelec
|
Senior
unsecured
|
BBB
|
Baa2
|
BBB
|
(1) Penn's
only senior
unsecured debt obligations are notes underlying pollution control revenue
refunding bonds issued by the Ohio Air Quality Development Authority to which
bonds this rating applies.
On
January 20,
2006, TE redeemed all 1.2 million of its outstanding shares of Adjustable
Rate Series B preferred stock at $25.00 per share, plus accrued dividends to
the
date of redemption.
FirstEnergy
will
consider a share repurchase program later in 2006 after we gain additional
clarity on three important milestones:
| · |
The
approval
of the RCP by the Ohio Commission (received in January
2006);
|
| · |
Completion
of
the Beaver Valley Unit 1 extended outage;
and
|
| · |
Finalization
of our environmental compliance plan for our fossil
plants.
|
25
Cash
Flows From
Investing Activities
Net
cash flows used
in investing activities resulted principally from property additions. Regulated
services expenditures for property additions primarily include expenditures
supporting the distribution of electricity. Capital expenditures by the power
supply management services segment are principally generation-related. The
following table summarizes investments for the three years ended
December 31, 2005 by our regulated services, power supply management
services and other segments:
|
Summary
of Cash Flows
|
Property
|
||||||||||||||
|
Used
for Investing Activities By Segment
|
Additions
|
Investments
|
Other
|
Total
|
|||||||||||
|
2005
Sources (Uses)
|
(In
millions)
|
||||||||||||||
|
Regulated
services
|
$
|
(788
|
)
|
$
|
(106
|
)
|
$
|
(14
|
)
|
$
|
(908
|
)
|
|||
|
Power
supply
management services
|
(375
|
)
|
(21
|
)
|
5
|
(391
|
)
|
||||||||
|
Other
|
(8
|
)
|
18
|
(21
|
)
|
(11
|
)
|
||||||||
|
Reconciling
adjustments
|
(37
|
)
|
8
|
6
|
(23
|
)
|
|||||||||
|
Total
|
$
|
(1,208
|
)
|
$
|
(101
|
)
|
$
|
(24
|
)
|
$
|
(1,333
|
)
|
|||
|
2004
Sources (Uses)
|
|||||||||||||||
|
Regulated
services
|
$
|
(572
|
)
|
$
|
184
|
$
|
(88
|
)
|
$
|
(476
|
)
|
||||
|
Power
supply
management services
|
(246
|
)
|
(13
|
)
|
(2
|
)
|
(261
|
)
|
|||||||
|
Other
|
(7
|
)
|
175
|
(4
|
)
|
164
|
|||||||||
|
Reconciling
adjustments
|
(21
|
)
|
(2
|
)
|
100
|
77
|
|||||||||
|
Total
|
$
|
(846
|
)
|
$
|
344
|
$
|
6
|
$
|
(496
|
)
|
|||||
|
2003
Sources (Uses)
|
|||||||||||||||
|
Regulated
services
|
$
|
(434
|
)
|
$
|
94
|
$
|
16
|
$
|
(324
|
)
|
|||||
|
Power
supply
management services
|
(335
|
)
|
(32
|
)
|
8
|
(359
|
)
|
||||||||
|
Other
|
(10
|
)
|
34
|
(83
|
)
|
(59
|
)
|
||||||||
|
Reconciling
adjustments
|
(77
|
)
|
90
|
138
|
151
|
||||||||||
|
Total
|
$
|
(856
|
)
|
$
|
186
|
$
|
79
|
$
|
(591
|
)
|
|||||
Net
cash used for
investing activities in 2005 increased by $837 million from 2004. The
increase was principally due to a $362 million increase in property
additions, a $153 million decrease in proceeds from asset sales (see Note
8) and the absence in 2005 of cash proceeds of $278 million from certificates
of
deposit (CD) received in 2004 when the CDs were no longer required as OE sale
leaseback LOC collateral.
Net
cash used for
investing activities in 2004 decreased by $95 million from 2003. The
decrease was primarily due to $278 million from certificates of deposit
cash proceeds, partially offset by a $117 million change in NUG trust
activity.
Our
capital spending
for the period 2006-2010 is expected to be about $6.7 billion (excluding
nuclear fuel), of which $1 billion applies to 2006. Investments for
additional nuclear fuel during the 2006-2010 period are estimated to be
approximately $711 million, of which about $169 million applies to
2006. During the same period, our nuclear fuel investments are expected to
be
reduced by approximately $560 million and $92 million, respectively,
as the nuclear fuel is consumed.
CONTRACTUAL
OBLIGATIONS
As
of
December 31, 2005, our estimated cash payments under existing contractual
obligations that we consider firm obligations are as follows:
|
|
2007-
|
2009-
|
|
|||||||||||||
|
Contractual
Obligations
|
Total
|
2006
|
2008
|
2010
|
Thereafter
|
|||||||||||
|
(In
millions)
|
||||||||||||||||
|
Long-term
debt
(1)
|
$
|
10,200
|
$
|
1,324
|
$
|
560
|
$
|
467
|
$
|
7,849
|
||||||
|
Short-term
borrowings
|
731
|
731
|
-
|
-
|
-
|
|||||||||||
|
Capital
leases
(2)
|
13
|
5
|
2
|
2
|
4
|
|||||||||||
|
Operating
leases (2)
|
2,356
|
202
|
397
|
399
|
1,358
|
|||||||||||
|
Pension
funding (3)
|
-
|
-
|
-
|
-
|
-
|
|||||||||||
|
Fuel
and
purchased power (4)
|
15,105
|
2,844
|
4,715
|
3,880
|
3,666
|
|||||||||||
|
Total
|
$
|
28,405
|
$
|
5,106
|
$
|
5,674
|
$
|
4,748
|
$
|
12,877
|
||||||
|
(1)
|
Amounts
reflected do not include interest on long-term
debt.
|
|
(2)
|
See
Note 6 to
the consolidated financial
statements.
|
|
(3)
|
We
estimate
that no further pension contributions will be required through 2010
to
maintain our defined benefit pension plan's funding at a minimum
required
level as determined by government regulations. We are unable to estimate
projected contributions beyond 2011. See Note 3 to the consolidated
financial statements.
|
|
(4)
|
Amounts
under
contract with fixed or minimum quantities and approximate
timing.
|
26
Guarantees
and
Other Assurances
As
part of normal
business activities, we enter into various agreements on behalf of our
subsidiaries to provide financial or performance assurances to third parties.
These agreements include contract guarantees, surety bonds, and LOCs. Some
of
the guaranteed contracts contain collateral provisions that are contingent
upon
our credit ratings.
As
of
December 31, 2005, our maximum exposure to potential future payments under
outstanding guarantees and other assurances totaled approximately
$3.4 billion, as summarized below:
|
|
Maximum
|
|||
|
Guarantees
and Other Assurances
|
Exposure
|
|||
|
|
(In
millions)
|
|||
|
FirstEnergy
Guarantees of Subsidiaries
|
|
|||
|
Energy
and
Energy-Related Contracts (1)
|
$
|
832
|
||
|
Other
(2)
|
894
|
|||
|
|
1,726
|
|||
|
|
||||
|
Surety
Bonds
|
312
|
|||
|
LOC
(3)(4)
|
1,324
|
|||
|
|
||||
|
Total
Guarantees and Other Assurances
|
$
|
3,362
|
||
|
(1)
|
Issued
for
open-ended terms, with a 10-day termination right by
FirstEnergy.
|
|
(2)
|
Issued
for
various terms.
|
|
(3)
|
Includes
$101
million issued for various terms under LOC capacity available in
FirstEnergy’s revolving credit agreement and $604 million outstanding in
support of pollution control revenue bonds issued with various
maturities.
|
|
(4)
|
Includes
approximately $194 million pledged in connection with the sale and
leaseback of Beaver Valley Unit 2 by CEI and TE, $291 million pledged
in
connection with the sale and leaseback of Beaver Valley Unit 2 by
OE and
$134 million pledged in connection with the sale and leaseback of
Perry
Unit 1 by OE.
|
We
guarantee energy
and energy-related payments of our subsidiaries involved in energy commodity
activities principally to facilitate normal physical transactions involving
electricity, gas, emission allowances and coal. We also provide guarantees
to
various providers of subsidiary financing principally for the acquisition of
property, plant and equipment. These agreements legally obligate us to fulfill
the obligations of our subsidiaries directly involved in these energy and
energy-related transactions or financings where the law might otherwise limit
the counterparties' claims. If demands of a counterparty were to exceed the
ability of a subsidiary to satisfy existing obligations, our guarantee enables
the counterparty's legal claim to be satisfied by our other assets. The
likelihood that such parental guarantees will increase amounts otherwise paid
by
us to meet our obligations incurred in connection with ongoing energy and
energy-related contracts is remote.
While
these types of
guarantees are normally parental commitments for the future payment of
subsidiary obligations, subsequent to the occurrence of a credit rating
downgrade or “material adverse event” the immediate posting of cash collateral
or provision of an LOC may be required of the subsidiary. The following table
summarizes collateral provisions in effect as of December 31,
2005:
|
Total
|
Collateral
Paid
|
Remaining
|
|||||||||||
|
Collateral
Provisions
|
Exposure
|
Cash
|
LOC
|
Exposure
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Credit
rating
downgrade
|
$
|
380
|
$
|
78
|
$
|
-
|
$
|
302
|
|||||
|
Material
adverse event
|
74
|
-
|
-
|
74
|
|||||||||
|
Total
|
$
|
454
|
$
|
78
|
$
|
-
|
$
|
376
|
|||||
Most
of our surety
bonds are backed by various indemnities common within the insurance industry.
Surety bonds and related guarantees provide additional assurance to outside
parties that contractual and statutory obligations will be met in a number
of
areas including construction contracts, environmental commitments and various
retail transactions.
27
We
have guaranteed
the obligations of the operators of the TEBSA project up to a maximum of
$6 million (subject to escalation) under the project's operations and
maintenance agreement. In connection with the sale of TEBSA in January 2004,
the
purchaser indemnified FirstEnergy against any loss under this guarantee. We
have
also provided an LOC ($36 million as of December 31, 2005), which is
renewable and declines yearly based upon the senior outstanding debt of TEBSA.
OFF-BALANCE
SHEET ARRANGEMENTS
We
have obligations
that are not included on our Consolidated Balance Sheets related to the sale
and
leaseback arrangements involving Perry Unit 1, Beaver Valley Unit 2
and the Bruce Mansfield Plant, which are satisfied through operating lease
payments. The present value of these sale and leaseback operating lease
commitments, net of trust investments, total $1.3 billion as of
December 31, 2005.
We
have equity
ownership interests in certain businesses that are accounted for using the
equity method. There are no undisclosed material contingencies related to these
investments. Certain guarantees that we do not expect will have a material
current or future effect on our financial condition, liquidity or results of
operations are disclosed under Guarantees and Other Assurances
above.
In
June 2005, the
CFC accounts receivables financing facility for CEI and TE was renewed and
restructured from an off-balancesheet transaction to an on-balance sheet
transaction. Under the revised facility, any borrowings by CFC appear on our
Consolidated Balance Sheets as short-term debt.
MARKET
RISK
INFORMATION
We
use various
market risk sensitive instruments, including derivative contracts, primarily
to
manage the risk of price and interest rate fluctuations. Our Risk Policy
Committee, comprised of members of senior management, provides general oversight
to risk management activities throughout the Company.
Commodity
Price
Risk
We
are exposed to
financial and market risks resulting from the fluctuation of interest rates
and
commodity prices primarily due to fluctuations in electricity, energy
transmission, natural gas, coal, nuclear fuel and emission allowance prices.
To
manage the volatility relating to these exposures, we use a variety of
non-derivative and derivative instruments, including forward contracts, options,
futures contracts and swaps. The derivatives are used principally for hedging
purposes. Derivatives that fall within the scope of SFAS 133 must be
recorded at their fair value and marked to market. The majority of our
derivative hedging contracts qualify for the normal purchase and normal sale
exception under SFAS 133 and are therefore excluded from the table below.
Contracts that are not exempt from such treatment include power purchase
agreements with NUG entities that were structured pursuant to the Public Utility
Regulatory Act of 1978. These non-trading contracts are adjusted to fair value
at the end of each quarter, with a corresponding regulatory asset recognized
for
above-market costs. The change in the fair value of commodity derivative
contracts related to energy production during 2005 is summarized in the
following table:
|
Increase
(Decrease) in the Fair Value of Derivative
Contracts
|
Non-Hedge
|
Hedge
|
Total
|
|||||||
|
(In
millions)
|
||||||||||
|
Change
in the fair value of commodity derivative
contracts:
|
||||||||||
|
Outstanding
net asset (liability) as of January 1, 2005
|
$
|
(1,939
|
)
|
$
|
2
|
$
|
(1,937
|
)
|
||
|
New
contract
value when entered
|
-
|
-
|
-
|
|||||||
|
Additions/change
in value of existing contracts
|
452
|
3
|
455
|
|||||||
|
Change
in
techniques/assumptions
|
-
|
-
|
-
|
|||||||
|
Settled
contracts
|
316
|
(2
|
)
|
314
|
||||||
|
Sale
of retail
natural gas contracts
|
1
|
(6
|
)
|
(5
|
)
|
|||||
|
Outstanding
net asset (liability) as of December 31, 2005(1)
|
$
|
(1,170
|
)
|
(3
|
)
|
(1,173
|
)
|
|||
|
Non-commodity
net assets as of December 31, 2005:
|
||||||||||
|
Interest
rate
swaps(2)
|
-
|
(21
|
)
|
(21
|
)
|
|||||
|
Net
Assets (Liabilities) - Derivative Contracts as of December 31,
2005
|
$
|
(1,170
|
)
|
$
|
(24
|
)
|
$
|
(1,194
|
)
|
|
|
Impact
of Changes in Commodity Derivative Contracts(3)
|
||||||||||
|
Income
Statement effects (Pre-Tax)
|
$
|
12
|
$
|
-
|
$
|
12
|
||||
|
Balance
Sheet
effects:
|
-
|
|||||||||
|
OCI
(Pre-Tax)
|
$
|
-
|
$
|
(5
|
)
|
$
|
(5
|
)
|
||
|
Regulatory
asset (net)
|
$
|
(757
|
)
|
$
|
-
|
$
|
(757
|
)
|
||
|
(1)
|
Includes
$1,183 million in non-hedge commodity derivative contracts (primarily
with
NUGs), which are offset by a regulatory
asset.
|
|
(2)
|
Interest
rate
swaps are treated as cash flow or fair value hedges (see Interest
Rate
Swap Agreements below).
|
|
(3)
|
Represents
the
change in value of existing contracts, settled contracts and changes
in
techniques/ assumptions.
|
28
Derivatives
are
included on the Consolidated Balance Sheet as of December 31, 2005 as
follows:
|
Balance
Sheet Classification
|
Non-Hedge
|
Hedge
|
Total
|
|||||||
|
(In
millions)
|
||||||||||
|
Current-
|
||||||||||
|
Other
assets
|
$
|
4
|
$
|
15
|
$
|
19
|
||||
|
Other
liabilities
|
(2
|
)
|
(19
|
)
|
(21
|
)
|
||||
|
Non-Current-
|
||||||||||
|
Other
deferred
charges
|
69
|
5
|
74
|
|||||||
|
Other
noncurrent liabilities
|
(1,241
|
)
|
(25
|
)
|
(1,266
|
)
|
||||
|
Net
assets (liabilities)
|
$
|
(1,170
|
)
|
$
|
(24
|
)
|
$
|
(1,194
|
)
|
|
The
valuation of
derivative contracts is based on observable market information to the extent
that such information is available. In cases where such information is not
available, we rely on model-based information. The model provides estimates
of
future regional prices for electricity and an estimate of related price
volatility. We use these results to develop estimates of fair value for
financial reporting purposes and for internal management decision making.
Sources of information for the valuation of commodity derivative contracts
by
year are summarized in the following table:
|
Source
of Information
|
|
|
|
|
|
|
|
|||||||||||||||
|
-
Fair
Value by Contract Year
|
2006
|
2007
|
2008
|
2009
|
2010
|
Thereafter
|
Total
|
|||||||||||||||
|
(In
millions)
|
||||||||||||||||||||||
|
Prices
actively quoted(1)
|
$
|
(278
|
)
|
$
|
(297
|
)
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
(575
|
)
|
|||||
|
Other
external
sources(2)
|
21
|
10
|
-
|
-
|
-
|
-
|
31
|
|||||||||||||||
|
Prices
based
on models
|
-
|
-
|
(260
|
)
|
(179
|
)
|
(142
|
)
|
(48
|
)
|
(629
|
)
|
||||||||||
|
Total(3)
|
$
|
(257
|
)
|
$
|
(287
|
)
|
$
|
(260
|
)
|
$
|
(179
|
)
|
$
|
(142
|
)
|
$
|
(48
|
)
|
$
|
(1,173
|
)
|
|
(1) Exchange
traded.
(2) Broker
quote
sheets.
(3) Includes
$1,183
million in non-hedge commodity derivative contracts (primarily with NUGs),
which
are offset by a regulatory asset.
We
perform
sensitivity analyses to estimate our exposure to the market risk of our
commodity positions. A hypothetical 10% adverse shift (an increase or decrease
depending on the derivative position) in quoted market prices in the near term
on our derivative instruments would not have had a material effect on our
consolidated financial position (assets, liabilities and equity) or cash flows
as of December 31, 2005. Based on derivative contracts held as of
December 31, 2005, an adverse 10% change in commodity prices would decrease
net income by approximately $4 million for the next twelve months.
Interest
Rate
Risk
Our
exposure to
fluctuations in market interest rates is reduced since a significant portion
of
our debt has fixed interest rates, as noted in the table below.
|
Comparison
of Carrying Value to Fair Value
|
||||||||||||||||||||||||||||
|
There-
|
Fair
|
|||||||||||||||||||||||||||
|
Year
of Maturity
|
2006
|
2007
|
2008
|
2009
|
2010
|
after
|
Total
|
Value
|
||||||||||||||||||||
|
(Dollars
in millions)
|
||||||||||||||||||||||||||||
|
Assets
|
||||||||||||||||||||||||||||
|
Investments
other than Cash and Cash
|
||||||||||||||||||||||||||||
|
Equivalents-Fixed
Income
|
$ |
|
96
|
$
|
77
|
$
|
57
|
$
|
68
|
$
|
84
|
$
|
1,648
|
$
|
2,030
|
$
|
2,135
|
|||||||||||
|
Average
interest rate
|
6.8
|
%
|
7.9
|
%
|
7.7
|
%
|
7.8
|
%
|
7.9
|
%
|
5.9
|
%
|
6.2
|
%
|
||||||||||||||
|
Liabilities
|
||||||||||||||||||||||||||||
|
Long-term
Debt
and Other
|
||||||||||||||||||||||||||||
|
Long-term
Obligations:
|
||||||||||||||||||||||||||||
|
Fixed
rate(1)
|
$ |
|
1,324
|
$
|
229
|
$
|
331
|
$
|
278
|
$
|
189
|
$
|
5,956
|
$
|
8,307
|
$
|
8,824
|
|||||||||||
|
Average
interest rate
|
5.7
|
%
|
6.6
|
%
|
5.3
|
%
|
6.8
|
%
|
5.4
|
%
|
6.5
|
%
|
6.3
|
%
|
||||||||||||||
|
Variable
rate(1)
|
$
|
1,893
|
$
|
1,893
|
$
|
1,892
|
||||||||||||||||||||||
|
Average
interest rate
|
3.3
|
%
|
3.3
|
%
|
||||||||||||||||||||||||
|
Short-term
Borrowings
|
$ |
|
731
|
$
|
731
|
$
|
731
|
|||||||||||||||||||||
|
Average
interest rate
|
4.7
|
%
|
4.7
|
%
|
||||||||||||||||||||||||
(1) Balances
and rates
do not reflect the fixed-to-floating interest rate swap agreements discussed
below.
29
We
are subject to
the inherent interest rate risks related to refinancing maturing debt by issuing
new debt securities. As discussed in Note 6 to the consolidated financial
statements, our investments in capital trusts effectively reduce future lease
obligations, also reducing interest rate risk. Fluctuations in the fair value
of
NGC's and the Ohio Companies' decommissioning trust balances will eventually
affect earnings (affecting OCI initially) based on the guidance in
SFAS 115. Our Pennsylvania and New Jersey companies, however, have the
opportunity to recover from customers, or refund to customers, the difference
between the investments held in trust and their decommissioning obligations.
Thus, there is not expected to be an earnings effect from fluctuations in their
decommissioning trust balances. As of December 31, 2005, our
decommissioning trust balances totaled $1.8 billion, with $1.3 billion
held by NGC and our Ohio Companies and the remaining balance held by JCP&L,
Met-Ed and Penelec. As of year-end 2005, the trust balances of NGC and our
Ohio
Companies were comprised of 61% equity securities and 39% debt instruments.
Interest
Rate
Swap Agreements - Fair Value Hedges
We
utilize
fixed-for-floating interest rate swap agreements as part of our ongoing effort
to manage the interest rate risk associated with our debt portfolio. These
derivatives are treated as fair value hedges of fixed-rate, long-term debt
issues - protecting against the risk of changes in the fair value of fixed-rate
debt instruments due to lower interest rates. Swap maturities, call options,
fixed interest rates and interest payment dates match those of the underlying
obligations. During 2005, we entered into interest rate swap agreements on
$150 million notional amount of senior notes with a weighted average fixed
interest rate of 6.59%. In addition, we unwound swaps with a total notional
amount of $700 million from which we received $16 million in cash
gains during 2005. The gains will be recognized over the remaining maturity
of
each respective hedged security as reduced interest expense. As of
December 31, 2005, the debt underlying the $1.1 billion outstanding
notional amount of interest rate swaps had a weighted average fixed interest
rate of 5.71%, which the swaps have effectively converted to a current weighted
average variable rate of 5.63%.
|
December
31, 2005
|
December
31, 2004
|
||||||||||||||||||
|
Notional
|
Maturity
|
Fair
|
Notional
|
Maturity
|
Fair
|
||||||||||||||
|
Interest
Rate Swaps
|
Amount
|
Date
|
Value
|
Amount
|
Date
|
Value
|
|||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
Fixed
to
Floating Rate
|
$
|
-
|
2006
|
$
|
-
|
$
|
200
|
2006
|
$
|
(1
|
)
|
||||||||
|
(Fair
value
hedges)
|
100
|
2008
|
(3
|
)
|
100
|
2008
|
(1
|
)
|
|||||||||||
|
50
|
2010
|
-
|
100
|
2010
|
1
|
||||||||||||||
|
50
|
2011
|
-
|
100
|
2011
|
2
|
||||||||||||||
|
450
|
2013
|
(4
|
)
|
400
|
2013
|
4
|
|||||||||||||
|
|
- |
2014
|
-
|
100
|
2014
|
2
|
|||||||||||||
|
150
|
2015
|
(9
|
)
|
150
|
2015
|
(7
|
)
|
||||||||||||
|
150
|
2016
|
-
|
200
|
2016
|
1
|
||||||||||||||
|
|
- |
2018
|
-
|
150
|
2018
|
5
|
|||||||||||||
|
|
- |
2019
|
-
|
50
|
2019
|
2
|
|||||||||||||
|
50
|
2025
|
(1
|
)
|
-
|
2025
|
-
|
|||||||||||||
|
100
|
2031
|
(5
|
)
|
100
|
2031
|
(4
|
)
|
||||||||||||
|
$
|
1,100
|
$
|
(22
|
)
|
$
|
1,650
|
$
|
4
|
|||||||||||
Forward
Starting
Swap Agreements - Cash Flow Hedges
During
2005, we
entered into several forward starting swap agreements (forward swaps) in order
to hedge a portion of the consolidated interest rate risk associated with the
future planned issuances of fixed-rate, long-term debt securities for one or
more of our consolidated entities in 2006 through 2008. These derivatives are
treated as cash flow hedges, protecting against the risk of changes in future
interest payments resulting from changes in benchmark U.S. Treasury rates
between the date of hedge inception and the date of the debt issuance. As of
December 31, 2005, we had entered into forward swaps with an aggregate
notional amount of $975 million. As of December 31, 2005 the forward swaps
had a fair value of $3 million.
|
December
31, 2005
|
||||||||||
|
Forward
Starting Swaps
|
Notional
|
Maturity
|
Fair
|
|||||||
|
(Cash
flow hedges)
|
Amount
|
Date
|
Value
|
|||||||
|
|
(In
millions)
|
|||||||||
|
|
$
|
25
|
2015
|
$
|
-
|
|||||
|
|
600
|
2016
|
2
|
|||||||
|
|
25
|
2017
|
-
|
|||||||
|
|
275
|
2018
|
1
|
|||||||
|
|
50
|
2020
|
-
|
|||||||
|
|
$
|
975
|
|
$
|
3
|
|||||
30
Equity
Price
Risk
Included
in nuclear
decommissioning trusts are marketable equity securities carried at their current
fair value of approximately $1.1 billion and $951 million as of
December 31, 2005 and 2004, respectively. A hypothetical 10% decrease in
prices quoted by stock exchanges would result in a $107 million reduction in
fair value as of December 31, 2005 (see Note 5 - Fair Value of Financial
Instruments).
CREDIT
RISK
Credit
risk is the
risk of an obligor’s failure to meet the terms of any investment contract, loan
agreement or otherwise perform as agreed. Credit risk arises from all activities
in which success depends on issuer, borrower or counterparty performance,
whether reflected on or off the balance sheet. We engage in transactions for
the
purchase and sale of commodities including gas, electricity, coal and emission
allowances. These transactions are often with major energy companies within
the
industry.
We
maintain credit
policies with respect to our counterparties to manage overall credit risk.
This
includes performing independent risk evaluations, actively monitoring portfolio
trends and using collateral and contract provisions to mitigate exposure. As
part of our credit program, we aggressively manage the quality of our portfolio
of energy contracts, evidenced by a current weighted average risk rating for
energy contract counterparties of BBB (S&P). As of December 31, 2005,
the largest credit concentration with one party (currently rated investment
grade) represented 7.6% of our total credit risk. Within our unregulated energy
subsidiaries, 99% of credit exposures, net of collateral and reserves, were
with
investment-grade counterparties as of December 31, 2005.
REGULATORY
MATTERS
The Companies
and ATSI recognize, as regulatory assets, costs which the FERC, PUCO, PPUC
and NJBPU have authorized for recovery from customers in future periods or
for
which authorization is probable. Without the probability of such authorization,
costs currently recorded as regulatory assets would have been charged to income
as incurred. The following tables disclose the regulatory assets by company
and
by source:
|
Regulatory
Assets
|
|
|
Increase
|
|||||||
|
As
of
December 31*
|
2005
|
2004
|
(Decrease)
|
|||||||
|
|
(In
millions)
|
|||||||||
|
OE
|
$
|
775
|
$
|
1,116
|
$
|
(341
|
)
|
|||
|
CEI
|
862
|
944
|
(82
|
)
|
||||||
|
TE
|
287
|
366
|
(79
|
)
|
||||||
|
JCP&L
|
2,227
|
2,169
|
58
|
|||||||
|
Met-Ed
|
310
|
691
|
(381
|
)
|
||||||
|
Penelec
|
-
|
200
|
(200
|
)
|
||||||
|
ATSI
|
25
|
13
|
12
|
|||||||
|
Total
|
$
|
4,486
|
$
|
5,499
|
$
|
(1,013
|
)
|
|||
* Penn
had net
regulatory liabilities of approximately $59 million and $19 million as of
December 31, 2005 and 2004, respectively; changes in Penelec's net regulatory
asset components in 2005 resulted in it having net regulatory liabilities of
approximately $163 million as of December 31, 2005. These net regulatory
liabilities are included in Other Noncurrent Liabilities on the Consolidated
Balance Sheets as of December 31, 2005 and 2004.
|
Regulatory
Assets By Source
|
Increase
|
|||||||||
|
As
of
December 31
|
2005
|
2004
|
(Decrease)
|
|||||||
|
(In
millions)
|
||||||||||
|
Regulatory
transition costs
|
$
|
3,576
|
$
|
4,889
|
$
|
(1,313
|
)
|
|||
|
Customer
shopping incentives
|
884
|
612
|
272
|
|||||||
|
Customer
receivables for future income taxes
|
217
|
246
|
(29
|
)
|
||||||
|
Societal
benefits charge
|
29
|
51
|
(22
|
)
|
||||||
|
Loss
on
reacquired debt
|
41
|
56
|
(15
|
)
|
||||||
|
Employee
postretirement benefits costs
|
55
|
65
|
(10
|
)
|
||||||
|
Nuclear
decommissioning, decontamination
|
||||||||||
|
and
spent fuel
disposal costs
|
(126
|
)
|
(169
|
)
|
43
|
|||||
|
Asset
removal
costs
|
(365
|
)
|
(340
|
)
|
(25
|
)
|
||||
|
Property
losses and unrecovered plant costs
|
29
|
50
|
(21
|
)
|
||||||
|
MISO
transmission costs
|
91
|
-
|
91
|
|||||||
|
JCP&L
reliability costs
|
23
|
-
|
23
|
|||||||
|
Other
|
32
|
39
|
(7
|
)
|
||||||
|
Total
|
$
|
4,486
|
$
|
5,499
|
$
|
(1,013
|
)
|
|||
31
Ohio
On
May 27,
2005, the Ohio Companies filed an application with the PUCO to establish a
GCAF
rider under the RSP which had been approved by the PUCO in August 2004. The
GCAF
application sought recovery of increased fuel costs from 2006 through 2008
applicable to the Ohio Companies' retail customers through a tariff rider to
be
implemented January 1, 2006. The application reflected projected increases
in fuel costs in 2006 compared to 2002 baseline costs. The new rider, after
adjustments made in testimony, sought to recover all costs above the baseline
(approximately $88 million in 2006). Various parties including the OCC
intervened in this case and the case was consolidated with the RCP application
discussed below. On November 1, 2005, the Ohio Companies filed tariffs in
compliance with the RSP, which were approved by the PUCO on December 7,
2005.
On
September 9,
2005, the Ohio Companies filed an application with the PUCO that supplemented
their existing RSP with an RCP which was designed to provide customers with
more
certain rate levels than otherwise available under the RSP during the plan
period. Major provisions of the RCP include:
|
·
|
Maintain
the
existing level of base distribution rates through December 31, 2008
for OE and TE, and April 30, 2009 for
CEI;
|
| · |
Defer
and
capitalize for
future
recovery with carrying charges certain distribution costs to be
incurred
during the period January 1, 2006 through December 31, 2008, not
to exceed $150 million in each of the three
years;
|
| · |
Adjust
the RTC
and
Extended
RTC recovery periods and rate levels so that full recovery of
authorized
costs will occur as of December 31, 2008 for OE and TE and as of
December 31, 2010 for
CEI;
|
| · |
Reduce
the
deferred shopping incentive balances as of January 1, 2006 by up to
$75 million for OE, $45 million for TE, and $85 million for
CEI by accelerating the application of each respective company's
accumulated cost of removal regulatory liability;
and
|
| · |
Recover
increased fuel costs of up to $75 million, $77 million, and
$79 million, in 2006, 2007, and 2008, respectively, from all OE and
TE distribution and transmission customers through a fuel recovery
mechanism. OE, TE, and CEI may defer and capitalize increased
fuel costs
above the amount collected through the fuel recovery mechanism
(in lieu of
implementation of the GCAF
rider).
|
The
following table
provides the estimated net amortization of regulatory transition costs and
deferred shopping incentives (including associated carrying charges) under
the
RCP for the period 2006 through 2010:
|
Amortization
|
|
|
|
Total
|
|||||||||
|
Period
|
OE
|
CEI
|
TE
|
Ohio
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
2006
|
$
|
169
|
$
|
100
|
$
|
80
|
$
|
349
|
|||||
|
2007
|
176
|
111
|
89
|
376
|
|||||||||
|
2008
|
198
|
129
|
100
|
427
|
|||||||||
|
2009
|
-
|
216
|
-
|
216
|
|||||||||
|
2010
|
-
|
268
|
-
|
268
|
|||||||||
|
Total
Amortization
|
$
|
543
|
$
|
824
|
$
|
269
|
$
|
1,636
|
|||||
On
November 4,
2005, a supplemental stipulation was filed with the PUCO which was in addition
to a stipulation filed with the September 9, 2005 application. On
January 4, 2006, the PUCO approved the RCP filing with modifications. On
January 10, 2006, the Ohio Companies filed a Motion for Clarification of
the PUCO order approving the RCP. The Ohio Companies sought clarity on issues
related to distribution deferrals, including requirements of the review process,
timing for recognizing certain deferrals and definitions of the types of
qualified expenditures. The Ohio Companies also sought confirmation that the
list of deferrable distribution expenditures originally included in the revised
stipulation fall within the PUCO order definition of qualified expenditures.
On
January 25, 2006, the PUCO issued an Entry on Rehearing granting in part,
and denying in part, the Ohio Companies’ previous requests and clarifying issues
referred to above. The PUCO granted the Ohio Companies’ requests to: 1)
recognize fuel and distribution deferrals commencing January 1, 2006; 2)
recognize distribution deferrals on a monthly basis prior to review by the
PUCO
Staff; 3) clarify that the types of distribution expenditures included in the
Supplemental Stipulation may be deferred; and 4) clarify that distribution
expenditures do not have to be “accelerated” in order to be deferred. The PUCO
granted the Ohio Companies’ methodology for determining distribution deferral
amounts, but denied the Motion in that the PUCO Staff must verify the level
of
distribution expenditures contained in current rates, as opposed to simply
accepting the amounts contained in the Companies’ Motion. On February 3, 2006,
several other parties filed applications for rehearing on the PUCO's
January 4, 2006 Order. The Ohio Companies responded to the application for
rehearing on February 13, 2006.
32
Under
provisions of
the RSP, the PUCO may require the Ohio Companies to undertake, no more often
than annually, a competitive bid process to secure generation for the years
2007
and 2008. On July 22, 2005, we filed a competitive bid process for the
period beginning in 2007 that is similar to the competitive bid process approved
by the PUCO for the Ohio Companies in 2004 which resulted in the PUCO accepting
no bids. Any acceptance of future competitive bid results would terminate the
RSP pricing, with no accounting impacts to the RSP, and not until twelve months
after the PUCO authorizes such termination. On September 28, 2005, the PUCO
issued an Entry that essentially approved the Ohio Companies' filing but delayed
the proposed timing of the competitive bid process by four months, calling
for
the auction to be held on March 21, 2006. OCC filed an application for
rehearing of the September 28, 2005 Entry, which the PUCO denied on
November 22, 2005. On February 23, 2006, the auction manager notified the
PUCO that there was insufficient interest in the auction process to allow it
to
proceed in 2006.
See
Note 10 to
the consolidated financial statements for further details and a complete
discussion of regulatory matters in Ohio.
Pennsylvania
As
of December 31,
2005, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998
Restructuring Settlement (including the Phase 2 Proceedings) and the
FirstEnergy/GPU Merger Settlement Stipulation are $333 million and
$48 million, respectively. Penelec's $48 million is subject to the pending
resolution of taxable income issues associated with NUG Trust Fund
proceeds.
Met-Ed
and Penelec
purchase a portion of their PLR requirements from FES through a wholesale power
sales agreement and a portion from contracts with unaffiliated third party
suppliers, including NUGs. Assuming continuation of these existing contractual
arrangements, the available supply represents approximately 100% of the combined
retail sales obligations of Met-Ed and Penelec in 2006 and 2007; almost 100%
for
2008; and approximately 85% for 2009 and 2010. Met-Ed and Penelec are authorized
to defer any excess of NUG contract costs over current market prices. Under
the
terms of the wholesale agreement with FES, FES retains the supply obligation
and
the supply profit and loss risk for the portion of power supply requirements
not
self-supplied by Met-Ed and Penelec under their contracts with NUGs and other
unaffiliated suppliers. This arrangement reduces Met-Ed's and Penelec's exposure
to high wholesale power prices by providing power at a fixed price for their
uncommitted PLR energy costs during the term of the agreement with FES. The
wholesale agreement with FES is automatically extended for each successive
calendar year unless any party elects to cancel the agreement by November 1
of
the preceding year. On November 1, 2005, FES and the other parties thereto
amended the agreement to provide FES the right over the next year to terminate
the agreement at any time upon 60 days notice. If the wholesale power agreement
were terminated or modified, Met-Ed and Penelec would need to satisfy the
portion of their PLR obligations currently supplied by FES from unaffiliated
suppliers at prevailing prices, which are likely to be higher than the current
price charged by FES under the agreement and, as a result, Met-Ed’s and
Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec
were to replace the FES supply at current market power prices without
corresponding regulatory authorization to increase their generation prices
to
customers, each company would likely incur a significant increase in operating
expenses and experience a material deterioration in credit quality metrics.
Under such a scenario, each company's credit profile would no longer support
an
investment grade rating for its fixed income securities. Met-Ed and Penelec
are
in the process of preparing a comprehensive rate filing that will address a
number of transmission, distribution and supply issues and is expected to be
filed with the PPUC in the second quarter of 2006. That filing will include,
among other things, a request for appropriate regulatory action to mitigate
adverse consequences from any future reduction, in whole or in part, in the
availability to Met-Ed and Penelec of supply under the existing FES agreement.
There can be no assurance, however, that if FES ultimately determines to
terminate, or significantly modify the agreement, timely regulatory relief
will be granted by the PPUC or, to the extent granted, adequate to mitigate
such adverse consequences.
On
October 11,
2005, Penn filed a plan with the PPUC to secure electricity supply for its
customers at set rates following the end of its transition period on
December 31, 2006. Penn is recommending that an RFP process cover the
period January 1, 2007 through May 31, 2008. Hearings were held on
January 10, 2006 with main briefs filed on January 27, 2006 and reply
briefs on February 3, 2006. On February
17,
2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with
modifications. A PPUC vote is expected in April 2006. Under
Pennsylvania's
electric competition law, Penn is required to secure generation supply for
customers who do not choose alternative suppliers for their
electricity..
See
Note 10 to
the consolidated financial statements for further details and a complete
discussion of regulatory matters in Pennsylvania.
33
New
Jersey
JCP&L
is
permitted to defer for future collection from customers the amounts by which
its
costs of supplying BGS to non-shopping customers and costs incurred under NUG
agreements exceed amounts collected through BGS and MTC rates and market sales
of NUG energy and capacity. As of December 31, 2005, the accumulated
deferred cost balance totaled approximately $541 million. New Jersey law
allows for securitization of JCP&L's deferred balance upon application by
JCP&L and a determination by the NJBPU that the conditions of the New Jersey
restructuring legislation are met. On February 14, 2003, JCP&L filed
for approval to securitize the July 31, 2003 deferred balance. JCP&L is
in discussions with the NJBPU staff as a result of the stipulated settlement
agreements (as further discussed below) which recommended that the NJBPU issue
an order regarding JCP&L's application. On July 20, 2005, JCP&L
requested the NJBPU to set a procedural schedule for this matter and is awaiting
NJBPU action. On February 1, 2006, the NJBPU selected Bear Stearns as the
financial advisor. On December 2, 2005, JCP&L filed a request for
recovery of $165 million of actual above-market NUG costs incurred from
August 1, 2005 through October 31, 2005 and forecasted above-market
NUG costs for November and December 2005. The filing also includes a request
for
recovery of $49 million for above-market NUG costs incurred prior to
August 1, 2003, to the extent those costs are not recoverable through
securitization.
On
May 25,
2005, the NJBPU approved two stipulated settlement agreements. The first
stipulation between JCP&L and the NJBPU staff resolves all of the issues
associated with JCP&L's motion for reconsideration of the 2003 NJBPU
decision on JCP&L's base electric rate proceeding (Phase I Order). The
second stipulation between JCP&L, the NJBPU staff and the Ratepayer Advocate
resolves all of the issues associated with JCP&L's Phase II petition
requesting an increase in base rates of $36 million for the recovery of
system reliability costs and a 9.75% return on equity. The stipulated
settlements provide for, among other things, the following:
|
·
|
An
annual
increase in distribution revenues of $23 million, effective
June 1, 2005, associated with the Phase I Order
reconsideration;
|
|
·
|
An
annual
increase in distribution revenues of $36 million, effective
June 1, 2005, related to JCP&L's Phase II
Petition;
|
|
·
|
An
annual
reduction in both rates and amortization expense of $8 million,
effective June 1, 2005, in anticipation of an NJBPU order regarding
JCP&L's request to securitize up to $277 million of its deferred
cost balance;
|
|
·
|
An
increase in
JCP&L's authorized return on common equity from 9.5% to 9.75%;
and
|
|
·
|
A
commitment
by JCP&L, through December 31, 2006 or until related legislation
is adopted, whichever occurs first, to maintain a target level
of customer
service reliability with a reduction in JCP&L's authorized return on
common equity from 9.75% to 9.5% if the target is not met for two
consecutive quarters. The authorized return on common equity would
then be
restored to 9.75% if the target is met for two consecutive
quarters.
|
The
Phase II
stipulation included an agreement that the distribution revenue increase also
reflects a three-year amortization of JCP&L's one-time service reliability
improvement costs incurred in 2003-2005. This resulted in the creation of a
regulatory asset associated with accelerated tree trimming and other reliability
costs which were expensed in 2003 and 2004. The establishment of the new
regulatory asset of approximately $28 million resulted in an increase to
net income of approximately $16 million ($0.05 per share of FirstEnergy
common stock) in the second quarater of 2005.
On
August 1,
2005, the NJBPU established a proceeding to determine whether additional
ratepayer protections are required at the state level in light of the recent
repeal of PUHCA under the EPACT. An NJBPU proposed rulemaking to address the
issues was published in the NJ Register on December 19, 2005. The proposal
would prevent a holding company that owns a gas or electric public utility
from
investing more than 25% of the combined assets of its utility and
utility-related subsidiaries into businesses unrelated to the utility industry.
A public hearing was held on February 7, 2006 and comments to the NJBPU
were due by February 17, 2006.
See
Note 10 to
the consolidated financial statements for further details and a complete
discussion of regulatory matters in New Jersey.
Transmission
ATSI,
JCP&L,
Met-Ed, Penelec, and FES continue to be involved in FERC hearings concerning
the
calculation and imposition of Seams Elimination Cost Adjustment (SECA) charges
to various load serving entities. Pursuant to its January 30, 2006 Order,
the FERC has compressed both phases of this proceeding into a single hearing
scheduled to begin May 1, 2006, with an initial decision on or before
August 11, 2006.
34
On
November 1,
2004, ATSI requested authority from the FERC to defer approximately
$54 million of vegetation management costs estimated to be incurred from
2004 through 2007. On March 4, 2005, the FERC approved ATSI's request to
defer those costs ($26 million deferred as of December 31, 2005). ATSI
expects to file a rate application with the FERC that would include recovery
of
the deferred costs beginning in June 2006.
On
January 24, 2006,
ATSI and MISO filed an application with the FERC to modify the Attachment O
formula rate mechanism to permit ATSI to accelerate recovery of revenues lost
due to the FERC's elimination of through and out rates between MISO and PJM,
and
the elimination of other ATSI rates in the MISO tariff. Revenues formerly
collected under these rates are currently used to reduce the ATSI zonal
transmission rate in the Attachment O formula. The revenue shortfall created
by
elimination of these rates would not be fully reflected in ATSI's formula rate
until June 1, 2006, unless the proposed Revenue Credit Collection is
approved by the FERC. The Revenue Credit Collection mechanism is designed to
collect approximately $40 million in revenues on an annualized basis beginning
June 1, 2006. FERC is expected to act on this filing on or before April 1,
2006.
On
August 31,
2005, the PUCO approved the Ohio Companies' settlement stipulation for a rider
to recover transmission and ancillary service-related costs beginning
January 1, 2006, to be adjusted each July 1 thereafter. The
incremental transmission and ancillary service revenues expected to be recovered
from January through June 2006 are approximately $66 million, including
recovery of the 2005 deferred MISO expenses as described below. In May 2006,
the
Ohio Companies will file a modification to the rider to determine revenues
from
July 2006 through June 2007. On
January 20,
2006, the OCC sought rehearing of the PUCO approval of the rider recovery during
the period January 1, 2006 through June 30, 2006, as that amount pertains
to recovery of the deferred costs. The PUCO denied the OCC's application on
February 6, 2006. The OCC has sixty days from that date to appeal the
PUCO's approval of the rider.
In
response to the
Ohio Companies' December 2004 application for authority to defer costs
associated with transmission and ancillary service-related costs incurred during
the period October 1, 2003 through December 31, 2005, the PUCO granted
the accounting authority in May 2005 for the Ohio Companies to defer incremental
transmission and ancillary service-related charges incurred as a participant
in
MISO, but only for those costs incurred during the period December 30, 2004
through December 31, 2005. Permission to defer costs incurred prior to
December 30, 2004 was denied. The PUCO also authorized the Ohio Companies
to accrue carrying charges on the deferred balances. On August 31, 2005,
the OCC appealed the PUCO's decision. All briefs have been filed. A motion
to
dismiss filed on behalf of the PUCO is currently pending. Unless the court
grants the motion, the appeal will be set for oral argument, which should be
heard in the second half of 2006.
On
January 12,
2005, Met-Ed and Penelec filed a request with the PPUC for deferral of
transmission-related costs beginning January 1, 2005, estimated to be
approximately $8 million per month. The OCA, OSBA, OTS, MEIUG, PICA,
Allegheny Electric Cooperative and Pennsylvania Rural Electric Association
have
all intervened in the case. To date no hearing schedule has been established,
and neither company has yet implemented deferral accounting for these
costs.
On
January 31,
2005, certain PJM transmission owners made three filings with the FERC pursuant
to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and
Penelec were parties to that proceeding and joined in two of the filings. In
the
first filing, the settling transmission owners submitted a filing justifying
continuation of their existing rate design within the PJM RTO. In the second
filing, the settling transmission owners proposed a revised Schedule 12 to
the PJM tariff designed to harmonize the rate treatment of new and existing
transmission facilities. Interventions and protests were filed on
February 22, 2005. In the third filing, Baltimore Gas and Electric Company
and Pepco Holdings, Inc. requested a formula rate for transmission service
provided within their respective zones. On May 31, 2005, the FERC issued an
order on these cases. First, it set for hearing the existing rate design and
indicated that it will issue a final order within six months. Second, the FERC
approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted
the proposed formula rate, subject to referral and hearing procedures. On
June 30, 2005, the settling PJM transmission owners filed a request for
rehearing of
the May 31,
2005
order. The rate
design and formula rate proceedings are currently being litigated before the
FERC. If the FERC accepts a proposal by American Electric Power Company, Inc.
to
create a "postage stamp" rate for high voltage transmission facilities across
PJM, significant additional transmission revenues would be imposed on JCP&L,
Met-Ed, Penelec, and other transmission zones within PJM.
On
November 1, 2005,
FES filed two power sales agreements for approval with the FERC. One power
sales
agreement provided for FES to provide the PLR requirements of the Ohio Companies
at a price equal to the retail generation rates approved by the PUCO for a
period of three years beginning January 1, 2006. The Ohio Companies will be
relieved of their obligation to obtain PLR power requirements from FES if the
Ohio competitive bid process, mandated by the PUCO, results in a lower price
for
retail customers. A similar power sales agreement between FES and Penn permits
Penn to obtain its PLR power requirements from FES at a fixed price equal to
the
retail generation price during 2006. Penn has filed a plan with the PPUC to
use
an RFP process to obtain its power supply requirements after 2006.
35
On
December 29,
2005, the FERC issued an order setting the two power sales agreements for
hearing. The order criticizes the Ohio competitive bid process, and requires
FES
to submit additional evidence in support of the reasonableness of the prices
charged in the two power sales agreements. A pre-hearing conference was held
on
January 18, 2006 to determine the hearing schedule in this case. FES expects
an
initial decision to be issued in this case in the fall of 2006. The outcome
of
this proceeding cannot be predicted. FES has sought rehearing of the
December 29, 2005 order.
Reliability
Initiatives
We
are proceeding
with the implementation of the recommendations that were issued from various
entities, including governmental, industry and ad-hoc reliability entities
(PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force) in
late
2003 and early 2004, regarding enhancements to regional reliability that were
to
be completed subsequent to 2004. We will continue to periodically assess the
FERC-ordered Reliability Study recommendations for forecasted 2009 system
conditions, recognizing revised load forecasts and other changing system
conditions which may impact the recommendations. Thus far, implementation of
the
recommendations has not required, nor is expected to require, substantial
investment in new, or material upgrades to existing, equipment. The FERC or
other applicable government agencies and reliability coordinators, however,
may
take a different view as to recommended enhancements or may recommend additional
enhancements in the future as the result of adoption of mandatory reliability
standards pursuant to EPACT that could require additional, material
expenditures. Finally, the PUCO is continuing to review our filing that
addressed upgrades to control room computer hardware and software and
enhancements to the training of control room operators before determining the
next steps, if any, in the proceeding.
As
a result of
outages experienced in JCP&L's service area in 2002 and 2003, the NJBPU had
implemented reviews into JCP&L's service reliability. In 2004, the NJBPU
adopted an MOU that set out specific tasks and a timetable for completion of
actions related to service reliability to be performed by JCP&L and also
approved a Stipulation that incorporates the final report of a Special
Reliability Master who made recommendations on appropriate courses of action
necessary to ensure system-wide reliability. JCP&L continues to file
compliance reports reflecting activities associated with the MOU and
Stipulation.
In
May 2004, the
PPUC issued an order approving revised reliability benchmarks and standards,
including revised benchmarks and standards for Met-Ed, Penelec and Penn. Met-Ed,
Penelec and Penn filed a Petition for Amendment of Benchmarks with the PPUC
on
May 26, 2004, due to their implementation of automated outage management
systems following restructuring. On December 30, 2005, the ALJ recommended
that
the PPUC adopt the Joint Petition for Settlement among the parties involved
in
the three Companies’ request to amend the distribution reliability benchmarks,
thereby eliminating the need for full litigation. The ALJ’s recommendation,
adopting the revised benchmarks and standards was approved by the PPUC on
February 9, 2006.
EPACT
provides for
the creation of an ERO to establish and enforce reliability standards for the
bulk power system, subject to FERC review. On February 3, 2006, the FERC adopted
a rule establishing certification requirements for the ERO, as well as regional
entities envisioned to assume monitoring responsibility for the new reliability
standards.
The
NERC has been
preparing the implementation aspects of reorganizing its structure to meet
the
FERC’s certification requirements for the ERO. The NERC will make a filing with
the FERC to obtain certification as the ERO and to obtain FERC approval of
delegation agreements with regional entities. The new FERC rule referred to
above, further provides for reorganizing regional reliability organizations
(regional entities) that would replace the current regional councils and for
rearranging the relationship with the ERO. The “regional entity” may be
delegated authority by the ERO, subject to FERC approval, for enforcing
reliability standards adopted by the ERO and approved by the FERC. NERC also
intends to make a parallel filing with the FERC seeking approval of mandatory
reliability standards. These
reliability
standards are expected to be based on the current NERC Version 0 reliability
standards with some additional standards. The
two filings are
expected to be made in the second quarter of 2006.
The
ECAR,
Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability
councils have completed the consolidation of these regions into a single new
regional reliability organization known as ReliabilityFirst Corporation.
ReliabilityFirst began operations as a regional reliability council under NERC
on January 1, 2006 and intends to file and obtain certification consistent
with the final rule as a “regional entity” under the ERO during 2006. All of
FirstEnergy’s facilities are located within the ReliabilityFirst
region.
On
a parallel path,
the NERC is establishing working groups to develop reliability standards to
be
filed for approval with the FERC following the NERC’s certification as an ERO.
These reliability standards are expected to build on the current NERC Version
0
reliability standards. It is expected that the proposed reliability standards
will be filed with the FERC in early 2006.
36
We
believe that we
are in compliance with all current NERC reliability standards. However, it
is
expected that the FERC will adopt stricter reliability standards than those
contained in the current NERC Version 0 standards. The financial impact of
complying with the new standards cannot be determined at this time. However,
EPACT requires that all prudent costs incurred to comply with the new
reliability standards be recovered in rates. If we are unable to meet the
reliability standards for the bulk power system in the future, it could have
a
material adverse effect on our financial condition, results of operations and
cash flows.
See
Note 10 to
the consolidated financial statements for a more detailed discussion of
reliability initiatives.
ENVIRONMENTAL
MATTERS
We
accrue
environmental liabilities only when it is probable that we have an obligation
for such costs and can reasonably estimate the amount of such costs. Unasserted
claims are reflected in our determination of environmental liabilities and
are
accrued in the period that they are both probable and reasonably
estimable.
On
December 1,
2005, we issued a comprehensive report to shareholders regarding air emissions
regulations and an assessment of our future risks and mitigation efforts. The
report is available on our web site at
www.firstenergycorp.com/environmental.
National
Ambient
Air Quality Standards
In
July 1997, the
EPA promulgated changes in the NAAQS for ozone and proposed a new NAAQS for
fine
particulate matter. On March 10, 2005, the EPA finalized CAIR covering a
total of 28 states (including Michigan, New Jersey, Ohio and Pennsylvania)
and
the District of Columbia based on proposed findings that air emissions from
28
eastern states and the District of Columbia significantly contribute to
non-attainment of the NAAQS for fine particles and/or the "8-hour" ozone NAAQS
in other states. CAIR provides each affected state until 2006 to develop
implementing regulations to achieve additional reductions of NOx
and SO2
emissions in two
phases (Phase I in 2009 for NOx,
2010 for
SO2
and Phase II in
2015 for both NOx
and SO2).
Our Michigan,
Ohio and Pennsylvania fossil-fired generation facilities will be subject to
caps
on SO2
and
NOx
emissions, whereas
our New Jersey fossil-fired generation facilities will be subject to a cap
on
NOx
emissions only.
According to the EPA, SO2
emissions
will be
reduced by 45% (from 2003 levels) by 2010 across the states covered by the
rule,
with reductions reaching 73% (from 2003 levels) by 2015, capping SO2
emissions in
affected states to just 2.5 million tons annually. NOx
emissions will be
reduced by 53% (from 2003 levels) by 2009 across the states covered by the
rule,
with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional
NOx
cap of
1.3 million tons annually. The future cost of compliance with these
regulations may be substantial and will depend on how they are ultimately
implemented by the states in which the Companies operate affected facilities.
Mercury
Emissions
In
December 2000,
the EPA announced it would proceed with the development of regulations regarding
hazardous air pollutants from electric power plants, identifying mercury as
the
hazardous air pollutant of greatest concern. On March 14, 2005, the EPA
finalized CAMR, which provides for a cap-and-trade program to reduce mercury
emissions from coal-fired power plants in two phases. Initially, mercury
emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit"
from implementation of SO2
and NOx
emission caps under
the EPA's CAIR program). Phase II of the mercury cap-and-trade program will
cap
nationwide mercury emissions from coal-fired power plants at 15 tons per
year by 2018. However, the final rules give states substantial discretion in
developing rules to implement these programs. In addition, both CAIR and CAMR
have been challenged in the United States Court of Appeals for the District
of
Columbia. Our future cost of compliance with these regulations may be
substantial and will depend on how they are ultimately implemented by the states
in which we operate affected facilities.
The
model rules for
both CAIR and CAMR contemplate an input-based methodology to allocate allowances
to affected facilities. Under this approach, allowances would be allocated
based
on the amount of fuel consumed by the affected sources. We would prefer an
output-based generation-neutral methodology in which allowances are allocated
based on megawatts of power produced. Since this approach is based on output,
new and non-emitting generating facilities, including renewables and nuclear,
would be entitled to their proportionate share of the allowances. Consequently,
we would be disadvantaged if these model rules were implemented because our
substantial reliance on non-emitting (largely nuclear) generation is not
recognized under input-based allocation.
37
W.
H. Sammis
Plant
In
1999 and 2000,
the EPA issued NOV or Compliance Orders to nine utilities alleging violations
of
the Clean Air Act based on operation and maintenance of 44 power plants,
including the W. H. Sammis Plant, which was owned at that time by OE and Penn.
In addition, the DOJ filed eight civil complaints against various investor-owned
utilities, including a complaint against OE and Penn in the U.S. District Court
for the Southern District of Ohio. These cases are referred to as New Source
Review cases. On March 18, 2005, OE and Penn announced that they had
reached a settlement with the EPA, the DOJ and three states (Connecticut, New
Jersey, and New York) that resolved all issues related to the W. H. Sammis
Plant
New Source Review litigation. This
settlement
agreement was approved by the Court on July 11, 2005, and requires
reductions of NOx
and SO2
emissions at the
W. H. Sammis Plant and other coal fired plants through the installation of
pollution control devices and provides for stipulated penalties for failure
to
install and operate such pollution controls in accordance with that
agreement.
Consequently, if we
fail to install such pollution control devices, for any reason, including,
but
not limited to, the failure of any third-party contractor to timely meet its
delivery obligations for such devices, we could be exposed to penalties under
the settlement agreement. Capital expenditures necessary to meet those
requirements are currently estimated to be $1.5 billion (the primary
portion of which is expected to be spent in the 2008 to 2011 time period).
On
August 26, 2005, FGCO entered into an agreement with Bechtel Power
Corporation (Bechtel), under which Bechtel will engineer, procure, and construct
air quality control systems for the reduction of sulfur dioxide emissions.
The
settlement agreement also requires OE and Penn to spend up to $25 million
toward environmentally beneficial projects, which include wind energy purchased
power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty
of $8.5 million. Results in 2005 included the penalties payable by OE and
Penn of $7.8 million and $0.7 million, respectively. OE and Penn also
recognized liabilities of $9.2 million and $0.8 million, respectively,
for
probable future cash contributions toward environmentally beneficial
projects.
Climate
Change
In
December 1997,
delegates to the United Nations' climate summit in Japan adopted an agreement,
the Kyoto Protocol, to address global warming by reducing the amount of man-made
GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and
2012. The United States signed the Kyoto Protocol in 1998 but it failed to
receive the two-thirds vote of the United States Senate required for
ratification. However, the Bush administration has committed the United States
to a voluntary climate change strategy to reduce domestic GHG intensity - the
ratio of emissions to economic output - by 18% through 2012. EPACT established
a
Committee on Climate Change Technology to coordinate federal climate change
activities and promote the development and deployment of GHG reducing
technologies.
We
cannot currently
estimate the financial impact of climate change policies, although the potential
restrictions on CO2
emissions could
require significant capital and other expenditures. However, the CO2
emissions per
kilowatt-hour of electricity generated by the Companies is lower than many
regional competitors due to the Companies' diversified generation sources which
include low or non-CO2
emitting gas-fired
and nuclear generators.
Regulation
of
Hazardous Waste
The
Companies have
been named as PRPs at waste disposal sites, which may require cleanup under
the
Comprehensive Environmental Response, Compensation, and Liability Act of 1980.
Allegations of disposal of hazardous substances at historical sites and the
liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all PRPs for a particular site are liable on a joint
and several basis. Therefore, environmental liabilities that are considered
probable have been recognized on the Consolidated Balance Sheet as of
December 31, 2005, based on estimates of the total costs of cleanup, our
proportionate responsibility for such costs and the financial ability of other
unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for
environmental remediation of former manufactured gas plants in New Jersey.
Those
costs are being recovered by JCP&L through a non-bypassable SBC. Total
liabilities of approximately $64 million have been accrued through
December 31, 2005.
See
Note 14(C)
to the consolidated financial statements for further details and a complete
discussion of environmental matters.
OTHER
LEGAL
PROCEEDINGS
There
are various
lawsuits, claims (including claims for asbestos exposure) and proceedings
related to our normal business operations pending against FirstEnergy and its
subsidiaries. The other material items not otherwise discussed above are
described below.
38
Power
Outages
and Related Litigation
On
August 14,
2003, various states and parts of southern Canada experienced widespread power
outages. The outages affected approximately 1.4 million customers in our service
area. The U.S. - Canada Power System Outage Task Force’s final report in April
2004 on the outages concludes, among other things, that the problems leading
to
the outages began in our Ohio service area. Specifically,
the
final report concluded, among other things, that the initiation of the
August 14, 2003 power outages resulted from an alleged failure of both
FirstEnergy and ECAR to assess and understand perceived inadequacies within
our
system; inadequate situational awareness of the developing conditions; and
a
perceived failure to adequately manage tree growth in certain transmission
rights of way. The Task Force also concluded that there was a failure of the
interconnected grid's reliability organizations (MISO and PJM) to provide
effective real-time diagnostic support. The final report is publicly available
through the Department of Energy’s website (www.doe.gov). We believe that the
final report does not provide a complete and comprehensive picture of the
conditions that contributed to the August 14, 2003 power outages and that
it does not adequately address the underlying causes of the outages. We remain
convinced that the outages cannot be explained by events on any one utility's
system. The final report contained 46 “recommendations to prevent or minimize
the scope of future blackouts.” Forty-five of those recommendations related to
broad industry or policy matters while one, including subparts, related to
activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM,
ECAR, and other parties to correct the causes of the August 14, 2003 power
outages. We implemented several initiatives, both prior to and since the
August 14, 2003 power outages, which were independently verified by NERC as
complete in 2004 and were consistent with these and other recommendations and
collectively enhance the reliability of our electric system. Our implementation
of these recommendations in 2004 included completion of the Task Force
recommendations that were directed toward FirstEnergy. We also are proceeding
with the implementation
of the
recommendations regarding enhancements to regional reliability that were to
be
completed subsequent to 2004 and will continue to periodically assess the
FERC-ordered Reliability Study recommendations for forecasted 2009 system
conditions, recognizing revised load forecasts and other changing system
conditions which may impact the recommendations. Thus far implementation of
the
recommendations has not required, nor is expected to require, substantial
investment in new or material upgrades to existing equipment, and therefore
we
have not accrued a liability as of December 31, 2005 for any expenditures
in excess of those actually incurred through that date. We note, however, that
the FERC or other applicable government agencies and reliability coordinators
may take a different view as to recommended enhancements or may recommend
additional enhancements in the future that could require additional, material
expenditures. Finally, the PUCO is continuing to review our filing that
addressed upgrades to control room computer hardware and software and
enhancements to the training of control room operators before determining the
next steps, if any, in the proceeding.
FirstEnergy
companies also are defending six separate complaint cases before the PUCO
relating to the August 14, 2003 power outage. Two cases were originally
filed in Ohio State courts but were subsequently dismissed for lack of subject
matter jurisdiction and further appeals were unsuccessful. In these cases
the
individual complainants—three in one case and four in the other—sought to
represent others as part of a class action. The PUCO dismissed the class
allegations, stating that its rules of practice do not provide for class
action
complaints. Of the four other pending PUCO complaint cases, three were filed
by
various insurance carriers either in their own name as subrogees or in the
name
of their insured. In each of the four cases, the carrier seeks reimbursement
from various FirstEnergy companies (and, in one case, from PJM, MISO and
American Electric Power Company, Inc. as well) for claims paid to insureds
for
claims allegedly arising as a result of the loss of power on August 14,
2003. The listed insureds in these cases, in many instances, are not customers
of any FirstEnergy company. The fourth case involves the claim of a non-customer
seeking reimbursement for losses incurred when its store was burglarized
on
August 14, 2003. In addition to these six cases, the Ohio Companies were
named as respondents in a regulatory proceeding that was initiated at the
PUCO
in response to complaints alleging failure to provide reasonable and adequate
service stemming primarily from the August 14, 2003 power outages. No
estimate of potential liability is available for any of these cases.
In
addition to the
above proceedings, FirstEnergy was named in a complaint filed in Michigan State
Court by an individual who is not a customer of any FirstEnergy company. A
responsive pleading to this matter has been filed. FirstEnergy was also named,
along with several other entities, in a complaint in New Jersey State Court.
The
allegations against FirstEnergy are based, in part, on an alleged failure to
protect the citizens of Jersey City from an electrical power outage. No
FirstEnergy entity serves any customers in Jersey City. A responsive pleading
has been filed. No estimate of potential liability has been undertaken in either
of these matters.
We
are vigorously
defending these actions, but cannot predict the outcome of any of these
proceedings or whether any further regulatory proceedings or legal actions
may
be initiated against the Companies. Although unable to predict the impact of
these proceedings, if FirstEnergy or its subsidiaries were ultimately determined
to have legal liability in connection with these proceedings, it could have
a
material adverse effect on our financial condition, results of operations and
cash flows.
39
Nuclear
Plant
Matters
On
January 20,
2006, FENOC announced that it has entered into a deferred prosecution agreement
with the U.S. Attorney’s Office for the Northern District of Ohio and the
Environmental Crimes Section of the Environment and Natural Resources Division
of the DOJ related to FENOC’s communications with the NRC during the fall of
2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power
Station. Under the agreement, which expires on December 31, 2006, the United
States acknowledged FENOC’s extensive corrective actions at Davis-Besse, FENOC’s
cooperation during investigations by the DOJ and the NRC, FENOC’s pledge of
continued cooperation in any related criminal and administrative investigations
and proceedings, FENOC’s acknowledgement of responsibility for the behavior of
its employees, and its agreement to pay a monetary penalty. The DOJ will refrain
from seeking an indictment or otherwise initiating criminal prosecution of
FENOC
for all conduct related to the statement of facts attached to the deferred
prosecution agreement, as long as FENOC remains in compliance with the
agreement, which FENOC fully intends to do. FENOC has agreed to pay a penalty
of
$28 million (which is not deductible for income tax purposes) which reduced
FirstEnergy's earnings by $0.09 per common share in the fourth quarter of 2005.
As part of the deferred prosecution agreement entered into with the DOJ,
$4.35 million of that amount will be directed to community service
projects.
On
April 21,
2005, the NRC issued a NOV and proposed a $5 million civil penalty related
to the degradation of the Davis-Besse reactor vessel head issue described above.
We accrued $2 million for a potential fine prior to 2005 and accrued the
remaining liability for the proposed fine during the first quarter of 2005.
On
September 14, 2005, FENOC filed its response to the NOV with the NRC. FENOC
accepted full responsibility for the past failure to properly implement its
boric acid corrosion control and corrective action programs. The NRC NOV
indicated that the violations do not represent current licensee performance.
We
paid the penalty in the third quarter of 2005. On January 23, 2006, FENOC
supplemented its response to the NRC's NOV on the Davis-Besse head degradation
to reflect the deferred prosecution agreement that FENOC had reached with the
DOJ.
Effective
July 1, 2005 the NRC oversight panel for Davis-Besse was terminated and
Davis-Besse returned to the standard NRC reactor oversight process. At that
time, NRC inspections were augmented to include inspections to support the
NRC's
Confirmatory Order dated March 8, 2004 that was issued at the time of
startup and to address an NRC White Finding related to the performance of the
emergency sirens. By letter dated December 8, 2005, the NRC advised FENOC
that the White Finding had been closed.
On
August 12,
2004, the NRC notified FENOC that it would increase its regulatory oversight
of
the Perry Nuclear Power Plant as a result of problems with safety system
equipment over the preceding two years and the licensee's failure to take prompt
and corrective action. FENOC operates the Perry Nuclear Power Plant.
On
April 4,
2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry
Nuclear Power Plant as identified in the NRC's annual assessment letter to
FENOC. Similar public meetings are held with all nuclear power plant licensees
following issuance by the NRC of their annual assessments. According to the
NRC,
overall the Perry Plant operated "in a manner that preserved public health
and
safety" even though it remained under heightened NRC oversight. During the
public meeting and in the annual assessment, the NRC indicated that additional
inspections will continue and that the plant must improve performance to be
removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action
Matrix. By an inspection report dated January 18, 2006, the NRC closed one
of the White Findings (related to emergency preparedness) which led to the
multiple degraded cornerstones.
On
May 26,
2005, the NRC held a public meeting to discuss its oversight of the Perry Plant.
While the NRC stated that the plant continued to operate safely, the NRC also
stated that the overall performance had not substantially improved since the
heightened inspection was initiated. The NRC reiterated this conclusion in
its
mid-year assessment letter dated August 30, 2005. On September 28,
2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made
to
improve the performance of Perry and stated that the CAL would remain open
until
substantial improvement was demonstrated. The CAL was anticipated as part of
the
NRC's Reactor Oversight Process. If performance does not improve, the NRC has
a
range of options under the Reactor Oversight Process, from increased oversight
to possible impact to the plant’s operating authority. Although unable to
predict a potential impact, its ultimate disposition could have a material
adverse effect on FirstEnergy's or its subsidiaries' financial condition,
results of operations and cash flows.
As
of December 16,
2005, NGC acquired ownership of the nuclear generation assets transferred from
OE, CEI, TE and Penn with the exception of leasehold interests of OE and TE
in
certain of the nuclear plants that are subject to sale and leaseback
arrangements with non-affiliates.
40
Other
Legal
Matters
On
October 20,
2004, we were notified by the SEC that the previously disclosed informal inquiry
initiated by the SEC's Division of Enforcement in September 2003 relating to
the
restatements in August 2003 of previously reported results by FirstEnergy and
the Ohio Companies, and the Davis-Besse extended outage, have become the subject
of a formal order of investigation. The SEC's formal order of investigation
also
encompasses issues raised during the SEC's examination of FirstEnergy and the
Companies under PUHCA. Concurrent with this notification, we received a subpoena
asking for background documents and documents related to the restatements and
Davis-Besse issues. On December 30, 2004, we received a subpoena asking for
documents relating to issues raised during the SEC's PUHCA examination. On
August 24, 2005 additional information was requested regarding Davis-Besse
related disclosures, which we have provided. We have cooperated fully with
the
informal inquiry and will continue to do so with the formal investigation.
On
August 22,
2005, a class action complaint was filed against OE in Jefferson County, Ohio
Common Pleas Court, seeking compensatory and punitive damages to be determined
at trial based on claims of negligence and eight other tort counts alleging
damages from W.H. Sammis Plant air emissions. The two named plaintiffs are
also
seeking injunctive relief to eliminate harmful emissions and repair property
damage and the institution of a medical monitoring program for class members.
JCP&L's
bargaining unit employees filed a grievance challenging JCP&L's 2002
call-out procedure that required bargaining unit employees to respond to
emergency power outages. On May 20, 2004, an arbitration panel concluded
that the call-out procedure violated the parties' collective bargaining
agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator
decided not to hear testimony on damages and closed the proceedings. On
September 9, 2005, the Arbitrator issued an opinion to award approximately
$16 million to the bargaining unit employees. On February 6, 2006, the
federal court granted a Union motion to dismiss JCP&L's appeal of the award
as premature. JCP&L will file its appeal again in federal district court
once the damages associated with this case are identified at an individual
employee level. JCP&L recognized a liability for the potential
$16 million award in 2005.
The
City of Huron
filed a complaint against OE with the PUCO challenging the ability of electric
distribution utilities to collect transition charges from a customer of a newly
formed municipal electric utility. The complaint was filed on May 28, 2003,
and OE timely filed its response on June 30, 2003. In a related filing, the
Ohio Companies filed for approval with the PUCO a tariff that would specifically
allow the collection of transition charges from customers of municipal electric
utilities
formed after 1998.
An adverse ruling could negatively affect full recovery of transition charges
by
the utility. Hearings on the matter were held in August 2005. Initial briefs
from all parties were filed on September 22, 2005 and reply briefs were
filed on October 14, 2005. It is unknown when the PUCO will decide this
case.
If
it were
ultimately determined that FirstEnergy or its subsidiaries have legal liability
or are otherwise made subject to liability based on the above matters, it could
have a material adverse effect on our financial condition, results of operations
and cash flows.
See
Note 14(D)
to the consolidated financial statements for further details and a complete
discussion of these other legal proceedings.
CRITICAL
ACCOUNTING POLICIES
We
prepare our
consolidated financial statements in accordance with GAAP. Application of these
principles often requires a high degree of judgment, estimates and assumptions
that affect financial results. All of our assets are subject to their own
specific risks and uncertainties and are regularly reviewed for impairment.
Our
more significant accounting policies are described below.
Revenue
Recognition
We
follow the
accrual method of accounting for revenues, recognizing revenue for electricity
that has been delivered to customers but not yet billed through the end of
the
accounting period. The determination of electricity sales to individual
customers is based on meter readings, which occur on a systematic basis
throughout the month. At the end of each month, electricity delivered to
customers since the last meter reading is estimated and a corresponding accrual
for unbilled sales is recognized. The determination of unbilled sales requires
management to make estimates regarding electricity available for retail load,
transmission and distribution line losses, demand by customer class,
weather-related impacts, prices in effect for each customer class and
electricity provided by alternative suppliers.
41
Regulatory
Accounting
Our
regulated
services segment is subject to regulation that sets the prices (rates) we are
permitted to charge our customers based on costs that the regulatory agencies
determine we are permitted to recover. At times, regulators permit the future
recovery through rates of costs that would be currently charged to expense
by an
unregulated company. This ratemaking process results in the recording of
regulatory assets based on anticipated future cash inflows. We regularly review
these assets to assess their ultimate recoverability within the approved
regulatory guidelines. Impairment risk associated with these assets relates
to
potentially adverse legislative, judicial or regulatory actions in the future.
Pension
and
Other Postretirement Benefits Accounting
Our
reported costs
of providing non-contributory qualified defined pension benefits and post
employment benefits other than pensions are dependent upon numerous factors
resulting from actual plan experience and certain assumptions.
Pension
and OPEB
costs are affected by employee demographics (including age, compensation levels,
and employment periods), the level of contributions we make to the plans, and
earnings on plan assets. Such factors may be further affected by business
combinations, which impact employee demographics, plan experience and other
factors. Pension and OPEB costs are also affected by changes to key assumptions,
including anticipated rates of return on plan assets, the discount rates and
health care trend rates used in determining the projected benefit obligations
for pension and OPEB costs.
In
accordance with
SFAS 87, changes in pension and OPEB obligations associated with these
factors may not be immediately recognized as costs on the income statement,
but
generally are recognized in future years over the remaining average service
period of plan participants. SFAS 87 and SFAS 106 delay recognition of
changes due to the long-term nature of pension and OPEB obligations and the
varying market conditions likely to occur over long periods of time. As such,
significant portions of pension and OPEB costs recorded in any period may not
reflect the actual level of cash benefits provided to plan participants and
are
significantly influenced by assumptions about future market conditions and
plan
participants' experience.
In
selecting an
assumed discount rate, we consider currently available rates of return on
high-quality fixed income investments expected to be available during the period
to maturity of the pension and other postretirement benefit obligations. Due
to
declines in corporate bond yields and interest rates in general, we reduced
the
assumed discount rate as of December 31, 2005 to 5.75% from 6.00% and 6.25%
used as of December 31, 2004 and 2003, respectively.
Our
assumed rate of
return on pension plan assets considers historical market returns and economic
forecasts for the types of investments held by our pension trusts. In 2005,
2004
and 2003, our qualified pension plan assets actually earned $325 million or
8.2%, $415 million or 11.1%
and $671 million or
24.2%, respectively. Our qualified pension costs in 2005, 2004 and 2003 were
computed using an assumed 9.0% rate of return on plan assets which generated
$345 million, $286 million and $248 million expected returns on plan
assets, respectively. The 2005 expected return was based upon projections of
future returns and our pension trust investment allocation of approximately
63%
equities, 33% bonds, 2% real estate and 2% cash. The gains or losses generated
as a result of the difference between expected and actual returns on plan assets
are deferred and amortized and will increase or decrease future net periodic
pension expense, respectively.
Using
an expected
rate of return on plan assets of 9.0%, we expect our qualified pension expense
to be approximately $94 million in 2006. This compares to $131 million
in 2005 and $194 million in 2004.
Pension
expense in
our non-qualified pension plans is expected to be approximately $19 million
in
2006, compared to $16 million in 2005 and $14 million in 2004.
In
the fourth
quarter of 2005, we made a $500 million voluntary contribution to our
pension plan. As a result of our voluntary contribution and the increased market
value of pension plan assets, we recognized a prepaid benefit cost of
$1 billion as of December 31, 2005. As prescribed by SFAS 87, we
eliminated our additional minimum liability of $567 million and our
intangible asset of $63 million. In addition, the entire AOCL balance was
credited by $295 million (net of $208 million of deferred taxes) as
the fair value of trust assets exceeded the accumulated benefit obligation
as of
December 31, 2005.
Health
care cost
trends continue to increase and will affect future OPEB costs. The 2005 and
2004
composite health care trend rate assumptions are approximately 9-11%, gradually
decreasing to 5% in later years. In determining our trend rate assumptions,
we
included the specific provisions of our health care plans, the demographics
and
utilization rates of plan participants, actual cost increases experienced in
our
health care plans, and projections of future medical trend rates. The effect
on
our pension and OPEB costs from changes in key assumptions are as follows:
42
|
Increase
in Costs from Adverse Changes in Key Assumptions
|
|||||||||||||||||||
|
Assumption
|
Adverse
Change
|
Pension
|
OPEB
|
Total
|
|||||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
Discount
rate
|
Decrease
by 0.25%
|
|
$
|
10
|
$ |
|
5
|
$
|
15
|
||||||||||
|
Long-term
return on assets
|
Decrease
by 0.25%
|
|
$
|
10
|
$ |
|
1
|
$
|
11
|
||||||||||
|
Health
care
trend rate
|
Increase
by 1%
|
|
na
|
$ |
|
41
|
$
|
41
|
|||||||||||
Ohio
Transition
Cost Amortization
In
connection with
the Ohio Companies' transition plan, the PUCO determined allowable transition
costs based on amounts recorded on the regulatory books of the Ohio Companies.
These costs exceeded those deferred or capitalized on our balance sheet prepared
under GAAP since they included certain costs which had not yet been incurred
or
that were recognized on the regulatory financial statements (fair value purchase
accounting adjustments). We use an effective interest method for amortizing
the
Ohio Companies’ transition costs, often referred to as a "mortgage-style"
amortization. The interest rate under this method is equal to the rate of return
authorized by the PUCO in the transition plan for each respective company.
In
computing the transition cost amortization, we include only the portion of
the
transition revenues associated with transition costs included on the balance
sheet prepared under GAAP. Revenues collected for the off-balance sheet costs
and the return associated with these costs are recognized as income when
received. Amortization of deferred customer shopping incentives and interest
costs will be equal to the related revenue recovery that is recognized under
the
RCP (see Note 2(A)).
Long-Lived
Assets
In
accordance with
SFAS 144, we periodically evaluate our long-lived assets to determine
whether conditions exist that would indicate that the carrying value of an
asset
might not be fully recoverable. The accounting standard requires that if the
sum
of future cash flows (undiscounted) expected to result from an asset is less
than the carrying value of the asset, an asset impairment must be recognized
in
the financial statements. If impairment has occurred, we recognize a loss -
calculated as the difference between the carrying value and the estimated fair
value of the asset (discounted future net cash flows).
The
calculation of
future cash flows is based on assumptions, estimates and judgment about future
events. The aggregate amount of cash flows determines whether an impairment
is
indicated. The timing of the cash flows is critical in determining the amount
of
the impairment.
Asset
Retirement
Obligations
In
accordance with
SFAS 143 and FIN 47, we recognize an ARO for the future
decommissioning of our nuclear power plants and future remediation of other
environmental liabilities associated with all of our long-lived assets. The
ARO
liability represents an estimate of the fair value of our current obligation
related to nuclear decommissioning and the retirement or remediation of
environmental liabilities of other assets. A fair value measurement inherently
involves uncertainty in the amount and timing of settlement of the liability.
We
use an expected cash flow approach to measure the fair value of the nuclear
decommissioning and environmental remediation ARO. This approach applies
probability weighting to discounted future cash flow scenarios that reflect
a
range of possible outcomes. The scenarios consider settlement of the ARO at
the
expiration of the nuclear power plants' current license, settlement based on
an
extended license term and expected remediation dates.
Income
Taxes
We
record income
taxes in accordance with the liability method of accounting. Deferred income
taxes reflect the net tax effect of temporary differences between the carrying
amounts of assets and liabilities for financial reporting purposes and the
amounts recognized for tax purposes. Investment tax credits, which were deferred
when utilized, are being amortized over the recovery period of the related
property. Deferred income tax liabilities related to tax and accounting basis
differences and tax credit carryforward items are recognized at the statutory
income tax rates in effect when the liabilities are expected to be paid.
Deferred tax assets are recognized based on income tax rates expected to be
in
effect when they are settled.
Goodwill
In
a business
combination, the excess of the purchase price over the estimated fair values
of
the assets acquired and liabilities assumed is recognized as goodwill. Based
on
the guidance provided by SFAS 142, we evaluate goodwill for impairment at
least annually and make such evaluations more frequently if indicators of
impairment arise. In accordance with the accounting standard, if the fair value
of a reporting unit is less than its carrying value (including goodwill), the
goodwill is tested for impairment. If an impairment is indicated we recognize
a
loss - calculated as the difference between the implied fair value of a
reporting unit's goodwill and the carrying value of the goodwill. Our annual
review was completed in the third quarter of 2005 with no impairment
indicated.
43
SFAS
142 requires
the goodwill of a reporting unit to be tested for impairment if there is a
more-likely-than-not expectation that the reporting unit or a significant asset
group within the reporting unit will be sold. In December 2005, MYR qualified
as
an asset held for sale in accordance with SFAS 144. As a result, in the
fourth quarter of 2005, the goodwill of MYR was retested for impairment,
resulting in a non-cash charge of $9 million (there is no corresponding
income tax benefit). In December 2004, the FSG subsidiaries qualified as an
asset held for sale, resulting in a non-cash charge of $36 million
($30 million, net of tax) in the fourth quarter of 2004.
The
forecasts used
in our evaluations of goodwill reflect operations consistent with our general
business assumptions. Unanticipated changes in those assumptions could have
a
significant effect on our future evaluations of goodwill.
NEW
ACCOUNTING STANDARDS AND INTERPRETATIONS
FSP
FAS 115-1
and FAS 124-1, "The Meaning of Other-Than-Temporary Impairment and its
Application to Certain Investments"
Issued
in November
2005, FSP 115-1 and FAS 124-1 addresses the determination as to when an
investment is considered impaired, whether that impairment is other than
temporary, and the measurement of an impairment loss. The FSP finalized and
renamed EITF 03-1 and 03-1-a to FSP FAS 115-1. This FSP will (1) nullify certain
requirements of Issue 03-1 and supersedes EITF topic No. D-44, "Recognition
of
Other Than Temporary Impairment upon the Planned Sale of a Security Whose Cost
Exceeds Fair Value," (2) clarify that an investor should recognize an impairment
loss no later than when the impairment is deemed other than temporary, even
if a
decision to sell has not been made, and (3) be effective for
other-than-temporary impairment and analyses conducted in periods beginning
after September 15, 2005. The FSP requires prospective application with an
effective date for reporting periods beginning after December 15, 2005. We
are currently evaluating this FSP Issue and any impact on our
investments.
FSP
No. FAS
13-1, "Accounting for Rental Costs Incurred during the Construction
Period"
Issued
in October
2005, FSP No. FAS 13-1 requires rental costs associated with ground or building
operating leases that are incurred during a construction period to be recognized
as rental expense. The effective date of the FSP guidance is the first reporting
period beginning after December 15, 2005. We will apply this FSP to all
construction projects, new and in progress, beginning after January 1,
2006.
EITF
Issue
04-13, "Accounting for Purchases and Sales of Inventory with the Same
Counterparty"
In
September 2005,
the EITF reached a final consensus on Issue 04-13 concluding that two or more
legally separate exchange transactions with the same counterparty should be
combined and considered as a single arrangement for purposes of applying
APB 29, when the transactions were entered into "in contemplation" of one
another. If two transactions are combined and considered a single arrangement,
the EITF reached a consensus that an exchange of inventory should be accounted
for at fair value. Although electric power is not capable of being held in
inventory, there is no substantive conceptual distinction between exchanges
involving power and other storable inventory. Therefore, we will adopt this
EITF
effective for new arrangements entered into, or modifications or renewals of
existing arrangements, in interim or annual periods beginning after
March 15, 2006.
|
SFAS
154 -
“Accounting Changes and Error Corrections - a replacement of APB Opinion
No. 20 and FASB Statement No.
3”
|
In
May 2005, the
FASB issued SFAS 154 to change the requirements for accounting and
reporting a change in accounting principle. It applies to all voluntary changes
in accounting principle and to changes required by an accounting pronouncement
when that pronouncement does not include specific transition provisions. This
Statement requires retrospective application to prior periods’ financial
statements of changes in accounting principle, unless it is impracticable to
determine either the period-specific effects or the cumulative effect of the
change. In those instances, this Statement requires that the new accounting
principle be applied to the balances of assets and liabilities as of the
beginning of the earliest period for which retrospective application is
practicable and that a corresponding adjustment be made to the opening balance
of retained earnings (or other appropriate components of equity or net assets
in
the statement of financial position) for that period rather than being reported
in the Consolidated Statements of Income. This Statement also requires that
a
change in depreciation, amortization, or depletion method for long-lived,
nonfinancial assets be accounted for as a change in accounting estimate affected
by a change in accounting principle. The provisions of this Statement are
effective for accounting changes and corrections of errors made in fiscal years
beginning after December 15, 2005. We adopted this Statement effective
January 1, 2006.
44
|
SFAS
153,
“Exchanges of Nonmonetary Assets - an amendment of APB Opinion No.
29”
|
In
December 2004,
the FASB issued SFAS 153 amending APB 29, which was based on the
principle that nonmonetary assets should be measured based on the fair value
of
the assets exchanged. The guidance in APB 29 included certain exceptions to
that principle. SFAS 153 eliminates the exception from fair value
measurement for nonmonetary exchanges of similar productive assets and replaces
it with an exception for exchanges that do not have commercial substance. This
Statement specifies that a nonmonetary exchange has commercial substance if
the
future cash flows of the entity are expected to change significantly as a result
of the exchange. The provisions of this Statement are effective January 1,
2006 for FirstEnergy. This FSP is not expected to have a material impact on
our
financial statements.
SFAS
123(R),
“Share-Based Payment”
In
December 2004,
the FASB issued SFAS 123(R), a revision to SFAS 123, which requires
expensing stock options in the financial statements. Important to applying
the
new standard is understanding how to (1) measure the fair value of stock-based
compensation awards and (2) recognize the related compensation cost for those
awards. For an award to qualify for equity classification, it must meet certain
criteria in SFAS 123(R). An award that does not meet those criteria will be
classified as a liability and remeasured each period. SFAS 123(R) retains
SFAS 123's requirements on accounting for income tax effects of stock-based
compensation. In April 2005, the SEC delayed the effective date of
SFAS 123(R) to annual, rather than interim, periods that begin after
June 15, 2005. We adopted this Statement effective January 1, 2006
with modified prospective application. We use the Black-Scholes option-pricing
model to value options for disclosure purposes only and continued to apply
this
pricing model with the adoption of SFAS 123(R). As discussed in
Note 4, we reduced our use of stock options beginning in 2005, with no
stock options being awarded subsequent to 2004. As a result, all currently
unvested stock options will vest by 2008. We expect the adoption of SFAS 123(R)
will increase annual compensation expense (after-tax) by approximately $7
million, $2 million and $0.5 million in 2006, 2007 and 2008, respectively
or
$0.02 per share in 2006 and less than $0.01 per share in 2007 and 2008.
SFAS
151,
“Inventory Costs - an amendment of ARB No. 43, Chapter 4”
In
November 2004,
the FASB issued SFAS 151 to clarify the accounting for abnormal amounts of
idle facility expense, freight, handling costs and wasted material (spoilage).
Previous guidance stated that in some circumstances these costs may be “so
abnormal” that they would require treatment as current period costs.
SFAS 151 requires abnormal amounts for these items to always be recorded as
current period costs. In addition, this Statement requires that allocation
of
fixed production overheads to the cost of conversion be based on the normal
capacity of the production facilities. The provisions of this statement are
effective for inventory costs incurred by us beginning January 1, 2006. We
do not expect it to have a material impact on the financial
statements.
45
|
FIRSTENERGY
CORP.
|
||||||||||
|
CONSOLIDATED
STATEMENTS OF INCOME
|
||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions, except per share amounts)
|
||||||||||
|
REVENUES:
|
||||||||||
|
Electric
utilities
|
$
|
9,704
|
$
|
8,860
|
$
|
8,777
|
||||
|
Unregulated
businesses
|
2,285
|
3,200
|
2,548
|
|||||||
|
Total
revenues
|
11,989
|
12,060
|
11,325
|
|||||||
|
OPERATING
EXPENSES AND TAXES:
|
||||||||||
|
Fuel
and
purchased power
|
4,011
|
4,469
|
4,159
|
|||||||
|
Other
operating expenses
|
3,725
|
3,374
|
3,640
|
|||||||
|
Claim
settlement (Note 8)
|
-
|
-
|
(168
|
)
|
||||||
|
Provision
for
depreciation
|
589
|
587
|
604
|
|||||||
|
Amortization
of regulatory assets
|
1,281
|
1,166
|
1,079
|
|||||||
|
Deferral
of
new regulatory assets
|
(405
|
)
|
(257
|
)
|
(194
|
)
|
||||
|
Goodwill
impairment
|
9
|
12
|
91
|
|||||||
|
General
taxes
|
713
|
678
|
638
|
|||||||
|
Total
expenses
|
9,923
|
10,029
|
9,849
|
|||||||
|
OPERATING
INCOME
|
2,066
|
2,031
|
1,476
|
|||||||
|
OTHER
INCOME (EXPENSE):
|
||||||||||
|
Investment
income
|
218
|
205
|
185
|
|||||||
|
Interest
expense
|
(661
|
)
|
(671
|
)
|
(799
|
)
|
||||
|
Capitalized
interest
|
19
|
25
|
32
|
|||||||
|
Subsidiaries'
preferred stock dividends
|
(15
|
)
|
(21
|
)
|
(42
|
)
|
||||
|
Total
other
income (expense)
|
(439
|
)
|
(462
|
)
|
(624
|
)
|
||||
|
INCOME
TAXES
|
754
|
673
|
408
|
|||||||
|
INCOME
BEFORE DISCONTINUED OPERATIONS AND
|
||||||||||
|
CUMULATIVE
EFFECT OF ACCOUNTING CHANGES
|
873
|
896
|
444
|
|||||||
|
Discontinued
operations (net of income taxes (benefit) of ($9 million),
|
||||||||||
|
$1
million and
($3 million) respectively) (Note 2(J))
|
18
|
(18
|
)
|
(123
|
)
|
|||||
|
Cumulative
effect of accounting changes (net of income taxes (benefit) of
|
||||||||||
|
($17
million)
and $72 million, respectively) (Note 2(K))
|
(30
|
)
|
-
|
102
|
||||||
|
NET
INCOME
|
$
|
861
|
$
|
878
|
$
|
423
|
||||
|
BASIC
EARNINGS PER SHARE OF COMMON STOCK:
|
||||||||||
|
Income
before
discontinued operations and cumulative effect of
|
||||||||||
|
accounting
changes
|
$
|
2.66
|
$
|
2.74
|
$
|
1.46
|
||||
|
Discontinued
operations (Note 2(J))
|
0.05
|
(0.06
|
)
|
(0.40
|
)
|
|||||
|
Cumulative
effect of accounting changes (Note 2(K))
|
(0.09
|
)
|
-
|
0.33
|
||||||
|
Net
Income
|
$
|
2.62
|
$
|
2.68
|
$
|
1.39
|
||||
|
WEIGHTED
AVERAGE NUMBER OF BASIC SHARES OUTSTANDING
|
328
|
327
|
304
|
|||||||
|
DILUTED
EARNINGS PER SHARE OF COMMON STOCK:
|
||||||||||
|
Income
before
discontinued operations and cumulative effect of
|
||||||||||
|
accounting
changes
|
$
|
2.65
|
$
|
2.73
|
$
|
1.46
|
||||
|
Discontinued
operations (Note 2(J))
|
0.05
|
(0.06
|
)
|
(0.40
|
)
|
|||||
|
Cumulative
effect of accounting changes (Note 2(K))
|
(0.09
|
)
|
-
|
0.33
|
||||||
|
Net
income
|
$
|
2.61
|
$
|
2.67
|
$
|
1.39
|
||||
|
WEIGHTED
AVERAGE NUMBER OF DILUTED SHARES OUTSTANDING
|
330
|
329
|
305
|
|||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
||||||||||
46
|
FIRSTENERGY
CORP.
|
|||||||
|
CONSOLIDATED
BALANCE SHEETS
|
|||||||
|
As
of
December 31,
|
2005
|
2004
|
|||||
|
(In
millions)
|
|||||||
|
ASSETS
|
|||||||
|
CURRENT
ASSETS:
|
|||||||
|
Cash
and cash
equivalents
|
$
|
64
|
$
|
53
|
|||
|
Receivables
-
|
|||||||
|
Customers
(less accumulated provisions of $38 million and $34
million,
|
|||||||
|
respectively,
for uncollectible accounts)
|
1,293
|
979
|
|||||
|
Other
(less
accumulated provisions of $27 million and $26 million,
|
|||||||
|
respectively,
for uncollectible accounts)
|
205
|
377
|
|||||
|
Materials
and
supplies, at average cost -
|
|||||||
|
Owned
|
518
|
364
|
|||||
|
Under
consignment
|
-
|
94
|
|||||
|
Prepayments
and other
|
237
|
145
|
|||||
|
2,317
|
2,012
|
||||||
|
PROPERTY,
PLANT AND EQUIPMENT:
|
|||||||
|
In
service
|
22,893
|
22,213
|
|||||
|
Less
-
Accumulated provision for depreciation
|
9,792
|
9,413
|
|||||
|
13,101
|
12,800
|
||||||
|
Construction
work in progress
|
897
|
679
|
|||||
|
13,998
|
13,479
|
||||||
|
INVESTMENTS:
|
|||||||
|
Nuclear
plant
decommissioning trusts
|
1,752
|
1,583
|
|||||
|
Investment
in
lease obligation bonds (Note 6)
|
890
|
951
|
|||||
|
Other
|
765
|
740
|
|||||
|
3,407
|
3,274
|
||||||
|
DEFERRED
CHARGES:
|
|||||||
|
Goodwill
|
6,010
|
6,050
|
|||||
|
Regulatory
assets
|
4,486
|
5,499
|
|||||
|
Prepaid
pension costs
|
1,023
|
-
|
|||||
|
Other
|
600
|
721
|
|||||
|
12,119
|
12,270
|
||||||
|
$
|
31,841
|
$
|
31,035
|
||||
|
LIABILITIES
AND CAPITALIZATION
|
|||||||
|
CURRENT
LIABILITIES:
|
|||||||
|
Currently
payable long-term debt
|
$
|
2,043
|
$
|
941
|
|||
|
Short-term
borrowings (Note 13)
|
731
|
170
|
|||||
|
Accounts
payable
|
727
|
611
|
|||||
|
Accrued
taxes
|
800
|
657
|
|||||
|
Other
|
1,152
|
929
|
|||||
|
5,453
|
3,308
|
||||||
|
CAPITALIZATION
(See
Consolidated Statements of Capitalization):
|
|||||||
|
Common
stockholders' equity
|
9,188
|
8,590
|
|||||
|
Preferred
stock of consolidated subsidiaries not subject to mandatory
redemption
|
184
|
335
|
|||||
|
Long-term
debt
and other long-term obligations
|
8,155
|
10,013
|
|||||
|
17,527
|
18,938
|
||||||
|
NONCURRENT
LIABILITIES:
|
|||||||
|
Accumulated
deferred income taxes
|
2,726
|
2,324
|
|||||
|
Asset
retirement obligations
|
1,126
|
1,078
|
|||||
|
Power
purchase
contract loss liability
|
1,226
|
2,001
|
|||||
|
Retirement
benefits
|
1,316
|
1,239
|
|||||
|
Lease
market
valuation liability
|
851
|
936
|
|||||
|
Other
|
1,616
|
1,211
|
|||||
|
8,861
|
8,789
|
||||||
|
COMMITMENTS,
GUARANTEES AND CONTINGENCIES (Notes 6 and 14)
|
|||||||
|
$
|
31,841
|
$
|
31,035
|
||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these balance sheets.
|
|||||||
47
|
FIRSTENERGY
CORP.
|
||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF CAPITALIZATION
|
||||||||||||||||||||||
|
As
of
December 31,
|
2005
|
2004
|
||||||||||||||||||||
|
(Dollars
in millions, except per
|
||||||||||||||||||||||
|
share
amounts)
|
||||||||||||||||||||||
|
COMMON
STOCKHOLDERS' EQUITY:
|
||||||||||||||||||||||
|
Common stock, $0.10 par value -authorized 375,000,000
shares-
|
|
|||||||||||||||||||||
|
329,836,276
shares outstanding
|
$
|
33
|
$
|
33
|
||||||||||||||||||
|
Other
paid-in
capital
|
7,043
|
7,056
|
||||||||||||||||||||
|
Accumulated
other comprehensive loss (Note 2(I))
|
(20
|
)
|
(313
|
)
|
||||||||||||||||||
|
Retained
earnings (Note 11(A))
|
2,159
|
1,857
|
||||||||||||||||||||
|
Unallocated
employee stock ownership plan common stock-
|
||||||||||||||||||||||
|
1,444,796
and
2,032,800 shares, respectively (Note 4(B))
|
(27
|
)
|
(43
|
)
|
||||||||||||||||||
|
Total
common
stockholders’ equity
|
9,188
|
8,590
|
||||||||||||||||||||
|
Number
of Shares
|
Optional
|
|||||||||||||||||||||
|
|
Outstanding(Thousands)
|
Redemption
Price
|
||||||||||||||||||||
|
|
|
|
2005
|
2004
|
|
Per
Share
|
Aggregate
|
|||||||||||||||
|
PREFERRED
STOCK OF CONSOLIDATED
|
||||||||||||||||||||||
|
SUBSIDIARIES
NOT SUBJECT TO
|
||||||||||||||||||||||
|
MANDATORY
REDEMPTION (Note 11(B)):
|
||||||||||||||||||||||
|
Ohio
Edison
Company
|
||||||||||||||||||||||
|
Cumulative,
$100 par value-
|
||||||||||||||||||||||
|
Authorized
6,000,000 shares
|
||||||||||||||||||||||
| 3.90% |
153
|
|
153 |
|
$
|
103.63
|
$
|
16
|
15
|
15
|
||||||||||||
| 4.40% |
176
|
|
176
|
108.00
|
19
|
18
|
18
|
|||||||||||||||
| 4.44% |
137
|
|
137
|
|
103.50
|
14
|
14
|
14
|
||||||||||||||
| 4.56% |
144
|
|
144
|
|
103.38
|
15
|
14
|
14
|
||||||||||||||
|
Total
|
610
|
610 |
|
64
|
61
|
61
|
||||||||||||||||
|
Pennsylvania
Power Company
|
||||||||||||||||||||||
|
Cumulative,
$100 par value-
|
||||||||||||||||||||||
|
Authorized
1,200,000 shares
|
||||||||||||||||||||||
| 4.24% |
40
|
|
40 |
|
103.13
|
4
|
4
|
4
|
||||||||||||||
| 4.25% |
41
|
|
41
|
|
105.00
|
4
|
4
|
4
|
||||||||||||||
| 4.64% |
60
|
|
60 |
|
102.98
|
6
|
6
|
6
|
||||||||||||||
| 7.75% |
-
|
|
250 |
|
-
|
-
|
25
|
|||||||||||||||
|
Total
|
141 |
391
|
|
14
|
14
|
39
|
||||||||||||||||
|
Cleveland
Electric Illuminating Company
|
||||||||||||||||||||||
|
Cumulative,
without par value-
|
||||||||||||||||||||||
|
Authorized
4,000,000 shares
|
||||||||||||||||||||||
|
$
7.40 Series
A
|
- |
500
|
-
|
-
|
50
|
|||||||||||||||||
|
Adjustable
Series L
|
- |
474
|
|
-
|
-
|
46
|
||||||||||||||||
|
Total
|
- |
974
|
|
-
|
-
|
96
|
||||||||||||||||
|
Toledo
Edison
Company
|
||||||||||||||||||||||
|
Cumulative,
$100 par value-
|
||||||||||||||||||||||
|
Authorized
3,000,000 shares
|
||||||||||||||||||||||
| $4.25 |
|
160
|
160
|
|
104.63
|
17
|
16
|
16
|
||||||||||||||
| $4.56 |
|
50
|
50
|
|
101.00
|
5
|
5
|
5
|
||||||||||||||
| $4.25 |
|
100
|
100
|
|
102.00
|
10
|
10
|
10
|
||||||||||||||
| 310 |
310
|
|
32
|
31
|
31
|
|||||||||||||||||
|
Cumulative,
$25 par value-
|
||||||||||||||||||||||
|
Authorized
12,000,000 shares
|
||||||||||||||||||||||
| $2.365 |
|
1,400
|
1,400
|
|
27.75
|
39
|
35
|
35
|
||||||||||||||
|
Adjustable
Series A
|
- |
1,200
|
|
-
|
-
|
30
|
||||||||||||||||
|
Adjustable
Series B
|
1,200 |
1,200
|
|
25.00
|
30
|
30
|
30
|
|||||||||||||||
| 2,600 |
3,800
|
|
69
|
65
|
95
|
|||||||||||||||||
|
Total
|
2,910 |
4,110
|
|
101
|
96
|
126
|
||||||||||||||||
|
Jersey
Central
Power & Light Company
|
||||||||||||||||||||||
|
Cumulative,
$100 stated value-
|
||||||||||||||||||||||
|
Authorized
15,600,000 shares
|
||||||||||||||||||||||
|
4.00%
Series
|
125 |
125
|
|
106.50
|
13
|
13
|
13
|
|||||||||||||||
48
|
FIRSTENERGY
CORP.
|
|||||||||||||||||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF CAPITALIZATION (Cont'd)
|
|||||||||||||||||||||||||||||||||||||
|
LONG-TERM
DEBT AND OTHER LONG-TERM OBLIGATIONS (Note 11(C))
|
|||||||||||||||||||||||||||||||||||||
|
(Interest
rates reflect weighted average
rates)
|
(In
millions)
|
||||||||||||||||||||||||||||||||||||
|
FIRST
MORTGAGE BONDS
|
|
SECURED
NOTES
|
|
UNSECURED
NOTES
|
TOTAL
|
||||||||||||||||||||||||||||||||
|
As
of
December 31,
|
2005
|
2004
|
2005
|
2004
|
2005
|
2004
|
2005
|
2004
|
|||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||
|
Ohio
Edison
Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due 2005-2010
|
-
|
$
|
-
|
$
|
80
|
4.00
|
%
|
|
$
113
|
$
|
169
|
4.68
|
%
|
$
|
331
|
$
|
361
|
||||||||||||||||||||
|
Due 2011-2015
|
-
|
-
|
-
|
3.35
|
%
|
19
|
59
|
5.45
|
%
|
150
|
150
|
||||||||||||||||||||||||||
|
Due 2016-2020
|
-
|
-
|
-
|
5.45
|
%
|
108
|
108
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due 2026-2030
|
-
|
-
|
-
|
3.47
|
%
|
180
|
180
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due 2031-2035
|
-
|
-
|
-
|
3.58
|
%
|
205
|
249
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Total-Ohio
Edison
|
-
|
80
|
625
|
765
|
481
|
511
|
$
|
1,106
|
$
|
1,356
|
|||||||||||||||||||||||||||
|
Cleveland
Electric
|
|||||||||||||||||||||||||||||||||||||
|
Illuminating
Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
6.86
|
%
|
125
|
125
|
6.23
|
%
|
399
|
401
|
5.31
|
%
|
28
|
28
|
|||||||||||||||||||||||||
|
Due
2011-2015
|
-
|
-
|
-
|
3.15
|
%
|
40
|
40
|
5.72
|
%
|
379
|
378
|
||||||||||||||||||||||||||
|
Due
2016-2020
|
-
|
-
|
-
|
6.72
|
%
|
506
|
506
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due
2021-2025
|
-
|
-
|
-
|
-
|
-
|
143
|
-
|
-
|
-
|
||||||||||||||||||||||||||||
|
Due
2026-2030
|
-
|
-
|
-
|
3.93
|
%
|
29
|
29
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due
2031-2035
|
-
|
-
|
-
|
3.66
|
%
|
219
|
76
|
9.00
|
%
|
103
|
103
|
||||||||||||||||||||||||||
|
Total-Cleveland
Electric
|
125
|
125
|
1,193
|
1,195
|
510
|
509
|
1,828
|
1,829
|
|||||||||||||||||||||||||||||
|
Toledo
Edison
Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
-
|
-
|
-
|
7.13
|
%
|
30
|
30
|
5.21
|
%
|
54
|
91
|
||||||||||||||||||||||||||
|
Due
2016-2020
|
-
|
-
|
-
|
-
|
-
|
99
|
-
|
-
|
-
|
||||||||||||||||||||||||||||
|
Due
2021-2025
|
-
|
-
|
-
|
3.26
|
%
|
67
|
67
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due
2026-2030
|
-
|
-
|
-
|
5.90
|
%
|
14
|
14
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due
2031-2035
|
-
|
-
|
-
|
3.57
|
%
|
127
|
82
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Total-Toledo
Edison
|
-
|
-
|
238
|
292
|
54
|
91
|
292
|
383
|
|||||||||||||||||||||||||||||
|
Pennsylvania
Power Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
9.74
|
%
|
5
|
6
|
5.55
|
%
|
54
|
10
|
3.50
|
%
|
15
|
15
|
|||||||||||||||||||||||||
|
Due
2011-2015
|
9.74
|
%
|
5
|
5
|
5.40
|
%
|
1
|
1
|
-
|
-
|
-
|
||||||||||||||||||||||||||
|
Due
2016-2020
|
9.74
|
%
|
4
|
4
|
4.27
|
%
|
28
|
45
|
-
|
-
|
-
|
||||||||||||||||||||||||||
|
Due
2021-2025
|
7.63
|
%
|
6
|
6
|
3.60
|
%
|
10
|
28
|
-
|
-
|
-
|
||||||||||||||||||||||||||
|
Due
2026-2030
|
-
|
-
|
-
|
5.44
|
%
|
9
|
23
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due
2031-2035
|
-
|
-
|
-
|
-
|
-
|
5
|
-
|
-
|
-
|
||||||||||||||||||||||||||||
|
Total-Penn
Power
|
20
|
21
|
102
|
112
|
15
|
15
|
137
|
148
|
|||||||||||||||||||||||||||||
|
Jersey
Central
Power & Light Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
6.85
|
%
|
40
|
46
|
5.88
|
%
|
245
|
261
|
-
|
-
|
-
|
||||||||||||||||||||||||||
|
Due
2011-2015
|
7.10
|
%
|
12
|
12
|
5.96
|
%
|
125
|
125
|
-
|
-
|
-
|
||||||||||||||||||||||||||
|
Due
2016-2020
|
-
|
-
|
-
|
5.42
|
%
|
494
|
495
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Due
2021-2025
|
7.09
|
%
|
275
|
325
|
-
|
-
|
-
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Total-Jersey
Central
|
327
|
383
|
864
|
881
|
-
|
-
|
1,191
|
1,264
|
|||||||||||||||||||||||||||||
|
Metropolitan
Edison Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
-
|
-
|
38
|
-
|
-
|
-
|
5.25
|
%
|
250
|
250
|
|||||||||||||||||||||||||||
|
Due
2011-2015
|
-
|
-
|
-
|
-
|
-
|
-
|
4.90
|
%
|
400
|
400
|
|||||||||||||||||||||||||||
|
Due
2021-2025
|
-
|
-
|
28
|
-
|
-
|
-
|
3.25
|
%
|
28
|
-
|
|||||||||||||||||||||||||||
|
Due
2026-2030
|
5.95
|
%
|
14
|
14
|
-
|
-
|
-
|
-
|
-
|
-
|
|||||||||||||||||||||||||||
|
Total-Metropolitan
Edison
|
14
|
80
|
-
|
-
|
678
|
650
|
692
|
730
|
|||||||||||||||||||||||||||||
|
Pennsylvania
Electric Co.-
|
|||||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
5.35
|
%
|
24
|
28
|
-
|
-
|
-
|
6.55
|
%
|
135
|
143
|
||||||||||||||||||||||||||
|
Due
2011-2015
|
-
|
-
|
-
|
-
|
-
|
-
|
5.13
|
%
|
150
|
150
|
|||||||||||||||||||||||||||
|
Due
2016-2020
|
-
|
-
|
20
|
-
|
-
|
-
|
6.16
|
%
|
145
|
125
|
|||||||||||||||||||||||||||
|
Due
2021-2025
|
-
|
-
|
25
|
-
|
-
|
-
|
3.19
|
%
|
25
|
-
|
|||||||||||||||||||||||||||
|
Total-Pennsylvania
Electric
|
24
|
73
|
-
|
-
|
455
|
418
|
479
|
491
|
|||||||||||||||||||||||||||||
49
|
FIRSTENERGY
CORP.
|
||||||||||||||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF CAPITALIZATION
(Cont'd)
|
||||||||||||||||||||||||||||||||||
|
LONG-TERM
DEBT AND OTHER LONG-TERM OBLIGATIONS
(Cont'd)
|
||||||||||||||||||||||||||||||||||
|
(Interest
rates reflect weighted average rates)
|
(In
millions)
|
|||||||||||||||||||||||||||||||||
|
FIRST
MORTGAGE BONDS
|
SECURED
NOTES
|
UNSECURED
NOTES
|
TOTAL
|
|||||||||||||||||||||||||||||||
|
As
of
December 31,
|
2005
|
2004
|
2005
|
2004
|
2005
|
2004
|
2005
|
2004
|
||||||||||||||||||||||||||
|
FirstEnergy
Corp.-
|
||||||||||||||||||||||||||||||||||
|
Due
2005-2010
|
-
|
$
|
-
|
$
|
-
|
-
|
$
|
-
|
$
|
-
|
5.50
|
%
|
$ |
1,000
|
$
|
1,515
|
||||||||||||||||||
|
Due
2011-2015
|
-
|
-
|
-
|
-
|
-
|
-
|
6.45
|
% |
1,500
|
1,500
|
||||||||||||||||||||||||
|
Due
2031-2035
|
-
|
-
|
-
|
-
|
-
|
-
|
7.38
|
% |
1,500
|
1,500
|
||||||||||||||||||||||||
|
Total-FirstEnergy
|
-
|
-
|
-
|
-
|
4,000
|
4,515
|
$
|
4,000
|
$
|
4,515
|
||||||||||||||||||||||||
|
Bay
Shore
Power
|
- |
-
|
-
|
6.25
|
% |
134
|
138
|
-
|
-
|
-
|
134
|
138
|
||||||||||||||||||||||
|
Facilities
Services Group
|
- |
-
|
-
|
7.29
|
% |
4
|
7
|
-
|
-
|
-
|
4
|
7
|
||||||||||||||||||||||
|
FirstEnergy
Generation
|
- |
-
|
-
|
-
|
-
|
-
|
4.25
|
% |
58
|
15
|
58
|
15
|
||||||||||||||||||||||
|
FirstEnergy
Nuclear Generation
|
- |
-
|
-
|
-
|
-
|
-
|
4.17
|
% |
270
|
-
|
270
|
-
|
||||||||||||||||||||||
|
FirstEnergy
Properties
|
- |
-
|
-
|
7.89
|
% |
9
|
9
|
-
|
-
|
-
|
9
|
9
|
||||||||||||||||||||||
|
First
Communications
|
- |
-
|
-
|
-
|
-
|
-
|
-
|
-
|
5
|
-
|
5
|
|||||||||||||||||||||||
|
Total
|
510
|
762
|
3,169
|
3,399
|
6,521
|
6,729
|
10,200
|
10,890
|
||||||||||||||||||||||||||
|
Preferred
stock subject to mandatory
|
||||||||||||||||||||||||||||||||||
|
redemption
|
-
|
17
|
||||||||||||||||||||||||||||||||
|
Capital
lease
obligations
|
8
|
10
|
||||||||||||||||||||||||||||||||
|
Net
unamortized premium (discount) on debt
|
(10
|
)
|
37
|
|||||||||||||||||||||||||||||||
|
Long-term
debt
due within one year
|
(2,043
|
)
|
(941
|
)
|
||||||||||||||||||||||||||||||
|
Total
long-term debt and other
|
||||||||||||||||||||||||||||||||||
|
long-term
obligations
|
8,155
|
10,013
|
||||||||||||||||||||||||||||||||
|
TOTAL
CAPITALIZATION
|
$
|
17,527
|
$
|
18,938
|
||||||||||||||||||||||||||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
||||||||||||||||||||||||||||||||||
50
|
FIRSTENERGY
CORP.
|
||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF COMMON STOCKHOLDERS' EQUITY
|
||||||||||||||||||||||
|
Accumulated
|
Unallocated
|
|||||||||||||||||||||
|
Other
|
Other
|
ESOP
|
||||||||||||||||||||
|
Comprehensive
|
Number
|
Par
|
Paid-In
|
Comprehensive
|
Retained
|
Common
|
||||||||||||||||
|
Income
|
of
Shares
|
Value
|
Capital
|
Income
(Loss)
|
Earnings
|
Stock
|
||||||||||||||||
|
(Dollars
in millions)
|
||||||||||||||||||||||
|
Balance,
January 1, 2003
|
297,636,276
|
$
|
30
|
$
|
6,120
|
$
|
(656
|
)
|
$
|
1,635
|
$
|
(78
|
)
|
|||||||||
|
Net
income
|
$
|
423
|
423
|
|||||||||||||||||||
|
Minimum
liability for unfunded retirement
|
||||||||||||||||||||||
|
benefits,
net
of $102 million of income taxes
|
144
|
144
|
||||||||||||||||||||
|
Unrealized
gain on investments, net of
|
||||||||||||||||||||||
|
$53
million of
income taxes
|
68
|
68
|
||||||||||||||||||||
|
Currency
translation adjustments
|
91
|
91
|
||||||||||||||||||||
|
Comprehensive
income
|
$
|
726
|
||||||||||||||||||||
|
Stock
options
exercised
|
(3
|
)
|
||||||||||||||||||||
|
Common
stock
issued
|
32,200,000
|
3
|
931
|
|||||||||||||||||||
|
Allocation
of
ESOP shares
|
15
|
20
|
||||||||||||||||||||
|
Cash
dividends
declared on common stock
|
(453
|
)
|
||||||||||||||||||||
|
Balance,
December 31, 2003
|
329,836,276
|
33
|
7,063
|
(353
|
)
|
1,605
|
(58
|
)
|
||||||||||||||
|
Net
income
|
$
|
878
|
878
|
|||||||||||||||||||
|
Minimum
liability for unfunded retirement
|
||||||||||||||||||||||
|
benefits,
net
of $(5) million of income taxes
|
(6
|
)
|
(6
|
)
|
||||||||||||||||||
|
Unrealized
gain on derivative hedges, net
|
||||||||||||||||||||||
|
of
$10 million
of income taxes
|
19
|
19
|
||||||||||||||||||||
|
Unrealized
gain on investments, net of
|
||||||||||||||||||||||
|
$20
million of
income taxes
|
27
|
27
|
||||||||||||||||||||
|
Comprehensive
income
|
$
|
918
|
||||||||||||||||||||
|
Stock
options
exercised
|
(24
|
)
|
||||||||||||||||||||
|
Allocation
of
ESOP shares
|
17
|
15
|
||||||||||||||||||||
|
Common
stock
dividends declared in 2004
|
||||||||||||||||||||||
|
payable
in
2005
|
(135
|
)
|
||||||||||||||||||||
|
Cash
dividends
declared on common stock
|
(491
|
)
|
||||||||||||||||||||
|
Balance,
December 31, 2004
|
329,836,276
|
33
|
7,056
|
(313
|
)
|
1,857
|
(43
|
)
|
||||||||||||||
|
Net
income
|
$
|
861
|
861
|
|||||||||||||||||||
|
Minimum
liability for unfunded retirement
|
||||||||||||||||||||||
|
benefits,
net
of $208 million of income taxes
|
295
|
295
|
||||||||||||||||||||
|
Unrealized
gain on derivative hedges, net
|
||||||||||||||||||||||
|
of
$9 million
of income taxes
|
14
|
14
|
||||||||||||||||||||
|
Unrealized
loss on investments, net of
|
||||||||||||||||||||||
|
$(15)
million
of income taxes
|
(16
|
)
|
(16
|
)
|
||||||||||||||||||
|
Comprehensive
income
|
$
|
1,154
|
||||||||||||||||||||
|
Stock
options
exercised
|
(41
|
)
|
||||||||||||||||||||
|
Allocation
of
ESOP shares
|
22
|
16
|
||||||||||||||||||||
|
Restricted
stock units
|
6
|
|||||||||||||||||||||
|
Cash
dividends
declared on common stock
|
(559
|
)
|
||||||||||||||||||||
|
Balance,
December 31, 2005
|
329,836,276
|
$
|
33
|
$
|
7,043
|
$
|
(20
|
)
|
$
|
2,159
|
$
|
(27
|
)
|
|||||||||
|
The
accompanying Notes to Consolidated Financial Statements are
an integral
part of these statements.
|
||||||||||||||||||||||
51
|
FIRSTENERGY
CORP.
|
|||||||||||||
|
CONSOLIDATED
STATEMENTS OF PREFERRED STOCK
|
|||||||||||||
|
Not
Subject to
|
Subject
to
|
||||||||||||
|
Mandatory
Redemption
|
Mandatory
Redemption*
|
||||||||||||
|
Par
or
|
|
|
|
Par
or
|
|
||||||||
|
|
|
Number
|
|
Stated
|
|
Number
|
|
Stated
|
|
||||
|
|
|
of
Shares
|
|
Value
|
|
of
Shares
|
|
Value
|
|||||
|
(Dollars
in millions)
|
|||||||||||||
|
Balance,
January 1, 2003
|
6,209,699
|
$
|
335
|
17,202,500
|
$
|
430
|
|||||||
|
Redemptions-
|
|||||||||||||
|
7.625%
Series
|
(7,500
|
)
|
(1
|
)
|
|||||||||
|
$7.35
Series
C
|
(10,000
|
)
|
(1
|
)
|
|||||||||
|
8.56%
Series
|
(5,000,000
|
)
|
(125
|
)
|
|||||||||
|
FIN
46
Deconsolidation-
|
|||||||||||||
|
9.00%
Series
|
(4,000,000
|
)
|
(100
|
)
|
|||||||||
|
7.35%
Series
|
(4,000,000
|
)
|
(92
|
)
|
|||||||||
|
7.34%
Series
|
(4,000,000
|
)
|
(92
|
)
|
|||||||||
|
Balance,
December 31, 2003
|
6,209,699
|
335
|
185,000
|
19
|
|||||||||
|
Redemptions-
|
|||||||||||||
|
7.625%
Series
|
(7,500
|
)
|
(1
|
)
|
|||||||||
|
$7.35
Series
C
|
(10,000
|
)
|
(1
|
)
|
|||||||||
|
Balance,
December 31, 2004
|
6,209,699
|
335
|
167,500
|
17
|
|||||||||
|
Redemptions-
|
|||||||||||||
|
7.750%
Series
|
(250,000
|
)
|
(25
|
)
|
|||||||||
|
$7.40
Series
A
|
(500,000
|
)
|
(50
|
)
|
|||||||||
|
Adjustable
Series L
|
(474,000
|
)
|
(46
|
)
|
|||||||||
|
Adjustable
Series A
|
(1,200,000
|
)
|
(30
|
)
|
|||||||||
|
7.625%
Series
|
(127,500
|
)
|
(13
|
)
|
|||||||||
|
$7.35
Series
C
|
(40,000
|
)
|
(4
|
)
|
|||||||||
|
Balance,
December 31, 2005
|
3,785,699
|
$
|
184
|
-
|
$
|
-
|
|||||||
|
*
Preferred
stock subject to mandatory redemption is classified as debt
under SFAS
150.
|
|||||||||||||
|
The
accompanying Notes to Consolidated Financial Statements are
an integral
part of these statements.
|
|||||||||||||
52
|
FIRSTENERGY
CORP.
|
||||||||||
|
CONSOLIDATED
STATEMENTS OF CASH FLOWS
|
||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
|||||||
|
(Dollars
in millions)
|
||||||||||
|
CASH
FLOWS FROM OPERATING ACTIVITIES:
|
||||||||||
|
Net
Income
|
$
|
861
|
$
|
878
|
$
|
423
|
||||
|
Adjustments
to
reconcile net income to net cash from
|
||||||||||
|
operating
activities-
|
||||||||||
|
Provision
for
depreciation
|
589
|
587
|
604
|
|||||||
|
Amortization
of regulatory assets
|
1,281
|
1,166
|
1,079
|
|||||||
|
Deferral
of
new regulatory assets
|
(405
|
)
|
(257
|
)
|
(194
|
)
|
||||
|
Nuclear
fuel
and lease amortization
|
90
|
96
|
66
|
|||||||
|
Deferred
purchased power and other costs
|
(384
|
)
|
(451
|
)
|
(459
|
)
|
||||
|
Deferred
income taxes and investment tax credits, net
|
154
|
258
|
(18
|
)
|
||||||
|
Disallowed
regulatory assets
|
-
|
-
|
153
|
|||||||
|
Investment
impairments (Note 2(H))
|
15
|
30
|
135
|
|||||||
|
Cumulative
effect of accounting changes
|
30
|
-
|
(102
|
)
|
||||||
|
Deferred
rents
and lease market valuation liability
|
(104
|
)
|
(84
|
)
|
(119
|
)
|
||||
|
Revenue
credits to customers
|
-
|
-
|
(72
|
)
|
||||||
|
Accrued
compensation and retirement benefits
|
90
|
156
|
202
|
|||||||
|
Tax
refund
related to pre-merger period
|
18
|
-
|
51
|
|||||||
|
Commodity
derivative transactions, net
|
6
|
18
|
19
|
|||||||
|
Loss
(income)
from discontinued operations (Note 2(J))
|
(18
|
)
|
18
|
123
|
||||||
|
Cash
collateral
|
196
|
(63
|
)
|
(89
|
)
|
|||||
|
Pension
trust
contribution
|
(500
|
)
|
(500
|
)
|
-
|
|||||
|
Decrease
(increase) in operating assets-
|
||||||||||
|
Receivables
|
(87
|
)
|
154
|
66
|
||||||
|
Materials
and supplies
|
(60
|
)
|
(9
|
)
|
5
|
|||||
|
Prepayments
and other current assets
|
3
|
47
|
(31
|
)
|
||||||
|
Increase
(decrease) in operating liabilities-
|
|
|||||||||
|
Accounts
payable
|
32
|
(111
|
)
|
(170
|
)
|
|||||
|
Accrued
taxes
|
154
|
(13
|
)
|
222
|
||||||
|
Accrued
interest
|
(6
|
)
|
(42
|
)
|
(60
|
)
|
||||
|
Electric
service prepayment programs
|
208
|
(18
|
)
|
(16
|
)
|
|||||
|
NUG
power
contract restructuring
|
-
|
53
|
-
|
|||||||
|
Other
|
57
|
(21
|
)
|
(41
|
)
|
|||||
|
Net
cash
provided from operating activities
|
2,220
|
1,892
|
1,777
|
|||||||
|
CASH
FLOWS FROM FINANCING ACTIVITIES:
|
||||||||||
|
New
Financing-
|
||||||||||
|
Common
Stock
|
-
|
-
|
934
|
|||||||
|
Long-term
debt
|
721
|
961
|
1,027
|
|||||||
|
Short-term
borrowings, net
|
561
|
-
|
-
|
|||||||
|
Redemptions
and Repayments-
|
||||||||||
|
Preferred
stock
|
(170
|
)
|
(2
|
)
|
(127
|
)
|
||||
|
Long-term
debt
|
(1,424
|
)
|
(1,572
|
)
|
(2,129
|
)
|
||||
|
Short-term
borrowings, net
|
-
|
(351
|
)
|
(575
|
)
|
|||||
|
Net
controlled
disbursement activity
|
(18
|
)
|
(2
|
)
|
25
|
|||||
|
Common
stock
dividend payments
|
(546
|
)
|
(491
|
)
|
(453
|
)
|
||||
|
Net
cash
used for financing activities
|
(876
|
)
|
(1,457
|
)
|
(1,298
|
)
|
||||
|
CASH
FLOWS FROM INVESTING ACTIVITIES:
|
||||||||||
|
Property
additions
|
(1,208
|
)
|
(846
|
)
|
(856
|
)
|
||||
|
Proceeds
from
asset sales
|
61
|
214
|
79
|
|||||||
|
Proceeds
from
certificates of deposit
|
-
|
278
|
-
|
|||||||
|
Nonutility
generation trusts withdrawals (contributions)
|
-
|
(51
|
)
|
66
|
||||||
|
Contributions
to nuclear decommissioning trusts
|
(101
|
)
|
(101
|
)
|
(101
|
)
|
||||
|
Long-term
note
receivable
|
-
|
-
|
82
|
|||||||
|
Cash
investments (Note 5)
|
36
|
27
|
53
|
|||||||
|
Other
|
(121
|
)
|
(17
|
)
|
86
|
|||||
|
Net
cash
used for investing activities
|
(1,333
|
)
|
(496
|
)
|
(591
|
)
|
||||
|
Net
increase
(decrease) in cash and cash equivalents
|
11
|
(61
|
)
|
(112
|
)
|
|||||
|
Cash
and cash
equivalents at beginning of year
|
53
|
114
|
226
|
|||||||
|
Cash
and cash
equivalents at end of year
|
$
|
64
|
$
|
53
|
$
|
114
|
||||
|
SUPPLEMENTAL
CASH FLOW INFORMATION:
|
||||||||||
|
Cash
Paid
During the Year-
|
||||||||||
|
Interest
(net
of amounts capitalized)
|
$
|
665
|
$
|
704
|
$
|
730
|
||||
|
Income
taxes
|
$
|
406
|
$
|
512
|
$
|
162
|
||||
|
The
accompanying Notes to Consolidated Financial Statements are
an integral
part of these statements.
|
||||||||||
53
|
FIRSTENERGY
CORP.
|
|||||||||||||
|
CONSOLIDATED
STATEMENTS OF TAXES
|
|||||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
||||||||||
|
(In
millions)
|
|||||||||||||
|
GENERAL
TAXES:
|
|||||||||||||
|
Kilowatt-hour
excise*
|
$
|
244
|
$
|
236
|
$
|
228
|
|||||||
|
State
gross
receipts*
|
151
|
140
|
130
|
||||||||||
|
Real
and
personal property
|
222
|
208
|
184
|
||||||||||
|
Social
security and unemployment
|
79
|
76
|
68
|
||||||||||
|
Other
|
17
|
18
|
28
|
||||||||||
|
Total
general
taxes
|
$
|
713
|
$
|
678
|
$
|
638
|
|||||||
|
PROVISION
FOR INCOME TAXES:
|
|||||||||||||
|
Currently
payable-
|
|||||||||||||
|
Federal
|
$
|
456
|
$
|
283
|
$
|
309
|
|||||||
|
State
|
143
|
133
|
118
|
||||||||||
|
Foreign
|
-
|
-
|
(1
|
)
|
|||||||||
|
599
|
416
|
426
|
|||||||||||
|
Deferred,
net-
|
|||||||||||||
|
Federal
|
72
|
245
|
16
|
||||||||||
|
State
|
110
|
39
|
(8
|
)
|
|||||||||
|
182
|
284
|
8
|
|||||||||||
|
Investment
tax
credit amortization
|
(27 | ) | (27 | ) | (26 | ) | |||||||
|
Total provision for income taxes
|
$
|
754
|
$
|
673
|
$
|
408
|
|||||||
|
RECONCILIATION
OF FEDERAL INCOME TAX EXPENSE AT
|
|||||||||||||
|
STATUTORY
RATE TO TOTAL PROVISION FOR INCOME TAXES:
|
|||||||||||||
|
Book
income
before provision for income taxes
|
$
|
1,627
|
$
|
1,569
|
$
|
852
|
|||||||
|
Federal
income
tax expense at statutory rate
|
$
|
569
|
$
|
549
|
$
|
298
|
|||||||
|
Increases
(reductions) in taxes resulting from-
|
|||||||||||||
|
Amortization
of investment tax credits
|
(27
|
)
|
(27
|
)
|
(26
|
)
|
|||||||
|
State
income
taxes, net of federal income tax benefit
|
165
|
111
|
72
|
||||||||||
|
Penalties
|
14
|
-
|
-
|
||||||||||
|
Amortization
of tax regulatory assets
|
38
|
33
|
32
|
||||||||||
|
Preferred
stock dividends
|
5
|
8
|
7
|
||||||||||
|
Reserve
for
foreign operations
|
-
|
-
|
44
|
||||||||||
|
Other,
net
|
(10
|
)
|
(1
|
)
|
(19
|
)
|
|||||||
|
Total
provision for income taxes
|
$
|
754
|
$
|
673
|
$
|
408
|
|||||||
|
ACCUMULATED
DEFERRED INCOME TAXES AS OF
|
|||||||||||||
|
DECEMBER
31:
|
|||||||||||||
|
Property
basis
differences
|
$
|
2,368
|
$
|
2,348
|
$
|
2,180
|
|||||||
|
Regulatory
transition charge
|
537
|
785
|
1,085
|
||||||||||
|
Customer
receivables for future income taxes
|
131
|
103
|
139
|
||||||||||
|
Shopping
credit incentive deferral
|
321
|
252
|
153
|
||||||||||
|
Deferred
sale
and leaseback costs
|
(86
|
)
|
(92
|
)
|
(95
|
)
|
|||||||
|
Nonutility
generation costs
|
(177
|
)
|
(174
|
)
|
(221
|
)
|
|||||||
|
Unamortized
investment tax credits
|
(54
|
)
|
(61
|
)
|
(70
|
)
|
|||||||
|
Other
comprehensive income
|
(18
|
)
|
(219
|
)
|
(244
|
)
|
|||||||
|
Retirement
benefits
|
(135
|
)
|
(280
|
)
|
(445
|
)
|
|||||||
|
Lease
market
valuation liability
|
(361
|
)
|
(420
|
)
|
(455
|
)
|
|||||||
|
Oyster
Creek
securitization (Note 11(D))
|
173
|
184
|
193
|
||||||||||
|
Loss
carryforwards
|
(417
|
)
|
(463
|
)
|
(495
|
)
|
|||||||
|
Loss
carryforward valuation reserve
|
402
|
420
|
471
|
||||||||||
|
Asset
retirement obligations
|
65
|
71
|
64
|
||||||||||
|
Deferred
nuclear expenses
|
(105
|
)
|
(100
|
)
|
(65
|
)
|
|||||||
|
All
other
|
82
|
(30
|
)
|
(17
|
)
|
||||||||
|
Net
deferred
income tax liability
|
$
|
2,726
|
$
|
2,324
|
$
|
2,178
|
|||||||
|
*
Collected from customers through regulated rates and included
in revenue
in the Consolidated Statements of Income.
|
|||||||||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
|||||||||||||
54
1. ORGANIZATION
AND BASIS OF PRESENTATION
FirstEnergy's
principal business is the holding, directly or indirectly, of all of the
outstanding common stock of its eight principal electric utility operating
subsidiaries: OE, CEI, TE, Penn, ATSI, JCP&L, Met-Ed and Penelec. Penn is a
wholly owned subsidiary of OE. FirstEnergy’s consolidated financial statements
also include its other subsidiaries: FENOC, FES and its subsidiary FGCO, NGC,
FESC, FSG and MYR.
FirstEnergy
and its
subsidiaries follow GAAP and comply with the regulations, orders, policies
and
practices prescribed by the SEC, FERC and, as applicable, PUCO, PPUC and NJBPU.
The preparation of financial statements in conformity with GAAP requires
management to make periodic estimates and assumptions that affect the reported
amounts of assets, liabilities, revenues and expenses and disclosure of
contingent assets and liabilities. Actual results could differ from these
estimates. The reported results of operations are not indicative of results
of
operations for any future period.
FirstEnergy
and its
subsidiaries consolidate all majority-owned subsidiaries over which they
exercise control and, when applicable, entities for which they have a
controlling financial interest. Intercompany transactions and balances are
eliminated in consolidation. FirstEnergy consolidates a VIE (see Note 7)
when it is determined to be the VIE's primary beneficiary. Investments in
non-consolidated affiliates over which FirstEnergy and its subsidiaries have
the
ability to exercise significant influence, but not control (20-50% owned
companies, joint ventures and partnerships) are accounted for under the equity
method. Under the equity method, the interest in the entity is reported as
an
investment in the Consolidated Balance Sheets and the percentage share of the
entity’s earnings is reported in the Consolidated Statements of Income.
Certain
prior year
amounts have been reclassified to conform to the current year presentation.
Certain businesses divested in 2005 have been classified as discontinued
operations on the Consolidated Statements of Income (see Note 2(J)). As
discussed in Note 16, segment reporting in 2004 and 2003 was reclassified
to conform to the 2005 business segment organization and
operations.
Unless
otherwise
indicated, defined terms used herein have the meanings set forth in the
accompanying Glossary of Terms.
2.
SUMMARY OF
SIGNIFICANT ACCOUNTING POLICIES
(A) ACCOUNTING
FOR THE EFFECTS OF REGULATION
FirstEnergy
accounts
for the effects of regulation through the application of SFAS 71 to its
operating utilities since their rates:
|
·
|
are
established by a third-party regulator with the authority to set
rates
that bind customers;
|
|
·
|
are
cost-based; and
|
|
·
|
can
be charged
to and collected from
customers.
|
An
enterprise
meeting all of these criteria capitalizes costs that would otherwise be charged
to expense if the rate actions of its regulator make it probable that those
costs will be recovered in future revenue. SFAS 71 is applied only to the
parts of the business that meet the above criteria. If a portion of the business
applying SFAS 71 no longer meets those requirements, previously recorded
regulatory assets are removed from the balance sheet in accordance with the
guidance in SFAS 101.
In
Ohio, Pennsylvania
and New Jersey, laws applicable to electric industry restructuring contain
similar provisions that are reflected in the Companies' respective state
regulatory plans. These provisions include:
|
·
|
restructuring
the electric generation business and allowing the Companies' customers
to
select a competitive electric generation supplier other than the
Companies;
|
|
·
|
establishing
or defining the PLR obligations to customers in the Companies'
service
areas;
|
|
·
|
providing
the
Companies with the opportunity to recover potentially stranded
investment
(or transition costs) not otherwise recoverable in a competitive
generation market;
|
|
·
|
itemizing
(unbundling) the price of electricity into its component elements
-
including generation, transmission, distribution and stranded costs
recovery charges;
|
55
|
·
|
continuing
regulation of the Companies' transmission and distribution systems;
and
|
|
·
|
requiring
corporate separation of regulated and unregulated business
activities.
|
Regulatory
Assets
The Companies
and ATSI recognize, as regulatory assets, costs which the FERC, PUCO, PPUC
and NJBPU have authorized for recovery from customers in future periods or
for
which authorization is probable. Without the probability of such authorization,
costs currently recorded as regulatory assets would have been charged to income
as incurred. All regulatory assets are expected to be recovered from customers
under the Companies' respective transition and regulatory plans. Based on those
plans, the Companies continue to bill and collect cost-based rates for their
transmission and distribution services, which remain regulated; accordingly,
it
is appropriate that the Companies continue the application of SFAS 71 to
those operations. Regulatory assets that do not earn a current return totaled
approximately $255 million as of December 31, 2005.
Net
regulatory
assets on the Consolidated Balance Sheets are comprised of the following:
|
2005
|
2004
|
||||||
|
(In
millions)
|
|||||||
|
Regulatory
transition costs
|
$
|
3,576
|
$
|
4,889
|
|||
|
Customer
shopping incentives
|
884
|
612
|
|||||
|
Customer
receivables for future income taxes
|
217
|
246
|
|||||
|
Societal
benefits charge
|
29
|
51
|
|||||
|
Loss
on
reacquired debt
|
41
|
56
|
|||||
|
Employee
postretirement benefit costs
|
55
|
65
|
|||||
|
Nuclear
decommissioning, decontamination
|
|||||||
|
and
spent fuel
disposal costs
|
(126
|
)
|
(169
|
)
|
|||
|
Asset
removal
costs
|
(365
|
)
|
(340
|
)
|
|||
|
Property
losses and unrecovered plant costs
|
29
|
50
|
|||||
|
MISO
transmission costs
|
91
|
-
|
|||||
|
JCP&L
reliability costs
|
23
|
-
|
|||||
|
Other
|
32
|
39
|
|||||
|
Total
|
$
|
4,486
|
$
|
5,499
|
|||
The
Ohio
Companies have been deferring customer shopping incentives and interest costs
(Extended RTC) as new regulatory assets in accordance with the prior
transition and rate stabilization plans. As a result of the RCP approved
in
January 2006, the Extended RTC balances (OE - $325 million, CEI -
$427 million, TE - $132 million, as of December 31, 2005) were
reduced on January 1, 2006 by $75 million for OE, $85 million for
CEI and $45 million for TE by accelerating the application of those amounts
of each respective company's accumulated cost of removal regulatory liability
against the Extended RTC balances. In accordance with the RCP, the recovery
periods for the aggregate of the regulatory transition costs and the Extended
RTC amounts were adjusted so that recovery of these aggregate amounts through
each company's RTC rate component began on January 1, 2006, with full
recovery expected to be completed for OE and TE as of December 31, 2008.
CEI's recovery of its regulatory transition costs is projected to be completed
by April 2009 at which time recovery of its Extended RTC will begin, with
recovery estimated to be completed as of December 31, 2010. At the end of
their respective recovery periods, any remaining unamortized regulatory
transition costs and Extended RTC balances will be eliminated, first, by
applying any remaining cost of removal regulatory liability balances; and
then
by writing off any remaining regulatory transition costs and Extended RTC
balances. In addition, the RCP allowed the Ohio Companies to defer and
capitalize certain distribution costs during the period January 1, 2006
through December 31, 2008, not to exceed $150 million in each of the
years 2006, 2007 and 2008. These deferrals will be recovered in distribution
rates effective on or after January 1, 2009. See Note 10 for further
discussion of the recovery of the shopping incentives and the new cost
deferrals.
Transition
Cost
Amortization
OE,
CEI and TE
amortize transition costs (see Regulatory Matters - Ohio) using the effective
interest method. Extended RTC amortization will be equal to the related revenue
recovery that is recognized. The following table provides the estimated net
amortization of RTCs and Extended RTCs (including associated carrying charges)
under the RCP for the period 2006 through 2010:
|
Amortization
|
|
|
|
Total
|
|||||||||
|
Period
|
OE
|
CEI
|
TE
|
Ohio
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
2006
|
$
|
169
|
$
|
100
|
$
|
80
|
$
|
349
|
|||||
|
2007
|
176
|
111
|
89
|
376
|
|||||||||
|
2008
|
198
|
129
|
100
|
427
|
|||||||||
|
2009
|
-
|
216
|
-
|
216
|
|||||||||
|
2010
|
-
|
268
|
-
|
268
|
|||||||||
|
Total
Amortization
|
$
|
543
|
$
|
824
|
$
|
269
|
$
|
1,636
|
|||||
56
Regulatory
transition costs as of December 31, 2005 for JCP&L and Met-Ed are
approximately $2.2 billion and $308 million, respectively. Deferral of
above-market costs from power supplied by NUGs to JCP&L are approximately
$1.2 billion and are being recovered through BGS and MTC revenues. Met-Ed
has deferred above-market NUG costs totaling approximately $143 million.
These costs are being recovered through CTC revenues. The liability for
projected above-market NUG costs and corresponding regulatory asset are adjusted
to fair value at the end of each quarter. Recovery of the remaining regulatory
transition costs is expected to continue under the provisions of the various
regulatory proceedings for New Jersey and Pennsylvania discussed in Note
10.
|
(B)
|
CASH
AND SHORT-TERM FINANCIAL
INSTRUMENTS
|
All
temporary cash
investments purchased with an initial maturity of three months or less are
reported as cash equivalents on the Consolidated Balance Sheets at cost, which
approximates their fair market value.
|
(C)
|
REVENUES
AND RECEIVABLES
|
The
Companies'
principal business is providing electric service to customers in Ohio,
Pennsylvania and New Jersey. The Companies' retail customers are metered on
a
cycle basis. Electric revenues are recorded based on energy delivered through
the end of the calendar month. An estimate of unbilled revenues is calculated
to
recognize electric service provided between the last meter reading and the
end
of the month. This estimate includes many factors including estimated weather
impacts, customer shopping activity, historical line loss factors and prices
in
effect for each class of customer. In each accounting period, the Companies
accrue the estimated unbilled amount receivable as revenue and reverse the
related prior period estimate.
Receivables
from
customers include sales to residential, commercial and industrial customers
and
sales to wholesale customers. There was no material concentration of receivables
as of December 31, 2005 with respect to any particular segment of
FirstEnergy's customers. Total customer receivables were $1.3 billion
(billed - $841 million and unbilled - $452 million) and
$979 million (billed - $672 million and unbilled - $307 million)
as of December 31, 2005 and 2004, respectively.
|
(D)
|
ACCOUNTING
FOR CERTAIN WHOLESALE ENERGY
TRANSACTIONS
|
FES
engages in
purchase and sale transactions in the PJM Market to support the supply of
end-use customers, including PLR requirements in Pennsylvania. In conjunction
with FirstEnergy's dedication of its Beaver Valley Plant to PJM on
January 1, 2005, FES began accounting for purchase and sale transactions in
the PJM Market based on its net hourly position -- recording each hour as either
an energy purchase or an energy sale in the Consolidated Statements of Income
relating to the Power Supply Management Services segment. Hourly energy
positions are aggregated to recognize gross purchases and sales for the month.
This revised method of accounting, which has no impact on net income, is
consistent with the practice of other energy companies that have dedicated
generating capacity in PJM and correlates with PJM's scheduling and reporting
of
hourly energy transactions. FES also applies the net hourly methodology to
purchase and sale transactions in MISO's energy market, which became active
on
April 1, 2005.
For
periods prior to
January 1, 2005, FirstEnergy did not have substantial generating capacity
in PJM and as such, FES recognized purchases and sales in the PJM Market by
recording each discrete transaction. Under those transactions, FES would often
buy a specific quantity of energy at a certain location in PJM and
simultaneously sell a specific quantity of energy at a different location.
Physical delivery occurred and the risks and rewards of ownership transferred
with each transaction. FES accounted for those transactions on a gross basis
in
accordance with EITF 99-19. The recognition of those transactions on a net
basis
in prior periods would have no impact on net income, but would have reduced
both
wholesale revenue and purchased power expense by $1.1 billion and
$617 million in 2004 and 2003, respectively.
(E) EARNINGS
PER
SHARE OF COMMON STOCK
Basic
earnings per
share of common stock are computed using the weighted average of actual common
shares outstanding during the respective period as the denominator. The
denominator for diluted earnings per share of common stock reflects the weighted
average of common shares outstanding plus the potential additional common shares
that could result if dilutive securities and other agreements to issue common
stock were exercised. In 2004 and 2003, stock-based awards to purchase shares
of
common stock totaling 0.1 million and 3.3 million, respectively, were
excluded from the calculation of diluted earnings per share of common stock
because their exercise prices were greater than the average market price of
common shares during the period. No stock-based awards were excluded from the
calculation in 2005. The following table reconciles the denominators for basic
and diluted earnings per share of common stock from Income Before Discontinued
Operations and Cumulative Effect of Accounting Changes:
57
|
Reconciliation
of Basic and Diluted
|
|
|
|
|||||||
|
Earnings
per Share of Common Stock
|
2005
|
2004
|
2003
|
|||||||
|
|
(In
millions, except per share amounts)
|
|||||||||
|
Income
Before
Discontinued Operations and
|
|
|
|
|||||||
|
Cumulative
Effect of Accounting Changes
|
$
|
873
|
$
|
896
|
$
|
444
|
||||
|
Average
Shares
of Common Stock Outstanding:
|
|
|
|
|||||||
|
Denominator
for basic earnings per share
|
|
|
|
|||||||
|
(weighted
average shares outstanding)
|
328
|
327
|
304
|
|||||||
|
|
|
|
|
|||||||
|
Assumed
exercise of dilutive stock options and awards
|
2
|
2
|
1
|
|||||||
|
|
|
|
||||||||
|
Denominator
for diluted earnings per share
|
330
|
329
|
305
|
|||||||
|
|
|
|
|
|||||||
|
Income
Before
Discontinued Operations and Cumulative
|
|
|
|
|||||||
|
Effect
of
Accounting Changes, per common share:
|
|
|
|
|||||||
|
Basic
|
$
|
2.66
|
$
|
2.74
|
$
|
1.46
|
||||
|
Diluted
|
$
|
2.65
|
$
|
2.73
|
$
|
1.46
|
||||
|
(F)
|
PROPERTY,
PLANT AND EQUIPMENT
|
Property,
plant and
equipment reflects original cost (except for nuclear generating assets which
were adjusted to fair value in accordance with SFAS 144), including payroll
and
related costs such as taxes, employee benefits, administrative and general
costs, and interest costs incurred to place the assets in service. The costs
of
normal maintenance, repairs and minor replacements are expensed as incurred.
FirstEnergy's accounting policy for planned major maintenance projects is to
recognize liabilities as they are incurred.
The
Companies
provide for depreciation on a straight-line basis at various rates over the
estimated lives of property included in plant in service. The respective annual
composite rates for the Companies' electric plant in 2005, 2004 and 2003 are
shown in the following table:
|
Annual
Composite
|
|||||||||||||||||||
|
Depreciation
Rate
|
|||||||||||||||||||
|
2005
|
2004
|
2003
|
|||||||||||||||||
|
OE
|
2.1
|
%
|
2.3
|
%
|
2.2
|
%
|
|||||||||||||
|
CEI
|
2.9
|
2.8
|
2.8
|
||||||||||||||||
|
TE
|
3.1
|
2.8
|
2.8
|
||||||||||||||||
|
Penn
|
2.4
|
2.2
|
2.2
|
||||||||||||||||
|
JCP&L
|
2.2
|
2.1
|
2.8
|
||||||||||||||||
|
Met-Ed
|
2.4
|
2.4
|
2.6
|
||||||||||||||||
|
Penelec
|
2.6
|
2.5
|
2.7
|
||||||||||||||||
In
October 2005, the
Ohio Companies' and Penn's non-nuclear generation assets were transferred to
FGCO and in December 2005, the Ohio Companies' and Penn's nuclear generation
assets were transferred to NGC. FGCO and NGC provide for depreciation on a
straight-line basis at various rates over the estimated lives of property
included in plant in service.
Jointly-Owned
Generating Stations
JCP&L
holds a
50% ownership interest in Yards Creek Pumped Storage Facility - its net book
value was approximately $20 million as of December 31, 2005. All other
generating units are owned and/or leased by FGCO, NGC and the
Companies.
Asset
Retirement
Obligations
FirstEnergy
recognizes a liability for retirement obligations associated with tangible
assets in accordance with SFAS 143 and FIN 47. These standards require
recognition of the fair value of a liability for an ARO in the period in which
it is incurred. The associated asset retirement costs are capitalized as part
of
the carrying value of the long-lived asset and depreciated over time, as
described further in Note 12, "Asset Retirement Obligations".
Nuclear
Fuel
Property,
plant and
equipment includes nuclear fuel recorded at original cost, which includes
material, enrichment, fabrication and interest costs incurred prior to reactor
load. Nuclear fuel is amortized based on the units of production method.
58
|
(G)
|
STOCK-BASED
COMPENSATION
|
FirstEnergy
applies
the recognition and measurement principles of APB 25 and related
Interpretations in accounting for its stock-based compensation plans (see
Note 4). No material stock-based employee compensation expense for options
is reflected in net income as all options granted under those plans had an
exercise price equal to the market value of the underlying common stock on
the
grant date, resulting in substantially no intrinsic value. FirstEnergy will
apply the recognition and measurement principles of SFAS 123(R) effective
January 1, 2006 (see Note 17).
(H)
ASSET
IMPAIRMENTS
Long-Lived
Assets
FirstEnergy
evaluates the carrying value of its long-lived assets when events or
circumstances indicate that the carrying amount may not be recoverable. In
accordance with SFAS 144, the carrying amount of a long-lived asset is not
recoverable if it exceeds the sum of the undiscounted cash flows expected to
result from the use and eventual disposition of the asset. If an impairment
exists, a loss is recognized for the amount by which the carrying value of
the
long-lived asset exceeds its estimated fair value. Fair value is estimated
by
using available market valuations or the long-lived asset's expected future
net
discounted cash flows. The calculation of expected cash flows is based on
estimates and assumptions about future events.
Goodwill
In
a business
combination, the excess of the purchase price over the estimated fair values
of
assets acquired and liabilities assumed is recognized as goodwill. Based on
the
guidance provided by SFAS 142, FirstEnergy evaluates its goodwill for
impairment at least annually and makes such evaluations more frequently if
indicators of impairment arise. In accordance with the accounting standard,
if
the fair value of a reporting unit is less than its carrying value (including
goodwill), the goodwill is tested for impairment. If an impairment is indicated,
FirstEnergy recognizes a loss - calculated as the difference between the implied
fair value of a reporting unit's goodwill and the carrying value of the
goodwill.
FirstEnergy's
2005
annual review was completed in the third quarter of 2005 with no impairment
indicated. In December 2005, MYR qualified as an asset held for sale in
accordance with SFAS 144. SFAS 142 requires the goodwill of a
reporting unit to be tested for impairment if there is a more-likely-than-not
expectation that the reporting unit or a significant asset group within the
reporting unit will be sold. As a result, in the fourth quarter of 2005, the
goodwill of MYR was retested for impairment. Based on market valuations that
were not available prior to the fourth quarter of 2005, it was determined that
the carrying value of MYR exceeded the fair value, resulting in a non-cash
goodwill impairment charge of $9 million in the fourth quarter of 2005,
with no corresponding income tax benefit.
FirstEnergy's
2004
annual review was completed in the third quarter of 2004 with no impairment
indicated. In December 2004, the FSG subsidiaries qualified as an asset held
for
sale in accordance with SFAS 144. As required by SFAS 142, the
goodwill of FSG was tested for impairment, resulting in a non-cash charge of
$36 million in the fourth quarter of 2004. Of that amount, $12 million
was reported as an operating expense and $24 million was included in the
results from discontinued operations. FSG's fair value was estimated using
current market valuations.
FirstEnergy's
2003
annual review resulted in a goodwill impairment charge of $122 million in
the third quarter of 2003, reducing the carrying value of FSG. Of that amount,
$91 million is reported as an operating expense and $31 million is
included in the results from discontinued operations. The impairment charge
reflected the slow down in the development of competitive retail markets and
depressed economic conditions that affected the value of FSG. The fair value
of
FSG was estimated using primarily its expected discounted future cash
flows.
The
forecasts used
in FirstEnergy's evaluations of goodwill reflect operations consistent with
its
general business assumptions. Unanticipated changes in those assumptions could
have a significant effect on FirstEnergy's future evaluations of goodwill.
FirstEnergy's goodwill primarily relates to its regulated services segment.
In
the year ended December 31, 2005, FirstEnergy adjusted goodwill related to
the divestiture of non-core operations (FES' retail natural gas business, MYR's
Power Piping Company subsidiary, and a portion of its interest in FirstCom)
as
further discussed in Note 8. In addition, adjustments to the former GPU and
Centerior companies' goodwill were recorded to reverse pre-merger tax accruals
due to final resolution of these tax contingencies. The impairment analysis
includes a significant source of cash representing the Companies' recovery
of
transition costs as described in Note 10. FirstEnergy estimates that
completion of transition cost recovery will not result in an impairment of
goodwill relating to its regulated business segment.
59
A
summary of the
changes in FirstEnergy's goodwill for the three years ended December 31,
2005 is shown below by segment (see Note 16 - Segment
Information):
|
Power
|
||||||||||||||||
|
Supply
|
||||||||||||||||
|
Regulated
|
Management
|
Facilities
|
||||||||||||||
|
Services
|
Services
|
Services
|
Other
|
Consolidated
|
||||||||||||
|
(In
millions)
|
||||||||||||||||
|
Balance
as of
January 1, 2003
|
$
|
5,993
|
$
|
24
|
$
|
196
|
$
|
65
|
$
|
6,278
|
||||||
|
Impairment
charges
|
(122
|
)
|
(122
|
)
|
||||||||||||
|
FSG
divestitures
|
(41
|
)
|
(41
|
)
|
||||||||||||
|
Other
|
3
|
10
|
13
|
|||||||||||||
|
Balance
as of
December 31, 2003
|
5,993
|
24
|
36
|
75
|
6,128
|
|||||||||||
|
Impairment
charges
|
(36
|
)
|
(36
|
)
|
||||||||||||
|
Adjustments
related to GPU acquisition
|
(42
|
)
|
(42
|
)
|
||||||||||||
|
Balance
as of
December 31, 2004
|
5,951
|
24
|
-
|
75
|
6,050
|
|||||||||||
|
Impairment
charges
|
(9
|
)
|
(9
|
)
|
||||||||||||
|
Non-core
asset
sales
|
(12
|
)
|
(12
|
)
|
||||||||||||
|
Adjustments
related to GPU acquisition
|
(10
|
)
|
(10
|
)
|
||||||||||||
|
Adjustments
related to Centerior acquisition
|
(9
|
)
|
(9
|
)
|
||||||||||||
|
Balance
as of
December 31, 2005
|
$
|
5,932
|
$
|
24
|
$
|
-
|
$
|
54
|
$
|
6,010
|
||||||
Investments
FirstEnergy
periodically evaluates other investments for impairment, including
available-for-sale securities held by its nuclear decommissioning trusts. In
accordance with SFAS 115, securities classified as available-for-sale are
evaluated to determine whether a decline in fair value below the cost basis
is
other than temporary. If the decline in fair value is determined to be other
than temporary, the cost basis of the security is written down to fair value.
FirstEnergy considers, among other factors, the length of time and the extent
to
which the security's fair value has been less than cost and the near-term
financial prospects of the security issuer when evaluating investments for
impairment. The fair value and unrealized gains and losses of FirstEnergy's
investments are disclosed in Note 5.
(I) COMPREHENSIVE
INCOME
Comprehensive
income
includes net income as reported on the Consolidated Statements of Income and
all
other changes in common stockholders' equity except those resulting from
transactions with common stockholders. As of December 31, 2005, AOCL
consisted of a minimum liability for unfunded retirement benefits on
non-qualified plans of $17 million, unrealized gains on investments in
securities available for sale of $74 million and unrealized losses on
derivative instrument hedges of $77 million. A summary of the changes in
FirstEnergy's AOCL balance for the three years ended December 31, 2005 is
shown below:
|
|
|
|
|
||||||||||
|
|
2005
|
2004
|
2003
|
||||||||||
|
|
(In
millions)
|
||||||||||||
|
AOCL
balance
as of January 1,
|
$ |
|
(313
|
)
|
$
|
(353
|
)
|
$
|
(656
|
)
|
|||
|
Minimum
liability for unfunded retirement benefits
|
|
503
|
(11
|
)
|
246
|
||||||||
|
Unrealized
gain (loss) on available for sale securities
|
|
(31
|
)
|
46
|
119
|
||||||||
|
Unrealized
gain (loss) on derivative hedges
|
|
23
|
29
|
2
|
|||||||||
|
Currency
translation adjustments
|
|
-
|
-
|
91
|
|||||||||
|
Other comprehensive income
|
|
495
|
64
|
458
|
|||||||||
|
Income
taxes
related to OCI
|
|
202
|
24
|
155
|
|||||||||
|
Other comprehensive income, net of tax
|
|
293
|
40
|
303
|
|||||||||
|
|
|
|
|
|
|||||||||
|
AOCL
balance
as of December 31,
|
$ |
|
(20
|
)
|
$
|
(313
|
)
|
$
|
(353
|
)
|
|||
Other
comprehensive
income reclassified to net income in 2005, 2004 and 2003 totaled $52 million,
$8 million and $29 million, respectively. These amounts were net of
income taxes in 2005, 2004 and 2003 of $35 million, $6 million and
$20 million, respectively.
(J) ASSETS
HELD
FOR SALE AND DISCONTINUED OPERATIONS
In
2005, three FSG
subsidiaries, Elliott-Lewis, Spectrum and Cranston, and MYR's Power Piping
Company subsidiary were sold resulting in an after-tax gain of $13 million.
As of December 31, 2005, the remaining FSG subsidiaries continue to qualify
as assets held for sale in accordance with SFAS 144. Management anticipates
that the transfer of FSG assets, with a carrying value of $100 million as
of December 31, 2005 will qualify for recognition as completed sales within
one year. The FSG facilities which were deemed held for sale as of
December 31, 2004 continue to be actively marketed as of December 31,
2005 and meet the criteria under SFAS 144 to continue to qualify as held
for sale. As of December 31, 2005, the FSG subsidiaries classified as held
for sale did not meet the criteria for discontinued operations. The carrying
amounts of FSG's assets and liabilities held for sale are not material and
have
not been classified as assets held for sale on FirstEnergy's Consolidated
Balance Sheet. See Note 16 for FSG's segment financial information.
60
In
December 2005,
MYR qualified as an asset held for sale but did not meet the criteria to be
classified as a discontinued operation. Management anticipates that the transfer
of MYR assets, with a carrying value of $226 million as of
December 31, 2005, will qualify for recognition as completed sales within
one year. As required by SFAS 142, the goodwill of MYR was tested for
impairment, resulting in a non-cash charge of $9 million in the fourth
quarter of 2005 (see Note 2(H)). The carrying amounts of MYR's assets and
liabilities held for sale are not material and have not been classified as
assets held for sale on FirstEnergy's Consolidated Balance Sheet. See Note
16
for MYR's segment financial information.
In
December 2004,
the FES retail natural gas business qualified as assets held for sale in
accordance with SFAS 144. As required by SFAS 142, goodwill associated with
the FES natural gas business was tested for impairment as of December 31,
2004 with no impairment indicated. On March 31, 2005, FES completed the
sale for an after-tax gain of $5 million.
The
FSG
subsidiaries, Colonial Mechanical, Webb Technologies and Ancoma, Inc., and
MARBEL subsidiary, NEO, were sold in 2003. The financial results for these
divested businesses included in discontinued operations totaled a loss of
$4 million for the year ended December 31, 2003 and are included in
“FSG and MYR subsidiaries” and "Other" in the table below.
In
December 2003,
EGSA, GPU Power’s Bolivia subsidiary, was sold to Bolivia Integrated Energy
Limited. FirstEnergy included in discontinued operations a $33 million loss
on the sale of EGSA in the fourth quarter of 2003 (no income tax benefit was
realized) and an operating loss for the year of $2 million.
In
April 2003,
FirstEnergy divested its ownership in Emdersa through the abandonment of its
shares in Emdersa's parent company, GPU Argentina Holdings, Inc. The abandonment
was accomplished by relinquishing FirstEnergy's shares to the independent Board
of Directors of GPU Argentina Holdings, relieving FirstEnergy of all rights
and
obligations relative to this business. FirstEnergy included in discontinued
operations Emdersa's operating income of $7 million and a $67 million
charge for the abandonment in the second quarter of 2003 (no income tax benefit
was recognized).
Revenues
associated
with discontinued operations were $206 million, $690 million and
$819 million in 2005, 2004 and 2003, respectively. The following table
summarizes the net income (loss) included in "Discontinued Operations" on the
Consolidated Statements of Income for the three years ended December 31,
2005:
|
2005
|
2004
|
2003
|
||||||||
|
(In
millions)
|
||||||||||
|
FES
natural
gas business
|
$
|
5
|
$
|
4
|
$
|
(2
|
)
|
|||
|
EGSA
|
-
|
-
|
(35
|
)
|
||||||
|
Emdersa
|
-
|
-
|
(60
|
)
|
||||||
|
FSG
and MYR
subsidiaries
|
13
|
(22
|
)
|
(25
|
)
|
|||||
|
Other
|
-
|
-
|
(1
|
)
|
||||||
|
Income
(loss)
from discontinued operations
|
$
|
18
|
$
|
(18
|
)
|
$
|
(123
|
)
|
||
|
(K)
|
CUMULATIVE
EFFECT OF ACCOUNTING
CHANGES
|
Results
in 2005
include an after-tax charge of $30 million recorded upon the adoption of
FIN 47 in December 2005. FirstEnergy identified applicable legal
obligations as defined under the new standard at its active and retired
generating units, substation control rooms, service center buildings, line
shops
and office buildings, identifying asbestos as the primary conditional ARO.
The
Company recorded a conditional ARO liability of $57 million (including
accumulated accretion for the period from the date the liability was incurred
to
the date of adoption), an asset retirement cost of $16 million (recorded as
part of the carrying amount of the related long-lived asset), and accumulated
depreciation of $12 million. FirstEnergy charged
regulatory
liabilities for $5 million upon adoption of FIN 47 for the transition
amounts related to establishing the ARO for asbestos removal from substation
control rooms and service center buildings for OE, Penn, CEI, TE and JCP&L.
The remaining cumulative effect adjustment for unrecognized depreciation and
accretion of $48 million was charged to income ($30 million, net of
tax), or $0.09 per share of common stock (basic and diluted share) for the
year
ended December 31, 2005. (See Note 12.)
As
a result of
adopting SFAS 143 in January 2003, FirstEnergy recorded a $175 million
increase to income, $102 million net of tax, or $0.33 per share of common
stock (basic and diluted) in the year ended December 31, 2003. Upon
adoption of the accounting standard, FirstEnergy reversed accrued nuclear plant
decommissioning costs of $1.24 billion and recorded an ARO of
$1.11 billion, including accumulated accretion of $507 million for the
period from the date the liability was incurred to the date of adoption.
FirstEnergy also recorded asset retirement costs of $602 million as part of
the carrying amount of the related long-lived asset and accumulated depreciation
of $415 million. FirstEnergy recognized a regulatory liability of
$185 million for the transition amounts subject to refund through rates
related to the ARO for nuclear decommissioning. The cumulative effect adjustment
also included the reversal of $60 million of accumulated estimated removal
costs for non-regulated generation assets.
61
|
(L)
|
INCOME
TAXES
|
Details
of the total
provision for income taxes are shown on the Consolidated Statements of Taxes.
FirstEnergy records income taxes in accordance with the liability method of
accounting. Deferred income taxes reflect the net tax effect of temporary
differences between the carrying amounts of assets and liabilities for financial
reporting purposes and loss carryforwards and the amounts recognized for tax
purposes. Investment tax credits, which were deferred when utilized, are being
amortized over the recovery period of the related property. Deferred income
tax
liabilities related to tax and accounting basis differences and tax credit
carryforward items are recognized at the statutory income tax rates in effect
when the liabilities are expected to be paid. Deferred tax assets are recognized
based on income tax rates expected to be in effect when they are settled. (See
Note 9 for Ohio Tax Legislation discussion.)
FirstEnergy
has
certain tax returns that are under review at the audit or appeals level of
the
IRS and certain state authorities. Since reserves have been recorded, final
settlements of these audits are not expected to have a material adverse effect
on FirstEnergy’s financial condition or result of operations.
FirstEnergy
has
capital loss carryforwards of approximately $1 billion, most of which
expire in 2007. The deferred tax assets associated with these capital loss
carryforwards ($354 million) are fully offset by a valuation allowance as
of December 31, 2005, since management is unable to predict whether
sufficient capital gains will be generated to utilize all of these capital
loss
carryforwards. Any ultimate utilization of capital loss carryforwards for which
valuation allowances were established through purchase accounting would adjust
goodwill. During 2005 the valuation allowance was reduced by $13 million
due to the utilization of capital loss carryforwards to offset realized capital
gains, resulting in an adjustment to goodwill.
Valuation
allowances
also include $48 million for deferred tax assets associated with impairment
losses related to certain domestic assets.
FirstEnergy
has net
operating loss carry forwards for state and local income tax purposes of
approximately $766 million. The associated deferred tax assets are $15
million. These losses expire as follows:
|
Expiration
Period
|
Amount
|
|||
|
(In
millions)
|
||||
|
2006-2010
|
$
|
277
|
||
|
2011-2015
|
34
|
|||
|
2016-2020
|
178
|
|||
|
2021-2024
|
277
|
|||
|
$
|
766
|
|||
3. PENSION
AND
OTHER POSTRETIREMENT BENEFIT PLANS
FirstEnergy
provides
noncontributory defined benefit pension plans that cover substantially all
of
its employees. The trusteed plans provide defined benefits based on years of
service and compensation levels. The Company's funding policy is based on
actuarial computations using the projected unit credit method. In the fourth
quarter of 2005, FirstEnergy made a $500 million voluntary cash
contribution to its qualified pension plan. Projections indicated that absent
this funding, cash contributions would have been required at some point prior
to
2010. Pre-funding the pension plan is expected to eliminate this future funding
requirement under current pension funding rules and should also minimize
FirstEnergy's exposure to any funding requirements resulting from proposed
pension reform.
FirstEnergy
provides
a minimum amount of noncontributory life insurance to retired employees in
addition to optional contributory insurance. Health care benefits, which include
certain employee contributions, deductibles and co-payments, are also available
upon retirement to employees hired prior to January 1, 2005, their
dependents and, under certain circumstances, their survivors. The Company
recognizes the expected cost of providing other postretirement benefits to
employees and their beneficiaries and covered dependents from the time employees
are hired until they become eligible to receive those benefits. In addition,
FirstEnergy has obligations to former or inactive employees after employment,
but before retirement for disability related benefits.
Pension
and OPEB
costs are affected by employee demographics (including age, compensation levels,
and employment periods), the level of contributions made to the plans and
earnings on plan assets. Such factors may be further affected by business
combinations which impact employee demographics, plan experience and other
factors. Pension and OPEB costs may also be affected by changes in key
assumptions, including anticipated rates of return on plan assets, the discount
rates and health care trend rates used in determining the projected benefit
obligations and pension and OPEB costs. FirstEnergy uses a December 31
measurement date for most of its plans.
62
|
Obligations
and Funded Status
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||
|
As
of
December 31
|
2005
|
2004
|
2005
|
2004
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Change
in benefit obligation
|
|||||||||||||
|
Benefit
obligation as of January 1
|
$
|
4,364
|
$
|
4,162
|
$
|
1,930
|
$
|
2,368
|
|||||
|
Service
cost
|
77
|
77
|
40
|
36
|
|||||||||
|
Interest
cost
|
254
|
252
|
111
|
112
|
|||||||||
|
Plan
participants’ contributions
|
-
|
-
|
18
|
14
|
|||||||||
|
Plan
amendments
|
15
|
-
|
(312
|
)
|
(281
|
)
|
|||||||
|
Actuarial
(gain) loss
|
310
|
134
|
197
|
(211
|
)
|
||||||||
|
Benefits
paid
|
(270
|
)
|
(261
|
)
|
(100
|
)
|
(108
|
)
|
|||||
|
Benefit
obligation as of December 31
|
$
|
4,750
|
$
|
4,364
|
$
|
1,884
|
$
|
1,930
|
|||||
|
Change
in fair value of plan assets
|
|||||||||||||
|
Fair
value of
plan assets as of January 1
|
$
|
3,969
|
$
|
3,315
|
$
|
564
|
$
|
537
|
|||||
|
Actual
return
on plan assets
|
325
|
415
|
33
|
57
|
|||||||||
|
Company
contribution
|
500
|
500
|
58
|
64
|
|||||||||
|
Plan
participants’ contribution
|
-
|
-
|
18
|
14
|
|||||||||
|
Benefits
paid
|
(270
|
)
|
(261
|
)
|
(100
|
)
|
(108
|
)
|
|||||
|
Fair
value of
plan assets as of December 31
|
$
|
4,524
|
$
|
3,969
|
$
|
573
|
$
|
564
|
|||||
|
Funded
status
|
$
|
(226
|
)
|
$
|
(395
|
)
|
$
|
(1,311
|
)
|
$
|
(1,366
|
)
|
|
|
Unrecognized
net actuarial loss
|
1,179
|
885
|
899
|
730
|
|||||||||
|
Unrecognized
prior service cost (benefit)
|
70
|
63
|
(645
|
)
|
(378
|
)
|
|||||||
|
Net
asset
(liability) recognized
|
$
|
1,023
|
$
|
553
|
$
|
(1,057
|
)
|
$
|
(1,014
|
)
|
|||
|
Amounts
Recognized in the
|
|||||||||||||
|
Consolidated
Balance Sheets
|
|||||||||||||
|
As
of
December 31
|
|||||||||||||
|
Prepaid
benefit cost
|
$
|
1,023
|
$
|
-
|
$
|
-
|
$
|
-
|
|||||
|
Accrued
benefit cost
|
-
|
(14
|
)
|
(1,057
|
)
|
(1,014
|
)
|
||||||
|
Intangible
assets
|
-
|
63
|
-
|
-
|
|||||||||
|
Accumulated
other comprehensive loss
|
-
|
504
|
-
|
-
|
|||||||||
|
Net
amount
recognized
|
$
|
1,023
|
$
|
553
|
$
|
(1,057
|
)
|
$
|
(1,014
|
)
|
|||
|
Decrease
in
minimum liability
|
|||||||||||||
|
included
in
other comprehensive income
|
|||||||||||||
|
(net
of
tax)
|
$
|
(295
|
)
|
$
|
(4
|
)
|
-
|
-
|
|||||
|
Assumptions
Used to Determine
|
|||||||||||||
|
Benefit
Obligations As of December 31
|
|||||||||||||
|
Discount
rate
|
5.75
|
%
|
6.00
|
%
|
5.75
|
%
|
6.00
|
%
|
|||||
|
Rate
of
compensation increase
|
3.50
|
%
|
3.50
|
%
|
|||||||||
|
Allocation
of Plan Assets
|
|||||||||||||
|
As
of
December 31
|
|||||||||||||
|
Asset
Category
|
|||||||||||||
|
Equity
securities
|
63
|
%
|
68
|
%
|
71
|
%
|
74
|
%
|
|||||
|
Debt
securities
|
33
|
29
|
27
|
25
|
|||||||||
|
Real
estate
|
2
|
2
|
-
|
-
|
|||||||||
|
Cash
|
2
|
1
|
2
|
1
|
|||||||||
|
Total
|
100
|
%
|
100
|
%
|
100
|
%
|
100
|
%
|
|||||
|
Information
for Pension Plans With an
|
|||||||
|
Accumulated
Benefit Obligation in
|
|||||||
|
Excess
of Plan Assets
|
2005
|
2004
|
|||||
|
(In
millions)
|
|||||||
|
Projected
benefit obligation
|
$
|
4,750
|
$
|
4,364
|
|||
|
Accumulated
benefit obligation
|
4,327
|
3,983
|
|||||
|
Fair
value of
plan assets
|
4,524
|
3,969
|
|||||
63
|
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||||||||
|
Components
of Net Periodic Benefit Costs
|
2005
|
2004
|
2003
|
2005
|
2004
|
2003
|
|||||||||||||
|
|
(In
millions)
|
||||||||||||||||||
|
Service
cost
|
$
|
77
|
$
|
77
|
$
|
66
|
$
|
40
|
$
|
36
|
$
|
43
|
|||||||
|
Interest
cost
|
254
|
252
|
253
|
111
|
112
|
137
|
|||||||||||||
|
Expected
return on plan assets
|
(345
|
)
|
(286
|
)
|
(248
|
)
|
(45
|
)
|
(44
|
)
|
(43
|
)
|
|||||||
|
Amortization
of prior service cost
|
8
|
9
|
9
|
(45
|
)
|
(40
|
)
|
(9
|
)
|
||||||||||
|
Amortization
of transition obligation
|
-
|
-
|
-
|
-
|
-
|
9
|
|||||||||||||
|
Recognized
net
actuarial loss
|
36
|
39
|
62
|
40
|
39
|
40
|
|||||||||||||
|
Net
periodic
cost
|
$
|
30
|
$
|
91
|
$
|
142
|
$
|
101
|
$
|
103
|
$
|
177
|
|||||||
|
|
|||||||||||||||||||
|
Weighted-Average
Assumptions Used
|
|||||||||||||||||||
|
to
Determine Net Periodic Benefit Cost
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||||||||
|
for
Years Ended December 31
|
2005
|
2004
|
2003
|
2005
|
2004
|
2003
|
|||||||||||||
|
Discount
rate
|
6.00
|
%
|
6.25
|
%
|
6.75
|
%
|
6.00
|
%
|
6.25
|
%
|
6.75
|
%
|
|||||||
|
Expected
long-term return on plan assets
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
|||||||
|
Rate
of
compensation increase
|
3.50
|
%
|
3.50
|
%
|
3.50
|
%
|
|||||||||||||
In
selecting an
assumed discount rate, FirstEnergy considers currently available rates of return
on high-quality fixed income investments expected to be available during the
period to maturity of the pension and other postretirement benefit obligations.
The assumed rates of return on pension plan assets consider historical market
returns and economic forecasts for the types of investments held by the
Company's pension trusts. The long-term rate of return is developed considering
the portfolio’s asset allocation strategy.
FirstEnergy
employs
a total return investment approach whereby a mix of equities and fixed income
investments are used to maximize the long-term return on plan assets for a
prudent level of risk. Risk tolerance is established through careful
consideration of plan liabilities, plan funded status, and corporate financial
condition. The investment portfolio contains a diversified blend of equity
and
fixed-income investments. Furthermore, equity investments are diversified across
U.S. and non-U.S. stocks, as well as growth, value, and small and large
capitalization funds. Other assets such as real estate are used to enhance
long-term returns while improving portfolio diversification. Derivatives may
be
used to gain market exposure in an efficient and timely manner; however,
derivatives are not used to leverage the portfolio beyond the market value
of
the underlying investments. Investment risk is measured and monitored on a
continuing basis through periodic investment portfolio reviews, annual liability
measurements, and periodic asset/liability studies.
|
Assumed
Health Care Cost Trend Rates
|
|||||||
|
As
of
December 31
|
2005
|
2004
|
|||||
|
Health
care
cost trend rate assumed for next
|
|||||||
|
year
(pre/post-Medicare)
|
9-11
|
%
|
9-11
|
%
|
|||
|
Rate
to which
the cost trend rate is assumed to
|
|||||||
|
decline
(the
ultimate trend rate)
|
5
|
%
|
5
|
%
|
|||
|
Year
that the
rate reaches the ultimate trend
|
|||||||
|
rate
(pre/post-Medicare)
|
2010-2012
|
2009-2011
|
|||||
Assumed
health care
cost trend rates have a significant effect on the amounts reported for the
health care plans. A one-percentage-point change in assumed health care cost
trend rates would have the following effects:
|
1-Percentage-
|
1-Percentage-
|
||||||
|
Point
Increase
|
Point
Decrease
|
||||||
|
(In
millions)
|
|||||||
|
Effect
on
total of service and interest cost
|
$
|
23
|
$
|
(19
|
)
|
||
|
Effect
on
accumulated postretirement benefit obligation
|
$
|
239
|
$
|
(209
|
)
|
||
As
a result of its
voluntary contribution and the increased market value of pension plan assets,
FirstEnergy recognized a prepaid benefit cost of $1 billion as of
December 31, 2005. As prescribed by SFAS 87, FirstEnergy eliminated
its additional minimum liability of $567 million and its intangible asset
of $63 million. In addition, the entire AOCL balance was credited by
$295 million (net of $208 million of deferred taxes) as the fair value
of trust assets exceeded the accumulated benefit obligation as of
December 31, 2005.
64
Taking
into account
estimated employee future service, FirstEnergy expects to make the following
benefit payments from plan assets:
|
Pension
|
Other
|
||||||||||||
|
Benefits
|
Benefits
|
||||||||||||
|
(In
millions)
|
|||||||||||||
|
2006
|
$ |
|
228
|
$ |
|
106
|
|||||||
|
2007
|
228
|
109
|
|||||||||||
|
2008
|
236
|
112
|
|||||||||||
|
2009
|
247
|
115
|
|||||||||||
|
2010
|
264
|
119
|
|||||||||||
|
Years
2011-
2015
|
1,531
|
642
|
|||||||||||
FirstEnergy
also
maintains two unfunded benefit plans, an Executive Deferred Compensation Plan
(EDCP) and Supplemental Executive Retirement Plan (SERP) under which
non-qualified supplemental pension benefits are paid to certain employees in
addition to amounts received under the Company’s qualified retirement plan,
which is subject to IRS limitations on covered compensation. See Note
4(C) for a discussion regarding the stock compensation component of the
EDCP. The net periodic pension cost of these plans was $16 million for the
year
ended 2005 and $14 million for the years ended 2004 and 2003. The projected
benefit obligation and the unfunded status was $161 million and $139 million
as
of December 31, 2005 and 2004, respectively. The net liability recognized was
$254 million and $222 million as of December 31, 2005 and 2004, respectively,
and is included in the caption “retirement benefits” on the Consolidated Balance
Sheets. The benefit payments, which reflect future service, as appropriate,
are
expected to be $7 million for each of the years ended 2006-2009, $8 million
in year ended 2010 and $53 million for years ended 2011-2015.
4. STOCK-BASED
COMPENSATION PLANS
FirstEnergy
has four
stock-based compensation programs: Long-term Incentive Program (LTIP); EDCP;
Employee Stock Ownership Plan (ESOP); and Deferred Compensation Plan for Outside
Directors (DCPD). FirstEnergy has also assumed responsibility for several
stock-based plans through acquisitions. In 2001, FirstEnergy assumed
responsibility for two stock-based plans as a result of its acquisition of
GPU.
No further stock-based compensation can be awarded under GPU’s Stock Option and
Restricted Stock Plan for MYR Group Inc. Employees (MYR Plan) or 1990 Stock
Plan
for Employees of GPU, Inc. and Subsidiaries (GPU Plan). All options and
restricted stock under both plans have been converted into FirstEnergy options
and restricted stock. Options under the GPU Plan became fully vested on
November 7, 2001, and will expire on or before June 1, 2010. Under the
MYR Plan, all options and restricted stock maintained their original vesting
periods, which range from one to four years, and will expire on or before
December 17, 2006. The Centerior Equity Plan (CE Plan) is an additional
stock-based plan administered by FirstEnergy for which it assumed responsibility
as a result of the acquisition of Centerior Energy Corporation in 1997. All
options are fully vested under the CE Plan, and no further awards are permitted.
Outstanding options will expire on or before February 25, 2007.
|
(A)
|
LTIP
|
FirstEnergy’s
LTIP
includes four stock-based compensation programs - restricted stock, restricted
stock units, stock options, and performance shares. During 2005, FirstEnergy
began issuing restricted stock units and reduced its use of stock
options.
Under
FirstEnergy’s
LTIP, total awards cannot exceed 22.5 million shares of common stock or their
equivalent. Only stock options, restricted stock and restricted stock units
have
currently been designated to pay out in common stock, with vesting periods
ranging from two months to ten years. Performance share awards are currently
designated to be paid in cash rather than common stock and therefore do not
count against the limit on stock-based awards. As of December 31, 2005,
3.9 million shares were available for future awards.
Restricted
Stock
and Restricted Stock Units
Eligible
employees
receive awards of FirstEnergy common stock or stock units subject to
restrictions. Those restrictions lapse over a defined period of time or based
on
performance. Dividends are received on the restricted stock and are reinvested
in additional shares. Restricted common stock grants under the FE Plan were
as
follows:
|
2005
|
2004
|
2003*
|
||||||||
|
Restricted
common shares granted
|
356,200
|
62,370
|
||||||||
|
Weighted
average market price
|
$
|
41.52
|
$
|
40.69
|
||||||
|
Weighted
average vesting period (years)
|
5.4
|
2.7
|
||||||||
|
Dividends
restricted
|
Yes
|
Yes
|
||||||||
*
No restricted
stock was granted.
65
There
are two types
of restricted stock unit awards -- discretionary-based and performance-based.
With the discretionary-based, the Company grants the right to receive, at the
end of the period of restriction, a number of shares of common stock of
FirstEnergy equal to the number of restricted stock units set forth in each
agreement. With performance-based, FirstEnergy grants the right to receive,
at
the end of the period of restriction, a number of shares of common stock of
FirstEnergy equal to the number of restricted stock units set forth in the
agreement subject to adjustment based on FirstEnergy’s stock performance.
Restricted stock units granted in 2005 were 477,920 with a weighted average
vesting period of 3.32 years.
Compensation
expense
recognized for restricted stock and restricted stock units during 2005
approximated $10 million. Compensation expense recognized for restricted
stock during 2004 and 2003 totaled $2 million in each year.
Stock
Options
Stock
options were
granted to eligible employees allowing them to purchase a specified number
of
common shares at a fixed grant price over a defined period of time. Stock option
activities under the FE Programs for the past three years were as follows:
|
Weighted
|
|||||||
|
Number
|
Average
|
||||||
|
of
|
Exercise
|
||||||
|
Stock
Option Activities
|
Options
|
Price
|
|||||
|
Balance,
January 1, 2003
|
10,435,486
|
$
|
28.95
|
||||
|
(1,400,206
options exercisable)
|
26.07
|
||||||
|
Options
granted
|
3,981,100
|
29.71
|
|||||
|
Options
exercised
|
455,986
|
25.94
|
|||||
|
Options
forfeited
|
311,731
|
29.09
|
|||||
|
Balance,
December 31, 2003
|
13,648,869
|
29.27
|
|||||
|
(1,919,662
options exercisable)
|
29.67
|
||||||
|
Options
granted
|
3,373,459
|
38.77
|
|||||
|
Options
exercised
|
3,622,148
|
26.52
|
|||||
|
Options
forfeited
|
167,425
|
32.58
|
|||||
|
Balance,
December 31, 2004
|
13,232,755
|
32.40
|
|||||
|
(3,175,023
options exercisable)
|
29.07
|
||||||
|
Options
granted
|
-
|
-
|
|||||
|
Options
exercised
|
4,140,893
|
29.79
|
|||||
|
Options
forfeited
|
225,606
|
34.37
|
|||||
|
Balance,
December 31, 2005
|
8,866,256
|
33.57
|
|||||
|
(4,090,829
options exercisable)
|
31.97
|
||||||
Options
outstanding
by plan and range of exercise price as of December 31, 2005 were as
follows:
|
Options
Outstanding
|
Options
Exercisable
|
||||||||||||||||||
|
Weighted
|
Weighted
|
||||||||||||||||||
|
Range
of
|
Average
|
Remaining
|
Average
|
||||||||||||||||
|
FE
Program
|
Exercise
Prices
|
Shares
|
Exercise
Price
|
Contractual
Life
|
Shares
|
Exercise
Price
|
|||||||||||||
|
FE
plan
|
$
|
19.31
- $29.87
|
3,828,991
|
$
|
29.13
|
6.4
|
2,114,691
|
$
|
28.66
|
||||||||||
|
$
|
30.17
-
$39.46
|
4,912,141
|
$
|
37.10
|
7.4
|
1,851,014
|
$
|
35.84
|
|||||||||||
|
GPU
plan
|
$
|
23.75
- $35.92
|
122,818
|
$
|
30.99
|
3.3
|
122,818
|
$
|
30.99
|
||||||||||
|
MYR
plan
|
$
|
14.23
|
1,256
|
$
|
14.23
|
3.8
|
1,256
|
$
|
14.23
|
||||||||||
|
CE
plan
|
$
|
25.14
|
1,050
|
$
|
25.14
|
1.2
|
1,050
|
$
|
25.14
|
||||||||||
|
Total
|
8,866,256
|
$
|
33.57
|
6.9
|
4,090,829
|
$
|
31.97
|
||||||||||||
There
were no stock
options granted in 2005. The weighted average fair value of options granted
in
2004 and 2003 are estimated below using the Black-Scholes option-pricing model
and the following assumptions:
|
|
2004
|
2003
|
|||||
|
Fair
value per
option
|
$
|
6.72
|
$
|
5.09
|
|||
|
Weighted
average valuation assumptions:
|
|
|
|||||
|
Expected
option term (years)
|
7.6
|
7.9
|
|||||
|
Expected
volatility
|
26.25
|
%
|
26.91
|
%
|
|||
|
Expected
dividend yield
|
3.88
|
%
|
5.09
|
%
|
|||
|
Risk-free
interest rate
|
1.99
|
%
|
3.67
|
%
|
|||
66
Compensation
expense
for FirstEnergy stock options is based on intrinsic value, which equals any
positive difference between FirstEnergy's common stock price on the option's
grant date and the option's exercise price. The exercise prices of all stock
options granted in 2004 and 2003 equaled the market price of FirstEnergy's
common stock on the options' grant dates. If fair value accounting were applied
to FirstEnergy's stock options, net income and earnings per share would be
reduced as summarized below.
|
2005
|
2004
|
2003
|
||||||||||||||
|
(In
millions, except per share amounts)
|
||||||||||||||||
|
Net
Income, as
reported
|
$
|
861
|
$ |
|
878
|
$ |
|
423
|
||||||||
|
Add
back
compensation expense
|
||||||||||||||||
|
reported
in
net income, net of tax
|
||||||||||||||||
|
(based
on APB
25)*
|
32
|
21
|
24
|
|||||||||||||
|
Deduct
compensation expense based
|
||||||||||||||||
|
upon
estimated
fair value, net of tax*
|
(39
|
)
|
(35
|
)
|
(36
|
)
|
||||||||||
|
Pro
forma net
income
|
$
|
854
|
$ |
|
864
|
$ |
|
411
|
||||||||
|
Earnings
Per
Share of Common Stock -
|
||||||||||||||||
|
Basic
|
||||||||||||||||
|
As
Reported
|
$
|
2.62
|
$
|
2.68
|
$ |
|
1.39
|
|||||||||
|
Pro
Forma
|
$
|
2.60
|
$
|
2.64
|
$ |
|
1.35
|
|||||||||
|
Diluted
|
||||||||||||||||
|
As
Reported
|
$
|
2.61
|
$
|
2.67
|
$ |
|
1.39
|
|||||||||
|
Pro
Forma
|
$
|
2.59
|
$
|
2.63
|
$ |
|
1.35
|
|||||||||
*
Includes restricted stock, restricted stock units, stock options, performance
shares, ESOP, EDCP and DCPD.
As
noted above,
FirstEnergy reduced its use of stock options beginning in 2005 and increased
its
use of performance-based, restricted stock units. FirstEnergy has not
accelerated out-of-the-money options in anticipation of adopting SFAS 123(R)
on
January 1, 2006 (see Note 17). As
a result, all
currently unvested stock options will vest by 2008. The Company expects the
adoption of SFAS 123(R) will increase annual compensation expense (after-tax)
by
approximately $7 million, $2 million and $0.5 million in 2006, 2007
and 2008, respectively,
or
$0.02 per share in 2006 and less than $0.01 per share in 2007 and 2008.
Performance
Shares
Performance
shares
are share equivalents and do not have voting rights. The shares track the
performance of FirstEnergy's common stock over a three-year vesting period.
During that time, dividend equivalents are converted into additional shares.
The
final account value may be adjusted based on the ranking of FirstEnergy stock
performance to a composite of peer companies. Compensation expense recognized
for performance shares during 2005, 2004 and 2003 totaled approximately
$7 million, $5 million and $7 million, respectively.
(B) ESOP
An
ESOP Trust funds
most of the matching contribution for FirstEnergy's 401(k) savings plan. All
full-time employees eligible for participation in the 401(k) savings plan are
covered by the ESOP. The ESOP borrowed $200 million from OE and acquired
10,654,114 shares of OE's common stock (subsequently converted to FirstEnergy
common stock) through market purchases. Dividends on ESOP shares are used to
service the debt. Shares are released from the ESOP on a pro rata basis as
debt
service payments are made.
In
determining the
amount of borrowing under the ESOP, assumptions were made including the size
and
growth rate of the Company's workforce, earnings, dividends, and trading price
of common stock. In 2005, the ESOP loan was refinanced ($66 million
principal amount) and its term was extended by three years. In 2005, 2004 and
2003, 588,004 shares, 864,151 shares and 1,069,318 shares, respectively, were
allocated to employees with the corresponding expense recognized based on the
shares allocated method. The fair value of 1,444,796 shares unallocated as
of
December 31, 2005 was approximately $71 million. Total ESOP-related
compensation expense was calculated as follows:
|
2005
|
2004
|
2003
|
||||||||
|
(In
millions)
|
||||||||||
|
Base
compensation
|
$
|
39
|
$
|
32
|
$
|
35
|
||||
|
Dividends
on
common stock held by the
ESOP
and used
to service debt
|
(10
|
)
|
(9
|
)
|
(9
|
)
|
||||
|
Net
expense
|
$
|
29
|
$
|
23
|
$
|
26
|
||||
67
(C) EDCP
Under
the EDCP,
covered employees can direct a portion of their compensation, including annual
incentive awards and/or long-term incentive awards, into an unfunded FirstEnergy
stock account to receive vested stock units or into an unfunded retirement
cash
account. An additional 20% premium is received in the form of stock units based
on the amount allocated to the FirstEnergy stock account. Dividends are
calculated quarterly on stock units outstanding and are paid in the form of
additional stock units. Upon withdrawal, stock units are converted to
FirstEnergy shares. Payout typically occurs three years from the date of
deferral; however, an election can be made in the year prior to payout to
further defer shares into a retirement stock account that will pay out in cash
upon retirement (see Note 3). Interest is calculated on the cash allocated
to
the cash account and the total balance will pay out in cash upon retirement.
Of
the 1.3 million EDCP stock units authorized, 678,503 stock units were
available for future awards as of December 31, 2005. Compensation expense
recognized on EDCP stock units in 2005, 2004 and 2003 approximated
$5 million, $2 million and $2 million, respectively.
|
(D)
|
DCPD
|
Under
the DCPD,
directors can elect to allocate all or a portion of their cash retainers,
meeting fees and chair fees to deferred stock or deferred cash accounts. If
the
funds are deferred into the stock account, a 20% match is added to the funds
allocated. The 20% match and any appreciation on it are forfeited if the
director leaves the Board within three years from the date of deferral for
any
reason other than retirement, disability, death, upon a change in control,
or
when a director is ineligible to stand for re-election. Compensation expense
is
recognized for the 20% match over the three-year vesting period. Directors
may
also elect to defer their equity retainers into the deferred stock account;
however, they do not receive a 20% match on that deferral. DCPD expenses
recognized in 2005, 2004 and 2003 were approximately $3 million,
$4 million and $2 million, respectively. The net liability recognized
was $5 million and $3 million as of December 31, 2005 and 2004, respectively,
and is included in the caption “retirement benefits” on the Consolidated Balance
Sheets.
5. FAIR
VALUE
OF FINANCIAL INSTRUMENTS
Long-term
Debt and Other Long-term Obligations
All
borrowings with
initial maturities of less than one year are defined as short-term financial
instruments under GAAP and are reported on the Consolidated Balance Sheets
at
cost in the caption "short-term borrowings", which approximates their fair
market value. The following table provides the approximate fair value and
related carrying amounts of long-term debt and other long-term obligations
(including currently payable) as of December 31:
|
2005
|
2004
|
||||||||||||
|
Carrying
|
Fair
|
Carrying
|
Fair
|
||||||||||
|
Value
|
Value
|
Value
|
Value
|
||||||||||
|
(In
millions)
|
|||||||||||||
|
Long-term
debt
|
$
|
10,097
|
$
|
10,576
|
$
|
10,787
|
$
|
11,341
|
|||||
|
Subordinated
debentures to affiliated trusts
|
103
|
140
|
103
|
112
|
|||||||||
|
Preferred
stock subject to mandatory redemption
|
-
|
-
|
17
|
16
|
|||||||||
|
$
|
10,200
|
$
|
10,716
|
$
|
10,907
|
$
|
11,469
|
||||||
The
fair values of
long-term debt and other long-term obligations reflect the present value of
the
cash outflows relating to those securities based on the current call price,
the
yield to maturity or the yield to call, as deemed appropriate at the end of
each
respective year. The yields assumed were based on securities with similar
characteristics offered by corporations with credit ratings similar to the
Companies' ratings.
Investments
The
carrying amounts
of cash and cash equivalents approximate fair value due to the short-term nature
of these investments. The following table provides the approximate fair value
and related carrying amounts of investments other than cash and cash equivalents
as of December 31:
|
2005
|
2004
|
||||||||||||
|
Carrying
|
Fair
|
Carrying
|
Fair
|
||||||||||
|
Value
|
Value
|
Value
|
Value
|
||||||||||
|
(In
millions)
|
|||||||||||||
|
Debt
securities:(1)
|
|||||||||||||
|
-Government
obligations
|
$
|
893
|
$
|
887
|
$
|
797
|
$
|
797
|
|||||
|
-Corporate
debt
securities(2)
|
1,137
|
1,248
|
1,205
|
1,362
|
|||||||||
|
-Mortgage-backed
securities
|
-
|
-
|
2
|
2
|
|||||||||
|
2,030
|
2,135
|
2,004
|
2,161
|
||||||||||
|
Equity
securities(1)
|
1,129
|
1,130
|
1,033
|
1,033
|
|||||||||
|
$
|
3,159
|
$
|
3,265
|
$
|
3,037
|
$
|
3,194
|
||||||
|
(1)
|
Includes
nuclear decommissioning, nuclear fuel disposal and NUG trust
investments.
|
|
(2)
|
Includes
investments in lease obligation bonds (see Note
6).
|
68
The
fair value of
investments other than cash and cash equivalents represent cost (which
approximates fair value) or the present value of the cash inflows based on
the
yield to maturity. The yields assumed were based on financial instruments with
similar characteristics and terms.
Investments
other
than cash and cash equivalents include held-to-maturity securities and
available-for-sale securities. Decommissioning trust investments are classified
as available-for-sale. The Companies and NGC have no securities held for trading
purposes. The following table summarizes the amortized cost basis, unrealized
gains and losses and fair values for decommissioning trust investments as of
December 31:
|
2005
|
2004
|
||||||||||||||||||||||||
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
||||||||||||||||||
|
Basis
|
Gains
|
Losses
|
Value
|
Basis
|
Gains
|
Losses
|
Value
|
||||||||||||||||||
|
(In
millions)
|
|||||||||||||||||||||||||
|
Debt
securities
|
$
|
681
|
$
|
12
|
$
|
7
|
$
|
686
|
$
|
616
|
$
|
19
|
$
|
3
|
$
|
632
|
|||||||||
|
Equity
securities
|
898
|
190
|
21
|
1,067
|
763
|
207
|
19
|
951
|
|||||||||||||||||
|
$
|
1,579
|
$
|
202
|
$
|
28
|
$
|
1,753
|
$
|
1,379
|
$
|
226
|
$
|
22
|
$
|
1,583
|
||||||||||
Proceeds
from the
sale of decommissioning trust investments, realized gains and losses on those
sales, and interest and dividend income for the three years ended
December 31, 2005 were as follows:
|
2005
|
2004
|
2003
|
||||||||
|
(In
millions)
|
||||||||||
|
Proceeds
from
sales
|
$
|
1,419
|
$
|
1,234
|
$
|
758
|
||||
|
Realized
gains
|
133
|
144
|
38
|
|||||||
|
Realized
losses
|
58
|
43
|
32
|
|||||||
|
Interest
and
dividend income
|
49
|
45
|
37
|
|||||||
The
following table
provides the fair value of, and unrealized losses on, nuclear decommissioning
trust investments that are deemed to be temporarily impaired as of
December 31, 2005:
|
Less
Than 12 Months
|
12
Months or More
|
Total
|
|||||||||||||||||
|
Fair
|
Unrealized
|
Fair
|
Unrealized
|
Fair
|
Unrealized
|
||||||||||||||
|
Value
|
Losses
|
Value
|
Losses
|
Value
|
Losses
|
||||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
Debt
securities
|
$
|
276
|
$
|
5
|
$
|
81
|
$
|
2
|
$
|
357
|
$
|
7
|
|||||||
|
Equity
securities
|
240
|
10
|
39
|
11
|
279
|
21
|
|||||||||||||
|
$
|
516
|
$
|
15
|
$
|
120
|
$
|
13
|
$
|
636
|
$
|
28
|
||||||||
The
Companies and
NGC periodically evaluate the securities held by their nuclear decommissioning
trusts for other-than-temporary impairment. FirstEnergy considers the length
of
time and the extent to which the security's fair value has been less than its
cost basis and other factors to determine whether impairment is other than
temporary. Unrealized gains and losses applicable to OE's, TE's and the majority
of NGC's decommissioning trusts are recognized in OCI in accordance with SFAS
115, as fluctuations in fair value will eventually affect earnings. The
decommissioning trusts of JCP&L, Met-Ed and Penelec are subject to
regulatory accounting in accordance with SFAS 71. Net unrealized gains and
losses are recorded as regulatory assets or liabilities since the difference
between investments held in trust and the decommissioning liabilities will
be
recovered from or refunded to customers.
The
investment
policy for the nuclear decommissioning trust funds restricts or limits the
ability to hold certain types of assets including private or direct placements,
warrants, securities of FirstEnergy, investments in companies owning nuclear
power plants, financial derivatives, preferred stocks, securities convertible
into common stock and securities of the trust fund's custodian or managers
and
their parents or subsidiaries.
Derivatives
FirstEnergy
is
exposed to financial risks resulting from the fluctuation of interest rates
and
commodity prices, including prices for electricity, natural gas, coal and energy
transmission. To manage the volatility relating to these exposures, FirstEnergy
uses a variety of non-derivative and derivative instruments, including forward
contracts, options, futures contracts and swaps. The derivatives are used
principally for hedging purposes. FirstEnergy's Risk Policy Committee, comprised
of members of senior management, provides general management oversight to risk
management activities throughout the Company. They are responsible for promoting
the effective design and implementation of sound risk management programs.
They
also oversee compliance with corporate risk management policies and established
risk management practices.
69
FirstEnergy
accounts
for derivative instruments on its Consolidated Balance Sheet at their fair
value
unless they meet the normal purchase and normal sales criteria. Derivatives
that
meet the normal purchase and sales criteria are accounted for on the accrual
basis. The changes in the fair value of derivative instruments that do not
meet
the normal purchase and sales criteria are recorded in current earnings, in
AOCL, or as part of the value of the hedged item, depending on whether or not
it
is designated as part of a hedge transaction, the nature of the hedge
transaction and hedge effectiveness.
FirstEnergy's
primary ongoing hedging activities involves cash flow hedges of electricity
and
natural gas purchases and anticipated interest payments associated with future
debt issuances. The effective portion of such hedges is initially recorded
in
equity as AOCL and is subsequently recorded in net income, as an operating
expense, when the underlying hedged commodities are delivered or interest
payments are made. AOCL as of December 31, 2005 includes a net deferred
loss of $78 million for derivative hedging activity. The $14 million
decrease from the December 31, 2004 balance of $92 million includes $2
million reduction related to current hedging activity and a $12 million
decrease due to net hedge losses included in earnings during the year.
Approximately $17 million (after tax) of the current net deferred loss on
derivative instruments in AOCL is expected to be reclassified to earnings during
the next twelve months as hedged transactions occur. The fair value of these
derivative instruments will continue to fluctuate from period to period based
on
various market factors. Gains and losses from any ineffective portion of the
cash flow hedge are recorded directly to earnings. The impact of ineffectiveness
on earnings during 2005 and 2004 was not material.
FirstEnergy
entered
into interest rate derivative transactions in 2001 to hedge a portion of the
anticipated interest payments on debt related to the GPU acquisition. Gains
and
losses from hedges of anticipated interest payments on acquisition debt are
included in net income, as a component of interest expense, over the periods
that hedged interest payments are made - 5, 10 and 30 years. In 2005, a $24
million loss was amortized to interest expense.
FirstEnergy
has
entered into fixed-for-floating interest rate swap agreements, whereby
FirstEnergy receives fixed cash flows based on the fixed coupons of the hedged
securities and pays variable cash flows based on short-term variable market
interest rates (3 and 6-month LIBOR indices). These derivatives are treated
as
fair value hedges of fixed-rate, long-term debt issues - protecting against
the
risk of changes in the fair value of fixed-rate debt instruments due to lower
interest rates. Swap maturities, fixed interest rates received, and interest
payment dates match those of the underlying obligations. During 2005,
FirstEnergy entered into interest rate swap agreements on $150 million
notional amount of senior notes with a weighted average fixed interest rate
of
6.59%. In addition, FirstEnergy unwound swaps with a total notional amount
of
$700 million from which it received $16 million in cash gains during 2005.
The
gains will be recognized over the remaining maturity of each respective hedged
security as reduced interest expense. As of December 31, 2005, the
aggregate notional value of interest rate swap agreements outstanding was
$1.1 billion.
During
2005,
FirstEnergy entered into several forward starting swap agreements (forward
swaps) in order to hedge a portion of the consolidated interest rate risk
associated with the future planned issuances of fixed-rate, long-term debt
securities for one or more of its consolidated entities in 2006 - 2008. These
derivatives are treated as cash flow hedges, protecting against the risk of
changes in future interest payments resulting from changes in benchmark U.S.
Treasury rates between the date of hedge inception and the date of the debt
issuance. As of December 31, 2005, FirstEnergy had entered into forward
swaps with an aggregate notional amount of $975 million. As of December 31,
2005, the forward swaps had a fair value of $3 million.
|
LEASES
|
The
Companies lease
certain generating facilities, office space and other property and equipment
under cancelable and noncancelable leases.
In
1987, OE sold
portions of its ownership interests in Perry Unit 1 and Beaver Valley Unit
2 and
entered into operating leases on the portions sold for basic lease terms of
approximately 29 years. In that same year, CEI and TE also sold portions of
their ownership interests in Beaver Valley Unit 2 and Bruce Mansfield Units
1, 2
and 3 and entered into similar operating leases for lease terms of approximately
30 years. During the terms of their respective leases, OE, CEI and TE continue
to be responsible, to the extent of their leasehold interests, for costs
associated with the units including construction expenditures, operation and
maintenance expenses, insurance, nuclear fuel, property taxes and
decommissioning. They have the right, at the expiration of the respective basic
lease terms, to renew their respective leases. They also have the right to
purchase the facilities at the expiration of the basic lease term or any renewal
term at a price equal to the fair market value of the facilities. The basic
rental payments are adjusted when applicable federal tax law changes.
70
Consistent
with the
regulatory treatment, the rentals for capital and operating leases are charged
to operating expenses on the Consolidated Statements of Income. Such costs
for
the three years ended December 31, 2005 are summarized as
follows:
|
2005
|
2004
|
2003
|
||||||||
|
(In
millions)
|
||||||||||
|
Operating
leases
|
||||||||||
|
Interest
element
|
$
|
171
|
$
|
175
|
$
|
184
|
||||
|
Other
|
162
|
140
|
166
|
|||||||
|
Capital
leases
|
||||||||||
|
Interest
element
|
1
|
1
|
2
|
|||||||
|
Other
|
2
|
3
|
2
|
|||||||
|
Total
rentals
|
$
|
336
|
$
|
319
|
$
|
354
|
||||
Established
by OE in
1996, PNBV purchased a portion of the lease obligation bonds issued on behalf
of
lessors in OE's Perry Unit 1 and Beaver Valley Unit 2 sale and leaseback
transactions. Similarly, CEI and TE established Shippingport in 1997 to purchase
the lease obligation bonds issued on behalf of lessors in their Bruce Mansfield
Units 1, 2 and 3 sale and leaseback transactions. The PNBV and Shippingport
arrangements effectively reduce lease costs related to those transactions (see
Note 7).
The
future minimum
lease payments as of December 31, 2005 are:
|
|
|
|
Operating
Leases
|
||||||||||
|
|
Capital
|
Lease
|
Capital
|
|
|||||||||
|
|
Leases
|
Payments
|
Trusts
|
Net
|
|||||||||
|
|
(In
millions)
|
||||||||||||
|
2006
|
$
|
5
|
$
|
344
|
$
|
142
|
$
|
202
|
|||||
|
2007
|
1
|
320
|
131
|
189
|
|||||||||
|
2008
|
1
|
313
|
105
|
208
|
|||||||||
|
2009
|
1
|
316
|
112
|
204
|
|||||||||
|
2010
|
1
|
316
|
121
|
195
|
|||||||||
|
Years
thereafter
|
4
|
1,997
|
639
|
1,358
|
|||||||||
|
Total
minimum
lease payments
|
13
|
$
|
3,606
|
$
|
1,250
|
$
|
2,356
|
||||||
|
Executory
costs
|
2
|
||||||||||||
|
Net
minimum
lease payments
|
11
|
||||||||||||
|
Interest
portion
|
3
|
||||||||||||
|
Present
value
of net minimum
|
8
|
||||||||||||
|
lease
payments
|
|||||||||||||
|
Less
current
portion
|
3
|
||||||||||||
|
Noncurrent
portion
|
$
|
5
|
|||||||||||
FirstEnergy
has
recorded above-market lease liabilities for Beaver Valley Unit 2 and the Bruce
Mansfield Plant associated with the 1997 merger between OE and Centerior. The
total above-market lease obligation of $722 million associated with Beaver
Valley Unit 2 is being amortized on a straight-line basis through the end of
the
lease term in 2017 (approximately $37 million per year). The total above-market
lease obligation of $755 million associated with the Bruce Mansfield Plant
is
being amortized on a straight-line basis through the end of 2016 (approximately
$48 million per year). As of December 31, 2005, the above-market lease
liabilities for Beaver Valley Unit 2 and the Bruce Mansfield Plant totaled
$936 million, of which $85 million is classified as current
liabilities.
|
7.
|
VARIABLE
INTEREST ENTITIES
|
FIN
46R addresses
the consolidation of VIEs, including special-purpose entities, that are not
controlled through voting interests or in which the equity investors do not
bear
the entity's residual economic risks and rewards. FirstEnergy adopted FIN 46R
for special-purpose entities as of December 31, 2003 and for all other entities
in the first quarter of 2004. FirstEnergy and its subsidiaries consolidate
VIEs
when they are determined to be the VIE's primary beneficiary as defined by
FIN
46R.
Leases
FirstEnergy’s
consolidated financial statements include PNBV and Shippingport, VIEs created
in
1996 and 1997, respectively, to refinance debt originally issued in connection
with the sale and leaseback transactions discussed above in Note 6. PNBV and
Shippingport financial data are included in the consolidated financial
statements of OE and CEI, respectively.
71
PNBV
was established
to purchase a portion of the lease obligation bonds issued in connection with
OE’s 1987 sale and leaseback of its interests in the Perry Plant and Beaver
Valley Unit 2. OE used debt and available funds to purchase the notes issued
by
PNBV. Ownership of PNBV includes a 3% equity interest by an unaffiliated third
party and a 3% equity interest held by OES Ventures, a wholly owned subsidiary
of OE. Shippingport was established to purchase all of the lease obligation
bonds issued in connection with CEI’s and TE’s Bruce Mansfield Plant sale and
leaseback transaction in 1987. CEI and TE used debt and available funds to
purchase the notes issued by Shippingport.
OE,
CEI and TE are
exposed to losses under the applicable sale-leaseback agreements upon the
occurrence of certain contingent events that each company considers unlikely
to
occur. OE, CEI and TE each have a maximum exposure to loss under these
provisions of approximately $1 billion, which represents the net amount of
casualty value payments upon the occurrence of specified casualty events that
render the applicable plant worthless. Under the applicable sale and leaseback
agreements, OE, CEI and TE have net minimum discounted lease payments of
$652 million, $105 million and $539 million, respectively, that
would not be payable if the casualty value payments are made.
Power
Purchase Agreements
In
accordance with
FIN 46R, FirstEnergy evaluated its power purchase agreements and determined
that
certain NUG entities may be VIEs to the extent they own a plant that sells
substantially all of its output to the Companies and the contract price for
power is correlated with the plant’s variable costs of production. FirstEnergy,
through its subsidiaries JCP&L, Met-Ed and Penelec, maintains approximately
30 long-term power purchase agreements with NUG entities. The agreements were
structured pursuant to the Public Utility Regulatory Policies Act of 1978.
FirstEnergy was not involved in the creation of, and has no equity or debt
invested in, these entities.
FirstEnergy
has
determined that for all but eight of these entities, neither JCP&L, Met-Ed
nor Penelec have variable interests in the entities or the entities are
governmental or not-for-profit organizations not within the scope of FIN 46R.
JCP&L, Met-Ed or Penelec may hold variable interests in the remaining eight
entities, which sell their output at variable prices that correlate to some
extent with the operating costs of the plants. As required by FIN 46R,
FirstEnergy periodically requests from these eight entities the information
necessary to determine whether they are VIEs or whether JCP&L, Met-Ed or
Penelec is the primary beneficiary. FirstEnergy has been unable to obtain the
requested information, which in most cases was deemed by the requested entity
to
be proprietary. As such, FirstEnergy applied the scope exception that exempts
enterprises unable to obtain the necessary information to evaluate entities
under FIN 46R.
Since
FirstEnergy
has no equity or debt interests in the NUG entities, its maximum exposure to
loss relates primarily to the above-market costs it incurs for power.
FirstEnergy recognizes a liability and a corresponding regulatory asset on
its
Consolidated Balance Sheets for the projected above-market costs related to
its
NUG agreements. As of December 31, 2005, the projected above-market loss
liability recognized for these eight NUG agreements was $119 million.
Purchased power costs from these entities during 2005, 2004 and 2003 were $180
million, $175 million and $167 million, respectively.
8.
DIVESTITURES
Other
Domestic Operations
In
2005, FirstEnergy
sold three FSG subsidiaries - Pennsylvania-based Elliott-Lewis Corporation,
Ohio-based Spectrum Control Systems, Inc. and Maryland-based L. H. Cranston
and
Sons, Inc. - and a MYR subsidiary - Power Piping Company, resulting in an
aggregate after-tax gain of $13 million. All of these sales, with the exception
of L.H. Cranston and Sons, Inc. met the discontinued operations criteria (see
Note 2(J)). In 2003, FirstEnergy sold three additional FSG subsidiaries -
Ancoma, Inc., a mechanical contracting company based in Rochester, New York,
and
Virginia-based Colonial Mechanical and Webb Technologies - and a MARBEL
subsidiary - Northeast Ohio Natural Gas, for an aggregate after-tax gain of
$3 million.
In
March 2005, FES
completed the sale of its retail natural gas business for an after-tax gain
of
$5 million. Also in March 2005, FirstEnergy sold 51% of its interest in
FirstCom, resulting in an after-tax gain of $4 million. FirstEnergy
accounts for its remaining 31.85% interest in FirstCom on the equity
basis.
FirstEnergy
sold its
50% interest in GLEP in June 2004. Proceeds of $220 million included cash
of $200 million and the right, valued at $20 million, to participate for up
to a 40% interest in future wells in Ohio. This transaction produced an
after-tax loss of $7 million, including the benefits of prior tax capital losses
that had been previously fully reserved, which offset the capital gain from
the
sale.
72
Generation
Assets
In
August 2002,
FirstEnergy cancelled a November 2001 agreement to sell four coal-fired power
plants (2,535 MW) to NRG Energy Inc. because NRG stated that it could not
complete the transaction under the original terms of the agreement. NRG filed
voluntary bankruptcy petitions in May 2003; subsequently, FirstEnergy reached
an
agreement for settlement of its claim against NRG. FirstEnergy sold its entire
claim for $170 million (including $32 million of cash proceeds received in
December 2003).
International
Operations
FirstEnergy
completed the sale of its international operations in January 2004 with the
sales of its remaining 20.1% interest in Avon (parent of Midlands Electricity
in
the United Kingdom) and its 28.67% interest in TEBSA, for $12 million. In
the fourth quarter of 2003, after-tax impairment charges reduced the carrying
value of Avon ($5 million) and TEBSA ($26 million). As a result, no gain or
loss
was recognized upon the sales in 2004. Avon, TEBSA and other international
assets sold in 2003 were originally acquired as part of FirstEnergy's November
2001 merger with GPU.
International
operations in Bolivia were divested by the December 2003 sale of FirstEnergy's
wholly owned subsidiary, Guaracachi America, Inc., a holding company with a
50.001% interest in EGSA, resulting in a loss on sale of $33 million
(recognized in Discontinued Operations in the Consolidated Statement of Income
for the year ended December 31, 2003). International operations in
Argentina represented by FirstEnergy's ownership in Emdersa were divested
through the abandonment of its shares in Emdersa's parent company, GPU Argentina
Holdings, Inc. in April 2003. As a result of the abandonment, FirstEnergy
recognized a one-time, non-cash charge of $67 million, or $0.23 per share of
common stock in 2003. The charge did not include the expected income tax
benefits related to the abandonment, which were fully reserved. FirstEnergy
expects tax benefits of approximately $129 million, of which $50 million would
increase net income in the period that it becomes probable those benefits will
be realized. The remaining $79 million of tax benefits would reduce goodwill
recognized in connection with the acquisition of GPU.
In
2003 FirstEnergy
recognized an after-tax impairment of $8 million related to the carrying value
of the note receivable from Aquila. After receiving the first annual installment
payment of $19 million in May 2003, FirstEnergy sold the remaining balance
of its note receivable in the secondary market and received $63 million in
proceeds in July 2003.
9. OHIO
TAX
LEGISLATION
On
June 30,
2005, tax legislation was enacted in the State of Ohio that created a new CAT
tax, which is based on qualifying “taxable gross receipts” and does not consider
any expenses or costs incurred to generate such receipts, except for items
such
as cash discounts, returns and allowances, and bad debts. The CAT tax was
effective July 1, 2005, and replaces the Ohio income-based franchise tax
and the Ohio personal property tax. The CAT tax is phased-in while the current
income-based franchise tax is phased-out over a five-year period at a rate
of
20% annually, beginning with the year ended 2005, and the personal property
tax
is phased-out over a four-year period at a rate of approximately 25% annually,
beginning with the year ended 2005. During the phase-out period the Ohio
income-based franchise tax will be computed consistent with the prior tax law,
except that the tax liability as computed will be multiplied by 4/5 in 2005;
3/5
in 2006; 2/5 in 2007 and 1/5 in 2008, therefore eliminating the current
income-based franchise tax over a five-year period. As a result of the new
tax
structure, all net deferred tax benefits that were not expected to reverse
during the five-year phase-in period were written-off as of June 30,
2005.
The
increase to
income taxes associated with the adjustment to net deferred taxes in 2005 is
summarized below (in millions):
|
OE
|
$
|
32
|
||
|
CEI
|
4
|
|||
|
TE
|
18
|
|||
|
Other
FirstEnergy subsidiaries
|
(2
|
)
|
||
|
Total
FirstEnergy
|
$
|
52
|
Income
tax expenses
were reduced (increased) during 2005 by the initial phase-out of the Ohio
income-based franchise tax and phase-in of the CAT tax as summarized below
(in
millions):
|
OE
|
$
|
3
|
||
|
CEI
|
5
|
|||
|
TE
|
1
|
|||
|
Other
FirstEnergy subsidiaries
|
(3
|
)
|
||
|
Total
FirstEnergy
|
$
|
6
|
73
10.
REGULATORY
MATTERS
(A) RELIABILITY
INITIATIVES
In
late 2003 and
early 2004, a series of letters, reports and recommendations were issued from
various entities, including governmental, industry and ad hoc reliability
entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force)
regarding enhancements to regional reliability. In 2004, FirstEnergy completed
implementation of all actions and initiatives related to enhancing area
reliability, improving voltage and reactive management, operator readiness
and
training and emergency response preparedness recommended for completion in
2004.
On July 14, 2004, NERC independently verified that FirstEnergy had
implemented the various initiatives to be completed by June 30 or summer
2004, with minor exceptions noted by FirstEnergy, which exceptions are now
essentially complete. FirstEnergy is proceeding with the implementation of
the
recommendations that were to be completed subsequent to 2004 and will continue
to periodically assess the FERC-ordered Reliability Study recommendations for
forecasted 2009 system conditions, recognizing revised load forecasts and other
changing system conditions which may impact the recommendations. Thus far,
implementation of the recommendations has not required, nor is expected to
require, substantial investment in new, or material upgrades to existing
equipment. The FERC or other applicable government agencies and reliability
coordinators may, however, take a different view as to recommended enhancements
or may recommend additional enhancements in the future as the result of adoption
of mandatory reliability standards pursuant to the EPACT that could require
additional, material expenditures. Finally, the PUCO is continuing to review
the
FirstEnergy filing that addressed upgrades to control room computer hardware
and
software and enhancements to the training of control room operators before
determining the next steps, if any, in the proceeding.
As
a result of
outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had
implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU
adopted an MOU that set out specific tasks related to service reliability to
be
performed by JCP&L and a timetable for completion and endorsed JCP&L’s
ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a
Stipulation that incorporates the final report of a Special Reliability Master
who made recommendations on appropriate courses of action necessary to ensure
system-wide reliability. The Stipulation also incorporates the Executive Summary
and Recommendation portions of the final report of a focused audit of
JCP&L’s Planning and Operations and Maintenance programs and practices
(Focused Audit). A final order in the Focused Audit docket was issued by the
NJBPU on July 23, 2004. On February 11, 2005, JCP&L met with the
Ratepayer Advocate to discuss reliability improvements. JCP&L continues to
file compliance reports reflecting activities associated with the MOU and
Stipulation.
In
May 2004, the
PPUC issued an order approving revised reliability benchmarks and standards,
including revised benchmarks and standards for Met-Ed, Penelec and Penn. Met-Ed,
Penelec and Penn filed a Petition for Amendment of Benchmarks with the PPUC
on
May 26, 2004, due to their implementation of automated outage management
systems following restructuring. On December 30, 2005 the ALJ recommended that
the PPUC adopt the Joint Petition for Settlement among the parties involved
in
the three Companies’ request to amend the distribution reliability benchmarks,
thereby eliminating the need for full litigation. The ALJ’s recommendation,
adopting the revised benchmarks and standards was approved by the PPUC on
February 9, 2006.
The
EPACT provides
for the creation of an ERO to establish and enforce reliability standards for
the bulk power system, subject to FERC review. On February 3, 2006, the FERC
adopted a rule establishing certification requirements for the ERO, as well
as
regional entities envisioned to assume monitoring responsibility for the new
reliability standards.
The
NERC has been
preparing the implementation aspects of reorganizing its structure to meet
the
FERC’s certification requirements for the ERO. The NERC will make a filing with
the FERC to obtain certification as the ERO and to obtain FERC approval of
delegation agreements with regional entities. The new FERC rule referred to
above, further provides for reorganizing regional reliability organizations
(regional entities) that would replace the current regional councils and for
rearranging the relationship with the ERO. The “regional entity” may be
delegated authority by the ERO, subject to FERC approval, for enforcing
reliability standards adopted by the ERO and approved by the FERC. NERC also
intends to make a parallel filing with the FERC seeking approval of mandatory
reliability standards. These
reliability
standards are expected to be based on the current NERC Version 0 reliability
standards with some additional standards. The
two filings are
expected to be made in the second quarter of 2006.
The
ECAR,
Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability
councils have completed the consolidation of these regions into a single new
regional reliability organization known as ReliabilityFirst Corporation.
ReliabilityFirst began operations as a regional reliability council under NERC
on January 1, 2006 and intends to file and obtain certification consistent
with the final rule as a “regional entity” under the ERO during 2006. All of
FirstEnergy’s facilities are located within the ReliabilityFirst
region.
On
a parallel path,
the NERC is establishing working groups to develop reliability standards to
be
filed for approval with the FERC following the NERC’s certification as an ERO.
These reliability standards are expected to build on the current NERC Version
0
reliability standards. It is expected that the proposed reliability standards
will be filed with the FERC in early 2006.
74
FirstEnergy
believes
it is in compliance with all current NERC reliability standards. However, it
is
expected that the FERC will adopt stricter reliability standards than those
contained in the current NERC Version 0 standards. The financial impact of
complying with the new standards cannot be determined at this time. However,
the
EPACT required that all prudent costs incurred to comply with the new
reliability standards be recovered in rates.
(B) OHIO
On
August 5,
2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO
in an August 4, 2004 Entry on Rehearing, subject to a competitive bid
process. The RSP was intended to establish generation service rates beginning
January 1, 2006, in response to PUCO concerns about price and supply
uncertainty following the end of the Ohio Companies' transition plan market
development period. In October 2004, the OCC and NOAC filed appeals with the
Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in
this proceeding as well as the associated entries on rehearing. On
September 28, 2005, the Ohio Supreme Court heard oral arguments on the
appeals and it is expected that the Court will issue its opinion in 2006. On
November 1, 2005, the Ohio Companies filed tariffs in compliance with the
approved RSP, which were approved by the PUCO on December 7,
2005.
On
May 27,
2005, the Ohio Companies filed an application with the PUCO to establish a
GCAF
rider under the RSP. The GCAF application sought recovery of increased fuel
costs from 2006 through 2008 applicable to the Ohio Companies' retail customers
through a tariff rider to be implemented January 1, 2006. The application
reflected projected increases in fuel costs in 2006 compared to 2002 baseline
costs. The new rider, after adjustments made in testimony, sought to recover
all
costs above the baseline (approximately $88 million in 2006). Various parties
including the OCC intervened in this case and the case was consolidated with
the
RCP application discussed below.
On
September 9,
2005, the Ohio Companies filed an application with the PUCO that supplemented
their existing RSP with an RCP which was designed to provide customers with
more
certain rate levels than otherwise available under the RSP during the plan
period. Major provisions of the RCP include:
|
·
|
Maintain
the
existing level of base distribution rates through December 31, 2008
for OE and TE, and April 30, 2009 for
CEI;
|
|
·
|
Defer
and
capitalize for future recovery with carrying charges certain distribution
costs to be incurred during the period January 1, 2006 through
December 31, 2008, not to exceed $150 million in each of the three
years;
|
|
·
|
Adjust
the RTC
and extended RTC recovery periods and rate levels so that full
recovery of
authorized costs will occur as of December 31, 2008 for OE and TE as
of December 31, 2010 for CEI;
|
|
·
|
Reduce
the
deferred shopping incentive balances as of January 1, 2006 by up to
$75 million for OE, $45 million for TE, and $85 million for CEI by
accelerating the application of each respective company's accumulated
cost
of removal regulatory liability;
and
|
|
·
|
Recover
increased fuel costs of up to $75 million, $77 million, and $79
million,
in 2006, 2007, and 2008, respectively, from all OE and TE distribution
and
transmission customers through a fuel recovery mechanism. OE, TE,
and CEI
may defer and capitalize increased fuel costs above the amount
collected
through the fuel recovery mechanism (in lieu of implementation
of the GCAF
rider).
|
On
November 4,
2005, a supplemental stipulation was filed with the PUCO which was in addition
to a stipulation filed with the September 9, 2005 application. On
January 4, 2006, the PUCO approved the RCP filing with modifications. On
January 10, 2006, the Ohio Companies filed a Motion for Clarification of
the PUCO order approving the RCP. The Ohio Companies sought clarity on issues
related to distribution deferrals, including requirements of the review process,
timing for recognizing certain deferrals and definitions of the types of
qualified expenditures. The Ohio Companies also sought confirmation that the
list of deferrable distribution expenditures originally included in the revised
stipulation fall within the PUCO order definition of qualified expenditures.
On
January 25, 2006, the PUCO issued an Entry on Rehearing granting in part,
and denying in part, the Ohio Companies’ previous requests and clarifying issues
referred to above. The PUCO granted the Ohio Companies’ requests to: 1)
recognize fuel and distribution deferrals commencing January 1, 2006; 2)
recognize distribution deferrals on a monthly basis prior to review by the
PUCO
Staff; 3) clarify that the types of distribution expenditures included in the
Supplemental Stipulation may be deferred; and 4) clarify that distribution
expenditures do not have to be “accelerated” in order to be deferred. The PUCO
granted the Ohio Companies’ methodology for determining distribution deferral
amounts, but denied the Motion in that the PUCO Staff must verify the level
of
distribution expenditures contained in current rates, as opposed to simply
accepting the amounts contained in the Companies’ Motion. On February 3, 2006,
several other parties filed applications for rehearing on the PUCO's
January 4, 2006 Order. The Ohio Companies responded to the application for
rehearing on February 13, 2006.
75
Under
provisions of
the RSP, the PUCO may require the Ohio Companies to undertake, no more often
than annually, a competitive bid process to secure generation for the years
2007
and 2008. On July 22, 2005, FirstEnergy filed a competitive bid process for
the period beginning in 2007 that is similar to the competitive bid process
approved by the PUCO for the Ohio Companies in 2004, which resulted in the
PUCO
accepting no bids. Any acceptance of future competitive bid results would
terminate the RSP pricing, with no accounting impacts to the RSP, and not until
twelve months after the PUCO authorizes such termination. On September 28,
2005, the PUCO issued an Entry that essentially approved the Ohio Companies'
filing but delayed the proposed timing of the competitive bid process by four
months, calling for the auction to be held on March 21, 2006. OCC filed an
application for rehearing of the September 28, 2005 Entry, which the PUCO
denied on November 22, 2005. On February 23, 2006, the auction manager
notified the PUCO that there was insufficient interest in the auction process
to
allow it to proceed in 2006.
(C) PENNSYLVANIA
A
February 2002
Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision
regarding approval of the FirstEnergy/GPU merger, remanded the issues of
quantification and allocation of merger savings to the PPUC and denied Met-Ed
and Penelec the rate relief initially approved in the PPUC decision. On
October 2, 2003, the PPUC issued an order concluding that the Commonwealth
Court reversed the PPUC’s June 2001 order in its entirety. In accordance
with the PPUC's direction, Met-Ed and Penelec filed supplements to their tariffs
that became effective in October 2003 and that reflected the CTC rates and
shopping credits in effect prior to the June 2001 order.
Met-Ed
and Penelec
had been negotiating with interested parties in an attempt to resolve the merger
savings issues that are the subject of remand from the Commonwealth Court.
Met-Ed’s and Penelec’s combined portion of total merger savings during 2001 -
2004 is estimated to be approximately $51 million. In late 2005, settlement
discussions broke off as unsuccessful. A procedural schedule was established
by
the ALJ on January 17, 2006. The companies’ initial testimony is due on March 1,
2006 with testimony of the other parties and additional testimony by the
companies to be filed through October, 2006. Hearings are scheduled for the
end
of October 2006 with the ALJ’s recommended decision to be issued in February,
2007. The companies are unable to predict the outcome of this
proceeding.
In
an
October 16, 2003 order, the PPUC approved September 30, 2004 as the
date for Met-Ed's and Penelec's NUG trust fund refunds. The PPUC order also
denied their accounting treatment request regarding the CTC rate/shopping credit
swap by requiring Met-Ed and Penelec to treat the stipulated CTC rates that
were
in effect from January 1, 2002 on a retroactive basis. On October 22,
2003, Met-Ed and Penelec filed an Objection with the Commonwealth Court asking
that the Court reverse this PPUC finding; a Commonwealth Court judge
subsequently denied their Objection on October 27, 2003 without
explanation. On October 31, 2003, Met-Ed and Penelec filed an Application
for Clarification of the Court order with the judge, a Petition for Review
of
the PPUC's October 2 and October 16, 2003 Orders, and an application
for reargument, if the judge, in his clarification order, indicates that
Met-Ed's and Penelec's Objection was intended to be denied on the merits. The
Reargument Brief before the Commonwealth Court was filed on January 28,
2005.
As
of December 31,
2005, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998
Restructuring Settlement (including the Phase 2 Proceedings) and the
FirstEnergy/GPU Merger Settlement Stipulation are $333 million and
$48 million, respectively. Penelec's $48 million is subject to the pending
resolution of taxable income issues associated with NUG Trust Fund
proceeds.
Met-Ed
and Penelec
purchase a portion of their PLR requirements from FES through a wholesale power
sales agreement and a portion from contracts with unaffiliated third party
suppliers, including NUGs. Assuming continuation of these existing contractual
arrangements, the available supply represents approximately 100% of the combined
retail sales obligations of Met-Ed and Penelec in 2006 and 2007; almost 100%
for
2008; and approximately 85% for 2009 and 2010. Met-Ed and Penelec are authorized
to defer any excess of NUG contract costs over current market prices. Under
the
terms of the wholesale agreement with FES, FES retains the supply obligation
and
the supply profit and loss risk for the portion of power supply requirements
not
self-supplied by Met-Ed and Penelec under their contracts with NUGs and other
unaffiliated suppliers. This arrangement reduces Met-Ed's and Penelec's exposure
to high wholesale power prices by providing power at a fixed price for their
uncommitted PLR energy costs during the term of the agreement with FES. The
wholesale agreement with FES is automatically extended for each successive
calendar year unless any party elects to cancel the agreement by November 1
of
the preceding year. On November 1, 2005, FES and the other parties thereto
amended the agreement to provide FES the right over the next year to terminate
the agreement at any time upon 60 days notice. If the wholesale power agreement
were terminated or modified, Met-Ed and Penelec would need to satisfy the
portion of their PLR obligations currently supplied by FES from unaffiliated
suppliers at prevailing prices, which are likely to be higher than the current
price charged by FES under the agreement and, as a result, Met-Ed’s and
Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec
were to replace the FES supply at current market power prices without
corresponding regulatory authorization to increase their generation prices
to
customers, each company would likely incur a significant increase in operating
expenses and experience a material deterioration in credit quality metrics.
Under such a scenario, each company's credit profile would no longer support
an
investment grade rating for its fixed income securities. Met-Ed and Penelec
are
in the process of preparing a comprehensive rate filing that will address a
number of transmission, distribution and supply issues and is expected to be
filed with the PPUC in the second quarter of 2006. That filing will include,
among other things, a request for appropriate regulatory action to mitigate
adverse consequences from any future reduction, in whole or in part, in the
availability to Met-Ed and Penelec of supply under the existing FES agreement.
There can be no assurance, however, that if FES ultimately determines to
terminate, or significantly modify the agreement, timely regulatory relief
will
be granted by the PPUC or, to the extent granted, adequate to mitigate such
adverse consequences.
76
On
October 11,
2005, Penn filed a plan with the PPUC to secure electricity supply for its
customers at set rates following the end of its transition period on
December 31, 2006. Penn is recommending that the RFP process cover the
period January 1, 2007 through May 31, 2008. Hearings were held on
January 10, 2006 with Main Briefs filed on January 27, 2006 and Reply
Briefs on February 3, 2006. On February 17, 2006, the ALJ issued a
Recommended Decision to adopt Penn's RFP process with modifications. A PPUC
vote is expected in April 2006. Under Pennsylvania's electric competition
law, Penn is required to secure generation supply for customers who do not
choose alternative suppliers for their electricity.
(D) NEW
JERSEY
JCP&L
is
permitted to defer for future collection from customers the amounts by which
its
costs of supplying BGS to non-shopping customers and costs incurred under NUG
agreements exceed amounts collected through BGS and MTC rates and market sales
of NUG energy and capacity. As of December 31, 2005, the accumulated
deferred cost balance totaled approximately $541 million. New Jersey law
allows for securitization of JCP&L's deferred balance upon application by
JCP&L and a determination by the NJBPU that the conditions of the New Jersey
restructuring legislation are met. On February 14, 2003, JCP&L filed
for approval to securitize the July 31, 2003 deferred balance. JCP&L is
in discussions with the NJBPU staff as a result of the stipulated settlement
agreements (as further discussed below) which recommended that the NJBPU issue
an order regarding JCP&L's application. On July 20, 2005, JCP&L
requested the NJBPU to set a procedural schedule for this matter and is awaiting
NJBPU action. On February 1, 2006, the NJBPU selected Bear Stearns as the
financial advisor. On December 2, 2005, JCP&L filed a request for
recovery of $165 million of actual above-market NUG costs incurred from
August 1, 2005 through October 31, 2005 and forecasted above-market
NUG costs for November and December 2005. The filing also includes a request
for
recovery of $49 million for above-market NUG costs incurred prior to
August 1, 2003, to the extent those costs are not recoverable through
securitization.
The
2003 NJBPU
decision on JCP&L's base electric rate proceeding (the Phase I Order)
disallowed certain regulatory assets and provided for an interim return on
equity of 9.5% on JCP&L's rate base. The Phase I order also provided for a
Phase II proceeding in which the NJBPU would review whether JCP&L is in
compliance with current service reliability and quality standards and determine
whether the expenditures and projects undertaken by JCP&L to increase its
system's reliability are prudent and reasonable for rate recovery. Depending
on
its assessment of JCP&L's service reliability, the NJBPU could have
increased JCP&L’s return on equity to 9.75% or decreased it to
9.25%.
On
July 16,
2004, JCP&L filed the Phase II petition and testimony with the NJBPU,
requesting an increase in base rates of $36 million for the recovery of system
reliability costs and a 9.75% return on equity. The filing also requested an
increase to the MTC deferred balance recovery of approximately $20 million
annually.
On
May 25,
2005, the NJBPU approved two stipulated settlement agreements. The first
stipulation between JCP&L and the NJBPU staff resolves all of the issues
associated with JCP&L's motion for reconsideration of the Phase I Order. The
second stipulation between JCP&L, the NJBPU staff and the Ratepayer Advocate
resolves all of the issues associated with JCP&L's Phase II proceeding. The
stipulated settlements provide for, among other things, the
following:
|
·
|
An
annual
increase in distribution revenues of $23 million effective June 1,
2005, associated with the Phase I Order
reconsideration;
|
|
·
|
An
annual
increase in distribution revenues of $36 million effective June 1,
2005, related to JCP&L's Phase II
Petition;
|
|
·
|
An
annual
reduction in both rates and amortization expense of $8 million,
effective
June 1, 2005, in anticipation of an NJBPU order regarding JCP&L's
request to securitize up to $277 million of its deferred cost
balance;
|
|
·
|
An
increase in
JCP&L's authorized return on common equity from 9.5% to 9.75%;
and
|
|
·
|
A
commitment
by JCP&L, through December 31, 2006 or until related legislation is
adopted, whichever occurs first, to maintain a target level of
customer
service reliability with a reduction in JCP&L's authorized return on
common equity from 9.75% to 9.5% if the target is not met for two
consecutive quarters. The authorized return on common equity would
then be
restored to 9.75% if the target is met for two consecutive
quarters.
|
The
Phase II
stipulation included an agreement that the distribution revenue increase also
reflects a three-year amortization of JCP&L's one-time service reliability
improvement costs incurred in 2003-2005. This resulted in the creation of a
regulatory asset associated with accelerated tree trimming and other reliability
costs which were expensed in 2003 and 2004. The establishment of the new
regulatory asset of approximately $28 million resulted in an increase to net
income of approximately $16 million ($0.05 per share of common stock) in the
second quarter of 2005.
77
JCP&L
sells all
self-supplied energy (NUGs and owned generation) to the wholesale market with
offsetting credits to its deferred energy balance with the exception of 300
MW
from JCP&L's NUG committed supply currently being used to serve BGS
customers pursuant to NJBPU order for the period June 1, 2005 through
May 31, 2006. New BGS tariffs reflecting the results of a February 2005
auction for the BGS supply became effective June 1, 2005.
The
NJBPU decision
approving the BGS procurement proposal for the period beginning June 1,
2006 was issued on October 12, 2005. JCP&L submitted a compliance
filing on October 26, 2005, which was approved on November 10, 2005. The
written Order was dated December 8, 2005. The auction
took
place in early February 2006 and the results have been approved by the
NJBPU.
In
accordance with
an April 28, 2004 NJBPU order, JCP&L filed testimony on June 7,
2004 supporting a continuation of the current level and duration of the funding
of TMI-2 decommissioning costs by New Jersey customers without a reduction,
termination or capping of the funding. On September 30, 2004, JCP&L
filed an updated TMI-2 decommissioning study. This study resulted in an updated
total decommissioning cost estimate of $729 million (in 2003 dollars) compared
to the estimated $528 million (in 2003 dollars) from the prior 1995
decommissioning study. The Ratepayer Advocate filed comments on
February 28, 2005. On March 18, 2005, JCP&L filed a response to
those comments. A schedule for further proceedings has not yet been
set.
On
August 1,
2005, the NJBPU established a proceeding to determine whether additional
ratepayer protections are required at the state level in light of the recent
repeal of PUHCA under the EPACT. An NJBPU proposed rulemaking to address the
issues was published in the NJ Register on December 19, 2005. The proposal
would prevent a holding company that owns a gas or electric public utility
from
investing more than 25% of the combined assets of its utility and
utility-related subsidiaries into businesses unrelated to the utility industry.
A public hearing was held on February 7, 2006 and comments may be submitted
to the NJBPU by February 17, 2006. JCP&L is not able to predict the
outcome of this proceeding at this time.
(E) TRANSMISSION
On
November 1, 2004, ATSI requested authority from the FERC to defer
approximately $54 million of vegetation management costs estimated to be
incurred from 2004 through 2007. On March 4, 2005, the FERC approved ATSI's
request to defer those costs ($26 million deferred as of December 31,
2005). ATSI expects to file an application with the FERC in 2006 that would
include recovery of the deferred costs beginning June 1, 2006.
On
January 24, 2006,
ATSI and MISO filed an application with the FERC to modify the Attachment O
formula rate mechanism to permit ATSI to accelerate recovery of revenues lost
due to the FERC's elimination of through and out rates between MISO and PJM,
and
the elimination of other ATSI rates in the MISO tariff. Revenues formerly
collected under these rates are currently used to reduce the ATSI zonal
transmission rate in the Attachment O formula. The revenue shortfall created
by
elimination of these rates would not be fully reflected in ATSI's formula rate
until June 1, 2006, unless the proposed Revenue Credit Collection is
approved by the FERC. The Revenue Credit Collection mechanism is designed to
collect approximately $40 million in revenues on an annualized basis beginning
June 1, 2006. FERC is expected to act on this filing on or before April 1,
2006.
ATSI,
JCP&L,
Met-Ed, Penelec, and FES continue to be involved in FERC hearings concerning
the
calculation and imposition of Seams Elimination Cost Adjustment (SECA) charges
to various load serving entities. Pursuant to its January 30, 2006 Order,
the FERC has compressed both phases of this proceeding into a single hearing
scheduled to begin May 1, 2006, with an initial decision on or before
August 11, 2006.
On
December 30,
2004, the Ohio Companies filed with the PUCO two applications related to the
recovery of transmission and ancillary service related costs. The first
application sought recovery of these costs beginning January 1, 2006. The
Ohio Companies requested that these costs be recovered through a rider that
would be effective on January 1, 2006 and adjusted each July 1
thereafter. The PUCO approved the settlement stipulation on August 31,
2005. The incremental transmission and ancillary service revenues expected
to be
recovered from January through June 2006 are approximately $66 million.
This amount includes the recovery of the 2005 deferred MISO expenses as
described below. In May 2006, the Companies will file a modification to the
rider to determine revenues from July 2006 through June 2007.
The
second
application sought authority to defer costs associated with transmission and
ancillary service related costs incurred during the period from October 1,
2003 through December 31, 2005. On May 18, 2005, the PUCO granted the
accounting authority for the Ohio Companies to defer incremental transmission
and ancillary service-related charges incurred as a participant in MISO, but
only for those costs incurred during the period December 30, 2004 through
December 31, 2005. Permission to defer costs incurred prior to
December 30, 2004 was denied. The PUCO also authorized the Ohio Companies
to accrue carrying charges on the
deferred
balances. On August 31, 2005, the OCC appealed the PUCO's decision. All
briefs have been filed. A motion to dismiss filed on behalf of the PUCO is
currently pending. Unless the court grants the motion, the appeal will be set
for oral argument, which should be heard in the third or fourth quarter of
2006.
78
On
January 20, 2006 the OCC sought rehearing of the PUCO approval of the rider
recovery during the period January 1, 2006 through June 30, 2006, as that
amount pertains to recovery of the deferred costs. The PUCO denied the OCC's
application on February 6, 2006. The OCC has sixty days from that date to
appeal the PUCO's approval of the rider.
On January 12, 2005, Met-Ed and Penelec filed, before the PPUC, a request for
deferral of transmission-related costs beginning January 1, 2005, estimated
to
be approximately $8 million per month. The OCA, OSBA, OTS, MEIUG, PICA,
Allegheny Electric Cooperative and Pennsylvania Rural Electric Association
have
all intervened in the case. To date, no hearing schedule has been established,
and neither company has yet implemented deferral accounting for these
costs.
On
January 31, 2005, certain PJM transmission owners made three filings
pursuant to a settlement agreement previously approved by the FERC. JCP&L,
Met-Ed and Penelec were parties to that proceeding and joined in two of the
filings. In the first filing, the settling transmission owners submitted a
filing justifying continuation of their existing rate design within the PJM
RTO.
In the second filing, the settling transmission owners proposed a revised
Schedule 12 to the PJM tariff designed to harmonize the rate treatment of
new and existing transmission facilities. Interventions and protests were filed
on February 22, 2005. In the third filing, Baltimore Gas and Electric
Company and Pepco Holdings, Inc. requested a formula rate for transmission
service provided within their respective zones. On May 31, 2005, the FERC
issued an order on these cases. First, it set for hearing the existing rate
design and indicated that it will issue a final order within six months. Second,
the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC
accepted the proposed formula rate, subject to referral and hearing procedures.
On June 30, 2005, the PJM transmission owners filed a request for rehearing
of the May 31, 2005 order. The rate design and formula rate proceedings are
currently being litigated before the FERC. If FERC accepts AEP’s proposal to
create a “postage stamp” rate for high voltage transmission facilities across
PJM, significant additional transmission revenues would be imposed on JCP&L,
Met-Ed, Penelec, and other transmission zones within PJM.
On
November 1, 2005,
FES filed two power sales agreements for approval with the FERC. One power
sales
agreement provided for FES to provide the PLR requirements of the Ohio Companies
at a price equal to the retail generation rates approved by the PUCO for a
period of three years beginning January 1, 2006. The Ohio Companies will
be relieved of their obligation to obtain PLR power requirements from FES
if the Ohio competitive bid process results in a lower price for retail
customers. A similar power sales agreement between FES and Penn permits Penn
to
obtain its PLR power requirements from FES at a fixed price equal to the retail
generation price during 2006. Penn has filed a plan with the PPUC to use an
RFP
process to obtain its power supply requirements after 2006.
On
December 29,
2005, the FERC issued an order setting the two power sales agreements for
hearing. The order criticizes the Ohio competitive bid process, and requires
FES
to submit additional evidence in support of the reasonableness of the prices
charged in the Ohio and Pennsylvania Contracts. A pre-hearing conference was
held on January 18, 2006 to determine the hearing schedule in this case.
FES expects an initial decision to be issued in this case in the fall of 2006.
The outcome of this proceeding cannot be predicted. FES has sought rehearing
of
the December 29, 2005 order.
11. CAPITALIZATION
(A) COMMON
STOCK
Retained
Earnings and Dividends
Under
applicable
federal law, FirstEnergy and its subsidiaries can pay dividends only from
retained or current earnings, unless the FERC specifically authorizes payment
from other capital accounts. As of December 31, 2005, FirstEnergy's
unrestricted retained earnings were $2.2 billion. The articles of incorporation,
indentures and various other agreements relating to the long-term debt and
preferred stock of certain FirstEnergy subsidiaries contain provisions that
could further restrict the payment of dividends on their common and preferred
stock. As of December 31, 2005, none of these provisions materially
restricted FirstEnergy’s subsidiaries ability to pay cash dividends to
FirstEnergy.
On
November 15,
2005, the Board of Directors increased the indicated annual dividend to $1.80
per share, payable quarterly at a rate of $0.45 per share beginning in the
first
quarter of 2006. Dividends declared in 2005 were $1.705 which included quarterly
dividends of $0.4125 per share paid in the second and third quarters of 2005,
a
quarterly dividend of $0.43 per share paid in the fourth quarter of 2005 and
a
quarterly dividend of $0.45 per share payable in the first quarter of 2006.
Dividends declared in 2004 were $1.9125, which included quarterly dividends
of
$0.375 per share paid in each quarter of 2004 and an additional dividend of
$.04125 paid in the first quarter of 2005. The amount and timing of all dividend
declarations are subject to the discretion of the Board and its consideration
of
business conditions, results of operations, financial condition and other
factors.
79
(B) PREFERRED
AND PREFERENCE STOCK
All
preferred stock
may be redeemed by the Companies in whole, or in part, with 30-90 days' notice.
On
January 20, 2006,
TE redeemed all 1.2 million of its outstanding shares of Adjustable Rate Series
B preferred stock at $25.00 per share, plus accrued dividends to the date of
redemption.
Met-Ed's
and
Penelec's preferred stock authorizations consist of 10 million and
11.435 million shares, respectively, without par value. No preferred shares
are currently outstanding for those companies.
The
Companies'
preference stock authorization consists of 8 million shares without par value
for OE; 3 million shares without par value for CEI; and 5 million shares,
$25 par value for TE. No preference shares are currently
outstanding.
|
(C)
|
LONG-TERM
DEBT AND OTHER LONG-TERM
OBLIGATIONS
|
Subordinated
Debentures to Affiliated Trusts
As
of
December 31, 2005, CEI's wholly owned statutory business trust, Cleveland
Electric Financing Trust, had $100 million of outstanding 9.00% preferred
securities that mature in 2031. The sole assets of the trust are CEI's
subordinated debentures having the same rate and maturity date as the preferred
securities.
CEI
formed the trust
to sell preferred securities and invested the gross proceeds in the 9.00%
subordinated debentures of CEI. The sole assets of the trust are the applicable
subordinated debentures. Interest payment provisions of the subordinated
debentures match the distribution payment provisions of the trust's preferred
securities. In addition, upon redemption or payment at maturity of subordinated
debentures, the trust's preferred securities will be redeemed on a pro rata
basis at their liquidation value. Under certain circumstances, the applicable
subordinated debentures could be distributed to the holders of the outstanding
preferred securities of the trust in the event that the trust is liquidated.
CEI
has effectively provided a full and unconditional guarantee of payments due
on
the trust's preferred securities. The trust's preferred securities are
redeemable at 100% of their principal amount at CEI's option beginning in
December 2006. Interest on the subordinated debentures (and therefore
distributions on the trust's preferred securities) may be deferred for up to
60
months, but CEI may not pay dividends on, or redeem or acquire, any of its
cumulative preferred or common stock until deferred payments on its subordinated
debentures are paid in full.
Securitized
Transition Bonds
JCP&L
Transition
(Issuer), a wholly owned limited liability company of JCP&L, sold
$320 million of transition bonds to securitize the recovery of JCP&L's
bondable stranded costs associated with the previously divested Oyster Creek
Nuclear Generating Station. JCP&L did not purchase and does not own any of
the transition bonds. As of December 31, 2005, $264 million of transition
bonds are outstanding and included in long-term debt on FirstEnergy's
Consolidated Balance Sheet. The transition bonds represent obligations only
of
the Issuer and are collateralized solely by the equity and assets of the Issuer,
which consist primarily of bondable transition property. The bondable transition
property is solely the property of the Issuer.
Bondable
transition
property represents the irrevocable right of a utility company to charge,
collect and receive from its customers, through a non-bypassable TBC, the
principal amount and interest on the transition bonds and other fees and
expenses associated with their issuance. JCP&L, as servicer, manages and
administers the bondable transition property, including the billing, collection
and remittance of the TBC, pursuant to a servicing agreement with the Issuer.
Other
Long-term
Debt
Each
of the
Companies has a first mortgage indenture under which it issues FMB secured
by a
direct first mortgage lien on substantially all of its property and franchises,
other than specifically excepted property. FirstEnergy and its subsidiaries
have
various debt covenants under their respective financing arrangements. The most
restrictive of the debt covenants relate to the nonpayment of interest and/or
principal on debt and the maintenance of certain financial ratios. There also
exist cross-default provisions among financing arrangements of FirstEnergy
and
the Companies.
Based
on the amount
of FMB authenticated by the respective mortgage bond trustees through
December 31, 2005, the Companies' annual sinking fund requirement for all
FMB issued under the various mortgage indentures amounts to $67 million. OE
and Penn expect to deposit funds with their respective mortgage bond trustees
in
2006 that will then be withdrawn upon the surrender for cancellation of a like
principal amount of FMB, specifically authenticated for such purposes against
unfunded property additions or against previously retired FMB. This method
can
result in minor increases in the amount of the annual sinking fund requirement.
JCP&L, Met-Ed and Penelec could fulfill their sinking fund obligations by
providing bondable property additions, previously retired FMB or cash to
the respective mortgage bond trustees.
80
Sinking
fund
requirements for FMB and maturing long-term debt (excluding capital leases)
for
the next five years are:
|
(In
millions)
|
||||
|
2006
|
$
|
2,040
|
||
|
2007
|
229
|
|||
|
2008
|
463
|
|||
|
2009
|
278
|
|||
|
2010
|
204
|
|||
Included
in the
table above are amounts for certain variable interest rate pollution control
bonds that have provisions by which individual debt holders are required to
"put
back" the respective debt to the issuer for redemption prior to its maturity
date. These amounts are $662 million, $132 million and $15
million
in 2006,
2008 and 2010, respectively, representing the next times the debt holders may
exercise this provision.
Obligations
to repay
certain pollution control revenue bonds are secured by several series of FMB.
Certain pollution control revenue bonds are entitled to the benefit of
irrevocable bank LOCs of $604 million at December 31, 2005 or
noncancelable municipal bond insurance policies of $1.419 billion at
December 31, 2005 to pay principal of, or interest on, the applicable
pollution control revenue bonds. To the extent that drawings are made under
the
LOCs or the policies, FGCO, NGC and the Companies are entitled to a credit
against their obligation to repay those bonds. FGCO, NGC and the Companies
pay
annual fees of 0.65% to 1.70% of the amounts of the LOCs to the issuing banks
and 0.16% to 0.60% of the amounts of the policies to the insurers and are
obligated to reimburse the banks or insurers, as the case may be, for any
drawings thereunder. Certain of the issuing banks and insurers hold FMB as
security for such reimbursement obligations.
Certain
secured
notes of CEI and TE are entitled to the benefit of noncancelable municipal
bond
insurance policies of $120 million and $30 million, respectively, to pay
principal of, or interest on, the applicable notes. To the extent that drawings
are made under the policies, CEI and TE are entitled to a credit against their
obligation to repay those notes. CEI and TE are obligated to reimburse the
insurer for any drawings thereunder.
CEI
and TE have
unsecured LOCs of approximately $194 million in connection with the sale and
leaseback of Beaver Valley Unit 2 for which they are jointly and severally
liable. OE has LOCs of $291 million and $134 million in connection
with the sale and leaseback of Beaver Valley Unit 2 and Perry Unit 1,
respectively. OE entered into a Credit Agreement pursuant to which a standby
LOC
was issued in support of the replacement LOCs and the issuer of the standby
LOC
obtained the right to pledge or assign participations in OE's reimbursement
obligations to a trust. The trust then issued and sold trust certificates to
institutional investors that were designed to be the credit equivalent of an
investment directly in OE.
|
12.
|
ASSET
RETIREMENT OBLIGATIONS
|
In
January 2003,
FirstEnergy implemented SFAS 143, which provides accounting guidance for
retirement obligations associated with tangible long-lived assets. This standard
requires recognition of the fair value of a liability for an ARO in the period
in which it is incurred. The associated asset retirement costs are capitalized
as part of the carrying amount of the long-lived asset. Over time the
capitalized costs are depreciated and the present value of the ARO increases,
resulting in a period expense. However, rate-regulated entities may recognize
a
regulatory asset or liability instead of an expense if the criteria for such
treatment are met. Upon retirement, a gain or loss would be recognized if the
cost to settle the retirement obligation differs from the carrying amount.
FirstEnergy
initially identified applicable legal obligations as defined under the standard
for nuclear power plant decommissioning, reclamation of a sludge disposal pond
related to the Bruce Mansfield Plant and closure of two coal ash disposal sites.
The ARO liability associated with decommissioning was $1.069 billion as of
December 31, 2005 and included $1.054 billion for decommissioning the
Beaver Valley, Davis-Besse, Perry and TMI-2 nuclear generating facilities.
The
obligation to decommission these units was developed based on site specific
studies performed by an independent engineer. FirstEnergy utilized an expected
cash flow approach to measure the fair value of the nuclear decommissioning
ARO.
In
2005, FirstEnergy
revised the ARO associated with Beaver Valley Units 1 and 2, Davis-Besse and
Perry, as a result of updated decommissioning studies. The present value of
revisions in the estimated cash flows associated with projected decommissioning
costs increased the ARO for Beaver Valley Unit 1 by $21 million and decreased
the ARO for Beaver Valley Unit 2 by $22 million, resulting in a net decrease
in
the ARO liability and corresponding plant asset of $1 million. The present
value of revisions in the estimated cash flows associated with projected
decommissioning costs decreased the ARO and corresponding plant asset for
Davis-Besse and Perry by $21 million and $57 million, respectively.
In
2004, FirstEnergy
revised the ARO associated with TMI-2 as the result of an updated study and
the
anticipated operating license extension for TMI-1. The abandoned TMI-2 is
adjacent to TMI-1 and the units are expected to be decommissioned concurrently.
The decrease in the present value of estimated cash flows associated with the
license extension of $202 million was partially offset by the $26 million
present value of an increase in projected decommissioning costs. The net
decrease in the TMI-2 ARO liability and corresponding regulatory asset was
$176 million.
81
FirstEnergy
maintains nuclear decommissioning trust funds that are legally restricted for
purposes of settling the nuclear decommissioning ARO. As of December 31,
2005, the fair value of the decommissioning trust assets was
$1.752 billion.
FirstEnergy implemented FIN 47, "Accounting for Conditional Asset Retirement
Obligations", an interpretation of SFAS 143, on December 31, 2005. FIN 47
provides accounting standards for conditional retirement obligations associated
with tangible long-lived assets, requiring recognition of the fair value of
a
liability for an ARO in the period in which it is incurred if a reasonable
estimate can be identified. FIN 47 states that an obligation
exists
even though there may be uncertainty about timing or method of settlement
and further
clarifies
SFAS 143, stating that the uncertainty surrounding the timing and method of
settlement when settlement is conditional on a future event occurring should
be
reflected in the measurement of the liability, not in the recognition of the
liability. Accounting for conditional ARO under FIN 47 is the same as described
above for SFAS 143.
FirstEnergy
identified applicable legal obligations as defined under the new standard at
its
active and retired generating units, substation control rooms, service center
buildings, line shops and office buildings, identifying asbestos remediation
as
the primary conditional ARO. As
a result of
adopting FIN 47 in December 2005, FirstEnergy recorded a conditional ARO
liability of $57 million (including accumulated accretion for the period from
the date the liability was incurred to the date of adoption), an asset
retirement cost of $16 million (recorded as part of the carrying amount of
the
related long-lived asset) and accumulated depreciation of $12
million.
FirstEnergy charged
a regulatory liability of $5 million upon adoption of FIN 47 for the transition
amounts related to establishing the ARO for asbestos removal from substation
control rooms and service center buildings for OE, Penn, CEI, TE and JCP&L.
The remaining cumulative effect adjustment for unrecognized depreciation and
accretion of $48 million was charged to income ($30 million, net of tax), --
$0.09 per share of common stock (basic and diluted) for the year ended
December 31, 2005. The
obligation to
remediate asbestos, lead paint abatement and other remediation costs at retired
generating units was developed based on site specific studies performed by
an
independent engineer. The cost to remediate asbestos, lead paint and other
environmental liabilities at active generating units was calculated utilizing
a
per-kilowatt removal cost developed from the independent studies completed
at
the retired generating units, applied to the specific kilowatt capacity of
each
individual active generating unit. The costs of asbestos, lead paint and other
remediation at the Company’s substation control rooms, service center buildings,
line shops and office buildings were based on costs incurred during recent
remediation projects performed at each of these locations. The conditional
ARO
liability was developed utilizing an expected cash flow approach (as discussed
in SFAC No. 7). The Company used a probability weighted analysis to estimate
when remediation payments would begin.
The
following table
describes the changes to the ARO balances during 2005 and 2004.
|
2005
|
2004
|
||||||
|
ARO
Reconciliation
|
(In
millions)
|
||||||
|
Balance
at
beginning of year
|
$
|
1,078
|
$
|
1,179
|
|||
|
Liabilities
incurred
|
-
|
-
|
|||||
|
Liabilities
settled
|
-
|
-
|
|||||
|
Accretion
|
70
|
75
|
|||||
|
Revisions
in
estimated cash flows
|
(79
|
)
|
(176
|
)
|
|||
|
FIN
47
ARO
|
57
|
-
|
|||||
|
Balance
at end
of year
|
$
|
1,126
|
$
|
1,078
|
|||
The
following table
provides the year-end balance of the conditional ARO as if FIN 47 had been
adopted on January 1, 2005 and 2004, respectively:
|
Adjusted
ARO Reconciliation
|
2005
|
2004
|
|||||
|
|
(In
millions)
|
||||||
|
Beginning
balance as of January 1
|
$
|
54
|
$
|
51
|
|||
|
Accretion
|
3
|
3
|
|||||
|
Ending
balance
as of December 31
|
$
|
57
|
$
|
54
|
|||
82
The
following table
provides the effect on income as if FIN 47 had been applied during 2004 and
2003.
|
Effect
of the Change in Accounting
|
|
|
|||||
|
Principle
Applied Retroactively
|
2004
|
2003
|
|||||
|
|
(In
millions, except per share amounts)
|
||||||
|
Net
income as
reported
|
$
|
878
|
$
|
423
|
|||
|
Increase
(Decrease):
|
|
|
|||||
|
Depreciation
of asset retirement cost
|
-
|
-
|
|||||
|
Accretion
of
ARO liability
|
(3
|
)
|
(2
|
)
|
|||
|
Income
tax
effect
|
1
|
1
|
|||||
|
Net
income
adjusted
|
$
|
876
|
$
|
422
|
|||
|
|
|
|
|||||
|
Basic
earnings
per share of common stock:
|
|
|
|||||
|
As
reported
|
$
|
2.68
|
$
|
1.39
|
|||
|
As
adjusted
|
$
|
2.68
|
$
|
1.39
|
|||
|
|
|
|
|||||
|
Diluted
earnings per share of common stock:
|
|
|
|||||
|
As
reported
|
$
|
2.67
|
$
|
1.39
|
|||
|
As
adjusted
|
$
|
2.66
|
$
|
1.38
|
|||
13.
SHORT-TERM
BORROWINGS AND BANK LINES OF CREDIT
FirstEnergy
had
approximately $731 million of short-term indebtedness as of December 31,
2005, comprised of $439 million in borrowings from a $2 billion revolving
line of credit, $280 million in borrowings through $550 million of
available accounts receivables financing and $12 million of other bank
borrowings. Total short-term bank lines of committed credit to FirstEnergy
and
the Companies as of December 31, 2005 were approximately $2.6 billion.
On
June 14,
2005, FirstEnergy, OE, Penn, CEI, TE, JCP&L, Met-Ed, Penelec, FES and ATSI,
as Borrowers, entered into a syndicated $2 billion five-year revolving credit
facility with a syndicate of banks that expires in June 2010. Borrowings under
the facility are available to each Borrower separately and mature on the earlier
of 364 days from the date of borrowing or the commitment expiration date, as
the
same may be extended. As of December 31, 2005, FirstEnergy was the only borrower
on this revolver with an outstanding balance of $439 million. The annual
facility fees are 0.15% to 0.50%.
The
Companies, with
the exception of TE and JCP&L, each have a wholly owned subsidiary whose
borrowings are secured by customer accounts receivable purchased from its
respective parent company. The CEI subsidiary's borrowings are also secured
by
customer accounts receivable purchased from TE. Each subsidiary company has
its
own receivables financing arrangement and, as a separate legal entity with
separate creditors, would have to satisfy its obligations to creditors before
any of its remaining assets could be available to its parent company. The
receivables financing borrowing capacity and outstanding balance by company,
as
of December 31, 2005, appear in the table that follows.
|
Subsidiary
Company
|
Parent
Company
|
Capacity
|
Outstanding
Balance
|
Annual
Facility
Fee
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
OES
Capital,
Incorporated
|
OE
|
$
|
170
|
$
|
140
|
0.20
|
%
|
||||||
|
Centerior
Funding Corp.
|
CEI
|
200
|
140
|
0.25
|
|||||||||
|
Penn
Power
Funding LLC
|
Penn
|
25
|
-
|
0.15
|
|||||||||
|
Met-Ed
Funding
LLC
|
Met-Ed
|
80
|
-
|
0.15
|
|||||||||
|
Penelec
Funding LLC
|
Penelec
|
75
|
-
|
0.15
|
|||||||||
|
$
|
550
|
$
|
280
|
||||||||||
All
of the
receivables financing agreements will terminate in 2006 and are expected to
be
renewed prior to expiration.
The
weighted average
interest rates on short-term borrowings outstanding as of December 31, 2005
and 2004 were 4.68% and 2.35% respectively. The annual facility fees on all
current committed short-term bank lines of credit range from 0.15% to
0.50%.
14. COMMITMENTS,
GUARANTEES AND CONTINGENCIES
(A)
NUCLEAR
INSURANCE
The
Price-Anderson
Act limits the public liability relative to a single incident at a nuclear
power
plant to $10.8 billion. The amount is covered by a combination of private
insurance and an industry retrospective rating plan. FirstEnergy's maximum
potential assessment under the industry retrospective rating plan would be
$402 million per incident but not more than $60 million in any one year for
each incident.
83
FirstEnergy
is also
insured under policies for each nuclear plant. Under these policies, up to
$2.75 billion is provided for property damage and decontamination costs.
FirstEnergy has also obtained approximately $1.7 billion of insurance
coverage for replacement power costs. Under these policies, FirstEnergy can
be
assessed a maximum of approximately $80 million for incidents at any covered
nuclear facility occurring during a policy year which are in excess of
accumulated funds available to the insurer for paying losses.
FirstEnergy
intends
to maintain insurance against nuclear risks, as described above, as long as
it
is available. To the extent that replacement power, property damage,
decontamination, repair and replacement costs and other such costs arising
from
a nuclear incident at any of FirstEnergy's plants exceed the policy limits
of
the insurance in effect with respect to that plant, to the extent a nuclear
incident is determined not to be covered by FirstEnergy's insurance policies,
or
to the extent such insurance becomes unavailable in the future, FirstEnergy
would remain at risk for such costs.
(B)
GUARANTEES
AND OTHER ASSURANCES
As
part of normal
business activities, FirstEnergy enters into various agreements on behalf of
its
subsidiaries to provide financial or performance assurances to third parties.
These agreements include contract guarantees, surety bonds and LOCs. As of
December 31, 2005, outstanding guarantees and other assurances aggregated
approximately $3.4 billion -- contract guarantees ($1.7 billion), surety
bonds ($0.3 billion) and LOC ($1.4 billion).
FirstEnergy
guarantees energy and energy-related payments of its subsidiaries involved
in
energy commodity activities principally to facilitate normal physical
transactions involving electricity, gas, emission allowances and coal.
FirstEnergy also provides guarantees to various providers of subsidiary
financing principally for the acquisition of property, plant and equipment.
These agreements legally obligate FirstEnergy to fulfill the obligations of
those subsidiaries directly involved in energy and energy-related transactions
or financing where the law might otherwise limit the counterparties' claims.
If
demands of a counterparty were to exceed the ability of a subsidiary to satisfy
existing obligations, FirstEnergy's guarantee enables the counterparty's legal
claim to be satisfied by other FirstEnergy assets. The likelihood is remote
that
such parental guarantees of $0.8 billion (included in the $1.7 billion discussed
above) as of December 31, 2005 would increase amounts otherwise payable by
FirstEnergy to meet its obligations incurred in connection with financings
and
ongoing energy and energy-related activities.
While
these types of
guarantees are normally parental commitments for the future payment of
subsidiary obligations, subsequent to the occurrence of a credit
rating-downgrade or “material adverse event” the immediate posting of cash
collateral or provision of an LOC may be required of the subsidiary. The
following table summarizes collateral provisions as of December 31,
2005:
|
Collateral
Paid
|
Remaining
|
|||||||||||||||||||||
|
Collateral
Provisions
|
Exposure
|
Cash
|
LOC
|
Exposure
|
||||||||||||||||||
|
(In
millions)
|
||||||||||||||||||||||
|
Credit
rating
downgrade
|
$
|
380
|
$ |
|
78
|
$ |
|
-
|
$ |
|
302
|
|||||||||||
|
Adverse
Event
|
74
|
-
|
-
|
74
|
||||||||||||||||||
|
Total
|
$
|
454
|
$ |
|
78
|
$ |
|
-
|
$ |
|
376
|
|||||||||||
Most
of
FirstEnergy's surety bonds are backed by various indemnities common within
the
insurance industry. Surety bonds and related FirstEnergy guarantees of $312
million provide additional assurance to outside parties that contractual and
statutory obligations will be met in a number of areas including construction
jobs, environmental commitments and various retail transactions.
FirstEnergy
has also
guaranteed the obligations of the operators of the TEBSA project, up to a
maximum of $6 million (subject to escalation) under the project's
operations and maintenance agreement. In connection with the sale of TEBSA
in
January 2004, the purchaser indemnified FirstEnergy against any loss under
this
guarantee. FirstEnergy has also provided an LOC ($36 million as of
December 31, 2005), which is renewable and declines yearly based upon the
senior outstanding debt of TEBSA.
(C) ENVIRONMENTAL
MATTERS
Various
federal,
state and local authorities regulate the Companies with regard to air and water
quality and other environmental matters. The effects of compliance on the
Companies with regard to environmental matters could have a material adverse
effect on FirstEnergy's earnings and competitive position to the extent that
it
competes with companies that are not subject to such regulations and therefore
do not bear the risk of costs associated with compliance, or failure to comply,
with such regulations. Overall, FirstEnergy believes it is in compliance with
existing regulations but is unable to predict future changes in regulatory
policies and what, if any, the effects of such changes would be. FirstEnergy
estimates additional capital expenditures for environmental compliance of
approximately $1.8 billion for 2006 through 2010.
84
The
Companies accrue
environmental liabilities only when they conclude that it is probable that
they
have an obligation for such costs and can reasonably estimate the amount of
such
costs. Unasserted claims are reflected in the Companies’ determination of
environmental liabilities and are accrued in the period that they are both
probable and reasonably estimable.
On
December 1, 2005,
FirstEnergy issued a comprehensive report to shareholders regarding air
emissions regulations and an assessment of its future risks and mitigation
efforts.
Clean
Air Act
Compliance
FirstEnergy
is
required to meet federally approved SO2
regulations.
Violations of such regulations can result in shutdown of the generating unit
involved and/or civil or criminal penalties of up to $32,500 for each day
the
unit is in violation. The EPA has an interim enforcement policy for
SO2
regulations in Ohio
that allows for compliance based on a 30-day averaging period. The Companies
cannot predict what action the EPA may take in the future with respect to
the
interim enforcement policy.
FirstEnergy
believes
it is complying with SO2
reduction
requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur
fuel, generating more electricity from lower-emitting plants, and/or using
emission allowances. NOx
reductions required
by the 1990 Amendments are being achieved through combustion controls and the
generation of more electricity at lower-emitting plants. In September 1998,
the
EPA finalized regulations requiring additional NOx
reductions from
FirstEnergy's facilities. The EPA's NOx
Transport Rule
imposes uniform reductions of NOx
emissions (an
approximate 85% reduction in utility plant NOx
emissions from
projected 2007 emissions) across a region of nineteen states (including
Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based
on a conclusion that such NOx
emissions are
contributing significantly to ozone levels in the eastern United States.
FirstEnergy believes its facilities are also complying with the NOx
budgets established
under State Implementation Plans through combustion controls and post-combustion
controls, including Selective Catalytic Reduction and Selective Non-Catalytic
Reduction systems, and/or using emission allowances.
National
Ambient
Air Quality Standards
In
July 1997, the
EPA promulgated changes in the NAAQS for ozone and proposed a new NAAQS for
fine
particulate matter. On March 10, 2005, the EPA finalized the "Clean Air
Interstate Rule" covering a total of 28 states (including Michigan, New Jersey,
Ohio and Pennsylvania) and the District of Columbia based on proposed findings
that air emissions from 28 eastern states and the District of Columbia
significantly contribute to non-attainment of the NAAQS for fine particles
and/or the "8-hour" ozone NAAQS in other states. CAIR provides each affected
state until 2006 to develop implementing regulations to achieve additional
reductions of NOx
and SO2
emissions in two
phases (Phase I in 2009 for NOx,
2010 for
SO2
and Phase II in
2015 for both NOx
and SO2).
FirstEnergy's
Michigan, Ohio and Pennsylvania fossil-fired generation facilities will be
subject to caps on SO2
and NOx
emissions, whereas
its New Jersey fossil-fired generation facilities will be subject to only a
cap
on NOx
emissions.
According to the EPA, SO2
emissions will be
reduced by 45% (from 2003 levels) by 2010 across the states covered by the
rule,
with reductions reaching 73% (from 2003 levels) by 2015, capping SO2
emissions in
affected states to just 2.5 million tons annually. NOx
emissions will be
reduced by 53% (from 2003 levels) by 2009 across the states covered by the
rule,
with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional
NOx
cap of 1.3 million
tons annually. The future cost of compliance with these regulations may be
substantial and will depend on how they are ultimately implemented by the states
in which FirstEnergy operates affected facilities.
Mercury
Emissions
In
December 2000,
the EPA announced it would proceed with the development of regulations regarding
hazardous air pollutants from electric power plants, identifying mercury as
the
hazardous air pollutant of greatest concern. On March 14, 2005, the EPA
finalized the CAMR, which provides a cap-and-trade program to reduce mercury
emissions from coal-fired power plants in two phases. Initially, mercury
emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit"
from implementation of SO2
and NOx
emission caps under
the EPA's CAIR program). Phase II of the mercury cap-and-trade program will
cap
nationwide mercury emissions from coal-fired power plants at 15 tons per year
by
2018. However, the final rules give states substantial discretion in developing
rules to implement these programs. In addition, both the CAIR and the CAMR
have
been challenged in the United States Court of Appeals for the District of
Columbia. FirstEnergy's future cost of compliance with these regulations may
be
substantial and will depend on how they are ultimately implemented by the states
in which FirstEnergy operates affected facilities.
The
model rules for
both CAIR and CAMR contemplate an input-based methodology to allocate allowances
to affected facilities. Under this approach, allowances would be allocated
based
on the amount of fuel consumed by the affected sources. We would prefer an
output-based generation-neutral methodology in which allowances are allocated
based on megawatts of power produced. Since this approach is based on output,
new and non-emitting generating facilities, including renewables and nuclear,
would be entitled to their proportionate share of the allowances. Consequently,
we would be disadvantaged if these model rules were implemented because our
substantial reliance on non-emitting (largely nuclear) generation is not
recognized under input-based allocation.
85
W.
H. Sammis
Plant
In
1999 and 2000,
the EPA issued NOV or Compliance Orders to nine utilities alleging violations
of
the Clean Air Act based on operation and maintenance of 44 power plants,
including the W. H. Sammis Plant, which was owned at that time by OE and Penn.
In addition, the DOJ filed eight civil complaints against various investor-owned
utilities, including a complaint against OE and Penn in the U.S. District Court
for the Southern District of Ohio. These cases are referred to as New Source
Review cases. On March 18, 2005, OE and Penn announced that they had
reached a settlement with the EPA, the DOJ and three states (Connecticut, New
Jersey, and New York) that resolved all issues related to the W. H. Sammis
Plant
New Source Review litigation. This
settlement
agreement was approved by the Court on July 11, 2005, and requires
reductions of NOx
and SO2
emissions at the
W. H. Sammis Plant and other coal fired plants through the installation of
pollution control devices and provides for stipulated penalties for failure
to
install and operate such pollution controls in accordance with that
agreement.
Consequently,
if FirstEnergy fails to install such pollution control devices, for any
reason, including, but not limited to, the failure of any third-party contractor
to timely meet its delivery obligations for such devices, FirstEnergy could
be exposed to penalties under the settlement agreement. Capital expenditures
necessary to meet those requirements are currently estimated to be
$1.5 billion (the primary portion of which is expected to be spent in the
2008 to 2011 time period). On August 26, 2005, FGCO entered into an
agreement with Bechtel Power Corporation (Bechtel), under which Bechtel will
engineer, procure, and construct air quality control systems for the reduction
of sulfur dioxide emissions. The settlement agreement also requires OE and
Penn
to spend up to $25 million toward environmentally beneficial projects,
which include wind energy purchased power agreements over a 20-year term. OE
and
Penn agreed to pay a civil penalty of $8.5 million. Results in 2005
included the penalties payable by OE and Penn of $7.8 million and
$0.7 million, respectively. OE and Penn also recognized liabilities of
$9.2 million and $0.8 million, respectively,
for
probable future cash contributions toward environmentally beneficial
projects.
Climate
Change
In
December 1997,
delegates to the United Nations' climate summit in Japan adopted an agreement,
the Kyoto Protocol, to address global warming by reducing the amount of man-made
GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and
2012. The United States signed the Kyoto Protocol in 1998 but it failed to
receive the two-thirds vote required for ratification by the United States
Senate. However, the Bush administration has committed the United States to
a
voluntary climate change strategy to reduce domestic GHG intensity - the ratio
of emissions to economic output - by 18% through 2012. The EPACT established
a
Committee on Climate Change Technology to coordinate federal climate change
activities and promote the development and deployment of GHG reducing
technologies.
FirstEnergy
cannot
currently estimate the financial impact of climate change policies, although
the
potential restrictions on CO2
emissions could
require significant capital and other expenditures. The CO2
emissions per
kilowatt-hour of electricity generated by FirstEnergy is lower than many
regional competitors due to its diversified generation sources, which include
low or non-CO2
emitting gas-fired
and nuclear generators.
Clean
Water
Act
Various
water
quality regulations, the majority of which are the result of the federal Clean
Water Act and its amendments, apply to FirstEnergy's plants. In addition, Ohio,
New Jersey and Pennsylvania have water quality standards applicable to
FirstEnergy's operations. As provided in the Clean Water Act, authority to
grant
federal National Pollutant Discharge Elimination System water discharge permits
can be assumed by a state. Ohio, New Jersey and Pennsylvania have assumed such
authority.
On
September 7,
2004, the EPA established new performance standards under Section 316(b) of
the
Clean Water Act for reducing impacts on fish and shellfish from cooling water
intake structures at certain existing large electric generating plants. The
regulations call for reductions in impingement mortality, when aquatic organisms
are pinned against screens or other parts of a cooling water intake system
and
entrainment, which occurs when aquatic species are drawn into a facility's
cooling water system. FirstEnergy is conducting comprehensive demonstration
studies, due in 2008, to determine the operational measures, equipment or
restoration activities, if any, necessary for compliance by its facilities
with
the performance standards. FirstEnergy is unable to predict the outcome of
such
studies. Depending on the outcome of such studies, the future cost of compliance
with these standards may require material capital expenditures.
Regulation
of
Hazardous Waste
As
a result of the
Resource Conservation and Recovery Act of 1976, as amended, and the Toxic
Substances Control Act of 1976, federal and state hazardous waste regulations
have been promulgated. Certain fossil-fuel combustion waste products, such
as
coal ash, were exempted from hazardous waste disposal requirements pending
the
EPA's evaluation of the need for future regulation. The EPA subsequently
determined that regulation of coal ash as a hazardous waste is unnecessary.
In
April 2000, the EPA announced that it will develop national standards regulating
disposal of coal ash under its authority to regulate nonhazardous
waste.
86
The
Companies have
been named as PRPs at waste disposal sites, which may require cleanup under
the
Comprehensive Environmental Response, Compensation, and Liability Act of 1980.
Allegations of disposal of hazardous substances at historical sites and the
liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all PRPs for a particular site are liable on a joint
and several basis. Therefore, environmental liabilities that are considered
probable have been recognized on the Consolidated Balance Sheet as of
December 31, 2005, based on estimates of the total costs of cleanup, the
Companies' proportionate responsibility for such costs and the financial ability
of other unaffiliated entities to pay. In addition, JCP&L has accrued
liabilities for environmental remediation of former manufactured gas plants
in
New Jersey; those costs are being recovered by JCP&L through a
non-bypassable SBC. Total liabilities of approximately $64 million have
been accrued through December 31, 2005.
|
(D)
|
OTHER
LEGAL PROCEEDINGS
|
Power
Outages
and Related Litigation
In
July 1999, the
Mid-Atlantic States experienced a severe heat wave, which resulted in power
outages throughout the service territories of many electric utilities, including
JCP&L's territory. In an investigation into the causes of the outages and
the reliability of the transmission and distribution systems of all four of
New
Jersey’s electric utilities, the NJBPU concluded that there was not a prima
facie case demonstrating that, overall, JCP&L provided unsafe, inadequate or
improper service to its customers. Two class action lawsuits (subsequently
consolidated into a single proceeding) were filed in New Jersey Superior Court
in July 1999 against JCP&L, GPU and other GPU companies, seeking
compensatory and punitive damages arising from the July 1999 service
interruptions in the JCP&L territory.
In
August 2002, the
trial court granted partial summary judgment to JCP&L and dismissed the
plaintiffs' claims for consumer fraud, common law fraud, negligent
misrepresentation, and strict product liability. In November 2003, the trial
court granted JCP&L's motion to decertify the class and denied plaintiffs'
motion to permit into evidence their class-wide damage model indicating damages
in excess of $50 million. These class decertification and damage rulings were
appealed to the Appellate Division. The Appellate Division issued a decision
on
July 8, 2004, affirming the decertification of the originally certified
class, but remanding for certification of a class limited to those customers
directly impacted by the outages of JCP&L transformers in Red Bank, New
Jersey. On September 8, 2004, the New Jersey Supreme Court denied the
motions filed by plaintiffs and JCP&L for leave to appeal the decision of
the Appellate Division. JCP&L has filed a motion for summary judgment.
FirstEnergy is unable to predict the outcome of these matters and no liability
has been accrued as of December 31, 2005.
On
August 14,
2003, various states and parts of southern Canada experienced widespread power
outages. The outages affected approximately 1.4 million customers in
FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s
final report in April 2004 on the outages concluded, among other things, that
the problems leading to the outages began in FirstEnergy’s Ohio service area.
Specifically,
the
final report concluded, among other things, that the initiation of the
August 14, 2003 power outages resulted from an alleged failure of both
FirstEnergy and ECAR to assess and understand perceived inadequacies within
the
FirstEnergy system; inadequate situational awareness of the developing
conditions; and a perceived failure to adequately manage tree growth in certain
transmission rights of way. The Task Force also concluded that there was a
failure of the interconnected grid's reliability organizations (MISO and PJM)
to
provide effective real-time diagnostic support. The final report is publicly
available through the Department of Energy’s website (www.doe.gov). FirstEnergy
believes that the final report does not provide a complete and comprehensive
picture of the conditions that contributed to the August 14, 2003 power
outages and that it does not adequately address the underlying causes of the
outages. FirstEnergy remains convinced that the outages cannot be explained
by
events on any one utility's system. The final report contained 46
“recommendations to prevent or minimize the scope of future blackouts.”
Forty-five of those recommendations related to broad industry or policy matters
while one, including subparts, related to activities the Task Force recommended
be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct
the
causes of the August 14, 2003 power outages. FirstEnergy implemented
several initiatives, both prior to and since the August 14, 2003 power
outages, which were independently verified by NERC as complete in 2004 and
were
consistent with these and other recommendations and collectively enhance the
reliability of its electric system. FirstEnergy’s implementation of these
recommendations in 2004 included completion of the Task Force recommendations
that were directed toward FirstEnergy. FirstEnergy also is proceeding with
the
implementation of the recommendations regarding enhancements to regional
reliability that were to be completed subsequent to 2004 and will continue
to
periodically assess the FERC-ordered Reliability Study recommendations for
forecasted 2009 system conditions, recognizing revised load forecasts and other
changing system conditions which may impact the recommendations. Thus far,
implementation of the recommendations has not required, nor is expected to
require, substantial investment in new or material upgrades to existing
equipment, and therefore FirstEnergy has not accrued a liability as of December
31, 2005 for any expenditures in excess of those actually incurred through
that
date. The FERC or other applicable government agencies and reliability
coordinators may, however, take a different view as to recommended enhancements
or may recommend additional enhancements in the future that could require
additional, material expenditures. Finally, the PUCO is continuing to review
FirstEnergy’s filing that addressed upgrades to control room computer hardware
and software and enhancements to the training of control room operators before
determining the next steps, if any, in the proceeding.
87
FirstEnergy
companies also are defending six separate complaint cases before the PUCO
relating to the August 14, 2003 power outage. Two cases were originally
filed in Ohio State courts but were subsequently dismissed for lack of subject
matter jurisdiction and further appeals were unsuccessful. In these cases the
individual complainants—three in one case and four in the other—sought to
represent others as part of a class action. The PUCO dismissed the class
allegations, stating that its rules of practice do not provide for class action
complaints. Of the four other pending PUCO complaint cases, three were filed
by
various insurance carriers either in their own name as subrogees or in the
name
of their insured. In each of the four cases, the carrier seeks reimbursement
from various FirstEnergy companies (and, in one case, from PJM, MISO and
American Electric Power Company, Inc. as well) for claims paid to insureds
for
claims allegedly arising as a result of the loss of power on August 14,
2003. The listed insureds in these cases, in many instances, are not customers
of any FirstEnergy company. The fourth case involves the claim of a non-customer
seeking reimbursement for losses incurred when its store was burglarized on
August 14, 2003. In addition to these six cases, the Ohio Companies were
named as respondents in a regulatory proceeding that was initiated at the PUCO
in response to complaints alleging failure to provide reasonable and adequate
service stemming primarily from the August 14, 2003 power outages. No
estimate of potential liability is available for any of these cases.
In
addition to the
above proceedings, FirstEnergy was named in a complaint filed in Michigan State
Court by an individual who is not a customer of any FirstEnergy company. A
responsive pleading to this matter has been filed. FirstEnergy was also named,
along with several other entities, in a complaint in New Jersey State Court.
The
allegations against FirstEnergy are based, in part, on an alleged failure to
protect the citizens of Jersey City from an electrical power outage. No
FirstEnergy entity serves any customers in Jersey City. A responsive pleading
has been filed. No estimate of potential liability has been undertaken in either
of these matters.
FirstEnergy
is
vigorously defending these actions, but cannot predict the outcome of any of
these proceedings or whether any further regulatory proceedings or legal actions
may be initiated against the Companies. Although unable to predict the impact
of
these proceedings, if FirstEnergy or its subsidiaries were ultimately determined
to have legal liability in connection with these proceedings, it could have
a
material adverse effect on FirstEnergy's or its subsidiaries' financial
condition, results of operations and cash flows.
Nuclear
Plant
Matters
On
May 11,
2005, FENOC received a subpoena for documents related to outside meetings
attended by Davis-Besse personnel on corrosion and cracking of control rod
drive
mechanisms and additional root cause evaluations. On January 20, 2006,
FENOC announced that it has entered into a deferred prosecution agreement with
the U.S. Attorney’s Office for the Northern District of Ohio and the
Environmental Crimes Section of the Environment and Natural Resources Division
of the DOJ related to FENOC’s communications with the NRC during the fall of
2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power
Station. Under the agreement, which expires on December 31, 2006, the United
States acknowledged FENOC’s extensive corrective actions at Davis-Besse, FENOC’s
cooperation during investigations by the DOJ and the NRC, FENOC’s pledge of
continued cooperation in any related criminal and administrative investigations
and proceedings, FENOC’s acknowledgement of responsibility for the behavior of
its employees, and its agreement to pay a monetary penalty. The DOJ will refrain
from seeking an indictment or otherwise initiating criminal prosecution of
FENOC
for all conduct related to the statement of facts attached to the deferred
prosecution agreement, as long as FENOC remains in compliance with the
agreement, which FENOC fully intends to do. FENOC has agreed to pay a penalty
of
$28 million (which is not deductible for income tax purposes) which reduced
FirstEnergy's earnings by $0.09 per common share in the fourth quarter of 2005.
As part of the deferred prosecution agreement entered into with the DOJ,
$4.35 million of that amount will be directed to community service
projects.
On
April 21,
2005, the NRC issued a NOV and proposed a $5 million civil penalty related
to the degradation of the Davis-Besse reactor vessel head issue described above.
We accrued $2 million for a potential fine prior to 2005 and accrued the
remaining liability for the proposed fine during the first quarter of 2005.
On
September 14, 2005, FENOC filed its response to the NOV with the NRC. FENOC
accepted full responsibility for the past failure to properly implement its
boric acid corrosion control and corrective action programs. The NRC NOV
indicated that the violations do not represent current licensee performance.
We
paid the penalty in the third quarter of 2005. On January 23, 2006, FENOC
supplemented its response to the NRC's NOV on the Davis-Besse head degradation
to reflect the deferred prosecution agreement that FENOC had reached with the
DOJ.
Effective
July 1, 2005, the NRC oversight panel for Davis-Besse was terminated and
Davis-Besse returned to the standard NRC reactor oversight process. At that
time, NRC inspections were augmented to include inspections to support the
NRC's
Confirmatory Order dated March 8, 2004 that was issued at the time of
startup and to address an NRC White Finding related to the performance of the
emergency sirens. By letter dated December 8, 2005, the NRC advised FENOC that
the White Finding had been closed.
On
August 12,
2004, the NRC notified FENOC that it would increase its regulatory oversight
of
the Perry Nuclear Power Plant as a result of problems with safety system
equipment over the preceding two years and the licensee's failure to take prompt
and corrective action. FENOC operates the Perry Nuclear Power Plant.
88
On
April 4,
2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry
Nuclear Power Plant as identified in the NRC's annual assessment letter to
FENOC. Similar public meetings are held with all nuclear power plant licensees
following issuance by the NRC of their annual assessments. According to the
NRC,
overall the Perry Plant operated "in a manner that preserved public health
and
safety" even though it remained under heightened NRC oversight. During the
public meeting and in the annual assessment, the NRC indicated that additional
inspections will continue and that the plant must improve performance to be
removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action
Matrix. By an inspection report dated January 18, 2006, the NRC closed one
of the White Findings (related to emergency preparedness) which led to the
multiple degraded cornerstones.
On
May 26,
2005, the NRC held a public meeting to discuss its oversight of the Perry Plant.
While the NRC stated that the plant continued to operate safely, the NRC also
stated that the overall performance had not substantially improved since the
heightened inspection was initiated. The NRC reiterated this conclusion in
its
mid-year assessment letter dated August 30, 2005. On September 28,
2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made
to
improve the performance of Perry and stated that the CAL would remain open
until
substantial improvement was demonstrated. The CAL was anticipated as part of
the
NRC's Reactor Oversight Process. If performance does not improve, the NRC has
a
range of options under the Reactor Oversight Process, from increased oversight
to possible impact to the plant’s operating authority. Although unable to
predict a potential impact, its ultimate disposition could have a material
adverse effect on FirstEnergy's or its subsidiaries' financial condition,
results of operations and cash flows.
As
of December 16,
2005 NGC acquired ownership of the nuclear generation assets transferred from
OE, CEI, TE and Penn with the exception of leasehold interests of OE and TE
in
certain of the nuclear plants that are subject to sale and leaseback
arrangements with non-affiliates.
Other
Legal
Matters
There
are various
lawsuits, claims (including claims for asbestos exposure) and proceedings
related to FirstEnergy's normal business operations pending against FirstEnergy
and its subsidiaries. The other potentially material items not otherwise
discussed above are described below.
On
October 20,
2004, FirstEnergy was notified by the SEC that the previously disclosed informal
inquiry initiated by the SEC's Division of Enforcement in September 2003
relating to the restatements in August 2003 of previously reported results
by
FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have
become the subject of a formal order of investigation. The SEC's formal order
of
investigation also encompasses issues raised during the SEC's examination of
FirstEnergy and the Companies under PUHCA. Concurrent with this notification,
FirstEnergy received a subpoena asking for background documents and documents
related to the restatements and Davis-Besse issues. On December 30, 2004,
FirstEnergy received a subpoena asking for documents relating to issues raised
during the SEC's PUHCA examination. On August 24, 2005 additional
information was requested regarding Davis-Besse. FirstEnergy has cooperated
fully with the informal inquiry and continues to do so with the formal
investigation.
On
August 22,
2005, a class action complaint was filed against OE in Jefferson County, Ohio
Common Pleas Court, seeking compensatory and punitive damages to be determined
at trial based on claims of negligence and eight other tort counts alleging
damages from W.H. Sammis Plant air emissions. The two named plaintiffs are
also
seeking injunctive relief to eliminate harmful emissions and repair property
damage and the institution of a medical monitoring program for class members.
JCP&L's
bargaining unit employees filed a grievance challenging JCP&L's 2002
call-out procedure that required bargaining unit employees to respond to
emergency power outages. On May 20, 2004, an arbitration panel concluded
that the call-out procedure violated the parties' collective bargaining
agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator
decided not to hear testimony on damages and closed the proceedings. On
September 9, 2005, the Arbitrator issued an opinion to award approximately
$16 million to the bargaining unit employees. On February 6, 2006, the
federal court granted a Union motion to dismiss JCP&L's appeal of the award
as premature. JCP&L will file its appeal again in federal district court
once the damages associated with this case are identified at an individual
employee level. JCP&L recognized a liability for the potential
$16 million award in 2005.
The
City of Huron
filed a complaint against OE with the PUCO challenging the ability of electric
distribution utilities to collect transition charges from a customer of a
newly-formed municipal electric utility. The complaint was filed on May 28,
2003, and OE timely filed its response on June 30, 2003. In a related
filing, the Ohio Companies filed for approval with the PUCO of a tariff that
would specifically allow the collection of transition charges from customers
of
municipal electric utilities formed after 1998. An adverse ruling could
negatively affect full recovery of transition charges by the utility. Hearings
on the matter were held in August 2005. Initial briefs from all parties were
filed on September 22, 2005 and reply briefs were filed on October 14,
2005. It is unknown when the PUCO will decide this case.
If
it were
ultimately determined that FirstEnergy or its subsidiaries have legal liability
or are otherwise made subject to liability based on the above matters, it could
have a material adverse effect on FirstEnergy's or its subsidiaries' financial
condition, results of operations and cash flows.
89
15. FIRSTENERGY
INTRA-SYSTEM GENERATION ASSET TRANSFERS
On
May 13,
2005, Penn, and on May 18, 2005, the Ohio Companies entered into certain
agreements implementing a series of intra-system generation asset transfers
that
were completed in the fourth quarter of 2005. The asset transfers resulted
in
the respective undivided ownership interests of the Ohio Companies and Penn
in
FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and
FGCO, respectively. The generating plant interests transferred do not include
leasehold interests of CEI, TE and OE in certain of the plants that are
currently subject to sale and leaseback arrangements with non-affiliates.
On
October 24, 2005,
the Ohio Companies and Penn completed the intra-system transfer of non-nuclear
generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master
Facility Lease with the Ohio Companies and Penn, leased, operated and maintained
the non-nuclear generation assets that it now owns. The asset transfers were
consummated pursuant to FGCO's purchase option under the Master Facility
Lease.
On
December 16,
2005, the Ohio Companies and Penn completed the intra-system transfer of their
respective ownership in the nuclear generation assets to NGC through, in the
case of OE and Penn, an asset spin-off by way of dividend and, in the case
of
CEI and TE, a sale at net book value. FENOC continues to operate and maintain
the nuclear generation assets.
These
transactions
were pursuant to the Ohio Companies’ and Penn’s restructuring plans that were
approved by the PUCO and the PPUC, respectively, under applicable Ohio and
Pennsylvania electric utility restructuring legislation. Consistent with the
restructuring plans, generation assets that had been owned by the Ohio Companies
and Penn were required to be separated from the regulated delivery business
of
those companies through transfer to a separate corporate entity. The
transactions essentially completed the divestitures contemplated by the
restructuring plans by transferring the ownership interests to NGC and FGCO
without impacting the operation of the plants.
16. SEGMENT
INFORMATION
FirstEnergy
has two
reportable segments: regulated services and power supply management services.
The aggregate “Other” segments do not individually meet the criteria to be
considered a reportable segment. FirstEnergy's primary segment is its regulated
services segment, whose operations include the regulated sale of electricity
and
distribution and transmission services by its eight utility subsidiaries in
Ohio, Pennsylvania and New Jersey. The power supply management services segment
primarily consists of the subsidiaries (FES, FGCO, NGC and FENOC) that sell
electricity in deregulated markets and operate and now own the generation
facilities of OE, CEI, TE and Penn resulting from the deregulation of the
Companies' electric generation business. “Other” consists of MYR (a construction
service company), retail natural gas operations (recently sold - see Note 8)
and
telecommunications services. The assets and revenues for the other business
operations are below the quantifiable threshold for operating segments for
separate disclosure as “reportable segments.”
The
regulated
services segment designs, constructs, operates and maintains FirstEnergy's
regulated transmission and distribution systems. Its revenues are primarily
derived from electricity delivery and transition cost recovery. Assets of the
regulated services segment as of December 31, 2004 included generating units
that were leased or whose output had been sold to the power supply management
services segment (see Note 15). The regulated services segment’s internal
revenues represented the rental revenues for the generating unit leases which
ceased in the fourth quarter of 2005 as a result of the intra-system asset
transfers (see Note 15).
The
power supply
management services segment supplies all of the electric power needs of
FirstEnergy’s end-use customers through retail and wholesale arrangements,
including regulated retail sales to meet the PLR requirements of our Ohio and
Pennsylvania companies and competitive retail sales to commercial and industrial
businesses primarily in Ohio, Pennsylvania and Michigan. This business segment
owns and operates our generating facilities and purchases electricity from
the
wholesale market to meet our sales obligations (See Note 15.) The segment's
net
income is primarily derived from all electric generation sales revenues less
the
related costs of electricity generation, including purchased power, and net
transmission, congestion and ancillary costs charged by PJM and MISO to deliver
energy to retail customers.
Segment
reporting
for interim periods in 2004 and 2003 have been reclassified to conform to the
current year business segment organization and operations and the
reclassification of discontinued operations (see Note 2(J)). FSG is being
disclosed as a reporting segment due to its subsidiaries qualifying as held
for
sale (see Note 2(J) for discussion of the divestiture of three of those
subsidiaries in 2005). Interest expense on holding company debt and corporate
support services revenues and expenses are included in "Reconciling
Items."
90
Segment
Financial Information
|
Power
|
|||||||||||||||||||
|
Supply
|
|||||||||||||||||||
|
Regulated
|
Management
|
Facilities
|
Reconciling
|
||||||||||||||||
|
Services
|
Services
|
Services
|
Other
|
Adjustments
|
Consolidated
|
||||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
2005
|
|||||||||||||||||||
|
External
revenues
|
$
|
5,483
|
$
|
5,739
|
$
|
212
|
$
|
533
|
$
|
22
|
$
|
11,989
|
|||||||
|
Internal
revenues
|
270
|
-
|
-
|
-
|
(270
|
)
|
-
|
||||||||||||
|
Total
revenues
|
5,753
|
5,739
|
212
|
533
|
(248
|
)
|
11,989
|
||||||||||||
|
Depreciation
and amortization
|
1,392
|
45
|
-
|
2
|
26
|
1,465
|
|||||||||||||
|
Investment
income
|
218
|
-
|
-
|
-
|
-
|
218
|
|||||||||||||
|
Net
interest
charges
|
390
|
54
|
1
|
6
|
206
|
657
|
|||||||||||||
|
Income
taxes
|
763
|
36
|
3
|
13
|
(61
|
)
|
754
|
||||||||||||
|
Income
before
discontinued operations and
|
1,067
|
23
|
(8
|
)
|
17
|
(226
|
)
|
873
|
|||||||||||
|
cumulative
effect of accounting change
|
|||||||||||||||||||
|
Discontinued
operations
|
-
|
-
|
13
|
5
|
-
|
18
|
|||||||||||||
|
Cumulative
effect of accounting change
|
(21
|
)
|
(9
|
)
|
-
|
-
|
-
|
(30
|
)
|
||||||||||
|
Net
income
|
1,046
|
14
|
5
|
22
|
(226
|
)
|
861
|
||||||||||||
|
Total
assets
|
23,975
|
6,556
|
69
|
536
|
705
|
31,841
|
|||||||||||||
|
Total
goodwill
|
5,932
|
24
|
-
|
54
|
-
|
6,010
|
|||||||||||||
|
Property
additions
|
788
|
375
|
2
|
6
|
36
|
1,207
|
|||||||||||||
|
2004
|
|||||||||||||||||||
|
External
revenues
|
$
|
5,191
|
$
|
6,204
|
$
|
217
|
$
|
444
|
$
|
4
|
$
|
12,060
|
|||||||
|
Internal
revenues
|
318
|
-
|
-
|
-
|
(318
|
)
|
-
|
||||||||||||
|
Total
revenues
|
5,509
|
6,204
|
217
|
444
|
(314
|
)
|
12,060
|
||||||||||||
|
Depreciation
and amortization
|
1,422
|
35
|
2
|
3
|
34
|
1,496
|
|||||||||||||
|
Investment
income
|
205
|
-
|
-
|
-
|
-
|
205
|
|||||||||||||
|
Net
interest
charges
|
363
|
37
|
1
|
14
|
252
|
667
|
|||||||||||||
|
Income
taxes
|
740
|
72
|
(8
|
)
|
(24
|
)
|
(107
|
)
|
673
|
||||||||||
|
Income
before
discontinued operations
|
1,015
|
104
|
(13
|
)
|
40
|
(250
|
)
|
896
|
|||||||||||
|
Discontinued
operations
|
-
|
-
|
(23
|
)
|
5
|
-
|
(18
|
)
|
|||||||||||
|
Net
income
|
1,015
|
104
|
(36
|
)
|
45
|
(250
|
)
|
878
|
|||||||||||
|
Total
assets
|
28,308
|
1,488
|
135
|
625
|
479
|
31,035
|
|||||||||||||
|
Total
goodwill
|
5,951
|
24
|
-
|
75
|
-
|
6,050
|
|||||||||||||
|
Property
additions
|
572
|
246
|
3
|
4
|
21
|
846
|
|||||||||||||
|
2003
|
|||||||||||||||||||
|
External
revenues
|
$
|
5,068
|
$
|
5,487
|
$
|
179
|
$
|
547
|
$
|
44
|
$
|
11,325
|
|||||||
|
Internal
revenues
|
319
|
-
|
-
|
-
|
(319
|
)
|
-
|
||||||||||||
|
Total
revenues
|
5,387
|
5,487
|
179
|
547
|
(275
|
)
|
11,325
|
||||||||||||
|
Depreciation
and amortization
|
1,423
|
29
|
-
|
2
|
35
|
1,489
|
|||||||||||||
|
Investment
income
|
185
|
-
|
-
|
-
|
-
|
185
|
|||||||||||||
|
Net
interest
charges
|
493
|
44
|
1
|
107
|
164
|
809
|
|||||||||||||
|
Income
taxes
|
779
|
(222
|
)
|
(34
|
)
|
(19
|
)
|
(96
|
)
|
408
|
|||||||||
|
Income
before
discontinued operations and
|
|||||||||||||||||||
|
cumulative
effect of accounting change
|
1,063
|
(320
|
)
|
(55
|
)
|
(64
|
)
|
(180
|
)
|
444
|
|||||||||
|
Discontinued
operations
|
-
|
-
|
(26
|
)
|
(97
|
)
|
-
|
(123
|
)
|
||||||||||
|
Cumulative
effect of accounting change
|
101
|
-
|
-
|
1
|
-
|
102
|
|||||||||||||
|
Net
income
|
1,164
|
(320
|
)
|
(81
|
)
|
(160
|
)
|
(180
|
)
|
423
|
|||||||||
|
Total
assets
|
29,789
|
1,423
|
166
|
912
|
620
|
32,910
|
|||||||||||||
|
Total
goodwill
|
5,993
|
24
|
36
|
75
|
-
|
6,128
|
|||||||||||||
|
Property
additions
|
434
|
335
|
4
|
9
|
74
|
856
|
|||||||||||||
Reconciling
adjustments to segment operating results from internal management reporting
to
consolidated external financial reporting primarily consist of interest expense
related to holding company debt, corporate support services revenues and
expenses, fuel marketing revenues, which are reflected as reductions to expenses
for internal management reporting purposes, and elimination of intersegment
transactions.
|
Products
and Services*
|
|
|
|
EnergyRelated
|
|||||
|
|
Electricity
|
Sales
and
|
|||||
|
Year
|
Sales
|
Services
|
|||||
|
2005
|
$
|
10,546
|
$
|
708
|
|||
|
2004
|
10,831
|
551
|
|||||
|
2003
|
10,205
|
601
|
|||||
*
See Note 2(J) for
discussion of discontinued operations.
91
Geographic
Information
Following
the sales
of international operations in 2002 through January of 2004, less than 1% of
FirstEnergy's revenues and assets were in foreign countries in 2003 and 2004.
See Note 8 for a discussion of the divestitures.
|
17.
|
NEW
ACCOUNTING STANDARDS AND
INTERPRETATIONS
|
FSP
FAS 115-1
and FAS 124-1, "The Meaning of Other-Than-Temporary Impairment and its
Application to Certain Investments"
Issued
in November
2005, FSP 115-1 and FAS 124-1 addresses the determination as to when an
investment is considered impaired, whether that impairment is other than
temporary, and the measurement of an impairment loss. The FSP finalized and
renamed EITF 03-1 and 03-1-a to FSP FAS 115-1. This FSP will (1) nullify certain
requirements of Issue 03-1 and supersedes EITF topic No. D-44, "Recognition
of
Other Than Temporary Impairment upon the Planned Sale of a Security Whose Cost
Exceeds Fair Value," (2) clarify that an investor should recognize an impairment
loss no later than when the impairment is deemed other than temporary, even
if a
decision to sell has not been made, and (3) be effective for
other-than-temporary impairment and analyses conducted in periods beginning
after September 15, 2005. The FSP requires prospective application with an
effective date for reporting periods beginning after December 15, 2005.
FirstEnergy is currently evaluating this FSP and any impact on its
investments.
FSP
No. FAS
13-1, "Accounting for Rental Costs Incurred during the Construction
Period"
Issued
in October
2005, FSP No. FAS 13-1 requires rental costs associated with ground or building
operating leases that are incurred during a construction period to be recognized
as rental expense. The effective date of the FSP guidance is the first reporting
period beginning after December 15, 2005. FirstEnergy will apply this FSP to
all
construction projects, beginning January 1, 2006.
EITF
Issue
04-13, "Accounting for Purchases and Sales of Inventory with the Same
Counterparty"
In
September 2005,
the EITF reached a final consensus on Issue 04-13 concluding that two or more
legally separate exchange transactions with the same counterparty should be
combined and considered as a single arrangement for purposes of applying APB
29,
when the transactions were entered into "in contemplation" of one another.
If
two transactions are combined and considered a single arrangement, the EITF
reached a consensus that an exchange of inventory should be accounted for at
fair value. Although electric power is not capable of being held in inventory,
there is no substantive conceptual distinction between exchanges involving
power
and other storable inventory. Therefore, FirstEnergy will adopt this EITF
effective for new arrangements entered into, or modifications or renewals of
existing arrangements, in interim or annual periods beginning after March 15,
2006.
|
SFAS
154 -
“Accounting Changes and Error Corrections - a replacement of APB Opinion
No. 20 and FASB Statement No.
3”
|
In
May 2005, the
FASB issued SFAS 154 to change the requirements for accounting and reporting
a
change in accounting principle. It applies to all voluntary changes in
accounting principle and to changes required by an accounting pronouncement
when
that pronouncement does not include specific transition provisions. This
Statement requires retrospective application to prior periods’ financial
statements of changes in accounting principle, unless it is impracticable to
determine either the period-specific effects or the cumulative effect of the
change. In those instances, this Statement requires that the new accounting
principle be applied to the balances of assets and liabilities as of the
beginning of the earliest period for which retrospective application is
practicable and that a corresponding adjustment be made to the opening balance
of retained earnings (or other appropriate components of equity or net assets
in
the statement of financial position) for that period rather than being reported
in the Consolidated Statements of Income. This Statement also requires that
a
change in depreciation, amortization, or depletion method for long-lived,
nonfinancial assets be accounted for as a change in accounting estimate affected
by a change in accounting principle. The provisions of this Statement are
effective for accounting changes and corrections of errors made in fiscal years
beginning after December 15, 2005. FirstEnergy and the Companies adopted
this Statement effective January 1, 2006.
|
SFAS
153,
“Exchanges of Nonmonetary Assets - an amendment of APB Opinion No.
29”
|
In
December 2004,
the FASB issued SFAS 153 amending APB 29, which was based on the principle
that
nonmonetary assets should be measured based on the fair value of the assets
exchanged. The guidance in APB 29 included certain exceptions to that principle.
SFAS 153 eliminates the exception from fair value measurement for nonmonetary
exchanges of similar productive assets and replaces it with an exception for
exchanges that do not have commercial substance. This Statement specifies that
a
nonmonetary exchange has commercial substance if the future cash flows of the
entity are expected to change significantly as a result of the exchange. The
provisions of this Statement are effective January 1, 2006 for FirstEnergy.
This FSP is not expected to have a material impact on FirstEnergy's financial
statements.
92
SFAS
123(R),
“Share-Based Payment”
In
December 2004,
the FASB issued SFAS 123(R), a revision to SFAS 123, which requires
expensing stock options in the financial statements. Important to applying
the
new standard is understanding how to (1) measure the fair value of stock-based
compensation awards and (2) recognize the related compensation cost for those
awards. For an award to qualify for equity classification, it must meet certain
criteria in SFAS 123(R). An award that does not meet those criteria will be
classified as a liability and remeasured each period. SFAS 123(R) retains
SFAS 123's requirements on accounting for income tax effects of stock-based
compensation. In April 2005, the SEC delayed the effective date of
SFAS 123(R) to annual, rather than interim, periods that begin after
June 15, 2005. FirstEnergy adopted this Statement effective January 1,
2006 with modified prospective application. The Company uses the Black-Scholes
option-pricing model to value options for disclosure purposes only and continued
to apply this pricing model with the adoption of SFAS 123(R). As discussed
in Note 4, the Company reduced its use of stock options beginning in 2005,
with
no stock options being awarded subsequent to 2004. As a result, all currently
unvested stock options will vest by 2008. We expect the adoption of SFAS 123(R)
will increase annual compensation expense (after-tax) by approximately $7
million, $2 million and $0.5 million in 2006, 2007 and 2008, respectively
or
$0.02 per share in 2006 and less than $0.01 per share in 2007 and 2008.
SFAS
151,
“Inventory Costs - an amendment of ARB No. 43, Chapter 4”
In
November 2004,
the FASB issued SFAS 151 to clarify the accounting for abnormal amounts of
idle
facility expense, freight, handling costs and wasted material (spoilage).
Previous guidance stated that in some circumstances these costs may be “so
abnormal” that they would require treatment as current period costs. SFAS 151
requires abnormal amounts for these items to always be recorded as current
period costs. In addition, this Statement requires that allocation of fixed
production overheads to the cost of conversion be based on the normal capacity
of the production facilities. The provisions of this statement are effective
for
inventory costs incurred by FirstEnergy beginning January 1, 2006.
FirstEnergy does not expect this Statement to have a material impact on its
financial statements.
93
18.
SUMMARY
OF
QUARTERLY FINANCIAL DATA (UNAUDITED)
The
following
summarizes certain consolidated operating results by quarter for 2005 and 2004.
Certain financial results have been reclassified to discontinued operations
from
amounts previously reported due to the divestiture of certain non-core
businesses in 2005 as discussed in Note 2(J).
|
March
31,
|
June
30,
|
September
30,
|
December
31,
|
||||||||||
|
Three
Months Ended
|
2005
|
2005
|
2005
|
2005
|
|||||||||
|
|
(In
millions, except per share amounts)
|
||||||||||||
|
Revenues
|
$
|
2,750
|
$
|
2,843
|
$
|
3,504
|
$
|
2,892
|
|||||
|
Expenses
|
2,358
|
2,309
|
2,861
|
2,395
|
|||||||||
|
Other
Expense,
net
|
130
|
114
|
74
|
122
|
|||||||||
|
Income
Taxes
|
121
|
241
|
237
|
155
|
|||||||||
|
Income
Before
Discontinued Operations and
|
|
|
|
|
|||||||||
|
Cumulative
Effect of Accounting Change
|
141
|
179
|
332
|
220
|
|||||||||
|
Discontinued
Operations (Net of Income Taxes)
|
19
|
(1
|
)
|
-
|
-
|
||||||||
|
Cumulative
Effect of Accounting Change (Net of Income
|
|
|
|
|
|||||||||
|
Taxes)
|
-
|
-
|
-
|
(30
|
)
|
||||||||
|
Net
Income
|
$
|
160
|
$
|
178
|
$
|
332
|
$
|
190
|
|||||
|
|
|
|
|
|
|||||||||
|
Basic
Earnings
Per Share of Common Stock:
|
|
|
|
|
|||||||||
|
Before
Discontinued Operations and Cumulative Effect
|
|
|
|
|
|||||||||
|
of
Accounting Change
|
$
|
0.43
|
$
|
0.54
|
$
|
1.01
|
$
|
0.67
|
|||||
|
Discontinued
Operations
|
0.06
|
-
|
-
|
-
|
|||||||||
|
Cumulative
Effect of Accounting Change
|
-
|
-
|
-
|
(0.09
|
)
|
||||||||
|
Basic
Earnings
Per Share of Common Stock
|
$
|
0.49
|
$
|
0.54
|
$
|
1.01
|
$
|
0.58
|
|||||
|
|
|
|
|
|
|||||||||
|
Diluted
Earnings Per Share of Common Stock:
|
|
|
|
|
|||||||||
|
Before
Discontinued Operations and Cumulative Effect
|
|
|
|
|
|||||||||
|
of
Accounting Change
|
$
|
0.42
|
$
|
0.54
|
$
|
1.01
|
$
|
0.67
|
|||||
|
Discontinued
Operations
|
0.06
|
-
|
-
|
-
|
|||||||||
|
Cumulative
Effect of Accounting Change
|
-
|
-
|
-
|
(0.09
|
)
|
||||||||
|
Diluted
Earnings Per Share of Common Stock
|
$
|
0.48
|
$
|
0.54
|
$
|
1.01
|
$
|
0.58
|
|||||
|
|
March
31,
|
June
30,
|
September
30,
|
December
31,
|
|||||||||
|
Three
Months Ended
|
2004
|
2004
|
2004
|
2004
|
|||||||||
|
|
(In
millions, except per share amounts)
|
||||||||||||
|
Revenues
|
$
|
2,934
|
$
|
2,929
|
$
|
3,365
|
$
|
2,832
|
|||||
|
Expenses
|
2,524
|
2,418
|
2,752
|
2,335
|
|||||||||
|
Other
Expense,
net
|
123
|
133
|
102
|
104
|
|||||||||
|
Income
Taxes
|
115
|
176
|
215
|
167
|
|||||||||
|
Income
Before
Discontinued Operations
|
172
|
202
|
296
|
226
|
|||||||||
|
Discontinued
Operations (Net of Income Taxes)
|
2
|
2
|
2
|
(24
|
)
|
||||||||
|
Net
Income
|
$
|
174
|
$
|
204
|
$
|
298
|
$
|
202
|
|||||
|
|
|
|
|
|
|||||||||
|
Basic
Earnings
Per Share of Common Stock:
|
|
|
|
|
|||||||||
|
Before
Discontinued Operations
|
0.53
|
0.61
|
0.90
|
0.69
|
|||||||||
|
Discontinued
Operations
|
-
|
0.01
|
0.01
|
(0.08
|
)
|
||||||||
|
Basic
Earnings
Per Share of Common Stock
|
$
|
0.53
|
$
|
0.62
|
$
|
0.91
|
$
|
0.61
|
|||||
|
|
|
|
|
|
|||||||||
|
Diluted
Earnings Per Share of Common Stock:
|
|
|
|
|
|||||||||
|
Before
Discontinued Operations
|
0.53
|
0.61
|
0.90
|
0.69
|
|||||||||
|
Discontinued
Operations
|
-
|
0.01
|
0.01
|
(0.08
|
)
|
||||||||
|
Diluted
Earnings Per Share of Common Stock
|
$
|
0.53
|
$
|
0.62
|
$
|
0.91
|
$
|
0.61
|
|||||
Results
for the
fourth quarter of 2005 included a $30 million, net of tax, or $0.09 per share,
cumulative effect adjustment associated with the adoption of FIN 47 (see Note
12), a $9 million (with no corresponding tax impact) or $0.03 per share,
non-cash charge for impairment of goodwill of MYR as required by SFAS 142 (see
Note 2(H)) and a $28 million (which is not deductible for income tax
purposes), or $0.09 per share, charge related to the Davis-Besse DOJ and NRC
fines (see Note 14). Net income
for the
fourth quarter also included a $15 million, net of tax, or $0.05 per share,
charge relating to prior periods as a result of a JCP&L tax audit adjustment
which was applicable to prior quarters in 2005 and prior years. Management
concluded that the adjustment was not material to FirstEnergy's reported
consolidated results of operations for any quarter of 2004 or 2005, nor was
it
material to the consolidated balance sheets and consolidated cash flows for
any
of these quarters.
Results
for the
fourth quarter of 2004 included a $37 million net-of-tax, or $0.11 per share,
non-cash charge for impairment of goodwill and other assets of FSG as required
by SFAS 142 and SFAS 144 (see Note 2 (H)).