Firstenergy Corp 10-K, filed Mar 2, 2006: Exhibit 13-7 Annual Report - Penelec
PENNSYLVANIA
ELECTRIC COMPANY
2005
ANNUAL
REPORT TO STOCKHOLDERS
Pennsylvania
Electric Company is a wholly owned electric utility operating subsidiary of
FirstEnergy Corp. It engages in the distribution and sale of electric energy
in
an area of approximately 17,600 square miles in western Pennsylvania. It also
engages in the sale, purchase and interchange of electric energy with other
electric companies. The area it serves has a population of approximately
1.7 million. The Company is a lessee of the property of the Waverly
Electric Light & Power Company, which provides electric energy service in
Waverly, New York and vicinity.
|
Contents
|
Page
|
|
|
Glossary
of
Terms
|
i-ii
|
|
|
Report
of
Independent Registered Public Accounting Firm
|
1
|
|
|
Selected
Financial Data
|
2
|
|
|
Management's
Discussion and Analysis
|
3-13
|
|
|
Consolidated
Statements of Income
|
14
|
|
|
Consolidated
Balance Sheets
|
15
|
|
|
Consolidated
Statements of Capitalization
|
16
|
|
|
Consolidated
Statements of Common Stockholder's Equity
|
17
|
|
|
Consolidated
Statements of Preferred Stock
|
17
|
|
|
Consolidated
Statements of Cash Flows
|
18
|
|
|
Consolidated
Statements of Taxes
|
19
|
|
|
Notes
to
Consolidated Financial Statements
|
20-35
|
GLOSSARY
OF
TERMS
The
following
abbreviations and acronyms are used in this report to identify Pennsylvania
Electric Company and its affiliates:
|
ATSI
|
American
Transmission Systems, Inc., owns and operates transmission
facilities
|
|
|
CEI
|
The
Cleveland
Electric Illuminating Company, an Ohio electric utility operating
subsidiary
|
|
|
Companies
|
OE,
CEI, TE,
Penn, JCP&L, Met-Ed and Penelec
|
|
|
FES
|
FirstEnergy
Solutions Corp., provides energy-related products and
services
|
|
|
FESC
|
FirstEnergy
Service Company, provides legal, financial, and other corporate support
services
|
|
|
FirstEnergy
|
FirstEnergy
Corp., a public utility holding company
|
|
|
GPU
|
GPU,
Inc.,
former parent of JCP&L, Met-Ed and Penelec, which merged with
FirstEnergy on
November 7,
2001
|
|
|
GPUS
|
GPU
Service
Company, previously provided corporate support services
|
|
|
JCP&L
|
Jersey
Central
Power & Light Company, an affiliated New Jersey electric
utility
|
|
|
Met-Ed
|
Metropolitan
Edison Company, an affiliated Pennsylvania electric
utility
|
|
|
NGC
|
FirstEnergy
Nuclear Generation Corp., owns nuclear generating
facilities
|
|
|
OE
|
Ohio
Edison
Company, an affiliated Ohio electric utility
|
|
|
Penelec
|
Pennsylvania
Electric Company
|
|
|
Penn
|
Pennsylvania
Power Company, an affiliated Pennsylvania electric
utility
|
|
|
TE
|
The
Toledo
Edison Company, an affiliated Ohio electric utility
|
|
|
The
following
abbreviations and acronyms are used to identify frequently used terms
in
this report:
|
||
|
ALJ
|
Administrative
Law Judge
|
|
|
AOCL
|
Accumulated
Other Comprehensive Loss
|
|
|
APB
|
Accounting
Principles Board
|
|
|
APB
29
|
APB
Opinion
No. 29, "Accounting for Accounting Research Bulletin"
|
|
|
ARB
|
Accounting
Research Bulletin
|
|
|
ARB
43
|
ARB
No. 43,
"Restatement and Revision of Accounting Research
Bulletin"
|
|
|
ARO
|
Asset
Retirement Obligation
|
|
|
CTC
|
Competitive
Transition Charge
|
|
|
ECAR
|
East
Central
Area Reliability Coordination Agreement
|
|
|
EITF
|
Emerging
Issues Task Force
|
|
|
EITF
03-1
|
EITF
Issue No.
03-1, "The Meaning of Other-Than-Temporary and Its Application to
Certain
Investments”
|
|
|
EITF
04-13
|
EITF
Issue No.
04-13, "Accounting for Purchases and Sales of Inventory with the
Same
Counterparty
|
|
|
EPACT
|
Energy
Policy
Act of 2005
|
|
|
FASB
|
Financial
Accounting Standards Board
|
|
|
FERC
|
Federal
Energy
Regulatory Commission
|
|
|
FIN
46R
|
FASB
Interpretation No. 46 (revised December 2003), "Consolidation of
Variable
Interest Entities"
|
|
|
FIN
47
|
FIN
47,
"Accounting for Conditional Asset Retirement Obligations - an
interpretation of FASB Statement No. 143"
|
|
|
FMB
|
First
Mortgage
Bonds
|
|
|
FSP
|
FASB
Staff
Position
|
|
|
FSP
106-1
|
FASB
Staff
Position No.106-1, "Accounting and Disclosure Requirements Related
to the
Medicare
Prescription Drug, Improvement and Modernization Act of
2003"
|
|
|
FSP
106-2
|
FASB
Staff
Position No.106-2, "Accounting and Disclosure Requirements Related
to the
Medicare
Prescription Drug, Improvement and Modernization Act of
2003"
|
|
|
FSP
115-1 and
FAS 124-1
|
FASB
Staff
Position No. 115-1 and FAS 124-1, "The Meaning of Other-Than-Temporary
Impairment
and
its Application to Certain Investments"
|
|
|
GAAP
|
Accounting
Principles Generally Accepted in the United States
|
|
|
IRS
|
Internal
Revenue Service
|
|
|
KWH
|
Kilowatt-hours
|
|
|
Medicare
Act
|
Medicare
Prescription Drug, Improvement and Modernization Act of
2003
|
|
|
MEIUG
|
Met-Ed
Industrial Users Group
|
|
|
MISO
|
Midwest
Independent Transmission System Operator, Inc.
|
|
|
Moody’s
|
Moody’s
Investors Service
|
|
|
NERC
|
North
American
Electric Reliability Council
|
|
|
NUG
|
Non-Utility
Generation
|
|
|
OCA
|
Office
of
Consumer Advocate
|
|
i
GLOSSARY
OF
TERMS Cont'd.
|
OCI
|
Other
Comprehensive Income
|
|
OPEB
|
Other
Post-Employment Benefits
|
|
OSBA
|
Office
of
Small Business Advocate
|
|
OTS
|
Office
of
Trial Staff
|
|
PICA
|
Penelec
Industrial Customer Association
|
|
PJM
|
PJM
Interconnection L. L. C.
|
|
PLR
|
Provider
of
Last Resort
|
|
PPUC
|
Pennsylvania
Public Utility Commission
|
|
PRP
|
Potentially
Responsible Party
|
|
PUCO
|
Public
Utilities Commission of Ohio
|
|
PUHCA
|
Public
Utility
Holding Company Act
|
|
S&P
|
Standard
&
Poor’s Ratings Service
|
|
SEC
|
United
States
Securities and Exchange Commission
|
|
SFAC
|
Statement
of
Financial Accounting Concepts
|
|
SFAC
7
|
SFAC
No. 7
“Using Cash Flow Information and Present Value in Accounting
Measurements”
|
|
SFAS
|
Statement
of
Financial Accounting Standards
|
|
SFAS
71
|
SFAS
No. 71,
"Accounting for the Effects of Certain Types of
Regulation"
|
|
SFAS
87
|
SFAS
No. 87,
"Employers' Accounting for Pensions"
|
|
SFAS
101
|
SFAS
No. 101,
"Accounting for Discontinuation of Application of SFAS
71"
|
|
SFAS
106
|
SFAS
No. 106,
"Employers' Accounting for Postretirement Benefits Other Than
Pensions"
|
|
SFAS
115
|
SFAS
No. 115,
"Accounting for Certain Investments in Debt and Equity
Securities"
|
|
SFAS
133
|
SFAS
No. 133,
“Accounting for Derivative Instruments and Hedging
Activities”
|
|
SFAS
142
|
SFAS
No. 142,
"Goodwill and Other Intangible Assets"
|
|
SFAS
143
|
SFAS
No. 143,
"Accounting for Asset Retirement Obligations"
|
|
SFAS
144
|
SFAS
No. 144,
"Accounting for the Impairment or Disposal of Long-Lived
Assets"
|
|
SFAS
151
|
SFAS
No. 151,
"Inventory Costs - an amendment of ARB No. 43, Chapter
4"
|
|
SFAS
153
|
SFAS
No. 153,
"Exchanges of Nonmonetary Assets - an amendment of APB Opinion No.
29"
|
|
SFAS
154
|
SFAS
No. 154,
"Accounting Changes and Error Corrections - a replacement of APB
Opinion
No. 20 and FASB Statement No. 3"
|
|
TMI-1
|
Three
Mile
Island Unit 1
|
|
TMI-2
|
Three
Mile
Island Unit 2
|
|
VIE
|
Variable
Interest Entity
|
ii
Report
of
Independent Registered Public Accounting Firm
To
the Stockholder
and Board of
Directors
of
Pennsylvania Electric Company:
In
our opinion, the
accompanying consolidated balance sheets and the related consolidated statements
of income, capitalization, common stockholder’s equity, preferred stock, cash
flows and taxes present fairly, in all material respects, the financial position
of Pennsylvania Electric Company and its subsidiaries at December 31, 2005
and 2004, and the results of their operations and their cash flows for each
of
the three years in the period ended December 31, 2005 in conformity with
accounting principles generally accepted in the United States of America. These
financial statements are the responsibility of the Company’s management. Our
responsibility is to express an opinion on these financial statements based
on
our audits. We conducted our audits of these statements in accordance with
the
standards of the Public Company Accounting Oversight Board (United States).
Those standards require that we plan and perform the audit to obtain reasonable
assurance about whether the financial statements are free of material
misstatement. An audit includes examining, on a test basis, evidence supporting
the amounts and disclosures in the financial statements, assessing the
accounting principles used and significant estimates made by management, and
evaluating the overall financial statement presentation. We believe that our
audits provide a reasonable basis for our opinion.
As
discussed in Note
2(G) and Note 9 to the consolidated financial statements, the Company changed
its method of accounting for asset retirement obligations as of January 1,
2003 and conditional asset retirement obligations as of December 31, 2005.
PricewaterhouseCoopers
LLP
Cleveland,
Ohio
February
27,
2006
1
The
following
selected financial data should be read in conjunction with, and is qualified
in
its entirety by reference to, the sections entitled “Management’s Discussion and
Analysis of Results of Operations and Financial Condition” and with our
consolidated financial statements and the “Notes to Consolidated Financial
Statements.” Our Consolidated Statements of Income are not necessarily
indicative of future conditions or results of operations.
|
PENNSYLVANIA
ELECTRIC COMPANY
|
|||||||||||||||||||
|
SELECTED
FINANCIAL DATA
|
|||||||||||||||||||
|
Nov
7
-
|
Jan
1-
|
||||||||||||||||||
|
2005
|
2004
|
2003
|
2002
|
Dec.
31, 2001
|
Nov.
6, 2001
|
||||||||||||||
|
(Dollars
in thousands)
|
|||||||||||||||||||
|
GENERAL
FINANCIAL INFORMATION:
|
|||||||||||||||||||
|
Operating
Revenues
|
$
|
1,122,025
|
$
|
1,036,070
|
$
|
974,857
|
$
|
1,027,102
|
$
|
140,062
|
$
|
834,548
|
|||||||
|
Operating
Income
|
$
|
63,977
|
$
|
73,680
|
$
|
60,245
|
$
|
88,190
|
$
|
14,341
|
$
|
70,049
|
|||||||
|
Income
Before
Cumulative Effect
|
|||||||||||||||||||
|
of
Accounting
Changes
|
$
|
27,553
|
$
|
36,030
|
$
|
20,237
|
$
|
50,910
|
$
|
10,795
|
$
|
23,718
|
|||||||
|
Net
Income
|
$
|
26,755
|
$
|
36,030
|
$
|
21,333
|
$
|
50,910
|
$
|
10,795
|
$
|
23,718
|
|||||||
|
Total
Assets
|
$
|
2,698,577
|
$
|
2,813,752
|
$
|
3,052,243
|
$
|
3,163,254
|
$
|
3,300,269
|
|||||||||
|
CAPITALIZATION
AS OF DECEMBER 31:
|
|||||||||||||||||||
|
Common
Stockholder’s Equity
|
$
|
1,333,877
|
$
|
1,305,015
|
$
|
1,297,332
|
$
|
1,353,704
|
$
|
1,306,576
|
|||||||||
|
Company-Obligated
Trust
|
|||||||||||||||||||
|
Preferred
Securities
|
-
|
-
|
-
|
92,214
|
92,000
|
||||||||||||||
|
Long-Term
Debt
and Other Long-Term Obligations
|
476,504
|
481,871
|
438,764
|
470,274
|
472,400
|
||||||||||||||
|
Total
Capitalization
|
$
|
1,810,381
|
$
|
1,786,886
|
$
|
1,736,096
|
$
|
1,916,192
|
$
|
1,870,976
|
|||||||||
|
CAPITALIZATION
RATIOS:
|
|||||||||||||||||||
|
Common
Stockholder’s Equity
|
73.7
|
%
|
73.0
|
%
|
74.7
|
%
|
70.7
|
%
|
69.8%
|
|
|||||||||
|
Company-Obligated
Trust
|
|||||||||||||||||||
|
Preferred
Securities
|
-
|
-
|
-
|
4.8
|
4.9
|
||||||||||||||
|
Long-Term
Debt
and Other Long-Term Obligations
|
26.3
|
27.0
|
25.3
|
24.5
|
25.3
|
||||||||||||||
|
Total
Capitalization
|
100.0
|
%
|
100.0
|
%
|
100.0
|
%
|
100.0
|
%
|
100.0%
|
|
|||||||||
|
DISTRIBUTION
KWH DELIVERIES (Millions):
|
|||||||||||||||||||
|
Residential
|
4,457
|
4,249
|
4,166
|
4,196
|
721
|
3,264
|
|||||||||||||
|
Commercial
|
5,010
|
4,792
|
4,748
|
4,753
|
758
|
3,733
|
|||||||||||||
|
Industrial
|
4,729
|
4,589
|
4,443
|
4,336
|
685
|
3,658
|
|||||||||||||
|
Other
|
40
|
39
|
41
|
42
|
7
|
34
|
|||||||||||||
|
Total
|
14,236
|
13,669
|
13,398
|
13,327
|
2,171
|
10,689
|
|||||||||||||
|
CUSTOMERS
SERVED:
|
|||||||||||||||||||
|
Residential
|
506,113
|
505,999
|
503,738
|
503,007
|
502,901
|
||||||||||||||
|
Commercial
|
78,847
|
78,519
|
77,737
|
77,125
|
76,005
|
||||||||||||||
|
Industrial
|
2,458
|
2,492
|
2,545
|
2,605
|
2,652
|
||||||||||||||
|
Other
|
1,053
|
1,056
|
1,069
|
1,081
|
1,099
|
||||||||||||||
|
Total
|
588,471
|
588,066
|
585,089
|
583,818
|
582,657
|
||||||||||||||
|
NUMBER
OF EMPLOYEES:
|
867
|
843
|
887
|
*
|
*
|
*
|
|||||||||||||
|
*
For
years
prior to 2003 Penelec's employees were employed by GPU Service
Company.
|
|||||||||||||||||||
2
PENNSYLVANIA
ELECTRIC COMPANY
Management’s
Discussion and Analysis of
Results
of
Operations and Financial Condition
Forward-looking
Statements. This
discussion
includes forward-looking statements based on information currently available
to
management. Such statements are subject to certain risks and uncertainties.
These statements typically contain, but are not limited to, the terms
"anticipate," "potential," "expect," "believe," "estimate" and similar words.
Actual results may differ materially due to the speed and nature of increased
competition and deregulation in the electric utility industry, economic or
weather conditions affecting future sales and margins, changes in markets for
energy services, changing energy and commodity market prices, replacement power
costs being higher than anticipated or inadequately hedged, the continued
ability of our regulated utilities to collect transition and other charges
or to
recover increased transmission costs, maintenance costs being higher than
anticipated, legislative and regulatory changes (including revised environmental
requirements), the repeal of PUHCA and the legal and regulatory changes
resulting from the implementation of the EPACT, the uncertainty of the timing
and amounts of the capital expenditures (including that such amounts could
be
higher than anticipated) or levels of emission reductions related to the
settlement agreement resolving the New Source Review litigation, adverse
regulatory or legal decisions and outcomes (including, but not limited to,
the
revocation of necessary licenses or operating permits, fines or other
enforcement actions and remedies) of governmental investigations and oversight,
including by the Securities and Exchange Commission, the United States
Attorney's Office, the Nuclear Regulatory Commission and the Pennsylvania Public
Utility Commission as disclosed in our Securities and Exchange Commission
filings, the continuing availability and operation of generating units, the
ability of generating units to continue to operate at, or near full capacity,
our inability to accomplish or realize anticipated benefits from strategic
goals
(including employee workforce factors), the anticipated benefits from our
voluntary pension plan contributions, our ability to improve electric commodity
margins and to experience growth in the distribution business, our ability
to
access the public securities and other capital markets and the cost of such
capital, the outcome, cost and other effects of present and potential legal
and
administrative proceedings and claims related to the August 14, 2003
regional power outage, the risks and other factors discussed from time to time
in our Securities and Exchange Commission filings, and other similar factors.
Also, a credit rating should not be viewed as a recommendation to buy, sell
or
hold securities and may be revised or withdrawn by a rating agency at any time.
We expressly disclaim any current intention to update any forward-looking
statements contained herein as a result of new information, future events,
or
otherwise.
Results
of
Operations
Net
income decreased
to $27 million in 2005, compared to $36 million in 2004. The decrease
in 2005 resulted from higher purchased power costs and other operating costs,
partially offset by higher operating revenues. Net income increased to
$36 million in 2004 from $21 million in 2003. In 2004, net income was
higher due to higher operating revenues and other income partially offset by
higher purchased power costs and other operating costs.
Operating
Revenues
Operating
revenues
increased by $86 million in 2005 compared to 2004, primarily due to higher
sales levels. Revenues from retail generation increased by $35 million due
mainly to a total 5.9% increase in KWH sales with increases in all sectors
(industrial - 8.5%, residential - 4.9% and commercial - 5.0%) due to unusually
warm summer temperatures and improved economic conditions in our service area
in
2005 compared to 2004. Retail generation KWH sales also increased as a result
of
reduced customer shopping in 2005 compared to 2004 as industrial customers
continued to return to us after switching to alternative suppliers (a 4.0
percentage point decrease in shopping). Revenues from distribution deliveries
increased by $11 million due to a 4.1% increase in electricity throughput,
reflecting the effect of the warmer summer temperatures, were partially offset
by lower unit prices. Transmission revenues increased $37 million in 2005
compared with 2004 in part from increased loads due to warmer weather and higher
transmission usage prices.
Operating
revenues
increased by $61 million in 2004 compared to 2003, primarily as a result of
higher revenues from distribution deliveries and transmission revenues, which
were partially offset by lower retail generation revenues. Revenues from
distribution deliveries increased by $30 million due to higher unit prices
and a 2.0% increase in electricity throughput with increases in all customer
sectors. KWH deliveries increased to commercial and industrial customers
reflecting an improving economy in our service area. Retail generation revenues
decreased by $9 million due to lower composite prices. This decrease was
partially offset by a 3.1% increase in retail generation KWH sales due to
generation customers returning to us after switching to alternative suppliers.
Transmission revenues increased $40 million in 2004 compared with 2003 due
to an amended power supply agreement with FES, which resulted in our recognizing
certain transmission revenues that were previously attributed to FES which
also
increased transmission expenses as discussed below.
3
Changes
in electric
generation sales and distribution deliveries in 2005 and 2004 are summarized
in
the following table:
|
Increases
in Distribution Deliveries
|
2005
|
2004
|
|||||
|
Residential
|
4.9
|
%
|
2.0
|
%
|
|||
|
Commercial
|
4.6
|
%
|
0.9
|
%
|
|||
|
Industrial
|
3.1
|
%
|
3.3
|
%
|
|||
|
Total
Increases in Distribution Deliveries
|
4.1
|
%
|
2.0
|
%
|
|||
Operating
Expenses and Taxes
Total
operating
expenses and taxes increased by $96 million, or 9.9%, in 2005 and increased
$48 million, or 5.2%, in 2004, compared to the preceding year. Higher
purchased power costs, other operating costs and depreciation partially offset
by lower income taxes and deferral of new regulatory assets, accounted for
the
increase in 2005. In 2004, the increase was due to higher purchased power costs,
other operating costs and income taxes. The following table presents changes
from the prior year by expense category:
|
Operating
Expenses and Taxes -
Changes
|
2005
|
2004
|
|||||
|
Increase
(Decrease)
|
(In
millions)
|
||||||
|
Purchased
power costs
|
$50
|
$20
|
|||||
|
Other
operating costs
|
61
|
19
|
|||||
|
Provision
for
depreciation
|
2
|
(6
|
)
|
||||
|
Amortization
of regulatory assets
|
-
|
7
|
|||||
|
Deferral
of
new regulatory assets
|
(3
|
)
|
-
|
||||
|
General
taxes
|
1
|
1
|
|||||
|
Income
taxes
|
(15
|
)
|
7
|
||||
|
Total
operating expenses and taxes
|
$
|
96
|
$
|
48
|
|||
Purchased
power
costs increased by $50 million or 8.8% in 2005, compared to the prior year.
The increase was due primarily to a 5.6% increase in KWH purchases to meet
the
increased retail generation sales. Purchased power costs increased by
$20 million or 3.7% in 2004, compared to 2003, due primarily to higher KWH
purchased to meet increased retail generation sales requirements caused by
reduced shopping and better economic conditions.
Other
operating
costs increased by $61 million or 30.9% in 2005, compared to 2004. The
increase was the result of significantly higher transmission expenses due
primarily
to
increased loads and higher transmission system usage charges.
Other operating
costs increased by $19 million or 10.5% in 2004, compared to 2003. The
increase was due primarily to increased transmission expenses, which were
assumed in 2004 due to a change in the power supply agreement with FES, and
to
higher vegetation management costs.
Depreciation
charges
increased in 2005 primarily due to the transfer of information system software
assets from FESC to Penelec in 2005. Depreciation charges decreased in 2004
compared to 2003 due to certain assets being fully depreciated in 2004.
Amortization of regulatory assets increased in 2004 from 2003 due to a higher
level of deferred NUG cost recovery. The deferral of new regulatory assets
represents costs incurred for the Universal Service and Energy Conservation
Programs that are recoverable through future rates.
Net
Interest
Charges
Interest
on
long-term debt decreased $1 million in 2005 due to the redemption and
refinancing of our outstanding debt using lower-rate instruments. This decrease
was partially offset by higher interest expense resulting from intercompany
loans through the money pool discussed below. In 2004, net interest charges
decreased $2 million compared to the prior year, reflecting the redemption
of $100 million of 7.34% subordinated debentures in September 2004. This
decrease was partially offset by interest expense resulting from intercompany
loans through the money pool.
Cumulative
Effect of Accounting Change
Results
in 2005
include an after-tax charge to net income of $0.8 million recorded upon the
adoption of FIN 47 in December 2005. We identified applicable legal
obligations as defined under the new standard at our substation control rooms,
service center buildings, line shops and office buildings, identifying asbestos
as the primary conditional ARO. As a result of adopting FIN 47 in December
2005, we recorded a conditional ARO liability of $1.6 million (including
accumulated accretion for the period from the date the liability was incurred
to
the date of adoption), an asset retirement cost of $0.4 million (recorded
as part of the carrying amount of the related long-lived asset), and accumulated
depreciation of $0.2 million.
4
Upon
adoption of
SFAS 143 in the first quarter of 2003, we recorded an after-tax gain to net
income of $1.1 million. The cumulative effect adjustment for unrecognized
depreciation and accretion, offset by the reduction in the existing
decommissioning liabilities and ceasing the accounting practice of depreciating
non-regulated generation assets using a cost of removal component was a
$1.9 million increase to income, or $1.1 million net of income
taxes.
Capital
Resources and Liquidity
Our
cash
requirements in 2005 for operating expenses, construction expenditures and
scheduled debt maturities were met with a combination of cash from operations
and funds from the capital markets. During 2006 and thereafter, we expect to
meet our contractual obligations with a combination of cash from operations
and
funds from the capital markets.
Changes
in Cash
Position
As
of
December 31, 2005, we had $35,000 of cash and cash equivalents compared
with $36,000 as of December 31, 2004. The major sources for changes in
these balances are summarized below.
Cash
Flows From
Operating Activities
Our
net cash
provided from operating activities was $143 million in 2005,
$46 million in 2004 and $16 million in 2003, summarized as follows:
|
Operating
Cash Flows
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
||||||||||
|
Cash
earnings(1)
|
$
|
77
|
$
|
112
|
$
|
88
|
||||
|
Pension
trust
contribution(2)
|
(14
|
)
|
(30
|
)
|
-
|
|||||
|
Working
capital and other
|
80
|
(36
|
)
|
(72
|
)
|
|||||
|
Net
cash provided from operating activities
|
$
|
143
|
$
|
46
|
$
|
16
|
||||
(1) Cash
earnings are a
Non-GAAP measure (see reconciliation below).
(2) Pension
trust
contributions in 2005 and 2004 are net of $6 million and
$20 million
of
income tax
benefits, respectively.
Cash
earnings (in
the table above) are not a measure of performance calculated in accordance
with
GAAP. We believe that cash earnings is a useful financial measure because it
provides investors and management with an additional means of evaluating our
cash-based operating performance. The following table reconciles cash earnings
with net income:
|
Reconciliation
of Cash Earnings
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
||||||||||
|
Net
Income
(GAAP)
|
$
|
27
|
$
|
36
|
$
|
21
|
||||
|
Non-Cash
Charges (Credits):
|
||||||||||
|
Provision
for
depreciation
|
49
|
47
|
52
|
|||||||
|
Amortization
of regulatory assets
|
50
|
50
|
45
|
|||||||
|
Deferral
of
new regulatory assets
|
(3
|
)
|
-
|
-
|
||||||
|
Deferred
costs
recoverable as regulatory assets
|
(59
|
)
|
(87
|
)
|
(80
|
)
|
||||
|
Deferred
income taxes and investment tax credits*
|
9
|
58
|
41
|
|||||||
|
Cumulative
effect of accounting change
|
1
|
-
|
(2
|
)
|
||||||
|
Other
non-cash
charges
|
3
|
8
|
11
|
|||||||
|
Cash
earnings (Non-GAAP)
|
$
|
77
|
$
|
112
|
$
|
88
|
||||
| * |
Excludes
$20 million of deferred tax benefits from pension contributions in
2004.
|
Net
cash provided
from operating activities increased $97 million in 2005 compared to 2004
resulting from an increase of $116 million from working capital changes and
a $16 million decrease in after-tax voluntary pension plan contributions,
partially offset by a decrease of $35 million in cash earnings. The
increase from working capital was principally due to an increase of
$73 million in cash provided from the settlement of receivables and an
increase in accrued taxes of $21 million. Cash earnings decreased for the
reasons described under "Results of Operations" above. Net cash from operating
activities increased by $30 million in 2004 compared to 2003 resulting from
increases of $36 million from working capital changes and $24 million
in cash earnings for the reason described under "Results of Operations" above,
partially offset by a $30 million after-tax voluntary pension contribution
in 2004. The increase from working capital was principally due to reduced cash
outflows for accounts payable.
5
Cash
Flows From
Financing Activities
Net
cash used for
financing activities of $39 million in 2005 compares to net cash provided
from financing activities of $76 million in 2004. The net change of
$115 million reflects a $76 million decrease of debt financings and a
$39 million increase in common stock dividend payments to FirstEnergy. Net
cash provided from financing activities of $76 million in 2004 compares to
cash used for financing activities of $49 million in 2003. The net change
reflects a $97 million increase in borrowings and a $28 million
decrease in common stock dividend payments to FirstEnergy. The following table
provides details regarding new issues and redemptions during each
year:
|
Securities
Issued or Redeemed
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
||||||||||
|
New
Issues:
|
||||||||||
|
Pollution
control notes
|
$
|
45
|
$
|
150
|
$
|
-
|
||||
|
Redemptions:
|
||||||||||
|
FMB
|
49
|
229
|
1
|
|||||||
|
Unsecured
notes
|
8
|
-
|
-
|
|||||||
|
$
|
57
|
$
|
229
|
$
|
1
|
|||||
|
Short-term
Borrowings, net
|
$
|
20
|
$
|
163
|
$
|
(12
|
)
|
|||
We
had approximately
$35,000 of cash and temporary investments and approximately $261 million of
short-term indebtedness as of December 31, 2005. We have authorization from
the SEC to incur short-term debt of up to $250 million and authorization
from the PPUC to incur money pool borrowings of up to $300 million.
In
addition, we have $75 million of available accounts receivable financing
facilities as of December 31, 2005 from Penelec Funding, our wholly owned
subsidiary. As
a separate legal
entity with separate creditors, Penelec Funding would have to satisfy its
obligations to creditors before any of its remaining assets could be made
available to us.
We
will not issue
FMB other than as collateral for senior notes, since our senior note indentures
prohibit (subject to certain exceptions) us from issuing any debt which is
senior to the senior notes. As of December 31, 2005, we had the capability
to issue $89 million
of
additional senior notes based upon FMB collateral. We have no restrictions
on
the issuance of preferred stock.
On
June 14,
2005, we, FirstEnergy, OE, Penn, CEI, TE, JCP&L, Met-Ed, FES and ATSI, as
Borrowers,
entered into a
syndicated $2 billion five-year revolving credit facility. Borrowings under
the facility are available to each Borrower separately and mature on the earlier
of 364 days from the date of borrowing or the commitment expiration date, as
the
same may be extended. Our borrowing limit under the facility is
$250 million.
Under
the revolving
credit facility, borrowers may request the issuance of letters of credit
expiring up to one year from the date of issuance. The stated amount of
outstanding letters of credit will count against total commitments available
under the facility and against the applicable borrower’s borrowing sub-limit.
Total unused borrowing capability under the existing credit facility and
accounts receivable financing facilities totaled $325 million as of
December 31, 2005.
The
revolving credit
facility contains financial covenants requiring each borrower to maintain a
consolidated debt to total capitalization ratio of no more than 65%. As of
December 31, 2005, our debt to total capitalization as defined under the
revolving credit facility was 36%.
The
facility does
not contain any provisions that either restrict our ability to borrow or
accelerate repayment of outstanding advances as a result of any change in our
credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds
borrowed under the facility is related to our credit ratings.
We
have the ability
to borrow from our regulated affiliates and FirstEnergy to meet our short-term
working capital requirements. FESC administers this money pool and tracks
surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving
a loan under the money pool agreements must repay the principal, together with
accrued interest, within 364 days of borrowing the funds. The rate of interest
is the same for each company receiving a loan from the pool and is based on
the
average cost of funds available through the pool. The
average interest
rate for borrowings in 2005 was 3.24%.
6
On
July 18, 2005, Moody’s revised its rating outlook on FirstEnergy and its
subsidiaries to positive from stable. Moody’s stated that the revision to
FirstEnergy’s outlook resulted from steady financial improvement and steps taken
by management to improve operations, including the stabilization of its nuclear
operations. On October 3, 2005, S&P raised its corporate credit rating
on FirstEnergy and the Companies to 'BBB' from 'BBB-'. At the same time, S&P
raised the senior unsecured ratings at the holding company to 'BBB-' from 'BB+'
and each of the Companies by one notch above the previous rating. S&P noted
that the upgrade followed the continuation of a good operating track record,
specifically for the nuclear fleet through the third quarter of 2005.
On
December 23, 2005, Fitch revised its rating outlook on FirstEnergy and the
Companies to positive from stable. Fitch stated that the revision to
FirstEnergy's outlook resulted from improved performance of its generating
fleet
and ongoing debt reduction.
Our access to capital markets and costs of financing are dependent on the
ratings of our securities and that of FirstEnergy. The following table shows
securities ratings as of December 31, 2005. The ratings outlook from
S&P on all securities is stable. The ratings outlook from Moody's &
Fitch on all securities is positive.
|
Ratings
of Securities
|
Securities
|
S&P
|
Moody’s
|
Fitch
|
|||||||||
|
FirstEnergy
|
Senior
unsecured
|
BBB-
|
Baa3
|
BBB-
|
|||||||||
|
Penelec
|
Senior
unsecured
|
BBB
|
Baa2
|
BBB
|
|||||||||
Cash
Flows From
Investing Activities
Cash
used for
investing activities totaled $104 million in 2005 and $123 million in
2004. The decrease in 2005 was primarily due to a $51 million repayment to
the NUG trust fund in 2004 (see Note 7 to Consolidated Financial Statements)
that did not recur in 2005 and an $11 million capital transfer from FESC in
2004, partially offset by a $56 million increase in property additions in
2005. Cash used for investing activities totaled $123 million in 2004 and
cash provided from investing activities totaled approximately $22 million
in 2003. The increase in cash used was primarily related to a $117 million
change in NUG trust activity. Cash outflows for property additions primarily
support Penelec's energy delivery operations.
Our
capital spending
for the period 2006 through 2010 is expected to be about $469 million, of
which approximately $83 million applies to 2006. The capital spending is
primarily for property additions supporting the distribution of
electricity.
Contractual
Obligations
As
of
December 31, 2005, our estimated cash payments under existing contractual
obligations that we consider firm obligations were as follows:
|
|
|
|
|
2007-
|
|
2009-
|
|
|
|
|||||||
|
Contractual
Obligations
|
|
Total
|
|
2006
|
|
2008
|
|
2010
|
|
Thereafter
|
|
|||||
|
|
(In
millions)
|
|
||||||||||||||
|
Long-term
debt
(1)
|
|
$
|
479
|
|
$
|
-
|
|
$
|
-
|
|
$
|
159
|
|
$
|
320
|
|
|
Short-term
borrowings
|
|
|
261
|
|
|
261
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
Operating
leases
|
|
|
19
|
|
|
4
|
|
|
6
|
|
|
5
|
|
|
4
|
|
|
Purchases
(2)
|
|
|
3,725
|
|
|
549
|
|
|
1,057
|
|
|
899
|
|
|
1,220
|
|
|
Total
|
|
$
|
4,484
|
|
$
|
814
|
|
$
|
1,063
|
|
$
|
1,063
|
|
$
|
1,544
|
|
(1) Amounts
reflected do
not include interest on long-term debt.
(2) Power
purchases
under contracts with fixed or minimum quantities and approximate
timing.
Market
Risk
Information
We
use various
market risk sensitive instruments, including derivative contracts, primarily
to
manage the risk of price and interest rate fluctuations. Our Risk Policy
Committee, comprised of members of senior management, provides general oversight
to risk management activities throughout the company.
7
Commodity
Price
Risk
We
are exposed to
market risk primarily due to fluctuations in electricity, energy transmission
and natural gas, prices. To manage the volatility relating to these exposures,
we use a variety of non-derivative and derivative instruments, including forward
contracts, options, futures contracts and swaps. The derivatives are used
principally for hedging purposes. All derivatives that fall within the scope
of
SFAS 133 must be recorded at their fair value and marked to market. The
majority of our derivative hedging contracts qualify for the normal purchase
and
normal sale exception under SFAS 133 and are therefore excluded from the
table below. Contracts that are not exempt from such treatment include power
purchase agreements with NUG entities that were structured pursuant to the
Public Utility Regulatory Act of 1978. These non-trading contracts are adjusted
to fair value at the end of each quarter, with a corresponding regulatory asset
recognized for above-market costs. The change in the fair value of commodity
derivative contracts related to energy production during 2005 is summarized
in
the following table:
|
Decrease
in the Fair Value of Derivative Contracts
|
Non-Hedge
|
Hedge
|
Total
|
|||||||
|
(In
millions)
|
||||||||||
|
Change
in the
fair value of commodity derivative contracts
|
||||||||||
|
Outstanding
net liability as of January 1, 2005
|
$
|
(368
|
)
|
$
|
-
|
$
|
(368
|
)
|
||
|
New
contract
value when entered
|
-
|
-
|
-
|
|||||||
|
Additions/Changes
in value of existing contracts
|
324
|
-
|
324
|
|||||||
|
Change
in
techniques/assumptions
|
-
|
-
|
-
|
|||||||
|
Settled
contracts
|
71
|
-
|
71
|
|||||||
|
Net
Assets - Derivatives Contracts as of December 31,
2005(1)
|
$
|
27
|
$
|
-
|
$
|
27
|
||||
|
Impact
of Changes in Commodity Derivative Contracts(2)
|
||||||||||
|
Income
Statement Effects (Pre-Tax)
|
$
|
13
|
$
|
-
|
$
|
13
|
||||
|
Balance
Sheet
Effects:
|
||||||||||
|
OCI
(Pre-Tax)
|
$
|
-
|
$
|
-
|
$
|
-
|
||||
|
Regulatory
Asset (net)
|
$
|
(382
|
)
|
$
|
-
|
$
|
(382
|
)
|
||
|
(1)
|
Includes
$13 million in non-hedge commodity derivative contracts, which are
offset by a regulatory liability.
|
|
(2)
|
Represents
the
decrease in value of existing contracts, settled contracts and changes
in
techniques/ assumptions.
|
Derivatives
are
included on the Consolidated Balance Sheet as of December 31, 2005 as
follows:
|
Non-Hedge
|
Hedge
|
Total
|
||||||||||
|
(In
millions)
|
||||||||||||
|
Current-
|
||||||||||||
|
Other
liabilities
|
$
|
-
|
$
|
-
|
$
|
-
|
||||||
|
Other
Assets
|
-
|
-
|
-
|
|||||||||
|
Non-Current-
|
||||||||||||
|
Other
noncurrent liabilities
|
-
|
-
|
-
|
|||||||||
|
Other
Deferred
Charges
|
27
|
-
|
27
|
|||||||||
|
Net
assets
|
$
|
27
|
$
|
-
|
$
|
27
|
||||||
The
valuation of derivative contracts is based on observable market information
to
the extent that such information is available. In cases where such information
is not available, we rely on model-based information. The model provides
estimates of future regional prices for electricity and an estimate of related
price volatility. We use these results to develop estimates of fair value for
financial reporting purposes and for internal management decision making.
Sources of information for the valuation of commodity derivative contracts
by
year are summarized in the following table:
|
Source
of Information
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
-
Fair
Value by Contract Year
|
|
2006
|
|
2007
|
|
2008
|
|
2009
|
|
2010
|
|
Thereafter
|
|
Total
|
|
|||||||
|
(In
millions)
|
||||||||||||||||||||||
|
Prices
actively quoted(1)
|
|
$
|
13
|
$
|
(7
|
)
|
$
|
-
|
|
$
|
-
|
|
$
|
-
|
|
$
|
-
|
|
$
|
6
|
||
|
Other
external
sources(2)
|
|
|
5
|
|
|
3
|
|
|
2
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
10
|
|
|
Prices
based
on models
|
|
|
-
|
|
|
-
|
|
|
(10
|
)
|
|
(2
|
)
|
|
1
|
|
|
22
|
|
|
11
|
|
|
Total(3)
|
|
$
|
18
|
$
|
(4
|
)
|
$
|
(8
|
)
|
$
|
(2
|
)
|
$
|
1
|
|
$
|
22
|
|
$
|
27
|
|
|
(1) Exchange
traded.
(2) Broker
quote
sheets.
(3) Includes
$13 million
in non-hedge commodity derivative contracts, which are offset by a regulatory
liability.
8
We
perform
sensitivity analyses to estimate our exposure to the market risk of our
commodity positions. A hypothetical 10% adverse shift in quoted market prices
in
the near term on both our trading and nontrading derivative instruments would
not have had a material effect on our consolidated financial position or cash
flows as of December 31, 2005. We estimate that if energy commodity prices
experienced an adverse 10% change, net income for the next twelve months would
not change, as the prices for all commodity positions are already above the
contract price caps.
Interest
Rate
Risk
We
are subject to
the inherent interest rate risks related to refinancing maturing debt by issuing
new debt securities. Our exposure to fluctuations in market interest rates
is
reduced since our debt has fixed interest rates, as noted in the following
table.
Comparison
of Carrying Value to Fair Value
|
There-
|
Fair
|
||||||||||||||||||||||||
|
Year
of Maturity
|
2006
|
2007
|
2008
|
2009
|
2010
|
after
|
Total
|
Value
|
|||||||||||||||||
|
(Dollars
in millions)
|
|||||||||||||||||||||||||
|
Assets
|
|||||||||||||||||||||||||
|
Investments
Other Than Cash
and
Cash
Equivalents-
|
|||||||||||||||||||||||||
|
Fixed
Income
|
$
|
148
|
$
|
148
|
$
|
149
|
|||||||||||||||||||
|
Average
interest rate
|
4.8
|
%
|
4.8
|
%
|
|||||||||||||||||||||
|
Liabilities
|
|||||||||||||||||||||||||
|
Long-term
Debt
and Other
Long-Term
Obligations:
|
|||||||||||||||||||||||||
|
Fixed
rate
|
$
|
100
|
$
|
59
|
$
|
275
|
$
|
434
|
$
|
453
|
|||||||||||||||
|
Average
interest rate
|
6.1
|
%
|
6.8
|
%
|
5.8
|
%
|
6.0
|
%
|
|||||||||||||||||
|
Variable
rate
|
$
|
45
|
$
|
45
|
$
|
45
|
|||||||||||||||||||
|
Average
interest rate
|
3.1
|
%
|
3.1
|
%
|
|||||||||||||||||||||
|
Short-term
Borrowings
|
$
|
261
|
$
|
261
|
$
|
261
|
|||||||||||||||||||
|
Average
interest rate
|
4.0
|
%
|
4.0
|
%
|
|||||||||||||||||||||
Equity Price Risk
Included
in nuclear
decommissioning trusts are marketable equity securities carried at their current
fair value of approximately $62 million and $60 million as of
December 31, 2005 and 2004, respectively. A hypothetical 10% decrease in
prices quoted by stock exchanges would result in a $6 million reduction in
fair value as of December 31, 2005 (see Note 4 - Fair Value of
Financial Instruments).
Outlook
All
of our customers
are able to select alternative energy suppliers. We continue to deliver power
to
homes and businesses through our existing distribution system, which remains
regulated. The PPUC authorized our rate restructuring plan, establishing
separate charges for transmission, distribution, generation and stranded cost
recovery, which is recovered through a CTC. Customers electing to obtain power
from an alternative supplier have their bills reduced based on the regulated
generation component, and the customers receive a generation charge from the
alternative supplier. We have a continuing responsibility, referred to as our
PLR obligation, to provide power to those customers not choosing to receive
power from an alternative energy supplier, subject to certain
limits.
Regulatory
assets
are costs which have been authorized by the PPUC and the FERC for recovery
from
customers in the future periods or for which authorization is probable. Without
the probability of such authorization, costs currently recorded as regulatory
assets would have been charged to income as incurred. All regulatory assets
are
expected to be recovered under the provisions of our transition plan and rate
restructuring plan.
As
of December 31,
2005, our regulatory deferrals pursuant to the 1998 Restructuring Settlement
(including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger Settlement
Stipulation are $48 million. This amount is subject to the pending resolution
of
taxable income issues associated with NUG Trust Fund proceeds.
9
Met-Ed
and Penelec purchase a
portion of their PLR requirements from FES through a wholesale power sales
agreement and a portion from contracts with unaffiliated third party suppliers,
including NUGs. Assuming continuation of these existing contractual
arrangements, the available supply represents approximately 100% of the combined
retail sales obligations of Met-Ed and Penelec in 2006 and 2007; almost 100%
for
2008; and approximately 85% for 2009 and 2010. Met-Ed and Penelec are authorized
to defer any excess of NUG contract costs over current market prices. Under
the
terms of the wholesale agreement with FES, FES retains the supply obligation
and
the supply profit and loss risk for the portion of power supply requirements
not
self-supplied by Met-Ed and Penelec under their contracts with NUGs and other
unaffiliated suppliers. This arrangement reduces Met-Ed's and Penelec's exposure
to high wholesale power prices by providing power at a fixed price for their
uncommitted PLR energy costs during the term of the agreement with FES. The
wholesale agreement with FES is automatically extended for each successive
calendar year unless any party elects to cancel the agreement by November 1
of
the preceding year. On November 1, 2005, FES and the other parties thereto
amended the agreement to provide FES the right over the next year to terminate
the agreement at any time upon 60 days notice. If the wholesale power agreement
were terminated or modified, Met-Ed and Penelec would need to satisfy the
portion of their PLR obligations currently supplied by FES from unaffiliated
suppliers at prevailing prices, which are likely to be higher than the current
price charged by FES under the agreement and, as a result, Met-Ed’s and
Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec
were to replace the FES supply at current market power prices without
corresponding regulatory authorization to increase their generation prices
to
customers, each company would likely incur a significant increase in operating
expenses and experience a material deterioration in credit quality metrics.
Under such a scenario, each company's credit profile would no longer support
an
investment grade rating for its fixed income securities. Met-Ed and Penelec
are
in the process of preparing a comprehensive rate filing that will address a
number of transmission, distribution and supply issues and is expected to be
filed with the PPUC in the second quarter of 2006. That filing will include,
among other things, a request for appropriate regulatory action to mitigate
adverse consequences from any future reduction, in whole or in part, in the
availability to Met-Ed and Penelec of supply under the existing FES agreement.
There can be no assurance, however, that if FES ultimately determines to
terminate, or significantly modify the agreement, timely regulatory relief
will
be granted by the PPUC or, to the extent granted, adequate to mitigate such
adverse consequences.
On
January 12,
2005, we filed a request with the PPUC for deferral of transmission-related
costs beginning January 1, 2005, estimated to be approximately
$4 million per month. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric
Cooperative and Pennsylvania Rural Electric Association have all intervened
in
the case. To date no hearing schedule has been established, and we have not
yet
implemented deferral accounting for these costs.
In
May 2004, the
PPUC issued an order approving revised reliability benchmarks and standards,
including revised benchmarks and standards for the Company. We filed a Petition
for Amendment of Benchmarks with the PPUC on May 26, 2004, due to their
implementation of automated outage management systems following restructuring.
On December 30, 2005, the ALJ recommended that the PPUC adopt the Joint Petition
for Settlement among the parties involved in our request to amend the
distribution reliability benchmarks, thereby eliminating the need for full
litigation. The ALJ’s recommendation, adopting the revised benchmarks and
standards was approved by the PPUC on February 9, 2006.
See
Note 7 to
the consolidated financial statements for further details and a complete
discussion of regulatory matters in Pennsylvania including a more detailed
discussion of reliability initiatives, including actions by the PPUC, that
impact us.
Environmental
Matters
We
accrue
environmental liabilities only when we can conclude that it is probable that
we
have an obligation for such costs and can reasonably determine the amount of
such costs. Unasserted claims, are reflected in our determination of
environmental liabilities and are accrued in the period that they are both
probable and reasonably estimable.
On
December 1, 2005,
FirstEnergy issued a comprehensive report to shareholders regarding air
emissions regulations and an assessment of our future risks and mitigation
efforts.
We
have been named
as a PRP at waste disposal sites which may require cleanup under the
Comprehensive Environmental Responsive, Comprehension and Liability Act of
1980.
Allegations of disposal of hazardous substances at historical sites and the
liability involved are often unsubstantial and subject to dispute; however,
federal law provides that PRPs for a particular site are held liable on a joint
and several basis. Therefore,
environmental liabilities that are considered probable have been recognized
on
the Consolidated Balance Sheet as of December 31, 2005, based on estimates
of the total costs of cleanup, our proportionate responsibility for such costs
and the financial ability of other unaffiliated entities to pay. Total
liabilities of approximately $3,000 have been accrued through December 31,
2005.
See
Note 11(B)
to the consolidated financial statements for further details and a complete
discussion of environmental matters.
10
Legal
Matters
There
are various
lawsuits, claims (including claims for asbestos exposure) and proceedings
related to our normal business operations pending against us. The other material
items not otherwise discussed above are described in
Note 11 to
the consolidated financial statements.
Critical
Accounting Policies
We
prepare our
consolidated financial statements in accordance with GAAP. Application of these
principles often requires a high degree of judgment, estimates and assumptions
that affect financial results. All of our assets are subject to their own
specific risks and uncertainties and are regularly reviewed for impairment.
Our
more significant accounting policies are described below.
Goodwill
In
a business
combination, the excess of the purchase price over the estimated fair values
of
the assets acquired and liabilities assumed is recognized as goodwill. Based
on
the guidance provided by SFAS 142, we evaluate our goodwill for impairment
at least annually and would make such an evaluation more frequently if
indicators of impairment should arise. In accordance with the accounting
standard, if the fair value of a reporting unit is less than its carrying value
(including goodwill), the goodwill is tested for impairment. If an impairment
were indicated, we recognize a loss - calculated as the difference between
the
implied fair value of our goodwill and the carrying value of the goodwill.
Our
annual review was completed in the third quarter of 2005, with no impairment
of
goodwill indicated. The forecasts used in our evaluation of goodwill reflect
operations consistent with our general business assumptions. Unanticipated
changes in those assumptions could have a significant effect on our future
evaluations of goodwill. In the year ended December 31, 2005, we adjusted
goodwill to reverse pre-merger tax accruals due to the final resolution of
tax
contingencies related to the GPU acquisition. As of December 31, 2005, we
had approximately $882 million of goodwill.
Revenue
Recognition
We
follow the
accrual method of accounting for revenues, recognizing revenue for electricity
that has been delivered to customers but not yet billed through the end of
the
accounting period. The determination of electricity sales to individual
customers is based on meter readings, which occur on a systematic basis
throughout the month. At the end of each month, electricity delivered to
customers since the last meter reading is estimated and a corresponding accrual
for unbilled sales is recognized. The determination of unbilled sales requires
management to make estimates regarding electricity available for retail load,
transmission and distribution line losses, demand by customer class,
weather-related impacts, prices in effect for each customer class and
electricity provided by alternative suppliers.
Regulatory
Accounting
We
are subject to
regulation that sets the prices (rates) we are permitted to charge our customers
based on costs that the regulatory agencies determine we are permitted to
recover. At times, regulators permit the future recovery through rates of costs
that would be currently charged to expense by an unregulated company. This
ratemaking process results in the recording of regulatory assets based on
anticipated future cash inflows. We regularly review these assets to assess
their ultimate recoverability within the approved regulatory guidelines.
Impairment risk associated with these assets relates to potentially adverse
legislative, judicial or regulatory actions in the future.
Pension
and
Other Postretirement Benefits Accounting
Our
reported costs
of providing non-contributory defined pension benefits and post employment
benefits other than pensions are dependent upon numerous factors resulting
from
actual plan experience and certain assumptions.
Pension
and OPEB
costs are affected by employee demographics (including age, compensation levels,
and employment periods), the level of contributions we make to the plans, and
earnings on plan assets. Such factors may be further affected by business
combinations, which impact employee demographics, plan experience and other
factors. Pension and OPEB costs are also affected by changes to key assumptions,
including anticipated rates of return on plan assets, the discount rates and
health care trend rates used in determining the projected benefit obligations
for pension and OPEB costs.
In
accordance with
SFAS 87, changes in pension and OPEB obligations associated with these
factors may not be immediately recognized as costs on the income statement,
but
generally are recognized in future years over the remaining average service
period of plan participants. SFAS 87 and SFAS 106 delay recognition of
changes due to the long-term nature of pension and OPEB obligations and the
varying market conditions likely to occur over long periods of time. As such,
significant portions of pension and OPEB costs recorded in any period may not
reflect the actual level of cash benefits provided to plan participants and
are
significantly influenced by assumptions about future market conditions and
plan
participants' experience.
11
In
selecting an
assumed discount rate, we consider currently available rates of return on
high-quality fixed income investments expected to be available during the period
to maturity of the pension and other postretirement benefit obligations. Due
to
recent declines in corporate bond yields and interest rates in general, we
reduced the assumed discount rate as of December 31, 2005 to 5.75% from
6.00% and 6.25% used as of December 31, 2004 and 2003, respectively.
Our
assumed rate of
return on pension plan assets considers historical market returns and economic
forecasts for the types of investments held by our pension trusts. In 2005,
2004
and 2003, plan assets actually earned $325 million or 8.2%,
$415 million or 11.1%
and
$671 million or 24.2%, respectively. Our pension costs in 2005, 2004 and
2003 were computed using an assumed 9.0% rate of return on plan assets which
generated $345 million, $286 million and $248 million expected return
on plan assets, respectively. The 2005 expected return was based upon
projections of future returns and our pension trust investment allocation of
approximately 63% equities, 33% bonds, 2% real estate and 2% cash. The gains
or
losses generated as a result of the difference between expected and actual
return on plan assets are deferred and amortized and will increase or decrease
future net periodic pension expense, respectively.
In
the fourth
quarter of 2005, FirstEnergy made a $500 million voluntary contribution to
its pension plan (our share was $20 million). As a result of our voluntary
contribution and the increased market value of pension plan assets, we
recognized a prepaid benefit cost of $90 million as of December 31,
2005. As prescribed by SFAS 87, we eliminated our additional minimum
liability of $90 million. In addition, the entire AOCL balance was credited
by $53 million (net of $37 million of deferred taxes) as the fair
value of trust assets exceeded the accumulated benefit obligation as of
December 31, 2005.
Health
care cost
trends have significantly increased and will affect future OPEB costs. The
2005
and 2004 composite health care trend rate assumptions are approximately 9-11%,
gradually decreasing to 5% in later years. In determining our trend rate
assumptions, we included the specific provisions of our health care plans,
the
demographics and utilization rates of plan participants, actual cost increases
experienced in our health care plans, and projections of future medical trend
rates. The effect on Penelec's portion of pension and OPEB costs from changes
in
key assumptions are as follows:
|
Increase
in Costs from Adverse Changes in Key Assumptions
|
||||||||||||||
|
Assumption
|
Adverse
Change
|
Pension
|
OPEB
|
Total
|
||||||||||
|
(In
millions)
|
||||||||||||||
|
Discount
rate
|
Decrease
by
0.25%
|
$
|
1.0
|
$
|
0.5
|
$
|
1.5
|
|||||||
|
Long-term
return on assets
|
Decrease
by
0.25%
|
$
|
1.2
|
$
|
0.3
|
$
|
1.5
|
|||||||
|
Health
care
trend rate
|
Increase
by
1%
|
na
|
$
|
2.7
|
$
|
2.7
|
||||||||
Long-Lived Assets
In
accordance with
SFAS No. 144, we periodically evaluate our long-lived assets
(principally goodwill) to determine whether conditions exist that would indicate
that the carrying value of an asset might not be fully recoverable. The
accounting standard requires that if the sum of future cash flows (undiscounted)
expected to result from an asset is less than the carrying value of the asset,
an asset impairment must be recognized in the financial statements. If
impairment has occurred, we recognize a loss - calculated as the difference
between the carrying value and the estimated fair value of the asset (discounted
future net cash flows).
The
calculation of
future cash flows is based on assumptions, estimates and judgment about future
events. The aggregate amount of cash flows determines whether an impairment
is
indicated. The timing of the cash flows is critical in determining the amount
of
the impairment.
Asset
Retirement
Obligations
In
accordance with
SFAS 143 and FIN 47, we recognize an ARO for the future
decommissioning of our nuclear power plants and future remediation of other
environmental liabilities associated with all of our long-lived assets. The
ARO
liability represents an estimate of the fair value of our current obligation
related to nuclear decommissioning and the retirement or remediation of
environmental liabilities of other assets. A fair value measurement inherently
involves uncertainty in the amount and timing of settlement of the liability.
We
used an expected cash flow approach to measure the fair value of the nuclear
decommissioning and environmental remediation ARO. This approach applies
probability weighting to discounted future cash flow scenarios that reflect
a
range of possible outcomes. The scenarios consider settlement of the ARO at
the
expiration of the nuclear power plants' current license; settlement based on
an
extended license term and expected remediation dates.
12
New
Accounting Standards and Interpretations Adopted
FSP
FAS 115-1
and FAS 124-1, "The Meaning of Other-Than-Temporary Impairment and its
Application to Certain Investments"
Issued
in November
2005, FSP 115-1 and FAS 124-1 addresses the determination as to when
an investment is considered impaired, whether that impairment is other than
temporary, and the measurement of an impairment loss. The FSP finalized and
renamed EITF 03-1 and 03-1-a to FSP FAS 115-1. This FSP will (1) nullify
certain requirements of Issue 03-1 and supersedes EITF topic No. D-44,
"Recognition of Other Than Temporary Impairment upon the Planned Sale of a
Security Whose Cost Exceeds Fair Value," (2) clarify that an investor should
recognize an impairment loss no later than when the impairment is deemed other
than temporary, even if a decision to sell has not been made, and (3) be
effective for other-than-temporary impairment and analyses conducted in periods
beginning after September 15, 2005. The FSP requires prospective
application with an effective date for reporting periods beginning after
December 15, 2005. We are currently evaluating this FSP and any impact on
our investments.
EITF
Issue
04-13, "Accounting for Purchases and Sales of Inventory with the Same
Counterparty"
In
September 2005,
the EITF reached a final consensus on Issue 04-13 concluding that two or more
legally separate exchange transactions with the same counterparty should be
combined and considered as a single arrangement for purposes of applying
APB 29, when the transactions were entered into "in contemplation" of one
another. If two transactions are combined and considered a single arrangement,
the EITF reached a consensus that an exchange of inventory should be accounted
for at fair value. Although electric power is not capable of being held in
inventory, there is no substantive conceptual distinction between exchanges
involving power and other storable inventory. Therefore, we will adopt this
EITF
effective for new arrangements entered into, or modifications or renewals of
existing arrangements, in interim or annual periods beginning after
March 15, 2006.
|
SFAS
154 -
“Accounting Changes and Error Corrections - a replacement of APB Opinion
No. 20 and FASB Statement No.
3”
|
In
May 2005, the
FASB issued SFAS 154 to change the requirements for accounting and
reporting a change in accounting principle. It applies to all voluntary changes
in accounting principle and to changes required by an accounting pronouncement
when that pronouncement does not include specific transition provisions. This
Statement requires retrospective application to prior periods’ financial
statements of changes in accounting principle, unless it is impracticable to
determine either the period-specific effects or the cumulative effect of the
change. In those instances, this Statement requires that the new accounting
principle be applied to the balances of assets and liabilities as of the
beginning of the earliest period for which retrospective application is
practicable and that a corresponding adjustment be made to the opening balance
of retained earnings (or other appropriate components of equity or net assets
in
the statement of financial position) for that period rather than being reported
in the Consolidated Statements of Income. This Statement also requires that
a
change in depreciation, amortization, or depletion method for long-lived,
nonfinancial assets be accounted for as a change in accounting estimate affected
by a change in accounting principle. The provisions of this Statement are
effective for accounting changes and corrections of errors made in fiscal years
beginning after December 15, 2005. We adopted this Statement effective
January 1, 2006.
|
SFAS
153,
“Exchanges of Nonmonetary Assets - an amendment of APB Opinion No.
29”
|
In
December 2004,
the FASB issued SFAS 153 amending APB 29, which was based on the
principle that nonmonetary assets should be measured based on the fair value
of
the assets exchanged. The guidance in APB 29 included certain exceptions to
that principle. SFAS 153 eliminates the exception from fair value
measurement for nonmonetary exchanges of similar productive assets and replaces
it with an exception for exchanges that do not have commercial substance. This
Statement specifies that a nonmonetary exchange has commercial substance if
the
future cash flows of the entity are expected to change significantly as a result
of the exchange. The provisions of this Statement are effective January 1,
2006 for us. This FSP is not expected to have a material impact on our financial
statements.
SFAS
151,
“Inventory Costs - an amendment of ARB No. 43, Chapter 4”
In
November 2004,
the FASB issued SFAS 151 to clarify the accounting for abnormal amounts of
idle facility expense, freight, handling costs and wasted material (spoilage).
Previous guidance stated that in some circumstances these costs may be “so
abnormal” that they would require treatment as current period costs.
SFAS 151 requires abnormal amounts for these items to always be recorded as
current period costs. In addition, this Statement requires that allocation
of
fixed production overheads to the cost of conversion be based on the normal
capacity of the production facilities. The provisions of this statement are
effective for inventory costs incurred by us beginning January 1, 2006. We
do not expect this statement to have a material impact on the financial
statements.
13
|
PENNSYLVANIA
ELECTRIC COMPANY
|
||||||||||
|
CONSOLIDATED
STATEMENTS OF INCOME
|
||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
|||||||
|
|
(In
thousands)
|
|||||||||
|
OPERATING
REVENUES (Note 2(I))
|
$
|
1,122,025
|
$
|
1,036,070
|
$
|
974,857
|
||||
|
OPERATING
EXPENSES AND TAXES:
|
||||||||||
|
Purchased
power (Note 2(I))
|
620,509
|
570,349
|
550,155
|
|||||||
|
Other
operating costs (Note 2(I))
|
257,869
|
197,089
|
178,393
|
|||||||
|
Provision
for
depreciation
|
49,410
|
47,104
|
51,754
|
|||||||
|
Amortization
of regulatory assets
|
50,348
|
50,403
|
44,908
|
|||||||
|
Deferral
of
new regulatory assets
|
(3,239
|
)
|
-
|
-
|
||||||
|
General
taxes
|
68,984
|
68,132
|
66,999
|
|||||||
|
Income
taxes
|
14,167
|
29,313
|
22,403
|
|||||||
|
Total
operating expenses and taxes
|
1,058,048
|
962,390
|
914,612
|
|||||||
|
OPERATING
INCOME
|
63,977
|
73,680
|
60,245
|
|||||||
|
OTHER
INCOME
|
2,568
|
2,314
|
1,885
|
|||||||
|
NET
INTEREST CHARGES:
|
||||||||||
|
Interest
on
long-term debt
|
29,540
|
30,029
|
29,565
|
|||||||
|
Allowance
for
borrowed funds used during construction
|
(908
|
)
|
(248
|
)
|
(320
|
)
|
||||
|
Deferred
interest
|
-
|
190
|
4,553
|
|||||||
|
Other
interest
expense
|
10,360
|
9,993
|
4,318
|
|||||||
|
Subsidiary's
preferred stock dividend requirements
|
-
|
-
|
3,777
|
|||||||
|
Net
interest
charges
|
38,992
|
39,964
|
41,893
|
|||||||
|
INCOME
BEFORE CUMULATIVE EFFECT
|
||||||||||
|
OF
ACCOUNTING CHANGES
|
27,553
|
36,030
|
20,237
|
|||||||
|
Cumulative
effect of accounting changes (net of income taxes
(benefit)
|
||||||||||
|
of
($566,000)
and $777,000, respectively) (Note 2(G))
|
(798
|
)
|
-
|
1,096
|
||||||
|
NET
INCOME
|
$
|
26,755
|
$
|
36,030
|
$
|
21,333
|
||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
||||||||||
14
|
PENNSYLVANIA
ELECTRIC COMPANY
|
|||||||
|
CONSOLIDATED
BALANCE SHEETS
|
|||||||
|
As
of
December 31,
|
2005
|
2004
|
|||||
|
(in
thousands)
|
|||||||
|
ASSETS
|
|||||||
|
UTILITY
PLANT:
|
|||||||
|
In
service
|
$
|
2,043,885
|
$
|
1,981,846
|
|||
|
Less
-
Accumulated provision for depreciation
|
784,494
|
776,904
|
|||||
|
1,259,391
|
1,204,942
|
||||||
|
Construction
work in progress
|
30,888
|
22,816
|
|||||
|
1,290,279
|
1,227,758
|
||||||
|
OTHER
PROPERTY AND INVESTMENTS:
|
|||||||
|
Nuclear
plant
decommissioning trusts
|
113,368
|
109,620
|
|||||
|
Non-utility
generation trusts
|
96,761
|
95,991
|
|||||
|
Long-term
notes receivable from associated companies
|
17,624
|
14,001
|
|||||
|
Other
|
15,031
|
18,746
|
|||||
|
242,784
|
238,358
|
||||||
|
CURRENT
ASSETS:
|
|||||||
|
Cash
and cash
equivalents
|
35
|
36
|
|||||
|
Receivables-
|
|||||||
|
Customers
(less accumulated provision of $4,184,000 and $4,712,000
|
|||||||
|
respectively,
for uncollectible accounts)
|
129,960
|
121,112
|
|||||
|
Associated
companies
|
18,626
|
97,528
|
|||||
|
Other
|
12,800
|
12,778
|
|||||
|
Notes
receivable from associated companies
|
-
|
7,352
|
|||||
|
Prepayments
and other
|
7,936
|
7,198
|
|||||
|
169,357
|
246,004
|
||||||
|
DEFERRED
CHARGES AND OTHER ASSETS:
|
|||||||
|
Goodwill
|
882,344
|
888,011
|
|||||
|
Regulatory
assets
|
-
|
200,173
|
|||||
|
Prepaid
pension costs
|
89,637
|
-
|
|||||
|
Other
|
24,176
|
13,448
|
|||||
|
996,157
|
1,101,632
|
||||||
|
$
|
2,698,577
|
$
|
2,813,752
|
||||
|
CAPITALIZATION
AND LIABILITIES
|
|||||||
|
CAPITALIZATION
(See
Consolidated Statements of Capitalization):
|
|||||||
|
Common
stockholder's equity
|
$
|
1,333,877
|
$
|
1,305,015
|
|||
|
Long-term
debt
and other long-term obligations
|
476,504
|
481,871
|
|||||
|
1,810,381
|
1,786,886
|
||||||
|
CURRENT
LIABILITIES:
|
|||||||
|
Currently
payable long-term debt
|
-
|
8,248
|
|||||
|
Short-term
borrowings (Note 10)-
|
|||||||
|
Associated
companies
|
261,159
|
241,496
|
|||||
|
Accounts
payable-
|
|||||||
|
Associated
companies
|
33,770
|
56,154
|
|||||
|
Other
|
38,277
|
25,960
|
|||||
|
Accrued
taxes
|
27,905
|
7,999
|
|||||
|
Accrued
interest
|
8,905
|
9,695
|
|||||
|
Other
|
19,756
|
23,750
|
|||||
|
389,772
|
373,302
|
||||||
|
NONCURRENT
LIABILITIES:
|
|||||||
|
Power
purchase
contract loss liability
|
-
|
382,548
|
|||||
|
Regulatory
liabilities
|
162,937
|
-
|
|||||
|
Retirement
benefits
|
102,046
|
118,247
|
|||||
|
Asset
retirement obligation
|
72,295
|
66,443
|
|||||
|
Accumulated
deferred income taxes
|
106,871
|
37,318
|
|||||
|
Other
|
54,275
|
49,008
|
|||||
|
498,424
|
653,564
|
||||||
|
COMMITMENTS
AND CONTINGENCIES
|
|||||||
|
(Notes
5
and 11)
|
$
|
2,698,577
|
$
|
2,813,752
|
|||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these balance sheets.
|
|||||||
15
|
PENNSYLVANIA
ELECTRIC COMPANY
|
|||||||||||||
|
CONSOLIDATED
STATEMENTS OF
CAPITALIZATION
|
|||||||||||||
|
As
of
December 31,
|
2005
|
2004
|
|||||||||||
|
(Dollars
in thousands, except per
share
amounts)
|
|||||||||||||
|
COMMON
STOCKHOLDER'S EQUITY:
|
|||||||||||||
| Common stock, par value $20 per share, authorized 5,400,000 shares |
|
||||||||||||
|
5,290,596
shares outstanding
|
$
|
105,812
|
$
|
105,812
|
|||||||||
|
Other
paid-in
capital
|
1,202,551
|
1,205,948
|
|||||||||||
|
Accumulated
other comprehensive loss (Note 2 (F))
|
(309
|
)
|
(52,813
|
)
|
|||||||||
|
Retained
earnings (Note 8(A))
|
25,823
|
46,068
|
|||||||||||
|
Total
common
stockholder's equity
|
1,333,877
|
1,305,015
|
|||||||||||
|
LONG-TERM
DEBT AND OTHER LONG-TERM OBLIGATIONS (Note 8
(C)):
|
|||||||||||||
|
First
mortgage
bonds:
|
|||||||||||||
|
6.125%
due
2007
|
-
|
3,495
|
|||||||||||
|
5.350%
due
2010
|
12,310
|
12,310
|
|||||||||||
|
5.350%
due
2010
|
12,000
|
12,000
|
|||||||||||
|
5.800%
due
2020
|
-
|
20,000
|
|||||||||||
|
6.050%
due
2025
|
-
|
25,000
|
|||||||||||
|
Total
first
mortgage bonds
|
24,310
|
72,805
|
|||||||||||
|
Unsecured
notes:
|
|||||||||||||
|
7.500%
due
2005
|
-
|
8,000
|
|||||||||||
|
6.125%
due
2009
|
100,000
|
100,000
|
|||||||||||
|
7.770%
due
2010
|
35,000
|
35,000
|
|||||||||||
|
5.125%
due
2014
|
150,000
|
150,000
|
|||||||||||
|
6.625%
due
2019
|
125,000
|
125,000
|
|||||||||||
|
*
3.080% due 2020
|
20,000
|
-
|
|||||||||||
|
*
3.030% due 2025
|
25,000
|
-
|
|||||||||||
|
Total
unsecured notes
|
455,000
|
418,000
|
|||||||||||
|
Capital
lease
obligations
|
-
|
43
|
|||||||||||
|
Net
unamortized discount on debt
|
(2,806
|
)
|
(729
|
)
|
|||||||||
|
Long-term
debt
due within one year
|
-
|
(8,248
|
)
|
||||||||||
|
Total
long-term debt
|
476,504
|
481,871
|
|||||||||||
|
TOTAL
CAPITALIZATION
|
$
|
1,810,381
|
$
|
1,786,886
|
|||||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
|||||||||||||
|
*
Unsecured
note has a variable-rate. Rate shown is the current applicable
rate.
|
|||||||||||||
16
|
PENNSYLVANIA
ELECTRIC COMPANY
|
|||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF COMMON STOCKHOLDER'S EQUITY
|
|||||||||||||||||||
|
Accumulated
|
|||||||||||||||||||
|
Common
Stock
|
Other
|
Other
|
|||||||||||||||||
|
Comprehensive
|
Number
|
Par
|
Paid-In
|
Comprehensive
|
Retained
|
||||||||||||||
|
Income
(Loss)
|
of
Shares
|
Value
|
Capital
|
Income
(Loss)
|
Earnings
|
||||||||||||||
|
(Dollars
in thousands)
|
|||||||||||||||||||
|
Balance,
January 1, 2003
|
5,290,596
|
$
|
105,812
|
$
|
1,215,256
|
$
|
(69
|
)
|
$
|
32,705
|
|||||||||
|
Net
income
|
$
|
21,333
|
21,333
|
||||||||||||||||
|
Net
unrealized
gain on derivative instruments
|
72
|
72
|
|||||||||||||||||
|
Minimum
liability for unfunded retirement benefits,
|
|||||||||||||||||||
|
net
of
$(29,908,000) of income taxes
|
(42,188
|
)
|
(42,188
|
)
|
|||||||||||||||
|
Comprehensive
loss
|
$
|
(20,783
|
)
|
||||||||||||||||
|
Cash
dividends
on common stock
|
(36,000
|
)
|
|||||||||||||||||
|
Purchase
accounting fair value adjustment
|
411
|
||||||||||||||||||
|
Balance,
December 31, 2003
|
5,290,596
|
105,812
|
1,215,667
|
(42,185
|
)
|
18,038
|
|||||||||||||
|
Net
income
|
$
|
36,030
|
36,030
|
||||||||||||||||
|
Net
unrealized
loss on investments
|
(2
|
)
|
(2
|
)
|
|||||||||||||||
|
Net
unrealized
loss on derivative instruments, net
|
|||||||||||||||||||
|
of
$(249,000)
of income taxes
|
(353
|
)
|
(353
|
)
|
|||||||||||||||
|
Minimum
liability for unfunded retirement benefits,
|
|||||||||||||||||||
|
net
of
$(7,298,000) of income taxes
|
(10,273
|
)
|
(10,273
|
)
|
|||||||||||||||
|
Comprehensive
income
|
$
|
25,402
|
|||||||||||||||||
|
Cash
dividends
on common stock
|
(8,000
|
)
|
|||||||||||||||||
|
Purchase
accounting fair value adjustment
|
(9,719
|
)
|
|||||||||||||||||
|
Balance,
December 31, 2004
|
5,290,596
|
105,812
|
1,205,948
|
(52,813
|
)
|
46,068
|
|||||||||||||
|
Net
income
|
$
|
26,755
|
26,755
|
||||||||||||||||
|
Net
unrealized
gain on investments
|
|||||||||||||||||||
|
of
$4,000 of
income taxes
|
3
|
3
|
|||||||||||||||||
|
Net
unrealized
gain on derivative instruments, net
|
|||||||||||||||||||
|
of
$24,000 of
income taxes
|
40
|
40
|
|||||||||||||||||
|
Minimum
liability for unfunded retirement benefits,
|
|||||||||||||||||||
|
net
of
$37,206,000 of income taxes
|
52,461
|
52,461
|
|||||||||||||||||
|
Comprehensive
income
|
$
|
79,259
|
|||||||||||||||||
|
Restricted
stock units
|
20
|
||||||||||||||||||
|
Cash
dividends
on common stock
|
(47,000
|
)
|
|||||||||||||||||
|
Purchase
accounting fair value adjustment
|
(3,417
|
)
|
|||||||||||||||||
|
Balance,
December 31, 2005
|
5,290,596
|
$
|
105,812
|
$
|
1,202,551
|
$
|
(309
|
)
|
$
|
25,823
|
|||||||||
|
CONSOLIDATED
STATEMENTS OF PREFERRED STOCK
|
|||||||
|
|
|||||||
|
Subject
to
|
|
||||||
|
|
|
Mandatory
Redemption
|
|
||||
|
|
|
Number
|
|
Carrying
|
|
||
|
|
|
of
Shares
|
|
Value
|
|
||
|
|
|
(Dollars
in thousands)
|
|||||
|
Balance,
January 1, 2003
|
4,000,000
|
$
|
92,214
|
||||
|
FIN
46
Deconsolidation
|
|||||||
|
7.34%
Series
|
(4,000,000
|
)
|
(92,428
|
)
|
|||
|
Amortization
of fair market
|
|||||||
|
value
adjustment
|
214
|
||||||
|
Balance,
December 31, 2003
|
-
|
-
|
|||||
|
Balance,
December 31, 2004
|
-
|
-
|
|||||
|
Balance,
December 31, 2005
|
-
|
$
|
-
|
||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
|||||||
17
|
PENNSYLVANIA
ELECTRIC COMPANY
|
||||||||||
|
CONSOLIDATED
STATEMENTS OF CASH FLOWS
|
||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
|||||||
|
(In
thousands)
|
||||||||||
|
CASH
FLOWS FROM OPERATING ACTIVITIES:
|
||||||||||
|
Net
income
|
$
|
26,755
|
$
|
36,030
|
$
|
21,333
|
||||
|
Adjustments
to
reconcile net income to net cash from
|
||||||||||
|
operating
activities -
|
||||||||||
|
Provision
for
depreciation
|
49,410
|
47,104
|
51,754
|
|||||||
|
Amortization
of regulatory assets
|
50,348
|
50,403
|
44,908
|
|||||||
|
Deferral
of
new regulatory assets
|
(3,239
|
)
|
-
|
-
|
||||||
|
Deferred
costs
recoverable as regulatory assets
|
(59,224
|
)
|
(87,379
|
)
|
(80,126
|
)
|
||||
|
Deferred
income taxes and investment tax credits, net
|
8,823
|
77,375
|
40,112
|
|||||||
|
Accrued
compensation and retirement benefits
|
3,596
|
9,048
|
10,683
|
|||||||
|
Cumulative
effect of accounting changes (Note 2(G))
|
798
|
-
|
(1,096
|
)
|
||||||
|
Pension
trust
contribution
|
(20,000
|
)
|
(50,281
|
)
|
-
|
|||||
|
Decrease
(increase) in operating assets:
|
||||||||||
|
Receivables
|
70,330
|
(2,591
|
)
|
13,052
|
||||||
|
Prepayments
and other current assets
|
(737
|
)
|
(4,687
|
)
|
41
|
|||||
|
Increase
(decrease) in operating liabilities:
|
||||||||||
|
Accounts
payable
|
(10,067
|
)
|
(13,909
|
)
|
(84,700
|
)
|
||||
|
Accrued
taxes
|
19,905
|
(705
|
)
|
(4,215
|
)
|
|||||
|
Accrued
interest
|
(790
|
)
|
(2,999
|
)
|
-
|
|||||
|
Other
|
7,158
|
(11,116
|
)
|
4,230
|
||||||
|
Net
cash
provided from operating activities
|
143,066
|
46,293
|
15,976
|
|||||||
|
CASH
FLOWS FROM FINANCING ACTIVITIES:
|
||||||||||
|
New
Financing-
|
||||||||||
|
Long-term
debt
|
45,000
|
150,000
|
-
|
|||||||
|
Short-term
borrowings, net
|
19,663
|
162,986
|
-
|
|||||||
|
Redemptions
and Repayments-
|
||||||||||
|
Long-term
debt
|
(56,538
|
)
|
(228,670
|
)
|
(812
|
)
|
||||
|
Short-term
borrowings, net
|
-
|
-
|
(11,917
|
)
|
||||||
|
Dividend
Payments-
|
||||||||||
|
Common
stock
|
(47,000
|
)
|
(8,000
|
)
|
(36,000
|
)
|
||||
|
Net
cash
provided from (used for) financing activities
|
(38,875
|
)
|
76,316
|
(48,729
|
)
|
|||||
|
CASH
FLOWS FROM INVESTING ACTIVITIES:
|
||||||||||
|
Property
additions
|
(107,602
|
)
|
(51,801
|
)
|
(44,657
|
)
|
||||
|
Non-utility
generation trusts withdrawals (contributions)
|
-
|
(50,614
|
)
|
66,327
|
||||||
|
Loan
repayments from (loans to) associated companies, net
|
3,730
|
(7,559
|
)
|
1,721
|
||||||
|
Other,
net
|
(320
|
)
|
(12,635
|
)
|
(912
|
)
|
||||
|
Net
cash
provided from (used for) investing activities
|
(104,192
|
)
|
(122,609
|
)
|
22,479
|
|||||
|
Net
change in
cash and cash equivalents
|
(1
|
)
|
-
|
(10,274
|
)
|
|||||
|
Cash
and cash
equivalents at beginning of year
|
36
|
36
|
10,310
|
|||||||
|
Cash
and cash
equivalents at end of year
|
$
|
35
|
$
|
36
|
$
|
36
|
||||
|
SUPPLEMENTAL
CASH FLOW INFORMATION:
|
||||||||||
|
Cash
Paid
During the Year-
|
||||||||||
|
Interest
(net
of amounts capitalized)
|
$
|
35,387
|
$
|
40,765
|
$
|
37,497
|
||||
|
Income
taxes
(refund)
|
$
|
(42,324
|
)
|
$
|
(36,434
|
)
|
$
|
10,695
|
||
|
The
accompanying Notes to Consolidated Financial Statements are
an integral
part of these statements.
|
||||||||||
18
|
PENNSYLVANIA
ELECTRIC COMPANY
|
|||||||||||||
|
CONSOLIDATED
STATEMENTS OF TAXES
|
|||||||||||||
|
For
the Years Ended December 31,
|
2005
|
2004
|
2003
|
||||||||||
|
(In
thousands)
|
|||||||||||||
|
GENERAL
TAXES:
|
|||||||||||||
|
State
gross
receipts*
|
$
|
58,184
|
$
|
55,390
|
$
|
53,716
|
|||||||
|
Real
and
personal property
|
1,404
|
2,686
|
1,624
|
||||||||||
|
Social
security and unemployment
|
5,248
|
5,103
|
3,312
|
||||||||||
|
Other
|
4,148
|
4,953
|
8,347
|
||||||||||
|
Total
general
taxes
|
$
|
68,984
|
$
|
68,132
|
$
|
66,999
|
|||||||
|
PROVISION
FOR INCOME TAXES:
|
|||||||||||||
|
Currently
payable-
|
|||||||||||||
|
Federal
|
$
|
6,652
|
$
|
(38,759
|
)
|
$
|
(15,968
|
)
|
|||||
|
State
|
571
|
(8,615
|
)
|
692
|
|||||||||
|
7,223
|
(47,374
|
)
|
(15,276
|
)
|
|||||||||
|
Deferred,
net-
|
|||||||||||||
|
Federal
|
10,529
|
64,435
|
35,136
|
||||||||||
|
State
|
(830
|
)
|
13,959
|
6,741
|
|||||||||
|
9,699
|
78,394
|
41,877
|
|||||||||||
|
Investment
tax
credit amortization
|
(876
|
)
|
(1,019
|
)
|
(988
|
)
|
|||||||
|
Total
provision for income taxes
|
$
|
16,046
|
$
|
30,001
|
$
|
25,613
|
|||||||
|
INCOME
STATEMENT CLASSIFICATION
|
|||||||||||||
|
OF
PROVISION FOR INCOME TAXES:
|
|||||||||||||
|
Operating
income
|
$
|
14,167
|
$
|
29,313
|
$
|
22,403
|
|||||||
|
Other
income
|
2,445
|
688
|
2,433
|
||||||||||
|
Cumulative
effect of accounting changes
|
(566
|
)
|
-
|
777
|
|||||||||
|
Total
provision for income taxes
|
$
|
16,046
|
$
|
30,001
|
$
|
25,613
|
|||||||
|
RECONCILIATION
OF FEDERAL INCOME TAX
|
|||||||||||||
|
EXPENSE
AT STATUTORY RATE TO TOTAL
|
|||||||||||||
|
PROVISION
FOR INCOME TAXES:
|
|||||||||||||
|
Book
income
before provision for income taxes
|
$
|
42,801
|
$
|
66,031
|
$
|
46,946
|
|||||||
|
Federal
income
tax expense at statutory rate
|
$
|
14,980
|
$
|
23,111
|
$
|
16,431
|
|||||||
|
Increases
(reductions) in taxes resulting from-
|
|||||||||||||
|
Amortization
of investment tax credits
|
(876
|
)
|
(1,019
|
)
|
(988
|
)
|
|||||||
|
Depreciation
|
4,005
|
1,649
|
2,655
|
||||||||||
|
State
income
taxes, net of federal income tax benefit
|
(168
|
)
|
3,474
|
4,831
|
|||||||||
|
Other,
net
|
(1,895
|
)
|
2,786
|
2,684
|
|||||||||
|
Total
provision for income taxes
|
$
|
16,046
|
$
|
30,001
|
$
|
25,613
|
|||||||
|
ACCUMULATED
DEFERRED INCOME TAXES AS OF
|
|||||||||||||
|
DECEMBER
31:
|
|||||||||||||
|
Property
basis
differences
|
$
|
308,297
|
$
|
287,234
|
$
|
284,667
|
|||||||
|
Non-utility
generation costs
|
(177,878
|
)
|
(181,649
|
)
|
(223,350
|
)
|
|||||||
|
Purchase
accounting basis difference
|
(762
|
)
|
(762
|
)
|
(762
|
)
|
|||||||
|
Asset
retirement obligations
|
(566
|
)
|
-
|
-
|
|||||||||
|
Sale
of
generation assets
|
7,495
|
7,495
|
7,495
|
||||||||||
|
Customer
receivables for future income taxes
|
55,169
|
52,063
|
55,817
|
||||||||||
|
Other
comprehensive income
|
(221
|
)
|
(37,455
|
)
|
(29,908
|
)
|
|||||||
|
Deferred
nuclear expenses
|
(57,469
|
)
|
(56,238
|
)
|
(47,745
|
)
|
|||||||
|
Employee
benefits
|
(17,566
|
)
|
(20,397
|
)
|
(42,368
|
)
|
|||||||
|
Other
|
(9,628
|
)
|
(12,973
|
)
|
(20,488
|
)
|
|||||||
|
Net
deferred
income tax liability
|
$
|
106,871
|
$
|
37,318
|
$
|
(16,642
|
)
|
||||||
|
*
Collected from customers through regulated rates and included
in revenue
in the Consolidated Statements of Income.
|
|||||||||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
|||||||||||||
19
NOTES
TO
CONSOLIDATED FINANCIAL STATEMENTS
1.
ORGANIZATION
AND BASIS OF PRESENTATION:
The
consolidated
financial statements include Penelec (Company) and its wholly owned
subsidiaries. The Company is a wholly owned subsidiary of FirstEnergy.
FirstEnergy also holds directly all of the issued and outstanding common shares
of its other principal electric utility subsidiaries, including OE, CEI, TE,
ATSI, JCP&L and Met-Ed.
The
Company follows
GAAP and complies with the regulations, orders, policies and practices
prescribed by the SEC, PPUC and the FERC. The preparation of financial
statements in conformity with GAAP requires management to make periodic
estimates and assumptions that affect the reported amounts of assets,
liabilities, revenues and expenses and the disclosure of contingent assets
and
liabilities. Actual results could differ from these estimates.
The
Company
consolidates all majority-owned subsidiaries over which the Company exercises
control and, when applicable, entities for which the Company has a controlling
financial interest. Intercompany transactions and balances are eliminated in
consolidation. Investments in non-consolidated affiliates (20-50% owned
companies, joint ventures and partnerships) over which the Company has the
ability to exercise significant influence, but not control, are accounted for
on
the equity basis.
Unless
otherwise
indicated, defined terms used herein have the meanings set forth in the
accompanying Glossary of Terms.
2.
SUMMARY
OF
SIGNIFICANT ACCOUNTING POLICIES:
(A) ACCOUNTING
FOR THE EFFECTS OF REGULATION
The
Company accounts
for the effects of regulation through the application of SFAS 71 since its
rates:
| · |
are
established by a third-party regulator with the authority to set
rates
that bind customers;
|
| · |
are
cost-based; and
|
| · |
can
be charged
to and collected from customers.
|
An
enterprise
meeting all of these criteria capitalizes costs that would otherwise be charged
to expense if the rate actions of its regulator make it probable that those
costs will be recovered
in future
revenue. SFAS 71 is applied only to the parts of the business that meet the
above criteria. If a portion of the business applying SFAS 71 no longer
meets those requirements, previously recorded regulatory assets are removed
from
the balance sheet in accordance with the guidance in SFAS 101.
Regulatory
Assets-
The
Company
recognizes, as regulatory assets, costs which the FERC and the PPUC have
authorized for recovery from customers in future periods or for which
authorization is probable. Without the probability of such authorization, costs
currently recorded as regulatory assets would have been charged to income as
incurred. All regulatory assets are expected to be recovered from customers
under the Company’s regulatory plan. The Company continues to bill and collect
cost-based rates for its transmission and distribution services, which remain
regulated; accordingly, it is appropriate that the Company continue the
application of SFAS 71 to those operations.
Net
regulatory
assets (liabilities)
on the
Consolidated Balance Sheets are comprised of the following:
|
2005
|
2004
|
||||||
|
(In
millions)
|
|||||||
|
Regulatory
transition costs
|
$
|
(272
|
)
|
$
|
114
|
||
|
Customer
receivables for future income taxes
|
141
|
119
|
|||||
|
Nuclear
decommissioning costs
|
(47
|
)
|
(47
|
)
|
|||
|
Gain/Loss
on
reacquired debt and other
|
15
|
14
|
|||||
|
Total
|
$
|
(163
|
)
|
$
|
200
|
||
Regulatory
liabilities
for
transition costs as of December 31, 2005 include the deferral of gains
associated with the previous divestiture of certain generation assets.
Regulatory liabilities are reduced to the extent above-market NUG costs incurred
exceed the amount recovered in CTC revenues. The Company's NUG power purchase
agreements are adjusted to fair value at the end of each quarter, with a
corresponding regulatory asset recognized for projected above-market NUG costs.
Recovery of any remaining regulatory transition costs is expected to continue
under the provisions of the various regulatory proceedings in
Pennsylvania.
20
(B) CASH
AND
SHORT-TERM FINANCIAL INSTRUMENTS-
All
temporary cash
investments purchased with an initial maturity of three months or less are
reported as cash equivalents on the Consolidated Balance Sheets at cost, which
approximates their fair market value.
(C)
REVENUES
AND
RECEIVABLES-
The
Company’s
principal business is providing electric service to customers in Pennsylvania.
The Company’s retail customers are metered on a cycle basis. Electric revenues
are recorded based on energy delivered through the end of the calendar month.
An
estimate of unbilled revenues is calculated to recognize electric service
provided between the last meter reading and the end of the month. This estimate
includes many factors including estimated weather impacts, customer shopping
activity, historical line loss factors and prices in effect for each class
of
customer. In each accounting period, the Company accrues the estimated unbilled
amount receivable as revenue and reverses the related prior period
estimate.
Receivables
from
customers include sales to residential, commercial and industrial customers
and
sales to wholesale customers. There was no material concentration of receivables
as of December 31, 2005 with respect to any particular segment of the
Company's customers. Total customer receivables were $130 million (billed -
$80 million and unbilled - $50 million) and $121 million (billed
- $76 million and unbilled - $45 million) as of December 31, 2005
and 2004, respectively.
(D) PROPERTY,
PLANT AND EQUIPMENT-
As
a result of the
Company's acquisition by FirstEnergy in 2001, a portion of the Company’s
property, plant and equipment was adjusted to reflect fair value. The majority
of the Company’s property, plant and equipment continues to be reflected at
original cost since such assets remain subject to rate regulation on a
historical cost basis. The costs of normal maintenance, repairs and minor
replacements are expensed as incurred. The Company's accounting policy for
planned major maintenance projects is to recognize liabilities as they are
incurred.
The
Company provides
for depreciation on a straight-line basis at various rates over the estimated
lives of property included in plant in service. The annualized composite rate
was approximately 2.6% in 2005, 2.5% in 2004 and 2.7% in 2003.
(E)
ASSET
IMPAIRMENTS-
Long-Lived
Assets
The
Company
evaluates the carrying value of its long-lived assets when events or
circumstances indicate that the carrying amount may not be recoverable. In
accordance with SFAS 144, the carrying amount of a long-lived asset is not
recoverable if it exceeds the sum of the undiscounted cash flows expected to
result from the use and eventual disposition of the asset. If an impairment
exists, a loss is recognized for the amount by which the carrying value of
the
long-lived asset exceeds its estimated fair value. Fair value is estimated
by
using available market valuations or the long-lived asset's expected future
net
discounted cash flows. The calculation of expected cash flows is based on
estimates and assumptions about future events.
Goodwill
In
a business
combination, the excess of the purchase price over the estimated fair values
of
assets acquired and liabilities assumed is recognized as goodwill. Based on
the
guidance provided by SFAS 142, the Company evaluates its goodwill for
impairment at least annually and would make such an evaluation more frequently
if indicators of impairment should arise. In accordance with the accounting
standard, if the fair value of a reporting unit is less than its carrying value
(including goodwill), the goodwill is tested for impairment. If an impairment
is
indicated, the Company recognizes a loss - calculated as the difference between
the implied fair value of a reporting unit's goodwill and the carrying value
of
the goodwill. The Company's annual review was completed in the third quarter
of
2005 with no impairment indicated. The
forecasts used
in the Company's evaluations of goodwill reflect operations consistent with
its
general business assumptions. Unanticipated changes in those assumptions could
have a significant effect on the Company's future evaluations of goodwill.
As of
December 31, 2005, the Company had $882 million of
goodwill.
In 2005, the
Company adjusted goodwill for the reversal of tax valuation allowances related
to income tax benefits realized attributable to prior period capital loss
carryforwards that were used to offset capital gains generated in 2005 and
above-market NUGs.
Investments
The
Company
periodically evaluates for impairment investments that include
available-for-sale securities held by its nuclear decommissioning trusts. In
accordance with SFAS 115, securities classified as available-for-sale are
evaluated to determine whether a decline in fair value below the cost basis
is
other than temporary. If the decline in fair value is determined to be other
than temporary, the cost basis of the security is written down to fair value.
The Company considers, among other factors, the length of time and the extent
to
which the security's fair value has been less than cost and the near-term
financial prospects of the security issuer when evaluating investments for
impairment. The fair value and unrealized gains and losses of the Company's
investments are disclosed in Note 4.
21
(F)
COMPREHENSIVE
INCOME-
Comprehensive
income
includes net income as reported on the Consolidated Statements of Income and
all
other changes in common stockholder’s equity except those resulting from
transactions with FirstEnergy. As of December 31, 2005,
accumulated other
comprehensive loss consisted of unrealized losses on derivative instrument
hedges of $0.3 million. As of December 31, 2004, accumulated other
comprehensive loss consisted of a minimum liability for unfunded retirement
benefits of $52 million and unrealized losses on derivative instrument
hedges of $1 million.
(G)
CUMULATIVE
EFFECT OF ACCOUNTING CHANGE
Results
in 2005
include an after-tax charge of $0.8 million
recorded upon the adoption of FIN 47 in December 2005. The Company
identified applicable legal obligations as defined under the new standard at
its
substation control rooms, service center buildings, line shops and office
buildings, identifying asbestos as the primary conditional ARO. The Company
recorded a conditional ARO liability of $1.6 million (including accumulated
accretion for the period from the date the liability was incurred to the date
of
adoption), an asset retirement cost of $0.4 million (recorded as part of
the carrying amount of the related long-lived asset) and accumulated
depreciation of $0.2 million.
As
a result of
adopting SFAS 143 in January 2003, asset retirement costs were recorded in
the amount of $93 million as part of the carrying amount of the related
long-lived asset, offset by accumulated depreciation of $93 million. The
ARO liability on the date of adoption was $99 million, including
accumulated accretion for the period from the date the liability was incurred
to
the date of adoption. The remaining cumulative effect adjustment for
unrecognized depreciation and accretion, offset by the reduction in the existing
decommissioning liabilities and the reversal of accumulated estimated removal
costs for non-regulated generation assets, was a $1.9 million increase to
income ($1.1 million, net of tax) in the year ended December 31,
2003.
(H)
INCOME
TAXES-
Details
of the total
provision for income taxes are shown on the Consolidated Statements of Taxes.
The Company records income taxes in accordance with the liability method of
accounting. Deferred income taxes reflect the net tax effect of temporary
differences between the carrying amounts of assets and liabilities for financial
reporting purposes and the amounts used for tax purposes. Investment tax
credits, which were deferred when utilized, are being amortized over the
recovery period of the related property. Deferred income tax liabilities related
to tax and accounting basis differences and tax credit carryforward items are
recognized at the statutory income tax rates in effect when the liabilities
are
expected to be paid. Deferred tax assets are recognized based on income tax
rates expected to be in effect when they are settled. The Company is included
in
FirstEnergy's consolidated federal income tax return. The consolidated tax
liability is allocated on a “stand-alone” company basis, with the Company
recognizing the tax benefit for any tax losses or credits it contributes to
the
consolidated return.
(I)
TRANSACTIONS
WITH AFFILIATED COMPANIES-
Operating
expenses
and other income included transactions with affiliated companies, primarily
FESC, GPUS and FES. GPUS (until it ceased operations in mid-2003) and FESC
have
provided legal, accounting, financial and other corporate support services
to
the Company. The Company purchases a portion of its PLR responsibility from
FES
through a wholesale power sale agreement. The primary affiliated companies
transactions are as follows:
|
2005
|
2004
|
2003
|
|||||||
|
(In
millions)
|
|||||||||
|
Services
Received:
|
|||||||||
|
Power
purchased from FES
|
$
|
321
|
$
|
404
|
$
|
307
|
|||
|
Company
support services
|
51
|
45
|
55
|
||||||
|
Power
purchased from other affiliates
|
-
|
-
|
5
|
||||||
FirstEnergy does not bill directly or allocate any of its costs to any subsidiary company. Costs are allocated to the Company from FESC, a subsidiary of FirstEnergy. The vast majority of costs are directly billed or assigned at no more than cost. The remaining costs are for services that are provided on behalf of more than one company, or costs that cannot be precisely identified and are allocated using formulas developed by FESC. The current allocation or assignment formulas used and their bases include multiple factor formulas; each company’s proportionate amount of FirstEnergy’s aggregate total for direct payroll, number of employees, asset balances, revenues, number of customers, other factors and specific departmental charge ratios. It is management’s belief that allocation methods utilized are reasonable. Intercompany transactions with FirstEnergy and its other subsidiaries are generally settled under commercial terms within thirty days.
22
| 3. |
PENSION
AND OTHER POSTRETIREMENT BENEFIT
PLANS:
|
FirstEnergy
provides
noncontributory defined benefit pension plans that cover substantially all
of
the Company's employees. The trusteed plans provide defined benefits based
on
years of service and compensation levels. The Company's funding policy is based
on actuarial computations using the projected unit credit method. In the fourth
quarter of 2005, FirstEnergy made a $500 million voluntary contribution to
its pension plan (Company's share was $20 million). Projections indicated
that absent this funding, cash contributions would have been required at some
point prior to 2010. Pre-funding the pension plan is expected to eliminate
this
future funding requirement under current pension funding rules and should also
minimize FirstEnergy's exposure to any funding requirements resulting from
proposed pension reform.
FirstEnergy
provides
a minimum amount of noncontributory life insurance to retired employees in
addition to optional contributory insurance. Health care benefits, which include
certain employee contributions, deductibles and co-payments, are also available
to retired employees hired prior to January 1, 2005, their dependents and,
under certain circumstances, their survivors. The Company recognizes the
expected cost of providing other postretirement benefits to employees and their
beneficiaries and covered dependents from the time employees are hired until
they become eligible to receive those benefits. In addition, FirstEnergy has
obligations to former or inactive employees after employment, but before
retirement for disability related benefits.
Pension
and OPEB
costs are affected by employee demographics (including age, compensation levels,
and employment periods), the level of contributions made to the plans, and
earnings on plan assets. Such factors may be further affected by business
combinations, which impact employee demographics, plan experience and other
factors. Pension and OPEB costs may also be affected by changes in key
assumptions, including anticipated rates of return on plan assets, the discount
rates and health care trend rates used in determining the projected benefit
obligations and pension and OPEB costs. FirstEnergy uses a December 31
measurement date for most of its plans.
23
Unless
otherwise
indicated, the following tables provide information applicable to FirstEnergy’s
pension and OPEB plans.
|
Obligations
and Funded Status
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||
|
As
of
December 31
|
2005
|
2004
|
2005
|
2004
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Change
in benefit obligation
|
|||||||||||||
|
Benefit
obligation as of January 1
|
$
|
4,364
|
$
|
4,162
|
$
|
1,930
|
$
|
2,368
|
|||||
|
Service
cost
|
77
|
77
|
40
|
36
|
|||||||||
|
Interest
cost
|
254
|
252
|
111
|
112
|
|||||||||
|
Plan
participants’ contributions
|
-
|
-
|
18
|
14
|
|||||||||
|
Plan
amendments
|
15
|
-
|
(312
|
)
|
(281
|
)
|
|||||||
|
Actuarial
(gain) loss
|
310
|
134
|
197
|
(211
|
)
|
||||||||
|
Benefits
paid
|
(270
|
)
|
(261
|
)
|
(100
|
)
|
(108
|
)
|
|||||
|
Benefit
obligation as of December 31
|
$
|
4,750
|
$
|
4,364
|
$
|
1,884
|
$
|
1,930
|
|||||
|
Change
in fair value of plan assets
|
|||||||||||||
|
Fair
value of
plan assets as of January 1
|
$
|
3,969
|
$
|
3,315
|
$
|
564
|
$
|
537
|
|||||
|
Actual
return
on plan assets
|
325
|
415
|
33
|
57
|
|||||||||
|
Company
contribution
|
500
|
500
|
58
|
64
|
|||||||||
|
Plan
participants’ contribution
|
-
|
-
|
18
|
14
|
|||||||||
|
Benefits
paid
|
(270
|
)
|
(261
|
)
|
(100
|
)
|
(108
|
)
|
|||||
|
Fair
value of
plan assets as of December 31
|
$
|
4,524
|
$
|
3,969
|
$
|
573
|
$
|
564
|
|||||
|
Funded
status
|
$
|
(226
|
)
|
$
|
(395
|
)
|
$
|
(1,311
|
)
|
$
|
(1,366
|
)
|
|
|
Unrecognized
net actuarial loss
|
1,179
|
885
|
899
|
730
|
|||||||||
|
Unrecognized
prior service cost (benefit)
|
70
|
63
|
(645
|
)
|
(378
|
)
|
|||||||
|
Net
asset
(liability) recognized
|
$
|
1,023
|
$
|
553
|
$
|
(1,057
|
)
|
$
|
(1,014
|
)
|
|||
|
Amounts
Recognized in the
Consolidated
Balance Sheets
As
of
December 31
|
|||||||||||||
|
Prepaid
benefit cost
|
$
|
1,023
|
$
|
-
|
$
|
-
|
$
|
-
|
|||||
|
Accrued
benefit cost
|
-
|
(14
|
)
|
(1,057
|
)
|
(1,014
|
)
|
||||||
|
Intangible
assets
|
-
|
63
|
-
|
-
|
|||||||||
|
Accumulated
other comprehensive loss
|
-
|
504
|
-
|
-
|
|||||||||
|
Net
amount
recognized
|
$
|
1,023
|
$
|
553
|
$
|
(1,057
|
)
|
$
|
(1,014
|
)
|
|||
|
Company's
share of net amount recognized
|
$
|
90
|
$
|
64
|
$
|
(101
|
)
|
$
|
(92
|
)
|
|||
|
Decrease
in
minimum liability
included
in
other comprehensive income
(net
of
tax)
|
$
|
(295
|
)
|
$
|
(4
|
)
|
$
|
-
|
$
|
-
|
|||
|
Assumptions
Used to Determine
Benefit
Obligations As of December 31
|
|||||||||||||
|
Discount
rate
|
5.75
|
%
|
6.00
|
%
|
5.75
|
%
|
6.00
|
%
|
|||||
|
Rate
of
compensation increase
|
3.50
|
%
|
3.50
|
%
|
|||||||||
|
Allocation
of Plan Assets
As
of
December 31
Asset
Category
|
|||||||||||||
|
Equity
securities
|
63
|
%
|
68
|
%
|
71
|
%
|
74
|
%
|
|||||
|
Debt
securities
|
33
|
29
|
27
|
25
|
|||||||||
|
Real
estate
|
2
|
2
|
-
|
-
|
|||||||||
|
Cash
|
2
|
1
|
2
|
1
|
|||||||||
|
Total
|
100
|
%
|
100
|
%
|
100
|
%
|
100
|
%
|
|||||
|
Information
for Pension Plans With an
|
|||||||
|
Accumulated
Benefit Obligation in
|
|||||||
|
Excess
of Plan Assets
|
2005
|
2004
|
|||||
|
(In
millions)
|
|||||||
|
Projected
benefit obligation
|
$
|
4,750
|
$
|
4,364
|
|||
|
Accumulated
benefit obligation
|
4,327
|
3,983
|
|||||
|
Fair
value of
plan assets
|
4,524
|
3,969
|
|||||
24
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||||||||||||
|
Components
of Net Periodic Benefit Costs
|
2005
|
2004
|
2003
|
2005
|
2004
|
2003
|
||||||||||||||||
|
(In
millions)
|
||||||||||||||||||||||
|
Service
cost
|
$
|
77
|
$
|
77
|
$
|
66
|
$
|
40
|
$
|
36
|
$
|
43
|
||||||||||
|
Interest
cost
|
254
|
252
|
253
|
111
|
112
|
137
|
||||||||||||||||
|
Expected
return on plan assets
|
(345
|
)
|
(286
|
)
|
(248
|
)
|
(45
|
)
|
(44
|
)
|
(43
|
)
|
||||||||||
|
Amortization
of prior service cost
|
8
|
9
|
9
|
(45
|
)
|
(40
|
)
|
(9
|
)
|
|||||||||||||
|
Amortization
of transition obligation
|
-
|
-
|
-
|
-
|
-
|
9
|
||||||||||||||||
|
Recognized
net
actuarial loss
|
36
|
39
|
62
|
40
|
39
|
40
|
||||||||||||||||
|
Net
periodic
cost
|
$
|
30
|
$
|
91
|
$
|
142
|
$
|
101
|
$
|
103
|
$
|
177
|
||||||||||
|
Company's
share of net periodic cost (income)
|
$
|
(5
|
)
|
$
|
-
|
$
|
7
|
$
|
8
|
$
|
3
|
$
|
10
|
|||||||||
|
Weighted-Average
Assumptions Used
|
|||||||||||||||||||
|
to
Determine Net Periodic Benefit Cost
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||||||||
|
for
Years Ended December 31
|
2005
|
2004
|
2003
|
2005
|
2004
|
2003
|
|||||||||||||
|
Discount
rate
|
6.00
|
%
|
6.25
|
%
|
6.75
|
%
|
6.00
|
%
|
6.25
|
%
|
6.75
|
%
|
|||||||
|
Expected
long-term return on plan assets
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
9.00
|
%
|
|||||||
|
Rate
of
compensation increase
|
3.50
|
%
|
3.50
|
%
|
3.50
|
%
|
|||||||||||||
In
selecting an
assumed discount rate, FirstEnergy considers currently available rates of return
on high-quality fixed income investments expected to be available during the
period to maturity of the pension and other postretirement benefit obligations.
The
assumed rate of return on pension plan assets consider historical market returns
and economic forecasts for the types of investments held by the Company's
pension trusts. The long-term rate of return is developed considering the
portfolio’s asset allocation strategy.
FirstEnergy
employs
a total return investment approach whereby a mix of equities and fixed income
investments are used to maximize the long-term return of plan assets for a
prudent level of risk. Risk tolerance is established through careful
consideration of plan liabilities, plan funded status, and corporate financial
condition. The investment portfolio contains a diversified blend of equity
and
fixed-income investments. Furthermore, equity investments are diversified across
U.S. and non-U.S. stocks, as well as growth, value, and small and large
capitalization funds. Other assets such as real estate are used to enhance
long-term returns while improving portfolio diversification. Derivatives may
be
used to gain market exposure in an efficient and timely manner; however,
derivatives are not used to leverage the portfolio beyond the market value
of
the underlying investments. Investment risk is measured and monitored on a
continuing basis through periodic investment portfolio reviews, annual liability
measurements, and periodic asset/liability studies.
|
Assumed
Health Care Cost Trend Rates
|
|||||||
|
As
of
December 31
|
2005
|
2004
|
|||||
|
Health
care
cost trend rate assumed for next
year
(pre/post-Medicare)
|
9-11
|
%
|
9-11
|
%
|
|||
|
Rate
to which
the cost trend rate is assumed to
decline
(the
ultimate trend rate)
|
5
|
%
|
5
|
%
|
|||
|
Year
that the
rate reaches the ultimate trend
rate
(pre/post-Medicare)
|
2010-2012
|
2009-2011
|
|||||
Assumed
health care
cost trend rates have a significant effect on the amounts reported for the
health care plans. A one-percentage-point change in assumed health care cost
trend rates would have the following effects:
|
1-Percentage-
|
1-Percentage-
|
||||||
|
Point
Increase
|
Point
Decrease
|
||||||
|
(In
millions)
|
|||||||
|
Effect
on
total of service and interest cost
|
$
|
23
|
$
|
(19
|
)
|
||
|
Effect
on
postretirement benefit obligation
|
$
|
239
|
$
|
(209
|
)
|
||
As
a result of its
voluntary contribution and the increased market value of pension plan assets,
the Company recognized a prepaid benefit cost of $90 million as of
December 31, 2005. As prescribed by SFAS 87, the Company eliminated
its additional minimum liability by $90 million. In addition, the entire
AOCL balance was credited by $53 million (net of $37 million in
deferred taxes) as the fair value of trust assets exceeded the accumulated
benefit obligation as of December 31, 2005.
Taking
into account
estimated employee future service, FirstEnergy expects to make the following
benefit payments from plan assets:
25
|
Pension
Benefits
|
Other
Benefits
|
||||||
|
(In
millions)
|
|||||||
|
2006
|
$
|
228
|
$
|
106
|
|||
|
2007
|
228
|
109
|
|||||
|
2008
|
236
|
112
|
|||||
|
2009
|
247
|
115
|
|||||
|
2010
|
264
|
119
|
|||||
|
Years
2011 -
2015
|
1,531
|
642
|
|||||
The
Company also
maintains an unfunded benefit plan under which non-qualified supplemental
pension benefits are paid to certain employees in addition to amounts received
under the Company’s qualified retirement plan, which is subject to IRS
limitations on covered compensation. The net liability recognized was $1 million
as of December 31, 2005.
4.
FAIR
VALUE
OF FINANCIAL INSTRUMENTS:
Long-term
Debt and Other Long-term Obligations-
All
borrowings with
initial maturities of less than one year are defined as financial instruments
under GAAP and are reported on the Consolidated Balance Sheets at cost, which
approximates their fair market value. The following table provides the
approximate fair value and related carrying amounts of long-term debt as of
December 31:
|
2005
|
2004
|
||||||||||||
|
Carrying
|
Fair
|
Carrying
|
Fair
|
||||||||||
|
Value
|
Value
|
Value
|
Value
|
||||||||||
|
(In
millions)
|
|||||||||||||
|
Long-term
debt
|
$
|
479
|
$
|
498
|
$
|
491
|
$
|
521
|
|||||
The
fair values of
long-term debt and
other long-term
obligations reflect the present value of the cash outflows relating to those
securities based on the current call price, the yield to maturity or the yield
to call, as deemed appropriate at the end of each respective year. The yields
assumed were based on securities with similar characteristics offered by
corporations with credit ratings similar to the Company’s ratings.
Investments-
The
carrying amounts
of cash and cash equivalents approximate fair value due to the short-term nature
of these investments. The following table provides the approximate fair value
and related carrying amounts of investments other than cash and cash equivalents
as of December 31:
|
2005
|
2004
|
||||||||||||
|
Carrying
|
Fair
|
Carrying
|
Fair
|
||||||||||
|
Value
|
Value
|
Value
|
Value
|
||||||||||
|
(In
millions)
|
|||||||||||||
|
Debt
securities:(1)
|
|||||||||||||
|
࿓-Government
obligations
|
$
|
148
|
$
|
148
|
$
|
146
|
$
|
146
|
|||||
|
࿓-Corporate
debt securities
|
1
|
1
|
-
|
-
|
|||||||||
|
149
|
149
|
146
|
146
|
||||||||||
|
Equity
securities(1)
|
62
|
62
|
62
|
62
|
|||||||||
|
$
|
211
|
$
|
211
|
$
|
208
|
$
|
208
|
||||||
(1) Includes
nuclear
decommissioning and NUG trust investments.
The
fair value of
investments other than cash and cash equivalents represent cost (which
approximates fair value) or the present value of the cash inflows based on
the
yield to maturity. The yields assumed were based on financial instruments with
similar characteristics and terms.
Investments
other
than cash and cash equivalents include held-to-maturity securities and
available-for-sale securities. Decommissioning trust investments are classified
as available-for-sale. The Company has no securities held for trading purposes.
The following table summarizes the amortized cost basis, gross unrealized gains
and losses and fair values for decommissioning trust investments as of
December 31:
26
|
2005
|
2004
|
||||||||||||||||||||||||
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
||||||||||||||||||
|
Basis
|
Gains
|
Losses
|
Value
|
Basis
|
Gains
|
Losses
|
Value
|
||||||||||||||||||
|
(In
millions)
|
|||||||||||||||||||||||||
|
Debt
securities
|
$
|
51
|
$
|
1
|
$
|
-
|
$
|
52
|
$
|
49
|
$
|
1
|
$
|
-
|
$
|
50
|
|||||||||
|
Equity
securities
|
56
|
7
|
1
|
62
|
55
|
7
|
2
|
60
|
|||||||||||||||||
|
$
|
107
|
$
|
8
|
$
|
1
|
$
|
114
|
$
|
104
|
$
|
8
|
$
|
2
|
$
|
110
|
||||||||||
Proceeds
from the
sale of decommissioning trust investments, gross realized gains and losses
on
those sales, and interest and dividend income for the three years ended
December 31, 2005 were as follows:
|
2005
|
2004
|
2003
|
||||||||
|
(In
millions)
|
||||||||||
|
Proceeds
from
sales
|
$
|
69
|
$
|
102
|
$
|
41
|
||||
|
Gross
realized
gains
|
4
|
18
|
1
|
|||||||
|
Gross
realized
losses
|
4
|
-
|
-
|
|||||||
|
Interest
and
dividend income
|
3
|
3
|
3
|
|||||||
The
following table
provides the fair value and gross unrealized losses of nuclear decommissioning
trust investments that are deemed to be temporarily impaired as of
December 31, 2005:
|
Less
Than 12 Months
|
12
Months or More
|
Total
|
|||||||||||||||||
|
Fair
|
Unrealized
|
Fair
|
Unrealized
|
Fair
|
Unrealized
|
||||||||||||||
|
Value
|
Losses
|
Value
|
Losses
|
Value
|
Losses
|
||||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
Debt
securities
|
$
|
29
|
$
|
-
|
$
|
10
|
$
|
-
|
$
|
39
|
$
|
-
|
|||||||
|
Equity
securities
|
9
|
1
|
2
|
-
|
11
|
1
|
|||||||||||||
|
$
|
38
|
$
|
1
|
$
|
12
|
$
|
-
|
$
|
50
|
$
|
1
|
||||||||
The
Company
periodically evaluates the securities held by its nuclear decommissioning trusts
for other-than-temporary impairment. The Company considers the length of time
and the extent to which the security's fair value has been less than its cost
basis and other factors to determine whether an impairment is other than
temporary. The recovery of amounts contributed to the Company's decommissioning
trusts are subject to regulatory accounting
in
accordance with SFAS 71. Net unrealized gains and losses are recorded as
regulatory liabilities or assets since the difference between investments held
in trust and the decommissioning liabilities are recovered from or refunded
to
customers.
The
investment
policy for the nuclear decommissioning trust funds restricts or limits the
ability to hold certain types of assets including private or direct placements,
warrants, securities of FirstEnergy, investments in companies owning nuclear
power plants, financial derivatives, preferred stocks, securities convertible
into common stock and securities of the trust fund's custodian or managers
and
their parents or subsidiaries.
5.
LEASES:
Consistent
with the
regulatory treatment, the rentals for capital and operating leases are charged
to operating expenses on the Consolidated Statements of Income. The Company
had
a capital lease for a building that expired in 2005. The Company’s most
significant operating lease relates to the lease of vehicles. Such costs for
the
three years ended December 31, 2005 are summarized as follows:
|
2005
|
2004
|
2003
|
||||||||
|
(In
millions)
|
||||||||||
|
Operating
leases
|
||||||||||
|
Interest
element
|
$
|
0.7
|
$
|
0.5
|
$
|
0.5
|
||||
|
Other
|
2.1
|
2.3
|
3.1
|
|||||||
|
Capital
Leases
|
||||||||||
|
Interest
Element
|
-
|
0.1
|
0.1
|
|||||||
|
Other
|
0.1
|
0.5
|
0.6
|
|||||||
|
Total
rentals
|
$
|
2.9
|
$
|
3.4
|
$
|
4.3
|
||||
27
The
future minimum
lease payments as of December 31, 2005 are:
|
Operating
Leases
|
||||
|
(In
millions)
|
||||
|
2006
|
$
|
3.5
|
||
|
2007
|
3.3
|
|||
|
2008
|
2.7
|
|||
|
2009
|
2.5
|
|||
|
2010
|
2.2
|
|||
|
Years
thereafter
|
4.5
|
|||
|
Total
minimum
lease payments
|
18.7
|
|||
6.
VARIABLE
INTEREST ENTITIES:
FIN 46R
addresses the
consolidation of VIEs, including special-purpose entities, that are not
controlled through voting interests or in which the equity investors do not
bear
the entity’s residual economic risks and rewards. FirstEnergy adopted
FIN 46R for special-purpose entities as of December 31, 2003 and for
all other entities in the first quarter of 2004. The Company consolidates VIEs
when it is determined to be the VIE’s primary beneficiary as defined by
FIN 46R.
The
Company has
evaluated its power purchase agreements and determined that certain NUG entities
may be VIEs to the extent they own a plant that sells substantially all of
its
output to the Company and the contract price for power is correlated with the
plant’s variable costs of production. The Company maintains several long-term
power purchase agreements with NUG entities. The agreements were structured
pursuant to the Public Utility Regulatory Policies Act of 1978. The Company
was
not involved in the creation of, and has no equity or debt invested in, these
entities.
The
Company has
determined that for all but two of these entities, the Company has no variable
interests in the entities or the entities are governmental or not-for-profit
organizations
not within the
scope of FIN 46R. The Company may hold variable interests in the remaining
two entities, which sell their output at variable prices that correlate to
some
extent with the operating costs of the plants. As required by FIN 46R, the
Company periodically requests the information necessary from these entities
to
determine whether they are VIEs or whether the Company is the primary
beneficiary. The Company has been unable to obtain the requested information,
which was deemed by the requested entity to be proprietary. As such, the Company
applied the scope exception that exempts enterprises unable to obtain the
necessary information to evaluate entities under FIN 46R. The purchased
power costs from these entities during 2005, 2004 and 2003 were
$28 million, $27 million and $27 million,
respectively.
7.
REGULATORY
MATTERS:
In
late 2003 and
early 2004, a series of letters, reports and recommendations were issued from
various entities, including governmental, industry and ad hoc reliability
entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force)
regarding enhancements to regional reliability. In 2004, FirstEnergy completed
implementation of all actions and initiatives related to enhancing area
reliability, improving voltage and reactive management, operator readiness
and
training and emergency response preparedness recommended for completion in
2004.
On July 14, 2004, NERC independently verified that FirstEnergy had
implemented the various initiatives to be completed by June 30 or summer
2004, with minor exceptions noted by FirstEnergy, which exceptions are now
essentially complete. FirstEnergy is proceeding with the implementation of
the
recommendations that were to be completed subsequent to 2004 and will continue
to periodically assess the FERC-ordered Reliability Study recommendations for
forecasted 2009 system conditions, recognizing revised load forecasts and other
changing system conditions which may impact the recommendations. Thus far,
implementation of the recommendations has not required, nor is expected to
require, substantial investment in new, or material upgrades to existing
equipment. The FERC or other applicable government agencies and reliability
coordinators may, however, take a different view as to recommended enhancements
or may recommend additional enhancements in the future as the result of adoption
of mandatory reliability standards pursuant to the EPACT that could require
additional, material expenditures. Finally, the PUCO is continuing to review
the
FirstEnergy filing that addressed upgrades to control room computer hardware
and
software and enhancements to the training of control room operators before
determining the next steps, if any, in the proceeding.
The
EPACT provides
for the creation of an ERO to establish and enforce reliability standards for
the bulk power system, subject to FERC review. On February 3, 2006, the FERC
adopted a rule establishing certification requirements for the ERO, as well
as
regional entities envisioned to assume monitoring responsibility for the new
reliability standards.
28
The
NERC has been
preparing the implementation aspects of reorganizing its structure to meet
the
FERC’s certification requirements for the ERO. The NERC will make a filing with
the FERC to obtain certification as the ERO and to obtain FERC approval of
delegation agreements with regional entities. The new FERC rule referred to
above, further provides for reorganizing regional reliability organizations
(regional entities) that would replace the current regional councils and for
rearranging the relationship with the ERO. The “regional entity” may be
delegated authority by the ERO, subject to FERC approval, for enforcing
reliability standards adopted by the ERO and approved by the FERC. NERC also
intends to make a parallel filing with the FERC seeking approval of mandatory
reliability standards. These
reliability
standards are expected to be based on the current NERC Version 0 reliability
standards with some additional standards. The
two filings are
expected to be made in the second quarter of 2006.
The
ECAR,
Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability
councils have completed the consolidation of these regions into a single new
regional reliability organization known as ReliabilityFirst Corporation.
ReliabilityFirst began operations as a regional reliability council under NERC
on January 1, 2006 and intends to file and obtain certification consistent
with the final rule as a “regional entity” under the ERO during 2006. All of
FirstEnergy’s facilities are located within the ReliabilityFirst
region.
On
a parallel path,
the NERC is establishing working groups to develop reliability standards to
be
filed for approval with the FERC following the NERC’s certification as an ERO.
These reliability standards are expected to build on the current NERC Version
0
reliability standards. It is expected that the proposed reliability standards
will be filed with the FERC in early 2006.
FirstEnergy
believes
it is in compliance with all current NERC reliability standards. However, it
is
expected that the FERC will adopt stricter reliability standards than those
contained in the current NERC Version 0 standards. The financial impact of
complying with the new standards cannot be determined at this time. However,
the
EPACT required that all prudent costs incurred to comply with the new
reliability standards be recovered in rates.
In
May 2004, the
PPUC issued an order approving revised reliability benchmarks and standards,
including revised benchmarks and standards for the Company. The Company filed
a
Petition for Amendment of Benchmarks with the PPUC on May 26, 2004, due to
their implementation of automated outage management systems following
restructuring. On December 30, 2005, the ALJ recommended that the PPUC adopt
the
Joint Petition for Settlement among the parties involved in the Company's
request to amend the distribution reliability benchmarks, thereby eliminating
the need for full litigation. The ALJ’s recommendation, adopting the revised
benchmarks and standards was approved by the PPUC on February 9,
2006.
A
February 2002
Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision
regarding approval of the FirstEnergy/GPU merger, remanded the issues of
quantification and allocation of merger savings to the PPUC and denied the
Company the rate relief initially approved in the PPUC decision. On
October 2, 2003, the PPUC issued an order concluding that the Commonwealth
Court reversed the PPUC’s June 2001 order in its entirety. In accordance
with the PPUC's direction, the Company filed supplements to its tariffs that
became effective in October 2003 and that reflected the CTC rates and shopping
credits in effect prior to the June 2001 order.
The
Company and
Met-Ed had been negotiating with interested parties in an attempt to resolve
the
merger savings issues that are the subject of remand from the Commonwealth
Court. The Company's and Met-Ed’s combined portion of total merger savings
during 2001 - 2004 is estimated to be approximately $51 million. In late 2005,
settlement discussions broke off as unsuccessful. A procedural schedule was
established by the ALJ on January 17, 2006. The companies’ initial testimony is
due on March 1, 2006 with testimony of the other parties and additional
testimony by the companies to be filed through October 2006. Hearings are
scheduled for the end of October 2006 with the ALJ’s recommended decision to be
issued in February 2007. The companies are unable to predict the outcome of
this
proceeding.
In
an
October 16, 2003 order, the PPUC approved September 30, 2004 as the
date for the Company's NUG trust fund refunds. The PPUC order also denied its
accounting treatment request regarding the CTC rate/shopping credit swap by
requiring the Company to treat the stipulated CTC rates that were in effect
from
January 1, 2002 on a retroactive basis. On October 22, 2003, the
Company filed an Objection with the Commonwealth Court asking that the Court
reverse this PPUC finding; a Commonwealth Court judge subsequently denied its
Objection on October 27, 2003 without explanation. On October 31,
2003, the Company filed an Application for Clarification of the Court order
with
the judge, a Petition for Review of the PPUC's October 2 and
October 16, 2003 Orders, and an application for reargument, if the judge,
in his clarification order, indicates that the Company's Objection was intended
to be denied on the merits. The Reargument Brief before the Commonwealth Court
was filed on January 28, 2005.
As
of December 31,
2005, the Company's regulatory deferral pursuant to the 1998 Restructuring
Settlement (including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger
Settlement Stipulation is $48 million. This amount is subject to the
pending resolution of taxable income issues associated with NUG Trust Fund
proceeds.
29
Met-Ed
and Penelec purchase a
portion of their PLR requirements from FES through a wholesale power sales
agreement and a portion from contracts with unaffiliated third party suppliers,
including NUGs. Assuming continuation of these existing contractual
arrangements, the available supply represents approximately 100% of the combined
retail sales obligations of Met-Ed and Penelec in 2006 and 2007; almost 100%
for
2008; and approximately 85% for 2009 and 2010. Met-Ed and Penelec are authorized
to defer any excess of NUG contract costs over current market prices. Under
the
terms of the wholesale agreement with FES, FES retains the supply obligation
and
the supply profit and loss risk for the portion of power supply requirements
not
self-supplied by Met-Ed and Penelec under their contracts with NUGs and other
unaffiliated suppliers. This arrangement reduces Met-Ed's and Penelec's exposure
to high wholesale power prices by providing power at a fixed price for their
uncommitted PLR energy costs during the term of the agreement with FES. The
wholesale agreement with FES is automatically extended for each successive
calendar year unless any party elects to cancel the agreement by November 1
of
the preceding year. On November 1, 2005, FES and the other parties thereto
amended the agreement to provide FES the right over the next year to terminate
the agreement at any time upon 60 days notice. If the wholesale power agreement
were terminated or modified, Met-Ed and Penelec would need to satisfy the
portion of their PLR obligations currently supplied by FES from unaffiliated
suppliers at prevailing prices, which are likely to be higher than the current
price charged by FES under the agreement and, as a result, Met-Ed’s and
Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec
were to replace the FES supply at current market power prices without
corresponding regulatory authorization to increase their generation prices
to
customers, each company would likely incur a significant increase in operating
expenses and experience a material deterioration in credit quality metrics.
Under such a scenario, each company's credit profile would no longer support
an
investment grade rating for its fixed income securities. Met-Ed and Penelec
are
in the process of preparing a comprehensive rate filing that will address a
number of transmission, distribution and supply issues and is expected to be
filed with the PPUC in the second quarter of 2006. That filing will include,
among other things, a request for appropriate regulatory action to mitigate
adverse consequences from any future reduction, in whole or in part, in the
availability to Met-Ed and Penelec of supply under the existing FES agreement.
There can be no assurance, however, that if FES ultimately determines to
terminate, or significantly modify the agreement, timely regulatory relief
will
be granted by the PPUC or, to the extent granted, adequate to mitigate such
adverse consequences.
The
Company, ATSI,
JCP&L, Met-Ed, and FES continue to be involved in FERC hearings concerning
the calculation and imposition of Seams Elimination Cost Adjustment (SECA)
charges to various load serving entities. Pursuant to its January 30, 2006
Order, the FERC has compressed both phases of this proceeding into a single
hearing scheduled to begin May 1, 2006, with an initial decision on or
before August 11, 2006.
On
January 12, 2005,
the Company filed, before the PPUC, a request for deferral of
transmission-related costs beginning January 1, 2005, estimated to be
approximately $4 million per month. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny
Electric Cooperative and Pennsylvania Rural Electric Association have all
intervened in the case. To date, no hearing schedule has been established,
and
the Company has not yet implemented deferral accounting for these
costs.
On
January 31,
2005, certain PJM transmission owners made three filings pursuant to a
settlement agreement previously approved by the FERC. JCP&L, Met-Ed and
Penelec were parties to that proceeding and joined in two of the filings. In
the
first filing, the settling transmission owners submitted a filing justifying
continuation of their existing rate design within the PJM RTO. In the second
filing, the settling transmission owners proposed a revised Schedule 12 to
the PJM tariff designed to harmonize the rate treatment of new and existing
transmission facilities. Interventions and protests were filed on
February 22, 2005. In the third filing, Baltimore Gas and Electric Company
and Pepco Holdings, Inc. requested a formula rate for transmission service
provided within their respective zones. On May 31, 2005, the FERC issued an
order on these cases. First, it set for hearing the existing rate design and
indicated that it will issue a final order within six months. Second, the FERC
approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted
the proposed formula rate, subject to referral and hearing procedures. On
June 30, 2005, the PJM transmission owners filed a request for rehearing of
the May 31, 2005 order. The rate design and formula rate proceedings are
currently being litigated before the FERC. If FERC accepts AEP’s proposal to
create a “postage stamp” rate for high voltage transmission facilities across
PJM, significant additional transmission revenues would be imposed on JCP&L,
Met-Ed, Penelec, and other transmission zones within PJM.
8.
CAPITALIZATION:
(A) RETAINED
EARNINGS-
In
general, the
Company’s first
mortgage
indenture restricts the payment of dividends or distributions on or with respect
to the Company’s common stock to amounts credited to earned surplus since the
date of its indenture. As of December 31, 2005, the Company had retained
earnings available to pay common stock dividends of $16 million, net of
amounts restricted under the Company’s first mortgage indenture.
(B) PREFERRED
STOCK-
The
Company’s
preferred stock authorization
consists of 11.4 million shares without par value. No preferred shares are
currently outstanding.
30
(C) LONG-TERM
DEBT AND OTHER LONG-TERM OBLIGATIONS-
The
Company's FMB
indenture, which secures all of the Company's FMB, serve as a direct first
mortgage lien on substantially all of the Company's property and franchises,
other than specifically excepted property.
The
Company has
various debt covenants under its financing arrangements. The most restrictive
of
these relate to the nonpayment of interest and/or principal on debt, which
could
trigger a default. Cross-default provisions also exist between FirstEnergy
and
the Company.
Based
on the amount
of bonds authenticated by the Trustee through December 31, 2005,
the Company’s
annual sinking fund requirements for all bonds issued under the mortgage amount
to approximately $13million. The Company could fulfill its sinking fund
obligation by providing bondable property additions, refundable bonds or cash
to
the Trustee.
Sinking
fund
requirements for FMB
and maturing
long-term debt for the next five years are:
|
|
(In
millions)
|
|||
|
2006
|
$-
|
|||
|
2007
|
-
|
|||
|
2008
|
-
|
|||
|
2009
|
100
|
|||
|
2010
|
59
|
|||
The
Company’s
obligations to repay certain pollution control revenue bonds are secured by
several series of FMB.
Certain
pollution control revenue bonds are entitled to the benefit of noncancelable
municipal bond insurance policies of $69 million to pay principal of, or
interest on, the pollution control revenue bonds. To the extent that drawings
are made under the policies, the Company is entitled to a credit against its
obligation to repay that bond. For the pollution control revenue bonds issued
in
2005, the Company pays annual fees of 0.16% of the amount of the policy to
the
insurer. The Company is obligated to reimburse the insurers for any drawings
thereunder.
|
9.
|
ASSET
RETIREMENT OBLIGATIONS
|
In
January 2003, the
Company implemented SFAS 143, which provides accounting guidance for
retirement obligations associated with tangible long-lived assets. This standard
requires recognition of the fair value of a liability for an ARO in the period
in which it is incurred. The associated asset retirement costs are capitalized
as part of the carrying amount of the long-lived asset. Over time the
capitalized costs are depreciated and the present value of the ARO increases,
resulting in a period expense. However, rate-regulated entities may recognize
a
regulatory asset or liability instead of an expense if the criteria for such
treatment are met. Upon retirement, a gain or loss would be recognized if the
cost to settle the retirement obligation differs from the carrying amount.
The
Company
initially identified applicable legal obligations as defined under the standard
for nuclear power plant decommissioning of TMI-2. The ARO liability as of the
date of adoption was $99 million, including accumulated accretion for the
period from the date the liability was incurred to the date of adoption. The
Company’s share of the obligation to decommission these units was developed
based on site specific studies performed by an independent engineer. The Company
utilized an expected cash flow approach to measure the fair value of the nuclear
decommissioning ARO.
In
2004, the Company
revised the ARO associated with TMI-2 as the result of an updated study and
the
anticipated operating license extension for TMI-1. The abandoned TMI-2 is
adjacent to TMI-1 and the units are expected to be decommissioned concurrently.
The net decrease in the TMI-2 ARO liability and corresponding regulatory asset
was $44 million.
The
Company
maintains the nuclear decommissioning trust funds that are legally restricted
for purposes of settling the nuclear decommissioning ARO. As of
December 31, 2005, the fair value of the decommissioning trust assets was
$113 million.
The
Company
implemented FIN 47, "Accounting for Conditional Asset Retirement
Obligations", an interpretation of SFAS 143 on December 31, 2005.
FIN 47 provides accounting standards for conditional retirement obligations
associated with tangible long-lived assets, requiring recognition of the fair
value of a liability for an ARO in the period in which it is incurred if a
reasonable estimate can be identified. FIN 47 states that an obligation
exists
even though there may be uncertainty about timing or method of settlement
and further
clarifies
SFAS 143, stating that the uncertainty surrounding the timing and method of
settlement when settlement is conditional on a future event occurring should
be
reflected in the measurement of the liability not in the recognition of the
liability. Accounting for conditional ARO under FIN 47 is the same as
described above in SFAS 143.
31
The
Company
identified applicable legal obligations as defined under the new standard at
its
substation control rooms, service center buildings, line shops and office
buildings, identifying asbestos as the primary conditional ARO. As
a result of
adopting FIN 47 in December 2005, the Company recorded a
conditional ARO
liability of $1.6 million (including accumulated accretion for the period
from the date the liability was incurred to the date of adoption), an
asset
retirement cost of $0.4 million (recorded as part of the carrying amount of
the
related long-lived asset), and accumulated depreciation of $0.2 million. As
a result, the Company recorded a $1.4 million cumulative effect adjustment
($0.8 million, net of tax) for unrecognized depreciation and accretion as
of December 31, 2005. The
costs of
remediation were based on costs incurred during recent remediation projects
performed at each of these locations. The conditional ARO liability was the
developed utilizing an expected cash flow approach (as discussed in SFAC 7)
to measure the fair value of the ARO. The Company used a probability weighted
analysis to estimate when remediation payments would begin. The effect on income
as if FIN 47 had been applied during 2004 and 2003 was immaterial.
The
following table
describes the changes to the ARO balances during 2005 and 2004.
|
2005
|
2004
|
||||||
|
ARO
Reconciliation
|
(In
millions)
|
||||||
|
Balance
at
beginning of year
|
$
|
66
|
$
|
105
|
|||
|
Accretion
|
4
|
5
|
|||||
|
Revisions
in
estimated cash flows
|
-
|
(44
|
)
|
||||
|
FIN
47
ARO
|
2
|
-
|
|||||
|
Balance
at end
of year
|
$
|
72
|
$
|
66
|
|||
10.
SHORT-TERM
BORROWINGS:
Short-term
borrowings outstanding as of December 31, 2005, consisted of
$261 million of borrowings from affiliates. Penelec Funding, a wholly owned
subsidiary of Penelec, is a limited liability company whose borrowings are
secured by customer accounts receivable purchased from Penelec. It can borrow
up
to $75 million under a receivables financing arrangement at rates based on
certain bank commercial paper and is required to pay an annual facility fee
of
0.15% on the entire finance limit. This financing arrangement expires on
June 29, 2006. As a separate legal entity with separate creditors, it would
have to satisfy its obligations to creditors before any of its remaining assets
could be made available to the Company.
In
June 2005,
the Company, FirstEnergy, OE, Penn, CEI, TE, JCP&L, Met-Ed, FES and ATSI, as
Borrowers, entered into a syndicated $2 billion five-year revolving credit
facility with a syndicate of banks that expires in June 2010. Borrowings under
the facility are available to each Borrower separately and mature on the earlier
of 364 days from the date of borrowing or the commitment expiration date, as
the
same may be extended. The Company's borrowing limit under the facility is
$250 million. The average interest rate on short-term borrowings
outstanding as of December 31, 2005 and 2004, was 4.0% and 2.0%,
respectively.
11.
COMMITMENTS,
GUARANTEES AND CONTINGENCIES:
(A) NUCLEAR
INSURANCE-
The
Price-Anderson
Act limits the public liability relative to a single incident at a nuclear
power
plant to $10.8 billion. The amount is covered by a combination of private
insurance and an industry retrospective rating plan. Based on its present
ownership interest in TMI-2, the Company is exempt from any potential assessment
under the industry retrospective rating plan.
The
Company is also
insured as to its interest in TMI-2 under a policy issued to the operating
company for the plant. Under this policy, $150 million
is
provided for property damage and decontamination and decommissioning costs.
Under this policy, the Company can be assessed a maximum of approximately
$0.2 million for incidents at any covered nuclear facility occurring during
a policy year which are in excess of accumulated funds available to the insurer
for paying losses.
The
Company intends
to maintain insurance against nuclear risks as described above as long as it
is
available. To the extent that property damage, decontamination, decommissioning,
repair and replacement costs and other such costs arising from a nuclear
incident at TMI-2 exceed the policy limits of the insurance in effect with
respect to that plant, to the extent a nuclear incident is determined not to
be
covered by the Company’s insurance policies, or to the extent such insurance
becomes unavailable in the future, the Company would remain at risk for such
costs.
| (B) |
ENVIRONMENTAL
MATTERS-
|
The
Company accrues
environmental liabilities only when it concludes that it is probable that we
have an obligation for such costs and can reasonably estimate the amount of
such
costs. Unasserted claims are reflected in our determination of environmental
liabilities and are accrued in the period that they are both probable and
reasonably estimable.
32
The
Company has been
named as a PRP at waste disposal sites, which may require cleanup under the
Comprehensive Environmental Response, Compensation, and Liability Act of 1980.
Allegations of disposal of hazardous substances at historical sites and the
liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all PRPs for a particular site are liable on a joint
and several basis. Therefore, environmental liabilities that are considered
probable have been recognized on the Consolidated Balance Sheet as of
December 31, 2005, based on estimates of the total costs of cleanup, the
Company’s proportionate responsibility for such costs and the financial ability
of other unaffiliated entities to pay. Total liabilities of approximately $3,000
have been accrued through December 31, 2005.
(C)
OTHER
LEGAL
PROCEEDINGS-
Power
Outages
and Related Litigation
On
August 14,
2003, various states and parts of southern Canada experienced widespread power
outages. The outages affected approximately 1.4 million customers in
FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s
final report in April 2004 on the outages concluded, among other things, that
the problems leading to the outages began in FirstEnergy’s Ohio service area.
Specifically,
the
final report concluded, among other things, that the initiation of the
August 14, 2003 power outages resulted from an alleged failure of both
FirstEnergy and ECAR to assess and understand perceived inadequacies within
the
FirstEnergy system; inadequate situational awareness of the developing
conditions; and a perceived failure to adequately manage tree growth in certain
transmission rights of way. The Task Force also concluded that there was a
failure of the interconnected grid's reliability organizations (MISO and PJM)
to
provide effective real-time diagnostic support. The final report is publicly
available through the Department of Energy’s website (www.doe.gov). FirstEnergy
believes that the final report does not provide a complete and comprehensive
picture of the conditions that contributed to the August 14, 2003 power
outages and that it does not adequately address the underlying causes of the
outages. FirstEnergy remains convinced that the outages cannot be explained
by
events on any one utility's system. The final report contained 46
“recommendations to prevent or minimize the scope of future blackouts.”
Forty-five of those recommendations related to broad industry or policy matters
while one, including subparts, related to activities the Task Force recommended
be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct
the
causes of the August 14, 2003 power outages. FirstEnergy implemented
several initiatives, both prior to and since the August 14, 2003 power
outages, which were independently verified by NERC as complete in 2004 and
were
consistent with these and other recommendations and collectively enhance the
reliability of its electric system. FirstEnergy’s implementation of these
recommendations in 2004 included completion of the Task Force recommendations
that were directed toward FirstEnergy. FirstEnergy also is proceeding with
the
implementation of the recommendations regarding enhancements to regional
reliability that were to be completed subsequent to 2004 and will continue
to
periodically assess the FERC-ordered Reliability Study recommendations for
forecasted 2009 system conditions, recognizing revised load forecasts and other
changing system conditions which may impact the recommendations. Thus far
implementation of the recommendations has not required, nor is expected to
require, substantial investment in new or material upgrades to existing
equipment, and therefore FirstEnergy has not accrued a liability as of
December 31, 2005 for any expenditures in excess of those actually incurred
through that date. The FERC or other applicable government agencies and
reliability coordinators may, however, take a different view as to recommended
enhancements or may recommend additional enhancements in the future that could
require additional, material expenditures. Finally, the PUCO is continuing
to
review FirstEnergy’s filing that addressed upgrades to control room computer
hardware and software and enhancements to the training of control room operators
before determining the next steps, if any, in the proceeding.
In
addition to the
above proceedings, FirstEnergy was named in a complaint filed in Michigan State
Court by an individual who is not a customer of any FirstEnergy company. A
responsive pleading to this matter has been filed. FirstEnergy was also named,
along with several other entities, in a complaint in New Jersey State Court.
The
allegations against FirstEnergy are based, in part, on an alleged failure to
protect the citizens of Jersey City from an electrical power outage. No
FirstEnergy entity serves any customers in Jersey City. A responsive pleading
has been filed. No estimate of potential liability has been undertaken in either
of these matters.
FirstEnergy
is
vigorously defending these actions, but cannot predict the outcome of any of
these proceedings or whether any further regulatory proceedings or legal actions
may be initiated against the Companies. In particular, if FirstEnergy or its
subsidiaries were ultimately determined to have legal liability in connection
with these proceedings, it could have a material adverse effect on FirstEnergy's
or its subsidiaries' financial condition, results of operations and cash
flows.
Legal
Matters
Various
lawsuits,
claims (including claims for asbestos exposure) and proceedings related to
the
Company's normal business operations are pending against the Company, the most
significant of which are described above.
33
12.
NEW
ACCOUNTING STANDARDS AND INTERPRETATIONS:
FSP
FAS 115-1 and FAS 124-1, "The Meaning of Other-Than-Temporary Impairment and
its
Application to Certain Investments"
Issued
in November
2005, FSP 115-1 and FAS 124-1 addresses the determination as to when
an investment is considered impaired, whether that impairment is other than
temporary, and the measurement of an impairment loss. The FSP finalized and
renamed EITF 03-1 and 03-1-a to FSP FAS 115-1. This FSP will (1) nullify
certain requirements of Issue 03-1 and supersedes EITF topic No. D-44,
"Recognition of Other Than Temporary Impairment upon the Planned Sale of a
Security Whose Cost Exceeds Fair Value," (2) clarify that an investor should
recognize an impairment loss no later than when the impairment is deemed other
than temporary, even if a decision to sell has not been made, and (3) be
effective for other-than-temporary impairment and analyses conducted in periods
beginning after September 15, 2005. The FSP requires prospective
application with an effective date for reporting periods beginning after
December 15, 2005. The Company is currently evaluating this FSP and any
impact on its investments.
EITF
Issue 04-13, "Accounting for Purchases and Sales of Inventory with the Same
Counterparty"
In
September 2005,
the EITF reached a final consensus on Issue 04-13 concluding that two or more
legally separate exchange transactions with the same counterparty should be
combined and considered as a single arrangement for purposes of applying
APB 29, when the transactions were entered into "in contemplation" of one
another. If two transactions are combined and considered a single arrangement,
the EITF reached a consensus that an exchange of inventory should be accounted
for at fair value. Although electric power is not capable of being held in
inventory, there is no substantive conceptual distinction between exchanges
involving power and other storable inventory. Therefore, the Company will adopt
this EITF effective for new arrangements entered into, or modifications or
renewals of existing arrangements, in interim or annual periods beginning after
March 15, 2006.
|
SFAS
154 -
“Accounting Changes and Error Corrections - a replacement of APB Opinion
No. 20 and FASB Statement No.
3”
|
In
May 2005, the
FASB issued SFAS 154 to change the requirements for accounting and
reporting a change in accounting principle. It applies to all voluntary changes
in accounting principle and to changes required by an accounting pronouncement
when that pronouncement does not include specific transition provisions. This
Statement requires retrospective application to prior periods’ financial
statements of changes in accounting principle, unless it is impracticable to
determine either the period-specific effects or the cumulative effect of the
change. In those instances, this Statement requires that the new accounting
principle be applied to the balances of assets and liabilities as of the
beginning of the earliest period for which retrospective application is
practicable and that a corresponding adjustment be made to the opening balance
of retained earnings (or other appropriate components of equity or net assets
in
the statement of financial position) for that period rather than being reported
in the Consolidated Statements of Income. This Statement also requires that
a
change in depreciation, amortization, or depletion method for long-lived,
nonfinancial assets be accounted for as a change in accounting estimate affected
by a change in accounting principle. The provisions of this Statement are
effective for accounting changes and corrections of errors made in fiscal years
beginning after December 15, 2005. The Company will adopt this Statement
effective January 1, 2006.
|
SFAS
153,
“Exchanges of Nonmonetary Assets - an amendment of APB Opinion No.
29”
|
In
December 2004,
the FASB issued SFAS 153 amending APB 29, which was based on the
principle that nonmonetary assets should be measured based on the fair value
of
the assets exchanged. The guidance in APB 29 included certain exceptions to
that principle. SFAS 153 eliminates the exception from fair value
measurement for nonmonetary exchanges of similar productive assets and replaces
it with an exception for exchanges that do not have commercial substance. This
Statement specifies that a nonmonetary exchange has commercial substance if
the
future cash flows of the entity are expected to change significantly as a result
of the exchange. The provisions of this Statement are effective January 1,
2006 for the Company. This FSP is not expected to have a material impact on
the
Company’s financial statements.
SFAS
151,
“Inventory Costs - an amendment of ARB No. 43, Chapter 4”
In
November 2004,
the FASB issued SFAS 151 to clarify the accounting for abnormal amounts of
idle facility expense, freight, handling costs and wasted material (spoilage).
Previous guidance stated that in some circumstances these costs may be “so
abnormal” that they would require treatment as current period costs.
SFAS 151 requires abnormal amounts for these items to always be recorded as
current period costs. In addition, this Statement requires that allocation
of
fixed production overheads to the cost of conversion be based on the normal
capacity of the production facilities. The provisions of this statement are
effective for inventory costs incurred by the Company beginning January 1,
2006. The Company does not expect this statement to have a material impact
on
its financial statements.
34
13.
SUMMARY
OF
QUARTERLY FINANCIAL DATA (UNAUDITED):
The
following
summarizes certain consolidated operating results by quarter for 2005 and 2004:
|
Three
Months Ended
|
March
31,
2005
|
June
30,
2005
|
September
30,
2005
|
December
31,
2005
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Operating
Revenues
|
$
|
293.9
|
$
|
262.0
|
$
|
290.4
|
$
|
275.6
|
|||||
|
Operating
Expenses and Taxes
|
263.8
|
246.1
|
284.3
|
263.9
|
|||||||||
|
Operating
Income
|
30.1
|
15.9
|
6.1
|
11.7
|
|||||||||
|
Other
Income
|
0.8
|
(0.3
|
)
|
1.1
|
1.1
|
||||||||
|
Net
Interest
Charges
|
9.5
|
9.8
|
9.6
|
10.1
|
|||||||||
|
Income
(Loss)
Before Cumulative Effect
|
21.4
|
5.8
|
(2.4
|
)
|
2.7
|
||||||||
|
Cumulative
Effect of Accounting Change
|
-
|
-
|
-
|
(0.8
|
)
|
||||||||
|
Net
Income
(Loss)
|
$
|
21.4
|
$
|
5.8
|
$
|
(2.4
|
)
|
$
|
1.9
|
||||
|
Three
Months Ended
|
March
31,
2004
|
June
30,
2004
|
September
30,
2004
|
December
31,
2004
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Operating
Revenues
|
$
|
256.4
|
$
|
242.2
|
$
|
254.3
|
$
|
283.1
|
|||||
|
Operating
Expenses and Taxes
|
240.9
|
229.3
|
226.9
|
265.3
|
|||||||||
|
Operating
Income
|
15.5
|
12.9
|
27.4
|
17.8
|
|||||||||
|
Other
Income
|
-
|
0.4
|
1.3
|
0.7
|
|||||||||
|
Net
Interest
Charges
|
9.8
|
10.2
|
10.5
|
9.4
|
|||||||||
|
Net
Income
|
$
|
5.7
|
$
|
3.1
|
$
|
18.2
|
$
|
9.1
|
|||||
35