Coronado Global Resources Inc. 10-K, filed Feb 21, 2023: EX-96.4
Coronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
February 2023
Prepared for:
Coronado Global Resources Inc.
100 Bill Baker Way
Beckley, West Virginia 25801
Prepared by:
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
582 Industrial Park Road
Bluefield, Virginia 24605
www.mma1.com
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Statement of Use and Preparation
This Technical Report Summary (
TRS
) was prepared by
Marshall Miller & Associates, Inc. (
MM&A
)
for the sole use of
Coronado Global Resources Inc. (
Coronado
)
and its affiliated and subsidiary
companies and advisors. Copies or references to information in this report may not be used without
the written permission of Coronado.
This report provides a statement of coal resources and coal reserves for Coronado, as defined under
the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(
JORC Code
) as well as under Subpart 1300 of Regulation S-K (Regulation S-K 1300) promulgated by
the
United States Securities and Exchange Commission (
SEC
)
.
report was also prepared in accordance with the
Australasian Code for Public Reporting of
Technical Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
The statement is based on information provided by Coronado and reviewed by
Qualified Persons
(
QPs
) who are full-time employees of MM&A.
As noted above, this report is a “Public Report” for the purposes of the VALMIN Code. However, in
accordance with paragraph 12.1 of the VALMIN Code, it is noted that this report is not a “Valuation
of Mineral Assets”, and it also does not comply with the following requirements that apply to
“Technical Assessments” (as defined in the VALMIN Code):
This report does not include a determination of the status of tenure (as required by paragraph
7.2 of the VALMIN Code) on the basis that tenure was separately reviewed by Coronado’s legal
advisors.
This report does not include separate commentary on the reasonableness and quality of the
Resources and Reserves estimates and the basis on which they have been reported (as required by
paragraph 7.3 of the VALMIN Code). MM&A did not consider that this was appropriate in
circumstances where MM&A was engaged for the specific purpose of preparing those estimates.
However, MM&A notes that, in accordance with its usual practice, a separate team of MM&A
employees undertook a peer review of this report and confirmed that both the process followed by
the authors of this report and the estimates prepared were reasonable and comply with the
requirements of the JORC Code.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
The information in this TRS related to coal resources and reserves is based on, and fairly represents,
information compiled by the QPs. At the time of reporting, MM&A’s QPs have sufficient experience
relevant to the style of mineralization and type of deposit under consideration and to the activity
they are undertaking to qualify as a QP as defined by Regulation S-K 1300 and the JORC Code. Each
QP consents to the inclusion in this report of the matters based on their information in the form
and context in which it appears.
Marshall Miller & Associates, Inc. (
MM&A
)
contained in this report dated December 31, 2022, relating to estimates of coal resources and coal
reserves controlled by Coronado.
Qualified Person:
/s/ Marshall Miller & Associates, Inc.
Date:
February 15, 2023
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
i
Table of Contents
1
Executive Summary ................................................................ ................................ ........... 1
1.1
Property Description ............................................................................................. 1
1.2
Ownership ............................................................................................................. 2
1.3
Geology .................................................................................................................. 2
1.4
Exploration Status ................................................................................................. 3
1.5
Operations and Development ............................................................................... 3
1.6
Mineral Resource .................................................................................................. 3
1.7
Mineral Reserve .................................................................................................... 4
1.8
Capital Summary ................................................................................................... 5
1.9
Operating Costs ..................................................................................................... 5
1.10
Economic Evaluation ............................................................................................. 6
1.10.1
Discounted Cash Flow Analysis ............................................................. 10
1.10.2
Sensitivity Analysis ................................................................................ 10
1.11
Permitting ............................................................................................................ 11
1.12
Conclusion and Recommendations ..................................................................... 11
2
Introduction ................................ ................................ ................................ .................... 12
2.1
Registrant and Terms of Reference ..................................................................... 12
2.2
Information Sources ............................................................................................ 12
2.3
Personal Inspections ........................................................................................... 14
3
Property Description ................................ ................................ ................................ ....... 14
3.1
Location ............................................................................................................... 14
3.2
Titles, Claims or Leases ........................................................................................ 14
3.3
Mineral Rights ..................................................................................................... 14
3.4
Encumbrances ..................................................................................................... 15
3.5
Other Risks........................................................................................................... 15
4
Accessibility, Climate, Local Resources, Infrastructure and Physiography ......................... 15
4.1
Topography, Elevation and Vegetation ............................................................... 15
4.2
Access and Transport .......................................................................................... 16
4.3
Proximity to Population Centers ......................................................................... 16
4.4
Climate and Length of Operating Season ............................................................ 16
4.5
Infrastructure ...................................................................................................... 16
5
History ................................................................ ................................ ............................ 17
5.1
Previous Operation .............................................................................................. 17
5.2
Previous Exploration ........................................................................................... 17
6
Geological Setting, Mineralization and Deposit ................................................................ 17
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
ii
6.1
Regional, Local and Property Geology ................................................................ 17
6.2
Mineralization ..................................................................................................... 18
6.3
Deposits ............................................................................................................... 20
7
Exploration................................ ................................ ................................ ...................... 20
7.1
Nature and Extent of Exploration ....................................................................... 20
7.2
Non-Drilling Procedures and Parameters ........................................................... 21
7.3
Drilling Procedures .............................................................................................. 21
7.4
Hydrology ............................................................................................................ 22
7.5
Geotechnical Data ............................................................................................... 22
8
Sample Preparation, Analyses and Security ................................ ................................ ..... 23
8.1
Prior to Sending to the Lab .................................................................................. 23
8.2
Lab Procedures .................................................................................................... 23
9
Data Verification ................................ ................................ ................................ ............. 24
9.1
Procedures of Qualified Person .......................................................................... 24
9.2
Limitations ........................................................................................................... 24
9.3
Opinion of Qualified Person ................................................................................ 24
10
Mineral Processing and Metallurgical Testing ................................ ................................ .. 25
10.1
Testing Procedures .............................................................................................. 25
10.2
Relationship of Tests to the Whole ..................................................................... 25
10.3
Lab Information ................................................................................................... 25
10.4
Relevant Results .................................................................................................. 26
11
Mineral Resource Estimates ................................ ................................ ............................ 26
11.1
Assumptions, Parameters and Methodology...................................................... 26
11.1.1
Geostatistical Analysis ........................................................................... 27
11.2
Qualified Person’s Estimates ............................................................................... 31
11.3
Qualified Person’s Opinion .................................................................................. 31
12
Mineral Reserve Estimates ................................ ................................ .............................. 31
12.1
Assumptions, Parameters and Methodology...................................................... 31
12.2
Qualified Person’s Estimates ............................................................................... 33
12.3
Qualified Person’s Opinion .................................................................................. 34
13
Mining Methods ................................ ................................ ................................ .............. 34
13.1
Geotech and Hydrology ....................................................................................... 35
13.2
Production Rates ................................................................................................. 35
13.3
Mining Related Requirements ............................................................................ 37
13.4
Required Equipment and Personnel ................................................................... 37
13.4.1
Mine: Pangburn .................................................................................... 37
13.4.2
Mine: Shaner ......................................................................................... 39
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
iii
13.4.3
Mine: Fallowfield ................................................................................... 40
14
Processing and Recovery Methods ................................ ................................ ................... 41
14.1
Description or Flowsheet .................................................................................... 41
14.2
Requirements for Energy, Water, Material and Personnel ................................ 41
15
Infrastructure ................................ ................................ ................................ .................. 42
16
Market Studies ................................ ................................ ................................ ................ 43
16.1
Market Description .............................................................................................. 43
16.2
Price Forecasts ..................................................................................................... 43
16.3
Contract Requirements ....................................................................................... 44
17
Environmental Studies, Permitting and Plans, Negotiations or Agreements with Local
Individuals ................................ ................................ ................................ .............. 44
17.1
Results of Studies ................................................................................................ 44
17.2
Requirements and Plans for Waste Disposal ...................................................... 44
17.3
Permit Requirements and Status ........................................................................ 44
17.4
Local Plans, Negotiations or Agreements ........................................................... 45
17.5
Mine Closure Plans .............................................................................................. 46
17.6
Qualified Person’s Opinion .................................................................................. 46
18
Capital and Operating Costs ................................ ................................ ............................. 46
18.1
Capital Cost Estimate........................................................................................... 46
18.2
Operating Cost Estimate ..................................................................................... 47
19
Economic Analysis ................................................................ ................................ ........... 48
19.1
Assumptions, Parameters and Methods ............................................................. 48
19.2
Results ................................................................................................................. 50
19.3
Sensitivity ............................................................................................................ 55
20
Adjacent Properties ................................ ................................ ................................ ......... 56
20.1
Information Used ................................................................................................ 56
21
Other Relevant Data and Information ................................................................ .............. 56
22
Interpretation and Conclusions ................................ ................................ ........................ 56
22.1
Conclusion ........................................................................................................... 56
22.2
Risk Factors .......................................................................................................... 56
22.2.1
Governing Assumptions ........................................................................ 57
22.2.2
Limitations ............................................................................................. 58
22.2.3
Methodology ......................................................................................... 58
22.2.4
Development of the Risk Matrix ........................................................... 58
22.2.5
Categorization of Risk Levels and Color Code Convention ................... 61
22.2.6
Description of the Coal Property .......................................................... 61
22.2.7
Summary of Residual Risk Ratings ........................................................ 62
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
iv
22.2.8
Risk Factors............................................................................................ 62
23
Recommendations ................................ ................................ ................................ .......... 68
24
References ................................ ................................ ................................ ...................... 68
25
Reliance on Information Provided by the Registrant ................................ ........................ 69
F
IGURES
(
IN
R
EPORT
)
Figure 1-1: Mon Valley Complex Property Location Map ................................................................... 2
Figure 1-2: CAPEX ................................................................................................................................ 5
Figure 1-3: OPEX .................................................................................................................................. 6
Figure 1-4: Sensitivity of NPV ............................................................................................................ 11
Figure 6-1: Stratigraphic Column ..................................................................................................... 19
Figure 7-1: Mon Valley Cross-Section ............................................................................................... 21
Figure 11-1: Histogram of the Total Seam Thickness for the Upper Freeport Seam Present in the
Mon Valley Complex ....................................................................................................... 28
Figure 11-2: Scatter plot of the Total Seam Thickness for the Upper Freeport Seam Present in the
Mon Valley Complex ....................................................................................................... 28
Figure 11-3: Variogram of the Total Seam Thickness for the Upper Freeport Seam Present in the
Mon Valley Complex ....................................................................................................... 29
Figure 11-4: Result of DHSA for the Upper Freeport Seam Present in the Mon Valley Complex .... 30
Figure 13-1: Proposed Pangburn Plant and Mine Site Infrastructure .............................................. 39
Figure 18-1: CAPEX ............................................................................................................................ 47
Figure 19-1: Cash Costs per Tonne ................................................................................................... 51
Figure 19-2: Sensitivity of NPV .......................................................................................................... 55
T
ABLES
(
IN
R
EPORT
)
Table 1-1: Coal Resources Summary as of December 31, 2022 ......................................................... 3
Table 1-2: Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt).................................. 4
Table 1-3: Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt) ........... 4
Table 1-4: Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000) .............................................. 7
Table 1-5: Project Cash Flow Summary (000)
*
Table 2-1: Information Provided to MM&A by Coronado ................................................................ 13
Table 11-1: General Reserve and Resource Criteria ......................................................................... 27
Table 11-2: DHSA Results Summary for Radius from a Central Point .............................................. 30
Table 11-3: Coal Resources Summary as of December 31, 2022 ..................................................... 31
Table 12-1: Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt) ............................. 33
Table 12-2: Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt) ....... 34
Table 13-1: Production Summary by Mine by Year (000) ................................................................. 36
Table 16-1: Quality Specifications by Product .................................................................................. 43
Table 18-1: Estimated Coal Production Taxes and Sales Costs ......................................................... 48
Table 18-2: Mon Valley Operating Costs .......................................................................................... 48
Table 19-1: Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000) .......................................... 51
Table 19-2: Summary of Mon Valley Key Financial Performance Metrics (2023-2030) ................... 52
Table 19-3: Project Cash Flow Summary (000)
*
Table 22-1: Probability Level Table ................................................................................................... 59
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
v
Table 22-2: Consequence Level Table ............................................................................................... 60
Table 22-3: Risk Matrix ..................................................................................................................... 61
Table 22-4: Risk Assessment Matrix ................................................................................................. 62
Table 22-5: Geological and Coal Resource Risk Assessment (Risks 1 and 2) .................................... 63
Table 22-6: Environmental (Risks 3 and 4) ....................................................................................... 64
Table 22-7: Regulatory Requirements (Risk 5) ................................................................................. 64
Table 22-8: Market and Transportation (Risks 6 and 7) ................................................................... 65
Table 22-9: Market and Transportation (Risk 8) ............................................................................... 65
Table 22-10: Methane Management (Risk 9) ................................................................................... 66
Table 22-11: Mine Fires (Risk 10) ...................................................................................................... 67
Table 22-12: Availability of Supplies and Equipment (Risk 11) ......................................................... 67
Table 22-13: Labor – Work Stoppage (Risk 12) ................................................................................. 68
Table 22-14: Labor – Retirement (Risk 13) ....................................................................................... 68
Table 25-1: Information from Registrant Relied Upon by MM&A ................................................... 69
Appendices
A .......................................................................................................................... MM&A Qualifications
B .................................................................................................................................................... Maps
C ................................................................................................................................ Glossary of Terms
D ........................................................................................................................................ JORC Table 1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
Property Description
Coronado Global Resources Inc. (
Coronado
)
authorized
Marshall Miller & Associates, Inc. (
MM&A
)
to prepare this Technical Report Summary (
TRS
) of its controlled coal resources and reserves for the
Mon Valley Complex in southwestern Pennsylvania (Mon Valley or the
Property
). An updated TRS
was prepared in February 2023 due to material differences in the key financial modifying factors
including coal sales price assumptions, operating costs and capital costs from December 31, 2021
to December 31, 2022. Coal sales price assumptions are discussed in
while operating costs and capital costs are discussed in
Sections 18 and 19
provides a statement of coal resources and coal reserves for Coronado, as defined under the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(
JORC
Code
) as well as under Subpart 1300 of Regulation S-K (Regulation S-K 1300) promulgated by the
United States Securities and Exchange Commission (
SEC
)
.
accordance with the
Australasian Code for Public Reporting of Technical Assessments and
Valuations of Mineral Assets
(
VALMIN Code
).
The Mon Valley property is comprised of three separate reserve holdings, namely, the Pangburn,
Shaner and Fallowfield proposed underground mines in the Upper Freeport seam. All three
respective reserve areas are greenfield sites and are undeveloped. The three mines have been
projected to operate independently, with production initially beginning at Pangburn. Shaner is
projected to come online as replacement production for Pangburn, and Fallowfield represents
expanded Mon Valley production after Pangburn is in full production. In addition to the individual
mine/plant sites, a barge loading dock on the Monongahela River adjacent to the Pangburn site is
proposed and will be used to ship clean coal for all three mines. Each mine site will include a coal
preparation plant and all necessary surface facilities.
Coal resources and coal reserves are herein reported in metric units of measurement and are
rounded to millions of metric tonnes (
Mt
).
The Mon Valley properties are located approximately 16 kilometers to 32 kilometers southeast of
Pittsburgh, Pennsylvania (see
Figure 1-1
). The property is composed of 41,615 total hectares, of
which 1,339 are leased from private landholders under two leases, and 40,276 hectares are owned
by Coronado. Subject to Coronado’s exercising its renewal rights thereunder, both of the leases
expire upon exhaustion of the relevant coal reserves, which is expected to occur in 2100.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1: Mon Valley Complex Property Location Map
1.2
Ownership
Mineral rights for the Property were formerly controlled by
Consolidation Coal Company (
CONSOL
)
.
Coronado acquired the Mon Valley properties from CONSOL in March 2016.
1.3
Geology
There are currently no active operations in the Mon Valley complex. Strata of economic interest for
this TRS are of the Pennsylvanian-age Allegheny Formation, and the subject Upper Freeport seam is
the principal coal seam of interest for Coronado. The Upper Freeport seam has been mined
extensively in the region. The seam is situated below drainage throughout the Property and will be
accessed by constructed mine shafts and slopes.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
1.4
Exploration Status
The Property has been explored extensively, largely by drilling using continuous coring method,
rotary drilling, and by downhole geophysical methods. The majority of the data was acquired or
generated by previous owners of the Property. These sources comprise the primary data used in
the evaluation of the coal resources and coal reserves on the Property. MM&A examined the data
available for the evaluation and incorporated all pertinent information into this TRS. Where data
appeared to be anomalous or not representative, that information was excluded from the digital
databases and subsequent processing by MM&A.
Ongoing exploration has been carried out by Coronado since acquiring the Mon Valley properties.
1.5
Operations and Development
Coronado currently has no active operations in the Mon Valley complex. The mines will produce
coal that is suitable for the high-volatile metallurgical coal markets.
The preliminary design for the Pangburn mine surface facilities was provided by Coronado. The
facilities include offices, warehouses, shops, a bathhouse for personnel, a preparation plant to
process run-of-mine (
ROM
) coal, a refuse area with a designed capacity of approximately 35 million
refuse tonnes, raw coal storage at the plant totaling approximately 100,000 tonnes, clean coal
storage at the plant site of approximately 54,000 tonnes, and three clean coal stockpiles adjacent
to the dock loading facility on the Monongahela River. The three river stockpiles have a designed
capacity of approximately 266,000 tonnes. Processes are expected to be typical of those used at
operating coal-processing plants and the coal industry in general. The river dock is anticipated to
also support production from the planned Fallowfield and Shaner operations. Room-and-pillar
mining will be employed at these properties.
1.6
Mineral Resource
Mineral resources, representing in-situ coal from a portion of which reserves are derived, are
presented below. A coal resource estimate, summarized in
Table 1-1
, was prepared as of December
31, 2022, for property controlled by Coronado.
Table 1-1: Coal Resources Summary as of December 31, 2022
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
291.0
213.5
9.3
513.8
31
1.4
26
Exclusive of Reserve
0.0
0.0
0.0
0.0
Total 12/31/2022
291.0
213.5
9.3
513.8
Note: Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are derived.
Note 2: Coal resources are reported on a dry basis. Surface moisture and inherent moisture are excluded.
Note 3: The Mon Valley properties do not have any resource tonnes exclusive of reserves as of December 31, 2022.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
1.7
Mineral Reserve
Reserve tonnage estimates provided herein report coal reserves derived from the in-situ resource
tonnes presented in
Table 1-1
, and not in addition to coal resources. Proven and probable coal
reserves were derived from the defined coal resource considering relevant mining, processing,
infrastructure, economic (including estimates of capital, revenue, and cost), marketing, legal,
environmental, socio-economic and regulatory factors. The Resource estimate has been used as
the basis for this Reserve calculation, which utilizes a reasonable Preliminary Feasibility Study, a Life-
of Mine (
LOM
) Mine Plan and practical recovery factors. Production modeling was completed with
an effective start date of May 1, 2032.
Factors that would typically preclude conversion of a coal resource to coal reserve include the
following: inferred resource classification; absence of coal quality; poor mine recovery; lack of
access; geological encumbrances associated with overlying and underlying strata; seam thinning;
structural complication; and insufficient exploration have all been considered. Reserve
consideration excludes those portions of the resource area which exhibit the aforementioned
geological and operational encumbrances.
Table 1-2: Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
Demonstrated Coal Reserves (Mt, Moist ROM)
By Reliability Category
By Mining Type
By Control Type
Quality (Dry)
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Mon Valley
113.9
83.2
197.1
0.0
197.1
195.7
1.4
37
1.2
23
Coal reserves are presented on a ROM basis in
Table 1-2
. Proven and probable coal reserves were
derived from the defined in-situ coal resource considering relevant processing, economic (including
technical estimates of capital, revenue, and cost), marketing, legal, environmental, socioeconomic,
and regulatory factors. The proven and probable coal reserves on the Property are summarized
below in
Table 1-3
.
Table 1-3: Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt)
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, Mt)
Quality (Dry Basis)
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Mon Valley
77.8
56.6
134.4
0.0
134.4
133.4
1.0
8
1.2
35
surface and inherent moisture is modeled at 6-percent. Actual product moisture is dependent upon multiple geological factors, operational
factors, and product contract specifications and can exceed 8-percent. As such, the modeled moisture values provide a level of conservatism
for reserve reporting. Life-of-mine sulfur for Pangburn is an estimated 1.21%; however, overall Mon Valley Complex reserve average is
1.36% sulfur.
In summary, Coronado controls a total of 134.4 Mt (moist basis) of marketable coal reserves at Mon
Valley, as of December 31, 2022. Of that total, 58 percent are proven, and 42 percent are probable.
There are 133.4 Mt of owned coal reserves and 1.0 Mt of leased coal reserves. All of the Mon Valley
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
reserves are considered suitable for the metallurgical coal market. All of the Mon Valley reserves
are unassigned.
1.8
Capital Summary
The MM&A financial model includes provisions for operating equipment at the proposed Mon
Valley operations. MM&A’s capital schedules assume that major equipment rebuilds occur over the
course of each machine’s remaining assumed operating life. Replacement equipment was
scheduled based on MM&A’s experience and knowledge of mining equipment and industry
standards with respect to the useful life of such equipment. A summary of the estimated capital for
the Property is provided in
Figure 1-2
Figure 1-2: CAPEX
1.9
Operating Costs
MM&A used the Coronado historical and/or budget cost information for comparable operations as
a reference and developed personnel schedules for the mine and support facilities. Hourly labor
rates and salaries were based upon information contained in Coronado’s financial summaries.
Fringe benefit costs were developed for vacation and holidays, federal and state unemployment
insurance, retirement, workers’ compensation and pneumoconiosis, casualty and life insurance,
healthcare, and bonuses. A cost factor for mine supplies was developed that relates expenditures
to mine advance rates for roof control costs and other mine supply costs at underground mines.
Other factors were developed for maintenance and repair costs, rentals, mine power, outside
services and other direct mining costs.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Operating-cost factors were also developed for the coal preparation plant processing, refuse
handling, coal loading, property taxes, and insurance and bonding. Appropriate royalty rates were
assigned for production from leased coal lands and sales taxes were calculated for the federal black
lung excise tax, and federal reclamation fees.
A summary of the projected operating costs for the Property is provided in
Figure 1-3
.
Figure 1-3: OPEX
1.10
Economic Evaluation
The pre-feasibility financial model prepared for this TRS was developed to test the economic viability
of each coal resource area. The results of this financial model are not intended to represent a
bankable feasibility study, required for financing of any current or future mining operations
contemplated for the Coronado properties, but are intended to establish the economic viability of
the estimated coal reserves. Cash flows are simulated on an annual basis in nominal dollars
assuming a 2% inflation rate based on projected production from the coal reserves. The discounted
cash flow analysis presented herein is based on an effective date of January 1, 2023.
On an un-levered basis, the net present value (
NPV
) of the project cash flow after taxes represents
the Enterprise Value of the project. The project cash flow, excluding debt service, is calculated by
subtracting direct and indirect operating expenses and capital expenditures from revenue. Direct
costs include labor, operating supplies, maintenance and repairs, facilities costs for materials
handling, coal preparation, refuse disposal, coal loading, reclamation and general and
administrative costs. Indirect costs include statutory and legally agreed upon fees related to direct
extraction of the mineral. The indirect costs are the Federal black lung tax, Federal reclamation
taxes, property taxes, coal production royalties, and income taxes.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Table 1-4
P&L
), and earnings before income tax, depreciation &
amortization (
EBITDA
) for each proposed Coronado mine at Mon Valley .
Table 1-4: Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000)
LOM
LOM
P&L
LOM
EBITDA
Tonnes
*
Pre-Tax P&L
Per Tonne
EBITDA
Per Ton ne
Pangburn
Fallowfield
Shaner
Consolidated PA Deep Mines
Note: *Financial model includes 0.9 million tonnes of inferred coal production. Inferred coal represents 0.6%
of the total production, and none of this coal was included in the estimate of reserves.
As shown in
Table 1-4,
Coronado’s consolidated operations show positive LOM P&L and LOM EBITDA of $13.8 billion and
$17.9 billion, respectively.
Coronado’s consolidated Mon Valley cash flow summary in nominal dollars assuming a 2% inflation
rate, excluding debt service, is shown in
Table 1-5
Table 1-5: Project Cash Flow Summary (000)
*
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
Total
2027
2028
2029
2030
2031
Production & Sales tonnes
135,311
-
-
-
-
-
Total Revenue
$37,567,900
$-
$-
$-
$-
$-
EBITDA
$12,956,210
$(388)
$(388)
$(388)
$(388)
$(388)
Net Income
$5,500,454
$(388)
$(388)
$(388)
$(388)
$(388)
Net Cash Provided by Operating Activities
$9,101,755
$(388)
$(388)
$(388)
$(388)
$(328)
Purchases of Property, Plant, and Equipment
$(3,799,269)
$-
$(5,533)
$(31,868)
$(36,156)
$(233,778)
Net Cash Flow
$5,302,486
$(388)
$(5,921)
$(32,256)
$(36,544)
$(234,106)
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2032
2033
2034
2035
2036
2037
Production & Sales tonnes
399
1,810
1,875
1,958
2,029
2,030
Total Revenue
$54,019
$249,974
$264,268
$281,660
$297,887
$304,147
EBITDA
$25,792
$134,660
$143,768
$156,696
$168,610
$172,267
Net Income
$(55,860)
$50,305
$57,801
$63,866
$62,105
$73,365
Net Cash Provided by Operating Activities
$20,744
$112,463
$139,070
$147,100
$143,903
$154,203
Purchases of Property, Plant, and Equipment
$(223,890)
$(6,093)
$(1,522)
$(23,061)
$(19,766)
$(224,451)
Net Cash Flow
$(203,146)
$106,370
$137,548
$124,039
$124,137
$(70,247)
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2038
2039
2040
2041
2042
2043
Production & Sales tonnes
2,062
1,960
1,762
2,366
1,804
1,724
Total Revenue
$315,229
$305,758
$280,640
$384,512
$299,179
$291,805
EBITDA
$178,445
$166,211
$140,888
$208,852
$140,775
$133,692
Net Income
$57,967
$72,886
$45,385
$92,177
$64,942
$53,969
Net Cash Provided by Operating Activities
$165,161
$154,094
$130,479
$163,610
$106,491
$111,512
Purchases of Property, Plant, and Equipment
$(202,332)
$(18,063)
$(15,711)
$(22,144)
$(8,827)
$(14,141)
Net Cash Flow
$(37,170)
$136,031
$114,769
$141,466
$97,664
$97,370
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2044
2045
2046
2047
2048
2049
Production & Sales tonnes
1,717
1,641
1,719
1,657
1,582
1,704
Total Revenue
$296,479
$289,255
$309,181
$304,039
$296,312
$325,698
EBITDA
$135,584
$128,438
$141,700
$136,176
$128,554
$149,022
Net Income
$67,285
$78,524
$86,380
$81,215
$75,423
$86,668
Net Cash Provided by Operating Activities
$115,188
$109,995
$111,937
$112,263
$106,871
$118,353
Purchases of Property, Plant, and Equipment
$(106,672)
$(33,173)
$(3,378)
$(5,687)
$(21,727)
$(45,062)
Net Cash Flow
$8,515
$76,822
$108,559
$106,575
$85,144
$73,291
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2050
2051
2052
2053
2054
2055
Production & Sales tonnes
1,656
1,732
1,702
1,596
1,642
1,750
Total Revenue
$322,894
$344,510
$345,451
$330,631
$347,164
$377,485
EBITDA
$144,852
$159,462
$158,323
$145,127
$155,737
$176,479
Net Income
$83,039
$106,381
$104,840
$90,665
$96,667
$115,492
Net Cash Provided by Operating Activities
$120,921
$126,371
$126,005
$119,262
$124,313
$138,665
Purchases of Property, Plant, and Equipment
$(25,998)
$(4,218)
$(20,921)
$(39,520)
$(28,042)
$(37,598)
Net Cash Flow
$94,923
$122,153
$105,084
$79,742
$96,271
$101,067
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2056
2057
2058
2059
2060
2061
Production & Sales tonnes
1,751
2,609
3,576
3,732
3,846
3,762
Total Revenue
$385,399
$586,004
$819,598
$872,775
$917,689
$916,057
EBITDA
$180,413
$271,312
$391,320
$425,108
$454,572
$448,794
Net Income
$139,507
$127,958
$209,809
$227,665
$251,397
$234,738
Net Cash Provided by Operating Activities
$160,731
$227,264
$308,925
$347,214
$369,575
$374,330
Purchases of Property, Plant, and Equipment
$(549,006)
$(91,928)
$(36,973)
$(45,463)
$(22,284)
$(131,772)
Net Cash Flow
$(388,274)
$135,335
$271,952
$301,751
$347,291
$242,558
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2062
2063
2064
2065
2066
2067
Production & Sales tonnes
3,488
3,390
3,466
3,397
2,961
2,826
Total Revenue
$866,529
$859,453
$896,756
$896,840
$797,498
$776,640
EBITDA
$406,027
$398,694
$424,167
$429,339
$389,140
$382,069
Net Income
$203,176
$262,307
$274,392
$274,792
$235,580
$226,904
Net Cash Provided by Operating Activities
$352,593
$331,050
$333,667
$341,553
$322,289
$312,496
Purchases of Property, Plant, and Equipment
$(58,035)
$(25,972)
$(64,621)
$(60,161)
$(120,574)
$(57,818)
Net Cash Flow
$294,558
$305,078
$269,045
$281,391
$201,715
$254,678
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2068
2069
2070
2071
2072
2073
Production & Sales tonnes
2,479
2,318
2,289
1,438
1,988
1,993
Total Revenue
$695,232
$663,381
$668,340
$428,531
$604,475
$618,406
EBITDA
$345,064
$315,895
$324,744
$177,919
$303,204
$313,068
Net Income
$200,677
$180,616
$183,214
$102,106
$185,575
$200,522
Net Cash Provided by Operating Activities
$290,478
$265,928
$264,648
$126,035
$207,165
$242,028
Purchases of Property, Plant, and Equipment
$(118,193)
$(38,552)
$(41,672)
$(26,538)
$(44,402)
$(30,383)
Net Cash Flow
$172,285
$227,376
$222,976
$99,497
$162,763
$211,645
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2074
2075
2076
2077
2078
2079
Production & Sales tonnes
1,822
2,098
2,055
2,107
1,883
2,129
Total Revenue
$576,706
$614,741
$614,611
$642,871
$586,223
$676,320
EBITDA
$282,323
$306,812
$304,834
$325,855
$282,672
$345,761
Net Income
$178,585
$209,539
$202,684
$211,767
$179,763
$230,583
Net Cash Provided by Operating Activities
$227,691
$232,044
$237,019
$247,117
$225,397
$251,932
Purchases of Property, Plant, and Equipment
$(3,360)
$(3,428)
$(42,925)
$(75,556)
$(16,116)
$(6,493)
Net Cash Flow
$224,330
$228,617
$194,094
$171,561
$209,281
$245,439
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2080
2081
2082
2083
2084
2085
Production & Sales tonnes
1,937
1,723
2,242
1,568
2,285
1,637
Total Revenue
$627,878
$570,149
$756,717
$540,176
$803,092
$587,274
EBITDA
$307,130
$261,187
$391,089
$241,080
$421,465
$261,759
Net Income
$201,018
$156,255
$247,475
$139,739
$281,600
$160,070
Net Cash Provided by Operating Activities
$240,316
$207,078
$272,041
$211,121
$285,491
$228,402
Purchases of Property, Plant, and Equipment
$(25,860)
$(72,719)
$(39,361)
$(12,940)
$(20,396)
$(34,296)
Net Cash Flow
$214,456
$134,359
$232,679
$198,181
$265,095
$194,106
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2086
2087
2088
2089
2090
2091
Production & Sales tonnes
1,982
1,477
1,857
1,616
1,993
1,305
Total Revenue
$725,512
$551,606
$707,457
$628,246
$790,874
$528,487
EBITDA
$356,300
$233,497
$334,352
$278,449
$389,504
$199,352
Net Income
$224,911
$128,018
$209,340
$168,393
$251,821
$107,463
Net Cash Provided by Operating Activities
$252,946
$200,997
$235,620
$222,633
$275,062
$188,238
Purchases of Property, Plant, and Equipment
$(42,736)
$(61,764)
$(27,589)
$(31,659)
$(4,613)
$(38,355)
Net Cash Flow
$210,209
$139,233
$208,030
$190,974
$270,449
$149,882
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2092
2093
2094
2095
2096
2097
Production & Sales tonnes
1,637
1,612
1,747
1,355
1,731
1,752
Total Revenue
$676,274
$679,478
$751,249
$594,733
$775,168
$800,781
EBITDA
$301,607
$299,832
$348,917
$215,004
$356,524
$378,911
Net Income
$176,267
$169,679
$213,755
$117,501
$219,452
$235,930
Net Cash Provided by Operating Activities
$211,547
$229,125
$256,552
$190,242
$246,204
$284,008
Purchases of Property, Plant, and Equipment
$(81,778)
$(76,560)
$(4,993)
$(5,093)
$(47,001)
$-
Net Cash Flow
$129,769
$152,566
$251,558
$185,149
$199,203
$284,008
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2098
2099
2100
2101
2102
2103
Production & Sales tonnes
1,387
916
393
-
-
-
Total Revenue
$646,856
$435,993
$190,649
$-
$-
$-
EBITDA
$266,452
$177,489
$71,896
$-
$-
$-
Net Income
$157,157
$132,037
$52,032
$-
$-
$-
Net Cash Provided by Operating Activities
$224,663
$61,085
$(105,016)
$-
$-
$-
Purchases of Property, Plant, and Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$224,663
$61,085
$(105,016)
$-
$-
$-
●
Financial model includes 0.9 million tonnes of inferred coal production. Inferred coal represents 0.6% of the total
production, and none of this coal was included in the estimate of reserves.
Consolidated cash flows are driven by annual sales tonnage, which grows from 0.4 million tonnes in
2032 to a peak of 3.8 million tonnes in 2060. Between years 2061 and 2090, sales ranges from 1.5
million to 2.7 million tonnes and between years 2091-2100, sales range from 0.4 million tonnes to
1.3 million tonnes. Projected consolidated revenue grows from $54.0 million in 2032 to a peak of
$917.7 million in 2060. Revenue totals $37.6 billion for the project’s life.
Consolidated cash flow from operations is positive throughout the projected operating period, with
the exception of post -production years, due to end-of-mine reclamation spending. Consolidated
cash flow from operations peaks at $374.3 million in 2061 and totals $9.1 billion over the project’s
life. Capital expenditures total $531.2 million during the first five years and $3.8 billion over the
project’s life.
1.10.1
Discounted Cash Flow Analysis
Cash flow after tax, but before debt service, generated over the life of the project was discounted
to NPV at a 10.0% discount rate, which represents Coronado’s estimate of the nominal dollar, risk
adjusted weighted average cost of capital (
WACC
) for likely market participants if the subject
reserves were offered for sale. On an un-levered basis, the NPV of the project cash flows represents
the Enterprise Value of the project and amounts to $168.3 million. The pre-feasibility financial
model prepared for the TRS was developed to test the economic viability of each coal resource area.
The NPV estimate was made for purposes of confirming the economics for classification of coal
reserves and not for purposes of valuing Coronado or its Mon Valley assets. Mine plans were not
optimized, and actual results of the operations may be different, but in all cases, the mine
production plan assumes the properties are under competent management.
1.10.2
Sensitivity Analysis
Sensitivity of the NPV results to changes in the key drivers is presented in the chart below. The
sensitivity study shows the NPV at the 10.0% discount rate when Base Case sales prices, operating
costs, and capital costs are increased and decreased in increments of 5% within a +/- 15% range.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Figure 1-4: Sensitivity of NPV
As shown, NPV is quite sensitive to changes in sales price and operating cost estimates, and slightly
sensitive to changes in capital cost estimates.
1.11
Permitting
Due to the projected start-up date of the Mon Valley mines, initial-stage permit work has been
completed to date; however, no permit applications have been submitted to the state or federal
regulatory agencies. The proposed mines are located in an area with a long history of coal mining,
with numerous permitted operations in close proximity. Coal mining permits are routinely
obtained; a 2 to 3-year lead time is recommended. Estimated expenditures for mine closure and
site reclamation are included in the financial model for each mine or plant site. MM&A is unaware
of any obvious or current Coronado permitting issues that are expected to prevent the issuance of
future permits. All coal producers are subject to a level of uncertainty regarding future clean water
permits due to
United States Environmental Protection Agency
(
EPA
)
United States Fish and
Wildlife (
USFW
)
1.12
Conclusion and Recommendations
Sufficient data has been obtained through various exploration, sampling programs, and mining
operations to support the geological interpretations of seam structure and thickness for coal
horizons situated on the Property. The data are of sufficient quantity and reliability to reasonably
support the coal-resource and coal-reserve estimates in this TRS.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
The geological data and preliminary feasibility study, which consider mining plans, revenue, and
operating- and capital-cost estimates are sufficient to support the classification of coal reserves
provided herein.
This geologic evaluation conducted in conjunction with the preliminary feasibility study concludes
that the 134.4 Mt of marketable underground coal reserves identified on the Property are
economically mineable under reasonable expectations of market prices for metallurgical coal
products, estimated operation costs, and capital expenditures.
2
Introduction
2.1
Registrant and Terms of Reference
This report was prepared for the sole use of
Coronado Global Resources Inc. (
Coronado
)
and its
affiliated and subsidiary companies and advisors. An updated TRS was prepared in February 2023
due to material differences in the key financial modifying factors including coal sales price
assumptions, operating costs and capital costs from December 31, 2021 to December 31, 2022. Coal
sales price assumptions are discussed in
capital costs are discussed in
Sections 18 and 19
resources and coal reserves for Coronado, as defined under the
Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves
(
JORC Code
) as well as under Subpart
1300 of Regulation S-K (Regulation S-K 1300) promulgated by the
United States Securities and
Exchange Commission (
SEC
)
.
Australasian
Code for Public Reporting of Technical Assessments and Valuations of Mineral Assets
(
VALMIN
Code
).
The Mon Valley property is comprised of three separate reserve holdings, namely, the Pangburn,
Shaner and Fallowfield proposed underground mines in the Upper Freeport seam.
The report provides a statement of coal resources and coal reserves for Coronado at the Property.
Exploration results and Resource calculations were used as the basis for the mine planning and the
preliminary feasibility study completed to determine the extent and viability of the reserve.
Coal resources and coal reserves are herein reported in metric units of measurement and are
rounded to millions of metric tonnes (
Mt
).
2.2
Information Sources
This TRS is based on information provided by Coronado and reviewed by MM&A. Sources of data
and information are listed below in
Table 2-1
:
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Table 2-1: Information Provided to MM&A by Coronado
Information Provided by Coronado
Report Section
Geological
Geologic data including digital databases and original source data including
geologist logs, driller’s logs, geophysical logs
9.1
Coal Quality
Database of coal quality information supplemented with original source
laboratory sheets where available
10.1
Mining
Historical productivities and manpower from operating and future Coronado
mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing current and future methods of
coal processing
14.1
Waste Disposal
Engineering data and estimates representing remaining capacities for coarse
and fine coal waste disposal
17.2
Costs
Historical and budgetary operating cost information used to derive cost drivers
for reserve financial modeling
18.2
Economic
WACC and inflation rate used in discounted cash flow analysis
19.1, 19.2, 19.3
Note: While the sources of data listed in Table 2-1 are not exhaustive, they represent a significant portion of information which supports this TRS.
MM&A reviewed the provided data and found it to be reasonable prior to incorporating it into the TRS. The TRS contains “forward-looking
information” including forecasts of productivity and annual coal production, operating and capital cost estimates, coals sales price forecasts, the
assumption that Coronado will continue to acquire necessary permits, and other assumptions. The TRS statements and conclusions are not a
guarantee of future performance and undue reliance should not be placed on them. The ability of Coronado to recover the estimated coal reserves
is dependent on multiple factors beyond the control of MM&A including, but not limited to geologic factors, mining conditions, regulatory approvals,
and changes in regulations. In all cases, the plans assume the Property is under competent management.
Coronado engaged MM&A to conduct a coal resource and reserve evaluation of the Coronado coal
properties as of December 31, 2022, the effective date of this TRS for Mon Valley. For the
evaluation, the following tasks were to be completed:
>
Conduct a site visit to the projected resource/reserve area;
>
Process the information supporting the estimation of coal resources and reserves into geological
models;
>
Develop life-of-reserve mine (
LOM
) plans and financial models;
>
Hold discussions with Coronado company management; and
>
Prepare and issue a TRS providing a statement of coal resources and reserves which would
include:
-
A description of the mines and facilities.
-
A description of the evaluation process.
-
An estimation of coal resources and reserves with compliance elements as stated under the
JORC Code and the SEC Regulation S-K 1300.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
2.3
Personal Inspections
MM&A is very familiar with the Mon Valley properties, having provided a variety of geological and
engineering evaluations of the subject property and neighboring properties in recent years. No
facilities are constructed on the properties.
3
Property Description
3.1
Location
The Mon Valley Complex will include the Pangburn, Shaner, and Fallowfield underground mines in
the Upper Freeport coal seam. The properties are located approximately 22.5 kilometers southeast
of Pittsburgh.
The property is located in Allegheny, Washington, and Westmoreland Counties, Pennsylvania.
Mining operations here have not yet been initiated. The Property is located on portions of eight
United States Geological Survey
(
USGS
) quadrangles: Irwin; Glassport; Monongahela; Donora;
Smithton; California; Ellsworth; and Hackett. The coordinate system and datum used for the model
of Mon Valley and the subsequent maps were produced in the Pennsylvania State Plane South
system, NAD 27.
3.2
Titles, Claims or Leases
The property is composed of 41,615 total hectares, of which 1,339 are leased from private
landholders under two leases, and 40,276 hectares are owned by Coronado. Subject to Coronado’s
exercising its renewal rights thereunder, both of the leases expire upon exhaustion of the relevant
coal reserves, which is expected to occur in 2100. MM&A has not carried out a separate title
verification for the coal properties and has not verified leases, deeds, surveys, or other property-
control instruments pertinent to the subject resources. Tenure was separately reviewed by
Coronado’s legal advisors. Coronado has represented to MM&A that it controls the mining rights
to the reserves as shown on its property maps, and MM&A has accepted these as being a true and
accurate depiction of the mineral rights controlled by Coronado. The TRS assumes the properties
are developed under responsible and experienced management.
3.3
Mineral Rights
Coronado supplied property control maps to MM&A related to properties for which mineral and/or
surface property are controlled by Coronado. While MM&A accepted these representations as
being true and accurate, MM&A has no knowledge of past property boundary disputes or other
concerns, through past knowledge of the Property, that would signal concern over future mining
operations or development potential.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Property control in Appalachia can be intricate. Coal-mining properties are typically composed of
numerous property tracts which are owned and/or leased from both land-holding companies and
private individuals or companies. It is common to encounter severed ownership, with different
entities or individuals controlling the surface and mineral rights. Mineral control in the region is
typically characterized by leases or ownership of larger tracts of land, with surface control generally
comprised of smaller tracts, particularly in developed areas.
Legal mining rights may reflect a combination of fee or mineral ownership and fee or mineral leases
of coal lands through various surface and mineral lease agreements.
Control of the surface property is necessary to conduct surface mining but is not necessary to
conduct underground mining. Given that the vicinity of the Mon Valley properties has an extensive
history of coal mining, Coronado and its predecessors have a successful history of obtaining any
necessary rights and the associated permits to mine.
3.4
Encumbrances
No Title Encumbrances are known. By assignment, MM&A did not complete a query related to Title
Encumbrances.
3.5
Other Risks
There is always risk involved in property control. Coronado and its predecessor, CONSOL, have both
had their legal teams examine the deeds and title control in order to minimize the risk.
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
Topography, Elevation and Vegetation
Topography of the area surrounding the proposed Mon Valley complex is typical of the Northern
Appalachian Plateau consisting of broad river valleys and rolling hills, with some upland regions.
Surface elevations near the Property range from approximately 396 meters above sea level in
upland regions to approximately 220 meters at stream level. The property is moderately vegetated
by primarily oak hardwood forests, but the majority of the land is developed for farm and residential
use. The property is situated near the major urban center of Pittsburgh, PA and is considered
suburban.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
4.2
Access and Transport
There is general access to the Mon Valley property via a well-developed network of primary,
secondary, and unimproved roads. The Monongahela and Youghiogheny Rivers traverse the
Property from south to north. There are numerous four -lane limited-access roads situated within
or adjacent to the Property as well as a network of improved two-lane state and county roads. U.S.
Interstate 70 and Pennsylvania Route 51 traverse the Fallowfield and Pangburn properties,
respectively. Numerous secondary and unimproved roads provide direct access to the mine
property, some being state - and town- maintained. These roads typically stay open throughout the
year. There are numerous transportation/logistical options for shipping product. The primary
means of transport for produced coal would be by barge on the Monongahela River/Ohio River
system. Additionally, a CSX rail line located along the banks of the Monongahela River would
provide another option for the shipment of coal.
4.3
Proximity to Population Centers
The Mon Valley property lies near the communities of Bentleyville, Lockview, Monongahela,
Elizabeth, Sutersville, and Irwin, Pennsylvania approximately 16 kilometers to 32 kilometers
southeast of Pittsburgh, and 16 kilometers to 32 kilometers from Washington and McKeesport,
Pennsylvania. As of the 2020 census Pittsburgh had a population of 302,971 residents; McKeesport,
18,825; and Washington, 13,176.
4.4
Climate and Length of Operating Season
The climate of the region is classified as warm-summer humid continental with four distinct seasons:
warm summers, cold winters, and moderate fall and spring seasons. Precipitation in the region is
consistent throughout the year with the most rain falling in spring and the early months of summer.
Average yearly rainfall is 53.1 centimeters. Summer months typically begin in late May and end in
early September and range in average temperature from 51 to 84 degrees Fahrenheit (or 10.6 to
28.9 degrees Celsius). Winters typically begin in mid to late November and run until mid to late
March with average temperatures ranging from 22 to 50 degrees Fahrenheit (or -5.6 to 10 degrees
Celsius). Precipitation in the winter typically comes in the form of snowfall or as a wintery mix (sleet
and snow) with severe snowfall events occurring occasionally. Seasonal variations in climate
typically do not affect underground mining in Pennsylvania. However, weather events could
potentially negatively impact efficiency of surface and preparation plant operations on a very
limited basis, typically lasting less than a few days.
4.5
Infrastructure
The Mon Valley property has sources of water, power, personnel, and supplies readily available for
use. Personnel have historically been sourced from the surrounding communities in Allegheny,
Washington, and Westmoreland Counties, and have proven to be adequate in numbers to operate
the mines. As mining is common in the surrounding areas, the workforce is generally familiar with
mining practices, and many are experienced miners. Water is expected to be sourced locally from
nearby public water sources or rivers. Electricity is anticipated to be sourced from
West Penn Power
(
West Penn
)
Duquesne Light
(
Duquesne Light
)
. The service industry in the areas surrounding the
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
proposed mine complex has historically provided supplies, equipment repairs and fabrication, etc.
Barge transport on the Monongahela River/Ohio River system will serve as the main means of
product transport from the mine, and currently serve as a means of coal transportation for
neighboring Pittsburgh seam operations. Rail access is provided by a
CSX
)
line.
5
History
5.1
Previous Operation
The property was formerly controlled by
Consolidation Coal Company
(
CONSOL
).
Historic
underground operations were active in the area in the early 1900’s and contour surface mining
operations were performed in the 1950 to 1960 era.
Coronado acquired the properties from
CONSOL in March 2016.
5.2
Previous Exploration
The properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado. The majority
of the drilling was accomplished using vertical continuous (diamond) coring and air rotary methods.
Drill records indicate that independent contract drilling operators have been engaged periodically
to carry out exploration drilling on the properties. Geophysical logging on those properties acquired
from CONSOL was often performed by both CONSOL’s in-house logging services and outside logging
firms.
6
Geological Setting, Mineralization and Deposit
6.1
Regional, Local and Property Geology
The property lies in the Northern Appalachian Coal basin in the Appalachian Plateau physiographic
province. The coal deposits in the eastern USA are the oldest and most extensively developed coal
deposits in the country. The coal deposits on the properties are Carboniferous in age, being of the
Pennsylvanian system. Overall, these Carboniferous coals contain roughly two-fifths of the
bituminous coal deposits in the United States and extend over 1,448 kilometers from northern
Alabama to Pennsylvania and are part of what is known as the
Appalachian Basin
. The Appalachian
Basin is more than 402 kilometers wide and, in some portions, contains over 60 coal seams of
varying economic significance.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Seams of economic significance typically range between 0.3 meters to 1.8 meters in thickness, with
relatively little structural deformation. Regional structure is typically characterized by gently
dipping strata to the northwest at less than one percent.
Seams of the Allegheny Formation have historically been mined in the Pennsylvania region with the
Upper Freeport seam being one of the principal seams in the formation. Coal from the area has
historically sold in thermal and metallurgical markets.
Future operations at the Mon Valley properties will extract the Upper Freeport coal seam, which
covers large areas of Pennsylvania, Ohio, Maryland, and West Virginia. The Upper Freeport seam is
situated at the top of the Allegheny Group of the middle Pennsylvanian period (307-315 million
years ago). The top of the Upper Freeport seam is commonly used as the marker between the top
of the Allegheny Formation and the overlying Upper Pennsylvanian Conemaugh Group. The
Allegheny Formation is made up of laminated cyclothemic sequences of coal, shale, limestone, and
clay. The Upper Freeport seam lies generally around 183 meters below the Pittsburgh seam.
Deposits associated with the Upper Freeport are often irregular and dislocated deposits (formed in
domed peat swamps commonly referred to as “peat islands”).
The primary structural controls on the Upper Freeport coal basin are localized syn-depositional
anticlines and synclines that directly influence the accumulation of peat bogs. These structures
create gently folded and rolling coal strata. The axis of the Waynesburg and Port Royal (Irwin)
synclines pass through the center and eastern portions of the properties with a trend and incline to
the Northeast. The Amity, Murrysville, and Belle Vernon anticlines (listed from west to east) reside
to the center and western portions of the properties. These anticlines often coincide with thicker
coal seams where peat accumulated in domes along the anticlinal crest. It is understood that local
anticlines represent the upthrown side of syn-depositionally active deep faults. Inversely, fluvial
channel sediments were deposited on the structural downthrown side within synclines.
Within the Pangburn, Shaner, and Fallowfield mine-plan areas, the Upper Freeport is typically 183
meters to 335 meters below the ground surface. Mine access is therefore to be provided by shaft
and slope development. The planned Pangburn shaft depth is approximately 195 meters in depth.
The shaft depths at the projected locations for the Shaner and Fallowfield shafts range from
approximately 232 meters to 268 meters.
6.2
Mineralization
The coal to be produced at The Mon Valley Complex is typically high volatile (>31% volatile matter)
bituminous coal.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
RM
Redstone Limestone
RML
Lower Redstone Limestone
PSU
Pittsburgh SS Upper Bench
PR
Pittsburgh Rider Coal
PSL
Pittsburgh SS Lower Bench
RCZ
Pittsburgh Roof Coal Zone
DS
Drawslate
PG
Pittsburgh Coal Main Bench
PGS
Pittsburgh Coal Expected Horizon (Surface)
AM
Ames Marine Zone
AMS
Ames Marine Zone Expected Horizon (Surface)
HR
Harlem Coal
BK2
Upper Bakerstown Coal
WRM
Woods Run Marine Zone
BK1
Lower Bakerstown Coal
PC
Pine Creek Marine Zone
BCM
Brush Creek Marine Zone
BC
Brush Creek Coal
BCS
Brush Creek Coal Expected Horizon (Surface)
MHU
Upper Mahoning Sandstone
MA
Mahoning Coal
MH
Lower Mahoning Sandstone
UFR
Upper Freeport Rider Coal
UF
Upper Freeport Coal
UFS
Upper Freeport Coal Expected Horizon (Surface)
UFL
Upper Freeport Leader Coal
LUF
Upper Freeport Limestone
BUT
Butler Sandstone
LFR
Lower Freeport Rider Coal
LF
Lower Freeport Coal
LFL
Lower Freeport Leader Coal
LLF
Lower Freeport Limestone
FSS
Freeport Sandstone
REQUIRED UNIT
Age
Group
Formation
Member
Code
Pennsylvanian
Monongahela
Pittsburgh
Lower
Major Units
Mahoning
Pennsylvanian
Conemaugh
Glenshaw
Ames
Saltsburg
Woods Run
Pine Creek
Brush Creek
Pennsylvanian
Allegheny
Freeport
The generalized stratigraphic columnar section in
Figure 6-1
of the principal coal seams and rock formations on the Property.
Figure 6-1: Stratigraphic Column
(not to scale)
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
6.3
Deposits
Historic underground mining has occurred in the overlying Pittsburgh Seam on this property.
Contour surface mining on the Pittsburgh and Redstone outcrop has occurred within the areas
projected for the coal refuse disposal area, the slope portal area and the preparation plant area.
The three proposed mines (Pangburn, Shaner, and Fallowfield) are all projected to be deep mines
in the Upper Freeport seam. Mining is projected in areas where the total seam thickness exceeds
1.2 meters. Areas of sandstone washout and seam thinning have been excluded from projections
by MM&A personnel. Additional exploration could identify additional geologically limiting features,
which could alter the proposed mine plan. The Upper Freeport seam in the projected areas ranges
from 0.7 meters to 3.1 meters thick and averages 1.95 meters thick.
7
Exploration
7.1
Nature and Extent of Exploration
Extensive exploration in the form of subsurface drill efforts has been carried out on the Property by
numerous entities, most of which efforts were completed prior to the acquisition by Coronado.
Diamond core and rotary drilling are the primary types of exploration on the Property. Data for
correlation and mining conditions are derived from core descriptions and geophysical logging (e-
logging). Coal quality analyses were also employed during the core exploration process. A total of
approximately 750 core and rotary holes have been drilled for exploration.
The location of the drilling is shown on the maps included in
Appendix B
.
The concentration of exploration varies slightly across the Property. Drilling on the Property is
typically sufficient for delineation of potential underground mineable benches. Core logging is
carried out by professional geologists in cases where roof and floor strata are of particular interest
and in cases where greater resolution and geologic detail are needed. Generally speaking, however,
most drill hole data come from simplified driller’s logs, which often lack specific details regarding
geotechnical conditions and specific geology, making correlations and floor and roof conditions
difficult to determine. Geophysical logging (e-logging) techniques, by contrast, document specific
details useful for geologic interpretation and mining conditions. Given the variability of data-
gathering methods,
definitive
projections and assumptions can be made within a
reasonable
A significant effort was put into verifying the integrity of the database. Once this was established,
stratigraphic columnar sections were generated using cross-sectional analysis to establish or
confirm coal seam correlations. A typical cross-section is shown in
Figure 7-1
.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Figure 7-1: Mon Valley Cross-Section
Due to the long history of exploration by various parties on the Property, a wide variety of survey
techniques exist for documentation of data point locations. Many of the older exploration drill holes
appear to have been located by survey and more recently-completed drill holes are often located
by high-resolution Global Positioning System (
GPS
) units. However, some holes appear to have been
approximately located using USGS topography maps or other methods which are less accurate.
Therefore, discretion had to be used regarding the accuracy for the location and ground surface
elevation of some of these older drill holes. In instances where a drill hole location (or associated
coal seam elevations) appeared to be inconsistent with the overall structural trend (or surface
topography for surface -mineable areas), the data point was not honored for geological modeling.
Others with apparently minor variances were adjusted and then used by MM&A.
Surveying of the underground and surface mined areas has been performed by the mine operators
and/or their consulting surveyors. By assignment, MM&A did not verify the accuracy or
completeness of supplied mine maps but accepted this information as being the work of responsible
engineers and surveyors.
MM&A compiled comprehensive topographic map files by selecting the best available aerial
mapping for each area and filling any gaps with digital USGS topographic mapping.
7.2
Non-Drilling Procedures and Parameters
All pertinent data used to characterize the coal resources and coal reserves have been acquired via
exploration-based drilling methods. The region has historically produced and sold Upper Freeport-
based coal into metallurgical and thermal markets, enhancing the confidence of the marketability
and quality of the resource.
7.3
Drilling Procedures
Core drilling methods utilize NX-size (~5.4 centimeter) or similar-sized core cylinders to recover core
samples, which can be used to delineate geologic characteristics, for coal-quality testing, and for
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
geotechnical logging. With core holes, geophysical logs are especially useful in verifying the core
recovery of both the coal samples (for assurance that the sample is representative of the full seam)
and of the roof and floor rock samples (for evaluating ground control characteristics of deep
mineable coal seams). In addition to the core holes, rotary-drilled holes also exist on most of the
Property. Data for the rotary-drilled holes are mainly derived from downhole geophysical logs,
which are used to interpret coal and rock thickness and depth, since logging of the drill cuttings is
unreliable. Exploratory drilling generally requires drilling to depths of over 152 meters to penetrate
the target coal seam at Mon Valley .
A wide variety of core-logging techniques exist for the properties. For many of the core holes, the
primary data source is a generalized lithology description by the driller, typically supplemented by
a more detailed core log completed by a geologist. These drilling logs were provided to MM&A as
a geological database. MM&A geologists were not involved in the production of original core logs
but did perform a basic check of information within the provided database. Where geophysical logs
for such holes were available, they were used by MM&A geologists to verify the coal thickness and
core recovery of seams.
7.4
Hydrology
Based on historical successful production of Upper Freeport, and stratigraphically proximal seams
in the region, the Mon Valley Complex is not expected to have hydrologic concerns of material issue.
Future mining is projected to occur in areas exhibiting similar hydrogeological conditions as past
mining, including stream undermining and undermining of aquifers. Based upon the successful
history of mining in the region with regards to hydrogeological features, MM&A assumes that the
operations will not be hindered by such issues.
The Pittsburgh seam has been mined extensively above the Upper Freeport seam on the Property.
The interval (approximately 183 meters) between the seams is anticipated to be adequate to
minimize inflow of water to the planned operations from the overlying Pittsburgh works.
7.5
Geotechnical Data
Mining plans for potential underground mines were developed by Coronado and modified by
MM&A to fit current property constraints. Pillar stability was tested by MM&A using the
Analysis
of Coal Pillar Stability (ACPS)
National Institute for
Occupational Safety and Health (
NIOSH
)
. MM&A reviewed the results from the ACPS analysis and
considered them in the development of the LOM plan.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
8
Sample Preparation, Analyses and Security
8.1
Prior to Sending to the Lab
Most of the coal samples have been obtained from the Property by subsurface exploration using
core drilling techniques. The protocol for preparing and testing the samples has varied over time
and is not well documented for the older holes drilled on the Property. Typical core-drilling sampling
methods for coal in the United States involves drilling through the seam, removing the core from
the barrel, describing the lithology, wrapping the sample in a sealed plastic sleeve and placing it
lengthwise into a covered core box, and carefully marking hole ID and depth intervals on each box
and lid, allowing the core to be delivered to a laboratory in correct stratigraphic order, and with
original moisture content. This process has been the norm for both historical and ongoing
exploration activities at the Property.
This work is typically performed by the supervising driller, geologist, or company personnel.
Samples are most often delivered to the company by the driller after each shift or acquired by
company personnel or representatives. Most of the coal core samples were obtained by previous
or current operators on the Property. MM&A did not participate in the collection, sampling and
analysis of the core samples. However, it is reasonable to assume, given the consistency of quality
from previous operators, that these samples were generally collected and processed under industry
best practices. This assumption is based on MM&A’s familiarity with the operating companies and
the companies used to perform the analyses.
8.2
Lab Procedures
Coal quality testing has been performed over many years by operating companies using different
laboratories and testing regimens. Some of the samples have raw analyses and washabilities on the
full seam (with coal and rock parting layers co-mingled) and are mainly useful for characterizing the
coal quality for projected production from underground mining. Other samples have coal and rock
analyzed separately, the results of which can be manipulated to forecast either surface or
underground mining quality. Care has been taken to use only those analyses that are representative
of the coal quality parameters for the appropriate mining type for each sample. Unlike many
Appalachian properties, Mon Valley only has interest in one deep seam; therefore, the analyses
have likely been completed following a consistent protocol.
Standard procedure upon receipt of core samples by the testing laboratory is to log the depth and
thickness of the sample, then perform testing as specified by a representative of the operating
company. Each sample is then analyzed in accordance with procedures defined under
ASTM
International (
ASTM
)
D3174); sulfur (ASTM D4239); Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free Swell
Index (
FSI
) (ASTM D720).
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
9
Data Verification
9.1
Procedures of Qualified Person
MM&A reviewed the digital geologic database supplied by Coronado. The database consists of data
records, which include drill hole information for holes that lie within and adjacent to the Property
and records for numerous supplemental coal seam thickness measurements. Upon completion of
the database verification, copies of each entry were printed, and cross referenced to the original
document for verification. Once the initial integrity of the database was established, stratigraphic
columnar sections were generated using cross-sectional analysis to establish or confirm coal-seam
correlations. Geophysical logs were used wherever available to assist in confirming the seam
correlation and to verify proper seam thickness measurements and recovery of coal samples.
After establishing and/or verifying proper seam correlation, seam data control maps and geological
cross-sections were generated and again used to verify seam correlations and data integrity. Once
the database was fully vetted, seam thickness, base-of-seam elevation, roof and floor lithology, and
overburden maps were independently generated for use in the mine planning process.
9.2
Limitations
As with any exploration program, localized anomalies cannot always be discovered. The greater the
density of the samples taken, the less the risk. Once an area is identified as being of interest for
inclusion in the mine plan, additional samples are taken to help reduce the risk in those specific
areas. In general, provision is made in the mine planning portion of the study to allow for localized
anomalies that are typically classed more as a nuisance than a hinderance.
9.3
Opinion of Qualified Person
Sufficient data has been obtained through various exploration and sampling programs and mining
operations to support the geological interpretations of seam structure and thickness for coal
horizons situated on the Property. The data is of sufficient quantity and reliability to reasonably
support the coal resource and coal reserve estimates in this TRS.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
10
Mineral Processing and Metallurgical Testing
10.1
Testing Procedures
Separate tabulations have been compiled for basic chemical analyses (both raw and washed
quality), petrographic data, rheological data and chlorine, ash, ultimate and sulfur analysis.
Available coal quality data was tabulated by resource area in a Microsoft® EXCEL workbook and the
details of that work are maintained on file at the offices of Coronado and MM&A. These tables also
provide basic statistical analyses of the coal quality data sets, including average value; maximum
and minimum values; and the number of samples available to represent each quality parameter of
the seam. Coal samples that were deemed by MM&A geologists to be unrepresentative were not
used for statistical analysis of coal quality, as documented in the tabulations. A representative
group of drill hole samples from the Property were then checked against the original drill laboratory
reports to verify accuracy and correctness.
The amount and areal extent of coal sampling for geological data is generally sufficient to represent
the quality characteristics of the coal horizons and allow for proper market placement of the subject
coal seams. For some of the coal deposits there are considerable laboratory data from core samples
that are representative of full extent of the resource area; and for others there are more limited
data to represent the resource area. For example, in the active operations with considerable
previous mining, there may be limited quality data within some of the remaining resource areas;
however, in those cases the core sampling data can be supplemented with operational data from
mining and shipped quality samples representative of the resource area.
10.2
Relationship of Tests to the Whole
The extensive sampling and testing procedures typically followed in the coal industry result in an
excellent correlation between samples and marketable product. The Upper Freeport seam has a
long history of saleable production in the high-volatile metallurgical and thermal markets,
consistent with exploration results. Degradation of coking coal characteristics over time is not
anticipated to be an issue.
10.3
Lab Information
Each sample is analyzed at area Laboratories that operate in accordance with procedures defined
under ASTM standards including, but not limited to; washability (ASTM D4371); ash (ASTM D3174);
sulfur (ASTM D4239); Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free Swell Index (
FSI
)
(ASTM D720).
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
10.4
Relevant Results
No critical factors have been found that would adversely affect the recovery of the Reserve.
11
Mineral Resource Estimates
MM&A independently created a geologic model to define the coal resources at the Property. Coal
resources were estimated as of December 31, 2022.
11.1
Assumptions, Parameters and Methodology
Geological data was imported into Carlson Mining
®
®
) geological modelling
software in the form of Microsoft
®
picks, bottom seam elevations and raw and washed coal quality. These data files were validated
prior to importing into the software. Once imported, a geologic model was created, reviewed, and
verified with a key element being a gridded model of coal seam thickness. Resource tonnes were
estimated by using the seam thickness grid based on each valid point of observation and by defining
resource confidence arcs around the points of observation. Points of observation for Measured and
Indicated confidence arcs were defined for all valid drill holes that intersected the seam using
standards deemed acceptable by MM&A based on a detailed geologic evaluation and a statistical
analysis of all drill holes within the projected reserve areas as described in
Section 11.1.1
. The
geological evaluation incorporated an analysis of seam thickness related to depositional
environments, adjacent roof and floor lithologies, and structural influences.
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of economic interest were used to generate a geologic model. Due to the relative structural
simplicity of the deposits and the reasonable continuity of the tabular coal beds, the principal
geological interpretation necessary to define the geometry of the coal deposits is the proper
modeling of their thickness and elevation. Both coal thickness and quality data are deemed by
MM&A to be reasonably sufficient within the resource areas. Therefore, there is a reasonable level
of confidence in the geologic interpretations required for coal resource determination based on the
available data and the techniques applied to the data.
Table 11-1
coal resource and reserve evaluation. These cut-off parameters have been developed by MM&A
based on its experience with the Coronado properties and are typical of mining operations in the
Northern Appalachian Coal Basin. This experience includes technical and economic evaluations of
numerous properties in the region for the purposes of determining the economic viability of the
subject coal reserves.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
Table 11-1: General Reserve and Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
• General Reserve Criteria
Reserve Classification
Reserve and Resource
Reliability Categories
Reserve (Proven and Probable)
To better reflect geological conditions of the coal
deposits, distance between points of observation are
standard USGS (in meters), respectively, for measured
and indicated and inferred.
Effective Date of Resource
Estimate
December 31, 2022
Effective Date of Reserve Estimate
December 31, 2022
Seam Density
Variable, dependent upon seam characteristics (based
on available drill hole quality). In the absence of
laboratory data, estimated by (1) assuming specific
gravity of 1.30 for coal and 2.25 to 2.5 for rock
parting, or (2) 1280 kg/m
3
to 1324 kg/m
3
seam)
• Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
1.2 meters (locally <1.2 m for limited areas integral to
the mine plan)
Pangburn was mapped at 0.92-meter cutoff in
conjunction with Coronado mine plan.
Minimum Mining Thickness
1.4 meters
Minimum In-Seam Wash Recovery
40 percent
Wash Recovery Applied to Coal
Reserves
Based on average yield for drill holes within reserve
area, or in the absence of laboratory washability data,
based on estimated visual recovery using specific
gravities noted above and 95 percent yield on "clean"
coal
Out-of-Seam Dilution Thickness
for Run-of-Mine Tonnes Applied
to Coal Reserves
0.05 meters minimum
2243 kg/m³ density used for dilution tonnage estimate
Mine Barrier
61-meter distance from abandoned mines and sealed
or pillared areas.
Adjustments Applied to Coal
Reserves
6 percent moisture increase; 5 percent preparation
plant inefficiency
Note: Exceptions for application of these criteria to resource and reserve estimation are made as warranted and demonstrated by either actual mining
experience or detailed data that allows for empirical evaluation of mining conditions. Final classification of coal reserve is made based on the pre-
feasibility evaluation.
11.1.1
Geostatistical Analysis
MM&A completed a geostatistical analysis on drill holes within the reserve boundaries to determine
the applicability of the common United States classification system for measured and indicated and
inferred coal resources. Historically, the United States has assumed that coal within 0.4-kilometers
of a point of observation represents a measured resource whereas coal between 0.4 kilometers and
1.2 kilometers from a point of observation is classified as indicated. Inferred resources are
commonly assumed to be located between 1.2 kilometers and 4.8 kilometers from a point of
observation. Per SEC regulations, only measured and indicated resources may be considered for
reserve classification, respectively as proven and probable reserves.
MM&A performed a geostatistical analysis test of the Mon Valley data set using the Drill Hole
Spacing Analysis (
DHSA
) method. This method attempts to quantify the uncertainty of applying a
measurement from a central location to increasingly larger square blocks and provides
recommendations for determining the distances between drill holes for measured, indicated, and
inferred resources.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
To perform DHSA the data set was processed to remove any erroneous data points, clustered data
points, as well as directional trends. This was achieved through the use of histograms, as seen in
Figure 11-1
, color coded scatter plots showing the geospatial positioning of the borings,
Figure 11-
2
, and trend analysis.
Figure 11-1: Histogram of the Total Seam Thickness
for the Upper Freeport Seam Present in the Mon
Valley Complex
Figure 11-2: Scatter plot of the Total Seam
Thickness for the Upper Freeport Seam Present
in the Mon Valley Complex
Following the completion of data processing, a variogram of the data set was created,
Figure 11-3
.
The variogram plots average square difference against the separation distance between the data
pairs. The separation distance is broken up into separate bins defined by a uniform lag distance
(e.g., for a lag distance of 152 meters the bins would be 0 – 152 meters, 153 – 305 meters, etc.).
Each pair of data points that are less than one lag distance apart are reported in the first bin. If the
data pair is further apart than one lag distance but less than two lag distances apart, then the
variance is reported in the second bin. The numerical average for differences reported for each bin
is then plotted on the variogram. Care was taken to define the lag distance in such a way as to not
overestimate any nugget effect present in the data set. Lastly, modeled equations, often spherical,
gaussian, or exponential, are applied to the variogram in order to represent the data set across a
continuous spectrum.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
Figure 11-3: Variogram of the Total Seam Thickness for the Upper Freeport Seam
Present in the Mon Valley Complex
The estimation variance is then calculated using information from the modeled variogram as well
as charts published by Journel and Huijbregts (1978). This value estimates the variance from
applying a single central measurement to increasingly larger square blocks. Care was taken to
ensure any nugget effect present was added back into the data. This process was repeated for each
test block size.
The final step of the process is to calculate the global estimation variance. In this step the number
square blocks that would fit inside the selected study area is determined for each block size that
was investigated in the previous step. The estimation variance is then divided by the number of
blocks that would fit inside the study area for each test block size. Following this determination,
the data is then transformed back to represent the relative error in the 95
th
-percentile range.
Figure 11-4
shows the results of the DHSA performed on the Upper Freeport data for the Mon Valley
Complex. DHSA provides hole to hole spacing values, these distances need to be converted to radius
from a central point in order to compare to the historical standards. A summary of the radius data
is shown in
Table 11-2
. DHSA prescribes measured, indicated, and inferred drill hole spacings be
determined at the 10-percent, 20-percent, and 50-percent levels of relative error, respectively.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
Figure 11-4: Result of DHSA for the Upper Freeport Seam Present in the Mon Valley Complex
Table 11-2: DHSA Results Summary for Radius from a Central Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial Distance
(20% Relative Error)
Inferred Radial Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.72
1.42
3.53
Spherical:
0.72
1.42
3.53
Exponential:
0.75
1.43
3.49
Comparing the results of the DHSA to the historical standards, it is evident that the historical
standards are more conservative than even the most conservative DHSA model with regards to
determining measured resources. The Gaussian and Spherical models recommend using a radius of
0.72 kilometers for measured resources compared to the historical value of 0.4 kilometers. With
respect to indicated resources the DHSA falls in line closely with the historical standards. The
Exponential model recommends using a radius of 1.43 kilometers, while the Spherical and Gaussian
models recommend a radius of 1.42 kilometers, respectively. These values line up closely with the
historical radius of 1.2 kilometers. These results have led the QPs to report the data following the
historical classification standards, rather than use the results of the DHSA.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
11.2
Qualified Person’s Estimates
Mineral resources, representing in-situ coal from a portion of which reserves are derived, are
presented below. Based on the work described and detailed modelling of the areas considering all
the parameters defined, a coal resource estimate, summarized in
Table 11-3
, was prepared as of
December 31, 2022, for property controlled by Coronado.
Table 11-3: Coal Resources Summary as of December 31, 2022
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserve
291.0
213.5
9.3
513.8
31
1.4
26
Exclusive of Reserve
0.0
0.0
0.0
0.0
Total 12/31/2022
291.0
213.5
9.3
513.8
Note: Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are derived.
Note 2: Coal resources are reported on a dry basis. Surface moisture and inherent moisture are excluded.
Note 3: The Mon Valley properties do not have any resource tonnes exclusive of reserves as of December 31, 2022.
11.3
Qualified Person’s Opinion
While there is some level of stratigraphically controlled seam-thickness variability due to sand
channels, etc., the Upper Freeport coal seam on the mine property at Mon Valley demonstrate
reasonable thickness consistency according to the classification system of
measured
– 0.4 kilometers),
indicated
inferred
kilometers). MM&A geologists and engineers modeled the deposit and delineated mineable regions
to reflect the nature of each seam and the practicality of mining constraints. Based on MM&A’s
geostatistical analysis, it would be possible to extend the measured, indicated and inferred arcs
slightly beyond historically accepted practices due to consistent geological settings. The QPs have
again elected not to extend arc distances, introducing a level of conservatism in measured and
indicated coal classification.
Based on the data review, the attendant work done to verify the data integrity and the creation of
an independent geologic model, the QPs believe this is a fair and accurate representation of the
Mon Valley coal resources.
12
Mineral Reserve Estimates
12.1
Assumptions, Parameters and Methodology
Coal Reserves are classified as
proven
probable
metallurgical, economic, marketing, legal, environmental, social, and governmental factors.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
>
Proven Coal Reserves
adjusted for diluting materials and allowances for losses when the material is mined. It is based
on appropriate assessment and studies in consideration of and adjusted for reasonably
assumed modifying factors. These assessments demonstrate that extraction could be
reasonably justified at the time of reporting.
>
Probable Coal Reserves
in some circumstances a measured coal resource, adjusted for diluting materials and
allowances for losses when the material is mined. It is based on appropriate assessment and
studies in consideration of and adjusted for reasonably assumed modifying factors. These
assessments demonstrate that extraction could be reasonably justified at the time of reporting.
Upon completion of delineation and calculation of coal resources, MM&A generated a LOM plan for
each of the projected mines within the Mon Valley Complex. The footprint of each reserve area is
shown on the maps in
Appendix B
. The mine plans were generated based on the forecast mine plan
and permit plan provided by Coronado with modifications by MM&A where necessary due to
current property control limits, modifications to geologic mapping, or other factors determined
during the evaluation.
Carlson Mining software was used to generate the LOM plan for Mon Valley. The mine plan was
sequenced based on productivity schedules provided by Coronado. MM&A determined the
productivity estimates and plans to be reasonable based on experience and current industry
practice.
At the Mon Valley mines, a minimum mining height of 1.4 meters was generally used due to the
continuous mining method being employed; however, Pangburn was mapped at a 0.92-meter cutoff
in conjunction with the Coronado mine plan. For coal seams thinner than the assigned mining
height, the difference between the coal seam height and assigned mining height consists of out-of-
seam dilution (
OSD
). Mine recovery generally varies between 40 percent and 55 percent for
continuous mining panels. Plant recovery is a function of in-seam recovery, OSD and plant efficiency
factor, which is set at 95 percent. Typical entry width is 5.8 meters.
Raw, ROM production data outputs from LOM plan sequencing were processed into Microsoft
®
EXCEL spreadsheets and summarized on an annual basis for processing into the economic model.
Average seam densities were estimated to determine raw coal tonnes produced from the LOM plan.
Average mine recovery and wash recovery factors were applied to determine coal reserve tonnes.
Coal reserve tonnes in this evaluation are reported at a 6.0 percent moisture and represent the
saleable product from the Property.
Pricing data as provided by Coronado is described in
Section 16.2
. The pricing data assumes HVB
domestic and export FOB-mine prices of approximately $130 and $114 per metric tonne for calendar
year 2028. HVB domestic and export prices respectively increase to approximately $204 and $178
per metric tonne through year 2050, and then increased by 2% annual inflation thereafter.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
The coal resource mapping and estimation process, described in the report, was used as a basis for
the coal reserve estimate. Proven and probable coal reserves were derived from the defined coal
resource considering relevant processing, economic (including technical estimates of capital,
revenue, and cost), marketing, legal, environmental, socio-economic, and regulatory factors and are
presented on a moist, recoverable basis.
As is customary in the USA, the categories for proven and probable coal reserves are based on the
distances from valid points of measurement as determined by the QPs for the area under
consideration. For this evaluation, measured resource, which may convert to a proven reserve, is
based on a 0.4-kilometer radius from a valid point of observation.
Points of observation include exploration drill holes, degas holes, and mine measurements which
have been fully vetted and processed into a geologic model. The geologic model is based on seam
depositional modeling, the interrelationship of overlying and underlying strata on seam mineability,
seam thickness trends, the impact of seam structure (i.e., faulting), intra-seam characteristics, etc.
Once the geologic model was completed, a statistical analysis, described in
Section 11.1.1
conducted and a 0.4-kilometer radius from a valid point of observation was selected to define
Measured Resources.
Likewise, the distance between 0.4 and 1.2 of a kilometer radius was selected to define Indicated
Resources. Indicated Resources may convert to Probable Reserves
Inferred Resources (greater than a 1.2-kilometer radius from a valid point of observation) are to be
excluded from Reserve consideration.
12.2
Qualified Person’s Estimates
Reserve tonnage estimates provided herein report coal reserves derived from the in-situ resource
tons presented in
Table 11-3
, and not in addition to coal resources. Coal reserves are presented on
a ROM basis in
Table 12-1
. Proven and probable coal reserves were derived from the defined coal
resource considering relevant mining, processing, infrastructure, economic (including estimates of
capital, revenue, and cost), marketing, legal, environmental, socio-economic and regulatory factors.
The coal reserves, as shown in
Table 12-2
, are based on a technical evaluation of the geology and a
preliminary feasibility study of the coal deposits. The extent to which the coal reserves may be
affected by any known environmental, permitting, legal, title, socio-economic, marketing, political,
or other relevant issues has been reviewed rigorously. Similarly, the extent to which the estimates
of coal reserves may be materially affected by mining, metallurgical, infrastructure and other
relevant factors has also been considered.
Table 12-1: Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
Demonstrated Coal Reserves (Mt, Moist ROM)
By Reliability Category
By Mining Type
By Control Type
Quality (Dry)
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Mon Valley
113.9
83.2
197.1
0.0
197.1
195.7
1.4
37
1.4
23
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
Table 12-2: Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt)
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, Mt)
Quality (Dry Basis)
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Mon Valley
77.8
56.6
134.4
0.0
134.4
133.4
1.0
8
1.4
35
surface and inherent moisture is modeled at 6-percent. Actual product moisture is dependent upon multiple geological factors, operational
factors, and product contract specifications and can exceed 8-percent. As such, the modeled moisture values provide a level of conservatism
for reserve reporting.
The results of this TRS define an estimated 134.4 Mt of proven and probable marketable coal
reserves. Of that total, 58 percent are proven, and 42 percent are probable. There are 133.4 Mt of
owned coal reserves and 1.0 Mt of leased coal reserves. All of the Mon Valley reserves are
considered to be suitable for the metallurgical coal market. All of the Mon Valley reserves are
unassigned.
12.3
Qualified Person’s Opinion
The estimate of coal reserves was determined in accordance with the JORC Code along with SEC
Regulation S-K 1300.
The LOM mining plans for Mon Valley were prepared to the level of preliminary feasibility. Mine
projections were prepared, and timing scheduled to match production with coal seam
characteristics. Production timing was carried out from current locations to depletion of the coal
reserve area. Coal reserve estimates could be materially affected by the risk factors described in
Section 22.2
.
Based on the Preliminary Feasibility Study and the attendant Economic Review, the QPs believe this
is a fair and accurate calculation of the Mon Valley coal reserves.
13
Mining Methods
Three separate underground mine areas were modeled and tested economically for the Mon Valley
Complex. Once the Resources were calculated, mine plans were created to project operating each
resource area to depletion, with crews and equipment scheduled to move to subsequent mining
areas as depletion occurs. Underground mine operations are projected to be exhausted in 2100.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
13.1
Geotech and Hydrology
Mining plans for potential underground mines were developed by Coronado and MM&A. Pillar
stability was tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS)
developed by the
National Institute for Occupational Safety and Health (
NIOSH
)
. MM&A reviewed
the results from the ACPS analysis and considered them in the development of the LOM plan.
Hydrology is not expected to be an issue of concern at Mon Valley. Extensive mining has occurred
in the Pittsburgh seam, 183 meters above the Upper Freeport horizon. The Upper Freeport coal has
been mined in the region—based on successful historical mining in comparable geologic settings,
material impacts related to hydrology are not anticipated to be of concern.
13.2
Production Rates
The Mon Valley Complex is not yet active, with three distinct mines and preparation plants planned.
The mine plan and productivity expectations reflect historical performance of similar operations
and efforts have been made to adjust the plan to reflect future conditions. MM&A is confident that
the mine plan is reasonably representative to provide an accurate estimation of coal reserves. Mine
development and operation has not been optimized within the TRS.
Production is scheduled for approximately 273 days each year, which represents production on
Monday through Friday plus every other Saturday with allowances for holidays. On each day, the
continuous mining sections produce coal on two shifts; the third shift is reserved for maintenance
and mine conveyor belt and power moves. The sections are configured as full super sections with
two continuous miners per section. Productivity is planned at the rate of 272 meters of advance
per shift for the super sections.
Carlson Mining software was used by MM&A to generate mine plans for the underground mineable
coal seam. Mine plans were sequenced based on productivity schedules provided by Coronado,
which were based on historically achieved productivity levels. All production forecasting ties
assumed production rates to geological models as constructed by MM&A’s team of geologists and
mining engineers.
As shown in
Table 13-1
, the areas planned for underground mines produce coal until 2100. Clean
coal production varies directly with coal thickness.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
Table 13-1: Production Summary by Mine by Year (000)
Mine Name
2023
2024
2025
2026
2027
2028
2029
2030
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Mine Name
2031
2032
2033
2034
2035
2036
2037
2038
Pangburn
0
399
1,810
1,875
1,958
2,029
2,030
1,695
Fallowfield
0
0
0
0
0
0
0
0
Shaner
0
0
0
0
0
0
0
367
0
399
1,810
1,875
1,958
2,029
2,030
2,062
Mine Name
2039
2040
2041
2042
2043
2044
2045
2046
Pangburn
1,339
637
603
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
620
1,125
1,763
1,804
1,724
1,717
1,641
1,719
1,960
1,762
2,366
1,804
1,724
1,717
1,641
1,719
Mine Name
2047
2048
2049
2050
2051
2052
2053
2054
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
1,657
1,582
1,704
1,656
1,732
1,702
1,596
1,642
1,657
1,582
1,704
1,656
1,732
1,702
1,596
1,642
Mine Name
2055
2056
2057
2058
2059
2060
2061
2062
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
859
1,780
2,009
2,006
1,987
1,814
Shaner
1,750
1,751
1,750
1,796
1,723
1,839
1,775
1,674
1,750
1,751
2,609
3,576
3,732
3,846
3,762
3,488
Mine Name
2063
2064
2065
2066
2067
2068
2069
2070
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,657
1,861
1,893
1,894
1,869
1,869
1,707
1,893
Shaner
1,733
1,605
1,504
1,067
957
610
612
395
3,390
3,466
3,397
2,961
2,826
2,479
2,318
2,289
Mine Name
2071
2072
2073
2074
2075
2076
2077
2078
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,438
1,988
1,993
1,822
1,903
1,864
1,911
1,708
Shaner
0
0
0
0
0
0
0
0
1,438
1,988
1,993
1,822
1,903
1,864
1,911
1,708
Mine Name
2079
2080
2081
2082
2083
2084
2085
2086
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,931
1,757
1,563
2,034
1,423
2,073
1,485
1,798
Shaner
0
0
0
0
0
0
0
0
1,931
1,757
1,563
2,034
1,423
2,073
1,485
1,798
Mine Name
2087
2088
2089
2090
2091
2092
2093
2094
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,340
1,684
1,466
1,808
1,184
1,485
1,462
1,584
Shaner
0
0
0
0
0
0
0
0
1,340
1,684
1,466
1,808
1,184
1,485
1,462
1,584
Mine Name
2095
2096
2097
2098
2099
2100
2101
2102
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,229
1,570
1,590
1,258
831
356
0
0
Shaner
0
0
0
0
0
0
0
0
1,229
1,570
1,590
1,258
831
356
0
0
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
13.3
Mining Related Requirements
A mine plan with sequenced mining projections was prepared for each logical mining unit. For each
mine plan, the appropriate number of production units is selected for the resource area, and a
productivity level assigned, expressed in meters of advance per unit-shift of production. The
productivity is based on the equipment and personnel configuration, mining height and expected
physical conditions.
13.4
Required Equipment and Personnel
Production from the proposed Mon Valley Complex mines will be conducted using the room and
pillar method, utilizing continuous miners and haulage using shuttle cars to a feeder-breaker located
at the tail of the section conveyor belt. The feeder-breaker crushes large pieces of coal and rock
and regulates coal feed onto the mine conveyor. Roof-bolting machines are used to support the
roof on the continuous miner sections. Roof-bolting machines are used to install roof bolts, and
battery scoops are available to clean the mine entries and assist in delivery of mine supplies to work
areas. Other supplemental equipment, such as personnel carriers, supply vehicles, etc., are also
used daily.
Mine conveyors typically range in width up to 1.5 meters. Multiple belt flights are arranged in series
to deliver raw coal to the underground storage. Along the main and sub-main entries and panels, a
travel way is provided for personnel and materials by rubber-tired equipment or on rail. The Mon
Valley mines will use conveyors to transport ROM coal from the underground production sections
to the surface where the coal may be sampled, crushed, washed in the preparation plant, and
stockpiled to await shipment.
Surface ventilation fans are installed as needed to provide a sufficient volume of air to ventilate
production sections, coal haulage and transport entries, battery charging stations, and transformers
in accordance with approved plans. High-voltage cables deliver power throughout the mine where
transformers reduce voltage for specific equipment requirements.
The Mine Improvement and New
Emergency Response Act of 2006
MINER Act
) requires that carbon monoxide detection systems be
installed along mine conveyor belts and that electronic two-way tracking and communications
systems be installed throughout underground mines. Water is required to control dust at
production sections and along conveyor belts, and to cool electric motors. Water is available from
nearby sources and is distributed within the mine by pipelines as required.
13.4.1
Mine: Pangburn
The Pangburn mine is proposed to start in 2032 with three continuous mining sections. The Upper
Freeport seam will be accessed via decline slope and vertical shaft. This mine will produce
metallurgical coal from leased and owned mineral.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
Production is scheduled for approximately 273 days each year, which represents production on
Monday through Friday and every other Saturday. On each day, three production sections are
scheduled to produce coal on two shifts; the third shift is reserved for maintenance and mine
conveyor belt and power moves. Each section is configured as full supersection with two continuous
miners available for production. Productivity is planned at the rate of 272 meters of advance per
shift for the super sections. A total of 203 employees are assigned to the mine.
Principal production equipment on each section includes two continuous miners, two roof bolters,
four shuttle cars, and two scoops. Coal is extracted from the production face with the continuous
miner and hauled to the mine conveyor in shuttle cars. At the conveyor belt, the coal is discharged
from the shuttle cars onto a feeder breaker for transfer onto the conveyor. The conveyors carry the
coal outside, where it is transported via overland conveyor to the proposed Pangburn preparation
plant and barge load-out on the Monongahela River. Rail access is provided by a
CSX rail line.
The proposed Pangburn mine will be located approximately 1.6 kilometers south of the community
of Elizabeth, Pennsylvania. Main paved roads exist both east and west of the site. The proposed
dock, located on the western boundary of the proposed Pangburn permit area, is currently used for
bulk material transshipment. The area has hosted both industrial and residential development for
an extensive time period. No extraordinary measures or expenses will be required to establish
infrastructure or utilities at the Pangburn site.
The preliminary design for the Pangburn mine surface facilities was provided by Coronado. The
facilities include offices, warehouses, shops, and a bathhouse for personnel; a preparation plant to
process ROM coal; a refuse area with a designed capacity of approximately 35 million refuse tonnes;
raw coal storage at the plant totaling approximated 100,000 tonnes, clean coal storage at the plant
site of approximately 54,000 tonnes, and three clean coal stockpiles adjacent to the dock loading
facility on the Monongahela River. The three river stockpiles have a designed capacity of
approximately 266,000 tonnes.
A study completed and approved through the
Pennsylvania Department of Environmental
Protection
with capacity of 22.6 million cubic meters. MM&A’s estimated requirements for Pangburn and
Shaner combined is 29.7 million tonnes or approximately 13.2 million cubic meters.
The preliminary design layout of the Pangburn facilities is shown
Figure 13-1
.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
Figure 13-1: Proposed Pangburn Plant and Mine Site Infrastructure
13.4.2
Mine: Shaner
The Shaner mine is a proposed mine in the Upper Freeport seam and is scheduled to begin
production in 2038 as the Pangburn reserve is depleted. This mine is a metallurgical coal operation
on leased and owned mineral property.
Production is scheduled for approximately 273 days each year, which represents production on
Monday through Friday and every other Saturday. On each day, three production sections are
scheduled to produce coal on two shifts; the third shift is reserved for maintenance and mine
conveyor belt and power moves. All three sections are full super sections with two continuous
miners per section. Productivity is planned at the rate of 272 meters of advance per shift for the
super sections. A total of 203 employees are assigned to the mine.
Principal production equipment per section includes two continuous miners, two roof bolters, four
shuttle cars, and two scoops. Coal is extracted from the production face with the continuous miner
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
and hauled to the mine conveyor in shuttle cars. At the conveyor belt, the coal is discharged onto
a feeder breaker for transfer onto the conveyor. The conveyors carry the coal to the outside and to
the preparation plant and load-out.
The Shaner mine will be located approximately 1.6 kilometers north of the community of Sutersville,
Pennsylvania, between the Youghiogheny and Monongahela Rivers. Numerous improved roads
traverse the Property. An additional shaft and slope will be required to access Upper Freeport seam
reserves west of the Monongahela River, accessed across the 1
st
Road. The immediate vicinity of the proposed Shaner surface facilities is well developed; no
extraordinary measures or expenses will be required to establish infrastructure or utilities at the
Fallowfield site. Due to the projected starting date for the Shaner mine, no detailed design of
infrastructure or surface facilities has been completed to date. The proposed mines are located in
the Appalachian Basin, which has an extensive history (>100 years) of coal mining. There is a
sufficient population base within commuting distance of the proposed operations; no Camp or Town
construction will be required. Mine opening capital expenditures are included in the MM&A
financial model.
Due to the projected start-up date of the Shaner mine, no permit work has been completed to date.
The proposed mine is located in an area with a long history of coal mining, with numerous permitted
operations in close proximity. Coal mining permits are routinely obtained in this region; a 2-year to
3-year lead time is recommended. Estimated expenditures for mine closure and site reclamation
are included in the financial model for each mine or plant site.
Infrastructure for Shaner will resemble that shown in
Figure 13-1
13.4.3
Mine: Fallowfield
The Fallowfield mine is proposed to start in 2057 with three production sections. The Upper
Freeport seam will be accessed via a decline slope and vertical shaft. This mine will be a
metallurgical coal operation on leased and owned mineral property.
Production is scheduled for approximately 273 days each year, which represents production on
Monday through Friday and every other Saturday. On each day, three production sections are
scheduled to produce coal on two shifts; the third shift is reserved for maintenance and mine
conveyor belt and power moves. The sections are configured as super sections with two continuous
miners available for production. Productivity is planned at the rate of 272 meters of advance per
shift of operation. A total of 203 employees are assigned to the mine.
Principal production equipment includes two continuous miners, two roof bolters, four shuttle cars,
and two scoops. Coal is extracted from the production face with the continuous miner and hauled
to the mine conveyor in shuttle cars. At the conveyor belt, the coal is discharged from the shuttle
cars onto a feeder breaker for transfer onto the conveyor. The conveyors carry the coal outside,
where it is transported to the Fallowfield preparation plant and truck load-out via overland
conveyor.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
The Fallowfield property boundary is traversed by the four-lane limited-access Mon-Fayette
Expressway in addition to numerous improved roads. Previous mining and coal preparation facilities
have existed in the immediate vicinity of the proposed Fallowfield surface facilities. No
extraordinary measures or expenses will be required to establish infrastructure or utilities at the
Fallowfield site. Due to the projected starting date for the Fallowfield mine, no detailed design of
infrastructure or surface facilities has been completed to date. The proposed mines are located in
the Appalachian Basin, which has an extensive history (greater than 100 years) of coal mining. There
is a sufficient population base within commuting distance of the proposed operations; no Camp or
Town construction will be required. Mine opening capital expenditures are included in the MM&A
financial model.
Due to the projected start-up date of the Fallowfield mine, no permit work has been completed to
date. The proposed mine is located in an area with a long history of coal mining, with numerous
permitted operations in close proximity. Coal mining permits are routinely obtained; a two- to
three-year lead time is recommended. Estimated expenditures for mine closure and site
reclamation are included in the financial model for each mine or plant site.
Infrastructure for Fallowfield will resemble that shown in
Figure 13-1
14
Processing and Recovery Methods
14.1
Description or Flowsheet
Due to the projected starting date for the Mon Valley Complex, only preliminary design of
preparation plant or associated material handling facilities has been initiated to date. Coal
processing is a well understood science—it is anticipated that typical coal sizing, cleaning and
dewatering equipment will be utilized for processing of run-of-mine coal at Pangburn, including
combinations of vibratory screens, classifying cyclones, heavy media baths, heavy media cyclones,
spirals, froth flotation, and drain-and-rinse screens, screen-bowl centrifuges, among others. No
novel technologies will be required to process run-of-mine material.
14.2
Requirements for Energy, Water, Material and Personnel
The Mon Valley property has sources of water, power, personnel, and supplies readily available for
use. Personnel have historically been sourced from the surrounding communities in Allegheny,
Washington, and Westmoreland Counties, and have proven to be adequate in numbers to operate
the mines. As mining is common in the surrounding areas, the workforce is generally familiar with
mining practices, and many are experienced miners. Water is expected to be sourced locally from
nearby public water sources or rivers. Electricity is anticipated to be sourced from West Penn
or
Duquesne Light. The service industry in the areas surrounding the proposed mine complex has
historically provided supplies, equipment repairs and fabrication, etc. Barge transport on the
Monongahela River/Ohio River system will serve as the main means of product transport from the
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
mine, and currently serve as a means of coal transportation for neighboring Pittsburgh seam
operations.
15
Infrastructure
Due to the projected starting date for the Mon Valley mines, only conceptual design of
infrastructure and surface facilities has been completed to date.
The proposed Pangburn mine will be located approximately 1.6 kilometers south of the community
of Elizabeth, PA. Main paved roads exist both east and west of the site. The proposed dock, located
on the western boundary of the proposed Pangburn permit area, is currently used for bulk material
transhipment. The area has hosted both industrial and residential development for an extensive
time period. No extraordinary measures or expenses will be required to establish infrastructure or
utilities at the Pangburn site.
The Shaner mine will be located approximately 1.6 kilometers north of the community of Sutersville,
PA, between the Youghiogheny and Monongahela Rivers. Numerous improved roads traverse the
Property. An additional shaft and slope will be required to access Upper Freeport seam reserves
west of the Monongahela River, accessed across the 1
st
immediate vicinity of the proposed Shaner surface facilities is well developed; no extraordinary
measures or expenses will be required to establish infrastructure or utilities at the Shaner site.
The Fallowfield property boundary is traversed by the 4-lane limited-access Mon-Fayette
Expressway in addition to numerous improved roads. Previous mining and coal preparation facilities
have existed in the immediate vicinity of the proposed Fallowfield surface facilities. No
extraordinary measures or expenses will be required to establish infrastructure or utilities at the
Fallowfield site. Due to the projected starting date for the Fallowfield mine, no detailed design of
infrastructure or surface facilities has been completed to date.
A CSX rail line and loadout on the Monongahela River as well as barge transportation on the river
are expected to serve as the primary means of transport for produced coal.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
16
Market Studies
16.1
Market Description
The quality characteristics for the subject coal resources and coal reserves have been reviewed in
detail by MM&A. The drill hole data were utilized to develop average coal quality characteristics
for the mining site. These average coal quality characteristics were then utilized as the basis for
determining the various markets into which the saleable coal will likely be placed.
The projected quality specifications for the Mon Valley products are as shown in
Table 16-1
.
Table 16-1: Quality Specifications by Product
HVB
Moisture (%)
7.50
Ash (%)
7.50
Sulfur (%)
1.2
Volatile Matter (%)
35
Btu/lb.
N/A
Fluidity (ddpm)
26,000
MMR (%)
0.98
CSR
55
FSI
7.50
Note: All Specs are dry basis except Moisture.
Life-of-
mine sulfur for Pangburn is an estimated 1.21%; however,
overall Mon Valley Complex reserve average is 1.36%
sulfur.
All of the mine production is projected to serve the metallurgical markets. The metallurgical coal is
marketed as a high-volatile (typically greater than 31 percent volatile matter content) product on
both the domestic and export markets.
16.2
Price Forecasts
Coronado provided MM&A with price forecasts for its active operations. Customer coal pricing is
derived from market observed forward estimates based on global economic supply and demand
analysis which is applied to mine plan sales volumes and product mix and is supplemented with
Coronado’s in-house knowledge of applicable rail transportation charges, ocean freight charges and
port charges. MM&A extrapolated the provided data for the greenfield Mon Valley operations.
Concurrent with aforementioned quality parameters in the preceding section, production from the
proposed operations is assumed to be sold in high volatile domestic and export coal markets with
respective percentages of 66 percent and 34 percent. The pricing data assumes HVB domestic and
export FOB-mine prices of approximately $130 and $114 per metric tonne for calendar year 2028.
HVB domestic and export prices respectively increase to approximately $204 and $178 per metric
tonne through year 2050, and then increased by 2% annual inflation thereafter.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
Coal price forecasts for the Mon Valley products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
16.3
Contract Requirements
Some contracts are necessary for successful marketing of the coal. For Mon Valley, since all mining,
preparation and marketing is done in-house, the remaining contracts required are:
>
Transportation
to transport the coal to either of the domestic customers ports for overseas shipments.
>
Handling
handled by annual negotiations based on projected shipments.
>
Sales
– Sales contracts are a mix of spot and contract sales. With the volatility of the market,
long-term contracts are not typically written.
17
Environmental Studies, Permitting and Plans,
Negotiations or Agreements with Local Individuals
17.1
Results of Studies
MM&A is not aware of any Phase I Environmental Site Assessment (
ESA
) completed on the Mon
Valley property on behalf of Coronado. Coronado reports not having conducted such a study. Based
on our experience with Coronado, it is the QPs’ opinion that Coronado has a generally typical coal
industry record of compliance with applicable mining, water quality, and environmental laws.
Estimated costs for mine closure, including water quality monitoring during site reclamation, are
included in the financial models.
17.2
Requirements and Plans for Waste Disposal
A study completed on behalf of Coronado has identified a Preferred Site for refuse disposal at
Pangburn with capacity of 22.6 million cubic meters. Estimated requirements for Pangburn and
Shaner combined is 29.7 million tonnes or approximately 13.2 million cubic meters. Permitting for
such a facility is anticipated to be achievable.
17.3
Permit Requirements and Status
All mining operations are subject to federal and state laws and must obtain permits to operate
mines, coal preparation and related facilities, haul roads, and other incidental surface disturbances
necessary for mining to occur. Permits generally require that the permittee post a performance
bond in an amount established by the regulatory program to provide assurance that any disturbance
or liability created during mining operations is properly restored to an approved post-mining land
use and that all regulations and requirements of the permits are fully satisfied before the bond is
returned to the permittee. Significant penalties exist for any permittee who fails to meet the
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
obligations of the permits including cessation of mining operations, which can lead to potential
forfeiture of the bond. Any company, and its directors, owners, and officers, which are subject to
bond forfeiture can be denied future permits under the program.
1
The refuse disposal area will receive combined coarse refuse from the proposed preparation plant
by conveyor belts. The fine material will be processed by filter press technology where the majority
of the water is removed. The filter cake material will be placed on the refuse conveyor for disposal
with the coarse portion of the refuse material.
New permits or permit revisions will occasionally be necessary to facilitate the expansion or addition
of new mining areas on the properties, such as amendments to existing permits and new permits
for mining of reserve areas. Exploration permits are also required. Property under lease includes
provisions for exploration among the terms of the lease. New or modified mining permits are
subject to a public advertisement process and comment period, and the public is provided an
opportunity to raise objections to any proposed mining operation. MM&A is not aware of any
specific prohibition of mining on the subject property and given sufficient time and planning,
Coronado should be able to secure new permits to maintain its planned mining operations within
the context of current regulations. Portions of the properties are located near local communities.
Regulations prohibit mining activities within 91 meters of a residential dwelling, school, church, or
similar structure unless written consent is first obtained from the owner of the structure. Where
required, such consents have been obtained where mining is proposed beyond the regulatory limits.
MM&A is unaware of any obvious or current Coronado permitting issues that are expected to
prevent the issuance of future permits. Coronado, along with all coal producers, is subject to a level
of uncertainty regarding future clean water permits due to
United States Environmental Protection
Agency
(
EPA
)
United States Fish and Wildlife (
USFW
)
17.4
Local Plans, Negotiations or Agreements
MM&A found no indication of requirements for agreements beyond the scope of Federal or State
Regulations.
1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
17.5
Mine Closure Plans
Applicable regulations require that mines be properly closed, and reclamation commenced
immediately upon abandonment. In general, site reclamation includes removal of structures,
backfilling, regrading, and revegetation of disturbed areas. Sediment control is required during the
establishment of vegetation, and bond release generally requires a minimum five-year period of site
maintenance, water sampling, and sediment control following mine completion. This requirement
is reduced to two years for certain operations involving re-mining. Reclamation of underground
mines includes closure and sealing of mine openings such as portals and shafts in addition to the
items listed above.
Estimated costs for mine closure, including water quality monitoring during site reclamation, are
included in the financial model. As with all mining companies, an accretion calculation is performed
annually so the necessary Asset Retirement Obligations (
ARO
) can be shown as a Liability on the
Balance Sheet.
17.6
Qualified Person’s Opinion
The QPs know
Estimated expenditures for site closure and reclamation are included in the financial model for these
sites.
18
Capital and Operating Costs
18.1
Capital Cost Estimate
The production sequence selected for a property must consider the proximity of each reserve area
to coal preparation plants, river docks and railroad loading points, along with suitability of
production equipment to coal seam conditions. The in-place infrastructure was evaluated, and any
future needs were planned to a level suitable for a Preliminary Feasibility Study and included in the
Capital Forecast.
MM&A
developed capital spending estimates for the proposed operations in the Mon Valley
Complex. MM&A’s capital schedules assume that major equipment rebuilds occur over the course
of each machine’s remaining assumed operating life. Replacement equipment was scheduled based
on MM&A’s experience and knowledge of mining equipment and industry standards with respect
to the useful life of such equipment.
A summary of the estimated capital for the Property is provided in
Figure 18-1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
Figure 18-1: CAPEX
18.2
Operating Cost Estimate
Coronado provided a historical summary of operating costs for similar operations for MM&A’s
review. MM&A used the historical and/or budget cost information as a reference and developed a
personnel schedule for the mine. Hourly labor rates and salaries were based upon information
contained in Coronado’s financial summaries. Fringe benefit costs were developed for vacation and
holidays, federal and state unemployment insurance, retirement, workers’ compensation and
pneumoconiosis, casualty and life insurance, healthcare, and bonuses. A cost factor for mine
supplies was developed that relates expenditures to mine advance rates for roof control costs and
other mine supply costs experienced at underground mines. Other factors were developed for
maintenance and repair costs, rentals, mine power, outside services and other direct mining costs.
Other cost factors were developed for coal preparation plant processing, refuse handling, coal
loading, property taxes, and insurance and bonding. Appropriate royalty rates were assigned for
production from leased coal lands and sales taxes were calculated for federal black lung excise tax,
and federal reclamation fees. There are currently no state coal severance or reclamation taxes
required in Pennsylvania.
Mandated Sales Related Costs such as Black Lung Excise are summarized in
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
Table 18-1: Estimated Coal Production Taxes and Sales Costs
Description of Tax or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax - Underground
Per Tonne
$1.21
Federal Reclamation Fees – Underground
Per Tonne
$0.13
Royalties – Underground
Percentage of Revenue
7%
Note:
1.
Federal black lung excise tax is paid only on coal sold domestically. MM&A assumed 45% of total coal sales to be
domestic in the economic analysis discussed below.
A summary of the projected Operating Costs is in
Table 18-2
.
Table 18-2: Mon Valley Operating Costs
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
YE
12/31
2030
Remaining
Total
LOM
Average
ROM Production Tonnes
198.4
-
-
-
-
-
-
-
-
2.9
Yield
68.19%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
68.19%
Saleable Production Tonnes
*
135.3
-
-
-
-
-
-
-
-
2.0
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic Met Tonnes
89.3
-
-
-
-
-
-
-
-
1.3
Export Met Tonnes
46.0
-
-
-
-
-
-
-
-
0.7
135.3
-
-
-
-
-
-
-
-
2.0
Cash Costs per Tonne:
Mining Costs
$100.61
$-
$-
$-
$-
$-
$-
$-
$-
$100.59
Processing and Transport
$37.98
$-
$-
$-
$-
$-
$-
$-
$-
$37.98
Sales Related Costs
$1.73
$-
$-
$-
$-
$-
$-
$-
$-
G&A
$-
$-
$-
$-
$-
$-
$-
$-
$145.74
$-
$-
$-
$-
$-
$-
$-
$-
$145.72
Financial model includes 0.9 million tonnes of inferred coal production. Inferred coal represents 0.6% of the total production, and none of this coal was included in
the estimate of reserves.
19
Economic Analysis
19.1
Assumptions, Parameters and Methods
A pre-feasibility LOM plan was prepared by MM&A for the proposed Mon Valley operations. MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
Production timing was carried out from 2032 to depletion (exhaustion) of the coal reserve areas,
which is projected for the year 2100. All costs and prices are based on 2022 nominal United States
dollars.
The Mine plan, productivity expectations and cost estimates generally reflect historical performance
by Coronado and efforts have been made to adjust plans and costs to reflect future conditions.
MM&A is confident that the mine plan and financial model are reasonably representative to provide
an accurate estimation of coal reserves.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
Capital schedules were developed by MM&A for mine development, infrastructure, and on-going
capital requirements for the life of the mine. Staffing levels were prepared, and operating costs
estimated by MM&A. MM&A utilized historical cost data provided by Coronado and its own
knowledge and experience to estimate direct and indirect operating costs.
The preliminary feasibility financial model, prepared for this TRS, was developed to test the
economic viability of the coal reserve area. The results of this financial model are not intended to
represent a bankable feasibility study, required for financing of any current or future mining
operations, but are intended to prove the economic viability of the estimated coal reserves. All
costs and prices are based on 2022 nominal United States dollars assuming a 2% inflation rate.
On an unlevered basis, the NPV of the project cash flows after taxes was estimated for the purpose
of classifying coal reserves. The project cash flows, excluding debt service, are calculated by
subtracting direct and indirect operating expenses and capital expenditures from revenue. Direct
costs include labor, drilling and blasting, operating supplies, maintenance and repairs, facilities costs
for materials handling, coal preparation, refuse disposal, coal loading, sampling and analysis
services, reclamation and general and administrative costs. Indirect costs include statutory and
legally agreed upon fees related to direct extraction of the mineral. The indirect costs are the
Federal black lung tax, Federal reclamation taxes, property taxes, local transportation prior to
delivery at rail or barge loading sites, coal production royalties, sales and use taxes, and income
taxes. Coronado’s historical costs provided a useful reference for MM&A’s cost estimates.
Sales revenue is based on the metallurgical coal price information provided to MM&A by Coronado.
Projected debt service is excluded from the P&L and cash flow model in order to determine
Enterprise Value.
The financial model expresses coal sales prices, operating costs, and capital expenditures in current
day dollars without adjustment for inflation. Capital expenditures and reclamation costs are
included based on engineering estimates for each mine by year. The Coronado division’s existing
allocations of administrative costs are continued in the future projections.
Coronado will pay royalties for the various current and projected operations. The royalty rates vary
by mining method and location. The royalty rates for Mon Valley are estimated to be 7% of the
sales revenue.
The projection model also includes consolidated income tax calculations at the Coronado level,
incorporating statutory depletion calculations, as well as state income taxes, and a federal tax rate
of 21%. To the extent the mine generates net operating losses for tax purposes, the losses are
carried over to offset future taxable income. The terms “cash flows” and “project cash flows” used
in this report refer to after tax cash flows.
Consolidated cash flows are driven by annual sales tonnage, which grows from 0.4 million tonnes in
2032 to a peak of 3.8 million tonnes in 2060. Between years 2061 and 2090, sales ranges from 1.5
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
million to 2.7 million tonnes and between years 2091-2100, sales range from 0.4 million tonnes to
1.3 million tonnes. Projected consolidated revenue grows from $54.0 million in 2032 to a peak of
$917.7 million in 2060. Revenue totals $37.6 billion for the project’s life.
Consolidated cash flow from operations is positive throughout the projected operating period, with
the exception of post -production years, due to end-of-mine reclamation spending. Consolidated
cash flow from operations peaks at $374.3 million in 2061 and totals $9.1 billion over the project’s
life. Capital expenditures total $531.2 million during the first five years and $3.8 billion over the
project’s life.
Coal price forecasts for coal products were prepared by Coronado for its active operations and
modified appropriately by MM&A for its greenfield operations. Such prices were used for the
revenue input into the financial model. Sales variable costs such as production royalties were based
upon the revenue input.
19.2
Results
The pre-feasibility financial model, prepared by MM&A for this TRS, was developed to test the
economic viability of each coal resource area. The results of this financial model are not intended
to represent a bankable feasibility study, as may be required for financing of any current or future
mining operations contemplated but are intended to prove the economic viability of the estimated
coal reserves. Optimization of the LOM plan was outside the scope of the engagement.
Figure 19-1
Table 19-1
and EBITDA for each proposed Coronado mines in Mon Valley .
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
Figure 19-1: Cash Costs per Tonne
As shown above, the mines’ average cash cost ranges between approximately $64 and $333 per
tonne for most of the operating period.
Table 19-1: Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000)
LOM
LOM
P&L
LOM
EBITDA
Tonnes
*
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Pangburn
Fallowfield
Shaner
Consolidated PA Deep Mines
Note: *Financial model includes 0.9 million tonnes of inferred coal production. Inferred coal represents 0.6%
of the total production, and none of this coal was included in the estimate of reserves.
As shown in
Table 19-1,
consolidated operations show positive LOM P&L and LOM EBITDA of $13.8 billion and $17.9 billion,
respectively. A summary of the key financial performance metrics projected for years is provided
below in
Table 19-2
.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
Table 19-2: Summary of Mon Valley Key Financial Performance Metrics (2023-2030)
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
YE
12/31
2030
Remaining
Total
LOM
Average
ROM Production Tonnes
198.4
-
-
-
-
-
-
-
-
2.9
Yield
68.19%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
68.19%
Saleable Production Tonnes
*
135.3
-
-
-
-
-
-
-
-
2.0
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic Met Tonnes
89.3
-
-
-
-
-
-
-
-
1.3
Export Met Tonnes
46.0
-
-
-
-
-
-
-
-
0.7
135.3
-
-
-
-
-
-
-
-
2.0
Cash Costs per Tonne:
Mining Costs
$100.61
$-
$-
$-
$-
$-
$-
$-
$-
$100.59
Processing and Transport
$37.98
$-
$-
$-
$-
$-
$-
$-
$-
$37.98
Sales Related Costs
$1.73
$-
$-
$-
$-
$-
$-
$-
$-
$1.73
G&A
$5.42
$-
$-
$-
$-
$-
$-
$-
$-
$5.42
$145.74
$-
$-
$-
$-
$-
$-
$-
$-
$145.72
EBITDA per Tonne
$131.90
$-
$-
$-
$-
$-
$-
$-
$-
$131.93
Expansion CapEx ($M)
$37.40
$-
$-
$-
$-
$-
$5.53
$31.87
$-
$-
Maintenance CapEx ($M)
$3,761.87
$-
$-
$-
$-
$-
$-
$-
$36.16
$53.22
$3,799.27
$1.02
$-
$-
$-
$-
$5.53
$31.87
$36.16
$53.22
●
Financial model includes 0.9 million tonnes of inferred coal production. Inferred coal represents 0.6% of the total
production, and none of this coal was included in the estimate of reserves.
After-Tax Cash Flows were developed in order to calculate the NPV for this Property. The NPV is
estimated to be $168.3 million at a discount rate of 10.0%. A summary of the Mon Valley after -tax
cash flow is shown in
Table 19-3
.
Table 19-3: Project Cash Flow Summary (000)
*
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
Total
2027
2028
2029
2030
2031
Production & Sales tonnes
135,311
-
-
-
-
-
Total Revenue
$37,567,900
$-
$-
$-
$-
$-
EBITDA
$12,956,210
$(388)
$(388)
$(388)
$(388)
$(388)
Net Income
$5,500,454
$(388)
$(388)
$(388)
$(388)
$(388)
Net Cash Provided by Operating Activities
$9,101,755
$(388)
$(388)
$(388)
$(388)
$(328)
Purchases of Property, Plant, and Equipment
$(3,799,269)
$-
$(5,533)
$(31,868)
$(36,156)
$(233,778)
Net Cash Flow
$5,302,486
$(388)
$(5,921)
$(32,256)
$(36,544)
$(234,106)
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2032
2033
2034
2035
2036
2037
Production & Sales tonnes
399
1,810
1,875
1,958
2,029
2,030
Total Revenue
$54,019
$249,974
$264,268
$281,660
$297,887
$304,147
EBITDA
$25,792
$134,660
$143,768
$156,696
$168,610
$172,267
Net Income
$(55,860)
$50,305
$57,801
$63,866
$62,105
$73,365
Net Cash Provided by Operating Activities
$20,744
$112,463
$139,070
$147,100
$143,903
$154,203
Purchases of Property, Plant, and Equipment
$(223,890)
$(6,093)
$(1,522)
$(23,061)
$(19,766)
$(224,451)
Net Cash Flow
$(203,146)
$106,370
$137,548
$124,039
$124,137
$(70,247)
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2038
2039
2040
2041
2042
2043
Production & Sales tonnes
2,062
1,960
1,762
2,366
1,804
1,724
Total Revenue
$315,229
$305,758
$280,640
$384,512
$299,179
$291,805
EBITDA
$178,445
$166,211
$140,888
$208,852
$140,775
$133,692
Net Income
$57,967
$72,886
$45,385
$92,177
$64,942
$53,969
Net Cash Provided by Operating Activities
$165,161
$154,094
$130,479
$163,610
$106,491
$111,512
Purchases of Property, Plant, and Equipment
$(202,332)
$(18,063)
$(15,711)
$(22,144)
$(8,827)
$(14,141)
Net Cash Flow
$(37,170)
$136,031
$114,769
$141,466
$97,664
$97,370
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2044
2045
2046
2047
2048
2049
Production & Sales tonnes
1,717
1,641
1,719
1,657
1,582
1,704
Total Revenue
$296,479
$289,255
$309,181
$304,039
$296,312
$325,698
EBITDA
$135,584
$128,438
$141,700
$136,176
$128,554
$149,022
Net Income
$67,285
$78,524
$86,380
$81,215
$75,423
$86,668
Net Cash Provided by Operating Activities
$115,188
$109,995
$111,937
$112,263
$106,871
$118,353
Purchases of Property, Plant, and Equipment
$(106,672)
$(33,173)
$(3,378)
$(5,687)
$(21,727)
$(45,062)
Net Cash Flow
$8,515
$76,822
$108,559
$106,575
$85,144
$73,291
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2050
2051
2052
2053
2054
2055
Production & Sales tonnes
1,656
1,732
1,702
1,596
1,642
1,750
Total Revenue
$322,894
$344,510
$345,451
$330,631
$347,164
$377,485
EBITDA
$144,852
$159,462
$158,323
$145,127
$155,737
$176,479
Net Income
$83,039
$106,381
$104,840
$90,665
$96,667
$115,492
Net Cash Provided by Operating Activities
$120,921
$126,371
$126,005
$119,262
$124,313
$138,665
Purchases of Property, Plant, and Equipment
$(25,998)
$(4,218)
$(20,921)
$(39,520)
$(28,042)
$(37,598)
Net Cash Flow
$94,923
$122,153
$105,084
$79,742
$96,271
$101,067
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2056
2057
2058
2059
2060
2061
Production & Sales tonnes
1,751
2,609
3,576
3,732
3,846
3,762
Total Revenue
$385,399
$586,004
$819,598
$872,775
$917,689
$916,057
EBITDA
$180,413
$271,312
$391,320
$425,108
$454,572
$448,794
Net Income
$139,507
$127,958
$209,809
$227,665
$251,397
$234,738
Net Cash Provided by Operating Activities
$160,731
$227,264
$308,925
$347,214
$369,575
$374,330
Purchases of Property, Plant, and Equipment
$(549,006)
$(91,928)
$(36,973)
$(45,463)
$(22,284)
$(131,772)
Net Cash Flow
$(388,274)
$135,335
$271,952
$301,751
$347,291
$242,558
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2062
2063
2064
2065
2066
2067
Production & Sales tonnes
3,488
3,390
3,466
3,397
2,961
2,826
Total Revenue
$866,529
$859,453
$896,756
$896,840
$797,498
$776,640
EBITDA
$406,027
$398,694
$424,167
$429,339
$389,140
$382,069
Net Income
$203,176
$262,307
$274,392
$274,792
$235,580
$226,904
Net Cash Provided by Operating Activities
$352,593
$331,050
$333,667
$341,553
$322,289
$312,496
Purchases of Property, Plant, and Equipment
$(58,035)
$(25,972)
$(64,621)
$(60,161)
$(120,574)
$(57,818)
Net Cash Flow
$294,558
$305,078
$269,045
$281,391
$201,715
$254,678
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2068
2069
2070
2071
2072
2073
Production & Sales tonnes
2,479
2,318
2,289
1,438
1,988
1,993
Total Revenue
$695,232
$663,381
$668,340
$428,531
$604,475
$618,406
EBITDA
$345,064
$315,895
$324,744
$177,919
$303,204
$313,068
Net Income
$200,677
$180,616
$183,214
$102,106
$185,575
$200,522
Net Cash Provided by Operating Activities
$290,478
$265,928
$264,648
$126,035
$207,165
$242,028
Purchases of Property, Plant, and Equipment
$(118,193)
$(38,552)
$(41,672)
$(26,538)
$(44,402)
$(30,383)
Net Cash Flow
$172,285
$227,376
$222,976
$99,497
$162,763
$211,645
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2074
2075
2076
2077
2078
2079
Production & Sales tonnes
1,822
2,098
2,055
2,107
1,883
2,129
Total Revenue
$576,706
$614,741
$614,611
$642,871
$586,223
$676,320
EBITDA
$282,323
$306,812
$304,834
$325,855
$282,672
$345,761
Net Income
$178,585
$209,539
$202,684
$211,767
$179,763
$230,583
Net Cash Provided by Operating Activities
$227,691
$232,044
$237,019
$247,117
$225,397
$251,932
Purchases of Property, Plant, and Equipment
$(3,360)
$(3,428)
$(42,925)
$(75,556)
$(16,116)
$(6,493)
Net Cash Flow
$224,330
$228,617
$194,094
$171,561
$209,281
$245,439
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2080
2081
2082
2083
2084
2085
Production & Sales tonnes
1,937
1,723
2,242
1,568
2,285
1,637
Total Revenue
$627,878
$570,149
$756,717
$540,176
$803,092
$587,274
EBITDA
$307,130
$261,187
$391,089
$241,080
$421,465
$261,759
Net Income
$201,018
$156,255
$247,475
$139,739
$281,600
$160,070
Net Cash Provided by Operating Activities
$240,316
$207,078
$272,041
$211,121
$285,491
$228,402
Purchases of Property, Plant, and Equipment
$(25,860)
$(72,719)
$(39,361)
$(12,940)
$(20,396)
$(34,296)
Net Cash Flow
$214,456
$134,359
$232,679
$198,181
$265,095
$194,106
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2086
2087
2088
2089
2090
2091
Production & Sales tonnes
1,982
1,477
1,857
1,616
1,993
1,305
Total Revenue
$725,512
$551,606
$707,457
$628,246
$790,874
$528,487
EBITDA
$356,300
$233,497
$334,352
$278,449
$389,504
$199,352
Net Income
$224,911
$128,018
$209,340
$168,393
$251,821
$107,463
Net Cash Provided by Operating Activities
$252,946
$200,997
$235,620
$222,633
$275,062
$188,238
Purchases of Property, Plant, and Equipment
$(42,736)
$(61,764)
$(27,589)
$(31,659)
$(4,613)
$(38,355)
Net Cash Flow
$210,209
$139,233
$208,030
$190,974
$270,449
$149,882
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2092
2093
2094
2095
2096
2097
Production & Sales tonnes
1,637
1,612
1,747
1,355
1,731
1,752
Total Revenue
$676,274
$679,478
$751,249
$594,733
$775,168
$800,781
EBITDA
$301,607
$299,832
$348,917
$215,004
$356,524
$378,911
Net Income
$176,267
$169,679
$213,755
$117,501
$219,452
$235,930
Net Cash Provided by Operating Activities
$211,547
$229,125
$256,552
$190,242
$246,204
$284,008
Purchases of Property, Plant, and Equipment
$(81,778)
$(76,560)
$(4,993)
$(5,093)
$(47,001)
$-
Net Cash Flow
$129,769
$152,566
$251,558
$185,149
$199,203
$284,008
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
2098
2099
2100
2101
2102
2103
Production & Sales tonnes
1,387
916
393
-
-
-
Total Revenue
$646,856
$435,993
$190,649
$-
$-
$-
EBITDA
$266,452
$177,489
$71,896
$-
$-
$-
Net Income
$157,157
$132,037
$52,032
$-
$-
$-
Net Cash Provided by Operating Activities
$224,663
$61,085
$(105,016)
$-
$-
$-
Purchases of Property, Plant, and Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$224,663
$61,085
$(105,016)
$-
$-
$-
●
Financial model includes 0.9 million tonnes of inferred coal production. Inferred coal represents 0.6% of the total
production, and none of this coal was included in the estimate of reserves.
19.3
Sensitivity
Sensitivity of the NPV results to changes in the key drivers is presented in the chart below. The
sensitivity study shows the NPV at the 10.0% discount rate when Base Case sales prices, operating
costs, and capital costs are increased and decreased in increments of 5% within a +/- 15% range.
Figure 19-2: Sensitivity of NPV
As shown, NPV is quite sensitive to changes in sales price and operating cost estimates, and slightly
sensitive to changes in capital cost estimates.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
20
Adjacent Properties
20.1
Information Used
No Proprietary information associated with neighboring properties was used as part of this study.
21
Other Relevant Data and Information
MM&A performed a previous audit of the Property in 2017 for Coronado based on SEC Industry
Guide 7 standards. MM&A has subsequently conducted Joint Ore Reserve Committee (
JORC
)
compliant resource and reserve assessments of the Mon Valley assets as of: (1) December 31, 2017,
(2) December 31, 2020, and (3) December 31, 2021. By assignment, the JORC assessment included
a preliminary feasibility level study of the subject coal reserves, encompassing detailed mine
planning and cost analysis through depletion of Mon Valley’s JORC-compliant coal reserves. MM&A
utilized these former preliminary feasibility studies as the basis of an updated study which meets
those standards set forth by the JORC Code and SEC.
22
Interpretation and Conclusions
22.1
Conclusion
Sufficient data has been obtained through various exploration and sampling programs and mining
operations to support the geological interpretations of seam structure and thickness for coal
horizons situated on the Property. The data is of sufficient quantity and reliability to reasonably
support the coal resource and coal reserve estimates in this TRS.
The geological data and preliminary feasibility study, which consider mining plans, revenue, and
operating and capital cost estimates are sufficient to support the classification of coal reserves
provided herein.
This geologic evaluation conducted in conjunction with the preliminary feasibility study is sufficient
to conclude that the 134.4 Mt of marketable underground coal reserves identified on the Property
are economically mineable under reasonable expectations of market prices for metallurgical coal
products, estimated operation costs, and capital expenditures.
22.2
Risk Factors
Risks have been identified for operational, technical and administrative subjects addressed in the
Pre-Feasibility Study. A risk matrix has been constructed to present the risk levels for all the risk
factors identified and quantified in the risk assessment process. The risk matrix and risk assessment
process are modeled to that presented in the Australian and New Zealand Standard on Risk
Management (AS/NZS 4360).
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
The purpose of the characterization of the project risk components is to inform the project
stakeholders of key aspects of the Coronado projects that can be impacted by events whose
consequences can affect the success of the venture. The significance of an impacted aspect of the
operation is directly related to both the probability of occurrence and the severity of the
consequences. The initial risk for a risk factor is herein defined as the risk level after the potential
impact of the risk factor is addressed by competent and prudent management utilizing control
measures readily available. Residual risk for a risk factor is herein defined as the risk level following
application of special mitigation measures if management determines that the initial risk level is
unacceptable. Initial risk and residual risk can be quantified numerically, derived by the product of
values assigned to probability and consequence ranging from very low risk to very high risk.
The probability and consequence parameters are subjective numerical estimates made by practiced
mine engineers and managers. Both are assigned values from 1 to 5 for which the value 1 represents
the lowest probability and least consequence, and the value 5 represents the highest probability
and greatest consequence. The products, which define the Risk Level, are classified from very low
to very high.
Risk Level Table (R = P x C)
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects identified and evaluated during this assignment total 13. No residual risks are rated
Very High. Four (4) residual risks are rated High. Six (6) of the risk aspects could be associated with
Moderate residual risk. Three (3) of the risk aspects were attributed Low or Very Low residual risks.
22.2.1
Governing Assumptions
The listing of the aspects is not presumed to be exhaustive. Instead that listing is presented based
on the experiences of the contributors to the TRS.
1.
The probability and consequence ratings are subjectively assigned, and it is assumed that
this subjectivity reasonably reflects the condition of the active and projected mine
operations.
2.
The Control Measures shown in the matrices presented in this chapter are not exhaustive.
They represent a condensed collection of activities that the author of the risk assessment
section has observed to be effective in coal mining scenarios.
3.
Mitigation Measures listed for each risk factor of the operation are not exhaustive. The
measures listed, however, have been observed by the author to be effective.
4.
The monetary values used in ranking the consequences are generally-accepted quantities for
the coal mining industry.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
22.2.2
Limitations
The risk assessment proposed in this report is subject to the limitations of the information currently
collected, tested, and interpreted at the time of the writing of the report.
22.2.3
Methodology
The numerical quantities (i.e., risk levels) attributable to either “initial” or “residual” risks are
derived by the product of values assigned to probability and consequence ranging from very low
risk to very high risk.
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The Probability (P) and Consequence (C) parameters recited in the formula are subjective numerical
estimates made by practiced mine engineers and managers. Both P and C are assigned integer
values ranging from 1 to 5 for which the value 1 represents the lowest probability and least
consequence, and the value 5 represents the highest probability and greatest consequence. The
products (R = P x C) which define the Risk Level, are thereafter classified from very low to very high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very high initial risks are considered to be unacceptable and require corrective action well in
advance of project development. In short, measures must be applied to reduce very high initial risks
to a tolerable level.
As shown and discussed above, after taking into account the operational, technical, and
administrative actions that have been applied or are available for action when required, the residual
risk can be determined. The residual risk provides a basis for the management team to determine
if the residual risk level is acceptable or tolerable. If the risk level is determined to be unacceptable,
further actions should be considered to reduce the residual risk to acceptable or tolerable levels to
provide justification for continuation of the proposed operation.
22.2.4
Development of the Risk Matrix
Risks have been identified for the technical, operational, and administrative subjects addressed in
the TRS. The risk matrix and risk assessment process are modeled to that presented in the
Australian and New Zealand Standard on Risk Management (AS/NZS 4360).
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
22.2.4.1
Probability Level Table
Table 22-1: Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under most circumstances; impossible to avoid.
>90%
The lowest rated probability of occurrence is assigned the value of 1 and described as remote, with
a likelihood of occurrence of less than 2 percent. Increasing values are assigned to each higher
probability of occurrence, culminating with the value of 5 assigned to incidents considered to be
almost certain to occur.
22.2.4.2
Consequence Level Table
Table 22-2
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
Table 22-2: Consequence Level Table
Correlation of Events in Key Elements of the Project Program to Event Severity Category
Category
Severity of
the Event
Financial Impact
of the Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the Environment
Events Affecting the Program's
Social and Community
Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health &
Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water, soil and
the environment.
Occasional nuisance impact on
travel.
-
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel. Transient adverse media
coverage.
-
First aid – lost time.
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population;
medium-term (≤10
years) detriment to
ecosystem function.
Measurable impact on travel
and water/air quality.
Significant adverse media
coverage / transient public
outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation. Avoiding event
recurrence requires modification to
established corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening
viability; long-term
(>10 years)
detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
Avoiding event
recurrence requires major overhaul of
policies and procedures.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
61
The lowest rated consequence is assigned the value of 1 and is described as Insignificant
Consequence, parameters of which include non-reportable safety incidents with zero days lost
accidents, no environmental damage, loss of production or systems for less than one week and cost
of less than USD $0.5 million. Increasing values are assigned to each higher consequence,
culminating with the value of 5 assigned to critical consequences, the parameters of which include
multiple-fatality accidents, major environmental damage, and loss of production or systems for
longer than one month and cost of greater than USD $50.0 million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk level, defined as the product of probability of occurrence and consequence, ranges in value
from 1 (lowest possible risk) to 25 (maximum risk level). The values are color-coded to facilitate
identification of the highest risk aspects.
Table 22-3: Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
Categorization of Risk Levels and Color Code Convention
Very high risks are considered to be unacceptable and require corrective action. Risk reduction
measures must be applied to reduce very high risks to a tolerable level.
22.2.6
Description of the Coal Property
The Mon Valley Reserve (including Pangburn, Shaner and Fallowfield Areas) is located in Allegheny,
Washington, and Westmoreland Counties, Pennsylvania. Mon Valley underground operations are
projected to commence in 2032 at the Mon Valley Complex in the large Upper Freeport seam
reserve area. Three mines are planned, and each will utilize continuous mining methods. The initial
operation is designated as the Pangburn Mine; subsequently, the Shaner Mine is projected for 2038
and followed by the Fallowfield Mine in 2057. The operations are projected to utilize continuous
mining production sections. The method provides continuity, preserving skilled work groups and
enabling effective utilization of production equipment. The Upper Freeport seam is below drainage
and therefore all mines will be accessed with slopes and shafts.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
62
22.2.7
Summary of Residual Risk Ratings
Each risk factor is numbered, and a risk level for each is determined by multiplying the assigned
probability by the assigned consequence. The risk levels are plotted on a risk matrix to provide a
composite view of the Coronado risk profile. The average risk level is 8.4, which is defined as
Moderate.
Table 22-4: Risk Assessment Matrix
Consequence
Critical
>$50 MM
9, 10
Major
$10-50MM
4
1, 2, 3
6
Moderate
$2-10 MM
12
Minor
$0.5-$2 MM
7, 13
5
8
Low
<$0.5 MM
11
<10%
10-30%
30-60%
60-90%
>90%
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
Risk Factors
A high-level approach is utilized to characterize risk factors that are generally similar across a
number of the active and proposed mining operations. Risk factors that are unique to a specific
operation or are particularly noteworthy are addressed individually.
22.2.8.1
Geological and Coal Resource
Coal mining is accompanied by risk that, despite exploration efforts, mining areas will be
encountered where geological conditions render extraction of the resource to be uneconomic, or
that coal quality characteristics disqualify the product for sale into target markets.
To illustrate these points, the Upper Freeport coal seam deposits at Mon Valley are examined. The
coal is deposited in large, elliptical pods. During deposition, the raised peat deposits were
surrounded by areas void of peat and deposited instead with dirt, clay, and stream channels.
Consequently, the perimeter of the peat, and consequent coal deposits may contain significantly
higher concentration of ash and sulfur, and reduced product yield. The perimeter deposits may also
be affected by immediate roof and floor conditions that adversely affect mining cost and
productivity. Meandering sandstone channels may reduce coal seam thickness by scouring action
at the top of the coal seam and support the migration of sulfur to the Upper Freeport seam.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
63
Offsetting the geological and coal resource risk are the massive size of the controlled property which
allows large areas to be mined in the three designated mine areas sufficiently away from areas
where coal quality and mineability are less favorable. In addition, the mines are designed to operate
with multiple production sections, which lessens the immediate impact when one section
encounters difficulties. The large reserve areas also provide a mitigation strategy of developing an
additional (spare) section at each mine which can be activated when adverse conditions are
encountered, thereby maintaining consistent production and quality. The spare section requires
additional mine extension cost but increases flexibility and performance consistency.
Table 22-5: Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Recoverable coal tonnes
recognized to be
significantly less than
previously estimated.
Reserve base is adequate to
serve market commitments
and respond to opportunities
for many years. Local
adverse conditions may
increase frequency and cost of
production unit relocations.
Previous and ongoing
exploration and extensive
regional mining history
provide a high level of
confidence of coal seam
correlation, continuity of the
coal seams, and coal
resource tonnes.
4
4
16
Optimize mine plan
to increase resource
recovery; develop
mine plan to provide
readily available
alternate mining
locations to sustain
expected production
level.
3
4
12
Coal quality locally
proves to be lower than
initially projected.
If uncontrolled, production and
sale of coal that is out of
specification can result in
rejection of deliveries,
cancellation of coal sales
agreements and damage to
reputation.
Exploration and vast
experience and history in
local coal seams provide
confidence in coal quality;
limited excursions can be
managed with careful
product segregation and
blending.
3
5
15
Develop mine plan
to provide readily
available alternate
mining locations to
sustain expected
production level;
modify coal sales
agreements to
reflect coal quality.
3
4
12
22.2.8.2
Environmental
Water quality and other permit requirements are subject to modification and such changes could
have a material impact on the capability of the operator to meet modified standards or to receive
new permits and modifications to existing permits. Permit protests may result in delays or denials
to permit applications.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
64
Environmental standards and permit requirements have evolved significantly over the past 50 years
and to-date, mining operators and regulatory bodies have been able to adapt successfully to
evolving environmental requirements.
The Residual Risk has is projected to be slightly higher for the PA reserves due to the proximity of
the rivers and the residual environmental complaints, in the vicinity, left from mining in the past.
Table 22-6: Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Environmental
performance standards
are modified in the future.
Delays in receiving new
permits and modifications to
existing permits; cost of testing
and treatment of water and
soils
Work with regulatory
agencies to understand and
influence final standards;
implement testing,
treatment and other actions
to comply with new
standards.
3
4
12
Modify mining and
reclamation plans to
improve compliance
with new standards
while reducing cost
of compliance.
3
4
12
New permits and permit
modifications are
increasingly delayed or
denied.
Interruption of production and
delayed implementation of
replacement production from
new mines.
Comply quickly with testing,
treatment and other actions
required; continue excellent
compliance performance
within existing permits.
2
4
8
Establish and
maintain close and
constructive working
relationships with
regulatory agencies,
local communities
and community
action groups.
2
4
8
22.2.8.3
Regulatory Requirements
Federal and state health and safety regulatory agencies occasionally amend mine laws and
regulations. The impact is industry-wide. Mining operators and regulatory agencies have been able
to adapt successfully to evolving health and safety requirements.
Table 22-7: Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Federal and state mine
safety and health
regulatory agencies
amend mine laws and
regulations.
Cost of training, materials,
supplies and equipment;
modification of mine
examination and production
procedures; modification of
mining plans.
Participate in hearings and
workshops when possible to
facilitate understanding and
implementation; work
cooperatively with agencies
and employees to facilitate
implementation of new laws
and regulations.
4
3
12
Familiarity and
experience with new
laws and regulations
results in reduced
impact to operations
and productivity and
improved supplies
and equipment
options.
4
2
8
22.2.8.4
Market and Transportation
Most of the current and future production is expected to be directed to domestic and international
metallurgical markets. Historically the metallurgical markets have been cyclical and highly volatile.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
65
The Mon Valley business plan assumes that 75 percent of production can be sold into the favorably
priced metallurgical market. The mining plan must minimize exposure to the perimeter reserves
where quality may not be suitable for the market plan and be flexible to manage exposure to areas
where coal quality fails to meet metallurgica l standards.
Table 22-8: Market and Transportation (Risks 6 and 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Volatile coal prices drop
precipitously.
Loss of revenue adversely
affects profitability; reduced
cash flow may disrupt capital
expenditures plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost operations
closed, and
employees
temporarily
furloughed.
4
4
16
Coal quality at Mon
Valley Upper Freeport
mines is not adequate to
support 100 percent
metallurgical sales.
Reduced revenue from a
percentage of thermal sales
jeopardizes financial
performance and expectations.
Lower preparation plant
gravities for ash and sulfur
reduction; segregate lower
quality coal when possible
and manage shipped
quality by blending.
3
5
15
Adjust mine plan
to keep minimize
exposure to
perimeter coal and
sandstone channels;
provide spare
section to sustain
production and
quality when low
quality areas are
encountered.
3
2
6
Occasional delay or interruption of rail, river and terminals service may be expected. The operator
can possibly minimize the impact of delays by being a preferred customer by fulfilling shipment
obligations promptly and maintaining close working relationships.
Table 22-9: Market and Transportation (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Rail or river transport is
delayed; storage and
shipping access at river
and ocean terminals is not
available.
Fulfillment of coal sales
agreements delayed; limited
coal storage at mines may
increase cost of rehandling;
production may be temporarily
idled.
Provide adequate storage
capacity at mines;
coordinate continuously with
railroad and shipping
companies to respond
quickly and effectively to
changing circumstances.
5
3
15
Provide back-up
storage facility along
with personnel,
equipment and
rehandle plan to
sustain production
and fulfill sales
obligations timely.
5
2
10
22.2.8.5
Mining Plan
Occupational health and safety risks are inherent in mining operations. Comprehensive training and
retraining programs, internal safety audits and examinations, regular mine inspections, safety
meetings, along with support of trained fire brigades and mine rescue teams are among activities
that greatly reduce accident risks. Employee health monitoring programs coupled with dust and
noise monitoring and abatement reduce health risks to miners.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
66
As underground mines are developed and extended, observation of geological, hydrogeological and
geotechnical conditions lead to modification of mine plans and procedures to enable safe work
within the mine environments.
Highlighted below are selected examples of safety and external factors relevant to Coronado
operations.
22.2.8.5.1
Methane Management
Coalbed methane is present in coal operations below drainage. Often the methane concentration
is at such low levels that it can be readily managed with frequent testing and monitoring, vigilance,
and routine mine ventilation. Very high methane concentrations may be present at greater depths.
High methane concentrations may require degasification of the coal seam to assure safe mining.
Table 22-10: Methane Management (Risk 9)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Methane hazard is present
in mines operating below
drainage.
Injury or loss of life; possible
ignition of gas and mine
explosion; potential loss of
mine and equipment
temporarily or permanently;
additional mine fan, mine
power, ventilation, monitoring
and examination requirements.
Low to moderate levels can
be managed with frequent
examinations, testing and
monitoring within the mine
ventilation system.
Excellent rock dust
maintenance minimizes
explosion propagation risk
should an ignition occur.
1
5
5
Very high-level
methane
concentrations may
require coal seam
degasification and
gob degasification if
longwall or pillar
extraction methods
are employed.
1
5
5
22.2.8.5.2
Mine Fires
Mine fires, once common at mine operations, are rare today. Most active coal miners have not
encountered a mine fire. Vastly improved mine power and equipment electrical systems, along with
safe mine practices reduce mine fire risks. Crew training and fire brigade support and training
improve response for containment and control if a fire occurs. Spontaneous combustion within coal
mines, which is the source of most fires that occur today, is not expected to commonly occur at the
Coronado property. When spontaneous combustion conditions are present, monitoring systems
are employed for early detection and mine plans are designed to facilitate isolation, containment
and rapid extinguishment.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
67
Table 22-11: Mine Fires (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Mine fire at underground
or surface mine operation.
Injury or loss of life; potential
loss of mine temporarily or
permanently; damage to
equipment and mine
infrastructure.
Inspection and maintenance
of mine power, equipment
and mine infrastructure;
good housekeeping;
frequent examination of
conveyor belt entries;
prompt removal of
accumulations of
combustible materials.
1
5
5
If spontaneous
combustion
conditions are
present, enhanced
monitoring and
examination
procedures will be
implemented; mine
design will
incorporate features
to facilitate isolation,
containment and
extinguishment of
spontaneous
combustion
locations.
1
5
5
22.2.8.5.3
Availability of Supplies and Equipment
The industry has periodically experienced difficulty receiving timely delivery of mine supplies and
equipment. Availability issues often accompanied boom periods for coal demand. Any future
delivery of supplies and equipment delays are expected to be temporary with limited impact on
production.
Table 22-12: Availability of Supplies and Equipment (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Disruption of availability
for supplies and
equipment.
Temporary interruption of
production.
Force majeure provision in
coal sales agreements to
limit liability for delayed or
lost sales.
3
2
6
Work closely with
customers to assure
delayed coal
delivery rather than
cancelled sales;
monitor external
conditions and
increase inventory
of critical supplies;
accelerate delivery
of equipment when
possible.
3
1
3
22.2.8.5.4
Labor
Work stoppage due to labor protests are considered to be unlikely and accompanied by limited
impact should it occur. Excellent employee relations and communications limit the exposure to
outside protesters. Loss of supervisors and skilled employees to retirement is inevitable; the impact
can be lessened with succession planning, training, and mentorship of new employees.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
68
These will be new mines in an historically United Mine Workers of America (
UMWA
) represented
area. Newer mines in the area are not represented so the precedent has been set. However, the
Residual risk is shown as slightly elevated over some other Coronado properties.
Table 22-13: Labor – Work Stoppage (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Work stoppage due to
strikes, slowdowns or
secondary boycott
activity.
Loss of production and coal
sales; damaged customer and
employee relations; reputation
loss.
Maintain excellent
employee relations and
communications; maintain
frequent customer
communications.
2
3
6
Develop plan for
employee
communications and
legal support to
minimize impact of
secondary boycott
activities.
2
3
6
Table 22-14: Labor – Retirement (Risk 13)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Retirement of supervisors
and skilled employees.
Loss of leadership and critical
skills to sustain high levels of
safety, maintenance and
productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching retirement
age; maintain employee
selection and training
programs.
3
3
9
Maintain selection of
candidates and
implementation of in-
house or third-party
training for
electricians and
mechanics; develop
employee mentoring
program.
3
2
6
23
Recommendations
Coronado is continuing to work both internally and with outside assistance to further define their
Resource Base and to Optimize the LOM Plan.
24
References
Publicly available information from various State and Federal agencies was used where relevant.
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Mon Valley Complex Upper Freeport Holdings
in Accordance with the JORC Code and
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
69
25
Reliance on Information Provided by the Registrant
A summary of the information provided by Coronado relied upon by MM&A for the purposes of this
TRS is provided in
Table 25-1
.
Table 25-1: Information from Registrant Relied Upon by MM&A
Information Provided by Coronado
Report
Section
Marketing
Long-term price forecast used in financial projections
16.2
Legal
Mineral control and surface control rights as shown on maps
3.2, 3.3
Environmental
Permit and bonding information
17.3
APPENDIX
A
MM&A QUALIFICATION
APPENDIX
B
MAPS
APPENDIX
C
GLOSSARY OF TERMS
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
ASTM International
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
modeling in the Appalachian region
CFR
Code of Federal Regulations
Coronado
Coronado Global Resources Inc.
CSR
Codes of State Rules
CSX
CSX Corporation, a rail-based freight transportation company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Interest, Taxes, Depreciation, and Amortization
EOM
End-of-mine reclamation
EPA
United States Environmental Protection Agency
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected development
option for a mineral project, which includes detailed assessments of all
applicable modifying factors together with any other relevant operational
factors, and detailed financial analysis that are necessary to demonstrate, at
the time of reporting, that extraction is economically viable. According to the
proposed definition, the results of the study may serve as the basis for a final
decision by a proponent or financial institution to proceed with, or finance,
the development of the project. Thus, a feasibility study is more
comprehensive, with a higher degree of accuracy, and yielding results with a
higher level of confidence, than a pre-feasibility study.”
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the situation
in which was originally formed or deposited
Indicated
Resources
Indicated resources are those lying between 0.4-kilometer and 1.2-kilometer
radius from such an observation point and reported herein as in-situ mineral
resources.
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Abbreviation
Definition
Inferred Resources
Inferred resources lie more than a 1.2-kilometer radius from a valid point of
measurement but less than 4.8 kilometers from one and reported herein as in-
situ mineral resources.
JORC Code
Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves
lb. SO
2
Pounds per sulfur dioxide per million British thermal units
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
LOM
Life-of-mine
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius from a valid
point of measurement and reported herein as in-situ mineral resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated Mineral
Resource. It includes dilution materials and allowances for losses, which occur
when the material is mined or extracted and is defined by studies at
Preliminary Feasibility or Feasibility level as appropriate that include
Modifying Factors. Such studies demonstrate that, at the time of reporting,
extraction of the mineral reserve is economically viable under reasonable
investment and marketing assumptions.”
Mineral Resource
“…a concentration or occurrence of solid material of economic interest or on
the Earth’s crust in such form, grade or quality that there are reasonable
prospects for eventual economic extraction. The location, quantity, grade,
continuity and other geological characteristics and continuity of a Mineral
Resource are known, estimated or interpreted from specific geological
evidence and knowledge, including sampling.”
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral Resources to Mineral Reserves.
These include, but are not restricted to, mining, processing, metallurgical,
infrastructure, economic, marketing, legal, environmental compliance, plans,
negotiations, or agreements with local individuals or groups and
governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety and Health
NS
Norfolk Southern Corporation, a rail-based freight transportation company
O&M
Operating and maintenance
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Abbreviation
Definition
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical and
economic viability of a mineral project that has advanced to a stage where a
qualified person has determined (in the case of underground mining) a
preferred mining method, or in the case of surface mining) a pit configuration,
and in all cases has determined an effective method of mineral processing and
an effective plan to sell the product. The study’s financial analysis must have
the level of detail necessary to demonstrate, at the time of reporting, that
extraction is economically viable. In addition, as noted in the proposed
definition of a pre-feasibility study, while a pre-feasibility study is less
comprehensive and results in a lower confidence level than a feasibility study,
a pre- feasibility study is more comprehensive and results in a higher
confidence level than an initial assessment.”
Property(ies)
Bituminous coal deposits located in southwestern Pennsylvania. The
Pennsylvania properties include the combined Pangburg, Shaner, and
Fallowfield underground mines in the Upper Freeport seam.
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least five years of
relevant experience in the type of mineralization and type of deposit under
consideration and in the specific type of activity that person is undertaking on
behalf of the registrant. In addition, the proposed definition requires a
qualified person to be an
eligible member or licensee in good standing of a
recognized professional organization at the
time the technical report is prepared.”
Rec.
Recovery
RECs
Recognized Environmental Conditions
Resource Database
The Resource Database is established by the collection, validation, recording,
storing and processing of data and forms the foundation necessary for the
estimation of Mineral Resource and Mineral Reserve.
A quality assurance and quality control program is essential and must be
established to govern the collection of all data. In reporting, a Mineral
Resource must meet the minimum requirement of “reasonable prospects for
economic extraction”. This will require the concurrent collection and storage
of preliminary economic, mining, metallurgical, environmental, legal and
social data and other information for use in the estimation of MRMR.
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data. It is recommended that data be stored
digitally, using a documented, standard format and a reliable storage medium
that allows for easy and complete retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional Organizations
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
S-K 1300
United States Securities and Exchange Commission Regulation S-K 1300
Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SME
Society for Mining Engineers
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary federal law
that regulates the environmental effects of coal mining in the United States.
Strip Ratio
Represented by bcm of overburden to recoverable coal tonnes
tph
tonnes per hour
TRS
Technical Report Summary
USA
United States of America
USFW
United States Fish and Wildlife
USGS
United States Geologic Survey
VALMIN Code
Australasian Code for Public Reporting of Technical Assessments and
Valuations of Mineral Assets
Vulcan™
Vulcan™ software is a product of Maptek™, a provider of software for the
global mining industry.
APPENDIX
D
JORC TABLE 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
>
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such
as downhole gamma sondes, or handheld XRF instruments, etc.). These examples should not
be taken as limiting the broad meaning of sampling.
>
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
>
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases, more explanation may be required,
such as where there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of
detailed information.
>
Most of the coal samples have been obtained from the Properties by subsurface exploration using
core drilling techniques. The protocol for preparing and testing the samples has varied over time
and is not well documented for the older holes drilled on the Properties.
>
Typical USA core drilling sampling technique is for the coal core sample, once recovered from the
core barrel, to be described then wrapped in a sealed plastic sleeve and placed into a covered core
box, which is the length of the sample so that the core can be delivered to a laboratory in relatively
intact condition and with original moisture content.
>
It is reasonable to assume, given the sophistication level of the previous operators, that these
samples were generally collected and processed under industry best-practices. This assumption is
based on MM&A’s familiarity with the operating companies and the companies used to perform
the analysis.
>
Some of the drill holes were air rotary bored and no coal core samples were collected. Seam
thickness for rotary-drilled bore holes is verified by calibrated downhole gamma-density logs.
>
Coal samples that were deemed by MM&A geologists to be unrepresentative were not used for
statistical analysis of coal quality, as documented in the tabulations. A representative group of drill
hole samples from the Properties were then checked against the original drill laboratory reports to
verify accuracy and correctness.
Drilling techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado. The majority
of the drilling was accomplished using vertical continuous (diamond) coring or air rotary methods.
>
Core drilling methods utilize NX-size (5.4 centimeter) or similar-sized core cylinders to recover core
samples, which can be used to delineate geologic characteristics, and for coal quality testing and
geotechnical logging.
>
Data for the rotary drilled holes is mainly derived from downhole geophysical logs, which are used
to interpret coal and rock thickness and depth since logging of the drill cuttings is not reliable.
>
Geophysical logging was performed on many of the holes, either by Geological Logging Systems (a
division of MM&A), other geophysical logging contractors, and on those properties acquired from
CONSOL geophysical logging was often performed by CONSOL’s in-house logging services.
Drill sample recovery
>
Method of recording and assessing core and chip sample recoveries and results assessed.
>
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
>
Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material.
>
Where available, core recovery thickness of coal samples was reconciled with the thickness
interpreted from geophysical logs.
>
Core recovery of the older coal samples lacking geophysical logs is sometimes not well-
documented: however, when the laboratory results for such holes had anomalous values, the data
was disqualified and not used.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Criteria
JORC Code explanation
Commentary
Logging
>
Whether core and chip samples have been geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
>
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
>
The total length and percentage of the relevant intersections logged.
>
A wide variety of core-logging techniques exist for the properties. For many of the core holes, the
primary data source is a generalized lithology description by the driller, in some cases
supplemented by a more detailed core log completed by a geologist.
>
The logging of core thickness and depth is quantitative. With the exception of the coal seams,
logging of rock strata type is more subjective and best considered as qualitative.
Sub-sampling
techniques and sample
preparation
>
If core, whether cut or sawn and whether quarter, half or all core taken.
>
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.
>
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
>
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.
>
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
>
Whether sample sizes are appropriate to the grain size of the material being sampled.
>
Typical US practice in the Appalachian Basin is that core samples for deep mineable core samples
are not sawn or subsampled (since seams are not of great thickness and the entire seam is mined
and co-mingled).
>
Oftentimes, core for surface-mineable coal seams are bench sampled separately by the various
coal and rock layers (plies).
>
MM&A has exercised diligence to use only those analyses that are representative of the coal
quality parameters for the appropriate mining type for each sample.
Quality of assay data
and laboratory tests
>
The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.
>
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used
in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
>
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
>
Sample analysis was typically carried out by accredited US laboratories.
>
Standard procedure upon receipt of core samples by the testing laboratory is to log the depth and
thickness of the sample, then perform testing as specified by a representative of the operating
company. Each sample is then analyzed in accordance with procedures defined under
ASTM
International (
ASTM
)
(ASTM D3174); sulfur (ASTM D4239); Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free
Swell Index (
FSI
) (ASTM D720).
>
Geophysical tools are calibrated by the logging company and where possible, validated using a
calibration hole.
Verification of
sampling and assaying
>
The verification of significant intersections by either independent or alternative company
personnel.
>
The use of twinned holes.
>
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
>
Discuss any adjustment to assay data.
>
All coal intersection data used to generate the geologic model has been cross referenced with the
lithological and geophysical logs by MM&A.
>
Laboratory quality was adjusted from dry basis to reflect the anticipated marketable product
moisture.
>
Coal quality results were verified by spot-check with laboratory analysis sheets by MM&A before
inclusion into the geologic model and use in the resource estimate.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Criteria
JORC Code explanation
Commentary
Location of data points
>
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
>
Specification of the grid system used.
>
Quality and adequacy of topographic control.
>
Due to the long history of exploration by various parties on the Properties, a wide variety of survey
techniques exist for documentation of data point locations. Many of the older exploration drill
holes appear to have been located by ground survey; more recently completed drill holes are often
located by high-resolution Global Positioning System (
GPS
) units.
>
Grid systems used are typically the State Plane Coordinate System pertinent to each property.
>
Topography is based on either the USGS topographic 7.5-minute quadrangle maps or on recent
aerial photogrammetry as necessary (subject to availability).
Data spacing and
distribution
>
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
>
Whether sample compositing has been applied.
>
Spacing and distribution of data point information may vary from seam to seam within each mining
area. The areas estimated for coal resource and coal reserve tonnes have been limited so that the
data spacing and distribution is sufficient to establish the degree of geological continuity
appropriate for the estimation and classification of the coal tonnes.
>
All of the coal resource tonnes are in the measured, indicated, and inferred categories, and all of
the coal reserve tonnes are in the proved and probable categories in accordance with the JORC
Code and SEC standards.
Orientation of data in
relation to geological
structure
>
Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type.
>
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
>
Drill holes have been vertically drilled. No downhole deviation logs have been collected and it is
therefore not known if the drill holes have deviated away from vertical. Based on the relatively
shallow seam depths, any deviation is expected to be insignificant and immaterial to the geologic
characterization of the Property.
>
The dip of the coal seams is relatively minor and not a material issue for representation of seam
thickness or quality.
Sample security
The measures taken to ensure sample security.
>
Sample handling procedures employed by explorationists follow typical US protocol and should be
adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
>
MM&A has reviewed all available geological information for the Properties in developing the
geologic model. Only that data deemed suitable has been used for the purpose of generating the
resource and reserve estimates.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
>
Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and environmental settings.
>
The security of the tenure held at the time of reporting along with any known impediments
to obtaining a licence to operate in the area.
>
The Coronado coal resources are located within three of the United State of America: Virginia;
West Virginia; and Pennsylvania. Control of these Properties is governed by many hundreds of
agreements.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
>
Coronado has represented to MM&A that it controls the mining rights to the coal deposits as
shown on its property maps, and MM&A has accepted these as being a true and accurate
depiction of the mineral rights controlled by Coronado. The TRS assumes the properties are
developed under responsible and experienced management.
>
There are no known legal or environmental encumbrances that would impede development of the
subject coal reserves.
Exploration done by
other parties
>
Acknowledgment and appraisal of exploration by other parties.
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
>
This exploration work was generally performed to prevailing US best practice standards and
deemed adequate for the purposes of this TRS.
Geology
>
Deposit type, geological setting and style of mineralisation.
>
The Coronado coal resources are located within the Northern and Central Appalachian Coal Basins.
>
The coal deposits are Carboniferous in age, being of the Pennsylvanian system.
>
Seam of economic significance typically range between 0.3 meters and 1.8 meters in thickness,
with relatively little structural deformation.
>
Regional structure is typically characterized by gently dipping strata to the northwest at less than
one percent.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Criteria
JORC Code explanation
Commentary
Drill hole Information
>
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
●
easting and northing of the drill hole collar
●
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
●
dip and azimuth of the hole
●
down hole length and interception depth
●
hole length.
>
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
>
MM&A reviewed and entered all pertinent data into a digital geologic database for each Coronado
property. The database consists of thousands of data records, which include drill hole and
supplemental coal seam thickness measurements from outcrop and mine exposures.
>
All drill holes in the database are provided with a collar elevation and the State Plane Coordinate
System easting and northing coordinate.
>
After MM&A confirmed proper coal seam thickness and correlation, the seam data was modelled
and compiled into coal resource maps.
>
The maps are provided in the TRS; however, a tabulation of the thousands of individual data
records is not practical to include.
Data aggregation
methods
>
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
>
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown in detail.
>
The assumptions used for any reporting of metal equivalent values should be clearly stated.
>
Where a coal seam has been bench sampled (typically for surface mining) the individual analyses
for the coal plies are normally weight-averaged to represent the total of recoverable coal.
>
Coal quality summary results have been documented in the TRS. Average coal quality on a per-
seam basis is used to represent the coal resources within a given mining area.
>
Average coal quality for each Coronado complex is provided in Tables 1-1, 1-2 and 1-3 of this TRS.
>
No other data aggregations methods are used.
Relationship between
mineralisation widths
and intercept lengths
>
These relationships are particularly important in the reporting of Exploration Results.
>
If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.
>
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
>
Coal thickness values from all coal intersections and down hole geophysical logs are considered to
be vertical thicknesses. Seam dip of approximately 2.0 to 3.0 degrees has little effect on the
vertical thickness of the seam.
Diagrams
>
Appropriate maps and sections (with scales) and tabulations of intercepts should be included
for any significant discovery being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate sectional views.
>
Diagrams and maps showing the coal seam intercepts are presented in the TRS.
Balanced reporting
>
Where comprehensive reporting of all Exploration Results is not practicable, representative
reporting of both low and high grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
>
All of the available, qualified exploration data has been included within the tabulations, maps, and
diagrams for this TRS.
>
Both coal thickness and quality data are deemed by MM&A to be reasonably sufficient within the
resource areas. Therefore, there is a reasonable level of confidence in the geologic interpretations
required for coal resource determination based on the available data and the techniques applied
to the data.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
>
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey results;
bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.
>
Informational material available from the U.S. Geological Survey and the respective State Surveys
was used to assist in the Resource estimate.
Further work
>
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
>
Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially
sensitive.
>
Further work is expected to include additional exploration, geotechnical testing, coal quality
analyses, and coal property acquisition.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database integrity
>
Measures taken to ensure that data has not been corrupted by, for example, transcription or
keying errors, between its initial collection and its use for Mineral Resource estimation
purposes.
>
Data validation procedures used.
>
MM&A confirmed coal seam thickness and correlations in databases used for coal deposit
modelling. Representative records were spot-checked for data entry validation.
>
Geophysical logs were used wherever available to assist in confirming the seam correlation and to
verify proper seam thickness measurements and recovery of coal samples.
Site
visits
>
Comment on any site visits undertaken by the Competent Person and the outcome of those
visits.
>
If no site visits have been undertaken indicate why this is the case.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Geological
interpretation
>
Confidence in (or conversely, the uncertainty of) the geological interpretation of the mineral
deposit.
>
Nature of the data used and of any assumptions made.
>
The effect, if any, of alternative interpretations on Mineral Resource estimation.
>
The use of geology in guiding and controlling Mineral Resource estimation.
>
The factors affecting continuity both of grade and geology.
>
Due to the relative structural simplicity of the deposits and the reasonable continuity of the tabular
coal beds, the principal geological interpretation necessary to define the geometry of the coal
deposits is the proper modeling of their thickness and elevation.
>
Both coal thickness and quality data are deemed by MM&A to be reasonable within the resource
areas.
>
Therefore, there is a reasonable level of confidence in the geologic interpretations required for coal
resource determination based on the available data and the techniques applied to the data.
Dimensions
>
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral
Resource.
>
The subject coal resource areas mostly exist in discreet, individual deposits of highly variable
dimensions, shapes and depth below the ground surface.
>
Such factors are best depicted in the maps contained in the TRS.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of the TRS.
Estimation
and
modelling techniques
>
The nature and appropriateness of the estimation technique(s) applied and key assumptions,
including treatment of extreme grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If a computer assisted estimation
method was chosen include a description of computer software and parameters used.
>
The availability of check estimates, previous estimates and/or mine production records and
whether the Mineral Resource estimate takes appropriate account of such data.
>
The assumptions made regarding recovery of by-products.
>
Estimation of deleterious elements or other non-grade variables of economic significance (e.g.
sulphur for acid mine drainage characterisation).
>
Geological data was imported into Carlson Mining
®
®
) geological modelling
software in the form of Microsoft
®
picks, bottom seam elevations and raw and washed coal quality. These data files were validated
prior to importing into the software.
>
Once imported, a geologic model was created.
>
The geological model was verified and reviewed.
>
Resources were estimated by defining seam thickness at each point of observation and by defining
resource confidence arcs around the points of observation.
>
Points of observation for Measured and Indicated confidence arcs were defined for all drill holes
that intersected the seam.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Criteria
JORC Code explanation
Commentary
>
In the case of block model interpolation, the block size in relation to the average sample
spacing and the search employed.
>
Any assumptions behind modelling of selective mining units.
>
Any assumptions about correlation between variables.
>
Description of how the geological interpretation was used to control the resource estimates.
>
Discussion of basis for using or not using grade cutting or capping.
>
The process of validation, the checking process used, the comparison of model data to drill
hole data, and use of reconciliation data if available.
>
As prescribed by the common United States classification system the following distances from points
of observation were used to define the corresponding Resource category arcs:
-
Inferred Resources – greater than 3,960 feet (1.2 kilometers) but less than 15,840 feet (4.8
kilometers)
-
Indicated Resources – 3,960 feet (1.2 kilometers)
-
Measured Resources – 1,320 feet (0.4 kilometers)
>
The use of the standards commonly used in the United States are appropriate and customary for
this resource jurisdiction and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s
have elected not to extend arc distances, introducing a level of conservatism in the coal
classification.
Moisture
>
Whether the tonnages are estimated on a dry basis or with natural moisture, and the method
of determination of the moisture content.
>
Coal resource tonnes are presented on a dry, in-situ basis.
>
Reserve tonnes are presented on a moist basis at anticipated product moisture ranging from 4.0 to
6.0 percent. Moisture content based on historic analyses of shipped coal.
Cut-off Parameters
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and other mining operations of the Central Appalachian coal basin. This
experience includes technical and economic evaluations of numerous properties in the region for
the purposes of determining the economic viability of the subject coal reserves.
Mining factors or
assumptions
Assumptions made regarding possible mining methods, minimum mining dimensions and
internal (or, if applicable, external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual economic extraction to consider
potential mining methods, but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not always be rigorous. Where this is the
>
Mining factors such as dilution, mining and washing recovery are variable and have been applied at
the coal deposits at each operation based on site-specific characteristics.
>
Details of the factors are cited within the TRS.
>
Factors that would typically preclude conversion of a coal resource to coal reserve include the
following: inferred resource classification; absence of coal quality; poor mine recovery; lack of
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
case, this should be reported with an explanation of the basis of the mining assumptions
made.
access; insufficient exploration; or uncontrolled surface property for areas of proposed for surface
mining.
>
While such factors were used to preclude the conversion of a very limited number of coal resources
to coal reserves in this report, the extensive history of mining on the Properties would suggest that
there are reasonable prospects for eventual economic extractions of all coal resources under
favorable market conditions.
Metallurgical factors
or assumptions
>
The basis for assumptions or predictions regarding metallurgical amenability. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider potential metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters made when reporting Mineral Resources
may not always be rigorous. Where this is the case, this should be reported with an
explanation of the basis of the metallurgical assumptions made.
>
The products mined from coal resources controlled by Coronado can be sold into high-, mid-, and
low-volatile metallurgical coal markets because of their inherent quality characteristics.
>
Run-of-mine production is washed at the coal preparation plants as needed for quality control.
>
Coronado may blend production from multiple sources to manage ash and sulfur content along with
the rheological and petrographic characteristics of the shipped products.
Environmental factors
or assumptions
>
Assumptions made regarding possible waste and process residue disposal options. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider the potential environmental impacts of the mining and processing
operation. While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the status of early
consideration of these potential environmental impacts should be reported. Where these
aspects have not been considered this should be reported with an explanation of the
environmental assumptions made.
>
MM&A completed a Limited Phase I Environmental Site Assessment (ESA) on the Buchanan
property in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf of
Coronado. Coronado reports not having conducted such a study since the MM&A studies.
>
The ESAs completed by MM&A included a site inspection, review of historical records, a database
search of State and Federal regulatory records and interviews to identify potential recognized
environmental conditions (RECs) that may create environmental liability for the sites.
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area. Coronado reported to MM&A that satisfactory clean-up efforts were completed
at Greenbrier.
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws. Estimated costs for mine closure, including water quality monitoring during
site reclamation, are included in the TRS financial models.
Bulk density
>
Whether assumed or determined. If assumed, the basis for the assumptions. If determined,
the method used, whether wet or dry, the frequency of the measurements, the nature, size
and representativeness of the samples.
>
The bulk density for bulk material must have been measured by methods that adequately
account for void spaces (vugs, porosity, etc), moisture and differences between rock and
alteration zones within the deposit.
>
Discuss assumptions for bulk density estimates used in the evaluation process of the different
materials.
>
Laboratory derived seam densities measured in specific gravity were used where available. As
needed, these data were supplemented by estimated seam density values based on the relative
proportion of coal and non-coal material within the seam (typically at 1.30 and 2.25 specific gravity,
respectively).
>
Average seam density was determined for each coal deposit and used to convert coal volumes into
coal tonnage estimates.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
Classification
>
The basis for the classification of the Mineral Resources into varying confidence categories.
>
Whether appropriate account has been taken of all relevant factors (i.e. relative confidence in
tonnage/grade estimations, reliability of input data, confidence in continuity of geology and
metal values, quality, quantity and distribution of the data).
>
Whether the result appropriately reflects the Competent
>
Person’s view of the deposit.
>
The Resource has been classified based on suitable distances from points of observations prescribed
in the common United States classification system.
>
The use of the United States standards is appropriate and customary for this resource jurisdiction
and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s
have elected not to extend arc distances, introducing a level of conservatism in the coal
classification.
>
All relevant factors have been accounted for and reflect the Competent Person’s view of the
deposit.
Audits or reviews
>
The results of any audits or reviews of Mineral Resource estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017. MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on U.S.
Securities and Exchange Commission (SEC) Industry Guide 7 and USGS Circular 891 standards.
>
Earlier audits were performed by various independent consultants for predecessors-in-title to
Coronado and at various levels of detail depending on the clients concerns and the allotted time for
completion. Previous audits and reviews defined the primary coal resource areas and estimated the
recoverable tonnes for each seam based on the expected mining methods.
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
>
Where appropriate a statement of the relative accuracy and confidence level in the Mineral
Resource estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the
relative accuracy of the resource within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors that could affect the relative
accuracy and confidence of the estimate.
>
The statement should specify whether it relates to global or local estimates, and, if local, state
the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
These statements of relative accuracy and confidence of the estimate should be compared
with production data, where available.
>
The relative accuracy of and confidence in the coal tonnage and quality estimates provided herein
are judged to be in conformance with current industry best-practices.
>
The representation of average coal quality characteristics should be understood to represent a
reasonably representative sampling that is generally indicative of coal quality and does not
represent a statistically rigorous approach to coal quality modeling.
>
Resource estimation has been completed using standard coal estimation methods which are
deemed appropriate for this deposit.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for conversion
to Ore Reserves
>
Description of the Mineral Resource estimate used as a basis for the conversion to an Ore
Reserve.
>
The coal resource estimate was prepared as part of the report Coronado Global Resources Inc.
Statement of Coal Resources and Reserves in Accordance with JORC Code and United States SEC
Standards as of December 31, 2022 – Northern and Central Appalachian Coal Basins – Virginia,
West Virginia and Pennsylvania, USA – February 2023 prepared by MM&A.
>
The resource estimation criteria were developed by MM&A based on the capabilities of the mining
equipment used within the production model and on industry-accepted standards to assure that
the basic geologic characteristics of the coal resources are in reasonable conformity with those to
be mined and marketed by Coronado.
>
Clear statement as to whether the Mineral Resources are reported additional to, or inclusive
of, the Ore Reserves.
>
Coal resources generally are reported inclusive of the coal reserves. In some cases, resources are
reported in addition to coal reserves. Tables 1-1 and 11-3 of the TRS clearly identify resources
“inclusive of mine plan” from which coal reserves were estimated along with those resources
“exclusive of mine plan” from which no reserves were estimated.
Site visits
>
Comment on any site visits undertaken by the Competent Person and the outcome of those
visits.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Study status
>
The type and level of study undertaken to enable Mineral Resources to be converted to Ore
Reserves.
>
A preliminary feasibility LOM plan was prepared by MM&A for active and proposed mines.
>
The Code requires that a study to at least Pre-Feasibility Study level has been undertaken to
convert Mineral Resources to Ore Reserves. Such studies will have been carried out and will
have determined a mine plan that is technically achievable and economically viable, and that
material Modifying Factors have been considered.
>
This geologic evaluation conducted in accordance with JORC and SEC standards and in conjunction
with the preliminary feasibility study is sufficient to conclude that the surface, highwall miner and
underground coal reserves identified on the Properties are economically mineable under
reasonable expectations of market prices for thermal and metallurgical coal products, estimated
operation costs, and capital expenditures.
>
The pre-feasibility financial models, prepared by MM&A for this TRS, was developed to test the
economic viability of each coal resource area.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
Cut-off parameters
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and are typical of mining operations in the Central Appalachian coal basin.
This experience includes technical and economic evaluations of numerous properties in the region
for the purposes of determining the economic viability of the subject coal reserves.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Criteria
JORC Code explanation
Commentary
Mining factors or
assumptions
>
The method and assumptions used as reported in the Pre-Feasibility or Feasibility Study to
convert the Mineral Resource to an Ore Reserve (i.e. either by application of appropriate
factors by optimisation or by preliminary or detailed design).
>
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of economic interest were used to generate a geologic model.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines. MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
Production timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas.
>
The choice, nature and appropriateness of the selected mining method(s) and other mining
parameters including associated design issues such as pre-strip, access, etc.
>
The room-and-pillar mining method was selected to model the underground mining resources,
utilizing continuous miners for coal extraction, shuttle cars for production section haulage and roof
bolters for roof control, with the exception that the Buchanan Mine also uses longwall shearers,
armored face conveyors, and hydraulic self-advancing roof support. The resource areas located
above drainage are relatively small and often have irregular boundaries.
The Buchanan Mine in
Buchanan County, Virginia is the only active longwall mine currently being operated by Coronado.
>
The Coronado underground mining resource areas which are located above-drainage require an
access road and mine access development along the outcrop, whereas below-drainage mines are
accessed via shaft or slope based on other proposed surface infrastructure locations and/or
surface property control.
>
The surface mining method selected utilizes highly productive hydraulic shovels, front-end loaders,
large tractors and rock trucks for overburden removal. The mobile equipment spreads adapt
readily to winding coal outcrops for contour surface mining and are effective for point-removal
and area mining applications.
>
Application of highwall and auger mining units is an effective method to recover coal resources not
suitable for underground mining and under excessive cover for surface mining.
>
The assumptions made regarding geotechnical parameters (e.g. pit slopes, stope sizes, etc.),
grade control and pre-production drilling.
>
Mining plans for potential underground mines were developed by MM&A. Pillar stability was
tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS
) program that was developed by
the
National Institute for Occupational Safety and Health (
NIOSH
)
.
>
Coronado must obtain approved mining plans from
United States Department of Labor Mine
Safety and Health Administration (
MSHA
)
that define safety parameters for the highwalls
developed during contour and area mining. MM&A’s planning model does not require input of
specific highwall design parameters, but provides for timing of mining within mine plan polygons
that is representative of the operation performance attained at Central Appalachia surface mines.
>
Highwall and auger mining is conducted under highwalls designed and constructed to meet MSHA
permit requirements. To better assure highwall stability and safety during highwall coal
extraction, MSHA requires that coal fenders, or stumps, be left in place between successive cuts.
Periodic barrier pillars must be left in place as an additional safeguard. MM&A has adjusted the
expected mining recovery for highwall and auger mining resources to reflect highwall stability and
safety requirements.
>
The major assumptions made and Mineral Resource model used for pit and stope
optimisation (if appropriate).
>
Underground Mining Resources: For metallurgical resources, minimum coal seam thickness
extends down to between 0.6 and 1.2 meters and a minimum overburden (depth of cover) of 30.5
meters. A 61-meter horizontal distance is maintained from abandoned mines and sealed or
pillared areas, and a 30-meter horizontal distance is maintained from planned highwall miner
panels. Mine recovery is reduced when a rider coal seam is present within a 1.5- to 3.0-meter
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
interval above the coal seam. No mining is projected when the interval between overlying and
underlying reserves is less than 12 meters.
>
Surface Mining Resources: For classification as a surface-mineable resource, a seam must be at
least 0.3 meters in thickness as a stand-alone (principle) seam and 0.15 meters in thickness when
less than 0.8 meters from a principal seam. The maximum cumulative area mining strip ratio is
generally 20:1 for thermal coal and 30:1 for metallurgical coal. Some areas were assessed for their
economic viability at higher ratios, and were included as reserves if deemed economic. For
contour surface mining, a minimum of 38-meter bench is provided to support HWM.
>
HWM and Auger Mining Resources: HWM cut depth (penetration) is established at a maximum of
244 meters. The minimum mineable coal thickness is limited at 0.6 meters. For coal seams less
than 0.8 meters thick, roof and/or floor characteristics must allow OSD cutting to maintain a 0.8-
meter minimum cutting height.
Auger mining cut depth is established at an average of 91 meters.
The minimum mineable coal thickness is limited at 0.5 meters.
>
The mining dilution factors used.
>
Underground Mining Reserves: The planning model assigns minimum mining heights of 1.4 to 1.8
meters for mains and panel development. At the Buchanan Mine, a minimum mining height of 1.8
meters was used due to the longwall mining method being employed. For coal seams thinner than
the assigned mining height, the difference between the coal seam height and assigned mining
height consists of OSD. In all cases a minimum of 0.05 meters of OSD was assumed, with the
exception of the Mon Valley mines, where a minimum 0.15 meters of OSD was assumed due to
weaker floor strata.
>
Surface Mining Reserves: Area mining is generally limited to a cumulative overburden ratio of 30:1
and a 15:1 ratio for contour mining. Exceptions were considered for mining of metallurgical grade
coal where deemed economical. It is assumed that careful cleaning of exposed coal pits will result
in minimal OSD.
>
HWM and Auger Mining Reserves: The mining plan assumes that the HWM cutting height is a
minimum of 76 to 99 centimeters for clearance purposes. When the coal seam is less than 76 to
99 centimeters thick, OSD assumed and included in the ROM product.
Because the auger has very
limited OSD cutting ability, it is assumed that an appropriate auger diameter will be chosen based
on the coal seam thickness and that OSD will be minimal.
>
The mining recovery factors used.
>
Underground Mining Reserves: Mine recovery generally varies between 40 and 60 percent for
continuous mining panels, and 100 percent for longwall.
>
Surface Mining Reserves: Mining recovery is 90 percent for virgin areas. Mining recovery is
reduced where second mining is projected in previously underground and auger mined areas.
>
HWM and Auger Mining Reserves: A mine recovery of 40 percent has been applied for HWM.
A
mine recovery of 35 percent has been applied for auger mining.
>
Any minimum mining widths used.
>
Underground Mining Reserves: Typical entry width is 5.8 to 6.1 meters.
>
The manner in which Inferred Mineral Resources are utilised in mining studies and the
sensitivity of the outcome to their inclusion.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
>
Mine plan LOM tonnage includes inferred coal and those areas that do not meet the minimum coal
thickness requirement for classification as reserve. Inferred coal represents approximately 0.6% of
the LOM production for Mon Valley and 0.000001% of the total LOM production for Logan. None
of this coal was included in the estimate of reserves.
>
The infrastructure requirements of the selected mining methods.
>
Underground Mining Resources: The continuous mining method provides for the extraction of
coal from the production faces using continuous miners (and longwall shearing machine at
Buchanan) and haulage using shuttle cars or battery haulers to a feeder-breaker located at the tail
of the section conveyor belt. The feeder-breaker crushes large pieces of coal and rock and
regulates coal feed onto the mine conveyor. A chain conveyor is used to remove coal from the
longwall face at the Buchanan Mine for placement onto the conveyor belt which is ultimately
delivered to an underground storage bunker. Roof-bolting machines are used to install roof bolts,
and battery scoops are available to clean the mine entries and assist in delivery of mine supplies to
work areas. Surface ventilation fans are installed as needed to provide a sufficient volume of air
to ventilate production sections, coal haulage and transport entries, battery charging stations, and
transformers in accordance with approved plans.
>
Coronado currently operates three coal preparation plants, one each at the Buchanan, Logan
County and Greenbrier Divisions. The Buchanan Plant operates at a feed rate of approximately
907 raw tonnes per hour (
tph
), whereas the Saunders Plant (Logan County Division) has a nominal
feed rate of 816 tph, and the Mountaineer Plant (Greenbrier Division) operates at 544 tph.
MM&A
has included capital estimates for construction of additional coal preparation plants at the Russell
County and Mon Valley Complex for the purposes of this TRS.
>
Surface Mining Resources: The surface mining mobile equipment spreads advance the contour and
area mining pits while systematically reclaiming the trailing side of pits where coal has been
removed. The coal haul roads are extended and maintained as the pits advance. Support facilities
are maintained nearby but away from the active mining, and include storage areas for blasting
agents, fuel and lubricants, and mine supplies along with maintenance facilities and offices. Most
of the surface mine production is transported to a loading point for crushing, blending and direct-
shipment to customers.
>
HWM and Auger Resources: The HWM equipment advances along with the contour mining pits.
The rate of advance of the contour mining is governed by the advancement rate of the HWM. A
diesel-powered generator trails the highwall miner and powers the continuous mining unit. Other
support facilities are provided along with the contour mining support facilities. HWM production
is all transported by truck to the coal preparation plant for washing.
Metallurgical factors or
assumptions
>
The metallurgical process proposed and the appropriateness of that process to the style of
mineralisation.
>
Coarse material is washed in a heavy medium vessel. Intermediate-size material is washed in
heavy medium cyclones. Fine material is washed using conventional froth flotation cells.
>
Whether the metallurgical process is well-tested technology or novel in nature.
>
Processes are typical of those used in the coal industry and are in use at adjacent coal processing
plants.
>
The nature, amount and representativeness of metallurgical test work undertaken, the
nature of the metallurgical domaining applied and the corresponding metallurgical recovery
factors applied.
>
The quality characteristics for the subject coal resources and coal reserves have been reviewed in
detail by MM&A. The drill hole data were utilized to develop average coal quality characteristics
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
mining site. These average coal quality characteristics were then utilized as the basis for
determining the various markets into which the saleable coal will likely be placed.
>
Any assumptions or allowances made for deleterious elements.
>
No significant effects on product quality are anticipated from dilution material; float product
quality was used to model final product quality.
>
The existence of any bulk sample or pilot scale test work and the degree to which such
samples are considered representative of the orebody as a whole
>
No bulk sample or pilot scale work has been completed.
>
For minerals that are defined by a specification, has the ore reserve estimation been based
on the appropriate mineralogy to meet specifications?
>
Notwithstanding the complexity of the coal quality data set, the seams of the central and northern
Appalachian coalfields have a long history of providing both high-Btu thermal coals and high-, mid-
and low-volatile coking coals with favorable metallurgical properties.
Environmental
>
The status of studies of potential environmental impacts of the mining and processing
operation. Details of waste rock characterisation and the consideration of potential sites,
status of design options considered and, where applicable, the status of approvals for
process residue storage and waste dumps should be reported.
>
MM&A completed a Limited Phase I Environmental Site Assessment (
ESA
) on the Buchanan
property in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf
of Coronado.
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area. Coronado reported to MM&A that satisfactory clean-up efforts were
completed at Greenbrier.
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws. Estimated costs for mine closure, including water quality monitoring during
site reclamation, are included in the TRS financial models.
Infrastructure
>
The existence of appropriate infrastructure: availability of land for plant development, power,
water, transportation (particularly for bulk commodities), labour, accommodation; or the ease
with which the infrastructure can be provided or accessed.
>
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine Complex);
Coronado also controls the idle Midland Surface Mine at the Greenbrier Mine Complex.
>
Coronado operates five underground mines as follows: Buchanan Mine at the Buchanan Mine
Complex; Winifrede, Eagle No. 1, Muddy Bridge and Lower War Eagle Mines in the Logan Mine
Complex; the Mountaineer #1 Mine at the Greenbrier Mine Complex is currently idle.
>
All ROM production is currently planned for either truck transportation from the mines to the
processing or shipping facilities, or in some cases there is either a current or planned mine mouth
preparation plant and barge/rail loading facility.
>
There is a network of public highways that provide serviceable coal haul routes and private,
internal roads on the Properties would be developed as may be needed. Rail service to the
Properties is most readily provided by NS and CSX
with connections to both domestic consumers
and international trans-shipment points. NS track is located across the Monongahela River from
the proposed Pangburn Hollow load-out facility. Coal would be shipped to customers via barge
and rail and sold as both metallurgical and thermal products.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
Costs
>
The derivation of, or assumptions made, regarding projected capital costs in the study.
>
The methodology used to estimate operating costs.
>
Coronado provided historical and 5-year budget operating costs for its active mines for MM&A’s
review. MM&A used the historical and/or budget cost information as a reference and developed
personnel schedules for each mine. Hourly labor rates and salaries were based upon information
contained in Coronado’s financial summaries. Fringe benefit costs were developed for vacation
and holidays, federal and state unemployment insurance, retirement, workers’ compensation and
pneumoconiosis, casualty and life insurance, healthcare and bonuses. A cost factor for mine
supplies was developed that relates expenditures to mine advance rates for roof control costs and
other mine supply costs at underground mines. Other factors were developed for maintenance
and repair costs, rentals, mine power, outside services and other direct mining costs.
>
Surface mine direct operating costs were developed as a function of overburden ratio for repair
and maintenance supplies, diesel fuel, explosives and blasting, and miscellaneous supplies and
services. Operating costs for highwall mines are based on costs per ROM tonne estimates. Other
cost factors were developed for coal preparation plant processing, refuse handling, coal loading,
trucking, property taxes, and insurance and bonding. Appropriate royalty rates were assigned for
production from leased coal lands and sales taxes were calculated for state severance taxes, the
federal black lung excise tax, and federal and state reclamation fees.
>
Capital schedules were developed by MM&A for mine development, infrastructure, and on-going
capital requirements for the life of each projected mine.
>
Staffing levels were prepared and operating costs estimated by MM&A for each projected mine.
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience
to estimate direct and indirect operating costs.
>
Allowances made for the content of deleterious elements.
>
No allowances have been made for deleterious elements; no impact to quality from deleterious
elements is anticipated.
>
The derivation of assumptions made of metal or commodity price(s), for the principal
minerals and co- products.
>
Coronado provided MM&A with price forecasts for all Properties. Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges. Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne. MM&A utilized this data for price
forecasting in financial modeling.
>
Derivation of transportation charges.
>
Coronado provided MM&A with price forecasts for all Properties. Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges. Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne. MM&A utilized this data for price
forecasting in financial modeling.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
>
The basis for forecasting or source of treatment and refining charges, penalties for failure to
meet specification, etc.
>
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience
to estimate direct and indirect operating costs. All ROM production is currently planned for either
truck transportation from the mines to the processing or shipping facilities, or in some cases there
is either a current or planned mine mouth preparation plant and barge/rail loading facility.
>
The allowances made for royalties payable, both Government and private.
>
Appropriate royalty rates were assigned for production from leased coal lands and sales taxes were
calculated for state severance taxes, the federal black lung excise tax, and federal and state
reclamation fees.
Revenue factors
>
The derivation of, or assumptions made regarding revenue factors including head grade,
metal or commodity price(s) exchange rates, transportation and treatment charges,
penalties, net smelter returns, etc.
>
Coronado provided MM&A with price forecasts for all Properties. Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges. Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne. MM&A utilized this data for price
forecasting in financial modeling.
>
The derivation of assumptions made of metal or commodity price(s), for the principal metals,
minerals and co-products.
>
Coal sales prices as defined above. All reported reserves are on a marketable basis.
Market assessment
>
The demand, supply and stock situation for the particular commodity, consumption trends
and factors likely to affect supply and demand into the future.
>
Coronado provided MM&A with price forecasts for all Properties. Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges. Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne. MM&A utilized this data for price
forecasting in financial modeling.
>
A customer and competitor analysis along with the identification of likely market windows
for the product.
>
All of the mine production serves metallurgical and thermal markets. The metallurgical coal is
marketed as high-volatile (typically 28 percent or greater volatile matter content); mid-volatile
(typically 23- to 27-percent volatile matter content) and low-volatile (typically less than 23 percent
volatile matter content) products.
>
Raw ROM production that requires washing is currently processed through Coronado owned and
operated coal preparation plants.
>
ROM coal that does not require further processing is delivered directly to the loading points for
sizing and delivery to customers. Coronado has access to two rail-loading points serviced by the
Norfolk Southern Corporation (
NS
)
CSX Corporation (
CSX
)
.
>
Price and volume forecasts and the basis for these forecasts.
>
Carlson Mining
®
mineable coal seams. Underground mine plans were sequenced based on productivity schedules
provided by Coronado, which were based on historically achieved productivity levels. Surface mine
plans were generated under productivity assumptions (bank cubic yard per shift) as provided by
Coronado and reviewed by MM&A, again based heavily on productivity levels achieved by
Coronado. All production forecasting ties assumed production rates to geological models as
constructed independently by MM&A’s team of geologists and mining engineers.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
>
Coronado provided MM&A with price forecasts for all Properties. Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges. Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne. MM&A utilized this data for price
forecasting in financial modeling.
Economic
>
The inputs to the economic analysis to produce the net present value (NPV) in the study, the
source and confidence of these economic inputs including estimated inflation, discount rate,
etc.
>
On an unlevered basis, the NPV of the project cash flows after taxes was estimated for the purpose
of classifying coal reserves. The project cash flows, excluding debt service, are calculated by
subtracting direct and indirect operating expenses and capital expenditures from revenue. Direct
costs include labor, drilling and blasting, operating supplies, maintenance and repairs, facilities
costs for materials handling, coal preparation, refuse disposal, coal loading, sampling and analysis
services, reclamation and general and administrative costs. Indirect costs include statutory and
legally agreed upon fees related to direct extraction of the mineral. The indirect costs are the
Federal black lung tax, Federal and State reclamation taxes, property taxes, local transportation
prior to delivery at rail or barge loading sites, coal production royalties, sales and use taxes, income
taxes and State severance taxes. Coronado’s historical costs provided a useful reference for
MM&A’s cost estimates.
>
Coronado provided MM&A with price forecasts for all Properties. Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges. Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne. MM&A utilized this data for price
forecasting in financial modeling.
>
All costs and prices are based on 2022 nominal United States dollars.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines. MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
Production timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas,
which is projected for the year 2100.
>
The all-mines average cash cost ranges between approximately $65 and $317 per tonne for most
of the operating period.
>
NPV ranges and sensitivity to variations in the significant assumptions and inputs.
>
An estimate of NPV at a base discount rate of 10.0% was included in Section 19 of the TRS.
>
NPV of the Buchanan, Russell, Mon Valley, Logan and Greenbrier Properties was estimated to be
$1.562 billion, $92.2 million, $168.3 million, $366.6 million and $62.7 million, respectively.
>
The sensitivity study shows the NPV at the 10.0% discount rate when Base Case sales prices,
operating costs, and capital costs are increased and decreased in increments of 5% within a +/-
15% range.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
Social
>
The status of agreements with key stakeholders and matters leading to social license to
operate.
>
Portions of the properties are located near local communities. Regulations prohibit mining
activities within 91 meters of a residential dwelling, school, church, or similar structure unless
written consent is first obtained from the owner of the structure. Where required, such consents
have been obtained where mining is proposed beyond the regulatory limits.
Other
To the extent relevant, the impact of the following on the project and/or on the estimation and
classification of the Ore Reserves:
>
Any identified material naturally occurring risks.
>
No material naturally occurring risks have been identified.
>
The status of material legal agreements and marketing arrangements.
>
The Coronado coal resources are located in Buchanan, Russell and Tazewell Counties, Virginia;
Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties, West Virginia; Allegheny,
Washington and Westmoreland Counties, Pennsylvania.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
>
Coronado has represented to MM&A that it controls the mining rights to the reserves as shown on
its property maps, and MM&A has accepted these as being a true and accurate depiction of the
mineral rights controlled by Coronado. The TRS assumes the properties are developed under
responsible and experienced management.
>
The status of government agreements and approvals critical to the viability of the project,
such as mineral tenement status and government and statutory approvals. There must be
reasonable grounds to expect that all necessary Government approvals will be received
within the timeframes anticipated in the Pre-Feasibility or Feasibility study. Highlight and
discuss the materiality of any unresolved matter that is dependent on a third part on which
extraction of the reserve is contingent.
>
Coronado has obtained all mining and discharge permits to operate 34 underground mines, 13
surface mines, and 18 processing, loadout or related facilities. MM&A is unaware of any obvious
or current Coronado permitting issues that are expected to prevent the issuance of future permits.
Coronado, along with all Central and Northern Appalachian basin coal producers, is subject to a
level of uncertainty regarding future clean water permits due to
United States Environmental
Protection Agency
(
EPA
)
Classification
>
The basis for the classification of the Ore Reserves into varying confidence categories.
Whether the result appropriately reflects the Competent Person’s view of the deposit. The
proportion of Probable Ore Reserves that have been derived from Measured Mineral
Resources (if any).
>
Measured and indicated resources have been converted to proved and probable reserves,
respectively.
>
None of the probable coal reserves have been derived from measured resources.
>
In a limited number of cases where there was only very limited data available to demonstrate the
metallurgical suitability of a given coal deposit, that deposit was classified as a probable reserve
instead of a proved reserve.
>
The results of this TRS define an estimated total initial ROM recoverable ore (coal) reserve
estimate of 551 million tonnes for Coronado as follows:
a)
Buchanan = 154 Mt
b)
Logan = 138 Mt
c)
Greenbrier= 12 Mt
d)
Russell = 50 Mt
e)
Mon Valley = 197 Mt
>
Coronado controls a total of 334 Mt (moist basis) of marketable coal reserves for Coronado as of
December 31, 2022 (total may not add due to rounding). Of that total, 74 percent are proved, and
26 percent are probable. Total reserves by complex are as follows:
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
a)
Buchanan = 93 Mt
b)
Logan = 71 Mt
c)
Greenbrier= 7 Mt
d)
Russell = 30 Mt
e)
Mon Valley = 134 Mt
Audits or reviews
>
The results of any audits or reviews of Ore Reserve estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017. MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on
U.S.
Securities and Exchange Commission (
SEC
)
performed by various independent consultants for predecessors-in-title to Coronado and at
various levels of detail depending on the clients concerns and the allotted time for completion.
Previous audits and reviews defined the primary coal resource areas and estimated the
recoverable tonnes for each seam based on the expected mining methods.
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
>
Where appropriate a statement of the relative accuracy and confidence level in the Ore
Reserve estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the
relative accuracy of the reserve within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors which could affect the relative
accuracy and confidence of the estimate.
>
Operations on the Properties by Coronado and its predecessors have been on-going for many
years.
>
MM&A is confident that the mine plans and financial models are reasonably representative to
provide an accurate estimation of coal reserves.
>
Mine development and operation have not been optimized within the TRS.
>
The statement should specify whether it relates to global or local estimates, and, if local,
state the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost),
marketing, legal, environmental, socioeconomic, and regulatory factors on a global scale as current
local data reflects the global assumptions.
>
Accuracy and confidence discussions should extend to specific discussions of any applied
Modifying Factors that may have a material impact on Ore Reserve viability, or for which
there are remaining areas of uncertainty at the current study stage.
The major risk factors for the active Coronado mines and future resource development are
summarized below:
>
Mine Accidents
>
Highwall Failure. Highwall failures are likely to result in a temporary mine closure and should not
have a material impact on the mine sustainability. The risk is considered to be probable.
>
Adverse Geological Conditions. Adverse geological conditions include such conditions as faults and
sandstone washouts. The risk is considered to be probable. The impact is expected to be
temporary with little material impact on mine sustainability.
>
Environmental Risk. Numerous federal and state permits are required to operate coal mines and
mine surface facilities. Permitting rules are complex and may change over time, making
compliance difficult or impossible.
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
Virginia, West Virginia and Pennsylvania, USA
Appendix D: JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Criteria
JORC Code explanation
Commentary
>
Water Quality. Permit requirements to fulfill Clean Water Act obligations are subject to
modification. The probability of water quality changes having a material impact on mine
operations is possible. As a contemporary example, the selenium discharge issue that affects
western Canadian and Central Appalachian Basin operators has only recently emerged as a
concern and its ultimate impact has not been determined.
>
New Permits. Permit protests by environmental groups and individuals can contribute to permit
delays or denial and increase the cost of permitting and delay development. Surface mining
activities, coal refuse disposal and construction of access roads in mountainous terrain often
require storage of material in valley fills. Authority to dispose of fill material into waters of the
United States must be granted by the
United States Army Corps of Engineers (
COE
)
. COE permits
are increasingly difficult to obtain.
>
Regulatory Requirements. Adverse impact from regulatory changes is considered to be probable.
The impact will likely affect the broader industry and is not expected to result in mine closure.
>
Market Risk. Metallurgical and thermal coal markets ultimately depend upon the global steel and
thermal coal demand and are considered to be volatile. Currently, the US coal market has seen a
decline in demand for thermal coal due to thermal plant closures, as a result of new air and water
pollution regulations, and competition from other commodities used for power generation such as
natural gas. This has resulted in an overall decline in CAPP coal production. Continued regulatory
changes and declining demand could result in material changes in domestic and global coal
markets. The impact cannot be predicted at this time; however, while MM&A expects the coal
reserve within this TRS to remain economically viable throughout the life of the projected mines,
the LOM financial model is very sensitive to changes in coal sales price and therefore market risk is
not insignificant.
>
Labor Risk. Work stoppage due to organized labor protests is considered to be unlikely and not
likely to lead to permanent mine closure. The mines are likely to suffer the loss of key supervisors
and skilled employees due to retirement as the workforce ages. The problem is industry-wide and
the impact is expected to be temporary and have no sustained impact on coal production.
>
Availability of Equipment and Supplies. Risk of equipment and supply availability is likely to be
temporary and should not have a sustained adverse impact on the production of coal.
>
Transportation Delay. Interruption of coal transport services by river or rail is considered to be
probable but unlikely to have a sustained impact on coal production.
>
It is recognised that this may not be possible or appropriate in all circumstances. These
statements of relative accuracy and confidence of the estimate should be compared with
production data, where available.
>
Mine plans, productivity expectations and cost estimates generally reflect historical performance