Platinum Group Metals Ltd 40-F, filed Nov 30, 2007: Annual Information Form 2007

Annual
Information Form of Platinum Group Metals Ltd.
For
year ended: August 31, 2007
Annual
Information Form - November 29, 2007
Table
of Contents
- -
Incorporated
by reference into this Annual Information Form (“AIF”) are the Consolidated
Financial Statements of Platinum Group Metals Ltd. for the year ended August
31,
2007 as filed on November 29, 2007 and the technical reports
entitled:
Information
Circular containing the Corporate Governance Practices filed on SEDAR November
29, 2006.
All
financial information in this Annual Information Form is prepared in accordance
with generally accepted accounting principles in Canada.
Date
of Information
All
information in this Annual Information Form is as of August 31, 2007 unless
otherwise indicated.
Currency
and Exchange Rates
All
dollar amounts in this Annual Information Form are expressed in Canadian dollars
unless otherwise indicated. Platinum Group Metals Ltd. accounts are maintained
in Canadian dollars. All references to “U.S. dollars” or to “US$” are to U.S.
dollars. All references to “ZAR” or to “R” or to “Rand” are to South African
Rand.
The
following table sets forth the rate of exchange for the Canadian dollar
expressed in United States dollars in effect at the end of the periods
indicated, the average of exchange rates in effect on the last day of each
month
during such periods, and the high and low exchange rates during such periods
based on the noon rate of exchange as reported by the Bank of Canada for
conversion of Canadian dollars into United States dollars.
|
Canadian
Dollars to
U.S.
Dollars
|
Year
Ended August 31
|
||
|
2007
|
2006
|
2005
|
|
|
Rate
at end of period
|
US$0.9466
|
US$0.9037
|
US$0.8411
|
|
Average
rate for period
|
US$0.8921
|
US$0.8711
|
US$0.8114
|
|
High
for period
|
US$0.9641
|
US$0.9099
|
US$0.8493
|
|
Low
for period
|
US$0.8437
|
US$0.8361
|
US$0.7652
|
The
noon
rate of exchange on November 21, 2007 as reported by the Bank of Canada for
the
conversion of Canadian dollars into United States dollars was Canadian $1.00
equals US$1.0106.
The
following table sets forth the rate of exchange for the South African Rand,
expressed in Canadian dollars in effect at the end of the periods indicated,
the
average of exchange rates in effect on the last day of each month during such
periods, and the high and low exchange rates during such periods based on the
noon rate of exchange as reported by the Bank of Canada for conversion of South
African Rand into Canadian dollars.
|
South
African Rand to Canadian Dollars
|
Year
Ended August 31
|
||
|
2007
|
2006
|
2005
|
|
|
Rate
at end of period
|
$
0.1474
|
$
0.1537
|
$
0.1856
|
|
Average
rate for period
|
$
0.1546
|
$
0.1755
|
$
0.1987
|
|
High
for period
|
$
0.1422
|
$
0.1512
|
$
0.1767
|
|
Low
for period
|
$
0.1692
|
$
0.1945
|
$
0.2190
|
The
noon
rate of exchange on November 21, 2007 as reported by the Bank of Canada for
the
conversion of South African Rand into Canadian dollars was one South African
Rand equals $0.1451.
Metric
Equivalents
For
ease
of reference, the following factors for converting Imperial measurements into
metric equivalents are provided:
|
To
convert from Imperial
|
To
metric
|
Multiply
by
|
|
Acres
|
Hectares
|
0.404686
|
|
Feet
|
Metres
|
0.30480
|
|
Miles
|
Kilometres
|
1.609344
|
|
Tons
|
Tonnes
|
0.907185
|
|
Ounces
(troy)/ton
|
Grams/Tonne
|
34.2857
|
Terms
used and not defined in this Annual Information Form that are defined in
National Instrument 51-102 Continuous Disclosure Obligations shall bear that
definition. Other definitions are set out in National Instrument 14-101
Definitions, as amended.
The
information contained within this AIF is based on a review of the Company’s
operations, financial position and plans for the future based on facts and
circumstances as of the fiscal year ended August 31, 2007, unless stated
otherwise. Except for statements of historical fact, the information contained
herein constitutes forward looking statements within the meaning of Canadian
and
U.S. securities laws. Forward-looking statements are frequently, but
not always, identified by words such as “expects,” “anticipates,” “believes,”
“intends,” “estimates,” “potential,” “possible” and similar expressions, or
statements that events, conditions or results “will,” “may,” “could” or “should”
occur or be achieved. Information concerning the interpretation of drill results
and mineral resource or reserve estimates also may be deemed to be
forward-looking statements, as such information constitutes a prediction of
what
mineralization might be found to be present if and when a project is actually
developed. Forward-looking statements are statements about the future
and are inherently uncertain, and actual achievements of the Company or other
future events or conditions may differ materially from those reflected in the
forward-looking statements due to a variety of risks, uncertainties and other
factors, including, without limitation, those described in this AIF under the
heading “Risk Factors.”
Forward
looking statements are based on the opinions, plans and estimates of management
at the date the statements are the Company undertakes no obligation to update
forward looking statements if circumstances or management’s estimates, plans or
opinions should change. The reader is cautioned not to place undue reliance
on
forward looking statements.
Cautionary
Note to United States Readers – Differences Regarding the Definitions of
Resource and Reserve Estimates in the United States and
Canada
|
Mineral
Reserve
|
The
definitions of “mineral reserves”, “proven mineral reserves” and “probable
mineral reserves,” as used in this report, are Canadian mining terms as
defined in accordance with National Instrument 43-101 - Standards of
Disclosure for Mineral Projects under the guidelines set out in the
Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”)
Standards on Mineral Resources and Mineral Reserves Definitions and
guidelines adopted by the CIM Council on August 20, 2000. CIM standards
differ from the standards in the United States.
Under
United States standards, a “mineral reserve” is defined as a part of a
mineral deposit which could be economically and legally extracted
or
produced at the time the mineral reserve determination is made,
where:
“reserve”
means that part of a mineral deposit which can be economically and
legally
extracted or produced at the time of the reserve
determination;
“economically”
implies that profitable extraction or production has been established
or
analytically demonstrated to be viable and justifiable under reasonable
investment and market assumptions; and
while
“legally” does not imply that all permits needed for mining and processing
have been obtained or that other legal issues have been completely
resolved, for a reserve to exist, there should be a reasonable certainty
based on applicable laws and regulations that issuance of permits
or
resolution of legal issues can be accomplished in a timely
manner.
Mineral
reserves are categorized as follows on the basis of the degree of
confidence in the estimate of the quantity and grade of the
deposit.
Under
United States standards, proven or measured reserves are defined
as
reserves for which (a) quantity is computed from dimensions revealed
in
outcrops, trenches, workings or drill holes, grade and/or quality
are
computed from the results of detailed sampling and (b) the sites
for
inspection, sampling and measurement are spaced so closely and the
geographic character is so well defined that size, shape, depth and
mineral content of reserves are well established.
Under
United States standards, probable reserves are defined as reserves
for
which quantity and grade and/or quality are computed from information
similar to that of proven reserves (under United States standards),
but
the sites for inspection, sampling, and measurement are further apart
or
are otherwise less adequately spaced. The degree of assurance, although
lower than that for proven mineral reserves, is high enough to assume
continuity between points of observation.
AT
THIS TIME, NONE OF OUR PROPERTIES CONTAIN ANY MINERAL RESERVE ESTIMATES
IN
ACCORDANCE WITH SEC GUIDE 7.
|
|
Mineral
Resource
|
While
the terms “mineral resource,” “measured mineral resource,” “indicated
mineral resource,” and “inferred mineral resource” are recognized and
required by Canadian regulations, they are not defined terms under
standards in the United States. As such, information contained in
this
report concerning descriptions of mineralization and resources under
Canadian standards may not be comparable to similar information made
public by U.S. companies subject to the reporting and disclosure
requirements of the Securities and Exchange Commission. “Indicated mineral
resource” and “inferred mineral resource” have a great amount of
uncertainty as to their existence and a great uncertainty as to their
economic and legal feasibility. It can not be assumed that all or
any part
of an “indicated mineral resource” or “inferred mineral resource” will
ever be upgraded to a higher category. Investors are cautioned not
to
assume that any part or all of mineral deposits in these categories
will
ever be converted into
reserves.
|
- -
Platinum
Group Metals Ltd. head office is located at:
328
–
550
Burrard Street
Vancouver,
British Columbia
Canada,
V6C 2B5
The
Company’s registered office is located at:
Gowlings
Lafleur Henderson
LLP
2300
-
1055 Dunsmuir Street
Vancouver,
British Columbia
Canada,
V7X 1J1
Platinum
Group Metals Ltd. (“Platinum Group” or the “Company”) is a British Columbia
corporation incorporated on February 18, 2002 by an order of the Supreme Court
of British Columbia approving an amalgamation between Platinum Group Metals
Ltd.
and New Millennium Metals Corporation. The Company was later transitioned on
February 22, 2005 under the Business Corporations Act (British
Columbia). On February 22, 2005, our stockholders passed a special resolution
to
amend the authorized share capital from 1,000,000,000 shares of Common Stock
without par value to an unlimited number of shares of Common Stock without
par
value, to remove the pre-existing company provisions and to adopt new
articles.
The
Company has one wholly owned subsidiary incorporated under the laws of The
Republic of South Africa under the name Platinum Group Metals (RSA) (Pty.)
Limited. The registered and records office of Platinum Group Metals (RSA) (Pty.)
Limited is located at 4th Floor,
Aloe Grove,
196 Louis Botha Avenue, Houghton Estate, Johannesburg, 2000, South Africa.
The
principal business address of the Company is Suite 328, 550 Burrard Street,
Vancouver, British Columbia, Canada, V6C 2B5. The principal business address
of
Platinum Group Metals (RSA) (Pty.) Limited is Technology House, Greenacres
Office park, Victory Park, Johannesburg 2193.
Three
year history
On
October 27, 2004, the Company entered into the Western Bushveld Joint Venture
Agreement and announced the formation of the Western Bushveld Joint Venture
(“WBJV”) with Anglo Platinum Limited (“Anglo Platinum”) and Africa Wide Mineral
Prospecting and Exploration (Pty) Limited. Work commenced immediately thereafter
on the project and the rate of work has accelerated since then. Activities
consist of research and data review, prospecting, mapping, engineering and
drilling of the project area. At the time of writing there are 4 high speed
diamond drills turning on WBJV properties. On January 10, 2007, the Company
completed a positive pre-feasibility study for the Project 1 area of the WBJV.
During 2007 the WBJV commissioned a bankable feasibility study for the Project
1
area of the WBJV. This work is currently underway. On September 7, 2007 the
Company published its most recent resource calculation for the
WBJV.
The
Company is primarily focused on the completion of a bankable feasibility study
for the WBJV and on obtaining relevant permitting from the Government of South
Africa. Delivery of the bankable feasibility study to the partners of
the WBJV is expected in early 2008. Permit applications are in
process and final permitting is expected during 2008. Should a
decision to build a mine on Project 1 of the WBJV in 2008 be taken the Company
will need to obtain its 37% share of project financing and expand its
capabilities as project operator in order to implement the project build
decision.
Total
global exploration expenditures for the Company’s account in fiscal 2007,
including the Company’s share of WBJV expenditures during, totaled $4,531,533
(2006 - $5,474,479), and of this $3,775,890 was for the WBJV (2006 - $4,998,447)
and $755,643 was for other exploration (2006 - $476,032). After meeting its
earn
in requirements in April 2006, Platinum Group Metals Ltd. is currently only
responsible for its 37% pro-rata share of expenditures for the WBJV. Total
WBJV
expenditures during fiscal 2007 by all Joint Venture partners totaled
$10,497,472 (2006: $7,705,592).
The
Company was also active with an exploration program on its War Springs and
Tweespalk projects in South Africa during the period 2005 through 2007,
consisting of diamond drilling, geophysical surveys and ground
prospecting.
The
Company has increased its general level of activity in the past three years
in
South Africa. Activities in Canada have been reduced as the more advanced nature
of the WBJV has caused it to become an investment focus for the Company. The
Company still actively reviews many potential property acquisitions in the
normal course of business.
The
Company owns rights to several mineral properties acquired by staking or option
in the Lac des Iles area of Ontario, Canada. Work during the years 2005 to
2007
in Canada has been limited, but has included the completion, assessment and
analysis of geophysical and drilling results from these projects. In fiscal
2007
a 1,090 metre drill program was conducted on the Company’s Lac Des Iles
projects.
On
November 6, 2003 the Company acquired an option to earn up to a 62% interest
in
the Lakemount property located near Wawa, Ontario. Exploration results on the
project were of interest, but in light of certain title deficiencies and a
complex title chain, the Company abandoned the project in fiscal 2007. Deferred
acquisition and exploration costs relating to the project in the amount of
$1,323,222 were written off.
The
Company issued a total of 7,297,569 (2006 – 10,532,547) common shares during the
2007 fiscal year. Of this 7,247,569 shares (2006 – 10,507,547) were issued for
cash proceeds of $12,080,366 (2006 - $16,197,711). The balance was issued in
relation to property acquisition payments. The Company’s primary source of
capital has been from the sale of equity. At August 31, 2007 the Company had
cash and short term investments (consisting of cashable GIC’s) on hand of
$14,669,067 compared to cash and cash equivalents of $10,066,801 at August
31,
2006. The primary use of cash during the year was for acquisition of mineral
properties, exploration expenditures, and investment in and advances to the
WBJV
being approximately $3,513,464, which includes $2,645,382 for the WBJV project
(2006 - $6,423,839 which includes $5,780,246 for the WBJV project), management
fees and expenses of $690,504 (2006 - $367,891) and other general and
administrative expenses of $3,895,573 (2006 - $2,440,824).
On
June
6th, 2005,
the
Company listed its shares on the Toronto Stock Exchange (“TSX”) and became a
reporting issuer in the Province of Ontario. Prior to its TSX listing the
Company’s shares traded on the TSX Venture Exchange. The Company is also a
reporting issuer in the Provinces of British Columbia, Alberta and
Quebec.
The
Company’s common shares are registered under the United States Securities
Exchange Act of 1934, and the Company files reports with the United States
Securities and Exchange Commission under file no. 1-33562. The
Company’s shares were called for trading on the American Stock Exchange in the
USA under the symbol “PLG” on June 28, 2007. Prior to its American
Stock Exchange listing the Company’s shares traded on the OTC Bulletin Board
under the symbol “PTMQF”.
Significant
Acquisitions
No
significant acquisitions were completed by the Company during its most recently
completed financial year.
The
Company is a British Columbia corporation incorporated on February 18, 2002
by
an order of the Supreme Court of British Columbia approving an amalgamation
between Platinum Group Metals Ltd. and New Millennium Metals Corporation. The
Company is a platinum focused exploration and development company conducting
work primarily on mineral properties it has staked or acquired by way of option
agreement in Ontario, Canada and the Republic of South Africa.
Platinum
Group Metals Ltd. is headquartered in Vancouver, British Columbia. The Company
and its consolidated subsidiary, Platinum Group Metals RSA (Pty.) Ltd., employ
approximately 50 people in Canada and South Africa, with the majority of
employees living and working in South Africa.
General
The
Company has not yet determined whether its mineral properties contain ore
reserves that are economically recoverable. The Company defers all acquisition,
exploration and development costs related to mineral properties. The
recoverability of these amounts is dependent upon the existence of economically
recoverable reserves, the ability of the Company to obtain the necessary
financing to complete the development of the property, and any future profitable
production; or alternatively upon the Company’s ability to dispose of its
interests on an advantageous basis.
The
Company’s key project is its 37% interest in the WBJV, a platinum exploration
and development project on combined mineral rights covering approximately 72
square kilometres on the Western Bushveld Complex of South Africa.
The
Company also holds interests in various other early stage exploration projects
located in Canada and in South Africa. The Company continues to evaluate
exploration opportunities both on currently owned properties and on new
prospects. Details of these other projects may be found in Note 6. of the
Company’s August 31, 2007 audited financial statements.
To
conduct its exploration and planning, the Company is dependent on
sub-contractors for certain engineering, geological services, drilling equipment
and supplies. These are generally available but vary in price and immediacy
of
availability subject to demand.
In
2003
the Company acquired a 100% South African subsidiary named Platinum Group Metals
RSA (Pty.) Ltd. for the purposes of holding mineral rights and conducting
operations on behalf of the Company. The Company conducts all of its South
African exploration and development work through Platinum Group Metals (RSA)
(Pty.) Limited.
The
Company has not earned any revenues from operations to date. The Company has
financed its operations principally through the sale of its equity securities.
While the Company believes it has sufficient capital and liquidity to finance
current operations, its ability to continue operations is dependent on the
ability of the Company to obtain additional financing.
At
this
time, the Company has sufficient financial resources; however there is no
assurance that additional funding will be available to it for the further
exploration of its properties. The Company has relied upon external financing,
including the issuance of equity securities, to fund its activities to date.
The
Company will continue to rely upon such forms of financing for the foreseeable
future. The Company intends to obtain financing for its planned work in 2008
through any or all of joint venturing projects, debt financing, equity financing
or other means. There can be no assurance that the Company will succeed in
obtaining additional financing, now or in the future. Failure to raise
additional financing on a timely basis could cause the Company to suspend its
operations and eventually to forfeit or sell, at fair market value, its
interests in its properties.
The
majority of the Company’s exploration and development activities to date have
been focused on the WBJV in order to advance it to the definitive feasibility
stage. During the three most recently completed fiscal years, the Company has
expended approximately $17.7 million in acquisition and exploration costs on
the
Company’s Canadian and South African projects, with approximately 77% of such
amount being expended on the WBJV.
The
Company’s securities should be considered a highly speculative investment and
investors should carefully consider all of the information disclosed in the
Company’s Canadian and U.S. regulatory filings prior to making an investment in
the Company. The following risk factors should be given special consideration
when evaluating an investment in the Company’s securities.
General
Resource
exploration and development is a speculative business, characterized by a number
of significant risks including, among other things, unprofitable efforts
resulting not only from the failure to discover mineral deposits but also from
finding mineral deposits, which, though present, are insufficient in quantity
or
quality to return a profit from production.
The
Company’s business is subject to exploration and development
risks
All
of
the Company’s properties are in the exploration stage and no known reserves have
been discovered on such properties. At this stage, favorable drilling results,
estimates and studies are subject to a number of risks, including:
|
·
|
the
limited amount of drilling and testing completed to
date;
|
|
·
|
the
preliminary nature of any operating and capital cost
estimates;
|
|
·
|
the
difficulties inherent in scaling up operations and achieving expected
metallurgical recoveries; and
|
|
·
|
the
likelihood of cost estimates increasing in the
future.
|
There
is
no certainty that the expenditures to be made by us or by our joint venture
partners in the exploration of the properties described herein will result
in
discoveries of precious metals in commercial quantities or that any of our
properties will be developed. Most exploration projects do not result in the
discovery of precious metals and no assurance can be given that any particular
level of recovery of precious metals will in fact be realized or that any
identified resource will ever qualify as a commercially mineable (or viable)
resource which can be legally and economically exploited. Estimates of reserves,
mineral deposits and production costs can also be affected by such factors
as
environmental permit regulations and requirements, weather, environmental
factors, unforeseen technical difficulties, unusual or unexpected geological
formations and work interruptions. In addition, the grade and/or quantity of
precious metals ultimately recovered may differ from that indicated by drilling
results. There can be no assurance that precious metals recovered in small-scale
tests will be duplicated in large-scale tests under on-site conditions or in
production scale.
Political
and economic instability may affect the Company’s business
South
Africa has undergone significant changes in its government and laws since the
free elections in 1994. At present, Mining Legislation in South Africa is
continuing to undergo change. The new Mineral and Petroleum Resources
Development Act became law on May 1, 2004. The regulation and operation of
this
new law is still being implemented. In association with the new Act, the Mining
Charter sets out a target of 26% ownership and participation in the mineral
industry by “Historically Disadvantaged Persons” within ten years, but the
mechanisms to fully affect this objective are still evolving. Accordingly,
the
South African legal regime may be considered relatively new, resulting in risks
related to the possible misinterpretation of new laws, unilateral modification
of mining or exploration rights, operating restrictions, increased taxes,
environmental regulation, mine safety and other risks arising out of new
sovereignty over mining, any or all of which could have an adverse effect on
the
Company. There is no certainty that the Company will be able to convert its
existing exploration rights into mining rights. The Company’s operations in
general may also be affected in varying degrees by political and economic
instability, terrorism, crime, fluctuations in currency exchange rates and
inflation.
The
Company is subject to the risk of fluctuations in the relative values of the
Canadian Dollar as compared to the South African Rand and the United States
Dollar
The
Company may be adversely affected by foreign currency fluctuations. The Company
is primarily funded through equity investments into the Company denominated
in
Canadian Dollars. Several of the Company’s options to acquire properties in the
Republic of South Africa may result in option payments by the Company
denominated in South African Rand or in U.S. Dollars over the next three years.
Exploration and development programs to be conducted by the Company in South
Africa will also be funded in South African Rand. Fluctuations in the exchange
rate between the Canadian Dollar and the South African Rand or U.S. Dollar
may
have an adverse affect on the Company.
- -
The
Company’s properties are subject to title risks
The
Company’s properties may be subject to prior unregistered agreements or
transfers and title may be affected by undetected defects. These defects could
adversely affect the Company’s title to such properties or delay or increase the
cost of the development of such properties. In addition, the Company’s
properties may be subject to aboriginal or other historical rights that may
be
claimed on Crown properties or other types of tenure with respect to which
mineral rights have been conferred.
Environmental
risk
Environmental
legislation on a global basis is evolving in a manner that will ensure stricter
standards and enforcement, increased fines and penalties for non-compliance,
more stringent environmental assessment of proposed development and a higher
level of responsibility for companies and their officers, directors and
employees. There is no assurance that future changes to environmental
legislation in Canada or South Africa will not adversely affect the Company’s
operations. Environmental risks may exist on properties in which the Company
holds interests which are unknown at present and which have been caused by
previous or existing owners or operators. Furthermore, future compliance with
environmental reclamation, closure and other requirements may involve
significant costs and other liabilities. In particular, the Company’s operations
and exploration activities are subject to Canadian and South African national
and provincial laws and regulations governing protection of the environment.
Such laws are continually changing, and in general are becoming more
restrictive.
The
mineral exploration industry is extremely competitive
The
resource industry is intensely competitive in all of its phases, and the Company
competes with many companies that possess greater financial resources and
technical facilities. Competition could adversely affect the Company’s ability
to acquire suitable new producing properties or prospects for exploration in
the
future. Competition could also affect the Company’s ability to raise financing
to fund the exploration and development of its properties or to hire qualified
personnel.
Metal
prices affect the success of the Company’s business
Metal
prices have historically been subject to significant price fluctuations. No
assurance may be given that metal prices will remain stable. Significant price
fluctuations over short periods of time may be generated by numerous factors
beyond the control of the Company, including domestic and international economic
and political trends, expectations of inflation, currency exchange fluctuations,
interest rates, global or regional consumption patterns, speculative activities
and increases or decreases in production due to improved mining and production
methods. Significant reductions or volatility in metal prices may have an
adverse effect on the Company’s business, including the economic attractiveness
of the Company’s projects, the Company’s ability to obtain financing and, if the
Company’s projects enter the production phase, the amount of the Company’s
revenues or profit or loss.
South
African foreign exchange controls may limit repatriation of
profits.
Loan
capital or equity capital may be introduced into South Africa through a formal
system of Exchange Control. Proceeds from the sale of assets in South Africa
owned by a non-resident are remittable to the non-resident. Approved loan
capital is generally remittable to a non-resident company from business profits.
Dividends declared by a non-listed South African company are remittable to
non-resident stockholders. However, there can be no assurance that restrictions
on repatriation of earnings from the Republic of South Africa will not be
imposed in the future.
Judgments
based upon the civil liability provisions of the United States federal
securities laws may be difficult to enforce.
The
ability of investors to enforce judgments of United States courts based upon
the
civil liability provisions of the United States federal securities laws against
our company and our directors and officers may be limited due to the fact that
a
majority of these persons reside outside of the United States and, in respect
of
our directors and officers, their assets are located outside the United States.
There is uncertainty as to whether Canadian courts would: (i) enforce judgments
of United States courts obtained against our company or our directors and
officers predicated upon the civil liability provisions of the United States
federal securities laws, or (ii) entertain original actions brought in Canadian
courts against our company or such persons predicated upon the federal
securities laws of the United States, as such laws may conflict with Canadian
laws. In Canada, civil rights are within the legislative jurisdiction of the
Provinces and Territories. The Province of British Columbia, in which our
company and all of our directors and officers are resident, does not have laws
for the reciprocal enforcement of judgments of United States
courts.
We
are a Passive Foreign Investment Company for United State Federal Income Tax
Purposes which may have consequences for U.S. investors.
We
believe that our company is a passive foreign investment company (“PFIC”) for
United States Federal income tax purposes because we earn 75% or more of our
gross income from passive sources. As a result, a United States holder of our
Common Stock could be subject to increased tax liability, possibly including
an
interest charge, upon the sale or other disposition of the United States
holders’ Common Stock or upon receipt of “excess distributions,” unless such
holder of common shares elect to be taxed currently on his or her pro rata
portion of our income, whether or not the income was distributed in the form
of
dividends or otherwise. The election requires certain conditions be met such
as
filing on or before the due date, as extended, for filing the stockholder’s
income tax return for the first taxable year to which the election will apply.
Otherwise, the election may only partially apply. Further, the elections will
increase the administrative and regulatory burden on us.
We
will need additional financing.
At
August
31, 2007, we had working capital of $12,643,928 (2006 - $8,602,700). Subsequent
to the year end, we received aggregate proceeds of $536,500 upon exercise of
463,000 stock options at prices between $0.50 per share and $2.57 per share.
We
believe that these funds will be sufficient to cover general and administrative
costs and fund the Company’s obligations, proposed exploration programs and
engineering studies on our properties to August 31, 2008. In the interim, should
a project build decision be taken on Project 1 of the Western Bushveld Joint
Venture, or should the purchase of long-lead capital items or other capital
expenditures related to Project 1 be approved, the Company will require
additional debt and/or equity financing. We have limited financial
resources and no sources of operating cash flow. There can be no assurance
that
additional funding will be available to us for further exploration and
development of our properties beyond the current programs. In the past, we
have
relied on sales of equity securities to meet our cash requirements. There can
be
no assurance that future operations will provide cash flow sufficient to satisfy
operational requirements and cash commitments.
Should
additional properties be acquired or programs be undertaken, we will require
additional funding. The exploration and development of our properties depends
upon our ability to obtain financing through any or all of the joint venturing
of projects, debt financing, equity financing or other means. There can be
no
assurance that we will be successful in obtaining any required financing now
or
in the future. Failure to obtain additional financing on a timely basis could
result in delay or indefinite postponement of further exploration and
development of our mineral properties, with the possible loss of such
properties, or the inability to acquire any additional properties.
Our
operations are subject to environmental and government
regulation.
Environmental
legislation on a global basis is evolving in a manner that will ensure stricter
standards and enforcement, increased fines and penalties for non-compliance,
more stringent environmental assessment of proposed development and a higher
level of responsibility for companies and their officers, directors and
employees. There can be no assurance that future changes to environmental
legislation in Canada or South Africa will not adversely affect our operations.
Environmental hazards may exist on our properties which are unknown at present
and which have been caused by previous or existing owners or operators.
Furthermore, future compliance with environmental reclamation, closure and
other
requirements may involve significant costs and other liabilities. In particular,
our operations and exploration activities are subject to Canadian and South
African national and provincial laws and regulations governing protection of
the
environment. Such laws are continually changing and, in general, are becoming
more restrictive.
Amendments
to current laws, regulations and permits governing operations and activities
of
mining companies, or more stringent implementation thereof, could have a
material adverse impact on us and cause increases in capital expenditures or
production costs or reduction in levels of production at producing properties
or
require abandonment or delays in development of new mining
properties.
We
have
not made any material expenditure for environmental compliance to date. However,
there can be no assurance that environmental laws will not give rise to
significant financial obligations in the future and such obligations could
have
a material adverse affect on our financial performance.
The
occurrence of events for which we are not insured or for which our insurance
is
inadequate may reduce or eliminate any future profitability and result in
increasing costs and a decline in the value of our securities.
In
the
course of exploration, development and production of mineral properties, certain
risks, and in particular, unexpected or unusual geological operating conditions
including rock bursts, cave-ins, fire, flooding and earthquakes may occur.
It is
not always possible to fully insure against such risks as a result of high
premiums or other reasons. Should such liabilities arise, they could reduce
or
eliminate any future profitability and result in increasing costs and a decline
in the value of our securities.
We
have limited experience with development-stage mining
operations.
We
have
limited experience in placing mineral properties into production, and our
ability to do so will be dependent upon using the services of appropriately
experienced personnel or entering into agreements with other major resource
companies that can provide such expertise. There can be no assurance that we
will have available the necessary expertise when and if we place our mineral
properties into production.
- -
We
have a history of losses and we anticipate continuing to incur losses for the
foreseeable future.
We
have a
history of losses including net losses of $6,758,123 in the year ended August
31, 2007; $3,853,273 in the year ended August 31, 2006; and $3,795,648 in the
year ended August 31, 2005. At August 31, 2007, we had an accumulated deficit
of
$22,168,927 (2006 - $15,410,804). We anticipate continuing to incur losses
for
the foreseeable future until we can successfully place one or more of our
properties into commercial production on a profitable basis.
We
have a
lack of cash flow, which may affect our ability to continue as a going
concern.
We
are an
exploration company with a history of losses and no history of revenues from
our
operations. None of our properties are in production or are expected to be
developed in the near future, if at all. During the year ended August 31, 2007,
we had a loss of $6,758,123 (2006 - $3,853,273) and used $3,682,561 (2006 -
$2,356,261) in cash for operating activities and $5,771,234 (2006 - $6,522,431)
in cash for investing activities. Historically, the only source of funds
available to us has been through the sale of our equity securities.
The
auditors’ report on our August 31, 2006 annual consolidated financial statements
includes additional comments which indicate that the financial statements are
affected by conditions and events that cast doubt on our ability to continue
as
a going concern. The financial statements do not include any adjustments that
might result from the outcome of this uncertainty. Our continuing operations
and
the recoverability of the amounts capitalized for mineral properties in our
consolidated financial statements, prepared in accordance with Canadian GAAP,
is
dependent upon our ability in the future to achieve profitable operations and,
in the meantime, to obtain the necessary financing to meet our obligations
and
repay our liabilities arising from normal business operations when they become
due. External financing, predominately by the issuance of equity to the public,
will be sought to finance our operations; however, there is no assurance that
sufficient funds will be raised.
We
are required to contribute our share of exploration costs to maintain our
interests in certain properties.
We
may,
in the future, be unable to meet our share of costs incurred under agreements
to
which we are a party and we may as a result be subject to loss or dilution
of
our rights to acquire interests in the properties subject to such
agreements.
None
of our properties contain any known reserves.
All
of
our properties are in the exploration stage meaning that we have not determined
whether any such property contains mineral reserves that are economically
recoverable. Failure to discover economically recoverable reserves will require
us to write-off costs capitalized in our Canadian GAAP financial statements,
which at August 31, 2007 totaled $17,789,082 (2006 -
$16,660,885).
We
depend on our key management employees.
Our
development to date has depended, and in the future will continue to depend,
on
the efforts of our key management figures: R. Michael Jones, our
Chairman, President, CEO and director; Frank R. Hallam, our Chief Financial
Officer and director; and Peter Busse, our Chief Operating Officer. The loss
of
any of our key management figures could have a material adverse effect on us.
We
have entered into contracts with the named directors, officers and employees.
We
do not maintain key man insurance on any of our management.
Our
directors may be associated with other mineral resource
companies.
Certain
of our officers and directors may become associated with other natural resource
companies that acquire interests in mineral properties. R. Michael Jones, our
Chairman, President, Chief Executive Officer and director is also a director
of
Jerico Explorations Inc., a public company with a mineral exploration property
in Arizona, a director of West Timmins Mining Inc., a public company with
mineral exploration properties in Canada and Mexico, and a director of MAG
Silver Corp., a public company with silver properties in Mexico. Frank Hallam,
our Chief Financial Officer and director, is also a senior officer of MAG Silver
Corp., a director of Jerico Explorations Inc., and a director and senior officer
of West Timmins Mining Inc. Eric Carlson, director, is also a director of MAG
Silver Corp. and a director of West Timmins Mining Inc. Any conflicts, which
may
arise, will be dealt with as disclosed below.
Such
associations may give rise to conflicts of interest from time to time. Our
directors are required by law to act honestly and in good faith with a view
to
the best interests of our company and to disclose any interest, which they
may
have in any project or opportunity of our company. If a subject involving a
conflict of interest arises at a meeting of the board of directors, any director
in a conflict will disclose his interest and abstain from voting on such matter.
In determining whether or not our company will participate in any project or
opportunity, the directors will primarily consider the degree of risk to which
our company may be exposed and our financial position at that time.
We
have outstanding stock options and share purchase warrants which, if exercised,
could cause dilution to existing stockholders.
At
November 29, 2007, we had 4,142,375 stock options issued and outstanding with
a
weighted average exercise price of $2.47 per share and 850,000 share purchase
warrants issued and outstanding with an exercise price of $1.75 per share.
Stock
options and share purchase warrants are likely to be exercised when the market
price of our Common Stock exceeds the exercise price of such stock options
or
share purchase warrants. The exercise of such stock options or share purchase
warrants and the subsequent resale of such Common Stock in the public market
could adversely affect the prevailing market price and our ability to raise
equity capital in the future at a time and price which we deem appropriate.
We
may also enter into commitments in the future which would require the issuance
of additional Common Stock and we may grant additional share purchase warrants
and stock options. Any share issuances from our treasury will result in
immediate dilution to existing stockholders.
Our
share price has been volatile in recent years.
In
recent
years, the securities markets in the United States and Canada have experienced
a
high level of price and volume volatility, and the market price of many
companies, particularly those considered exploration or development stage
companies, have experienced wide fluctuations in price which have not
necessarily been related to the operating performance, underlying asset values
or prospects of such companies. In particular, the per share price of our Common
Stock on the TSX fluctuated from a high of $4.79 to a low of $1.85 and on the
American Stock Exchange and the NASD OTC Bulletin Board Service from a high
of
US$5.00 to a low of US$1.64 within the twelve month period preceding the date
of
this Annual Information Form. There can be no assurance that continual
fluctuations in price will not occur.
- -
We
do
not expect to pay dividends.
We
have
not paid any dividends since incorporation and we have no plans to pay dividends
for some time. Our directors will determine if and when dividends should be
declared and paid in the future based on our financial position at the relevant
time. All of the shares of Common Stock are entitled to an equal share of any
dividends declared and paid.
Companies
with Asset-back Securities Outstanding
The
Company holds no asset-backed securities or commercial paper.
Project
Description and Location
Western
Bushveld Joint Venture
Readers
are encouraged to read the following technical reports, from which the
discussions in this section are derived:
|
1.
|
Filed
on SEDAR October 30, 2007: Competent Persons Report on Project Area
1 and
1A of the Western Bushveld Joint Venture (WBJV) Located on the Western
Limb of the Bushveld Igneous Complex, South Africa (n/r of September
7,
2007);
|
|
2.
|
Filed
on SEDAR June 19, 2007: Mineral Resource Estimate, Frischgewaagd
96JQ
Portion 11 North West Province, Republic of South Africa, June 2007
(n/r
of April 30, 2007);
|
|
3.
|
Filed
on SEDAR March 23, 2007: Inferred Mineral Resource Estimation on
Project
Area 2 of the Western Bushveld Joint Venture (WBJV) Located on the
Western
Limb of the Bushveld Igneous Complex, South Africa (n/r of February
7,
2007);
|
|
4.
|
Filed
on SEDAR January 30th,
2007:
Technical Report Western Bushveld Joint Venture Project 1 (Elandsfontein
and Frischgewaagd) – (n/r of January 10,
2007);
|
Introduction
On
October 26, 2004 the Company (37%) entered into a Joint Venture with Anglo
Platinum (37%) and Africa Wide Mineral Prospecting and Exploration (Pty) Limited
(26%) to pursue platinum exploration and development on combined mineral rights
covering 72 square kilometres on the Western Bushveld Complex of South Africa.
The Company contributed all of its interests in portions of the farms
Onderstepoort 98 JQ, Mimosa 81 JQ and Elandsfontein 102 JQ. The Company was
also
required to complete Rand 35 million (at August 31, 2005 approx. C$6.44 million)
in expenditures as part of its earn-in, which expenditure the Company completed
in April 2006. Certain portions of Elandsfontein 102 JQ, Onderstepoort 98 JQ,
Frischgewaagd 96 JQ, Mimosa 81 JQ and Koedoesfontein 94 JQ were contributed
by
Rustenburg Platinum Mines Ltd., a wholly-owned subsidiary of Anglo Platinum.
Under the terms of the original WBJV Agreement, upon the delivery of a bankable
feasibility study, each partner to the WBJV will receive credit for ounces
contributed by their original property as to inferred ounces at US$0.50 per
ounce, indicated ounces at US$3.20 per ounce and measured ounces at US$6.20
per
ounce. The Company will also be credited for its Rand 35 million expenditure
as
described above. Each party will then have the opportunity to make equalizing
cash payment, or contribute capital going forward in order to catch up any
resulting shortfall in their contributed capital and thereby maintain their
respective working interest in the JV. Together the properties of the WBJV
are
centred on Longitude 27o 00’
00’’
(E) and
Latitude 25o
20’ 00’’ (S). For more details of the WBJV option agreement and the properties
contributed by the Company see Note 5. of the Company’s August 31, 2007 audited
year end financial statements available on SEDAR at www.sedar.com in part
1(f).
The
WBJV
property is located on the south-western limb of the Bushveld Igneous Complex
(“BIC”), 110km west-northwest of Pretoria and 120km from Johannesburg. The
resources of the WBJV Project Area are located approximately 11km along strike
from the active Merensky Reef mining face at the operating Bafokeng Rasimone
Platinum Mine (BRPM). BRPM completed opencast mining on the UG2 Reef within
100m
of the WBJV property boundary. There are no known mine workings,
tailings ponds or waste deposits on the project area itself. The
property is cross cut from north-west to south-east by the intermittent Elands
River. There are no known environmental liabilities associated with
the project area. The Rustenburg highway cross cuts the project area
along its westerly edge from south to north. Small scale developments
including farmland, commercial facilities and a hotel are located west of the
highway.
All
of
the mineral rights for the properties of the WBJV are now held under New Order
Prospecting Permits issued by the Government of South Africa.
Accessibility,
Climate, Local Resources, Infrastructure and Physiography
The
project area is located, some 41km northwest of the North West Province town
of
Rustenburg. The town of Boshoek is situated 16km to the south along the tar
road
that links Rustenburg with Sun City and crosses the project area. The WBJV
adjoins the Anglo Platinum-managed BRPM to the southeast. A railway line linking
BRPM to the national network passes the project area immediately to the east
with a railway siding at Boshoek. The WBJV properties are readily accessible
from Johannesburg by traveling 120km northwest on Regional Road 24 to the town
of Rustenburg and then a further 41km. Both BRPM to the south of the project
area and Styldrift, a joint venture between the Royal Bafokeng Nation and Anglo
Platinum, which lies directly to the east of the property, have modern access
roads and services. Numerous gravel roads crossing the WBJV properties provide
easy access to all portions.
The
area
is characterized by extensive savannah with vegetation consisting of grasses
and
shrub with few trees. There is low rainfall, (the area is considered semi arid
with an annual rainfall of 520mm) and high summer temperatures. The area is
typical of the Highveld Climatic Zone. The rainy season is in the summer months
from October to April with the highest rainfall in December and January. In
summer (November to April) the days are warm to hot, with afternoon showers
or
thunderstorms; temperatures average 26ºC (79ºF) and can rise to 38ºC (100ºF);
and night temperatures drop to around 15ºC (60ºF). During winter months (May to
October), days are dry and sunny with moderate to cool temperatures, while
evening temperatures drop sharply. Temperatures by day generally reach 20ºC
(68ºF) and can drop to below 0ºC with frost occurring in the early morning. The
hottest months are generally December and January with June and July being
the
coldest. The climate of the area does not hinder the operating season and
exploration can continue all year long.
South
Africa has a large and well-developed mining industry. The project is located
in
an area with a long history of mining activity and this, among other factors,
means that the infrastructure in the area is well established, with
well-maintained roads and highways as well as electricity distribution networks
and telephone systems. All project areas are close to major towns and informal
settlements as a potential source of labour with paved roads being the norm.
Power lines cross both project areas and water for drilling and other purposes
is, as a rule, drawn from boreholes. Water for potential project development
will need to be piped in. Water rights and supply for the project have yet
to be
secured. As several platinum mines are located adjacent to and within 50km
of
the property, there is excellent access to materials and skilled labour. One
of
the smelter complexes of Anglo Platinum is located within 60km of the
property.
Surface
rights to 365 ha on the Farm Elandsfontein have been purchased by the Company
on
behalf of the WBJV and this property will be of some use for potential
operations. Further surface rights will be required within the footprint of
the
mineral rights area for location of shaft infrastructure, mill facilities,
mill
and concentrator facilities and waste and tailings sites.
The
WBJV
area is located on a central plateau. The project has prominent hills, which
occur in the northern most portions, but generally, variations in topography
are
minor and limited to low, gently sloped hills. Elevations range from 1,080
metres above mean sea level (AMSL) towards the Elands River in the north to
1,156m AMSL towards the farm Onderstepoort in the southwest.
History
Since
the
1920’s the Western Limb of the BIC has been explored, developed and exploited
for platinum group elements. Approximately 70% of the World’s platinum
production is currently produced in this area and it has been the major World
source for platinum since the late 1920’s. The main areas of development on the
Western Limb have been approximately 90 kilometres to the south and south east
of the project area along the exposed strike extension of the Critical Zone,
the
main platinum bearing stratigrahic unit of the BIC. The Critical Zone is not
exposed at surface in the project area. In the project area itself records
indicate only moderate exploration activity by a few operators commencing in
the
1970’s. Work since that time until 2004 included limited surface work, drilling
and geophysical surveys.
The
Company is the operator of the WBJV. From inception of the WBJV in October
2004
to April 2006 the Company funded a required exploration program in the amount
of
Rand 35 million (at August 31, 2005 approx. C$6.44 million). Since then the
partners of the WBJV have been required to fund their portion of further
expenditures pro-rata based upon their working interest in the Joint Venture.
From April 2006 to March 2007 the partners to the WBJV approved budgets in
the
amount of Rand 76,393,208 (approximately C $11.7 million at September 2006).
In
July 2007 the WBJV participants approved a new cash budget for the WBJV
totalling Rand 102,976,176 (approximately C $15.5 million in July
2007).
In
April
2007 Africa Wide accepted an offer for the purchase of 100% their company from
Wesizwe Platinum Ltd. (WEZ:JSE) (“Wesizwe”). The transaction closed in September
2007 and Wesizwe paid consideration of 57.4 million new shares of Wesizwe at
a
deemed price of Rand 10.48 per share for total consideration of Rand 601.5
million (approximately C$90 million). Since September 2007 Wesizwe has become
responsible for all of the rights and obligations of Africa Wide. In November
2007 Wesizwe paid all amounts previously due by Africa Wide to both the WBJV
and
to the Company.
On
April
9, 2007 the Company announced the formal contribution to the WBJV of a 50%
interest in the mineral rights to the 494 hectare Portion 11 of the Farm
Frischgewaagd 96 JQ (“Portion 11”) by Rustenburg Platinum Mines Ltd., a
subsidiary of Anglo Platinum. With this addition the geographic area of the
WBJV
now covers approximately 72 square kilometres of territory. Portion 11 now
forms
part of the Project 2 area of the WBJV. This expanded Project 2 area is adjacent
to the WBJV “Project 1” area. Anglo Platinum’s 50% interest in Portion 11
relates to New Order mineral rights that were converted from Old Order rights
in
2007. All of the parties to the shared mineral rights on Portion 11 and RE
4 are
working toward a detailed co-operation agreement. Current drilling, being
conducted under initial co-operation agreements, is expected to
continue.
Under
the
terms of the WBJV agreement, once a bankable feasibility study has been
completed the respective deemed capital contribution of each party will be
credited based on their contribution of measured, indicated, and inferred
platinum group metal (“PGM”) ounces from the contributed properties comprising
the WBJV, determined in accordance with the South African SAMREC code. Under
the
terms of the original WBJV Agreement, inferred ounces will be credited at
US$0.50 per ounce, indicated ounces will be credited at US$3.20 per ounce and
measured ounces will be credited at US$6.20 per ounce. The Company will also
be
credited for its Rand 35 million expenditure as described above. Each party
will
then have the opportunity to make equalizing cash payment, or contribute capital
going forward in order to catch up any resulting shortfall in their contributed
capital and thereby maintain their respective working interest in the JV. Should
a party not wish to participate, the JV agreement provides a mechanism whereby
the parties may elect to become “non-contributory” to the JV and by doing so
they would be subject to dilution. Anglo Platinum may only be diluted to a
minimum 15% non-contributory interest in the WBJV.
Portion
11 was contributed to the WBJV in 2007 as originally planned under the existing
terms of the October 2004 WBJV Agreement. For this later contribution of Portion
11 the original credit rates for equalization as described above have been
amended to US$0.62 per inferred ounce, US$10.37 per indicated ounce and US$39.55
per measured ounce in order to adjust for current market
conditions.
In
January 2007 the Company published a Pre-Feasibility Report and an updated
Independent Resource Estimate which shows Measured, Indicated and Inferred
“4E”
(platinum, palladium, rhodium and gold) resources for the Project 1 area of
the
WBJV. On February 7, 2007 the Company published an initial Independent Resource
Estimate for the Project 2 area of the WBJV. Later, on September 7, 2007 the
Company published its most recent resource calculation for the
WBJV.
The
Pre-Feasibility Study and revised resource estimation for the Project 1 area
of
the WBJV was dated January 15, 2007. A report titled “Technical Report Western
Bushveld Joint Venture Project 1 (Elandsfontein and Frischgewaagd)” was filed by
the Company on www.sedar.com January 30, 2007. The Pre-Feasibility Study
considers and outlines the details and possible mitigation of several considered
projects risks, not yet assessed in full detail, including metallurgical
recoveries, smelting and refining costs, surface and mining rights, permits,
and
involvement of communities in compliance with the Minerals and Petroleum
Resources Development Act (2002).
The
Pre-Feasibility Study’s findings were positive for a platinum mine in the
Project 1 area of the WBJV in South Africa. The partners of the WBJV gave their
approval to advance towards a bankable feasibility study with a potential scope
for an underground mine producing 155,000 ounces per annum platinum or 250,000
ounces per annum platinum, palladium, rhodium and gold in concentrate. (See
section in this report on “Risk Factors”)
Resources
in the Measured and Indicated categories can be included in a bankable
feasibility financial model under SAMREC and NI-43101 guidelines. Resources
that
are not reserves do not have demonstrated viability. Further drilling is now
investigating additional areas with reef potential along strike on Project
areas
2 and 3 within the Joint Venture area. At the time of writing the Company has
four diamond drilling rigs deployed on the WBJV. The WBJV property includes
the
untested projected surface trace of the Merensky and UG2 reefs which have been
intercepted in a number of drill holes outside of areas where resources have
been defined to date. To the time of writing the WBJV has completed more than
100,000 metres of drilling in approximately 200 boreholes.
Geological
Setting
Regional
Geology of the BIC
The
stable Kaapvaal and Zimbabwe Cratons in southern Africa are characterised by
the
presence of large mafic-ultramafic layered complexes. These include the Great
Dyke of Zimbabwe, the Molopo Farms Complex in Botswana and the well-known
BIC.
The
BIC
was intruded about 2,060 million years ago into rocks of the Transvaal
Supergroup along an unconformity between the Magaliesberg quartzites (Pretoria
Group) and the overlying Rooiberg felsites (a dominantly felsic volcanic
precursor). The BIC is by far the most economically important of these deposits
as well as the largest in terms of preserved lateral extent, covering an area
of
over 66,000km2.
It has a maximum thickness of 8km, and is matched in size only by the Windimurra
intrusion in Western Australia and the Stillwater intrusion in the USA
(Cawthorn, 1996). The mafic component of the Complex hosts layers rich in PGEs,
nickel, copper, chromium and vanadium. The BIC is reported to contain about
75%
and 50% of the world’s platinum and palladium resources respectively (Vermaak,
1995). The mafic component of the BIC is subdivided into several generally
arcuate segments/limbs, each associated with a pronounced gravity anomaly.
These
include the western, eastern, northern/Potgietersrus, far western/Nietverdient
and southeastern/Bethal limbs. The mafic rocks are collectively termed the
Rustenburg Layered Suite (RLS) and are subdivided into the following
five zones (figure 1 and figure 2):
|
·
|
Marginal
Zone comprising finer-grained gabbroic rocks with abundant
country-rock fragments.
|
|
·
|
Lower
Zone – the overlying Lower Zone is dominated by
darker, more iron and magnesium bearing rocks (orthopyroxenite with
associated olivine-rich cumulates, harzburgite,
dunite).
|
|
·
|
Critical
Zone – its commencement is marked by first
appearance of well-defined cumulus chromitite layers. Seven Lower
Group
chromitite layers have been identified within the lower Critical
Zone. Two
further chromitite layers – Middle Group (MG) – mark the top of the lower
Critical Zone. From this stratigraphic position upwards, plagioclase
becomes the dominant cumulus phase and lighter coloured (noritic)
rocks
predominate. The MG3 and MG4 chromitite layers occur at the base
of the
upper Critical Zone, which is characterised from here upwards by
a number
of cyclical units. The cycles commence in general with narrow, darker
(pyroxenitic) horizons (with or without olivine and chromitite layers);
these invariably pass up into norites, which in turn pass into near
white
layers (leuconorites and anorthosites). The UG1 – first of the two Upper
Group chromitite layers – is a cyclical unit consisting of chromitite
layers with overlying footwall units that are supported by an underlying
anorthosite. The overlying UG2 chromitite layer is of considerable
importance because of its economic concentrations of PGEs. The two
uppermost cycles of the Critical Zone include the Merensky and Bastard
cycles. The Merensky Reef (MR) is found at the base of the Merensky
cycle,
which consists of a pyroxenite and pegmatoidal feldspathic pyroxenite
assemblage with associated thin chromitite layers that rarely exceed
one
metre in thickness. The top contact of the Critical Zone is defined
by a
giant mottled anorthosite that forms the top of the Bastard cyclic
unit.
|
|
·
|
Main
Zone– consists of norites grading upwards into gabbronorites. It
includes several distinctive mottled anorthosite units towards the
base
and a distinctive pyroxenite, the Pyroxenite Marker, two thirds of
the way
up. This marker-unit does not occur in the project area, but is evident
in
the adjacent BRPM. The middle to upper part of the Main Zone is very
resistant to erosion and gives rise to distinctive hills, which are
currently being mined for dimension stone (black
granite).
|
|
·
|
Upper
Zone– the base is defined by the appearance of cumulus magnetite
above the Pyroxenite Marker. The Upper Zone is divided into Subzone
A at
the base; Subzone B, where cumulus iron-rich olivine appears; and
Subzone
C, where apatite appears as an additional cumulus
phase.
|
Local
Geology –Western Bushveld Limb
Exposures
of the BIC located on the western limb include the stratigraphic units of the
RLS. The local geology includes the classic layered sequence of the RLS and
the
footwall rocks of the Transvaal Supergroup. The Merensky Reef is believed to
be
present within much of this lobe. The position of the Merensky Reef is closely
associated with the upper Critical Zone.
Project
Geology
The
sequence of the BIC within the WBJV area is confined to the lower part of the
Main Zone (Porphyritic Gabbro Marker) and the Critical Zone (HW5–1 and Bastard
Reef to UG1 footwall sequence). The rock sequence thins towards the southwest
(subcrop) including the marker horizons with concomitant middling of the
economic reefs or total elimination thereof. The UG2 Reef and, more often,
the
UG1 Reef are not developed in some areas owing to the irregular and elevated
palaeo-floor of the Transvaal sediments. In the north end of the WBJV project
area a younger volcanic root, the Pilanesburg Complex, crosscuts the BIC and
the
Critical Zone, the main strata of economic interest.
Surface
Geology
The
WBJV
is underlain by the lower portion of the RLS, the Critical Zone and the lower
portion of the Main Zone. The ultramafic Lower Critical Zone and the Mafic
Upper
Critical Zone and the Main Zone weather to dark, black clays with very little
topography. The underlying Transvaal Supergroup comprises shale and quartzite
of
the Magaliesberg Formation, which creates a more undulating topography. Gravity,
magnetic, LANDSAT, aerial photography and geochemistry have been used to map
out
lithological units.
In
parts
of the WBJV the MR outcrops, as does the UG2 Reef, beneath a relatively thick
(2-5m) overburden of red Hutton to darker Swartland soil forms. The sequence
strikes northwest to southeast and dips between 4° and 42° with an average of
20° in the Project 1 and 1A areas. The top 32m of rock formation below the soil
column is characterized by a highly weathered rock profile (regolith) consisting
mostly of gabbro within the Main Zone. Thicknesses of this profile increase
near
intrusive dykes traversing the area.
Reefs
The
MR is
a well developed seam along the central part and towards the north eastern
boundary of the Project area. Islands of thin reef and relatively low-level
mineralization are present. The better-developed reef package, in which the
intensity of chromitite is generally combined with pegmatoidal feldspathic
pyroxenite development, occurs as larger island domains along a wide central
strip in a north south orientation from subcrop to deeper portions.
The
UG2
reef is well developed towards the northeast of the project area, but
deteriorates towards the southwest. Within the latter area, the reef is present
as a thin discontinuous or disrupted chromitite/pyroxenite layer. It also
appears to be disrupted by the shear zone along the footwall alteration zone.
Towards the northwest on Frischgewaagd, the reef is generally well developed
and
occurs as a single prominent chromitite layer varying in thickness from a few
centimetres to ~2m.
Identification
of the reefs relies on the recognition of the layered sequence or stratigraphy
and an example of this is provided in figure 2.
The
thickness of the sequences between the UG2 and MR in the Project 1 and 1A areas
increases from ~10m to 80m in a southwest-northeast direction. A similar
situation exists in the north of the project area but with the thickness between
the reefs ranging from 6m to 25m at depths of 200m below surface. In general,
the thickness between the reefs appears to increase in a northeasterly
direction, sub-parallel to the strike of the BIC layered
lithologies.
Local
Structure
Floor
rocks in the southwestern BIC display increasingly varied degrees of deformation
towards the contact with the RLS. Structure within the floor rocks is dominated
by the north-northwest trending post-Bushveld Rustenburg Fault. This normal
fault with down-throw to the east extends northwards towards the west of the
Pilanesberg Complex. A second set of smaller faults and joints, striking 70° and
dipping very steeply south-southeast or north-northwest, are related to the
Rustenburg fault system. These structures were reactivated during the intrusion
of the Pilanesberg Complex. Dykes associated with this Complex intruded along
these faults and joints.
Major
structures, which occur within the WBJV area, include the Caldera and Elands
faults and Chaneng Dyke and a major north-south trending feature, which can
be
observed across the entire Pilanesberg Complex (figure 3). These east-west
trending structures dip steeply (between 80° and 90°). The magnetics indicate
that the Chaneng Dyke dips steeply to the north. This is consistent with similar
structures intersected underground on the neighbouring Bafokeng Rasimone
Platinum Mine, which all dip steeply northward.
Two
stages of folding have been recognized within the area. The earliest folds
are
mainly confined to the Magaliesberg Quartzite Formation. The fold axes are
parallel to the contact between the RLS and the Magaliesberg Formation.
Quartzite fragments are present close to the contact with the RLS and the
sedimentary floor. Examples of folding within the floor rocks are the
Boekenhoutfontein, Rietvlei and Olifantsnek anticlines. The folding was
initiated by compressional stresses generated by isostatic subsidence of the
Transvaal Supergroup during sedimentation and the emplacement of the
pre-Bushveld sills. The presence of an undulating contact between the floor
rocks and the RLS, and in this instance the resultant formation of large-scale
folds, substantiates a second stage of deformation. The fold axes trend at
approximately orthogonal angles to the first folding event. Deformation during
emplacement of the BIC was largely ductile and led to the formation of basins
by
sagging and folding of the floor rocks. This exerted a strong influence on
the
subsequent evolution of the Lower and Critical Zones and associated chromitite
layers.
The
structural events that influenced the floor rocks played a major role during
emplacement of the BIC. There is a distinct thinning of rocks from east to
west
as the BIC onlaps onto the Transvaal floor rocks, even to the extent that some
of the normal stratigraphic units have been eliminated. The vertical separation
Merensky and UG2 decreases from 60m to 2m at outcrop position.
Project
Structure
A
structural model was developed from data provided by the magnetic survey
results, geological logs of drilled cores, and more recently with 3-D seismic
survey interpretations. At least three generations of faults were identified
on
the property.
Down
hole
geophysical logging was also used to confirm the orientation of structures
identified and interpreted. The geophysical information provided good
correlation to the interpretation. Project level structure is an important
risk
factor for potential economic considerations and has been studied.
The
oldest event appears to be associated with dykes and sills trending at 305
degrees and is of post-BIC age. It appears to be the most prominent, with the
largest displacement component of more than 20m. The majority of the faults
are
normal faults dipping in a westerly direction, decreasing in their dip downwards
and displaying typical listric fault system behaviour.
A
second
phase represented by younger fault features is trending in two directions at
345
degrees and 315 degrees northwards respectively and appears to have consistent
down-throws towards the west.
A
third
phase of deformation may be related to a regional east-west-striking dyke system
causing discontinuity on adjacent structures. Several dolerite intrusives,
mainly steep-dipping dykes and bedding-parallel sills, were intersected in
boreholes. These range in thickness from 0.5–30m and most appear to be of a
chilled nature; some are associated with faulted contacts. Evident on the
magnetic image is an east-west-trending dyke, which was intersected in borehole
WBJV005 and appears to be of Pilanesberg-intrusion age. This dyke has a buffer
effect on structural continuity as faulting and earlier stage intrusives are
difficult to correlate on either side; and more work is required to understand
the mechanics.
- -



Exploration
The
Company is the operator of the WBJV and Company personnel have conducted or
supervised the work described below. Third party contractors are used to conduct
specific components of the work, such as drilling contractors or geophysical
contractors, for example, but they remain under the direction of the
Company.
Fieldwork
in the form of soil sampling and surface mapping was initially done on the
farm
Onderstepoort, where various aspects of the lower Critical Zone, intrusive
ultramafic bodies and structural features were identified. Efforts were later
extended southwards to the farms Frischgewaagd and Elandsfontein.
Geophysical
information obtained from Anglo Platinum was very useful during the
identification and extrapolation of major structural features as well as the
lithological layering of the BIC.
Additional
ground gravity survey measurements of 120.2km have been completed by the Company
on 500m line spacing perpendicular to the strike across the deposit, together
with 65.5km of ground magnetic survey. The ground gravity data played a
significant role in determining the hinge line where the BIC rocks start
thickening down-dip, and this raised the possibility of more economic
mineralisation. At the same time, the data shows where the Transvaal footwall
causes the abutment or onlapping of the BIC rocks. Ground magnetic data helped
to highlight faults and dykes as well as to delineate iron replacement
ultramafic pegmatoids, which generally disrupt the economic viability of the
reefs within the Critical Zone.
An
aeromagnetic survey was flown for Anglo Platinum by Fugro Airborne using a
Midas
Heli-borne magnetic gradiometer system. A total of 25,324 line kilometres were
flown on lines with a direction of 55° (true north) and with a sensor at a
nominal elevation of 20m. The area covered by the survey was some four times
larger than the WBJV area, which was situated in the north western quadrant
of
the surveyed area. The high resolution survey data was of a very high quality.
The aeromagnetic data alone made it possible to delineate magnetic units in
the
Main Zone, to recognise the strata strike and to identify the dykes and
iron-replacements
Since
March 2005 PTM has drilled 137,954 metres of core from borehole WBJV001 to
WBJV216. Including borehole assay data provided by Anglo Platinum a total of
40,122 samples have been compiled into the project database. Of this
total the Company has contributed 30,909 assay samples from the above boreholes
comprised of 25,982 field samples, 2,445 standards and 2,482
blanks. Of the standards submitted by the Company 1.60% failed for
platinum and 1.27% failed for palladium. Of the blanks submitted by
the Company 0.81% failed for platinum and 0.32% failed for
palladium A failure is defined as a result more than 3 standard
deviations from the mean of the results returned. The failures
reported are well within the acceptable limit according to industry
guidelines. Of the failures reported the majority were related to
laboratory problems or data entry errors. The Company has determined
that the database is reliable. A failed standard is considered to be cause
for
re-assay if it falls within a determined mining cut for either the Merensky
or
UG2 Reefs (MRMC and UG2MC).
Mineralization
Exposures
of the BIC located on the western limb include the stratigraphic units of the
Rustenburg Layered Suite (“RLS”). The sequence comprises mostly
gabbros, norites, anorthosites and pyroxenites. The potential economic horizons
within the BIC and within the WBJV Project Area are the Merensky Reef and UG2
Reef situated in the Critical Zone of the RLS of the BIC; these horizons are
known for their continuity. The Merensky Reef is generally associated with
a
0.1–1.2m-thick pegmatoidal feldspathic pyroxenite unit and is also generally
associated with thin chromitite layers on either/both the top and bottom
contacts of the reef. The UG2 chromitite layer occurs sequentially below the
Merensky Reef and is on average 1.50m thick. Both Reefs are pervasive along
the
Western Limb of the BIC and occur within the project area.
The
Merensky and UG2 Reefs are mined at the BRPM adjoining the WBJV property as
well
as on other contiguous platinum-mine properties. In general, the layered package
dips at less than 20 degrees and local variations in the reef attitude have
been
modelled. The Merensky and UG2 reefs, in the Project Area dip between 4 and
42
degrees.
Drilling
The
type
of drilling being conducted on the WBJV is a diamond-drilling core-recovery
technique involving a BQ-size solid core extraction. The drilling is placed
on
an unbiased 500m x 500m grid and detailed when necessary to a 250m x 250m grid.
To date, 162 boreholes have been drilled by the Company on Project Area 1 and
27
boreholes have been drilled on Project Area 1A. A total of 17 holes have been
drilled on the Farm Koedoesfontein within the Project 3 area. A total of 7
holes
have been drilled on RE 4 and Portion 11 of the Farm Frischgewaagd within the
Project 2 area by the WBJV. Additional holes have also been drilled on RE 4
and
Portion 11 by Project 2 operator Wesizwe, who reports that they have drilled
a
further 95 bore holes for a total of 74,138 metres on those farm
portions.
The
results of the drilling and the general geological interpretation are digitally
captured in SABLE (a commercially available logging software) and in a GIS
software package named ARCVIEW. The exact borehole locations, together with
the
results of the economic evaluation, are plotted on plan. From the geographic
location of the holes drilled, regularly spaced sections are drawn by hand
and
digitised. This information was useful for interpreting the sequence of the
stratigraphy intersected as well as for verifying the borehole
information.
The
structural features identified from aeromagnetic data were interpreted in terms
of a regional structural model. Major dyke features were easily recognised
and
these assisted in the compilation of a structural model for the WBJV project
area. Exploration drilling later helped to confirm these
interpretations.
The
geometry of the deposit has been clearly defined in the sections drawn through
the property. All holes were drilled vertically and the down hole surveys
indicate very little deviation. A three-dimensional surface – digital terrain
model (DTM) – was created and used in the calculation of the average dip of 10
to 30 degrees. This dip has been factored into the calculations on which
resource estimates are based.
Sampling
and Analysis
Collection
of Core
Drilled
core is cleaned, de-greased and packed into metal core boxes by the drilling
company. The core is collected from the drilling site on a daily basis by a
Company geologist and transported to the exploration office by Company
personnel. Before the core is taken off the drilling site, the depths are
checked and entered on a daily drilling report, which is then signed off by
the
Company. The core yard manager is responsible for checking all drilled core
pieces and recording the following information:
|
·
|
Drillers’
depth markers (discrepancies are
recorded).
|
|
·
|
Fitment
and marking of core pieces.
|
|
·
|
Core
losses and core gains.
|
|
·
|
Grinding
of core.
|
|
·
|
One-meter-interval
markings on core for sample
referencing.
|
|
·
|
Re-checking
of depth markings for accuracy.
|
Core
sampling is carried out by qualified geologists under the supervision of the
project geologist, who is responsible for timely delivery of the samples to
the
relevant laboratory. The supervising and project geologists ensure that samples
are transported by Company contractors.
Sample
Preparation, Laboratory Standards and Procedures
The
first
step in the sampling of the diamond-drilled core is to mark the core from the
distance below collar in 1m units and then for major stratigraphic units. Once
the stratigraphic units are identified, the economic units – Merensky Reef and
UG2 Reef – are marked. The top and bottom contacts of the reefs are clearly
marked on the core. Thereafter the core is rotated in such a manner that all
lineations pertaining to stratification are aligned to produce a representative
split. A centre cut line is then drawn lengthways for cutting. After cutting,
the material is replaced in the core trays. The sample intervals are then marked
as a line and a distance from collar.
The
sample intervals are typically 15–25cm in length. In areas where no economic
zones are expected, the sampling interval could be as much as a metre. The
sample intervals are allocated a sampling number, and this is written on the
core for reference purposes. The half-core is then removed and placed into
high-quality plastic bags together with a sampling tag containing the sampling
number, which is entered onto a sample sheet. The start and end depths are
marked on the core with a corresponding line. The duplicate tag stays as a
permanent record in the sample booklet, which is secured on site. The
responsible project geologist then seals the sampling bag. The sampling
information is recorded on a specially designed sampling sheet that facilitates
digital capture into the SABLE system. The sampling extends for about a metre
into the hangingwall and footwall of the economic reefs.
When
samples are prepared for shipment to the analytical facility the following
steps
are followed:
|
·
|
Samples
are sequenced within the secure storage area and the sample sequences
examined to determine if any samples are out of order or
missing.
|
|
·
|
The
sample sequences and numbers shipped are recorded both on the
chain-of-custody form and on the analytical request
form.
|
|
·
|
The
samples are placed according to sequence into large plastic bags.
(The
numbers of the samples are enclosed on the outside of the bag with
the
shipment, waybill or order number and the number of bags included
in the
shipment).
|
|
·
|
The
chain-of-custody form and analytical request sheet are completed,
signed
and dated by the project geologist before the samples are removed
from
secured storage. The project geologist keeps copies of the analytical
request form and the chain-of-custody form on
site.
|
|
·
|
Once
the above is completed and the sample shipping bags are sealed, the
samples may be removed from the secured area. The method by which
the
sample shipment bags have been secured must be recorded on the
chain-of-custody document so that the recipient can inspect for tampering
of the shipment.
|
For
the
present database, field samples have been analyzed by three different
laboratories: ALS Chemex (South Africa), Genalysis (Australia) and currently
Set
Point laboratories (South Africa). Samples from borehole WBJV008 onwards were
sent to the Set Point laboratory preparation facility at Mokopane.
Transportation
from their preparation laboratory in Mokopane to their laboratory in
Johannesburg was done under secure conditions as required by the Company. Dr
B
Smee, a geochemist and a director of the Company, has reviewed the facilities
of
Set Point Laboratories.
Samples
are received, sorted, verified and checked for moisture and dried if necessary.
Each sample is weighed and the results are recorded. Rocks, rock chips or lumps
are crushed using a jaw crusher to less than 10mm. The samples are then milled
for 5 minutes in a Labtech Essa LM2 mill to achieve a fineness of 90% less
than
106µm, which is the minimum requirement to ensure the best accuracy and
precision during analysis.
Samples
are analyzed for Pt (ppb), Pd (ppb) Rh (ppb) and Au (ppb) by standard 25g lead
fire-assay using silver as requested by a co-collector to facilitate easier
handling of prills as well as to minimize losses during the cupellation process.
Although collection of three elements (Pt, Pd and Au) is enhanced by this
technique, the contrary is true for rhodium (Rh), which volatilizes in the
presence of silver during cupellation. Palladium is used as the co-collector
for
Rh analysis. The resulting prills are dissolved with aqua regia for ICP
analysis.
After
pre-concentration by fire assay and microwave dissolution, the resulting
solutions are analyzed for Au and PGM’s by the technique of ICP-OES (inductively
coupled plasma–optical emission spectrometry).
Quality
Assurance and Quality Control (QA&QC) Procedures and
Results
The
Company protocols for quality control are as follows:
|
1.
|
The
project geologist oversees the sampling
process.
|
|
2.
|
The
core yard manager oversees the core quality
control.
|
|
3.
|
The
exploration geologists and the sample technicians are responsible
for the
actual sampling process.
|
|
4.
|
The
project geologist oversees the chain of
custody.
|
|
5.
|
The
internal QP verifies both processes and receives the laboratory
data.
|
|
6.
|
The
internal resource geologist and the database manager merge the data
and
produce the SABLE sampling log with assay
values.
|
|
7.
|
Together
with the project geologist, the resource geologist determines the
initial
mining cut.
|
|
8.
|
The
external auditor verifies the sampling process and signs off on the
mining
cut.
|
|
9.
|
The second
external database auditor verifies the SABLE database and highlights
QA&QC failures.
|
|
10.
|
A
Company technician runs the QA&QC graphs (standards, blanks and
duplicates) and reports anomalies and failures to the internal
QP.
|
|
11.
|
The
internal QP requests re-assay.
|
|
12.
|
Check
samples are sent to a second laboratory to verify the validity of
data
received from the first laboratory.
|
Standards
Standards
are used to asses the accuracy and possible bias of assay values for Platinum
(Pt) and Palladium (Pd). Rhodium (Rh) and Gold (Au) were monitored where data
for the standards were available, but standards were not failed on Rh and Au
alone.
Generally
the standards are inserted in place of the fifteenth sample in the sample
sequence. The standards are stored in sealed containers and considerable care
is
taken to ensure that they are not contaminated in any manner (e.g. through
storage in a dusty environment, being placed in a less than pristine sample
bag
or being in any way contaminated in the core saw process).
Assay
testing refers to Round Robin programmes involving collection and preparation
of
material of varying matrices and grades, to provide homogeneous material for
developing reference materials (standards) necessary for monitoring assaying.
Assay testing is also useful in ensuring that analytical methods are matched
to
the mineralogical characteristics of the mineralization being explored. Samples
are sent to a sufficient number of international testing laboratories to provide
enough assay data to statistically determine a representative mean value and
standard deviation necessary for setting acceptance/rejection tolerance
limits.
Tolerance
limits are set at two and three standard deviations from the Round Robin mean
value of the reference material. A single analytical batch is rejected for
accuracy when reference material assays are beyond three standard deviations
from the certified mean, and any two consecutive standards within the same
batch
are rejected on the basis of bias when both reference material assays are beyond
two standard deviations limit on the same side of the mean. Reasons why
standards failed may include database errors, selection of wrong standards
in
the field, sample mis-ordering errors and bias from the laboratory. A failed
standard is considered to be cause for re-assay if it falls within a determined
mining cut for either the Merensky or UG2 Reefs (MRMC and UG2MC). The bulk
of
the economic value of the reefs is located within the combined value for Pt
and
Pd with Rh and Au comprising only 10% of the 4E value (refer to Item 3 for
the
prill splits). As requested by a result, standards that failed for Rh and/or
Au
(Rh evaluated for AMIS0005, AMIS0007 and AMIS0010 standards; Au evaluated for
CDN-PGMS-5, 6, 7 and 11) are not included in the final results as the influence
is deemed as not of material economic value.
Blanks
The
insertion of blanks provides an important check on the laboratory practices,
especially potential contamination or sample sequence mis-ordering. Blanks
consist of a selection of Transvaal Quartzite pieces (devoid of platinum,
palladium, copper and nickel mineralization) of a mass similar to that of a
normal core sample. The blank being used is always noted to track its behaviour
and trace metal content. Typically the first blank is sample 5 in a given
sampling sequence.
Duplicates
The
purpose of having field duplicates is to provide a check on possible sample
over-selection. The field duplicate contains all levels of error – core or
reverse-circulation cutting splitting, sample size reduction in the prep lab,
sub-sampling at the pulp, and analytical error.
Field
duplicates were, however, not used on this project by very significant reason
of
the assemblage of the core. Firstly, BQ core has an outer diameter of only
36.2mm. Secondly, it is friable and brittle owing to the chrome content: this
makes it extremely difficult to quarter the core, which usually ends up in
broken pieces and not a solid piece of core.
Because
of this problem, the laboratory was asked to regularly assay split pulp samples
as a duplicate sample to monitor analytical precision.
Assay
Validation
Although
samples are assayed with reference materials, an assay validation programme
is
being conducted to ensure that assays are repeatable within statistical limits
for the styles of mineralization being investigated. It should be noted that
validation is different from verification; the latter implies 100%
repeatability. The assay validation programme entails:
|
·
|
a
re-assay programme conducted on standards that failed the tolerance
limits
set at two and three standard deviations from the Round Robin mean
value
of the reference material;
|
|
·
|
ongoing
blind pulp duplicate assays at Set Point
Laboratory;
|
|
·
|
check
assays conducted at an independent assaying facility
(Genalysis).
|
Re-assay
This
procedure entails re-submission and re-assaying of failed standard #2 together
with standard #1 submitted before and standard #3 submitted after the particular
failed standard #2, as well as all submitted field samples (pulps) in between
#1
and #3.
Sampling
Procedures
The
QA&QC practice of the Company is a process beginning with the actual
placement of the borehole position (on the grid) and continuing through to
the
decision for the 3D economic intersection to be included in (passed into) the
database. The values are also confirmed, as well as the correctness of
correlation of reef/mining cut so that populations used in the geostatistical
modeling are not mixed; this makes for a high degree of reliability in
estimates. Outside reviews are completed on geological and database controls
regularly in addition to independent qualified person due
diligence.
Security
of Samples
Samples
are not removed from secured storage location without completion of a
chain-of-custody document; this forms part of a continuous tracking system
for
the movement of the samples and persons responsible for their security. Ultimate
responsibility for the secure and timely delivery of the samples to the chosen
analytical facility rests with the project geologist and samples are not
transported in any manner without the project geologist’s
permission.
During
the process of transportation between the project site and analytical facility
the samples are inspected and signed for by each individual or company handling
the samples. It is the mandate of both the supervising and project geologist
to
ensure secure transportation of the samples to the analytical facility. The
original chain-of-custody document always accompanies the samples to their
final
destination.
The
supervising geologist ensures that the analytical facility is aware of the
Company standards and requirements. It is the responsibility of the analytical
facility to inspect for evidence of possible contamination of, or tampering
with, the shipment received from the Company. A photocopy of the
chain-of-custody document, signed and dated by an official of the analytical
facility, is faxed to the Company’s offices in Johannesburg upon receipt of the
samples by the analytical facility and the original signed letter is returned
to
the Company along with the signed analytical certificate(s).
The
analytical facility’s instructions are that if they suspect the sample shipment
has been tampered with, they will immediately contact the supervising geologist,
who will arrange for someone in the employment of the Company to examine the
sample shipment and confirm its integrity prior to the start of the analytical
process.
If,
upon
inspection, the supervising geologist has any concerns whatsoever that the
sample shipment may have been tampered with or otherwise compromised, the
responsible geologist will immediately notify the Company management in writing
and will decide, with the input of management, how to proceed. In most cases
analysis may still be completed although the data must be treated, until proven
otherwise, as suspect and unsuitable as a basis for a news release until
additional sampling, quality control checks and examination prove their
validity.
Should
there be evidence or suspicions of tampering or contamination of the sampling,
the Company will immediately undertake a security review of the entire operating
procedure. The investigation will be conducted by an independent third party,
whose the report is to be delivered directly and solely to the directors of
the
Company, for their consideration and drafting of an action plan. All in-country
exploration activities will be suspended until this review is complete and
the
findings have been conveyed to the directors of the company and acted
upon.
Mineral
Resource and Mineral Reserve Estimates
Summary
resource details from published reports for Project 1, Project 1a and Project
2
follow in the table below. Platinum Group Metals Ltd. holds a 37% interest
in
the 4E ounces attributable to the WBJV. The prill splits and 4E estimates for
Project 2 have been calculated by arithmetic mean. The prill splits and 4E
estimates for Project 1 and 1a have been tested for reasonableness by kriging
on
the individual elements. Copper and nickel as well as the minor platinum group
elements have also been estimated with a statistical process of Simple Kriging
for Project 1 and 1a. Absent values for copper, nickel and the minor platinum
group elements have been derived from regressed values.
|
Project
|
Reef
|
Resource
Category
|
Cut-Off
|
WBJV
Interest
|
Tonnes
In Millions
|
Grade
4E
|
Width
Metres
|
Prill
Split (4E)
|
WBJV
Ozs In Millions
|
|||
|
Pt
|
Pd
|
Rh
|
Au
|
|||||||||
|
Project
1
|
||||||||||||
|
MR
|
Measured
|
300
cm g/t
|
100%
|
6.305
|
7.03
|
1.18
|
64%
|
27%
|
4%
|
5%
|
1.425
|
|
|
UG2
|
Measured
|
300
cm g/t
|
100%
|
7.165
|
3.75
|
1.56
|
63%
|
26%
|
10%
|
1%
|
0.864
|
|
|
MR
|
Indicated
|
300
cm g/t
|
100%
|
12.181
|
6.78
|
1.22
|
64%
|
27%
|
4%
|
5%
|
2.655
|
|
|
UG2
|
Indicated
|
300
cm g/t
|
100%
|
18.579
|
3.96
|
1.44
|
63%
|
26%
|
10%
|
1%
|
2.365
|
|
|
MR
|
Inferred
|
300
cm g/t
|
100%
|
0.289
|
6.47
|
1.03
|
64%
|
27%
|
4%
|
5%
|
0.060
|
|
|
UG2
|
Inferred
|
300
cm g/t
|
100%
|
2.387
|
4.40
|
1.49
|
63%
|
26%
|
10%
|
1%
|
0.338
|
|
|
Project
1a
|
||||||||||||
|
MR
|
Inferred
|
300
cm g/t
|
100%
|
1.871
|
6.48
|
1.15
|
64%
|
27%
|
4%
|
5%
|
0.390
|
|
|
UG2
|
Inferred
|
300
cm g/t
|
100%
|
2.973
|
5.00
|
1.57
|
63%
|
26%
|
10%
|
1%
|
0.478
|
|
|
Project
2
|
||||||||||||
|
RE
4
|
MR
|
Inferred
|
100
cm g/t
|
50%
|
6.54
|
5.84
|
1.42
|
68%
|
24%
|
5%
|
3%
|
0.614
|
|
UG2
|
Inferred
|
100
cm g/t
|
50%
|
11.95
|
4.63
|
1.57
|
59%
|
29%
|
11%
|
1%
|
0.890
|
|
|
Ptn
11
|
MR
|
Indicated
|
1.18
- 1.24 m
|
50%
|
0.220
|
7.38
|
1.21
|
62%
|
28%
|
5%
|
5%
|
0.025
|
|
UG2
|
Indicated
|
1.27
m
|
50%
|
0.050
|
4.32
|
1.27
|
59%
|
29%
|
11%
|
1%
|
0.004
|
|
|
MR
|
Inferred
|
1.11
- 1.55 m
|
50%
|
16.100
|
6.00
|
1.46
|
62%
|
28%
|
5%
|
5%
|
1.550
|
|
|
UG2
|
Inferred
|
1.23
m
|
50%
|
16.240
|
4.62
|
1.23
|
59%
|
29%
|
11%
|
1%
|
1.200
|
|
|
Total
Measured 4E
Ounces
|
2.289
|
|||||||||||
|
Total
Indicated 4E
Ounce
|
5.049
|
|||||||||||
|
Total
Inferred 4E
Ounces
|
5.520
|
|||||||||||
MR
= Merensky
Reef
UG2
= Upper Group 2
Reef
Project
1 and Project 1a
A
39% and
41% total geological loss for the Merensky Reef and UG2 Reef respectively
was
applied to the resource area to accommodate for areas of potentially un-mineable
structural and geological conditions. This geological loss considers losses
for
faults, dykes, potholes and areas of iron replacement pegmatite. Structural
loss
estimates are based on drilling, field mapping and remote sensing data
which
include a high resolution aeromagnetic survey. The Merensky mineral resource
estimate is based on 158 boreholes with 178 intercepts and the UG2 is based
on
192 intercepts within the 1,087 hectare area. The prill split has been
calculated by weighted averages as a proportion of the total 4E and the
grades
have been estimated with a more rigorous statistical process of Simple
Kriging.
The cut-off was determined on a practical mining width and the known costs
and
mining methods regionally. Platinum Group’s independent consulting Qualified
Person has provided the resource estimate according to the SAMREC code.
The
reconciliation to the CIM codes is that the categories are the same. The
resources are located on New Order prospecting permits that provide for
the
right to be converted to mining rights. Charles Muller of Minxcon is the
Qualified Person (“QP”) for this report. He is registered with the SACNASP
(South African Council for Natural Scientific Professions) (Registration
No.
400201/04). Mr. Muller is an independent consultant with 18 years experience
as
a geologist, and resource evaluator. Samples were analyzed under Platinum
Group’s and Anglo Platinum’s protocols including insertion of blanks, duplicates
and certified reference materials in the assay stream once in every 24
or fewer
samples. This is in addition to internal quality control measures undertaken
by
the contracted analytical facilities. Mr. Muller has visited the property
on
numerous occasions and has completed sufficient testing procedure to be
satisfied that he has reasonably verified the data.
Project
2 – Remaining Extent of Ptn 4 of the farm Frischgewaagd 96
JQ
An
iron
replacement area that was delineated by drilling and detailed aeromagnetics
was
subtracted. In addition to that, a further 18% geological loss was applied.
Charles Muller is the Qualified Person (“QP”) for the resource assessment
report. He is registered with the SACNASP (South African Council for Natural
Scientific Professions) (Registration No. 400201/04). Mr. Muller is an
independent consultant with 18 years experience as a geologist, and resource
evaluator. Samples were analyzed under Platinum Group’s and Anglo Platinum’s
protocols previously published for the project including insertion of blanks,
duplicates and certified reference materials in the assay stream once in
every
24 or fewer samples. This is in addition to internal quality control measures
undertaken by the contracted analytical facilities.
Project
2 – Ptn 11 of the farm Frischgewaagd 96 JQ
A
20%-30%
total geological loss was applied to the area to accommodate for areas
of
potentially un-mineable structural and geological conditions. This geological
loss considers losses for faults, dykes, potholes and an area of iron
replacement pegmatite. Structural loss estimates are based on drilling,
field
mapping and remote sense data which include a high resolution aeromagnetic
survey. The Merensky mineral resource estimate is based on 15 boreholes
with 39
intercepts within the 494 ha area and 13 boreholes with 35 intercepts for
the
UG2 mineral resource estimate. The cut-off was determined according to
a
practical mining width and the associated global mining methods. There
are
several other qualified person estimates in the public domain with other
degrees
of confidence on the same area. Once due diligence on further drilling
and
evaluation has been completed by the Company’s QP, the resource classification
for a 43-101 compliant report will be updated. The Company’s independent
consulting Qualified Person has provided this initial resource according
to the
SAMREC code. The reconciliation to the CIM codes is that the categories
are the
same. Mr. David Gray, of Snowden, is the independent QP for the resource
assessment report of Frischgewaagd 96 JQ, Portion 11. He is registered
with the
SACNASP, the South African Council for Natural Scientific Professions,
Registration No 400018/04. Mr. Gray has more than 17 years of relevant
experience in platinum group metal resource assessments. Sampling was conducted
using Anglo Platinum’s protocols, as previously published for the project. This
includes the insertion of blanks, duplicates and certified reference materials
in the assay stream, which is followed by routine quality analysis. These
quality controls are in addition to the internal quality control measures
undertaken by the contracted analytical facilities. Assays have been completed
largely at Anglo Platinum’s laboratories in Johannesburg by standard fire assay
procedures. Data has been verified by the QP to the extent that he has
personal
experience with the compilation of the data at the time it was collected
and the
protocols employed at Anglo Platinum during the data collection.
Mining
Operations
The
Company has conducted no mining operations to date on any of its
properties.
Exploration
and Development
Our
business is conducted primarily in South Africa, and to a lesser extent,
in
Ontario, Canada. As at the date hereof, our WBJV Project in South Africa
constitutes our only material property. None of our properties contain
any
mineral reserve estimates.
Exploration
on our South Africa and Ontario properties are not affected by seasonal
changes
although in Ontario, heavy equipment may or may not be moved over the soft
ground for approximately six weeks in the spring during thaw.
To
conduct our exploration, we are dependent on sub-contractors for certain
geological services, drilling equipment and supplies. These are generally
available but vary in price and immediacy of availability subject to
demand.
The
Company has not declared nor paid dividends on its common shares. The Company
has no present intention of paying dividends on its common shares, as it
anticipates that all available funds will be invested to finance the growth
of
its business.
Our
authorized capital consists of an unlimited number of shares of Common
Stock
without par value, of which 61,451,747 shares of Common Stock were issued
and
outstanding as at November 16, 2007. All of the issued shares of Common
Stock
are fully paid. Our company does not own any shares of Common
Stock.
The
stockholders are entitled to one vote for each share on all matters to
be voted
on by the stockholders. Each share of Common Stock is equal to every other
share
of Common Stock and all shares participate equally on liquidation, dissolution
or winding up of our company, whether voluntary or involuntary, or any
other
distribution of our assets among our stockholders for the purpose of winding
up
our affairs after we have paid out our liabilities. The stockholders are
entitled to vote for each share held and are entitled to receive pro
rata such dividends as may be declared by the board of directors out of
funds legally available therefore and to receive pro rata the remaining
property of our company upon dissolution. No shares have been issued subject
to
call or assessment. There are no pre-emptive or conversion rights, and
no
provisions for redemption, purchase or cancellation, surrender, sinking
fund or
purchase fund. Provisions as to the creation, modification, amendment or
variation of such rights or such provisions are contained in the Business
Corporations Act (British Columbia) (the
“BCA”).
Trading
Price and Volume
The
following table provides information as to the high, low and closing prices
of
the Company’s shares during the 12 months of the most recently completed
financial year as well as the volume of shares traded for each
month:
|
Toronto
Stock Exchange - PTM
|
|||
|
Month
|
High
|
Low
|
Volume
|
|
September,
2006
|
$1.90
|
$1.59
|
603,300
|
|
October,
2006
|
$1.98
|
$1.51
|
1,485,700
|
|
November,
2006
|
$2.37
|
$1.74
|
3,334,900
|
|
December,
2006
|
$2.37
|
$1.85
|
3,351,100
|
|
January,
2007
|
$2.50
|
$2.00
|
426,409
|
|
February,
2007
|
$3.00
|
$2.28
|
3,785,000
|
|
March,
2007
|
$3.24
|
$2.40
|
3,175,200
|
|
April,
2007
|
$3.83
|
$2.86
|
5,610,600
|
|
May,
2007
|
$4.79
|
$3.60
|
3,966,700
|
|
June,
2007
|
$4.60
|
$3.61
|
2,078,200
|
|
July,
2007
|
$4.40
|
$3.57
|
4,168,300
|
|
August,
2007
|
$3.83
|
$3.03
|
95,614
|
|
American
Stock Exchange - PLG
|
|||
|
Month
|
High
|
Low
|
Volume
|
|
September,
2006
|
not
trading
|
not
trading
|
not
trading
|
|
October,
2006
|
not
trading
|
not
trading
|
not
trading
|
|
November,
2006
|
not
trading
|
not
trading
|
not
trading
|
|
December,
2006
|
not
trading
|
not
trading
|
not
trading
|
|
January,
2007
|
not
trading
|
not
trading
|
not
trading
|
|
February,
2007
|
not
trading
|
not
trading
|
not
trading
|
|
March,
2007
|
not
trading
|
not
trading
|
not
trading
|
|
April,
2007
|
not
trading
|
not
trading
|
not
trading
|
|
May,
2007
|
not
trading
|
not
trading
|
not
trading
|
|
June,
2007
|
$
4.35
|
$
3.87
|
134,900
|
|
July,
2007
|
$
4.25
|
$
3.38
|
545,500
|
|
August,
2007
|
$
3.86
|
$
2.80
|
788,900
|
|
Over
The Counter Bulletin Board – PTMQF
|
|||
|
Month
|
High
|
Low
|
Volume
|
|
September,
2006
|
$
1.68
|
$
1.41
|
312,800
|
|
October,
2006
|
$
1.75
|
$
1.26
|
247,600
|
|
November,
2006
|
$
2.09
|
$
1.61
|
427,900
|
|
December,
2006
|
$
2.04
|
$
1.64
|
436,000
|
|
January,
2007
|
$
2.13
|
$
1.73
|
419,600
|
|
February,
2007
|
$
2.58
|
$
2.02
|
820,500
|
|
March,
2007
|
$
2.81
|
$
2.04
|
397,200
|
|
April,
2007
|
$
3.44
|
$
2.50
|
1,016,700
|
|
May,
2007
|
$
4.30
|
$
3.30
|
1,722,600
|
|
June,
2007
|
$
4.35
|
$
3.37
|
823,400
|
|
July,
2007
|
not
trading
|
not
trading
|
not
trading
|
|
August,
2007
|
not
trading
|
not
trading
|
not
trading
|
Prior
Sales
The
following table provides disclosure as to the securities of the Company
issued
but not listed on the Toronto Stock Exchange as of November 28,
2007:
|
Date
of
Sale
|
Type
of
Security
|
Number
of Securities
|
Exercise/
Conversion
Price
|
Expiry
Date
|
|
March
6, 2006
|
Share
Purchase Warrants
|
850,000
|
$1.75
|
March
6, 2008
|
There
are
no securities of the Company held in escrow.
|
Name
& Position
|
Principal
Occupation or Employment
|
No.
of Shares(3)(4)
|
No.
of Options/price
|
|
R.
MICHAEL JONES
President,
CEO and Director
British
Columbia, Canada
|
Professional
Geological Engineer
President,
and Chief Executive Officer of the Company and a predecessor
company from
2000 to present.
|
1,391,872(6)
|
250,000/$1.00
230,000/$2.57
125,000/$4.40
|
|
FRANK
R. HALLAM
CFO,
Secretary and Director
British
Columbia, Canada
|
Chartered
Accountant
Chief
Financial Officer of the Company and the founder of a predecessor
company
from 1983 to present.
|
518,014
|
57,000/$0.70
226,000/$1.00
220,000/$2.57
115,000/$4.40
|
|
BARRY
SMEE (1)
(2)
Director
British
Columbia,
Canada
|
Geologist
and Geochemist
President
of Smee & Associates, a private consulting, geological and
geochemistry company, since 1990.
|
33,100
|
75,000/$1.00
100,000/$2.57
75,000/$4.40
|
|
IAIN
McLEAN (1)
(2)
Director
and Corp. Consultant to Co.
British
Columbia, Canada
|
General
Management Consultant. Former CEO of Municipal Software Corporation
of
Canada, a software development company based in Victoria BC.
Former Vice
President and General Manager of Total Care Technologies, a division
of Ad
Opt Technologies Inc, a medical software development
company.
|
141,839
|
125,000/$1.00
100,000/$2.57
75,000/$4.40
|
|
ERIC
CARLSON (1)
Director
British
Columbia, Canada
|
Chartered
Accountant
President
and Chief Executive Officer of Anthem Properties Corp., an investment
group specializing in the acquisition and management of residential
and
office properties in Canada and the United States, since July
1994.
|
82,800(7)
|
175,000/$1.00
100,000/$2.57
75,000/$4.40
|
|
PETER
BUSSE
COO
British
Columbia, Canada
|
Professional
Geological Engineer
Chief
Operating Officer of the Company since October 2007. Former GM
Procon
Group, a contract mining development company, 2006 to 2007. Former
Mine
Manager, Placer Dome, Campbell Mine, 2002 to 2006.
|
Nil
|
150,000/$4.15
|
Notes:
(1) Member
of the Audit Committee
(2) Member
of Compensation Committee
(3) Includes
beneficial, direct and indirect shareholdings.
(4) Does
not include stock options and other rights to purchase or acquire
shares.
(5) There
are 61,451,747 shares of Common Stock issued and outstanding as of the
date of
this Form 20-F Annual Report.
|
(6)
|
Of
these shares, 956,000 (confirmed) shares are held by 599143 B.C.
Ltd., a
company 50% owned by Mr. Jones and 50% owned by Mr. Jones’
wife.
|
(7) Of
these shares, 55,800 shares are held by Carmax Enterprises Corporation,
a
private company owned by Mr. Carlson.
As
of
November 21, 2005, directors and officers of the Company own or control
approximately 2,167,625 common shares of the Company representing approximately
3.5% of its issued and outstanding shares.
Corporate
Cease Trade Orders or Bankruptcies
No
director or any proposed management nominee for election as a director
of the
Company is, or during the ten years preceding the date of this Annual
Information Form has been, a director or officer of any company that, while
the
person was acting in that capacity:
|
(a)
|
was
the subject of a cease trade order or similar order that denied
the
relevant company access to any exemption under securities legislation,
for
a period of more than 30 consecutive
days;
|
|
(b)
|
was
subject to an event that resulted, after the director or proposed
management nominee ceased to be a director or officer of the
relevant
company, in the relevant company being the subject of a cease
trade order
or similar order that denied the relevant company access to any
exemption
under securities legislation, for a period of more than
30 consecutive days; or
|
|
(c)
|
within
a year of the director or proposed management nominee ceasing
to be a
director or officer of the relevant company, became bankrupt,
made a
proposal under any legislation relating to bankruptcy or insolvency
or was
subject to or instituted any proceedings, arrangement, or compromise
with
creditors, or had a receiver, receiver manager, or trustee appointed
to
hold its assets.
|
Penalties
or Sanctions
No
director or officer of the Company has been the subject of any penalties
or
sanctions imposed by a court relating to Canadian securities legislation
or by a
Canadian securities regulatory authority or has entered into a settlement
agreement with a Canadian securities regulatory authority or, except as
hereafter set out, has been subject to any other penalties or sanctions
imposed
by a court or regulatory body that would be likely to be considered important
to
a reasonable investor in making an investment decision.
In
1991,
R. Michael Jones breached section 147 of the Alberta Securities Act in
relation
to late filing of insider reports. A settlement was reached and fulfilled,
which
included a fine of $250.00.
Personal
Bankruptcies
During
the ten years preceding the date of this Annual Information Form, no director
or
proposed management nominee for election as a director of the Company has
been
declared bankrupt or made a voluntary assignment in bankruptcy, made a
proposal
under any legislation relating to bankruptcy or insolvency, or been subject
to
or instituted any proceedings, arrangement or compromise with creditors,
or had
a receiver, receiver manager or trustee appointed to hold the assets of
that
individual.
Conflicts
of Interest
The
Company’s directors and officers may serve as directors or officers of other
companies or have significant shareholdings in other resource companies
and, to
the extent that such other companies may participate in ventures in which
the
Company may participate, the directors of the Company may have a conflict
of
interest in negotiating and concluding terms respecting the extent of such
participation. In the event that such a conflict of interest arises at
a meeting
of the Company’s directors, a director who has such a conflict will abstain from
voting for or against the approval of such participation or such terms.
From
time to time several companies may participate in the acquisition, exploration
and development of natural resource properties thereby allowing for their
participation in larger programs, permitting involvement in a greater number
of
programs and reducing financial exposure in respect of any one program.
It may
also occur that a particular company will assign all or a portion of its
interest in a particular program to another of these companies due to the
financial position of the company making the assignment. In accordance
with the
laws of British Columbia the directors of the Company are required to act
honestly, in good faith and in the best interests of the Company. In determining
whether or not the Company will participate in a particular program and
the
interest therein to be acquired by it, the directors will primarily consider
the
degree of risk to which the Company may be exposed and its financial position
at
that time.
The
directors and officers of the Company are aware of the existence of laws
governing the accountability of directors and officers for corporate opportunity
and requiring disclosures by the directors of conflicts of interest and
the
Company will rely upon such laws in respect of any directors’ and officers’
conflicts of interest or in respect of any breaches of duty by any of its
directors and officers. All such conflicts will be disclosed by such directors
or officers in accordance with the laws of British Columbia shall govern
themselves in respect thereof to the best of their ability in accordance
with
the obligations imposed upon them by law. The directors and officers of
the
Company are not aware of any such conflicts of interests.
Code
of Ethics
The
Company has adopted a Code of Business Conduct (the “Code”) that applies to all
of its directors, officers and employees, including the Chief Executive
Officer
and Chief Financial Officer. The Code includes provisions covering conflicts
of
interest, ethical conduct, compliance with applicable government laws,
rules and
regulations, and accountability for adherence to the Code. A copy of the
Code is
posted on the Company’s website, at www.platinumgroupmetals.net.
Committees
of the Board of Directors
Audit
Committee
The
Audit
Committee is responsible for reviewing the Company’s financial reporting
procedures, internal controls and the performance of the Company’s external
auditors. See Audit Committee Charter attached herein as Schedule
“A”.
Audit
Committee Composition and Background
The
Audit
Committee is comprised of Eric Carlson (Chairman), Iain McLean and Barry
Smee.
All three members of the Audit Committee are independent and financially
literate, meaning they are able to read and understand the Company’s financial
statements and to understand the breadth and level of complexity of the
issues
that can reasonably be expected to be raised by the Company’s financial
statements. In addition to each member’s general business experience, the
education and experience of each member of the Audit Committee that is
relevant
to the performance of his responsibilities as a member of the Audit Committee
are set forth below:
Eric
H.
Carlson, B.Comm,
Chartered Accountant - Mr.
Carlson has over 19 years of real estate investment, development and management
experience and he has been the President of Anthem Properties Corp. since
July
1994. Anthem is an investment group that specializes in the acquisition
and
management of Class B retail, multi family residential and office properties
in
high growth markets in Canada and the USA.
Ian
D. C.
McLean, B.Sc.Eng
(ARSM), M.B.A., MIMM. C. Eng. - Experience as senior executive in several
public
companies managing operations, listings, capital raising, etc. Also has
experience in underground mining operations in the UK and South
Africa.
Dr.
Barry
W. Smee, Ph.D., P.Geo - Professional Geologist/Geochemist with 35 years
in
mineral exploration as quality control and laboratory audit expert.
The
Board
of Directors has determined that each of Mr. McLean and Mr. Carlson is
an audit
committee financial expert within the meaning of the regulations promulgated
by
the United States Securities and Exchange Commission and is independent
within
the meaning of the American Stock Exchange Company Guide. Mr. McLean has
an
M.B.A. from Harvard Business School and a B.Sc (Eng.) in Mining from the
Imperial College of Science and Technology (London, England). In addition
to his
education, Mr. McLean has gained relevant experience acting as the Chief
Operating Officer of several private technology companies since 1995 and
as the
Vice President of Operations at Ballard Power Systems from 1993 to
1995. Mr. Carlson is a Chartered Accountant and holds a Bachelor of
Commerce degree from the University of British Columbia.
Reliance
on Certain Exemptions
At
no
time since the commencement of the Company’s most recently completed financial
year has the Company relied on the exemption in Section 2.4 of MI 52-110,
or an
exemption from MI 52-110, in whole or in part, granted under Part 8 of
MI
52-110. No non-audit services were approved pursuant to a de minimis exemption
to the pre-approval requirement.
Audit
Committee Oversight
At
no
time since the commencement of the Company’s most recently completed financial
year was a recommendation of the Audit Committee to nominate or compensate
an
external auditor not adopted by the Board of Directors.
Pre-Approval
Policies and Procedures
The
Company’s audit committee is authorized to review the performance of the
Company’s unrepentant auditors and pre-approves all audit and non-audit services
to be provided to the Company by its independent auditor. Prior to granting
any
pre-approval, the audit committee must be satisfied that the performance
of the
services in question is not prohibited by applicable securities laws and
will
not compromise the independence of the independent auditor. All non-audit
services performed by the Company’s auditor for the fiscal year ended August 31,
2007 have been pre-approved by the audit committee.
Independent
Auditor’s Fees
The
aggregate fees billed by the Company’s current independent auditor,
PricewaterhouseCoopers LLP, and former independent auditor, Deloitte &
Touche LLP, in each of the last two fiscal years are as follows. All
fees for the fiscal year ended August 31, 2006 were billed by Deloitte
&
Touche LLP.
|
Year
ended
August
31, 2007
|
Year
ended
August
31, 2006
|
|
|
Audit
Fees
|
$200,000
|
$90,000
|
|
Audit-Related
Fees(1)
|
$15,160
|
$13,801
|
|
Tax
Fees(2)
|
$
Nil
|
$3,000
|
|
All
Other Fees(3)
|
$
Nil
|
Nil
|
|
Total
|
$
215,160
|
$106,801
|
Notes:
|
|
(1)
|
The
aggregate fees billed for assurance and related services that
are
reasonably related to the performance of the audit or review
of our
financial statements, which are not included under the heading
“Audit
Fees”.
|
(2) The
aggregate fees billed for professional services rendered for tax compliance,
tax
advice and tax planning.
|
|
(3)
|
The
aggregate fees billed for products and services other than as
set out
under the headings “Audit Fees”, “Audit Related Fees” and “Tax
Fees”.
|
Compensation
Committee
The
Compensation Committee is comprised of Barry Smee (Chairman), Eric Carlson
and
Iain McLean. The primary objective of the committee is to discharge the
Board’s
responsibilities relating to compensation and benefits of the executive
officers
and directors of the Company. The Compensation Committee Charter is herewith
incorporated by reference.
Corporate
Governance and Nominating Committee
The
Corporate Governance and Nominating Committee is comprised of Iain McLean
(Chairman), Barry Smee and Frank Hallam. The primary objective of the committee
is to assist the Board in fulfilling its oversight responsibilities by
(a)
identifying individuals qualified to become board, and board committee
members,
and recommending the Board select director nominees for appointment or
election
to the Board, and (b) developing and recommending to the Board corporate
governance guidelines for the Company and making recommendations to the
Board
with respect to corporate governance practices. The Corporate Governance
and
Nominating Committee Charter is herewith incorporated by reference.
Disclosure
Committee
The
Disclosure Committee is comprised of R. Michael Jones (Chairman), Frank
Hallam
and Iain McLean. The primary objective of the committee is to ensure the
Company
and all persons to whom this Policy applies to meet their obligations under
the
provisions of securities laws and stock exchange rules by establishing
a process
for the timely disclosure of all material information, ensuring that all
persons
to whom the policy applies understand their obligations to preserve the
confidentiality of undisclosed material information and ensuring that all
appropriate parties who have undisclosed material information are prohibited
from insider trading and tipping under applicable law, stock exchange rules
and
this Policy. The Disclosure Committee Charter is herewith incorporated
by
reference.
There
are
no pending or material proceedings to which our company is or is likely
to be a
party or of which any of our properties is or is likely to be the
subject.
No
director, executive officer or principal shareholder of the Company, or
any
associate or affiliate of the foregoing, has had any material interest,
direct
or indirect, in any transaction within the three most recently completed
financial years or during the current financial year prior to the date
of this
Annual Information Form that has materially affected or will materially
affect
the Company.
The
Company’s transfer agent and registrar is:
Computershare
Investor Services
Inc.
3rd
floor – 510
Burrard Street
Vancouver,
British
Columbia
Canada V6C
3B9
There
are
no contracts of the Company other than contracts entered into in the ordinary
course of business of the Company and the Western Bushveld Joint Venture
Agreement (See “General Development of the Company – Three Year History”), that
are material to the Company and that were entered into within the most
recently
completed financial year of the Company or before the most recently completed
financial year of the Company and which are still in effect.
Names
of Experts
PricewaterhouseCoopers
LLP is the independent auditor of the Company within the meaning of the
Rules of
Professional Conduct of the Institute of the Chartered Accountants of British
Columbia.
Gordon
Cunningham, B.Eng. (Chemical), Pr.Eng., a registered professional engineer
with
the Engineering Council of South Africa (Reg. No. 920082), is responsible
for
the overall preparation of the report entitled “Technical Report Western
Bushveld Joint Venture Project 1 (Elandsfontein and Frischgewaagd)”, dated
January 15, 2007
Timothy
Spindler, BSc. (Mining), Pr.Eng., a registered professional engineer with
the
Engineering Council of South Africa (Reg. No. 880491), is responsible for
the
overall preparation of the report entitled “Technical Report Western
Bushveld Joint Venture Project 1 (Elandsfontein and Frischgewaagd)”, dated
January 15, 2007
Charles
Muller, BSc (Hons), Pr.Sc.Nat., a registered professional natural scientist
with
the South African Council for Natural Scientific Professionals (SACNASP)
(Reg.
No. 400201/04), responsible for the overall preparation of the report entitled
“Technical Report Western Bushveld Joint Venture Project 1 (Elandsfontein
and Frischgewaagd)”, dated January 15, 2007, and the report entitled
“Inferred Mineral Resourse Estimation on Project Area 2 of the
Western
Bushveld Joint Venture (“WBJV”) Located on the Western Limb of the Bushveld
Igneous Complex, South Africa” dated March 20, 2007, and the report
entitled“Competent Persons Report on Project Area 1 and 1A of the
Western Bushveld Joint Venture (“WBJV”) Located on the Western Limb of the
Bushveld Igneous Complex, South Africa”, dated September 7,
2007
David
Gray, BSc (Hons), Pr.Sci.Nat., responsible for the overall preparation
of the
report entitled “Mineral Resource Estimate, Frischgewaagd 96JQ Portion 11
North West Province, Republic of South Africa”, dated June, 2007, prepared
for the Issuer (the “Report”),
Adam
Miethke, BAppSc (Hons), MAusIMM (CP), responsible for the overall preparation
of
the report entitled “Mineral Resource Estimate, Frischgewaagd 96JQ Portion
11 North West Province, Republic of South Africa”, dated June 2007,
prepared for the Issuer (the “Report”),
Interests
of Experts
No
Qualified Person having an interest in the common shares of the Company,
directly or indirectly, or through stock options, has prepared or certified
a
statement, report or valuation described or included in a filing, or referred
to
in a filing, made under National Instrument 51-102 or National Instrument
43-101
by the Company during or related to the Company’s most recently completed
financial year.
The
Company’s technical reports are available on the SEDAR website at
www.sedar.com.
Additional
information, including details as to directors’ and officers’ remuneration,
principal holders of the Company’s shares, options to purchase Company shares
and certain other matters, is contained in the Company’s Management Information
Circular for the Annual General Meeting of shareholders to be held on January
8,
2008. The Circular will be made available on SEDAR and on the Company’s website
concurrent with the delivery of the document to the Company’s
shareholders.
Additional
Information is provided in the Company’s 2007 Annual Report containing the
Management’s Discussion and Analysis and the Consolidated Financial Statements
for the year ended August 31, 2007.
Copies
of
the above may be obtained, when available, on the Company’s website
www.platinumgroupmetals.net; on the SEDAR website at
www.sedar.com; or by calling the Company’s investor relations personnel
at 604-899-5450.
PLATINUM
GROUP METALS LTD.
(the
“Corporation”)
AUDIT
COMMITTEE CHARTER
|
1.
|
General
|
The
Board
of Directors of the Corporation (the “Board”) has established an Audit Committee
(the “Committee”) to assist the Board in fulfilling its oversight
responsibilities. The Committee will review and oversee the financial
reporting and accounting process of the Corporation, the system of internal
control and management of financial risks, the external audit process,
and the
Corporation’s process for monitoring compliance with laws and regulations and
its own code of business conduct. In performing its duties, the
Committee will maintain effective working relationships with the Board,
management, and the external auditors and monitor the independence of those
auditors. To perform his or her role effectively, each Committee
member will obtain an understanding of the responsibilities of Committee
membership as well as the Corporation’s business, operations and
risks.
The
Corporation’s independent auditor is ultimately accountable to the Board and to
the Committee. The Board and Committee, as representatives of the Corporation’s
shareholders, have the ultimate authority and responsibility to evaluate
the
independent auditor, to nominate annually the independent auditor to be
proposed
for shareholder approval, to determine appropriate compensation for the
independent auditor, and where appropriate, to replace the outside
auditor. In the course of fulfilling its specific responsibilities
hereunder, the Committee must maintain free and open communication between
the
Corporation’s independent auditors, Board and Corporation
management. The responsibilities of a member of the Committee are in
addition to such member’s duties as a member of the Board.
|
2.
|
Members
|
The
Board
will in each year appoint a minimum of three (3) directors as members of
the
Committee. All members of the Committee shall be non-management
directors and shall be independent within the meaning of all applicable
U.S. and
Canadian securities laws and the rules of the Toronto Stock Exchange and
the
American Stock Exchange, unless otherwise exempt from such
requirements.
None
of
the members of the Committee may have participated in the preparation of
the
financial statements of the Corporation or any current subsidiary of the
Corporation at any time during the past three years.
All
members of the Committee shall be able to read and understand fundamental
financial statements and must be financially literate within the meaning
of all
applicable U.S. and Canadian securities laws or become financially literate
within a reasonable period of time following his or her
appointment. Additionally, at least one member of the Committee shall
be financially sophisticated and shall have past employment experience
in
finance or accounting, requisite professional certification in accounting,
or
any other comparable experience or background which results in the individual’s
financial sophistication, which may include being or having been a chief
executive officer, chief financial officer, or other senior officer with
financial oversight responsibilities.
|
3.
|
Duties
|
The
Committee will have the following duties:
|
·
|
Gain
an understanding of whether internal control recommendations
made by
external auditors have been implemented by
management.
|
|
·
|
Gain
an understanding of the current areas of greatest financial risk
and
whether management is managing these
effectively.
|
|
·
|
Review
significant accounting and reporting issues, including recent
professional
and regulatory pronouncements, and understand their impact on
the
financial statements.
|
|
·
|
Review
any legal matters which could significantly impact the financial
statements as reported on by the Corporation’s counsel and engage outside
independent counsel and other advisors whenever as deemed necessary
by the
Committee to carry out its duties.
|
|
·
|
Review
the Corporation’s annual and quarterly financial statements, including
Management’s Discussion and Analysis with respect thereto, and all annual
and interim earnings press releases, prior to public dissemination,
including any certification, report, opinion or review rendered
by the
external auditors and determine whether they are complete and
consistent
with the information known to Committee members; determine that
the
auditors are satisfied that the financial statements have been
prepared in
accordance with generally accepted accounting
principles.
|
|
·
|
Pay
particular attention to complex and/or unusual transactions such
as those
involving derivative instruments and consider the adequacy of
disclosure
thereof.
|
|
·
|
Focus
on judgmental areas, for example those involving valuation of
assets and
liabilities and other commitments and
contingencies.
|
|
·
|
Review
audit issues related to the Corporation’s material associated and
affiliated companies that may have a significant impact on the
Corporation’s equity investment.
|
|
·
|
Meet
with management and the external auditors to review the annual
financial
statements and the results of the
audit.
|
|
·
|
Evaluate
the fairness of the interim financial statements and related
disclosures
including the associated Management’s Discussion and Analysis, and obtain
explanations from management on
whether:
|
|
o
|
actual
financial results for the interim period varied significantly
from
budgeted or projected results;
|
|
o
|
generally
accepted accounting principles have been consistently
applied;
|
|
o
|
there
are any actual or proposed changes in accounting or financial
reporting
practices; or
|
|
o
|
there
are any significant or unusual events or transactions which require
disclosure and, if so, consider the adequacy of that
disclosure.
|
|
·
|
Review
the external auditors’ proposed audit scope and approach and ensure no
unjustifiable restriction or limitations have been placed on
the
scope.
|
|
·
|
Recommend
to the Board an external auditor to be nominated for appointment
by the
Corporation’s shareholders. Subject to the appointment of the
Corporation’s external auditor by the Corporation’s shareholders, the
Committee will be directly responsible for the appointment, compensation,
retention and oversight of the work of external auditor engaged
for the
purpose of preparing or issuing an auditor’s report or performing other
audit, review or attest services for the Corporation, including
the
resolution of disagreements between management and the external
auditor
regarding financial reporting. The Corporation’s external
auditor shall report directly to the
Committee.
|
|
·
|
Review
with the Corporation’s management, on a regular basis, the performance of
the external auditors, the terms of the external auditor’s engagement,
accountability and experience.
|
|
·
|
Pre-approve
all non-audit services to be provided to the Corporation or its
subsidiary
entities by the external auditor.
|
|
·
|
Consider
at least annually the independence of the external auditors,
including
reviewing the range of services provided in the context of all
consulting
services obtained by the Corporation,
including:
|
|
o
|
insuring
receipt from the independent auditor of a formal written statement
delineating all relationships between the independent auditor
and the
Company, consistent with the Independence Standards Board Standard
No. 1
and related Canadian regulatory body
standards;
|
|
o
|
considering
and discussing with the independent auditor any relationships
or services,
including non-audit services, that may impact the objectivity
and
independence of the independent auditor;
and
|
|
o
|
as
necessary, taking, or recommending that the Board take, appropriate
action
to oversee the independence of the independent
auditor.
|
|
·
|
Ensure
that adequate procedures are in place for the review of the Corporation’s
public disclosure of financial information extracted or derived
from the
Corporation’s financial statements, other than the public disclosure
contained in the Corporation’s financial statements, Management’s
Discussion and Analysis and annual and interim earnings press
releases;
and must periodically assess the adequacy of those
procedures.
|
|
·
|
Review
any significant disagreement among management and the external
auditors in
connection with the preparation of the financial
statements.
|
|
·
|
Review
and approve the Corporation’s hiring policies regarding partners,
employees and former partners and employees of the present and
former
external auditors of the
Corporation.
|
|
·
|
Establish
a procedure for:
|
|
o
|
the
confidential, anonymous submission by employees of the Corporation
of
concerns regarding questionable accounting or auditing matters;
and
|
|
o
|
the
receipt, retention and treatment of complaints received by the
Corporation
regarding accounting, internal accounting controls, or auditing
matters.
|
|
·
|
Meet
separately with the external auditors to discuss any matters
that the
committee or auditors believe should be discussed privately in
the absence
of management.
|
|
·
|
Endeavour
to cause the receipt and discussion on a timely basis of any
significant
findings and recommendations made by the external
auditors.
|
|
·
|
Ensure
that the Board is aware of matters which may significantly impact
the
financial condition or affairs of the
business.
|
|
·
|
Review
and oversee all related party
transactions.
|
|
·
|
Perform
other functions as requested by the
Board.
|
|
·
|
If
necessary, institute special investigations and, if appropriate,
hire
special counsel or experts to assist, and set the compensation
to be paid
to such special counsel or other
experts.
|
|
·
|
Review
and re-assess annually the adequacy of this Charter and recommend
updates
to this charter; receive approval of changes from the
Board.
|
|
·
|
With
regard to the Corporation’s internal control procedures, the Committee is
responsible to:
|
|
o
|
review
the appropriateness and effectiveness of the Corporation’s policies and
business practices which impact on the financial integrity of
the
Corporation, including those related to internal auditing, insurance,
accounting, information services and systems and financial controls,
management reporting and risk management;
and
|
|
o
|
review
compliance under the Corporation’s business conduct and ethics policies
and to periodically review these policies and recommend to the
Board
changes which the Committee may deem appropriate;
and
|
|
o
|
review
any unresolved issues between management and the external auditors
that
could affect the financial reporting or internal controls of
the
Corporation; and
|
|
·
|
periodically
review the Corporation’s financial and auditing procedures and the extent
to which recommendations made by the internal audit staff or
by the
external auditors have been
implemented.
|
|
·
|
Comply
with Rule 10A – 3(b)(2), (3), (4) and (5) under the Securities Exchange
Act of 1934.
|
|
4.
|
Chair
|
The
Committee will in each year appoint the Chair of the Committee from among
the
members of the Committee. In the Chair’s absence, or if the position
is vacant, the Committee may select another member as Chair. The Chair
will not
have a casting vote.
|
5.
|
Meetings
|
The
Committee will meet at least once every calendar quarter. Special
meetings shall be convened as required. Notices calling meetings
shall be sent to all members of the Committee, all Board members and the
external auditor. The external auditor of the Corporation must be
given reasonable notice of, and has the right to appear before and to be
heard
at, each meeting of the Committee. At the request of the external
auditor, the Committee must convene a meeting of the Committee to consider
any
matter that the external auditor believes should be brought to the attention
of
the Board or shareholders of the Corporation.
The
Committee may invite such other persons (e.g. without limitation, the President
or Chief Financial Officer) to its meetings, as it deems
appropriate.
|
6.
|
Quorum
|
A
majority of members of the Committee, present in person, by teleconferencing,
or
by videoconferencing, or by any combination of the foregoing, will constitute
a
quorum.
|
7.
|
Removal
and Vacancy
|
A
member
may resign from the Committee, and may also be removed and replaced at
any time
by the Board, and will automatically cease to be a member as soon as the
member
ceases to be a director of the Corporation. The Board will fill
vacancies in the Committee by appointment from among the directors in accordance
with Section 2 of this Charter. Subject to quorum requirements, if a
vacancy exists on the Committee, the remaining members will exercise all
of the
Committee’s powers.
|
8.
|
Authority
|
The
Committee may:
|
·
|
engage
independent counsel and other advisors as it determines necessary
to carry
out its duties.
|
|
·
|
set
and pay the compensation for any advisors employed by the Committee;
and
|
|
·
|
communicate
directly with the internal and external
auditors.
|
The
Committee may also, within the scope of its responsibilities, seek any
information it requires from any employee and from external parties, to
obtain
outside legal or professional advice, and to ensure the attendance of
Corporation officers at meetings as appropriate.
|
9.
|
Secretary
and Minutes
|
The
Chair
of the Committee will appoint a member of the Committee or other person
to act
as Secretary of the Committee for purposes of a meeting of the
Committee. The minutes of the Committee meetings shall be in writing
and duly entered into the books of the Corporation, and will be circulated
to
all members of the Board.
|
10.
|
Funding
|
The
Corporation shall provide for appropriate funding, as determined by the
Committee, for payment of (a) compensation to any registered public accounting
firm engaged for the purposes of preparing or issuing an audit report or
performing other audit, review or attest services for the Corporation;
(b)
compensation to any advisers employed by the Committee; and (c) ordinary
administrative expenses of the Committee that are necessary or appropriate
in
carry out its duties.
Glossary
of Mining Terms
The
following is a glossary of certain mining terms used in this Annual Information
Form.
“AEM”
is an abbreviation for airborne electromagnetic.
"Ag"
refers to silver.
“anomalous”
refers to a sample or location that either (i) the concentration
of an
element(s) or (ii) geophysical measurement is significantly different from
the
average background values in the area.
“anomaly”
refers to the geographical area corresponding to anomalous geochemical
or
geophysical values.
“anorthosite”
is a rock comprised of largely feldspar minerals and minor mafic iron-magnesium
minerals.
"As"
refers to arsenic.
“assay”
is an analysis to determine the quantity of one or more elemental
components.
"Au"
refers to gold.
“BIC”
is an abbreviation for the Bushveld Igneous Complex in South Africa, the
source
of most of the world’s platinum and is a significant producer of palladium and
other platinum group metals (PGM’s) as well as chrome.
“breccia”
is a rock type with angular fragments of one composition surrounded by
rock of
another composition or texture.
"bulk
placer sampling" (in the context of placer properties) refers to the
process of obtaining individual gravel samples in the order of 5 to 15
cubic
yards using an excavating machine and running the samples through a
concentrating device to measure the placer gold content per cubic
yard.
“chalcopyrite”
is a copper sulfide mineral.
“channel
sample” is a surface sample which has been collected by continuous
sampling across a measured interval, and is considered to be representative
of
the area sampled.
“chargeability”
is a measure of electrical capacitance of a rock that may indicate the
presence
of disseminated sulfide minerals but not all chargeability features are
caused
by such sulfides.
"cm"
refers to centimetres.
“crosscut”
is a mine working, which is driven horizontally and at right angles
to
an adit, drift or level.
"Cu"
refers to copper.
“deposit”
is a mineralized body, which has been physically delineated by
sufficient drilling, trenching, and/or underground work, and found to contain
a
sufficient average grade of metal or metals to warrant further exploration
and/or development expenditures. Such a deposit does not qualify as a
commercially mineable ore body or as containing ore reserves, until final
legal,
technical, and economic factors have been resolved.
“diamond
drill” is a type of rotary drill in which the cutting is done by
abrasion rather than percussion. The cutting bit is set with diamonds and
is
attached to the end of the long hollow rods through which water is pumped
to the
cutting face. The drill cuts a core of rock that is covered in long cylindrical
sections, an inch or more in diameter.
“early-stage
exploration property” refers to a property that has been subjected to a
limited amount of physical testing and systematic exploration work with
no known
extensive zone of mineralization.
“EM”
is an abbreviation for electromagnetic.
“exploration
stage” refers to the stage where a company is engaged in the search
for
minerals deposits (reserves), which are not in either the development or
production stage.
“fault”
is a fracture in a rock across which there has been displacement.
“fracture”
is a break in a rock, usually along flat surfaces.
“gabbro”
is an intrusive rock comprised of a mixture of mafic minerals and
feldspars.
“gossanous”
refers to a rock outcrop that is strongly stained by iron oxides.
“grab
sample” is a sample of selected rock chips collected from within a
restricted area of interest.
“grade”
is the concentration of an ore metal in a rock sample, given either as
weight
percent for base metals (i.e., Cu, Zn, Pb) or in grams per tonne (g/t)
or ounces
per short ton (oz/t) for precious or platinum group metals.
"g/t"
refers to grams per tonne.
“highly
anomalous” is an anomaly, which is in approximately the 90th
percentile of the
sample or measurement population.
"ICP"
refers to inductively coupled plasma, a laboratory technique used for the
quantitative analysis of samples (soil, rock, etc.) taken during field
exploration programs.
“indicated
mineral resource” is that part of a mineral resource for which
quantity, grade or quality, densities, shape and physical characteristics
can be
estimated with a level of confidence sufficient to allow the appropriate
application of technical and economic parameters, to support mine planning
and
evaluation of the economic viability of the deposit. The estimate is
based on detailed and reliable exploration and testing information gathered
through appropriate techniques from locations such as outcrops, trenches,
pits,
workings and drill holes that are spaced closely enough for geological
and grade
continuity to be reasonably assumed.
“inferred
mineral resource” is that part of a mineral resource for which quantity
and grade or quality can be estimated on the basis of geological evidence
and
limited sampling and reasonably assumed, but not verified, geological and
grade
continuity. The estimate is based on limited information and sampling
gathered through appropriate techniques from locations such as outcrops,
trenches, pits, workings and drill holes.
“intrusive”
is a rock mass formed below earth’s surface from molten magma, which was
intruded into a pre-existing rock mass and cooled to solid.
"IP
survey" refers to induced polarization survey, a geophysical method of
exploring an area in which physical properties relating to geology are
used.
“kriging”
is the numerical modelling by applying statistics to resource
calculations (or other earth sciences problems). The method recognizes
that
samples are not independent and that spatial continuity between samples
exists.
"lode
mining" refers to mining in solid rock.
“mafic”
is a rock type consisting of predominantly iron and magnesium silicate
minerals
with little quartz or feldspar minerals.
“magmatic”
means pertaining to magma, a naturally occurring silicate melt, which may
contain suspended silicate crystals, dissolved gases, or both; magmatic
processes are at work under the earth’s crust.
“measured
mineral resource” is that part of a mineral resource for which
quantity, grade or quality, densities, shape, physical characteristics
are so
well established that they can be estimated with confidence sufficient
to allow
the appropriate application of technical and economic parameters, to support
production planning and evaluation of the economic viability of the
deposit. The estimate is based on detailed and reliable exploration,
sampling and testing information gathered through appropriate techniques
from
locations such as outcrops, trenches, pits, workings and drill holes that
are
spaced closely enough to confirm both geological and grade
continuity.
“mid-stage
exploration property” is one hosting a known zone of mineralization,
which has been subjected to a limited amount of physical testing and systematic
exploration work.
“mineralization”
refers to minerals of value occurring in rocks.
“mineral
reserve” is the economically mineable part of a measured or indicated
mineral resource demonstrated by at least a preliminary feasibility
study. This study must include adequate information on mining,
processing, metallurgical, economic and other relevant factors that demonstrate,
at the time of reporting, that economic extraction can be
justified. A mineral reserve includes diluting materials and
allowances for losses that may occur when material is mined.
“mineral
resource” is a concentration or occurrence of natural, solid, inorganic
or fossilized organic material in or on the Earth’s crust in such form and
quantity and of such a grade or quality that it has reasonable prospects
for
economic extraction. The location, quantity, grade, geological
characteristics and continuity of a mineral resource are known, estimated
or
interpreted from specific geological evidence and knowledge.
"Mo"
refers to molybdenum, a hard, silver-white metal.
“National
Instrument 43-101” NI 43-101 entitled “Standards if Disclosure for
Mineral Projects” sets out Canadian securities reporting guidelines for mining
companies.
“Ni”
is an abbreviation for nickel.
“outcrop”
refers to an exposure of rock at the earth’s surface.
“overburden”
is any material covering or obscuring rocks from view.
"Pd"
refers to palladium.
"PGM"
refers to platinum group metals, i.e. platinum, palladium, rhodium and
gold.
"PGE"
refers to mineralization containing platinum group elements, i.e. platinum,
palladium, rhodium and gold.
"placer
mining" is the mining of unconsolidated material, which overlies solid
rock (bedrock).
“ppb”
refers to parts per billion.
"ppm"
refers to parts per million.
“probable
mineral reserve” is the economically mineable part of an indicated, and
in some circumstances a measured mineral resource demonstrated by at least
a
preliminary feasibility study. This study must include adequate
information on mining, processing, metallurgical, economic, and other relevant
factors that demonstrate, at the time of reporting, that economic extraction
can
be justified.
“proven
mineral reserve” is the economically mineable part of a measured
mineral resource demonstrated by at least a preliminary feasibility
study. This study must include adequate information on mining,
processing, metallurgical, economic and other relevant factors that demonstrate,
at the time of reporting, that economic extraction is justified
"Pt”
refers to platinum.
“pyrite”
is an iron sulfide mineral.
“pyroxenite”
refers to a relatively uncommon dark-coloured rock consisting chiefly of
pyroxene; pyroxene is a type of rock containing sodium, calcium, magnesium,
iron, titanium and aluminum combined with oxygen.
“quartz”
is a common rock-forming mineral (SiO2).
"Rh"
refers to rhodium, a platinum metal. Rhodium shares some of the
notable properties of platinum, including its resistance to corrosion,
its
hardness and ductility. Wherever there is platinum in the earth, there
is
rhodium as well. In fact, most rhodium is extracted from a sludge that
remains
after platinum is removed from the ore. A high percentage of rhodium is
also
found in certain nickel deposits in Canada.
“room
and pillar mining” is a method of mining flat-lying ore deposits in
which the mined-out areas, or rooms, are separated by pillars of approximately
the same size.
“stope”
is an underground excavation from which ore has been
extracted.
“tailings”
is the material that remains after all metals considered economic
have
been removed from ore during milling.
“ultramafic”
refers to types of rock containing relatively high proportions of the heavier
elements such as magnesium, iron, calcium and sodium; these rocks are usually
dark in colour and have relatively high specific gravities.
“VLF”
means very low frequency.