PG&E Corp 10-K, filed Feb 17, 2006: Annual Report
UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
FORM 10-K
|
(Mark
One)
|
|
|
⌧
|
ANNUAL
REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE
ACT OF
1934
|
|
For
the Fiscal Year Ended December 31, 2005
|
|
|
Or
|
|
|
□
|
TRANSITION
REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934
|
|
For
the transition period from to
|
|
|
Commission
File
Number
|
Exact
Name of Registrant
as
specified in its charter
|
State
or Other Jurisdiction of
Incorporation
or Organization
|
IRS
Employer
Identification
Number
|
|
|
1-12609
|
PG&E
CORPORATION
|
California
|
94-3234914
|
|
|
1-2348
|
PACIFIC
GAS AND ELECTRIC COMPANY
|
California
|
94-0742640
|
|
|
PG&E
Corporation
One
Market, Spear Tower
Suite
2400
San
Francisco, California 94105
(Address
of principal executive offices) (Zip Code)
(415)
267-7000
(Registrant's
telephone number, including area code)
|
Pacific
Gas and Electric Company
77
Beale Street
P.O.
Box 770000
San
Francisco, California 94177
(Address
of principal executive offices) (Zip Code)
(415)
973-7000
(Registrant's
telephone number, including area
code)
|
|||
Securities
registered pursuant to Section 12(b) of the Act:
|
Title
of Each Class
|
Name
of Each Exchange on Which Registered
|
|
PG&E
Corporation: Common
Stock, no par value
|
New
York Stock Exchange and Pacific Exchange
|
|
Pacific
Gas and Electric Company: First
Preferred Stock,
cumulative,
par value $25 per share:
|
American
Stock Exchange and Pacific Exchange
|
|
Redeemable:
5% Series A, 5%, 4.80%, 4.50%, 4.36%
|
|
|
Nonredeemable:
6%, 5.50%, 5%
|
Securities
registered pursuant to Section 12(g) of the Act: None
Indicate
by check mark if the registrant is a well-known seasoned issuer, as defined
in
Rule 405 of the Securities Act:
|
PG&E
Corporation
|
Yes
⌧
No
□
|
|
Pacific
Gas and Electric Company
|
Yes
⌧
No
◻
|
Indicate
by check mark if the registrant is not required to file reports pursuant to
Section 13 or Section 15(d) of the Act:
|
PG&E
Corporation
|
Yes
◻
No
⌧
|
|
Pacific
Gas and Electric Company
|
Yes
□
No
⌧
|
Indicate
by check mark whether the registrant (1) has filed all reports required to
be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934
during the preceding 12 months (or for such shorter period that the
registrant was required to file such reports), and (2) has been subject to
such filing requirements for the past 90 days.
|
PG&E
Corporation
|
Yes
⌧
No
□
|
|
Pacific
Gas and Electric Company
|
Yes
⌧
No
◻
|
Indicate
by check mark if disclosure of delinquent filers pursuant to Item 405 of
Regulation S-K is not contained herein, and will not be contained, to the
best of registrant's knowledge, in definitive proxy or information statements
incorporated by reference in Part III of this Form 10-K or any
amendment to this Form 10-K:
|
PG&E
Corporation
|
⌧
|
|
Pacific
Gas and Electric Company
|
⌧
|
Indicate
by check mark whether the registrant is a large accelerated filer, an
accelerated filer, or a non-accelerated filer. See definition of “accelerated
filer” and “large accelerated filer” in Rule 12b-2 of the Exchange Act. (Check
one).:
|
PG&E
Corporation
|
Large
accelerated filer ⌧
|
Accelerated
filer ◻
|
Non-accelerated
filer ◻
|
|
Pacific
Gas and Electric Company
|
Large
accelerated filer ◻
|
Accelerated
filer ◻
|
Non-accelerated
filer ⌧
|
Indicate
by check mark whether the registrant is a shell company (as defined in Rule
12b-2 of the Exchange Act).
|
PG&E
Corporation
|
Yes
◻
No
⌧
|
|
Pacific
Gas and Electric Company
|
Yes
□
No
⌧
|
Aggregate
market value of voting and non-voting common equity held by non-affiliates
of
the registrants as of June 30, 2005, the last business day of the second
fiscal quarter:
|
PG&E
Corporation Common Stock
|
$13,975
million
|
|
Pacific
Gas and Electric Company Common Stock
|
Wholly
owned by PG&E Corporation
|
|
Common
Stock outstanding as of February 10, 2006:
|
|
|
PG&E
Corporation:
|
345,319,971
(excluding shares held by a wholly owned subsidiary)
|
|
Pacific
Gas and Electric Company:
|
Wholly
owned by PG&E Corporation
|
DOCUMENTS
INCORPORATED BY REFERENCE
Portions
of the documents listed below have been incorporated by reference into the
indicated parts of this report, as specified in the responses to the item
numbers involved:
|
Designated
portions of the combined 2005 Annual Report to
Shareholders
|
Part I
(Item 1, Item 1.A.), Part II (Items 5, 6, 7, 7A, 8 and
9A)
|
|
Designated
portions of the Joint Proxy Statement relating to the 2006
|
Part III
(Items 10, 11, 12, 13 and 14)
|
|
Annual
Meetings of Shareholders
|
TABLE
OF CONTENTS
|
Page
|
||
|
iii
|
||
|
1
|
||
|
1
|
||
|
1
|
||
|
1
|
||
|
1
|
||
|
1
|
||
|
3
|
||
|
3
|
||
|
4
|
||
|
4
|
||
|
5
|
||
|
5
|
||
|
7
|
||
|
8
|
||
|
9
|
||
|
9
|
||
|
9
|
||
|
11
|
||
|
11
|
||
|
12
|
||
|
12
|
||
|
12
|
||
|
13
|
||
|
13
|
||
|
14
|
||
|
15
|
||
|
15
|
||
|
16
|
||
|
16
|
||
|
17
|
||
|
18
|
||
|
18
|
||
|
18
|
||
|
18
|
||
|
20
|
||
|
20
|
||
|
20
|
||
|
21
|
||
|
22
|
||
|
|
24
|
|
|
25
|
||
|
25
|
||
|
25
|
||
|
26
|
||
|
27
|
||
|
27
|
||
|
29
|
||
|
30
|
||
|
31
|
||
|
31
|
||
|
i
|
||
|
32
|
||
|
32
|
||
|
32
|
||
|
33
|
||
|
33
|
||
|
33
|
||
|
33
|
||
|
33
|
||
|
36
|
||
|
37
|
||
|
38
|
||
|
|
||
|
39
|
||
|
39
|
||
|
40
|
||
|
40
|
||
|
40
|
||
|
40
|
||
|
40
|
||
|
40
|
||
|
40
|
||
|
40
|
||
|
41
|
||
|
43
|
||
|
43
|
||
|
43
|
||
|
44
|
||
|
44
|
||
|
45
|
||
|
50
|
||
|
51
|
||
|
52
|
||
ii
|
1
Kilowatt (kW)
|
=
|
One
thousand watts
|
|
1
Kilowatt-Hour (kWh)
|
=
|
One
kilowatt continuously for one hour
|
|
1
Megawatt (MW)
|
=
|
One
thousand kilowatts
|
|
1
Megawatt-Hour (MWh)
|
=
|
One
megawatt continuously for one hour
|
|
1
Gigawatt (GW)
|
=
|
One
million kilowatts
|
|
1
Gigawatt-Hour (GWh)
|
=
|
One
gigawatt continuously for one hour
|
|
1
Kilovolt (kV)
|
=
|
One
thousand volts
|
|
1
MVA
|
=
|
One
megavolt ampere
|
|
1
Mcf
|
=
|
One
thousand cubic feet
|
|
1
MMcf
|
=
|
One
million cubic feet
|
|
1
Bcf
|
=
|
One
billion cubic feet
|
|
1
MDth
|
=
|
One
thousand decatherms
|
iii
Corporate
Structure and Business
PG&E
Corporation, incorporated in California in 1995, is an energy-based holding
company that conducts its business through Pacific Gas and Electric Company,
or
the Utility, a public utility operating in northern and central California.
The
Utility engages primarily in the businesses of electricity and natural gas
distribution, electricity generation, procurement and transmission, and natural
gas procurement, transportation and storage. The Utility was incorporated in
California in 1905. PG&E Corporation became the holding company of the
Utility and its subsidiaries on January 1, 1997.
The
Utility served approximately 5 million electricity distribution customers
and approximately 4.2 million natural gas distribution customers at
December 31, 2005. The Utility had approximately $33.8 billion of
assets at December 31, 2005, and generated revenues of approximately
$11.7 billion in 2005. Its revenues are generated mainly through the sale
and delivery of electricity and natural gas. The Utility is regulated primarily
by the California Public Utilities Commission, or the CPUC, and the Federal
Energy Regulatory Commission, or the FERC.
The
principal executive office of PG&E Corporation is located at One Market,
Spear Tower, Suite 2400, San Francisco, California 94105, and its telephone
number is (415) 267-7000. The principal executive office of the Utility is
located at 77 Beale Street, P.O. Box 770000, San Francisco,
California 94177, and its telephone number is (415) 973-7000. PG&E
Corporation and the Utility file various reports with the Securities and
Exchange Commission, or the SEC. These reports, including Annual Reports on
Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on
Form 8-K and any amendments to those reports filed or furnished pursuant to
Sections 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended,
are
available free of charge on both PG&E Corporation's website, www.pgecorp.com,
and the
Utility's website, www.pge.com.
The
information contained on these websites is not incorporated by reference into
this Annual Report on Form 10-K and should not be considered part of this
report.
At
December 31, 2005, PG&E Corporation and its subsidiaries had
approximately 19,800 employees, including approximately 19,500 employees of
the
Utility. Of the Utility's employees, approximately 12,800 are covered by
collective bargaining agreements with three labor unions: the International
Brotherhood of Electrical Workers, Local 1245, AFL-CIO, or IBEW; the Engineers
and Scientists of California, IFPTE Local 20, AFL-CIO and CLC, or ESC; and
the
Service Employees International Union, Local 24/7, or SEIU. The ESC and IBEW
collective bargaining agreements expire on December 31, 2008. The SEIU
collective bargaining agreement expires on February 28, 2009.
This
combined Annual Report on Form 10-K, including the information incorporated
by reference, contains forward-looking statements that are necessarily subject
to various risks and uncertainties, the realization or resolution of which
are
outside of management's control. These statements are based on current
expectations and projections about future events, and assumptions regarding
these events and management's knowledge of facts at the date of this report.
These forward-looking statements are identified by words such as "assume,"
"expect," "intend," "plan," "project," "believe," "estimate," "predict,"
"anticipate," "aim, " "may," "might," "should," "would," "could," "goal,"
"potential" and similar expressions. PG&E Corporation’s and the Utility’s
results of operations and financial condition depend primarily on whether the
Utility is able to operate its business within authorized revenue requirements,
timely recover its authorized costs, and earn its authorized rate of return.
PG&E Corporation and the Utility are not able to predict all the factors
that may affect future results. Some of the factors that could cause future
results to differ materially from those expressed or implied by the
forward-looking statements, or from historical results, are discussed below
in
Item 1A. Risk Factors. These factors include, but are not limited
to:
1
Operating
Environment
|
·
|
How
the Utility manages its responsibility to procure electric capacity
and
energy for its customers;
|
|
·
|
The
adequacy and price of natural gas supplies, and the ability of the
Utility
to manage and respond to the volatility of the natural gas market
for its
customers;
|
|
·
|
Weather,
storms, earthquakes, fires, floods, other natural disasters, explosions,
accidents, mechanical breakdowns, acts of terrorism, and other events
or
hazards that affect demand for electricity or natural gas, result
in power
outages, reduce generating output, disrupt natural gas supply, cause
damage to the Utility's assets or generating facilities, cause damage
to
the operations or assets of third parties on which the Utility relies,
or
subject the Utility to third party claims for damage or
injury;
|
|
·
|
Unanticipated
population growth or decline, general economic and financial market
conditions, changes in technology including the development of alternative
energy sources, all of which may affect customer demand for natural
gas or
electricity;
|
|
·
|
Whether
the Utility is required to cease operations temporarily or permanently
at
its Diablo Canyon nuclear power plant because the Utility is unable
to
increase its on-site spent nuclear fuel storage capacity, find another
depositary for spent fuel, or timely complete the replacement of
the steam
generators, or because of mechanical breakdown, lack of nuclear fuel,
environmental constraints, or for some other reason and the risk
that the
Utility may be required to purchase electricity from more expensive
sources; and
|
|
·
|
Whether
the Utility is able to recognize the anticipated cost benefits and
savings
expected to result from its efforts to improve customer service through
implementation of specific initiatives to streamline business processes
and deploy new technology.
|
Legislative
Actions and Regulatory Proceedings
|
·
|
The
outcome of the regulatory proceedings pending at the CPUC and the
FERC and
the impact of future ratemaking actions by the CPUC and the FERC;
|
|
·
|
The
impact of the recently enacted Energy Policy Act of 2005 which, among
other provisions, repeals the Public Utility Holding Company Act
of 1935
making electric utility industry consolidation more likely; expands
the
FERC’s authority to review proposed mergers; changes the FERC regulatory
scheme applicable to qualifying co-generation facilities, or QFs;
authorizes the formation of an Electric Reliability Organization
to be
overseen by the FERC to establish electric reliability standards;
and
modifies certain other aspects of energy regulation and federal tax
policies applicable to the Utility;
|
|
·
|
The
extent to which the CPUC or the FERC delays or denies recovery of
the
Utility's costs, including electricity or gas purchase costs, from
customers due to a regulatory determination that such costs were
not
reasonable or prudent, or for other reasons, resulting in write-offs
of
regulatory assets;
|
|
·
|
How
the CPUC administers the capital structure, stand-alone dividend,
and
first priority conditions of the CPUC's past decisions permitting
the
establishment of holding companies for the California investor-owned
electric utilities and the outcome of the CPUC's new rulemaking proceeding
concerning the relationship between the California investor-owned
energy
utilities and their holding companies and non-regulated affiliates,
which
may include (1) establishing reporting requirements for the allocation
of
capital between utilities and their non-regulated affiliates by the
parent
holding companies, and (2) changing the CPUC's affiliate transaction
rules;
|
|
·
|
Whether
the Utility is determined to be in compliance with all applicable
rules,
tariffs and orders relating to electricity and natural gas utility
operations, including tariffs related to the Utility’s billing and
collection practices, and the extent to which a finding of non-compliance
could result in customer refunds, penalties or other non-recoverable
expenses, such as has been recommended with respect to the CPUC’s
investigation into the Utility’s billing and collection practices;
and
|
|
·
|
Whether
the Utility is required to incur material costs or capital expenditures
or
curtail or cease operations at affected facilities, including the
Utility’s natural gas compressor stations, to comply with existing and
future environmental laws, regulations and
policies.
|
2
Pending
Litigation
|
·
|
The
outcome of pending litigation; and
|
|
·
|
The
timing and resolution of the pending appeal of the bankruptcy court
order
confirming the Utility's plan of reorganization under Chapter 11
of the
U.S. Bankruptcy Code.
|
Municipalization
and Bypass
|
·
|
Continuing
efforts by local public utilities to take over the Utility's distribution
assets through exercise of their condemnation power or by duplication
of
the Utility's distribution assets or service, and other forms of
municipalization that may result in stranded investment capital,
decreased
customer growth, loss of customer load and additional barriers to
cost
recovery; and
|
|
·
|
The
extent to which the Utility's distribution customers are permitted
to
switch between purchasing electricity from the Utility and from alternate
energy service providers as direct access customers, and the extent
to
which cities, counties and others in the Utility's service territory
begin
directly serving the electricity needs of the Utility's customers,
potentially resulting in stranded generating asset costs and
non-recoverable procurement costs.
|
PG&E
Corporation and the Utility do not undertake an obligation to update
forward-looking statements, whether in response to new information, future
events or otherwise.
The
Utility's electricity distribution network extends throughout all or a part
of
47 of California's 58 counties, comprising most of northern and central
California. The Utility's network consists of 128,128 circuit miles of
distribution lines (of which approximately 20% are underground and approximately
80% are overhead). There are 89 transmission substations and 48
transmission-switching stations. A transmission substation is a fenced facility
where voltage is transformed from one transmission voltage level to another.
There are 611 distribution substations and 118 low-voltage distribution
substations. There are 290 combined transmission and distribution substations.
Combined transmission and distribution substations have both transmission and
distribution transformers.
The
Utility's distribution network interconnects to the Utility's electricity
transmission system at 671 points. This interconnection between the Utility's
distribution network and the transmission system typically occurs at
distribution substations where transformers and switching equipment reduce
the
high-voltage transmission levels at which the electricity transmission system
transmits electricity, ranging from 500 kV to 60 kV, to lower voltages, ranging
from 44 kV to 2.4 kV, suitable for distribution to the Utility's customers.
The
distribution substations serve as the central hubs of the Utility's electricity
distribution network and consist of transformers, voltage regulation equipment,
protective devices and structural equipment. Emanating from each substation
are
primary and secondary distribution lines connected to local transformers and
switching equipment that link distribution lines and provide delivery to
end-users. In some cases, the Utility sells electricity from its distribution
lines or other facilities to entities, such as municipal and other utilities,
that then resell the electricity.
3
The
following table shows the percentage of the Utility's total 2005 electricity
deliveries represented by each of its major customer classes.
Total
2005 Electricity Delivered: 81,626 GWh
|
Agricultural
and Other Customers
|
6%
|
|
Industrial
Customers
|
18%
|
|
Residential
Customers
|
36%
|
|
Commercial
Customers
|
40%
|
The
following table shows certain of the Utility's operating statistics from 2001
to
2005 for electricity sold or delivered, including the classification of sales
and revenues by type of service.
|
2005
|
2004
|
2003
|
2002
|
2001
|
||||||
|
Customers
(average for the year):
|
||||||||||
|
Residential
|
4,353,458
|
4,366,897
|
4,286,085
|
4,171,365
|
4,165,073
|
|||||
|
Commercial
|
509,786
|
509,501
|
493,638
|
483,946
|
484,430
|
|||||
|
Industrial
|
1,271
|
1,339
|
1,372
|
1,249
|
1,368
|
|||||
|
Agricultural
|
78,876
|
80,276
|
81,378
|
78,738
|
81,375
|
|||||
|
Public
street and highway lighting
|
28,021
|
27,176
|
26,650
|
24,119
|
23,913
|
|||||
|
Other
electric utilities
|
4
|
3
|
4
|
5
|
5
|
|||||
|
Total
(1)
|
4,971,362
|
4,985,192
|
4,889,127
|
4,759,422
|
4,756,164
|
|||||
|
Deliveries
(in GWh):(2)
|
||||||||||
|
Residential
|
29,752
|
29,453
|
29,024
|
27,435
|
26,840
|
|||||
|
Commercial
|
32,375
|
32,268
|
31,889
|
31,328
|
30,780
|
|||||
|
Industrial
|
14,932
|
14,796
|
14,653
|
14,729
|
16,001
|
|||||
|
Agricultural
|
3,742
|
4,300
|
3,909
|
4,000
|
4,093
|
|||||
|
Public
street and highway lighting
|
792
|
2,091
|
605
|
674
|
418
|
|||||
|
Other
electric utilities
|
33
|
28
|
76
|
64
|
241
|
|||||
|
Subtotal
|
81,626
|
82,936
|
80,156
|
78,230
|
78,373
|
|||||
|
California
Department of Water Resources (DWR)
|
(20,476)
|
(19,938)
|
(23,554)
|
(21,031)
|
(28,640)
|
|||||
|
Total
non-DWR electricity
|
61,150
|
62,998
|
56,602
|
57,199
|
49,733
|
|||||
|
Revenues
(in millions):
|
||||||||||
|
Residential
|
$3,856
|
$3,718
|
$3,671
|
$3,646
|
$3,396
|
|||||
|
Commercial
|
4,114
|
4,179
|
4,440
|
4,588
|
4,105
|
|||||
|
Industrial
|
1,232
|
1,204
|
1,410
|
1,449
|
1,554
|
|||||
|
Agricultural
|
446
|
491
|
522
|
520
|
525
|
|||||
|
Public
street and highway lighting
|
66
|
71
|
69
|
73
|
60
|
|||||
|
Other
electric utilities
|
4
|
22
|
24
|
10
|
39
|
|||||
|
Subtotal
|
9,718
|
9,685
|
10,136
|
10,286
|
9,679
|
|||||
|
DWR
|
(1,699)
|
(1,933)
|
(2,243)
|
(2,056)
|
(2,173)
|
|||||
|
Direct
access credits
|
—
|
—
|
(277)
|
(285)
|
(461)
|
|||||
|
Miscellaneous(3)
|
235
|
(248)
|
(52)
|
193
|
244
|
|||||
|
Regulatory
balancing accounts
|
(327)
|
363
|
18
|
40
|
37
|
|||||
|
Total
electricity operating revenues
|
$7,927
|
$7,867
|
$7,582
|
$8,178
|
$7,326
|
|||||
|
Other
Data:
|
||||||||||
|
Average
annual residential usage (kWh)
|
6,834
|
6,744
|
6,772
|
6,577
|
6,444
|
|||||
|
Average
billed revenues (cents per kWh):
|
||||||||||
|
Residential
|
12.96
|
12.62
|
12.65
|
13.29
|
12.65
|
|||||
|
Commercial
|
12.71
|
12.95
|
13.92
|
14.65
|
13.34
|
|||||
|
Industrial
|
8.25
|
8.14
|
9.62
|
9.84
|
9.71
|
|||||
|
Agricultural
|
11.92
|
11.41
|
13.35
|
13.00
|
12.83
|
|||||
|
Net
plant investment per customer
|
$2,966
|
$2,790
|
$2,689
|
$2,105
|
$2,018
|
4
(1) Starting
in 2005, the Utility’s methodology used to count customers changed from the
number of billings to the number of active service agreements.
(2) These
amounts include electricity provided to direct access customers who procure
their own supplies of electricity.
(3) Miscellaneous
revenues in 2003 include a $125 million reduction due to refunds to
electricity customers from generation-related revenues in excess of
generation-related costs.
The
following table shows the percentage of the Utility's total sources of
electricity for 2005 represented by each major electricity
resource:
|
Owned
generation (nuclear, fossil fuel-fired and hydroelectric
facilities)
|
40%
|
|
DWR
|
27%
|
|
Qualifying
Facilities/Renewables
|
22%
|
|
Irrigation
Districts
|
5%
|
|
Other
Power Purchases
|
6%
|
The
Utility is required to dispatch all of the electricity resources within its
portfolio, including electricity provided under DWR contracts, in the most
cost-effective way. To the extent the Utility's electricity resources are not
sufficient to meet the demand of the Utility's customers, the Utility purchases
the electricity from the wholesale electricity market. At other times,
least-cost dispatch requires the Utility to schedule more electricity than
is
necessary to meet its retail load and to sell this additional electricity on
the
wholesale electricity market. The Utility typically schedules excess electricity
when the expected electricity sales proceeds exceed the variable costs to
operate a generation facility or buy electricity on an optional
contract.
At
December 31, 2005, the Utility owned and operated the following generation
facilities, all located in California, listed by energy source:
|
Generation
Type
|
County
Location
|
Number
of
Units
|
Net
Operating
Capacity
(MW)
|
|||
|
Nuclear:
|
||||||
|
Diablo
Canyon
|
San
Luis Obispo
|
2
|
2,174
|
|||
|
Hydroelectric:
|
||||||
|
Conventional
|
16
counties in northern
and
central California
|
107
|
2,684
|
|||
|
Helms
pumped storage
|
Fresno
|
3
|
1,212
|
|||
|
Hydroelectric
subtotal
|
110
|
3,896
|
||||
|
Fossil
fuel:
|
||||||
|
Humboldt
Bay(1)
|
Humboldt
|
2
|
105
|
|||
|
Hunters
Point(2)
|
San
Francisco
|
2
|
215
|
|||
|
Mobile
turbines
|
Humboldt
|
2
|
30
|
|||
|
Fossil
fuel subtotal
|
6
|
350
|
||||
|
Total
|
118
|
6,420
|
(1) The
Humboldt Bay facilities consist of a retired nuclear generation unit and two
operating fossil fuel-fired plants.
(2) In
July 1998, the Utility reached an agreement with the City and County of San
Francisco regarding the Utility's Hunters Point fossil fuel-fired plant, which
has been designated as a "must run" facility by the California Independent
System Operator, to support system reliability. The agreement expresses the
Utility's intention to retire the plant when it is no longer needed. The Utility
expects to retire the plant in 2006 after the completion of a new 230-kV
transmission line from Redwood City to Brisbane, known as the Jefferson-Martin
230-kV Line, that will provide additional transmission system reliability in
San
Francisco and northern San Mateo County. Construction of this project is
expected to be completed in April 2006.
5
Diablo
Canyon Power Plant.
The
Utility's Diablo Canyon power plant consists of two nuclear power reactor units,
each capable of generating up to approximately 1,087 MW of electricity. Unit
1
began commercial operation in May 1985 and the operating license for this
unit expires in September 2021. Unit 2 began commercial operation in
March 1986 and the operating license for this unit expires in
April 2025. For the 10-year period ended December 31, 2005, the
Utility's Diablo Canyon power plant achieved an average overall capacity factor
of approximately 89.1%.
The
following table outlines the Diablo Canyon power plant's refueling schedule
for
the next five years. The Diablo Canyon power plant refueling outages are
typically scheduled every 16 to 21 months. The average length of a
refueling outage over the last five years has been approximately 47 days.
It is anticipated, however, that additional work will be required during future
scheduled outages leading up to the replacement of the steam generators in
Unit
2 in 2008 and in Unit 1 in 2009. The capital expenditures necessary to complete
these projects are discussed further in the section of PG&E Corporation’s
and the Utility’s combined 2005 Annual Report to Shareholders, or 2005 Annual
Report, entitled “Management’s Discussion and Analysis of Financial Condition
and Results of Operations,” or MD&A. This additional work will lengthen the
forecasted outage durations to the time periods shown below. The table below
shows outages of up to 45 days to accommodate non-routine tasks, such as
expanded steam generator inspection and repair and low-pressure turbine rotor
replacement. Outages of up to 80 days are scheduled for steam generator
replacements. The actual refueling schedule and outage duration will depend
on
the scope of the work required for a particular outage and other
factors.
|
2006
|
2007
|
2008
|
2009
|
2010
|
|||||
|
Unit
1
|
|||||||||
|
Refueling
|
-
|
April
|
-
|
January
|
October
|
||||
|
Duration
(days)
|
-
|
35
|
-
|
80
|
35
|
||||
|
Startup
|
-
|
June
|
-
|
April
|
November
|
||||
|
Unit
2
|
|||||||||
|
Refueling
|
April
|
-
|
February
|
October
|
-
|
||||
|
Duration
(days)
|
45
|
-
|
80
|
35
|
-
|
||||
|
Startup
|
June
|
-
|
April
|
November
|
-
|
In
addition, as discussed below under “Environmental Matters —Nuclear Fuel
Disposal,” the Utility is constructing an on-site dry cask storage facility to
store the spent nuclear fuel that is expected to be completed by 2008. To
provide another storage alternative in the event construction of the dry cask
storage facility is delayed, in November 2005, the Nuclear Regulatory
Commission, or the NRC, authorized the Utility to install a temporary storage
rack in each unit's existing spent fuel storage pool that would increase the
on-site storage capability to permit the Utility to operate Unit 1 until 2010
and Unit 2 until 2011. The Utility anticipates that it would complete the
installation of the temporary storage racks by December 2006. If the Utility
is
unable to complete the dry cask storage facility, or if construction is delayed
beyond 2010, and if the Utility is otherwise unable to increase its on-site
storage capacity, it is possible that the operation of Diablo Canyon may have
to
be curtailed or halted as early as 2010 with respect to Unit 1 and 2011 with
respect to Unit 2 and until such time as additional spent fuel can be safely
stored.
The
Utility has several types of nuclear insurance for its Diablo Canyon power
plant
and the retired nuclear generating unit at Humboldt Bay, or Humboldt Bay Unit
3.
The Utility has insurance coverage for property damages and business
interruption losses as a member of Nuclear Electric Insurance Limited, or NEIL.
NEIL is a mutual insurer owned by utilities with nuclear facilities. NEIL
provides property damage and business interruption coverage of up to
$3.24 billion per incident for Diablo Canyon. In addition, NEIL provides
$131 million of property damage insurance for Humboldt Bay Unit 3. Under this
insurance, if any nuclear generating facility insured by NEIL suffers a
catastrophic loss causing a prolonged outage, the Utility may be required to
pay
an additional premium of up to $43.6 million per one-year policy
term.
NEIL
also
provides coverage for damages caused by acts of terrorism at nuclear power
plants. If one or more acts of domestic terrorism cause property damage covered
under any of the nuclear insurance policies issued by NEIL to any NEIL member
within a 12-month period, the maximum recovery under all those nuclear insurance
policies may not exceed $3.24 billion plus the additional amounts recovered
by NEIL for these losses from reinsurance. There is no policy coverage
limitation for an act caused by foreign terrorism because NEIL would be entitled
to receive substantial reimbursement by the federal government under the
Terrorism Risk Insurance Extension Act of 2005. The Terrorism Risk Insurance
Extension Act of 2005 expires on December 31, 2007.
Under
the
Price-Anderson Act, public liability claims from a nuclear incident are limited
to $10.8 billion. As required by the Price-Anderson Act, the Utility
purchased the maximum available public liability insurance of $300 million
for the Diablo
6
Canyon
power plant. The balance of the $10.8 billion of liability protection is
covered by a loss-sharing program (secondary financial protection) among
utilities owning nuclear reactors. Under the Price-Anderson Act, owner
participation in this loss-sharing program is required for all owners of nuclear
reactors that are licensed to operate, are designed for the production of
electrical energy, and have a rated capacity of 100 MW or higher. If a nuclear
incident results in costs in excess of $300 million, then the Utility may
be responsible for up to $100.6 million per reactor, with payments in each
year limited to a maximum of $15 million per incident until the Utility has
fully paid its share of the liability. Since the Diablo Canyon power plant
has
two nuclear reactors each with a rated capacity of over 100 MW, the Utility
may
be assessed up to $201.2 million per incident, with payments in each year
limited to a maximum of $30 million per incident. The Energy Policy Act of
2005 extended the Price-Anderson Act through December 31, 2025. Both the maximum
assessment per reactor and the maximum yearly assessment will be adjusted for
inflation beginning August 31, 2008.
In
addition, the Utility has $53.3 million of liability insurance for Humboldt
Bay Unit 3 and has a $500 million indemnification from the NRC for public
liability arising from nuclear incidents covering liabilities in excess of
the
$53.3 million of liability insurance.
Hydroelectric
Generation Facilities.
The
Utility's hydroelectric system consists of 110 generating units at 68
powerhouses, including a pumped storage facility, with a total generating
capacity of 3,896 MW. The system includes 99 reservoirs, 76 diversions, 174
dams, 184 miles of canals, 44 miles of flumes, 135 miles of tunnels, 19 miles
of
pipe and 5 miles of natural waterways. The system also includes water rights
as
specified in 87 permits or licenses and 160 statements of water diversion and
use. With the exception of three non-jurisdictional powerhouses, all of the
Utility's powerhouses are licensed by the FERC. Pursuant to the Federal Power
Act, the term of a hydroelectric project license issued by the FERC is between
30 and 50 years. In the last four years, the Utility has received six
renewed hydroelectric project licenses from the FERC totaling 699 MW. Licenses
associated with approximately 917 MW now in relicensing have expired; these
projects are being operated on automatically renewed annual licenses pending
issuance of renewed licenses. Within the next three years 2006 through 2008,
licenses associated with another 12 MW will expire. Licenses associated with
approximately 2,960 MW will expire between 2009 and 2043.
During
the 2000-2001 energy crisis the California investor-owned electric utilities
lost their creditworthiness and were unable to purchase electricity in the
wholesale market for their customers. As a result, in January 2001, the
State of California authorized the DWR to purchase electricity to meet the
portion of the demand of the utilities' customers, plus applicable reserve
margins, not satisfied from their own generation facilities and existing
electricity contracts. California Assembly Bill, or AB, 1X, which was passed
in
February 2001, authorized the DWR to enter into contracts for the purchase
of electricity and to issue revenue bonds to finance electricity purchases.
The
Utility and the other California investor-owned electric utilities act as the
billing and collection agent for the DWR's sales of electricity to retail
customers.
The
DWR
is currently legally and financially responsible for these contracts. The DWR
has stated publicly in the past that it intended to transfer full legal title
to, and responsibility for, the DWR power purchase contracts to the California
investor-owned electric utilities as soon as possible. However, the DWR power
purchase contracts cannot be transferred to the Utility without the consent
of
the CPUC. The settlement agreement
approved
by the CPUC on December 18, 2003, and entered into among the CPUC, the
Utility and PG&E Corporation on December 19, 2003, to resolve the
Utility's proceeding under Chapter 11 of the U.S. Bankruptcy Code, or the
Settlement Agreement,
provides
that the CPUC will not require the Utility to accept an assignment of, or to
assume legal or financial responsibility for, the DWR power purchase contracts
unless each of the following conditions has been met:
| · |
After
assumption, the Utility's issuer rating by Moody's Investors Service,
or
Moody's, will be no less than A2 and the Utility's long-term issuer
credit
rating by Standard & Poor's, or S&P, will be no less than
A;
|
| · |
The
CPUC first makes a finding that the DWR power purchase contracts
to be
assumed are just and reasonable;
and
|
| · |
The
CPUC has acted to ensure that the Utility will receive full and timely
recovery in its retail electricity rates of all costs associated
with the
DWR power purchase contracts to be assumed without further
review.
|
The
Settlement Agreement does not limit the CPUC's discretion to review the prudence
of the Utility's administration and dispatch of the assumed DWR power purchase
contracts consistent with applicable law.
7
Qualifying
Facility Power Purchase Agreements
The
Utility is required by CPUC decisions to purchase energy and capacity from
independent power producers that are qualifying facilities under the Public
Utility Regulatory Policies Act of 1978, or PURPA. To implement PURPA, the
CPUC
required California investor-owned electric utilities to enter into long-term
power purchase agreements with qualifying facilities, or QFs, and approved
the
applicable terms, conditions, prices and eligibility requirements. These
agreements require the Utility to pay for energy and capacity. Energy payments
are based on the QF's actual electrical output and CPUC-approved energy prices,
while capacity payments are based on the QF's total available capacity and
contractual capacity commitment. Capacity payments may be adjusted if the QF
fails to meet or exceeds performance requirements specified in the applicable
power purchase agreement.
As
of
December 31, 2005, the Utility had agreements with 280 QFs for
approximately 4,200 MW that are in operation. Agreements for approximately
3,900
MW expire at various dates between 2006 and 2028. QF power purchase agreements
for approximately 300 MW have no specific expiration dates and will terminate
only when the owner of the QF exercises its termination option. The Utility
also
has power purchase agreements with approximately 60 inoperative QFs. The total
of approximately 4,200 MW consists of approximately 2,600 MW from cogeneration
projects, 600 MW from wind projects and 1,000 MW from projects with other fuel
sources, including biomass, waste-to-energy, geothermal, solar and
hydroelectric.
On
January 22, 2004, the CPUC ordered the California investor-owned electric
utilities to allow owners of QFs with certain power purchase agreements expiring
before the end of 2005 to extend these contracts for five years with modified
pricing terms. As of December 31, 2005, 21 QFs had entered into such
five-year contract extensions, 13 QFs entered in extensions in 2004 and 8 QFs
entered into extensions in 2005. QF power purchase agreements accounted for
approximately 22% of the Utility’s 2005 electricity sources, approximately 23%
of the Utility's 2004 electricity sources and approximately 20% of the Utility's
2003 electricity sources. No single QF accounted for more than 5% of the
Utility's 2005, 2004 or 2003 electricity sources.
There
are
proceedings pending at the CPUC that may impact both the amount of payments
to
QFs and the number of QFs holding power purchase agreements with the Utility.
The CPUC will address whether certain payments for short-term power deliveries
required by the power purchase agreements comply with the pricing requirements
of the PURPA. The CPUC is also considering whether to require the California
investor-owned electric utilities to enter into new power purchase agreements
with existing QFs with expiring power purchase agreements and with
newly-constructed QFs. For a further discussion of QF matters,
see the
section of Note 17:
Commitments and Contingencies— Power Purchase Agreements—Qualifying Facility
Power Purchase Agreements, of the Notes to the Consolidated Financial Statements
in the 2005 Annual Report.
On
January 19, 2006, the FERC proposed regulations to implement Section 210(m)
of
PURPA which was enacted as part of the Energy Policy Act of 2005. Section 210(m)
authorizes the FERC to waive the obligation of an electric utility under Section
210 of PURPA both (1) to purchase the electricity offered to it by a QF (under
a
new contract or obligation) if certain conditions are met, and (2) to sell
electricity to a QF if certain conditions are met. The statute would permit
such
waivers as to a particular QF or on a “service territory-wide basis.” While the
FERC's proposed regulations would grant blanket waivers from the obligation
to
purchase for certain areas under the control of a regional transmission
organization, the FERC has concluded that the ISO market does not qualify for
such status due to the lack of a functioning day-ahead market, i.e., a market
in
which electricity deliveries are scheduled a day before
delivery. The ISO intends to implement a day-ahead market in late 2007.
The proposed regulations would authorize utilities to make a showing on a
case-by-case basis that short and long-term markets are sufficiently competitive
to warrant waiver of the PURPA mandatory purchase obligation. The Utility
intends to apply for a service territory-wide waiver of its QF purchase
obligations under this case-by-case approach.
Irrigation
Districts and Water Agencies
The
Utility has contracts with various irrigation districts and water agencies
to
purchase hydroelectric power. Under these contracts, the Utility must make
specified semi-annual minimum payments based on the irrigation districts' and
water agencies' debt service requirements, regardless of whether or not any
hydroelectric power is supplied, and variable payments for operation and
maintenance costs incurred by the suppliers. These contracts expire on various
dates from 2005 to 2031. The Utility's irrigation district and water agency
contracts accounted for approximately 5% of the Utility’s 2005 electricity
sources, approximately 5% of the Utility's 2004 electricity sources and
approximately 5% of the Utility's 2003 electricity sources.
8
Electricity
Purchases to Satisfy the Net Open Position
In
2005,
the Utility continued buying electricity to meet its net open
position,
which
is the portion of the demand of a utility's customers, plus applicable reserve
margins, not satisfied from that utility's own generation facilities and
existing electricity contracts.
During
2005, more than 9,000 GWh of energy was bought or sold in the wholesale market
to manage the Utility’s 2005 net open position. Contracts entered into in 2005
had both terms of less than one year, and multi-year terms. In 2005, the Utility
both submitted and requested bids in competitive solicitations to meet
intermediate and long-term needs and anticipates procuring electricity under
contracts with multi-year terms beginning in 2006 or later.
Renewable
Energy Contracts
California
law requires each California retail seller of electricity, except for municipal
utilities, to increase its purchases of renewable energy (such as biomass,
wind,
solar and geothermal energy) by at least 1% of its retail sales per year, the
annual procurement target, so that the amount of electricity purchased from
renewable resources equals at least 20% of its total retail sales by the end
of
2017. In January 2005, the California Senate introduced a bill proposing to
require the goal to be met by the end of 2010 instead of 2017. The CPUC also
has
suggested that the 20% goal be met by 2010 and a 33% goal be met by 2020. The
Utility estimates that the accelerated goal would require the Utility to
increase the amount of its annual renewable energy purchases to approximately
800-900 GWh. During 2005, the Utility entered into several new renewable power
purchase contracts that will help the Utility meet its goals.
For
more
information regarding the Utility's power purchase contracts, see Note 17:
Commitments and Contingencies— Power Purchase Agreements, of the Notes to the
Consolidated Financial Statements in the 2005 Annual Report.
At
December 31, 2005, the Utility owned 18,616 circuit miles of interconnected
transmission lines operated at voltages of 500 kV to 60 kV and transmission
substations with a capacity of 49,158 MVA. Electricity is transmitted across
these lines and substations and is then distributed to customers through 128,128
circuit miles of distribution lines and substations with a capacity of 25,254
MVA. In 2005, the Utility delivered 81,626 GWh to its customers, including
8,867
GWh delivered to direct access customers. The Utility is interconnected with
electric power systems in the Western Electricity Coordinating Council which
includes 14 western states, Alberta and British Columbia, Canada, and parts
of
Mexico.
In
connection with electricity industry restructuring, the California
investor-owned electric utilities relinquished control, but not ownership,
of
their transmission facilities to the California Independent System Operator,
or
the ISO, in 1998. The FERC has jurisdiction over these transmission facilities,
and the revenue requirements and rates for transmission service are set by
the
FERC. The ISO, which is regulated by the FERC, controls the operation of the
transmission system and provides open access transmission service on a
nondiscriminatory basis. The ISO also is responsible for assuring that the
reliability of the transmission system is maintained.
On
August 19, 2004, the CPUC also approved a project to install approximately
28 miles of 230-kV transmission line from Redwood City to Brisbane, known as
the
Jefferson-Martin 230-kV Line. The improvement is intended to provide additional
transmission system reliability in San Francisco and northern San Mateo County.
Construction of this project is expected to be completed in April 2006.
The
Utility owns and operates an integrated natural gas transportation, storage
and
distribution system in California that extends throughout all or a part of
38 of
California's 58 counties and includes most of northern and central California.
In 2005, the Utility served approximately 4.2 million natural gas
distribution customers. The total volume of natural gas throughput during 2005
was approximately 856 Bcf.
At
December 31, 2005, the Utility's natural gas system consisted of 40,704
miles of distribution pipelines, 6,128 miles of backbone and local transmission
pipelines and three storage facilities. The Utility's distribution network
connects to the Utility's transmission and storage system at approximately
2,200
major interconnection points. The
Utility’s backbone transmission system, composed of Lines 300, 400 and 401, is
used to transport gas from the Utility’s interconnection with
interstate
9
pipelines,
other local distribution companies, and California gas fields to the Utility’s
local transmission and distribution system.
The
Utility's Line 300, which interconnects with the U.S. southwest and
California-Oregon pipeline systems owned by third parties (Transwestern Pipeline
Co., El Paso Natural Gas Company, Questar Southern Trails Pipeline Company
and
Kern River Pipeline Company), has a receipt capacity at the California-Arizona
border of approximately 1.1 Bcf per day. The Utility's Line 400/401
interconnects with the natural gas transportation pipeline of TransCanada's
Gas
Transmission Northwest Corporation at the California-Oregon border. This line
has a receipt capacity at the border of approximately 2.0 Bcf per day. Through
interconnections with other interstate pipelines, the Utility can receive
natural gas from all the major natural gas basins in western North America,
including basins in western Canada, the Rocky Mountains and the southwestern
United States. The Utility also is supplied by natural gas fields in
California.
The
Utility also owns and operates three underground natural gas storage fields
connected to the Utility's transmission and storage system. These storage fields
have a combined annual cycle capacity of approximately 42 Bcf. In addition,
two
independent storage operators are interconnected to the Utility's northern
California transportation system.
The
CPUC
divides the Utility's natural gas customers into two categories: core and
noncore customers. This classification is based largely on a customer's annual
natural gas usage. The core customer class is comprised mainly of residential
and smaller commercial natural gas customers. The noncore customer class is
comprised of industrial, larger commercial and electric generation natural
gas
customers. In 2005, core customers represented more than 99% of the Utility's
total customers and 40% of its total natural gas deliveries, while noncore
customers comprised less than 1% of the Utility's total customers and 60% of
its
total natural gas deliveries.
The
Utility provides natural gas delivery services to all core and noncore customers
connected to the Utility's system in its service territory. Core customers
can
purchase natural gas from alternate energy service providers or can elect to
have the Utility provide both delivery service and natural gas supply. When
the
Utility provides both supply and delivery, the Utility refers to the service
as
natural gas bundled service. Currently, over 99% of core customers, representing
over 96% of core market demand, receive natural gas bundled services from the
Utility.
The
Utility does not provide procurement service to noncore customers. Electricity
generators, cogenerators, enhanced oil recovery and refiners, and other large
noncore customers may not transfer to core service, and smaller noncore
customers must sign up for a minimum five-year term if they elect to transfer
to
core service. These restrictions were put in place because large increases
in
the Utility's natural gas supply portfolio demand from significant transfers
of
noncore customers to core service would raise prices for all other core
procurement customers and obligate the Utility to reinforce its pipeline system
to provide core service reliability on a short-term basis to serve this new
load.
The
Utility offers backbone gas transmission, delivery (local transmission and
distribution), and storage services as separate and distinct services to its
noncore customers. These customers may elect to receive storage services from
the Utility or other third-party storage providers. Noncore customers formerly
were able to subscribe for natural gas bundled service as if they were core
customers but are no longer allowed to do so. Access to the Utility's backbone
gas transmission system is available for all natural gas marketers and shippers,
as well as noncore customers.
The
Utility has regulatory balancing accounts for core customers designed to ensure
that the Utility's results of operations over the long term are not affected
by
weather variations, conservation or changes in their consumption levels. The
Utility's results of operations can, however, be affected by noncore consumption
levels because there are fewer regulatory balancing accounts related to noncore
customers. Approximately 97% of the Utility's natural gas distribution base
revenues are recovered from core customers and 3% are recovered from noncore
customers.
The
California Gas Report is prepared by the California electric and natural gas
utilities to present an outlook for natural gas requirements and supplies for
California over a long-term planning horizon. It is prepared in even-numbered
years followed by a supplemental report in odd-numbered years. The 2004
California Gas Report forecasts average annual growth in the Utility's natural
gas deliveries (for core customers and non-core transportation) of approximately
1.3% for the years 2004 through 2025. The natural gas requirements forecast
is
subject to many uncertainties and there are many factors that can influence
the
demand for natural gas, including weather conditions, level of economic
activity, conservation, price, and the number and location of electricity
generation facilities.
10
The
following table shows the percentage of the Utility's total 2005 natural gas
deliveries represented by each of the Utility's major customer
classes:
Total
2005 Natural Gas Deliveries: 856 Bcf
|
Residential
Customers
|
28%
|
|
Transport-only
Customers (noncore)
|
60%
|
|
Commercial
Customers
|
12%
|
The
following table shows the Utility's operating statistics from 2001 through
2005
(excluding subsidiaries) for natural gas, including the classification of sales
and revenues by type of service:
|
2005
|
2004
|
2003
|
2002
|
2001
|
|||||
|
Customers
(average for the year):
|
|||||||||
|
Residential
|
3,929,117
|
3,812,914
|
3,744,011
|
3,738,524
|
3,705,141
|
||||
|
Commercial
|
216,749
|
215,547
|
208,857
|
206,953
|
205,681
|
||||
|
Industrial
|
962
|
2,178
|
1,988
|
1,819
|
1,764
|
||||
|
Other
gas utilities
|
6
|
6
|
6
|
5
|
6
|
||||
|
Total
|
4,146,834
|
4,030,645
|
3,954,862
|
3,947,301
|
3,912,592
|
||||
|
Gas
supply (MMcf):
|
|||||||||
|
Purchased
from suppliers in:
|
|||||||||
|
Canada
|
204,884
|
205,180
|
196,278
|
210,716
|
209,630
|
||||
|
California
|
(18,951)
|
(9,108)
|
(7,421)
|
19,533
|
20,352
|
||||
|
Other
states
|
103,237
|
103,801
|
102,941
|
67,878
|
76,589
|
||||
|
Total
purchased
|
289,170
|
299,873
|
291,798
|
298,127
|
306,571
|
||||
|
Net
(to storage) from storage
|
(3,659)
|
(532)
|
1,359
|
(218)
|
(27,027)
|
||||
|
Total
|
285,511
|
299,341
|
293,157
|
297,909
|
279,544
|
||||
|
Utility
use, losses, etc.(1)
|
(14,312)
|
(19,287)
|
(14,307)
|
(16,393)
|
(8,988)
|
||||
|
Net
gas for sales
|
271,199
|
280,054
|
278,850
|
281,516
|
270,556
|
||||
|
Bundled
gas sales (MMcf):
|
|||||||||
|
Residential
|
194,108
|
201,601
|
198,580
|
202,141
|
197,184
|
||||
|
Commercial
|
77,056
|
78,080
|
79,891
|
78,812
|
72,528
|
||||
|
Industrial
|
35
|
373
|
379
|
563
|
831
|
||||
|
Other
gas utilities
|
—
|
—
|
—
|
—
|
13
|
||||
|
Total
|
271,199
|
280,054
|
278,850
|
281,516
|
270,556
|
||||
|
Transportation
only (MMcf):
|
572,869
|
597,706
|
525,353
|
508,090
|
646,079
|
||||
|
Revenues
(in millions):
|
|||||||||
|
Bundled
gas sales:
|
|||||||||
|
Residential
|
$2,336
|
$1,944
|
$1,836
|
$1,379
|
$2,308
|
||||
|
Commercial
|
885
|
712
|
697
|
499
|
783
|
||||
|
Industrial
|
—
|
—
|
1
|
3
|
16
|
||||
|
Other
gas utilities
|
—
|
—
|
1
|
1
|
—
|
||||
|
Miscellaneous
|
(22)
|
(29)
|
(31)
|
127
|
(93)
|
||||
|
Regulatory
balancing accounts
|
340
|
316
|
68
|
11
|
(253)
|
||||
|
Bundled
gas revenues
|
3,539
|
2,943
|
2,572
|
2,020
|
2,761
|
||||
|
Transportation
service only revenue
|
238
|
270
|
284
|
316
|
375
|
||||
|
Operating
revenues
|
$3,777
|
$3,213
|
$2,856
|
$2,336
|
$3,136
|
||||
|
Selected
Statistics:
|
|||||||||
|
Average
annual residential usage (Mcf)
|
49
|
53
|
53
|
54
|
53
|
||||
|
Average
billed bundled gas sales revenues per Mcf:
|
|||||||||
|
Residential
|
$12.04
|
$9.64
|
$9.25
|
$6.82
|
$11.70
|
||||
|
Commercial
|
11.48
|
9.12
|
8.73
|
6.33
|
10.80
|
||||
|
Industrial
|
0.61
|
(0.56)
|
2.48
|
4.35
|
19.15
|
||||
|
Average
billed transportation only revenue per Mcf
|
0.42
|
0.45
|
0.54
|
0.62
|
0.58
|
||||
|
Net
plant investment per customer
|
$1,262
|
$1,266
|
$1,261
|
$1,006
|
$970
|
||||
(1) Includes
fuel for the Utility's fossil fuel-fired generation plants.
11
The
Utility purchases natural gas to serve the Utility's core customers directly
from producers and marketers in both Canada and the United States. The contract
lengths and natural gas sources of the Utility's portfolio of natural gas
purchase contracts have fluctuated, generally based on market conditions. During
2005, the Utility purchased approximately 289,000 MMcf of natural gas (net
of
the sale of excess supply) from 57 suppliers. Consistent with existing CPUC
policy directives, substantially all this natural gas was purchased under
contracts with a term of one year or less. The Utility's largest individual
supplier represented approximately 10.4% of the total natural gas volume the
Utility purchased during 2005.
The
following table shows the total volume and the average price of natural gas
in
dollars per Mcf of the Utility's natural gas purchases by region during each
of
the last five years. The average prices for Canadian and U.S. southwest gas
shown below include the commodity natural gas prices, pipeline demand or
reservation charges, transportation charges and other pipeline assessments.
The
volumes purchased are shown net of sales of excess supplies of gas. In 2005,
the
sale of excess supplies to parties located in California exceeded purchases
from
parties located in California.
|
2005
|
2004
|
2003
|
2002
|
2001
|
||||||||||||||||||||||||||
|
MMcf
|
Avg.
Price
|
MMcf
|
Avg.
Price
|
MMcf
|
Avg.
Price
|
MMcf
|
Avg.
Price
|
MMcf
|
Avg.
Price
|
|||||||||||||||||||||
|
Canada
|
204,884
|
$
|
7.12
|
205,180
|
$
|
5.37
|
196,278
|
$
|
4.73
|
210,716
|
$
|
2.42
|
209,630
|
$
|
4.43
|
|||||||||||||||
|
California(1)
|
(18,951
|
)
|
$
|
7.70
|
(9,108
|
)
|
$
|
4.89
|
(7,421
|
)
|
$
|
3.39
|
19,533
|
$
|
2.88
|
20,352
|
$
|
11.55
|
||||||||||||
|
Other
states (substantially all U.S southwest)
|
103,237
|
$
|
7.10
|
103,801
|
$
|
5.44
|
102,941
|
$
|
4.63
|
67,878
|
$
|
3.04
|
76,589
|
$
|
10.41
|
|||||||||||||||
|
Total/weighted
average
|
289,170
|
$
|
7.07
|
299,873
|
$
|
5.41
|
291,798
|
$
|
4.73
|
298,127
|
$
|
2.59
|
306,571
|
$
|
6.40
|
|||||||||||||||
(1) California
purchases include supplies from various California producers and supplies
transported into California by others.
The
Utility's gas gathering system collects natural gas from third-party wells
in
California. During 2005, approximately 4% of the gas transported on the
Utility's system came from various California producers, with the balance coming
from supplies transported into California by others. The natural gas well
production is processed by producers to remove various impurities from the
natural gas stream and the Utility then odorizes the natural gas so that it
may
be detected in the event of a leak. The facilities include approximately 420
miles of gas gathering pipelines. The Utility receives gas well production
at
approximately 300 metering facilities. The Utility’s gas gathering system is
geographically dispersed and is located in 13 California counties. Approximately
119 MMcf per day of natural gas produced in northern California was delivered
into the Utility's gas gathering system during 2005.
In
2005,
approximately 65% of the gas transported on the Utility's system came from
western Canada. The Utility has a number of arrangements with interstate and
Canadian third-party transportation service providers to serve core customers'
service demands. The Utility has firm transportation agreements for delivery
of
natural gas from western Canada to the United States- Canadian border with
TransCanada NOVA Gas Transmission, Ltd. and TransCanada
PipeLines Ltd., B.C. System. These companies' pipeline systems connect at
the border to the pipeline system owned by Gas Transmission Northwest
Corporation which provides natural gas transportation services to
interconnection points with the Utility's natural gas transportation system
in
the area of California near Malin, Oregon. The Utility has a firm transportation
agreement with Gas Transmission Northwest Corporation for these
services.
During
2005, approximately 31% of the gas transported on the Utility's system came
from
the western United States, excluding California. The Utility has firm
transportation agreements with Transwestern Pipeline Co., or Transwestern,
and
El Paso Natural Gas Company, or El Paso, to transport this natural gas from
supply points in this region to interconnection points with the Utility's
natural gas transportation system in the area of California near Topock,
Arizona.
12
The
following table shows certain information about the Utility's firm natural
gas
transportation agreements, including the contract quantities, contract durations
and associated demand charges, net of sales of excess supplies, for capacity
reservations. These agreements require the Utility to pay fixed demand charges
for reserving firm capacity on the pipelines. The total demand charges may
change periodically as a result of changes in regulated tariff rates approved
by
Canadian regulators in the case of TransCanada NOVA Gas Transmission, Ltd.
and TransCanada PipeLines Ltd., B.C. System, and by the FERC in all other
cases. The Utility recovers these demand charges through the Core Procurement
Incentive Mechanism, or CPIM. The Utility may, upon prior notice and with the
CPUC’s approval, extend each of these natural gas transportation agreements. On
the FERC-regulated pipelines, the Utility has either a right of first refusal
or
evergreen rights allowing it to renew natural gas transportation agreements
at
the end of their terms. If another prospective shipper also wants the capacity,
the Utility would be required to match the competing bid with respect to both
price and term.
|
Pipeline
|
Expiration
Date
|
Quantity
MDth
per day
|
Demand
Charges
for
the Year Ended
December 31,
2005
(In
millions)
|
||||
|
TransCanada
NOVA Gas Transmission, Ltd.
|
12/31/2007
|
(a)
|
616
|
28.0
|
|||
|
TransCanada
PipeLines Ltd., B.C. System
|
10/31/2007
|
607
|
13.0
|
||||
|
Gas
Transmission Northwest Corporation
|
10/31/2007
|
610
|
54.8
|
||||
|
Transwestern
Pipeline Co.
|
03/31/2007
|
150
|
20.5
|
||||
|
El
Paso Natural Gas Company (b)
|
Various
|
202
|
19.2
|
| (a) | A small portion (23 MDth/d) of the Utility’s capacity is due to expire on October 31, 2007. |
|
(b)
|
As
of December 31, 2005, the Utility has three active contracts with
El Paso
with expiration dates ranging from June 30, 2007 to June 30, 2010.
|
Historically,
energy utilities operated as regulated monopolies within service territories
where they were essentially the sole suppliers of natural gas and electricity
services. These utilities owned and operated all of the businesses and
facilities necessary to generate, transport and distribute energy. Services
were
priced on a combined, or bundled, basis with rates charged by the energy
companies designed to include all the costs of providing these services. Under
traditional cost-of-service regulation, the utilities undertook a continuing
obligation to serve their customers, in return for which the utilities were
authorized to charge regulated rates sufficient to recover their costs of
service, including timely recovery of their operating expenses and a reasonable
return on their invested capital. The objective of this regulatory policy was
to
provide universal access to safe and reliable utility services. Regulation
was
designed in part to take the place of competition and ensure that these services
were provided at fair prices.
In
recent
years, energy utilities have faced intensifying pressures to unbundle, or price
separately, those services that are no longer considered natural monopolies.
The
most significant of these services are the commodity components—the supply of
electricity and natural gas. The driving forces behind these competitive
pressures have been customers who believe they can obtain energy at lower unit
prices and competitors who want access to those customers. Regulators and
legislators responded to these forces by providing for more competition in
the
energy industry. Regulators and legislators, to varying degrees, have required
utilities to unbundle rates in order to allow customers to compare unit prices
of the utilities and other providers when selecting their energy service
provider.
The
FERC's policies have supported the development of a competitive electricity
generation industry. FERC Order 888, issued in 1996, established standard terms
and conditions for parties seeking access to regulated utilities' transmission
grids. The FERC's subsequent Order 2000, issued in late 1999, established
national standards for regional transmission organizations, or RTOs, and
advanced the view that a regulated, unbundled transmission sector should
facilitate competition in both wholesale electricity generation and retail
electricity markets. The ISO also issued its own comprehensive energy market
design proposal to effect changes to the structure and operation of the
California electricity market. The first phase of the ISO’s new market design
has been approved by the FERC and was implemented by the ISO in the fourth
quarter of 2004. On February 14, 2006, the ISO filed its proposed tariff
language with the FERC to implement the balance of its market design
proposal. Assuming
FERC approval, the balance of the ISO’s new market design could be implemented
as early as November 2007.
13
In
July 2003, in order to limit opportunities for transmission providers to
favor their own generation, facilitate market entry for generation competitors
by streamlining and standardizing interconnection procedures, and encourage
needed investment in generator and transmission infrastructure, the FERC issued
final rules on the interconnection of generators larger than 20 MW with a
transmission system. The new rules require regulated transmission providers,
such as the Utility or the ISO, generally to use standard interconnection
procedures and a standard agreement for generator interconnections. These rules
required the Utility and the ISO to revise the current form of agreements and
procedures used when constructing facilities to interconnect new generators.
In
July 2005, the FERC accepted tariff changes filed by the Utility and the ISO
to
implement the new rules. In doing so, the FERC confirmed that the ISO is
authorized to implement California-specific modifications to the FERC's pro
forma agreement and procedures for new interconnections under what is known
as
an "independent entity variation." The new rules, tariffs and related
interconnection procedures establish time-frames for completing studies on
behalf of new generator applicants, and codify the FERC's preexisting policy
regarding financing of transmission system upgrades needed in order to
interconnect a new generator. Under this policy, the generator must finance
such
upgrade facilities in the first instance, but then is reimbursed the funds,
with
interest, over a five-year period after the power plant achieves commercial
operation. The cost of the network upgrades then is recovered by the Utility
in
its overall transmission rates.
In
1998,
California implemented AB 1890, which mandated the restructuring of the
California electricity industry and established a market framework for
electricity generation in which generators and other electricity providers
were
permitted to charge market-based prices for wholesale electricity. AB 1890
also
gave customers the choice of continuing to buy electricity from the California
investor-owned electric utilities or, beginning in April 1998, entering
into contracts to purchase electricity from alternate energy service providers
(i.e.,
becoming direct access customers). The CPUC suspended the right of retail
end-user customers to become direct access customers on September 20, 2001.
The CPUC has assessed an additional charge on certain direct access customers
to
avoid a shift of costs from direct access customers to customers who receive
bundled service.
California
AB 117 permits cities and counties to purchase and sell electricity for their
local residents and businesses once they have registered as community choice
aggregators. Under AB 117, the Utility would continue to provide distribution,
metering and billing services to the community choice aggregators' customers
and
be those customers' provider of electricity of last resort. However, once
registration has occurred, each community choice aggregator would procure
electricity for all of its residents who do not affirmatively elect to continue
to receive electricity from the Utility. To prevent a shifting of costs to
customers of a utility who receive bundled services, AB 117 requires the CPUC
to
determine a cost-recovery mechanism so that retail end-users of the community
choice aggregator will pay an appropriate share of the DWR's and the Utility's
costs. AB 117 also authorized the Utility to recover from each community choice
aggregator any costs of implementing the program that are reasonably
attributable to the community choice aggregator, and to recover from customers
any costs of implementing the program not reasonably attributable to a community
choice aggregator. In December 2005, the CPUC adopted rules
that allow for the implementation of community choice aggregation.
FERC
Order 636, issued in 1992, required interstate natural gas pipeline companies
to
divide their services into separate gas commodity sales, transportation and
storage services. Under Order 636, interstate natural gas pipeline companies
must provide transportation service regardless of whether the customer (often
a
local gas distribution company) buys the natural gas commodity from these
companies. The Utility’s natural gas pipelines are located within the State of
California and are exempt from FERC rules and regulations applicable to
interstate pipelines.
The
Utility’s pipeline operations are subject to the jurisdiction of the CPUC. In
1998, the Utility implemented the Gas Accord settlement agreement, a
CPUC-approved settlement agreement reached among the Utility and many interested
parties under which the natural gas transportation and storage services the
Utility provides were separated for ratemaking purposes from the Utility's
distribution services. The Gas Accord changed the terms of service and rate
structure for natural gas transportation, allowing the Utility's core customers
greater flexibility to purchase natural gas from competing suppliers. The
Utility's noncore customers purchase their natural gas from producers, marketers
and brokers, and purchase their preferred mix of transportation, storage and
distribution services from the Utility. Although they can select the gas
suppliers of their choice, substantially all core customers buy natural gas,
as
well as transportation and distribution services, from the Utility as a bundled
service. The Gas Accord market structure has been extended by the CPUC through
2007.
The
Utility competes with other natural gas pipeline companies for customers
transporting natural gas into the southern California market on the basis of
transportation rates, access to competitively priced supplies of natural gas
and
the quality and reliability of transportation services. The most important
competitive factor affecting the Utility's market share for
transportation
14
of
natural gas to the southern California market is the total delivered cost of
western Canadian natural gas relative to the total delivered cost of natural
gas
from the southwestern United States. The total delivered cost of natural gas
includes, in addition to the commodity cost, transportation costs on all
pipelines that are used to deliver the natural gas, which, in the Utility's
case, includes the cost of transportation of the natural gas from Canada to
the
California border and the amount that the Utility charges for transportation
from the border to southern California. In general, when the total cost of
western Canadian natural gas increases relative to other competing natural
gas
sources, the Utility's market share of transportation services into southern
California decreases. The Utility also competes for storage services with other
third-party storage providers, primarily in northern California.
From
time
to time, existing pipeline companies propose to expand their pipeline systems
for delivery of natural gas into northern and central California. As a result
of
the California energy crisis, several new natural gas pipeline proposals were
initiated to serve proposed new generation facilities for northern and central
California. Many of the electricity generation projects have been cancelled
or
delayed, making it difficult for sponsors of the various gas pipeline projects
to acquire enough firm capacity commitments to go forward with
construction.
The
Utility, along with Fort Chicago Energy Partners, L.P. and Northwest Pipeline
Corporation, have agreed to jointly pursue the development of a new 250-mile
interstate gas transmission pipeline that would increase natural gas supplies
for the entire West Coast region of the United States. The proposed Pacific
Connector Gas Pipeline, expected to be operational in 2010, together with the
Jordan Cove liquefied natural gas, or LNG, terminal in Coos Bay, Oregon, being
developed by Fort Chicago Partners. L.P., would open growing West Coast natural
gas markets to diverse worldwide natural gas supply sources, providing
additional alternatives to traditional Canadian, Southwest and Rocky Mountain
supplies and increasing supply options and reliability. The Pacific Connector
project would connect the proposed Jordan Cove LNG terminal to Northwest
Pipeline Corporation’s pipeline system near Roseburg, Oregon, and to the
Utility's backbone gas transmission system near Malin, Oregon. The Pacific
Connector would be capable of delivering 1 bcf per day to the West Coast natural
gas market - both to customers in the Pacific Northwest through Northwest
Pipeline Corporation's pipeline system and to the Utility's system for delivery
to customers in California. The group intends to seek market commitments for
the
proposed pipeline project and to begin environmental assessments along the
proposed route in April 2006. The group plans to file an application to seek
the
FERC's approval for the new pipeline by January 2007. Subject
to regulatory approval, the proposed LNG terminal and pipeline are anticipated
to begin commercial operation in 2010.
Federal
Energy Regulation
The
Public Utility Holding Company Act of 1935, or PUHCA, imposed structural and
regulatory approval requirements on certain public utility holding companies
that have limited their utility operations to a single integrated system. These
requirements primarily related to sales and acquisitions of utility property
and
securities, issuance of securities by the top-level holding company, and various
affiliate arrangements involving extensions of credit and the provision of
goods, services or construction. PUHCA prevented these holding companies from
owning other businesses that are not reasonably incidental or functionally
related to the utility business. PUHCA also discouraged ownership of U.S.
electric and gas utilities by domestic industrial and financial institutions
and
by foreign institutions generally. As a holding company with utility operations
confined to one state, PG&E Corporation and its subsidiaries were exempt
from most of PUHCA’s requirements.
In
August
2005, a comprehensive federal energy bill named the “Energy Policy Act of 2005”
was enacted. Among its key provisions, the Energy Policy Act of 2005 repealed
PUHCA, effective February 8, 2006, and enacted in its place the Public Utility
Holding Company Act of 2005, or PUHCA 2005. Under PUHCA 2005, public utility
holding companies fall principally under the regulatory oversight of the FERC,
rather than the SEC (which previously administered PUHCA). On December 8, 2005,
the FERC issued its final rule implementing PUHCA 2005 and, among other actions,
adopted a requirement that, unless otherwise eligible for exemption, every
utility holding company provide the FERC with access to its books and records
that are relevant to the FERC’s ratemaking responsibilities. The
authorities granted to the FERC under PUHCA 2005 are supplementary to and
somewhat duplicative of authorities it holds under other applicable law. On
February 7, 2006, the
FERC
decided that it will rehear its December 8, 2005 order. In addition to
providing for FERC access to utility holding company books and records and
other matters, PUHCA 2005 also provides for access by state utility commissions
to utility holding company books and records in certain
circumstances..
The
Energy Policy Act of 2005 modifies the FERC's authority and standard of review
with respect to mergers and consolidations. The repeal of PUHCA is expected
to
trigger a period of consolidation among public utilities, as well
as
15
acquisitions
of public utilities by other businesses. As a result, the repeal of PUHCA could
increase competitive pressures on the energy utility industry, including
competition from sources the Utility does not currently view as competitors.
State
Energy Regulation
PG&E
Corporation is not a public utility under the laws of California and is not
subject to regulation as such by the CPUC. CPUC approval authorizing the
formation of holding companies has been granted subject to various
conditions set forth in CPUC decisions issued in 1996 and 1999 related to
finance, human resources, records and bookkeeping, and the transfer of customer
information. In 2004, the California Court of Appeal issued an opinion finding
that the CPUC has limited jurisdiction over the holding companies to enforce
these conditions. The financial conditions provide that:
| · |
The
Utility is precluded from guaranteeing any obligations of PG&E
Corporation without prior written consent from the
CPUC;
|
| · |
The
Utility's dividend policy must continue to be established by the
Utility's
Board of Directors as though the Utility were a stand-alone utility
company;
|
| · |
The
capital requirements of the Utility, as determined to be necessary
and
prudent to meet the Utility's obligation to serve or to operate the
Utility in a prudent and efficient manner, must be given first priority
by
PG&E Corporation's Board of Directors (known as the “first priority”
condition); and
|
| · |
The
Utility must maintain on average its CPUC-authorized utility capital
structure, although it shall have an opportunity to request a waiver
of
this condition if an adverse financial event reduces the Utility's
equity
ratio by 1% or more.
|
As
discussed below under "Item 3—Legal Proceedings," the California Attorney
General and the City and County of San Francisco have alleged that PG&E
Corporation and its directors, as well as the directors of the Utility, violated
the CPUC’s holding company conditions during the California energy crisis.
PG&E Corporation and the Utility believe that they have complied with
applicable statutes, CPUC decisions, rules and orders.
The
CPUC
also has adopted complex and detailed rules governing transactions between
California's electricity and natural gas distribution companies and their
non-regulated affiliates. The rules address the use of the regulated utilities’
name and logo by their non-regulated affiliates, the separation of regulated
utilities and their non-regulated affiliates, information exchange among the
affiliates, and power-procurement related transactions among regulated utilities
and their non-regulated affiliates. The rules also prohibit each utility from
engaging in certain practices that would discriminate against energy service
providers that compete with that utility's non-regulated affiliates.
The
CPUC
also has established specific penalties and enforcement procedures for affiliate
rules violations. Utilities are required to self-report affiliate
rules violations.
In
October 2005, the CPUC issued an Order Instituting Rulemaking, or OIR, to allow
the CPUC to re-examine the relationship between California energy utilities
and
their parent holding companies and affiliates. The CPUC noted that in light
of
the repeal of PUHCA, as discussed above, the parent holding companies of the
California energy utilities may try to expand the unregulated activities of
their affiliates, may try to merge with or acquire other companies or may be
acquired by other companies, and that it was necessary for the CPUC to review
its existing regulations and to consider whether additional, new rules or
regulations are needed. The CPUC stated that it may propose rules to ensure
that
the California energy utilities retain sufficient capital and the ability to
access capital in order to meet their customers' needs, and to address the
potential conflicts between the utilities' ratepayers' interests and the parent
holding companies' and affiliates' interests in order to ensure that these
conflicts do not undermine the utilities' ability to meet their public service
obligations at the lowest possible cost. The CPUC stated that it may propose
additional rules or regulations regarding, but not necessarily limited to,
(1)
reporting requirements for the allocation of capital between utilities and
their
non-regulated affiliates by the parent holding companies, and (2) changes to
the
CPUC's affiliate transaction rules.
The
Utility's Regulatory Environment
Various
aspects of the Utility's business are subject to a complex set of energy,
environmental and other governmental laws, regulations and regulatory
proceedings at the federal, state and local levels. This section and the
"Ratemaking Mechanisms"
16
section
below summarize some of the more significant laws, regulations and regulatory
mechanisms affecting the Utility. These sections are not an exhaustive
description of all the laws, regulations and regulatory proceedings that affect
the Utility. The energy laws, regulations and regulatory proceedings may change
or be implemented or applied in a way that the Utility does not currently
anticipate. For discussion of specific regulatory proceedings affecting the
Utility, see the section of MD&A entitled “Regulatory Matters” in the 2005
Annual Report.
The
FERC
The
FERC
is an independent agency within the U.S. Department of Energy, or the DOE,
that
regulates the transmission and wholesale sales of electricity in interstate
commerce and the transmission and sale of natural gas for resale in interstate
commerce. The FERC also regulates electricity transmission, interconnections,
tariffs and conditions of service of the ISO, and the terms and rates of
wholesale electricity sales. The ISO is responsible for providing open access
transmission service on a non-discriminatory basis, meeting applicable
reliability criteria, planning transmission system additions and assuring the
maintenance of adequate reserves of generation capacity. In addition, the FERC
has jurisdiction over the Utility's electricity transmission revenue
requirements and rates, the licensing of substantially all of the Utility's
hydroelectric generation facilities and the interstate sale and transportation
of natural gas.
As
discussed above, the Energy Policy Act of 2005 contains provisions addressing
electric transmission and natural gas pipeline siting and investment, siting
of
LNG terminals, energy efficiency, and electric market manipulation. The Energy
Policy Act of 2005 also changes the FERC regulatory scheme applicable to QFs,
creates an Electric Reliability Organization to be overseen by the FERC to
establish electric reliability standards, and modifies certain other aspects
of
energy regulation and federal tax policies applicable to the Utility. In
addition, the Energy Policy Act of 2005 gives the FERC broader authority to
police and penalize the exercise of market power or behavior intended to
manipulate the prices paid in FERC-jurisdictional transactions. In January
2006,
the FERC adopted rules to prohibit market manipulation, modeling its new rules
on SEC Rule 10b-5 which prohibits fraud and manipulation with respect to the
purchase or sale of securities. In
response to the California energy crisis, the FERC issued a series of orders
in
the spring and summer of 2001 and July 2002 aimed at prospectively
mitigating extreme wholesale energy prices like those that prevailed in 2000
and
2001. These orders established a cap on bids for real-time electricity and
ancillary services of $250 per MWh (unless a generator could demonstrate that
its costs justified a rate in excess of $250 per MWh) and established various
automatic mitigation procedures. As of December 2003, all sellers with
market-based rate authority became subject to, and incorporated in their
market-based rate tariffs, behavioral conditions designed to prevent market
manipulation. The FERC has proposed to repeal these behavioral conditions in
favor of its more generalized prohibition on market manipulation that it adopted
in January 2006 based on SEC Rule 10b-5, as discussed above. On
January 13, 2006, the FERC approved an increase in the energy price cap, from
$250 to $400 per MWh, in response to the ISO’s request to reflect natural gas
price increases. The FERC's January 13 order also initiated a proceeding to
consider whether to extend the energy price cap increase throughout the Western
Electricity Coordinating Council area, as well as whether to increase the price
cap for ancillary services to the same level as the energy price cap.
Various
entities, including the Utility and the state of California are seeking refunds
from energy suppliers in the California ISO and California Power Exchange,
or
PX, markets for electricity overcharges on behalf of California electricity
purchasers for the period May 2000 to June 2001 through FERC regulatory and
judicial proceedings. The Utility has entered into settlements with various
power suppliers resolving certain disputed claims and the Utility's refund
claims against these power suppliers. For further discussion of these
settlements, see the section of Note 17:
Commitments and Contingencies—California Energy Crisis Proceedings, of the Notes
to the Consolidated Financial Statements in the 2005 Annual Report.
The
NRC
The
NRC
oversees the licensing, construction, operation and decommissioning of nuclear
facilities, including the Utility's Diablo Canyon power plant and Humboldt
Bay
Unit 3. NRC regulations require extensive monitoring and review of the safety,
radiological, environmental and security aspects of these facilities. In the
event of non-compliance, the NRC has the authority to impose fines or to force
a
shutdown of a nuclear plant, or both. Safety requirements promulgated by the
NRC
have, in the past, necessitated substantial capital expenditures at the
Utility's Diablo Canyon power plant and additional significant capital
expenditures could be required in the future.
17
The
CPUC
The
CPUC
has jurisdiction to set the rates, terms and conditions of service for the
Utility's electricity distribution, natural gas distribution and natural gas
transportation and storage services in California. The CPUC also has
jurisdiction over the Utility's issuances of securities, dispositions of utility
assets and facilities, energy purchases on behalf of the Utility's electricity
and natural gas retail customers, rate of return, rates of depreciation, aspects
of the siting and operation of natural gas transportation assets, oversight
of
nuclear decommissioning and aspects of the siting of the electricity
transmission system. Ratemaking for retail sales from the Utility's generation
facilities is under the jurisdiction of the CPUC. To the extent this electricity
is sold for resale into wholesale markets, however, it is under the ratemaking
jurisdiction of the FERC. In addition, the CPUC has general jurisdiction over
most of the Utility’s operations, and regularly reviews utility performance,
using measures such as the frequency and duration of outages. The CPUC also
conducts investigations into various matters, such as deregulation, competition
and the environment, in order to determine its future policies. The CPUC
consists of five members appointed by the Governor of California and confirmed
by the California State Senate for staggered six-year terms.
The
California Energy Resources Conservation and Development Commission
The
California Energy Resources Conservation and Development Commission, commonly
called the California Energy Commission, or CEC, is the state's primary energy
policy and planning agency. The CEC is responsible for licensing of all thermal
power plants over 50 MW; overseeing funding programs that support public
interest energy research; advancing energy science and technology through
research, development and demonstration; and providing market support to
existing, new and emerging renewable technologies. In addition, the CEC is
responsible for forecasting future energy needs that will be used by the CPUC
in
determining the adequacy of the utilities' electricity procurement
plans.
The
Utility obtains a number of permits, authorizations and licenses in connection
with the construction and operation of the Utility's generation facilities,
electricity transmission lines, natural gas transportation pipelines and gas
compressor station facilities. Discharge permits, various Air Pollution Control
District permits, U.S. Department of Agriculture-Forest Service permits, FERC
hydroelectric generation facility and transmission line licenses, and NRC
licenses are some of the more significant examples. Some licenses and permits
may be revoked or modified by the granting agency if facts develop or events
occur that differ significantly from the facts and projections assumed in
granting the approval. Furthermore, discharge permits and other approvals and
licenses are granted for a term less than the expected life of the associated
facility. Licenses and permits may require periodic renewal, which may result
in
additional requirements being imposed by the granting agency. The Utility
currently has seven hydroelectric projects and one transmission line project
undergoing FERC relicensing. The Utility will begin relicensing proceedings
on
two additional hydroelectric projects within the next two years.
The
Utility has over 520 franchise agreements with various cities and counties
that
permit the Utility to install, operate and maintain the Utility's electric,
natural gas, oil and water facilities in the public streets and roads. In
exchange for the right to use public streets and roads, the Utility pays annual
fees to the cities and counties under the franchises. Franchise fees are
computed pursuant to statute under either the Broughton Act or the Franchise
Act
of 1937. However, there are 38 charter cities that can set a fee of their own
determination. The Utility also periodically obtains permits, authorizations
and
licenses in connection with distribution of electricity and natural gas. Under
these permits, authorizations and licenses, the Utility has rights to occupy
and/or use public property for the operation of the Utility's business and
to
conduct certain related operations.
Cost-of-Service
Ratemaking
The
Utility’s rates for electricity and natural gas utility services are based on
its costs of service. Before rates can be set, the CPUC and the FERC must
determine the amount of “revenue requirements” the Utility is authorized to
collect from its customers to recover the Utility’s operating and capital costs.
The CPUC determines the Utility’s revenue requirements associated with
electricity and gas distribution operations, electricity generation, and natural
gas transportation and storage. The Utility’s revenue requirements associated
with its electricity transmission operations are established by the FERC.
Revenue
18
requirements
are primarily determined based on the Utility’s forecast of future costs,
including electricity and natural gas procurement costs. The
components of revenue requirements for electricity and natural gas utility
service include depreciation, operating, administrative and general expenses,
taxes and return on investment, as applicable, for each area of these services,
including distribution, transmission, transportation, generation, procurement
and public purpose programs. Revenue requirements are then allocated among
customer classes and specific rates designed to produce the required revenue
are
established. In the Utility's rate cases, interveners have the opportunity
to
comment on the Utility's application. The issues raised by these comments are
then resolved by the appropriate regulatory agency. If the Utility and the
interveners can settle these issues, these settlements are submitted to the
regulatory agency for approval. Changes
in any individual revenue requirement will affect customers' electricity and
gas
rates and the Utility's revenues.
Revenue
requirements are designed to allow a utility an opportunity to recover its
reasonable costs of providing utility services, including a return of, and
a
fair rate of return on, its investment in utility facilities, or rate base.
To
the
extent that the Utility is unable to recover its costs through rates because
the
Utility’s actual costs are determined to be unreasonable or are higher than
forecast, the Utility may be unable to earn its authorized rate of return.
General
Rate Cases
The
Utility's primary revenue requirement proceeding is the general rate case,
or
GRC, filed with the CPUC. In the GRC, the CPUC authorizes the Utility to collect
from customers an amount known as base revenues to recover base business and
operational costs related to the Utility's electricity and natural gas
distribution and electricity generation operations. The GRC typically sets
annual revenue requirement levels for a three-year rate period. The CPUC
authorizes these revenue requirements in GRC proceedings based on a forecast
of
costs for the first, or test, year. After authorizing the revenue requirements,
the CPUC allocates revenue requirements among customer classes (mainly
residential, commercial, industrial and agricultural) and establishes specific
rate levels. Typical interveners in the Utility's GRC include the Office of
Ratepayer Advocate, or ORA, and The Utility Reform Network, or TURN. On
December
2, 2005, the Utility filed its 2007 GRC application with the CPUC. For
more
information, see “Regulatory Matters—2007 General Rate Case” in the MD&A in
the 2005 Annual Report.
Attrition
Rate Adjustments
The
CPUC
may authorize the Utility to receive annual increases for the years between
GRCs
in the base revenues authorized for the test year of a GRC to avoid a reduction
in earnings in those years due to, among other things, inflation and increases
in invested capital. These adjustments are known as attrition rate adjustments.
Attrition rate adjustments provide increases in the revenue requirements that
the Utility is authorized to collect in rates for electricity and natural gas
distribution and electricity generation operations.
Cost
of Capital Proceedings
The
CPUC
generally conducts an annual cost of capital proceeding to determine the
Utility's authorized capital structure and the authorized rate of return that
the Utility may earn on its electricity and natural gas distribution and
electricity generation assets. The cost of capital proceeding establishes the
percentage components that common equity, preferred equity and debt will
represent in the Utility's total authorized capital structure for a specific
year. The CPUC then establishes the authorized return on common equity,
preferred equity and debt that the Utility will have the opportunity to collect
in its authorized rates. On
December 15, 2005, the CPUC issued a cost of capital decision approving a
capital structure for the Utility consisting of 46% long-term debt, 2% preferred
stock and 52% equity. The CPUC set the rate of return that the Utility may
earn
on its electricity and natural gas distribution and electricity generation
rate
base for 2006 at 6.02% for long-term debt, 5.87% for preferred stock and 11.35%
for equity, resulting in an overall rate of return on rate base of 8.79%.
Although the FERC has authority to set the Utility’s rate of return for its
electricity transmission operations, the rate of return is often unspecified
if
the Utility's transmission rates are determined through a negotiated rate
settlement. The Utility’s rates of return for its backbone and local gas
transmission and storage operations through 2007 has been previously set in
the
Gas Accord at 11.22% for the return on equity and 8.77% for the overall rate
of
return.
Baseline
Allowance
The
CPUC
sets and periodically revises a baseline allowance for the Utility's residential
gas and electricity customers. A customer's baseline allowance is the amount
of
its monthly usage that is covered under the lowest possible natural gas or
electric rate. Natural gas or electricity usage in excess of the baseline
allowance is covered by higher rates that increase with usage.
19
The
Utility administers, and/or funds, several state-mandated public purpose
programs. California law requires the CPUC to authorize certain levels of
funding for electric and gas public purpose programs related to energy
efficiency, low-income energy efficiency, research and development, and
renewable energy resources. For 2005, the CPUC has authorized the Utility to
collect revenue requirements of approximately $250 million from electricity
customers to fund these electricity public purpose programs and to collect
revenue requirements of approximately $40 million from gas customers to fund
these natural gas public purpose programs.
In
addition to the amounts required to be authorized by California law, the CPUC
has authorized the Utility to collect approximately $50 million from retail
electricity customers to recover the cost of additional energy efficiency
programs put in place in accordance with the “loading order” stated in the
CPUC’s Energy Action Plan for meeting the state’s energy resource needs. The
“loading order” requires optimization of energy efficiency measures first,
followed by demand response initiatives, and the use of renewable energy, before
conventional generation is sought to be developed.
The
Utility also provides a discount rate called the California Alternate Rates
for
Energy, or CARE, for low-income customers. This rate subsidy of approximately
$220 million per year (including avoided surcharges) is paid for by the
Utility's other customers.
The
CPUC
is responsible for authorizing the programs, funding levels and cost recovery
mechanisms for the Utility's operation of both energy efficiency and low-income
energy efficiency programs. The CEC administers both the electric public
interest research and development program and the renewable energy program
on a
statewide basis. In 2005, the Utility transferred $102 million to the CEC
for these two programs.
On
September 22, 2005, the CPUC authorized 2006 through 2008 energy efficiency
portfolio plans and program funding levels, not including funding for
evaluation, measurement and verification activities, or EM&V, for the
Utility and the other investor-owned California utilities. The CPUC approved
funding of approximately $850 million for the Utility's energy efficiency
programs over the 2006 through 2008 period, 20% of which is to be awarded to
third-parties through a competitive bid process. On November 18, 2005, the
CPUC
authorized funding for EM&V activities of approximately $75 million for the
Utility over the 2006 through 2008 period. The increased energy efficiency
funding level is part of a larger effort by the state of California to reduce
consumption of fossil fuels. The increased funding level will enable both
residential and business customers to take more advantage of the diverse mix
of
energy efficiency programs.
On
January 12, 2006, the CPUC authorized increased funding to provide customer
incentives and set additional policies to develop solar resources in California
over the next 11 years, 2006 through 2017. This program, called the California
Solar Initiative, or CSI, was designed with the objective of bringing 3,000
MW
of solar power on-line by 2017. The CPUC’s decision consolidates existing and
anticipated solar incentives for the California investor-owned utilities,
including a $300 million increase in 2006 funding for the Self Generation
Incentive Program that was authorized in December 2005. In total, the CPUC
authorized the California investor-owned utilities to collect an additional
$2.8
billion over the 2006 through 2017 period from their customers to fund customer
incentives for the installation of retail solar energy projects to serve onsite
load. The intent of the CSI is to
help
California move toward a cleaner energy future and bring the costs of solar
electricity down for California consumers so that solar products will be
cost-effective without incentives. Of the total amount authorized, the Utility
has been allocated $1.2 billion to fund customer incentives. When combined
with
previously authorized funding, the total funds to be provided to achieve the
CSI’s objectives are $3.25 billion, of which $1.4 billion is allocated to the
Utility. The CSI also allocates up to 5% of the annual budget for research,
development and demonstration activities, with emphasis on the demonstration
of
solar and solar-related technologies.
As
a
consequence of the California energy crisis and the resulting inability of
the
California investor-owned utilities to purchase electricity in the wholesale
market, on January 17, 2001, the Governor of California signed an order
declaring an emergency
and authorizing the DWR to purchase electricity to maintain the continuity
of
supply to retail customers. This was followed by AB 1X, which authorized the
DWR
to purchase electricity and sell that electricity directly to the California
investor-owned utilities' retail end-user customers and to issue revenue bonds
to finance electricity purchases. AB 1X also
20
required
the Utility to deliver the electricity purchased by the DWR over the Utility's
distribution systems and to act as a billing and collection agent for the DWR,
without taking title to DWR-purchased electricity or reselling it to the
Utility's customers.
AB
1X
allows the DWR to recover its costs of electricity and associated transmission
and related services, principal and interest on bonds issued to finance the
purchase of electricity, administrative costs and certain other amounts
associated with purchasing electricity through a revenue requirement. AB 1X
also
authorizes the CPUC to set rates to cover the DWR's revenue requirements, but
prohibits the CPUC from increasing electricity rates for residential customers
who use less electricity than 130% of their existing baseline
quantities.
Under
AB
1X, the DWR was prohibited after December 31, 2002 from entering into new
electricity purchase contracts and from purchasing electricity on the spot
market. California Senate Bill, or SB,1976, which became law in
September 2002, required the CPUC to allocate electricity from existing DWR
contracts among the customers of the California investor-owned electric
utilities, including the Utility's customers. The DWR continues to be legally
and financially responsible for the contracts that have been allocated to the
utilities.
The
DWR
pays for its costs of purchasing electricity from a revenue requirement
collected from electricity customers of the three California investor-owned
electric utilities through what is known as a power charge. The Utility's
customers also must pay what is known as a bond charge to pay a share of the
DWR's revenue requirements to recover costs associated with the DWR's
$11.3 billion bond offering completed in November 2002. The proceeds
of this bond offering were used to repay the State of California and lenders
to
the DWR for electricity purchases made before the implementation of the DWR's
revenue requirement and to provide the DWR with funds to make its electricity
purchases. Because the Utility acts as a billing and collection agent for the
DWR, amounts collected for the DWR and any adjustments are not included in
the
Utility's revenues.
On
January 1, 2003, the California investor-owned electric utilities resumed
responsibility for procuring electricity to meet their net open positions.
They
also became responsible for scheduling and dispatching the electricity subject
to the DWR allocated contracts on a least-cost basis and for many administrative
functions associated with those contracts. The utilities also were required
by
SB 1976 to submit short-term and long-term procurement plans to the CPUC for
approval.
Effective
January 1, 2003, under California law, the Utility established a balancing
account, the Energy Resource Recovery Account, or ERRA, designed to track and
allow recovery of the difference between the recorded electricity procurement
revenues and actual costs incurred under the Utility's authorized procurement
plans, excluding the costs associated with the DWR allocated contracts and
certain other items.
On
December 16, 2004, the CPUC issued a final decision which approved, with
certain modifications, each California investor-owned electric utility's
long-term electricity procurement plan, or LTPP, in order to authorize each
utility to plan for and procure the resources necessary to provide reliable
service to their customers for the 10-year period 2005 through 2014. The
decision recognizes that each utility will have capacity needs over the 10-year
period, especially in 2011 when most of the DWR contracts expire. The decision
includes the following key points:
|
·
|
The
decision finds that the Utility's strategy of adding approximately
1,200
MW of capacity and new peaking generation in 2008 and approximately
1,000
MW of new peaking and dispatchable generation in 2010 through requests
for
offers, or RFOs, is reasonable and compatible with the Utility's
resource
needs under its medium load preferred case scenario, does not crowd
out
policy-preferred resources, and is a reasonable level of commitment
given
load uncertainty.
|
|
·
|
To
meet the utilities' resource requirements, the utilities are required
to
solicit bids from providers of all potential sources of new generation
(e.g. conventional or renewable resources to be provided under
turnkey
developments, buyouts, or power purchase agreements, or PPAs) through
a
single, open, transparent and competitive RFO process, although
an utility
can tailor a RFO to meet specific resource needs. In particular,
bids for
long-term generation resources (whether PPAs or utility-owned)
would be
evaluated side-by-side. In evaluating bids, the IOUs are required
to:
|
21
|
·
|
To
meet the utilities' resource requirements, the utilities are required
to
solicit bids from providers of all potential sources of new generation
(e.g. conventional or renewable resources to be provided under
turnkey
developments, buyouts, or power purchase agreements, or PPAs) through
a
single, open, transparent and competitive RFO process, although
an utility
can tailor a RFO to meet specific resource needs. In particular,
bids for
long-term generation resources (whether PPAs or utility-owned)
would be
evaluated side-by-side. In evaluating bids, the IOUs are required
to:
|
|
|
Ø
|
procure
the maximum amount of renewable generation resources, and be prepared
to
defend any selection of fossil-fuel generation resources over renewable
resources,
|
|
|
Ø
|
employ
the Least-Cost Best-Fit methodology when evaluating bids for PPAs
and
utility-owned generation resources, taking into account the qualitative
and quantitative attributes (such as performance risk, credit risk,
price
diversity, term and operational flexibility) associated with each
bid,
and
|
|
|
Ø
|
employ
a "greenhouse gas adder" to evaluate fossil-fuel generation bids
as a
method to recognize the risk of future greenhouse gas emissions
costs to
develop a more accurate price comparison between fossil-fuel, renewable
and demand-side bids (the greenhouse gas adder would be used for
analytical purposes only and would not be paid to a
generator).
|
|
|
·
|
The
CPUC has agreed that it will consider the debt equivalence impact
of
procurement contracts on credit ratings in future cost of capital
proceedings. The Utility is required to employ S&P’s method for
assessing the debt equivalence of power purchase agreements when
evaluating bids in an all-source solicitation, except that the
debt
equivalence factor should be 20% instead of 30%.
|
|
|
·
|
The
utilities are prohibited from recovering initial capital costs
in excess
of their final bid price for utility-owned generation resources.
If final
project costs are less than the final bid price, the savings would
be
shared with customers and any cost overruns would be absorbed by
the
utilities. Costs of future plant additions and annual operating
and
maintenance costs and similar costs incurred by a utility would
be
eligible for cost-of service ratemaking treatment.
|
|
|
·
|
Affiliates
of the utilities are permitted to participate in the bidding process
for
long-term generation resources, subject to certain guidelines and
safeguards, including a requirement that the utility use an independent
third-party evaluator in resource solicitations where there are
bids that
involve affiliates or utility-built or utility-turnkey development
projects. The independent evaluator will not be able to make binding
decisions on behalf of the utility.
|
|
|
·
|
The
utilities are permitted to recover their net stranded costs of
all new
fossil-fuel generation resources from all customers, including
departing
customers, for a period of 10 years or the life of the PPA, whichever
is less, provided that the CPUC will allow the utilities an opportunity
to
justify a longer recovery period on a case-by-case basis. Stranded
costs
arising from renewable generation procurement activities can be
collected
from all customers, including departing load, over the life of
the
contract. The utilities are required to take appropriate steps
to minimize
potential stranded costs by selling excess energy and capacity
needs into
the marketplace and crediting the revenues from these sales against
the
utilities' costs.
|
|
|
·
|
The
CPUC extended the mandatory rate adjustment mechanism provided
under SB
1976 (which otherwise expired on January 1, 2006) to the length of a
resource commitment or 10 years, whichever is longer. Under this rate
adjustment mechanism, the CPUC has agreed to adjust retail electricity
rates or order refunds, as appropriate, when the aggregate
over-collections or under-collections exceed 5% of the utility's
prior-year electricity procurement revenues, excluding amounts
collected
for the DWR allocated contracts.
|
|
|
·
|
With
respect to the utilities' contracting authority, the decision permits
the
utilities to enter into short-term, mid-term and long-term contracts
with
starting delivery dates through 2014, provided the utilities submit
necessary compliance filings and provided that contracts with terms
five
years or longer are submitted to the CPUC for pre-approval. The
decision
adopts a rolling 10-year procurement period, noting that the LTPPs
cover a
10-year period and will be updated and reviewed every 2 years.
|
|
For
a
discussion of the Utility’s request for offers to solicit bids to develop or
acquire long-term generation resources in accordance with the Utility’s plan,
see the section of MD&A entitled “Regulatory Matters—Electricity Generation
Resources—Long-Term Generation Resource Commitments.”
The
Utility's electricity transmission revenues and its wholesale and retail
transmission rates are subject to authorization by the FERC. The Utility has
two
sources of transmission revenues: charges under the Utility's transmission
owner
tariff and charges under specific contracts with wholesale transmission
customers that the Utility entered into before 1998, when the ISO commenced
operations. These customers are referred to as existing transmission contract
customers and are charged individualized rates based on the terms of their
contracts. Other customers pay transmission rates that are established by
the
22
FERC
in
the Utility's transmission owner rate cases and are included by the CPUC in
the
Utility's retail electricity rates and collected from retail electricity
customers receiving bundled service under the federal filed rate
doctrine.
Transmission
Owner Rate Cases
Under
the
FERC's regulatory regime, the Utility is able to file a new base
transmission rate case under the Utility's transmission owner tariff whenever
the Utility deems it necessary to increase its rates within certain guidelines
set forth by the FERC. The Utility is typically able to charge new rates,
subject to refund, before the outcome of the FERC ratemaking review
process.
The
Utility's transmission owner tariff includes two rate components:
| · |
Base
transmission rates, which are intended to recover the Utility's operating
and maintenance expenses, depreciation and amortization expenses,
interest
expense, tax expense and return on equity;
and
|
| · |
Rates
to recover the pass-through of ISO charges for reliability service
costs
and an ISO charge associated with cost differences in utility-specific
transmission charges and an ISO grid-wide charge, both of which are
discussed below.
|
The
Utility derives the majority of the Utility's transmission revenue from base
transmission rates.
Transmission
Control Agreement
The
Utility has entered into a Transmission Control Agreement, or TCA, with the
ISO
and other participating transmission owners (including Southern California
Edison, or SCE, San Diego Gas & Electric Company, and several
California municipal utilities) under which the transmission owners have
assigned operational control of their electricity transmission systems to the
ISO. The Utility is required to give the ISO two years’ notice and receive
approval from the FERC if it wishes to withdraw from the TCA.
Reliability
Must Run Agreements
The
ISO
also has entered into reliability must run, or RMR, agreements with various
power plant owners, including the Utility, that require designated units in
certain power plants, known as RMR units, to remain available to generate
electricity upon the ISO's demand when needed for local transmission system
reliability. As a participating transmission owner under the TCA, the Utility
is
responsible for the ISO's costs paid under RMR agreements to power plant owners
within or adjacent to the Utility's service territory. The Utility’s share of
the ISO’s reliability service costs in 2005 was approximately $217 million.
Under the Utility’s transmission owner tariff, the Utility recovers these costs,
without mark-up or service fees. The Utility also received approximately $59
million in 2005 under the RMR agreements that the Utility entered into with
the
ISO for the Utility’s units that have been designated as RMR units. The Utility
tracks these costs and revenues in the reliability services balancing account.
Periodically, the Utility’s electricity transmission rates are adjusted to
refund over-collections to the Utility’s customers or to collect any
under-collections from customers. For further discussion of other RMR-related
issues, see
the
section of Note 17:
Commitments and Contingencies— Reliability Must Run Agreements, of the Notes to
the Consolidated Financial Statements in the 2005 Annual Report.
Transmission
Access Charge
The
ISO
imposes a transmission access charge on users of the ISO-controlled electricity
transmission grid. The ISO's transmission access charge methodology approved
by
the FERC in December 2004 provides for transition over a 10-year period to
a
uniform statewide high-voltage transmission rate, based on the revenue
requirements of all participating transmission owners associated with facilities
operated at 200 kV and above. The transmission access charge methodology may
result in a cost shift from transmission owners whose costs for existing
transmission are higher than that embedded in the uniform rate, to transmission
owners with lower embedded costs for existing transmission, such as the Utility.
The Utility's obligation for this cost differential has been capped at
$32 million per year during the 10-year transition period.
23
The
Gas Accord
Under
a
ratemaking pact called the Gas Accord, the Utility's natural gas transportation
and storage services were separated for ratemaking purposes from its
distribution services. The Gas Accord established natural gas transportation
rates and natural gas storage rates. On December 16, 2004, the CPUC
approved a multi-party settlement agreement to retain the Gas Accord market
structure, and resolve the rates, and terms and conditions of service for the
Utility's natural gas transportation and storage system for the three-year
period of 2005 through 2007. The Utility continues to be at risk of not
recovering its natural gas transportation and storage costs and does not have
regulatory balancing account protection for over-collections or
under-collections of most of its natural gas transportation or storage revenues,
except for core local transmission revenue and core storage costs.
Biennial
Cost Allocation Proceeding
Certain
of the Utility's natural gas distribution costs and balancing account balances
are allocated to customers in the Biennial Cost Allocation Proceeding. This
proceeding normally occurs every two years and is updated in the interim year
for purposes of adjusting natural gas rates to recover from customers any
under-collection, or refund to customers any over-collection, in the balancing
accounts. Balancing accounts for gas distribution and other authorized expenses
accumulate differences between authorized amounts and actual
revenues.
Natural
Gas Procurement
The
Utility sets the natural gas procurement rate for core customers monthly based
on the forecasted costs of natural gas, core pipeline capacity and storage
costs. The Utility reflects the difference between actual natural gas purchase
costs and forecasted natural gas purchase costs in several natural gas balancing
accounts, with under-collections and over-collections taken into account in
subsequent monthly rates.
The
CPIM
is
used to
determine the reasonableness of the Utility's costs of purchasing natural gas
for its customers. Under the CPIM,
the
Utility's natural gas purchase costs (including Canadian and interstate capacity
and volumetric transportation charges) for a twelve-month period are compared
to
an aggregate market-based benchmark based on a weighted average of published
monthly and daily natural gas price indices at the points where the Utility
typically purchases natural gas. Costs that fall within a tolerance band, which
is currently between 99% and 102% of the benchmark, are considered reasonable
and are fully recoverable in customers' rates. One-half of the costs above
102%
of the benchmark are recoverable in customers' rates, and the Utility's
customers receive three-fourths of the savings when the costs are below 99%
of
the benchmark. The shareholder award is capped at the lower of 1.5% of total
natural gas commodity costs or $25 million.
Any
awards associated with the CPIM are reflected annually in the purchased natural
gas balancing account after the close of the annual period ending
October 31 that is used to measure the CPIM. These awards are not included
in earnings until approved by the CPUC.
In
response to rising natural gas prices, on October 6, 2005, the CPUC granted
the
Utility authority to purchase hedges on behalf of the Utility's core gas
customers for the winters of 2005-06, 2006-07, and 2007-08, and to book the
costs of such hedges in a separate balancing account, outside of the CPIM.
As a
result, core customers will pay the cost of these hedges and receive any payouts
under these hedges. Since the hedging is outside of CPIM, the Utility is at
risk
to the extent that the CPUC may disallow portions of the hedging cost based
on
its subsequent review of the Utility’s performance under the filed hedging plan.
As part of the hedging plan, the Utility also agreed to forgo a shareholder
award under the CPIM for the 2004-2005 CPIM year.
On
September 2, 2004, the CPUC issued an order establishing a process whereby
utilities receive CPUC pre-approval of contracts for interstate and Canadian
pipeline capacity to support their natural gas procurement activities.
Interstate
and Canadian Natural Gas Transportation and Storage
The
Utility's interstate and Canadian natural gas transportation agreements with
third party service providers are governed by tariffs that detail rates, rules
and terms of service for the provision of natural gas transportation services
to
the Utility on interstate and Canadian pipelines. United States tariffs are
approved for each pipeline for service to all of its shippers, including the
Utility, by the FERC in a FERC ratemaking review process and the applicable
Canadian tariffs are approved by the Alberta Energy and Utilities Board and
the
National Energy Board. The Utility's agreements with interstate and Canadian
natural
24
gas
transportation service providers are administered as part of the Utility's
core
natural gas procurement business. Their purpose is to transport natural gas
from
the points at which the Utility takes delivery of natural gas (typically in
Canada and the southwestern United States) to the points at which the Utility's
natural gas transportation system begins.
The
following discussion includes certain forward-looking information relating
to
estimated expenditures for environmental protection measures and the possible
future impact of environmental compliance. The information below reflects
current estimates that are periodically evaluated and revised. Future estimates
and actual results may differ materially from those indicated below. These
estimates are subject to a number of assumptions and uncertainties, including
changing laws and regulations, the ultimate outcome of complex factual
investigations, evolving technologies, selection of compliance alternatives,
the
nature and extent of required remediation, the extent of the facility owner's
responsibility and the availability of recoveries or contributions from third
parties.
The
Utility is subject to a number of federal, state and local laws and requirements
relating to the protection of the environment and the safety and health of
the
Utility's personnel and the public. These laws and requirements relate to a
broad range of activities, including:
| · |
The
discharge of pollutants into air, water and
soil;
|
| · |
The
identification, generation, storage, handling, transportation, treatment,
disposal, record keeping, labeling, reporting of, remediation of
and
emergency response in connection with hazardous and radioactive
substances; and
|
| · |
Land
use, including endangered species and habitat
protection.
|
The
penalties for violation of these laws and requirements can be severe, and may
include significant fines, damages and criminal or civil sanctions. These laws
and requirements also may require the Utility, under certain circumstances,
to
interrupt or curtail operations. To comply with these laws and requirements,
the
Utility may need to spend substantial amounts from time to time to construct,
acquire, modify or replace equipment, acquire permits and/or marketable
allowances or other emission credits for facility operations and clean up or
decommission waste disposal areas at the Utility's current or former facilities
and at third-party sites where the Utility may have disposed of
wastes.
Generally,
the Utility has recovered the costs of complying with environmental laws and
regulations in the Utility's rates, subject to reasonableness review.
Environmental costs associated with the clean-up of sites that contain hazardous
substances are subject to a special ratemaking mechanism under which the Utility
is authorized to recover hazardous waste remediation costs for environmental
claims (e.g.,
for
cleaning up the Utility's facilities and sites where the Utility has sent
hazardous substances) from customers. This mechanism allows the Utility to
include 90% of the hazardous waste remediation costs in the Utility's rates
without a reasonableness review. Ten
percent of any net insurance recoveries associated with hazardous waste
remediation sites are assigned to the Utility's customers. The balance of any
insurance recoveries, (90%) are retained by the Utility until it has been
reimbursed for the 10% share of clean-up costs not included in rates. Any
insurance recoveries above full cost reimbursement levels would then be
allocated 60% to customers and 40% to the Utility. Finally, 10% of
any
recoveries from the Utility's claims against third parties associated with
hazardous waste remediation sites are retained by the Utility; 90% of any such
recoveries are assigned to the Utility's customers.
Hazardous
waste remediation costs are rising and likely to be significant into the
foreseeable future. Based on the Utility's past experience, it believes it
can
recover most of the future costs that it may incur to remediate hazardous waste
through rates and insurance recoveries. The Utility cannot provide assurance,
however, that these costs will not be material, or that the Utility will be
able
to recover its costs in the future.
The
Utility's generation plants and natural gas pipeline operations are subject
to
numerous air pollution control laws, including the federal Clean Air Act and
similar state and local statutes. These laws and regulations cover, among other
pollutants, those contributing to the formation of ground-level ozone, carbon
monoxide, sulfur dioxide, nitrogen oxide and particulate
matter.
25
Fossil
fuel-fired electric utility plants and gas compressor stations used in the
Utility's pipeline operations are sources of air pollutants and, therefore,
are
subject to substantial regulation and enforcement oversight by the applicable
governmental agencies.
During
2003, 2004 and 2005, various multi-pollutant initiatives were introduced in
the
U.S. Senate and House of Representatives. These initiatives proposed limits
on
the emissions of nitrogen oxide, sulfur dioxide, mercury and carbon dioxide,
and
some would allow the use of trading mechanisms to achieve or maintain compliance
with the proposed rules. Although these initiatives were not enacted into law,
similar
legislation is expected to be introduced in 2006. Two
of
the local air districts in which the Utility owns and operates fossil fuel-fired
generation facilities adopted final rules under the California Clean Air Act
and
the federal Clean Air Act that required reductions in nitrogen oxide emissions
from the facilities of approximately 90% by 2004. The Utility is in compliance
with these rules. The Utility is permitted to recover in customer rates the
Utility's costs for its nitrogen oxide retrofit projects related to natural
gas
compressor stations on the Utility's Line 300, which delivers gas from the
southwest. Several other air districts are considering nitrogen oxide rules
that
would apply to the Utility's other natural gas compressor stations in
California. Eventually, the rules are likely to require nitrogen oxide
reductions of up to 80% at many of these natural gas compressor stations.
Substantially all these costs will be capital costs which the Utility expects
to
recover through rates.
In
addition, current federal and state regulatory initiatives relating to emissions
of carbon dioxide and other greenhouse gases, particulates and other toxic
pollutants could increase the Utility's compliance costs and capital
expenditures primarily with respect to the Utility's gas transportation
facilities, fleet and fuel storage tanks. If enacted, these laws could require
the Utility to replace equipment, install additional pollution controls,
purchase various emission allowances, or curtail operations. Although associated
costs and capital expenditures could be material, the Utility expects that
it
would be able to recover these costs and capital expenditures in rates.
The
federal Clean Water Act generally prohibits the discharge of any pollutants,
including heat, into any body of surface water, except in compliance with a
discharge permit issued by a state environmental regulatory agency and/or the
U.S. Environmental Protection Agency, or the EPA. The Utility's generation
facilities are subject to federal and state water quality standards with respect
to discharge constituents and thermal effluents. The Utility's steam-electric
generation facilities comply in all material respects with the discharge
constituents standards and the thermal standards. In addition, under the federal
Clean Water Act, the Utility is required to demonstrate that the location,
design, construction and capacity of generation facility cooling water intake
structures reflect the best technology available for minimizing adverse
environmental impacts at its existing water-cooled thermal plants. The Utility
has submitted detailed studies of each steam-electric generation facility's
intake structure to various governmental agencies and each power plant's
existing intake structure was found to meet the best technology available
requirements.
The
Utility's Diablo Canyon power plant employs a "once-through" cooling water
system that is regulated under a National Pollutant Discharge Elimination
System, or NPDES, permit issued by the Central Coast Regional Water Quality
Control Board, or Central Coast Board. This permit allows the Diablo Canyon
power plant to discharge the cooling water at an average temperature of no
more
than 22 degrees above the temperature of the ambient receiving water, and
requires that the beneficial uses of the water be protected. The beneficial
uses
of water in this region include industrial water supply, recreation,
commercial/sport fishing, marine and wildlife habitat, shellfish harvesting
and
preservation of rare and endangered species. In January 2000, the Central
Coast Board issued a proposed draft cease and desist order alleging that,
although the temperature limit has never been exceeded, the Diablo Canyon power
plant's discharge was not protective of beneficial uses. In January 2005,
the Central Coast Board published a draft report prepared by a team of
scientists recommending several measures to mitigate the effect of the cooling
water system. If the Central Coast Board adopts the scientists' recommendations,
and if the Utility ultimately is required to implement the projects proposed
in
the draft report, it could incur costs of up to approximately $30 million.
The Utility would seek to recover these costs through rates charged to
customers. For a further discussion of this matter, see “Item 3. Legal
Proceedings,” below.
In
addition, on July 9, 2004, the EPA published regulations under
Section 316(b) of the Clean Water Act for cooling water intake structures.
The regulations affect existing electricity generation facilities using over
50 million gallons per day, typically including some form of "once-through"
cooling. The Utility's Diablo Canyon, Hunters Point and Humboldt Bay power
plants are among an estimated 539 generation facilities nationwide that are
affected by this rulemaking. The regulations establish a set of performance
standards that vary with the type of water body and that are intended to reduce
impacts to aquatic organisms. Significant capital investment may be required
to
achieve the standards. The regulations allow site-specific
compliance
26
determinations
if a facility's cost of compliance is significantly greater than either the
benefits achieved or the compliance costs considered by the EPA. The Utility
is
developing compliance strategies for each plant.
Groundwater
at the Utility’s Hinkley and Topock natural gas compressor stations contains
hexavalent chromium as a result of the Utility’s past operating practices. The
Utility has a comprehensive program to monitor a network of groundwater wells
at
both the Hinkley and Topock natural gas compressor stations. At Hinkley, the
Utility is cooperating with the Regional Water Quality Control Board to evaluate
and remediate the chromium groundwater plume. In 2005, the Utility took interim
measures to control movement of the Hinkley plume, as well as evaluated options
to remediate the plume. At the Topock gas compressor station, located near
Needles, California adjacent to the Colorado River, hexavalent chromium has
been
detected in samples taken from groundwater monitoring wells located
approximately 65 feet from the Colorado River. The Utility is cooperating
with the California Department of Toxic Substances Control, or DTSC, other
state
agencies, appropriate federal agencies and other interested parties, to
implement interim measures as well as develop a long-term plan to ensure that
the hexavalent chromium does not affect the Colorado River. In 2005, the Utility
took interim measures to control the chromium plume by extracting impacted
groundwater and spent approximately $38.8 million on these measures. The Utility
plans to continue these activities in 2006 and to work toward the development
of
a final plan to address the plume in 2006. The Utility currently estimates
that
it will spend at least $22 million in 2006 for remediation activities at Topock
and $7.4 million in 2006 for remediation activities at Hinkley. Although work
at
the Topock site poses several technical and regulatory obstacles, the Utility’s
remediation costs for Topock are subject to the ratemaking mechanism described
above. The Utility does not expect the remediation of the Topock
and Hinkley
gas
compressor sites to have a material adverse effect on its results of operations
or financial condition. The Utility does not expect that it will incur any
material expenditures related to any remediation at its Kettleman natural gas
compressor station.
Many
of
the Utility's facilities and operations are located in or pass through areas
that are designated as critical habitats for federal or state-listed endangered,
threatened or sensitive species. The Utility may be required to incur additional
costs or be subjected to additional restrictions on operations if additional
threatened or endangered species are listed or additional critical habitats
are
designated near the Utility's facilities or operations. The Utility is seeking
to secure "habitat conservation plans" to ensure long-term compliance with
the
state and federal endangered species acts. The Utility expects that it will
be
able to recover costs of complying with state and federal endangered species
acts through rates.
The
Utility's facilities are subject to the requirements issued by the EPA under
the
Resource Conservation and Recovery Act, or RCRA, and the Comprehensive
Environmental Response, Compensation and Liability Act of 1980, as amended,
or
CERCLA, as well as other state hazardous waste laws and other environmental
requirements. CERCLA and similar state laws impose liability, without regard
to
fault or the legality of the original conduct, on certain classes of persons
that contributed to the release of a hazardous substance into the environment.
These persons include the owner or operator of the site where the release
occurred and companies that disposed or arranged for the disposal of the
hazardous substances found at the site. Under CERCLA, these persons may be
subject to joint and several liability for the costs of cleaning up the
hazardous substances that have been released into the environment, damages
to
natural resources and the costs of required health studies. In the ordinary
course of the Utility's operations, the Utility generates waste that falls
within CERCLA's definition of a hazardous substance and, as a result, has been
and may be jointly and severally liable under CERCLA for all or part of the
costs required to clean up sites at which these hazardous substances have been
released into the environment.
The
Utility assesses, on an ongoing basis, measures that may be necessary to comply
with federal, state and local laws and regulations related to hazardous
materials and hazardous waste compliance and remediation activities. The Utility
has a comprehensive program to comply with hazardous waste storage, handling
and
disposal requirements issued by the EPA under RCRA and CERCLA, state hazardous
waste laws and other environmental requirements.
The
Utility has been, and may be, required to pay for environmental remediation
at
sites where the Utility has been, or may be, a potentially responsible party
under CERCLA and similar state environmental laws. These sites include former
manufactured gas plant sites, power plant sites, gas gathering sites, compressor
stations and sites where the Utility stores, recycles and disposes of
potentially hazardous materials. Under federal and California laws, the Utility
may be responsible for remediation of hazardous substances even if it did not
deposit those substances on the site.
27
Operations
at the Utility's current and former generation facilities may have resulted
in
contaminated soil or groundwater. Although the Utility sold most of its
geothermal generation facilities and most of its fossil fuel-fired plants,
in
many cases the Utility retained pre-closing environmental liability under
various environmental laws. The Utility currently is investigating or
remediating several such sites with the oversight of various governmental
agencies.
In
addition, the federal Toxic Substances Control Act regulates the use, disposal
and clean-up of polychlorinated biphenyls, or PCBs, which are used in certain
electrical equipment. The Utility has removed from service all of the
distribution capacitors and network transformers containing high concentrations
of PCBs, the vast majority of PCBs existing in the Utility's electricity
distribution system.
The
Utility is assessing whether and to what extent remedial action may be necessary
to mitigate potential hazards posed by certain disposal sites and retired
manufactured gas plant sites. During their operation from the mid-1800s through
the early 1900s, manufactured gas plants produced lampblack and tar residues.
The residues that may remain at some sites contain chemical compounds that
now
are classified as hazardous. The Utility owns all or a portion of 27
manufactured gas plant sites. The Utility has a program, in cooperation with
environmental agencies, to evaluate and take appropriate action to mitigate
any
potential health or environmental hazards at these sites. The Utility spent
approximately $2 million in 2005 and expects to spend approximately $5
million in 2006 on these projects. The Utility expects that expenses will
increase as remedial actions related to these sites are approved by regulatory
agencies. In addition, approximately 68 other manufactured gas plants in the
Utility's service territory are now owned by others. The Utility spent
approximately $4.1 million settling third-party remediation claims by the
current owners of former manufactured gas plant sites in 2005 and it is possible
that the Utility may incur additional clean-up costs related to these sites
in
the future if hazardous substances for which the Utility has liability are
found.
Under
environmental laws such as CERCLA, the Utility has been or may be required
to
take remedial action at third-party sites used for the disposal of waste from
the Utility's facilities, or to pay for associated clean-up costs or natural
resource damages. The Utility is currently aware of eight such sites where
investigation or clean-up activities are currently underway. At the Geothermal
Incorporated site in Lake County, California, the Utility has been directed
to
perform site studies and any necessary remedial measures by regulatory agencies.
At the Casmalia disposal facility near Santa Maria, California, the Utility
and
several other generators of waste sent to the site have entered into a
court-approved agreement with the EPA that requires the Utility and the other
parties to perform certain site investigation and mitigation
measures.
In
addition, the Utility has been named as a defendant in several civil lawsuits
in
which plaintiffs allege that the Utility is responsible for performing or paying
for remedial action at sites that it no longer owns or never owned. Remedial
actions may include investigations, health and ecological assessments and
removal of wastes.
The
cost
of environmental remediation is difficult to estimate. The Utility records
an
environmental remediation liability when site assessments indicate remediation
is probable and it can estimate a range of reasonably likely clean-up costs.
The
Utility reviews its remediation liability on a quarterly basis for each site
where it may be exposed to remediation responsibilities. The liability is an
estimate of costs for site investigations, remediation, operations and
maintenance, monitoring and site closure using current technology, enacted
laws
and regulations, experience gained at similar sites, and an assessment of the
probable level of involvement and financial condition of other potentially
responsible parties. Unless there is a better estimate within this range of
possible costs, the Utility records the costs at the lower end of this range.
It
is reasonably possible that a change in these estimates may occur in the near
term due to uncertainty concerning the Utility's responsibility, the complexity
of environmental laws and regulations, and the selection of compliance
alternatives. The Utility estimates the upper end of the cost range using
reasonably possible outcomes least favorable to the Utility.
The
Utility had an undiscounted environmental remediation liability of approximately
$469 million at December 31, 2005 and approximately $327 million
at December 31, 2004. During the year ended December 31, 2005, the
liability increased by approximately $142 million. This net increase
reflects a $131 million increase attributable to a revised remediation estimate
for the Topock gas compressor station and a $24 million increase attributable
to
a revised remediation estimate for the Hinkley gas compressor station. These
increases, in addition to other increases in liability, were offset by
remediation payments. The approximately $469 million accrued at
December 31, 2005, includes approximately $193 million for remediation
at these gas compressor sites, approximately $100 million related to the
pre-closing remediation liability associated with divested generation
facilities, and approximately $176 million related to remediation costs for
those generation facilities that the Utility still owns, gas gathering sites,
third-party disposal sites, and manufactured gas plant sites that either are
owned by the Utility or are the subject of remediation orders by environmental
agencies or claims by the current owners of the former manufactured gas plant
sites. Of the approximately $469 million environmental remediation
liability, approximately $141 million has been included in prior
rate-setting proceedings and the Utility expects that an additional
approximately $259 million will be allowable for inclusion in
future
28
rates
in
accordance with the ratemaking mechanism described above. The Utility also
recovers its costs from insurance carriers and from other third parties whenever
possible. Any amounts collected in excess of the Utility's ultimate obligations
may be subject to refund to customers. The Utility's undiscounted future costs
could increase to as much as $680 million if the other potentially
responsible parties are not financially able to contribute to these costs,
or if
the extent of contamination or necessary remediation is greater than
anticipated. The amount of approximately $680 million does not include an
estimate for the cost of remediation at known sites owned or operated in the
past by the Utility's predecessor corporations for which the Utility has not
been able to determine whether a liability exists.
Under
the
Nuclear Waste Policy Act of 1982, or Nuclear Waste Act, the DOE is responsible
for the transportation, and permanent storage and disposal of spent nuclear
fuel
and high-level radioactive waste. Under the Nuclear Waste Act, utilities are
required to provide interim storage facilities until permanent storage
facilities are provided by the federal government. The Nuclear Waste Act
mandates that one or more permanent disposal sites be in operation by 1998.
Consistent with the law, the Utility entered into a contract with the DOE
providing for the disposal of the spent nuclear fuel and high-level radioactive
waste from the Utility's nuclear power facilities beginning not later than
January 1998. The DOE has been unable to meet its contractual commitment to
begin accepting spent fuel. First, there was a delay in identifying a storage
site. Then, after the DOE selected Yucca Mountain, Nevada for the site,
protracted litigation has prevented the DOE from constructing the storage
facility. The DOE's current estimate for an available site to begin accepting
physical possession of the spent nuclear fuel is 2010. However, considerable
uncertainty exists regarding when the DOE will begin to accept spent fuel for
storage or disposal. Under the Utility's contract with the DOE, if the DOE
completes a storage facility by 2010, the earliest Diablo Canyon's spent fuel
would be accepted for storage or disposal would be 2018.
On
January 22, 2004, the Utility filed separate complaints in the U.S. Court
of Federal Claims against the DOE alleging that the DOE has breached its
contractual obligation to move used nuclear fuel from Diablo Canyon and Humboldt
Bay Unit 3 to a national repository beginning in 1998. The complaints seek
recovery of the Utility's costs incurred for the planning and development of
on-site storage at both facilities as a result of the DOE's failure to meet
its
obligations. The Utility's complaints are similar to complaints filed by at
least 20 other utilities with nuclear facilities. Trial is scheduled to begin
on
June 5, 2006.
At
the
projected level of operation for Diablo Canyon, the Utility's current facilities
are able to store on-site all spent fuel produced through approximately 2007.
In
March 2004, the NRC authorized the Utility to build an on-site dry cask storage
facility to store spent fuel through approximately 2021 for Unit 1 and to 2024
for Unit 2. Several interveners appealed the NRC's decision to the U.S. Court
of
Appeals for the Ninth Circuit, or Ninth Circuit. The Ninth Circuit heard oral
argument on the appeal in October 2005, and a decision is pending. PG&E
Corporation and the Utility cannot predict the outcome of this appeal.
In
April 2004, San Luis Obispo County (the California county where Diablo
Canyon is located) issued a permit under the California Coastal Act, subject
to
a number of conditions. The Utility, along with several other interested
parties, filed appeals of the County's decision with the California Coastal
Commission. The Utility's appeal challenged one of the conditions pertaining
to
the granting of public access to the coast and other portions of the Utility's
property surrounding Diablo Canyon. On December 8, 2004, the California
Coastal Commission granted the Utility's application for a coastal development
permit authorizing it to proceed with its planned construction of an on-site
dry
cask storage facility. The Commission granted the Utility's appeal, denied
the
appeals of other parties and conducted a de novo review of the application.
The
Commission's December 8, 2004 decision requires that the Utility provide
expanded public access to the coast and other lands surrounding Diablo Canyon,
although such public access is less expansive than the County had originally
required and will be subject to a one-year study process. Construction of the
on-site dry cask storage facility began in the third quarter 2005 and is
expected to be completed by 2008.
To
provide another storage alternative in the event construction of the dry cask
storage facility is delayed, in November 2005 the NRC authorized the Utility
to
install a temporary storage rack in each unit's existing spent fuel storage
pool
that would increase the on-site storage capability to permit the Utility to
operate Unit 1 until 2010 and Unit 2 until 2011. The Utility anticipates that
it
would complete the installation of the temporary storage racks by December
2006.
This temporary option does not require local or California Coastal Commission
permits to be obtained. If the Utility is unable to complete the dry cask
storage facility, or if construction is delayed beyond 2010, and if the Utility
is otherwise unable to increase its on-site storage capacity, it is possible
that the operation of Diablo Canyon may have to be curtailed or halted as early
as 2010 with respect to Unit 1 and 2011 with respect to Unit 2 and until such
time as additional spent fuel can be safely stored.
29
In
July 1988, the NRC gave the Utility final approval to store radioactive
waste from the Utility's retired nuclear generating facility, Humboldt Bay
Unit
3, at the plant until 2015 before ultimately decommissioning the unit. The
Utility has agreed to remove all spent fuel when the federal disposal site
is
available. In 1988, the Utility completed the first step in the decommissioning
of Humboldt Bay Unit 3 and placed the unit into SAFSTOR, a condition of
monitored safe storage in which the unit will be maintained until the spent
nuclear fuel is removed from the spent fuel pool and the facility is dismantled.
The used fuel assemblies currently are stored in metal racks submerged in a
pool
of water called a wet storage pool. The specially designed storage pool is
constructed of steel-reinforced concrete and lined with stainless
steel.
In
June 2004, the Utility reported to the NRC that the Utility was unable to
account for all of the used fuel segments from Humboldt Bay Unit 3 that the
Utility's records indicate were sent to storage, and that the Utility was
evaluating whether the used fuel was placed in the storage pool. On
August
19, 2005, the NRC issued an inspection report concluding that the Utility was
unable to account for the location of three 18-inch segments of used nuclear
fuel. The NRC issued its report after the Utility filed its final report in
May
2005 updating the NRC as to the Utility's efforts to locate the used fuel.
The
Utility's report concludes that it is very likely that these pieces were shipped
to a low-level radioactive waste facility. In its August 19, 2005 report, the
NRC determined that the Utility's inability to conclusively locate the used
fuel
did not pose any threat to the health and safety of the public. In December
2005, the NRC issued a notice of violation to the Utility and imposed a penalty
of $96,000 on the Utility for failure to control its inventory and to keep
adequate records of these materials. The Utility did not contest the finding
of
a violation and paid the penalty in January 2006.
The
Utility has received a license from the NRC to build an on-site dry cask storage
facility at Humboldt Bay Unit 3. The Utility also has received approval from
the
California Coastal Commission for a permit to build the facility. Transfer
of
spent fuel to the dry cask facility would allow early decommissioning of
Humboldt Bay Unit 3. The Utility anticipates that construction of the dry cask
storage facility can be completed in time for decommissioning of Humboldt Bay
Unit 3 to begin in 2009.
Nuclear
decommissioning requires the safe removal of nuclear facilities from service
and
the reduction of residual radioactivity to a level that permits termination
of
the NRC license and release of the property for unrestricted use. For ratemaking
purposes, the eventual decommissioning of Diablo Canyon Unit 1 is scheduled
to
begin in 2021 and to be completed in 2040. Decommissioning of Diablo Canyon
Unit
2 is scheduled to begin in 2025 and to be completed in 2041, and decommissioning
of Humboldt Bay Unit 3 is scheduled to begin in 2009 and to be completed in
2015.
As
presented in the Utility’s Nuclear Decommissioning Costs Triennial Proceeding,
or NDCTP, pending at the CPUC, the estimated nuclear decommissioning cost for
the Diablo Canyon Units 1 and 2 and Humboldt Bay Unit 3 is approximately
$2.03 billion in 2005 dollars (or approximately $5.12 billion in
future dollars). These estimates are based on the 2005 decommissioning cost
studies, prepared in accordance with CPUC requirements. The Utility's revenue
requirements for nuclear decommissioning costs are recovered from customers
through a non-bypassable charge that will continue until those costs are fully
recovered. The decommissioning cost estimates are based on the plant location
and cost characteristics for the Utility's nuclear power plants. Actual
decommissioning costs may vary from these estimates as a result of changes
in
assumptions such as decommissioning dates, regulatory requirements, technology,
and costs of labor, materials and equipment.
The
nuclear decommissioning cost estimate described above is used for regulatory
purposes. Under generally accepted accounted principles, or GAAP, requirements,
the decommissioning cost estimate is calculated using a different method. In
accordance with Statement of Financial Accounting Standards No. 143, the
Utility adjusts its nuclear decommissioning obligation to reflect the fair
value
of decommissioning its nuclear power facilities. The Utility records the
Utility's total nuclear decommissioning obligation as an asset retirement
obligation on the Utility's Consolidated Balance Sheet. Decommissioning costs
are recorded as a component of depreciation expense, with a corresponding credit
to the asset retirement costs regulatory liability. The total nuclear
decommissioning obligation accrued in accordance with GAAP was approximately
$1.3 billion at December 31, 2005 and $1.2 billion at
December 31, 2004. The primary difference between the Utility's estimated
nuclear decommissioning obligation as recorded in accordance with GAAP and
the
estimate prepared in accordance with the CPUC requirements is that GAAP
incorporates various potential settlement dates for the obligation and includes
an estimated amount for third-party labor costs into the fair value
calculation.
Decommissioning
costs recovered in rates are placed in nuclear decommissioning trusts. The
funds
in the decommissioning trusts, along with accumulated earnings, will be used
exclusively for decommissioning and dismantling the Utility's nuclear
facilities. The Utility has three decommissioning trusts for its Diablo Canyon
and Humboldt Bay Unit 3 nuclear facilities. The Utility has elected that two
of
these trusts be treated under the Internal Revenue Code as qualified trusts.
If
certain
30
conditions
are met, the Utility is allowed a deduction for the payments made to the
qualified trusts. These payments cannot exceed the amount collected from
customers through the decommissioning charge. The qualified trusts are subject
to a lower tax rate on income and capital gains, thereby increasing the trusts'
after-tax returns. Among other requirements, to maintain the qualified trust
status the IRS must approve the amount to be contributed to the qualified trusts
for any taxable year. The remaining non-qualified trust is exclusively for
decommissioning Humboldt Bay Unit 3. The Utility cannot deduct amounts
contributed to the non-qualified trust until such decommissioning costs are
actually incurred.
As
authorized in the 2002 NDCTP, in 2005, the Utility was authorized to collect
approximately $18.4 million in rates and contributed approximately
$18.4 million to the qualified nuclear decommissioning trust for Humboldt
Bay Unit 3. For 2006, the Utility is authorized to collect approximately
$18.4 million in rates for decommissioning Humboldt Bay Unit 3. The Utility
expects to contribute that entire amount to the qualified trusts for Humboldt
Bay Unit 3. The Utility has received approval from the IRS to contribute all
of
the collected amounts to the qualified trust for Humboldt Bay Unit 3 for 2005.
The Utility expects to file a ruling request with the IRS in the first quarter
of 2006 for contributions made in 2006. The CPUC issued a decision in the 2002
NDCTP finding that the funds in the Diablo Canyon nuclear decommissioning trusts
are sufficient to pay for the eventual decommissioning. Therefore, no
contributions were made to the Diablo Canyon trusts in 2005 and no contributions
are expected for 2006.
On
November 10, 2005, the Utility filed its 2005 NDCTP, seeking approval for its
proposed nuclear decommissioning revenue requirements for the years 2007-2009.
The Utility’s 2005 NDCTP seeks recovery of $9.5 million in revenue requirements
relating to the qualified trust for Diablo Canyon and $14.6 million in revenue
requirements relating to the qualified trust for Humboldt Bay Unit 3. The
Utility expects to begin evidentiary hearings with the CPUC in May 2006 and
expects a decision in October 2006.
For
more
information about nuclear decommissioning, see Note 13 of the Notes to the
Consolidated Financial Statements in the 2005 Annual Report.
Several
lawsuits have been filed against the Utility seeking damages from alleged
chromium contamination at the Utility's Hinkley, Topock and Kettleman natural
gas compressor stations. See “Item 3. Legal Proceedings,” below for a
description of the pending litigation.
Electric
and magnetic fields, or EMFs, naturally result from the generation,
transmission, distribution and use of electricity. In January 1991, the
CPUC opened an investigation to address increasing public concern, especially
with respect to schools, regarding potential health risks that may be associated
with EMFs from utility facilities. In its order instituting the investigation,
the CPUC acknowledged that the scientific community has not reached consensus
on
the nature of any health impacts from contact with EMFs, but went on to state
that a body of evidence has been compiled that raises the question of whether
adverse health impacts might exist.
In
November 1993, the CPUC adopted an interim EMF policy for California energy
utilities that, among other things, requires California energy utilities to
take
no-cost and low-cost steps to reduce EMFs from new or upgraded utility
facilities. California energy utilities were required to fund an EMF education
program and an EMF research program managed by the California Department of
Health Services. As part of the Utility's effort to educate the public about
EMFs, the Utility provides interested customers with information regarding
the
EMF exposure issue. The Utility also provides a free field measurement service
to inform customers about EMF levels at different locations in and around their
residences or commercial buildings.
In
October 2002, the California Department of Health Services released its
report, based primarily on its review of studies by others, evaluating the
possible risks from EMFs, to the CPUC and the public. The report's conclusions
contrast with other recent reports by authoritative health agencies in that
the
California Department of Health Services' report has assigned a higher
probability to the possibility that there is a causal connection between EMF
exposures and a number of diseases and conditions, including childhood leukemia,
adult leukemia, amyotrophic lateral sclerosis and miscarriages.
On
January 26, 2006, the CPUC issued a decision which affirms the CPUC’s
“low-cost/no-cost, prudent avoidance” policy to mitigate EMF exposure for new
utility transmission and substation projects. The CPUC ordered the continued
use
of a 4% of project cost benchmark for EMF mitigation. In addition, the CPUC
(1)
adopted rules and policies to improve
31
utility
design guidelines for reducing EMFs, (2) ordered a utility workshop to implement
these policies and standardize design guidelines, and (3) established
a
rule
whereby the CPUC will not take EMF testimony in any future proceedings other
than issues concerning utilities’ compliance with established CPUC mitigation
standards.
The
CPUC also reaffirmed that it has exclusive jurisdiction with respect to utility
EMF matters.
The
Utility currently is not involved in third-party litigation concerning EMFs.
In
August 1996, the California Supreme Court held that homeowners are barred
from suing utilities for alleged property value losses caused by fear of EMFs
from power lines. The court expressly limited its holding to property value
issues, leaving open the question as to whether lawsuits for alleged personal
injury resulting from exposure to EMFs are similarly barred. The Utility was
one
of the defendants in civil litigation in which the plaintiffs alleged personal
injuries resulting from exposure to EMFs. In January 1998, the appeals
court in this matter held that the CPUC has exclusive jurisdiction over personal
injury and wrongful death claims arising from allegations of harmful exposure
to
EMFs and barred plaintiffs' personal injury claims. Plaintiffs filed an appeal
of this decision with the California Supreme Court. The California Supreme
Court
declined to hear the case.
A
discussion of the significant risks associated with investments in the
securities of PG&E Corporation and the Utility is set forth under the
heading "Management's Discussion and Analysis of Financial Condition and Results
of Operations— Risk Factors” in the 2005 Annual Report, which information is
hereby incorporated by reference and filed as part of Exhibit 13 to this
report.
Not
applicable.
The
Utility owns or has obtained the right to occupy and/or use real property
comprising the Utility's electricity and natural gas distribution facilities,
natural gas gathering facilities and generation facilities, and natural gas
and
electricity transmission facilities, all of which are described above under
"Electricity Utility Operations" and "Gas Utility Operations." In total, the
Utility occupies 8.2 million square feet of real property, including 7.0
million square feet the Utility owns. Of the 8.2 million square feet of occupied
real property, approximately 1.5 million square feet represent the
Utility's corporate headquarters located in several buildings in San Francisco,
California. The Utility leases approximately 120,000 square feet of the
approximate 1.5 million square feet of office space. The Utility occupies
or uses real property that it does not own primarily through various leases,
easements, rights-of-way, permits or licenses from private landowners or
governmental authorities
The
Utility currently owns approximately 167,000 acres of land, approximately
140,000 acres of which it will encumber with conservation easements and/or
donate to public agencies or non-profit conservation organizations under the
Settlement Agreement. Approximately 75,000 acres of this land may be donated
in
fee and encumbered with conservation easements. The remaining land contains
the
Utility's or a joint licensee's hydroelectric generation facilities and will
only be encumbered with conservation easements. As contemplated in the
Settlement Agreement, the Utility formed an entity, the Pacific Forest Watershed
Lands Stewardship Council, or the Council, to oversee the development and
implementation of a Land Conservation Plan, or LCP, that will articulate the
long-term management objectives for the 140,000 acres. The Council is guided
by
an 18-member Board of Directors that represent a range of diverse interests,
including the CPUC, California environmental agencies, organizations
representing underserved and minority constituencies, agricultural and business
interests, and public officials. The Utility has appointed one out of 18 members
of the Board of Directors of the Council. The Council is charged to adopt and
present the LCP to the Utility by April 2007. The Utility will then seek
authorization from the CPUC, the FERC and other approving entities to proceed
with the transactions necessary to implement the LCP. If the Council is unable
to reach consensus on all or part of the LCP, the Utility will seek regulatory
approval of the transactions required to implement its own plan, along with
a
description of the positions of the disputing board members before April
2013.
PG&E
Corporation also leases approximately 74,000 square feet of office space from
a
third party in San Francisco, California. This lease expires in
2012.
32
In
addition to the following legal proceedings, PG&E Corporation and the
Utility are involved in various legal proceedings in the ordinary course of
their business.
On
April 6, 2001, the Utility filed a voluntary petition for relief under the
provisions of Chapter 11 of the U.S. Bankruptcy Code, or Chapter 11, in the
U.S.
Bankruptcy Court for the Northern District of California, or Bankruptcy Court.
On April 12, 2004, the Utility's plan of reorganization under Chapter 11
became effective. On this date, the effective date, the Utility emerged from
Chapter 11. On the effective date, the Utility paid all valid claims, deposited
funds into escrow accounts for the payment of disputed claims upon their
resolution, reinstated certain obligations, and paid other
obligations.
The
Utility's plan of reorganization incorporated the terms of the Settlement
Agreement. Under the Settlement Agreement, the CPUC has waived all existing
and
future rights of sovereign immunity, and all other similar immunities, as a
defense in connection with any action or proceeding concerning the enforcement
of, or other determination of the parties' rights under the Settlement
Agreement, the plan of reorganization or the confirmation order. The CPUC also
consented to the jurisdiction of any court or other tribunal or forum for those
actions or proceedings, including the Bankruptcy Court. The CPUC's waiver is
irrevocable and applies to the jurisdiction of any court, legal process, suit,
judgment, attachment in aid of execution of a judgment, attachment before
judgment, set-off or any other legal process with respect to the enforcement
of,
or other determination of the parties' rights under, the Settlement Agreement,
the plan of reorganization or the confirmation order. The Settlement Agreement
contemplates that neither the CPUC nor any other California entity acting on
its
behalf may assert immunity in an action or proceeding concerning the parties'
rights under the Settlement Agreement, the plan of reorganization or the
confirmation order.
The
Settlement Agreement generally terminates nine years after the effective date
of
the plan of reorganization, except that the rights of the parties to the
Settlement Agreement that vest on or before termination, including any rights
arising from any default under the Settlement Agreement, will survive
termination for the purpose of enforcement. The parties agreed that the
Bankruptcy Court will have jurisdiction over the parties for all purposes
relating to enforcement of the Settlement Agreement, the plan of reorganization
and the confirmation order. The Bankruptcy Court retains jurisdiction to resolve
remaining disputed claims. The parties also agreed that the Settlement
Agreement, the plan of reorganization or any order entered by the Bankruptcy
Court contemplated or required to implement the Settlement Agreement or the
plan
of reorganization will be irrevocable and binding on the parties and enforceable
under federal law notwithstanding any future decisions or orders of the
CPUC.
Two
former CPUC commissioners who did not vote to approve the Settlement Agreement
filed an appeal of the Bankruptcy Court's confirmation order with the U.S.
District Court for the Northern District of California, or the District Court.
On
July 15, 2004, the District Court dismissed their appeal. The
former commissioners have appealed the District Court's order to the U.S. Court
of Appeals for the Ninth Circuit, or Ninth Circuit. The Ninth Circuit heard
oral
arguments on the appeal on February 13, 2006. It is uncertain when a decision
will be issued.
Under
applicable federal precedent, once the plan of reorganization has been
"substantially consummated," any pending appeals of the confirmation order
should be dismissed as moot. If
the
Bankruptcy Court's confirmation order is overturned or modified on appeal,
PG&E Corporation's and the Utility's financial condition and results of
operations, and the Utility's ability to pay dividends or otherwise make
distributions to PG&E Corporation, could be materially adversely affected.
PG&E Corporation and the Utility believe the former commissioners' appeal of
the confirmation order is without merit and will be rejected.
On
November 8, 2000, the Utility filed a lawsuit in the District Court against
the CPUC commissioners. In this lawsuit, the Utility seeks a declaration that
the federally tariffed wholesale electricity costs that the Utility had incurred
to serve the Utility's customers are recoverable in retail rates under the
federal filed rate doctrine.
Under
the
Settlement Agreement, the Utility agreed to dismiss the filed rate case with
prejudice on or as soon as practicable after the later of the effective date
of
the plan of reorganization and the date on which CPUC approval of the Settlement
Agreement is no longer subject to appeal. On August 11, 2003, the Ninth
Circuit issued an order staying proceedings in the filed rate case as requested
by the Utility. Since the appeal brought by two former CPUC commissioners
challenging the
33
Bankruptcy
Court’s confirmation order incorporating the terms of the Settlement Agreement
is still pending in the Ninth Circuit, as discussed above, the Utility has
not
yet dismissed its complaint.
The
Utility's Diablo Canyon power plant employs a "once-through" cooling water
system that is regulated under a NPDES permit issued by the Central Coast
Regional Water Quality Control Board, or Central Coast Board. This permit allows
the Diablo Canyon power plant to discharge the cooling water at a temperature
no
more than 22 degrees above the temperature of the ambient receiving water,
and
requires that the beneficial uses of the water be protected. The beneficial
uses
of water in this region include industrial water supply, marine and wildlife
habitat, shellfish harvesting and preservation of rare and endangered species.
In January 2000, the Central Coast Board issued a proposed draft cease and
desist order alleging that, although the temperature limit has never been
exceeded, the Utility's Diablo Canyon power plant's discharge was not protective
of beneficial uses.
In
October 2000, the Utility and the Central Coast Board reached a tentative
settlement of this matter pursuant to which the Central Coast Board agreed
to
find that the Utility's discharge of cooling water from the Utility's Diablo
Canyon power plant protects beneficial uses and that the intake technology
reflects the best technology available, as defined in the federal Clean Water
Act. As part of the Central Coast settlement agreement, the Utility agreed
to
take measures to preserve certain acreage north of the plant and to fund
approximately $6 million in environmental projects and future environmental
monitoring related to coastal resources. On March 21, 2003, the Central
Coast Board voted to accept the Central Coast settlement agreement. On
June 17, 2003, the Central Coast settlement agreement was executed by the
Utility, the Central Coast Board and the California Attorney General's Office.
A
condition to the effectiveness of the settlement agreement is that the Central
Coast Board renew Diablo Canyon's NPDES permit.
At
its
July 10, 2003 meeting, the Central Coast Board did not renew the permit and
continued the permit renewal hearing indefinitely. Several Central Coast Board
members indicated that they no longer supported the Central Coast settlement
agreement accepted in March 2003, and the Central Coast Board requested a
team of independent scientists, as part of a technical working group, to develop
additional information on possible mitigation measures for Central Coast Board
staff. In January 2005, the Central Coast Board published the scientists'
draft report recommending several such mitigation measures. If the Central
Coast
Board adopts the scientists' recommendations, and if the Utility ultimately
is
required to implement the projects proposed in the draft report, it could incur
costs of up to approximately $30 million. The Utility would seek to recover
these costs through rates charged to customers.
The
Utility believes that the ultimate outcome of this matter will not have a
material adverse impact on the Utility's financial condition or results of
operations.
On
January 10, 2002, the California Attorney General filed a complaint in the
San Francisco Superior Court for the County of San Francisco, or Superior Court,
against PG&E Corporation and its directors, as well as against directors of
the Utility, based on allegations of unfair or fraudulent business acts or
practices in violation of California Business and Professions Code
Section 17200, or Section 17200. Among other allegations, the
California Attorney General alleged that past transfers of funds from the
Utility to PG&E Corporation during the period from 1997 through 2000
(primarily in the form of dividends and stock repurchases), and allegedly from
PG&E Corporation to other affiliates of PG&E Corporation, violated
various conditions established by the CPUC in decisions approving the holding
company formation. The California Attorney General alleged that the defendants
violated these conditions when PG&E Corporation allegedly failed to provide
adequate financial support to the Utility during the California energy crisis.
The
complaint seeks injunctive relief, the appointment of a receiver, restitution
in
an amount according to proof, civil penalties of $2,500 against each defendant
for each violation of Section 17200, a total penalty of not less than
$500 million and costs of suit. The California Attorney General's complaint
also seeks restitution of assets allegedly wrongfully transferred to PG&E
Corporation from the Utility.
On
February 11, 2002, a complaint entitled City
and County of San Francisco; People of the State of California v. PG&E
Corporation, and Does 1-150,
was
filed in the Superior Court. The complaint contains some of the same allegations
contained in the California Attorney General's complaint, including allegations
of unfair competition in violation of Section 17200. In addition, the complaint
alleges causes of action for conversion, claiming that PG&E Corporation
"took at least
34
$5.2 billion
from the Utility," and for unjust enrichment. The City and County of San
Francisco, or CCSF, seeks injunctive relief, the appointment of a receiver,
restitution, disgorgement, the imposition of a constructive trust, civil
penalties of $2,500 against each defendant for each violation of Section 17200
and costs of suit.
The
complaints were filed after the CPUC issued two decisions in its investigative
proceeding commenced in April 2001 into whether the California investor-owned
electric utilities, including the Utility, complied with past CPUC decisions,
rules and orders authorizing their holding company formations and/or governing
affiliate transactions, as well as applicable statutes. The order states that
the CPUC would, among other matters, investigate the utilities' transfer of
money to their holding companies, including during times when their utility
subsidiaries were experiencing financial difficulties the failure of the holding
companies to financially assist the utilities when needed, the transfer by
the
holding companies of assets to unregulated subsidiaries, and the holding
companies' actions to "ringfence" their unregulated subsidiaries. In May 2005,
the CPUC closed this investigation without making any findings. Under the
Settlement Agreement, the CPUC agreed to dismiss with prejudice PG&E
Corporation and the Utility from the CPUC's investigation as to past
practices.
PG&E
Corporation believes that the intercompany transactions challenged by the
California Attorney General and CCSF were in full compliance with applicable
law
and CPUC conditions. The challenged transactions forming the bulk of the
restitution claims were regular quarterly dividends and stock repurchases.
As
part of its annual cost of capital proceedings, the Utility advised the CPUC
in
advance of its forecast stock repurchases and dividends. The CPUC did not
challenge or question those payments.
In
February and March 2002, PG&E Corporation filed notices of removal in the
Bankruptcy
Court to
transfer the complaints to the Bankruptcy Court. Subsequently,
the plaintiffs filed motions to remand their actions to state court.
In
June
2002, the Bankruptcy Court held that federal law preempted the California
Attorney General’s allegations concerning PG&E Corporation’s participation
in the Utility’s bankruptcy proceedings. The Bankruptcy Court directed the
California Attorney General to file an amended complaint omitting certain of
his
Section 17200 allegations and remanded the amended complaint to the Superior
Court. The Bankruptcy Court retained jurisdiction over CCSF’s causes of action
for conversion and unjust enrichment, finding that these claims belong solely
to
the Utility and cannot be asserted by CCSF, but remanded CCSF’s Section 17200
cause of action to state court. In both cases, the parties appealed the
Bankruptcy Court’s remand order to the District Court. In August 2002, the
California Attorney General filed its amended complaint in the Superior Court.
The Superior Court has coordinated the California Attorney General’s case with
the case filed by CCSF.
On
October 8, 2003, the District Court reversed, in part, the Bankruptcy Court’s
June 2002 decision and ordered that the plaintiffs’ restitution claims under
Section 17200 be sent to the Bankruptcy Court. The District Court found that
these claims, estimated by plaintiffs to be approximately $5 billion, are the
property of the Utility’s Chapter 11 estate and are therefore properly within
the Bankruptcy Court’s jurisdiction. The District Court also affirmed, in part,
the Bankruptcy Court’s June 2002 decision and found that the plaintiffs’ civil
penalty and injunctive relief claims under Section 17200 could be resolved
in
Superior Court. The California Attorney General and CCSF appealed the District
Court’s remand order to the Ninth Circuit.
While
the
Ninth Circuit appeal was pending, the Superior Court held a trial in December
2004 to consider the appropriate standard to determine what constitutes a
separate violation of Section 17200 in order to determine the magnitude of
potential penalties under Section 17200 (up to $2,500 per separate “violation”).
The Superior Court did not address the question of whether any violations
occurred. In March 2005, the Superior Court issued a decision rejecting the
“per
victim” and “per [customer] bill” approaches advocated by the plaintiffs,
standards that potentially could have resulted in millions of separate
“violations.” The Superior Court found that the appropriate standard was each
transfer of money from the Utility to PG&E Corporation that plaintiffs
allege violated Section 17200. In July 27, 2005, the California Court of Appeal
summarily denied a petition filed by the California Attorney General and CCSF
seeking to overturn this decision.
On
January 10, 2006, a three-judge panel of the Ninth Circuit issued a 2-1 decision
reversing the District Court’s October 2003 order regarding which court had
jurisdiction of the California Attorney General’s and CCSF’s restitution claims.
The Ninth Circuit ruled
that the plaintiffs’ restitution claims constituted
actions to enforce their police or regulatory power, actions which are exempt
from the provisions of the Bankruptcy Code permitting removal of state actions
to Bankruptcy Court. The Ninth Circuit remanded the restitution claims back
to
the Superior Court. PG&E Corporation has filed a request for rehearing en
banc with the Ninth Circuit.
The
Ninth
Circuit did not address the California Attorney General’s and CCSF’s underlying
allegations that PG&E Corporation and the other defendants violated Section
17200.
The
Ninth
Circuit also did not decide the issue of who would
35
be
entitled to receive the proceeds, if any, of a restitution award,
and
PG&E Corporation continues to believe that any such proceeds would be the
property of the Utility. The Settlement Agreement provides that all claims
by
the CPUC against PG&E Corporation or the Utility arising out of or in any
way related to the energy crisis are released, including the CPUC’s
investigation into past PG&E Corporation actions during the energy crisis.
Accordingly, PG&E Corporation believes that any claims for such proceeds by
the CPUC would be precluded.
PG&E
Corporation believes that the California
Attorney General’s and CCSF’s allegations
have no merit and will continue to vigorously respond to and defend against
the
litigation.
PG&E
Corporation believes that the ultimate outcome of this matter would not result
in a material adverse effect on PG&E Corporation’s financial condition or
results of operations.
The
following 12 civil suits are pending against the Utility relating to alleged
chromium contamination: (1) Aguayo
v. Pacific Gas and Electric Company,
filed
March 15, 1995, in the Superior Court for the County of Los Angeles or Los
Angeles County Superior Court, (2) Aguilar
v. Pacific Gas and Electric Company,
filed
October 4, 1996, in Los Angeles County Superior Court,
(3) Acosta,
et al. v. Betz Laboratories, Inc., et al.,
filed
November 27, 1996, in Los Angeles County Superior Court,
(4) Adams
v. Pacific Gas and Electric Company and Betz Chemical Company,
filed
July 25, 2000, in Los Angeles County Superior Court, (5) Baldonado
v. Pacific Gas and Electric Company,
filed
October 25, 2000, in Los Angeles County Superior Court,
(6) Gale
v. Pacific Gas and Electric Company,
filed
January 30, 2001, in Los Angeles County Superior Court, Puckett
v. Pacific Gas and Electric Company,
filed
March 30, 2001, in Los Angeles County Superior Court, (9) Alderson,
et al. v. PG&E Corporation, Pacific Gas and Electric Company, Betz Chemical
Company, et al.,
filed
April 11, 2001, in Los Angeles County Superior Court,
(10) Bowers,
et al. v. Pacific Gas and Electric Company, et al.,
filed
April 20, 2001, in Los Angeles County Superior Court,
(11) Boyd,
et al. v. Pacific Gas and Electric Company, et al.,
filed
May 2, 2001, in Los Angeles County Superior Court, (12) Martinez,
et al. v. Pacific Gas and Electric Company,
filed
June 29, 2001, in San Bernardino County Superior Court and
(13) Miller
v. Pacific Gas and Electric Company,
filed
November 21, 2001, in Los Angeles County Superior Court.
All
of
these civil actions, referred to as the Chromium Litigation, are now pending
in
the Los Angeles County Superior Court, or Superior Court. There are now
approximately 1,200 plaintiffs in the Chromium Litigation who seek compensatory
damages, more than 1,000 of whom are also seeking punitive damages. Although
the
plaintiffs’ complaints in the Chromium Litigation do not state the amount of
compensatory or punitive damages claimed, approximately 1,000 of the current
plaintiffs filed claims in the Utility’s Chapter 11 proceeding requesting
compensatory damages in an approximate aggregate amount of $500 million and
others filed claims for an "unknown amount." These claims were not discharged
when the Utility’s plan of reorganization became effective.
In
general, plaintiffs and claimants allege that exposure to chromium contamination
in the vicinity of the Utility's gas compressor stations located at Kettleman
and Hinkley, California, and the area of California near Topock, Arizona, caused
personal injuries, wrongful death or other injuries, and seek related damages.
On
February 3, 2006, the Utility entered into a settlement agreement with attorneys
for approximately 1,100 plaintiffs in the Chromium Litigation. The following
cases are covered by the settlement agreement: Aguayo,
Aguilar,
Acosta,
Baldonado,
Bowers,
Boyd,
Gale,
Martinez,
Miller
and
Puckett.
The
Utility has agreed to pay $295 million to the settling plaintiffs. The
Utility will deposit the settlement amount into escrow on April 21, 2006.
The
settling plaintiffs are required to execute general releases in favor of the
Utility, PG&E Corporation, its officers, directors, employees, and other
affiliates, as to any
and
all claims asserted or which could have been asserted in the Chromium
Litigation. After receipt of releases from at least 90% of the settling
plaintiffs, executed requests for dismissals with prejudice of the settled
cases, and documentation evidencing the Superior Court’s approval
of the compromises or settlements with the settling plaintiffs who are minors,
payments will be released from escrow to plaintiffs’ attorneys for the
plaintiffs who have submitted executed releases. If
90% of
the settling plaintiffs do not execute releases
by
September 15, 2006, including
a release signed by each of the eighteen plaintiffs scheduled to participate
in
the first trial, the Utility may,
at
its option, terminate the settlement agreement. In order to obtain 100% of
the
settlement funds from escrow, plaintiffs’ attorneys must submit releases from or
on behalf of 100% of the settling plaintiffs.
With
respect to the unresolved claims, the Utility will continue to pursue
appropriate legal defenses, including the statute of limitations and the
exclusivity of workers’ compensation and factual defenses, including lack of
exposure to chromium and the inability of chromium to cause certain of the
illnesses alleged.
36
The
Utility has recorded a $314 million reserve in its financial statements with
respect to the Chromium Litigation. PG&E Corporation and the Utility do not
expect that the outcome with respect to the remaining unresolved claims will
have a material adverse effect on their financial condition or results of
operations.
Not
applicable.
The
names, ages and positions of PG&E Corporation "executive officers," as
defined by Rule 3b-7 of the General Rules and Regulations under the
Securities and Exchange Act of 1934, or Exchange Act, at February 1, 2006,
are
as follows:
|
Name
|
Age
|
Position
|
||
|
P.
A. Darbee
|
53
|
Chairman
of the Board, Chief Executive Officer and President
|
||
|
L.
H. Everett
|
55
|
Senior
Vice President, Communications and Public Affairs
|
||
|
K.M.
Harvey
|
47
|
Senior
Vice President and Chief Risk and Audit Officer
|
||
|
R.
M. Jackson
|
48
|
Senior
Vice President, Human Resources
|
||
|
C.
P. Johns
|
45
|
Senior
Vice President, Chief Financial Officer and Treasurer
|
||
|
T.
B. King
|
44
|
Senior
Vice President; President and Chief Executive Officer, Pacific
Gas and
Electric Company
|
||
|
R.
L. Rosenberg
|
52
|
Senior
Vice President, Corporate Strategy and Development
|
||
|
B.
R. Worthington
|
56
|
Senior
Vice President and General
Counsel
|
All
officers of PG&E Corporation serve at the pleasure of the Board of
Directors. During the past five years, the executive officers of PG&E
Corporation had the following business experience. Except as otherwise noted,
all positions have been held at PG&E Corporation.
|
Name
|
Position
|
Period
Held Office
|
||
|
P.
A. Darbee
|
Chairman
of the Board, Chief Executive Officer and President
|
January 1,
2006 to present
|
||
|
Chairman
of the Board, Pacific Gas and Electric Company
|
January 1,
2006 to present
|
|||
|
President
and Chief Executive Officer
|
January 1,
2005 to December 31, 2005
|
|||
|
Senior
Vice President and Chief Financial Officer
|
July 9,
2001 to December 31, 2004
|
|||
|
Senior
Vice President, Chief Financial Officer, and Treasurer
|
September 20,
1999 to July 8, 2001
|
|||
|
L.
H. Everett
|
Senior
Vice President, Communications and Public Affairs
|
January 9,
2006 to present
|
||
|
Senior
Vice President and Assistant to the Chief Executive
Officer
|
January 1,
2005 to January 8, 2006
|
|||
|
Senior
Vice President and Assistant to the Chairman
|
August 2,
2004 to December 31, 2004
|
|||
|
Vice
President and Assistant to the Chairman
|
June 1,
2001 to August 1, 2004
|
|||
|
Vice
President, Corporate Secretary, and Assistant to the
Chairman
|
May 1,
2001 to May 31, 2001
|
|||
|
Vice
President and Corporate Secretary
|
July 1,
1997 to April 30, 2001
|
|||
|
Vice
President and Corporate Secretary, Pacific Gas and Electric
Company
|
November 1,
1996 to May 31, 2001
|
|||
|
K.
M. Harvey
|
Senior
Vice President and Chief Risk and Audit Officer
|
October 1,
2005 to present
|
||
|
Senior
Vice President - Chief Financial Officer and Treasurer, Pacific
Gas and
Electric Company
|
November 1,
2000 to September 30, 2005
|
|||
|
Senior
Vice President - Chief Financial Officer, Controller, and
Treasurer,
Pacific Gas and Electric Company
|
January 1,
2000 to October 31, 2000
|
|||
|
R.
M. Jackson
|
Senior
Vice President, Human Resources, PG&E Corporation and Pacific Gas and
Electric Company
|
August 2,
2004 to present
|
||
|
Vice
President, Human Resources, PG&E Corporation
|
June 1,
2004 to August 1, 2004
|
|||
|
Vice
President, Human Resources, Pacific Gas and Electric
Company
|
June 1,
1999 to August 1, 2004
|
|||
|
C.
P. Johns
|
Senior
Vice President, Chief Financial Officer and Treasurer
|
October 4,
2005 to present
|
||
|
Senior
Vice President, Chief Financial Officer and Treasurer, Pacific
Gas and
Electric Company
|
October 1,
2005 to present
|
|||
|
Senior
Vice President, Chief Financial Officer and Controller
|
January 1,
2005 to October 3, 2005
|
|||
|
Senior
Vice President and Controller
|
September 19,
2001 to December 31, 2004
|
|||
|
Vice
President and Controller
|
July 1,
1997 to September 18, 2001
|
|||
|
T.
B. King
|
Senior
Vice President, PG&E Corporation
|
January 1,
2006 to present
|
||
|
President
and Chief Executive Officer, Pacific Gas and Electric
Company
|
January 1,
2006 to present
|
|||
|
Executive
Vice President and Chief Operating Officer, Pacific Gas and Electric
Company
|
July 1,
2005 to December 31, 2005
|
|||
|
Executive
Vice President and Chief of Utility Operations, Pacific Gas and
Electric
Company
|
August 2,
2004 to June 30, 2005
|
|||
|
Senior
Vice President and Chief of Utility Operations, Pacific Gas and
Electric
Company
|
November 1,
2003 to August 1, 2004
|
|||
|
Senior
Vice President, PG&E Corporation
|
January 1,
1999 to October 31, 2003
|
|||
|
President,
PG&E National Energy Group, Inc.
|
November 15,
2002 to July 8, 2003
|
|||
|
President
and Chief Operating Officer, PG&E Gas Transmission
Corporation
|
August 27,
2002 to July 8, 2003
|
|||
|
President
and Chief Operating Officer, Gas Transmission, PG&E National Energy
Group, Inc.
|
August 9,
2002 to November 14, 2002
|
|||
|
President
and Chief Operating Officer, West Region, PG&E National Energy
Group, Inc.
|
July 1,
2000 to August 8, 2002
|
|||
|
President
and Chief Operating Officer, PG&E Gas Transmission
Corporation
|
November 23,
1998 to September 10, 2002
|
|||
|
R.
L. Rosenberg
|
Senior
Vice President, Corporate Strategy and Development
|
November 1,
2005 to present
|
||
|
Executive
Vice President and Chief Financial Officer, Infospace,
Inc.
|
September
2000 to January 20, 2001
|
|||
|
Chief
Financial Officer and Senior Vice President, Finance and Corporate
Development, Infospace, Inc.
|
June
2000 to September 2000
|
|||
|
B.
R. Worthington
|
Senior
Vice President and General Counsel
|
June 1,
1997 to present
|
37
The
names, ages and positions of the Utility's "executive officers," as defined
by
Rule 3b-7 of the General Rules and Regulations under the Exchange Act at
February 1, 2006, are as follows:
|
Name
|
Age
|
Position
|
||
|
P.A.
Darbee
|
53
|
Chairman
of the Board
|
||
|
T.
B. King
|
44
|
President
and Chief Executive Officer
|
||
|
T.
E. Bottorff
|
52
|
Senior
Vice President, Regulatory Relations
|
||
|
J.
D. Butler
|
50
|
Senior
Vice President, Energy Delivery
|
||
|
L.H.
Everett
|
55
|
Senior
Vice President, Communications and Public Affairs, PG&E
Corporation
|
||
|
R.M.
Jackson
|
48
|
Senior
Vice President, Human Resources
|
||
|
C.
P. Johns
|
45
|
Senior
Vice President, Chief Financial Officer and Treasurer
|
||
|
J.
S. Keenan
|
57
|
Senior
Vice President, Generation and Chief Nuclear Officer
|
||
|
S.
M. Ramsay
|
47
|
Vice
President, Asset Management and Electric Transmission
|
||
|
F
Wan
|
44
|
Vice
President, Energy Procurement
|
||
|
B.
R. Worthington
|
56
|
Senior
Vice President and General Counsel, PG&E
Corporation
|
All
officers of the Utility serve at the pleasure of the Board of Directors. During
the past five years through February 1, 2006, the executive officers of the
Utility had the following business experience. Except as otherwise noted, all
positions have been held at Pacific Gas and Electric Company.
|
Name
|
Position
|
Period
Held Office
|
||
|
P.
A. Darbee
|
Chairman
of the Board, Pacific Gas and Electric Company
|
January 1,
2006 to present
|
||
|
Chairman
of the Board, Chief Executive Officer and President, PG&E
Corporation
|
January 1,
2006 to present
|
|||
|
President
and Chief Executive Officer, PG&E Corporation
|
January 1,
2005 to December 31, 2005
|
|||
|
Senior
Vice President and Chief Financial Officer, PG&E
Corporation
|
July 9,
2001 to December 31, 2004
|
|||
|
Senior
Vice President, Chief Financial Officer, and Treasurer, PG&E
Corporation
|
September 20,
1999 to July 8, 2001
|
|||
|
T.
B. King
|
President
and Chief Executive Officer
|
January 1,
2006 to present
|
||
|
Senior
Vice President, PG&E Corporation
|
January 1,
2006 to present
|
|||
|
Executive
Vice President and Chief Operating Officer
|
July 1,
2005 to December 31, 2005
|
|||
|
Executive
Vice President and Chief of Utility Operations
|
August
2, 2004 to June 30, 2005
|
|||
|
Senior
Vice President and Chief of Utility Operations
|
November
1, 2003 to August 1, 2004
|
|||
|
Senior
Vice President, PG&E Corporation
|
January
1, 1999 to October 31, 2003
|
|||
|
President,
PG&E National Energy Group, Inc.
|
November
15, 2002 to July 8, 2003
|
|||
|
President
and Chief Operating Officer, PG&E Gas Transmission
Corporation
|
August
27, 2002 to July 8, 2003
|
|||
|
President
and Chief Operating Officer, Gas Transmission, PG&E National Energy
Group, Inc.
|
August
9, 2002 to November 14, 2002
|
|||
|
President
and Chief Operating Officer, West Region, PG&E National Energy Group,
Inc.
|
July
1, 2000 to August 8, 2002
|
|||
|
President
and Chief Operating Officer, PG&E Gas Transmission
Corporation
|
November
23, 1998 to September 10, 2002
|
|||
|
T.
E. Bottorff
|
Senior
Vice President, Regulatory Relations
|
October 14,
2005 to present
|
||
|
Senior
Vice President, Customer Service and Revenue
|
March 1,
2004 to October 13, 2005
|
|||
|
Vice
President, Customer Service
|
June 1,
1999 to February 29, 2004
|
|||
|
J.
D. Butler
|
Senior
Vice President, Energy Delivery
|
January 9,
2006 to present
|
||
|
Senior
Vice President, Transmission and Distribution
|
March 1,
2004 to January 8, 2006
|
|||
|
Vice
President, Operations, Maintenance and Construction
|
June 12,
2000 to February 29, 2004
|
|||
|
L.
H. Everett
|
Senior
Vice President, Communications and Public Affairs, PG&E
Corporation
|
January 9,
2006 to present
|
||
|
Senior
Vice President and Assistant to the Chief Executive Officer, PG&E
Corporation
|
January 1,
2005 to January 8, 2006
|
|||
|
Senior
Vice President and Assistant to the Chairman, PG&E
Corporation
|
August
2, 2004 to December 31, 2004
|
|||
|
Vice
President and Assistant to the Chairman, PG&E
Corporation
|
June
1, 2001 to August 1, 2004
|
|||
|
Vice
President, Corporate Secretary, and Assistant to the Chairman,
PG&E
Corporation
|
May
1, 2001 to May 31, 2001
|
|||
|
Vice
President and Corporate Secretary, PG&E Corporation
|
July
1, 1997 to April 30, 2001
|
|||
|
Vice
President and Corporate Secretary
|
November
1, 1996 to May 31, 2001
|
|||
|
R.
M. Jackson
|
Senior
Vice President, Human Resources, Pacific Gas and Electric Company
and
PG&E Corporation
|
August
2, 2004 to present
|
||
|
Vice
President, Human Resources, PG&E Corporation
|
June 1,
2004 to August 1, 2004
|
|||
|
Vice
President, Human Resources
|
June
1, 1999 to August 1, 2004
|
|||
|
C.
P. Johns
|
Senior
Vice President, Chief Financial Officer and Treasurer
|
October 1,
2005 to present
|
||
|
Senior
Vice President, Chief Financial Officer and Treasurer, PG&E
Corporation
|
October 4,
2005 to present
|
|||
|
Senior
Vice President, Chief Financial Officer and Controller, PG&E
Corporation
|
January 1,
2005 to October 3, 2005
|
|||
|
Senior
Vice President and Controller, PG&E Corporation
|
September 19,
2001 to December 31, 2004
|
|||
|
Vice
President and Controller, PG&E Corporation
|
July 1,
1997 to September 18, 2001
|
|||
|
J.
S. Keenan
|
Senior
Vice President, Generation and Chief Nuclear Officer
|
December 19,
2005 to present
|
||
|
Vice
President, Fossil Generation, Progress Energy
|
November 10,
2003 to December 18, 2005
|
|||
|
Vice
President, Brunswick Nuclear Plant, Progress Energy
|
May 1,
1998 to November 9, 2003
|
|||
|
S.
M. Ramsay
|
Vice
President, Asset Management and Electric Transmission
|
January 9,
2006 to present
|
||
|
Vice
President, Electric Transmission
|
July 1,
2005 to January 8, 2006
|
|||
|
Vice
President, Distribution Asset Management, American Electric
Power
|
February 1,
2004 to June 30,
2005
|
|||
|
Senior
Vice President, Power and Gas, UMS Group, Inc.
|
October 1,
2001 to January 31, 2004
|
|||
|
Managing
Director, UK Operations, UMS Group, Inc.
|
January 2,
2001 to September 30, 2001
|
|||
|
F.
Wan
|
Vice
President, Energy Procurement
|
January 9,
2006 to present
|
||
|
Vice
President, Power Contracts and Electric Resource
Development
|
May 1,
2004 to January 8, 2006
|
|||
|
Vice
President, Risk Initiatives, PG&E Corporation Support Services,
Inc.
|
November
1, 2000 to April 30, 2004
|
|||
|
B.
R. Worthington
|
Senior
Vice President and General Counsel, PG&E Corporation
|
June
1, 1997 to present
|
38
(a) As
of
February 1, 2006, there were 98,083 holders of record of PG&E
Corporation common stock. PG&E Corporation common stock is listed
principally on the New York Stock Exchange. PG&E Corporation common stock
also is listed on the Pacific Exchange and the Swiss stock exchanges. The high
and low sales prices of PG&E Corporation common stock for each quarter of
the two most recent fiscal years are set forth under the heading "Quarterly
Consolidated Financial Data (Unaudited)" in the 2005 Annual Report, which
information is hereby incorporated by reference and filed as part of
Exhibit 13 to this report. The discussion of dividends with respect to
PG&E Corporation's common stock is hereby incorporated by reference from
"Management's Discussion and Analysis of Financial Condition and Results of
Operations—Liquidity and Financial Resources—Dividends" of the 2005 Annual
Report.
As
previously disclosed, in connection with its entry into certain credit
agreements, in June 2002 and October 2002, PG&E Corporation issued
warrants to purchase 5,066,931 shares of common stock of PG&E Corporation at
an exercise price of $0.01
per
share. On November 17, 2005 and December 29, 2005, warrant holders exercised,
on
a net exercise basis, warrants to purchase, in the aggregate, 73,559 shares,
and
received, in the aggregate, 73,538 shares of PG&E Corporation common stock
in reliance on the exemption from the registration requirements of the
Securities Act of 1933 provided by Section 4(2) of the Act.
Pacific
Gas and Electric Company did not make any sales of unregistered equity
securities during the quarter ended December 31, 2005.
(b) Issuer
Purchases of Equity Securities
PG&E
Corporation common stock:
|
Period
|
Total
Number of Shares Purchased
|
Average
Price Paid Per Share
|
Total
Number of Shares Purchased as Part of Publicly Announced Plans
or
Programs(1)(2)(3)
|
Approximate
Dollar Value of Shares that May Yet be Purchased Under the Plans
or
Programs
|
|||||||||
|
October
1 through October 31, 2005
|
-
|
$
|
-
|
-
|
$
|
-
|
|||||||
|
November
1 through November 30, 2005
|
31,650,300
|
$
|
34.75
|
31,650,300
|
$
|
500,000,000
|
|||||||
|
December 1
through December 31, 2005
|
-
|
$
|
-
|
-
|
$
|
-
|
|||||||
|
Total
|
31,650,300
|
$
|
34.75
|
31,650,300
|
$
|
500,000,000
|
|||||||
_________________________________
|
(1)
|
On
September 15, 2004, the PG&E Corporation Board of Directors
authorized PG&E Corporation and its subsidiaries to repurchase shares
of PG&E Corporation's common stock with an aggregate purchase price
not to exceed PG&E Corporation's net cash proceeds from sales of
PG&E Corporation's common stock upon exercise of options granted under
PG&E Corporation's Stock Option Plan. The program was publicly
announced in a Current Report on Form 8-K filed by PG&E
Corporation on October 14, 2004. The program expired on
December 31, 2005.
|
|
(2)
|
On
December 15, 2004, the PG&E Corporation Board of Directors
authorized the repurchase of up to $975 million in PG&E
Corporation common stock. The program was publicly announced in a
Current
Report on Form 8-K filed by PG&E Corporation on December 16,
2004. On February 16, 2005, the Board of Directors increased the
repurchase authorization to $1.05 billion, which was announced in
PG&E Corporation’s Annual Report on Form 10-K for the year ended
December 31, 2004. PG&E Corporation used all of this authorization to
enter into an accelerated share repurchase arrangement on March 4,
2005
with Goldman, Sachs & Co., Inc., or GS&Co, to repurchase
29,489,400
shares at an initial price of $35.60 per share.
Under
the share forward component of the March 2005 arrangement, certain
additional payments were required by both PG&E Corporation and
GS&Co upon termination. Most significantly, PG&E Corporation was
to receive from, or be required to pay to, GS&Co a price adjustment on
the repurchased shares based on the difference between the amount
it paid
and the daily volume weighted average price, or VWAP, of PG&E
Corporation common stock over the approximately six-month intended
arrangement period. PG&E Corporation made additional payments to
GS&Co of $78,000 on June 30, 2005 and $22 million on September 12,
2005. The amount of the price adjustment based on the VWAP of PG&E
Corporation common stock over the term of the arrangement increased
the
average purchase price per share to $36.19.
|
|
(3)
|
On
October 19, 2005, the PG&E Corporation Board of Directors authorized
the repurchase of up to $1.6 billion in shares of PG&E Corporation's
common stock, from time to time, but no later than December 31, 2006.
The
program was publicly announced in a Current
Report on Form
8-K filed by PG&E Corporation on October 21, 2005. As described in a
Current
Report on
Form 8-K filed by PG&E Corporation on November 18, 2005, PG&E
Corporation entered into an accelerated share repurchase arrangement
with
GS&Co on November 16, 2005 under which PG&E Corporation
repurchased 31,650,300 shares of its outstanding common stock at
an
initial price of $34.75 per share and an aggregate price of approximately
$1.1 billion. As with the March 2005arrangement, PG&E Corporation may
receive from, or be required to pay, GS&Co various payments, including
a price adjustment based on the daily VWAP of PG&E Corporation common
stock over a period of approximately seven
months.
|
During
the fourth quarter of 2005, Pacific Gas and Electric Company did not redeem
or
repurchase any shares of its various series of preferred stock outstanding.
A
summary
of selected financial information, for each of PG&E Corporation and Pacific
Gas and Electric Company for each of the last five fiscal years, is set forth
under the heading "Selected Financial Data" in the 2005 Annual Report, which
information is hereby incorporated by reference and filed as part of
Exhibit 13 to this report.
A
discussion of PG&E Corporation's and Pacific Gas and Electric Company's
consolidated results of operations and financial condition is set forth under
the heading "Management's Discussion and Analysis of Financial Condition and
Results of Operations" in the 2005 Annual Report, which discussion is hereby
incorporated by reference and filed as part of Exhibit 13 to this
report.
Information
responding to Item 7A appears in the 2005 Annual Report under the heading
"Management's Discussion and Analysis of Financial Condition and Results of
Operations—Risk Management Activities," and under Notes 1 and 12 of the "Notes
to the Consolidated Financial Statements" of the 2005 Annual Report, which
information is hereby incorporated by reference and filed as part of
Exhibit 13 to this report.
Information
responding to Item 8 appears in the 2005 Annual Report under the following
headings for PG&E Corporation: "Consolidated Statements of Income,"
"Consolidated Balance Sheets," "Consolidated Statements of Cash Flows," and
"Consolidated Statements of Shareholders' Equity;" under the following headings
for Pacific Gas and Electric Company: "Consolidated Statements of Income,"
"Consolidated Balance Sheets," "Consolidated Statements of Cash Flows," and
"Consolidated Statements of Shareholders' Equity;" and under the following
headings for PG&E Corporation and Pacific Gas and Electric Company jointly:
"Notes to the Consolidated Financial Statements," "Quarterly Consolidated
Financial Data (Unaudited)," and "Report of Independent Registered Public
Accounting Firm," which information is hereby incorporated by reference and
filed as part of Exhibit 13 to this report.
Not
applicable.
39
Based
on
an evaluation of PG&E Corporation's and the Utility's disclosure controls
and procedures as of December 31, 2005, PG&E Corporation's and the
Utility's respective principal executive officers and principal financial
officers have concluded that such controls and procedures are effective to
ensure that information required to be disclosed by PG&E Corporation and the
Utility in reports the companies file or submit under the Securities and
Exchange Act of 1934 is recorded, processed, summarized, and reported within
the
time periods specified in the Securities and Exchange Commission rules and
forms.
There
were no changes in internal control over financial reporting that occurred
during the quarter ended December 31, 2005 that have materially affected,
or are reasonably likely to materially affect, PG&E Corporation's or the
Utility's internal control over financial reporting.
Management
of PG&E Corporation and the Utility have prepared an annual report on
internal control over financial reporting. Management's report, together with
the report of the independent registered public accounting firm, appears in
their joint 2005 Annual Report to Shareholders under the heading "Management's
Report on Internal Control Over Financial Reporting" and "Report of Independent
Registered Public Accounting Firm," which information is hereby incorporated
by
reference and filed as part of Exhibit 13 to this report.
In
response to a shareholder proposal that was approved at PG&E Corporation’s
2005 annual meeting of shareholders on February 15, 2006, the Board of Directors
of PG&E Corporation, or the Board, adopted a Golden Parachute Restriction
Policy that became effective on February 15, 2006, subject to existing
contractual obligations. This policy requires that the holders of a majority
of
the shares represented and voting approve executive severance payments provided
in connection with a change in control of PG&E Corporation to the extent
that those payments exceed 2.99 times the sum of a covered officer’s base salary
and target annual bonus. The Golden Parachute Restriction Policy applies
generally to the value of cash, special benefits, or perquisites that would
be
due to the executive following both a change in control and the termination
or
constructive termination of an officer covered by the PG&E Corporation
Officer Severance Policy. It does not apply to the value of benefits that would
be triggered by a change in control without severance, or to the value of
benefits that would be triggered by severance in the absence of a change in
control. Under the Golden Parachute Restriction Policy, the Board has delegated
to the Nominating, Compensation and Governance Committee of the Board, or the
Committee, full authority to make determinations regarding the interpretation
of
the provisions of the Golden Parachute Restriction Policy in its sole
discretion.
On
February 15, 2006, the Board also adopted amendments to the definition of the
term “change in control” that appears in the PG&E Corporation Officer
Severance Policy, or the Officer Severance Policy, and the PG&E Corporation
2006 Long-Term Incentive Plan, or the 2006 LTIP. The definition of the term
“change in control” has been amended so that a “change in control” will occur
upon the consummation of a consolidation or merger of PG&E Corporation,
other than a merger or consolidation that would result in the voting securities
of PG&E Corporation outstanding immediately prior thereto continuing to
represent (either by remaining outstanding or by being converted into voting
securities of the surviving entity or any parent of such surviving entity)
at
least 70 percent of the combined voting power of PG&E Corporation, such
surviving entity, or the parent of such surviving entity outstanding immediately
after the merger or consolidation. Under the prior definition, a “change in
control” would have occurred upon shareholder approval of such a transaction.
Certain other events, including the turnover of two-thirds of the incumbent
board members without incumbent board member approval within two years, the
acquisition of a 20 percent voting stake in PG&E Corporation, and
shareholder approval of certain asset sales or a plan of liquidation or
dissolution, will continue to constitute a change in control.
Payments
granted pursuant to the Officer Severance Policy became subject to the Golden
Parachute Restriction Policy and the new definition of “change in control”
effective as of February 15, 2006, subject to existing contractual obligations.
The Officer Severance Policy provides that any changes which would reduce the
aggregate level of benefits provided under the policy will become effective
three years after the covered officers receive notice of those changes. The
Golden Parachute Restriction Policy and the amendments to the Officer Severance
Policy would reduce the aggregate level of benefits, and therefore will become
effective three years after the covered officers receive notice of those
changes. PG&E Corporation intends to provide such notice shortly.
40
The
Officer Severance Policy has been further amended to provide that: (i) the
term
“Participating Employers” is defined to more clearly identify which entities may
provide severance benefits to their officers pursuant to the Officer Severance
Policy and (ii) upon severance related to a change in control, benefits
conditioned upon continued future employment will accelerate in full. These
amendments became effective on February 15, 2006.
The
2006
LTIP also has been amended such that a change in control by itself will not
generally result in the accelerated vesting or settling of grants under the
2006
LTIP. Accelerated vesting or settling will occur upon a change in control only
if (1) the successor or surviving company does not assume or continue the grants
in a manner that preserves the value of the grants or (2) the grant holder
is
terminated within a set amount of time before or after the change in control.
These amendments will take effect starting with grants made in 2007. The 2006
LTIP administrative provisions were amended to clarify that benefits that may
be
payable upon termination of employment following the sale or other divestiture
of a subsidiary will be identical to those provided upon severance. These
amendments became effective February 15, 2006.
In
addition, the Committee amended the Executive Stock Ownership Program
Administrative Guidelines, or the Guidelines, to replace the reference to the
current PG&E Corporation Long-Term Incentive Program, which expired on
December 31, 2005, with the new 2006 LTIP, which became effective on January
1,
2006. The Guidelines also were amended to be consistent with the amended terms
of the 2006 LTIP as described above. These changes became effective February
15,
2006.
As
previously disclosed, the Committee has approved the structure of the 2006
Short-Term Incentive Plan, or STIP, under which officers of PG&E Corporation
and the Utility are provided an opportunity to receive annual incentive cash
payments. For these officers, corporate
financial performance, as measured by corporate earnings from operations, will
account for 70 percent of the award and Utility operational performance, as
measured by 11 equally weighted financial, operating, and service measures,
will
account for 30 percent of the award. At
its
meeting on February 15, 2006, the Committee approved the specific
performance scale that will be used to determine the extent to which the
corporate financial objective, as measured by earnings from operations, has
been
met. The Committee used the same methodology to establish the performance scale
for the corporate financial performance portion of the 2006 STIP as was used
for
the 2005 STIP. The corporate financial performance measure is based on PG&E
Corporation's budgeted earnings from operations that were previously approved
by
the Board, consistent with the basis for reporting and guidance to the financial
community. As with previous earnings performance scales, unbudgeted items
impacting comparability such as changes in accounting methods, workforce
restructuring, and one-time occurrences will be excluded.
The
Committee also approved the following 2006 performance targets for each of
the
11 equally weighted financial, operating, and service measures that will be
used
to determine whether the portion of the STIP award based on the achievement
of
operational excellence and improved customer service has been met. The 2005
performance results for each measure are included for reference:
41
2006
STIP Performance Targets
|
Measure
|
2005
Results
|
2006
Target
|
||||
|
1.
|
Customer
Satisfaction (Residential & Business) 1
|
94.0
|
96.0
|
|||
|
2.
|
Timely
bills (% issued within 35 days)
|
99.38%
|
99.51%
|
|||
|
3.
|
Estimate
of Outage Restoration Accuracy
|
47%
|
50%
|
|||
|
4.
|
System
Average Interruption Duration Index (SAIDI) 2
|
178.7
|
166
|
|||
|
5.
|
System
Average Interruption Frequency Index (SAIFI) 2
|
1.344
|
1.31
|
|||
|
6.
|
Energy
Availability (Generation and Procurement) 3
|
--
3
|
--
3
|
|||
|
7.
|
Telephone
Service Level 4
|
75/20
|
76/20
|
|||
|
8.
|
Expense
Per Customer
|
$278
|
$283
5
|
|||
|
9.
|
Diablo
Canyon composite performance index6
|
98.2
|
98.2
|
|||
|
10.
|
Employee
survey (Premier) index
|
64.0%
|
68.0%
|
|||
|
11.
|
Lost
workday case rate7
|
1.04
|
0.878
|
1. This
measure is based on the JD Power Residential Survey and the JD Power Business
Survey combined with equal weighting. The 2006 target assumes the 2006 quartile
ranges will be the same as the 2005 quartile ranges. The 2006 target will be
adjusted to reflect the revised quartile ranges expected to be available in
July
2006.
2. “SAIDI,”
or system average interruption duration index, refers to the average outage
time
over a one-year period. “SAIFI,” or system average interruption frequency index,
refers to the average number of sustained outages over a one-year period.
3. The
Energy Availability measure combines two separate reliability measures, each
equally weighted. One assesses whether Utility-owned generation is available
as
planned and the other assesses whether the Utility has obtained adequate
electric supplies for its customers, as measured by California Independent
System Operator alerts. This is a new measure in 2006.
4. This
refers to the percentage of customer calls to the contact centers that are
answered within a specified number of seconds; 75/20 means that 75% of calls
are
answered within 20 seconds.
5. The
2006
target expense per customer amount is based on the approved budget for 2006.
The
increase of 1.7 percent over the 2005 recorded amount of $278 is comprised
of a
3.3 percent increase in expenses, offset by a 1.5 percent increase in customers.
6. The
composite performance index provides a quantitative indication of plant
performance in the areas of nuclear plant safety and reliability and plant
efficiency.
7. This
measures the number of non-fatal injury and illness cases that (1) satisfy
certain federal requirements for recordability, (2) occur in the current year,
and (3) result in at least one day away from work. The rate measures how
frequently new lost workday cases occur for every 200,000 hours worked, or
for
approximately every 100 employees.
The
Chief
Executive Officer of PG&E Corporation has the discretion to recommend to the
Committee an additional performance rating for an individual officer. This
rating will be determined by such officer’s efforts to manage their
organization’s respective financial budget. This additional performance rating
can modify (up or down) an individual officer’s final STIP award by no more than
15 percent. The Committee will continue to retain full discretion as to the
determination of final officer STIP awards.
42
PART
III
Information
regarding executive officers of PG&E Corporation and Pacific Gas and
Electric Company is included above in a separate item captioned "Executive
Officers of the Registrants" at the end of Part I of this report. Other
information responding to Item 10 is included under the heading "Item
No. 1: Election of Directors of PG&E Corporation and Pacific Gas and
Electric Company" and under the heading "Section 16(a) Beneficial Ownership
Reporting Compliance" in the Joint Proxy Statement relating to the 2006 Annual
Meetings of Shareholders, which information is hereby incorporated by
reference.
Website
Availability of Corporate Governance and Other Documents
The
following documents are available both on PG&E Corporation's website
www.pgecorp.com,
and
Pacific Gas and Electric Company's website, www.pge.com:
(1) the codes of conduct and ethics adopted by PG&E Corporation and
Pacific Gas and Electric Company applicable to their respective directors and
employees, including their respective Chief Executive Officers, Chief Financial
Officers, Controllers and other executive officers, (2) PG&E
Corporation's and Pacific Gas and Electric Company's corporate governance
guidelines, and (3) key Board Committee charters, including charters for
the companies' Audit Committees and the PG&E Corporation Nominating,
Compensation, and Governance Committee. Shareholders also may obtain print
copies of these documents by submitting a written request to Linda Y.H. Cheng,
Corporate Secretary of PG&E Corporation and Pacific Gas and Electric
Company, One Market, Spear Tower, Suite 2400, San Francisco, California
94105.
If
any
amendments are made to, or any waivers are granted with respect to, provisions
of the codes of conduct and ethics adopted by PG&E Corporation and Pacific
Gas and Electric Company that apply to their respective Chief Executive
Officers, Chief Financial Officers or Controllers, the company whose code is
so
affected will disclose the nature of such amendment or waiver on its respective
website and any waivers to the code will be disclosed in a Current Report on
Form 8-K filed within 4 business days of the waiver.
Item
11. Executive
Compensation
Information
responding to Item 11, for each of PG&E Corporation and Pacific Gas and
Electric Company, is included under the heading "Compensation of Directors"
and
under the headings "Summary Compensation Table," "Option/SAR Grants in 2005,"
"Aggregated Option/SAR Exercises in 2005 and Year-End Option/SAR Values,"
"Long-Term Incentive Program—Awards in 2005," "Retirement Benefits," and
"Employment Contracts, Termination of Employment, and Change In Control
Provisions" in the Joint Proxy Statement relating to the 2006 Annual Meetings
of
Shareholders, which information is hereby incorporated by
reference.
Information
responding to Item 12, for each of PG&E Corporation and Pacific Gas and
Electric Company, is included under the heading "Security Ownership of
Management" and under the heading "Principal Shareholders" in the Joint Proxy
Statement relating to the 2006 Annual Meetings of Shareholders, which
information is hereby incorporated by reference.
43
Equity
Compensation Plan Information
The
following table provides information as of December 31, 2005 concerning
shares of PG&E Corporation common stock authorized for issuance under
PG&E Corporation's existing equity compensation plans.
|
Plan
Category
|
(a)
Number
of Securities to
be
Issued Upon Exercise
of
Outstanding Options,
Warrants
and Rights
|
(b)
Weighted
Average
Exercise
Price of
Outstanding
Options,
Warrants
and Rights
|
(c)
Number
of Securities
Remaining
Available for
Future
Issuance Under
Equity
Compensation Plans
(Excluding
Securities
Reflected
in Column(a))
|
|||
|
Equity
compensation plans approved by shareholders
|
12,012,774
|
$23.26
|
8,952,785(1)
|
|||
|
Equity
compensation plans not approved by shareholders
|
—
|
$—
|
—
|
|||
|
Total
equity compensation plans
|
12,012,774
|
$23.26
|
8,952,785
|
(1)
Represents the total number of shares available for issuance under PG&E
Corporation's Long-Term Incentive Program, or LTIP, as of December 31,
2005. Outstanding stock-based awards granted under the LTIP include stock
options, restricted stock and phantom stock payable in an equal number of shares
upon termination of employment or service as a director. The LTIP expired on
December 31, 2005. The PG&E Corporation 2006 Long-Term Incentive Plan, or
2006 LTIP, became effective on January 1, 2006. The 2006 LTIP authorizes up
to
12 million shares to be issued pursuant to awards granted under the 2006 LTIP.
For a description of the LTIP and the 2006 LTIP, see Note 14 of the Notes
to the Consolidated Financial Statements in the 2005 Annual Report.
Information
responding to Item 13, for each of PG&E Corporation and Pacific Gas and
Electric Company, is included under the heading "Certain Relationships and
Related Transactions" in the Joint Proxy Statement relating to the 2006 Annual
Meetings of Shareholders, which information is hereby incorporated by
reference.
Information
responding to Item 14, for each of PG&E Corporation and Pacific Gas and
Electric Company, is included under the heading "Information Regarding the
Independent Registered Public Accounting Firm of PG&E Corporation and
Pacific Gas and Electric Company" in the Joint Proxy Statement relating to
the
2006 Annual Meetings of Shareholders, which information is hereby incorporated
by reference.
44
PART
IV
(a) The
following documents are filed as a part of this report:
1. The
following consolidated financial statements, supplemental information and report
of independent registered public accounting firm are contained in the 2005
Annual Report and are incorporated by reference in this report:
Consolidated
Statements of Income for the Years Ended December 31, 2005, 2004, and 2003,
for each of PG&E Corporation and Pacific Gas and Electric
Company.
Consolidated
Balance Sheets at December 31, 2005, and 2004 for each of PG&E
Corporation and Pacific Gas and Electric Company.
Consolidated
Statements of Shareholders' Equity for the Years Ended December 31, 2005,
2004, and 2003, for each of PG&E Corporation and Pacific Gas and Electric
Company.
Notes
to
the Consolidated Financial Statements.
Quarterly
Consolidated Financial Data (Unaudited).
Report
of
Independent Registered Public Accounting Firm (Deloitte & Touche
LLP).
2. The
following financial statement schedules and report of independent registered
public accounting firm are filed as part of this report:
Report
of
Independent Registered Public Accounting Firm (Deloitte & Touche
LLP).
I—Condensed
Financial Information of Parent as of December 31, 2005 and 2004 and for
the Years Ended December 31, 2005, 2004, and 2003.
II—Consolidated
Valuation and Qualifying Accounts for each of PG&E Corporation and Pacific
Gas and Electric Company for the Years Ended December 31, 2005, 2004, and
2003.
Schedules
not included are omitted because of the absence of conditions under which they
are required or because the required information is provided in the consolidated
financial statements, including the notes thereto.
3. Exhibits
required by Item 601 of Regulation S-K:
|
Exhibit
Number
|
Exhibit
Description
|
||
|
2.1
|
Order
of the U.S. Bankruptcy Court for the Northern District of California
dated
December 22, 2003, Confirming Plan of Reorganization of Pacific Gas
and Electric Company, including Plan of Reorganization, dated July
31,
2003 as modified by modifications dated November 6, 2003 and December
19,
2003 (Exhibit B to Confirmation Order and Exhibits B and C to the
Plan of
Reorganization omitted) (incorporated by reference to Pacific Gas
and
Electric Company's Registration Statement on Form S-3 No. 333-109994,
Exhibit 2.1)
|
||
|
2.2
|
Order
of the U.S. Bankruptcy Court for the Northern District of California
dated
February 27, 2004 Approving Technical Corrections to Plan of
Reorganization of Pacific Gas and Electric Company and Supplementing
Confirmation Order to Incorporate such Corrections (incorporated
by
reference to Pacific Gas and Electric Company's Registration Statement
on
Form S-3 No. 333-109994, Exhibit 2.2)
|
||
|
3.1
|
Restated
Articles of Incorporation of PG&E Corporation effective as of May 29,
2002 (incorporated by reference to PG&E Corporation's Quarterly Report
on Form 10-Q for the quarter ended March 31, 2003 (File No. 1-12609),
Exhibit 3.1)
|
||
|
3.2
|
Certificate
of Determination for PG&E Corporation Series A Preferred Stock filed
December 22, 2000 (incorporated by reference to PG&E Corporation's
Form 10-K for the year ended December 31, 2000 (File No. 1-12609),
Exhibit
3.2)
|
||
|
3.3
|
Bylaws
of PG&E Corporation amended as of January 1, 2006
|
||
|
3.4
|
Restated
Articles of Incorporation of Pacific Gas and Electric Company effective
as
of April 12, 2004 (incorporated by reference to Pacific Gas and
Electric Company's Form 8-K filed April 12, 2004 (File
No. 1-2348), Exhibit 3)
|
||
|
3.5
|
Bylaws
of Pacific Gas and Electric Company amended as of January 1,
2006
|
||
|
4.1
|
Indenture,
dated as of April 22, 2005, supplementing, amending and restating
the
Indenture of Mortgage, dated as of March 11, 2004, as supplemented
by a
First Supplemental Indenture, dated as of March 23, 2004, and a Second
Supplemental Indenture, dated as of April 12, 2004, between Pacific
Gas
and Electric Company and The Bank of New York Trust Company, N.A.
(incorporated by reference to PG&E Corporation and Pacific Gas and
Electric Company's Form 10-Q filed May 4, 2005 (File No. 1-12609
and File
No. 1-2348), Exhibit 4.1)
|
||
|
4.2
|
Indenture
related to PG&E Corporation's 7.5% Convertible Subordinated Notes due
June 2007, dated as of June 25, 2002, between PG&E Corporation
and U.S. Bank, N.A., as Trustee (incorporated by reference to PG&E
Corporation's Form 8-K filed June 26, 2002 (File No. 1-12609),
Exhibit 99.1).
|
||
|
4.3
|
Supplemental
Indenture related to PG&E Corporation's 9.50% Convertible Subordinated
Notes due June 2010, dated as of October 18, 2002, between PG&E
Corporation and U.S. Bank, N.A., as Trustee (incorporated by reference
to
PG&E Corporation's Quarterly Report on Form 10-Q for the quarter ended
September 30, 2002 (File No. 1-12609),
Exhibit 4.1)
|
||
|
4.4
|
Warrant
Agreement, dated as of October 18, 2002, by and among PG&E
Corporation, LB I Group Inc., and each other entity named on the
signature
pages thereto (incorporated by reference to PG&E Corporation's
Quarterly Report on Form 10-Q for the quarter ended September 30,
2002
(File No. 1-12609), Exhibit 4.2)
|
||
|
10.1
|
Credit
Agreement dated as of April 8, 2005, among Pacific Gas and Electric
Company, Citicorp North America, Inc., as administrative agent and
a
lender, JP Morgan Chase Bank, N.A., as syndication agent and a lender,
Barclays Bank PLC, BNP Paribas and Deutsche Bank Securities Inc.,
as
documentation agents and lenders, ABN Amro Bank N.V., Lehman Brothers
Bank, FSB, Mellon Bank, N.A., Royal Bank of Canada, The Bank of New
York,
The Bank of Nova Scotia, UBS Loan Finance LLC, and Union Bank of
California, N.A., as senior managing agents, and KBC Bank, NV, Morgan
Stanley Bank and William Street Commitment Corporation, as lenders
(incorporated
by reference to PG&E Corporation and Pacific Gas and Electric
Company's Form 10-Q filed May 4, 2005 (File No. 1-12609 and File
No. 1-2348), Exhibit 10.3)
|
||
|
10.2
|
First
Amendment, dated as of November 30, 2005, to the Credit Agreement
among
Pacific Gas and Electric Company, Citicorp North America, Inc., as
administrative agent and a lender, JPMorgan Chase Bank, N.A., as
syndication agent and a lender, Barclays Bank PLC and BNP Paribas
as
documentation agents and lenders, Deutsche Bank Securities Inc.,
as
documentation agent, and the following other lenders: Deutsche Bank
AG New
York Branch, ABN Amro Bank N.V., Lehman Brothers Bank, FSB, Mellon
Bank,
N.A., Royal Bank of Canada, The Bank of New York, UBS Loan Finance
LLC,
Union Bank of California, N.A., KBC Bank, N.V., Morgan Stanley Bank
and
William Street Commitment Corporation.
|
||
|
10.3
|
Credit
Agreement, dated as of December 10, 2004, among PG&E Corporation, BNP
Paribas, as administrative agent and a lender, Deutsche Bank Securities,
as syndication agent, ABN Amro Bank, N.V., Goldman Sachs Credit Partners
L.P., and Union Bank of California, N.A., as documentation agents
and
lenders, and the following other lenders: Barclays Bank PLC, Citicorp
USA,
Inc., Deutsche Bank AG New York Branch, JP Morgan Chase Bank, N.A.,
Lehman
Brothers Bank, FSB, Morgan Stanley Bank, Royal Bank of Canada, The
Bank of
Nova Scotia, and The Bank of New York (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K filed
December 15, 2004 (File No. 1-12609 and File No. 1-2348),
Exhibit 99)
|
||
| 45 | |||
|
|
|||
|
10.4
|
First
Amendment, dated as of April 8, 2005, to the Credit Agreement dated
as of
December 10, 2004, among
PG&E Corporation, BNP Paribas, as administrative agent and a lender,
Deutsche Bank Securities Inc., as syndication agent and a lender,
ABN Amro
Bank, N.V., Goldman Sachs Credit Partners L.P., and Union Bank of
California, N.A., as documentation agents and lenders, and the following
other lenders: Barclays Bank PLC, Citicorp USA, Inc., Deutsche Bank
AG New
York Branch, JP Morgan Chase Bank, N.A., Lehman Brothers Bank, FSB,
Morgan
Stanley Bank, Royal Bank of Canada, The Bank of Nova Scotia, KBC
Bank
N.V., and The Bank of New York (incorporated by reference to PG&E
Corporation and Pacific Gas and Electric Company's Form 10-Q filed
May 4,
2005 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.2)
|
||
|
10.5
|
Master
Confirmation dated November 16, 2005, for accelerated share repurchase
arrangements between PG&E Corporation and Goldman, Sachs &
Co.
|
||
|
10.6
|
Settlement
Agreement among California Public Utilities Commission, Pacific Gas
and
Electric Company and PG&E Corporation, dated as of December 19, 2003,
together with appendices (incorporated by reference to PG&E
Corporation's and Pacific Gas and Electric Company's Form 8-K filed
December 22, 2003) (File No. 1-12609 and File No. 1-2348), Exhibit
99)
|
||
|
10.7
|
Firm
Transportation Service Agreement between Pacific Gas and Electric
Company
and Pacific Gas Transmission Company dated October 26, 1993, Rate
Schedule
FTS-1, and general terms and conditions (incorporated by reference
to
PG&E Corporation's and Pacific Gas and Electric Company's Form 10-K
for the year ended December 31, 2003) (File No. 1-12609 and File
No. 1-2348), Exhibit 10.4)
|
||
|
10.8
|
Operating
Agreement between Pacific Gas and Electric Company and Pacific Gas
Transmission Company dated July 9, 1996 (incorporated by reference
to
PG&E Corporation's and Pacific Gas and Electric Company's Form 10-K
for the year ended December 31, 2003) (File No. 1-12609 and File
No.
1-2348), Exhibit 10.5)
|
||
|
10.9
|
PG&E
Trans-User Agreement between Pacific Gas and Electric Company and
PG&E
Gas Transmission, Northwest Corporation dated November 15, 1999
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Form 10-K for the year ended December 31, 2003)
(File
No. 1-12609 and File No. 1-2348), Exhibit 10.6)
|
||
|
10.10
|
Transmission
Control Agreement among the California Independent System Operator
(CAISO)
and the Participating Transmission Owners, including Pacific Gas
and
Electric Company, effective as of March 31, 1998, as amended (CAISO,
FERC Electric Tariff No. 7) (incorporated by reference to PG&E
Corporation’s and Pacific Gas and Electric Company’s Form 10-K for the
year ended December 31, 2004 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.8)
|
||
|
10.11
|
Operating
Agreement, as amended on November 12, 2004, effective as of December
22,
2004, between the State of California Department of Water Resources
and
Pacific Gas and Electric Company (incorporated by reference to PG&E
Corporation’s and Pacific Gas and Electric Company’s Form 10-K for the
year ended December 31, 2004 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.9)
|
||
|
*10.12
|
PG&E
Corporation Supplemental Retirement Savings Plan amended effective
as of
September 19, 2001, and frozen after December 31, 2004 (incorporated
by
reference to PG&E Corporation’s Form 10-K for the year ended December
31, 2004) (File No. 1-12609), Exhibit 10.10)
|
||
| 46 | |||
|
|
|||
|
*10.13
|
PG&E
Corporation Supplemental Retirement Savings Plan effective as of
January
1, 2005 (incorporated by reference to PG&E Corporation’s Form 10-K for
the year ended December 31, 2004) (File No. 1-12609), Exhibit 10.11)
|
||
|
*10.14
|
Description
of Compensation Arrangement between PG&E Corporation and Peter Darbee
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended September 30, 1999 (File No. 1-12609),
Exhibit 10.3)
|
||
|
*10.15
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Peter
Darbee effective July 1, 2003 (incorporated by reference to PG&E
Corporation's Quarterly Report on Form 10-Q for the quarter ended
June 30,
2003 (File No. 1-12609), Exhibit 10.4)
|
||
|
*10.16
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Thomas
B. King dated November 4, 1998 (incorporated by reference to PG&E
Corporation's Form 10-K for the year ended December 31, 2000 (File
No.
1-12609), Exhibit 10.6)
|
||
|
*10.17
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Thomas
B. King dated June 18, 2003 (incorporated by reference to PG&E
Corporation's Quarterly Report on Form 10-Q for the quarter ended
June 30,
2003 (File No. 1-12609), Exhibit 10.3)
|
||
|
*10.18
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Rand
L. Rosenberg dated October 19, 2005
|
||
|
*10.19
|
Severance
Agreement and Release by and between Pacific Gas and Electric Company
and
Gordon R. Smith dated September 21, 2005 (incorporated by
reference to Pacific Gas and Electric Company’s Quarterly Report on Form
10-Q for the quarter ended September 30, 2005 (File No. 1-2348),
Exhibit
10.1)
|
||
|
*10.20
|
Actions
taken by the Nominating, Compensation and Governance Committee of
the
PG&E Corporation Board of Directors on October 19, 2005, regarding the
2006 Officer Compensation Program (incorporated
by
reference to PG&E Corporation’s Quarterly Report on Form 10-Q for the
quarter ended September 30, 2005 (File No. 1-12609), Exhibit
10.2)
|
||
|
*10.21
|
PG&E
Corporation 2005 Deferred Compensation Plan for Non-Employee Directors,
effective as of January 1, 2005 (incorporated by reference to PG&E
Corporation’s Form 10-K for the year ended December 31, 2004) (File No.
1-12609), Exhibit 10.17)
|
||
|
*10.22
|
Description
of Short-Term Incentive Plan for Officers of PG&E Corporation and its
subsidiaries, effective January 1, 2006
|
||
|
*10.23
|
Description
of Short-Term Incentive Plan for Officers of PG&E Corporation and its
subsidiaries, effective January 1, 2005 (incorporated by reference
to
PG&E Corporation's Form 10-K for the year ended December 31, 2004
(File No. 1-12609), Exhibit 10.18)
|
||
|
*10.24
|
Schedule
of 2006 Base Salary and Short-Term Incentive Plan Target Participation
Rates for certain officers of PG&E Corporation and its subsidiaries
|
||
|
*10.25
|
Schedule
of 2006 award values under the PG&E Corporation 2006 Long-Term
Incentive Plan for certain officers of PG&E Corporation and its
subsidiaries
|
||
|
*10.26
|
Supplemental
Executive Retirement Plan of the Pacific Gas and Electric Company
amended
effective as of December 31, 2004, and frozen as of January 1, 2005
(incorporated by reference to Pacific Gas and Electric Company’s Form 10-K
for the year ended December 31, 2004) (File No. 1-2348), Exhibit
10.20)
|
||
|
*10.27
|
Supplemental
Executive Retirement Plan of PG&E Corporation as amended effective as
of January 1, 2006
|
||
|
*10.28.1
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Robert D. Glynn, Jr. dated December 20, 2002
(incorporated by reference to PG&E Corporation's Form 10-K for the
year ended December 31, 2002 (File No. 1-12609),
Exhibit 10.37.1)
|
||
|
*10.28.2
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Bruce R. Worthington dated December 20, 2002
(incorporated by reference to PG&E Corporation's Form 10-K for the
year ended December 31, 2002 (File No. 1-12609),
Exhibit 10.37.2)
|
||
|
*10.28.3
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Gregory M. Rueger dated December 20, 2002
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Form 10-K for the year ended December 31, 2002
(File
No. 1-12609 and File No. 1-2348), Exhibit 10.37.3)
|
||
|
*10.28.4
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Gordon R. Smith dated December 20, 2002
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Form 10-K for the year ended December 31, 2002
(File
No. 1-12609 and File No. 1-2348), Exhibit 10.37.4)
|
||
|
*10.29.1
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Robert D. Glynn, Jr. dated April 18, 2003
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended June 30, 2003 (File No. 1-12609),
Exhibit
10.2.1)
|
||
| 47 | |||
|
|
|||
|
*10.29.2
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Gordon R. Smith dated April 18, 2003
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Quarterly Report on Form 10-Q for the quarter
ended June 30, 2003 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.2.2)
|
||
|
*10.29.3
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Gregory M. Rueger dated April 18, 2003
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Quarterly Report on Form 10-Q for the quarter
ended June 30, 2003 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.2.4)
|
||
|
*10.29.4
|
Agreement
and Release regarding annuitization of SERP benefits by and between
PG&E Corporation and Bruce R. Worthington dated April 18, 2003
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended June 30, 2003 (File No. 1-12609),
Exhibit
10.2.5)
|
||
|
*10.30
|
Pacific
Gas and Electric Company Relocation Assistance Program for Officers
(incorporated by reference to Pacific Gas and Electric Company's
Form 10-K
for fiscal year 1989 (File No. 1-2348), Exhibit
10.16)
|
||
|
*10.31
|
Postretirement
Life Insurance Plan of the Pacific Gas and Electric Company (incorporated
by reference to Pacific Gas and Electric Company's Form 10-K for
fiscal
year 1991 (File No. 1-2348), Exhibit 10.16)
|
||
|
*10.32
|
PG&E
Corporation Non-Employee Director Stock Incentive Plan (a component
of the
PG&E Corporation Long-Term Incentive Program) as amended effective as
of July 1, 2004 (reflecting amendments adopted by the PG&E Corporation
Board of Directors on June 16, 2004 set forth in resolutions filed
as
Exhibit 10.3 to PG&E Corporation's and Pacific Gas and Electric
Company's Quarterly Report on Form 10-Q for the quarter ended June
30,
2004)
(incorporated
by reference to PG&E Corporation’s and Pacific Gas and Electric
Company’s Form 10-K for the year ended December 31, 2004 (File No. 1-12609
and File No. 1-2348), Exhibit 10.27)
|
||
|
*10.33
|
Resolution
of the PG&E Corporation Board of Directors dated June 16, 2004,
adopting director compensation arrangement (incorporated by reference
to
PG&E Corporation's and Pacific Gas and Electric Company's Quarterly
Report on Form 10-Q for the quarter ended June 30, 2004 (File
No. 1-12609 and File No. 12348), Exhibit 10.1)
|
||
|
*10.34
|
Resolution
of the Pacific Gas and Electric Company Board of Directors dated
June 16,
2004, adopting director compensation arrangement (incorporated by
reference to PG&E Corporation's and Pacific Gas and Electric Company's
Quarterly Report on Form 10-Q for the quarter ended June 30, 2004
(File
No. 1-12609 and File No. 12348), Exhibit 10.2)
|
||
|
*10.35
|
PG&E
Corporation 2006 Long-Term Incentive Plan, effective as of January
1,
2006, as amended February 15, 2006
|
||
|
*10.36
|
PG&E
Corporation Long-Term Incentive Program (including the PG&E
Corporation Stock Option Plan and Performance Unit Plan), as amended
May
16, 2001, (incorporated by reference to PG&E Corporation's Quarterly
Report on Form 10-Q for the quarter ended June 30, 2001 (File
No. 1-12609), Exhibit 10)
|
||
|
*10.37
|
Form
of Restricted Stock Award Agreement for 2003 grants made under the
PG&E Corporation Long-Term Incentive Program (incorporated by
reference to PG&E Corporation's Form 10-K for the year ended December
31, 2002 (File No. 1-12609), Exhibit 10.46)
|
||
|
*10.38
|
Form
of Restricted Stock Award Agreement for 2004 grants made under the
PG&E Corporation Long-Term Incentive Program (incorporated by
reference to PG&E Corporation's Form 10-K for the year ended December
31, 2003 (File No. 1-12609), Exhibit 10.37)
|
||
|
*10.39
|
Form
of Restricted Stock Agreement for 2005 grants under the PG&E
Corporation Long-Term Incentive Program (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K filed
January 6, 2005 (File No. 12609 and File No. 1-2348),
Exhibit 99.3)
|
||
|
*10.40
|
Form
of Restricted Stock Agreement for 2006 grants under the PG&E
Corporation 2006 Long-Term Incentive Plan (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K filed
January 9, 2006, Exhibit 99.1)
|
||
|
*10.41
|
Form
of Non-Qualified Stock Option Agreement under the PG&E Corporation
Long-Term Incentive Program (incorporated by reference to PG&E
Corporation and Pacific Gas and Electric Company's Form 8-K filed
January 6, 2005 (File No. 12609 and File No. 1-2348),
Exhibit 99.1)
|
||
|
*10.42
|
Form
of Performance Share Award Agreement for 2004 grants under the PG&E
Corporation Long-Term Incentive Program (incorporated by reference
to
PG&E Corporation's Form 10-K for the year ended December 31, 2003
(File No. 1-12609), Exhibit 10.38)
|
||
|
*10.43
|
Form
of Performance Share Agreement for 2005 grants under the PG&E
Corporation Long-Term Incentive Program (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K filed
January 6, 2005 (File No. 12609 and File No. 1-2348),
Exhibit 99.2)
|
||
|
*10.44
|
Form
of Performance Share Agreement for 2006 grants under the PG&E
Corporation 2006 Long-Term Incentive Plan (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K filed
January 9, 2006, Exhibit 99.2)
|
||
| 48 | |||
|
|
|||
|
*10.45
|
PG&E
Corporation Executive Stock Ownership Program Guidelines dated as
of
February 19, 2003 (incorporated by reference to PG&E Corporation's
Quarterly Report on Form 10-Q for the quarter ended March 31, 2003
(File
No. 1-12609) Exhibit 10. 2)
|
||
|
*10.46
|
PG&E
Corporation Executive Stock Ownership Program Guidelines as amended
February 15, 2006
|
||
|
*10.47
|
PG&E
Corporation Officer Severance Policy, as amended effective as of
January
1, 2005 (incorporated by reference to PG&E Corporation's Form 10-K for
the year ended December 31, 2004 (File No. 1-12609),
Exhibit 10.37)
|
||
|
*10.48
|
PG&E
Corporation Officer Severance Policy, as amended effective as of
February
15, 2006
|
||
|
*10.49
|
PG&E
Corporation Golden Parachute Restriction Policy effective as of February
15, 2006
|
||
|
*10.50
|
PG&E
Corporation Director Grantor Trust Agreement dated April 1, 1998
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended March 31, 1998 (File No. 1-12609),
Exhibit 10.1)
|
||
|
*10.51
|
PG&E
Corporation Officer Grantor Trust Agreement dated April 1, 1998,
as
updated effective January 1, 2005 (incorporated by reference to PG&E
Corporation's Form 10-K for the year ended December 31, 2004 (File
No. 1-12609), Exhibit 10.39)
|
||
|
*10.52
|
Resolution
of the Board of Directors of PG&E Corporation regarding
indemnification of officers and directors dated December 18, 1996
(incorporated by reference to PG&E Corporation's Form 10-K for the
year ended December 31, 2004 (File No. 1-12609),
Exhibit 10.40)
|
||
|
*10.53
|
Resolution
of the Board of Directors of Pacific Gas and Electric Company regarding
indemnification of officers and directors dated July 19, 1995
(incorporated by reference to Pacific Gas and Electric Company’s Form 10-K
for the year ended December 31, 2004 (File No. 1-2348),
Exhibit 10.41)
|
||
|
11
|
Computation
of Earnings Per Common Share
|
||
|
12.1
|
Computation
of Ratios of Earnings to Fixed Charges for Pacific Gas and Electric
Company
|
||
|
12.2
|
Computation
of Ratios of Earnings to Combined Fixed Charges and Preferred Stock
Dividends for Pacific Gas and Electric Company
|
||
|
13
|
The
following portions of the 2005 Annual Report to Shareholders of PG&E
Corporation and Pacific Gas and Electric Company are included: "Selected
Financial Data," "Management's Discussion and Analysis of Financial
Condition and Results of Operations," financial statements of PG&E
Corporation entitled "Consolidated Statements of Income," "Consolidated
Balance Sheets," "Consolidated Statements of Cash Flows," and
"Consolidated Statements of Shareholders' Equity," financial statements
of
Pacific Gas and Electric Company entitled "Consolidated Statements
of
Income," "Consolidated Balance Sheets," "Consolidated Statements
of Cash
Flows," and "Consolidated Statements of Shareholders' Equity," "Notes
to
the Consolidated Financial Statements," and "Quarterly Consolidated
Financial Data (Unaudited)," "Management's Report on Internal Control
Over
Financial Reporting," "Report of Independent Registered Public Accounting
Firm," and "Report of Independent Registered Public Accounting
Firm."
|
||
|
21
|
Subsidiaries
of the Registrant
|
||
|
23
|
Consent
of Independent Registered Public Accounting Firm (Deloitte & Touche
LLP)
|
||
|
24.1
|
Resolutions
of the Boards of Directors of PG&E Corporation and Pacific Gas and
Electric Company authorizing the execution of the Form 10-K
|
||
|
24.2
|
Powers
of Attorney
|
||
|
31.1
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer of
PG&E
Corporation required by Section 302 of the Sarbanes-Oxley Act of
2002
|
||
|
31.2
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer of
Pacific
Gas and Electric Company required by Section 302 of the Sarbanes-Oxley
Act
of 2002
|
||
|
**32.1
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer of
PG&E
Corporation required by Section 906 of the Sarbanes-Oxley Act of
2002
|
||
|
**32.2
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer of
Pacific
Gas and Electric Company required by Section 906 of the Sarbanes-Oxley
Act
of 2002
|
||
* Management
contract or compensatory agreement.
** Pursuant
to Item 601(b) (32) of SEC Regulation S-K, these exhibits are
furnished rather than filed with this report.
49
SIGNATURES
Pursuant
to the requirements of Section 13 or 15(d) of the Securities Exchange Act
of 1934, the registrants have duly caused this Annual Report on Form 10-K
for the year ended December 31, 2005 to be signed on their behalf by the
undersigned, thereunto duly authorized.
|
PG&E
CORPORATION
|
PACIFIC
GAS AND ELECTRIC COMPANY
|
||
|
By
|
(Registrant)
BRUCE
R WORTHINGTON
(Bruce
R. Worthington, Attorney-in-Fact)
|
By
|
(Registrant)
BRUCE
R WORTHINGTON
(Bruce
R. Worthington, Attorney-in-Fact)
|
|
Date:
|
February
17, 2006
|
Date:
|
February
17, 2006
|
Pursuant
to the requirements of the Securities Exchange Act of 1934, this report has
been
signed below by the following persons on behalf of the registrants and in the
capacities and on the dates indicated.
|
Signature
|
Title
|
Date
|
|
|
A.
|
Principal
Executive Officers
|
||
|
*PETER
A. DARBEE
|
Chairman
of the Board, Chief Executive Officer and President (PG&E
Corporation)
|
February
17, 2006
|
|
|
*THOMAS
B. KING
|
President
and Chief Executive Officer (Pacific Gas and Electric
Company)
|
February
17, 2006
|
|
|
B.
|
Principal
Financial Officers
|
||
|
*CHRISTOPHER
P. JOHNS
|
Senior
Vice President, Chief Financial Officer and Treasurer (PG&E
Corporation and Pacific Gas and Electric Company )
|
February
17, 2006
|
|
|
C.
|
Principal
Accounting Officers
|
||
|
*G.
ROBERT POWELL
|
Vice
President and Controller (PG&E Corporation and Pacific Gas and
Electric Company)
|
February
17, 2006
|
|
|
D.
|
Directors
|
||
|
*DAVID
R. ANDREWS
*DAVID
A. COULTER
*C.
LEE COX
*PETER
A. DARBEE
*MARYELLEN
C. HERRINGER
*THOMAS
B. KING
(Director
of Pacific Gas andElectric Company only)
*MARY
S. METZ
*BARBARA
L. RAMBO
*BARRY
LAWSON WILLIAMS
|
Directors
of PG&E Corporation and
Pacific
Gas and Electric Company,
except
as noted
|
February
17, 2006
|
|
|
*By
|
BRUCE
R WORTHINGTON
(Bruce
R. Worthington, Attorney-in-Fact)
|
50
REPORT
OF
INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To
the
Boards of Directors and Shareholders of
PG&E
Corporation and Pacific Gas and Electric Company
We
have
audited the consolidated financial statements of PG&E Corporation and
subsidiaries (the “Company”) and Pacific Gas and Electric Company and
subsidiaries (the “Utility”) as of December 31, 2005 and 2004, and for each of
the three years in the period ended December 31, 2005, management’s assessment
of the effectiveness of the Company’s and the Utility’s internal control over
financial reporting as of December 31, 2005, and the effectiveness of the
Company’s and the Utility’s internal control over financial reporting as of
December 31, 2005, and have issued our reports thereon dated February 15, 2006;
such consolidated financial statements and reports are included in your 2005
Annual Report to Shareholders of the Company and the Utility and are
incorporated herein by reference. Our audits also included the condensed
financial statement schedules of the Company and the Utility listed in Item
15
(a) 2. These condensed financial statement schedules are the
responsibility of the Company’s and the Utility’s management. Our
responsibility is to express an opinion based on our audits. In our
opinion, such condensed financial statement schedules, when considered in
relation to the basic consolidated financial statements taken as a whole,
present fairly, in all material respects, the information set forth
therein.
DELOITTE
& TOUCHE LLP
San
Francisco, California
February
15, 2006
51
PG&E
CORPORATION
SCHEDULE
I —
CONDENSED
FINANCIAL INFORMATION
OF
PARENT
CONDENSED
BALANCE SHEETS
(in
millions)
|
Balance
at December 31,
|
|||||||
|
2005
|
2004
|
||||||
|
ASSETS
|
|||||||
|
Cash
and cash equivalents
|
$
|
250
|
$
|
183
|
|||
|
Advances
to affiliates
|
38
|
22
|
|||||
|
Other
current assets
|
3
|
3
|
|||||
|
Total
current assets
|
291
|
208
|
|||||
|
Equipment
|
15
|
15
|
|||||
|
Accumulated
depreciation
|
(14
|
)
|
(13
|
)
|
|||
|
Net
equipment
|
1
|
2
|
|||||
|
Investments
in subsidiaries
|
7,401
|
8,848
|
|||||
|
Other
investments
|
71
|
31
|
|||||
|
Deferred
income taxes
|
127
|
104
|
|||||
|
Other
|
15
|
14
|
|||||
|
Total
Assets
|
$
|
7,906
|
$
|
9,207
|
|||
|
LIABILITIES
AND SHAREHOLDERS' EQUITY
|
|||||||
|
Current
Liabilities
|
|||||||
|
Accounts
payable—related parties
|
$
|
27
|
$
|
3
|
|||
|
Accounts
payable—other
|
17
|
15
|
|||||
|
Income
taxes payable
|
28
|
83
|
|||||
|
Other
|
193
|
53
|
|||||
|
Total
current liabilities
|
265
|
154
|
|||||
|
Noncurrent
Liabilities:
|
|||||||
|
Long-term
debt
|
280
|
280
|
|||||
|
Other
|
143
|
140
|
|||||
|
Total
noncurrent liabilities
|
423
|
420
|
|||||
|
Preferred
stock
|
—
|
—
|
|||||
|
Common
Shareholders' Equity
|
|||||||
|
Common
stock
|
5,827
|
6,518
|
|||||
|
Common
stock held by subsidiary
|
(718
|
)
|
(718
|
)
|
|||
|
Unearned
compensation
|
(22
|
)
|
(26
|
)
|
|||
|
Reinvested
earnings
|
2,139
|
2,863
|
|||||
|
Accumulated
other comprehensive loss
|
(8
|
)
|
(4
|
)
|
|||
|
Total
common shareholders' equity
|
7,218
|
8,633
|
|||||
|
Total
Liabilities and Shareholders' Equity
|
$
|
7,906
|
$
|
9,207
|
|||
52
PG&E
CORPORATION
SCHEDULE
I —
CONDENSED
FINANCIAL INFORMATION OF PARENT —
(Continued)
CONDENSED
STATEMENTS OF INCOME
(in
millions, except per share amounts)
|
Year
Ended December 31,
|
||||||||||
|
2005
|
2004
|
2003
|
||||||||
|
Administrative
service revenue
|
$
|
97
|
$
|
85
|
$
|
101
|
||||
|
Equity
in earnings of subsidiaries
|
918
|
3,959
|
917
|
|||||||
|
Operating
expenses
|
(97
|
)
|
(110
|
)
|
(133
|
)
|
||||
|
Interest
income
|
9
|
15
|
20
|
|||||||
|
Interest
expense
|
(35
|
)
|
(132
|
)
|
(200
|
)
|
||||
|
Other
income (expense)
|
(17
|
)
|
(91
|
)
|
2
|
|||||
|
Income
before income taxes
|
875
|
3,726
|
707
|
|||||||
|
Income
tax benefit
|
29
|
|
94
|
|
84
|
|
||||
|
Income
from continuing operations
|
904
|
3,820
|
791
|
|||||||
|
Gain
on disposal of NEGT
|
13
|
684
|
—
|
|||||||
|
Discontinued
operations
|
—
|
—
|
(365
|
)
|
||||||
|
Cumulative
effect of changes in accounting principles
|
—
|
—
|
(6
|
)
|
||||||
|
Net
income before intercompany eliminations
|
$
|
917
|
$
|
4,504
|
$
|
420
|
||||
|
Weighted
average common shares outstanding
|
372
|
398
|
385
|
|||||||
|
Earnings
per common share, basic(1)
|
$
|
2.40
|
$
|
10.80
|
$
|
1.04
|
||||
|
Earnings
per common share, diluted(1)
|
$
|
2.37
|
$
|
10.57
|
$
|
1.02
|
||||
53
PG&E
CORPORATION
SCHEDULE
I —
CONDENSED
FINANCIAL INFORMATION OF PARENT —
(Continued)
CONDENSED
STATEMENTS OF CASH FLOWS
(in
millions)
|
|
Year
Ended December 31,
|
|
||||||||
|
|
|
2005
|
|
2004
|
|
2003
|
|
|||
|
Cash
Flows from Operating Activities:
|
|
|
|
|
|
|
|
|
|
|
|
Net
income
|
|
$
|
917
|
|
$
|
4,504
|
|
$
|
(420
|
)
|
|
Gain
on disposal of NEGT (net of income tax benefit of $13 million
in 2005 and
income tax expense of $374 million in 2004)
|
|
|
(13
|
)
|
|
(684
|
)
|
|
—
|
|
|
Loss
from operations of NEGT (net of income tax benefit of $320
million)
|
|
|
—
|
|
|
—
|
|
|
365
|
|
|
Cumulative
effect of changes in accounting principles
|
|
|
—
|
|
|
—
|
|
|
6
|
|
|
Net
income from continuing operations
|
|
|
904
|
|
|
3,820
|
|
|
791
|
|
|
Adjustments
to reconcile net income to net cash provided by operating
activities:
|
|
|
|
|
|
|
|
|
|
|
|
Equity
in earnings of subsidiaries
|
|
|
(918
|
)
|
|
(3,959
|
)
|
|
(917
|
)
|
|
Deferred
taxes
|
|
|
(23
|
)
|
|
27
|
|
|
265
|
|
|
NEGT
settlement payment
|
|
|
—
|
|
|
(30
|
)
|
|
—
|
|
|
Other
|
|
|
86
|
|
|
160
|
|
|
391
|
|
|
Net
cash provided by operating activities
|
|
|
49
|
|
|
18
|
|
|
530
|
|
|
Cash
Flows From Investing Activities:
|
|
|
|
|
|
|
|
|
|
|
|
Capital
expenditures
|
|
|
(1
|
)
|
|
—
|
|
|
—
|
|
|
Investment
in subsidiaries
|
|
|
—
|
|
|
(28
|
)
|
|
—
|
|
|
Stock
repurchase by subsidiary
|
|
|
1,910
|
|
|
—
|
|
|
—
|
|
|
Dividends
received from subsidiaries
|
|
|
445
|
|
|
—
|
|
|
—
|
|
|
Increase
in restricted cash
|
|
|
—
|
|
|
361
|
|
|
—
|
|
|
Other
|
|
|
(38
|
)
|
|
—
|
|
|
—
|
|
|
Net
cash provided by investing activities
|
|
|
2,316
|
|
|
333
|
|
|
—
|
|
|
Cash
Flows From Financing Activities(2):
|
|
|
|
|
|
|
|
|
|
|
|
Common
stock issued
|
|
|
243
|
|
|
162
|
|
|
166
|
|
|
Common
stock repurchased
|
|
|
(2,188
|
)
|
|
(350
|
)
|
|
—
|
|
|
Common
stock dividends paid
|
|
|
(334
|
)
|
|
—
|
|
|
—
|
|
|
Long-term
debt issued
|
|
|
—
|
|
|
—
|
|
|
581
|
|
|
Long-term
debt redeemed
|
|
|
(2
|
)
|
|
(652
|
)
|
|
(787
|
)
|
|
Other
|
|
|
(17
|
)
|
|
(1
|
)
|
|
1
|
|
|
Net
cash used by financing activities
|
|
|
(2,298
|
)
|
|
(841
|
)
|
|
(39
|
)
|
|
Net
change in cash and cash equivalents
|
|
|
67
|
|
|
(490
|
)
|
|
491
|
|
|
Cash
and cash equivalents at January 1
|
|
|
183
|
|
|
673
|
|
|
182
|
|
|
Cash
and cash equivalents at December 31
|
|
$
|
250
|
|
$
|
183
|
|
$
|
673
|
|
__________________________________
|
(1)
|
PG&E
Corporation adopted the consensus reached by Emerging Issues
Task Force,
or EITF, in EITF issue No. 03-06, "Participating Securities and the
Two-Class Method under FASB Statement No. 128," or EITF 03-06, as
ratified by the Financial Accounting Standards Board on March 31,
2004.
|
|
PG&E
Corporation currently has outstanding $280 million principal amount
of convertible subordinated 9.50% notes due 2010, or Convertible
Notes,
that are entitled to receive (non-cumulative) dividend payments
without
exercising the conversion option. These Convertible Notes,
which were
issued in June 2002, meet the criteria of a participating security in
the calculation of earnings per share using the "two-class"
method.
|
|
|
Accordingly,
the basic and diluted earnings per share calculations for
each of the
years in the three year period ended December 31, 2005 reflect the
allocation of earnings between PG&E Corporation common stock and the
participating security.
|
|
|
(2)
|
On
April 15, July 15 and October 17, 2005, PG&E Corporation paid a
quarterly common stock dividend of $0.30 per share, totaling
approximately
$356 million. Of the total dividend payments made by PG&E Corporation
in 2005, approximately $22 million was paid to Elm Power
Corporation, a
wholly owned subsidiary of PG&E Corporation. PG&E Corporation did
not pay any dividends during 2004 and
2003.
|
54
PG&E
CORPORATION
SCHEDULE
II—CONSOLIDATED VALUATION AND QUALIFYING ACCOUNTS
For
the Years Ended December 31, 2005, 2003 and 2004
|
Additions
|
||||||||||||||||
|
Description
|
Balance
at
Beginning of Period
|
Charged
to Costs and
Expenses
|
Charged
to Other
Accounts
|
Deductions(3)
|
Balance
at
End of Period
|
|||||||||||
|
(in
millions)
|
||||||||||||||||
|
Valuation
and qualifying accounts deducted from assets:
|
||||||||||||||||
|
2005
|
||||||||||||||||
|
Allowance
for uncollectible accounts(1)
|
$
|
93
|
$
|
21
|
$
|
—
|
$
|
37
|
$
|
77
|
||||||
|
2004:
|
||||||||||||||||
|
Allowance
for uncollectible accounts(1)(2)
|
$
|
68
|
$
|
85
|
$
|
—
|
$
|
60
|
$
|
93
|
||||||
|
2003:
|
||||||||||||||||
|
Allowance
for uncollectible accounts(1)(2)
|
$
|
59
|
$
|
42
|
$
|
—
|
$
|
33
|
$
|
68
|
||||||
__________________________________
(1) Allowance
for uncollectible accounts is deducted from "Accounts receivable Customers,
net."
(2) Allowance
for uncollectible accounts does not include NEGT.
(3) Deductions
consist principally of write-offs, net of collections of receivables previously
written off.
55
PACIFIC
GAS AND ELECTRIC COMPANY
SCHEDULE
II—CONSOLIDATED VALUATION AND QUALIFYING ACCOUNTS
For
the Years Ended December 31, 2005, 2004 and 2003
|
Additions
|
||||||||||||||||
|
Description
|
Balance
at
Beginning of Period
|
Charged
to Costs and
Expenses
|
Charged
to Other Accounts
|
Deductions(2)
|
Balance
at
End of Period
|
|||||||||||
|
(in
millions)
|
||||||||||||||||
|
Valuation
and qualifying accounts deducted from assets:
|
||||||||||||||||
|
2005
|
||||||||||||||||
|
Allowance
for uncollectible accounts(1)
|
$
|
93
|
$
|
21
|
$
|
—
|
$
|
37
|
$
|
77
|
||||||
|
2004:
|
||||||||||||||||
|
Allowance
for uncollectible accounts(1)
|
$
|
68
|
$
|
85
|
$
|
—
|
$
|
60
|
$
|
93
|
||||||
|
2003:
|
||||||||||||||||
|
Allowance
for uncollectible accounts(1)
|
$
|
59
|
$
|
42
|
$
|
—
|
$
|
33
|
$
|
68
|
||||||
__________________________
(1) Allowance
for uncollectible accounts is deducted from "Accounts receivable Customers,
net."
(2) Deductions
consist principally of write-offs, net of collections of receivables previously
written off.
56
EXHIBIT
INDEX
|
Exhibit
Number
|
Exhibit
Description
|
||
|
2.1
|
Order
of the U.S. Bankruptcy Court for the Northern District of California
dated
December 22, 2003, Confirming Plan of Reorganization of Pacific Gas
and Electric Company, including Plan of Reorganization, dated
July 31,
2003 as modified by modifications dated November 6, 2003 and
December 19,
2003 (Exhibit B to Confirmation Order and Exhibits B and C
to the Plan of
Reorganization omitted) (incorporated by reference to Pacific
Gas and
Electric Company's Registration Statement on Form S-3 No. 333-109994,
Exhibit 2.1)
|
||
|
2.2
|
Order
of the U.S. Bankruptcy Court for the Northern District of California
dated
February 27, 2004 Approving Technical Corrections to Plan of
Reorganization of Pacific Gas and Electric Company and Supplementing
Confirmation Order to Incorporate such Corrections (incorporated
by
reference to Pacific Gas and Electric Company's Registration
Statement on
Form S-3 No. 333-109994, Exhibit 2.2)
|
||
|
3.1
|
Restated
Articles of Incorporation of PG&E Corporation effective as of May 29,
2002 (incorporated by reference to PG&E Corporation's Quarterly Report
on Form 10-Q for the quarter ended March 31, 2003 (File No.
1-12609),
Exhibit 3.1)
|
||
|
3.2
|
Certificate
of Determination for PG&E Corporation Series A Preferred Stock filed
December 22, 2000 (incorporated by reference to PG&E Corporation's
Form 10-K for the year ended December 31, 2000 (File No. 1-12609),
Exhibit
3.2)
|
||
|
3.3
|
Bylaws
of PG&E Corporation amended as of January 1, 2006
|
||
|
3.4
|
Restated
Articles of Incorporation of Pacific Gas and Electric Company
effective as
of April 12, 2004 (incorporated by reference to Pacific Gas and
Electric Company's Form 8-K filed April 12, 2004 (File
No. 1-2348), Exhibit 3)
|
||
|
3.5
|
Bylaws
of Pacific Gas and Electric Company amended as of January 1,
2006
|
||
|
4.1
|
Indenture,
dated as of April 22, 2005, supplementing, amending and restating
the
Indenture of Mortgage, dated as of March 11, 2004, as supplemented
by a
First Supplemental Indenture, dated as of March 23, 2004, and
a Second
Supplemental Indenture, dated as of April 12, 2004, between
Pacific Gas
and Electric Company and The Bank of New York Trust Company,
N.A.
(incorporated by reference to PG&E Corporation and Pacific Gas and
Electric Company's Form 10-Q filed May 4, 2005 (File No. 1-12609
and File
No. 1-2348), Exhibit 4.1)
|
||
|
4.2
|
Indenture
related to PG&E Corporation's 7.5% Convertible Subordinated Notes due
June 2007, dated as of June 25, 2002, between PG&E Corporation
and U.S. Bank, N.A., as Trustee (incorporated by reference
to PG&E
Corporation's Form 8-K filed June 26, 2002 (File No. 1-12609),
Exhibit 99.1).
|
||
|
4.3
|
Supplemental
Indenture related to PG&E Corporation's 9.50% Convertible Subordinated
Notes due June 2010, dated as of October 18, 2002, between
PG&E
Corporation and U.S. Bank, N.A., as Trustee (incorporated by
reference to
PG&E Corporation's Quarterly Report on Form 10-Q for the quarter
ended
September 30, 2002 (File No. 1-12609),
Exhibit 4.1)
|
||
|
4.4
|
Warrant
Agreement, dated as of October 18, 2002, by and among PG&E
Corporation, LB I Group Inc., and each other entity named on
the signature
pages thereto (incorporated by reference to PG&E Corporation's
Quarterly Report on Form 10-Q for the quarter ended September
30, 2002
(File No. 1-12609), Exhibit 4.2)
|
||
|
10.1
|
Credit
Agreement dated as of April 8, 2005, among Pacific Gas and
Electric
Company, Citicorp North America, Inc., as administrative agent
and a
lender, JP Morgan Chase Bank, N.A., as syndication agent and
a lender,
Barclays Bank PLC, BNP Paribas and Deutsche Bank Securities
Inc., as
documentation agents and lenders, ABN Amro Bank N.V., Lehman
Brothers
Bank, FSB, Mellon Bank, N.A., Royal Bank of Canada, The Bank
of New York,
The Bank of Nova Scotia, UBS Loan Finance LLC, and Union Bank
of
California, N.A., as senior managing agents, and KBC Bank,
NV, Morgan
Stanley Bank and William Street Commitment Corporation, as
lenders
(incorporated
by reference to PG&E Corporation and Pacific Gas and Electric
Company's Form 10-Q filed May 4, 2005 (File No. 1-12609 and File
No. 1-2348), Exhibit 10.3)
|
||
|
10.2
|
First
Amendment, dated as of November 30, 2005, to the Credit Agreement
among
Pacific Gas and Electric Company, Citicorp North America, Inc.,
as
administrative agent and a lender, JPMorgan Chase Bank, N.A.,
as
syndication agent and a lender, Barclays Bank PLC and BNP Paribas
as
documentation agents and lenders, Deutsche Bank Securities
Inc., as
documentation agent, and the following other lenders: Deutsche
Bank AG New
York Branch, ABN Amro Bank N.V., Lehman Brothers Bank, FSB,
Mellon Bank,
N.A., Royal Bank of Canada, The Bank of New York, UBS Loan
Finance LLC,
Union Bank of California, N.A., KBC Bank, N.V., Morgan Stanley
Bank and
William Street Commitment Corporation.
|
||
|
10.3
|
Credit
Agreement, dated as of December 10, 2004, among PG&E Corporation, BNP
Paribas, as administrative agent and a lender, Deutsche Bank
Securities,
as syndication agent, ABN Amro Bank, N.V., Goldman Sachs Credit
Partners
L.P., and Union Bank of California, N.A., as documentation
agents and
lenders, and the following other lenders: Barclays Bank PLC,
Citicorp USA,
Inc., Deutsche Bank AG New York Branch, JP Morgan Chase Bank,
N.A., Lehman
Brothers Bank, FSB, Morgan Stanley Bank, Royal Bank of Canada,
The Bank of
Nova Scotia, and The Bank of New York (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K
filed
December 15, 2004 (File No. 1-12609 and File No. 1-2348),
Exhibit 99)
|
||
|
57
|
|||
|
|
|||
|
10.4
|
First
Amendment, dated as of April 8, 2005, to the Credit Agreement
dated as of
December 10, 2004, among
PG&E Corporation, BNP Paribas, as administrative agent and a lender,
Deutsche Bank Securities Inc., as syndication agent and a lender,
ABN Amro
Bank, N.V., Goldman Sachs Credit Partners L.P., and Union Bank
of
California, N.A., as documentation agents and lenders, and
the following
other lenders: Barclays Bank PLC, Citicorp USA, Inc., Deutsche
Bank AG New
York Branch, JP Morgan Chase Bank, N.A., Lehman Brothers Bank,
FSB, Morgan
Stanley Bank, Royal Bank of Canada, The Bank of Nova Scotia,
KBC Bank
N.V., and The Bank of New York (incorporated by reference to
PG&E
Corporation and Pacific Gas and Electric Company's Form 10-Q
filed May 4,
2005 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.2)
|
||
|
10.5
|
Master
Confirmation dated November 16, 2005, for accelerated share
repurchase
arrangements between PG&E Corporation and Goldman, Sachs &
Co.
|
||
|
10.6
|
Settlement
Agreement among California Public Utilities Commission, Pacific
Gas and
Electric Company and PG&E Corporation, dated as of December 19, 2003,
together with appendices (incorporated by reference to PG&E
Corporation's and Pacific Gas and Electric Company's Form 8-K
filed
December 22, 2003) (File No. 1-12609 and File No. 1-2348),
Exhibit
99)
|
||
|
10.7
|
Firm
Transportation Service Agreement between Pacific Gas and Electric
Company
and Pacific Gas Transmission Company dated October 26, 1993,
Rate Schedule
FTS-1, and general terms and conditions (incorporated by reference
to
PG&E Corporation's and Pacific Gas and Electric Company's Form
10-K
for the year ended December 31, 2003) (File No. 1-12609 and File
No. 1-2348), Exhibit 10.4)
|
||
|
10.8
|
Operating
Agreement between Pacific Gas and Electric Company and Pacific
Gas
Transmission Company dated July 9, 1996 (incorporated by reference
to
PG&E Corporation's and Pacific Gas and Electric Company's Form
10-K
for the year ended December 31, 2003) (File No. 1-12609 and
File No.
1-2348), Exhibit 10.5)
|
||
|
10.9
|
PG&E
Trans-User Agreement between Pacific Gas and Electric Company
and PG&E
Gas Transmission, Northwest Corporation dated November 15,
1999
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Form 10-K for the year ended December 31,
2003) (File
No. 1-12609 and File No. 1-2348), Exhibit 10.6)
|
||
|
10.10
|
Transmission
Control Agreement among the California Independent System Operator
(CAISO)
and the Participating Transmission Owners, including Pacific
Gas and
Electric Company, effective as of March 31, 1998, as amended (CAISO,
FERC Electric Tariff No. 7) (incorporated by reference to PG&E
Corporation’s and Pacific Gas and Electric Company’s Form 10-K for the
year ended December 31, 2004 (File No. 1-12609 and File No.
1-2348),
Exhibit 10.8)
|
||
|
10.11
|
Operating
Agreement, as amended on November 12, 2004, effective as of
December 22,
2004, between the State of California Department of Water Resources
and
Pacific Gas and Electric Company (incorporated by reference
to PG&E
Corporation’s and Pacific Gas and Electric Company’s Form 10-K for the
year ended December 31, 2004 (File No. 1-12609 and File No.
1-2348),
Exhibit 10.9)
|
||
|
*10.12
|
PG&E
Corporation Supplemental Retirement Savings Plan amended effective
as of
September 19, 2001, and frozen after December 31, 2004 (incorporated
by
reference to PG&E Corporation’s Form 10-K for the year ended December
31, 2004) (File No. 1-12609), Exhibit 10.10)
|
||
|
*10.13
|
PG&E
Corporation Supplemental Retirement Savings Plan effective
as of January
1, 2005 (incorporated by reference to PG&E Corporation’s Form 10-K for
the year ended December 31, 2004) (File No. 1-12609), Exhibit
10.11)
|
||
|
*10.14
|
Description
of Compensation Arrangement between PG&E Corporation and Peter Darbee
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended September 30, 1999 (File No.
1-12609),
Exhibit 10.3)
|
||
|
*10.15
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Peter
Darbee effective July 1, 2003 (incorporated by reference to
PG&E
Corporation's Quarterly Report on Form 10-Q for the quarter
ended June 30,
2003 (File No. 1-12609), Exhibit 10.4)
|
||
|
*10.16
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Thomas
B. King dated November 4, 1998 (incorporated by reference to
PG&E
Corporation's Form 10-K for the year ended December 31, 2000
(File No.
1-12609), Exhibit 10.6)
|
||
|
*10.17
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Thomas
B. King dated June 18, 2003 (incorporated by reference to PG&E
Corporation's Quarterly Report on Form 10-Q for the quarter
ended June 30,
2003 (File No. 1-12609), Exhibit 10.3)
|
||
|
*10.18
|
Letter
regarding Compensation Arrangement between PG&E Corporation and Rand
L. Rosenberg dated October 19, 2005
|
||
|
58
|
|||
|
|
|||
|
*10.19
|
Severance
Agreement and Release by and between Pacific Gas and Electric
Company and
Gordon R. Smith dated September 21, 2005 (incorporated by
reference to Pacific Gas and Electric Company’s Quarterly Report on Form
10-Q for the quarter ended September 30, 2005 (File No. 1-2348),
Exhibit
10.1)
|
||
|
*10.20
|
Actions
taken by the Nominating, Compensation and Governance Committee
of the
PG&E Corporation Board of Directors on October 19, 2005, regarding
the
2006 Officer Compensation Program (incorporated
by
reference to PG&E Corporation’s Quarterly Report on Form 10-Q for the
quarter ended September 30, 2005 (File No. 1-12609), Exhibit
10.2)
|
||
|
*10.21
|
PG&E
Corporation 2005 Deferred Compensation Plan for Non-Employee
Directors,
effective as of January 1, 2005 (incorporated by reference
to PG&E
Corporation’s Form 10-K for the year ended December 31, 2004) (File No.
1-12609), Exhibit 10.17)
|
||
|
*10.22
|
Description
of Short-Term Incentive Plan for Officers of PG&E Corporation and its
subsidiaries, effective January 1, 2006
|
||
|
*10.23
|
Description
of Short-Term Incentive Plan for Officers of PG&E Corporation and its
subsidiaries, effective January 1, 2005 (incorporated by reference
to
PG&E Corporation's Form 10-K for the year ended December 31, 2004
(File No. 1-12609), Exhibit 10.18)
|
||
|
*10.24
|
Schedule
of 2006 Base Salary and Short-Term Incentive Plan Target Participation
Rates for certain officers of PG&E Corporation and its subsidiaries
|
||
|
*10.25
|
Schedule
of 2006 award values under the PG&E Corporation 2006 Long-Term
Incentive Plan for certain officers of PG&E Corporation and its
subsidiaries
|
||
|
*10.26
|
Supplemental
Executive Retirement Plan of the Pacific Gas and Electric Company
amended
effective as of December 31, 2004, and frozen as of January
1, 2005
(incorporated by reference to Pacific Gas and Electric Company’s Form 10-K
for the year ended December 31, 2004) (File No. 1-2348), Exhibit
10.20)
|
||
|
*10.27
|
Supplemental
Executive Retirement Plan of PG&E Corporation as amended effective as
of January 1, 2006
|
||
|
*10.28.1
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Robert D. Glynn, Jr. dated December 20, 2002
(incorporated by reference to PG&E Corporation's Form 10-K for the
year ended December 31, 2002 (File No. 1-12609),
Exhibit 10.37.1)
|
||
|
*10.28.2
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Bruce R. Worthington dated December 20, 2002
(incorporated by reference to PG&E Corporation's Form 10-K for the
year ended December 31, 2002 (File No. 1-12609),
Exhibit 10.37.2)
|
||
|
*10.28.3
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Gregory M. Rueger dated December 20, 2002
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Form 10-K for the year ended December 31,
2002 (File
No. 1-12609 and File No. 1-2348), Exhibit 10.37.3)
|
||
|
*10.28.4
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Gordon R. Smith dated December 20, 2002
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Form 10-K for the year ended December 31,
2002 (File
No. 1-12609 and File No. 1-2348), Exhibit 10.37.4)
|
||
|
*10.29.1
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Robert D. Glynn, Jr. dated April 18, 2003
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended June 30, 2003 (File No. 1-12609),
Exhibit
10.2.1)
|
||
|
*10.29.2
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Gordon R. Smith dated April 18, 2003
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Quarterly Report on Form 10-Q for the quarter
ended June 30, 2003 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.2.2)
|
||
|
*10.29.3
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Gregory M. Rueger dated April 18, 2003
(incorporated by reference to PG&E Corporation's and Pacific Gas and
Electric Company's Quarterly Report on Form 10-Q for the quarter
ended June 30, 2003 (File No. 1-12609 and File No. 1-2348),
Exhibit 10.2.4)
|
||
|
*10.29.4
|
Agreement
and Release regarding annuitization of SERP benefits by and
between
PG&E Corporation and Bruce R. Worthington dated April 18, 2003
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended June 30, 2003 (File No. 1-12609),
Exhibit
10.2.5)
|
||
|
*10.30
|
Pacific
Gas and Electric Company Relocation Assistance Program for
Officers
(incorporated by reference to Pacific Gas and Electric Company's
Form 10-K
for fiscal year 1989 (File No. 1-2348), Exhibit
10.16)
|
||
|
*10.31
|
Postretirement
Life Insurance Plan of the Pacific Gas and Electric Company
(incorporated
by reference to Pacific Gas and Electric Company's Form 10-K
for fiscal
year 1991 (File No. 1-2348), Exhibit 10.16)
|
||
|
*10.32
|
PG&E
Corporation Non-Employee Director Stock Incentive Plan (a component
of the
PG&E Corporation Long-Term Incentive Program) as amended effective
as
of July 1, 2004 (reflecting amendments adopted by the PG&E Corporation
Board of Directors on June 16, 2004 set forth in resolutions
filed as
Exhibit 10.3 to PG&E Corporation's and Pacific Gas and Electric
Company's Quarterly Report on Form 10-Q for the quarter ended
June 30,
2004)
(incorporated
by reference to PG&E Corporation’s and Pacific Gas and Electric
Company’s Form 10-K for the year ended December 31, 2004 (File No.
1-12609
and File No. 1-2348), Exhibit 10.27)
|
||
|
59
|
|||
|
|
|||
|
*10.33
|
Resolution
of the PG&E Corporation Board of Directors dated June 16, 2004,
adopting director compensation arrangement (incorporated by
reference to
PG&E Corporation's and Pacific Gas and Electric Company's Quarterly
Report on Form 10-Q for the quarter ended June 30, 2004 (File
No. 1-12609 and File No. 12348), Exhibit 10.1)
|
||
|
*10.34
|
Resolution
of the Pacific Gas and Electric Company Board of Directors
dated June 16,
2004, adopting director compensation arrangement (incorporated
by
reference to PG&E Corporation's and Pacific Gas and Electric Company's
Quarterly Report on Form 10-Q for the quarter ended June 30,
2004 (File
No. 1-12609 and File No. 12348), Exhibit 10.2)
|
||
|
*10.35
|
PG&E
Corporation 2006 Long-Term Incentive Plan, effective as of
January 1,
2006, as amended February 15, 2006
|
||
|
*10.36
|
PG&E
Corporation Long-Term Incentive Program (including the PG&E
Corporation Stock Option Plan and Performance Unit Plan), as
amended May
16, 2001, (incorporated by reference to PG&E Corporation's Quarterly
Report on Form 10-Q for the quarter ended June 30, 2001 (File
No. 1-12609), Exhibit 10)
|
||
|
*10.37
|
Form
of Restricted Stock Award Agreement for 2003 grants made under
the
PG&E Corporation Long-Term Incentive Program (incorporated by
reference to PG&E Corporation's Form 10-K for the year ended December
31, 2002 (File No. 1-12609), Exhibit 10.46)
|
||
|
*10.38
|
Form
of Restricted Stock Award Agreement for 2004 grants made under
the
PG&E Corporation Long-Term Incentive Program (incorporated by
reference to PG&E Corporation's Form 10-K for the year ended December
31, 2003 (File No. 1-12609), Exhibit 10.37)
|
||
|
*10.39
|
Form
of Restricted Stock Agreement for 2005 grants under the PG&E
Corporation Long-Term Incentive Program (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K
filed
January 6, 2005 (File No. 12609 and File No. 1-2348),
Exhibit 99.3)
|
||
|
*10.40
|
Form
of Restricted Stock Agreement for 2006 grants under the PG&E
Corporation 2006 Long-Term Incentive Plan (incorporated by
reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K
filed
January 9, 2006, Exhibit 99.1)
|
||
|
*10.41
|
Form
of Non-Qualified Stock Option Agreement under the PG&E Corporation
Long-Term Incentive Program (incorporated by reference to PG&E
Corporation and Pacific Gas and Electric Company's Form 8-K
filed
January 6, 2005 (File No. 12609 and File No. 1-2348),
Exhibit 99.1)
|
||
|
*10.42
|
Form
of Performance Share Award Agreement for 2004 grants under
the PG&E
Corporation Long-Term Incentive Program (incorporated by reference
to
PG&E Corporation's Form 10-K for the year ended December 31, 2003
(File No. 1-12609), Exhibit 10.38)
|
||
|
*10.43
|
Form
of Performance Share Agreement for 2005 grants under the PG&E
Corporation Long-Term Incentive Program (incorporated by reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K
filed
January 6, 2005 (File No. 12609 and File No. 1-2348),
Exhibit 99.2)
|
||
|
*10.44
|
Form
of Performance Share Agreement for 2006 grants under the PG&E
Corporation 2006 Long-Term Incentive Plan (incorporated by
reference
to
PG&E Corporation and Pacific Gas and Electric Company's Form 8-K
filed
January 9, 2006, Exhibit 99.2)
|
||
|
*10.45
|
PG&E
Corporation Executive Stock Ownership Program Guidelines dated
as of
February 19, 2003 (incorporated by reference to PG&E Corporation's
Quarterly Report on Form 10-Q for the quarter ended March 31,
2003 (File
No. 1-12609) Exhibit 10. 2)
|
||
|
*10.46
|
PG&E
Corporation Executive Stock Ownership Program Guidelines as
amended
February 15, 2006
|
||
|
*10.47
|
PG&E
Corporation Officer Severance Policy, as amended effective
as of January
1, 2005 (incorporated by reference to PG&E Corporation's Form 10-K for
the year ended December 31, 2004 (File No. 1-12609),
Exhibit 10.37)
|
||
|
*10.48
|
PG&E
Corporation Officer Severance Policy, as amended effective
as of February
15, 2006
|
||
|
*10.49
|
PG&E
Corporation Golden Parachute Restriction Policy effective as
of February
15, 2006
|
||
|
*10.50
|
PG&E
Corporation Director Grantor Trust Agreement dated April 1,
1998
(incorporated by reference to PG&E Corporation's Quarterly Report on
Form 10-Q for the quarter ended March 31, 1998 (File No. 1-12609),
Exhibit 10.1)
|
||
|
*10.51
|
PG&E
Corporation Officer Grantor Trust Agreement dated April 1,
1998, as
updated effective January 1, 2005 (incorporated by reference
to PG&E
Corporation's Form 10-K for the year ended December 31, 2004
(File
No. 1-12609), Exhibit 10.39)
|
||
|
*10.52
|
Resolution
of the Board of Directors of PG&E Corporation regarding
indemnification of officers and directors dated December 18,
1996
(incorporated by reference to PG&E Corporation's Form 10-K for the
year ended December 31, 2004 (File No. 1-12609),
Exhibit 10.40)
|
||
|
60
|
|||
|
|
|||
|
*10.53
|
Resolution
of the Board of Directors of Pacific Gas and Electric Company
regarding
indemnification of officers and directors dated July 19, 1995
(incorporated by reference to Pacific Gas and Electric Company’s Form 10-K
for the year ended December 31, 2004 (File No. 1-2348),
Exhibit 10.41)
|
||
|
11
|
Computation
of Earnings Per Common Share
|
||
|
12.1
|
Computation
of Ratios of Earnings to Fixed Charges for Pacific Gas and
Electric
Company
|
||
|
12.2
|
Computation
of Ratios of Earnings to Combined Fixed Charges and Preferred
Stock
Dividends for Pacific Gas and Electric Company
|
||
|
13
|
The
following portions of the 2005 Annual Report to Shareholders
of PG&E
Corporation and Pacific Gas and Electric Company are included:
"Selected
Financial Data," "Management's Discussion and Analysis of Financial
Condition and Results of Operations," financial statements
of PG&E
Corporation entitled "Consolidated Statements of Income," "Consolidated
Balance Sheets," "Consolidated Statements of Cash Flows," and
"Consolidated Statements of Shareholders' Equity," financial
statements of
Pacific Gas and Electric Company entitled "Consolidated Statements
of
Income," "Consolidated Balance Sheets," "Consolidated Statements
of Cash
Flows," and "Consolidated Statements of Shareholders' Equity,"
"Notes to
the Consolidated Financial Statements," and "Quarterly Consolidated
Financial Data (Unaudited)," "Management's Report on Internal
Control Over
Financial Reporting," "Report of Independent Registered Public
Accounting
Firm," and "Report of Independent Registered Public Accounting
Firm."
|
||
|
21
|
Subsidiaries
of the Registrant
|
||
|
23
|
Consent
of Independent Registered Public Accounting Firm (Deloitte
& Touche
LLP)
|
||
|
24.1
|
Resolutions
of the Boards of Directors of PG&E Corporation and Pacific Gas and
Electric Company authorizing the execution of the Form 10-K
|
||
|
24.2
|
Powers
of Attorney
|
||
|
31.1
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer
of PG&E
Corporation required by Section 302 of the Sarbanes-Oxley Act
of
2002
|
||
|
31.2
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer
of Pacific
Gas and Electric Company required by Section 302 of the Sarbanes-Oxley
Act
of 2002
|
||
|
**32.1
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer
of PG&E
Corporation required by Section 906 of the Sarbanes-Oxley Act
of
2002
|
||
|
**32.2
|
Certifications
of the Chief Executive Officer and the Chief Financial Officer
of Pacific
Gas and Electric Company required by Section 906 of the Sarbanes-Oxley
Act
of 2002
|
||
* Management
contract or compensatory agreement.
** Pursuant
to Item 601(b) (32) of SEC Regulation S-K, these exhibits are
furnished rather than filed with this report.
61