First Mining Gold Corp. 40-F, filed Apr 2, 2019: Management'S Discussion and Analysis
Exhibit
99.3

FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
TABLE OF CONTENTS
|
COMPANY OVERVIEW AND STRATEGY
|
3
|
|
2018 HIGHLIGHTS
|
4
|
|
SUMMARY OF QUARTERLY FINANCIAL INFORMATION
|
9
|
|
CANADIAN MINERAL PROPERTY PORTFOLIO LOCATIONS
|
10
|
|
MINERAL PROPERTY PORTFOLIO GOLD RESOURCES
|
11
|
|
MINERAL PROPERTY PORTFOLIO REVIEW
|
12
|
|
MINERAL PROPERTY BALANCES
|
16
|
|
RESULTS OF CONTINUING OPERATIONS
|
18
|
|
FINANCIAL CONDITION, LIQUIDITY AND CAPITAL RESOURCES
|
20
|
|
OUTLOOK
|
21
|
|
FINANCIAL INSTRUMENTS
|
22
|
|
RELATED PARTY TRANSACTIONS
|
23
|
|
OFF-BALANCE SHEET ARRANGEMENTS
|
23
|
|
NON-IFRS MEASURES
|
23
|
|
CHANGES IN ACCOUNTING POLICIES
|
24
|
|
ACCOUNTING STANDARDS ISSUED BUT NOT YET APPLIED
|
24
|
|
CRITICAL ACCOUNTING JUDGMENTS AND ESTIMATES
|
24
|
|
RISKS AND UNCERTAINTIES
|
25
|
|
QUALIFIED PERSONS
|
34
|
|
SECURITIES OUTSTANDING
|
34
|
|
MANAGEMENT’S REPORT ON INTERNAL CONTROL OVER FINANCIAL
REPORTING
|
35
|
|
FORWARD-LOOKING INFORMATION
|
36
|
|
CAUTIONARY NOTE TO U.S. INVESTORS REGARDING MINERAL RESOURCE AND
MINERAL RESERVE ESTIMATES
|
37
|
Page 2
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
GENERAL
This
Management’s Discussion and Analysis (“MD&A”) should be read in
conjunction with the audited consolidated financial statements of
First Mining Gold Corp. (the “Company” or “First Mining”) for the years ended
December 31, 2018 and 2017, which are prepared in accordance with
International Financial Reporting Standards (“IFRS”). These documents along with
additional information on the Company, including the
Company’s Annual Information Form for the year ended December
31, 2018, are available under the Company’s SEDAR profile at
www.sedar.com,
on EDGAR at www.sec.gov.,
and on the Company’s website at www.firstmininggold.com.
In this
MD&A, unless the context otherwise requires, references to the
“Company”, “First Mining”,
“we”, us”, and “our” refer to First
Mining Gold Corp. and its subsidiaries.
This
MD&A contains “forward-looking statements” and
“forward-looking information” within the meaning of
applicable Canadian securities laws. See the section on page 36 of
this MD&A titled “Forward-Looking Information” for
further details. In addition, this MD&A has been prepared
in accordance with the requirements of Canadian securities laws,
which differ in certain material respects from the disclosure
requirements of United States securities laws, particularly with
respect to the disclosure of mineral reserves and mineral
resources. See the section on page 37 of this MD&A titled
“Cautionary Note to U.S. Investors Regarding Mineral Resource
and Mineral Reserve Estimates” for further
details.
All
dollar amounts included in this MD&A are expressed in thousands
of Canadian dollars unless otherwise noted. This MD&A is dated
as of April 1, 2019 and all information contained in this MD&A
is current as of March 29, 2019.
First
Mining (formerly First Mining Finance Corp.) was incorporated in
Canada on April 4, 2005. The Company changed its name to First
Mining Gold Corp. in January 2018. First Mining is an emerging
mineral development company with a diversified portfolio of gold
projects in North America. The Company’s vision is to advance
its material assets towards a construction decision and,
ultimately, to production, and we may acquire additional mineral
assets in the future. As at the date of this MD&A, the Company
has assembled a large resource base of approximately 7.3 million
ounces of gold in the Measured and Indicated categories and
approximately 3.6 million ounces of gold in the Inferred category
in mining friendly jurisdictions in eastern Canada.
The
following table highlights the Company’s material projects
that were accumulated since 2015:
|
Date
|
Acquired Legal Entity
|
Project
|
Location
|
|
June
16, 2016
|
Tamaka
Gold Corporation (“Tamaka”) (1)
|
Goldlund
Gold Project “(Goldlund”)
|
Northern
Ontario, Canada
|
|
June 9,
2016
|
Cameron
Gold Operations Ltd. (“Cameron Gold”)(2)
|
Cameron
Gold Project (“Cameron”)
|
Northern
Ontario, Canada
|
|
April
8, 2016
|
Clifton
Star Resources Inc. (“Clifton
Star”)(3)
|
10%
indirect interest in the Duparquet Gold Project
|
Québec,
Canada
|
|
November
16, 2015
|
PC Gold
Inc. (“PC Gold”)
(3)
|
Pickle
Crow Gold Project (“Pickle
Crow”)
|
Northern
Ontario, Canada
|
|
November
13, 2015
|
Gold
Canyon Resources Inc. (“Gold
Canyon”)(3)
|
Springpole
Gold Project (“Springpole”)
|
Northern
Ontario, Canada
|
|
July 7,
2015
|
Coastal
Gold Corp. (“Coastal
Gold”)(3)
|
Hope
Brook Gold Project (“Hope
Brook”)
|
Newfoundland,
Canada
|
(1)
Previously
a privately held company.
(2)
Previously
a subsidiary of a publicly listed company.
(3)
Previously
a publicly listed company.
Page 3
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
2018 HIGHLIGHTS
The
following highlights for the Company’s developments during
fiscal 2018 (together with subsequent events up to March 29, 2019).
For further information, please refer to the “News”
section in the Company’s website at www.firstmininggold.com.
Springpole Project Updates
Metallurgical study
●
On June 11, 2018,
the Company commenced a study to determine the optimal
metallurgical flow sheet for Springpole. The results from the study
are expected to be incorporated into the preparation of an updated
Preliminary Economic Assessment (“PEA”) in the second half of 2019,
and thereafter, into the preparation of a Pre-Feasibility Study for
Springpole, expected to be initiated in 2019. In addition, the
metallurgical study aims to improve the expected future recovery of
gold for the Whole-Ore Carbon-in-Pulp (“Whole-Ore CIP”) presented in the
independent PEA technical report for Springpole that was prepared
by SRK Consulting (Canada) Inc. in accordance with National
Instrument 43-101 Standards of
Disclosure for Mineral Projects (“NI 43-101”).
●
On February 19,
2019, the Company announced interim metallurgical test results
which indicated the potential for significant increases in the
ultimate recovery of both gold and silver from the project.
Flotation tests achieved total recoveries of 90.6% for gold and
95.1% for silver through flotation followed by separate cyanide
leaching of both concentrate and flotation tails. This represents a
13.2% increase in gold recovery and an 11.9% increase in silver
recovery over the Whole-Ore CIP flowsheet presented in the
independent PEA technical report for Springpole that was prepared
by SRK Consulting (Canada) Inc. in accordance with NI 43-101 and
filed by the Company on SEDAR on October 27, 2017, which
demonstrated recovery levels of 80% for gold and 85% for silver.
Readers are cautioned that the PEA is preliminary in nature, it
includes inferred mineral resources that are considered too
speculative geologically to have the economic considerations
applied to them that would enable them to be categorized as mineral
reserves, and there is no certainty that the PEA will be realized.
Mineral resources that are not mineral reserves do not have
demonstrated economic viability.
The
next stage of metallurgical testing will involve further
investigation into flotation, fine and ultrafine grinding
alternatives, and potential pre-flotation removal of silicate
gangue and will eventually lead to locked cycle metallurgical
testing to confirm the final processing flowsheet. This final
flowsheet will be selected after completing trade-off studies on
capital and operating costs prior to commencing a Pre-Feasibility
Study for Springpole.
Environmental Assessment process
●
On March 7, 2018, the Company announced that a
Project Description had been submitted to, and subsequently
accepted by, the Canadian Environmental Assessment Agency
(“CEAA”). The project description is a required
government filing that initiated the federal Environmental
Assessment (“EA”) process for Springpole. The EA process
and eventual project approval is expected to take approximately 24
months, after which permitting for construction can
commence.
●
In parallel with the federal EA process, on April
23, 2018, the Company announced that it had entered into a
Voluntary Agreement with the Ontario Ministry of Environment and
Climate Change (“MOECC”) to complete certain requirements under
the Ontario Environmental Assessment
Act. This marks the
commencement of a provincial Individual EA for Springpole, and the
Company is in the process of preparing the Terms of Reference,
which will describe the scope of the EA and how the Company intends
to undertake all aspects of the EA, including consultation efforts
with Indigenous communities and other
stakeholders.
Page 4
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
●
On June 26, 2018, the Company announced that the
final Environmental Impact Statement (“EIS”) guidelines on Springpole were issued by
CEAA. The final EIS guidelines were issued following the expiry of
a public comment period on the draft EIS guidelines which had been
made available to the public since April 27, 2018. The final EIS
guidelines outline federal information requirements for the
preparation of an EIS and were prepared taking into consideration
comments received from federal departments, the Ontario provincial
ministry, Indigenous groups and the general public. To meet the
requirements of the EIS, the Company has already undertaken a broad
range of environmental baseline studies at Springpole to collect
biophysical data, which includes fish community and habitat
surveys, species at risk surveys, atmospheric environment surveys
as well as surface, ground water and hydrology
surveys.
Geotechnical coffer dam drilling
●
On April 19, 2018,
the Company announced the completion of the geotechnical drilling
program to investigate the lake bed sediments and bedrock along the
proposed alignment of the coffer dam at Springpole. The
pre-feasibility level geotechnical drilling program has been
completed over the approximately 800 metre long footprint of the
three coffer dams which are required to dewater the north bay of
Springpole Lake.
Indigenous consultation process
●
On February 13, 2018, the Company announced that
it signed a negotiation protocol agreement (the
“Negotiation
Protocol”) with the Lac
Seul First Nation, the Slate Falls First Nation and the Cat Lake
First Nation in Ontario (together, the “Shared Territory Protocol
Nations”).
Goldlund Gold Project Updates
Updated NI 43-101 Resource
On
March 27, 2019, the Company announced the results of an
updated mineral resource estimate for Goldund, which has an
effective date of March 15, 2019, and was prepared in accordance
with NI 43-101 by WSP Canada Inc. (“WSP”) of Sudbury,
Ontario. A summary of the overall changes in the updated resource
estimate for Goldlund are as follows:
●
Indicated resource
gold (“Au”) ounces (“oz.”) tonnes increased
by 248,700 oz.. This increase in oz. corresponds to an increase in
tonnage of 3,595,900 tonnes from 9,324,100 tonnes at an average
grade of 1.87 grams per tonne (“g/t”) Au to 12,860,000 tonnes at
an average grade of 1.96 g/t Au.
●
Inferred resource
Au oz. decreased by 628,400 oz., after adjusting for the proportion
of Inferred resource tonnes removed due to the upgrade of certain
tonnes to the Indicated resource category. This represents an
overall reduction in tonnage of 22,533,000 tonnes from 40,895,000
tonnes at an average grade of 1.33 g/t Au to 18,362,000 tonnes at
an average grade of 1.49 g/t Au.
In
summary, the updated mineral resource estimate for Goldlund
incorporated approximately 40,000 metres (“m”) of incremental drilling, the
bulk of which was focused on Zone 7. While the increased data
density and geological understanding of the deposits resulted in
increased confidence of the resource, adding 3,595,900 tonnes at an
average grade of 1.96 g/t Au, it also resulted in the loss of a
large number of tonnes and ounces in the inferred resource. The
First Mining technical team believes that the increased
understanding of the deposit will assist the Company in better
targeting subsequent drill programs aimed at growing the current
resource body at Goldlund, which remains open along strike to both
the south west and north east, in addition to at
depth.
Page 5
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Resource drilling
The
Company’s Phase 1 drilling campaign at Goldlund, located near
the town of Sioux Lookout in northwestern Ontario, Canada,
concluded in June 2017 and comprised 100 holes for approximately
24,300 m. The Company commenced its Phase 2 drilling campaign in
late 2017 and completed that drilling campaign in March 2018. The
Phase 2 drilling campaign comprised 42 holes for approximately
16,000 m, of which 38 holes were new drill holes and the other 4
holes were holes that were originally drilled during the Phase 1
drilling campaign and were extended at depth during the Phase 2
drilling campaign. Eleven sets of assays results were announced
between April 25, 2017 and May 15, 2018 for both the Phase 1 and 2
drilling campaigns. For further details regarding the assay results
please see the Company’s news releases for the period from
April 25, 2017 to May 15, 2018.
Highlights
of the released Goldlund resource drilling results are as
follows:
|
Phase
|
Hole
|
Metres
|
Grade
|
|
2
|
Hole GL-17-136
|
72.0
|
6.26 g/t Au
|
|
|
Including
|
1.1
|
367.00 g/t Au
|
|
2
|
Hole GL-17-106
|
202.0
|
1.39 g/t Au
|
|
|
including
|
2.0
|
43.28 g/t Au
|
|
1
|
Hole GL-17-084
|
34.0
|
4.30 g/t Au
|
|
|
including
|
2.0
|
48.72 g/t Au
|
|
1
|
Hole GL-17-032
|
64.5
|
3.25 g/t Au
|
|
|
Including
|
0.5
|
335.76 g/t Au
|
|
1
|
Hole GL-17-059
|
70.5
|
2.50 g/t Au
|
|
|
Including
|
0.5
|
186.49 g/t Au
|
|
1
|
Hole GL-17-053
|
179.0
|
1.13 g/t Au
|
|
|
Including
|
2.0
|
12.07 g/t Au
|
|
1
|
Hole GL-17-014
|
6.0
|
30.69 g/t Au
|
|
|
Including
|
2.0
|
91.63 g/t Au
|
Regional drilling
Following
the Phase 1 and 2 drilling campaigns, the Company commenced a
regional exploration drilling campaign at Goldlund in June 2018.
The exploration drilling campaign focused on showings at the
Miller, Eaglelund and Miles targets, which are approximately 10
kilometres (“km”) northeast of the current
resource area, and include 16 holes totaling 688 m.
Final
fire assay results and partial metallic screen fire assay results
for the Miller prospect were announced on August 20, 2018,
September 20, 2018 and March 27, 2019, respectively. The early
results from the Miller prospect indicate that the entire width of
the sill/dyke appears receptive to gold mineralization and this
mineralization remains open along strike in both directions and
also at depth. For further details regarding the assay results
please see the Company’s news releases dated August 20, 2018,
September 20, 2018 and March 27, 2019.
In
addition to drilling the Miller prospect, the Company has completed
seven diamond drill holes at the Eaglelund prospect, and one
diamond drill hole at the Miles prospect. This completes this phase
of the Company's regional drill program at Goldlund.
Page 6
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Highlights
of the released Miller prospect drilling results are as
follows:
|
Hole
|
Metres
|
Grade
|
|
Hole MI-18-001
|
107.6
|
0.42 g/t Au
|
|
including
|
73.6
|
0.55 g/t Au
|
|
Hole MI-18-002
|
142.1
|
1.90 g/t Au
|
|
including
|
108.0
|
2.43 g/t Au
|
|
Hole MI-18-003
|
48.0
|
1.17 g/t Au
|
|
including
|
15.0
|
1.71 g/t Au
|
|
Hole MI-18-004
|
23.8
|
0.54 g/t Au
|
|
including
|
5.8
|
1.40 g/t Au
|
|
Hole MI-18-005
|
10.0
|
0.45 g/t Au
|
|
including
|
1.0
|
4.18 g/t Au
|
|
Hole MI-18-006
|
22.0
|
0.68 g/t Au
|
|
including
|
10.0
|
0.45 g/t Au
|
|
Hole MI-18-007
|
49.0
|
2.49 g/t Au
|
|
including
|
21.5
|
5.34 g/t Au
|
|
Hole MI-18-008
|
14.0
|
0.62 g/t Au
|
|
including
|
2.5
|
1.80 g/t Au
|
Hope Brook Gold Project
On July 9, 2018, the Company announced the commencement of
permitting for the construction of a resource access road to
connect Hope Brook to Highway 480 (also known as the Burgeo
Highway). A project registration document was submitted to the
environmental assessment division of the government of Newfoundland
and Labrador in relation to the access road. The access road will
be approximately 58 km in length and is intended to support a more
efficient mode of transportation by allowing vehicles to access
Hope Brook for exploration and development activities.
Option Agreement on the Las Margaritas Gold Project,
Mexico
On July
30, 2018, the Company entered into an option agreement (the
“Option
Agreement”) with Gainey Capital Corp.
(“Gainey”), (TSX
Venture Exchange: GNC) , granting Gainey the right to earn a 100%
interest in First Mining’s Las Margaritas gold project
(“Las Margaritas”) located in the State of Durango,
Mexico.
Under
the terms of the Option Agreement, Gainey can elect to make share
or cash payments to the Company for aggregate consideration of
between $900 and $1,015 over the four year option period. In
addition, as per terms of the Option Agreement, Gainey will make
the following:
●
Annual payments of
USD $25,000 in September 2018 (paid), September 2019, September
2020 and USD $250,000 in September 2021 in connection with an
existing agreement on the property; and
●
Exploration
expenditures totaling USD $1,000,000 over the four year option
period on Las Margaritas.
Upon
completion of the four-year option period and satisfaction of the
above payment and exploration requirements, Gainey obtains a 100%
ownership interest in Las Margaritas, except that First Mining will
retain a 2% net smelter returns (“NSR”) royalty interest, with
Gainey having the right to buy back 1% of the NSR royalty interest
for USD $1,000,000 up until the first anniversary of the
commencement of commercial production at Las Margaritas. As at
December 31, 2018, the carrying value of Las Margaritas property is
$244 (2017 - $183).
The
transaction and the issuance of Gainey’s common shares
pursuant to the Option Agreement are subject to the acceptance by
the TSX Venture Exchange following the submission of a NI 43-101
technical report expected in the first half of 2019.
Page 7
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
New Strategy, Name Change, and Management Changes
On January 10, 2018, the Company announced a change in its
corporate name to “First Mining Gold Corp.”, and a
change in the Company’s strategy to focus on advancing its
existing mineral properties towards production.
On December 20, 2018, the Company appointed Mr. Daniel W. Wilton as
its Chief Executive Officer (“CEO”) effective as of January 7, 2019, and
David Shaw continued serving as a director of the
Company.
SELECT FINANCIAL INFORMATION
|
|
For the twelve months ended December 31,
|
||
|
Financial Results:
|
2018
|
2017
|
2016
|
|
Mineral Property
Expenditures(1)
|
$7,402
|
$11,996
|
$4,053
|
|
Net
Loss
|
(11,645)
|
(11,184)
|
(11,155)
|
|
Write-down of
Mineral Properties
|
4,181
|
-
|
485
|
|
Net Loss Excluding
Share-based Payments and Mineral Properties Write-down
(non-cash)(2)
|
(4,432)
|
(5,687)
|
(5,515)
|
|
Basic and Diluted
Net Loss Per Share (in Dollars) (3)
|
$(0.02)
|
$(0.02)
|
$(0.03)
|
|
|
December 31,
|
December 31,
|
December 31,
|
|
Financial Position:
|
2018
|
2017
|
2016
|
|
Cash and Cash
Equivalents
|
$5,115
|
$15,400
|
$33,157
|
|
Working Capital(2)
|
7,536
|
19,401
|
39,601
|
|
Mineral
Properties
|
244,129
|
239,871
|
223,462
|
|
|
|
|
|
|
Total
Assets
|
257,532
|
265,737
|
269,558
|
|
Total Non-current
Liabilities
|
$-
|
$-
|
$(2,106)
|
(1)
This
represents the cost directly related to exploration and evaluation
expenditures that have been capitalized into mineral properties,
excluding share-based payments.
(2)
This
is a non-IFRS measurement with no standardized meaning under IFRS
and may not be comparable to similar financial measures presented
by other issuers. For further information and a detailed
reconciliation, please see the section in this MD&A titled
“Non-IFRS Measures”.
(3)
The basic and diluted loss per share calculations
result in the same amount due to the anti-dilutive effect of
outstanding stock options and warrants
The Company had no revenues from its operating activities in
2018, 2017 or 2016, and the Company has never paid any
distributions or cash dividends to its shareholders.
Net Loss
Net
loss remained comparable between the three years presented. During
the year ended December 31, 2018, net loss included a one-off
$4,181 write-down of Mexican mineral properties, and $3,032 in
share-based payment expenses, which was significantly lower than
the $5,497 share-based payment expense recorded in the prior year
owing to a lower fair value per stock option granted. After
removing these non-cash items, the underlying operating
expenditures in 2018 fell by $1,255 primarily due to lower investor
relations and marketing communications activities when compared to
the prior year.
Page 8
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Cash and Cash Equivalents
Cash
and cash equivalents decreased by $17,757 from December 31, 2016 to
December 31, 2017, and decreased by $10,285 from December 31, 2017
to December 31, 2018. During 2018 and 2017, the decrease in cash
and cash equivalents was primarily attributable to cash used in
mineral property exploration and development activities and, to a
lesser extent, cash used in operating activities. In 2017 the
Company drilled approximately 35,000 m at Goldlund compared with
approximately 7,000 m in 2018, which resulted in lower cash used in
mineral property exploration and development activities when
comparing the two periods.
Total Assets
Total
assets decreased by $3,821 from December 31, 2016 to December 31,
2017 primarily related to the cash used in operating activities and
due to the decrease in marketable securities fair value. Total
assets decreased by $8,205 from December 31, 2017 to December 31,
2018 mainly due to the cash used in operating activities, the
decrease in marketable securities fair value, and the write-down of
Mexican mineral properties.
SUMMARY OF QUARTERLY FINANCIAL INFORMATION
|
|
2018-Q4
|
2018-Q3
|
2018-Q2
|
2018-Q1
|
|
Net
Loss
|
$(5,658)
|
$(937)
|
$(1,298)
|
$(3,752)
|
|
Write-down of
Mineral Properties
|
4,181
|
-
|
-
|
-
|
|
Net Loss Excluding
Share-based Payments and Write-down of Mineral Properties
(non-cash)(1)
|
(1,085)
|
(910)
|
(1,213)
|
(1,224)
|
|
Basic and Diluted
Net Loss Per Share (in dollars)(2)
|
(0.01)
|
(0.00)
|
(0.00)
|
(0.01)
|
|
Cash and Cash
Equivalents
|
5,115
|
6,950
|
9,585
|
12,289
|
|
Working
Capital(1)
|
7,536
|
9,688
|
12,463
|
16,016
|
|
Mineral
Properties
|
244,129
|
246,652
|
245,199
|
243,895
|
|
Total
Assets
|
257,532
|
262,146
|
263,586
|
266,704
|
|
Total Non-Current
Liabilities
|
$-
|
$-
|
$-
|
$-
|
|
|
2017-Q4
|
2017-Q3
|
2017-Q2
|
2017-Q1
|
|
Net
Loss
|
$(1,237)
|
$(1,296)
|
$(1,998)
|
$(6,653)
|
|
Write-down of
Mineral Properties
|
-
|
-
|
-
|
-
|
|
Net Loss Excluding
Share-based Payments and Write-down of Mineral Properties
(non-cash)(1)
|
(1,217)
|
(1,197)
|
(1,914)
|
(1,359)
|
|
Basic and Diluted
Net Loss Per Share (in dollars)(2)
|
(0.01)
|
(0.00)
|
(0.00)
|
(0.01)
|
|
Cash and Cash
Equivalents
|
15,400
|
18,291
|
21,957
|
28,078
|
|
Working
Capital(1)
|
19,401
|
23,411
|
28,463
|
33,584
|
|
Mineral
Properties
|
239,871
|
237,413
|
233,861
|
229,513
|
|
Total
Assets
|
265,736
|
267,208
|
268,307
|
270,169
|
|
Total Non-current
Liabilities
|
$-
|
$-
|
$-
|
$(2,106)
|
(1)
These are non-IFRS
measures with no standardized meaning under IFRS. For further
information and a detailed reconciliation, please refer to the
section in this MD&A titled “Non-IFRS
Measures”.
(2)
The basic and
diluted loss per share calculations result in the same amount due
to the anti-dilutive effect of outstanding stock options and
warrants in all periods.
Page 9
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
The
most significant variance in net loss quarter to quarter is due to
the timing of stock option grants, the number of underlying options
granted and the associated fair value dollar amount calculated at
the time of the grant. Furthermore, in 2018-Q4 there was a $4,181
one-off write-down of Mexican mineral properties and a
non-recurring severance payment of $300. In 2018-Q3 and 2017-Q3
there was a decrease in marketing activities undertaken by the
Company when compared to 2018-Q2 and 2017-Q2, respectively, due to
decreases in marketing campaigns. In 2017-Q2, there were additional
transfer agent and filing fees and professional fees in connection
with TSX initial listing fees, which followed graduation from the
TSX-V.
In
terms of cash and cash equivalents, variances between quarters
would typically depend on the amount, type and timing of work being
performed on the Company’s mineral property portfolio,
classified under investing activities in the interim statements of
cashflows. This is in addition to other one-off events such as in
Q2-2017 when the Company repaid its outstanding loans payable and
settled its debenture liability, which were recorded as non-current
liabilities in the statement of financial of position. Furthermore,
in 2017-Q1, the Company completed the acquisition of certain
additional mining claims located near Pickle Lake, Ontario and in
the Township of Duparquet, Québec.
The
fluctuation in total assets from one quarter to the next is
primarily a function of decreases in cash used to fund operating
activities, changes in the fair value of its marketable securities,
and additions to or write-down of mineral property balances. It is
worth noting that cash used in investing activities for the
purposes of exploration and development work being performed on the
Company’s mineral properties remains within total assets,
given these amounts are capitalized in connection with the
Company’s accounting policies.
CANADIAN MINERAL PROPERTY PORTFOLIO LOCATIONS

The
Company classifies its mineral properties as Tier 1, Tier 2, and
Tier 3:
●
Tier 1 projects are core, material
assets which include the Company’s largest and most advanced
mineral resource-stage projects.
●
Tier 2 projects are resource-stage
assets which host mineral resources.
●
Tier 3 projects are grassroots
exploration projects that host mineralization but have not received
sufficient drilling to delineate mineral resources.
Page 10
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
MINERAL PROPERTY PORTFOLIO GOLD RESOURCES (1)
|
Project
|
Tonnes
|
Gold
Grade (g/t)
|
Silver
Grade (g/t)
|
Contained Gold Ounces (oz.)
|
Contained Silver Ounces (oz.)
|
|
Measured Resources
|
|||||
|
Cameron
Gold Project(2)
|
3,360,000
|
2.75
|
-
|
297,000
|
-
|
|
Duparquet
Gold Project(3)
|
16,500
|
1.45
|
-
|
770
|
-
|
|
Indicated Resources
|
|||||
|
Springpole Gold
Project(4)
|
139,100,000
|
1.04
|
5.40
|
4,670,000
|
24,190,000
|
|
Goldlund Gold
Project
|
12,860,000
|
1.96
|
-
|
809,200
|
-
|
|
Hope Brook Gold
Project
|
5,500,000
|
4.77
|
-
|
844,000
|
-
|
|
Cameron Gold
Project(5)
|
2,170,000
|
2.40
|
-
|
167,000
|
-
|
|
Duparquet Gold
Project(3)
|
5,954,000
|
1.57
|
-
|
300,700
|
-
|
|
Duquesne Gold
Project
|
1,859,000
|
3.33
|
-
|
199,000
|
-
|
|
Inferred Resources
|
|||||
|
Springpole Gold
Project(4)
|
11,400,000
|
0.63
|
3.10
|
230,000
|
1,120,000
|
|
Goldlund Gold
Project
|
18,360,000
|
1.49
|
-
|
877,000
|
-
|
|
Hope Brook Gold
Project
|
836,000
|
4.11
|
-
|
110,000
|
-
|
|
Cameron Gold
Project(6)
|
6,535,000
|
2.54
|
-
|
533,000
|
-
|
|
Pickle Crow Gold
Project(7)
|
9,452,000
|
4.10
|
-
|
1,230,500
|
-
|
|
Duparquet Gold
Project(3)
|
2,846,000
|
1.46
|
-
|
133,400
|
-
|
|
Duquesne Gold
Project
|
1,563,000
|
5.58
|
-
|
281,000
|
-
|
|
Pitt Gold
Project
|
1,076,000
|
7.42
|
-
|
257,000
|
-
|
|
|
|||||
|
Total Measured Resources
|
3,376,500
|
2.74
|
-
|
297,770
|
-
|
|
Total Indicated Resources
|
167,443,000
|
1.30
|
5.40
|
6,989,900
|
24,190,000
|
|
Total Measured and Indicated Resources
|
170,819,500
|
1.33
|
5.40
|
7,287,670
|
24,190,000
|
|
Total Inferred Resources
|
52,068,000
|
2.19
|
3.10
|
3,651,900
|
1,120,000
|
(1)
The mineral
resources and reserves set out in this table are based on the
technical report for the applicable property, the title and date of
which are set out under the applicable property description within
the section “Mineral Property Portfolio Review” in this
MD&A or in the Company’s Annual Information Form for the
year ended December 31, 2018, which is available under the
Company’s SEDAR profile at www.sedar.com.
(2)
Comprises 2,670,000
tonnes of pit-constrained (0.55 g/t Au cut-off) Measured resources
at 2.66 g/t Au, and 690,000 tonnes of underground (2.00 g/t Au
cut-off) Measured resources at 3.09 g/t Au.
(3)
The Company owns a
10% indirect interest in the Duparquet Gold Project, and the
Measured, Indicated and Inferred Resources shown in the above table
reflect the Company’s 10% indirect interest.
(4)
Open pit mineral
resources are reported at a cut off grade of 0.4 g/t
Au.
(5)
Comprises 820,000
tonnes of pit-constrained (0.55 g/t Au cut-off) Indicated resources
at 1.74 g/t Au, and 1,350,000 tonnes of underground (2.00 g/t Au
cut-off) Indicated resources at 2.08 g/t Au.
(6)
Comprises 35,000
tonnes of pit-constrained (0.55 g/t Au cut-off) Inferred resources
at 2.45 g/t Au, and 6,500,000 tonnes of underground (2.00 g/t Au
cut-off) Inferred resources at 2.54 g/t Au.
(7)
Comprises 1,887,000
tonnes of pit-constrained (0.35 g/t Au cut-off) Inferred resources
at 1.30 g/t Au, and 7,565,000 tonnes of underground Inferred
resources that consist of: (i) a bulk tonnage, long-hole stoping
(2.00 g/t Au cut-off); and (ii) a high-grade cut-and-fill component
(2.60 g/t Au cut-off) over a minimum width of 1 metre.
(8)
Resources (0.40
g/t Au cut-off) are stated as contained within a potentially
economic limiting pit shell using a metal price of US$1,350 per
ounce of gold, mining costs of US$2.00 per tonne, processing plus
G&A costs of US$15.40 per tonne, 93% recoveries and an average
pit slope of 48 degrees.
Page 11
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
MINERAL PROPERTY PORTFOLIO REVIEW
First
Mining has properties located in Canada, Mexico, and the United
States. The following section discusses the Company’s
priority and other significant projects.
Readers are cautioned that, with respect to any Preliminary
Economic Assessment (“PEA”) referenced in the section
below or anywhere else in this MD&A, a PEA is preliminary in
nature, any inferred mineral resources included therein are
considered too speculative geologically to have the economic
considerations applied to them that would enable them to be
categorized as mineral reserves, and there is no certainty that the
PEA will be realized. Mineral resources that are not mineral
reserves do not have demonstrated economic viability. Actual
results may vary, perhaps materially. The Company is not aware of
any environmental, permitting, legal, title, taxation,
socio-political, marketing or other issue which may materially
affect this estimate of mineral resources. The projections,
forecasts and estimates herein and in any technical reports
referred to herein constitute forward-looking statements and
readers are urged not to place undue reliance on such
forward-looking statements.
Canadian Mineral Properties
Tier 1 Projects
Springpole, Ontario
The
Springpole property covers an area of 32,240 hectares in
Northwestern Ontario, consisting of 36 patented claims and 300
unpatented claims. The project is located approximately 110 km
northeast of the town of Red Lake and is situated within the
Birch-Uchi Greenstone Belt. The large, open pittable resource is
supported by significant infrastructure, including a 72 man onsite
camp, winter road access, a logging road and nearby power lines
within 40 km. Springpole is located within an area that is covered
by Treaty Three and Treaty Nine First Nations
Agreements.
With
approximately 4.7 million ounces of gold in the Measured and
Indicated categories, Springpole is one of the largest undeveloped
gold projects in Ontario1.
A
technical report titled “Preliminary Economic Assessment
Update for the Springpole Gold Project, Ontario, Canada”,
prepared by SRK, was filed by the Company on SEDAR on October 27,
2017, and is available under the Company’s SEDAR profile at
www.sedar.com
and on the Company’s website at www.firstmininggold.com.
The PEA contemplates mining and processing material at 36,000
tonnes per day at an average head grade of 1.00 g/t Au and 5.28 g/t
Ag. Highlights of the PEA are as follows:
|
Parameters
|
2017 PEA
|
|
Mine
life
|
12
years
|
|
Initial
capital cost
|
US$586
million
|
|
Base
case gold price
|
US$1,300
per oz
|
|
Base
case silver price
|
US$20
per oz
|
|
Exchange
rate (CAD/USD)
|
0.75
|
|
Average
annual payable production
|
296,500
oz Au and 1,632,000 oz Ag
|
|
Economic Results
|
2017 PEA
|
|
Pre-tax
NPV at 5% discount rate
|
US$1,159
million
|
|
Pre-tax
Internal rate of return
|
32.3%
|
|
Post-tax
NPV at 5% discount rate
|
US$792
million
|
|
Post-tax
Internal rate of return
|
26.2%
|
|
Non-discounted
post-tax payback period
|
3.2
years
|
|
“All-in”
cash costs
|
US$806
per oz of Au equivalent
|
1 Source: S&P Market Intelligence database as
of June 29, 2018. Ranking among undeveloped primary gold resources
per jurisdiction.
Page 12
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
The
Company is focused on advancing the permitting and development,
including the environmental assessment process, for Springpole
throughout 2018. In April 2018, the Company completed geotechnical
drilling to test the footing locations for the proposed coffer dams
at Springpole. During the nine months ended September 30, 2018, the
Company submitted a Project Description for Springpole to CEAA and
subsequently received the final EIS guidelines for the project.
Currently, the Company is collecting environmental baseline data
and other information to prepare the EIS for Springpole and is in
discussions with the Ministry of Natural Resources district office
in Red Lake for a permit to build an access road to Springpole. In
addition, the Company is conducting a metallurgical study to
determine the optimal flow sheet for Springpole to potentially
increase the estimated gold recoveries.
Goldlund, Ontario
The
Goldlund property covers an area of 23,858 hectares in northwestern
Ontario, and consists of 27 patented claims, 152 unpatented claims,
1 mining lease, and 1 license of occupation. Rocks at the property
consist of a volcanic sequence about 1.5 km wide. This
north-easterly striking volcanic sequence is intruded by several
granodiorite sills. These sills are the host rock of the gold
mineralization. These strata-parallel intrusions are known to
extend for over 50 km along the strike of the property. A number of
historic gold occurrences are present on the property. The majority
of identified mineralization is hosted within the Central and
Southern Volcanic Belts and historic production demonstrates the
presence of small zones of higher-grade mineralization. A technical
report titled “Technical Report and Resource Estimation
Update – Goldlund Project, Sioux Lookout, ON”, prepared
by WSP, was filed on SEDAR on April 1, 2019, and is available under
the Company’s SEDAR profile at www.sedar.com
and on the Company’s website at www.firstmininggold.com.
Mining
at Goldlund in the 1980s produced approximately 90,700 tonnes
of ore grading 4.23 g/t Au from underground and 39,000 tonnes of
ore grading 4.80 g/t from a small open pit. The project has
year-round road access to the property from Ontario Highway 72,
which is 2 km to the south, and regional power lines are located 15
km to the north.
For the
year 2018, the Company spent approximately $2.4 million for
exploration expenditures on the Goldlund property, including
approximately 5,000 m of in-fill drilling and 1,850 m for regional
exploration drilling along the property’s 50 km strike
length. The early results from the Miller prospect indicate that
the entire width of the sill/dyke appears receptive to gold
mineralization and this mineralization remains open along strike in
both directions and also at depth.
In
August and September 2018, the Company received initial and final
fire assay results from the regional exploration drilling program
consisting of 8 drill holes. The objective of this drill program
was to test the presence and character of potential gold
mineralization distal from the current resource area. Visible
gold was observed in seven of the eight drill holes.
Hope Brook, Newfoundland
The
Hope Brook property covers an area of 26,650 hectares in
Newfoundland, including 7 mineral licenses, with a deposit hosted
by pyritic silicified zones occurring within a deformed,
strike-extensive advanced argillic alteration zone. A technical
report titled “2015 Mineral Resource Estimate Technical
Report for the Hope Brook Gold Project, Newfoundland and Labrador,
Canada”, prepared by Mercator Geological Services Limited,
was filed by the Company on SEDAR on November 27, 2015, and is
available under the Company’s SEDAR at www.sedar.com
profile and on the Company’s website at www.firstmininggold.com.
The
resource covers 1.5 km of an 8 km mineralized structure.
Substantial infrastructure at the property includes a ramp to 350 m
below surface with vent raise, power, access by sea and air, and a
strong local labour force. Hope Brook was a former operating gold
mine that produced 752,163 oz. Au from 1987 to 1997.
In
September 2017, the Company completed approximately 850 m of
drilling to identify new areas of mineralization within the
Ironbound Hill target which is located approximately 25 km from the
main resource area and 8 km from Highway 480.
Page 13
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
The
Company intends to advance a regional exploration and target
delineation program at Hope Brook in 2019. In addition, the Company
plans to conduct an internal scoping study of a production scenario
for Hope Brook to assess the economics of the project and better
define a permitting timeframe.
Cameron, Ontario
The
Cameron property covers an area of 44,853 hectares in Northern
Ontario and comprises 24 patented claims, 226 unpatented claims, 4
mining leases, and 7 licenses of occupation. The Cameron deposit is
a greenstone‐hosted gold deposit and the mineralization is
mainly hosted in mafic volcanic rocks within a northwest trending
shear zone (Cameron Lake Shear Zone) which dips steeply to the
north east. A technical report titled “Technical Report on
the Cameron Gold Deposit, Ontario, Canada”, prepared by
Optiro, was filed on SEDAR on March 22, 2017, and is available
under the Company’s SEDAR profile at www.sedar.com
and on the Company’s website at www.firstmininggold.com.
There is year-round road access to the property from nearby highway
and power lines within 20 km.
The
Company conducted minimal environmental studies, including fish
community and habitat surveys as well as hydrology surveys, to
support a potential environmental assessment or permitting
application in the future.
Pickle Crow, Ontario
The
Pickle Crow project covers an area of 13,184 hectares and comprises
114 patented claims and 83 unpatented claims. The area is located
in northwestern Ontario and is covered by the Treaty Nine First
Nations Agreement. A technical report titled “An Updated
Mineral Resource Estimate for the Pickle Crow Property, Patricia
Mining Division, Northwestern Ontario, Canada”, prepared by
Micon International Limited and dated June 15, 2018, was filed on
SEDAR on August 23, 2018, and is available under the
Company’s SEDAR profile at www.sedar.com
and on the Company’s website at www.firstmininggold.com.
Extensive infrastructure in place or proximal to the Pickle Crow
project includes a 200 tonne per day gravity mill on site,
generators and fuel storage and gravel road access to the property,
and the property is within 10 km of a regional airport at Pickle
Lake. Pickle Crow was a former high-grade operating mine until the
late 1960s.
In
February 2017, the Company completed a 9-hole drilling program
comprising approximately 1,300 m. The objectives of this drill
program were to test extensions of known vein zones and discover
new high-grade gold mineralization. Gold mineralization was
encountered in seven of the nine drill holes and visible gold was
intercepted in the lowermost vein zone of the No. 15 Vein
structure.
In
August 2018, an 85-hole
drilling program was conducted on the historic Pickle Crow
tailings, which was split into 4 distinct geographic zones. Of the
total 302 m program, 225 m were
sampled, and taken on 1 m intervals with intervals as short as 0.3
m where the base of the tails were encountered.
The Company is considering undertaking an independent resource
estimate of the Pickle Crow tailings in an update of the current
technical report noted above. Whilst the gold content is
anticipated to be small the tailings may offer opportunities for
small-scale production using the onsite Extreme Gravity
mill.
Tier 2 Projects
Duquesne Gold Project, Québec
Duquesne
Gold Project located in the Abitibi Region of Québec
(“Duquesne”) is
situated on a property that covers an area of 2,323 hectares. The
Company owns a 100% interest in Duquesne which hosts an indicated
mineral resource of 1.9 Mt grading 3.33 g/t Au, containing
199,000 oz Au, and an inferred mineral resource of 1.6 Mt grading
5.58 g/t Au, containing 281,000 oz. Au. A technical
report titled “43-101 Technical Report Resource Estimate of
the Duquesne Gold Property”, was filed by the prior owner on
SEDAR on October 28, 2011, and is available under Clifton
Star’s SEDAR profile at www.sedar.com.
The Duquesne project is situated along the Destor-Porcupine Break,
which boasts historical production of 192 million oz.
Au.
Page 14
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Pitt Gold Project, Québec
The
Pitt Gold Project located in the Abitibi Region of Québec
(“Pitt Gold”) is
situated on a property that covers an area of 384 hectares and is
close to Duquesne and the Duparquet Gold Project (in which First
Mining holds a 10% indirect interest). A technical report in
support of these resources, titled “NI 43-101 Technical
Report and Review of the Preliminary Mineral Resource Estimate for
the Pitt Gold Project, Duparquet Township, Abitibi Region, Quebec,
Canada”, was filed by the Company on SEDAR on January 6, 2017
under the Company’s SEDAR profile at www.sedar.com.
At a cut-off grade of 3.0 g/t Au, Pitt Gold is estimated to have
inferred mineral resources of 1,076,000 tonnes grading 7.42 g/t Au,
containing 257,000 oz. Au.
Mexican Mineral Properties
Tier 3 Projects
As at
December 31, 2018, the Company recorded a write-down of certain
Mexican properties amounting to $4,181 (2017 - $nil). The
write-down represents the complete write-off of the carrying value
of these Mexican properties (except Las Margaritas), as the Company
has no plans for future exploration and has not paid the associated
concession taxes for over 12 months.
Las Margaritas, Durango
The Las
Margaritas property covers an area of 500 hectares consisting of
two mining concessions approximately 150 km from Durango City,
Mexico. The project is located in the Barrancas subprovince of the
Sierra Madre Occidental. Some limited gold mining by artisanal
prospectors is known to have taken place on the project in the
early 20th
century and the project contains a known vein with quartz, argillic
alteration striking for at least 1.8 km. The property was acquired
through an Assignments of Rights Agreement signed July 6, 2011 and
is subject to a 1% NSR royalty payable to the vendor which may be
purchased at any time before July 6, 2016 for USD $500,000. In
2018, an extension was negotiated with the vendor which granted the
Company the option to purchase the 1% NSR royalty by December 2021
for USD $375,000, of which USD $75,000 has been paid.
USA Mineral Property
Tier 3 Projects
Turquoise Canyon, Nevada
The
Turquoise Canyon property (formerly the Bald Mountain property)
located in Nevada is wholly-owned by First Mining. The property
covers an area of 1,562 hectares and is located along the Battle
Mountain-Eureka Trend, 16 km south of Barrick Gold Corp.'s Cortez
Mine Complex (23 million oz Au), 9 km west of its newly discovered
Gold Rush deposit (7.0 million oz. Au) and 1.5 km east of the
Toiyabe Mine, a Carlin type gold deposit that produced 89,000 oz.
Au in the 1990s.
Results
of an airborne ZTEM survey commissioned by the Company show an
antiformal structure in the underlying Roberts Mountain Thrust
which will be the focus of future exploration. A gravity high and
anomalous conductive/polarizable anomalies at the southwest corner
of the property are high priority drill targets. Six other
potential drill targets were interpreted from two induced
polarization/resistivity lines run over the property.
Page 15
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
MINERAL PROPERTY BALANCES
As at
December 31, 2018 and December 31, 2017, the Company had
capitalized the following acquisition, exploration and evaluation
costs to its mineral properties:

The
Company continues with its environmental, permitting and Indigenous
consultation processes at its Tier 1 Canadian mineral properties,
focusing on Springpole, Goldlund and Hope Brook. At Springpole, the
Company continues to collect environmental baseline data and other
information required for its federal and provincial permitting
efforts. At Goldlund, the Company continues with environmental
baseline work and at Hope Brook, the Company has initiated an
Environmental Assessment review of its proposed access road to the
project by submitting a Project Registration document in June
2018.
In
addition to the above mineral property balances, $4,417 is recorded
as mineral property investments on the statements of financial
position, which represents the Company’s 10% indirect
interest in the Duparquet Gold Project in Québec,
Canada.
The
Company’s $8.0 million expenditures on mineral properties
during the year ended December 31, 2018 (2017 - $12.5 million) are
primarily related to the following:
Page 16
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Goldlund
During
the year ended December 31, 2018, the Company drilled approximately
5,000 m, which completed its 16,000 m Phase 2 drilling campaign at
Goldlund. In addition, drill programs were completed at the Miller
and Eaglelund prospect areas, approximating 1,300 m and 600 m,
respectively. The Phase 1 and 2 drilling campaigns were intended to
accomplish four primary objectives:
1.
Convert mineral
resources currently in the inferred category into the indicated
category;
2.
Test drill deeper
exploration targets;
3.
Identify and add
additional mineralization within areas that are adjacent to the
current resource boundary; and
4.
Test drill
additional exploration targets within regional areas.
Springpole
In
2018, the Company completed a 250 m geotechnical coffer dam
drilling program by drilling 11 holes where future coffer dam
footings are planned. Preliminary drill results show low bedrock
hydraulic conductivity which may be an indication of low
permeability. The drill results will be used to create advanced
design plans for the coffer dams and to confirm their optimal
locations, which will form part of the pre-feasibility study work
planned in 2019.
Hope Brook
During
2018, the Company commenced permitting for the construction of a
resource access road to connect its Hope Brook Project to Highway
480 (also known as the Burgeo Highway). The Company also conducted
a broad range of environmental baseline studies at the camp area,
as well as along the proposed access road corridor, to collect the
necessary biophysical data to support a potential EA and future
permitting requirements. These studies include fish community and
habitat surveys, Species at Risk surveys, as well as surface,
groundwater and hydrology surveys.
Page 17
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
RESULTS OF CONTINUING OPERATIONS
For the three months and years ended December 31, 2018 and
2017
Unless
otherwise stated, the following financial data was prepared on a
basis consistent with IFRS:
|
|
Three months ended
December 31,
|
Year ended
December 31,
|
||
|
|
2018
|
2017
|
2018
|
2017
|
|
|
|
|
|
|
|
EXPENDITURES
|
|
|
|
|
|
General and
administration
|
$761
|
$552
|
$2,438
|
$2,509
|
|
Exploration and
evaluation
|
150
|
122
|
658
|
628
|
|
Investor relations
and marketing communications
|
95
|
579
|
1,197
|
2,556
|
|
Corporate
development and due diligence
|
93
|
25
|
270
|
102
|
|
Share-based
payments (non-cash)
|
392
|
20
|
3,032
|
5,497
|
|
Write-down of
mineral properties (non-cash)
|
4,181
|
-
|
4,181
|
-
|
|
Loss from
operational activities
|
(5,672)
|
(1,298)
|
(11,776)
|
(11,292)
|
|
|
|
|
|
|
|
OTHER
ITEMS
|
|
|
|
|
|
Foreign exchange
loss
|
(17)
|
(1)
|
(5)
|
(147)
|
|
Other
expenses
|
(4)
|
(2)
|
(54)
|
(89)
|
|
Interest and other
income
|
35
|
64
|
190
|
344
|
|
Net
loss
|
$(5,658)
|
$(1,237)
|
$(11,645)
|
$(11,184)
|
|
|
|
|
|
|
|
Other
comprehensive income (loss)
|
|
|
|
|
|
Items that will not be reclassified to net income or
loss:
|
|
|
|
|
|
Marketable
securities fair value loss
|
(54)
|
(473)
|
(1,680)
|
(3,399)
|
|
Items that may be reclassified to net income or loss:
|
|
|
|
|
|
Currency
translation adjustment
|
265
|
22
|
431
|
(280)
|
|
Other comprehensive
loss
|
211
|
(451)
|
(1,249)
|
(3,679)
|
|
|
|
|
|
|
|
Total
comprehensive loss
|
$(5,447)
|
$(1,688)
|
$(12,894)
|
$(14,863)
|
Fourth Quarter 2018 Compared to Fourth Quarter 2017
For the
three months ended December 31, 2018, total operating expenditures
(excluding the write-down of mineral properties) increased by $193
compared to the three months ended December 31, 2017. This change
was explained by the following:
Investor relations and marketing communications
Investor
relations and marketing communications decreased by $484 during the
three months ended December 31, 2018 compared to the same period in
2017, primarily due to less marketing activities during the fourth
quarter of 2018.
General and administration
General
and administration increased by $209 during the three months ended
December 31, 2018 compared to the same period in 2017. This
increase is mainly due to severance payments during the fourth
quarter of 2018.
Page 18
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Other functional expenditures
The
amounts in exploration and evaluation; and corporate development
and due diligence were comparable between periods. Exploration and
evaluation expenditures consisted of overhead costs not directly
attributable to specific exploration and evaluation
activities.
Share-based payments (non-cash)
Share-based
payments increased by $372 during the three months ended December
31, 2018 compared to the same period in 2017, primarily due to a
higher number of incentive stock options granted in the fourth
quarter of 2018.
Fiscal Year 2018 Compared to Fiscal Year 2017
For the
year ended December 31, 2018, total operating expenditures
(excluding the write-down of mineral properties) have decreased
compared to the same period in 2017. Some notable variances within
certain functional expenditures are discussed below.
Investor relations and marketing communications
Investor
relations and marketing communications decreased by $1,359 during
the year ended December 31, 2018 compared to the prior year,
primarily due to initiating more focused marketing campaigns during
the current year.
Corporate development and due diligence
Corporate
development and due diligence increased by $168 during the year
ended December 31, 2018 compared to the prior year, primarily due
to allocations related to severance payments which occurred during
the year.
Other functional expenditures
The
amounts in general and administration; and exploration and
evaluation were comparable year-over-year. Exploration and
evaluation expenditures consisted of overhead costs not directly
attributable to specific exploration and evaluation
activities.
Share-based payments (non-cash)
Despite
the total number of incentive stock option grants increasing
year-over-year, the fair value per option decreased by
approximately 55% from $0.49 in the prior year to $0.22 in 2018,
which contributed to an overall decrease of $2,465 in share-based
payments expenditure (non-cash) between the periods. In addition,
the Company adopted vesting criteria for all new grants beginning
in the fourth quarter of 2018.
Page 19
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
FINANCIAL CONDITION, LIQUIDITY AND CAPITAL RESOURCES
|
|
Year
ended December 31,
|
|
|
|
2018
|
2017
|
|
CASH PROVIDED BY (USED IN)
|
|
|
|
Operating
activities
|
$(3,781)
|
$(5,313)
|
|
Investing
activities
|
(7,495)
|
(13,726)
|
|
Financing
activities
|
989
|
1,361
|
|
Foreign exchange
effect on cash
|
2
|
(79)
|
|
CHANGE IN CASH AND CASH EQUIVALENTS
|
(10,285)
|
(17,757)
|
|
Working
capital(1)
|
7,536
|
19,401
|
|
Cash and cash
equivalents, beginning
|
15,400
|
33,157
|
|
Cash and cash
equivalents, ending
|
$5,115
|
$15,400
|
(1)
Working capital is
a non-IFRS measurement with no standardized meaning under IFRS and
may not be comparable to similar financial measures presented by
other issuers. For further information and a detailed
reconciliation, please see the section “Non-IFRS Measures – Working
Capital”.
Cash and Cash Equivalents
The
decrease of $10,285 in cash and cash equivalents from $15,400 at
December 31, 2017 to $5,115 at December 31, 2018 was primarily due
to cash used in investing activities which comprised drilling,
technical analysis, environmental and permitting activities at
Springpole and Goldlund.
Operating Activities
Cash
used in operating activities decreased by $1,532 during the year
ended December 31, 2018 compared to the prior year. This decrease
was driven by a decrease in marketing activities as well as the
absence of a few one-time general and administration expenditures
incurred during the prior year, which included the Company’s
graduation to the TSX and associated one-time TSX initial listing
fees and related professional fees incurred during the second
quarter of 2017.
Investing Activities
For the
year ended December 31, 2018, the cash used in investing activities
was primarily a result of Canadian mineral property expenditures
including the completion of Phase 2 drilling (comprising
approximately 16,000 m) and regional campaigns (comprising
approximately 2,000 m) at Goldlund and environmental and permitting
activities at Springpole. In the prior year period, the cash used
in investing activities of $13,700 was primarily related to the
Phase 1 drilling campaign at Goldlund (comprising approximately
24,300 m) in addition to the purchase of marketable securities for
strategic investment purposes.
Financing Activities
Cash
provided by financing activities from the exercise of warrants and
stock options was $372 higher in the prior year period as more
options were exercised at a higher price.
Trends in Liquidity, Working Capital, and Capital
Resources
As at
December 31, 2018, the Company has working capital of $7,536. The
Company has no history of revenues from its operating activities.
The Company is not in commercial production on any of its mineral
properties and accordingly does not generate cash from operations.
During the year ended December 31, 2018, the Company had negative
cash flow from operating activities, and the Company anticipates it
will have negative cash flow from operating activities in future
periods.
The
Company has, in the past, financed its activities by raising
capital through issuances of new shares. In addition to adjusting
spending, disposing of assets and obtaining other non-equity
sources of financing, the Company will remain reliant on equity
markets for raising capital until it can generate positive cash
flow to finance its exploration and development
programs.
Page 20
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
The
Company believes it has sufficient cash resources to meet its
exploration, development, and administrative overhead expenses and
maintain its planned exploration and development activities for the
next twelve months. However, there is no assurance that the Company
will be able to maintain sufficient working capital in the future
due to market, economic and commodity price
fluctuations.
FINANCIAL LIABILITIES AND COMMITMENTS
The
Company’s financial liabilities as at December 31, 2018 are
summarized as follows:
|
|
Contractual Cash Flows
|
Less than 1 year
|
1 – 3 years
|
4 – 5 years
|
After 5 years
|
|
Accounts payable
and accrued liabilities
|
$582
|
$582
|
$-
|
$-
|
$-
|
There
were no other material financial commitments as at December 31,
2018. Management is of the view that the above financial
liabilities and commitments will be sufficiently funded by current
working capital.
OUTLOOK
First
Mining is an emerging mineral development company with a
diversified portfolio of gold projects in North America. The
Company’s vision is to advance its material assets towards a
construction decision and, ultimately, to production, and we may
acquire additional mineral assets in the future. As at December 31,
2018, the Company held a portfolio of 24 mineral properties located
in Canada, Mexico and the United States.
The
Company is actively conducting environmental studies at its core
Tier 1 Canadian mineral properties, and is continuing Indigenous
community consultations related to these properties. In particular,
the Company is actively collecting environmental baseline data in
relation to fish community and habitat and has begun consultation
efforts with local Indigenous communities within the Springpole
area to support the ongoing federal and provincial EA processes and
prepare the EIS for the project.
The
following is a summary of various milestones achieved by the
Company in 2018, as well as ongoing activities planned for the next
year:
Completed in 2018:
●
The Company signed
the Negotiation Protocol with the Shared Territory Protocol Nations
in relation to Springpole project.
●
The Company
completed the geotechnical drilling program to investigate the lake
bed sediments and bedrock along the proposed alignment of the
coffer dam at Springpole.
●
The Project
Description was filed with CEAA to initiate the federal
Environmental Assessment process for Springpole. Subsequently, CEAA
issued the final EIS guidelines to the Company, and the Company is
now moving forward with the necessary work to prepare an EIS for
the Springpole project.
In Progress – expected to be completed in 2019 or
beyond:
●
The Company is
planning to submit a Terms of Reference to MOECC for Springpole.
The Terms of Reference will provide a framework for the preparation
of a provincial Environmental Assessment, and it will set out the
Company’s work plan for addressing the legislated
requirements of the Ontario Environmental Assessment Act when
preparing the provincial Environmental Assessment.
●
The Company is
conducting further metallurgical studies and testwork to optimize
the process flowsheet and potentially improve the metallurgical
recoveries at Springpole. Following this, the Company plans to
initiate a pre-feasibility study.
●
The Company
undertook a geotechnical drilling program to test the footing
locations for the proposed coffer dams at Springpole. The
information collected will be used to create advanced design plans
for the coffer dams and to confirm their ideal
locations.
Page 21
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
●
The Company plans
to complete additional resource and regional drilling at
Goldlund.
●
The Company plans
to conduct an internal scoping study to assess the economic
potential of the Hope Brook project in 2019.
●
The Company has
commenced permitting for the construction of a resource access road
to Springpole to support a more efficient mode of transportation
for exploration and development activities.
FINANCIAL INSTRUMENTS
Cash and Cash Equivalents
Cash
and cash equivalents include cash and short-term deposits that are
readily convertible to known amounts of cash and which are subject
to an insignificant risk of changes in value. The carrying amounts
approximate fair value due to the short-term maturities of these
instruments.
Cash
and cash equivalents are mainly held in interest bearing accounts
at large Canadian financial institutions.
MARKETABLE SECURITIES
The
Company holds shares in Silver One Resources Inc., which the
Company received as a result of the Company’s sale of certain
Mexican silver assets, and other investments in publicly traded
companies within the mining industry for strategic
purposes.
|
|
Silver One Resources Inc.
|
Other Marketable Securities
|
Total
|
|
Balance
as at December 31, 2017
|
$2,280
|
$1,997
|
$4,277
|
|
Loss recorded in
other comprehensive loss
|
(1,290)
|
(390)
|
(1,680)
|
|
Balance
as at December 31, 2018
|
$990
|
$1,607
|
$2,597
|
|
|
Silver One Resources Inc.
|
Other Marketable Securities
|
Total
|
|
Balance
as at December 31, 2016
|
$5,280
|
$567
|
$5,847
|
|
Purchases
|
-
|
1,829
|
1,829
|
|
Loss recorded in
other comprehensive loss
|
(3,000)
|
(399)
|
(3,399)
|
|
Balance
as at December 31, 2017
|
$2,280
|
$1,997
|
$4,277
|
The
Company holds marketable securities as strategic investments and
has less than a 10% equity interest in each of the
investees.
MINERAL PROPERTY INVESTMENTS
The
Company, through its subsidiary Clifton Star, has a 10% equity
interest in the shares of Beattie Gold Mines Ltd., 2699681 Canada
Ltd., and 2588111 Manitoba Ltd., which directly or indirectly own
various mining concessions and surface rights, collectively known
as the Duparquet Gold Project. As at December 31, 2018, the fair
value of mineral property investments was $4,417 (December 31, 2017
- $4,417). Management concluded that there was no material change
in the fair value of these investments during the
year.
Duparquet Gold Project, Québec
The
Company’s 10% indirect interest in the Duparquet Gold Project
was acquired through the acquisition of Clifton Star. The Duparquet
Gold Project covers an area of 1,147 hectares and is located in the
Abitibi Region of Québec which is one of the world's most
prolific gold producing regions. The Company owns a 10% indirect
interest in the Duparquet Gold Project which, on a 100% basis,
hosts measured mineral resources of 165,000 tonnes grading
1.45 g/t Au, containing 7,700 oz. Au, indicated mineral
resources of 59.5 Mt grading 1.57 g/t Au, containing 3.0 million
oz. Au and inferred mineral resources of 28.5 Mt grading 1.46 g/t
Au, containing 1.3 million oz. Au. The technical report entitled
“Technical Report and Prefeasibility Study for the Duparquet
Project” was filed on SEDAR by Clifton Star on May 23, 2014.
Infrastructure includes site roads, access to electrical power 15
km away, tailings storage facility and water management solutions
and ancillary site buildings. The Duparquet Gold Project is
currently comprised of three mineral properties: Beattie,
Donchester and Dumico. The 2014 prefeasibility study includes
pre-production capital costs of $394 million, a pay-back period of
4.3 years and pre-tax NPV (5%) of $222 million at USD $1,300 per
ounce of gold.
Page 22
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
RELATED PARTY TRANSACTIONS
Amounts
paid to related parties were incurred in the normal course of
business and measured at the exchange amount, which is the amount
agreed upon by the transacting parties and on terms and conditions
similar to non-related parties. There were no significant
transactions with related parties outside of the ordinary course of
business during the year ended December 31, 2018.
OFF-BALANCE SHEET ARRANGEMENTS
The
Company has no off-balance sheet arrangements that have, or are
reasonably likely to have, a current or future effect on the
results of operations or financial condition of the Company
including, without limitation, such considerations as liquidity and
capital resources.
NON-IFRS MEASURES
The
Company has included a non-IFRS measure for “net (loss)
income excluding share-based payments (non-cash)”, “net
(loss) income excluding share-based payments and write-down of
mineral properties (non-cash)” and “working
capital” in this MD&A to supplement its financial
statements, which are presented in accordance with IFRS. The
Company believes that this measure provides investors with an
improved ability to evaluate the performance of the Company.
Non-IFRS measures do not have any standardized meaning prescribed
under IFRS. Therefore, such measures may not be comparable to
similar measures employed by other companies. The data is intended
to provide additional information and should not be considered in
isolation or as a substitute for measures of performance prepared
in accordance with IFRS.
The
Company determines working capital and net (loss) income excluding
share-based payments (non-cash) and write-down of mineral
properties (non-cash) as follows:
Quarterly Reconciliations:
|
Reconciliation as of the end of the period
|
2018-Q4
|
2018-Q3
|
2018-Q2
|
2018-Q1
|
|
Current
assets
|
$8,118
|
$10,166
|
$13,036
|
$17,437
|
|
Less current
liabilities
|
(582)
|
(478)
|
(573)
|
(1,421)
|
|
Working capital
|
$7,536
|
$9,688
|
$12,463
|
$16,016
|
|
Reconciliation as of the end of the period
|
2017-Q4
|
2017-Q3
|
2017-Q2
|
2017-Q1
|
|
Current
assets
|
$20,484
|
$24,420
|
$29,064
|
$35,263
|
|
Less current
liabilities
|
(1,083)
|
(1,009)
|
(601)
|
(1,679)
|
|
Working capital
|
$19,401
|
$23,411
|
$28,463
|
$33,584
|
|
Reconciliation for the three months ended
|
2018-Q4
|
2018-Q3
|
2018-Q2
|
2018-Q1
|
|
Net
loss
|
$(5,658)
|
$(937)
|
$(1,298)
|
$(3,752)
|
|
Excluding
share-based payments (non-cash)
|
392
|
27
|
85
|
2,528
|
|
Excluding
write-down of mineral properties (non-cash)
|
4,181
|
-
|
-
|
-
|
|
Net loss excluding share-based payments and
write-down
of mineral properties
(non-cash)
|
$(1,085)
|
$(910)
|
$(1,213)
|
$(1,224)
|
|
Reconciliation for the three months ended
|
2017-Q4
|
2017-Q3
|
2017-Q2
|
2017-Q1
|
|
Net
loss
|
$(1,237)
|
$(1,296)
|
$(1,998)
|
$(6,653)
|
|
Excluding
share-based payments (non-cash)
|
20
|
99
|
84
|
5,294
|
|
Excluding
write-down of mineral properties (non-cash)
|
-
|
-
|
-
|
-
|
|
Net loss excluding share-based payments and
write-down
of mineral properties
(non-cash)
|
$(1,217)
|
$(1,197)
|
$(1,914)
|
$(1,359)
|
Page 23
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Annual Reconciliations:
|
Reconciliation as of the end of the period
|
2018
|
2017
|
2016
|
|
Current
assets
|
$8,118
|
$20,484
|
$40,826
|
|
Less current
liabilities
|
(582)
|
(1,083)
|
(1,225)
|
|
Working capital
|
$7,536
|
$19,401
|
$39,601
|
|
Reconciliation for the years ended
|
2018
|
2017
|
2016
|
|
Net
loss
|
$(11,645)
|
$(11,184)
|
$(11,155)
|
|
Excluding
share-based payments (non-cash)
|
3,032
|
5,497
|
5,155
|
|
Excluding
write-down of mineral properties (non-cash)
|
4,181
|
-
|
485
|
|
Net loss excluding share-based payments and
write-down of mineral properties (non-cash)
|
$(4,432)
|
$(5,687)
|
$(5,515)
|
CHANGES IN ACCOUNTING POLICIES
There
were no changes in the Company’s significant accounting
policies during the year ended December 31, 2018 that had a
material effect on its consolidated financial statements. The
Company’s significant accounting policies and accounting
estimates are contained in the audited consolidated financial
statements for the year ended December 31, 2018.
ACCOUNTING STANDARDS ISSUED BUT NOT YET APPLIED
The
following are accounting standards anticipated to be effective
January 1, 2019 or later:
IFRS 16 Leases
IFRS 16
will replace IAS 17 “Leases”. IFRS 16 specifies
how to recognize, measure, present and disclose leases. The
standard provides a single lessee accounting model, requiring
lessees to recognize assets and liabilities for all leases unless
the lease term is 12 months or less or the underlying asset has a
low value. Application of the standard is mandatory for annual
periods beginning on or after January 1, 2019. IFRS 16 will result
in an increase in assets and liabilities as fewer lease payments
will be expensed. Management expects an increase in depreciation
expense and also an increase in cash flow from operating activities
as lease payments will be recorded as financing outflows in the
consolidated statements of cash flows. The Company does not expect
these impacts to be material.
There
are no other IFRS or International Financial Reporting
Interpretations Committee interpretations that are not yet
effective that would be expected to have a material impact on the
Company’s consolidated financial statements.
CRITICAL ACCOUNTING JUDGMENTS AND ESTIMATES
The
preparation of financial statements requires the use of accounting
estimates. It also requires management to exercise judgment in the
process of applying its accounting policies. Estimates and
judgments are regularly evaluated and are based on
management’s experience and other factors, including
expectations about future events that are believed to be reasonable
under the circumstances. The use of judgments, estimates and
assumptions affects the application of accounting policies and the
reported amounts of assets and liabilities, income and expense.
Actual results may differ from these estimates. The following discusses
the accounting judgments and estimates that the Company has made in
the preparation of the audited consolidated financial statements
for the year ended December 31, 2018, which could result in a
material adjustment to the carrying amounts of assets and
liabilities:
Impairment of mineral properties:
In
accordance with the Company’s accounting policy for its
mineral properties, exploration and evaluation expenditures on
mineral properties are capitalized. There is no certainty that the
expenditures made by the Company in the exploration of its property
interests will result in discoveries of commercial quantities of
minerals. The Company applies judgment to determine whether
indicators of impairment exist for these capitalized
costs.
Page 24
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Management
uses several criteria in making this assessment, including the
period for which the Company has the right to explore, expected
renewals of exploration rights, whether substantive expenditures on
further exploration and evaluation of mineral properties are
budgeted, and evaluation of the results of exploration and
evaluation activities up to the reporting date.
Determining amount and timing of reclamation
provisions:
A
reclamation provision represents the present value of estimated
future costs for the reclamation of the Company’s mineral
properties. These estimates include assumptions as to the future
activities, cost of services, timing of the reclamation work to be
performed, inflation rates, exchange rates and interest rates. The
actual cost to reclaim a mine may vary from the estimated amounts
because there are uncertainties in factors used to estimate the
cost and potential changes in regulations or laws governing the
reclamation of a mineral property. Management periodically reviews
the reclamation requirements and adjusts the liability, if any, as
new information becomes available and will assess the impact of new
regulations and laws as they are enacted.
Mineral Property Investments:
The
Company makes estimates and assumptions that affect the carrying
value of its mineral property investments, which are comprised of
equity interests in the shares of private companies. These
financial assets are designated as fair value through other
comprehensive income (loss), and management needs to determine the
fair value as at each period end. As there is no observable market
data which can be used to determine this fair value, management
applies judgment in determining whether a significant change in the
fair value of this investment may have occurred. Factors that are
considered include a change in the performance of the investee, a
change in the market for the investee’s future products, a
change in the performance of comparable entities, a change in price
of gold or other metals, a change in the economic environment, or
evidence from external transactions in the investee’s equity.
Changes to these variables could result in the fair value being
less than or greater than the amount recorded.
RISKS AND UNCERTAINTIES
The
Company is subject to a number of risks and uncertainties, each of
which could have an adverse effect on its business operation or
financial results. Some of these risks and uncertainties are
detailed below. For a comprehensive list of the Company’s
risks and uncertainties, see the Company’s Annual Information
Form under the heading “Risks that can affect our
business” for the year ended December 31, 2018 which are
available under our SEDAR profile at www.sedar.com,
and on EDGAR as an exhibit to Form 40-F.
Risks related to Financial Instruments
The
Company thoroughly examines the various financial instruments and
risks to which it is exposed and assesses the impact and likelihood
of those risks. These risks include market risk, price risk,
foreign currency risk, interest rate risk, credit risk, liquidity
risk, and capital risk. Where material, these risks are reviewed
and monitored by the Company’s Board of Directors (the
“Board”).
The
Board has overall responsibility for the determination of the
Company’s risk management objectives and policies. The
overall objective of the Board is to set policies that seek to
reduce risk as far as possible without unduly affecting the
Company’s competitiveness and flexibility.
a)
Market
Risk
Market
risk is the risk that the fair value of future cash flows of a
financial instrument will fluctuate due to changes in market
prices. Market risk includes equity price risk, foreign currency
risk and interest rate risk.
Equity Price Risk
The
Company is exposed to equity price risk as a result of holding
equity investments, which are comprised of marketable securities
and mineral property investments, in other mineral property
exploration companies.
Page 25
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
If the
fair value of our investments in equity instruments had been 10%
higher or lower as at December 31, 2018, other comprehensive loss
for the year ended December 31, 2018 would have decreased or
increased, respectively, by approximately $701 (2017 - $869), as a
result of changes in the fair value of equity
investments.
Foreign Currency Risk
The
Company is exposed to the financial risk related to the fluctuation
of foreign exchange rates. The Company operates in Canada, the
United States, and Mexico, and a portion of the Company’s
expenses are incurred in Canadian dollars (“CAD”), US dollars
(“USD”), and
Mexican Pesos (“MXN”). A significant change in the
currency exchange rates between the Canadian, US and Mexican
currencies, could have an effect on the Company’s results of
operations, financial position or cash flows. The Company has not
hedged its exposure to currency fluctuations.
As at
December 31, 2018, the Company is exposed to currency risk on
certain financial instruments denominated in USD and MXN. The
Company does not have significant transactions or hold significant
cash or other financial instruments denominated in USD and MXN
currencies. Therefore, the Company considers this risk to be
immaterial.
Interest Rate Risk
Interest
rate risk is the risk that future cash flows will fluctuate as a
result of changes in market interest rates. The Company does not
have any borrowings that are subject to fluctuations in market
interest rates. Interest rate risk is limited to potential
decreases on the interest rate offered on cash and cash equivalents
held with chartered Canadian financial institutions. The Company
considers this risk to be immaterial.
b)
Credit
Risk
Credit
risk is the risk of financial loss to the Company if a customer or
counterparty to a financial instrument fails to meet its
contractual obligations. Financial instruments which are
potentially subject to credit risk for the Company consist
primarily of cash and cash equivalents, accounts and other
receivables, and the reclamation deposit. The Company considers
credit risk with respect to its cash and cash equivalents to be
immaterial as cash and cash equivalents are mainly held through
large Canadian financial institutions.
c)
Liquidity
Risk
Liquidity
risk is the risk that the Company will not be able to meet its
financial obligations as they become due. The Company’s
policy is to ensure that it will have sufficient cash to allow it
to meet its liabilities when they become due, under both normal and
stressed conditions, without incurring unacceptable losses or
risking damage to the Company’s reputation. The Company
manages its liquidity risk by preparing annual estimates of
exploration and administrative expenditures and monitoring actual
expenditures compared to the estimates to ensure that there is
sufficient capital on hand to meet ongoing
obligations.
The
following table summarizes the maturities of the Company’s
financial liabilities as at December 31, 2018 based on the
undiscounted contractual cash flows:
|
|
Carrying Amount
|
Contractual Cash Flows
|
Less than 1 year
|
1 – 3
years
|
4 – 5
years
|
After 5
years
|
|
Accounts payable
and accrued liabilities
|
$582
|
$582
|
$582
|
$-
|
$-
|
$-
|
As at
December 31, 2018, the Company had cash and cash equivalents of
$5,115 (December 31, 2017 - $15,400). The Company believes it has
sufficient cash on hand to meet operating requirements as they
arise for at least the next 12 months.
Page 26
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
d)
Capital
Risk Management
The
Company’s objectives when managing capital are to safeguard
the Company’s ability to continue as a going concern in order
to pursue the exploration and retention of its mineral properties.
The Company has historically demonstrated the ability to raise new
capital through equity issuances and/or through surplus cash as
part of its acquisitions. In the management of capital, the Company
includes the components of shareholders’ equity as well as
cash.
The
Company prepares annual estimates of exploration and administrative
expenditures and monitors actual expenditures compared to the
estimates to ensure that there is sufficient capital on hand to
meet ongoing obligations.
Other Risk Factors
Financing Risks
The
Company has finite financial resources, has no current source of
operating cash flow and has no assurance that additional funding
will be available to it for its future activities, including
exploration or development of mineral projects. Such further
activities may be dependent upon the Company’s ability to
obtain financing through equity or debt financing or other
means. Failure to obtain additional financing could result in
delay or indefinite postponement of exploration and development of
the Company’s existing mineral projects and could result in
the loss of one or more of its properties.
Exploration and Development Risks
The
exploration for and development of minerals involves significant
risks, which even a combination of careful evaluation, experience
and knowledge may not eliminate. These risks include:
●
few properties that
are explored are ultimately developed into producing
mines;
●
there can be no
guarantee that the estimates of quantities and qualities of
minerals disclosed will be economically recoverable;
●
with all mining
operations there is uncertainty and, therefore, risk associated
with operating parameters and costs resulting from the scaling up
of extraction methods tested in pilot conditions; and
●
mineral exploration
is speculative in nature and there can be no assurance that any
minerals discovered will result in an increase in our resource
base.
Unsuccessful
exploration or development programs could have a material adverse
impact on the Company’s operations and financial
condition.
Operational hazards and risks
The
Company's operations will be subject to all of the hazards and
risks normally encountered in the exploration and development of
minerals. To the extent that the Company takes a property to
production, the Company will be subject to all of the hazards and
risks associated with the production of minerals. These risks
include:
●
unusual and
unexpected geological formations;
●
rock
falls;
●
seismic
activity;
●
flooding and other
conditions involved in the extraction of material, any of which
could result in damage to, or destruction of, mines and other
producing facilities, damage to life or property, environmental
damage and possible legal liability;
●
environmental
pollution, and consequent liability that could have a material
adverse impact on the Company's business, operations and financial
performance;
●
mechanical
equipment and facility performance problems; and
●
periodic
disruptions due to inclement or hazardous weather
conditions.
Page 27
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Substantial expenditures
Substantial
expenditures are required to establish resources and reserves
through drilling, to develop metallurgical processes to extract the
metal from the ore and, in certain cases, to develop infrastructure
at any site chosen for exploration. Although substantial benefits
may be derived from the discovery of a major mineralized deposit,
no assurance can be given that minerals will be discovered in
sufficient quantities to justify commercial operations or that
funds required for development can be obtained on a timely
basis.
The
economics of developing mineral properties is affected by many
factors including:
●
the cost of
operations;
●
variations in the
grade of mineralized material mined;
●
fluctuations in
metal markets; and
●
such other factors
as government regulations, including regulations relating to
royalties, allowable production, importing and exporting of
minerals and environmental protection.
The
remoteness and restrictions on access of properties in which we
have an interest will have an adverse effect on expenditures as a
result of higher infrastructure costs. There are also physical
risks to the exploration personnel working in the terrain in which
the Company's properties are located, occasionally in poor climate
conditions.
No History of Mineral Production
The
Company has no history of commercially producing metals from its
mineral exploration properties. There can be no assurance that the
Company or any other party will successfully establish mining
operations or profitably produce gold or other precious metals on
any of the Company’s properties. The development of mineral
properties involves a high degree of risk and few properties that
are explored are ultimately developed into producing mines. The
commercial viability of a mineral deposit is dependent upon a
number of factors which are beyond the Company’s control,
including the attributes of the deposit, commodity prices,
government policies and regulation and environmental protection.
Fluctuations in the market prices of minerals may render reserves
and deposits containing relatively lower grades of mineralization
uneconomic.
None of
the Company’s properties are currently under development or
production. The future development of any properties found to be
economically feasible will require applicable licenses and permits
and will require the construction and operation of mines,
processing plants and related infrastructure. As a result, the
development of any property will be subject to all of the risks
associated with establishing new mining operations and business
enterprises, including, but not limited to:
●
the timing and cost
of the construction of mining and processing
facilities;
●
the availability
and costs of skilled labour and mining equipment;
●
the availability
and cost of appropriate smelting and/or refining
arrangements;
●
the need to obtain
necessary environmental and other governmental approvals and
permits and the timing of those approvals and permits;
and
●
the availability of
funds to finance construction and development
activities.
It is
common in new mining operations to experience unexpected problems
and delays during development, construction and mine start-up. In
addition, delays in the commencement of mineral production often
occur. Accordingly, there are no assurances that the
Company’s activities will result in profitable mining
operations or that mining operations will be established at any of
the Company’s properties.
Acquisition of Business Arrangements
As part
of the Company’s business strategy, First Mining has sought
and may continue to seek to acquire new mining and exploration
projects. In pursuit of such opportunities, the Company may fail to
select appropriate acquisition targets or negotiate acceptable
arrangements, including arrangements to finance acquisitions or
integrate the acquired businesses into the Company. Ultimately, any
acquisitions would be accompanied by risks, which could
include:
Page 28
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
●
a significant
change in commodity prices after the Company has committed to
complete the transaction and established the purchase price or
exchange ratio;
●
a material ore body
could prove to be below expectations;
●
difficulty in
integrating and assimilating the operations and workforce of any
acquired companies;
●
realizing
anticipated synergies and maximizing the financial and strategic
position of the combined enterprise;
●
the bankruptcy of
parties with whom the Company has arrangements;
●
maintaining uniform
standards, policies and controls across the
organization;
●
disruption of our
ongoing business and relationships with employees, suppliers,
contractors and other stakeholders as the Company integrates the
acquired business or assets;
●
the acquired
business or assets may have unknown liabilities which may be
significant;
●
delays as a result
of regulatory approvals; and
●
exposure to
litigation (including actions commenced by shareholders) in
connection with the transaction.
Any
material issues that the Company encounters in connection with an
acquisition could have a material adverse effect on its business,
results of operations and financial position.
Mineral Reserves/Mineral Resources
The
properties in which the Company holds an interest are currently
considered to be in the early exploration stage only and do not
contain a known body of commercial minerals beyond the PEA level.
Mineral resources and mineral reserves are, in large part,
estimates and no assurance can be given that any anticipated
tonnages and grades will be achieved or that the particular level
of recovery will be realized.
Mineral
resources on the Company’s properties have been determined
based upon assumed cut-off grades, metal prices and operating costs
at the time of calculation, as set out in the applicable technical
reports. Future production could differ dramatically from resource
and reserve estimates because, among other reasons:
●
mineralization or
formations could be different from those predicted by drilling,
sampling and similar examinations;
●
calculation errors
could be made in estimating mineral resources and mineral
reserves;
●
increases in
operating mining costs and processing costs could adversely affect
mineral resources and mineral reserves;
●
the grade of the
mineral resources and mineral reserves may vary significantly from
time to time and there is no assurance that any particular level of
metals may be recovered from the ore; and
●
declines in the
market price of the metals may render the mining of some or all of
the mineral reserves uneconomic.
Estimated
mineral resources may require downward revisions based on changes
in metal prices, further exploration or development activity,
increased production costs or actual production experience. This
could materially and adversely affect estimates of the tonnage or
grade of mineralization, estimated recovery rates or other
important factors that influence mineral resource and mineral
reserve estimates.
Any
reduction in estimated mineral resources as a result could require
material write downs in investment in the affected mining property
and increased amortization, reclamation and closure charges, which
could have a material and adverse effect on future cash flows for
the property and on the Company’s earnings, results of
operations and financial condition.
Because
the Company does not currently have any producing properties,
mineralization estimates for its properties may require adjustments
or downward revisions based upon further exploration or development
work or actual future production experience. In addition, the grade
of mineralized material ultimately mined, if any, may differ from
that indicated by drilling results. There can be no assurance that
minerals recovered in small-scale tests will be duplicated in
large-scale tests under on- site conditions or in production
scale.
Page 29
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
The
mineral resource estimates contained in this MD&A have been
determined and valued based on assumed future prices, cut-off
grades and operating costs that may prove to be inaccurate.
Extended declines in market prices for gold or other metals may
render portions of our mineralization uneconomic and result in
reduced reported mineralization. Any material reductions in
mineralization estimates, or of the ability to extract mineralized
material from our properties, could (directly or indirectly) have a
material adverse effect on the Company’s results of
operations or financial condition.
Capital Costs, Operating Costs, Production and Economic
Returns
Actual
capital costs, operating costs, production and economic returns
with respect to our properties may differ significantly from those
we have anticipated and there are no assurances that any future
development activities will result in profitable mining operations.
The capital costs required to develop or take our projects into
production may be significantly higher than anticipated. To the
extent that such risks impact upon any such properties, there may
be a material adverse effect on results of operations on such
properties which may in turn have a material adverse effect on our
financial condition.
Substantial Capital Requirements
The
Company’s management team anticipates that it may make
substantial capital expenditures for the exploration and
development of properties in the future. As the Company is in the
exploration stage with no revenue being generated from the
exploration activities on its mineral properties, the Company has
limited ability to raise the capital necessary to undertake or
complete future exploration work, including drilling programs.
There can be no assurance that debt or equity financing will be
available or sufficient to meet these requirements or for other
corporate purposes or, if debt or equity financing is available,
that it will be on terms acceptable to the Company and any such
financing may result in substantial dilution to existing
shareholders. Moreover, future activities may require the Company
to alter its capitalization significantly. The Company’s
inability to access sufficient capital for its operations could
have a material adverse effect on the Company’s financial
condition, results of operations or prospects. In particular,
failure to obtain such financing on a timely basis could cause the
Company to forfeit its interest in certain properties, miss certain
acquisition opportunities and reduce or terminate its
operations.
History of Net Losses
The
Company hasn’t received any revenue to date from activities
on its properties, and there is no assurance that any of its
properties will generate earnings, operate profitably or provide a
return on investment in the future. The Company has not determined
that production activity is warranted on any of its mineral
properties. Even if the Company (alone or in conjunction with a
third party) undertakes development and production activities on
any of its mineral properties, there is no certainty that the
Company will produce revenue, operate profitably or provide a
return on investment in the future. The Company is subject to all
of the risks associated with new mining operations and business
enterprises including, but not limited to:
●
the timing and
cost, which can be considerable, for the future construction of
mining and processing facilities;
●
the availability
and costs of skilled labour, consultants, mining equipment and
supplies;
●
the availability
and cost of appropriate smelting and/or refining
arrangements;
●
the need to first
obtain necessary environmental and other governmental approvals,
licenses and permits, and the timing of those approvals, licenses
and permits; and
●
the availability of
funds to finance construction and development
activities.
It is
common in new mining operations to experience unexpected problems
and delays during construction, development, and mine start-up. In
addition, delays in mineral production often occur. Accordingly,
there are no assurances that the Company’s activities will
result in sustainable profitable mining operations or that the
Company will successfully establish mining operations or profitably
produce metals at any of its properties.
Page 30
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Global Financial Conditions
Global
financial conditions have, at various times in the past and may, in
the future, experience extreme volatility. Many industries,
including the mining industry, are impacted by volatile market
conditions. Global financial conditions may be subject to sudden
and rapid destabilizations in response to economic shocks. A
slowdown in the financial markets or other economic conditions,
including but not limited to consumer spending, employment rates,
business conditions, inflation, fluctuations in fuel and energy
costs, consumer debt levels, lack of available credit, the state of
the financial markets, interest rates and tax rates, may adversely
affect the Company’s growth and financial condition. Future
economic shocks may be precipitated by a number of causes,
including government debt levels, fluctuations in the price of oil
and other commodities, volatility of metal prices, geopolitical
instability, changes in laws or governments, war, terrorism, the
volatility of currency exchanges inflation or deflation, the
devaluation and volatility of global stock markets and natural
disasters. Any sudden or rapid destabilization of global economic
conditions could impact the Company’s ability to obtain
equity or debt financing in the future on terms favourable to the
Company or at all. In such an event, the Company’s operations
and financial condition could be adversely impacted.
Indigenous Peoples
Various
international and national laws, codes, court decisions,
resolutions, conventions, guidelines, and other materials relate to
the rights of Indigenous peoples including the First Nations of
Canada. The Company operates in areas presently or previously
inhabited or used by Indigenous peoples including areas covered by
treaties among the First Nations, the federal government and
applicable provincial governments. Many of these materials impose
obligations on government to respect the rights of Indigenous
people. Some mandate that government consult with Indigenous people
regarding government actions which may affect Indigenous people,
including actions to approve or grant mining rights or exploration,
development or production permits. The obligations of government
and private parties under the various international and national
materials pertaining to Indigenous people continue to evolve.
Government policy and its implementation regarding Indigenous
consultation (including the requirements that are imposed on
industry) continue to change. In certain circumstances, Indigenous
communities are entitled to be consulted prior to, and during,
resource development. The consultation process and expectations of
parties (government, Indigenous communities and industry
proponents) involved can vary considerably from project to project,
within stages of the project life and among Indigenous communities.
There can be overlapping or inconsistent Indigenous or treaty
claims respecting a project. These can contribute to process
uncertainty, increased costs, delay in receiving required
approvals, and potentially, an inability to secure the required
approvals for a project, each of which could have a material
adverse effect on the Company’s business, operations, results
of operations, financial condition and future
prospects.
The
Company’s current and future exploration and development
programs may be subject to a risk that one or more groups of
Indigenous people may oppose development on any of its properties
or on properties in which it holds a direct or indirect interest,
even where the Company has entered into agreements with applicable
Indigenous and non-Indigenous authorities. Such opposition may be
directed through legal or administrative proceedings or expressed
in manifestations such as protests, roadblocks or other forms of
public expression against the Company’s activities.
Opposition by Indigenous people to the Company’s operations
may require modification of or preclude development of its projects
or may require the Company to enter into agreements with or make
payments to Indigenous people with respect to projects on such
properties. Such agreements may result in significant costs to the
Company or have a material adverse effect on the Company’s
business, financial condition and results of operations. Even where
such agreements have been entered into, there can be no certainty
that there will not be disagreements between the Company and groups
or sub-groups of Indigenous persons which may result in project
delays or have other material adverse effects on the
Company.
Page 31
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Environmental Laws and Regulations
All
phases of the mining business present environmental risks and
hazards and are subject to environmental regulation pursuant to a
variety of international conventions and federal, provincial and
local laws and regulations. Environmental legislation provides for,
among other things, restrictions and prohibitions on spills,
releases or emissions of various substances produced in association
with mining operations. The legislation also requires that mines
and exploration sites be operated, maintained, abandoned and
reclaimed to the satisfaction of applicable regulatory authorities.
Compliance with such legislation can require significant
expenditures and a breach may result in the imposition of fines and
penalties, some of which may be material. Environmental legislation
is evolving in a manner expected to result in stricter standards
and enforcement, larger fines and liability and potentially
increased capital expenditures and operating costs. Environmental
Assessments of proposed projects carry a heightened degree of
responsibility for companies and Directors, Officers and employees.
The cost of compliance with changes in governmental regulations has
a potential to reduce the profitability of operations.
The
Company believes it is in substantial compliance with all material
laws and regulations which currently apply to its activities. The
Company cannot give any assurance that, notwithstanding its
precautions and limited history of activities, breaches of
environmental laws (whether inadvertent or not) or environmental
pollution will not result in additional costs or curtailment of
planned activities and investments, which could have a material
adverse effect on the Company’s future cash flows, earnings,
results of operations and financial condition. Failure to comply
with applicable laws, regulations, and permitting requirements may
result in enforcement actions thereunder, including orders issued
by regulatory or judicial authorities causing operations to cease
or be curtailed, and may include corrective measures requiring
capital expenditures, installation of additional equipment, or
remedial actions. Companies engaged in mining operations may be
required to compensate those suffering loss or damage by reason of
the mining activities and may have civil or criminal fines or
penalties imposed for violations of applicable laws or regulations
and, in particular, environmental laws.
Amendments
to current laws, regulations and permits governing operations and
activities of mining companies, or more stringent implementation
thereof, could have a material adverse impact on the Company and
cause increases in capital expenditures or any future production
costs or require abandonment or delays in the development of new
mining properties.
Companies
engaged in the exploration and development of mineral properties
may from time to time experience increased costs and delays in
exploration and production as a result of the need to comply with
applicable laws, regulations and permits. The Company believes it
is in substantial compliance with all material laws and regulations
which currently apply to its activities. First Mining cannot give
any assurance that, notwithstanding our precautions and limited
history of activities, breaches of environmental laws (whether
inadvertent or not) or environmental pollution will not result in
additional costs or curtailment of planned activities and
investments, which could have a material and adverse effect on our
future cash flows, earnings, results of operations and financial
condition.
Title Risks
Title
to mineral properties, as well as the location of boundaries on the
ground may be disputed. Moreover, additional amounts may be
required to be paid to surface right owners in connection with any
mineral exploration or development activities. At all properties
where the Company has current or planned exploration activities, it
believes that it has either contractual, statutory, or common law
rights to make such use of the surface as is reasonably necessary
in connection with those activities.
The
Company does not have title insurance with respect to any of its
mining claims and the Company’s ability to ensure that it has
obtained secure claims to individual mineral properties or mining
concessions may be severely constrained. The Company has not
conducted surveys of all of its claims; therefore, the precise area
and location of such claims may be in doubt. In addition, all of
the Company’s mineral properties have had previous owners,
and third parties may have valid claims (known or unknown)
underlying our interests therein. Accordingly, the Company’s
properties may be subject to prior unregistered liens, agreements,
royalties, transfers or claims, including First Nations land
claims, and title may be affected by, among other things,
undetected defects. In addition, the Company may be unable to
explore its properties as permitted or to enforce its rights with
respect to its properties. An impairment to or defect in the
Company’s title to its properties could have a material
adverse effect on its business, financial condition or results of
operation.
Page 32
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Compliance with Laws
The
Company’s activities are subject to government approvals,
various laws governing prospecting, development, land resumptions,
production taxes, labour standards and occupational health, mine
safety, toxic substances and other matters, including issues
affecting local First Nations populations. The costs associated
with compliance with these laws and regulations can be substantial.
Although the Company believes its activities are carried out in
accordance with all applicable rules and regulations, no assurance
can be given that new rules and regulations will not be enacted or
that existing rules and regulations will not be applied in a manner
which could limit or curtail production or development, or cause
additional expense, capital expenditures, restrictions or delays in
the development of its properties. Amendments to current laws and
regulations governing operations and activities of exploration and
mining, or more stringent implementation thereof, could have a
material adverse impact on our business, operations and financial
performance. Further, the mining licenses and permits issued in
respect of our projects may be subject to conditions which, if not
satisfied, may lead to the revocation of such licenses. In the
event of revocation, the value of the Company’s investments
in such projects may decline.
The
Company’s mineral claims, licenses and permits are subject to
periodic renewal and may only be renewed a limited number of times
for a limited period of time. While the Company anticipates that
renewals will be given as and when sought, there is no assurance
that such renewals will be given as a matter of course and there is
no assurance that new conditions will not be imposed in connection
therewith. The Company’s business objectives may also be
impeded by the costs of holding and/or renewing the mineral claims,
licenses and permits. In addition, the duration and success of
efforts to obtain and renew mineral claims, licenses and permits
are contingent upon many variables not within the Company’s
control.
Permitting
The
Company’s current and anticipated future operations,
including further exploration, development activities and
commencement of production on its properties, require licenses and
permits from various governmental authorities. Our business
requires many environmental, construction and mining permits, each
of which can be time-consuming and costly to obtain, maintain and
renew. In connection with our current and future operations, we
must obtain and maintain a number of permits that impose strict
conditions, requirements and obligations on the Company, including
those relating to various environmental and health and safety
matters. To obtain, maintain and renew certain permits, we are
required to conduct environmental assessments pertaining to the
potential impact of our operations on the environment and to take
steps to avoid or mitigate those impacts. The Company cannot be
certain that all licenses and permits that it may require for its
operations will be obtainable on reasonable terms or at all. Delays
or a failure to obtain such licenses and permits, or a failure to
comply with the terms of any such licenses and permits that we have
obtained, could have a material adverse impact on First
Mining.
In
February 2018, the Government of Canada released Bill C-69 to amend
the current federal approval processes. It is uncertain when the
new legislation will be brought into force and what types of
projects may be affected by the proposed legislation. It is also
uncertain whether any new approval process adopted by the federal
government will result in a more efficient approval process. The
lack of regulatory certainty is likely to have an influence on
investment decisions for major projects. Even when projects are
approved on a federal level, such projects often face further
delays due to interference by provincial and municipal governments,
as well as court challenges related to issues such as indigenous
title, the government's duty to consult and accommodate indigenous
peoples and the sufficiency of the relevant environmental review
processes. Such political and legal opposition creates further
uncertainty.
Climate Change
Climate
change is an international concern and poses risks to issuers of
both direct and indirect effects of physical climate changes and
government policy including climate change legislation and
treaties. Both types of risks could result in increased costs, and
therefore decreased profitability of our operations. Governments at
all levels may be moving towards enacting legislation to address
climate change concerns, such as requirements to reduce emission
levels and increase energy efficiency, and political and economic
events may significantly affect the scope and timing of climate
change measures that are ultimately put in place. Where legislation
has already been enacted, such regulations may become more
stringent, which may result in increased costs of compliance. There
is no assurance that compliance with such regulations will not have
an adverse effect on the Company’s results of operations and
financial condition. Furthermore, given the evolving nature of the
debate related to climate change and resulting requirements, it is
not possible to predict the impact on the Company’s results
of operations and financial condition.
Page 33
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
Climate
change may result in a number of physical impacts on our business,
including an increasing frequency of extreme weather events (such
as increased periods of snow and increased frequency and intensity
of storms), water shortages and extreme temperatures, which have
the potential to disrupt our exploration and development plans and
may have other indirect impacts on our business, including
transportation difficulties and supply disruptions. The
Company’s emergency plans for managing such extreme weather
conditions may not be sufficient and extended disruptions could
have adverse effects on our results of operations and financial
condition.
Key Persons
The
Company manages its business with a number of key personnel,
including key contractors, the loss of a number of whom could have
a material adverse effect on the Company. In addition, as its
business develops and expands, the Company believes that its future
success will depend greatly on our continued ability to attract and
retain highly-skilled and qualified personnel and contractors. In
assessing the risk of an investment in the Company’s shares,
potential investors should realize that they are relying on the
experience, judgment, discretion, integrity and good faith of our
management team and Board of Directors. The Company cannot be
certain that key personnel will continue to be employed by it or
that it will be able to attract and retain qualified personnel and
contractors in the future. Failure to retain or attract key
personnel could have a material adverse effect on the Company. The
Company does not maintain “key person” insurance
policies in respect of its key personnel.
QUALIFIED PERSONS
Dr.
Christopher Osterman, P.Geo, Chief Operating Officer of First
Mining, is a Qualified Person as defined by NI 43-101, and is
responsible for the review and verification of the scientific and
technical information in this MD&A.
SECURITIES OUTSTANDING
Authorized
share capital: The Company can issue an unlimited number of common
shares with no par value and an unlimited number of preferred
shares with no par value. No preferred shares have been issued as
at March 29, 2019.
The
following table sets out all outstanding securities of the Company
as of March 29, 2019.
|
|
Number
|
Weighted Average Exercise Price
|
Expiry Date
|
|
Common
shares – issued
|
558,316,916
|
|
|
|
Stock
options(1)
|
45,715,000
|
$0.57
|
March
30, 2020 – January 7, 2024
|
|
Warrants(2)
|
20,116,855
|
$0.99
|
April
2, 2019 – June 16, 2021
|
|
Common
shares - fully diluted
|
624,148,771
|
|
|
(1)
Each stock option
is exercisable for one common share of the Company.
(2)
Each warrant is
exercisable for one common share of the Company.
The
Company has a number of escrow agreements which arose from past
transactions and the initial formation of the Company:
●
There were a total
of 7,332,273 common shares of the Company held in escrow under the
Escrow Value Security Agreement (“EVSA”) dated March
30, 2015. Under this agreement, 10% of the shares were released
immediately and 15% were released every six months thereafter with
the final release being on March 30, 2018. As at December 31,
2018, there were nil common shares of the Company in the EVSA
escrow (December 31, 2017 – 1,099,842).
●
There were a total
of 1,369,500 common shares of the Company held in escrow under the
CPC Escrow Agreement (“CPC”) dated August 2, 2005. On
March 30, 2015, 10% of the common shares were released and 15% were
released every six months thereafter with the final release being
March 30, 2018. As at December 31, 2018, there were nil common
shares of the Company in the CPC escrow (December 31, 2017 –
194,425).
Page 34
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
●
During the
amalgamation of Tamaka on June 16, 2016, certain vendors deposited
an aggregate of 29,658,290 First Mining shares received into
escrow. Twenty percent of such escrowed shares were released from
escrow on June 17, 2017, and an additional 20% will be released
every six months thereafter, with the final tranche to be released
on June 17, 2019. As at December 31, 2018 there were a total of
5,931,658 shares held in escrow as a result of the Tamaka
transaction (December 31, 2017 – 17,794,974).
DISCLOSURE CONTROLS AND PROCEDURES
The
Company’s management, with the participation of its CEO and
its CFO, have evaluated the effectiveness of the Company’s
disclosure controls and procedures. Based upon the results of that
evaluation, the Company’s CEO and CFO have concluded that, as
of December 31, 2018, the Company’s disclosure controls and
procedures were effective to provide reasonable assurance that the
information required to be disclosed by the Company in reports it
files is recorded, processed, summarized and reported, within the
appropriate time periods and is accumulated and communicated to
management, including the CEO and CFO, as appropriate to allow
timely decisions regarding required disclosure.
MANAGEMENT’S REPORT ON INTERNAL CONTROL OVER FINANCIAL
REPORTING
The
Company’s management, with the participation of its CEO and
CFO, is responsible for establishing and maintaining adequate
internal control over financial reporting as such term is defined
in the SEC’s rules and the rules of the Canadian Securities
Administrators. The Company’s internal control over financial
reporting is a process designed to provide reasonable assurance
regarding the reliability of financial reporting and the
preparation of financial statements for external purposes in
accordance with IFRS as issued by the IASB. The Company’s
internal control over financial reporting includes policies and
procedures that:
●
address maintaining
records that accurately and fairly reflect, in reasonable detail,
the transactions and dispositions of assets of the
Company;
●
provide reasonable
assurance that transactions are recorded as necessary for
preparation of financial statements in accordance with
IFRS;
●
provide reasonable
assurance that the Company’s receipts and expenditures are
made only in accordance with authorizations of management and the
Company’s Directors; and
●
provide reasonable
assurance regarding prevention or timely detection of unauthorized
acquisition, use, or disposition of the Company’s assets that
could have a material effect on the Company’s consolidated
financial statements.
The
Company’s internal control over financial reporting may not
prevent or detect all misstatements because of inherent
limitations. Additionally, projections of any evaluation of
effectiveness for future periods are subject to the risk that
controls may become inadequate because of changes in conditions or
deterioration in the degree of compliance with the Company’s
policies and procedures.
The
Company's management evaluated the effectiveness of our ICFR based
upon the Internal Control - Integrated Framework (2013) issued by
the Committee of Sponsoring Organizations of the Treadway
Commission. Based on management's evaluation, our CEO and CFO
concluded that our ICFR was effective and there were no material
weaknesses as of December 31, 2018.
There
has been no change in the Company's internal control over financial
reporting during the year ended December 31, 2018 that has
materially affected, or is reasonably likely to materially affect,
the Company's internal control over financial
reporting.
LIMITATIONS OF CONTROLS AND PROCEDURES
The
Company’s management, including the CEO and CFO, believes
that any disclosure controls and procedures or internal control
over financial reporting, no matter how well conceived and
operated, may not prevent or detect all misstatements because of
inherent limitations. Further, the design of a control system must
reflect the fact that there are resource constraints, and the
benefits of controls must be considered relative to their costs.
Because of the inherent limitations in all control systems, they
cannot provide absolute assurance that all control issues and
instances of fraud, if any, within the Company have been prevented
or detected. These inherent limitations include the realities that
judgments in decision-making can be faulty, and that breakdowns can
occur because of a simple error or mistake. Additionally, controls
can be circumvented by the individual acts of some persons, by
collusion of two or more people, or by unauthorized override of the
control. The design of any control system is also based in part
upon certain assumptions about the likelihood of future events, and
there can be no assurance that any design will succeed in achieving
its stated goals under all potential future conditions.
Accordingly, because of the inherent limitations in a cost
effective control system, misstatements due to error or fraud may
occur and may not be detected.
Page 35
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
FORWARD-LOOKING INFORMATION
This
MD&A is based on a review of the Company’s operations,
financial position and plans for the future based on facts and
circumstances as of December 31, 2018. This MD&A contains
“forward-looking statements” within the meaning of
applicable Canadian securities regulations (collectively,
“forward-looking statements”). Any statements that
express or involve discussions with respect to predictions,
expectations, beliefs, plans, projections, objectives, assumptions
or future events or performance (often, but not always, using words
or phrases such as “seek”, “anticipate”,
“plan”, “continue”, “estimate”,
“expect”, “may”, “will”,
“project”, “predict”,
“forecast”, “potential”,
“targeting”, “intend”, “could”,
“might”, “should”, “believe”
and similar expressions) are not statements of historical fact and
may be “forward-looking statements”. These statements
relate to future events or the Company’s future performance,
business prospects or opportunities. Forward-looking statements
include, but are not limited to: statements regarding the
advancement of the Company’s mineral assets towards
production; statements regarding the next stages of the
metallurgical study or the environmental, permitting and indigenous
consultation process at Springpole; statements regarding the
Company’s intentions and expectations regarding exploration,
infrastructure and production potential of any of its mineral
properties; statements relating to the Company's working capital,
capital expenditures and ability and intentions to raise capital;
statements regarding the potential effects of financing on the
Company's capitalization, financial condition and operations;
forecasts relating to mining, development and other activities at
the Company’s operations; forecasts relating to market
developments and trends in global supply and demand for gold;
statements relating to future global financial conditions and the
potential effects on the Company; statements relating to future
work on the Company’s non-material properties; statements
relating to the Company’s mineral reserve and mineral
resource estimates; statements regarding regulatory approval and
permitting including, but not limited to, EA approval for the
Springpole project and the expected timing of such EA approval;
statements regarding the Company's compliance with laws and
regulations including, but not limited to environmental laws and
regulations; statements regarding Gainey's anticipated adherence to
required payment and expenditure obligations pursuant to the Option
Agreement; statements regarding improved efficiency as a result of
building new access roads to mineral properties; statements
regarding the Company’s engagement with local stakeholders;
statements regarding the Company's ability to enter into agreements
with local stakeholders including, but not limited to, local
Indigenous groups; statements regarding key personnel; statements
regarding non-IFRS measures and changes in accounting standards;
statements relating to the limitation of the Company's internal
controls over financial reporting; and statements regarding the
preparation or conduct of studies and reports and the expected
timing of the commencement and completion of such studies and
reports.
There
can be no assurance that such statements will prove to be accurate,
and future events and actual results could differ materially from
those anticipated in such statements. Important factors that could
cause actual results to differ materially from the Company’s
expectations are disclosed under the heading “Risk
Factors” in the Company’s Annual Information Form for
the year ended December 31, 2018 and other continuous disclosure
documents filed from time to time via SEDAR with the applicable
Canadian securities regulators. Forward-looking statements are
based on the estimates and opinions of management on the date the
statements are made, and the Company does not undertake any
obligation to update forward-looking statements should conditions
or our estimates or opinions change, except as required by
applicable laws. Actual results may differ materially from those
expressed or implied by such forward-looking statements. These
statements involve known and unknown risks, uncertainties, and
other factors that may cause the Company’s actual results,
levels of activity, performance or achievements to be materially
different from any future results, levels of activity, performance
or achievement expressed or implied by these forward-looking
statements.
The
Company believes that the expectations reflected in any such
forward-looking statements are reasonable, but no assurance can be
given that these expectations will prove to be correct and such
forward-looking statements included herein this MD&A should not
be unduly relied upon.
Page 36
FIRST MINING GOLD
CORP.
Management Discussion &
Analysis
(Expressed in
thousands of Canadian dollars, unless otherwise
indicated)
For the three months and year ended
December 31, 2018
CAUTIONARY NOTE TO U.S. INVESTORS REGARDING MINERAL RESOURCE AND
MINERAL RESERVE ESTIMATES
This
MD&A has been prepared in accordance with the requirements of
Canadian securities laws, which differ in certain material respects
from the disclosure requirements of United States securities laws.
The terms “mineral reserve”, “proven mineral
reserve” and “probable mineral reserve” are
Canadian mining terms as defined in accordance with NI 43-101 and
the Canadian Institute of Mining, Metallurgy and Petroleum
(“CIM”) 2014
Definition Standards on Mineral Resources and Mineral Reserves,
adopted by the CIM Council, as amended. These definitions differ
from the definitions in the disclosure requirements promulgated by
the United States Securities and Exchange Commission (the
“SEC”) and
contained in SEC Industry Guide 7 (“Industry Guide 7”). Under Industry
Guide 7 standards, a “final” or “bankable”
feasibility study is required to report mineral reserves, the
three-year historical average price is used in any mineral reserve
or cash flow analysis to designate mineral reserves and the primary
environmental analysis or report must be filed with the appropriate
governmental authority.
In
addition, the terms “mineral
resource”, “measured mineral resource”,
“indicated mineral
resource” and “inferred mineral resource” are
defined under the 2014 CIM definition standards, and are required
to be disclosed by NI 43-101. However, these terms are not defined
under Industry Guide 7 and are not permitted to be used in reports
and registration statements of United States companies filed with
the SEC. Investors are cautioned not to assume that any part or all
of the mineral deposits in these categories will ever be converted
into mineral reserves. “Inferred mineral resources”
have a great amount of uncertainty as to their existence, and great
uncertainty as to their economic and legal feasibility. It cannot
be assumed that all or any part of an inferred mineral resource
will ever be upgraded to a higher category. Under Canadian rules,
estimates of inferred mineral resources may not form the basis of
feasibility or pre-feasibility studies, except in rare cases.
Investors are cautioned not to assume that all or any part of an
inferred mineral resource exists or is economically or legally
mineable. Disclosure of “contained ounces” in a mineral
resource is permitted disclosure under Canadian regulations. In
contrast, the SEC only permits U.S. companies to report
mineralization that does not constitute “mineral
reserves” by SEC standards as in place tonnage and grade
without reference to unit measures.
Accordingly,
information contained in this MD&A may not be comparable to
similar information made public by U.S. companies subject to the
reporting and disclosure requirements under the United States
federal securities laws and the rules and regulations of the SEC
thereunder.
Page 37