Firstenergy Corp 10-K, filed Feb 28, 2007: Annual Report - Fe
GLOSSARY
OF
TERMS
The
following
abbreviations and acronyms are used in this report to identify FirstEnergy
Corp.
and its current and former subsidiaries:
|
ATSI
|
American
Transmission Systems, Inc., owns and operates transmission
facilities
|
|
Avon
|
Avon
Energy
Partners Holdings
|
|
CEI
|
The
Cleveland
Electric Illuminating Company, an Ohio electric utility operating
subsidiary
|
|
Centerior
|
Centerior
Energy Corporation, former parent of CEI and TE, which merged
with OE to
form
FirstEnergy
on
November 8, 1997
|
|
Companies
|
OE,
CEI, TE,
Penn, JCP&L, Met-Ed and Penelec
|
|
FENOC
|
FirstEnergy
Nuclear Operating Company, operates nuclear generating
facilities
|
|
FES
|
FirstEnergy
Solutions Corp., provides energy-related products and
services
|
|
FESC
|
FirstEnergy
Service Company, provides legal, financial, and other corporate
support
services
|
|
FGCO
|
FirstEnergy
Generation Corp., owns and operates non-nuclear generating
facilities
|
|
FirstCom
|
First
Communications, LLC, provides local and long-distance telephone
service
|
|
FirstEnergy
|
FirstEnergy
Corp., a public utility holding company
|
|
FSG
|
FirstEnergy
Facilities Services Group, LLC, former parent of several heating,
ventilation,
air
conditioning and energy management companies
|
|
GLEP
|
Great
Lakes
Energy Partners, LLC, an oil and natural gas exploration and
production
venture
|
|
GPU
|
GPU,
Inc.,
former parent of JCP&L, Met-Ed and Penelec, which merged with
FirstEnergy on
November 7,
2001
|
|
JCP&L
|
Jersey
Central
Power & Light Company, a New Jersey electric utility operating
subsidiary
|
|
JCP&L
Transition
Funding
|
JCP&L
Transition Funding LLC, a Delaware limited liability company
and issuer of
transition bonds
|
|
JCP&L
Transition
Funding
II
|
JCP&L
Transition Funding II LLC, a Delaware limited liability company
and issuer
of transition bonds
|
|
Met-Ed
|
Metropolitan
Edison Company, a Pennsylvania electric utility operating
subsidiary
|
|
MYR
|
MYR
Group,
Inc., a utility infrastructure construction service
company
|
|
NGC
|
FirstEnergy
Nuclear Generation Corp., owns nuclear generating
facilities
|
|
OE
|
Ohio
Edison
Company, an Ohio electric utility operating subsidiary
|
|
Ohio
Companies
|
CEI,
OE and
TE
|
|
Penelec
|
Pennsylvania
Electric Company, a Pennsylvania electric utility operating
subsidiary
|
|
Penn
|
Pennsylvania
Power Company, a Pennsylvania electric utility operating subsidiary
of
OE
|
|
PNBV
|
PNBV
Capital
Trust, a special purpose entity created by OE in 1996
|
|
Shippingport
|
Shippingport
Capital Trust, a special purpose entity created by CEI and TE
in
1997
|
|
TE
|
The
Toledo
Edison Company, an Ohio electric utility operating
subsidiary
|
|
TEBSA
|
Termobarranquilla
S.A., Empresa de Servicios
Publicos
|
|
The
following
abbreviations and acronyms are used to identify frequently used
terms in
this report:
|
|
ALJ
|
Administrative
Law Judge
|
|
|
AOCL
|
Accumulated
Other Comprehensive Loss
|
|
|
APB
|
Accounting
Principles Board
|
|
|
APB
25
|
APB
Opinion
No. 25, "Accounting for Stock Issued to Employees"
|
|
|
ARO
|
Asset
Retirement Obligation
|
|
|
B&W
|
Babcock
&
Wilcox Company
|
|
|
Bechtel
|
Bechtel
Power
Corporation
|
|
|
BGS
|
Basic
Generation Service
|
|
|
BTU
|
British
Thermal Unit
|
|
|
CAIR
|
Clean
Air
Interstate Rule
|
|
|
CAL
|
Confirmatory
Action Letter
|
|
|
CAMR
|
Clean
Air
Mercury Rule
|
|
|
CAT
|
Commercial
Activity Tax
|
|
|
CBP
|
Competitive
Bid Process
|
|
|
CO2
|
Carbon
Dioxide
|
|
|
CONSOL
|
CONSOL
Energy
Inc.
|
|
|
CTC
|
Competitive
Transition Charge
|
|
|
DCPD
|
Deferred
Compensation Plan for Outside Directors
|
|
|
DOJ
|
United
States
Department of Justice
|
|
i
GLOSSARY
OF
TERMS, Cont'd.
|
DRA
|
Division
of
Ratepayer Advocate
|
|
|
ECAR
|
East
Central
Area Reliability Coordination Agreement
|
|
|
EDCP
|
Executive
Deferred Compensation Plan
|
|
|
EEI
|
Edison
Electric Institute
|
|
|
EITF
|
Emerging
Issues Task Force
|
|
|
EITF
99-19
|
EITF
Issue No.
99-19, "Reporting Revenue Gross as a Principal versus Net as an
Agent"
|
|
|
EPA
|
Environmental
Protection Agency
|
|
|
EPACT
|
Energy
Policy
Act of 2005
|
|
|
ERO
|
Electric
Reliability Organization
|
|
|
ESOP
|
Employee
Stock
Ownership Plan
|
|
|
FASB
|
Financial
Accounting Standards Board
|
|
|
FERC
|
Federal
Energy
Regulatory Commission
|
|
|
FIN
|
FASB
Interpretation
|
|
|
FIN
46R
|
FIN
46
(revised December 2003), "Consolidation of Variable Interest
Entities"
|
|
|
FIN
47
|
FIN
47,
"Accounting for Conditional Asset Retirement Obligations - an
interpretation of FASB Statement No. 143"
|
|
|
FIN
48
|
FIN
48,
“Accounting for Uncertainty in Income Taxes-an interpretation of FASB
Statement No. 109”
|
|
|
Fitch
|
Fitch
Ratings,
Ltd.
|
|
|
FMB
|
First
Mortgage
Bonds
|
|
|
FSP
|
FASB
Staff
Position
|
|
|
FSP
SFAS 115-1
and
SFAS
124-1
|
FSP
SFAS 115-1
and SFAS 124-1, “The Meaning of Other-Than-Temporary Impairment and its
Application
to
Certain Investments”
|
|
|
GAAP
|
Accounting
Principles Generally Accepted in the United States
|
|
|
GHG
|
Greenhouse
Gases
|
|
|
HVAC
|
Heating,
Ventilation and Air-conditioning
|
|
|
IRS
|
Internal
Revenue Service
|
|
|
KWH
|
Kilowatt-hours
|
|
|
LOC
|
Letter
of
Credit
|
|
|
LTIP
|
Long-term
Incentive Program
|
|
|
MISO
|
Midwest
Independent Transmission System Operator, Inc.
|
|
|
Moody’s
|
Moody’s
Investors Service
|
|
|
MOU
|
Memorandum
of
Understanding
|
|
|
MTC
|
Market
Transition Charge
|
|
|
MW
|
Megawatts
|
|
|
NAAQS
|
National
Ambient Air Quality Standards
|
|
|
NERC
|
North
American
Electric Reliability Corporation
|
|
|
NJBPU
|
New
Jersey
Board of Public Utilities
|
|
|
NOPR
|
Notice
of
Proposed Rulemaking
|
|
|
NOV
|
Notice
of
Violation
|
|
|
NOX
|
Nitrogen
Oxide
|
|
|
NRC
|
Nuclear
Regulatory Commission
|
|
|
NUG
|
Non-Utility
Generation
|
|
|
NUGC
|
Non-Utility
Generation Charge
|
|
|
OCC
|
Office
of the
Ohio Consumers' Counsel
|
|
|
OCI
|
Other
Comprehensive Income
|
|
|
OPEB
|
Other
Post-Employment Benefits
|
|
|
PJM
|
PJM
Interconnection L. L. C.
|
|
|
PLR
|
Provider
of
Last Resort
|
|
|
PPUC
|
Pennsylvania
Public Utility Commission
|
|
|
PRP
|
Potentially
Responsible Party
|
|
|
PUCO
|
Public
Utilities Commission of Ohio
|
|
|
PUHCA
|
Public
Utility
Holding Company Act of 1935
|
|
|
RCP
|
Rate
Certainty
Plan
|
|
|
RFP
|
Request
for
Proposal
|
|
|
RSP
|
Rate
Stabilization Plan
|
|
|
RTC
|
Regulatory
Transition Charge
|
|
|
RTO
|
Regional
Transmission Organization
|
|
|
RTOR
|
Regional
Through and Out Rates
|
|
|
S&P
|
Standard
&
Poor’s Ratings Service
|
|
|
S&P
500
|
Standard
&
Poor’s Index of Widely Held Common Stocks
|
|
|
SBC
|
Societal
Benefits Charge
|
|
|
SEC
|
U.S.
Securities and Exchange Commission
|
|
ii
GLOSSARY
OF
TERMS, Cont'd.
|
SFAS
|
Statement
of
Financial Accounting Standards
|
|
SFAS
71
|
SFAS
No. 71,
"Accounting for the Effects of Certain Types of
Regulation"
|
|
SFAS
87
|
SFAS
No. 87,
"Employers' Accounting for Pensions"
|
|
SFAS
101
|
SFAS
No. 101,
"Accounting for Discontinuation of Application of SFAS
71"
|
|
SFAS
106
|
SFAS
No. 106,
"Employers' Accounting for Postretirement Benefits Other Than
Pensions"
|
|
SFAS
107
|
SFAS
No. 107,
“Disclosure about Fair Value of Financial Instruments”
|
|
SFAS
115
|
SFAS
No. 115,
"Accounting for Certain Investments in Debt and Equity
Securities"
|
|
SFAS
123(R)
|
SFAS
No.
123(R), "Share-Based Payment"
|
|
SFAS
133
|
SFAS
No. 133,
“Accounting for Derivative Instruments and Hedging
Activities”
|
|
SFAS
142
|
SFAS
No. 142,
"Goodwill and Other Intangible Assets"
|
|
SFAS
143
|
SFAS
No. 143,
"Accounting for Asset Retirement Obligations"
|
|
SFAS
144
|
SFAS
No. 144,
"Accounting for the Impairment or Disposal of Long-Lived
Assets"
|
|
SFAS
157
|
SFAS
No. 157,
“Fair Value Measurements”
|
|
SFAS
158
|
SFAS
No. 158,
“Employers’ Accounting for Defined Benefit Pension and Other
Postretirement
Plans-an
amendment of FASB Statements No. 87, 88, 106, and
132(R)”
|
|
SFAS
159
|
SFAS
No. 159,
“The Fair Value Option for Financial Assets and Financial Liabilities
-
Including an
Amendment
of
FASB Statement No. 115”
|
|
SIP
|
State
Implementation Plan(s) Under the Clean Air Act
|
|
SO2
|
Sulfur
Dioxide
|
|
SRM
|
Special
Reliability Master
|
|
TBC
|
Transition
Bond Charge
|
|
TMI-1
|
Three
Mile
Island Unit 1
|
|
TMI-2
|
Three
Mile
Island Unit 2
|
|
VIE
|
Variable
Interest Entity
|
|
VMEP
|
Vegetation
Management Enhancement Project
|
iii
MANAGEMENT
REPORTS
Management's
Responsibility for Financial Statements
The
consolidated
financial statements were prepared by management, who takes responsibility
for
their integrity and objectivity. The statements were prepared in conformity
with
accounting principles generally accepted in the United States and are consistent
with other financial information appearing elsewhere in this report.
PricewaterhouseCoopers LLP, an independent registered public accounting firm,
has expressed an unqualified opinion on the Company’s 2006 consolidated
financial statements.
FirstEnergy
Corp.’s
internal auditors, who are responsible to the Audit Committee of FirstEnergy’s
Board of Directors, review the results and performance of operating units within
the Company for adequacy, effectiveness and reliability of accounting and
reporting systems, as well as managerial and operating controls.
FirstEnergy’s
Audit
Committee consists of five independent directors whose duties include:
consideration of the adequacy of the internal controls of the Company and the
objectivity of financial reporting; inquiry into the number, extent, adequacy
and validity of regular and special audits conducted by independent auditors
and
the internal auditors; and reporting to the Board of Directors the Committee’s
findings and any recommendation for changes in scope, methods or procedures
of
the auditing functions. The Committee is directly responsible for appointing
the
Company’s independent registered public accounting firm and is charged with
reviewing and approving all services performed for the Company by the
independent registered public accounting firm and for reviewing and approving
the related fees. The Committee reviews the independent registered public
accounting firm's report on internal quality control and reviews all
relationships between the independent registered public accounting firm and
the
Company, in order to assess the independent registered public accounting firm's
independence. The Committee also reviews management’s programs to monitor
compliance with the Company’s policies on business ethics and risk management.
The Committee establishes procedures to receive and respond to complaints
received by the Company regarding accounting, internal accounting controls,
or
auditing matters and allows for the confidential, anonymous submission of
concerns by employees. The Audit Committee held ten meetings in
2006.
Management's
Report on Internal Control Over Financial Reporting
Management
is
responsible for establishing and maintaining adequate internal control over
financial reporting as defined in Rule 13a-15(f) of the Securities Exchange
Act of 1934. Using the criteria set forth by the Committee of Sponsoring
Organizations of the Treadway Commission in Internal
Control
- Integrated Framework,
management
conducted an evaluation of the effectiveness of the Company’s internal control
over financial reporting under the supervision of the chief executive officer
and the chief financial officer. Based on that evaluation, management concluded
that the Company’s internal control over financial reporting was effective as of
December 31, 2006.
Management’s
assessment of the effectiveness of the Company’s internal control over financial
reporting, as of December 31, 2006, has been audited by
PricewaterhouseCoopers LLP, an independent registered public accounting firm,
as
stated in their report which appears on page 2.
1
To
the Stockholders and Board of Directors of FirstEnergy Corp.:
We
have completed
integrated audits of FirstEnergy Corp.’s consolidated financial statements
and of its internal control over financial reporting as of December 31, 2006,
in
accordance with the standards of the Public Company Accounting Oversight Board
(United States). Our opinions, based on our audits, are presented
below.
Consolidated
financial statements and financial statement schedules
In
our opinion, the
accompanying consolidated balance sheets and the related consolidated statements
of income, capitalization, common stockholders' equity, preferred stock and
cash
flows present fairly, in all material respects, the financial position of
FirstEnergy Corp. and its subsidiaries at December 31, 2006 and 2005, and the
results of their operations and their cash flows for each of the three years
in
the period ended December 31, 2006 in conformity with accounting principles
generally accepted in the United States of America. These financial statements
are the responsibility of the Company’s management. Our responsibility is to
express an opinion on these financial statements based on our audits. We
conducted our audits of these statements in accordance with the standards of
the
Public Company Accounting Oversight Board (United States). Those standards
require that we plan and perform the audit to obtain reasonable assurance about
whether the financial statements are free of material misstatement. An audit
of
financial statements includes examining, on a test basis, evidence supporting
the amounts and disclosures in the financial statements, assessing the
accounting principles used and significant estimates made by management, and
evaluating the overall financial
statement
presentation. We believe that our audits provide a reasonable basis for our
opinion.
As
discussed in Note
3 to the consolidated financial statements, the Company changed the manner
in
which it accounts for defined benefit pension and other postretirement benefit
plans as of December 31, 2006. As discussed in Note 2(K) and Note 12 to the
consolidated financial statements, the Company changed its method of accounting
for conditional
asset
retirement obligations as of December 31, 2005.
Internal
control
over financial reporting
Also,
in our
opinion, management’s assessment, included in the accompanying Management's
Report on Internal Control Over Financial Reporting, that the Company maintained
effective internal control over financial reporting as of December 31, 2006
based on criteria established in Internal
Control
- Integrated Framework
issued by the
Committee of Sponsoring Organizations of the Treadway Commission (COSO), is
fairly stated, in all material respects, based on those criteria. Furthermore,
in our opinion, the Company maintained, in all material respects, effective
internal control over financial reporting as of December 31, 2006, based on
criteria established in Internal
Control
- Integrated Framework
issued by the COSO.
The Company’s management is responsible for maintaining effective internal
control over financial reporting and for its assessment of the effectiveness
of
internal control over financial reporting. Our responsibility is to express
opinions on management’s assessment and on the effectiveness of the Company’s
internal control over financial reporting based on our audit. We conducted
our
audit of internal control over financial reporting in accordance with the
standards of the Public Company Accounting Oversight Board (United States).
Those standards require that we plan and perform the audit to obtain reasonable
assurance about whether effective internal control over financial reporting
was
maintained in all material respects. An audit of internal control over financial
reporting includes obtaining an understanding of internal control over financial
reporting, evaluating management’s assessment, testing and evaluating the design
and operating effectiveness of internal control, and performing such other
procedures as we consider necessary in the circumstances. We believe that our
audit provides a reasonable basis for our opinions.
A
company’s internal
control over financial reporting is a process designed to provide reasonable
assurance regarding the reliability of financial reporting and the preparation
of financial statements for external purposes in accordance with generally
accepted accounting principles. A company’s internal control over financial
reporting includes those policies and procedures that (i) pertain to the
maintenance of records that, in reasonable detail, accurately and fairly reflect
the transactions and dispositions of the assets of the company;
(ii) provide reasonable assurance that transactions are recorded as
necessary to permit preparation of financial statements in accordance with
generally accepted accounting principles, and that receipts and expenditures
of
the company are being made only in accordance with authorizations of management
and directors of the company; and (iii) provide reasonable assurance
regarding prevention or timely detection of unauthorized acquisition, use,
or
disposition of the company’s assets that could have a material effect on the
financial statements.
Because
of its
inherent limitations, internal control over financial reporting may not prevent
or detect misstatements. Also, projections of any evaluation of effectiveness
to
future periods are subject to the risk that controls may become inadequate
because of changes in conditions, or that the degree of compliance with the
policies or procedures may deteriorate.
PricewaterhouseCoopers
LLP
Cleveland,
Ohio
February
27,
2007
2
The
following
selected financial data should be read in conjunction with, and is qualified
in
its entirety by reference to, the sections entitled “Management’s Discussion and
Analysis of Results of Operations and Financial Condition” and with
our
consolidated financial statements and the “Notes to Consolidated Financial
Statements.” Our Statements of Income are not necessarily indicative of future
conditions or results of operations.
|
FIRSTENERGY
CORP.
|
|||||||||||||||||||||||
|
SELECTED
FINANCIAL DATA
|
|||||||||||||||||||||||
|
For
the Years Ended December 31,
|
2006
|
2005
|
2004
|
2003
|
2002
|
||||||||||||||||||
|
(In
millions, except per share amounts)
|
|||||||||||||||||||||||
|
Revenues
|
$
|
11,501
|
$
|
11,358
|
$
|
11,600
|
$
|
10,802
|
$
|
10,527
|
|||||||||||||
|
Income
From
Continuing Operations
|
$
|
1,258
|
$
|
879
|
$
|
907
|
$
|
494
|
$
|
609
|
|||||||||||||
|
Net
Income
|
$
|
1,254
|
$
|
861
|
$
|
878
|
$
|
423
|
$
|
553
|
|||||||||||||
|
Basic
Earnings
per Share of Common Stock:
|
|||||||||||||||||||||||
|
Income
from
continuing operations
|
$
|
3.85
|
$
|
2.68
|
$
|
2.77
|
$
|
1.63
|
$
|
2.08
|
|||||||||||||
|
Net
earnings
per basic share
|
$
|
3.84
|
$
|
2.62
|
$
|
2.68
|
$
|
1.39
|
$
|
1.89
|
|||||||||||||
|
Diluted
Earnings per Share of Common Stock:
|
|||||||||||||||||||||||
|
Income
from
continuing operations
|
$
|
3.82
|
$
|
2.67
|
$
|
2.76
|
$
|
1.62
|
$
|
2.07
|
|||||||||||||
|
Net
earnings
per diluted share
|
$
|
3.81
|
$
|
2.61
|
$
|
2.67
|
$
|
1.39
|
$
|
1.88
|
|||||||||||||
|
Dividends
Declared per Share of Common Stock (1)
|
$
|
1.85
|
$
|
1.705
|
$
|
1.9125
|
$
|
1.50
|
$
|
1.50
|
|||||||||||||
|
Total
Assets
|
$
|
31,196
|
$
|
31,841
|
$
|
31,035
|
$
|
32,878
|
$
|
34,366
|
|||||||||||||
|
Capitalization
as of December 31:
|
|||||||||||||||||||||||
|
Common
Stockholders’ Equity
|
$
|
9,035
|
$
|
9,188
|
$
|
8,590
|
$
|
8,290
|
$
|
7,051
|
|||||||||||||
|
Preferred
Stock:
|
|||||||||||||||||||||||
|
Not
Subject to
Mandatory Redemption
|
-
|
184
|
335
|
335
|
335
|
||||||||||||||||||
|
Subject
to
Mandatory Redemption
|
-
|
-
|
-
|
-
|
428
|
||||||||||||||||||
|
Long-Term
Debt
and Other Long-Term
|
|||||||||||||||||||||||
|
Obligations
|
8,535
|
8,155
|
10,013
|
9,789
|
10,872
|
||||||||||||||||||
|
Total
Capitalization
|
$
|
17,570
|
$
|
17,527
|
$
|
18,938
|
$
|
18,414
|
$
|
18,686
|
|||||||||||||
|
Weighted
Average Number of Basic
|
|||||||||||||||||||||||
|
Shares
Outstanding
|
324
|
328
|
327
|
304
|
293
|
||||||||||||||||||
|
Weighted
Average Number of Diluted
|
|||||||||||||||||||||||
|
Shares
Outstanding
|
327
|
330
|
329
|
305
|
294
|
||||||||||||||||||
|
(1)
Dividends declared in 2006 include three
quarterly payments
of $0.45 per share in 2006 and one quarterly payment of $0.50
per share
payable in
2007,
increasing
the
indicated annual dividend rate from $1.80 to $2.00 per share.
Dividends
declared in 2005 include two quarterly payments of
$0.4125
per share
in 2005,
one quarterly payment of $0.43 per share in 2005 and one
quarterly payment
of $0.45 per share in 2006. Dividends declared in
2004
include
four quarterly dividends of $0.375 per share paid in 2004
and a quarterly
dividend of $0.4125 per share paid in 2005. Dividends
declared in
2002
and
2003 include four quarterly dividends of $0.375 per
share.
|
|||||||||||||||||||||||
PRICE
RANGE
OF COMMON STOCK
The
Common Stock of
FirstEnergy Corp. is listed on the New York Stock Exchange under the symbol
"FE"
and is traded on other registered exchanges.
|
2006
|
2005
|
||||||||||||
|
First
Quarter
High-Low
|
$
|
52.17
|
$
|
47.75
|
$
|
42.36
|
$
|
37.70
|
|||||
|
Second
Quarter
High-Low
|
$
|
54.57
|
$
|
48.23
|
$
|
48.96
|
$
|
40.75
|
|||||
|
Third
Quarter
High-Low
|
$
|
57.50
|
$
|
53.47
|
$
|
53.00
|
$
|
47.46
|
|||||
|
Fourth
Quarter
High-Low
|
$
|
61.70
|
$
|
55.99
|
$
|
53.36
|
$
|
45.78
|
|||||
|
Yearly
High-Low
|
$
|
61.70
|
$
|
47.75
|
$
|
53.36
|
$
|
37.70
|
|||||
|
Prices
are
from http://finance.yahoo.com.
|
|||||||||||||
3
SHAREHOLDER
RETURN
The
following graph
shows the total cumulative return from a $100 investment on December 31,
2001 in FirstEnergy’s common stock compared with the total cumulative returns of
the EEI’s Index of Investor-Owned Electric Utility Companies and the S&P
500.

HOLDERS
OF
COMMON STOCK
There
were 127,400
and 126,821 holders of 319,205,517 shares of FirstEnergy's Common Stock as
of
December 31, 2006 and January 31, 2007, respectively. Information
regarding retained earnings available for payment of cash dividends is given
in
Note 11(A) to the consolidated financial statements.
4
FIRSTENERGY
CORP.
MANAGEMENT'S
DISCUSSION AND ANALYSIS OF
RESULTS
OF
OPERATIONS AND FINANCIAL CONDITION
Forward-Looking
Statements:
This discussion
includes forward-looking statements based on information currently available
to
management. Such statements are subject to certain risks and uncertainties.
These statements typically contain, but are not limited to, the terms
“anticipate,” “potential,” “expect,” “believe,” “estimate” and similar words.
Actual results may differ materially due to the speed and nature of increased
competition and deregulation in the electric utility industry, economic or
weather conditions affecting future sales and margins, changes in markets for
energy services, changing energy and commodity market prices, replacement power
costs being higher than anticipated or inadequately hedged, the continued
ability of our regulated utilities to collect transition and other charges
or to
recover increased transmission costs, maintenance costs being higher than
anticipated, legislative and regulatory changes (including revised environmental
requirements), and the legal and regulatory changes resulting from the
implementation of the EPACT (including, but not limited to, the repeal of the
PUHCA), the uncertainty of the timing and amounts of the capital expenditures
needed to, among other things, implement the Air Quality Compliance Plan
(including that such amounts could be higher than anticipated) or levels of
emission reductions related to the Consent Decree resolving the New Source
Review litigation, adverse regulatory or legal decisions and outcomes
(including, but not limited to, the revocation of necessary licenses or
operating permits, fines or other enforcement actions and remedies) of
governmental investigations and oversight, including by the SEC, the NRC and
the
various state public utility commissions as disclosed in our SEC filings,
generally, and heightened scrutiny at the Perry Nuclear Power Plant in
particular, the timing and outcome of various proceedings before the PUCO
(including, but not limited to, the successful resolution of the issues remanded
to the PUCO by the Ohio Supreme Court regarding the Rate Stabilization Plan)
and
the PPUC, including the transition rate plan filings for Met-Ed and Penelec,
the
continuing availability and operation of generating units, the ability of our
generating units to continue to operate at, or near full capacity, the inability
to accomplish or realize anticipated benefits from strategic goals (including
employee workforce initiatives), the anticipated benefits from voluntary pension
plan contributions, the ability to improve electric commodity margins and to
experience growth in the distribution business, the ability to access the public
securities and other capital markets and the cost of such capital, the outcome,
cost and other effects of present and potential legal and administrative
proceedings and claims related to the August 14, 2003 regional power
outage, the successful structuring and completion of a potential sale and
leaseback transaction for Bruce Mansfield Unit 1 currently under consideration
by management, the successful implementation of the share repurchase program
announced January 31, 2007, the risks and other factors discussed from time
to time in our SEC filings, and other similar factors. Dividends declared from
time to time on FirstEnergy’s common stock during any annual period may in
aggregate vary from the indicated amounts due to circumstances considered by
FirstEnergy’s Board of Directors at the time of the actual declarations. Also, a
security rating is not a recommendation to buy, sell or hold securities, and
it
may be subject to revision or withdrawal at any time and each such rating should
be evaluated independently of any other rating. We expressly disclaim any
current intention to update any forward-looking statements contained herein
as a
result of new information, future events, or otherwise.
EXECUTIVE
SUMMARY
Net
income in 2006
was $1.25 billion, or basic earnings of $3.84 per share of common stock
($3.81 diluted), compared with net income of $861 million, or basic
earnings of $2.62 per share ($2.61 diluted) in 2005 and $878 million, or basic
earnings of $2.68 per share ($2.67 diluted) in 2004. The
increase in
FirstEnergy’s earnings was driven primarily by increased electric sales
revenues, reduced transition cost amortization for the Ohio Companies, cost
deferrals authorized by the PUCO and PPUC, and reduced operating
expenses.
|
Change
in Basic Earnings Per Share From Prior Year
|
|
2006
|
|
2005
|
|
2004
|
|
||||
|
Basic
Earnings
Per Share - Prior Year
|
$
|
2.62
|
$
|
2.68
|
$
|
1.39
|
|||||
|
PPUC
NUG
accounting adjustment in 2006
|
(0.02
|
)
|
-
|
-
|
|||||||
|
Trust
securities impairment in 2006
|
(0.02
|
)
|
-
|
-
|
|||||||
|
Ohio/New
Jersey income tax adjustments in 2005
|
0.19
|
(0.19
|
)
|
-
|
|||||||
|
Sammis
Plant
New Source Review settlement in 2005
|
0.04
|
(0.04
|
)
|
-
|
|||||||
|
Davis-Besse
fine/penalty in 2005
|
0.10
|
(0.10
|
)
|
-
|
|||||||
|
JCP&L
arbitration decision in 2005
|
0.03
|
(0.03
|
)
|
-
|
|||||||
|
New
regulatory
assets - JCP&L settlement in 2005
|
(0.05
|
)
|
0.05
|
-
|
|||||||
|
Lawsuits
settlements in 2004
|
-
|
0.03
|
(0.03
|
)
|
|||||||
|
Nuclear
operations severance costs in 2004
|
-
|
0.01
|
(0.01
|
)
|
|||||||
|
Davis-Besse
extended outage impacts
|
-
|
0.12
|
0.44
|
||||||||
|
Discontinued
Operations:
|
|||||||||||
|
Non-core
asset
sales/impairments
|
(0.02
|
)
|
0.21
|
(0.19
|
)
|
||||||
|
Other
|
(0.02
|
)
|
(0.09
|
)
|
0.67
|
||||||
|
Revenues
|
|
|
0.26
|
(0.44
|
)
|
1.46
|
|||||
|
Transition
costs amortization
|
0.82
|
(0.18
|
)
|
(0.10
|
)
|
||||||
|
Deferral
of
new regulatory assets
|
0.23
|
0.22
|
0.12
|
||||||||
|
Fuel
and
purchased power
|
(0.43
|
)
|
0.72
|
(0.81
|
)
|
||||||
|
Other
expenses
|
0.24
|
(0.30
|
)
|
(0.20
|
)
|
||||||
|
Investment
income
|
|
|
(0.11
|
)
|
0.02
|
0.04
|
|||||
|
Interest
expense
|
|
|
(0.11
|
)
|
0.02
|
0.23
|
|||||
|
Cumulative
effect of a change in accounting principle
|
0.09
|
(0.09
|
)
|
(0.33
|
)
|
||||||
|
Basic
Earnings
Per Share
|
|
$
|
3.84
|
$
|
2.62
|
$
|
2.68
|
||||
5
Total
electric
generation sales increased 1.1% during 2006 compared to the prior year as a
6.7%
increase in retail sales more than offset a 19.1% reduction in wholesale sales.
The increase was primarily due to the return of customers to the Ohio Companies
from third-party suppliers that exited the northern Ohio marketplace. Electric
distribution deliveries were down 2.3% in 2006, compared to 2005, reflecting
milder weather conditions in 2006.
Dividends
- On
December 19, 2006, FirstEnergy’s Board of Directors declared a quarterly
dividend of $0.50 per share on outstanding common stock payable March 1,
2007. The new indicated annual dividend will be $2.00 per share, $0.20 per
share
higher than the previous annual level. This action is consistent with our
policy, which targets sustainable annual dividend growth and a payout that
is
appropriate for our level of earnings.
Share
Repurchase
-
On
January 30, 2007, FirstEnergy’s Board of Directors authorized a new share
repurchase program for up to 16 million shares, or approximately 5% of
FirstEnergy's outstanding common stock. This new program supplements the prior
repurchase program approved on June 20, 2006, such that up to 26.6 million
potential shares may ultimately be repurchased under the combined plans. At
management's discretion, shares may be acquired on the open market or through
privately negotiated transactions, subject to market conditions and other
factors. The Board's authorization of the repurchase program does not require
FE
to purchase any shares and the program may be terminated at any time. Under
the
prior program, approximately 10.6 million shares were repurchased on
August 10, 2006 at an initial purchase price of $600 million, or
$56.44 per share. The final purchase price under that program will be adjusted
to reflect the ultimate cost to acquire the shares over a period of up to seven
months ending March 2007. FirstEnergy is currently in negotiations with a major
financial institution to enter into a new accelerated share repurchase program
contingent among other things on amending its current accelerated share
repurchase program to allow FirstEnergy to enter into the new accelerated
repurchase program.
Generation
FirstEnergy's
generating fleet produced a record 82.0 billion KWH during 2006 compared to
80.2 billion KWH in 2005. FirstEnergy's non-nuclear fleet produced a record
53.0 billion KWH, while its nuclear facilities produced 29.0 billion
KWH.
Increased
Generation
Capacity - During 2006, generation capacity at several units in FirstEnergy’s
fleet increased as a result of work completed in connection with outages for
refueling or other maintenance. These capacity additions were achieved in
support of FirstEnergy’s operating strategy to maximize its existing
generation assets. The resulting increases in generating capacity are summarized
below:
|
2006
Power Uprates (MW)
|
||
|
Fossil:
|
||
|
Bruce
Mansfield Unit 2
|
50
|
|
|
Nuclear:
|
||
|
Beaver
Valley
Unit 1
|
25
|
|
|
Beaver
Valley
Unit 2
|
10
|
|
|
Davis-Besse
|
14
|
|
|
49
|
||
|
Total
|
99
|
|
Beaver Valley Power Station - On December 19, 2006, the NRC issued a NOV and
a
Confirmatory Order related to a June 1, 2005, incident in which a contract
engineer at Beaver Valley signed off on an incomplete Engineering Change Package
(ECP) related to the planned 2006 Beaver Valley Unit 1 reactor head replacement.
The NRC’s investigation concluded that the contractor deliberately violated
FENOC’s procedure; that FENOC quickly identified and resolved the incomplete
ECP; and that FENOC implemented corrective actions to prevent a recurrence.
The
violation was classified as Level III, with no civil penalty.
New
Coal Supply
Agreement -
On June 22, 2006,
FGCO entered into a new coal supply agreement with CONSOL under which CONSOL
will supply a total of more than 128 million tons of high-BTU coal to
FirstEnergy for a 20-year period beginning in 2009. The new agreement will
replace a coal supply agreement that took effect in 2003 and extended through
2020. Under the new agreement, CONSOL will increase its coal shipments by
approximately 2 million tons per year.
Environmental Update - In
June 2006,
FirstEnergy finalized its air quality compliance strategy for 2006 through
2011.
The program, which is currently expected to cost approximately $1.8 billion
with the majority of those expenditures occurring between 2007 and 2009, is
consistent with previous estimates and assumptions reflected in FirstEnergy’s
long-term financial planning for air and water quality and other environmental
matters.
6
Wind Power Generation - In 2006, FirstEnergy entered into multi-year agreements
to purchase a combined 284.5 MW of wind power output from three wind power
generation projects. Two of the projects are being developed in Pennsylvania
and
the third is being developed in West Virginia. The projects are anticipated
to
be completed by the end of 2007. When combined with prior agreements, this
brings the total wind power generation output under long-term contracts to
314.5
MW.
Rate
Matters
Pennsylvania
- On
April 10, 2006 Met-Ed and Penelec made a comprehensive rate filing with the
PPUC
that addressed transmission, distribution and supply issues and requested annual
rate increases of $216 million and $157 million, respectively. On January 11,
2007, the PPUC issued an order approving overall rate increases for Met-Ed
of 5%
($59 million) and Penelec of 4.5% ($50 million). Based on the outcome of the
rate filing, Met-Ed, Penelec and FES agreed to restate their partial
requirements power sales agreement effective January 1, 2007. The restated
agreement incorporates the same fixed price for energy and capacity supplied
by
FES as in prior arrangements and allows Met-Ed and Penelec to sell the output
of
their NUG generation into the market.
New
Jersey - On
December 6, 2006, the NJBPU approved a stipulation of settlement in its
NUGC rate proceeding allowing JCP&L to recover $165 million of deferred
costs over an 18-month period beginning on December 6, 2006. The costs were
incurred by JCP&L during the period August 1, 2003 through
December 31, 2005 to meet a portion of customers’ generation needs with
mandated NUG supply contracts. The approved stipulation increases JCP&L’s
cash flow, but is earnings neutral.
Ohio
- On
May 3, 2006, the Ohio Supreme Court affirmed the Ohio Companies’ RSP for
their customers, with respect to the rate stabilization charge, the shopping
credits, the granting of interest on shopping credit incentive deferral amounts,
and the Ohio Companies’ financial separation plan. It remanded back to the PUCO
the matter of ensuring the availability of sufficient means for customer
participation in the competitive marketplace. On September 29, 2006,
FirstEnergy’s Ohio electric utility companies filed their proposal to establish
a competitive bid process for market-based generation supply under which
suppliers could submit prices to serve a portion of each Ohio Company’s customer
load. This proposal was in response to a July 26, 2006 PUCO directive to file
plans for a competitive retail electric service option. If adopted, customers
would have the opportunity to switch to alternative generation suppliers at
prices established through the RFP program during 2007 and 2008.
Penn
Power RFP - On
October 19, 2006, the PPUC certified the RFP results for all customer
classes reflecting the successful completion of the RFP bidding process. The
RFP
was conducted to secure Penn’s PLR supply for the period January 1, 2007
through May 31, 2008 for those customers that do not choose alternative
suppliers.
Financings
New
Long-Term Debt
Issuances - During 2006, several of FirstEnergy’s subsidiaries issued new
long-term debt. The proceeds from these transactions were primarily used to
support FirstEnergy’s financing strategy of obtaining more financial flexibility
at the holding company and having more appropriate capital structures at the
operating companies. The table below summarizes the new long-term debt issued
in
2006, including the respective uses of proceeds:
|
Company
|
Principal
(millions)
|
Maturity
|
Use
of
Proceeds
|
|
|
JCP&L
|
$
|
200
|
2036
|
Fund
maturing
long-term debt
|
|
JCP&L*
|
182
|
2021
|
Preferred
stock redemption; common stock repurchase; short-term debt
reduction
|
|
|
OE
|
250
|
2016
|
Preferred
stock redemption; common stock repurchase; short-term debt
reduction
|
|
|
OE
|
350
|
2036
|
Preferred
stock redemption; common stock repurchase; short-term debt
reduction
|
|
|
TE
|
300
|
2037
|
Preferred
stock redemption; common stock repurchase
|
|
|
CEI
|
300
|
2036
|
Common
stock
repurchase
|
|
|
FGCO
|
26
|
2041
|
Short-term
debt reduction
|
|
|
$
|
1,608
|
|||
|
*
Securitization bonds
|
||||
FirstEnergy
Senior
Note Retirement - On July 31, 2006, FirstEnergy redeemed $400 million of the
$1 billion principal amount of its 5.5% Notes, Series A, in advance of the
November 15, 2006 maturity date, with the remaining $600 million repaid at
maturity.
Preferred
Stock
Redemptions - During the year, several of FirstEnergy’s electric utilities
redeemed all of their outstanding issues of preferred stock to reduce overall
financing costs and improve financial flexibility: OE - $61 million, Penn -
$14 million, TE - $96 million and JCP&L - $13 million. As a
result of these redemptions, FirstEnergy’s electric utility subsidiaries no
longer have outstanding preferred stock.
7
Pollution Control Debt Transfers - In
April and
December 2006, approximately $1.1 billion of pollution control debt of OE,
CEI,
TE, and Penn was refinanced by FGCO and NGC. These transactions bring the total
amount of the utilities’ pollution control debt refinanced by the generation
companies to approximately $1.4 billion, with approximately
$700 million remaining to be transferred. These refinancings support the
intra-system generation asset transfer that was completed in 2005.
Renewed and Upsized Credit Facility - On August 24, 2006, FirstEnergy and
certain of its subsidiaries, including all of its operating utility
subsidiaries, entered into a new five-year syndicated credit facility totaling
$2.75 billion. The new facility replaced FirstEnergy’s previous
$2 billion credit facility and provides an average annual savings of 10
basis points on facility-related borrowing costs.
FIRSTENERGY’S
BUSINESS
FirstEnergy
is a
public utility holding company headquartered in Akron, Ohio that operates
primarily through two core business segments (see Results of
Operations).
|
·
|
Regulated
Services
transmits and
distributes electricity through FirstEnergy's eight utility operating
companies, serving 4.5 million customers within 36,100 square miles
of Ohio, Pennsylvania and New Jersey. This business segment derives
its
revenue principally from the delivery of electricity generated or
purchased by the Power Supply Management Services segment or, in
some
cases, purchased from independent suppliers in the states where the
utility subsidiaries operate and transition cost recovery.
|
The
service areas of
FirstEnergy’s utilities are summarized below:
|
Company
|
Area
Served
|
Customers
Served
|
|
OE
|
Central
and
Northeastern Ohio
|
1,042,000
|
|
Penn
|
Western
Pennsylvania
|
159,000
|
|
CEI
|
Northeastern
Ohio
|
762,000
|
|
TE
|
Northwestern
Ohio
|
314,000
|
|
JCP&L
|
Northern,
Western and East
Central
New
Jersey
|
1,082,000
|
|
Met-Ed
|
Eastern
Pennsylvania
|
542,000
|
|
Penelec
|
Western
Pennsylvania
|
589,000
|
|
ATSI
|
Service
areas
of OE, Penn,
CEI
and
TE
|
|
·
|
Power
Supply Management Services
owns and
operates FirstEnergy's power plants and purchases power to supply
the
electric power needs of customers in Ohio, Pennsylvania, Michigan,
Maryland and New Jersey. Wholesale arrangements with FirstEnergy's
Ohio
and Pennsylvania utility subsidiaries provide the power to meet all
or a
portion of their PLR requirements. This segment also markets energy
and
energy-related products to deregulated wholesale and retail markets.
The
segment's net income is primarily derived from electric generation
sales
revenues less the related costs of electricity generation, including
purchased power, and net transmission, congestion and ancillary costs
charged by PJM and MISO to deliver energy to retail
customers.
|
Other
operating
segments include HVAC services (divestiture completed in 2006) and
telecommunication services. We have substantially completed the divestiture
of
our non-core businesses (see Note 16 to the consolidated financial
statements). The assets and revenues for the other business operations are
below
the quantifiable threshold for separate disclosure as “reportable operating
segments.”
STRATEGY
We have targeted four objectives that reflect our strong focus on the
fundamentals: improve operating performance, strengthen financial performance,
enhance shareholder value; and ensure a safe work environment for employees.
To
achieve these goals, we are pursuing strategies that include successfully
managing the transition to competitive generation markets; investing in our
transmission and distribution infrastructure to enhance system reliability
and
customer service; reinvesting in our generating assets for cost-effective growth
and environmental improvement; effectively managing commodity supplies and
risks; and delivering consistent and predictable financial
results.
8
Our success in these and other key areas will help us continue to achieve our
vision of being a leading regional energy provider, recognized for operational
excellence, customer service and our commitment to safety; the choice for
long-term growth, investment value and financial strength; and a company driven
by the leadership, skills, diversity and character of its employees.
RISKS
AND
CHALLENGES
In
executing our
strategy, we face a number of industry and enterprise risks and challenges,
including:
|
·
|
Risks
arising
from the reliability of our power plants and transmission and distribution
equipment;
|
|
·
|
Changes
in
commodity prices that could adversely affect our profit margins;
|
|
·
|
We
are exposed
to operational, price and credit risks associated with selling
and
marketing products in the power markets that we do not always completely
hedge against;
|
|
·
|
Our
risk
management policies relating to energy and fuel prices, and counterparty
credit are by their very nature risk related, and we could suffer
economic
losses despite such policies;
|
|
·
|
Nuclear
generation involves risks that include uncertainties relating to
health
and safety, additional capital costs, the adequacy of insurance
coverage
and nuclear plant decommissioning;
|
|
·
|
We
rely on
transmission and distribution assets that we do not own or control
to
deliver our wholesale electricity. If transmission is disrupted
including
our own transmission, or not operated efficiently, or if capacity
is
inadequate, our ability to sell and deliver power may be
hindered;
|
|
·
|
Disruptions
in
our fuel supplies could occur, which could adversely affect our
ability to
operate our generation facilities;
|
|
·
|
Seasonal
temperature variations, as well as weather conditions or other
natural
disasters, could have a negative impact on our results of operations
specifically with respect to our PLR contracts that do not provide
for a
specific level of supply, and demand significantly below or above
our
forecasts could adversely affect our energy margins;
|
|
·
|
We
are subject
to financial performance risks related to the economic cycles of
the
electric utility industry;
|
|
·
|
The
goodwill of
one or more of our operating subsidiaries may become impaired,
which would
result in write-offs of the impaired amounts;
|
|
·
|
We
face
certain human resource risks associated with the availability of
trained
and qualified labor to meet our future staffing requirements;
|
|
·
|
Significant
increases in our operation and maintenance expenses, including
our health
care and pension costs, that could adversely affect our future
earnings
and liquidity;
|
|
·
|
Acts
of war or
terrorism that could negatively impact our business;
|
|
·
|
Complex
and
changing government regulations could have a negative impact on
our
results of operations;
|
|
·
|
Regulatory
changes in the electric industry including a reversal, discontinuance
or
delay of the present trend towards competitive markets could affect
our
competitive position and result in unrecoverable costs adversely
affecting
our business and results of operations;
|
|
·
|
Our
profitability is impacted by our affiliated companies’ continued
authorization to sell power at market-based rates;
|
|
·
|
The
amount we
charge third parties for using our transmission facilities may
be reduced
and not recovered;
|
|
·
|
There
are
uncertainties relating to our participation in the PJM and MISO
regional
transmission organizations;
|
9
|
·
|
Costs
of
compliance with environmental laws are significant, and the cost
of
compliance with future environmental laws could adversely affect
cash flow
and profitability;
|
|
·
|
We
are and may
become subject to legal claims arising from the presence of asbestos
or
other regulated substances at some of our facilities;
|
|
·
|
The
continuing
availability and operation of generating units is dependent on
retaining
the necessary licenses, permits, and operating authority from governmental
entities, including the NRC;
|
|
·
|
We
may
ultimately incur liability in connection with federal
proceedings;
|
|
·
|
Interest
rates
and/or a credit ratings downgrade could negatively affect our financing
costs and our ability to access capital;
|
|
·
|
We
must rely
on cash from our subsidiaries; and
|
|
·
|
We
cannot
assure common shareholders that future dividend payments will be
made, or
if made, in what amounts they may be
paid.
|
FIRSTENERGY
INTRA-SYSTEM GENERATION ASSET TRANSFERS
In
2005, the Ohio
Companies and Penn entered into certain agreements implementing a series of
intra-system generation asset transfers that were completed in the fourth
quarter of 2005. The asset transfers resulted in the respective undivided
ownership interests of the Ohio Companies and Penn in our nuclear and
non-nuclear generation assets being owned by NGC and FGCO, respectively. The
generating plant interests transferred do not include leasehold interests of
CEI, OE and TE in certain of the plants that are currently subject to sale
and
leaseback arrangements with non-affiliates.
On
October 24,
2005, the Ohio Companies and Penn completed the intra-system transfer of
non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee
under a Master Facility Lease with the Ohio Companies and Penn, leased, operated
and maintained the non-nuclear generation assets that it now owns. The asset
transfers were consummated pursuant to FGCO's purchase option under the Master
Facility Lease.
On
December 16,
2005, the Ohio Companies and Penn completed the intra-system transfer of their
respective ownership interests in the nuclear generation assets to NGC through,
in the case of OE and Penn, an asset spin-off in the form of a dividend and,
in
the case of CEI and TE, a sale at net book value.
On
December 28,
2006, the NRC approved the transfer of ownership in NGC from FirstEnergy to
FES.
Effective December 31, 2006, NGC is a wholly owned subsidiary of FES and
second tier subsidiary of FirstEnergy. FENOC continues to operate and maintain
the nuclear generation assets.
These
transactions
were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans
that were approved by the PUCO and the PPUC, respectively, under applicable
Ohio
and Pennsylvania electric utility restructuring legislation. Consistent with
the
restructuring plans, generation assets that had been owned by the Ohio Companies
and Penn were required to be separated from the regulated delivery business
of
those companies through transfer or sale to a separate corporate entity. The
transactions essentially completed the divestitures of owned assets contemplated
by the restructuring plans by transferring the ownership interests to NGC and
FGCO without impacting the operation of the plants. The transfers were
intracompany transactions and, therefore, had no impact on our consolidated
results.
RECLASSIFICATIONS
As
discussed in
Notes 1 and 16 to the consolidated financial statements, certain prior year
amounts have been reclassified to conform to the current year presentation
and
to reflect certain businesses divested in 2006 that have been classified as
discontinued operations (see Note 2(J)). These reclassifications did not
change previously reported earnings for 2005 and 2004. All reclassifications
have been evaluated and determined to be properly reflected as reclassifications
in the respective period as presented in the Consolidated Statements of Income,
Balance Sheets and Statements of Cash Flow.
The
financial
results discussed below include revenues and expenses from transactions among
our business segments. A reconciliation of segment financial results is provided
in Note 16 to the consolidated financial statements. The divested FSG
business segment is included in “Other and Reconciling Adjustments” due to its
immaterial impact on current period financial results. Net income (loss) by
major business segment was as follows:
10
|
|
|
|
|
Increase
(Decrease)
|
||||||||||||
|
|
2006
|
2005
|
2004
|
2006
vs 2005
|
2005
vs 2004
|
|||||||||||
|
|
(In
millions, except per share amounts)
|
|||||||||||||||
|
Net
Income (Loss)
|
|
|
|
|
|
|||||||||||
|
By
Business Segment:
|
|
|
|
|
|
|||||||||||
|
Regulated
services
|
$
|
932
|
$
|
1,153
|
$
|
1,047
|
$
|
(221
|
)
|
$
|
106
|
|||||
|
Power
supply
management services
|
465
|
(50
|
)
|
112
|
515
|
(162
|
)
|
|||||||||
|
Other
and
reconciling adjustments*
|
(143
|
)
|
(242
|
)
|
(281
|
)
|
99
|
39
|
||||||||
|
Total
|
$
|
1,254
|
$
|
861
|
$
|
878
|
$
|
393
|
$
|
(17
|
)
|
|||||
|
|
||||||||||||||||
|
Basic
Earnings Per Share:
|
||||||||||||||||
|
Income
from
continuing operations
|
$
|
3.85
|
$
|
2.68
|
$
|
2.77
|
$
|
1.17
|
$
|
(0.09
|
)
|
|||||
|
Discontinued
operations
|
(0.01
|
)
|
0.03
|
(0.09
|
)
|
(0.04
|
)
|
0.12
|
||||||||
|
Cumulative
effect of a change in accounting
principle
|
-
|
(0.09
|
)
|
-
|
0.09
|
(0.09
|
)
|
|||||||||
|
Basic
earnings
per share
|
$
|
3.84
|
$
|
2.62
|
$
|
2.68
|
$
|
1.22
|
$
|
(0.06
|
)
|
|||||
|
Diluted
Earnings Per Share:
|
||||||||||||||||
|
Income
from
continuing operations
|
$
|
3.82
|
$
|
2.67
|
$
|
2.76
|
$
|
1.15
|
$
|
(0.09
|
)
|
|||||
|
Discontinued
operations
|
(0.01
|
)
|
0.03
|
(0.09
|
)
|
(0.04
|
)
|
0.12
|
||||||||
|
Cumulative
effect of a change in accounting
principle
|
-
|
(0.09
|
)
|
-
|
0.09
|
(0.09
|
)
|
|||||||||
|
Diluted
earnings per share
|
$
|
3.81
|
$
|
2.61
|
$
|
2.67
|
$
|
1.20
|
$
|
(0.06
|
)
|
|||||
* Represents
other
operating segments and reconciling items including interest expense on holding
company debt, corporate support services revenues and expenses and the impact
of
the 2005 Ohio tax legislation.
Summary
of Results of Operations - 2006 Compared with 2005
Financial
results
for our major business segments in 2006 and 2005 were as follows:
|
|
|
|
|
Power
|
|
|
|
|
|
||||
|
|
|
|
|
Supply
|
|
Other
and
|
|
|
|
||||
|
|
Regulated
|
|
Management
|
|
Reconciling
|
|
FirstEnergy
|
|
|||||
|
2006
Financial Results
|
|
Services
|
|
Services
|
|
Adjustments
|
|
Consolidated
|
|
||||
|
|
|
(In
millions)
|
|
||||||||||
|
Revenues:
|
|
|
|
|
|
|
|
|
|
||||
|
External
|
|
|
|
|
|
|
|
|
|
||||
|
Electric
|
|
$
|
3,850
|
$
|
6,821
|
$
|
-
|
$
|
10,671
|
||||
|
Other
|
|
|
591
|
|
208
|
|
31
|
|
830
|
||||
|
Internal
|
|
|
-
|
|
-
|
|
-
|
|
-
|
||||
|
Total
Revenues
|
|
|
4,441
|
|
7,029
|
|
31
|
|
11,501
|
||||
|
Expenses:
|
|
|
|
|
|
||||||||
|
Fuel
and
purchased power
|
|
|
-
|
|
4,253
|
|
-
|
|
4,253
|
||||
|
Other
operating expenses
|
|
|
1,204
|
|
1,721
|
|
40
|
|
2,965
|
||||
|
Provision
for
depreciation
|
|
|
376
|
|
194
|
|
26
|
|
596
|
||||
|
Amortization
of regulatory assets
|
|
|
842
|
|
19
|
|
-
|
|
861
|
||||
|
Deferral
of
new regulatory assets
|
|
|
(217
|
)
|
|
(283
|
)
|
|
-
|
|
(500
|
)
|
|
|
General
taxes
|
|
|
532
|
|
171
|
|
17
|
|
720
|
||||
|
Total
Expenses
|
|
|
2,737
|
|
6,075
|
|
83
|
|
8,895
|
||||
|
Operating
Income (Loss)
|
1,704
|
954
|
(52
|
)
|
2,606
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
270
|
36
|
(157
|
)
|
149
|
||||||||
|
Interest
expense
|
(408
|
)
|
(226
|
)
|
(87
|
)
|
(721
|
)
|
|||||
|
Capitalized
interest
|
14
|
11
|
1
|
26
|
|||||||||
|
Subsidiaries'
preferred stock dividends
|
(16
|
)
|
-
|
9
|
(7
|
)
|
|||||||
|
Total
Other
Expense
|
(140
|
)
|
(179
|
)
|
(234
|
)
|
(553
|
)
|
|||||
|
Income
From
Continuing Operations Before Income Taxes
|
1,564
|
775
|
(286
|
)
|
2,053
|
||||||||
|
Income
taxes
(benefit)
|
|
|
632
|
|
310
|
|
(147
|
)
|
|
795
|
|||
|
Income
from
continuing operations
|
|
|
932
|
|
465
|
|
(139
|
)
|
|
1,258
|
|||
|
Discontinued
operations
|
|
|
-
|
|
-
|
|
(4
|
)
|
|
(4
|
)
|
||
|
Cumulative
effect of a change in accounting principle
|
|
-
|
|
-
|
|
-
|
|
-
|
|||||
|
Net
Income
(Loss)
|
|
$
|
932
|
$
|
465
|
$
|
(143
|
)
|
$
|
1,254
|
|||
11
|
|
|
|
|
Power
|
|
|
|
|
|
||||
|
|
|
|
|
Supply
|
|
Other
and
|
|
|
|
||||
|
|
Regulated
|
|
Management
|
|
Reconciling
|
|
FirstEnergy
|
|
|||||
|
2005
Financial Results
|
|
Services
|
|
Services
|
|
Adjustments
|
|
Consolidated
|
|
||||
|
|
|
(In
millions)
|
|
||||||||||
|
Revenues:
|
|
|
|
|
|
|
|
|
|
||||
|
External
|
|
|
|
|
|
|
|
|
|
||||
|
Electric
|
|
$
|
4,582
|
|
$
|
5,964
|
|
$
|
-
|
|
$
|
10,546
|
|
|
Other
|
|
|
573
|
|
|
103
|
|
|
136
|
|
|
812
|
|
|
Internal
|
|
|
270
|
|
|
-
|
|
|
(270
|
)
|
|
-
|
|
|
Total
Revenues
|
|
|
5,425
|
|
|
6,067
|
|
|
(134
|
)
|
|
11,358
|
|
|
Expenses:
|
|
|
|
|
|
|
|
|
|
||||
|
Fuel
and
purchased power
|
|
|
-
|
|
|
4,011
|
|
|
-
|
|
|
4,011
|
|
|
Other
operating expenses
|
|
|
1,250
|
|
|
1,986
|
|
|
(133
|
)
|
|
3,103
|
|
|
Provision
for
depreciation
|
|
|
516
|
|
|
45
|
|
|
27
|
|
|
588
|
|
|
Amortization
of regulatory assets
|
|
|
1,281
|
|
|
-
|
|
|
-
|
|
|
1,281
|
|
|
Deferral
of
new regulatory assets
|
|
|
(314
|
)
|
|
(91
|
)
|
|
-
|
|
(405
|
)
|
|
|
General
taxes
|
|
|
562
|
|
|
131
|
|
|
20
|
|
713
|
|
|
|
Total
Expenses
|
|
|
3,295
|
|
|
6,082
|
|
|
(86
|
)
|
|
9,291
|
|
|
Operating
Income (Loss)
|
2,130
|
(15
|
)
|
(48
|
)
|
2,067
|
|||||||
|
Other
Income
(Expense):
|
|
||||||||||||
|
Investment
income
|
217
|
-
|
-
|
217
|
|
||||||||
|
Interest
expense
|
(392
|
)
|
(55
|
)
|
(213
|
)
|
(660
|
)
|
|||||
|
Capitalized
interest
|
18
|
1
|
-
|
19
|
|||||||||
|
Subsidiaries'
preferred stock dividends
|
(15
|
)
|
-
|
-
|
(15
|
)
|
|||||||
|
Total
Other
Expense
|
(172
|
)
|
(54
|
)
|
(213
|
)
|
(439
|
)
|
|||||
|
Income
From
Continuing Operations Before Income Taxes
|
1,958
|
(69
|
)
|
(261
|
)
|
1,628
|
|||||||
|
Income
taxes
(benefit)
|
|
|
784
|
|
|
(28
|
)
|
|
(7
|
)
|
|
749
|
|
|
Income
from
continuing operations
|
|
|
1,174
|
|
|
(41
|
)
|
|
(254
|
)
|
|
879
|
|
|
Discontinued
operations
|
|
|
-
|
|
|
-
|
|
|
12
|
|
|
12
|
|
|
Cumulative
effect of a change in accounting principle
|
|
(21
|
)
|
|
(9
|
)
|
|
-
|
|
|
(30
|
)
|
|
|
Net
Income
|
|
$
|
1,153
|
|
$
|
(50
|
)
|
$
|
(242
|
)
|
$
|
861
|
|
|
|
|
|
|
Power
|
|
|
|
|
|
||||
|
|
|
|
|
Supply
|
|
Other
and
|
|
|
|
||||
|
Changes
Between 2006 and
|
|
Regulated
|
|
Management
|
|
Reconciling
|
|
FirstEnergy
|
|
||||
|
2005
Financial Results - Increase (Decrease)
|
|
Services
|
|
Services
|
|
Adjustments
|
|
Consolidated
|
|
||||
|
|
|
(In
millions)
|
|
||||||||||
|
Revenues:
|
|
|
|
|
|
|
|
|
|
||||
|
External
|
|
|
|
|
|
|
|
|
|
||||
|
Electric
|
|
$
|
(732
|
)
|
$
|
857
|
$
|
-
|
$
|
125
|
|||
|
Other
|
|
|
18
|
|
105
|
|
(105
|
)
|
|
18
|
|||
|
Internal
|
|
|
(270
|
)
|
|
-
|
|
270
|
|
-
|
|||
|
Total
Revenues
|
|
|
(984
|
)
|
|
962
|
|
165
|
|
143
|
|||
|
Expenses:
|
|
|
|
|
|
||||||||
|
Fuel
and
purchased power
|
|
|
-
|
|
242
|
|
-
|
|
242
|
||||
|
Other
operating expenses
|
|
|
(46
|
)
|
|
(265
|
)
|
|
173
|
|
(138
|
)
|
|
|
Provision
for
depreciation
|
|
|
(140
|
)
|
|
149
|
|
(1
|
)
|
|
8
|
||
|
Amortization
of regulatory assets
|
|
|
(439
|
)
|
|
19
|
|
-
|
|
(420
|
)
|
||
|
Deferral
of
new regulatory assets
|
|
|
97
|
|
(192
|
)
|
|
-
|
|
(95
|
)
|
||
|
General
taxes
|
|
|
(30
|
)
|
|
40
|
|
(3
|
)
|
|
7
|
||
|
Total
Expenses
|
|
|
(558
|
)
|
|
(7
|
)
|
|
169
|
|
(396
|
)
|
|
|
Operating
Income
|
(426
|
)
|
969
|
(4
|
)
|
539
|
|||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
53
|
36
|
(157
|
)
|
(68
|
)
|
|||||||
|
Interest
expense
|
(16
|
)
|
(171
|
)
|
126
|
(61
|
)
|
||||||
|
Capitalized
interest
|
(4
|
)
|
10
|
1
|
7
|
||||||||
|
Subsidiaries'
preferred stock dividends
|
(1
|
)
|
-
|
9
|
8
|
||||||||
|
Total
Other
Income (Expense)
|
32
|
(125
|
)
|
(21
|
)
|
(114
|
)
|
||||||
|
Income
From
Continuing Operations Before Income Taxes
|
(394
|
)
|
844
|
(25
|
)
|
425
|
|||||||
|
Income
taxes
(benefit)
|
|
|
(152
|
)
|
|
338
|
|
(140
|
)
|
|
46
|
||
|
Income
from
continuing operations
|
|
|
(242
|
)
|
|
506
|
|
115
|
|
379
|
|||
|
Discontinued
operations
|
|
|
-
|
|
-
|
|
(16
|
)
|
|
(16
|
)
|
||
|
Cumulative
effect of a change in accounting principle
|
|
21
|
|
9
|
|
-
|
|
30
|
|||||
|
Net
Income
|
|
$
|
(221
|
)
|
$
|
515
|
$
|
99
|
$
|
393
|
|||
12
Regulated
Services -2006 Compared with 2005
Net
income decreased $221 million (19%) to $932 million in 2006 compared
to $1.153 billion in 2005, primarily due to decreased operating revenues
partially offset by lower operating expenses.
Revenues
-
The
decrease in total revenues by service type is summarized below:
|
Increase
|
||||||||||
|
Revenues
By Type of Service
|
2006
|
2005
|
(Decrease)
|
|||||||
|
(In
millions)
|
||||||||||
|
Distribution
services
|
$
|
3,850
|
$
|
4,582
|
$
|
(732
|
)
|
|||
|
Transmission
services
|
389
|
415
|
(26
|
)
|
||||||
|
Internal
lease
revenues
|
-
|
270
|
(270
|
)
|
||||||
|
Other
|
202
|
158
|
44
|
|||||||
|
Total
Revenues
|
$
|
4,441
|
$
|
5,425
|
$
|
(984
|
)
|
|||
Decreases
in distribution deliveries by customer class are summarized in the following
table:
|
Electric
Distribution Deliveries
|
||||
|
Residential
|
(3.9
|
)%
|
||
|
Commercial
|
(1.4
|
)%
|
||
|
Industrial
|
(1.4
|
)%
|
||
|
Total
Distribution Deliveries
|
(2.3
|
)%
|
||
The
completion of our Ohio Companies' and Penn’s generation transition cost recovery
under their respective transition plans in 2005 were the primary reasons for
lower distribution unit prices, which, in conjunction with lower KWH deliveries,
resulted in lower distribution delivery revenues. The decreases in deliveries
to
customers were primarily due to milder weather during 2006 as compared to 2005.
The following table summarizes major factors contributing to the $732 million
decrease in distribution service revenues in 2006 compared to 2005:
|
Sources
of Change in Distribution Revenues
|
Increase
(Decrease)
|
|||
|
(In
millions)
|
||||
|
Changes
in
customer usage
|
$
|
(221
|
)
|
|
|
Ohio
shopping
incentives
|
222
|
|||
|
Reduced
Ohio
transition rates
|
(817
|
)
|
||
|
Other
|
84
|
|||
|
Net
Decrease
in Distribution Revenues
|
$
|
(732
|
)
|
|
The
decrease in internal lease revenues reflected the effect of the 2005 generation
asset transfers discussed above. The 2005 generation assets lease revenue from
affiliates ceased as a result of the transfers. The increase in other revenues
is due to higher payments received during the first quarter of 2006 under a
contract provision associated with the prior sale of TMI-1, a 2006 uranium
enrichment settlement and increased income from life insurance
investments.
Expenses-
The
decrease in revenues discussed above was partially offset by a $558 million
decrease in total expenses
|
·
|
Other
operating expenses were $46 million lower in 2006 due, in part, to
the following factors:
|
|
· |
The
absence in
2006 of expenses for ancillary service refunds to third parties of
$27 million in 2005 associated with implementation of the Ohio
Companies’ RCP in 2006 (under which alternate suppliers of ancillary
services now bill customers directly for those
services);
|
|
· |
A
$52 million
decrease in employee and contractor costs resulting from lower
storm-related expenses, reduced employee benefit costs and the decreased
use of outside contractors for tree trimming, reliability work, legal
services and jobbing and contracting;
and
|
|
· |
A
$31 million increase in other expenses principally due to increased
corporate support services of $18.5 million, and to the absence in
2006 of a $6 million insurance premium credit and an $8.6 million
insurance settlement received in
2005.
|
13
|
·
|
Lower
depreciation expense of $140 million resulted principally from the
generation asset transfers;
|
|
·
|
Reduced
amortization of regulatory assets of $439 million resulted from the
completion of Ohio generation transition cost recovery and Penn's
transition plan in 2005;
|
|
·
|
A
$97 million decrease in deferral of new regulatory assets due to a
2005 rate decision for JCP&L and the end of shopping incentive
deferrals under the Ohio Companies’ transition plan partially offset by
the distribution cost deferrals authorized under the Ohio Companies’ RCP;
and
|
|
·
|
General
taxes
decreased by $30 million primarily due to lower property taxes as a
result of the generation asset
transfers.
|
Other
Income and
Expense -
|
·
|
Higher
investment income reflects the impact of the generation asset transfers.
Interest income on the affiliated company notes receivable from the
power
supply management services segment in 2006 is partially offset by
the
absence of nuclear decommissioning trust investments, the majority
of
which is now included in the power supply management services segment;
and
|
|
·
|
Interest
expense increased by $16 million due to the Ohio Companies’ 2006
long-term debt issuances. As further discussed under Capital Resources
and
Liquidity, the Ohio Companies used the debt proceeds to repurchase
portions of their respective common stock from FirstEnergy, where
the
proceeds were used for the retirement of FirstEnergy notes maturing
in
2006.
|
Power
Supply Management Services - 2006 Compared with 2005
Net
income for this segment was $465 million in 2006 compared to a net loss of
$50 million in 2005. Substantial improvement in the gross generation margin
and
increased transmission and fuel cost deferrals were partially offset by higher
depreciation, general taxes and interest expense resulting from the generation
asset transfers.
Revenues
-
Electric
generation
sales revenues increased $763 million in 2006 compared to 2005. This
increase primarily resulted from a 6.7% increase in retail KWH sales due
principally to the return of customers as a result of third-party suppliers
leaving the northern Ohio marketplace, and higher unit prices resulting from
implementation in 2006 of the rate stabilization and fuel recovery charges
under
the Ohio companies’ RCP. The higher retail sales reduced energy available for
sale to the wholesale market. Increased transmission revenues reflected new
revenues of approximately $117 million under a new MISO transmission rider
that began in 2006. These increases were partially offset by a reduction in
wholesale sales revenue as a result of both lower KWH sales and lower unit
prices.
The increase in reported segment revenues resulted from the following
sources:
|
Increase
|
||||||||||
|
Revenues
By Type of Service
|
2006
|
2005
|
(Decrease)
|
|||||||
|
(In
millions)
|
||||||||||
|
Electric
Generation Sales:
|
||||||||||
|
Retail
|
$
|
5,459
|
$
|
4,219
|
$
|
1,240
|
||||
|
Wholesale
|
935
|
1,412
|
(477
|
)
|
||||||
|
Total
Electric
Generation Sales
|
6,394
|
5,631
|
763
|
|||||||
|
Transmission
|
572
|
403
|
169
|
|||||||
|
Other
|
63
|
33
|
30
|
|||||||
|
Total
Revenues
|
$
|
7,029
|
$
|
6,067
|
$
|
962
|
||||
14
The following table summarizes the price and volume factors contributing to
changes in sales revenues from retail and wholesale customers:
|
Increase
|
||||
|
Source
of Change in Electric Generation Sales
|
|
(Decrease)
|
||
|
(In
millions)
|
||||
|
Retail:
|
|
|
|
|
|
Effect
of 6.7%
increase in customer usage
|
|
$
|
285
|
|
|
Change
in
prices
|
|
|
955
|
|
|
|
|
|
1,240
|
|
|
Wholesale:
|
|
|
||
|
Effect
of
19.1% decrease in KWH sales
|
|
|
(270
|
)
|
|
Change
in
prices
|
|
|
(207
|
)
|
|
|
|
|
(477
|
)
|
|
Net
Increase
in Electric Generation Sales
|
|
$
|
763
|
|
Expenses
-
Total
operating expenses decreased by $7 million. The decrease was due to the
following factors:
· Lower
non-fuel
operating expenses of $265 million, which reflected the absence in 2006 of
generating asset lease rents of $270 million charged in 2005 due to the
generation asset transfers, lower transmission expenses compared to 2005, and
credits from the sale of emission allowances. Also absent in 2006 were the
2005
accruals of $8.5 million for a civil penalty, $10 million for obligations to
fund environmentally beneficial projects in connection with the Sammis Plant
New
Source Review settlement, and $31.5 million for a civil penalty related to
the
Davis-Besse outage; and
· An
increase of
$192 million in the deferral of new regulatory assets, which consisted of
PJM/MISO costs incurred that will be recovered from customers through future
rates ($79 million) and the Ohio RCP fuel deferral and related interest
($113 million).
The
above decreases in expenses were partially offset by:
|
·
|
Higher
fuel
and purchased power costs of $242 million, including increased fuel
costs
of $94 million caused by our generation fleet’s record output of
82.0 billion KWH. In particular, coal costs increased
$128 million as a result of increased generation output, higher coal
prices and increased transportation costs for western coal. The increased
coal costs were partially offset by lower natural gas and emission
allowance costs of $42 million. Purchased power costs increased $148
million due to higher prices partially offset by lower volumes. Factors
contributing to the higher costs are summarized in the following
table:
|
|
|
|
Increase
|
||
|
Source
of Change in Fuel and Purchased Power
|
|
(Decrease)
|
||
|
|
|
(In
millions)
|
||
|
Fuel:
|
|
|
|
|
|
Change
due to
increased unit costs
|
|
$
|
70
|
|
|
Change
due to
volume consumed
|
|
|
24
|
|
|
|
|
|
94
|
|
|
Purchased
Power:
|
||||
|
Change
due to
increased unit costs
|
|
206
|
||
|
Change
due to
volume purchased
|
|
|
(33
|
)
|
|
PPUC
NUG
adjustment applicable to prior year
|
10
|
|||
|
Increase
in
NUG costs deferred
|
|
|
(35
|
)
|
|
148
|
||||
|
Net
Increase
in Fuel and Purchased Power Costs
|
|
$
|
242
|
|
|
·
|
An
increase in
nuclear operating expenses of $55 million due to three refueling
outages in 2006 compared with two refueling outages in 2005;
|
|
·
|
Increased
depreciation expenses of $149 million, resulting principally from the
generation asset transfers; and
|
|
·
|
Higher
general
taxes of $40 million due principally to additional property taxes
resulting from the generation asset transfers.
|
15
Other
Income and
Expense -
|
·
|
Investment income in 2006 was $36 million
higher primarily due to nuclear decommissioning trust
investments acquired through the generation asset transfers;
and
|
|
·
|
Interest
expense increased by $171 million, primarily due to interest on the
associated company
notes payable that financed the generation asset transfers.
|
Other
-
2006 Compared to 2005
FirstEnergy’s financial results from other operating segments and reconciling
items, including interest expense on holding company debt and corporate support
services revenues and expenses, resulted in a $99 million increase to
FirstEnergy’s net income in 2006 compared to 2005. The increase was primarily
due to the absence of 2005 income tax expenses of $63 million consisting of
the
write-off of income tax benefits of $51 million due to the 2005 change in
Ohio tax legislation and $12 million due to a 2005 JCP&L tax audit
adjustment; $23 million of 2006 income tax benefits, primarily reflecting the
2005 federal income tax return filed in the third quarter of 2006 and the Ohio
tax benefit related to a voluntary $300 million pension plan contribution (see
Note 3); a $3 million gain related to interest rate swap financing
arrangements and a $14 million increase in investment income in 2006. These
increases were partially offset by financing redemption charges of $16 million
in 2006, a $5 million decrease in gas commodity transaction results and the
absence of 2005 non-core assets sale net gains of $9 million. The following
table summarizes the sources of income from discontinued operations (in
millions) for 2006 and 2005:
|
Discontinued
Operations (Net of tax)
|
|
2006
|
2005
|
||||
|
Gain
on
sale:
|
|
|
|
||||
|
Natural
gas
business
|
|
$
|
-
|
$
|
5
|
||
|
FSG
Subsidiaries
|
|
|
2
|
|
12
|
||
|
Reclassification
of operating income
|
|
|
(6
|
)
|
(5
|
)
|
|
|
Total
|
$
|
(4
|
)
|
$
|
12
|
||
Summary
of Results of Operations - 2005 Compared with 2004
Financial
results
for our reportable major business segments in 2004 were as follows:
|
Power
|
|||||||||||||
|
Supply
|
Other
and
|
||||||||||||
|
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
||||||||||
| 2004 Financial Results |
Services
|
Services
|
Adjustments
|
Consolidated
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Revenues:
|
|
|
|
|
|
|
|
|
|||||
|
External
|
|
|
|
|
|
|
|
|
|||||
|
Electric
|
|
$
|
4,396
|
|
$
|
6,435
|
|
$
|
-
|
|
$
|
10,831
|
|
|
Other
|
|
|
489
|
|
|
75
|
|
|
205
|
|
|
769
|
|
|
Internal
|
|
|
318
|
|
|
-
|
|
|
(318
|
)
|
|
-
|
|
|
Total
Revenues
|
|
|
5,203
|
|
|
6,510
|
|
|
(113
|
)
|
|
11,600
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenses:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fuel
and
purchased power
|
|
|
-
|
|
|
4,469
|
|
|
-
|
|
|
4,469
|
|
|
Other
operating expenses
|
|
|
1,340
|
|
|
1,660
|
|
|
(90
|
)
|
|
2,910
|
|
|
Provision
for
depreciation
|
|
|
513
|
|
|
35
|
|
|
37
|
|
|
585
|
|
|
Amortization
of regulatory assets
|
|
|
1,166
|
|
|
-
|
|
|
-
|
|
|
1,166
|
|
|
Deferral
of
new regulatory assets
|
|
|
(257
|
)
|
|
-
|
|
|
-
|
|
|
(257
|
) |
|
General
taxes
|
|
|
538
|
|
|
122
|
|
|
18
|
|
|
678
|
|
|
Total
Expenses
|
|
|
3,300
|
|
|
6,286
|
|
|
(35
|
)
|
|
9,551
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating
Income (Loss)
|
|
|
1,903
|
|
|
224
|
|
|
(78
|
)
|
|
2,049
|
|
|
Other
Income
(Expense):
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Investment
income
|
|
|
205
|
|
|
-
|
|
|
-
|
|
|
205
|
|
|
Interest
expense
|
|
|
(361
|
)
|
|
(43
|
)
|
|
(267
|
)
|
|
(671
|
) |
|
Capitalized
interest
|
|
|
19
|
|
|
6
|
|
|
1
|
|
|
26
|
|
|
Subsidiaries'
preferred stock dividends
|
|
|
(21
|
)
|
|
-
|
|
|
-
|
|
|
(21
|
) |
|
Total
Other
Income (Expense)
|
|
|
(158
|
)
|
|
(37
|
)
|
|
(266
|
)
|
|
(461
|
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income
From
Continuing Operations Before
Income
Taxes
|
1,745
|
187
|
(344
|
)
|
1,588
|
||||||||
|
Income
taxes
(benefit)
|
|
|
698
|
|
|
75
|
|
|
(92
|
)
|
|
681
|
|
|
Income
from
continuing operations
|
|
|
1,047
|
|
|
112
|
|
|
(252
|
)
|
|
907
|
|
|
Discontinued
operations
|
|
|
-
|
|
|
-
|
|
|
(29
|
)
|
|
(29
|
) |
|
Cumulative
effect of a change in accounting
principle
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
Net
Income
(Loss)
|
|
$
|
1,047
|
|
$
|
112
|
|
$
|
(281
|
)
|
$
|
878
|
|
16
|
Power
|
|||||||||||||
| Changes Between 2005 and 2004 |
|
Supply
|
Other
and
|
||||||||||
| Financial Results |
Regulated
|
Management
|
Reconciling
|
FirstEnergy
|
|||||||||
| Increase (Decrease) |
Services
|
Services
|
Adjustments(1)
|
Consolidated
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Revenues:
|
|
|
|
|
|||||||||
|
External
|
|
|
|
|
|||||||||
|
Electric
|
$
|
186
|
$
|
(471
|
)
|
$
|
-
|
$
|
(285
|
)
|
|||
|
Other
|
84
|
28
|
(69
|
)
|
43
|
||||||||
|
Internal
|
(48
|
)
|
-
|
48
|
-
|
||||||||
|
Total
Revenues
|
222
|
(443
|
)
|
(21
|
)
|
(242
|
)
|
||||||
|
Expenses:
|
|||||||||||||
|
Fuel
and
purchased power
|
-
|
(458
|
)
|
-
|
(458
|
)
|
|||||||
|
Other
operating expenses
|
(90
|
)
|
326
|
(43
|
)
|
193
|
|||||||
|
Provision
for
depreciation
|
3
|
10
|
(10
|
)
|
3
|
||||||||
|
Amortization
of regulatory assets
|
115
|
-
|
-
|
115
|
|||||||||
|
Deferral
of
new regulatory assets
|
(57
|
)
|
(91
|
)
|
-
|
(148
|
)
|
||||||
|
General
taxes
|
24
|
9
|
2
|
35
|
|||||||||
|
Total
Expenses
|
(5
|
)
|
(204
|
)
|
(51
|
)
|
(260
|
)
|
|||||
|
Operating
Income
|
227
|
(239
|
)
|
30
|
18
|
||||||||
|
Other
Income
(Expense):
|
|||||||||||||
|
Investment
income
|
12
|
-
|
-
|
12
|
|||||||||
|
Interest
expense
|
(31
|
)
|
(12
|
)
|
54
|
11
|
|||||||
|
Capitalized
interest
|
(1
|
)
|
(5
|
)
|
(1
|
)
|
(7
|
)
|
|||||
|
Subsidiaries'
preferred stock dividends
|
6
|
-
|
-
|
6
|
|||||||||
|
Total
Other
Income (Expense)
|
(14
|
)
|
(17
|
)
|
53
|
22
|
|||||||
|
Income
From
Continuing Operations Before
Income
Taxes
|
213
|
(256
|
)
|
83
|
40
|
||||||||
|
Income
taxes
|
86
|
(103
|
)
|
85
|
68
|
||||||||
|
Income
from
continuing operations
|
127
|
(153
|
)
|
(2
|
)
|
(28
|
)
|
||||||
|
Discontinued
operations
|
-
|
-
|
41
|
41
|
|||||||||
|
Cumulative
effect of a change in accounting
principle
|
(21
|
)
|
(9
|
)
|
-
|
(30
|
)
|
||||||
|
Net
Income
|
$
|
106
|
$
|
(162
|
)
|
$
|
39
|
$
|
(17
|
)
|
|||
|
(1)
The
impact of
the new Ohio tax legislation is included with our other operating
segments
and reconciling adjustments.
|
|||||||||||||
Regulated
Services - 2005 Compared with 2004
Net
income increased
by $106 million to $1.15 billion, a 10.1% increase in 2005, compared to
$1.05 billion in 2004, primarily as a result of increased sales to
customers.
Revenues
-
Total
revenues
increased by $222 million in 2005 compared to 2004, resulting from the
following sources:
|
|
|
Increase
|
|
|||||||
|
Revenues
by Type of Service
|
|
2005
|
|
2004
|
|
(Decrease)
|
|
|||
|
|
|
(In
millions)
|
||||||||
|
Distribution
services
|
|
$
|
4,582
|
|
$
|
4,396
|
|
$
|
186
|
|
|
Transmission
services
|
|
|
415
|
|
|
333
|
|
|
82
|
|
|
Internal
lease
revenues
|
|
|
270
|
|
|
318
|
|
|
(48
|
)
|
|
Other
|
|
|
158
|
|
|
156
|
|
|
2
|
|
|
Total
Revenues
|
|
$
|
5,425
|
|
$
|
5,203
|
|
$
|
222
|
|
Increases
in
distribution deliveries by customer class are summarized in the following
table:
|
Electric
Distribution Deliveries
|
|
|
|
||||
|
Residential
|
|
|
|
7.3
|
%
|
||
|
Commercial
|
|
|
|
4.8
|
|||
|
Industrial
|
|
|
|
2.0
|
|||
|
Total
Distribution Deliveries
|
|
|
|
4.7
|
%
|
||
17
Increased
consumption offset in part by lower composite prices to customers resulted
in
higher distribution delivery revenue. The following table summarizes major
factors contributing to the $186 million increase in distribution service
revenue in 2005:
|
|
Increase
|
|||
|
Sources
of Change in Distribution Revenues
|
(Decrease)
|
|||
|
|
(In
millions)
|
|||
|
Changes
in
customer usage
|
$
|
264
|
||
|
Changes
in
prices:
|
|
|||
|
Rate
changes
--
|
|
|||
|
Ohio
shopping
credit incentives
|
(44
|
)
|
||
|
JCP&L
rate
settlements
|
48
|
|||
|
Billing
component reallocations
|
(82
|
)
|
||
|
Net
Increase
in Distribution Revenues
|
$
|
186
|
||
Distribution
revenues benefited from unseasonably warmer summer temperatures in 2005,
compared to 2004, which increased air-conditioning loads of residential and
commercial customers. While industrial deliveries also increased, that impact
was more than offset by lower unit prices in that sector. Higher base rates
from
JCP&L's stipulated rate settlements were more than offset by additional
credits provided to customers under the Ohio transition plan who shop for
electricity from suppliers other than their local utility. Reallocation of
billing components between distribution and generation for certain Ohio
industrial customers with special contracts also offset the higher base rates.
Shopping credit incentives do not affect current period earnings due to deferral
of the incentives for future recovery from customers.
Transmission
revenues increased $82 million in 2005 from 2004 due in part to increased
loads resulting from warmer summer weather and higher transmission usage prices.
Lease revenue from affiliates decreased $48 million due to the intra-system
generation asset transfers discussed above.
Expenses
-
Total
operating
expenses decreased by $5 million in 2005 compared to the prior year, which
reflected lower other operating expenses due, in part, to lower regulation
management expenses, employee benefit costs and additional deferrals of
regulatory assets of $57 million, primarily due to shopping incentive
credits and related interest on these deferrals.
Partially
offsetting
these lower costs were the following factors:
|
·
|
Additional
amortization of regulatory assets of $115 million, principally Ohio
transition costs, due primarily to using the interest method to amortize
transition costs; and
|
|
·
|
General
taxes
increased by $24 million due to higher property taxes and increased
KWH deliveries which increased the Ohio KWH tax and the Pennsylvania
gross
receipts tax.
|
Other
Income
-
Total
other income
(expense) decreased by $14 million in 2005 compared to 2004 due to the net
effect of the following:
|
·
|
Investment
income increased approximately $12 million in 2005 due primarily to
realized gains on nuclear decommissioning trust investments;
and
|
|
·
|
Interest
expense was $31 million higher in
2005.
|
Power
Supply Management Services - 2005 Compared with 2004
Net
income for this
segment decreased $162 million resulting in a net loss of $50 million
for 2005 compared to net income of $112 million in 2004. Lower generation
gross margin, higher nuclear operating costs and amounts recognized for fines,
penalties and obligations associated with the proceedings involving the
W. H. Sammis Plant and the Davis-Besse Nuclear Power Station contributed to
the decrease in net income in 2005 when compared to 2004.
18
Revenues
-
A
decrease in
wholesale electric revenues and purchased power costs in 2005 compared to the
prior year primarily resulted from FES recording PJM sales and purchased power
transactions on an hourly net position basis beginning in the first quarter
of
2005 compared with recording each discrete transaction (on a gross basis) in
2004 (see PJM INTERCONNECTION TRANSACTIONS discussed later). This change had
no
impact on earnings and resulted from the dedication of the generation output
of
the Beaver Valley Power Station to PJM in January 2005. Wholesale electric
revenues and purchased power costs in 2004 were each $1.1 billion higher
due to recording those transactions on a gross basis.
Excluding
the effect
of the change in recording PJM wholesale transactions on a gross basis in 2004
($1.1 billion), electric generation revenues increased $569 million in
2005 compared to 2004 primarily resulting from a 3.5% increase in KWH sales
from
higher retail customer usage and a 14% average increase in unit prices in the
wholesale market. The increase in retail sales reduced energy available for
sale
to the wholesale market, resulting in a 2% reduction in wholesale sales (before
the PJM adjustment). Transmission revenues increased $59 million in 2005
compared to 2004 due primarily to higher transmission system usage.
The
change in
reported revenues resulted from the following:
|
|
|
Increase
|
|
|||||||
|
Revenues
by Type of Service
|
|
2005
|
|
2004
|
|
(Decrease)
|
|
|||
|
(In
millions)
|
||||||||||
|
Electric
generation sales:
|
|
|
|
|
|
|
|
|||
|
Retail
|
|
$
|
4,219
|
|
$
|
3,795
|
|
$
|
424
|
|
|
Wholesale(1)
|
|
|
1,412
|
|
|
1,267
|
|
|
145
|
|
|
Total
electric
generation sales
|
|
|
5,631
|
|
|
5,062
|
|
|
569
|
|
|
Transmission
|
|
|
403
|
|
|
344
|
|
|
59
|
|
|
Other
|
|
|
33
|
|
|
36
|
|
(3
|
)
|
|
|
|
|
6,067
|
|
|
5,442
|
|
|
625
|
||
|
PJM
adjustment
|
|
|
-
|
|
|
1,068
|
|
|
(1,068
|
)
|
|
Total
Revenues
|
|
$
|
6,067
|
|
$
|
6,510
|
|
$
|
(443
|
)
|
|
(1)
Excluding
2004
effect of recording PJM transactions on a gross
basis.
|
||||||||||
The
following table
summarizes the price and volume factors contributing to increased sales revenue
from retail and wholesale customers:
|
Increase
|
||||
|
Source
of Change in Electric Generation Sales
|
|
(Decrease)
|
|
|
|
(In
millions)
|
||||
|
Retail:
|
|
|
|
|
|
Effect
of 5.2%
increase in customer usage
|
|
$
|
228
|
|
|
Change
in
prices
|
|
|
196
|
|
|
|
|
|
424
|
|
|
Wholesale:
|
|
|
|
|
|
Effect
of 2.3%
reduction in customer usage(1)
|
|
|
(28
|
)
|
|
Change
in
prices
|
|
|
173
|
|
|
|
|
|
145
|
|
|
Net
Increase
in Electric Generation Sales
|
|
$
|
569
|
|
|
(1)
Decrease of
46.5% including the effect of the PJM adjustment.
|
||||
Expenses
-
Excluding
the effect
of the $1.1 billion of PJM purchased power costs recorded on a gross basis
in 2004, total operating expenses increased by $864 million in 2005
compared to 2004. Higher fuel and purchased power costs contributed
$610 million of the increase, resulting from higher fuel costs of
$308 million and increased purchased power costs of $302 million.
Factors contributing to the higher costs are summarized in the following
table:
19
|
|
|
Increase
|
|
|
|
Source
of Change in Fuel and Purchased Power
|
|
(Decrease)
|
|
|
|
|
|
(In
millions)
|
|
|
|
Fuel:
|
|
|
|
|
|
Change
due to
increased unit costs
|
|
$
|
254
|
|
|
Change
due to
volume consumed
|
|
|
54
|
|
|
|
|
|
308
|
|
|
Purchased
Power:
|
|
|||
|
Change
due to
increased unit costs
|
|
360
|
||
|
Change
due to
volume purchased
|
|
|
(55
|
)
|
|
Increase
in
costs deferred
|
|
|
(3
|
)
|
|
|
|
|
302
|
|
|
Total
Increase
|
610
|
|||
|
PJM
adjustment
|
|
|
(1,068
|
)
|
|
Net
Decrease
in Fuel and Purchased Power Costs
|
|
$
|
(458
|
)
|
Our
generation fleet
established a record output of 80.2 billion KWH in 2005. As a result,
increased coal consumption and the related cost of emission allowances combined
to increase fossil fuel expense. Higher coal costs resulted from increased
market purchases, higher contract coal prices and increased transportation
costs. Emission allowance costs increased primarily from higher prices. To
a
lesser extent, fuel expense increased due to higher costs associated with the
increase in generation from the fossil units relative to nuclear generation.
Fossil generation output increased 11% in 2005 and nuclear output decreased
by
4%, compared to 2004, due to the nuclear refueling outages discussed below.
Other
operating
costs increased $326 million in 2005 compared to 2004. Non-fuel nuclear
costs were higher in 2005 due to increased transmission costs and refueling
outages at Perry Unit 1 (including an unplanned extension) and Beaver
Valley Unit 2 and a scheduled 23-day mid-cycle inspection outage at the
Davis-Besse Plant. There was only one refueling outage in 2004. Fines and
penalties related to the Davis-Besse reactor head issue (approximately
$31.5 million) and the EPA settlement related to the W. H. Sammis
Plant ($18.5 million) also contributed to the higher costs. Higher
transmission costs of $303 million due primarily to increased loads and
higher transmission system usage charges further increased other operating
costs
in 2005. The higher costs in 2005 were partially offset by lower fossil
generation costs that resulted primarily from emission allowance transactions
and reduced maintenance outages in 2005. Also offsetting the cost increases
were
lower intersegment lease expenses due to the intra-system generation asset
transfer and the PUCO-approved deferral of MISO transmission costs.
Income
taxes -
Income taxes decreased as a result of lower taxable income, partially offset
by
the impact of the $28 million penalty related to the Davis-Besse reactor head
issue that was not deductible for income tax purposes.
Other
-
2005 Compared with 2004
FirstEnergy’s
financial results from other operating segments and reconciling adjustments,
including interest expense on holding company debt, corporate support services
revenues and expenses and the impacts of the new Ohio tax legislation (discussed
below) all contributed to a $39 million increase in net income compared to
2004. The increase was partially due to the absence in 2005 of goodwill
impairments at FSG of $26 million (included in discontinued operations in
2004) and the 2004 class action lawsuit settlement as well as gains on the
sale
of assets ($17 million) in 2005 compared to net losses on the sale of
assets ($6 million) in 2004, partially offset by a goodwill impairment at
MYR of $9 million (included in discontinued operations in 2005) not present
in 2004.
On
June 30,
2005, tax legislation was enacted in the State of Ohio that created a new CAT
tax, which is based on qualifying “taxable gross receipts” that does not
consider any expenses or costs incurred to generate such receipts, except for
items such as cash discounts, returns and allowances, and bad debts. The CAT
tax
was effective July 1, 2005, and replaces the Ohio income-based franchise
tax and the Ohio personal property tax. The CAT tax is phased-in while the
current income-based franchise tax is phased-out over a five-year period at
a
rate of 20% annually, beginning with the year ended 2005, and the personal
property tax is phased-out over a four-year period at a rate of approximately
25% annually, beginning with the year ended 2005. During the phase-out period
the Ohio income-based franchise tax was or will be computed consistent with
the
prior law, except that the tax liability as computed will be multiplied by
80%
in 2005; 60% in 2006; 40% in 2007 and 20% in 2008 to determine the actual
liability, thereby eliminating the current income-based franchise tax over
a
five-year period. As a result of the new tax structure, all net deferred tax
benefits that are not expected to reverse during the five-year phase-in period
were written off as of June 30, 2005. The impact on income taxes associated
with the required adjustment to net deferred taxes for 2005 was an additional
tax expense of approximately $52 million, which was partially offset by the
initial phase-out of the Ohio income-based franchise tax, which reduced income
taxes by approximately $6 million in 2005. See Note 9 to the
Consolidated Financial Statements.
20
Cumulative
Effect of Accounting Change
Results
in 2005
included an after-tax charge of $30 million recorded upon the adoption of
FIN 47 in December 2005. We identified applicable legal obligations as
defined under FIN 47 at our active and retired generating units and retired
plants (retained by the regulated utilities), substation control rooms, service
center buildings, line shops and office buildings, identifying asbestos as
the
primary conditional ARO. We recorded a conditional ARO liability of
$57 million (including accumulated accretion for the period from the date
the liability was incurred to the date of adoption), an asset retirement cost
of
$16 million (recorded as part of the carrying amount of the related
long-lived asset), and accumulated depreciation of $12 million.
We
charged regulatory liabilities for $5 million upon adoption of FIN 47
for the transition amounts related to establishing the ARO for asbestos removal
from substation control rooms and service center buildings for OE, Penn, CEI,
TE
and JCP&L. The remaining cumulative effect adjustment for unrecognized
depreciation and accretion of $48 million was charged to income
($30 million, net of tax), or $0.09 per share of common stock for the year
ended December 31, 2005. (See Note 12.)
DISCONTINUED
OPERATIONS
Discontinued
operations for
2006 include the
remaining FSG subsidiaries (Hattenbach, Dunbar, Edwards, and RPC), and a portion
of MYR. FirstEnergy sold 60% of MYR in March 2006 and began accounting for
its
remaining interest in MYR under the equity method. An additional 1.67% was
sold
in June 2006 and the remaining 38.33% was sold in November 2006. MYR’s results
prior to the sale of the initial 60% in March 2006 and the gain on the March
sale is included in discontinued operations. The 2006 MYR results, subsequent
to
the March 2006 sale, recorded as equity investment income by FirstEnergy, and
the gain on the November sale are included in income from continuing
operations.
The
following table
summarizes the sources of income (loss) from discontinued
operations:
|
Discontinued
Operations (net
of
tax)
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
||||||||||
|
FES
natural
gas business - gain on sale
|
$
|
-
|
$
|
5
|
$
|
-
|
||||
|
FSG
subsidiaries - gain on sale
|
2
|
12
|
-
|
|||||||
|
Net
gain on
divestitures
|
2
|
17
|
-
|
|||||||
|
Reclassification
of operating (loss) income
to
discontinued operations:
|
||||||||||
|
FES
natural
gas business
|
-
|
-
|
4
|
|||||||
|
FSG
subsidiaries
|
(8
|
)
|
(4
|
)
|
(29
|
)
|
||||
|
MYR
|
2
|
(1
|
)
|
(4
|
)
|
|||||
|
Income
(Loss)
from discontinued operations
|
$
|
(4
|
)
|
$
|
12
|
$
|
(29
|
)
|
||
POSTRETIREMENT
BENEFITS
Strengthened
equity
markets, as well as $500 million voluntary cash pension contributions made
in both 2005 and 2004, contributed to reductions of $27 million
and
$66 million in postretirement benefits expenses in 2006 and 2005,
respectively, from the prior year. The following table reflects the portion
of
postretirement costs that were charged to expense in 2006, 2005 and
2004:
|
Postretirement
Benefits Expenses
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
||||||||||
|
Pension
|
$
|
29
|
$
|
32
|
$
|
83
|
||||
|
OPEB
|
48
|
72
|
87
|
|||||||
|
Total
|
$
|
77
|
$
|
104
|
$
|
170
|
||||
Pension
and OPEB
expenses are included in various cost categories and have contributed to cost
decreases discussed above for 2006. We made an additional contribution of
$300 million on January 2, 2007 that is expected to result in further
reduced pension costs in 2007. In 2008, we will increase the share of
coinsurance, as well as increase the health care premiums paid by certain
retirees, which is expected to significantly reduce OPEB costs in 2007. See
"Critical Accounting Policies - Pension and Other Postretirement Benefits
Accounting" for a discussion of the impact of underlying assumptions on
postretirement expenses.
21
SUPPLY
PLAN
Our
subsidiaries are
obligated to provide generation service with an estimated power demand of
134.5 billion KWH in 2007. These obligations arise from customers who have
elected to continue to receive generation service from our utility subsidiaries
under regulated retail tariffs and from customers who have selected FES as
their
alternate generation provider. Geographically,
approximately 50% of the total generation service obligation is for customers
located in the MISO market area and 50% for customers located in the PJM market
area.
Within
the franchise
territories of our utility subsidiaries, alternative energy suppliers currently
provide generation service for approximately 60 MW (summer peak) of load
with an estimated energy requirement of 500 million KWH. If these alternate
suppliers fail to deliver power to their customers located in one of our utility
subsidiaries’ service area, the utility subsidiary must procure replacement
power in the role of PLR (see Note 10 for a discussion of the auction of
JCP&L's PLR obligation). JCP&L's costs for any replacement power would
be recovered under NJBPU rules.
To
meet these
generation service obligations, our subsidiaries have access, either through
ownership or lease, to 14,041 MW of installed generating capacity, which
for 2007 is expected to provide approximately 60% of the required power supply.
The balance has been secured through a combination of long-term purchases
(contract term of greater than one year) and short-term purchases (contract
of
term of less than one year). Additional power supply requirements will be met
through spot market transactions.
PJM
AND MISO
INTERCONNECTION TRANSACTIONS
FES
engages in
purchase and sale transactions in the PJM market to support the supply of
end-use customers, including PLR requirements in Pennsylvania. In conjunction
with our dedication of the Beaver Valley Plant to PJM on January 1, 2005,
FES began accounting for purchase and sale transactions in the PJM market based
on its net hourly position - recording each hour as either an energy purchase
or
an energy sale in the Consolidated Statements of Income relating to the Power
Supply Management Services segment. Hourly energy positions are aggregated
to
recognize gross purchases and sales for the month. This revised method of
accounting, which has no impact on net income, is consistent with the practice
of other energy companies that have dedicated generating capacity in PJM and
correlates with PJM's scheduling and reporting of hourly energy transactions.
FES also applies the net hourly methodology to purchase and sale transactions
in
MISO's energy market, which became active on April 1, 2005.
CAPITAL
RESOURCES AND LIQUIDITY
Our
business is
capital intensive and requires considerable capital resources to fund operating
expenses, construction expenditures, scheduled debt maturities and interest
and
dividend payments. Our cash requirements in 2006 for these items were met
without significantly increasing our net debt. In 2007 and subsequent years,
we
expect to meet our contractual obligations and other cash requirements primarily
with a combination of cash from operations and funds from the capital markets.
We also expect that borrowing capacity under credit facilities will continue
to
be available to manage working capital requirements during those periods.
Changes
in Cash
Position
Our
primary source
of cash required for continuing operations as a holding company is cash from
the
operations of our subsidiaries. We also have access to $2.75 billion of
short-term financing under a revolving credit facility which expires in 2011,
subject to short-term debt limitations under current regulatory approvals of
$1.5 billion and to outstanding borrowings by our subsidiaries that are
also parties to such facility. With the exception of Met-Ed, which is currently
in an accumulated deficit position, there are no material restrictions on the
payment of cash dividends by our subsidiaries.
In
2006, FirstEnergy
redeemed $400 million of the $1 billion principal amount of its 5.5%
Notes, Series A, in advance of the November 15, 2006 maturity date, with
the remaining $600 million repaid at maturity using cash proceeds from the
Ohio Companies’ repurchases of their respective common stock from FirstEnergy
(OE - $500 million, CEI - $300 million and TE -
$225 million).
On
August 10,
2006,
FirstEnergy repurchased 10.6 million shares, or approximately 3.2%, of its
outstanding common stock at an initial purchase price of $600 million, pursuant
to an accelerated share repurchase program. The repurchase was funded with
borrowings from FirstEnergy’s revolving credit facility.
As
of
December 31, 2006, we had $90 million of cash and cash equivalents
compared with $64 million as of December 31, 2005. The major sources
for changes in these balances are summarized below.
22
Cash
Flows From
Operating Activities
Net
cash provided
from operating activities was $1.9 billion in 2006, $2.2 billion in
2005 and $1.9 billion in 2004, summarized as follows:
|
Operating
Cash Flows
|
2006
|
2005
|
2004
|
|||||||
|
|
(In
millions)
|
|||||||||
|
Net
income
|
$
1,254
|
$
861
|
$
878
|
|||||||
|
Non-cash
charges (credits)
|
770
|
1,324
|
1,326
|
|||||||
|
Pension
trust
contribution*
|
90
|
(341
|
)
|
(300
|
)
|
|||||
|
Working
capital and other
|
(175
|
)
|
376
|
(12
|
)
|
|||||
|
Net
cash
provided from operating activities
|
$
|
1,939
|
$
|
2,220
|
$
|
1,892
|
||||
* Pension
trust
contributions in 2005 and 2004 are net of $159 million and $200 million of
related
current year
cash income tax benefits, respectively. The $90 million cash
inflow
in
2006 represents
reduced income taxes paid in 2006 relating to a January 2007
pension
contribution.
Net
cash provided
from operating activities decreased by $281 million in 2006 compared to
2005 primarily due to a $551 million decrease from working capital and a
$554 million decrease in non-cash charges. These decreases were partially
offset by the tax benefit in 2006 relating to the January 2007 pension
contribution and the absence in 2006 of the pension trust contribution in 2005
and higher net income in 2006 compared to 2005 (see Results of Operations).
The
decrease from working capital changes primarily resulted from the absence of
$242 million of funds received in 2005 for prepaid electric service (under
a three-year Energy for Education Program with the Ohio Schools Council),
increased tax payments of $325 million, and $273 million of cash
collateral returned to suppliers. These decreases were partially offset by
an
increase in working capital from the collection of receivables of
$192 million, reflecting increased electric sales revenues.
Net
cash provided
from operating activities increased $328 million in 2005 compared to 2004
primarily due to a $388 million increase from changes in working capital
and a $2 million decrease in non-cash charges. In 2005 and 2004, we made
voluntary after-tax pension trust contributions of $341 million and
$300 million, respectively. The increase from working capital resulted from
increased returned cash collateral of $259 million, decreased outflow of
$143 million for payables and $242 million of funds received in 2005 for
prepaid electric service as discussed above. These increases were partially
offset by decreases in cash provided from the collection of receivables of
$241 million and the absence of a $53 million NUG power contract
restructuring transaction in 2005.
Cash
Flows From
Financing Activities
In
2006, 2005 and
2004, net cash used for financing activities was $804 million,
$876 million and $1.5 billion, respectively, primarily reflecting the
redemptions of debt and preferred stock shown below:
|
Securities
Issued or Redeemed
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
||||||||||
|
New
Issues
|
||||||||||
|
Pollution
control notes
|
$ 1,157
|
$
721
|
$261
|
|||||||
|
Senior
secured
notes
|
382
|
-
|
300
|
|||||||
|
Unsecured
notes
|
1,200
|
-
|
400
|
|||||||
|
$
2,739
|
$
721
|
$ 961
|
||||||||
|
Redemptions
|
||||||||||
|
First
mortgage
bonds
|
$ 41
|
$252
|
$
589
|
|||||||
|
Pollution
control notes
|
1,189
|
555
|
80
|
|||||||
|
Senior
secured
notes
|
206
|
94
|
471
|
|||||||
|
Long-term
revolving credit
|
-
|
215
|
95
|
|||||||
|
Unsecured
notes
|
1,100
|
308
|
337
|
|||||||
|
Common
stock
|
600
|
-
|
-
|
|||||||
|
Preferred
stock
|
193
|
170
|
2
|
|||||||
|
$
|
3,329
|
$
|
1,594
|
$
|
1,574
|
|||||
|
Short-term
borrowings (repayments), net
|
$
|
386
|
$
|
561
|
$
|
(351
|
)
|
|||
23
FirstEnergy
had
approximately $1.1 billion of short-term indebtedness as of December 31,
2006 compared to approximately $731 million as of December 31, 2005.
This increase primarily reflects FirstEnergy’s use of short-term debt to fund
its $600 million common share repurchase in August 2006. Available bank
borrowing capability (in millions) as of December 31, 2006 included the
following:
|
Borrowing
Capability
|
|
|
||
|
Short-term
credit facilities(1)
|
|
$
|
2,870
|
|
|
Accounts
receivable financing facilities
|
550
|
|||
|
Utilized
|
|
|
(1,105
|
)
|
|
LOCs
|
|
|
(478
|
)
|
|
Net
|
|
$
|
1,837
|
|
|
|
|
|
||
|
(1)
Includes the
$2.75 billion revolving credit facility described below, a
$100 million revolving credit facility that expires in December 2009
and a $20 million uncommitted line of credit
facility.
|
||||
As
of
December 31, 2006, the Ohio Companies and Penn had the aggregate capability
to issue approximately $2.8 billion of additional FMB on the basis of
property additions and retired bonds under the terms of their respective
mortgage indentures. The issuance of FMB by OE, CEI and TE is also subject
to
provisions of their senior note indentures generally limiting the incurrence
of
additional secured debt, subject to certain exceptions that would permit, among
other things, the issuance of secured debt (including FMB) (i) supporting
pollution control notes or similar obligations, or (ii) as an extension, renewal
or replacement of previously outstanding secured debt. In addition, these
provisions would permit OE, CEI and TE to incur additional secured debt not
otherwise permitted by a specified exception of up to $543 million,
$491 million and $126 million, respectively, as of December 31,
2006. Under the provisions of its senior note indenture, JCP&L may issue
additional FMB only as collateral for senior notes. As of December 31,
2006, JCP&L had the capability to issue $678 million of additional
senior notes upon the basis of FMB collateral.
As
of
December 31, 2006, each of OE, TE, Penn and JCP&L have redeemed all of
their outstanding preferred stock. As a result of these redemptions, the
applicable earnings coverage tests in each of their respective charters are
inoperative. In the event that any of OE, TE, Penn and JCP&L issues
preferred stock in the future, the applicable earnings coverage test will govern
the amount of preferred stock that may be issued. CEI, Met-Ed and Penelec do
not
have similar restrictions and could issue up to the number of preferred shares
authorized under their respective charters.
As
of
December 31, 2006, approximately $1.0 billion of capacity remained
unused under an existing FirstEnergy shelf registration statement filed with
the
SEC in 2003 to support future securities issuances. The shelf registration
provides the flexibility to issue and sell various types of securities,
including common stock, debt securities, and share purchase contracts and
related share purchase units. As of December 31, 2006, OE and CEI had
approximately $400 million and $250 million, respectively, of capacity
remaining unused under their existing shelf registrations for unsecured debt
securities filed with the SEC in 2006.
On
August 24, 2006,
FirstEnergy and certain of its subsidiaries entered into a new $2.75 billion
five-year revolving credit facility (included in the borrowing capability table
above), which replaced FirstEnergy’s prior $2 billion credit facility.
FirstEnergy
may
request an increase in the total commitments available under the new facility
up
to a maximum of $3.25 billion. Commitments under the new facility are
available until August 24, 2011, unless the lenders agree, at the request
of the Borrowers, to two additional one-year extensions. Generally, borrowings
under the facility must be repaid within 364 days. Available amounts for each
Borrower are subject to a specified sublimit, as well as applicable regulatory
and other limitations.
24
The
following table
summarizes the borrowing sub-limits for each borrower under the facility, as
well as the limitations on short-term indebtedness applicable to each borrower
under current regulatory approvals and applicable statutory and/or charter
limitations:
|
|
|
Revolving
|
Regulatory
and
|
||||||
|
|
|
Credit
Facility
|
Other
Short-Term
|
||||||
|
Borrower
|
|
Sub-Limit
|
Debt
Limitations(1)
|
||||||
|
|
|
(In
millions)
|
|||||||
|
FirstEnergy
|
|
$
|
2,750
|
$
|
1,500
|
||||
|
OE
|
|
|
500
|
|
500
|
||||
|
Penn
|
|
|
50
|
|
39
|
||||
|
CEI
|
|
|
250
|
(2)
|
|
600
|
|||
|
TE
|
|
|
250
|
(2)
|
|
500
|
|||
|
JCP&L
|
|
|
425
|
|
414
|
||||
|
Met-Ed
|
|
|
250
|
|
250
|
(3)
|
|||
|
Penelec
|
|
|
250
|
|
250
|
(3)
|
|||
|
FES
|
|
|
-
|
(4)
|
|
n/a
|
|||
|
ATSI
|
|
|
-
|
(4)
|
|
50
|
|||
|
(1)
|
As
of
December 31, 2006.
|
|
(2)
|
Borrowing
sub-limits for CEI and TE may be increased to up to $500 million by
delivering notice to the administrative
agent
that
such borrower has senior unsecured debt ratings of at least BBB by
S&P
and Baa2 by Moody’s.
|
|
(3)
|
Excluding
amounts which may be borrowed under the regulated money
pool.
|
|
(4)
|
Borrowing
sub-limits for FES and ATSI may be increased up to $250 million and
|
$100 million,
respectively, by delivering notice to the administrative agent that either
(i)
such
borrower has
senior unsecured debt ratings of at least BBB- by S&P and Baa3 by
Moody’s
or (ii)
FirstEnergy has guaranteed the obligations of such borrower under the
facility.
The
revolving credit facility, combined with an aggregate $550
million (unused
as of December 31, 2006) of accounts receivable financing facilities for
OE, CEI, TE, Met-Ed, Penelec and Penn, are intended to provide liquidity to
meet
working capital requirements and for other general corporate purposes for
FirstEnergy and its subsidiaries.
Under
the revolving
credit facility, borrowers may request the issuance of LOCs expiring up to
one
year from the date of issuance. The stated amount of outstanding LOCs will
count
against total commitments available under the facility and against the
applicable borrower’s borrowing sub-limit. Total unused borrowing capability
under existing credit facilities and accounts receivable financing facilities
was $1.8 billion as of December 31, 2006.
The
revolving credit
facility contains financial covenants requiring each borrower to maintain a
consolidated debt to total capitalization ratio of no more than 65%, measured
at
the end of each fiscal quarter. As of December 31, 2006, FirstEnergy and
its subsidiaries' debt to total capitalization ratios (as defined under the
revolving credit facility) were as follows:
|
Borrower
|
|
||
|
FirstEnergy
|
|
57
|
%
|
|
OE
|
|
41
|
%
|
|
Penn
|
|
24
|
%
|
|
CEI
|
|
57
|
%
|
|
TE
|
|
53
|
%
|
|
JCP&L
|
|
24
|
%
|
|
Met-Ed
|
|
42
|
%
|
|
Penelec
|
|
33
|
%
|
The
revolving credit
facility does not contain provisions that either restrict the ability to borrow
or accelerate repayment of outstanding advances as a result of any change in
credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds
borrowed under the facility is related to the credit ratings of the company
borrowing the funds.
FirstEnergy's
regulated companies also have the ability to borrow from each other and the
holding company to meet their short-term working capital requirements. A similar
but separate arrangement exists among FirstEnergy's unregulated companies.
FESC
administers these two money pools and tracks surplus funds of FirstEnergy and
the respective regulated and unregulated subsidiaries, as well as proceeds
available from bank borrowings. Companies receiving a loan under the money
pool
agreements must repay the principal amount of the loan, together with
accrued
interest, within 364 days of borrowing the funds. The rate of interest is the
same for each company receiving a loan from their respective pool and is based
on the average cost of funds available through the pool. The average interest
rate for borrowings in 2006 was approximately 5.22% for both the regulated
companies’ money pool and the unregulated companies' money
pool.
25
FirstEnergy’s
access
to capital markets and costs of financing are influenced by the ratings of
its
securities. The following table displays FirstEnergy’s and the Companies’
securities ratings as of February 2,
2007. The ratings outlook from S&P on all securities is stable. The ratings
outlook from Moody’s on all securities is Positive. The ratings outlook from
Fitch is positive for CEI and TE and stable for all other
securities.
|
Issuer
|
Securities
|
S&P
|
Moody’s
|
Fitch
|
||||
|
FirstEnergy
|
Senior
unsecured
|
BBB-
|
Baa3
|
BBB
|
||||
|
OE
|
Senior
unsecured
|
BBB-
|
Baa2
|
BBB
|
||||
|
CEI
|
Senior
secured
|
BBB
|
Baa2
|
BBB
|
||||
|
Senior
unsecured
|
BBB-
|
Baa3
|
BBB-
|
|||||
|
TE
|
Senior
secured
|
BBB
|
Baa2
|
BBB
|
||||
|
Senior
unsecured
|
BBB-
|
Baa3
|
BBB-
|
|||||
|
Penn
|
Senior
secured
|
BBB+
|
Baa1
|
BBB+
|
||||
|
JCP&L
|
Senior
secured
|
BBB+
|
Baa1
|
A-
|
||||
|
Met-Ed
|
Senior
unsecured
|
BBB
|
Baa2
|
BBB
|
||||
|
Penelec
|
Senior
unsecured
|
BBB
|
Baa2
|
BBB
|
||||
On
January 20,
2006, TE redeemed all 1.2 million of its outstanding shares of Adjustable
Rate Series B preferred stock at $25.00 per share, plus accrued dividends to
the
date of redemption.
On
April 3, 2006,
$253 million of pollution control revenue refunding bonds were issued by
Ohio and Pennsylvania industrial development authorities on behalf of NGC
($106 million) and FGCO ($147 million). On December 5,
2006, $878 million of pollution control revenue refunding bonds were issued
by
such authorities on behalf of NGC ($485 million) and FGCO ($393 million). In
each case, proceeds from the issuance and sale of the bonds were used to refund
an equal aggregate amount of pollution control bonds previously issued in
various series on behalf of OE, Penn, CEI and TE. The refundings resulted in
corresponding reductions in each of the utility operating subsidiaries’ notes
receivable from NGC and FGCO relating to the generation asset transfers
completed in 2005. All of the refunding issues are currently supported by bank
LOCs for which FirstEnergy is either the account party or the guarantor of
the
reimbursement obligation of NGC or FGCO, as applicable. Provisions have been
included in the April 2006 transactions, as well as other transactions, that
permit FES to replace FirstEnergy as guarantor effective as early as 91 days
after FES obtains senior unsecured debt ratings of at least BBB- by S&P and
Baa3 by Moody’s.
On
May 12, 2006,
JCP&L issued $200 million of 6.40% secured senior notes due 2036. The
proceeds of the offering were used to repay at maturity $150 million
aggregate principal amount of JCP&L’s 6.45% senior notes due May 15, 2006
and for general corporate purposes.
On
June 26,
2006, OE issued $600 million of unsecured senior notes, comprised of
$250 million of 6.4% notes due 2016 and $350 million of 6.875% notes
due 2036. The majority of the proceeds from this offering were used in July
2006
to repurchase $500 million of OE common stock from FirstEnergy, enabling
FirstEnergy to redeem $400 million of the $1 billion outstanding
principal amount of FirstEnergy’s 5.5% senior notes prior to their
November 15, 2006 scheduled maturity. The remainder of the proceeds were
used to redeem approximately $61 million of OE’s preferred stock on July 7,
2006 and to reduce short-term borrowings.
On
August 10,
2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L,
issued $182 million of transition bonds with a weighted average interest rate
of
5.5%
to
securitize the recovery of deferred costs associated with JCP&L’s supply of
BGS. The majority of the proceeds were used in December 2006 to repurchase
$77 million of JCP&L common stock from FirstEnergy. The remainder of
the proceeds was used to redeem approximately $13 million of JCP&L’s
preferred stock on September 9, 2006, and to reduce short-term
borrowings.
On
November 18,
2006, TE issued $300 million of 6.15% senior unsecured notes due 2037. On
December 11, 2006, CEI issued $300 million of 5.95% senior unsecured notes
due
2036. TE and CEI used $225 million and $300 million, respectively, of the
proceeds to repurchase common stock from FirstEnergy to provide funds for the
repayment at maturity of a portion of the $1 billion outstanding principal
amount of FirstEnergy’s 5.5% senior notes that matured November 15, 2006. The
remainder of TE’s proceeds was used to redeem $66 million of TE’s preferred
stock in December 2006.
26
On
December 15,
2006, Penn redeemed all of its outstanding shares of preferred stock for
approximately $14 million, plus accrued dividends to the date of
redemption.
On
January 30, 2007,
FirstEnergy’s Board of Directors authorized a new share repurchase program for
up to 16 million shares, or approximately 5% of the FirstEnergy’s outstanding
common stock. This new program supplements the prior repurchase program approved
on June 20, 2006, such that up to 26.6 million potential shares may
ultimately be repurchased under the combined plans. At management’s discretion,
shares may be acquired on the open market or through privately negotiated
transactions, subject to market conditions and other factors. The Board’s
authorization of the repurchase program does not require FirstEnergy to purchase
any shares and the program may be terminated at any time. Under the prior
program, approximately 10.6 million shares were repurchased on August 10, 2006
at an initial purchase price of $600 million, or $56.44 per share. The final
purchase price under that program will be adjusted to reflect the ultimate
cost
to acquire the shares over a period of up to seven months ending March 2007.
FirstEnergy is currently in negotiations with a major financial institution
to
enter into a new accelerated share repurchase program contingent among other
things on amending its current accelerated share repurchase program to allow
FirstEnergy to enter into the new accelerated repurchase program.
Cash
Flows From
Investing Activities
Net
cash flows used
in investing activities resulted principally from property additions. Regulated
services expenditures for property additions primarily include expenditures
supporting the distribution of electricity. Capital expenditures by the power
supply management services segment are principally generation-related. The
following table summarizes investments for the three years ended
December 31, 2006 by our regulated services, power supply management
services and other segments:
|
Summary
of Cash Flows
|
Property
|
||||||||||||||
|
Used
for Investing Activities By Segment
|
Additions
|
Investments
|
Other
|
Total
|
|||||||||||
|
2006
Sources (Uses)
|
(In
millions)
|
||||||||||||||
|
Regulated
services
|
$
|
(633
|
)
|
$
|
147
|
$
|
(10
|
)
|
$
|
(496
|
)
|
||||
|
Power
supply
management services
|
(644
|
)
|
(5
|
)
|
(1
|
)
|
(650
|
)
|
|||||||
|
Other
|
(1
|
)
|
(26
|
)
|
1
|
(26
|
)
|
||||||||
|
Reconciling
adjustments
|
(37
|
)
|
90
|
10
|
63
|
||||||||||
|
Total
|
$
|
(1,315
|
)
|
$
|
206
|
$
|
-
|
$
|
(1,109
|
)
|
|||||
|
2005
Sources (Uses)
|
|||||||||||||||
|
Regulated
services
|
$
|
(788
|
)
|
$
|
(106
|
)
|
$
|
(14
|
)
|
$
|
(908
|
)
|
|||
|
Power
supply
management services
|
(375
|
)
|
(19
|
)
|
3
|
(391
|
)
|
||||||||
|
Other
|
(8
|
)
|
18
|
(21
|
)
|
(11
|
)
|
||||||||
|
Reconciling
adjustments
|
(37
|
)
|
13
|
1
|
(23
|
)
|
|||||||||
|
Total
|
$
|
(1,208
|
)
|
$
|
(94
|
)
|
$
|
(31
|
)
|
$
|
(1,333
|
)
|
|||
|
2004
Sources (Uses)
|
|||||||||||||||
|
Regulated
services
|
$
|
(572
|
)
|
$
|
184
|
$
|
(88
|
)
|
$
|
(476
|
)
|
||||
|
Power
supply
management services
|
(246
|
)
|
(13
|
)
|
(2
|
)
|
(261
|
)
|
|||||||
|
Other
|
(7
|
)
|
175
|
(4
|
)
|
164
|
|||||||||
|
Reconciling
adjustments
|
(21
|
)
|
(2
|
)
|
100
|
77
|
|||||||||
|
Total
|
$
|
(846
|
)
|
$
|
344
|
$
|
6
|
$
|
(496
|
)
|
|||||
Net
cash used for
investing activities in 2006 decreased by $224 million compared to 2005.
The decrease was principally due to a $58 million increase in proceeds from
asset sales (see Note 8), an $86 million decrease in net nuclear
decommissioning trust activities due to the completion of the Ohio Companies'
and Penn's transition cost recovery for decommissioning at the end of 2005
and a
$163 million decrease in cash investments, primarily from the use of
restricted cash investments to repay debt. These decreases were partially offset
by a $107 million increase in property additions which reflects the
replacement of the steam generators and reactor head at Beaver Valley Unit
1,
air quality control system expenditures and the distribution system Accelerated
Reliability Improvement Program.
Net
cash used for
investing activities in 2005 increased by $837 million from 2004. The
increase was principally due to a $362 million increase in property
additions, a $119 million decrease in proceeds from asset sales (see Note
8) and the absence in 2005 of cash proceeds of $278 million from certificates
of
deposit received by OE in 2004 when the certificates of deposit were no longer
required to be held as collateral.
27
Our
capital spending
for the period 2007-2011 is expected to be nearly $8 billion (excluding
nuclear fuel), of which $1.4 billion applies to 2007. Investments for
additional nuclear fuel during the 2007-2011 period are estimated to be
approximately $893 million, of which about $86 million applies to
2007. During the same period, our nuclear fuel investments are expected to
be
reduced by approximately $702 million and $103 million, respectively,
as the nuclear fuel is consumed.
CONTRACTUAL
OBLIGATIONS
As
of
December 31, 2006, our estimated cash payments under existing contractual
obligations that we consider firm obligations are as follows:
|
|
|
|
|
2008-
|
|
2010-
|
|
|
|
|||||||
|
Contractual
Obligations
|
|
Total
|
|
2007
|
|
2009
|
|
2011
|
|
Thereafter
|
|
|||||
|
|
(In
millions)
|
|
||||||||||||||
|
Long-term
debt
|
|
$
|
10,424
|
$
|
241
|
$
|
623
|
$
|
1,739
|
$
|
7,821
|
|||||
|
Short-term
borrowings
|
|
|
1,108
|
|
1,108
|
|
-
|
|
-
|
|
-
|
|||||
|
Interest
on
long-term debt
|
9,564
|
609
|
1,172
|
1,110
|
6,673
|
|||||||||||
|
Capital
leases
(1)
|
|
|
7
|
|
1
|
|
2
|
|
2
|
|
2
|
|||||
|
Operating
leases (1)
|
|
|
2,298
|
|
204
|
|
449
|
|
416
|
|
1,229
|
|||||
|
Pension
funding (2)
|
300
|
300
|
-
|
-
|
-
|
|||||||||||
|
Fuel
and
purchased power (3)
|
|
|
16,108
|
|
2,809
|
|
4,927
|
|
3,835
|
|
4,537
|
|||||
|
Total
|
|
$
|
39,809
|
|
$
|
5,272
|
|
$
|
7,173
|
|
$
|
7,102
|
$
|
20,262
|
||
|
(1)
|
See
Note 6 to
the consolidated financial
statements.
|
|
(2)
|
We
estimate
that no further pension contributions will be required during the
2008-2011 period to maintain our defined benefit pension plan's funding
at
a minimum required level as determined by government regulations.
We are
unable to estimate projected contributions beyond 2011. See Note
3 to the
consolidated financial statements.
|
|
(3)
|
Amounts
under
contract with fixed or minimum quantities and approximate
timing.
|
Guarantees
and
Other Assurances
As
part of normal
business activities, we enter into various agreements on behalf of our
subsidiaries to provide financial or performance assurances to third parties.
These agreements include contract guarantees, surety bonds, and LOCs. Some
of
the guaranteed contracts contain collateral provisions that are contingent
upon
our credit ratings.
As
of
December 31, 2006, our maximum exposure to potential future payments under
outstanding guarantees and other assurances totaled approximately
$5.4 billion, as summarized below:
|
|
|
Maximum
|
|
|
|
Guarantees
and Other Assurances
|
|
Exposure
|
|
|
|
|
|
(In
millions)
|
|
|
|
FirstEnergy
Guarantees of Subsidiaries
|
|
|
|
|
|
Energy
and
Energy-Related Contracts (1)
|
|
$
|
953
|
|
|
Other
(2)
|
|
|
1,585
|
|
|
|
|
|
2,538
|
|
|
|
|
|
||
|
Surety
Bonds
|
|
|
130
|
|
|
LOC
(3)(4)
|
|
|
2,740
|
|
|
|
|
|
||
|
Total
Guarantees and Other Assurances
|
|
$
|
5,408
|
|
|
(1)
|
Issued
for
open-ended terms, with a 10-day termination right by
FirstEnergy.
|
|
(2)
|
Issued
for
various terms.
|
|
(3)
|
Includes
$479 million issued for various terms under LOC capacity available in
FirstEnergy’s revolving credit agreement and an additional
$1.6 billion outstanding in support of pollution control revenue
bonds issued with various
maturities.
|
|
(4)
|
Includes
approximately $194 million pledged in connection with the sale and
leaseback of Beaver Valley Unit 2 by CEI and TE, $291 million pledged
in connection with the sale and leaseback of Beaver Valley Unit 2
by OE
and $134 million pledged in connection with the sale and leaseback of
Perry Unit 1 by OE.
|
28
We
guarantee energy
and energy-related payments of our subsidiaries involved in energy commodity
activities principally to facilitate normal physical transactions involving
electricity, gas, emission allowances and coal. We also provide guarantees
to
various providers of subsidiary financing principally for the acquisition of
property, plant and equipment. These agreements legally obligate us to fulfill
the obligations of our subsidiaries directly involved in these energy and
energy-related transactions or financings where the law might otherwise limit
the counterparties' claims. If demands of a counterparty were to exceed the
ability of a subsidiary to satisfy existing obligations, our guarantee enables
the counterparty's legal claim to be satisfied by our other assets. The
likelihood that such parental guarantees will increase amounts otherwise paid
by
us to meet our obligations incurred in connection with ongoing energy and
energy-related contracts is remote.
While
these types of
guarantees are normally parental commitments for the future payment of
subsidiary obligations, subsequent to the occurrence of a credit rating
downgrade or “material adverse event” the immediate posting of cash collateral
or provision of an LOC may be required of the subsidiary. As of
December 31, 2006, our maximum exposure under these collateral provisions
was $468 million.
Most
of our surety
bonds are backed by various indemnities common within the insurance industry.
Surety bonds and related guarantees provide additional assurance to outside
parties that contractual and statutory obligations will be met in a number
of
areas including construction contracts, environmental commitments and various
retail transactions.
We
have guaranteed
the obligations of the operators of the TEBSA project up to a maximum of
$6 million (subject to escalation) under the project's operations and
maintenance agreement. In connection with the sale of TEBSA in January 2004,
the
purchaser indemnified FirstEnergy against any loss under this guarantee. We
have
also provided an LOC ($27 million as of December 31, 2006), which is
renewable and declines yearly based upon the senior outstanding debt
of
TEBSA.
OFF-BALANCE
SHEET ARRANGEMENTS
We
have obligations
that are not included on our Consolidated Balance Sheets related to the sale
and
leaseback arrangements involving Perry Unit 1, Beaver Valley Unit 2
and the Bruce Mansfield Plant, which are satisfied through operating lease
payments. The present value of these sale and leaseback operating lease
commitments, net of trust investments, total $1.2 billion as of
December 31, 2006.
We
have equity
ownership interests in certain businesses that are accounted for using the
equity method. There are no undisclosed material contingencies related to these
investments. Certain guarantees that we do not expect will have a material
current or future effect on our financial condition, liquidity or results of
operations are disclosed under Guarantees and Other Assurances
above.
MARKET
RISK
INFORMATION
We
use various
market risk sensitive instruments, including derivative contracts, primarily
to
manage the risk of price and interest rate fluctuations. Our Risk Policy
Committee, comprised of members of senior management, provides general oversight
to risk management activities throughout the Company.
Commodity
Price
Risk
We
are exposed to
financial and market risks resulting from the fluctuation of interest rates
and
commodity prices -- electricity, energy transmission, natural gas, coal, nuclear
fuel and emission allowances. To manage the volatility relating to these
exposures, we use a variety of non-derivative and derivative instruments,
including forward contracts, options, futures contracts and swaps. The
derivatives are used principally for hedging purposes. Derivatives that fall
within the scope of SFAS 133 must be recorded at their fair value and
marked to market. The majority of our derivative hedging contracts qualify
for
the normal purchase and normal sale exception under SFAS 133 and are
therefore excluded from the tables below. Contracts that are not exempt from
such treatment include certain power purchase agreements with NUG entities
that
were structured pursuant to the Public Utility Regulatory Policies Act of 1978.
These non-trading contracts are adjusted to fair value at the end of each
quarter, with a corresponding regulatory asset recognized for above-market
costs. On April 1, 2006, we elected to apply the normal purchase and normal
sale exception to certain NUG power purchase agreements having a fair value
of
$13 million (included in “Other” in the table below). The change in the
fair value of commodity derivative contracts related to energy production during
2006 is summarized in the following table:
29
|
Increase
(Decrease) in the Fair Value of Derivative
Contracts
|
Non-Hedge
|
Hedge
|
Total
|
|||||||
|
(In
millions)
|
||||||||||
|
Change
in the fair value of commodity derivative
contracts:
|
||||||||||
|
Outstanding
net liability as of January 1, 2006
|
$
|
(1,170
|
)
|
$
|
(3
|
)
|
$
|
(1,173
|
)
|
|
|
New
contract
value when entered
|
-
|
-
|
-
|
|||||||
|
Additions/change
in value of existing contracts
|
(244
|
)
|
(23
|
)
|
(267
|
)
|
||||
|
Change
in
techniques/assumptions
|
-
|
-
|
-
|
|||||||
|
Settled
contracts
|
287
|
9
|
296
|
|||||||
|
Other
|
(13
|
)
|
-
|
(13
|
)
|
|||||
|
Outstanding
net liability as of December 31, 2006(1)
|
$
|
(1,140
|
)
|
$
|
(17
|
)
|
$
|
(1,157
|
)
|
|
|
Non-commodity
net liabilities as of December 31, 2006:
|
||||||||||
|
Interest
rate
swaps(2)
|
-
|
(39
|
)
|
(39
|
)
|
|||||
|
Net
Liabilities - Derivative Contracts as of December 31,
2006
|
$
|
(1,140
|
)
|
$
|
(56
|
)
|
$
|
(1,196
|
)
|
|
|
Impact
of Changes in Commodity Derivative Contracts(3)
|
||||||||||
|
Income
Statement effects (pre-tax)
|
$
|
(3
|
)
|
$
|
-
|
$
|
(3
|
)
|
||
|
Balance
Sheet
effects:
|
||||||||||
|
OCI
(pre-tax)
|
$
|
-
|
$
|
(14
|
)
|
$
|
(14
|
)
|
||
|
Regulatory
asset (net)
|
$
|
(46
|
)
|
$
|
-
|
$
|
(46
|
)
|
||
|
(1)
|
Includes
$1.14 billion in non-hedge commodity derivative contracts (primarily
with NUGs), which are offset by a regulatory
asset.
|
|
(2)
|
Interest
rate
swaps are treated as cash flow or fair value hedges (see Interest
Rate
Swap Agreements below).
|
|
(3)
|
Represents
the
change in value of existing contracts, settled contracts and changes
in
techniques/ assumptions.
|
Derivatives
are
included on the Consolidated Balance Sheet as of December 31, 2006 as
follows:
|
Balance
Sheet Classification
|
Non-Hedge
|
Hedge
|
Total
|
|||||||
|
(In
millions)
|
||||||||||
|
Current-
|
||||||||||
|
Other
assets
|
$
|
-
|
$
|
21
|
$
|
21
|
||||
|
Other
liabilities
|
(4
|
)
|
(38
|
)
|
(42
|
)
|
||||
|
Non-Current-
|
||||||||||
|
Other
deferred
charges
|
46
|
16
|
62
|
|||||||
|
Other
noncurrent liabilities
|
(1,182
|
)
|
(55
|
)
|
(1,237
|
)
|
||||
|
Net
liabilities
|
$
|
(1,140
|
)
|
$
|
(56
|
)
|
$
|
(1,196
|
)
|
|
The
valuation of
derivative contracts is based on observable market information to the extent
that such information is available. In cases where such information is not
available, we rely on model-based information. The model provides estimates
of
future regional prices for electricity and an estimate of related price
volatility. We use these results to develop estimates of fair value for
financial reporting purposes and for internal management decision making.
Sources of information for the valuation of commodity derivative contracts
as of
December 31, 2006 are summarized by year in the following table:
|
Source
of Information
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
-
Fair
Value by Contract Year
|
|
2007
|
|
2008
|
|
2009
|
|
2010
|
|
2011
|
|
Thereafter
|
|
Total
|
|
|||||||
|
(In
millions)
|
||||||||||||||||||||||
|
Prices
actively quoted(1)
|
|
$
|
(3
|
)
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
-
|
$
|
(3
|
)
|
|||||
|
Other
external
sources(2)
|
|
|
(323
|
)
|
|
(249
|
)
|
|
(193
|
)
|
|
-
|
|
-
|
|
-
|
|
(765
|
)
|
|||
|
Prices
based
on models
|
|
|
-
|
|
-
|
|
-
|
|
(185
|
)
|
|
(105
|
)
|
|
(99
|
)
|
|
(389
|
)
|
|||
|
Total(3)
|
|
$
|
(326
|
)
|
$
|
(249
|
)
|
$
|
(193
|
)
|
$
|
(185
|
)
|
$
|
(105
|
)
|
$
|
(99
|
)
|
$
|
(1,157
|
)
|
(1) Exchange
traded.
(2) Broker
quote
sheets.
(3) Includes
$1.14 billion in non-hedge commodity derivative contracts (primarily with
NUGs), which are offset by a regulatory asset.
We
perform
sensitivity analyses to estimate our exposure to the market risk of our
commodity positions. A hypothetical 10% adverse shift (an increase or decrease
depending on the derivative position) in quoted market prices in the near term
on our derivative instruments would not have had a material effect on our
consolidated financial position (assets, liabilities and equity) or cash flows
as of December 31, 2006. Based on derivative contracts held as of
December 31, 2006, an adverse 10% change in commodity prices would decrease
net income by approximately $2 million for the next twelve months.
30
Interest
Rate
Risk
Our
exposure to
fluctuations in market interest rates is reduced since a significant portion
of
our debt has fixed interest rates, as noted in the table below.
|
Comparison
of Carrying Value to Fair Value
|
|||||||||||||||||||||||||
|
There-
|
Fair
|
||||||||||||||||||||||||
|
Year
of Maturity
|
2007
|
2008
|
2009
|
2010
|
2011
|
after
|
Total
|
Value
|
|||||||||||||||||
|
(Dollars
in millions)
|
|||||||||||||||||||||||||
|
Assets
|
|||||||||||||||||||||||||
|
Investments
other than Cash and Cash
|
|||||||||||||||||||||||||
|
Equivalents-Fixed
Income
|
$
|
100
|
$
|
57
|
$
|
68
|
$
|
84
|
$
|
92
|
$
|
1,565
|
$
|
1,966
|
$
|
2,068
|
|||||||||
|
Average
interest rate
|
7.1
|
%
|
7.7
|
%
|
7.9
|
%
|
7.9
|
%
|
7.9
|
%
|
5.6
|
%
|
6.0%
|
||||||||||||
|
Liabilities
|
|||||||||||||||||||||||||
|
Long-term
Debt
and Other
|
|||||||||||||||||||||||||
|
Long-term
Obligations:
|
|||||||||||||||||||||||||
|
Fixed
rate(1)
|
$
|
241
|
$
|
336
|
$
|
287
|
$
|
199
|
$
|
1,540
|
$
|
5,820
|
$
|
8,423
|
$
|
8,829
|
|||||||||
|
Average
interest rate
|
6.5
|
%
|
5.2
|
%
|
6.7
|
%
|
5.4
|
%
|
6.4
|
%
|
6.5
|
%
|
6.4
|
%
|
|||||||||||
|
Variable
rate(1)
|
$
|
2,001
|
$
|
2,001
|
$
|
2,001
|
|||||||||||||||||||
|
Average
interest rate
|
3.9
|
%
|
3.9
|
%
|
|||||||||||||||||||||
|
Short-term
Borrowings
|
$
|
1,108
|
$
|
1,108
|
$
|
1,108
|
|||||||||||||||||||
|
Average
interest rate
|
5.7
|
%
|
5.7
|
%
|
|||||||||||||||||||||
(1) Balances
and rates
do not reflect the fixed-to-floating interest rate swap agreements discussed
below.
We
are subject to
the inherent interest rate risks related to refinancing maturing debt by issuing
new debt securities. As discussed in Note 6 to the consolidated financial
statements, our investments in capital trusts effectively reduce future lease
obligations, also reducing interest rate risk. Fluctuations in the fair value
of
NGC's and the Ohio Companies' decommissioning trust balances will eventually
affect earnings (immediately for unrealized losses and affecting OCI initially
for unrealized gains) based on the guidance in SFAS 115,
FSP SFAS 115-1 and SFAS 124-1. Our Pennsylvania and New Jersey
companies, however, have the opportunity to recover from customers, or refund
to
customers, the difference between the investments held in trust and their
decommissioning obligations. Thus, there is not expected to be an earnings
effect from fluctuations in their decommissioning trust balances. As of
December 31, 2006, our decommissioning trust balances totaled
$2.0 billion, with $1.4 billion held by NGC and our Ohio Companies and
the remaining balance held by JCP&L, Met-Ed and Penelec. As of year-end
2006, the trust balances of NGC and our Ohio Companies were comprised of 67%
equity securities and 33% debt instruments.
Interest
Rate
Swap Agreements - Fair Value Hedges
We
utilize
fixed-for-floating interest rate swap agreements as part of our ongoing effort
to manage the interest rate risk associated with our debt portfolio. These
derivatives are treated as fair value hedges of fixed-rate, long-term debt
issues - protecting against the risk of changes in the fair value of fixed-rate
debt instruments when interest rates decrease. Swap maturities, call options,
fixed interest rates and interest payment dates match those of the underlying
obligations. During 2006, we unwound swaps with a total notional amount of
$350 million for which we incurred $1 million in cash losses. The
losses will be recognized over the remaining maturity of each respective hedged
security as increased interest expense. As of December 31, 2006, the debt
underlying the $750 million outstanding notional amount of interest rate
swaps had a weighted average fixed interest rate of 5.74%, which the swaps
have
effectively converted to a current weighted average variable rate of 6.42%.
|
December
31, 2006
|
December
31, 2005
|
||||||||||||||||||
|
Notional
|
Maturity
|
Fair
|
Notional
|
Maturity
|
Fair
|
||||||||||||||
|
Interest
Rate Swaps
|
Amount
|
Date
|
Value
|
Amount
|
Date
|
Value
|
|||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
Fair
value
hedges
|
$
|
100
|
2008
|
$
|
(2
|
)
|
$
|
100
|
2008
|
$
|
(3
|
)
|
|||||||
|
50
|
2010
|
(1
|
)
|
50
|
2010
|
-
|
|||||||||||||
|
-
|
2011
|
-
|
50
|
2011
|
-
|
||||||||||||||
|
300
|
2013
|
(6
|
)
|
450
|
2013
|
(4
|
)
|
||||||||||||
|
150
|
2015
|
(10
|
)
|
150
|
2015
|
(9
|
)
|
||||||||||||
|
-
|
2016
|
-
|
150
|
2016
|
-
|
||||||||||||||
|
50
|
2025
|
(2
|
)
|
50
|
2025
|
(1
|
)
|
||||||||||||
|
100
|
2031
|
(6
|
)
|
100
|
2031
|
(5
|
)
|
||||||||||||
|
$
|
750
|
$
|
(27
|
)
|
$
|
1,100
|
$
|
(22
|
)
|
||||||||||
31
Forward
Starting
Swap Agreements - Cash Flow Hedges
We
utilize forward
starting swap agreements (forward swaps) in order to hedge a portion of the
consolidated interest rate risk associated with the anticipated future issuances
of fixed-rate, long-term debt securities for one or more of our consolidated
subsidiaries in 2007 and 2008. These derivatives are treated as cash flow
hedges, protecting against the risk of changes in future interest payments
resulting from changes in benchmark U.S. Treasury rates between the date of
hedge inception and the date of the debt issuance. During 2006, we revised
the
tenor and timing of our financing plans and, ultimately, terminated forward
swaps with an aggregate notional value of $1.2 billion concurrent with our
subsidiaries issuing long-term debt. We received $40 million in cash
related to the terminations. The gain associated with the ineffective portion
of
the terminated hedges of $5.4 million was recognized in earnings, with the
remainder to be recognized over the terms of the associated future debt. As
of
December 31, 2006, FirstEnergy had outstanding forward swaps with an
aggregate notional amount of $300 million and an aggregate fair value of
($4) million.
|
December
31, 2006
|
December
31, 2005
|
||||||||||||||||||
|
Notional
|
Maturity
|
Fair
|
Notional
|
Maturity
|
Fair
|
||||||||||||||
|
Forward
Starting Swaps
|
Amount
|
Date
|
Value
|
Amount
|
Date
|
Value
|
|||||||||||||
|
(In
millions)
|
|||||||||||||||||||
|
Cash
flow
hedges
|
$
|
25
|
2015
|
$
|
-
|
$
|
25
|
2015
|
$
|
-
|
|||||||||
|
-
|
2016
|
-
|
600
|
2016
|
2
|
||||||||||||||
|
200
|
2017
|
(4
|
)
|
25
|
2017
|
-
|
|||||||||||||
|
25
|
2018
|
(1
|
)
|
275
|
2018
|
1
|
|||||||||||||
|
50
|
2020
|
1
|
50
|
2020
|
-
|
||||||||||||||
|
$
|
300
|
$
|
(4
|
)
|
$
|
975
|
$
|
3
|
|||||||||||
Equity
Price
Risk
Included
in nuclear
decommissioning trusts are marketable equity securities carried at their current
fair value of approximately $1.3 billion and $1.1 billion as of
December 31, 2006 and 2005, respectively. A hypothetical 10% decrease in
prices quoted by stock exchanges would result in a $128 million reduction in
fair value as of December 31, 2006 (see Note 5(B)).
CREDIT
RISK
Credit
risk is the
risk of an obligor’s failure to meet the terms of any investment contract, loan
agreement or otherwise perform as agreed. Credit risk arises from all activities
in which success depends on issuer, borrower or counterparty performance,
whether reflected on or off the balance sheet. We engage in transactions for
the
purchase and sale of commodities including gas, electricity, coal and emission
allowances. These transactions are often with major energy companies within
our
industry.
We
maintain credit
policies with respect to our counterparties to manage overall credit risk.
This
includes performing independent risk evaluations, actively monitoring portfolio
trends and using collateral and contract provisions to mitigate exposure. As
part of our credit program, we aggressively manage the quality of our portfolio
of energy contracts, evidenced by a current weighted average risk rating for
energy contract counterparties of BBB (S&P). As of December 31, 2006,
the largest credit concentration with one party (currently rated investment
grade) represented 11.6% of our total credit risk. Within our unregulated energy
subsidiaries, 99% of credit exposures, net of collateral and reserves, were
with
investment-grade counterparties as of December 31, 2006.
32
REGULATORY
MATTERS
In
Ohio, New Jersey
and Pennsylvania, laws applicable to electric industry restructuring contain
similar provisions that are reflected in the Companies' respective state
regulatory plans. These provisions include:
|
·
|
restructuring the electric generation business and allowing the Companies'
customers to select a competitive electric generation supplier other
than
the Companies;
|
|
·
|
establishing or defining the PLR obligations to customers in the
Companies' service areas;
|
|
·
|
providing the Companies with the opportunity to recover potentially
stranded investment (or transition costs) not otherwise recoverable
in a
competitive
generation market;
|
|
·
|
itemizing (unbundling) the price of electricity into its component
elements - including generation, transmission, distribution and stranded
costs recovery charges;
|
|
·
|
continuing regulation of the Companies' transmission and distribution
systems; and
|
|
·
|
requiring corporate separation of regulated and unregulated business
activities.
|
The
Companies and
ATSI recognize, as regulatory assets, costs which the FERC, PUCO, PPUC and
NJBPU
have authorized for recovery from customers in future periods or for which
authorization is probable. Without the probability of such authorization, costs
currently recorded as regulatory assets would have been charged to income as
incurred. Regulatory assets that do not earn a current return totaled
approximately $200 million as of December 31, 2006. The following
table discloses the regulatory assets by company:
|
|
December
31,
|
December
31,
|
Increase
|
|||||||
|
Regulatory
Assets*
|
2006
|
2005
|
(Decrease)
|
|||||||
|
|
(In
millions)
|
|||||||||
|
OE
|
$
|
741
|
$
|
775
|
$
|
(34
|
)
|
|||
|
CEI
|
855
|
862
|
(7
|
)
|
||||||
|
TE
|
248
|
287
|
(39
|
)
|
||||||
|
JCP&L
|
2,152
|
2,227
|
(75
|
)
|
||||||
|
Met-Ed
|
409
|
310
|
99
|
|||||||
|
ATSI
|
36
|
25
|
11
|
|||||||
|
Total
|
$
|
4,441
|
$
|
4,486
|
$
|
(45
|
)
|
|||
|
*
|
Penn
had net
regulatory liabilities of approximately $69 million and
$59 million as of December 31, 2006 and 2005. Penelec had net
regulatory liabilities of approximately $96 million and
$163 million as of December 31, 2006 and 2005, respectively.
These net regulatory liabilities are included in Other Non-current
Liabilities on the Consolidated Balance
Sheets.
|
Regulatory
assets by
source are as follows:
|
|
|
December
31,
|
|
December
31,
|
|
Increase
|
|
|||
|
Regulatory
Assets By Source
|
|
2006
|
|
2005
|
|
(Decrease)
|
|
|||
|
|
|
(In
millions)
|
|
|||||||
|
Regulatory
transition costs
|
|
$
|
3,266
|
$
|
3,576
|
|
$
|
(310
|
)
|
|
|
Customer
shopping incentives
|
|
|
603
|
|
884
|
|
|
(281
|
)
|
|
|
Customer
receivables for future income taxes
|
|
|
217
|
|
217
|
|
|
-
|
||
|
Societal
benefits charge
|
|
|
11
|
|
29
|
|
|
(18
|
)
|
|
|
Loss
on
reacquired debt
|
|
|
43
|
|
41
|
|
|
2
|
||
|
Employee
postretirement benefits
|
|
|
47
|
|
55
|
|
|
(8
|
)
|
|
|
Nuclear
decommissioning, decontamination
|
|
|
|
|
|
|||||
|
and
spent fuel
disposal costs
|
|
|
(145
|
)
|
|
(126
|
)
|
|
(19
|
)
|
|
Asset
removal
costs
|
|
|
(168
|
)
|
|
(365
|
)
|
|
197
|
|
|
Property
losses and unrecovered plant costs
|
|
|
19
|
|
29
|
|
|
(10
|
)
|
|
|
MISO/PJM
transmission costs
|
|
|
213
|
|
91
|
|
|
122
|
||
|
Fuel
costs -
RCP
|
|
|
113
|
|
-
|
|
|
113
|
||
|
Distribution
costs - RCP
|
|
|
155
|
|
-
|
|
|
155
|
||
|
Other
|
|
|
67
|
|
55
|
|
|
12
|
||
|
Total
|
|
$
|
4,441
|
$
|
4,486
|
|
$
|
(45
|
)
|
|
33
Ohio
On
October 21, 2003,
the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the
Ohio Companies accepted the RSP as modified and approved by the PUCO in an
August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to
establish generation service rates beginning January 1, 2006, in response to
the
PUCO’s concerns about price and supply uncertainty following the end of the Ohio
Companies' transition plan market development period. On May 3, 2006, the
Supreme Court of Ohio issued an opinion affirming the PUCO's order in all
respects, except it remanded back to the PUCO the matter of ensuring the
availability of sufficient means for customer participation in the marketplace.
The RSP contained a provision that permitted the Ohio Companies to withdraw
and
terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio,
rejected all or part of the RSP. In such event, the Ohio Companies have 30
days
from the final order or decision to provide notice of termination. On July
20,
2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding
on Remand. In their Request, the Ohio Companies provided notice of termination
to those provisions of the RSP subject to termination, subject to being
withdrawn, and also set forth a framework for addressing the Supreme Court
of
Ohio’s findings on customer participation. If the PUCO approves a resolution to
the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio
Companies, the Ohio Companies’ termination will be withdrawn and considered to
be null and void. On July 26, 2006, the PUCO issued an Entry directing the
Ohio
Companies to file a plan in a new docket to address the Court’s concern. The
Ohio Companies filed their RSP Remand CBP on September 29, 2006. Initial
comments were filed on January 12, 2007 and reply comments were filed on
January 29,
2007.
In
their reply comments the Ohio Companies described the highlights of a new tariff
offering they would be willing to make available to customers that would allow
customers to purchase renewable energy certificates associated with a renewable
generation source, subject to PUCO approval.
No further
proceedings are scheduled at this time.
The
Ohio Companies
filed an application and stipulation with the PUCO on September 9, 2005
seeking approval of the RCP, a supplement to the RSP. On November 4, 2005,
the
Ohio Companies filed a supplemental stipulation with the PUCO, which constituted
an additional component of the RCP filed on September 9, 2005. Major provisions
of the RCP include:
|
|
Maintaining
the existing level of base distribution rates through December 31,
2008 for OE and TE, and April 30, 2009 for CEI;
|
|
|
Deferring
and
capitalizing for future recovery (over a 25-year period) with carrying
charges certain distribution costs to be incurred during the period
January 1, 2006 through December 31, 2008, not to exceed
$150 million in each of the three years;
|
|
|
Adjusting
the
RTC and extended RTC recovery periods and rate levels so that full
recovery of authorized costs will occur as of December 31, 2008 for
OE and TE and as of December 31, 2010 for CEI;
|
|
|
Reducing
the
deferred shopping incentive balances as of January 1, 2006 by up to
$75 million for OE, $45 million for TE, and $85 million for CEI
by accelerating the application of each respective company's accumulated
cost of removal regulatory liability; and
|
|
|
Recovering
increased fuel costs (compared to a 2002 baseline) of up to
$75 million, $77 million, and $79 million, in 2006, 2007,
and 2008, respectively, from all OE and TE distribution and transmission
customers through a fuel recovery mechanism. OE, TE, and CEI may
defer and
capitalize (for recovery over a 25-year period) increased fuel
costs above
the amount collected through the fuel recovery
mechanism.
|
The
following table
provides the estimated net amortization of regulatory transition costs and
deferred shopping incentives (including associated carrying charges) under
the
RCP for the period 2007 through 2010:
|
Amortization
|
|
|
|
|
|
|
|
Total
|
|
|||||||
|
Period
|
|
OE
|
|
CEI
|
|
TE
|
|
Ohio
|
|
|||||||
|
|
|
(In
millions)
|
|
|||||||||||||
|
2007
|
|
$
|
179
|
$
|
108
|
$
|
93
|
$
|
380
|
|||||||
|
2008
|
|
|
208
|
|
124
|
|
119
|
|
451
|
|||||||
|
2009
|
|
|
-
|
|
216
|
|
-
|
|
216
|
|||||||
|
2010
|
|
|
-
|
|
273
|
|
-
|
|
273
|
|||||||
|
Total
Amortization
|
|
$
|
387
|
$
|
721
|
$
|
212
|
$
|
1,320
|
|||||||
34
On
January 4, 2006,
the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the
RSP to provide customers with more certain rate levels than otherwise available
under the RSP during the plan period. On
January 10,
2006, the Ohio Companies filed a Motion for Clarification seeking clarity on
a
number of issues. On January 25, 2006, the PUCO issued an Entry on
Rehearing granting in part, and denying in part, the Ohio Companies’ previous
requests and clarifying issues referred to above. The PUCO granted the Ohio
Companies’ requests to:
|
|
Recognize
fuel
and distribution deferrals commencing January 1,
2006;
|
|
|
Recognize
distribution deferrals on a monthly basis prior to review by the
PUCO
Staff;
|
|
|
Clarify
that
the types of distribution expenditures included in the Supplemental
Stipulation may be deferred; and
|
|
|
Clarify
that
distribution expenditures do not have to be “accelerated” in order to be
deferred.
|
The
PUCO approved
the Ohio Companies’ methodology for determining distribution deferral amounts,
but denied the Motion in that the PUCO Staff must verify the level of
distribution expenditures contained in current rates, as opposed to simply
accepting the amounts contained in the Ohio Companies’ Motion. On
February 3, 2006, several other parties filed applications for rehearing,
which the PUCO denied on March 1, 2006. Two of these parties subsequently filed
notices of appeal with the Supreme Court of Ohio. The Ohio Supreme Court
scheduled this case for oral argument on February 27, 2007. On January 31,
2007,
the Ohio Companies filed a stipulation which, among other matters and subject
to
PUCO approval, affirmed that the supplemental stipulation in the RCP would
be
implemented. This stipulation was approved by the PUCO on February 14,
2007.
On
December 30,
2004, the Ohio Companies filed with the PUCO two applications related to the
recovery of transmission and ancillary service related costs. The first
application sought recovery of these costs beginning January 1, 2006. The
Ohio Companies requested that these costs be recovered through a rider that
would be effective on January 1, 2006 and adjusted each July 1
thereafter. The parties reached a settlement agreement that was approved by
the
PUCO on August 31, 2005. The incremental transmission and ancillary service
revenues recovered from January 1 through June 30, 2006 were
approximately $54 million. That amount included the recovery of a portion
of the 2005 deferred MISO expenses as described below. On April 27, 2006,
the Ohio Companies filed the annual update rider to determine revenues
($124 million) from July 2006 through June 2007. The filed rider went into
effect on July 1, 2006.
The
second
application sought authority to defer costs associated with transmission and
ancillary service related costs incurred during the period October 1, 2003
through December 31, 2005. On May 18, 2005, the PUCO granted the
accounting authority for the Ohio Companies to defer incremental transmission
and ancillary service-related charges incurred as a participant in MISO, but
only for those costs incurred during the period December 30, 2004 through
December 31, 2005. Permission to defer costs incurred prior to
December 30, 2004 was denied. The PUCO also authorized the Ohio Companies
to accrue carrying charges on the deferred balances. On August 31, 2005,
the OCC appealed the PUCO's decision. On
January 20,
2006, the OCC sought rehearing of the PUCO’s approval of the recovery of
deferred costs through the rider during the period January 1, 2006 through
June 30, 2006. The PUCO denied the OCC's application on February 6,
2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio
Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate
this appeal with the deferral appeals discussed above and to postpone oral
arguments in the deferral appeal until after all briefs are filed in this most
recent appeal of the rider recovery mechanism. On
March 20, 2006,
the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of
the
Ohio Companies' case with a similar case involving Dayton Power & Light
Company. Oral arguments were heard on May 10, 2006. On November 29,
2006, the Ohio Supreme Court issued its opinion upholding the PUCO’s
determination that the Ohio Companies may defer transmission and ancillary
service related costs incurred on and after December 30, 2004. The Ohio
Supreme Court also determined that the PUCO erred when it denied the OCC
intervention, but further ruled that such error did not prejudice OCC and,
therefore, the Ohio Supreme Court did not reverse or remand the PUCO on this
ground. The Ohio Supreme Court also determined that the OCC’s appeal was not
premature. No party filed a motion for reconsideration with the Ohio Supreme
Court.
Pennsylvania
Met-Ed
and Penelec
have been purchasing a portion of their PLR requirements from FES through
a
partial requirements wholesale power sales agreement and various amendments.
Under these agreements, FES retained the supply obligation and the supply
profit
and loss risk for the portion of power supply requirements not self-supplied
by
Met-Ed and Penelec. The FES agreements have reduced Met-Ed's and Penelec's
exposure to high wholesale power prices by providing power at a fixed price
for
their uncommitted PLR capacity and energy costs during the term of these
agreements with FES.
35
On
April 7,
2006, the parties entered into a Tolling Agreement that arose from FES’ notice
to Met-Ed and Penelec that FES elected to exercise its right to terminate the
partial requirements agreement effective midnight December 31, 2006. On
November 29, 2006, Met-Ed, Penelec and FES agreed to suspend the April 7
Tolling Agreement pending resolution of the PPUC’s proceedings regarding the
Met-Ed and Penelec Transition Rate cases filed April 10, 2006, described below.
Separately, on September 26, 2006, Met-Ed and Penelec successfully
conducted a competitive RFP for a portion of their PLR obligation for the period
December 1, 2006 through December 31, 2008. FES was one of the
successful bidders in that RFP process and on September 26, 2006 entered into
a
Supplier Master Agreement to supply a certain portion of Met-Ed’s and Penelec’s
PLR requirements at market prices that substantially exceed the fixed price
in
the partial requirements agreements.
Based
on the outcome
of the Transition Rate filing, as described below, Met-Ed, Penelec and FES
agreed to restate the partial requirements power sales agreement effective
January 1, 2007. The restated agreement incorporates the same fixed price for
residual capacity and energy supplied by FES as in the prior arrangements
between the parties, and automatically extends for successive one year terms
unless any party gives 60 days’ notice prior to the end of the year. The
restated agreement allows Met-Ed and Penelec to sell the output of NUG
generation to the market and requires FES to provide energy at fixed prices
to
replace any NUG energy thus sold to the extent needed for Met-Ed and Penelec
to
satisfy their PLR obligations. The parties have also separately terminated
the
Tolling, Suspension and Supplier Master agreements in connection with the
restatement of the partial requirements agreement. Accordingly, the energy
that
would have been supplied under the Master Supplier Agreement will now be
provided under the restated partial requirements agreement.
If
Met-Ed and
Penelec were to replace the entire FES supply at current market power prices
without corresponding regulatory authorization to increase their generation
prices to customers, each company would likely incur a significant increase
in
operating expenses and experience a material deterioration in credit quality
metrics. Under such a scenario, each company's credit profile would no longer
be
expected to support an investment grade rating for its fixed income securities.
Based on the PPUC’s January 11, 2007 order described below, if FES ultimately
determines to terminate, reduce, or significantly modify the agreement prior
to
the expiration of Met-Ed’s and Penelec’s generation rate caps in 2010, timely
regulatory relief is not likely to be granted by the PPUC.
Met-Ed
and Penelec
made a comprehensive rate filing with the PPUC on April 10, 2006 to address
a number of transmission, distribution and supply issues. If Met-Ed's and
Penelec's preferred approach involving accounting deferrals was approved, the
filing would have increased annual revenues by $216 million and
$157 million, respectively. That filing included, among other things, a
request to charge customers for an increasing amount of market priced power
procured through a CBP as the amount of supply provided under the then existing
FES agreement is phased out in accordance with the April 7, 2006 Tolling
Agreement described above. Met-Ed
and Penelec
also requested approval of the January 12, 2005 petition for the deferral
of transmission-related costs discussed above, but only for those costs incurred
during 2006. In this rate filing, Met-Ed and Penelec also requested recovery
of
annual transmission and related costs incurred on or after January 1, 2007,
plus the amortized portion of 2006 costs over a ten-year period, along with
applicable carrying charges, through an adjustable rider similar to that
implemented in Ohio.
Changes in the
recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs
were also included in the filing. Hearings were held in late August 2006 and
briefing occurred in September and October. The ALJs issued their Recommended
Decision on November 2, 2006.
The
PPUC entered its
Opinion and Order in the rate filing proceeding on January 11, 2007. The Order
approved the recovery of transmission costs, including the 2006 deferral, and
determined that no merger savings from prior years should be considered in
determining customers’ rates. The request for increases in generation supply
rates was denied as were the requested changes in NUG expense recovery and
Met-Ed’s non-NUG stranded costs. The order decreased Met-Ed’s and Penelec’s
distribution rates by $80 million and $19 million, respectively. These
decreases were offset by the increases allowed for the recovery of transmission
expenses and the 2006 transmission deferral. Overall rates increased by 5.0%
for
Met-Ed ($59 million) and 4.5% for Penelec ($50 million). Met-Ed and
Penelec filed a Petition for Reconsideration on January 26, 2007 on the issues
of consolidated tax savings and rate of return on equity. Other parties filed
Petitions for Reconsideration on transmission congestion, transmission deferrals
and rate design issues. The PPUC on February 8, 2007 entered an order
granting Met-Ed’s, Penelec’s and the other parties’ petitions for procedural
purposes. Due to that ruling, the period for appeals to the Commonwealth Court
is tolled until 30 days after the PPUC enters a subsequent order ruling on
the
substantive issues raised in the petitions.
36
As
of
December 31, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to
the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and the
FirstEnergy/GPU Merger Settlement Stipulation were $303 million and
$70 million, respectively. Penelec’s $70 million deferral is subject
to final resolution of an IRS settlement associated with NUG trust fund
proceeds. During the PPUC’s annual audit of Met-Ed’s and Penelec’s NUG stranded
cost balances in 2006, it noted a modification to the NUG purchased power
stranded cost accounting methodology made by Met-Ed and Penelec. On August
18,
2006, a PPUC Order was entered requiring Met-Ed and Penelec to reflect the
deferred NUG cost balances as if the stranded cost accounting methodology
modification had not been implemented. As a result of the PPUC’s Order, Met-Ed
recognized a pre-tax charge of approximately $10.3 million in the third quarter
of 2006, representing incremental costs deferred under the revised methodology
in 2005. Met-Ed and Penelec continue to believe that the stranded cost
accounting methodology modification is appropriate and on August 24, 2006 filed
a petition with the PPUC pursuant to its Order for authorization to reflect
the
stranded cost accounting methodology modification effective January 1, 1999.
Hearings on this petition are scheduled for late February 2007. It is not known
when the PPUC may issue a final decision in this matter.
On
February 1, 2007
the Governor of Pennsylvania proposed an Energy Independence Strategy (EIS).
The
EIS includes four pieces of preliminary draft legislation that, according
to the
Governor, is designed to reduce energy costs, promote energy independence
and
stimulate the economy. Elements of the EIS include the installation of smart
meters, funding for solar panels on residences and small businesses,
conservation programs to meet demand growth, a requirement that electric
distribution companies acquire power through a "Least Cost Portfolio", the
utilization of micro-grids and a three year phase-in of rate increases. Since
the EIS has only recently been proposed, the final form of any legislation
is
uncertain. Consequently, FirstEnergy is unable to predict what impact, if
any,
such legislation may have on its operations.
New
Jersey
JCP&L
is
permitted to defer for future collection from customers the amounts by which
its
costs of supplying BGS to non-shopping customers and costs incurred under NUG
agreements exceed amounts collected through BGS and NUGC rates and market sales
of NUG energy and capacity. As of December 31, 2006, the accumulated
deferred cost balance totaled approximately $369 million. New Jersey law
allows for securitization of JCP&L's deferred balance upon application by
JCP&L and a determination by the NJBPU that the conditions of the New Jersey
restructuring legislation are met. On February 14, 2003, JCP&L filed for
approval to securitize the July 31, 2003 deferred balance. On June 8, 2006,
the
NJBPU approved JCP&L’s request to issue securitization bonds associated with
BGS stranded cost deferrals. On August 10, 2006, JCP&L Transition
Funding II, a wholly owned subsidiary of JCP&L, issued $182 million of
transition bonds with a weighted average interest rate of 5.5%.
On
December 2,
2005, JCP&L filed its request for recovery of $165 million of actual
above-market NUG costs incurred from August 1, 2003 through
October 31, 2005 and forecasted above-market NUG costs for November and
December 2005. On February 23, 2006, JCP&L filed updated data reflecting
actual amounts through December 31, 2005 of $154 million of costs
incurred since July 31, 2003. On July 18, 2006, JCP&L further
requested an additional $14 million of costs that had been eliminated from
the securitized amount. A Stipulation of Settlement was signed by all parties,
approved by the ALJ and adopted by the NJBPU in its Order dated December 6,
2006. The Order approves an annual $110 million increase in NUGC rates
designed to recover deferred costs incurred since August 1, 2003, and a
portion of costs incurred prior to August 1, 2003 that were not
securitized. The Order requires that JCP&L absorb any net annual operating
losses associated with the Forked River Generating Station. In the Settlement,
JCP&L also agreed not to seek an increase to the NUGC to become effective
before January 2010, unless the deferred balance exceeds $350 million any
time after June 30, 2007.
Reacting
to the
higher closing prices of the 2006 BGS fixed rate auction, the NJBPU, on
March 16, 2006, initiated a generic proceeding to evaluate the auction
process and potential options for the future. On April 6, 2006, initial
comments were submitted. A public meeting was held on April 21, 2006 and a
legislative-type hearing was held on April 28, 2006. On June 21, 2006, the
NJBPU approved the continued use of a descending block auction for the Fixed
Price Residential Class. JCP&L filed its 2007 BGS company specific addendum
on July 10, 2006. On October 27, 2006, the NJBPU approved the auction
format to procure the 2007 Commercial Industrial Energy Price as well as the
specific rules for both the Fixed Price and Commercial Industrial Energy Price
auctions. These rules were essentially unchanged from the prior
auctions.
On
August 1,
2005, the NJBPU established a proceeding to determine whether additional
ratepayer protections are required at the state level in light of the repeal
of
PUHCA pursuant to the EPACT. The NJBPU approved regulations effective October
2,
2006 that would prevent a holding company that owns a gas or electric public
utility from investing more than 25% of the combined assets of its utility
and
utility-related subsidiaries into businesses unrelated to the utility industry.
These regulations are not expected to materially impact FirstEnergy or
JCP&L. Also, in the same proceeding, the NJBPU Staff issued an additional
draft proposal on March 31, 2006 addressing various issues including access
to
books and records, ring-fencing, cross subsidization, corporate governance
and
related matters. With the approval of the NJBPU Staff, the affected utilities
jointly submitted an alternative proposal on June 1, 2006. Comments on the
alternative proposal were submitted on June 15, 2006. On November 3,
2006, the NJPBU Staff circulated a revised draft proposal to interested
stakeholders.
37
New
Jersey statutes
require that the state periodically undertake a planning process, known as
the
Energy Master Plan (EMP), to address energy related issues including energy
security, economic growth, and environmental impact. The EMP is to be developed
with involvement of the Governor’s Office and the Governor’s Office of Economic
Growth, and is to be prepared by a Master Plan Committee, which is chaired
by
the NJBPU President and includes representatives of several State departments.
In
October 2006 the
current EMP process was initiated with the issuance of a proposed set of
objectives which, as to electricity, included the following:
·
Reduce
the total projected electricity demand by 20% by 2020;
· Meet
22.5% of the
State’s electricity needs with renewable energy resources by that
date;
· Reduce
air pollution
related to energy use;
· Encourage
and
maintain economic growth and development;
· Achieve
a 20% reduction in both Customer Average
Interruption Duration Index and System Average Interruption Frequency Index
by
2020
· Unit
prices for
electricity should remain no more than +5% of the regional average price
(region
includes New York, New Jersey, Pennsylvania,
Delaware, Maryland
and the
District of Columbia); and
· Eliminate
transmission congestion by 2020.
Comments
on the
objectives and participation in the development of the EMP have been solicited
and a number of working groups have been formed to attain input from a broad
range of interested stakeholders including utilities, environmental groups,
customer groups, and major customers. Public stakeholder meetings were held
in
the fall of 2006 and in early 2007, and further public meetings are expected
in
the summer of 2007. A final draft of the EMP is expected to be presented
to the
Governor in the fall of 2007 with further public hearings anticipated in
early
2008. At this time we cannot predict the outcome of this process nor determine
its impact.
See
Note 10 to
the consolidated financial statements for further details and a complete
discussion of regulatory matters in New Jersey.
FERC
Matters
On
March 28, 2006,
ATSI and MISO filed with the FERC a request to modify ATSI’s Attachment O
formula rate to include revenue requirements associated with recovery of
deferred Vegetation Management Enhancement Program (VMEP) costs. ATSI estimated
that it may defer approximately $54 million of such costs over a five-year
period. Approximately $42 million has been deferred as of December 31,
2006. The effective date for recovery was June 1, 2006. The FERC conditionally
approved the filing on May 22, 2006, and on July 14, 2006 FERC accepted the
ATSI
compliance filing. A request for rehearing of the FERC’s May 22, 2006 Order was
denied by FERC on October 25, 2006. The estimated annual revenues to ATSI from
the VMEP cost recovery is $12 million for each of the five years beginning
June 1, 2006.
On
January 24, 2006,
ATSI and MISO filed a request with the FERC to correct ATSI’s Attachment 0
formula rate to reverse revenue credits associated with termination of revenue
streams from transitional rates stemming from FERC’s elimination of RTOR between
the Midwest ISO and PJM. Revenues formerly collected under these transitional
rates were included in, and served to reduce, ATSI’s zonal transmission rate
under the Attachment O formula. Absent the requested correction, elimination
of
these revenue credits would not be fully reflected in ATSI’s formula rate until
June 1, 2008. On March 16, 2006, the FERC approved the revenue credit correction
without suspension, effective April 1, 2006. One party sought rehearing of
the
FERC's order, which was denied on June 27, 2006. No petition for review of
the
FERC’s decision was filed. The estimated revenue impact of the correction
mechanism is approximately $37 million for the period June 1, 2006 though May
31, 2007.
On
November 18,
2004, the FERC issued an order eliminating the RTOR for transmission service
between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the
transmission owners within MISO and PJM to submit compliance filings containing
a SECA mechanism to recover lost RTOR revenues during a 16-month transition
period from load serving entities. The FERC issued orders in 2005 setting the
SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES participated in the
FERC hearings held in May 2006 concerning the calculation and imposition of
the
SECA charges. The Presiding Judge issued an Initial Decision on August 10,
2006,
rejecting the compliance filings made by the RTOs and transmission owners,
ruling on various issues and directing new compliance filings. This decision
is
subject to review and approval by the FERC. Briefs addressing the Initial
Decision were filed on September 11, 2006 and October 20, 2006. A final order
could be issued by the FERC in early 2007.
38
On
January 31, 2005,
certain PJM transmission owners made three filings with the FERC pursuant to
a
settlement agreement previously approved by the FERC. JCP&L, Met-Ed and
Penelec were parties to that proceeding and joined in two of the filings. In
the
first filing, the settling transmission owners submitted a filing justifying
continuation of their existing rate design within the PJM RTO. In the second
filing, the settling transmission owners proposed a revised Schedule 12 to
the
PJM tariff designed to harmonize the rate treatment of new and existing
transmission facilities. Interventions and protests were filed on February
22,
2005. In the third filing, Baltimore Gas and Electric Company and Pepco
Holdings, Inc. requested a formula rate for transmission service provided within
their respective zones. On May 31, 2005, the FERC issued an order on these
cases. First, it set for hearing the existing rate design and indicated that
it
will issue a final order within six months. American Electric Power Company,
Inc. filed in opposition proposing to create a "postage stamp" rate for high
voltage transmission facilities across PJM. Second, the FERC approved the
proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed
formula rate, subject to refund and hearing procedures. On June 30, 2005, the
settling PJM transmission owners filed a request for rehearing of the May 31,
2005 order. On March 20, 2006, a settlement was filed with FERC in the formula
rate proceeding that generally accepts the companies' formula rate proposal.
The
FERC issued an order approving this settlement on April 19, 2006. Hearings
in
the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial
Decision was issued by the ALJ. The ALJ adopted the FERC Trial Staff’s position
that the cost of all PJM transmission facilities should be recovered through
a
postage stamp rate. The
ALJ recommended
an April 1, 2006 effective date for this change in rate design. If the FERC
accepts this recommendation, the transmission rate applicable to many load
zones
in PJM would increase. We believe that significant additional transmission
revenues would have to be recovered from the JCP&L, Met-Ed and Penelec
transmission zones within PJM. JCP&L, Met-Ed and Penelec, as part of the
Responsible Pricing Alliance, filed a brief addressing the Initial Decision
on
August 14, 2006 and September 5, 2006. The case will be reviewed by the FERC
with a decision anticipated in early 2007.
On
November 1, 2005,
FES filed two power sales agreements for approval with the FERC. One power
sales
agreement provided for FES to provide the PLR requirements of the Ohio Companies
at a price equal to the retail generation rates approved by the PUCO for a
period of three years beginning January 1, 2006. The Ohio Companies will be
relieved of their obligation to obtain PLR power requirements from FES if the
Ohio CBP results in a lower price for retail customers. A similar power sales
agreement between FES and Penn permits Penn to obtain its PLR power requirements
from FES at a fixed price equal to the retail generation price during 2006.
On
December 29,
2005, the FERC issued an order setting the two power sales agreements for
hearing. The order criticized the Ohio CBP, and required FES to submit
additional evidence in support of the reasonableness of the prices charged
in
the power sales agreements. On July 14, 2006, the Chief Judge granted the joint
motion of FES and the Trial Staff to appoint a settlement judge in this
proceeding and the procedural schedule was suspended pending settlement
discussions among the parties. A settlement conference was held on September
5,
2006. FES and the Ohio Companies, Penn, and the PUCO, along
with other
parties, reached an agreement to settle the case. The settlement was filed
with
the FERC on October 17, 2006, and was unopposed by the remaining parties,
including the FERC Trial Staff. This settlement was accepted by the FERC on
December 8, 2006.
The
terms of the
settlement provide for modification of both the Ohio and Penn power supply
agreements with FES. Under the Ohio power supply agreement, separate rates
are
established for the Ohio Companies’ PLR requirements; special retail contract
requirements, wholesale contract requirements, and interruptible buy-through
retail load requirements. For their PLR and special retail contract
requirements, the Ohio Companies will pay FES no more than the lower of (i)
the
sum of the retail generation charge, the rate stabilization charge, the fuel
recovery mechanism charge, and FES’ actual incremental fuel costs for such
sales; or (ii) the wholesale price cap. Different wholesale price caps are
imposed for PLR sales, special retail contracts, and wholesale contracts. The
wholesale price for interruptible buy-through retail load requirements is
limited to the actual spot price of power obtained by FES to provide this power.
FES billed the Ohio Companies for the additional amount payable to FES for
incremental fuel costs on power supplied during 2006. The total power supply
cost billed by FES was lower in each case than the wholesale price caps
specified in the settlement accepted by the FERC. In addition, pursuant to
the
settlement, the wholesale rate charged by FES under the Penn power supply
agreement can be no greater than the generation component of charges for retail
PLR load in Pennsylvania. The modifications to the Ohio and Pennsylvania power
supply agreements became effective January 1, 2006. The Penn supply agreement
subject to the settlement expired at midnight on December 31, 2006.
As
a result of
Penn’s PLR competitive solicitation process approved by the PPUC for the period
January 1, 2007 through May 31, 2008, FES was selected as the winning
bidder for a number of the tranches for individual customer classes. The balance
of the tranches will be supplied by unaffiliated power suppliers. On October
2,
2006, FES filed an application with the FERC under Section 205 of the Federal
Power Act for authorization to make these affiliate sales to Penn. Interventions
or protests were due on this filing on October 23, 2006. Penn was the only
party
to file an intervention in this proceeding. This filing was accepted by the
FERC
on November 15, 2006, and no requests for rehearing were
filed.
39
On
February 15,
2007, MISO filed documents with the FERC to establish a market-based,
competitive ancillary services market. MISO contends that the filing will
integrate operating reserves into MISO’s existing day-ahead and real-time
settlements process, incorporate opportunity costs into these markets, address
scarcity pricing through the implementation of a demand curve methodology,
foster demand response in the provision of operating reserves, and provide
for
various efficiencies and optimization with regard to generation dispatch. The
filing also proposes amendments to existing documents to provide for the
transfer of balancing functions from existing local balancing authorities to
MISO. MISO will then carry out this reliability function as the NERC-certified
balancing authority for the MISO region. MISO is targeting implementation for
the second or third quarter of 2008. The FERC has established March 23, 2007,
as
the date for interested parties to submit comments addressing the filing. The
filing has not yet been fully evaluated to assess its impact on our operations.
On
February 16,
2007, the FERC issued a final rule that revises its decade-old open access
transmission regulations and policies. The FERC explained that the final rule
is
intended to strengthen non-discriminatory access to the transmission grid,
facilitate FERC enforcement, and provide for a more open and coordinated
transmission planning process. The final rule will not be effective until 60
days after publication in the Federal Register. The final rule has not yet
been
fully evaluated to assess its impact on our operations.
Reliability
Initiatives
We
are
proceeding with the
implementation of the recommendations that were issued from various entities,
including governmental, industry and ad hoc reliability entities (PUCO, FERC,
NERC and the U.S. - Canada Power System Outage Task Force) in late 2003 and
early 2004, regarding enhancements to regional reliability that were to be
completed subsequent to 2004. We will continue to periodically assess the
FERC-ordered Reliability Study recommendations for forecasted 2009 system
conditions, recognizing revised load forecasts and other changing system
conditions which may impact the recommendations. Thus far, implementation of
the
recommendations has not required, nor is expected to require, substantial
investment in new, or material upgrades to existing, equipment. The FERC or
other applicable government agencies and reliability entities, however, may
take
a different view as to recommended enhancements or may recommend additional
enhancements in the future that could require additional, material expenditures.
As
a result of
outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had
implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU
adopted an MOU that set out specific tasks related to service reliability to
be
performed by JCP&L and a timetable for completion and endorsed JCP&L’s
ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a
Stipulation that incorporates the final report of an SRM who made
recommendations on appropriate courses of action necessary to ensure system-wide
reliability. The Stipulation also incorporates the Executive Summary and
Recommendation portions of the final report of a focused audit of JCP&L’s
Planning and Operations and Maintenance programs and practices (Focused Audit).
On February 11, 2005, JCP&L met with the DRA to discuss reliability
improvements. The SRM completed his work and issued his final report to the
NJBPU on June 1, 2006. JCP&L filed a comprehensive response to the NJBPU on
July 14, 2006. JCP&L continues to file compliance reports reflecting
activities associated with the MOU and Stipulation.
The
EPACT provides
for the creation of an ERO to establish and enforce reliability standards for
the bulk power system, subject to FERC’s review. On February 3, 2006, the
FERC adopted a rule establishing certification requirements for the ERO, as
well
as regional entities envisioned to assume compliance monitoring and enforcement
responsibility for the new reliability standards. The FERC issued an order
on
rehearing on March 30, 2006, providing certain clarifications and
essentially affirming the rule.
The
NERC has been
preparing the implementation aspects of reorganizing its structure to meet
the
FERC’s certification requirements for the ERO. The NERC made a filing with the
FERC on April 4, 2006 to obtain certification as the ERO and to obtain FERC
approval of pro forma delegation agreements with regional reliability
organizations (regional entities). The new FERC rule referred to above, further
provides for reorganizing regional entities that would replace the current
regional councils and for rearranging their relationship with the ERO. The
“regional entity” may be delegated authority by the ERO, subject to FERC
approval, for compliance and enforcement of reliability standards adopted by
the
ERO and approved by the FERC. The ERO filing was noticed on April 7, 2006 and
comments and reply comments were filed in May, June and July 2006. On July
20,
2006, the FERC certified the NERC as the ERO to implement the provisions of
Section 215 of the Federal Power Act and directed the NERC to make compliance
filings addressing governance and non-governance issues and the regional
delegation agreements. On September 18, 2006 and October 18, 2006, NERC
submitted compliance filings addressing the governance and non-governance issues
identified in the FERC ERO Certification Order, dated July 20, 2006. On October
30, 2006, the FERC issued an order accepting most of NERC’s governance filings.
On January 18, 2007, the FERC issued an order largely accepting NERC’s
compliance filings addressing non-governance issues, subject to an additional
compliance filing requirement.
40
On
April 4, 2006,
NERC also submitted a filing with the FERC seeking approval of mandatory
reliability standards, as well as for approval with the relevant Canadian
authorities. These reliability standards are based, with some modifications
and
additions, on the current NERC Version 0 reliability standards. The reliability
standards filing was subsequently evaluated by the FERC on May 11, 2006, leading
to the FERC staff’s release of a preliminary assessment that cited many
deficiencies in the proposed reliability standards. The NERC and industry
participants filed comments in response to the Staff’s preliminary assessment.
The FERC held a technical conference on the proposed reliability standards
on
July 6, 2006. The FERC issued a NOPR on the proposed reliability standards
on
October 20, 2006. In the NOPR, the FERC proposed to approve 83 of the 107
reliability standards and directed NERC to make technical improvements to 62
of
the 83 standards approved. The 24 standards that were not approved remain
pending at the FERC awaiting further clarification and filings by the NERC
and
regional entities. The FERC also provided additional clarification within the
NOPR regarding the proposed application of final standards and guidance with
regard to technical improvements of the standards. On November 15, 2006, NERC
submitted several revised reliability standards and three new proposed
reliability standards. Interested parties were provided the opportunity to
comment on the NOPR (including the revised standards submitted by NERC in
November) by January 3, 2007. Numerous parties, including FirstEnergy, filed
comments on the NOPR on January 3, 2007. Mandatory reliability standards
enforceable with penalties are expected to be in place by the summer of 2007.
In
a separate order issued October 24, 2006, the FERC approved NERC’s 2007
budget and business plan subject to certain compliance filings.
On
November 29,
2006, NERC submitted an additional compliance filing with the FERC regarding
the
Compliance Monitoring and Enforcement Program (CMEP) along with the proposed
Delegation Agreements between the ERO and the regional reliability entities.
The
FERC provided opportunity for interested parties to comment on the CMEP by
January 10, 2007. We, as well as other parties, moved to intervene and submitted
responsive comments on January 10, 2007. This filing is pending before the
FERC.
The
ECAR,
Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability
councils completed the consolidation of these regions into a single new regional
reliability organization known as ReliabilityFirst
Corporation.
ReliabilityFirst
began operations as
a regional reliability council under NERC on January 1, 2006 and on
November 29, 2006 filed a proposed Delegation Agreement with NERC to obtain
certification consistent with the final rule as a “regional entity” under the
ERO. All of our facilities are located within the ReliabilityFirst
region.
On
May 2, 2006, the
NERC Board of Trustees adopted eight new cyber security standards that replaced
interim standards put in place in the wake of the September 11, 2001 terrorist
attacks, and thirteen additional reliability standards. The security standards
became effective on June 1, 2006, and the remaining standards will become
effective throughout 2006 and 2007. NERC filed these proposed standards with
the
FERC and relevant Canadian authorities for approval. The cyber security
standards were not included in the October 20, 2006 NOPR and are being
addressed in a separate FERC docket. On December 11, 2006, the FERC Staff
provided its preliminary assessment of these proposed mandatory reliability
standards and again cited various deficiencies in the proposed standards,
providing interested parties with the opportunity to comment on the assessment
by February 12, 2007.
We
believe that we
are in compliance with all current NERC reliability standards. However, based
upon a review of the October 20, 2006 NOPR, it appears that the FERC will
adopt more strict reliability standards than those contained in the current
NERC
standards. The financial impact of complying with the new standards cannot
be
determined at this time. However, the EPACT required that all prudent costs
incurred to comply with the new reliability standards be recovered in rates.
If
we are unable to meet the reliability standards for our bulk power system in
the
future, it could have a material adverse effect on our financial condition,
results of operations and cash flows.
See
Note 10 to
the consolidated financial statements for a more detailed discussion of
reliability initiatives.
ENVIRONMENTAL
MATTERS
We
accrue
environmental liabilities only when it is probable that we have an obligation
for such costs and can reasonably estimate the amount of such costs. Unasserted
claims are reflected in our determination of environmental liabilities and
are
accrued in the period that they become both probable and reasonably
estimable.
Clean
Air Act
Compliance
We
are required to
meet federally-approved SO2
emissions
regulations. Violations of such regulations can result in shutdown of the
generating unit involved and/or civil or criminal penalties of up to $32,500
for
each day the unit is in violation. The EPA has an interim enforcement policy
for
SO2
regulations in Ohio
that allows for compliance based on a 30-day averaging period. We believe that
we are currently in compliance with this policy, but cannot predict what action
the EPA may take in the future with respect to the interim enforcement
policy.
41
The
EPA Region 5
issued a Finding of Violation and NOV to the Bay Shore Power Plant dated June
15, 2006 alleging violations to various sections of the Clean Air Act. We have
disputed those alleged violations based on our Clean Air Act permit, the Ohio
SIP and other information provided at an August 2006 meeting with the EPA.
The
EPA has several enforcement options (administrative compliance order,
administrative penalty order, and/or judicial, civil or criminal action) and
has
indicated that such option may depend on the time needed to achieve and
demonstrate compliance with the rules alleged to have been
violated.
We
comply with
SO2
reduction
requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur
fuel, generating more electricity from lower-emitting plants, and/or using
emission allowances. NOX
reductions required
by the 1990 Amendments are being achieved through combustion controls and the
generation of more electricity at lower-emitting plants. In September 1998,
the
EPA finalized regulations requiring additional NOX
reductions at our
facilities. The EPA's NOX
Transport Rule
imposes uniform reductions of NOX
emissions (an
approximate 85% reduction in utility plant NOX
emissions from
projected 2007 emissions) across a region of nineteen states (including
Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based
on a conclusion that such NOX
emissions are
contributing significantly to ozone levels in the eastern United States. We
believe our facilities are also complying with the NOX
budgets established
under SIPs through combustion controls and post-combustion controls, including
Selective Catalytic Reduction and Selective Non-Catalytic Reduction systems,
and/or using emission allowances.
National
Ambient
Air Quality Standards
In
July 1997, the
EPA promulgated changes in the NAAQS for ozone and fine particulate matter.
In
March 2005, the EPA finalized CAIR covering a total of 28 states (including
Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based
on proposed findings that air emissions from 28 eastern states and the
District of Columbia significantly contribute to non-attainment of the NAAQS
for
fine particles and/or the "8-hour" ozone NAAQS in other states. CAIR provided
each affected state until 2006 to develop implementing regulations to achieve
additional reductions of NOX
and SO2
emissions in two
phases (Phase I in 2009 for NOX,
2010 for
SO2
and Phase II in
2015 for both NOX
and SO2).
Our Michigan,
Ohio and Pennsylvania fossil-fired generation facilities will be subject to
caps
on SO2
and
NOX
emissions, whereas
its New Jersey fossil-fired generation facility will be subject to a cap on
NOX
emissions only.
According to the EPA, SO2
emissions
will be
reduced by 45% (from 2003 levels) by 2010 across the states covered by the
rule,
with reductions reaching 73% (from 2003 levels) by 2015, capping SO2
emissions in
affected states to just 2.5 million tons annually. NOX
emissions will be
reduced by 53% (from 2003 levels) by 2009 across the states covered by the
rule,
with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional
NOX
cap of
1.3 million tons annually. The future cost of compliance with these
regulations may be substantial and will depend on how they are ultimately
implemented by the states in which we operate affected facilities.
Mercury
Emissions
In
December 2000,
the EPA announced it would proceed with the development of regulations regarding
hazardous air pollutants from electric power plants, identifying mercury as
the
hazardous air pollutant of greatest concern. In March 2005, the EPA
finalized CAMR, which provides for a cap-and-trade program to reduce mercury
emissions from coal-fired power plants in two phases. Initially, mercury
emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit"
from implementation of SO2
and NOX
emission caps under
the EPA's CAIR program). Phase II of the mercury cap-and-trade program will
cap
nationwide mercury emissions from coal-fired power plants at 15 tons per
year by 2018. However, the final rules give states substantial discretion in
developing rules to implement these programs. In addition, both CAIR and CAMR
have been challenged in the United States Court of Appeals for the District
of
Columbia. Our future cost of compliance with these regulations may be
substantial and will depend on how they are ultimately implemented by the states
in which we operate affected facilities.
The
model rules for
both CAIR and CAMR contemplate an input-based methodology to allocate allowances
to affected facilities. Under this approach, allowances would be allocated
based
on the amount of fuel consumed by the affected sources. We would prefer an
output-based generation-neutral methodology in which allowances are allocated
based on megawatts of power produced, allowing new and non-emitting generating
facilities (including renewables and nuclear) to be entitled to their
proportionate share of the allowances. Consequently, we will be disadvantaged
if
these model rules were implemented as proposed because our substantial reliance
on non-emitting (largely nuclear) generation is not recognized under the
input-based allocation.
42
Pennsylvania
has
submitted a new mercury rule for EPA approval that does not provide a cap and
trade approach as in the CAMR, but rather follows a command and control approach
imposing emission limits on individual sources. Pennsylvania’s mercury
regulation would deprive FES of mercury emission allowances that were to be
allocated to the Mansfield Plant under the CAMR and that would otherwise be
available for achieving FirstEnergy system-wide compliance. The future cost
of
compliance with these regulations, if approved and implemented, may be
substantial.
W.
H. Sammis
Plant
In
1999 and 2000,
the EPA issued NOV or compliance orders to nine utilities alleging violations
of
the Clean Air Act based on operation and maintenance of 44 power plants,
including the W. H. Sammis Plant, which was owned at that time by OE and Penn.
In addition, the DOJ filed eight civil complaints against various investor-owned
utilities, including a complaint against OE and Penn in the U.S. District Court
for the Southern District of Ohio. These cases are referred to as the New Source
Review cases.
On
March 18, 2005,
OE and Penn announced that they had reached a settlement with the EPA, the
DOJ
and three states (Connecticut, New Jersey, and New York) that resolved all
issues related to the New Source Review litigation. This settlement agreement,
which is in the form of a consent decree, was approved by the Court on July
11,
2005, and requires reductions of NOX
and SO2
emissions at the W.
H. Sammis Plant and other FES coal-fired plants through the installation of
pollution control devices and provides for stipulated penalties for failure
to
install and operate such pollution controls in accordance with that agreement.
Consequently, if we fail to install such pollution control devices, for any
reason, including, but not limited to, the failure of any third-party contractor
to timely meet its delivery obligations for such devices, we could be exposed
to
penalties under the Sammis NSR Litigation consent decree. Capital expenditures
necessary to complete requirements of the Sammis NSR Litigation are currently
estimated to be $1.5 billion ($400 million of which is expected to be spent
in
2007, with the largest portion of the remaining $1.1 billion expected to be
spent in 2008 and 2009).
The
Sammis NSR
Litigation consent decree also requires us to spend up to $25 million
toward environmentally beneficial projects, $14 million of which is
satisfied by entering into 93 MW (or 23 MW if federal tax credits are not
applicable) of wind energy purchased power agreements with a 20-year term.
An
initial 16 MW of the 93 MW consent decree obligation was satisfied
during 2006.
On
August 26, 2005,
FGCO entered into an agreement with Bechtel Power Corporation under which
Bechtel will engineer, procure, and construct air quality control systems for
the reduction of SO2
emissions. FGCO
also entered into an agreement with B&W on August 25, 2006 to supply flue
gas desulfurization systems for the reduction of SO2
emissions.
Selective Catalytic Reduction (SCR) systems for the reduction of NOx emissions
also are being installed at the W.H. Sammis Plant under a 1999 agreement with
B&W.
OE
and Penn agreed
to pay a civil penalty of $8.5 million. Results for the first quarter of
2005 included the penalties paid by OE and Penn of $7.8 million and
$0.7 million, respectively. OE and Penn also recognized liabilities in the
first quarter of 2005 of $9.2 million and $0.8 million, respectively,
for probable future cash contributions toward environmentally beneficial
projects.
Climate
Change
In
December 1997,
delegates to the United Nations' climate summit in Japan adopted an agreement,
the Kyoto Protocol, to address global warming by reducing the amount of man-made
GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and
2012. The United States signed the Kyoto Protocol in 1998 but it failed to
receive the two-thirds vote of the United States Senate required for
ratification. However, the Bush administration has committed the United States
to a voluntary climate change strategy to reduce domestic GHG intensity - the
ratio of emissions to economic output - by 18% through 2012. The EPACT
established a Committee on Climate Change Technology to coordinate federal
climate change activities and promote the development and deployment of GHG
reducing technologies.
We
cannot currently
estimate the financial impact of climate change policies, although the potential
restrictions on CO2
emissions could
require significant capital and other expenditures. However, the CO2
emissions per
kilowatt-hour of electricity generated by FirstEnergy is lower than many
regional competitors due to its diversified generation sources which include
low
or non-CO2
emitting gas-fired
and nuclear generators.
43
Regulation
of
Hazardous Waste
Under
NRC
regulations, we must ensure that adequate funds will be available to
decommission our nuclear facilities. As of December 31, 2006, we had
approximately $1.4 billion invested in external trusts to be used for the
decommissioning and environmental remediation of Davis-Besse, Beaver Valley
and
Perry. As part of the application to the NRC to transfer the ownership of these
nuclear facilities to NGC, we agreed to contribute another $80 million to these
trusts by 2010. Consistent with NRC guidance, utilizing a “real” rate of return
on these funds of approximately 2% over inflation, these trusts are expected
to
exceed the minimum decommissioning funding requirements set by the NRC.
Conservatively, these estimates do not include any rate of return that the
trusts may earn over the 20-year plant useful life extensions that we plan
to
seek for these facilities.
The
Companies have
been named as PRPs at waste disposal sites, which may require cleanup under
the
Comprehensive Environmental Response, Compensation, and Liability Act of 1980.
Allegations of disposal of hazardous substances at historical sites and the
liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all PRPs for a particular site are liable on a joint
and several basis. Therefore, environmental liabilities that are considered
probable have been recognized on the Consolidated Balance Sheet as of
December 31, 2006, based on estimates of the total costs of cleanup, the
Companies' proportionate responsibility for such costs and the financial ability
of other unaffiliated entities to pay. In addition, JCP&L has accrued
liabilities for environmental remediation of former manufactured gas plants
in
New Jersey. Those costs are being recovered by JCP&L through a
non-bypassable SBC. Total liabilities of approximately $88 million have
been accrued through December 31, 2006.
See
Note 14(D)
to the consolidated financial statements for further details and a complete
discussion of environmental matters.
OTHER
LEGAL
PROCEEDINGS
There
are various
lawsuits, claims (including claims for asbestos exposure) and proceedings
related to our normal business operations pending against FirstEnergy and its
subsidiaries. The other material items not otherwise discussed above are
described below.
Power
Outages
and Related Litigation
On
August 14,
2003, various states and parts of southern Canada experienced widespread power
outages. The outages affected approximately 1.4 million customers in our service
area. The U.S. - Canada Power System Outage Task Force’s final report in April
2004 on the outages concluded, among other things, that the problems leading
to
the outages began in our Ohio service area. Specifically,
the
final report concluded, among other things, that the initiation of the
August 14, 2003 power outages resulted from an alleged failure of both
FirstEnergy and ECAR to assess and understand perceived inadequacies within
our
system; inadequate situational awareness of the developing conditions; and
a
perceived failure to adequately manage tree growth in certain transmission
rights of way. The Task Force also concluded that there was a failure of the
interconnected grid's reliability organizations (MISO and PJM) to provide
effective real-time diagnostic support. The final report is publicly available
through the Department of Energy’s Web site (www.doe.gov). We believe that the
final report does not provide a complete and comprehensive picture of the
conditions that contributed to the August 14, 2003 power outages and that
it does not adequately address the underlying causes of the outages. We remain
convinced that the outages cannot be explained by events on any one utility's
system. The final report contained 46 “recommendations to prevent or minimize
the scope of future blackouts.” Forty-five of those recommendations related to
broad industry or policy matters while one, including subparts, related to
activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM,
ECAR, and other parties to correct the causes of the August 14, 2003 power
outages. We implemented several initiatives, both prior to and since the
August 14, 2003 power outages, which were independently verified by NERC as
complete in 2004 and were consistent with these and other recommendations and
collectively enhance the reliability of our electric system. Our implementation
of these recommendations in 2004 included completion of the Task Force
recommendations that were directed toward FirstEnergy. We are also proceeding
with the implementation of the recommendations that were to be completed
subsequent to 2004 and will continue to periodically assess the FERC-ordered
Reliability Study recommendations for forecasted 2009 system conditions,
recognizing revised load forecasts and other changing system conditions which
may impact the recommendations. Thus far, implementation of the recommendations
has not required, nor is expected to require, substantial investment in new
or
material upgrades to existing equipment. The FERC or other applicable government
agencies and reliability coordinators may, however, take a different view as
to
recommended enhancements or may recommend additional enhancements in the future
that could require additional material expenditures.
44
FirstEnergy
companies also are defending five separate complaint cases before the PUCO
relating to the August 14, 2003 power outages. Two cases were originally
filed in Ohio State courts but were subsequently dismissed for lack of subject
matter jurisdiction and further appeals were unsuccessful. In these cases the
individual complainants—three in one case and four in the other—sought to
represent others as part of a class action. The PUCO dismissed the class
allegations, stating that its rules of practice do not provide for class action
complaints. Three other pending PUCO complaint cases were filed by various
insurance carriers either in their own name as subrogees or in the name of
their
insured. In each of these three cases, the carrier seeks reimbursement from
various FirstEnergy companies (and, in one case, from PJM, MISO and American
Electric Power Company, Inc., as well) for claims paid to insureds for damages
allegedly arising as a result of the loss of power on August 14, 2003. The
listed insureds in these cases, in many instances, are not customers of any
FirstEnergy company. A sixth case involving the claim of a non-customer seeking
reimbursement for losses incurred when its store was burglarized on
August 14, 2003 was dismissed. On
March 7,
2006, the PUCO issued a ruling, consolidating all of the pending outage cases
for hearing; limiting the litigation to service-related claims by customers
of
the Ohio operating companies; dismissing FirstEnergy as a defendant; and ruling
that the U.S.-Canada Power System Outage Task Force Report was not admissible
into evidence. In
response to a
motion for rehearing filed by one of the claimants, the PUCO ruled on April
26,
2006 that the insurance company claimants, as insurers, may prosecute their
claims in their name so long as they also identify the underlying insured
entities and the Ohio utilities that provide their service. The PUCO denied
all
other motions for rehearing. The plaintiffs in each case have since filed
amended complaints and the named FirstEnergy companies have answered and also
have filed a motion to dismiss each action. On September 27, 2006, the PUCO
dismissed certain parties and claims and otherwise ordered the complaints to
go
forward to hearing. The cases have been set for hearing on October 16,
2007.
On
October 10, 2006,
various insurance carriers refiled a complaint in Cuyahoga County Common Pleas
Court seeking reimbursement for claims paid to numerous insureds who allegedly
suffered losses as a result of the August 14, 2003 outages. All of the insureds
appear to be non-customers. The plaintiff insurance companies are the same
claimants in one of the pending PUCO cases. FirstEnergy, the Ohio Companies
and
Penn were served on October 27, 2006. On January 18, 2007, the Court
granted the Companies’ motion to dismiss the case. It is unknown whether or not
the matter will be further appealed. No estimate of potential liability is
available for any of these cases.
We
were also named,
along with several other entities, in a complaint in New Jersey State Court.
The
allegations against FirstEnergy were based, in part, on an alleged failure
to
protect the citizens of Jersey City from an electrical power outage. None of
our
subsidiaries serve customers in Jersey City. A responsive pleading has been
filed. On April 28, 2006, the Court granted our motion to dismiss. The
plaintiff has not appealed.
We
are vigorously
defending these actions, but cannot predict the outcome of any of these
proceedings or whether any further regulatory proceedings or legal actions
may
be initiated against the Companies. Although we are unable to predict the impact
of these proceedings, if FirstEnergy or our subsidiaries were ultimately
determined to have legal liability in connection with these proceedings, it
could have a material adverse effect on our financial condition, results of
operations and cash flows.
Nuclear
Plant
Matters
On
January 20,
2006, FENOC announced that it had entered into a deferred prosecution agreement
with the U.S. Attorney’s Office for the Northern District of Ohio and the
Environmental Crimes Section of the Environment and Natural Resources Division
of the DOJ related to FENOC’s communications with the NRC during the fall of
2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power
Station. Under the agreement, the United States acknowledged FENOC’s extensive
corrective actions at Davis-Besse, FENOC’s cooperation during investigations by
the DOJ and the NRC, FENOC’s pledge of continued cooperation in any related
criminal and administrative investigations and proceedings, FENOC’s
acknowledgement of responsibility for the behavior of its employees, and its
agreement to pay a monetary penalty. The DOJ agreed to refrain from seeking
an
indictment or otherwise initiating criminal prosecution of FENOC for all conduct
related to the statement of facts attached to the deferred prosecution
agreement, as long as FENOC remained in compliance with the agreement, which
FENOC has done. FENOC paid a monetary penalty of $28 million (not
deductible for income tax purposes) which reduced our earnings by $0.09 per
common share in the fourth quarter of 2005. The deferred prosecution agreement
expired on December 31, 2006.
On
April 21,
2005, the NRC issued a NOV and proposed a $5.45 million civil penalty
related to the degradation of the Davis-Besse reactor vessel head issue
discussed above. We accrued $2 million for a potential fine prior to 2005
and accrued the remaining liability for the proposed fine during the first
quarter of 2005. On September 14, 2005, FENOC filed its response to the NOV
with the NRC. FENOC accepted full responsibility for the past failure to
properly implement its boric acid corrosion control and corrective action
programs. The NRC NOV indicated that the violations do not represent current
licensee performance. We paid the penalty in the third quarter of 2005. On
January 23, 2006, FENOC supplemented its response to the NRC's NOV on the
Davis-Besse head degradation to reflect the deferred prosecution agreement
that
FENOC had reached with the DOJ.
45
On
August 12,
2004, the NRC notified FENOC that it would increase its regulatory oversight
of
the Perry Nuclear Power Plant as a result of problems with safety system
equipment over the preceding two years and the licensee's failure to take prompt
and corrective action.
On
April 4,
2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry
Nuclear Power Plant as identified in the NRC's annual assessment letter to
FENOC. Similar public meetings are held with all nuclear power plant licensees
following issuance by the NRC of their annual assessments. According to the
NRC,
overall the Perry Nuclear Power Plant operated "in a manner that preserved
public health and safety" even though it remained under heightened NRC
oversight. During the public meeting and in the annual assessment, the NRC
indicated that additional inspections will continue and that the plant must
improve performance to be removed from the Multiple/Repetitive Degraded
Cornerstone Column of the Action Matrix.
On
September 28, 2005, the NRC sent a CAL to FENOC describing commitments that
FENOC had made to improve the performance at the Perry Nuclear Power Plant
and
stated that the CAL would remain open until substantial improvement was
demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight
Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and
associated meetings to discuss the performance of the Perry Nuclear Power Plant
on March 14, 2006, the NRC again stated that the Perry Nuclear Power Plant
continued to operate in a manner that "preserved public health and safety."
However, the NRC also stated that increased levels of regulatory oversight
would
continue until sustained improvement in the performance of the facility was
realized. If performance does not improve, the NRC has a range of options under
the Reactor Oversight Process, from increased oversight to possible impact
to
the plant’s operating authority. Although we are unable to predict the impact of
the ultimate disposition of this matter, it could have a material adverse effect
on our financial condition, results of operations and cash flows.
Other
Legal
Matters
On
October 20,
2004, we were notified by the SEC that the previously disclosed informal inquiry
initiated by the SEC's Division of Enforcement in September 2003 relating to
the
restatements in August 2003 of previously reported results by FirstEnergy and
the Ohio Companies, and the Davis-Besse extended outage, have become the subject
of a formal order of investigation. The SEC's formal order of investigation
also
encompasses issues raised during the SEC's examination of FirstEnergy and the
Companies under the now repealed PUHCA. Concurrent with this notification,
we
received a subpoena asking for background documents and documents related to
the
restatements and Davis-Besse issues. On December 30, 2004, we received a
subpoena asking for documents relating to issues raised during the SEC's PUHCA
examination. On August 24, 2005, additional information was requested
regarding Davis-Besse-related disclosures, which has been provided. We have
cooperated fully with the informal inquiry and continue to do so with the formal
investigation.
On
August 22,
2005, a class action complaint was filed against OE in Jefferson County, Ohio
Common Pleas Court, seeking compensatory and punitive damages to be determined
at trial based on claims of negligence and eight other tort counts alleging
damages from W.H. Sammis Plant air emissions. The two named plaintiffs are
also
seeking injunctive relief to eliminate harmful emissions and repair property
damage and the institution of a medical monitoring program for class members.
On
October 18, 2006, the Ohio Supreme Court transferred this case to a
Tuscarawas County Common Pleas Court judge due to concerns over potential class
membership by the Jefferson County Common Pleas Court.
JCP&L's
bargaining unit employees filed a grievance challenging JCP&L's 2002
call-out procedure that required bargaining unit employees to respond to
emergency power outages. On May 20, 2004, an arbitration panel concluded
that the call-out procedure violated the parties' collective bargaining
agreement. At the conclusion of the June 1, 2005 hearing, the arbitration
panel decided not to hear testimony on damages and closed the proceedings.
On
September 9, 2005, the arbitration panel issued an opinion to award
approximately $16 million to the bargaining unit employees. On February 6,
2006, a federal district court granted a union motion to dismiss, as premature,
a JCP&L appeal of the award filed on October 18, 2005. JCP&L
intends to re-file an appeal again in federal district court once the damages
associated with this case are identified at an individual employee level.
JCP&L recognized a liability for the potential $16 million award in
2005.
If
it were
ultimately determined that FirstEnergy or our subsidiaries have legal liability
or are otherwise made subject to liability based on the above matters, it could
have a material adverse effect on our financial condition, results of operations
and cash flows.
See
Note 14(E)
to the consolidated financial statements for further details and a complete
discussion of these other legal proceedings.
46
CRITICAL
ACCOUNTING POLICIES
We
prepare our
consolidated financial statements in accordance with GAAP. Application of these
principles often requires a high degree of judgment, estimates and assumptions
that affect financial results. All of our assets are subject to their own
specific risks and uncertainties and are regularly reviewed for impairment.
Our
more significant accounting policies are described below.
Revenue
Recognition
We
follow the
accrual method of accounting for revenues, recognizing revenue for electricity
that has been delivered to customers but not yet billed through the end of
the
accounting period. The determination of electricity sales to individual
customers is based on meter readings, which occur on a systematic basis
throughout the month. At the end of each month, electricity delivered to
customers since the last meter reading is estimated and a corresponding accrual
for unbilled sales is recognized. The determination of unbilled sales requires
management to make estimates regarding electricity available for retail load,
transmission and distribution line losses, demand by customer class,
weather-related impacts, prices in effect for each customer class and
electricity provided by alternative suppliers.
Regulatory
Accounting
Our
regulated
services segment is subject to regulation that sets the prices (rates) we are
permitted to charge our customers based on costs that the regulatory agencies
determine we are permitted to recover. At times, regulators permit the future
recovery through rates of costs that would be currently charged to expense
by an
unregulated company. This ratemaking process results in the recording of
regulatory assets based on anticipated future cash inflows. We regularly review
these assets to assess their ultimate recoverability within the approved
regulatory guidelines. Impairment risk associated with these assets relates
to
potentially adverse legislative, judicial or regulatory actions in the future.
Pension
and
Other Postretirement Benefits Accounting
Our
reported costs
of providing non-contributory qualified and non-qualified defined pension
benefits and post employment benefits other than pensions are dependent upon
numerous factors resulting from actual plan experience and certain assumptions.
Pension
and OPEB
costs are affected by employee demographics (including age, compensation levels,
and employment periods), the level of contributions we make to the plans, and
earnings on plan assets. Such factors may be further affected by business
combinations, which impact employee demographics, plan experience and other
factors. Pension and OPEB costs are also affected by changes to key assumptions,
including anticipated rates of return on plan assets, the discount rates and
health care trend rates used in determining the projected benefit obligations
for pension and OPEB costs.
In
accordance with
SFAS 87, changes in pension and OPEB obligations associated with these
factors may not be immediately recognized as costs on the income statement,
but
generally are recognized in future years over the remaining average service
period of plan participants. SFAS 87 and SFAS 106 delay recognition of
changes due to the long-term nature of pension and OPEB obligations and the
varying market conditions likely to occur over long periods of time. As such,
significant portions of pension and OPEB costs recorded in any period may not
reflect the actual level of cash benefits provided to plan participants and
are
significantly influenced by assumptions about future market conditions and
plan
participants' experience.
As
of December 31,
2006, we adopted SFAS 158 which requires a net liability or asset to be
recognized for the overfunded or underfunded status of our defined benefit
pension and other postretirement benefit plans on the balance sheet and
recognize changes in funded status in the year in which the changes occur
through other comprehensive income. We will continue to apply the provisions
of
SFAS 87 and SFAS 106 in measuring plan assets and benefit obligations as of
the
balance sheet date and in determining the amount of net periodic benefit cost.
Our underfunded status at December 31, 2006 is $637 million.
In
selecting an
assumed discount rate, we consider currently available rates of return on
high-quality fixed income investments expected to be available during the period
to maturity of the pension and other postretirement benefit obligations. The
assumed discount rate as of December 31, 2006 is 6.00% from 5.75% and 6.00%
used as of December 31, 2005 and 2004, respectively.
47
Our
assumed rate of
return on pension plan assets considers historical market returns and economic
forecasts for the types of investments held by our pension trusts. In 2006,
2005
and 2004, our qualified pension plan assets actually earned $567 million or
12.5%, $325 million or 8.2%
and $415 million or
11.1%, respectively. Our qualified pension costs in 2006, 2005 and 2004 were
computed using an assumed 9.0% rate of return on plan assets which generated
$396
million,
$345 million
and $286 million expected returns on plan assets, respectively. The 2006
expected return was based upon projections of future returns and our pension
trust investment allocation of approximately 64% equities, 29% bonds, 5% real
estate, 1% private equities and 1% cash. The gains or losses generated as a
result of the difference between expected and actual returns on plan assets
are
deferred and amortized and will increase or decrease future net periodic pension
expense, respectively.
Our
pension and OPEB
expense was $94 million in 2006 and $131 million in 2005. On January 2, 2007
FirstEnergy made a $300 million voluntary contribution to our pension plan.
In
addition during 2006, we amended our OPEB plan effective in 2008 to cap our
monthly contribution for many of the retirees and their spouses receiving
subsidized health care coverage. As a result of the $300 million voluntary
contribution and the amendment to the OPEB plan effective in 2008, we expect
the
pension and OPEB costs for 2007 to be a credit of $94 million for
FirstEnergy.
Pension
expense in
our non-qualified pension plans is expected to be approximately $21
million
in 2007, compared to $21
million
in 2006 and $16 million in 2005.
Health
care cost
trends continue to increase and will affect future OPEB costs. The 2006 and
2005
composite health care trend rate assumptions are approximately 9-11%, gradually
decreasing to 5%. in later years. In determining our trend rate assumptions,
we
included the specific provisions of our health care plans, the demographics
and
utilization rates of plan participants, actual cost increases experienced in
our
health care plans, and projections of future medical trend rates. The effect
on
our pension and OPEB costs from changes in key assumptions are as follows:
|
Increase
in Costs from Adverse Changes in Key Assumptions
|
||||||||||||||||
|
Assumption
|
Adverse
Change
|
Pension
|
OPEB
|
Total
|
||||||||||||
|
(In
millions)
|
||||||||||||||||
|
Discount
rate
|
Decrease
by
0.25%
|
$
|
13
|
$
|
2
|
$
|
15
|
|||||||||
|
Long-term
return on assets
|
Decrease
by
0.25%
|
$
|
13
|
$
|
1
|
$
|
14
|
|||||||||
|
Health
care
trend rate
|
Increase
by
1%
|
N/A
|
$
|
6
|
$
|
6
|
||||||||||
Ohio
Transition
Cost Amortization
In
connection with
the Ohio Companies' transition plan, the PUCO determined allowable transition
costs based on amounts recorded on the regulatory books of the Ohio Companies.
These costs exceeded those deferred or capitalized on our balance sheet prepared
under GAAP since they included certain costs which had not yet been incurred
or
that were recognized on the regulatory financial statements (fair value purchase
accounting adjustments). We use an effective interest method for amortizing
the
Ohio Companies’ transition costs, often referred to as a "mortgage-style"
amortization. The interest rate under this method is equal to the rate of return
authorized by the PUCO in the transition plan for each respective company.
In
computing the transition cost amortization, we include only the portion of
the
transition revenues associated with transition costs included on the balance
sheet prepared under GAAP. Revenues collected for the off-balance sheet costs
and the return associated with these costs are recognized as income when
received. Amortization of deferred customer shopping incentives and interest
costs are equal to the related revenue recovery that is recognized under the
RCP
(see Note 2(A)).
Long-Lived
Assets
In
accordance with
SFAS 144, we periodically evaluate our long-lived assets to determine
whether conditions exist that would indicate that the carrying value of an
asset
might not be fully recoverable. The accounting standard requires that if the
sum
of future cash flows (undiscounted) expected to result from an asset is less
than the carrying value of the asset, an asset impairment must be recognized
in
the financial statements. If impairment has occurred, we recognize a loss -
calculated as the difference between the carrying value and the estimated fair
value of the asset (discounted future net cash flows).
The
calculation of
future cash flows is based on assumptions, estimates and judgment about future
events. The aggregate amount of cash flows determines whether an impairment
is
indicated. The timing of the cash flows is critical in determining the amount
of
the impairment.
48
Asset
Retirement
Obligations
In
accordance with
SFAS 143 and FIN 47, we recognize an ARO for the future
decommissioning of our nuclear power plants and future remediation of other
environmental liabilities associated with all of our long-lived assets. The
ARO
liability represents an estimate of the fair value of our current obligation
related to nuclear decommissioning and the retirement or remediation of
environmental liabilities of other assets. A fair value measurement inherently
involves uncertainty in the amount and timing of settlement of the liability.
We
use an expected cash flow approach to measure the fair value of the nuclear
decommissioning and environmental remediation ARO. This approach applies
probability weighting to discounted future cash flow scenarios that reflect
a
range of possible outcomes. The scenarios consider settlement of the ARO at
the
expiration of the nuclear power plants' current license, settlement based on
an
extended license term and expected remediation dates.
Income
Taxes
We
record income
taxes in accordance with the liability method of accounting. Deferred income
taxes reflect the net tax effect of temporary differences between the carrying
amounts of assets and liabilities for financial reporting purposes and the
amounts recognized for tax purposes. Investment tax credits, which were deferred
when utilized, are being amortized over the recovery period of the related
property. Deferred income tax liabilities related to tax and accounting basis
differences and tax credit carryforward items are recognized at the statutory
income tax rates in effect when the liabilities are expected to be paid.
Deferred tax assets are recognized based on income tax rates expected to be
in
effect when they are settled.
Goodwill
In
a business
combination, the excess of the purchase price over the estimated fair values
of
the assets acquired and liabilities assumed is recognized as goodwill. Based
on
the guidance provided by SFAS 142, we evaluate goodwill for impairment at
least annually and make such evaluations more frequently if indicators of
impairment arise. In accordance with the accounting standard, if the fair value
of a reporting unit is less than its carrying value (including goodwill), the
goodwill is tested for impairment. If an impairment is indicated we recognize
a
loss - calculated as the difference between the implied fair value of a
reporting unit's goodwill and the carrying value of the goodwill. Our annual
review was completed in the third quarter of 2006 with no impairment indicated.
As discussed in Note 10 to the consolidated financial statements, the PPUC
issued its order on January 11, 2007 related to the comprehensive rate
filing made by Met-Ed and Penelec on April 10, 2006. Prior to issuing the
order, the PPUC conducted an informal, nonbinding polling of Commissioners
at
its public meeting on December 21, 2006 that indicated that the rate
increase ultimately granted could be substantially lower than the amounts
requested. As a result of the polling, FirstEnergy determined that an interim
review of goodwill for its Regulated Services segment would be required. No
impairment was indicated as a result of that review.
SFAS
142 requires
the goodwill of a reporting unit to be tested for impairment if there is a
more-likely-than-not expectation that the reporting unit or a significant asset
group within the reporting unit will be sold. In December 2005, MYR qualified
as
an asset held for sale in accordance with SFAS 144. As a result, in the
fourth quarter of 2005, the goodwill of MYR was retested for impairment,
resulting in a non-cash charge of $9 million (there was no corresponding
income tax benefit).
The
forecasts used
in our evaluations of goodwill reflect operations consistent with our general
business assumptions. Unanticipated changes in those assumptions could have
a
significant effect on our future evaluations of goodwill.
NEW
ACCOUNTING STANDARDS AND INTERPRETATIONS
|
SFAS
159 -
The Fair Value Option for Financial Assets and Financial Liabilities
-
Including an amendment of FASB Statement No.
115
|
In
February 2007,
the FASB issued SFAS 159, which provides companies with an option to report
selected financial assets and liabilities at fair value. The Standard requires
companies to provide additional information that will help investors and other
users of financial statements to more easily understand the effect of the
company’s choice to use fair value on its earnings. The Standard also requires
companies to display the fair value of those assets and liabilities for which
the company has chosen to use fair value on the face of the balance sheet.
This
guidance does not eliminate disclosure requirements included in other accounting
standards, including requirements for disclosures about fair value measurements
included in SFAS 157, Fair
Value
Measurements, and
SFAS 107,
Disclosures
about Fair Value of Financial Instruments. We
are currently
evaluating the impact of this Statement on our financial
statements.
49
|
FSP
EITF
00-19-2 - “Accounting for Registration Payment
Arrangements”
|
In
December 2006,
the FASB issued FSP EITF 00-19-2, which addresses an issuer’s accounting for
registration payment arrangements. This guidance specifies that the contingent
obligation to make future payments or otherwise transfer consideration under
a
registration payment arrangement, whether issued as a separate agreement or
included as a provision of a financial instrument or other agreement, should
be
separately recognized and measured in accordance with SFAS 5, Accounting
for
Contingencies. This
FSP shall be
effective immediately for registration payment arrangements and the financial
instruments subject to those arrangements that are entered into or modified
subsequent to the date of issuance of this FSP. For arrangements that were
entered into prior to the issuance of this FSP, this guidance shall be effective
for financial statements issued for fiscal years beginning after December 15,
2006, and interim periods within those fiscal years. We do not expect this
FSP
to have a material effect on our financial statements.
|
EITF
06-5
- “Accounting for Purchases of Life Insurance-Determining the Amount
That
Could Be Realized in Accordance with FASB Technical Bulletin No.
85-4,
Accounting for Purchases of Life
Insurance”
|
In
September 2006,
the EITF reached a consensus on Issue 06-5 concluding that a policyholder should
consider any additional amounts included in the contractual terms of the policy
in determining the amount that could be realized under the insurance contract.
Contractual limitations should be considered when determining the realizable
amounts. Amounts that are recoverable by the policyholder at the discretion
of
the insurance company should be excluded from the amount that could be realized.
Recoverable amounts in periods beyond one year from the surrender of the policy
should be discounted in accordance with APB Opinion No. 21, “Interest on
Receivables and Payables.” Consensus was also reached that a policyholder should
determine the amount that could be realized under the insurance contract
assuming the surrender of an individual-life by individual-life policy (or
certificate by certificate in a group policy). Any amount that would ultimately
be realized by the policyholder upon the assumed surrender of the final policy
(or final certificate) should be included in the amount that could be realized
under the insurance contract. The EITF also concluded that a policyholder should
not discount the cash surrender value component of the amount that could be
realized when contractual restrictions on the ability to surrender a policy
exist. However, if the contractual limitations prescribe that the cash surrender
value component of the amount that could be realized is a fixed amount, then
the
amount that could be realized should be discounted in accordance with APB
Opinion No. 21. This Issue is effective for fiscal years beginning after
December 15, 2006. We do not expect this EITF to have a material impact on
our financial statements.
SFAS
157 - “Fair
Value Measurements”
In
September 2006,
the FASB issued SFAS 157 that establishes how companies should measure fair
value when they are required to use a fair value measure for recognition or
disclosure purposes under GAAP. This Statement addresses the need for increased
consistency and comparability in fair value measurements and for expanded
disclosures about fair value measurements. The key changes to current practice
are: (1) the definition of fair value which focuses on an exit price rather
than
entry price; (2) the methods used to measure fair value such as emphasis that
fair value is a market-based measurement, not an entity-specific measurement,
as
well as the inclusion of an adjustment for risk, restrictions and credit
standing; and (3) the expanded disclosures about fair value measurements. This
Statement is effective for financial statements issued for fiscal years
beginning after November 15, 2007, and interim periods within those years.
We are currently evaluating the impact of this Statement on our financial
statements.
FSP
FIN 46(R)-6
- “Determining the Variability to Be Considered in Applying FASB interpretation
No. 46(R)”
In
April 2006, the
FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should
determine the variability to be considered in applying FASB interpretation
No.
46 (revised December 2003). We adopted FIN 46(R) in the first quarter of 2004,
consolidating VIEs when we or one of our subsidiaries are determined to be
the
VIE’s primary beneficiary. The variability that is considered in applying
interpretation 46(R) affects the determination of (a) whether the entity is
a
VIE; (b) which interests are variable interests in the entity; and (c) which
party, if any, is the primary beneficiary of the VIE. This FSP states that
the
variability to be considered shall be based on an analysis of the design of
the
entity, involving two steps:
|
Step
1:
|
Analyze
the
nature of the risks in the entity
|
|
Step
2:
|
Determine
the
purpose(s) for which the entity was created and determine the variability
the entity is designed to create and pass along to its interest
holders.
|
50
After
determining
the variability to consider, the reporting enterprise can determine which
interests are designed to absorb that variability. The guidance in this FSP
is
applied prospectively to all entities (including newly created entities) with
which that enterprise first becomes involved and to all entities previously
required to be analyzed under interpretation 46(R) when a reconsideration event
has occurred after July 1, 2006. Our adoption of this Statement had no
impact on our financial statements.
FIN
48 -
“Accounting for Uncertainty in Income Taxes - an interpretation of FASB
Statement No. 109”
In
June 2006, the
FASB issued FIN 48 which clarifies the accounting for uncertainty in income
taxes recognized in an enterprise’s financial statements in accordance with FASB
Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes
a recognition threshold and measurement attribute for the financial statement
recognition and measurement of a tax position taken or expected to be taken
on a
tax return. This interpretation also provides guidance on derecognition,
classification, interest, penalties, accounting in interim periods, disclosure
and transition. The evaluation of a tax position in accordance with this
interpretation will be a two-step process. The first step will determine if
it
is more likely than not that a tax position will be sustained upon examination
and should therefore be recognized. The second step will measure a tax position
that meets the more likely than not recognition threshold to determine the
amount of benefit to recognize in the financial statements. This interpretation
is effective for fiscal years beginning after December 15, 2006. We do not
expect this Statement to have a material impact on our financial
statements.
51
|
FIRSTENERGY
CORP.
|
||||||||||
|
CONSOLIDATED
STATEMENTS OF INCOME
|
||||||||||
|
For
the Years Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions, except per share amounts)
|
||||||||||
|
REVENUES:
|
||||||||||
|
Electric
utilities
|
$
|
10,007
|
$
|
9,703
|
$
|
8,860
|
||||
|
Unregulated
businesses
|
1,494
|
1,655
|
2,740
|
|||||||
|
Total
revenues*
|
11,501
|
11,358
|
11,600
|
|||||||
|
EXPENSES:
|
||||||||||
|
Fuel
and
purchased power
|
4,253
|
4,011
|
4,469
|
|||||||
|
Other
operating expenses
|
2,965
|
3,103
|
2,910
|
|||||||
|
Provision
for
depreciation
|
596
|
588
|
585
|
|||||||
|
Amortization
of regulatory assets
|
861
|
1,281
|
1,166
|
|||||||
|
Deferral
of
new regulatory assets
|
(500
|
)
|
(405
|
)
|
(257
|
)
|
||||
|
General
taxes
|
720
|
713
|
678
|
|||||||
|
Total
expenses
|
8,895
|
9,291
|
9,551
|
|||||||
|
OPERATING
INCOME
|
2,606
|
2,067
|
2,049
|
|||||||
|
OTHER
INCOME (EXPENSE):
|
||||||||||
|
Investment
income
|
149
|
217
|
205
|
|||||||
|
Interest
expense
|
(721
|
)
|
(660
|
)
|
(671
|
)
|
||||
|
Capitalized
interest
|
26
|
19
|
26
|
|||||||
|
Subsidiaries’
preferred stock dividends
|
(7
|
)
|
(15
|
)
|
(21
|
)
|
||||
|
Total
other
expense
|
(553
|
)
|
(439
|
)
|
(461
|
)
|
||||
|
INCOME
FROM CONTINUING OPERATIONS BEFORE INCOME TAXES
|
2,053
|
1,628
|
1,588
|
|||||||
|
INCOME
TAXES
|
795
|
749
|
681
|
|||||||
|
INCOME
FROM CONTINUING OPERATIONS
|
1,258
|
879
|
907
|
|||||||
|
Discontinued
operations (net of income tax benefits of $2 million, $4 million,
|
||||||||||
|
and
$7
million, respectively) (Note 2(J))
|
(4
|
)
|
12
|
(29
|
)
|
|||||
|
INCOME
BEFORE CUMULATIVE EFFECT OF A CHANGE IN ACCOUNTING PRINCIPLE
|
1,254
|
891
|
878
|
|||||||
|
Cumulative
effect of a change in accounting principle (net of income tax
benefit
of
|
||||||||||
|
$17
million)
(Note 2(K))
|
-
|
(30
|
)
|
-
|
||||||
|
NET
INCOME
|
$
|
1,254
|
$
|
861
|
$
|
878
|
||||
|
BASIC
EARNINGS PER SHARE OF COMMON STOCK:
|
||||||||||
|
Income
from
continuing operations
|
$
|
3.85
|
$
|
2.68
|
$
|
2.77
|
||||
|
Discontinued
operations (Note 2(J))
|
(0.01
|
)
|
0.03
|
(0.09
|
)
|
|||||
|
Cumulative
effect of a change in accounting principle (Note 2(K))
|
-
|
(0.09
|
)
|
-
|
||||||
|
Net
earnings
per basic share
|
$
|
3.84
|
$
|
2.62
|
$
|
2.68
|
||||
|
WEIGHTED
AVERAGE NUMBER OF BASIC SHARES
|
||||||||||
|
OUTSTANDING
|
324
|
328
|
327
|
|||||||
|
DILUTED
EARNINGS PER SHARE OF COMMON STOCK:
|
||||||||||
|
Income
from
continuing operations
|
$
|
3.82
|
$
|
2.67
|
$
|
2.76
|
||||
|
Discontinued
operations (Note 2(J))
|
(0.01
|
)
|
0.03
|
(0.09
|
)
|
|||||
|
Cumulative
effect of a change in accounting principle (Note 2(K))
|
-
|
(0.09
|
)
|
-
|
||||||
|
Net
earnings
per diluted share
|
$
|
3.81
|
$
|
2.61
|
$
|
2.67
|
||||
|
WEIGHTED
AVERAGE NUMBER OF DILUTED SHARES
|
||||||||||
|
OUTSTANDING
|
327
|
330
|
329
|
|||||||
| * Includes $400 million, $395 million and $376 million of excise tax collections in 2006, 2005 and 2004, respectively. | ||||||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
||||||||||
52
|
FIRSTENERGY
CORP.
|
|||||||
|
CONSOLIDATED
BALANCE SHEETS
|
|||||||
|
As
of
December 31,
|
2006
|
2005
|
|||||
|
(In
millions)
|
|||||||
|
ASSETS
|
|||||||
|
CURRENT
ASSETS:
|
|||||||
|
Cash
and cash
equivalents
|
$
|
90
|
$
|
64
|
|||
|
Receivables-
|
|||||||
|
Customers
(less accumulated provisions of $43 million and
|
|||||||
|
$38
million,
respectively, for uncollectible accounts)
|
1,135
|
1,293
|
|||||
|
Other
(less
accumulated provisions of $24 million and
|
|||||||
|
$27
million,
respectively, for uncollectible accounts)
|
132
|
205
|
|||||
|
Materials
and
supplies, at average cost
|
577
|
518
|
|||||
|
Prepayments
and other
|
149
|
237
|
|||||
|
2,083
|
2,317
|
||||||
|
PROPERTY,
PLANT AND EQUIPMENT:
|
|||||||
|
In
service
|
24,105
|
22,893
|
|||||
|
Less
-
Accumulated provision for depreciation
|
10,055
|
9,792
|
|||||
|
14,050
|
13,101
|
||||||
|
Construction
work in progress
|
617
|
897
|
|||||
|
14,667
|
13,998
|
||||||
|
INVESTMENTS:
|
|||||||
|
Nuclear
plant
decommissioning trusts
|
1,977
|
1,752
|
|||||
|
Investments
in
lease obligation bonds (Note 6)
|
811
|
890
|
|||||
|
Other
|
746
|
709
|
|||||
|
3,534
|
3,351
|
||||||
|
DEFERRED
CHARGES AND OTHER ASSETS:
|
|||||||
|
Goodwill
|
5,898
|
6,010
|
|||||
|
Regulatory
assets
|
4,441
|
4,486
|
|||||
|
Prepaid
pension costs (Note 3)
|
-
|
1,023
|
|||||
|
Other
|
573
|
656
|
|||||
|
10,912
|
12,175
|
||||||
|
$
|
31,196
|
$
|
31,841
|
||||
|
LIABILITIES
AND CAPITALIZATION
|
|||||||
|
CURRENT
LIABILITIES:
|
|||||||
|
Currently
payable long-term debt
|
$
|
1,867
|
$
|
2,043
|
|||
|
Short-term
borrowings (Note 13)
|
1,108
|
731
|
|||||
|
Accounts
payable
|
726
|
727
|
|||||
|
Accrued
taxes
|
598
|
800
|
|||||
|
Other
|
956
|
1,152
|
|||||
|
5,255
|
5,453
|
||||||
|
CAPITALIZATION
(See
Consolidated Statements of Capitalization):
|
|||||||
|
Common
stockholders’ equity
|
9,035
|
9,188
|
|||||
|
Preferred
stock of consolidated subsidiaries
|
-
|
184
|
|||||
|
Long-term
debt
and other long-term obligations
|
8,535
|
8,155
|
|||||
|
17,570
|
17,527
|
||||||
|
NONCURRENT
LIABILITIES:
|
|||||||
|
Accumulated
deferred income taxes
|
2,740
|
2,726
|
|||||
|
Asset
retirement
obligations
|
1,190
|
1,126
|
|||||
|
Power
purchase
contract loss liability
|
1,182
|
1,226
|
|||||
|
Retirement
benefits
|
944
|
1,316
|
|||||
|
Lease
market
valuation liability
|
767
|
851
|
|||||
|
Other
|
1,548
|
1,616
|
|||||
|
8,371
|
8,861
|
||||||
|
COMMITMENTS,
GUARANTEES AND CONTINGENCIES (Notes 6 and 14)
|
|||||||
|
$
|
31,196
|
$
|
31,841
|
||||
|
The
accompanying Notes to Consolidated Financial Statements are
an integral
part of these balance sheets.
|
|||||||
53
|
FIRSTENERGY
CORP.
|
||||||||||||||||||||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF CAPITALIZATION
|
||||||||||||||||||||||||||||||||||||||||
|
As
of
December 31,
|
2006
|
2005
|
||||||||||||||||||||||||||||||||||||||
|
(Dollars
in millions)
|
||||||||||||||||||||||||||||||||||||||||
|
COMMON
STOCKHOLDERS' EQUITY:
|
||||||||||||||||||||||||||||||||||||||||
|
Common
stock,
$0.10 par value -authorized 375,000,000 shares-
|
||||||||||||||||||||||||||||||||||||||||
|
319,205,517
and 329,836,276 shares outstanding, respectively
|
$
|
32
|
$
|
33
|
||||||||||||||||||||||||||||||||||||
|
Other
paid-in
capital
|
6,466
|
7,043
|
||||||||||||||||||||||||||||||||||||||
|
Accumulated
other comprehensive loss (Note 2(I))
|
(259
|
)
|
(20
|
)
|
||||||||||||||||||||||||||||||||||||
|
Retained
earnings (Note 11(A))
|
2,806
|
2,159
|
||||||||||||||||||||||||||||||||||||||
|
Unallocated
employee stock ownership plan common stock-
|
||||||||||||||||||||||||||||||||||||||||
|
521,818
and
1,444,796 shares, respectively (Note 4(B))
|
(10
|
)
|
(27
|
)
|
||||||||||||||||||||||||||||||||||||
|
Total
common
stockholders’ equity
|
9,035
|
9,188
|
||||||||||||||||||||||||||||||||||||||
|
PREFERRED
STOCK OF CONSOLIDATED SUBSIDIARIES (Note 11(B)):
|
Number
of Shares
|
|||||||||||||||||||||||||||||||||||||||
|
Outstanding
(Thousands)
|
||||||||||||||||||||||||||||||||||||||||
|
2006
|
2005
|
|||||||||||||||||||||||||||||||||||||||
|
Ohio
Edison
Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Cumulative,
$100 par value-authorized 6,000,000 shares
|
-
|
610
|
-
|
61
|
||||||||||||||||||||||||||||||||||||
|
Pennsylvania
Power Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Cumulative,
$100 par value-authorized 1,200,000 shares
|
-
|
141
|
-
|
14
|
||||||||||||||||||||||||||||||||||||
|
Toledo
Edison
Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Cumulative,
$100 par value-authorized 3,000,000 shares
|
-
|
310
|
-
|
31
|
||||||||||||||||||||||||||||||||||||
|
Cumulative,
$25 par value-authorized 12,000,000 shares
|
-
|
2,600
|
-
|
65
|
||||||||||||||||||||||||||||||||||||
|
Total
Toledo
Edison Company
|
-
|
2,910
|
-
|
96
|
||||||||||||||||||||||||||||||||||||
|
Jersey
Central
Power & Light Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Cumulative,
$100 stated value-authorized 15,600,000 shares
|
-
|
125
|
-
|
13
|
||||||||||||||||||||||||||||||||||||
|
Total
preferred stock of consolidated subsidiaries
|
-
|
184
|
||||||||||||||||||||||||||||||||||||||
|
LONG-TERM
DEBT AND OTHER LONG-TERM OBLIGATIONS (Note
11(C)):
|
||||||||||||||||||||||||||||||||||||||||
|
(Interest
rates
reflect weighted average rates)
|
||||||||||||||||||||||||||||||||||||||||
|
|
FIRST
MORTGAGE BONDS
|
SECURED
NOTES
|
UNSECURED
NOTES
|
TOTAL
|
||||||||||||||||||||||||||||||||||||
|
|
%
|
2006
|
2005
|
%
|
2006
|
2005
|
%
|
2006
|
2005
|
2006
|
2005
|
|||||||||||||||||||||||||||||
|
Ohio
Edison
Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
-
|
$
|
-
|
$
|
-
|
7.24
|
$
|
8
|
$
|
113
|
4.79
|
$
|
331
|
$
|
331
|
|||||||||||||||||||||||||
|
Due
2012-2016
|
-
|
-
|
-
|
-
|
-
|
67
|
6.04
|
400
|
150
|
|||||||||||||||||||||||||||||||
|
Due
2017-2021
|
-
|
-
|
-
|
-
|
-
|
60
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2027-2031
|
-
|
-
|
-
|
4.15
|
120
|
250
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2032-2036
|
-
|
-
|
-
|
-
|
-
|
135
|
6.88
|
350
|
-
|
|||||||||||||||||||||||||||||||
|
Total-Ohio
Edison
|
-
|
-
|
128
|
625
|
1,081
|
481
|
1,209
|
1,106
|
||||||||||||||||||||||||||||||||
|
Cleveland
Electric Illuminating Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
6.86
|
125
|
125
|
6.47
|
351
|
399
|
-
|
-
|
28
|
|||||||||||||||||||||||||||||||
|
Due
2012-2016
|
-
|
-
|
-
|
-
|
-
|
40
|
5.72
|
379
|
379
|
|||||||||||||||||||||||||||||||
|
Due
2017-2021
|
-
|
-
|
-
|
7.32
|
433
|
506
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2027-2031
|
-
|
-
|
-
|
5.38
|
6
|
29
|
9.00
|
103
|
103
|
|||||||||||||||||||||||||||||||
|
Due
2032-2036
|
-
|
-
|
-
|
3.94
|
54
|
219
|
5.95
|
300
|
-
|
|||||||||||||||||||||||||||||||
|
Total-Cleveland
Electric
|
125
|
125
|
844
|
1,193
|
782
|
510
|
1,751
|
1,828
|
||||||||||||||||||||||||||||||||
|
Toledo
Edison
Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
-
|
-
|
-
|
7.13
|
30
|
30
|
-
|
-
|
54
|
|||||||||||||||||||||||||||||||
|
Due
2022-2026
|
-
|
-
|
-
|
-
|
-
|
67
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2027-2031
|
-
|
-
|
-
|
5.90
|
14
|
14
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2032-2036
|
-
|
-
|
-
|
4.10
|
45
|
127
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2037-2041
|
-
|
-
|
-
|
-
|
-
|
-
|
6.15
|
300
|
-
|
|||||||||||||||||||||||||||||||
|
Total-Toledo
Edison
|
-
|
-
|
89
|
238
|
300
|
54
|
389
|
292
|
||||||||||||||||||||||||||||||||
|
Pennsylvania
Power Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
9.74
|
5
|
6
|
-
|
-
|
54
|
-
|
-
|
15
|
|||||||||||||||||||||||||||||||
|
Due
2012-2016
|
9.74
|
5
|
5
|
5.40
|
1
|
1
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2017-2021
|
9.74
|
3
|
3
|
-
|
-
|
39
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2022-2026
|
7.63
|
6
|
6
|
-
|
-
|
-
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2027-2031
|
-
|
-
|
-
|
5.38
|
2
|
8
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Total-Penn
Power
|
19
|
20
|
3
|
102
|
-
|
15
|
22
|
137
|
||||||||||||||||||||||||||||||||
54
|
FIRSTENERGY
CORP.
|
||||||||||||||||||||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF CAPITALIZATION (Cont'd)
|
||||||||||||||||||||||||||||||||||||||||
|
As
of
December 31,
|
||||||||||||||||||||||||||||||||||||||||
|
(Dollars
in millions)
|
||||||||||||||||||||||||||||||||||||||||
|
LONG-TERM
DEBT AND OTHER LONG-TERM OBLIGATIONS (Cont'd)
|
||||||||||||||||||||||||||||||||||||||||
|
(Interest
rates reflect weighted average rates)
|
||||||||||||||||||||||||||||||||||||||||
|
|
FIRST
MORTGAGE BONDS
|
SECURED
NOTES
|
UNSECURED
NOTES
|
TOTAL
|
||||||||||||||||||||||||||||||||||||
|
|
%
|
2006
|
2005
|
%
|
2006
|
2005
|
%
|
2006
|
2005
|
2006
|
2005
|
|||||||||||||||||||||||||||||
|
Jersey
Central
Power & Light Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
- |
$
|
-
|
$
|
40
|
5.28
|
$
|
152
|
$
|
267
|
-
|
$
|
-
|
$
|
-
|
|||||||||||||||||||||||||
|
Due
2012-2016
|
7.10 |
12
|
12
|
5.71
|
493
|
432
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2017-2021
|
- |
-
|
-
|
5.12
|
235
|
165
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2022-2026
|
7.09 |
275
|
275
|
-
|
-
|
-
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Due
2032-2036
|
- |
-
|
-
|
6.40
|
200
|
-
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Total-Jersey
Central
|
287
|
327
|
1,080
|
864
|
-
|
-
|
$
|
1,367
|
$
|
1,191
|
||||||||||||||||||||||||||||||
|
Metropolitan
Edison Company-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
- |
-
|
-
|
-
|
-
|
-
|
4.94
|
150
|
250
|
|||||||||||||||||||||||||||||||
|
Due
2012-2016
|
- |
-
|
-
|
-
|
-
|
-
|
4.90
|
400
|
400
|
|||||||||||||||||||||||||||||||
|
Due
2017-2021
|
- |
-
|
-
|
-
|
-
|
-
|
3.96
|
28
|
28
|
|||||||||||||||||||||||||||||||
|
Due
2027-2031
|
5.95 |
14
|
14
|
-
|
-
|
-
|
-
|
-
|
-
|
|||||||||||||||||||||||||||||||
|
Total-Metropolitan
Edison
|
14
|
14
|
-
|
-
|
578
|
678
|
592
|
692
|
||||||||||||||||||||||||||||||||
|
Pennsylvania
Electric Company-
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
Due
2006-2011
|
5.35 |
24
|
24
|
-
|
-
|
-
|
6.55
|
135
|
135
|
|||||||||||||||||||||||||||||||
|
Due
2012-2016
|
- |
-
|
-
|
-
|
-
|
-
|
5.13
|
150
|
150
|
|||||||||||||||||||||||||||||||
|
Due
2017-2021
|
- |
-
|
-
|
-
|
-
|
-
|
6.25
|
145
|
145
|
|||||||||||||||||||||||||||||||
|
Due
2022-2026
|
- |
-
|
-
|
- |
-
|
-
|
4.11 |
25
|
25
|
|
|
|||||||||||||||||||||||||||||
|
Total-Pennsylvania
Electric
|
24 | 24 | - | - | 455 | 455 | 479 | 479 | ||||||||||||||||||||||||||||||||
|
FirstEnergy
Corp.-
|
||||||||||||||||||||||||||||||||||||||||
|
Due
2006-2011
|
- |
-
|
-
|
-
|
-
|
-
|
6.45
|
1,500
|
2,500
|
|||||||||||||||||||||||||||||||
|
Due
2027-2031
|
- |
-
|
-
|
-
|
-
|
-
|
7.38
|
1,500
|
1,500
|
|||||||||||||||||||||||||||||||
|
Total-FirstEnergy
|
-
|
-
|
-
|
-
|
3,000
|
4,000
|
3,000
|
4,000
|
||||||||||||||||||||||||||||||||
|
Bay
Shore
Power
|
-
|
-
|
-
|
6.25
|
130
|
134
|
-
|
-
|
-
|
130
|
134
|
|||||||||||||||||||||||||||||
|
Facilities
Services Group
|
-
|
-
|
-
|
-
|
-
|
4
|
-
|
-
|
-
|
-
|
4
|
|||||||||||||||||||||||||||||
|
FirstEnergy
Generation
|
-
|
-
|
-
|
-
|
-
|
-
|
4.55
|
624
|
58
|
624
|
58
|
|||||||||||||||||||||||||||||
|
FirstEnergy
Nuclear Generation
|
-
|
-
|
-
|
-
|
-
|
-
|
4.61
|
861
|
270
|
861
|
270
|
|||||||||||||||||||||||||||||
|
FirstEnergy
Properties
|
-
|
-
|
-
|
-
|
-
|
9
|
-
|
-
|
-
|
-
|
9
|
|||||||||||||||||||||||||||||
|
Total
|
469
|
510
|
2,274
|
3,169
|
7,681
|
6,521
|
10,424
|
10,200
|
||||||||||||||||||||||||||||||||
|
Capital
lease
obligations
|
4
|
8
|
||||||||||||||||||||||||||||||||||||||
|
Net
unamortized discount on debt
|
(26
|
)
|
(10
|
)
|
||||||||||||||||||||||||||||||||||||
|
Long-term
debt
due within one year
|
(1,867
|
)
|
(2,043
|
)
|
||||||||||||||||||||||||||||||||||||
|
Total
long-term debt and other long-term obligations
|
8,535
|
8,155
|
||||||||||||||||||||||||||||||||||||||
|
TOTAL
CAPITALIZATION
|
$
|
17,570
|
$
|
17,527
|
||||||||||||||||||||||||||||||||||||
|
The
accompanying Notes to Consolidated Financial Statements
are an integral
part of these statements.
|
||||||||||||||||||||||||||||||||||||||||
55
|
FIRSTENERGY
CORP.
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
CONSOLIDATED
STATEMENTS OF COMMON STOCKHOLDERS' EQUITY
|
||||||||||||||||||||||
|
Accumulated
|
Unallocated
|
|||||||||||||||||||||
|
Other
|
Other
|
ESOP
|
||||||||||||||||||||
|
Comprehensive
|
Number
|
Par
|
Paid-In
|
Comprehensive
|
Retained
|
Common
|
||||||||||||||||
|
Income
|
of
Shares
|
Value
|
Capital
|
Income
(Loss)
|
Earnings
|
Stock
|
||||||||||||||||
|
(Dollars
in millions)
|
||||||||||||||||||||||
| Balance, January 1, 2004 |
329,836,276
|
$
|
33 |
$
|
7,063 |
$
|
(353 | ) |
$
|
1,605 |
$
|
(58 | ) | |||||||||
|
Net
income
|
$
|
878
|
878
|
|||||||||||||||||||
|
Minimum
liability for unfunded retirement
|
||||||||||||||||||||||
|
benefits,
net
of $5 million of income tax benefits
|
(6
|
)
|
(6
|
)
|
||||||||||||||||||
|
Unrealized
gain on derivative hedges, net
|
||||||||||||||||||||||
|
of
$10 million
of income taxes
|
19
|
19
|
||||||||||||||||||||
|
Unrealized
gain on investments, net of
|
||||||||||||||||||||||
|
$20
million of
income taxes
|
27
|
27
|
||||||||||||||||||||
|
Comprehensive
income
|
$
|
918
|
||||||||||||||||||||
|
Stock
options
exercised
|
(24
|
)
|
||||||||||||||||||||
|
Allocation
of
ESOP shares
|
17
|
15
|
||||||||||||||||||||
|
Common
stock
dividends declared in 2004
|
||||||||||||||||||||||
|
payable
in
2005
|
(135
|
)
|
||||||||||||||||||||
|
Cash
dividends
declared on common stock
|
|
|
|
|
|
(491
|
)
|
|
||||||||||||||
|
Balance,
December 31, 2004
|
329,836,276
|
33
|
7,056
|
(313
|
)
|
1,857
|
(43
|
)
|
||||||||||||||
|
Net
income
|
$
|
861
|
861
|
|||||||||||||||||||
|
Minimum
liability for unfunded retirement
|
||||||||||||||||||||||
|
benefits,
net
of $208 million of income taxes
|
295
|
295
|
||||||||||||||||||||
|
Unrealized
gain on derivative hedges, net
|
||||||||||||||||||||||
|
of
$9 million
of income taxes
|
14
|
14
|
||||||||||||||||||||
|
Unrealized
loss on investments, net of
|
||||||||||||||||||||||
|
$15
million of
income tax benefits
|
(16
|
)
|
(16
|
)
|
||||||||||||||||||
|
Comprehensive
income
|
$
|
1,154
|
||||||||||||||||||||
|
Stock
options
exercised
|
(41
|
)
|
||||||||||||||||||||
|
Allocation
of
ESOP shares
|
22
|
16
|
||||||||||||||||||||
|
Restricted
stock units
|
6
|
|||||||||||||||||||||
|
Cash
dividends
declared on common stock
|
|
|
|
|
|
(559
|
)
|
|
||||||||||||||
|
Balance,
December 31, 2005
|
|
329,836,276
|
33
|
7,043
|
(20
|
)
|
2,159
|
(27
|
)
|
|||||||||||||
|
Net
income
|
$
|
1,254
|
1,254
|
|||||||||||||||||||
|
Unrealized
gain on derivative hedges, net
|
||||||||||||||||||||||
|
of
$10 million
of income taxes
|
19
|
19
|
||||||||||||||||||||
|
Unrealized
gain on investments, net of
|
||||||||||||||||||||||
|
$40
million of
income taxes
|
69
|
69
|
||||||||||||||||||||
|
Comprehensive
income
|
$
|
1,342
|
||||||||||||||||||||
|
Net
liability
for unfunded retirement benefits
|
||||||||||||||||||||||
|
due
to the
implementation of SFAS 158, net
|
||||||||||||||||||||||
|
of
$292
million of income tax benefits
|
(327
|
)
|
||||||||||||||||||||
|
Redemption
premiums on preferred stock
|
(9
|
)
|
||||||||||||||||||||
|
Stock
options
exercised
|
(28
|
)
|
||||||||||||||||||||
|
Allocation
of
ESOP shares
|
33
|
17
|
||||||||||||||||||||
|
Restricted
stock units
|
11
|
|||||||||||||||||||||
|
Stock
based
compensation
|
6
|
|||||||||||||||||||||
|
Repurchase
of
common stock
|
(10,630,759
|
)
|
(1
|
)
|
(599
|
)
|
||||||||||||||||
|
Cash
dividends
declared on common stock
|
|
|
|
|
|
(598
|
)
|
|
||||||||||||||
|
Balance,
December 31, 2006
|
|
319,205,517
|
$
|
32
|
$
|
6,466
|
$
|
(259
|
)
|
$
|
2,806
|
$
|
(10
|
)
|
||||||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
||||||||||||||||||||||
56
|
FIRSTENERGY
CORP.
|
|||||||||||||
|
CONSOLIDATED
STATEMENTS OF PREFERRED STOCK
|
|||||||||||||
|
Not
Subject to
|
Subject
to
|
||||||||||||
|
Mandatory
Redemption
|
Mandatory
Redemption
|
||||||||||||
|
Par
or
|
Par
or
|
||||||||||||
|
Number
|
Stated
|
Number
|
Stated
|
||||||||||
|
of
Shares
|
Value
|
of
Shares
|
Value
|
||||||||||
|
(Dollars
in millions)
|
|||||||||||||
|
Balance,
January 1, 2004
|
6,209,699
|
$
|
335
|
185,000
|
$
|
19
|
|||||||
|
Redemptions-
|
|||||||||||||
|
7.625%
Series
|
(7,500
|
)
|
(1
|
)
|
|||||||||
|
$7.35
Series
C
|
(10,000
|
)
|
(1
|
)
|
|||||||||
|
Balance,
December 31, 2004
|
6,209,699
|
335
|
167,500
|
17
|
|||||||||
|
Redemptions-
|
|||||||||||||
|
7.750%
Series
|
(250,000
|
)
|
(25
|
)
|
|||||||||
|
$7.40
Series
A
|
(500,000
|
)
|
(50
|
)
|
|||||||||
|
Adjustable
Series L
|
(474,000
|
)
|
(46
|
)
|
|||||||||
|
Adjustable
Series A
|
(1,200,000
|
)
|
(30
|
)
|
|||||||||
|
7.625%
Series
|
(127,500
|
)
|
(13
|
)
|
|||||||||
|
$7.35
Series
C
|
(40,000
|
)
|
(4
|
)
|
|||||||||
|
Balance,
December 31, 2005
|
3,785,699
|
184
|
-
|
-
|
|||||||||
|
Redemptions-
|
|||||||||||||
|
3.90%
Series
|
(152,510
|
)
|
(15
|
)
|
|||||||||
|
4.40%
Series
|
(176,280
|
)
|
(18
|
)
|
|||||||||
|
4.44%
Series
|
(136,560
|
)
|
(14
|
)
|
|||||||||
|
4.56%
Series
|
(144,300
|
)
|
(14
|
)
|
|||||||||
|
4.24%
Series
|
(40,000
|
)
|
(4
|
)
|
|||||||||
|
4.25%
Series
|
(41,049
|
)
|
(4
|
)
|
|||||||||
|
4.64%
Series
|
(60,000
|
)
|
(6
|
)
|
|||||||||
|
$4.25
Series
|
(160,000
|
)
|
(16
|
)
|
|||||||||
|
$4.56
Series
|
(50,000
|
)
|
(5
|
)
|
|||||||||
|
$4.25
Series
|
(100,000
|
)
|
(10
|
)
|
|||||||||
|
$2.365
Series
|
(1,400,000
|
)
|
(35
|
)
|
|||||||||
|
Adjustable
Series B
|
(1,200,000
|
)
|
(30
|
)
|
|||||||||
|
4.00%
Series
|
(125,000
|
)
|
(13
|
)
|
|||||||||
|
Balance,
December 31, 2006
|
-
|
$
|
-
|
-
|
$
|
-
|
|||||||
|
The
accompanying Notes to Consolidated Financial Statements
are an integral
part of these statements.
|
|||||||||||||
57
|
FIRSTENERGY
CORP.
|
||||||||||
|
CONSOLIDATED
STATEMENTS OF CASH
FLOWS
|
||||||||||
|
For
the Years Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
||||||||||
|
CASH
FLOWS FROM OPERATING ACTIVITIES:
|
||||||||||
|
Net
income
|
$
|
1,254
|
$
|
861
|
$
|
878
|
||||
|
Adjustments
to
reconcile net income to net cash from operating
activities-
|
||||||||||
|
Provision
for
depreciation
|
596
|
588
|
585
|
|||||||
|
Amortization
of regulatory assets
|
861
|
1,281
|
1,166
|
|||||||
|
Deferral
of
new regulatory assets
|
(500
|
)
|
(405
|
)
|
(257
|
)
|
||||
|
Nuclear
fuel
and lease amortization
|
90
|
90
|
96
|
|||||||
|
Deferred
purchased power and other costs
|
(445
|
)
|
(384
|
)
|
(451
|
)
|
||||
|
Deferred
income taxes and investment tax credits, net
|
159
|
154
|
258
|
|||||||
|
Investment
impairment (Note 2(H))
|
14
|
6
|
28
|
|||||||
|
Cumulative
effect of a change in accounting principle
|
-
|
30
|
-
|
|||||||
|
Deferred
rents
and lease market valuation liability
|
(113
|
)
|
(104
|
)
|
(84
|
)
|
||||
|
Accrued
compensation and retirement benefits
|
193
|
90
|
156
|
|||||||
|
Tax
refunds
related to pre-merger period
|
-
|
18
|
-
|
|||||||
|
Commodity
derivative transactions, net
|
24
|
6
|
18
|
|||||||
|
Loss
(gain) on
asset sales
|
(49
|
)
|
(35
|
)
|
20
|
|||||
|
Loss
(income)
from discontinued operations (Note 2(J))
|
4
|
(12
|
)
|
29
|
||||||
|
Cash
collateral, net
|
(77
|
)
|
196
|
(63
|
)
|
|||||
|
Pension
trust
contribution
|
-
|
(500
|
)
|
(500
|
)
|
|||||
|
Decrease
(increase) in operating assets-
|
||||||||||
|
Receivables
|
105
|
(87
|
)
|
154
|
||||||
|
Materials
and
supplies
|
(25
|
)
|
(32
|
)
|
(9
|
)
|
||||
|
Prepayments
and other current assets
|
3
|
3
|
47
|
|||||||
|
Increase
(decrease) in operating liabilities-
|
||||||||||
|
Accounts
payable
|
99
|
32
|
(111
|
)
|
||||||
|
Accrued
taxes
|
(175
|
)
|
150
|
(5
|
)
|
|||||
|
Accrued
interest
|
7
|
(6
|
)
|
(42
|
)
|
|||||
|
Electric
service prepayment programs
|
(64
|
)
|
208
|
(18
|
)
|
|||||
|
Other
|
(22
|
)
|
72
|
(3
|
)
|
|||||
|
Net
cash
provided from operating activities
|
1,939
|
2,220
|
1,892
|
|||||||
|
CASH
FLOWS FROM FINANCING ACTIVITIES:
|
||||||||||
|
New
Financing-
|
||||||||||
|
Long-term
debt
|
2,739
|
721
|
961
|
|||||||
|
Short-term
borrowings, net
|
386
|
561
|
-
|
|||||||
|
Redemptions
and Repayments-
|
||||||||||
|
Common
stock
|
(600
|
)
|
-
|
-
|
||||||
|
Preferred
stock
|
(193
|
)
|
(170
|
)
|
(2
|
)
|
||||
|
Long-term
debt
|
(2,536
|
)
|
(1,424
|
)
|
(1,572
|
)
|
||||
|
Short-term
borrowings, net
|
-
|
-
|
(351
|
)
|
||||||
|
Net
controlled
disbursement activity
|
(27
|
)
|
(18
|
)
|
(2
|
)
|
||||
|
Stock-based
compensation tax benefit
|
13
|
-
|
-
|
|||||||
|
Common
stock
dividend payments
|
(586
|
)
|
(546
|
)
|
(491
|
)
|
||||
|
Net
cash used
for financing activities
|
(804
|
)
|
(876
|
)
|
(1,457
|
)
|
||||
|
CASH
FLOWS FROM INVESTING ACTIVITIES:
|
||||||||||
|
Property
additions
|
(1,315
|
)
|
(1,208
|
)
|
(846
|
)
|
||||
|
Proceeds
from
asset sales
|
162
|
104
|
223
|
|||||||
|
Proceeds
from
certificates of deposits
|
-
|
-
|
278
|
|||||||
|
Nonutility
generation trusts contributions
|
-
|
-
|
(51
|
)
|
||||||
|
Proceeds
from
nuclear decommissioning trust fund sales
|
1,571
|
1,715
|
1,131
|
|||||||
|
Investments
in
nuclear decommissioning trust funds
|
(1,586
|
)
|
(1,816
|
)
|
(1,232
|
)
|
||||
|
Cash
investments and restricted funds (Note 5)
|
121
|
(42
|
)
|
27
|
||||||
|
Other
|
(62
|
)
|
(86
|
)
|
(26
|
)
|
||||
|
Net
cash used
for investing activities
|
(1,109
|
)
|
(1,333
|
)
|
(496
|
)
|
||||
|
Net
increase
(decrease) in cash and cash equivalents
|
26
|
11
|
(61
|
)
|
||||||
|
Cash
and cash
equivalents at beginning of year
|
64
|
53
|
114
|
|||||||
|
Cash
and cash
equivalents at end of year
|
$
|
90
|
$
|
64
|
$
|
53
|
||||
|
SUPPLEMENTAL
CASH FLOW INFORMATION:
|
||||||||||
|
Cash
Paid
During the Year-
|
||||||||||
|
Interest
(net
of amounts capitalized)
|
$
|
656
|
$
|
665
|
$
|
704
|
||||
|
Income
taxes
|
$
|
688
|
$
|
406
|
$
|
512
|
||||
|
The
accompanying Notes to Consolidated Financial Statements are an
integral
part of these statements.
|
||||||||||
58
NOTES
TO
CONSOLIDATED FINANCIAL STATEMENTS
1. ORGANIZATION
AND BASIS OF PRESENTATION
FirstEnergy's
principal business is the holding, directly or indirectly, of all of the
outstanding common stock of its eight principal electric utility operating
subsidiaries: OE, CEI, TE, Penn, ATSI, JCP&L, Met-Ed and Penelec. Penn is a
wholly owned subsidiary of OE. FirstEnergy’s consolidated financial statements
also include its other subsidiaries: FENOC, FES, and its subsidiaries FGCO
and
NGC, and FESC.
FirstEnergy
and its
subsidiaries follow GAAP and comply with the regulations, orders, policies
and
practices prescribed by the SEC, FERC and, as applicable, the PUCO, PPUC
and
NJBPU. The preparation of financial statements in conformity with GAAP requires
management to make periodic estimates and assumptions that affect the reported
amounts of assets, liabilities, revenues and expenses and disclosure of
contingent assets and liabilities. Actual results could differ from these
estimates. The reported results of operations are not indicative of results
of
operations for any future period.
FirstEnergy
and its
subsidiaries consolidate all majority-owned subsidiaries over which they
exercise control and, when applicable, entities for which they have a
controlling financial interest. Intercompany transactions and balances are
eliminated in consolidation. FirstEnergy consolidates a VIE (see Note 7)
when it is determined to be the VIE's primary beneficiary. Investments in
non-consolidated affiliates over which FirstEnergy and its subsidiaries have
the
ability to exercise significant influence, but not control (20-50% owned
companies, joint ventures and partnerships) are accounted for under the equity
method. Under the equity method, the interest in the entity is reported as
an
investment in the Consolidated Balance Sheets and the percentage share of
the
entity’s earnings is reported in the Consolidated Statements of Income.
Certain
prior year
amounts have been reclassified to conform to the current year presentation.
Certain businesses divested in 2006 have been classified as discontinued
operations on the Consolidated Statements of Income (see Note 2(J)). As
discussed in Note 16, segment reporting in 2005 and 2004 was reclassified
to conform to the 2006 business segment organization and
operations.
Unless
otherwise
indicated, defined terms used herein have the meanings set forth in the
accompanying Glossary of Terms.
2.
SUMMARY
OF
SIGNIFICANT ACCOUNTING POLICIES
(A) ACCOUNTING
FOR THE EFFECTS OF REGULATION-
FirstEnergy
accounts
for the effects of regulation through the application of SFAS 71 to its
operating utilities since their rates:
|
·
|
are
established by a third-party regulator with the authority to set
rates
that bind customers;
|
|
·
|
are
cost-based; and
|
|
·
|
can
be charged
to and collected from customers.
|
An
enterprise
meeting all of these criteria capitalizes costs that would otherwise be charged
to expense if the rate actions of its regulator make it probable that those
costs will be recovered in future revenue. SFAS 71 is applied only to the
parts of the business that meet the above criteria. If a portion of the business
applying SFAS 71 no longer meets those requirements, previously recorded
net regulatory assets are removed from the balance sheet in accordance with
the
guidance in SFAS 101.
In Ohio, Pennsylvania and New Jersey, laws applicable to electric industry
restructuring contain similar provisions that are reflected in the Companies'
respective state regulatory plans. These provisions include:
|
·
|
restructuring
the electric generation business and allowing the Companies' customers
to
select a competitive electric generation supplier other than the
Companies;
|
|
·
|
establishing
or defining the PLR obligations to customers in the Companies'
service
areas;
|
|
·
|
providing
the
Companies with the opportunity to recover potentially stranded
investment
(or transition costs) not otherwise recoverable in a competitive
generation market;
|
|
·
|
itemizing
(unbundling) the price of electricity into its component elements
-
including generation, transmission, distribution and stranded costs
recovery charges;
|
|
·
|
continuing
regulation of the Companies' transmission and distribution systems;
and
|
|
·
|
requiring
corporate separation of regulated and unregulated business
activities.
|
59
Regulatory
Assets
The
Companies and
ATSI recognize, as regulatory assets, costs which the FERC, PUCO, PPUC and
NJBPU
have authorized for recovery from customers in future periods or for which
authorization is probable. Without the probability of such authorization,
costs
currently recorded as regulatory assets would have been charged to income
as
incurred. All regulatory assets are expected to be recovered from customers
under the Companies' respective transition and regulatory plans. Based on
those
plans, the Companies continue to bill and collect cost-based rates for their
transmission and distribution services, which remain regulated; accordingly,
it
is appropriate that the Companies continue the application of SFAS 71 to
those operations. As of December 31, 2006, regulatory assets that do not
earn a current return totaled approximately $200 million, consisting
of Penelec NUG stranded costs ($70 million), JCP&L outage funding
costs ($32 million), post employment benefit costs ($20 million) and
reliability costs ($14 million).
Net
regulatory
assets on the Consolidated Balance Sheets are comprised of the following:
|
2006
|
2005
|
||||||
|
(In
millions)
|
|||||||
|
Regulatory
transition costs
|
$3,266
|
$3,576
|
|||||
|
Customer
shopping incentives
|
603
|
884
|
|||||
|
Customer
receivables for future income taxes
|
217
|
217
|
|||||
|
Societal
benefits charge
|
11
|
29
|
|||||
|
Loss
on
reacquired debt
|
43
|
41
|
|||||
|
Employee
postretirement benefit costs
|
47
|
55
|
|||||
|
Nuclear
decommissioning, decontamination
|
|||||||
|
and
spent fuel
disposal costs
|
(145)
|
(126)
|
|||||
|
Asset
removal
costs
|
(168)
|
(365)
|
|||||
|
Property
losses and unrecovered plant costs
|
19
|
29
|
|||||
|
MISO/PJM
transmission costs
|
213
|
91
|
|||||
|
Fuel
costs -
RCP
|
113
|
-
|
|||||
|
Distribution
costs - RCP
|
155
|
-
|
|||||
|
Other
|
67
|
55
|
|||||
|
Total
|
$
|
4,441
|
$
|
4,486
|
|||
The
Ohio Companies
have been deferring customer shopping incentives and interest costs (Extended
RTC) as new regulatory assets in accordance with the prior transition and
rate
stabilization plans. As a result of the RCP approved in January 2006, the
Extended RTC balances (OE - $325 million, CEI - $427 million, TE -
$132 million, as of December 31, 2005) were reduced on January 1,
2006 by $75 million for OE, $85 million for CEI and $45 million
for TE by accelerating the application of those amounts of each respective
company's accumulated cost of removal regulatory liability against the Extended
RTC balances. In accordance with the RCP, the recovery periods for the aggregate
of the regulatory transition costs and the Extended RTC amounts were adjusted
so
that recovery of these aggregate amounts through each company's RTC rate
component began on January 1, 2006, with full recovery expected to be
completed for OE and TE as of December 31, 2008. CEI's recovery of its
regulatory transition costs is projected to be completed by April 2009 at
which
time recovery of its Extended RTC will begin, with recovery estimated to
be
completed as of December 31, 2010. At the end of their respective recovery
periods, any remaining unamortized regulatory transition costs and Extended
RTC
balances will be eliminated, first, by applying any remaining cost of removal
regulatory liability balances; any remaining regulatory transition costs
and
Extended RTC balances would be written off. The RCP allows the Ohio Companies
to
defer and capitalize certain distribution costs during the period
January 1, 2006 through December 31, 2008, not to exceed
$150 million in each of the years 2006, 2007 and 2008. These deferrals will
be recovered in distribution rates effective on or after January 1, 2009.
In addition, the RCP allows the Ohio Companies to defer certain increased
fuel
costs above the amount collected through a PUCO approved fuel recovery
mechanism. See Note 10(B) for further discussion of the recovery of the
shopping incentives and the new cost deferrals.
Transition
Cost Amortization
OE,
CEI and TE
amortize transition costs (see Regulatory Matters - Ohio) using the effective
interest method. Extended RTC amortization is equal to the related revenue
recovery that is recognized. The following table provides the estimated net
amortization of regulatory transition costs and Extended RTC amounts (including
associated carrying charges) under the RCP for the period 2007 through
2010:
|
Amortization
|
|
|
|
|
|
|
|
Total
|
|
|||||||
|
Period
|
|
OE
|
|
CEI
|
|
TE
|
|
Ohio
|
|
|||||||
|
|
|
(In
millions)
|
|
|||||||||||||
|
2007
|
|
$
|
179
|
$
|
108
|
$
|
93
|
$
|
380
|
|||||||
|
2008
|
|
|
208
|
|
124
|
|
119
|
|
451
|
|||||||
|
2009
|
|
|
-
|
|
216
|
|
-
|
|
216
|
|||||||
|
2010
|
|
|
-
|
|
273
|
|
-
|
|
273
|
|||||||
|
Total
Amortization
|
|
$
|
387
|
$
|
721
|
$
|
212
|
$
|
1,320
|
|||||||
60
Total
regulatory
transition costs as of December 31, 2006 were $3.3 billion, of which
approximately $2.2 billion and $285 million apply to JCP&L and
Met-Ed, respectively. JCP&L and Met-Ed’s regulatory transition costs include
deferral of above-market costs from power supplied by NUGs of $1.2 billion
for JCP&L being recovered through BGS and MTC revenues, and
$134 million for Met-Ed recovered through CTC revenues. The liability for
JCP&L’s projected above-market NUG costs and corresponding regulatory asset
are adjusted to fair value at the end of each quarter. Recovery of the remaining
regulatory transition costs is expected to continue under the provisions
of the
various regulatory proceedings for New Jersey and Pennsylvania discussed
in Note
10.
|
(B)
|
CASH
AND SHORT-TERM FINANCIAL
INSTRUMENTS-
|
All
temporary cash
investments purchased with an initial maturity of three months or less are
reported as cash equivalents on the Consolidated Balance Sheets at cost,
which
approximates their fair market value.
|
(C)
|
REVENUES
AND RECEIVABLES-
|
The
Companies'
principal business is providing electric service to customers in Ohio,
Pennsylvania and New Jersey. The Companies' retail customers are metered
on a
cycle basis. Electric revenues are recorded based on energy delivered through
the end of the calendar month. An estimate of unbilled revenues is calculated
to
recognize electric service provided between the last meter reading and the
end
of the month. This estimate includes many factors including historical customer
usage, load profiles, estimated weather impacts, customer shopping activity
and
prices in effect for each class of customer. In each accounting period, the
Companies accrue the estimated unbilled amount receivable as revenue and
reverse
the related prior period estimate.
Receivables
from
customers include sales to residential, commercial and industrial customers
and
sales to wholesale customers. There was no material concentration of receivables
as of December 31, 2006 with respect to any particular segment of
FirstEnergy's customers. Total customer receivables were $1.1 billion
(billed - $650 million and unbilled - $485 million) and $1.3 billion
(billed - $841 million and unbilled - $452 million) as of
December 31, 2006 and 2005, respectively.
|
(D)
|
ACCOUNTING
FOR CERTAIN WHOLESALE ENERGY
TRANSACTIONS-
|
FES
engages in
purchase and sale transactions in the PJM Market to support the supply of
end-use customers, including PLR requirements in Pennsylvania. In conjunction
with FirstEnergy's dedication of its Beaver Valley Plant to PJM on
January 1, 2005, FES began accounting for purchase and sale transactions in
the PJM Market based on its net hourly position -- recording each hour as
either
an energy purchase or an energy sale in the Consolidated Statements of Income
relating to the Power Supply Management Services segment. Hourly energy
positions are aggregated to recognize gross purchases and sales for the month.
This revised method of accounting, which has no impact on net income, is
consistent with the practice of other energy companies that have dedicated
generating capacity in PJM and correlates with PJM's scheduling and reporting
of
hourly energy transactions. FES also applies the net hourly methodology to
purchase and sale transactions in MISO's energy market, which became active
on
April 1, 2005.
For
periods prior to
January 1, 2005, FirstEnergy did not have substantial generating capacity
in PJM and as such, FES recognized purchases and sales in the PJM Market
by
recording each discrete transaction. Under those transactions, FES would
often
buy a specific quantity of energy at a certain location in PJM and
simultaneously sell a specific quantity of energy at a different location.
Physical delivery occurred and the risks and rewards of ownership transferred
with each transaction. FES accounted for those transactions on a gross basis
in
accordance with EITF 99-19. The recognition of those transactions on a net
basis
in prior periods would have no impact on net income, but would have reduced
both
wholesale revenue and purchased power expense by $1.1 billion in
2004.
(E)
EARNINGS
PER
SHARE OF COMMON STOCK-
Basic
earnings per
share of common stock is computed using the weighted average of actual common
shares outstanding during the respective period as the denominator. The
denominator for diluted earnings per share of common stock reflects the weighted
average of common shares outstanding plus the potential additional common
shares
that could result if dilutive securities and other agreements to issue common
stock were exercised. The pool of stock-based compensation tax benefits is
calculated in accordance with SFAS 123(R). On
August 10,
2006, FirstEnergy repurchased 10.6 million shares, approximately 3.2%, of
its outstanding common stock through an accelerated share repurchase program
(see Note 14(C)). The initial purchase price was $600 million, or $56.44
per share. The final purchase price will be adjusted to reflect the ultimate
cost to acquire the shares over a period of up to seven months. The
2006 basic and
diluted earnings per share calculations reflect the impact associated with
the
August 2006 accelerated share repurchase program. FirstEnergy intends to
settle,
in shares or cash, any obligation on its part to pay the difference between
the
average of the daily volume-weighted average price of the shares as calculated
under the program and the initial price of the shares. The effect of any
potential settlement in shares is currently unknown.
61
|
Reconciliation
of Basic and Diluted
|
|
|
|
|
|
|
|
|||||
|
Earnings
per Share of Common Stock
|
|
2006
|
|
2005
|
|
2004
|
|
|||||
|
|
|
(In
millions, except per share amounts)
|
|
|||||||||
|
|
|
|
|
|||||||||
|
Income
from
continuing operations
|
|
$
|
1,258
|
$
|
879
|
$
|
907
|
|||||
|
Less:
Redemption premium on subsidiary preferred stock
|
(9
|
)
|
-
|
-
|
||||||||
|
Income
from
continuing operations available to common shareholders
|
1,249
|
879
|
907
|
|||||||||
|
Discontinued
operations
|
(4
|
)
|
12
|
(29
|
)
|
|||||||
|
Income
before
cumulative effect of a change in accounting principle
|
1,245
|
891
|
878
|
|||||||||
|
Cumulative
effect of a change in accounting principle
|
-
|
(30
|
)
|
-
|
||||||||
|
Net
income
available for common shareholders
|
$
|
1,245
|
$
|
861
|
$
|
878
|
||||||
|
Average
shares
of common stock outstanding - Basic
|
324
|
328
|
327
|
|||||||||
|
Assumed
exercise of dilutive stock options and awards
|
3
|
2
|
2
|
|||||||||
|
Average
shares
of common stock outstanding - Dilutive
|
327
|
330
|
329
|
|||||||||
|
Earnings
per
share:
|
||||||||||||
|
Basic
earnings
per share:
|
||||||||||||
|
Earnings
from
continuing operations
|
$
|
3.85
|
$
|
2.68
|
$
|
2.77
|
||||||
|
Discontinued
operations
|
(0.01
|
)
|
0.03
|
(0.09
|
)
|
|||||||
|
Cumulative
effect of change in accounting principle
|
-
|
(0.09
|
)
|
-
|
||||||||
|
Net
earnings
per basic share
|
$
|
3.84
|
$
|
2.62
|
$
|
2.68
|
||||||
|
Diluted
earnings per share:
|
||||||||||||
|
Earnings
from
continuing operations
|
$
|
3.82
|
$
|
2.67
|
$
|
2.76
|
||||||
|
Discontinued
operations
|
(0.01
|
)
|
0.03
|
(0.09
|
)
|
|||||||
|
Cumulative
effect of change in accounting principle
|
-
|
(0.09
|
)
|
-
|
||||||||
|
Net
earnings
per diluted share
|
$
|
3.81
|
$
|
2.61
|
$
|
2.67
|
||||||
|
(F)
|
PROPERTY,
PLANT AND EQUIPMENT-
|
Property,
plant and
equipment reflects original cost (except for nuclear generating assets which
were adjusted to fair value in accordance with SFAS 144), including payroll
and
related costs such as taxes, employee benefits, administrative and general
costs, and interest costs incurred to place the assets in service. The costs
of
normal maintenance, repairs and minor replacements are expensed as incurred.
FirstEnergy's accounting policy for planned major maintenance projects is
to
recognize liabilities as they are incurred.
FirstEnergy
provides
for depreciation on a straight-line basis at various rates over the estimated
lives of property included in plant in service. The respective annual composite
rates for FirstEnergy’s subsidiaries’ electric plant in 2006, 2005 and 2004 are
shown in the following table:
|
Annual
Composite
|
|||||||||||||||||||
|
Depreciation
Rate
|
|||||||||||||||||||
|
2006
|
2005
|
2004
|
|||||||||||||||||
|
OE
|
2.8
|
%
|
2.1
|
%
|
2.3
|
%
|
|||||||||||||
|
CEI
|
3.2
|
2.9
|
2.8
|
||||||||||||||||
|
TE
|
3.8
|
3.1
|
2.8
|
||||||||||||||||
|
Penn
|
2.6
|
2.4
|
2.2
|
||||||||||||||||
|
JCP&L
|
2.1
|
2.2
|
2.1
|
||||||||||||||||
|
Met-Ed
|
2.3
|
2.4
|
2.4
|
||||||||||||||||
|
Penelec
|
2.3
|
2.6
|
2.5
|
||||||||||||||||
|
FGCO
|
4.1
|
N/A
|
N/A
|
||||||||||||||||
|
NGC
|
2.7
|
N/A
|
N/A
|
||||||||||||||||
Jointly-Owned
Generating Stations
JCP&L
holds a
50% ownership interest in Yards Creek Pumped Storage Facility - its net book
value was approximately $20 million as of December 31, 2006. All other
generating units are owned and/or leased by FGCO, NGC and the
Companies.
Asset
Retirement
Obligations
FirstEnergy
recognizes a liability for retirement obligations associated with tangible
assets in accordance with SFAS 143 and FIN 47. These standards require
recognition of the fair value of a liability for an ARO in the period in
which
it is incurred. The associated asset retirement costs are capitalized as
part of
the carrying value of the long-lived asset and depreciated over time, as
described further in Note 12, "Asset Retirement Obligations."
62
Nuclear
Fuel
Property,
plant and
equipment includes nuclear fuel recorded at original cost, which includes
material, enrichment, fabrication and interest costs incurred prior to reactor
load. Nuclear fuel is amortized based on the units of production method.
|
(G)
|
STOCK-BASED
COMPENSATION-
|
FirstEnergy
applied
the recognition and measurement principles of SFAS 123(R) and related
interpretations as of January 1, 2006, which required the expensing of
stock-based compensation. All share-based compensation costs are measured
at the
grant date based on the fair value of the award, and is recognized as an
expense
over the employee’s service period. Those awards that have been classified as
liabilities are re-measured each reporting period at the current fair value.
FirstEnergy adopted SFAS 123(R) using the modified prospective method under
which compensation expense recognized in the year ended December 31, 2006
includes the expense for all share-based payments granted prior to, but not
yet
vested, as of January 1, 2006.
(H)
ASSET
IMPAIRMENTS-
Long-Lived
Assets
FirstEnergy
evaluates the carrying value of its long-lived assets when events or
circumstances indicate that the carrying amount may not be recoverable. In
accordance with SFAS 144, the carrying amount of a long-lived asset is not
recoverable if it exceeds the sum of the undiscounted cash flows expected
to
result from the use and eventual disposition of the asset. If an impairment
exists, a loss is recognized for the amount by which the carrying value of
the
long-lived asset exceeds its estimated fair value. Fair value is estimated
by
using available market valuations or the long-lived asset's expected future
net
discounted cash flows. The calculation of expected cash flows is based on
estimates and assumptions about future events.
Goodwill
In
a business
combination, the excess of the purchase price over the estimated fair values
of
assets acquired and liabilities assumed is recognized as goodwill. Based
on the
guidance provided by SFAS 142, FirstEnergy evaluates its goodwill for impairment
at least annually and makes such evaluations more frequently if indicators
of
impairment arise. In accordance with the accounting standard, if the fair
value
of a reporting unit is less than its carrying value (including goodwill),
the
goodwill is tested for impairment. If an impairment is indicated, FirstEnergy
recognizes a loss - calculated as the difference between the implied fair
value
of a reporting unit’s goodwill and the carrying value of the goodwill.
FirstEnergy's
2006
annual review was completed in the third quarter of 2006 with no impairment
indicated. As discussed in Note 10 to the consolidated financial statements,
the
PPUC issued its order on January 11, 2007 related to the comprehensive rate
filing made by Met-Ed and Penelec on April 10, 2006. Prior to issuing the
order, the PPUC conducted an informal, nonbinding polling of Commissioners
at
its public meeting on December 21, 2006 that indicated that the rate
increase ultimately granted could be substantially lower than the amounts
requested. As a result of the polling, FirstEnergy determined that an interim
review of goodwill for its Regulated Services reporting unit would be required.
No impairment was indicated as a result of that review.
FirstEnergy's
2005
annual review was completed in the third quarter of 2005 with no impairment
indicated. In December 2005, MYR qualified as an asset held for sale in
accordance with SFAS 144. SFAS 142 requires the goodwill of a
reporting unit to be tested for impairment if there is a more-likely-than-not
expectation that the reporting unit or a significant asset group within the
reporting unit will be sold. As a result, in the fourth quarter of 2005,
the
goodwill of MYR was retested for impairment. Based on market valuations that
were not available prior to the fourth quarter of 2005, it was determined
that
the carrying value of MYR exceeded the fair value, resulting in a non-cash
goodwill impairment charge of $9 million in the fourth quarter of 2005,
with no corresponding income tax benefit.
FirstEnergy's
2004
annual review was completed in the third quarter of 2004 with no impairment
indicated. In December 2004, the FSG subsidiaries qualified as an asset held
for
sale in accordance with SFAS 144. As required by SFAS 142, the
goodwill of FSG was tested for impairment, resulting in a non-cash charge
of
$36 million in the fourth quarter of 2004. Of that amount, $10 million
was reported as an operating expense and $26 million was included in the
results from discontinued operations. FSG's fair value was estimated using
current market valuations.
63
The
forecasts used
in FirstEnergy's evaluations of goodwill reflect operations consistent with
its
general business assumptions. Unanticipated changes in those assumptions
could
have a significant effect on FirstEnergy's future evaluations of goodwill.
FirstEnergy's goodwill primarily relates to its regulated services segment.
In
the year ended December 31, 2006, FirstEnergy
adjusted
goodwill related to the divestiture of a non-core asset (MYR), a successful
tax
claim relating to the former Centerior companies, and adjustments to the
former
GPU companies due to the realization of tax benefits that had been reserved
in
purchase accounting.
The impairment
analysis includes a significant source of cash representing the Companies'
recovery of transition costs as described in Note 10. FirstEnergy estimates
that completion of transition cost recovery will not result in an impairment
of
goodwill relating to its regulated business segment.
A
summary of the
changes in FirstEnergy's goodwill for the three years ended December 31,
2006 is shown below by segment (see Note 16 - Segment
Information):
|
Power
|
||||||||||||||||
|
Supply
|
||||||||||||||||
|
Regulated
|
Management
|
Facilities
|
||||||||||||||
|
Services
|
Services
|
Services
|
Other
|
Consolidated
|
||||||||||||
|
(In
millions)
|
||||||||||||||||
|
Balance
as of
January 1, 2004
|
$
|
5,993
|
$
|
24
|
$
|
36
|
$
|
75
|
$
|
6,128
|
||||||
|
Impairment
charges
|
(36
|
)
|
(36
|
)
|
||||||||||||
|
Adjustments
related to GPU acquisition
|
(42
|
)
|
(42
|
)
|
||||||||||||
|
Balance
as of
December 31, 2004
|
5,951
|
24
|
-
|
75
|
6,050
|
|||||||||||
|
Impairment
charges
|
(9
|
)
|
(9
|
)
|
||||||||||||
|
Non-core
asset
sales
|
(12
|
)
|
(12
|
)
|
||||||||||||
|
Adjustments
related to GPU acquisition
|
(10
|
)
|
(10
|
)
|
||||||||||||
|
Adjustments
related to Centerior acquisition
|
(9
|
)
|
(9
|
)
|
||||||||||||
|
Balance
as of
December 31, 2005
|
5,932
|
24
|
-
|
54
|
6,010
|
|||||||||||
|
Non-core
asset
sale
|
(53
|
)
|
(53
|
)
|
||||||||||||
|
Adjustments
related to Centerior acquisition
|
(1
|
)
|
(1
|
)
|
||||||||||||
|
Adjustments
related to GPU acquisition
|
(58
|
)
|
(58
|
)
|
||||||||||||
|
Balance
as of
December 31, 2006
|
$
|
5,873
|
$
|
24
|
$
|
-
|
$
|
1
|
$
|
5,898
|
||||||
Investments
At
the end of each
reporting period, FirstEnergy evaluates its investments for impairment. In
accordance with SFAS 115 and FSP SFAS 115-1 and SFAS 124-1,
investments classified as available-for-sale securities are evaluated to
determine whether a decline in fair value below the cost basis is
other-than-temporary. FirstEnergy first considers its intent and ability
to hold
the investment until recovery and then considers, among other factors, the
duration and the extent to which the security's fair value has been less
than
cost and the near-term financial prospects of the security issuer when
evaluating investments for impairment. If the decline in fair value is
determined to be other-than-temporary, the cost basis of the investment is
written down to fair value. Upon adoption of FSP SFAS 115-1 and
SFAS 124-1, FirstEnergy began recognizing in earnings the unrealized losses
on available-for-sale securities held in the nuclear decommissioning trusts
since the trust arrangements, as they are currently defined, do not meet
the
required ability and intent to hold criteria in consideration of
other-than-temporary impairment. The fair value and unrealized gains and
losses
of the Company's investments are disclosed in Note 5(B) and
5(C).
(I) COMPREHENSIVE
INCOME-
Comprehensive
income
includes net income as reported on the Consolidated Statements of Income
and all
other changes in common stockholders' equity, excluding the effect from the
adoption of SFAS 158. As of December 31, 2006, AOCL consisted of a net
liability for unfunded retirement benefits including the implementation of
SFAS 158, net of income tax benefits (see Note 3) of $344 million,
unrealized gains on investments in securities available for sale of
$143 million and unrealized losses on derivative instrument hedges of
$58 million. A summary of the changes in FirstEnergy's AOCL balance for the
three years ended December 31, 2006 is shown below:
|
|
|
|
|
|
|
|
|||
|
|
2006
|
|
2005
|
|
2004
|
|
|||
|
|
(In
millions)
|
|
|||||||
|
AOCL
balance
as of January 1,
|
$
|
(20
|
)
|
$
|
(313
|
)
|
$
|
(353
|
)
|
|
Minimum
liability for unfunded retirement benefits
|
|
-
|
|
503
|
|
|
(11
|
)
|
|
|
Unrealized
gain (loss) on available for sale securities
|
|
109
|
|
(31
|
)
|
|
46
|
|
|
|
Unrealized
gain on derivative hedges
|
|
29
|
|
23
|
|
|
29
|
|
|
|
Other
comprehensive income
|
|
138
|
|
495
|
|
|
64
|
|
|
|
Income
taxes
related to OCI
|
|
50
|
|
202
|
|
|
24
|
|
|
|
Other
comprehensive income, net of tax
|
|
88
|
|
293
|
|
|
40
|
|
|
|
Net
liability
for unfunded retirement benefits
|
|
|
|
||||||
|
due
to the
implementation of SFAS 158, net
|
|||||||||
|
of
$292
million of income tax benefits
|
(327
|
)
|
-
|
-
|
|||||
|
AOCL
balance
as of December 31,
|
$
|
(259
|
)
|
$
|
(20
|
)
|
$
|
(313
|
)
|
64
Other
comprehensive
loss reclassified to net income in 2006 totaled $4 million (net of income
tax benefits of $1 million). Other comprehensive income reclassified to net
income in 2005 and 2004 totaled $28 million and $8 million,
respectively. These amounts were net of income taxes in 2005 and 2004 of
$19 million and $6 million, respectively.
(J)
ASSETS
HELD
FOR SALE AND DISCONTINUED OPERATIONS-
In
2006, FirstEnergy
sold its remaining FSG subsidiaries (Roth Bros., Hattenbach, Dunbar, Edwards
and
RPC) for an aggregate net after-tax gain of $2.2 million. Hattenbach,
Dunbar, Edwards, and RPC were accounted for as discontinued operations as
of
December 31, 2006; Roth Bros. did not meet the criteria for that classification
as of December 31, 2006.
In
December 2005,
MYR had qualified as an asset held for sale but did not meet the criteria
to be
classified as a discontinued operation. As required by SFAS 142, the
goodwill of MYR was tested for impairment, resulting in a non-cash charge
of
$9 million in the fourth quarter of 2005 (see Note 2(H)). The carrying
amounts of MYR's assets and liabilities as of December 31, 2005 held for
sale
were not material and had not been classified as assets held for sale on
FirstEnergy's Consolidated Balance Sheet.
In
March 2006,
FirstEnergy sold 60% of its interest in MYR for an after-tax gain of $0.2
million. In June 2006, as part of the March agreement, FirstEnergy sold an
additional 1.67% interest. As a result of the March sale, FirstEnergy
deconsolidated MYR in the first quarter of 2006 and accounted for its remaining
38.33% interest under the equity method. In the fourth quarter of 2006,
FirstEnergy sold its remaining MYR interest for an after-tax gain of
$8.6 million. The income for the period that MYR was accounted for as an
equity method investment has not been included in discontinued operations;
however, results for all reporting periods prior to the initial sale in March
2006, including the gain on the sale, were reported as discontinued operations.
As of December 31, 2006, no assets have been classified as held for
sale.
In
2005, three FSG
subsidiaries, Elliott-Lewis, Spectrum and Cranston, and MYR's Power Piping
Company subsidiary were sold resulting in an after-tax gain of $13 million.
As of December 31, 2005, the remaining FSG subsidiaries had qualified as
assets held for sale in accordance with SFAS 144 but did not meet the
criteria for discontinued operations. The carrying amounts of FSG's assets
and
liabilities held for sale as of December 31, 2005 were not material and were
not
classified as assets held for sale on FirstEnergy's Consolidated Balance
Sheet.
In
December 2004,
the FES retail natural gas business qualified as assets held for sale in
accordance with SFAS 144. As required by SFAS 142, goodwill associated with
the FES natural gas business was tested for impairment as of December 31,
2004 with no impairment indicated. On March 31, 2005, FES completed the
sale for an after-tax gain of $5 million.
Revenues
associated
with discontinued operations were $225 million, $845 million and
$1.15 billion in 2006, 2005 and 2004, respectively. The following table
summarizes the net income (loss) included in "Discontinued Operations" on
the
Consolidated Statements of Income for the three years ended December 31,
2006:
|
2006
|
2005
|
2004
|
||||||||
|
(In
millions)
|
||||||||||
|
FES
natural
gas business
|
$
|
-
|
$
|
5
|
$
|
4
|
||||
|
FSG
subsidiaries
|
(7
|
)
|
8
|
(29
|
)
|
|||||
|
MYR
|
3
|
(1
|
)
|
(4
|
)
|
|||||
|
Income
(loss)
from discontinued operations
|
$
|
(4
|
)
|
$
|
12
|
$
|
(29
|
)
|
||
|
(K)
|
CUMULATIVE
EFFECT OF A CHANGE IN ACCOUNTING
PRINCIPLE-
|
Results
in 2005
included an after-tax charge of $30 million recorded upon the adoption of
FIN 47 in December 2005. FirstEnergy identified applicable legal
obligations as defined under FIN 47 at its active and retired generating
units,
substation control rooms, service center buildings, line shops and office
buildings, identifying asbestos as the primary conditional ARO. The Company
recorded a conditional ARO liability of $57 million (including accumulated
accretion for the period from the date the liability was incurred to the
date of
adoption), an asset retirement cost of $16 million (recorded as part of the
carrying amount of the related long-lived asset), and accumulated depreciation
of $12 million. FirstEnergy charged
regulatory
liabilities for $5 million upon adoption of FIN 47 for the transition
amounts related to establishing the ARO for asbestos removal from substation
control rooms and service center buildings for OE, Penn, CEI, TE and JCP&L.
The remaining cumulative effect adjustment for unrecognized depreciation
and
accretion of $48 million was charged to income ($30 million, net of
tax), or $0.09 per share of common stock (basic and diluted) for the year
ended
December 31, 2005 (see Note 12).
65
|
(L)
|
TAXES-
|
Details
of the total
taxes for the three years ended December 31, 2006 are shown in the
following tables:
|
GENERAL
TAXES
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
||||||||||
|
Kilowatt-hour
excise*
|
$
|
241
|
$
|
244
|
$
|
236
|
||||
|
State
gross
receipts*
|
159
|
151
|
140
|
|||||||
|
Real
and
personal property
|
222
|
222
|
208
|
|||||||
|
Social
security and unemployment
|
83
|
79
|
76
|
|||||||
| Other |
15
|
17
|
18
|
|||||||
|
Total
general
taxes
|
$
|
720
|
$
|
713
|
$
|
678
|
||||
| * Collected from customers through regulated rates and included in revenue in the Consolidated Statements of Income. | ||||||||||
|
PROVISION
FOR INCOME TAXES
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
||||||||||
|
Currently
payable-
|
||||||||||
|
Federal
|
$
|
519
|
$
|
452
|
$
|
289
|
||||
|
State
|
116
|
142
|
135
|
|||||||
|
|
635
|
594
|
424
|
|||||||
|
Deferred,
net-
|
||||||||||
|
Federal
|
147
|
72
|
245
|
|||||||
|
State
|
28
|
110
|
39
|
|||||||
|
175
|
182
|
284
|
||||||||
|
Investment
tax
credit amortization
|
(15
|
)
|
(27
|
)
|
(27
|
)
|
||||
|
Total
provision for income taxes
|
$
|
795
|
$
|
749
|
$
|
681
|
||||
|
RECONCILIATION
OF FEDERAL INCOME TAX EXPENSE AT
|
||||||||||
|
STATUTORY
RATE TO TOTAL PROVISION FOR INCOME TAXES:
|
||||||||||
|
Book
income
before provision for income taxes
|
$
|
2,053
|
$
|
1,628
|
$
|
1,588
|
||||
|
Federal
income
tax expense at statutory rate
|
$
|
719
|
$
|
569
|
$
|
556
|
||||
|
Increases
(reductions) in taxes resulting from-
|
||||||||||
|
Amortization
of investment tax credits
|
(15
|
)
|
(27
|
)
|
(27
|
)
|
||||
|
State
income
taxes, net of federal income tax benefit
|
94
|
165
|
111
|
|||||||
|
Penalties
|
-
|
14
|
-
|
|||||||
|
Amortization
of tax regulatory assets
|
2
|
38
|
33
|
|||||||
|
Preferred
stock dividends
|
5
|
5
|
8
|
|||||||
|
Other,
net
|
(10
|
)
|
(15
|
)
|
-
|
|||||
|
Total
provision for income taxes
|
$
|
795
|
$
|
749
|
$
|
681
|
||||
|
ACCUMULATED
DEFERRED INCOME TAXES AS OF
|
||||||||||
|
DECEMBER
31:
|
||||||||||
|
Property
basis
differences
|
$
|
2,595
|
$
|
2,368
|
$
|
2,348
|
||||
|
Regulatory
transition charge
|
457
|
537
|
785
|
|||||||
|
Customer
receivables for future income taxes
|
141
|
131
|
103
|
|||||||
|
Deferred
customer shopping incentive
|
219
|
321
|
252
|
|||||||
|
Deferred
sale
and leaseback costs
|
(86
|
)
|
(86
|
)
|
(92
|
)
|
||||
|
Nonutility
generation costs
|
(122
|
)
|
(177
|
)
|
(174
|
)
|
||||
|
Unamortized
investment tax credits
|
(50
|
)
|
(54
|
)
|
(61
|
)
|
||||
|
Other
comprehensive income
|
(260
|
)
|
(18
|
)
|
(219
|
)
|
||||
|
Retirement
benefits
|
10
|
(135
|
)
|
(280
|
)
|
|||||
|
Lease
market
valuation liability
|
(331
|
)
|
(361
|
)
|
(420
|
)
|
||||
|
Oyster
Creek
securitization (Note 10(D))
|
162
|
173
|
184
|
|||||||
|
Loss
carryforwards
|
(426
|
)
|
(417
|
)
|
(463
|
)
|
||||
|
Loss
carryforward valuation reserve
|
415
|
402
|
420
|
|||||||
|
Asset
retirement obligations
|
45
|
65
|
71
|
|||||||
|
Nuclear
decommissioning
|
(116
|
)
|
(105
|
)
|
(100
|
)
|
||||
|
All
other
|
87
|
82
|
(30
|
)
|
||||||
|
Net
deferred
income tax liability
|
$
|
2,740
|
$
|
2,726
|
$
|
2,324
|
||||
|
|
||||||||||
66
FirstEnergy
records
income taxes in accordance with the liability method of accounting. Deferred
income taxes reflect the net tax effect of temporary differences between
the
carrying amounts of assets and liabilities for financial reporting purposes
and
loss carryforwards and
the amounts
recognized for tax purposes. Investment tax credits, which were deferred
when
utilized, are being amortized over the recovery period of the related property.
Deferred income tax liabilities related to temporary tax and accounting basis
differences and tax credit carryforward items are recognized at the statutory
income tax rates in effect when the liabilities are expected to be paid.
Deferred tax assets are recognized based on income tax rates expected to
be in
effect when they are settled (See Note 9 for Ohio Tax Legislation
discussion).
FirstEnergy
has
certain tax returns that are under review at the audit or appeals level of
the
IRS and certain state authorities. Reserves have been recorded, and final
settlement of these audits is not expected to have an adverse impact on the
financial condition or results of operations of FirstEnergy.
FirstEnergy
has
capital loss carryforwards of approximately $1 billion, most of which expire
in
2007. The deferred tax assets associated with these capital loss carryforwards
of ($374 million) are fully offset by a valuation allowance as of
December 31, 2006, since management is unable to predict whether sufficient
capital gains will be generated to utilize all of these capital loss
carryforwards. Any ultimate utilization of capital loss carryforwards for
which
valuation allowances were established through purchase accounting would adjust
goodwill.
During
2006 a ($15)
million net change in valuation allowance occurred due to Pennsylvania tax
law
changes and the utilization of capital loss carryforwards to offset realized
capital gains resulting in a $1 million adjustment to goodwill. The valuation
allowances also include $48 million for deferred tax assets associated with
impairment losses related to certain assets.
FirstEnergy
has
pre-tax net operating loss carryforwards for state and local income tax purposes
of approximately $1.034 billion of which $184 million is expected to be
utilized. The associated deferred tax assets are $11 million. These losses
expire as follows:
|
Expiration
Period
|
Amount
|
||||
|
(in
millions)
|
|||||
|
2007-2011
|
$
|
332
|
|||
|
2012-2016
|
37
|
||||
|
2017-2021
|
297
|
||||
|
2022-2026
|
368
|
||||
|
$
|
1,034
|
||||
3. PENSION
AND
OTHER POSTRETIREMENT BENEFIT PLANS
FirstEnergy
provides
noncontributory defined benefit pension plans that cover substantially all
of
its employees. The trusteed plans provide defined benefits based on years
of
service and compensation levels. The Company's funding policy is based on
actuarial computations using the projected unit credit method. On
January 2, 2007 FirstEnergy made a $300 million voluntary cash
contribution to its qualified pension plan. Projections indicated that
additional cash contributions will not be required before 2016.
FirstEnergy
provides
a minimum amount of noncontributory life insurance to retired employees in
addition to optional contributory insurance. Health care benefits, which
include
certain employee contributions, deductibles and co-payments, are also available
upon retirement to employees hired prior to January 1, 2005, their
dependents and, under certain circumstances, their survivors. The Company
recognizes the expected cost of providing other postretirement benefits to
employees and their beneficiaries and covered dependents from the time employees
are hired until they become eligible to receive those benefits. During 2006,
FirstEnergy amended the OPEB plan effective in 2008 to cap the monthly
contribution for many of the retirees and their spouses receiving subsidized
healthcare coverage. In addition, FirstEnergy has obligations to former or
inactive employees after employment, but before retirement for disability
related benefits.
Pension
and OPEB
costs are affected by employee demographics (including age, compensation
levels,
and employment periods), the level of contributions made to the plans and
earnings on plan assets. Such factors may be further affected by business
combinations which impact employee demographics, plan experience and other
factors. Pension and OPEB costs may also be affected by changes in key
assumptions, including anticipated rates of return on plan assets, the discount
rates and health care trend rates used in determining the projected benefit
obligations and pension and OPEB costs. FirstEnergy uses a December 31
measurement date for its pension and OPEB plans. The fair value of the plan
assets represents the actual market value as of December 31, 2006.
67
In
December 2006,
FirstEnergy adopted SFAS 158. This Statement requires employers to recognize
an
asset or liability for the overfunded or underfunded status of their pension
and
other postretirement benefit plans. For a pension plan, the asset or liability
is the difference between the fair value of the plan’s assets and the projected
benefit obligation. For any other postretirement benefit plan, the asset
or
liability is the difference between the fair value of the plan’s assets and the
accumulated postretirement benefit obligation. The Statement required employers
to recognize all unrecognized prior service costs and credits and unrecognized
actuarial gains and losses in AOCL, net of tax. Such amounts will be adjusted
as
they are subsequently recognized as components of net periodic benefit cost
or
income pursuant to the current recognition and amortization provisions. The
incremental impact of adopting SFAS 158 was a decrease of $ 1.0 billion in
pension assets, a decrease of $383 million in pension liabilities and a
decrease in AOCL of $327 million, net of tax.
|
Obligations
and Funded Status
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||
|
As
of
December 31
|
2006
|
2005
|
2006
|
2005
|
|||||||||
|
(In
millions)
|
|||||||||||||
|
Change
in benefit obligation
|
|||||||||||||
|
Benefit
obligation as of January 1
|
$
|
4,750
|
$
|
4,364
|
$
|
1,884
|
$
|
1,930
|
|||||
|
Service
cost
|
83
|
77
|
34
|
40
|
|||||||||
|
Interest
cost
|
266
|
254
|
105
|
111
|
|||||||||
|
Plan
participants’ contributions
|
-
|
-
|
20
|
18
|
|||||||||
|
Plan
amendments
|
3
|
15
|
(620
|
)
|
(312
|
)
|
|||||||
|
Medicare
retiree drug subsidy
|
-
|
-
|
6
|
-
|
|||||||||
|
Actuarial
(gain) loss
|
33
|
310
|
(119
|
)
|
197
|
||||||||
|
Benefits
paid
|
(274
|
)
|
(270
|
)
|
(109
|
)
|
(100
|
)
|
|||||
|
Benefit
obligation as of December 31
|
$
|
4,861
|
$
|
4,750
|
$
|
1,201
|
$
|
1,884
|
|||||
|
Change
in fair value of plan assets
|
|||||||||||||
|
Fair
value of
plan assets as of January 1
|
$
|
4,524
|
$
|
3,969
|
$
|
573
|
$
|
564
|
|||||
|
Actual
return
on plan assets
|
568
|
325
|
69
|
33
|
|||||||||
|
Company
contribution
|
-
|
500
|
54
|
58
|
|||||||||
|
Plan
participants’ contribution
|
-
|
-
|
20
|
18
|
|||||||||
|
Benefits
paid
|
(274
|
)
|
(270
|
)
|
(109
|
)
|
(100
|
)
|
|||||
|
Fair
value of
plan assets as of December 31
|
$
|
4,818
|
$
|
4,524
|
$
|
607
|
$
|
573
|
|||||
|
Funded
status
|
$
|
(43
|
)
|
$
|
(226
|
)
|
$
|
(594
|
)
|
$
|
(1,311
|
)
|
|
|
Accumulated
benefit obligation
|
$
|
4,447
|
$
|
4,327
|
|||||||||
|
Amounts
Recognized in the Statement of
|
|||||||||||||
|
Financial
Position
|
|||||||||||||
|
Noncurrent
assets
|
$
|
-
|
$
|
1,023
|
$
|
-
|
$
|
-
|
|||||
|
Current
liabilities
|
-
|
-
|
-
|
-
|
|||||||||
|
Noncurrent
liabilities
|
(43
|
)
|
-
|
(594
|
)
|
(1,057
|
)
|
||||||
|
Net
asset
(liability) as of December 31
|
$
|
(43
|
)
|
$
|
1,023
|
$
|
(594
|
)
|
$
|
(1,057
|
)
|
||
|
Amounts
Recognized in
|
|||||||||||||
|
Accumulated
Other Comprehensive Income
|
|||||||||||||
|
Prior
service
cost (credit)
|
$
|
63
|
$
|
-
|
$
|
(1,190
|
)
|
$
|
-
|
||||
|
Actuarial
loss
|
982
|
-
|
702
|
-
|
|||||||||
|
Net
amount
recognized
|
$
|
1,045
|
$
|
-
|
$
|
(488
|
)
|
$
|
-
|
||||
|
Assumptions
Used to Determine
|
|||||||||||||
|
Benefit
Obligations As of December 31
|
|||||||||||||
|
Discount
rate
|
6.00
|
%
|
5.75
|
%
|
6.00
|
%
|
5.75
|
%
|
|||||
|
Rate
of
compensation increase
|
3.50
|
%
|
3.50
|
%
|
|||||||||
|
Allocation
of Plan Assets
|
|||||||||||||
|
As
of
December 31
|
|||||||||||||
|
Asset
Category
|
|||||||||||||
|
Equity
securities
|
64
|
%
|
63
|
%
|
72
|
%
|
71
|
%
|
|||||
|
Debt
securities
|
29
|
33
|
26
|
27
|
|||||||||
|
Real
estate
|
5
|
2
|
1
|
-
|
|||||||||
|
Private
equities
|
1
|
-
|
-
|
-
|
|||||||||
|
Cash
|
1
|
2
|
1
|
2
|
|||||||||
|
Total
|
100
|
%
|
100
|
%
|
100
|
%
|
100
|
%
|
|||||
68
|
Estimated
Items to be Amortized in 2007 Net
|
|||||||
|
Periodic
Pension Cost from Accumulated
|
Pension
|
Other
|
|||||
|
Other
Comprehensive Income
|
Benefits
|
Benefits
|
|||||
|
|
(In
millions)
|
||||||
|
Prior
service
cost (credit)
|
$
|
10
|
$
|
(149
|
)
|
||
|
Actuarial
loss
|
$
|
41
|
$
|
45
|
|||
|
|
|
Pension
Benefits
|
|
Other
Benefits
|
|
||||||||||||||
|
Components
of Net Periodic Benefit Costs
|
|
2006
|
|
2005
|
|
2004
|
|
2006
|
|
2005
|
|
2004
|
|
||||||
|
|
|
(In
millions)
|
|
||||||||||||||||
|
Service
cost
|
|
$
|
83
|
$
|
77
|
|
$
|
77
|
|
$
|
34
|
|
$
|
40
|
|
$
|
36
|
|
|
|
Interest
cost
|
|
|
266
|
|
254
|
|
|
252
|
|
|
105
|
|
|
111
|
|
|
112
|
|
|
|
Expected
return on plan assets
|
|
|
(396
|
)
|
|
(345
|
)
|
|
(286
|
)
|
|
(46
|
)
|
|
(45
|
)
|
|
(44
|
)
|
|
Amortization
of prior service cost
|
|
|
10
|
|
8
|
|
|
9
|
|
|
(76
|
)
|
|
(45
|
)
|
|
(40
|
)
|
|
|
Recognized
net
actuarial loss
|
|
|
58
|
|
36
|
|
|
39
|
|
|
56
|
|
40
|
|
|
39
|
|
||
|
Net
periodic
cost
|
|
$
|
21
|
$
|
30
|
|
$
|
91
|
|
$
|
73
|
|
$
|
101
|
|
$
|
103
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Weighted-Average
Assumptions Used
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to
Determine Net Periodic Benefit Cost
|
Pension
Benefits
|
Other
Benefits
|
|||||||||||||||||
|
for
Years Ended December 31
|
|
|
2006
|
|
|
2005
|
|
|
2004
|
|
|
2006
|
|
|
2005
|
|
|
2004
|
|
|
Discount
rate
|
|
|
5.75
|
%
|
|
6.00
|
%
|
|
6.25
|
%
|
|
5.75
|
%
|
|
6.00
|
%
|
|
6.25
|
%
|
|
Expected
long-term return on plan assets
|
|
|
9.00
|
%
|
|
9.00
|
%
|
|
9.00
|
%
|
|
9.00
|
%
|
|
9.00
|
%
|
|
9.00
|
%
|
|
Rate
of
compensation increase
|
|
|
3.50
|
%
|
|
3.50
|
%
|
|
3.50
|
%
|
|
|
|
|
|
|
|
|
|
In
selecting an
assumed discount rate, FirstEnergy considers currently available rates
of return
on high-quality fixed income investments expected to be available during
the
period to maturity of the pension and other postretirement benefit obligations.
The assumed rates of return on pension plan assets consider historical
market
returns and economic forecasts for the types of investments held by the
Company's pension trusts. The long-term rate of return is developed considering
the portfolio’s asset allocation strategy.
FirstEnergy
employs a
total return investment approach whereby a mix of equities and fixed income
investments are used to maximize the long-term return on plan assets for
a
prudent level of risk. Risk tolerance is established through careful
consideration of plan liabilities, plan funded status, and corporate financial
condition. The investment portfolio contains a diversified blend of equity
and
fixed-income investments. Furthermore, equity investments are diversified
across
U.S. and non-U.S. stocks, as well as growth, value, and small and large
capitalization funds. Other assets such as real estate are used to enhance
long-term returns while improving portfolio diversification. Derivatives
may be
used to gain market exposure in an efficient and timely manner; however,
derivatives are not used to leverage the portfolio beyond the market value
of
the underlying investments. Investment risk is measured and monitored on
a
continuing basis through periodic investment portfolio reviews, annual
liability
measurements, and periodic asset/liability studies.
|
Assumed
Health Care Cost Trend Rates
|
|||||||
|
As
of
December 31
|
2006
|
2005
|
|||||
|
Health
care
cost trend rate assumed for next
|
|||||||
|
year
(pre/post-Medicare)
|
9-11
|
%
|
9-11
|
%
|
|||
|
Rate
to which
the cost trend rate is assumed to
|
|||||||
|
decline
(the
ultimate trend rate)
|
5
|
%
|
5
|
%
|
|||
|
Year
that the
rate reaches the ultimate trend
|
|||||||
|
rate
(pre/post-Medicare)
|
2011-2013
|
2010-2012
|
|||||
Assumed
health care
cost trend rates have a significant effect on the amounts reported for the
health care plans. A one-percentage-point change in assumed health care cost
trend rates would have the following effects:
|
1-Percentage-
|
1-Percentage-
|
||||||
|
Point
Increase
|
Point
Decrease
|
||||||
|
(In
millions)
|
|||||||
|
Effect
on
total of service and interest cost
|
$
|
6
|
$
|
(5
|
)
|
||
|
Effect
on
accumulated postretirement benefit obligation
|
$
|
33
|
$
|
(29
|
)
|
||
Taking
into account
estimated employee future service, FirstEnergy expects to make the following
benefit payments from plan assets:
69
|
Pension
|
Other
|
||||
|
Benefits
|
Benefits
|
||||
|
(In
millions)
|
|||||
|
2007
|
$
|
247
|
$
|
91
|
|
|
2008
|
249
|
91
|
|||
|
2009
|
256
|
94
|
|||
|
2010
|
269
|
98
|
|||
|
2011
|
280
|
101
|
|||
|
Years
2012-
2016
|
1,606
|
537
|
|||
FirstEnergy
also
maintains two unfunded benefit plans, an Executive Deferred Compensation
Plan
(EDCP) and Supplemental Executive Retirement Plan (SERP) under which
non-qualified supplemental pension benefits are paid to certain employees
in
addition to amounts received under the Company’s qualified retirement plan,
which is subject to IRS limitations on covered compensation. See Note 4(C)
for a
discussion regarding the stock compensation component of the EDCP. The net
periodic pension cost of these plans was $21 million, $16 million and $14
million for the years ended 2006, 2005 and 2004, respectively. The projected
benefit obligation and the unfunded status was $170 million and $161 million
as
of December 31, 2006 and 2005, respectively. The net liability recognized
was
$301 million and $238 million as of December 31, 2006 and 2005, respectively,
and is included in the caption “retirement benefits” on the Consolidated Balance
Sheets. The benefit payments, which reflect future service, as appropriate,
are
expected to be as follows:
|
Benefit
|
|||
|
Payments
|
|||
|
(In
millions)
|
|||
|
2007
|
$
|
7
|
|
|
2008
|
9
|
||
|
2009
|
8
|
||
|
2010
|
8
|
||
|
2011
|
9
|
||
|
Years
2012-
2016
|
61
|
||
4. STOCK-BASED
COMPENSATION PLANS
FirstEnergy
has four
stock-based compensation programs: LTIP; EDCP; ESOP; and DCPD. FirstEnergy
has
also assumed responsibility for several stock-based plans through acquisitions.
In 2001, FirstEnergy assumed responsibility for two stock-based plans as
a
result of its acquisition of GPU. No further stock-based compensation can
be
awarded under GPU’s Stock Option and Restricted Stock Plan for MYR Group Inc.
Employees (MYR Plan) or 1990 Stock Plan for Employees of GPU, Inc. and
Subsidiaries (GPU Plan). All options and restricted stock under both plans
have
been converted into FirstEnergy options and restricted stock. Options under
the
GPU Plan became fully vested on November 7, 2001, and will expire on or
before June 1, 2010. Under the MYR Plan, all options and restricted stock
maintained their original vesting periods, which ranged from one to four
years.
As of February 2006, all awards under the MYR Plan were exercised. The Centerior
Equity Plan (CE Plan) is an additional stock-based plan administered by
FirstEnergy for which it assumed responsibility as a result of the acquisition
of Centerior Energy Corporation in 1997. All options are fully vested under
the
CE Plan, and no further awards are permitted. There were no outstanding options
at December 31, 2006 under the CE Plan.
Effective
January 1,
2006, FirstEnergy adopted SFAS 123(R), which requires the expensing of
stock-based compensation. Under SFAS 123(R), all share-based compensation
cost
is measured at the grant date based on the fair value of the award, and is
recognized as an expense over the employee’s requisite service period.
FirstEnergy adopted the modified prospective method, under which compensation
expense recognized in the year ended December 31, 2006 included the expense
for
all share-based payments granted prior to but not yet vested as of January
1,
2006. Results for prior periods were not restated.
Prior
to the
adoption of SFAS 123(R) on January 1, 2006, FirstEnergy’s LTIP, EDCP, ESOP, and
DCPD stock-based compensation programs were accounted for under the recognition
and measurement principles of APB 25 and related interpretations. Under APB
25,
no compensation expense was reflected in net income for stock options as
all
options granted under those plans have exercise prices equal to the market
value
of the underlying common stock on the respective grant dates, resulting in
substantially no intrinsic value. The pro forma effects on net income for
stock
options were instead disclosed in a footnote to the financial statements.
Under
APB 25 and SFAS 123(R), compensation expense was recorded in the income
statement for restricted stock, restricted stock units, performance shares
and
the EDCP and DCPD programs. No stock options have been granted since the
third
quarter of 2004. Consequently, the impact of adopting SFAS 123(R) was not
material to FirstEnergy’s net income and earnings per share in the year ended
December 31, 2006.
70
|
(A)
|
LTIP
|
FirstEnergy’s
LTIP
includes four stock-based compensation programs - restricted stock, restricted
stock units, stock options, and performance shares. During 2005, FirstEnergy
began issuing restricted stock units and reduced its use of stock
options.
Under
FirstEnergy’s
LTIP, total awards cannot exceed 22.5 million shares of common stock or their
equivalent. Only stock options, restricted stock and restricted stock units
have
currently been designated to pay out in common stock, with vesting periods
ranging from two months to ten years. Performance share awards are currently
designated to be paid in cash rather than common stock and therefore do not
count against the limit on stock-based awards. As of December 31, 2006,
3.3 million shares were available for future awards.
Restricted
Stock
and Restricted Stock Units
Eligible
employees
receive awards of FirstEnergy common stock or stock units subject to
restrictions. Those restrictions lapse over a defined period of time or based
on
performance. Dividends are received on the restricted stock and are reinvested
in additional shares. Restricted common stock grants under the FE Plan were
as
follows:
|
2006
|
2005
|
2004
|
||||||||
|
Restricted
common shares granted
|
229,271
|
356,200
|
62,370
|
|||||||
|
Weighted
average market price
|
$
|
53.18
|
$
|
41.52
|
$
|
40.69
|
||||
|
Weighted
average vesting period (years)
|
4.47
|
5.4
|
2.7
|
|||||||
|
Dividends
restricted
|
Yes
|
Yes
|
Yes
|
|||||||
Vesting
activity for
restricted common stock during the year was as follows:
|
Weighted
|
||||||||
|
Number
|
Average
|
|||||||
|
of
|
Grant-Date
|
|||||||
|
Restricted
Stock
|
|
Shares
|
|
Fair
Value
|
||||
|
Nonvested
at
January 1, 2006
|
|
424,411
|
|
$
|
41.43
|
|||
|
Nonvested
at
December 31, 2006
|
|
629,482
|
|
|
45.79
|
|||
|
Vested
in
2006
|
|
19,200
|
|
|
38.80
|
|||
There
are two types
of restricted stock unit awards -- discretionary-based and performance-based.
With the discretionary-based, the Company grants the right to receive, at
the
end of the period of restriction, a number of shares of common stock of
FirstEnergy equal to the number of restricted stock units set forth in each
agreement. With performance-based, FirstEnergy grants the right to receive,
at
the end of the period of restriction, a number of shares of common stock
of
FirstEnergy equal to the number of restricted stock units set forth in the
agreement subject to adjustment based on FirstEnergy’s stock performance.
|
2006
|
2005
|
2004
|
||||||||
|
Restricted
common share units granted
|
440,676
|
477,920
|
-
|
|||||||
|
Weighted
average vesting period (years)
|
3.32
|
3.32
|
-
|
|||||||
Vesting
activity for
restricted stock units during the year was as follows:
|
Weighted
|
||||||||
|
Number
|
Average
|
|||||||
|
of
|
Grant-Date
|
|||||||
|
Restricted
Stock Units
|
|
Shares
|
|
Fair
Value
|
||||
|
Nonvested
at
January 1, 2006
|
|
464,924
|
|
$
|
41.44
|
|||
|
Nonvested
at
December 31, 2006
|
|
887,794
|
|
|
45.97
|
|||
| Granted during 2006 |
440,676
|
50.92
|
||||||
|
Vested
in
2006
|
|
6,026
|
|
|
41.42
|
|||
Compensation
expense
recognized for restricted stock and restricted stock units during 2006
approximated $17 million. Compensation expense recognized for restricted
stock during 2005 and 2004 totaled $10 million and $2 million,
respectively.
71
Stock
Options
Stock
options were
granted to eligible employees allowing them to purchase a specified number
of
common shares at a fixed grant price over a defined period of time. Stock
option
activities under the FE Programs for the past three years were as follows:
|
Weighted
|
||||||
|
Number
|
Average
|
|||||
|
of
|
Exercise
|
|||||
|
Stock
Option Activities
|
Options
|
Price
|
||||
|
Balance,
January 1, 2004
|
$
|
13,648,869
|
$
|
29.27
|
||
|
(1,919,662
options exercisable)
|
29.67
|
|||||
|
Options
granted
|
3,373,459
|
38.77
|
||||
|
Options
exercised
|
3,622,148
|
26.52
|
||||
|
Options
forfeited
|
167,425
|
32.58
|
||||
|
Balance,
December 31, 2004
|
13,232,755
|
32.40
|
||||
|
(3,175,023
options exercisable)
|
29.07
|
|||||
|
Options
granted
|
-
|
-
|
||||
|
Options
exercised
|
4,140,893
|
29.79
|
||||
|
Options
forfeited
|
225,606
|
34.37
|
||||
|
Balance,
December 31, 2005
|
8,866,256
|
33.57
|
||||
|
(4,090,829
options exercisable)
|
31.97
|
|||||
|
Options
granted
|
-
|
-
|
||||
|
Options
exercised
|
2,221,417
|
32.65
|
||||
|
Options
forfeited
|
26,550
|
33.36
|
||||
|
Balance,
December 31, 2006
|
6,618,289
|
33.88
|
||||
|
(4,160,859
options exercisable)
|
32.85
|
|||||
Options
outstanding
by plan and range of exercise price as of December 31, 2006 were as
follows:
|
Options
Outstanding
|
Options
Exercisable
|
||||||||||||||||||
|
Weighted
|
Weighted
|
||||||||||||||||||
|
Range
of
|
Average
|
Remaining
|
Average
|
||||||||||||||||
|
FE
Program
|
Exercise
Prices
|
Shares
|
Exercise
Price
|
Contractual
Life
|
Shares
|
Exercise
Price
|
|||||||||||||
| FE plan |
$
|
19.31 - $29.87 |
2,744,608
|
$
|
29.16
|
5.49
|
1,887,458
|
$ |
28.90
|
||||||||||
|
$
|
30.17
-
$39.46
|
3,848,267
|
$
|
37.31
|
6.49
|
2,247,987
|
$
|
36.27
|
|||||||||||
|
GPU
plan
|
$
|
23.75
-
$35.92
|
25,414
|
$
|
24.29
|
3.37
|
25,414
|
$
|
24.29
|
||||||||||
|
Total
|
6,618,289
|
$
|
33.88
|
6.07
|
4,160,859
|
$
|
32.85
|
||||||||||||
There
were no stock
options granted in 2006 or 2005. The weighted average fair value of options
granted in 2004 are estimated below using the Black-Scholes option-pricing
model
and the following assumptions:
|
|
|
2004
|
|
|||
|
Fair
value per
option
|
|
$
|
6.72
|
|
||
|
Weighted
average valuation assumptions:
|
|
|
|
|||
|
Expected
option term (years)
|
|
|
7.6
|
|
||
|
Expected
volatility
|
|
|
26.25
|
%
|
||
|
Expected
dividend yield
|
|
|
3.88
|
%
|
||
|
Risk-free
interest rate
|
|
|
1.99
|
%
|
||
Prior
to the
adoption of SFAS 123(R) compensation expense for FirstEnergy stock options
was
based on intrinsic value, which equals any positive difference between
FirstEnergy's common stock price on the option's grant date and the option's
exercise price. The exercise prices of all stock options granted in 2004
equaled
the market price of FirstEnergy's common stock on the options' grant dates.
If
fair value accounting were applied to FirstEnergy's stock options, net income
and earnings per share would be reduced as summarized below.
72
|
2005
|
2004
|
|||||||||
|
(In
millions, except per share amounts)
|
||||||||||
|
Net
Income, as
reported
|
$ |
861
|
$ |
878
|
||||||
|
Add
back
compensation expense
|
||||||||||
|
reported
in
net income, net of tax
|
||||||||||
|
(based
on APB
25)*
|
32
|
21
|
||||||||
|
Deduct
compensation expense based
|
||||||||||
|
upon
estimated
fair value, net of tax*
|
(39
|
)
|
(35
|
)
|
||||||
|
Pro
forma net
income
|
$
|
854
|
$
|
864
|
||||||
|
Earnings
Per
Share of Common Stock -
|
||||||||||
|
Basic
|
||||||||||
|
As
Reported
|
$
|
2.62
|
$
|
2.68
|
||||||
|
Pro
Forma
|
$
|
2.60
|
$
|
2.64
|
||||||
|
Diluted
|
||||||||||
|
As
Reported
|
$
|
2.61
|
$
|
2.67
|
||||||
|
Pro
Forma
|
$
|
2.59
|
$
|
2.63
|
||||||
*
Includes
restricted stock, restricted stock units, stock options, performance shares,
ESOP, EDCP and DCPD.
As
noted above,
FirstEnergy reduced its use of stock options beginning in 2005 and increased
its
use of performance-based, restricted stock units. FirstEnergy has not
accelerated out-of-the-money options in anticipation of adopting SFAS 123(R)
on
January 1, 2006. As
a result, all
currently unvested stock options will vest by 2008. Compensation expense
recognized for stock options during 2006 total $6 million.
Performance
Shares
Performance
shares
are share equivalents and do not have voting rights. The shares track the
performance of FirstEnergy's common stock over a three-year vesting period.
During that time, dividend equivalents are converted into additional shares.
The
final account value may be adjusted based on the ranking of FirstEnergy stock
performance to a composite of peer companies. Compensation expense recognized
for performance shares during 2006, 2005 and 2004 totaled approximately
$25 million, $7 million and $5 million, respectively.
(B)
ESOP
An
ESOP Trust funds
most of the matching contribution for FirstEnergy's 401(k) savings plan.
All
full-time employees eligible for participation in the 401(k) savings plan
are
covered by the ESOP. The ESOP borrowed $200 million from OE and acquired
10,654,114 shares of OE's common stock (subsequently converted to FirstEnergy
common stock) through market purchases. Dividends on ESOP shares are used
to
service the debt. Shares are released from the ESOP on a pro rata basis as
debt
service payments are made.
In
determining the
amount of borrowing under the ESOP, assumptions were made including the size
and
growth rate of the Company's workforce, earnings, dividends, and trading
price
of common stock. In 2005, the ESOP loan was refinanced ($66 million
principal amount) and its term was extended by three years. In 2006, 2005
and
2004, 922,978 shares, 588,004 shares and 864,151 shares, respectively, were
allocated to employees with the corresponding expense recognized based on
the
shares allocated method. The fair value of 521,818 shares unallocated as
of
December 31, 2006 was approximately $31 million. Total ESOP-related
compensation expense was calculated as follows:
|
2006
|
2005
|
2004
|
||||||||
|
(In
millions)
|
||||||||||
|
Base
compensation
|
$
|
50
|
$
|
39
|
$
|
32
|
||||
|
Dividends
on
common stock held by the
ESOP
and used
to service debt
|
(11
|
)
|
(10
|
)
|
(9
|
)
|
||||
|
Net
expense
|
$
|
39
|
$
|
29
|
$
|
23
|
||||
73
(C) EDCP
Under
the EDCP,
covered employees can direct a portion of their compensation, including annual
incentive awards and/or long-term incentive awards, into an unfunded FirstEnergy
stock account to receive vested stock units or into an unfunded retirement
cash
account. An additional 20% premium is received in the form of stock units
based
on the amount allocated to the FirstEnergy stock account. Dividends are
calculated quarterly on stock units outstanding and are paid in the form
of
additional stock units. Upon withdrawal, stock units are converted to
FirstEnergy shares. Payout typically occurs three years from the date of
deferral; however, an election can be made in the year prior to payout to
further defer shares into a retirement stock account that will pay out in
cash
upon retirement (see Note 3). Interest is calculated on the cash allocated
to
the cash account and the total balance will pay out in cash upon retirement.
Of
the 1.3 million EDCP stock units authorized, 628,539 stock units were
available for future awards as of December 31, 2006. Compensation expense
recognized on EDCP stock units in 2006 and 2005 were approximately $5 million
each year and approximately $2 million in 2004.
|
(D)
|
DCPD
|
Under
the DCPD,
directors can elect to allocate all or a portion of their cash retainers,
meeting fees and chair fees to deferred stock or deferred cash accounts.
If the
funds are deferred into the stock account, a 20% match is added to the funds
allocated. The 20% match and any appreciation on it are forfeited if the
director leaves the Board within three years from the date of deferral for
any
reason other than retirement, disability, death, upon a change in control,
or
when a director is ineligible to stand for re-election. Compensation expense
is
recognized for the 20% match over the three-year vesting period. Directors
may
also elect to defer their equity retainers into the deferred stock account;
however, they do not receive a 20% match on that deferral. DCPD expenses
recognized in 2006 and 2005 were approximately $3 million each year and
$4 million in 2004. The net liability recognized was $5 million as of
December 31, 2006 and 2005 and is included in the caption “retirement benefits”
on the Consolidated Balance Sheets.
5.
FAIR
VALUE
OF FINANCIAL INSTRUMENTS
|
(A)
|
Long-term
Debt and Other Long-term
Obligations
|
All
borrowings with
initial maturities of less than one year are defined as short-term financial
instruments under GAAP and are reported on the Consolidated Balance Sheets
at
cost in the caption "short-term borrowings", which approximates their fair
market value. The following table provides the approximate fair value and
related carrying amounts of long-term debt and other long-term obligations
as
shown in the Consolidated Statements of Capitalization as of December 31:
|
2006
|
2005
|
||||||||||||
|
Carrying
|
Fair
|
Carrying
|
Fair
|
||||||||||
|
Value
|
Value
|
Value
|
Value
|
||||||||||
|
(In
millions)
|
|||||||||||||
|
Long-term
debt
|
$
|
10,321
|
$
|
10,725
|
$
|
10,097
|
$
|
10,576
|
|||||
|
Subordinated
debentures to affiliated trusts
|
103
|
105
|
103
|
140
|
|||||||||
|
$
|
10,424
|
$
|
10,830
|
$
|
10,200
|
$
|
10,716
|
||||||
The
fair values of
long-term debt and other long-term obligations reflect the present value
of the
cash outflows relating to those securities based on the current call price,
the
yield to maturity or the yield to call, as deemed appropriate at the end
of each
respective year. The yields assumed were based on securities with similar
characteristics offered by corporations with credit ratings similar to the
Companies' ratings.
|
(B)
|
Investments
|
Investments
other
than cash and cash equivalents include held-to-maturity securities and
available-for-sale securities. The Companies and NGC periodically evaluate
their
investments for other-than-temporary impairment. They first consider their
intent and ability to hold the investment until recovery and then consider,
among other factors, the duration and the extent to which the security’s fair
value has been less than cost and the near-term financial prospects of the
security issuer when evaluating investments for impairment. The following
table
provides the approximate fair value and related carrying amounts of investments
excluding the nuclear decommissioning trust fund investments and investments
of
$265 million and $244 million for 2006 and 2005 excluded by SFAS 107,
“Disclosures about Fair Values of Financial Instruments”, as of
December 31:
74
|
2006
|
2005
|
|||||||||||||
|
Carrying
|
Fair
|
Carrying
|
Fair
|
|||||||||||
|
Value
|
Value
|
Value
|
Value
|
|||||||||||
|
(In
millions)
|
||||||||||||||
|
Restricted
funds
|
$
|
11
|
$
|
11
|
$
|
-
|
$
|
-
|
||||||
|
Notes
receivable
|
70
|
67
|
68
|
67
|
||||||||||
|
Debt
securities:
|
||||||||||||||
|
|
-
Government
obligations (1)
|
383
|
379
|
374
|
370
|
|||||||||
|
-
Corporate
debt securities
|
3
|
5
|
3
|
40
|
||||||||||
|
-
Lease
obligation bonds
|
811
|
908
|
890
|
997
|
||||||||||
|
Total
debt
securities
|
1,197
|
1,292
|
1,267
|
1,407
|
||||||||||
|
Equity
securities
|
9
|
9
|
20
|
20
|
||||||||||
|
$
|
1,287
|
$
|
1,379
|
$
|
1,355
|
$
|
1,497
|
|||||||
| (1) |
Excludes
$5
million of cash in 2006
|
The
table above
includes restricted funds, notes receivable, nuclear fuel disposal trust
investments, NUG trust investments, investments in lease obligation bonds,
and
other miscellaneous investments. The carrying value of the restricted funds
is
assumed to approximate market value. The fair value of notes receivable
represents the present value of the cash inflows based on the yield to maturity.
The yields assumed were based on financial instruments with similar
characteristics and terms. The maturity dates range from 2007 to 2040. The
nuclear fuel disposal and NUG trust investments consist of debt securities
classified as available-for-sale with the fair value determined based on
quoted
market prices. The investments in lease obligation bonds are accounted for
as
held-to-maturity securities and the fair value is based on present value
of the
cash inflows based on the yield to maturity similar to the notes receivable.
The
maturity dates range from 2007 to 2017.
The
following table
provides the amortized cost basis, unrealized gains and losses, and fair
values
for the investments in debt and equity securities above excluding the restricted
funds and notes receivable:
|
2006
|
2005
|
||||||||||||||||||||||||
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
||||||||||||||||||
|
Basis
|
Gains
|
Losses
|
Value
|
Basis
|
Gains
|
Losses
|
Value
|
||||||||||||||||||
|
(In
millions)
|
|||||||||||||||||||||||||
|
Debt
securities
|
$
|
1,197
|
$
|
100
|
$
|
5
|
$
|
1,292
|
$
|
1,267
|
$
|
145
|
$
|
5
|
$
|
1,407
|
|||||||||
|
Equity
securities
|
9
|
-
|
-
|
9
|
20
|
-
|
-
|
20
|
|||||||||||||||||
|
$
|
1,206
|
$
|
100
|
$
|
5
|
$
|
1,301
|
$
|
1,287
|
$
|
145
|
$
|
5
|
$
|
1427
|
||||||||||
Proceeds
from the
sale of the
investments
detailed above, realized gains and losses on those sales, and interest and
dividend income for the three years ended December 31, 2006 were as
follows:
|
2006
|
2005
|
2004
|
||||||||
|
(In
millions)
|
||||||||||
|
Proceeds
from
sales
|
$
|
1,442
|
$
|
4,732
|
$
|
17,564
|
||||
|
Realized
gains
|
-
|
-
|
4
|
|||||||
|
Realized
losses
|
4
|
2
|
1
|
|||||||
|
Interest
and
dividend income
|
15
|
14
|
11
|
|||||||
(C)
Nuclear
Decommissioning Trust Fund Investments
Nuclear
decommissioning trust investments are classified as available-for-sale with
the
fair value representing quoted market prices. The Companies and NGC have
no
securities held for trading purposes. Upon adoption of FSP SFAS 115-1
and SFAS 124-1, FirstEnergy began expensing unrealized losses on
available-for-sale securities held in the nuclear decommissioning trusts
since
the trust arrangements, as they are currently defined, do not meet the required
ability and intent to hold criteria in consideration of other-than-temporary
impairment. Approximately $13 million of unrealized losses on these
available-for-sale securities were reclassified from OCI to earnings upon
adoption of these pronouncements. The following table provides the carrying
value, which equals fair value of the nuclear decommissioning trust funds
as of
December 31, 2006 and 2005, respectively. The fair value was determined
using the specific identification method.
75
|
2006
|
2005
|
|||||||||||||||
|
(In
millions)
|
||||||||||||||||
|
Debt
securities:
|
||||||||||||||||
|
-Government
obligations
|
$
|
526
|
$
|
561
|
||||||||||||
|
-Corporate
debt
securities
|
153
|
125
|
||||||||||||||
|
-Mortgage-backed
securities
|
12
|
-
|
||||||||||||||
|
691
|
686
|
|||||||||||||||
|
Equity
securities
|
1,284
|
1,066
|
||||||||||||||
|
$
|
1,975
|
(1) |
(1
|
)
|
$
|
1,752
|
||||||||||
(1)
Excludes $2 million
of receivables and payables
The
following table
summarizes the amortized cost basis, unrealized gains and losses and fair
values
for decommissioning trust investments as of December 31:
|
2006
|
2005
|
||||||||||||||||||||||||
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
Cost
|
Unrealized
|
Unrealized
|
Fair
|
||||||||||||||||||
|
Basis
|
Gains
|
Losses
|
Value
|
Basis
|
Gains
|
Losses
|
Value
|
||||||||||||||||||
|
(In
millions)
|
|||||||||||||||||||||||||
|
Debt
securities
|
$
|
681
|
$
|
10
|
$
|
-
|
$
|
691
|
$
|
681
|
$
|
12
|
$
|
7
|
$
|
686
|
|||||||||
|
Equity
securities
|
952
|
332
|
-
|
1,284
|
898
|
190
|
22
|
1,066
|
|||||||||||||||||
|
$
|
1,633
|
$
|
342
|
$
|
-
|
$
|
1,975
|
(1)1)
|
$
|
1,579
|
$
|
202
|
$
|
29
|
$
|
1,752
|
|||||||||
(1) Excludes
$2 million of receivables and payables
Unrealized
gains
applicable to OE's, TE's and the majority of NGC's decommissioning trusts
are
recognized in OCI in accordance with SFAS 115, as fluctuations in fair value
will eventually affect earnings. The decommissioning trusts of JCP&L, Met-Ed
and Penelec are subject to regulatory accounting in accordance with
SFAS 71. Net unrealized gains and losses are recorded as regulatory assets
or liabilities since the difference between investments held in trust and
the
decommissioning liabilities will be recovered from or refunded to
customers.
Proceeds
from the
sale of decommissioning trust investments, realized gains and losses on those
sales, and interest and dividend income for the three years ended
December 31, 2006 were as follows:
|
2006
|
2005
|
2004
|
||||||||
|
(In
millions)
|
||||||||||
|
Proceeds
from
sales
|
$
|
1,569
|
$
|
1,419
|
$
|
1,234
|
||||
|
Realized
gains
|
121
|
133
|
144
|
|||||||
|
Realized
losses
|
101
|
58
|
43
|
|||||||
|
Interest
and
dividend income
|
55
|
49
|
45
|
|||||||
The
investment
policy for the nuclear decommissioning trust funds restricts or limits the
ability to hold certain types of assets including private or direct placements,
warrants, securities of FirstEnergy, investments in companies owning nuclear
power plants, financial derivatives, preferred stocks, securities convertible
into common stock and securities of the trust fund's custodian or managers
and
their parents or subsidiaries.
|
(D)
|
DERIVATIVES-
|
FirstEnergy
is
exposed to financial risks resulting from the fluctuation of interest rates
and
commodity prices, including prices for electricity, natural gas, coal and
energy
transmission. To manage the volatility relating to these exposures, FirstEnergy
uses a variety of non-derivative and derivative instruments, including forward
contracts, options, futures contracts and swaps. The derivatives are used
principally for hedging purposes. FirstEnergy's Risk Policy Committee, comprised
of members of senior management, provides general management oversight to
risk
management activities throughout the Company. They are responsible for promoting
the effective design and implementation of sound risk management programs.
They
also oversee compliance with corporate risk management policies and established
risk management practices.
FirstEnergy
accounts
for derivative instruments on its Consolidated Balance Sheet at their fair
value
unless they meet the normal purchase and normal sales criterion. Derivatives
that meet that criterion are accounted for on the accrual basis. The changes
in
the fair value of derivative instruments that do not meet the normal purchase
and sales criterion are recorded in current earnings, in AOCL, or as part
of the
value of the hedged item, depending on whether or not it is designated as
part
of a hedge transaction, the nature of the hedge transaction and hedge
effectiveness.
76
FirstEnergy's
primary ongoing hedging activities involve cash flow hedges of electricity
and
natural gas purchases and anticipated interest payments associated with future
debt issuances. The effective portion of such hedges is initially recorded
in
equity as AOCL and is subsequently recorded in net income, as an expense,
when
the underlying hedged commodities are delivered or interest payments are
made.
AOCL as of December 31, 2006 includes a net deferred loss of
$58 million for derivative hedging activity. The $20 million decrease
from the December 31, 2005 balance of $78 million consists of a
$20 million decrease due to net hedge losses included in earnings, with
current hedging activity having no effect on net income during the year.
Approximately $19 million (after tax) of the current net deferred loss on
derivative instruments in AOCL is expected to be reclassified to earnings
during
the next twelve months as hedged transactions occur. The fair value of these
derivative instruments will continue to fluctuate from period to period based
on
various market factors. Gains and losses from any ineffective portion of
the
cash flow hedge are recorded directly to earnings. The impact of ineffectiveness
on earnings during 2006 and 2005 was not material.
FirstEnergy
entered
into interest rate derivative transactions in 2001 to hedge a portion of
the
anticipated interest payments on debt related to the GPU acquisition. Gains
and
losses from hedges of anticipated interest payments on acquisition debt are
included in net income, as a component of interest expense, over the periods
that hedged interest payments are made - 5, 10 and 30 years. In 2006, a
$23 million loss was amortized to interest expense.
FirstEnergy
has
entered into fixed-for-floating interest rate swap agreements, whereby
FirstEnergy receives fixed cash flows based on the fixed coupons of the hedged
securities and pays variable cash flows based on short-term variable market
interest rates (3 and 6-month LIBOR indices). These derivatives are treated
as
fair value hedges of fixed-rate, long-term debt issues - protecting against
the
risk of changes in the fair value of fixed-rate debt instruments due to lower
interest rates. Swap maturities, fixed interest rates received, and interest
payment dates match those of the underlying obligations. During 2006,
FirstEnergy unwound swaps with a total notional amount of $350 million for
which it incurred $1 million in cash losses during 2006. The losses will be
recognized over the remaining maturity of each respective hedged security
as
increased interest expense. As of December 31, 2006, the aggregate notional
value of interest rate swap agreements outstanding was
$750 million.
During
2005,
FirstEnergy entered into several forward starting swap agreements (forward
swaps) in order to hedge a portion of the consolidated interest rate risk
associated with the future planned issuances of fixed-rate, long-term debt
securities for one or more of its consolidated entities in 2006 - 2008. These
derivatives are treated as cash flow hedges, protecting against the risk
of
changes in future interest payments resulting from changes in benchmark U.S.
Treasury rates between the date of hedge inception and the date of the debt
issuance. As of December 31, 2006, FirstEnergy had entered into forward
swaps with an aggregate notional amount of $300 million. As of
December 31, 2006, the forward swaps had a fair value of ($4) million.
|
6.
|
LEASES
|
The
Companies lease
certain generating facilities, office space and other property and equipment
under cancelable and noncancelable leases.
In
1987, OE sold
portions of its ownership interests in Perry Unit 1 and Beaver Valley Unit
2 and
entered into operating leases on the portions sold for basic lease terms
of
approximately 29 years. In that same year, CEI and TE also sold portions
of
their ownership interests in Beaver Valley Unit 2 and Bruce Mansfield Units
1, 2
and 3 and entered into similar operating leases for lease terms of approximately
30 years. During the terms of their respective leases, OE, CEI and TE continue
to be responsible, to the extent of their leasehold interests, for costs
associated with the units including construction expenditures, operation
and
maintenance expenses, insurance, nuclear fuel, property taxes and
decommissioning. They have the right, at the expiration of the respective
basic
lease terms, to renew their respective leases. They also have the right to
purchase the facilities at the expiration of the basic lease term or any
renewal
term at a price equal to the fair market value of the facilities. The basic
rental payments are adjusted when applicable federal tax law changes.
Consistent
with the
regulatory treatment, the rentals for capital and operating leases are charged
to operating expenses on the Consolidated Statements of Income. Such costs
for
the three years ended December 31, 2006 are summarized as
follows:
|
2006
|
2005
|
2004
|
|||||||
|
(In
millions)
|
|||||||||
|
Operating
leases
|
|||||||||
|
Interest
element
|
$
|
160
|
$
|
171
|
$
|
175
|
|||
|
Other
|
190
|
162
|
140
|
||||||
|
Capital
leases
|
|||||||||
|
Interest
element
|
1
|
1
|
1
|
||||||
|
Other
|
2
|
2
|
3
|
||||||
|
Total
rentals
|
$
|
353
|
$
|
336
|
$
|
319
|
|||
77
Established
by OE in
1996, PNBV purchased a portion of the lease obligation bonds issued on behalf
of
lessors in OE's Perry Unit 1 and Beaver Valley Unit 2 sale and leaseback
transactions. Similarly, CEI and TE established Shippingport in 1997 to purchase
the lease obligation bonds issued on behalf of lessors in their Bruce Mansfield
Units 1, 2 and 3 sale and leaseback transactions. The PNBV and Shippingport
arrangements effectively reduce lease costs related to those transactions
(see
Note 7).
The
future minimum
lease payments as of December 31, 2006 are:
|
|
|
|
|
Operating
Leases
|
|
||||||||
|
|
|
Capital
|
|
Lease
|
|
Capital
|
|
|
|
||||
|
|
|
Leases
|
|
Payments
|
|
Trusts
|
|
Net
|
|
||||
|
|
|
(In
millions)
|
|
||||||||||
|
2007
|
|
$
|
1
|
$
|
335
|
$
|
131
|
$
|
204
|
||||
|
2008
|
|
|
1
|
|
332
|
|
105
|
|
227
|
||||
|
2009
|
|
|
1
|
|
334
|
|
112
|
|
222
|
||||
|
2010
|
|
|
1
|
|
334
|
|
121
|
|
213
|
||||
|
2011
|
|
|
1
|
|
324
|
|
121
|
|
203
|
||||
|
Years
thereafter
|
|
|
2
|
|
1,748
|
|
519
|
|
1,229
|
||||
|
Total
minimum
lease payments
|
|
|
7
|
$
|
3,407
|
$
|
1,109
|
$
|
2,298
|
||||
|
Executory
costs
|
|
|
-
|
|
|
|
|
|
|
|
|
|
|
|
Net
minimum
lease payments
|
|
|
7
|
|
|
|
|
|
|
|
|
|
|
|
Interest
portion
|
|
|
2
|
|
|
|
|
|
|
|
|
|
|
|
Present
value
of net minimum
|
|
|
5
|
|
|
|
|
|
|
|
|
|
|
|
lease
payments
|
|
|
|
|
|
|
|
|
|
|
|
||
|
Less
current
portion
|
|
|
1
|
|
|
|
|
|
|
|
|
|
|
|
Noncurrent
portion
|
|
$
|
4
|
|
|
|
|
|
|
|
|
|
|
FirstEnergy
has
recorded above-market lease liabilities for Beaver Valley Unit 2 and the
Bruce
Mansfield Plant associated with the 1997 merger between OE and Centerior.
The
total above-market lease obligation of $722 million associated with Beaver
Valley Unit 2 is being amortized on a straight-line basis through the end
of the
lease term in 2017 (approximately $37 million per year). The total above-market
lease obligation of $755 million associated with the Bruce Mansfield Plant
is
being amortized on a straight-line basis through the end of 2016 (approximately
$48 million per year). As of December 31, 2006, the above-market lease
liabilities for Beaver Valley Unit 2 and the Bruce Mansfield Plant totaled
$852 million, of which $85 million is classified as current
liabilities.
|
7.
|
VARIABLE
INTEREST ENTITIES
|
FIN
46R addresses
the consolidation of VIEs, including special-purpose entities, that are not
controlled through voting interests or in which the equity investors do not
bear
the entity's residual economic risks and rewards. FirstEnergy adopted FIN
46R
for special-purpose entities as of December 31, 2003 and for all other entities
in the first quarter of 2004. FirstEnergy and its subsidiaries consolidate
a VIE
when FirstEnergy is determined to be the VIE's primary beneficiary as defined
by
FIN 46R.
Leases
FirstEnergy’s
consolidated financial statements include PNBV and Shippingport, VIEs created
in
1996 and 1997, respectively, to refinance debt originally issued in connection
with the sale and leaseback transactions discussed in Note 6. PNBV is included
in the consolidated financial statements of OE and Shippingport is included
in
the consolidated financial statements of CEI.
PNBV
was established
to purchase a portion of the lease obligation bonds issued in connection
with
OE’s 1987 sale and leaseback of its interests in the Perry Plant and Beaver
Valley Unit 2. OE used debt and available funds to purchase the notes issued
by
PNBV. Ownership of PNBV includes a 3% equity interest by an unaffiliated
third
party and a 3% equity interest held by OES Ventures, a wholly owned subsidiary
of OE. Shippingport was established to purchase all of the lease obligation
bonds issued in connection with CEI’s and TE’s Bruce Mansfield Plant sale and
leaseback transaction in 1987. CEI and TE used debt and available funds to
purchase the notes issued by Shippingport.
OE,
CEI and TE are
exposed to losses under the applicable sale and leaseback agreements upon
the
occurrence of certain contingent events that each company considers unlikely
to
occur. OE, CEI and TE each have a maximum exposure to loss under these
provisions of approximately $835 million, $955 million, and $955 million,
respectively, which represents the net amount of casualty value payments
upon
the occurrence of specified casualty events that render the applicable plant
worthless. Under the applicable sale and leaseback agreements, OE, CEI and
TE
have net minimum discounted lease payments of $631 million,
$97 million and $503 million, respectively, that would not be payable
if the casualty value payments are made.
78
Power
Purchase Agreements
In
accordance with
FIN 46R, FirstEnergy evaluated its power purchase agreements and determined
that
certain NUG entities may be VIEs to the extent they own a plant that sells
substantially all of its output to the Companies and the contract price for
power is correlated with the plant’s variable costs of production. FirstEnergy,
through its subsidiaries JCP&L, Met-Ed and Penelec, maintains approximately
30 long-term power purchase agreements with NUG entities. The agreements
were
structured pursuant to the Public Utility Regulatory Policies Act of 1978.
FirstEnergy was not involved in the creation of, and has no equity or debt
invested in, these entities.
FirstEnergy
has
determined that for all but eight of these entities, neither JCP&L, Met-Ed
nor Penelec have variable interests in the entities or the entities are
governmental or not-for-profit organizations not within the scope of FIN
46R.
JCP&L, Met-Ed or Penelec may hold variable interests in the remaining eight
entities, which sell their output at variable prices that correlate to some
extent with the operating costs of the plants. As required by FIN 46R,
FirstEnergy periodically requests from these eight entities the information
necessary to determine whether they are VIEs or whether JCP&L, Met-Ed or
Penelec is the primary beneficiary. FirstEnergy has been unable to obtain
the
requested information, which in most cases was deemed by the requested entity
to
be proprietary. As such, FirstEnergy applied the scope exception that exempts
enterprises unable to obtain the necessary information to evaluate entities
under FIN 46R.
Since
FirstEnergy
has no equity or debt interests in the NUG entities, its maximum exposure
to
loss relates primarily to the above-market costs it incurs for power.
FirstEnergy expects any above-market costs it incurs to be recovered from
customers. As of December 31, 2006, the net above-market loss liability
recognized for these eight NUG agreements was $171 million. Purchased power
costs from these entities during 2006, 2005 and 2004 were $171 million,
$180 million and $175 million, respectively.
8. DIVESTITURES
In
2006, FirstEnergy
sold its remaining FSG subsidiaries (Roth Bros., Hattenbach, Dunbar, Edwards
and
RPC) for an aggregate net after-tax gain of $2.2 million. Based on SFAS 144
criteria, Hattenbach, Dunbar, Edwards, and RPC are accounted for as discontinued
operations as of December 31, 2006. Roth Bros. did not meet the criteria
for
classification as discontinued operations as of December 31, 2006 (see Note
2(J)).
In
March 2006,
FirstEnergy sold 60% of its interest in MYR for an after-tax gain of $0.2
million. In June 2006, an additional 1.67% interest was sold pursuant to
the
same March 2006 sale agreement. As a result of the March sale, FirstEnergy
deconsolidated MYR in the first quarter of 2006 and accounted for its remaining
interest under the equity method. In November 2006, FirstEnergy sold the
remaining 38.33% interest in MYR for an after-tax gain of $8.6 million. In
accordance with SFAS 144, the income for the time period that MYR was accounted
for as an equity method investment has not been included in discontinued
operations; however, in accordance with EITF 03-13, Applying
the
Conditions in Paragraph 42 of FASB Statement No. 144 in Determining Whether
to
Report Discontinued Operations,
results
for all
reporting
periods prior to the initial sale in March 2006, including the portion of
2006
prior to the sale are reported as discontinued operations (see Note
2(J)).
In
2005, FirstEnergy
sold three FSG subsidiaries - Elliott-Lewis, Spectrum Control Systems and
L. H.
Cranston and Sons - and an MYR subsidiary - Power Piping Company, resulting
in
an aggregate after-tax gain of $13 million. All of these sales, with the
exception of Spectrum Control Systems met the discontinued operations criteria
(see Note 2(J)).
In
March 2005, FES
completed the sale of its retail natural gas business for an after-tax gain
of
$5 million. Also in March 2005, FirstEnergy sold 51% of its interest in
FirstCom, resulting in an after-tax gain of $4 million. FirstEnergy
accounts for its remaining 31.85% interest in FirstCom on the equity
basis.
FirstEnergy
sold its
50% interest in GLEP in June 2004. Proceeds of $220 million included cash
of $200 million and the right, valued at $20 million, to participate for up
to a 40% interest in future wells in Ohio. This transaction produced an
after-tax loss of $7 million, including the benefits of prior tax capital
losses
that had been previously fully reserved, which offset the capital gain from
the
sale.
FirstEnergy
completed the sale of its international operations in January 2004 with the
sales of its remaining 20.1% interest in Avon (parent of Midlands Electricity
in
the United Kingdom) and its 28.67% interest in TEBSA, for $12 million. No
gain or loss was recognized upon the sales in 2004. Avon and TEBSA were
originally acquired as part of FirstEnergy's November 2001 merger with GPU.
79
9. OHIO
TAX
LEGISLATION
On
June 30,
2005, tax legislation was enacted in the State of Ohio that created a new
CAT
tax, which is based on qualifying “taxable gross receipts” and does not consider
any expenses or costs incurred to generate such receipts, except for items
such
as cash discounts, returns and allowances, and bad debts. The CAT tax was
effective July 1, 2005, and replaces the Ohio income-based franchise tax
and the Ohio personal property tax. The CAT tax is phased-in while the current
income-based franchise tax is phased-out over a five-year period at a rate
of
20% annually, beginning with the year ended 2005, and the personal property
tax
is phased-out over a four-year period at a rate of approximately 25% annually,
beginning with the year ended 2005. During the phase-out period the Ohio
income-based franchise tax was or will be computed consistent with the prior
tax
law, except that the tax liability as computed was multiplied by 80% in 2005;
60% in 2006; 40% in 2007 and 20% in 2008, therefore eliminating the current
income-based franchise tax over a five-year period. As a result of the new
tax
structure, all net deferred tax benefits that were not expected to reverse
during the five-year phase-in period were written-off as of June 30,
2005.
The
increase to
income taxes associated with the adjustment to net deferred taxes in 2005
is
summarized below (in millions):
|
OE
|
|
$
|
32
|
|
|
CEI
|
|
|
4
|
|
|
TE
|
|
|
18
|
|
|
Other
FirstEnergy subsidiaries
|
|
|
(2
|
)
|
|
Total
FirstEnergy
|
|
$
|
52
|
Income
tax expenses
were reduced (increased) during 2005 by the initial phase-out of the Ohio
income-based franchise tax and phase-in of the CAT tax as summarized below
(in
millions):
|
OE
|
|
$
|
3
|
|
|
CEI
|
|
5
|
||
|
TE
|
|
1
|
||
|
Other
FirstEnergy subsidiaries
|
|
(3
|
)
|
|
|
Total
FirstEnergy
|
|
$
|
6
|
10. REGULATORY
MATTERS
(A)
RELIABILITY
INITIATIVES-
In
late 2003 and
early 2004, a series of letters, reports and recommendations were issued
from
various entities, including governmental, industry and ad hoc reliability
entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task
Force)
regarding enhancements to regional reliability. In 2004, FirstEnergy completed
implementation of all actions and initiatives related to enhancing area
reliability, improving voltage and reactive management, operator readiness
and
training and emergency response preparedness recommended for completion in
2004.
On July 14, 2004, NERC independently verified that FirstEnergy had
implemented the various initiatives to be completed by June 30 or summer
2004, with minor exceptions noted by FirstEnergy, which exceptions are now
essentially complete. FirstEnergy is proceeding with the implementation of
the
recommendations that were to be completed subsequent to 2004 and will continue
to periodically assess the FERC-ordered Reliability Study recommendations
for
forecasted 2009 system conditions, recognizing revised load forecasts and
other
changing system conditions which may impact the recommendations. Thus far,
implementation of the recommendations has not required, nor is expected to
require, substantial investment in new equipment or material upgrades to
existing equipment. The FERC or other applicable government agencies and
reliability entities may, however, take a different view as to recommended
enhancements or may recommend additional enhancements in the future, which
could
require additional, material expenditures.
As
a result of
outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had
implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU
adopted an MOU that set out specific tasks related to service reliability
to be
performed by JCP&L and a timetable for completion and endorsed JCP&L’s
ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a
Stipulation that incorporates the final report of an SRM who made
recommendations on appropriate courses of action necessary to ensure system-wide
reliability. The Stipulation also incorporates the Executive Summary and
Recommendation portions of the final report of a focused audit of JCP&L’s
Planning and Operations and Maintenance programs and practices (Focused Audit).
On February 11, 2005, JCP&L met with the DRA to discuss reliability
improvements. The SRM completed his work and issued his final report to the
NJBPU on June 1, 2006. JCP&L filed a comprehensive response to the NJBPU on
July 14, 2006. JCP&L continues to file compliance reports reflecting
activities associated with the MOU and Stipulation.
80
The
EPACT provides
for the creation of an ERO to establish and enforce reliability standards
for
the bulk power system, subject to FERC’s review. On February 3, 2006, the
FERC adopted a rule establishing certification requirements for the ERO,
as well
as regional entities envisioned to assume compliance monitoring and enforcement
responsibility for the new reliability standards. The FERC issued an order
on
rehearing on March 30, 2006, providing certain clarifications and
essentially affirming the rule.
The
NERC has been
preparing the implementation aspects of reorganizing its structure to meet
the
FERC’s certification requirements for the ERO. The NERC made a filing with the
FERC on April 4, 2006 to obtain certification as the ERO and to obtain FERC
approval of pro forma delegation agreements with regional reliability
organizations (regional entities). The new FERC rule referred to above, further
provides for reorganizing regional entities that would replace the current
regional councils and for rearranging their relationship with the ERO. The
“regional entity” may be delegated authority by the ERO, subject to FERC
approval, for compliance and enforcement of reliability standards adopted
by the
ERO and approved by the FERC. The ERO filing was noticed on April 7, 2006
and
comments and reply comments were filed in May, June and July 2006. On July
20,
2006, the FERC certified the NERC as the ERO to implement the provisions
of
Section 215 of the Federal Power Act and directed the NERC to make compliance
filings addressing governance and non-governance issues and the regional
delegation agreements. On September 18, 2006 and October 18, 2006, NERC
submitted compliance filings addressing the governance and non-governance
issues
identified in the FERC ERO Certification Order, dated July 20, 2006. On October
30, 2006, the FERC issued an order accepting most of NERC’s governance filings.
On January 18, 2007, the FERC issued an order largely accepting NERC’s
compliance filings addressing non-governance issues, subject to an additional
compliance filing requirement.
On
April 4, 2006,
NERC also submitted a filing with the FERC seeking approval of mandatory
reliability standards, as well as for approval with the relevant Canadian
authorities. These reliability standards are based, with some modifications
and
additions, on the current NERC Version 0 reliability standards. The reliability
standards filing was subsequently evaluated by the FERC on May 11, 2006,
leading
to the FERC staff’s release of a preliminary assessment that cited many
deficiencies in the proposed reliability standards. The NERC and industry
participants filed comments in response to the Staff’s preliminary assessment.
The FERC held a technical conference on the proposed reliability standards
on
July 6, 2006. The FERC issued a NOPR on the proposed reliability standards
on
October 20, 2006. In the NOPR, the FERC proposed to approve 83 of the 107
reliability standards and directed NERC to make technical improvements to
62 of
the 83 standards approved. The 24 standards that were not approved remain
pending at the FERC awaiting further clarification and filings by the NERC
and
regional entities. The FERC also provided additional clarification within
the
NOPR regarding the proposed application of final standards and guidance with
regard to technical improvements of the standards. On November 15, 2006,
NERC
submitted several revised reliability standards and three new proposed
reliability standards. Interested parties were provided the opportunity to
comment on the NOPR (including the revised standards submitted by NERC in
November) by January 3, 2007. Numerous parties, including FirstEnergy, filed
comments on the NOPR on January 3, 2007. Mandatory reliability standards
enforceable with penalties are expected to be in place by the summer of 2007.
In
a separate order issued October 24, 2006, the FERC approved NERC’s 2007
budget and business plan subject to certain compliance filings.
On
November 29,
2006, NERC submitted an additional compliance filing with the FERC regarding
the
Compliance Monitoring and Enforcement Program (CMEP) along with the proposed
Delegation Agreements between the ERO and the regional reliability entities.
The
FERC provided opportunity for interested parties to comment on the CMEP by
January 10, 2007. FirstEnergy, as well as other parties, moved to intervene
and
submitted responsive comments on January 10, 2007. This filing is pending
before
the FERC.
The
ECAR,
Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability
councils completed the consolidation of these regions into a single new regional
reliability organization known as ReliabilityFirst
Corporation.
ReliabilityFirst
began operations as
a regional reliability council under NERC on January 1, 2006 and on
November 29, 2006 filed a proposed Delegation Agreement with NERC to obtain
certification consistent with the final rule as a “regional entity” under the
ERO. All of FirstEnergy’s facilities are located within the
ReliabilityFirst
region.
On
May 2, 2006, the
NERC Board of Trustees adopted eight new cyber security standards that replaced
interim standards put in place in the wake of the September 11, 2001 terrorist
attacks, and thirteen additional reliability standards. The security standards
became effective on June 1, 2006, and the remaining standards will become
effective throughout 2006 and 2007. NERC filed these proposed standards with
the
FERC and relevant Canadian authorities for approval. The cyber security
standards were not included in the October 20, 2006 NOPR and are being
addressed in a separate FERC docket. On December 11, 2006, the FERC Staff
provided its preliminary assessment of these proposed mandatory reliability
standards and again cited various deficiencies in the proposed standards,
providing interested parties with the opportunity to comment on the assessment
by February 12, 2007.
FirstEnergy
believes
it is in compliance with all current NERC reliability standards. However,
based
upon a review of the October 20, 2006 NOPR, it appears that the FERC will
adopt more strict reliability standards than those contained in the current
NERC
standards. The financial impact of complying with the new standards cannot
be
determined at this time. However, the EPACT required that all prudent costs
incurred to comply with the new reliability standards be recovered in rates.
If
FirstEnergy is unable to meet the reliability standards for its bulk power
system in the future, it could have a material adverse effect on FirstEnergy’s
and its subsidiaries’ financial condition, results of operations and cash
flows.
81
(B)
OHIO-
On
October 21, 2003,
the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004,
the
Ohio Companies accepted the RSP as modified and approved by the PUCO in an
August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended
to
establish generation service rates beginning January 1, 2006, in response
to the
PUCO’s concerns about price and supply uncertainty following the end of the Ohio
Companies' transition plan market development period. On May 3, 2006, the
Supreme Court of Ohio issued an opinion affirming the PUCO's order in all
respects, except it remanded back to the PUCO the matter of ensuring the
availability of sufficient means for customer participation in the marketplace.
The RSP contained a provision that permitted the Ohio Companies to withdraw
and
terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio,
rejected all or part of the RSP. In such event, the Ohio Companies have 30
days
from the final order or decision to provide notice of termination. On July
20,
2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding
on Remand. In their Request, the Ohio Companies provided notice of termination
to those provisions of the RSP subject to termination, subject to being
withdrawn, and also set forth a framework for addressing the Supreme Court
of
Ohio’s findings on customer participation. If the PUCO approves a resolution to
the issues raised by the Supreme Court of Ohio that is acceptable to the
Ohio
Companies, the Ohio Companies’ termination will be withdrawn and considered to
be null and void. On July 26, 2006, the PUCO issued an Entry directing the
Ohio
Companies to file a plan in a new docket to address the Court’s concern. The
Ohio Companies filed their RSP Remand CBP on September 29, 2006. Initial
comments were filed on January 12, 2007 and reply comments were filed on
January 29,
2007.
In
their reply comments the Ohio Companies described the highlights of a new
tariff
offering they would be willing to make available to customers that would
allow
customers to purchase renewable energy certificates associated with a renewable
generation source, subject to PUCO approval.
No further
proceedings are scheduled at this time.
The
Ohio Companies
filed an application and stipulation with the PUCO on September 9, 2005
seeking approval of the RCP, a supplement to the RSP. On November 4, 2005,
the
Ohio Companies filed a supplemental stipulation with the PUCO, which constituted
an additional component of the RCP filed on September 9, 2005. Major provisions
of the RCP include:
|
|
Maintaining
the existing level of base distribution rates through December 31,
2008 for OE and TE, and April 30, 2009 for CEI;
|
|
|
Deferring
and
capitalizing for future recovery (over a 25-year period) with carrying
charges certain distribution costs to be incurred during the period
January 1, 2006 through December 31, 2008, not to exceed
$150 million in each of the three years;
|
|
|
Adjusting
the
RTC and extended RTC recovery periods and rate levels so that full
recovery of authorized costs will occur as of December 31, 2008 for
OE and TE and as of December 31, 2010 for CEI;
|
|
|
Reducing
the
deferred shopping incentive balances as of January 1, 2006 by up to
$75 million for OE, $45 million for TE, and $85 million for CEI
by accelerating the application of each respective company's accumulated
cost of removal regulatory liability; and
|
|
|
Recovering
increased fuel costs (compared to a 2002 baseline) of up to
$75 million, $77 million, and $79 million, in 2006, 2007,
and 2008, respectively, from all OE and TE distribution and transmission
customers through a fuel recovery mechanism. OE, TE, and CEI may
defer and
capitalize (for recovery over a 25-year period) increased fuel
costs above
the amount collected through the fuel recovery
mechanism.
|
On
January 4, 2006,
the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the
RSP to provide customers with more certain rate levels than otherwise available
under the RSP during the plan period. On
January 10,
2006, the Ohio Companies filed a Motion for Clarification seeking clarity
on a
number of issues. On January 25, 2006, the PUCO issued an Entry on
Rehearing granting in part, and denying in part, the Ohio Companies’ previous
requests and clarifying issues referred to above. The PUCO granted the Ohio
Companies’ requests to:
|
|
Recognize
fuel
and distribution deferrals commencing January 1,
2006;
|
|
|
Recognize
distribution deferrals on a monthly basis prior to review by the
PUCO
Staff;
|
|
|
Clarify
that
the types of distribution expenditures included in the Supplemental
Stipulation may be deferred; and
|
|
|
Clarify
that
distribution expenditures do not have to be “accelerated” in order to be
deferred.
|
82
The
PUCO approved
the Ohio Companies’ methodology for determining distribution deferral amounts,
but denied the Motion in that the PUCO Staff must verify the level of
distribution expenditures contained in current rates, as opposed to simply
accepting the amounts contained in the Ohio Companies’ Motion. On
February 3, 2006, several other parties filed applications for rehearing,
which the PUCO denied on March 1, 2006. Two of these parties subsequently
filed
notices of appeal with the Supreme Court of Ohio. The Ohio Supreme Court
scheduled this case for oral argument on February 27, 2007. On January 31,
2007,
the Ohio Companies filed a stipulation which, among other matters and subject
to
PUCO approval, affirmed that the supplemental stipulation in the RCP would
be
implemented. This stipulation was approved by the PUCO on February 14,
2007.
On
December 30,
2004, the Ohio Companies filed with the PUCO two applications related to
the
recovery of transmission and ancillary service related costs. The first
application sought recovery of these costs beginning January 1, 2006. The
Ohio Companies requested that these costs be recovered through a rider that
would be effective on January 1, 2006 and adjusted each July 1
thereafter. The parties reached a settlement agreement that was approved
by the
PUCO on August 31, 2005. The incremental transmission and ancillary service
revenues recovered from January 1 through June 30, 2006 were
approximately $54 million. That amount included the recovery of a portion
of the 2005 deferred MISO expenses as described below. On April 27, 2006,
the Ohio Companies filed the annual update rider to determine revenues
($124 million) from July 2006 through June 2007. The filed rider went into
effect on July 1, 2006.
The
second
application sought authority to defer costs associated with transmission
and
ancillary service related costs incurred during the period October 1, 2003
through December 31, 2005. On May 18, 2005, the PUCO granted the
accounting authority for the Ohio Companies to defer incremental transmission
and ancillary service-related charges incurred as a participant in MISO,
but
only for those costs incurred during the period December 30, 2004 through
December 31, 2005. Permission to defer costs incurred prior to
December 30, 2004 was denied. The PUCO also authorized the Ohio Companies
to accrue carrying charges on the deferred balances. On August 31, 2005,
the OCC appealed the PUCO's decision. On
January 20,
2006, the OCC sought rehearing of the PUCO’s approval of the recovery of
deferred costs through the rider during the period January 1, 2006 through
June 30, 2006. The PUCO denied the OCC's application on February 6,
2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio
Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate
this appeal with the deferral appeals discussed above and to postpone oral
arguments in the deferral appeal until after all briefs are filed in this
most
recent appeal of the rider recovery mechanism. On
March 20, 2006,
the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal
of the
Ohio Companies' case with a similar case involving Dayton Power & Light
Company. Oral arguments were heard on May 10, 2006. On November 29,
2006, the Ohio Supreme Court issued its opinion upholding the PUCO’s
determination that the Ohio Companies may defer transmission and ancillary
service related costs incurred on and after December 30, 2004. The Ohio
Supreme Court also determined that the PUCO erred when it denied the OCC
intervention, but further ruled that such error did not prejudice OCC and,
therefore, the Ohio Supreme Court did not reverse or remand the PUCO on this
ground. The Ohio Supreme Court also determined that the OCC’s appeal was not
premature. No party filed a motion for reconsideration with the Ohio Supreme
Court.
(C)
PENNSYLVANIA-
A
February 2002
Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision
regarding approval of the FirstEnergy/GPU merger, remanded the issues of
quantification and allocation of merger savings to the PPUC and denied Met-Ed
and Penelec the rate relief initially approved in the PPUC decision. On
May 4, 2006, the PPUC consolidated the merger savings proceeding with the
April 10, 2006 comprehensive rate filing proceeding discussed below. On
January 11, 2007, the PPUC entered an order in that rate filing proceeding
and
determined that no merger savings from prior years should be considered in
determining customers’ rates.
On
January 12, 2005,
Met-Ed and Penelec filed, before the PPUC, a request for deferral of
transmission-related costs beginning January 1, 2005. Met-Ed and Penelec
sought
to consolidate this proceeding (and modified their request to provide deferral
of 2006 transmission-related costs only) with the comprehensive rate filing
made
on April 10, 2006, described below. On May 4, 2006, the PPUC approved the
modified request.
Met-Ed
and Penelec
have been purchasing a portion of their PLR requirements from FES through
a
partial requirements wholesale power sales agreement and various amendments.
Under these agreements, FES retained the supply obligation and the supply
profit
and loss risk for the portion of power supply requirements not self-supplied
by
Met-Ed and Penelec. The FES agreements have reduced Met-Ed's and Penelec's
exposure to high wholesale power prices by providing power at a fixed price
for
their uncommitted PLR capacity and energy costs during the term of these
agreements with FES.
83
On
April 7,
2006, the parties entered into a Tolling Agreement that arose from FES’ notice
to Met-Ed and Penelec that FES elected to exercise its right to terminate
the
partial requirements agreement effective midnight December 31, 2006. On
November 29, 2006, Met-Ed, Penelec and FES agreed to suspend the April 7
Tolling Agreement pending resolution of the PPUC’s proceedings regarding the
Met-Ed and Penelec Transition Rate cases filed April 10, 2006, described
below.
Separately, on September 26, 2006, Met-Ed and Penelec successfully
conducted a competitive RFP for a portion of their PLR obligation for the
period
December 1, 2006 through December 31, 2008. FES was one of the
successful bidders in that RFP process and on September 26, 2006 entered
into a
Supplier Master Agreement to supply a certain portion of Met-Ed’s and Penelec’s
PLR requirements at market prices that substantially exceed the fixed price
in
the partial requirements agreements.
Based
on the outcome
of the Transition Rate filing, as described below, Met-Ed, Penelec and FES
agreed to restate the partial requirements power sales agreement effective
January 1, 2007. The restated agreement incorporates the same fixed price
for
residual capacity and energy supplied by FES as in the prior arrangements
between the parties, and automatically extends for successive one year terms
unless any party gives 60 days’ notice prior to the end of the year. The
restated agreement allows Met-Ed and Penelec to sell the output of NUG
generation to the market and requires FES to provide energy at fixed prices
to
replace any NUG energy thus sold to the extent needed for Met-Ed and Penelec
to
satisfy their PLR obligations. The parties have also separately terminated
the
Tolling, Suspension and Supplier Master agreements in connection with the
restatement of the partial requirements agreement. Accordingly, the energy
that
would have been supplied under the Master Supplier Agreement will now be
provided under the restated partial requirements agreement.
If
Met-Ed and
Penelec were to replace the entire FES supply at current market power prices
without corresponding regulatory authorization to increase their generation
prices to customers, each company would likely incur a significant increase
in
operating expenses and experience a material deterioration in credit quality
metrics. Under such a scenario, each company's credit profile would no longer
be
expected to support an investment grade rating for its fixed income securities.
Based on the PPUC’s January 11, 2007 order described below, if FES ultimately
determines to terminate, reduce, or significantly modify the agreement prior
to
the expiration of Met-Ed’s and Penelec’s generation rate caps in 2010, timely
regulatory relief is not likely to be granted by the PPUC.
Met-Ed
and Penelec
made a comprehensive rate filing with the PPUC on April 10, 2006 to address
a number of transmission, distribution and supply issues. If Met-Ed's and
Penelec's preferred approach involving accounting deferrals was approved,
the
filing would have increased annual revenues by $216 million and
$157 million, respectively. That filing included, among other things, a
request to charge customers for an increasing amount of market priced power
procured through a CBP as the amount of supply provided under the then existing
FES agreement is phased out in accordance with the April 7, 2006 Tolling
Agreement described above. Met-Ed
and Penelec
also requested approval of the January 12, 2005 petition for the deferral
of transmission-related costs discussed above, but only for those costs incurred
during 2006. In this rate filing, Met-Ed and Penelec also requested recovery
of
annual transmission and related costs incurred on or after January 1, 2007,
plus the amortized portion of 2006 costs over a ten-year period, along with
applicable carrying charges, through an adjustable rider similar to that
implemented in Ohio.
Changes in the
recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs
were also included in the filing. Hearings were held in late August 2006
and
briefing occurred in September and October. The ALJs issued their Recommended
Decision on November 2, 2006.
The
PPUC entered its
Opinion and Order in the rate filing proceeding on January 11, 2007.
The Order approved
the recovery of transmission costs, including the 2006 deferral, and determined
that no merger savings from prior years should be considered in determining
customers’ rates. The request for increases in generation supply rates was
denied as were the requested changes in NUG expense recovery and Met-Ed’s
non-NUG stranded costs. The order decreased Met-Ed’s and Penelec’s distribution
rates by $80 million and $19 million, respectively. These decreases
were offset by the increases allowed for the recovery of transmission expenses
and the 2006 transmission deferral. Met-Ed’s and Penelec’s request for recovery
of Saxton decommissioning costs was granted and in January 2007, they recognized
income of $27 million to establish a regulatory asset for the previously
expensed decommissioning costs. Overall rates increased by 5.0% for Met-Ed
($59 million) and 4.5% for Penelec ($50 million). Met-Ed and Penelec
filed a Petition for Reconsideration on January 26, 2007 on the issues of
consolidated tax savings and rate of return on equity. Other parties filed
Petitions for Reconsideration on transmission congestion, transmission deferrals
and rate design issues. The PPUC on February 8, 2007 entered an order granting
Met-Ed’s, Penelec’s and the other parties’ petitions for procedural purposes.
Due to that ruling, the period for appeals to the Commonwealth Court is tolled
until 30 days after the PPUC enters a subsequent order ruling on the substantive
issues raised in the petitions.
84
As
of
December 31, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to
the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and
the
FirstEnergy/GPU Merger Settlement Stipulation were $303 million and
$70 million, respectively. Penelec’s $70 million deferral is subject
to final resolution of an IRS settlement associated with NUG trust fund
proceeds. During the PPUC’s annual audit of Met-Ed’s and Penelec’s NUG stranded
cost balances in 2006, it noted a modification to the NUG purchased power
stranded cost accounting methodology made by Met-Ed and Penelec. On August
18,
2006, a PPUC Order was entered requiring Met-Ed and Penelec to reflect the
deferred NUG cost balances as if the stranded cost accounting methodology
modification had not been implemented. As a result of the PPUC’s Order, Met-Ed
recognized a pre-tax charge of approximately $10.3 million in the third quarter
of 2006, representing incremental costs deferred under the revised methodology
in 2005. Met-Ed and Penelec continue to believe that the stranded cost
accounting methodology modification is appropriate and on August 24, 2006
filed
a petition with the PPUC pursuant to its Order for authorization to reflect
the
stranded cost accounting methodology modification effective January 1, 1999.
Hearings on this petition are scheduled for late February 2007. It is not
known
when the PPUC may issue a final decision in this matter.
On
February 1, 2007
the Governor of Pennsylvania proposed an Energy Independence Strategy (EIS).
The
EIS includes four pieces of preliminary draft legislation that, according
to the
Governor, is designed to reduce energy costs, promote energy independence
and
stimulate the economy. Elements of the EIS include the installation of
smart
meters, funding for solar panels on residences and small businesses,
conservation programs to meet demand growth, a requirement that electric
distribution companies acquire power through a "Least Cost Portfolio",
the
utilization of micro-grids and a three year phase-in of rate increases.
Since
the EIS has only recently been proposed, the final form of any legislation
is
uncertain. Consequently, FirstEnergy is unable to predict what impact,
if any,
such legislation may have on its operations.
(D)
NEW
JERSEY-
JCP&L
is
permitted to defer for future collection from customers the amounts by which
its
costs of supplying BGS to non-shopping customers and costs incurred under
NUG
agreements exceed amounts collected through BGS and NUGC rates and market
sales
of NUG energy and capacity. As of December 31, 2006, the accumulated
deferred cost balance totaled approximately $369 million. New Jersey law
allows for securitization of JCP&L's deferred balance upon application by
JCP&L and a determination by the NJBPU that the conditions of the New Jersey
restructuring legislation are met. On February 14, 2003, JCP&L filed for
approval to securitize the July 31, 2003 deferred balance. On June 8, 2006,
the
NJBPU approved JCP&L’s request to issue securitization bonds associated with
BGS stranded cost deferrals. On August 10, 2006, JCP&L Transition
Funding II, a wholly owned subsidiary of JCP&L, issued $182 million of
transition bonds with a weighted average interest rate of 5.5%.
On
December 2,
2005, JCP&L filed its request for recovery of $165 million of actual
above-market NUG costs incurred from August 1, 2003 through
October 31, 2005 and forecasted above-market NUG costs for November and
December 2005. On February 23, 2006, JCP&L filed updated data reflecting
actual amounts through December 31, 2005 of $154 million of costs
incurred since July 31, 2003. On July 18, 2006, JCP&L further
requested an additional $14 million of costs that had been eliminated from
the securitized amount. A Stipulation of Settlement was signed by all parties,
approved by the ALJ and adopted by the NJBPU in its Order dated December 6,
2006. The Order approves an annual $110 million increase in NUGC rates
designed to recover deferred costs incurred since August 1, 2003, and a
portion of costs incurred prior to August 1, 2003 that were not
securitized. The Order requires that JCP&L absorb any net annual operating
losses associated with the Forked River Generating Station. In the Settlement,
JCP&L also agreed not to seek an increase to the NUGC to become effective
before January 2010, unless the deferred balance exceeds $350 million any
time after June 30, 2007.
Reacting
to the
higher closing prices of the 2006 BGS fixed rate auction, the NJBPU, on
March 16, 2006, initiated a generic proceeding to evaluate the auction
process and potential options for the future. On April 6, 2006, initial
comments were submitted. A public meeting was held on April 21, 2006 and
a
legislative-type hearing was held on April 28, 2006. On June 21, 2006, the
NJBPU approved the continued use of a descending block auction for the Fixed
Price Residential Class. JCP&L filed its 2007 BGS company specific addendum
on July 10, 2006. On October 27, 2006, the NJBPU approved the auction
format to procure the 2007 Commercial Industrial Energy Price as well as
the
specific rules for both the Fixed Price and Commercial Industrial Energy
Price
auctions. These rules were essentially unchanged from the prior
auctions.
In
accordance with
an April 28, 2004 NJBPU order, JCP&L filed testimony on June 7,
2004 supporting a continuation of the current level and duration of the funding
of TMI-2 decommissioning costs by New Jersey customers without a reduction,
termination or capping of the funding. On September 30, 2004, JCP&L
filed an updated TMI-2 decommissioning study. This study resulted in an updated
total decommissioning cost estimate of $729 million (in 2003 dollars)
compared to the estimated $528 million (in 2003 dollars) from the prior 1995
decommissioning study. The DRA filed comments on February 28, 2005
requesting that decommissioning funding be suspended. On March 18, 2005,
JCP&L filed a response to the Ratepayer Advocate’s comments. A schedule for
further NJBPU proceedings has not yet been set.
85
On August 1, 2005, the NJBPU established a proceeding to determine whether
additional ratepayer protections are required at the state level in light
of the
repeal of PUHCA pursuant to the EPACT. The NJBPU approved regulations effective
October 2, 2006 that would prevent a holding company that owns a gas or electric
public utility from investing more than 25% of the combined assets of its
utility and utility-related subsidiaries into businesses unrelated to the
utility industry. These regulations are not expected to materially impact
FirstEnergy or JCP&L. Also, in the same proceeding, the NJBPU Staff issued
an additional draft proposal on March 31, 2006 addressing various issues
including access to books and records, ring-fencing, cross subsidization,
corporate governance and related matters. With the approval of the NJBPU
Staff,
the affected utilities jointly submitted an alternative proposal on June
1,
2006. Comments on the alternative proposal were submitted on June 15, 2006.
On November 3, 2006, the NJPBU Staff circulated a revised draft proposal to
interested stakeholders.
New
Jersey statutes
require that the state periodically undertake a planning process, known as
the
Energy Master Plan (EMP), to address energy related issues including energy
security, economic growth, and environmental impact. The EMP is to be developed
with involvement of the Governor’s Office and the Governor’s Office of Economic
Growth, and is to be prepared by a Master Plan Committee, which is chaired
by
the NJBPU President and includes representatives of several State departments.
In
October 2006 the
current EMP process was initiated with the issuance of a proposed set of
objectives which, as to electricity, included the following:
-
Reduce the total projected electricity demand by 20% by 2020;
-
Meet 22.5% of the State’s electricity needs with renewable energy resources by that date;
-
Reduce air pollution related to energy use;
-
Encourage and maintain economic growth and development;
-
Achieve a 20% reduction in both Customer Average Interruption Duration Index and System Average Interruption Frequency Index by 2020;
-
Unit prices for electricity should remain no more than +5% of the regional average price (region includes New York, New Jersey, Pennsylvania, Delaware, Maryland and the District of Columbia); and
-
Eliminate transmission congestion by 2020
Comments
on the
objectives and participation in the development of the EMP have been solicited
and a number of working groups have been formed to attain input from a broad
range of interested stakeholders including utilities, environmental groups,
customer groups, and major customers. Public stakeholder meetings were held
in
the fall of 2006 and in early 2007, and further public meetings are expected
in
the summer of 2007. A final draft of the EMP is expected to be presented
to the
Governor in the fall of 2007 with further public hearings anticipated in
early
2008. At this time FirstEnergy cannot predict the outcome of this process
nor
determine its impact.
(E)
FERC
MATTERS-
On
March 28, 2006,
ATSI and MISO filed with the FERC a request to modify ATSI’s Attachment O
formula rate to include revenue requirements associated with recovery of
deferred Vegetation Management Enhancement Program (VMEP) costs. ATSI estimated
that it may defer approximately $54 million of such costs over a five-year
period. Approximately $42 million has been deferred as of December 31, 2006.
The
effective date for recovery was June 1, 2006. The FERC conditionally approved
the filing on May 22, 2006, and on July 14, 2006 FERC accepted the ATSI
compliance filing. A request for rehearing of the FERC’s May 22, 2006 Order was
denied by FERC on October 25, 2006. The estimated annual revenues to ATSI
from
the VMEP cost recovery is $12 million for each of the five years beginning
June 1, 2006.
On
January 24, 2006,
ATSI and MISO filed a request with the FERC to correct ATSI’s Attachment 0
formula rate to reverse revenue credits associated with termination of revenue
streams from transitional rates stemming from FERC’s elimination of RTOR between
the Midwest ISO and PJM. Revenues formerly collected under these transitional
rates were included in, and served to reduce, ATSI’s zonal transmission rate
under the Attachment O formula. Absent the requested correction, elimination
of
these revenue credits would not be fully reflected in ATSI’s formula rate until
June 1, 2008. On March 16, 2006, the FERC approved the revenue credit correction
without suspension, effective April 1, 2006. One party sought rehearing of
the
FERC's order, which was denied on June 27, 2006. No petition for review of
the
FERC’s decision was filed. The estimated revenue impact of the correction
mechanism is approximately $37 million for the period June 1, 2006 though
May
31, 2007.
86
On
November 18,
2004, the FERC issued an order eliminating the RTOR for transmission service
between the MISO and PJM regions. The FERC also ordered the MISO, PJM and
the
transmission owners within MISO and PJM to submit compliance filings containing
a SECA mechanism to recover lost RTOR revenues during a 16-month transition
period from load serving entities. The FERC issued orders in 2005 setting
the
SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES participated in the
FERC hearings held in May 2006 concerning the calculation and imposition
of the
SECA charges. The Presiding Judge issued an Initial Decision on August 10,
2006,
rejecting the compliance filings made by the RTOs and transmission owners,
ruling on various issues and directing new compliance filings. This decision
is
subject to review and approval by the FERC. Briefs addressing the Initial
Decision were filed on September 11, 2006 and October 20, 2006. A final order
could be issued by the FERC in early 2007.
On
January 31, 2005,
certain PJM transmission owners made three filings with the FERC pursuant
to a
settlement agreement previously approved by the FERC. JCP&L, Met-Ed and
Penelec were parties to that proceeding and joined in two of the filings.
In the
first filing, the settling transmission owners submitted a filing justifying
continuation of their existing rate design within the PJM RTO. In the second
filing, the settling transmission owners proposed a revised Schedule 12 to
the
PJM tariff designed to harmonize the rate treatment of new and existing
transmission facilities. Interventions and protests were filed on February
22,
2005. In the third filing, Baltimore Gas and Electric Company and Pepco
Holdings, Inc. requested a formula rate for transmission service provided
within
their respective zones. On May 31, 2005, the FERC issued an order on these
cases. First, it set for hearing the existing rate design and indicated that
it
will issue a final order within six months. American Electric Power Company,
Inc. filed in opposition proposing to create a "postage stamp" rate for high
voltage transmission facilities across PJM. Second, the FERC approved the
proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed
formula rate, subject to refund and hearing procedures. On June 30, 2005,
the
settling PJM transmission owners filed a request for rehearing of the May
31,
2005 order. On March 20, 2006, a settlement was filed with FERC in the formula
rate proceeding that generally accepts the companies' formula rate proposal.
The
FERC issued an order approving this settlement on April 19, 2006. Hearings
in
the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial
Decision was issued by the ALJ. The ALJ adopted the FERC Trial Staff’s position
that the cost of all PJM transmission facilities should be recovered through
a
postage stamp rate. The
ALJ recommended
an April 1, 2006 effective date for this change in rate design. If the FERC
accepts this recommendation, the transmission rate applicable to many load
zones
in PJM would increase. FirstEnergy believes that significant additional
transmission revenues would have to be recovered from the JCP&L, Met-Ed and
Penelec transmission zones within PJM. JCP&L, Met-Ed and Penelec, as part of
the Responsible Pricing Alliance, filed a brief addressing the Initial Decision
on August 14, 2006 and September 5, 2006. The case will be reviewed by the
FERC
with a decision anticipated in early 2007.
On
November 1, 2005,
FES filed two power sales agreements for approval with the FERC. One power
sales
agreement provided for FES to provide the PLR requirements of the Ohio Companies
at a price equal to the retail generation rates approved by the PUCO for
a
period of three years beginning January 1, 2006. The Ohio Companies will
be
relieved of their obligation to obtain PLR power requirements from FES if
the
Ohio CBP results in a lower price for retail customers. A similar power sales
agreement between FES and Penn permits Penn to obtain its PLR power requirements
from FES at a fixed price equal to the retail generation price during 2006.
On
December 29,
2005, the FERC issued an order setting the two power sales agreements for
hearing. The order criticized the Ohio CBP, and required FES to submit
additional evidence in support of the reasonableness of the prices charged
in
the power sales agreements. On July 14, 2006, the Chief Judge granted the
joint
motion of FES and the Trial Staff to appoint a settlement judge in this
proceeding and the procedural schedule was suspended pending settlement
discussions among the parties. A settlement conference was held on September
5,
2006. FES and the Ohio Companies, Penn, and the PUCO, along
with other
parties, reached an agreement to settle the case. The settlement was filed
with
the FERC on October 17, 2006, and was unopposed by the remaining parties,
including the FERC Trial Staff. This settlement was accepted by the FERC
on
December 8, 2006.
The
terms of the
settlement provide for modification of both the Ohio and Penn power supply
agreements with FES. Under the Ohio power supply agreement, separate rates
are
established for the Ohio Companies’ PLR requirements; special retail contract
requirements, wholesale contract requirements, and interruptible buy-through
retail load requirements. For their PLR and special retail contract
requirements, the Ohio Companies will pay FES no more than the lower of (i)
the
sum of the retail generation charge, the rate stabilization charge, the fuel
recovery mechanism charge, and FES’ actual incremental fuel costs for such
sales; or (ii) the wholesale price cap. Different wholesale price caps are
imposed for PLR sales, special retail contracts, and wholesale contracts.
The
wholesale price for interruptible buy-through retail load requirements is
limited to the actual spot price of power obtained by FES to provide this
power.
FES billed the Ohio Companies for the additional amount payable to FES for
incremental fuel costs on power supplied during 2006. The total power supply
cost billed by FES was lower in each case than the wholesale price caps
specified in the settlement accepted by the FERC. In addition, pursuant to
the
settlement, the wholesale rate charged by FES under the Penn power supply
agreement can be no greater than the generation component of charges for
retail
PLR load in Pennsylvania. The modifications to the Ohio and Pennsylvania
power
supply agreements became effective January 1, 2006. The Penn supply agreement
subject to the settlement expired at midnight on December 31, 2006.
87
As
a result of
Penn’s PLR competitive solicitation process approved by the PPUC for the period
January 1, 2007 through May 31, 2008, FES was selected as the winning
bidder for a number of the tranches for individual customer classes. The
balance
of the tranches will be supplied by unaffiliated power suppliers. On October
2,
2006, FES filed an application with the FERC under Section 205 of the Federal
Power Act for authorization to make these affiliate sales to Penn. Interventions
or protests were due on this filing on October 23, 2006. Penn was the only
party
to file an intervention in this proceeding. This filing was accepted by the
FERC
on November 15, 2006, and no requests for rehearing were filed.
On
February 15,
2007, MISO filed documents with the FERC to establish a market-based,
competitive ancillary services market. MISO contends that the filing will
integrate operating reserves into MISO’s existing day-ahead and real-time
settlements process, incorporate opportunity costs into these markets, address
scarcity pricing through the implementation of a demand curve methodology,
foster demand response in the provision of operating reserves, and provide
for
various efficiencies and optimization with regard to generation dispatch.
The
filing also proposes amendments to existing documents to provide for the
transfer of balancing functions from existing local balancing authorities
to
MISO. MISO will then carry out this reliability function as the NERC-certified
balancing authority for the MISO region. MISO is targeting implementation
for
the second or third quarter of 2008. The FERC has established March 23, 2007,
as
the date for interested parties to submit comments addressing the filing.
The
filing has not yet been fully evaluated to assess its impact
on FirstEnergy's operations.
On
February 16,
2007, the FERC issued a final rule that revises its decade-old open access
transmission regulations and policies. The FERC explained that the final
rule is
intended to strengthen non-discriminatory access to the transmission grid,
facilitate FERC enforcement, and provide for a more open and coordinated
transmission planning process. The final rule will not be effective until
60
days after publication in the Federal Register. The final rule has not yet
been
fully evaluated to assess its impact on FirstEnergy
operations.
11. CAPITALIZATION
(A)
COMMON
STOCK-
Retained
Earnings and Dividends
Under
applicable
federal law, FirstEnergy can pay cash dividends to its common shareholders
only
from retained or current earnings. As of December 31, 2006, FirstEnergy's
unrestricted retained earnings were $2.8 billion. Each of FirstEnergy’s electric
utility subsidiaries has authorization from the FERC to pay cash dividends
to
FirstEnergy from paid-in capital accounts, as long as its equity to total
capitalization ratio (without consideration of retained earnings) remains
above
35%. The articles of incorporation, indentures and various other agreements
relating to the long-term debt and preferred stock of certain FirstEnergy
subsidiaries contain provisions that could further restrict the payment of
dividends on their common and preferred stock. As of December 31, 2006,
none of these provisions materially restricted FirstEnergy’s subsidiaries’
ability to pay cash dividends to FirstEnergy.
On
December 19,
2006, the Board of Directors increased the indicated annual common stock
dividend to $2.00 per share, payable quarterly at a rate of $0.50 per share
beginning in the first quarter of 2007. Dividends declared in 2006 were $1.85
which included three quarterly dividends of $0.45 per share paid in the second,
third and fourth quarters of 2006 and a quarterly dividend of $0.50 per share
payable in the first quarter of 2007. Dividends declared in 2005 were $1.705
which included quarterly dividends of $0.4125 per share paid in the second
and
third quarters of 2005, a quarterly dividend of $0.43 per share paid in the
fourth quarter of 2005 and a quarterly dividend of $0.45 per share paid in
the
first quarter of 2006. The amount and timing of all dividend declarations
are
subject to the discretion of the Board and its consideration of business
conditions, results of operations, financial condition and other
factors.
(B) PREFERRED
AND PREFERENCE STOCK-
FirstEnergy
has
5 million authorized shares of $100 par value preferred stock and OE has
8 million authorized shares of $25 par value preferred stock. CEI’s,
Met-Ed's and Penelec's preferred stock authorizations consist of 4 million,
10 million and 11.435 million shares, respectively, without par value.
No preferred shares were outstanding for those companies as of December 31,
2006 or 2005.
The
Companies'
preference stock authorization consists of 8 million shares without par value
for OE; 3 million shares without par value for CEI; and 5 million shares,
$25 par value for TE. No preference shares are currently
outstanding.
88
|
(C)
|
LONG-TERM
DEBT AND OTHER LONG-TERM
OBLIGATIONS-
|
Subordinated
Debentures to Affiliated Trusts
As of December 31, 2006, CEI's wholly owned statutory business trust,
Cleveland Electric Financing Trust, had $100 million of outstanding 9.00%
preferred securities that mature in 2031. The sole assets of the trust
are CEI's
subordinated debentures having the same rate and maturity date as the preferred
securities.
CEI formed the trust to sell preferred securities and invested the gross
proceeds in the 9.00% subordinated debentures of CEI. The sole assets of
the
trust are the applicable subordinated debentures. Interest payment provisions
of
the subordinated debentures match the distribution payment provisions of
the
trust's preferred securities. In addition, upon redemption or payment at
maturity of subordinated debentures, the trust's preferred securities will
be
redeemed on a pro rata basis at their liquidation value. Under certain
circumstances, the applicable subordinated debentures could be distributed
to
the holders of the outstanding preferred securities of the trust in the event
that the trust is liquidated. CEI has effectively provided a full and
unconditional guarantee of payments due on the trust's preferred securities.
The
trust's preferred securities were redeemable at 100% of their principal amount
at CEI's option beginning in December 2006. Interest on the subordinated
debentures (and therefore distributions on the trust's preferred securities)
may
be deferred for up to 60 months, but CEI may not pay dividends on, or redeem
or
acquire, any of its cumulative preferred or common stock until deferred payments
on its subordinated debentures are paid in full.
Securitized
Transition Bonds
The
consolidated
financial statements of FirstEnergy and JCP&L include the results of
JCP&L Transition Funding and JCP&L Transition Funding II, wholly owned
limited liability companies of JCP&L. In June 2002, JCP&L Transition
Funding sold $320 million of transition bonds to securitize the recovery of
JCP&L's bondable stranded costs associated with the previously divested
Oyster Creek Nuclear Generating Station. In August 2006, JCP&L Transition
Funding II sold $182 million of transition bonds to securitize the recovery
of
deferred costs associated with JCP&L’s supply of BGS.
JCP&L
did not
purchase and does not own any of the transition bonds, which are included
as
long-term debt on FirstEnergy's Consolidated Balance Sheet. As of
December 31, 2006, $429 million of transition bonds are outstanding.
The transition bonds are the sole obligations of JCP&L Transition Funding
and JCP&L Transition Funding II and are collateralized by each company’s
equity and assets, which consists primarily of bondable transition property.
Bondable
transition
property represents the irrevocable right under New Jersey law of a utility
company to charge, collect and receive from its customers, through a
non-bypassable TBC, the principal amount and interest on transition bonds
and
other fees and expenses associated with their issuance. JCP&L sold its
bondable transition property to JCP&L Transition Funding and JCP&L
Transition Funding II and, as servicer, manages and administers the bondable
transition property, including the billing, collection and remittance of
the
TBC, pursuant to separate servicing agreements with JCP&L Transition Funding
and JCP&L Transition Funding II. For the two series of transition bonds,
JCP&L is entitled to aggregate annual servicing fees of up to $628,000 that
are payable from TBC collections.
Other
Long-term
Debt
Each of the Companies has a first mortgage indenture under which it issues
FMB
secured by a direct first mortgage lien on substantially all of its property
and
franchises, other than specifically excepted property. FirstEnergy and its
subsidiaries have various debt covenants under their respective financing
arrangements. The most restrictive of the debt covenants relate to the
nonpayment of interest and/or principal on debt and the maintenance of certain
financial ratios. There also exist cross-default provisions among financing
arrangements of FirstEnergy and the Companies.
Based on the amount of FMB authenticated by the respective mortgage bond
trustees through December 31, 2006, the Companies' annual sinking fund
requirement for all FMB issued under the various mortgage indentures amounts
to
$104 million. OE and Penn expect to deposit funds with their respective
mortgage bond trustees in 2007 that will then be withdrawn upon the surrender
for cancellation of a like principal amount of FMB, specifically authenticated
for such purposes against unfunded property additions or against previously
retired FMB. This method can result in minor increases in the amount of the
annual sinking fund requirement. JCP&L, Met-Ed and Penelec could fulfill
their sinking fund obligations by providing bondable property additions,
previously retired FMB or cash to the respective mortgage bond trustees.
89
Sinking
fund requirements for FMB and maturing long-term debt (excluding capital
leases)
for the next five years are:
|
(In
millions)
|
|||
|
2007
|
$
|
1,867
|
|
|
2008
|
418
|
||
|
2009
|
287
|
||
|
2010
|
214
|
||
|
2011
|
1,540
|
||
Included in the table above are amounts for certain variable interest rate
pollution control revenue bonds that have provisions by which individual
debt
holders are required to "put back" the respective debt to the issuer for
redemption prior to its maturity date. These amounts are $1.6 billion,
$82 million and $15 million in 2006, 2008 and 2010, respectively,
representing the next time the debt holders may exercise this provision.
Obligations
to repay certain pollution control revenue bonds are secured by several series
of FMB. Certain pollution control revenue bonds are entitled to the benefit
of
irrevocable bank LOCs of $1.6 billion as of December 31, 2006 or
noncancelable municipal bond insurance policies of $343 million at
December 31, 2006 to pay principal of, or interest on, the applicable
pollution control revenue bonds. To the extent that drawings are made under
the
LOCs or the policies, FGCO, NGC and the Companies are entitled to a credit
against their obligation to repay those bonds. FGCO, NGC and the Companies
pay
annual fees of 0.55% to 1.70% of the amounts of the LOCs to the issuing banks
and 0.16% to 0.38% of the amounts of the policies to the insurers and are
obligated to reimburse the banks or insurers, as the case may be, for any
drawings thereunder. Certain of the issuing banks and insurers hold FMB as
security for such reimbursement obligations.
Certain
secured notes of CEI and TE are entitled to the benefit of noncancelable
municipal bond insurance policies of $120 million and $30 million, respectively,
to pay principal of, or interest on, the applicable notes. To the extent
that
drawings are made under the policies, CEI and TE are entitled to a credit
against their obligation to repay those notes. CEI and TE are obligated to
reimburse the insurer for any drawings thereunder.
CEI and TE have unsecured LOCs of approximately $194 million in connection
with
the sale and leaseback of Beaver Valley Unit 2 for which they are jointly
and
severally liable. OE has LOCs of $291 million and $134 million in connection
with the sale and leaseback of Beaver Valley Unit 2 and Perry Unit 1,
respectively. OE entered into a Credit Agreement pursuant to which a standby
LOC
was issued in support of the replacement LOCs and the issuer of the standby
LOC
obtained the right to pledge or assign participations in OE's reimbursement
obligations to a trust. The trust then issued and sold trust certificates
to
institutional investors that were designed to be the credit equivalent of
an
investment directly in OE.
|
12.
|
ASSET
RETIREMENT OBLIGATIONS-
|
FirstEnergy
has
recognized applicable legal obligations under SFAS 143 for nuclear power
plant
decommissioning, reclamation of a sludge disposal pond and closure of two
coal
ash disposal sites. In addition, FirstEnergy has recognized conditional
retirement obligations (primarily for asbestos remediation) in accordance
with
FIN 47, which was implemented on December 31, 2005.
The
ARO liability of
$1.19 billion as of December 31, 2006 primarily relates to the nuclear
decommissioning of the Beaver Valley, Davis-Besse, Perry and TMI-2 nuclear
generating facilities. The obligation to decommission these units was developed
based on site specific studies performed by an independent engineer. FirstEnergy
uses an expected cash flow approach to measure the fair value of the nuclear
decommissioning ARO.
In
2006, FirstEnergy
revised the ARO associated with Perry as a result of revisions to the 2005
decommissioning study. The present value of revisions in the estimated cash
flows associated with projected decommissioning costs increased the ARO and
corresponding plant asset for Perry by $4 million. The ARO for
FirstEnergy’s sludge disposal pond located near the Mansfield plant was revised
in 2006 due to an updated cost study. The present value of revisions in the
estimated cash flows associated with projected remediation costs associated
with
the site decreased the ARO and corresponding plant asset by $6 million. In
May 2006, CEI sold its interest in the Ashtabula C plant. As part of the
transaction, CEI settled the $6 million ARO that had been established with
the adoption of FIN 47.
In
2005, FirstEnergy revised the ARO associated with Beaver Valley Units 1 and
2,
Davis-Besse and Perry, as a result of updated decommissioning studies. The
present value of revisions in the estimated cash flows associated with projected
decommissioning costs increased the ARO for Beaver Valley Unit 1 by $21 million
and decreased the ARO for Beaver Valley Unit 2 by $22 million, resulting
in a
net decrease in the ARO liability and corresponding plant asset of
$1 million. The present value of revisions in the estimated cash flows
associated with projected decommissioning costs decreased the ARO and
corresponding plant asset for Davis-Besse and Perry by $21 million and
$57 million, respectively.
90
FirstEnergy
maintains nuclear decommissioning trust funds that are legally restricted
for
purposes of settling the nuclear decommissioning ARO. As of December 31,
2006, the fair value of the decommissioning trust assets was approximately
$2.0 billion.
FIN
47 provides
accounting standards for conditional retirement obligations associated with
tangible long-lived assets, requiring recognition of the fair value of a
liability for an ARO in the period in which it is incurred if a reasonable
estimate can be identified. FIN 47 states that an obligation
exists
even though there may be uncertainty about timing or method of settlement
and further
clarifies
SFAS 143, stating that the uncertainty surrounding the timing and method
of
settlement when settlement is conditional on a future event occurring should
be
reflected in the measurement of the liability, not in the recognition of
the
liability. Accounting for conditional ARO under FIN 47 is the same as described
above for SFAS 143.
FirstEnergy
identified applicable legal obligations as defined under the new standard
at its
active and retired generating units, substation control rooms, service center
buildings, line shops and office buildings, identifying asbestos remediation
as
the primary conditional ARO. As a result of adopting FIN 47 in December 2005,
FirstEnergy recorded a conditional ARO liability of $57 million (including
accumulated accretion for the period from the date the liability was incurred
to
the date of adoption), an asset retirement cost of $16 million (recorded
as part
of the carrying amount of the related long-lived asset) and accumulated
depreciation of $12 million.
FirstEnergy charged
a regulatory liability of $5 million upon adoption of FIN 47 for the transition
amounts related to establishing the ARO for asbestos removal from substation
control rooms and service center buildings for OE, Penn, CEI, TE and JCP&L.
The remaining cumulative effect adjustment for unrecognized depreciation
and
accretion of $48 million was charged to income ($30 million, net of tax),
--
$0.09 per share of common stock (basic and diluted) for the year ended
December 31, 2005.
The following table describes the changes to the ARO balances during 2006
and
2005.
|
2006
|
2005
|
||||||
|
ARO
Reconciliation
|
(In
millions)
|
||||||
|
Balance
at
beginning of year
|
$1,126
|
$1,078
|
|||||
|
Liabilities
incurred
|
-
|
-
|
|||||
|
Liabilities
settled
|
(6
|
)
|
-
|
||||
|
Accretion
|
72
|
70
|
|||||
|
Revisions
in
estimated cash flows
|
(2
|
)
|
(79
|
) | |||
|
FIN
47 ARO
upon adoption
|
-
|
57
|
|||||
|
Balance
at end
of year
|
$
|
1,190
|
$
|
1,126
|
|||
The
following table
provides the December 31, 2005 balance of the conditional ARO as if FIN 47
had been adopted on January 1, 2005:
|
Adjusted
ARO Reconciliation
|
2005
|
|||
|
(In
millions)
|
||||
|
Beginning
balance as of January 1, 2005
|
$
|
54
|
||
|
Accretion
|
3
|
|||
|
Ending
balance
as of December 31, 2005
|
$
|
57
|
||
The
effect on income
as if FIN 47 had been applied during 2004 was immaterial.
13.
SHORT-TERM
BORROWINGS AND BANK LINES OF CREDIT
FirstEnergy
had approximately $1.1 billion of short-term indebtedness as of
December 31, 2006, comprised of $1.0 billion in borrowings under a
$2.75 billion revolving line of credit and $103 million of other bank
borrowings. Total short-term bank lines of committed credit to FirstEnergy
and
the Companies as of December 31, 2006 were approximately $3.4 billion.
On August 24, 2006, FirstEnergy and certain of its subsidiaries, as borrowers,
entered into a new $2.75 billion five-year revolving credit facility, which
replaced FirstEnergy’s prior $2 billion credit facility. FirstEnergy
may
request an increase in the total commitments available under the new facility
up
to a maximum of $3.25 billion. Commitments under the new facility are
available until August 24, 2011, unless the lenders agree, at the request
of the Borrowers, to two additional one-year extensions. Generally, borrowings
under the facility must be repaid within 364 days. Available amounts for
each
Borrower are subject to a specified sub-limit, as well as applicable regulatory
and other limitations. As
of December 31,
2006, FirstEnergy was the only borrower on this revolver. The annual facility
fee is 0.125%.
91
The Companies, with the exception of TE and JCP&L, each have a wholly owned
subsidiary whose borrowings are secured by customer accounts receivable
purchased from its respective parent company. The CEI subsidiary's borrowings
are also secured by customer accounts receivable purchased from TE. Each
subsidiary company has its own receivables financing arrangement and, as
a
separate legal entity with separate creditors, would have to satisfy its
obligations to creditors before any of its remaining assets could be available
to its parent company. The receivables financing borrowing capacity by company
are shown in the following table. There were no outstanding borrowings as
of
December 31, 2006.
|
Subsidiary
Company
|
Parent
Company
|
Capacity
|
Annual
Facility
Fee
|
||||||||||||
|
(In
millions)
|
|||||||||||||||
|
OES
Capital,
Incorporated
|
OE
|
$
|
170
|
0.15
|
%
|
||||||||||
|
Centerior
Funding Corp.
|
CEI
|
200
|
0.15
|
||||||||||||
|
Penn
Power
Funding LLC
|
Penn
|
25
|
0.13
|
||||||||||||
|
Met-Ed
Funding
LLC
|
Met-Ed
|
80
|
0.13
|
||||||||||||
|
Penelec
Funding LLC
|
Penelec
|
75
|
0.13
|
||||||||||||
|
|
|
$ |
550
|
||||||||||||
The weighted average interest rates on short-term borrowings outstanding
as of
December 31, 2006 and 2005 were 5.71% and 4.68%, respectively. The annual
facility fees on all current committed short-term bank lines of credit range
from 0.125% to 0.15%.
14.
COMMITMENTS,
GUARANTEES AND CONTINGENCIES
(A) NUCLEAR
INSURANCE-
The Price-Anderson Act limits the public liability relative to a single incident
at a nuclear power plant to $10.8 billion. The amount is covered by a
combination of private insurance and an industry retrospective rating plan.
FirstEnergy's maximum potential assessment under the industry retrospective
rating plan would be $402 million per incident but not more than $60
million in any one year for each incident.
FirstEnergy is also insured under policies for each nuclear plant. Under
these
policies, up to $2.75 billion is provided for property damage and
decontamination costs. FirstEnergy has also obtained approximately
$2.0 billion of insurance coverage for replacement power costs. Under these
policies, FirstEnergy can be assessed a maximum of approximately $72 million
for
incidents at any covered nuclear facility occurring during a policy year
which
are in excess of accumulated funds available to the insurer for paying losses.
FirstEnergy intends to maintain insurance against nuclear risks, as described
above, as long as it is available. To the extent that replacement power,
property damage, decontamination, repair and replacement costs and other
such
costs arising from a nuclear incident at any of FirstEnergy's plants exceed
the
policy limits of the insurance in effect with respect to that plant, to the
extent a nuclear incident is determined not to be covered by FirstEnergy's
insurance policies, or to the extent such insurance becomes unavailable in
the
future, FirstEnergy would remain at risk for such costs.
(B) GUARANTEES
AND OTHER ASSURANCES-
As part of normal business activities, FirstEnergy enters into various
agreements on behalf of its subsidiaries to provide financial or performance
assurances to third parties. These agreements include contract guarantees,
surety bonds and LOCs. As of December 31, 2006, outstanding guarantees and
other assurances aggregated approximately $5.4 billion -contract guarantees
$2.5 billion, surety bonds $0.1 billion and LOCs
$2.8 billion.
FirstEnergy guarantees energy and energy-related payments of its subsidiaries
involved in energy commodity activities principally to facilitate normal
physical transactions involving electricity, gas, emission allowances and
coal.
FirstEnergy also provides guarantees to various providers of credit support
for
subsidiary financings or refinancings of costs related to the acquisition
of
property, plant and equipment. These agreements legally obligate FirstEnergy
to
fulfill the obligations of those subsidiaries directly involved in energy
and
energy-related transactions or financing where the law might otherwise limit
the
counterparties' claims. If demands of a counterparty were to exceed the ability
of a subsidiary to satisfy existing obligations, FirstEnergy's guarantee
enables
the counterparty's legal claim to be satisfied by other FirstEnergy assets.
The
likelihood is remote that such parental guarantees of $1.0 billion
(included in the $2.5 billion discussed above) as of December 31, 2006
would increase amounts otherwise payable by FirstEnergy to meet its obligations
incurred in connection with financings and ongoing energy and energy-related
activities.
92
While
these types of
guarantees are normally parental commitments for the future payment of
subsidiary obligations, subsequent to the occurrence of a credit
rating-downgrade or “material adverse event” the immediate posting of cash
collateral or provision of an LOC may be required of the subsidiary. As of
December 31, 2006, FirstEnergy's maximum exposure under these collateral
provisions was $468 million.
Most of FirstEnergy's surety bonds are backed by various indemnities common
within the insurance industry. Surety bonds and related FirstEnergy guarantees
of $130 million provide additional assurance to outside parties that
contractual and statutory obligations will be met in a number of areas including
construction jobs, environmental commitments and various retail transactions.
FirstEnergy has also guaranteed the obligations of the operators of the TEBSA
project, up to a maximum of $6 million (subject to escalation) under the
project's operations and maintenance agreement. In connection with the sale
of
TEBSA in January 2004, the purchaser indemnified FirstEnergy against any
loss
under this guarantee. FirstEnergy has also provided an LOC ($27 million as
of December 31, 2006), which is renewable and declines yearly based upon
the senior outstanding debt of TEBSA.
(C) ACCELERATED
SHARE REPURCHASE PROGRAM-
On
August 9, 2006,
FirstEnergy entered into an accelerated share repurchase agreement with a
financial institution counterparty under which FirstEnergy repurchased 10.6
million shares, or approximately 3.2%, of its outstanding common stock on
August
10, 2006 at an initial price of $56.44 per share, or a total initial purchase
price of $600 million. This forward sale contract is being accounted for
as an
equity instrument. The final purchase price is subject to a contingent purchase
price adjustment based on the average of the daily volume-weighted average
prices over a subsequent purchase period of up to seven months, as well as
other
purchase price adjustments in the event of an extraordinary cash dividend
or
other dilution events. The price adjustment can be settled, at FirstEnergy’s
option, in cash or in shares of its common stock. The size of any settlement
amount and whether it is to be paid or received by FirstEnergy will depend
upon
the average of the daily volume-weighted average prices of the shares as
calculated by the counterparty under the program. The settlement is expected
to
occur in the first quarter of 2007.
The accelerated share repurchase was completed under a program authorized
by the
Board of Directors on June 20, 2006 to repurchase up to 12 million
shares of common stock. At management’s discretion, additional shares may be
acquired under the program on the open market or through privately negotiated
transactions, subject to market conditions and other factors. The Board’s
authorization of the repurchase program does not require FirstEnergy to make
any
further repurchases of shares and the program may be terminated at any time.
On
January 30, 2007, FirstEnergy’s Board of Directors authorized a new share
repurchase program for up to 16 million shares, or approximately 5% of
FirstEnergy’s outstanding common stock. This new program supplements the prior
repurchase program approved on June 20, 2006, such
that up to
26.6 million potential shares may ultimately be repurchased under the
combined plans.
At management’s
discretion, shares may be acquired on the open market or through privately
negotiated transactions, subject to market conditions and other factors.
FirstEnergy
is
currently in negotiations with a major financial institution to enter into
a new
accelerated share repurchase program contingent among other things on amending
its current accelerated share repurchase program to allow FirstEnergy to
enter
into the new accelerated repurchase program.
(D) ENVIRONMENTAL
MATTERS-
Various federal, state and local authorities regulate FirstEnergy with regard
to
air and water quality and other environmental matters. The effects of compliance
on FirstEnergy with regard to environmental matters could have a material
adverse effect on FirstEnergy's earnings and competitive position to the
extent
that it competes with companies that are not subject to such regulations
and
therefore do not bear the risk of costs associated with compliance, or failure
to comply, with such regulations. Overall, FirstEnergy believes it is in
compliance with existing regulations but is unable to predict future changes
in
regulatory policies and what, if any, the effects of such changes would be.
FirstEnergy estimates additional capital expenditures for environmental
compliance of approximately $1.8 billion for 2007 through 2011.
FirstEnergy accrues environmental liabilities only when it concludes that
it is
probable that it has an obligation for such costs and can reasonably estimate
the amount of such costs. Unasserted claims are reflected in FirstEnergy’s
determination of environmental liabilities and are accrued in the period
that
they become both probable and reasonably estimable.
Clean
Air Act
Compliance
FirstEnergy is required to meet federally-approved SO2
emissions
regulations. Violations of such regulations can result in shutdown of the
generating unit involved and/or civil or criminal penalties of up to $32,500
for
each day the unit is in violation. The EPA has an interim enforcement policy
for
SO2
regulations in Ohio
that allows for compliance based on a 30-day averaging period. FirstEnergy
believes it is currently in compliance with this policy, but cannot predict
what
action the EPA may take in the future with respect to the interim enforcement
policy.
93
The EPA Region 5 issued a Finding of Violation and NOV to the Bay Shore Power
Plant dated June 15, 2006 alleging violations to various sections of the
Clean
Air Act. FirstEnergy has disputed those alleged violations based on its Clean
Air Act permit, the Ohio SIP and other information provided at an August
2006
meeting with the EPA. The EPA has several enforcement options (administrative
compliance order, administrative penalty order, and/or judicial, civil or
criminal action) and has indicated that such option may depend on the time
needed to achieve and demonstrate compliance with the rules alleged to have
been
violated.
FirstEnergy complies with SO2
reduction
requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur
fuel, generating more electricity from lower-emitting plants, and/or using
emission allowances. NOX
reductions required
by the 1990 Amendments are being achieved through combustion controls and
the
generation of more electricity at lower-emitting plants. In September 1998,
the
EPA finalized regulations requiring additional NOX
reductions at
FirstEnergy's facilities. The EPA's NOX
Transport Rule
imposes uniform reductions of NOX
emissions (an
approximate 85% reduction in utility plant NOX
emissions from
projected 2007 emissions) across a region of nineteen states (including
Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia
based
on a conclusion that such NOX
emissions are
contributing significantly to ozone levels in the eastern United States.
FirstEnergy believes its facilities are also complying with the NOX
budgets established
under SIPs through combustion controls and post-combustion controls, including
Selective Catalytic Reduction and Selective Non-Catalytic Reduction systems,
and/or using emission allowances.
National
Ambient
Air Quality Standards
In
July 1997, the
EPA promulgated changes in the NAAQS for ozone and fine particulate matter.
In
March 2005, the EPA finalized the CAIR covering a total of 28 states
(including Michigan, New Jersey, Ohio and Pennsylvania) and the District
of
Columbia based on proposed findings that air emissions from 28 eastern states
and the District of Columbia significantly contribute to non-attainment of
the
NAAQS for fine particles and/or the "8-hour" ozone NAAQS in other states.
CAIR
provided each affected state until 2006 to develop implementing regulations
to
achieve additional reductions of NOX
and SO2
emissions in two
phases (Phase I in 2009 for NOX,
2010 for
SO2
and Phase II in
2015 for both NOX
and SO2).
FirstEnergy's
Michigan, Ohio and Pennsylvania fossil-fired generation facilities will be
subject to caps on SO2
and NOX
emissions, whereas
its New Jersey fossil-fired generation facility will be subject to only a
cap on
NOX
emissions.
According to the EPA, SO2
emissions will be
reduced by 45% (from 2003 levels) by 2010 across the states covered by the
rule,
with reductions reaching 73% (from 2003 levels) by 2015, capping SO2
emissions in
affected states to just 2.5 million tons annually. NOX
emissions will be
reduced by 53% (from 2003 levels) by 2009 across the states covered by the
rule,
with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional
NOX
cap of 1.3 million
tons annually. The future cost of compliance with these regulations may be
substantial and will depend on how they are ultimately implemented by the
states
in which FirstEnergy operates affected facilities.
Mercury
Emissions
In December 2000, the EPA announced it would proceed with the development
of
regulations regarding hazardous air pollutants from electric power plants,
identifying mercury as the hazardous air pollutant of greatest concern. In
March
2005, the EPA finalized the CAMR, which provides a cap-and-trade program
to
reduce mercury emissions from coal-fired power plants in two phases. Initially,
mercury emissions will be capped nationally at 38 tons by 2010 (as a
"co-benefit" from implementation of SO2
and NOX
emission caps under
the EPA's CAIR program). Phase II of the mercury cap-and-trade program will
cap
nationwide mercury emissions from coal-fired power plants at 15 tons per
year by 2018. However, the final rules give states substantial discretion
in
developing rules to implement these programs. In addition, both the CAIR
and the
CAMR have been challenged in the United States Court of Appeals for the District
of Columbia. FirstEnergy's future cost of compliance with these regulations
may
be substantial and will depend on how they are ultimately implemented by
the
states in which FirstEnergy operates affected facilities.
The
model rules for both CAIR and CAMR contemplate an input-based methodology
to
allocate allowances to affected facilities. Under this approach, allowances
would be allocated based on the amount of fuel consumed by the affected sources.
FirstEnergy would prefer an output-based generation-neutral methodology in
which
allowances are allocated based on megawatts of power produced, allowing new
and
non-emitting generating facilities (including renewables and nuclear) to
be
entitled to their proportionate share of the allowances. Consequently,
FirstEnergy will be disadvantaged if these model rules were implemented as
proposed because FirstEnergy’s substantial reliance on non-emitting (largely
nuclear) generation is not recognized under the input-based
allocation.
Pennsylvania
has submitted a new mercury rule for EPA approval that does not provide a
cap
and trade approach as in the CAMR, but rather follows a command and control
approach imposing emission limits on individual sources. Pennsylvania’s mercury
regulation would deprive FES of mercury emission allowances that were to
be
allocated to the Mansfield Plant under the CAMR and that would otherwise
be
available for achieving FirstEnergy system-wide compliance. The future cost
of
compliance with these regulations, if approved and implemented, may be
substantial.
94
W.
H. Sammis
Plant
In
1999 and 2000,
the EPA issued NOV or compliance orders to nine utilities alleging violations
of
the Clean Air Act based on operation and maintenance of 44 power plants,
including the W. H. Sammis Plant, which was owned at that time by OE and
Penn.
In addition, the DOJ filed eight civil complaints against various investor-owned
utilities, including a complaint against OE and Penn in the U.S. District
Court
for the Southern District of Ohio. These cases are referred to as the New
Source
Review cases.
On
March 18, 2005,
OE and Penn announced that they had reached a settlement with the EPA, the
DOJ
and three states (Connecticut, New Jersey, and New York) that resolved all
issues related to the New Source Review litigation. This settlement agreement,
which is in the form of a consent decree, was approved by the Court on July
11,
2005, and requires reductions of NOX
and SO2
emissions at the W.
H. Sammis Plant and other FES coal-fired plants through the installation
of
pollution control devices and provides for stipulated penalties for failure
to
install and operate such pollution controls in accordance with that agreement.
Consequently, if FirstEnergy fails to install such pollution control devices,
for any reason, including, but not limited to, the failure of any third-party
contractor to timely meet its delivery obligations for such devices, FirstEnergy
could be exposed to penalties under the Sammis NSR Litigation consent decree.
Capital expenditures necessary to complete requirements of the Sammis NSR
Litigation are currently estimated to be $1.5 billion ($400 million of which
is
expected to be spent in 2007, with the largest portion of the remaining $1.1
billion expected to be spent in 2008 and 2009).
The
Sammis NSR
Litigation consent decree also requires us to spend up to $25 million
toward environmentally beneficial projects, $14 million of which is
satisfied by entering into 93 MW (or 23 MW if federal tax credits are not
applicable) of wind energy purchased power agreements with a 20-year term.
An
initial 16 MW of the 93 MW consent decree obligation was satisfied
during 2006.
On
August 26, 2005,
FGCO entered into an agreement with Bechtel Power Corporation under which
Bechtel will engineer, procure, and construct air quality control systems
for
the reduction of SO2
emissions. FGCO
also entered into an agreement with B&W on August 25, 2006 to supply flue
gas desulfurization systems for the reduction of SO2
emissions.
Selective Catalytic Reduction (SCR) systems for the reduction of NOx emissions
also are being installed at the W.H. Sammis Plant under a 1999 agreement
with
B&W.
OE
and Penn agreed
to pay a civil penalty of $8.5 million. Results for the first quarter of
2005 included the penalties paid by OE and Penn of $7.8 million and
$0.7 million, respectively. OE and Penn also recognized liabilities in the
first quarter of 2005 of $9.2 million and $0.8 million, respectively,
for probable future cash contributions toward environmentally beneficial
projects.
Climate
Change
In
December 1997,
delegates to the United Nations' climate summit in Japan adopted an agreement,
the Kyoto Protocol, to address global warming by reducing the amount of man-made
GHG emitted by developed countries by 5.2% from 1990 levels between 2008
and
2012. The United States signed the Kyoto Protocol in 1998 but it failed to
receive the two-thirds vote required for ratification by the United States
Senate. However, the Bush administration has committed the United States
to a
voluntary climate change strategy to reduce domestic GHG intensity - the
ratio
of emissions to economic output - by 18% through 2012. The EPACT established
a
Committee on Climate Change Technology to coordinate federal climate change
activities and promote the development and deployment of GHG reducing
technologies.
FirstEnergy
cannot
currently estimate the financial impact of climate change policies, although
the
potential restrictions on CO2
emissions could
require significant capital and other expenditures. The CO2
emissions per KWH
of electricity generated by FirstEnergy is lower than many regional competitors
due to its diversified generation sources, which include low or
non-CO2
emitting gas-fired
and nuclear generators.
Clean
Water
Act
Various
water
quality regulations, the majority of which are the result of the federal
Clean
Water Act and its amendments, apply to FirstEnergy's plants. In addition,
Ohio,
New Jersey and Pennsylvania have water quality standards applicable to
FirstEnergy's operations. As provided in the Clean Water Act, authority to
grant
federal National Pollutant Discharge Elimination System water discharge permits
can be assumed by a state. Ohio, New Jersey and Pennsylvania have assumed
such
authority.
95
On
September 7,
2004, the EPA established new performance standards under Section 316(b)
of the
Clean Water Act for reducing impacts on fish and shellfish from cooling water
intake structures at certain existing large electric generating plants. The
regulations call for reductions in impingement mortality, when aquatic organisms
are pinned against screens or other parts of a cooling water intake system,
and
entrainment, which occurs when aquatic life is drawn into a facility's cooling
water system. On January 26, 2007, the federal Court of Appeals for the Second
Circuit remanded portions of the rulemaking dealing with impingement mortality
and entrainment back to EPA for further rulemaking and eliminated the
restoration option from EPA’s regulations. FirstEnergy is conducting
comprehensive demonstration studies, due in 2008, to determine the operational
measures or equipment, if any, necessary for compliance by its facilities
with
the performance standards. FirstEnergy is unable to predict the outcome of
such
studies or changes in these requirements from the remand to EPA. Depending
on
the outcome of such studies and EPA’s further rulemaking, the future cost of
compliance with these standards may require material capital
expenditures.
Regulation
of
Hazardous Waste
As
a result of the
Resource Conservation and Recovery Act of 1976, as amended, and the Toxic
Substances Control Act of 1976, federal and state hazardous waste regulations
have been promulgated. Certain fossil-fuel combustion waste products, such
as
coal ash, were exempted from hazardous waste disposal requirements pending
the
EPA's evaluation of the need for future regulation. The EPA subsequently
determined that regulation of coal ash as a hazardous waste is unnecessary.
In
April 2000, the EPA announced that it will develop national standards regulating
disposal of coal ash under its authority to regulate nonhazardous
waste.
Under
NRC
regulations, FirstEnergy must ensure that adequate funds will be available
to
decommission its nuclear facilities. As of December 31, 2006, FirstEnergy
had
approximately $1.4 billion invested in external trusts to be used for the
decommissioning and environmental remediation of Davis-Besse, Beaver Valley
and
Perry. As part of the application to the NRC to transfer the ownership of
these
nuclear facilities to NGC, FirstEnergy agreed to contribute another $80 million
to these trusts by 2010. Consistent with NRC guidance, utilizing a “real” rate
of return on these funds of approximately 2% over inflation, these trusts
are
expected to exceed the minimum decommissioning funding requirements set by
the
NRC. Conservatively, these estimates do not include any rate of return that
the
trusts may earn over the 20-year plant useful life extensions that FirstEnergy
plans to seek for these facilities.
The
Companies have
been named as PRPs at waste disposal sites, which may require cleanup under
the
Comprehensive Environmental Response, Compensation, and Liability Act of
1980.
Allegations of disposal of hazardous substances at historical sites and the
liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all PRPs for a particular site are liable on a
joint
and several basis. Therefore, environmental liabilities that are considered
probable have been recognized on the Consolidated Balance Sheet as of
December 31,
2006, based on estimates of the total costs of cleanup, the Companies'
proportionate responsibility for such costs and the financial ability of
other
unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for
environmental remediation of former manufactured gas plants in New Jersey;
those
costs are being recovered by JCP&L through a non-bypassable SBC.
Total
liabilities of approximately $88 million have been accrued through
December 31, 2006.
|
(E)
|
OTHER
LEGAL PROCEEDINGS-
|
Power
Outages
and Related Litigation
In
July 1999, the
Mid-Atlantic States experienced a severe heat wave, which resulted in power
outages throughout the service territories of many electric utilities, including
JCP&L's territory. In an investigation into the causes of the outages and
the reliability of the transmission and distribution systems of all four
of New
Jersey’s electric utilities, the NJBPU concluded that there was not a prima
facie case demonstrating that, overall, JCP&L provided unsafe, inadequate or
improper service to its customers. Two class action lawsuits (subsequently
consolidated into a single proceeding) were filed in New Jersey Superior
Court
in July 1999 against JCP&L, GPU and other GPU companies, seeking
compensatory and punitive damages arising from the July 1999 service
interruptions in the JCP&L territory.
In
August 2002, the
trial court granted partial summary judgment to JCP&L and dismissed the
plaintiffs' claims for consumer fraud, common law fraud, negligent
misrepresentation, and strict product liability. In November 2003, the trial
court granted JCP&L's motion to decertify the class and denied plaintiffs'
motion to permit into evidence their class-wide damage model indicating damages
in excess of $50 million. These class decertification and damage rulings
were
appealed to the Appellate Division. The Appellate Division issued a decision
on
July 8, 2004, affirming the decertification of the originally certified
class, but remanding for certification of a class limited to those customers
directly impacted by the outages of JCP&L transformers in Red Bank, New
Jersey. In 2005, JCP&L renewed its motion to decertify the class based on a
very limited number of class members who incurred damages and also filed
a
motion for summary judgment on the remaining plaintiffs’ claims for negligence,
breach of contract and punitive damages. In July 2006, the New Jersey Superior
Court dismissed the punitive damage claim and again decertified the class
based
on the fact that a vast majority of the class members did not suffer damages
and
those that did would be more appropriately addressed in individual actions.
Because it effectively terminates this class action, plaintiffs appealed
this
ruling to the New Jersey Appellate Division, where the matter is currently
pending. FirstEnergy is unable to predict the outcome of these matters and
no
liability has been accrued as of December 31, 2006.
96
On
August 14,
2003, various states and parts of southern Canada experienced widespread
power
outages. The outages affected approximately 1.4 million customers in
FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s
final report in April 2004 on the outages concluded, among other things,
that
the problems leading to the outages began in FirstEnergy’s Ohio service area.
Specifically,
the
final report concluded, among other things, that the initiation of the
August 14, 2003 power outages resulted from an alleged failure of both
FirstEnergy and ECAR to assess and understand perceived inadequacies within
the
FirstEnergy system; inadequate situational awareness of the developing
conditions; and a perceived failure to adequately manage tree growth in certain
transmission rights of way. The Task Force also concluded that there was
a
failure of the interconnected grid's reliability organizations (MISO and
PJM) to
provide effective real-time diagnostic support. The final report is publicly
available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy
believes that the final report does not provide a complete and comprehensive
picture of the conditions that contributed to the August 14, 2003 power
outages and that it does not adequately address the underlying causes of
the
outages. FirstEnergy remains convinced that the outages cannot be explained
by
events on any one utility's system. The final report contained 46
“recommendations to prevent or minimize the scope of future blackouts.”
Forty-five of those recommendations related to broad industry or policy matters
while one, including subparts, related to activities the Task Force recommended
be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct
the
causes of the August 14, 2003 power outages. FirstEnergy implemented
several initiatives, both prior to and since the August 14, 2003 power
outages, which were independently verified by NERC as complete in 2004 and
were
consistent with these and other recommendations and collectively enhance
the
reliability of its electric system. FirstEnergy’s implementation of these
recommendations in 2004 included completion of the Task Force recommendations
that were directed toward FirstEnergy. FirstEnergy is also proceeding with
the
implementation of the recommendations that were to be completed subsequent
to
2004 and will continue to periodically assess the FERC-ordered Reliability
Study
recommendations for forecasted 2009 system conditions, recognizing revised
load
forecasts and other changing system conditions which may impact the
recommendations. Thus far, implementation of the recommendations has not
required, nor is expected to require, substantial investment in new or material
upgrades to existing equipment. The FERC or other applicable government agencies
and reliability coordinators may, however, take a different view as to
recommended enhancements or may recommend additional enhancements in the
future
that could require additional material expenditures.
FirstEnergy
companies also are defending five separate complaint cases before the PUCO
relating to the August 14, 2003 power outages. Two cases were originally
filed in Ohio State courts but were subsequently dismissed for lack of subject
matter jurisdiction and further appeals were unsuccessful. In these cases
the
individual complainants—three in one case and four in the other—sought to
represent others as part of a class action. The PUCO dismissed the class
allegations, stating that its rules of practice do not provide for class
action
complaints. Three other pending PUCO complaint cases were filed by various
insurance carriers either in their own name as subrogees or in the name of
their
insured. In each of these three cases, the carrier seeks reimbursement from
various FirstEnergy companies (and, in one case, from PJM, MISO and American
Electric Power Company, Inc., as well) for claims paid to insureds for damages
allegedly arising as a result of the loss of power on August 14, 2003. The
listed insureds in these cases, in many instances, are not customers of any
FirstEnergy company. A sixth case involving the claim of a non-customer seeking
reimbursement for losses incurred when its store was burglarized on
August 14, 2003 was dismissed. On
March 7,
2006, the PUCO issued a ruling, consolidating all of the pending outage cases
for hearing; limiting the litigation to service-related claims by customers
of
the Ohio operating companies; dismissing FirstEnergy as a defendant; and
ruling
that the U.S.-Canada Power System Outage Task Force Report was not admissible
into evidence. In
response to a
motion for rehearing filed by one of the claimants, the PUCO ruled on April
26,
2006 that the insurance company claimants, as insurers, may prosecute their
claims in their name so long as they also identify the underlying insured
entities and the Ohio utilities that provide their service. The PUCO denied
all
other motions for rehearing. The plaintiffs in each case have since filed
amended complaints and the named FirstEnergy companies have answered and
also
have filed a motion to dismiss each action. On September 27, 2006, the PUCO
dismissed certain parties and claims and otherwise ordered the complaints
to go
forward to hearing. The cases have been set for hearing on October 16,
2007.
On
October 10, 2006,
various insurance carriers refiled a complaint in Cuyahoga County Common
Pleas
Court seeking reimbursement for claims paid to numerous insureds who allegedly
suffered losses as a result of the August 14, 2003 outages. All of the insureds
appear to be non-customers. The plaintiff insurance companies are the same
claimants in one of the pending PUCO cases. FirstEnergy, the Ohio Companies
and
Penn were served on October 27, 2006. On January 18, 2007, the Court
granted the Companies’ motion to dismiss the case. It is unknown whether or not
the matter will be further appealed. No estimate of potential liability is
available for any of these cases.
FirstEnergy
was also
named, along with several other entities, in a complaint in New Jersey State
Court. The allegations against FirstEnergy were based, in part, on an alleged
failure to protect the citizens of Jersey City from an electrical power outage.
None of FirstEnergy’s subsidiaries serve customers in Jersey City. A responsive
pleading has been filed. On April 28, 2006, the Court granted FirstEnergy's
motion to dismiss. The plaintiff has not appealed.
FirstEnergy
is
vigorously defending these actions, but cannot predict the outcome of any
of
these proceedings or whether any further regulatory proceedings or legal
actions
may be initiated against the Companies. Although FirstEnergy is unable to
predict the impact of these proceedings, if FirstEnergy or its subsidiaries
were
ultimately determined to have legal liability in connection with these
proceedings, it could have a material adverse effect on FirstEnergy's or
its
subsidiaries' financial condition, results of operations and cash flows.
97
Nuclear
Plant
Matters
On
January 20,
2006, FENOC announced that it had entered into a deferred prosecution agreement
with the U.S. Attorney’s Office for the Northern District of Ohio and the
Environmental Crimes Section of the Environment and Natural Resources Division
of the DOJ related to FENOC’s communications with the NRC during the fall of
2001 in connection with the reactor head issue at the Davis-Besse Nuclear
Power
Station. Under the agreement, the United States acknowledged FENOC’s extensive
corrective actions at Davis-Besse, FENOC’s cooperation during investigations by
the DOJ and the NRC, FENOC’s pledge of continued cooperation in any related
criminal and administrative investigations and proceedings, FENOC’s
acknowledgement of responsibility for the behavior of its employees, and
its
agreement to pay a monetary penalty. The DOJ agreed to refrain from seeking
an
indictment or otherwise initiating criminal prosecution of FENOC for all
conduct
related to the statement of facts attached to the deferred prosecution
agreement, as long as FENOC remained in compliance with the agreement, which
FENOC has done. FENOC paid a monetary penalty of $28 million (not
deductible for income tax purposes) which reduced FirstEnergy's earnings
by
$0.09 per common share in the fourth quarter of 2005. The deferred prosecution
agreement expired on December 31, 2006.
On
April 21,
2005, the NRC issued a NOV and proposed a $5.45 million civil penalty
related to the degradation of the Davis-Besse reactor vessel head issue
discussed above. FirstEnergy accrued $2 million for a potential fine prior
to 2005 and accrued the remaining liability for the proposed fine during
the
first quarter of 2005. On September 14, 2005, FENOC filed its response to
the NOV with the NRC. FENOC accepted full responsibility for the past failure
to
properly implement its boric acid corrosion control and corrective action
programs. The NRC NOV indicated that the violations do not represent current
licensee performance. FirstEnergy paid the penalty in the third quarter of
2005.
On January 23, 2006, FENOC supplemented its response to the NRC's NOV on
the Davis-Besse head degradation to reflect the deferred prosecution agreement
that FENOC had reached with the DOJ.
On
August 12,
2004, the NRC notified FENOC that it would increase its regulatory oversight
of
the Perry Nuclear Power Plant as a result of problems with safety system
equipment over the preceding two years and the licensee's failure to take
prompt
and corrective action. On April 4, 2005, the NRC held a public meeting to
discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in
the NRC's annual assessment letter to FENOC. Similar public meetings are
held
with all nuclear power plant licensees following issuance by the NRC of their
annual assessments. According to the NRC, overall the Perry Nuclear Power
Plant
operated "in a manner that preserved public health and safety" even though
it
remained under heightened NRC oversight. During the public meeting and in
the
annual assessment, the NRC indicated that additional inspections will continue
and that the plant must improve performance to be removed from the
Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.
On
September 28, 2005, the NRC sent a CAL to FENOC describing commitments that
FENOC had made to improve the performance at the Perry Nuclear Power Plant
and
stated that the CAL would remain open until substantial improvement was
demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight
Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and
associated meetings to discuss the performance of the Perry Nuclear Power
Plant
on March 14, 2006, the NRC again stated that the Perry Nuclear Power Plant
continued to operate in a manner that "preserved public health and safety."
However, the NRC also stated that increased levels of regulatory oversight
would
continue until sustained improvement in the performance of the facility was
realized. If performance does not improve, the NRC has a range of options
under
the Reactor Oversight Process, from increased oversight to possible impact
to
the plant’s operating authority. Although FirstEnergy is unable to predict the
impact of the ultimate disposition of this matter, it could have a material
adverse effect on FirstEnergy's or its subsidiaries' financial condition,
results of operations and cash flows.
Other
Legal
Matters
There
are various
lawsuits, claims (including claims for asbestos exposure) and proceedings
related to FirstEnergy's normal business operations pending against FirstEnergy
and its subsidiaries. The other potentially material items not otherwise
discussed above are described below.
On
October 20,
2004, FirstEnergy was notified by the SEC that the previously disclosed informal
inquiry initiated by the SEC's Division of Enforcement in September 2003
relating to the restatements in August 2003 of previously reported results
by
FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage,
have
become the subject of a formal order of investigation. The SEC's formal order
of
investigation also encompasses issues raised during the SEC's examination
of
FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with
this
notification, FirstEnergy received a subpoena asking for background documents
and documents related to the restatements and Davis-Besse issues. On
December 30, 2004, FirstEnergy received a subpoena asking for documents
relating to issues raised during the SEC's PUHCA examination. On August 24,
2005, additional information was requested regarding Davis-Besse-related
disclosures, which has been provided. FirstEnergy has cooperated fully with
the
informal inquiry and continues to do so with the formal investigation.
98
On
August 22,
2005, a class action complaint was filed against OE in Jefferson County,
Ohio
Common Pleas Court, seeking compensatory and punitive damages to be determined
at trial based on claims of negligence and eight other tort counts alleging
damages from W.H. Sammis Plant air emissions. The two named plaintiffs are
also
seeking injunctive relief to eliminate harmful emissions and repair property
damage and the institution of a medical monitoring program for class members.
On
October 18, 2006, the Ohio Supreme Court transferred this case to a
Tuscarawas County Common Pleas Court judge due to concerns over potential
class
membership by the Jefferson County Common Pleas Court.
JCP&L's
bargaining unit employees filed a grievance challenging JCP&L's 2002
call-out procedure that required bargaining unit employees to respond to
emergency power outages. On May 20, 2004, an arbitration panel concluded
that the call-out procedure violated the parties' collective bargaining
agreement. At the conclusion of the June 1, 2005 hearing, the arbitration
panel decided not to hear testimony on damages and closed the proceedings.
On
September 9, 2005, the arbitration panel issued an opinion to award
approximately $16 million to the bargaining unit employees. On February 6,
2006, a federal district court granted a union motion to dismiss, as premature,
a JCP&L appeal of the award filed on October 18, 2005. JCP&L
intends to re-file an appeal again in federal district court once the damages
associated with this case are identified at an individual employee level.
JCP&L recognized a liability for the potential $16 million award in
2005.
If
it were
ultimately determined that FirstEnergy or its subsidiaries have legal liability
or are otherwise made subject to liability based on the above matters, it
could
have a material adverse effect on FirstEnergy's or its subsidiaries' financial
condition, results of operations and cash flows.
15.
FIRSTENERGY
INTRA-SYSTEM GENERATION ASSET TRANSFERS
In
2005, the Ohio
Companies and Penn entered into certain agreements implementing a series
of
intra-system generation asset transfers that were completed in the fourth
quarter of 2005. The asset transfers resulted in the respective undivided
ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and
non-nuclear generation assets being owned by NGC and FGCO, respectively.
The
generating plant interests transferred do not include leasehold interests
of
CEI, TE and OE in certain of the plants that are currently subject to sale
and
leaseback arrangements with non-affiliates.
On
October 24, 2005,
the Ohio Companies and Penn completed the intra-system transfer of non-nuclear
generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a
Master
Facility Lease with the Ohio Companies and Penn, leased, operated and maintained
the non-nuclear generation assets that it now owns. The asset transfers were
consummated pursuant to FGCO's purchase option under the Master Facility
Lease.
On
December 16,
2005, the Ohio Companies and Penn completed the intra-system transfer of
their
respective ownership in the nuclear generation assets to NGC through, in
the
case of OE and Penn, an asset spin-off in the form of a dividend and, in
the
case of CEI and TE, a sale at net book value.
On
December 28,
2006, the NRC approved the transfer of ownership in NGC from FirstEnergy
to FES.
Effective December 31, 2006, NGC is a wholly owned subsidiary of FES and
second tier subsidiary of FirstEnergy. FENOC continues to operate and maintain
the nuclear generation assets.
These
transactions
were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans
that were approved by the PUCO and the PPUC, respectively, under applicable
Ohio
and Pennsylvania electric utility restructuring legislation. Consistent with
the
restructuring plans, generation assets that had been owned by the Ohio Companies
and Penn were required to be separated from the regulated delivery business
of
those companies through transfer or sale to a separate corporate entity.
The
transactions essentially completed the divestitures of owned assets contemplated
by the restructuring plans by transferring the ownership interests to NGC
and
FGCO without impacting the operation of the plants. The transfers were
intracompany transactions and, therefore, had no impact on our consolidated
results.
16. SEGMENT
INFORMATION
FirstEnergy
has two
reportable operating segments: regulated services and power supply management
services. None of the aggregate “Other” segments individually meet the criteria
to be considered a reportable segment. The regulated services segment consists
of the regulated sale of electricity and distribution and transmission services
by FirstEnergy’s eight utility subsidiaries in Ohio, Pennsylvania and New
Jersey. The power supply management services segment primarily consists of
the
subsidiaries (FES, FGCO, NGC and FENOC) that sell electricity in deregulated
markets and operate and own generation facilities. “Other” consists of
telecommunications services and the recently sold MYR (a construction service
company) and retail natural gas operations (see Note 8). The assets and revenues
for the other business operations are below the quantifiable threshold for
operating segments for separate disclosure as “reportable operating
segments.”
99
The
regulated
services segment designs, constructs, operates and maintains FirstEnergy's
regulated transmission and distribution systems. Its revenues are primarily
derived from the delivery of electricity and transition cost recovery. Assets
of
the regulated services segment as of December 31, 2004 included generating
units
that were leased or whose output had been sold to the power supply management
services segment (see Note 15). The regulated services segment’s internal
revenues in 2005 and 2004 represented the rental revenues for the generating
unit leases which ceased in the fourth quarter of 2005 as a result of the
intra-system asset transfers (see Note 15).
The
power supply
management services segment supplies the electric power needs of FirstEnergy’s
end-use customers through retail and wholesale arrangements, including regulated
retail sales to meet all or a portion of the PLR requirements of its Ohio
and
Pennsylvania utility subsidiaries and competitive retail sales to customers
primarily in Ohio, Pennsylvania, Maryland and Michigan. This business segment
owns and operates FirstEnergy’s generating facilities and purchases electricity
to meet sales obligations (see Note 15). The segment's net income is primarily
derived from all electric generation sales revenues less the related costs
of
electricity generation, including purchased power and net transmission,
congestion and ancillary costs charged by PJM and MISO to deliver energy
to
retail customers.
Segment
reporting in
2005 and 2004 has been revised to conform to the current year business segment
organization and operations and the reclassification of discontinued operations
sold in 2006 (See Note 2(J)). Changes in the current year operations reporting
reflected in the revised 2005 and 2004 segment reporting primarily includes
the
transfer of retail transmission revenues and PJM/MISO transmission revenues
and
expenses associated with serving electricity load previously included in
the
regulated services segment to the power supply management services segment.
In
addition, as a result of the 2005 Ohio tax legislation reducing the effective
state income tax rate, the calculated composite income tax rates used in
the two
reportable segments’ results have been changed to 40% from the tax rates
previously reported in their 2005 and 2004 segment results. The net amounts
of
the changes in the 2005 and 2004 reportable segments' income taxes
reclassifications have been correspondingly offset in the respective year’s
"Reconciling Adjustments” results. FSG, which had been classified as held for
sale as of December 31, 2005 (See Note 2(J)), completed the sale of its
five remaining subsidiaries in 2006. Its assets and results for 2006, 2005
and
2004 are combined in the “Other” segments in this report, as the remaining
business does not meet the criteria of a reportable segment. Interest expense
on
holding company debt and corporate support services revenues and expenses
are
included in "Reconciling Items."
100
|
Power
|
||||||||||||||||
|
Supply
|
||||||||||||||||
|
Regulated
|
Management
|
Reconciling
|
||||||||||||||
|
Segment
Financial Information
|
Services
|
Services
|
Other
|
Adjustments
|
Consolidated
|
|||||||||||
|
(In
millions)
|
||||||||||||||||
|
2006
|
||||||||||||||||
|
External
revenues
|
$
|
4,441
|
$
|
7,029
|
$
|
103
|
$
|
(72
|
)
|
$
|
11,501
|
|||||
|
Internal
revenues
|
-
|
-
|
-
|
-
|
-
|
|||||||||||
|
Total
revenues
|
4,441
|
7,029
|
103
|
(72
|
)
|
11,501
|
||||||||||
|
Depreciation
and amortization
|
1,001
|
(70
|
)
|
4
|
22
|
957
|
||||||||||
|
Investment
income
|
270
|
36
|
1
|
(158
|
)
|
149
|
||||||||||
|
Net
interest
charges
|
410
|
215
|
6
|
71
|
702
|
|||||||||||
|
Income
taxes
|
632
|
310
|
(20
|
)
|
(127
|
)
|
795
|
|||||||||
|
Income
from
continuing operations
|
932
|
465
|
44
|
(183
|
)
|
1,258
|
||||||||||
|
Discontinued
operations
|
-
|
-
|
(4
|
)
|
-
|
(4
|
)
|
|||||||||
|
Net
income
|
932
|
465
|
40
|
(183
|
)
|
1,254
|
||||||||||
|
Total
assets
|
23,336
|
6,976
|
297
|
587
|
31,196
|
|||||||||||
|
Total
goodwill
|
5,873
|
24
|
1
|
-
|
5,898
|
|||||||||||
|
Property
additions
|
633
|
644
|
1
|
37
|
1,315
|
|||||||||||
|
2005
|
||||||||||||||||
|
External
revenues
|
$
|
5,155
|
$
|
6,067
|
$
|
115
|
$
|
21
|
$
|
11,358
|
||||||
|
Internal
revenues
|
270
|
-
|
-
|
(270
|
)
|
-
|
||||||||||
|
Total
revenues
|
5,425
|
6,067
|
115
|
(249
|
)
|
11,358
|
||||||||||
|
Depreciation
and amortization
|
1,483
|
(46
|
)
|
2
|
25
|
1,464
|
||||||||||
|
Investment
income
|
217
|
-
|
-
|
-
|
217
|
|||||||||||
|
Net
interest
charges
|
389
|
54
|
6
|
207
|
656
|
|||||||||||
|
Income
taxes
|
784
|
(28
|
)
|
12
|
(19
|
)
|
749
|
|||||||||
|
Income
(loss)
from continuing operations
|
1,174
|
(41
|
)
|
14
|
(268
|
)
|
879
|
|||||||||
|
Discontinued
operations
|
-
|
-
|
12
|
-
|
12
|
|||||||||||
|
Cumulative
effect of accounting change
|
(21
|
)
|
(9
|
)
|
-
|
-
|
(30
|
)
|
||||||||
|
Net
income
(loss)
|
1,153
|
(50
|
)
|
26
|
(268
|
)
|
861
|
|||||||||
|
Total
assets
|
23,975
|
6,556
|
605
|
705
|
31,841
|
|||||||||||
|
Total
goodwill
|
5,932
|
24
|
54
|
-
|
6,010
|
|||||||||||
|
Property
additions
|
788
|
375
|
8
|
37
|
1,208
|
|||||||||||
|
2004
|
||||||||||||||||
|
External
revenues
|
$
|
4,885
|
$
|
6,510
|
$
|
201
|
$
|
4
|
$
|
11,600
|
||||||
|
Internal
revenues
|
318
|
-
|
-
|
(318
|
)
|
-
|
||||||||||
|
Total
revenues
|
5,203
|
6,510
|
201
|
(314
|
)
|
11,600
|
||||||||||
|
Depreciation
and amortization
|
1,422
|
35
|
3
|
34
|
1,494
|
|||||||||||
|
Investment
income
|
205
|
-
|
-
|
-
|
205
|
|||||||||||
|
Net
interest
charges
|
363
|
37
|
15
|
251
|
666
|
|||||||||||
|
Income
taxes
|
698
|
75
|
(24
|
)
|
(68
|
)
|
681
|
|||||||||
|
Income
from
continuing operations
|
1,047
|
112
|
38
|
(290
|
)
|
907
|
||||||||||
|
Discontinued
operations
|
-
|
-
|
(29
|
)
|
-
|
(29
|
)
|
|||||||||
|
Net
income
|
1,047
|
112
|
9
|
(290
|
)
|
878
|
||||||||||
|
Total
assets
|
28,308
|
1,488
|
760
|
479
|
31,035
|
|||||||||||
|
Total
goodwill
|
5,951
|
24
|
75
|
-
|
6,050
|
|||||||||||
|
Property
additions
|
572
|
246
|
7
|
21
|
846
|
|||||||||||
Reconciling
adjustments to segment operating results from internal management reporting
to
consolidated external financial reporting primarily consist of interest expense
related to holding company debt, corporate support services revenues and
expenses, fuel marketing revenues (which are reflected as reductions to expenses
for internal management reporting purposes) and elimination of intersegment
transactions.
101
|
|
Products
and Services*
|
|
|
|
|
|
Energy
Related
|
|
||
|
|
|
Electricity
|
|
Sales
and
|
|
||
|
Year
|
|
Sales
|
|
Services
|
|
||
|
2006
|
|
$
|
10,671
|
$
|
48
|
||
|
2005
|
|
|
10,546
|
|
|
77
|
|
|
2004
|
|
|
10,831
|
|
91
|
|
|
*
See Note 2(J) for
discussion of discontinued operations.
|
17.
|
NEW
ACCOUNTING STANDARDS AND INTERPRETATIONS
|
|
|
SFAS
159 -
The Fair Value Option for Financial Assets and Financial Liabilities
-
Including an amendment of FASB Statement No.
115
|
In
February 2007,
the FASB issued SFAS 159, which provides companies with an option to report
selected financial assets and liabilities at fair value. The Standard requires
companies to provide additional information that will help investors and
other
users of financial statements to more easily understand the effect of the
company’s choice to use fair value on its earnings. The Standard also requires
companies to display the fair value of those assets and liabilities for which
the company has chosen to use fair value on the face of the balance sheet.
This
guidance does not eliminate disclosure requirements included in other accounting
standards, including requirements for disclosures about fair value measurements
included in SFAS 157, Fair
Value
Measurements, and
SFAS 107,
Disclosures
about Fair Value of Financial Instruments. FirstEnergy
is
currently evaluating the impact of this Statement on its financial
statements.
|
|
FSP
EITF
00-19-2 - “Accounting for Registration Payment
Arrangements”
|
In
December 2006,
the FASB issued FSP EITF 00-19-2, which addresses an issuer’s accounting for
registration payment arrangements. This guidance specifies that the contingent
obligation to make future payments or otherwise transfer consideration under
a
registration payment arrangement, whether issued as a separate agreement
or
included as a provision of a financial instrument or other agreement, should
be
separately recognized and measured in accordance with SFAS 5, Accounting
for
Contingencies. This
FSP shall be
effective immediately for registration payment arrangements and the financial
instruments subject to those arrangements that are entered into or modified
subsequent to the date of issuance of this FSP. For arrangements that were
entered into prior to the issuance of this FSP, this guidance shall be effective
for financial statements issued for fiscal years beginning after December
15,
2006, and interim periods within those fiscal years. FirstEnergy does not
expect
this FSP to have a material effect on its financial statements.
EITF
06-5 -
“Accounting for Purchases of Life Insurance-Determining the Amount That Could
Be
Realized in Accordance with FASB Technical Bulletin No. 85-4, Accounting
for
Purchases of Life Insurance”
In
September 2006,
the EITF reached a consensus on Issue 06-5 concluding that a policyholder
should
consider any additional amounts included in the contractual terms of the
policy
in determining the amount that could be realized under the insurance contract.
Contractual limitations should be considered when determining the realizable
amounts. Amounts that are recoverable by the policyholder at the discretion
of
the insurance company should be excluded from the amount that could be realized.
Recoverable amounts in periods beyond one year from the surrender of the
policy
should be discounted in accordance with APB Opinion No. 21, “Interest on
Receivables and Payables.” Consensus was also reached that a policyholder should
determine the amount that could be realized under the insurance contract
assuming the surrender of an individual-life by individual-life policy (or
certificate by certificate in a group policy). Any amount that would ultimately
be realized by the policyholder upon the assumed surrender of the final policy
(or final certificate) should be included in the amount that could be realized
under the insurance contract. The EITF also concluded that a policyholder
should
not discount the cash surrender value component of the amount that could
be
realized when contractual restrictions on the ability to surrender a policy
exist. However, if the contractual limitations prescribe that the cash surrender
value component of the amount that could be realized is a fixed amount, then
the
amount that could be realized should be discounted in accordance with APB
Opinion No. 21. This Issue is effective for fiscal years beginning after
December 15, 2006. FirstEnergy does not expect this EITF to have a material
impact on its financial statements.
SFAS
157 - “Fair
Value Measurements”
In
September 2006,
the FASB issued SFAS 157, that establishes how companies should measure fair
value when they are required to use a fair value measure for recognition
or
disclosure purposes under GAAP. This Statement addresses the need for increased
consistency and comparability in fair value measurements and for expanded
disclosures about fair value measurements. The key changes to current practice
are: (1) the definition of fair value which focuses on an exit price rather
than
entry price; (2) the methods used to measure fair value such as emphasis
that
fair value is a market-based measurement, not an entity-specific measurement,
as
well as the inclusion of an adjustment for risk, restrictions and credit
standing; and (3) the expanded disclosures about fair value measurements.
This
Statement is effective for financial statements issued for fiscal years
beginning after November 15, 2007, and interim periods within those years.
FirstEnergy is currently evaluating the impact of this Statement on its
financial statements.
102
FSP
FIN 46(R)-6
- “Determining the Variability to Be Considered in Applying FASB interpretation
No. 46(R)”
In
April 2006, the
FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should
determine the variability to be considered in applying FASB interpretation
No.
46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter
of 2004, consolidating VIEs when FirstEnergy or one of its subsidiaries is
determined to be the VIE’s primary beneficiary. The variability that is
considered in applying interpretation 46(R) affects the determination of
(a)
whether the entity is a VIE; (b) which interests are variable interests in
the
entity; and (c) which party, if any, is the primary beneficiary of the VIE.
This
FSP states that the variability to be considered shall be based on an analysis
of the design of the entity, involving two steps:
|
Step
1:
|
Analyze
the
nature of the risks in the entity
|
|
Step
2:
|
Determine
the
purpose(s) for which the entity was created and determine the variability
the entity is designed to create and pass along to its interest
holders.
|
After
determining the variability to consider, the reporting enterprise can determine
which interests are designed to absorb that variability. The guidance in
this
FSP is applied prospectively to all entities (including newly created entities)
with which that enterprise first becomes involved and to all entities previously
required to be analyzed under interpretation 46(R) when a reconsideration
event
has occurred after July 1, 2006. FirstEnergy does not expect this Statement
to have a material impact on its financial statements.
FIN
48 -
“Accounting for Uncertainty in Income Taxes - an interpretation of FASB
Statement No. 109”
In
June 2006, the
FASB issued FIN 48 which clarifies the accounting for uncertainty in income
taxes recognized in an enterprise’s financial statements in accordance with FASB
Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes
a recognition threshold and measurement attribute for the financial statement
recognition and measurement of a tax position taken or expected to be taken
on a
tax return. This interpretation also provides guidance on derecognition,
classification, interest, penalties, accounting in interim periods, disclosure
and transition. The evaluation of a tax position in accordance with this
interpretation will be a two-step process. The first step will determine
if it
is more likely than not that a tax position will be sustained upon examination
and should therefore be recognized. The second step will measure a tax position
that meets the more likely than not recognition threshold to determine the
amount of benefit to recognize in the financial statements. This interpretation
is effective for fiscal years beginning after December 15, 2006. FirstEnergy
is
currently evaluating the impact of this Statement. The Company does not expect
this Statement to have a material impact on its financial
statements.
103
18.
SUMMARY
OF
QUARTERLY FINANCIAL DATA (UNAUDITED)
The
following
summarizes certain consolidated operating results by quarter for 2006 and
2005.
Certain financial results have been reclassified to discontinued operations
from
amounts previously reported due to the divestiture of certain non-core
businesses in 2006 as discussed in Note 2(J).
|
|
|
March
31,
|
|
June
30,
|
|
September
30,
|
|
December
31,
|
|
||||
|
Three
Months Ended
|
|
2006
|
|
2006
|
|
2006
|
|
2006
|
|
||||
|
(In
millions, except per share amounts)
|
|||||||||||||
|
Revenues
|
|
$
|
2,705
|
$
|
2,751
|
$
|
3,365
|
$
|
2,680
|
||||
|
Expenses
|
|
|
2,233
|
|
2,081
|
|
2,505
|
|
2,076
|
||||
|
Operating
Income
|
|
|
472
|
|
670
|
|
860
|
|
604
|
||||
|
Other
Expense
|
|
|
117
|
|
142
|
|
134
|
|
160
|
||||
|
Income
From
Continuing Operations Before Income Taxes
|
|
|
355
|
|
528
|
|
726
|
|
444
|
||||
|
Income
Taxes
|
136
|
216
|
274
|
170
|
|||||||||
|
Income
From
Continuing Operations
|
|
|
219
|
|
312
|
|
452
|
|
274
|
||||
|
Discontinued
Operations
|
|||||||||||||
|
(Net
of Income
Taxes) (Note 2(J))
|
2
|
(8
|
)
|
2
|
-
|
||||||||
|
Net
Income
|
|
$
|
221
|
$
|
304
|
$
|
454
|
$
|
274
|
||||
|
|
|
|
|
|
|
||||||||
|
Basic
Earnings
Per Share of Common Stock:
|
|
|
|||||||||||
|
Income
From
Continuing Operations
|
$
|
0.67
|
$
|
0.94
|
$
|
1.41
|
$
|
0.85
|
|||||
|
Discontinued
Operations
|
|
-
|
(0.02
|
)
|
-
|
-
|
|||||||
|
Net
Earnings
Per Basic Share
|
$
|
0.67
|
$
|
0.92
|
$
|
1.41
|
$
|
0.85
|
|||||
|
Diluted
Earnings Per Share of Common Stock:
|
|
||||||||||||
|
Income
From
Continuing Operations
|
$
|
0.67
|
$
|
0.93
|
$
|
1.40
|
$
|
0.84
|
|||||
|
Discontinued
Operations
|
|
-
|
(0.02
|
)
|
-
|
-
|
|||||||
|
Net
Earnings
Per Diluted Share
|
$
|
0.67
|
$
|
0.91
|
$
|
1.40
|
$
|
0.84
|
|||||
|
|
March
31,
|
June
30,
|
September
30,
|
December
31,
|
|||||||||
| Three Months Ended |
2005
|
2005
|
2005
|
2005
|
|||||||||
|
|
|
(In
millions, except per shar amounts)
|
|||||||||||
|
Revenues
|
|
$
|
2,627
|
$
|
2,678
|
$
|
3,333
|
$
|
2,721
|
||||
|
Expenses
|
|
|
2,234
|
|
2,146
|
|
2,692
|
|
2,220
|
||||
|
Operating
Income
|
|
|
393
|
|
532
|
|
641
|
|
501
|
||||
|
Other
Expense
|
|
|
129
|
|
114
|
|
75
|
|
122
|
||||
|
Income
From
Continuing Operations Before Income Taxes
|
|
|
264
|
|
418
|
|
566
|
|
379
|
||||
|
Income
Taxes
|
122
|
238
|
236
|
153
|
|||||||||
|
Income
From
Continuing Operations
|
|
|
142
|
|
180
|
|
330
|
|
226
|
||||
|
Discontinued
Operations
|
|||||||||||||
|
(Net
of Income
Taxes) (Note 2(J))
|
18
|
(2
|
)
|
2
|
(6
|
)
|
|||||||
|
Cumulative
Effect of a Change in Accounting Principle
|
|||||||||||||
|
(Net
of Income
Taxes) (Note 2(K))
|
-
|
-
|
-
|
(30
|
)
|
||||||||
|
Net
Income
|
|
$
|
160
|
$
|
178
|
$
|
332
|
$
|
190
|
||||
|
|
|
|
|
|
|
||||||||
|
Basic
Earnings
Per Share of Common Stock:
|
|
|
|||||||||||
|
Income
From
Continuing Operations
|
$
|
0.43
|
$
|
0.55
|
$
|
1.00
|
$
|
0.69
|
|||||
|
Discontinued
Operations (Note 2(J))
|
|
0.06
|
(0.01
|
)
|
0.01
|
(0.02
|
)
|
||||||
|
Cumulative
Effect of a Change in Accounting Principle
|
-
|
-
|
-
|
(0.09
|
)
|
||||||||
|
Net
Earnings
Per Basic Share
|
$
|
0.49
|
$
|
0.54
|
$
|
1.01
|
$
|
0.58
|
|||||
|
Diluted
Earnings Per Share of Common Stock:
|
|
||||||||||||
|
Income
From
Continuing Operations
|
$
|
0.43
|
$
|
0.55
|
$
|
1.00
|
$
|
0.69
|
|||||
|
Discontinued
Operations
|
|
0.05
|
(0.01
|
)
|
0.01
|
(0.02
|
)
|
||||||
|
Cumulative
Effect of a Change in Accounting Principle
|
-
|
-
|
-
|
(0.09
|
)
|
||||||||
|
Net
Earnings
Per Diluted Share
|
$
|
0.48
|
$
|
0.54
|
$
|
1.01
|
$
|
0.58
|
|||||
Results
for the
fourth quarter of 2005 included a $30 million after-tax ($0.09 per share)
cumulative effect adjustment associated with the adoption of FIN 47 (see
Note
12), a $9 million (with no corresponding tax impact) ($0.03 per share)
non-cash charge for impairment of goodwill of MYR as required by SFAS 142
(see
Note 2(H)) and a $28 million (which is not deductible for income tax
purposes) ($0.09 per share) charge related to the Davis-Besse DOJ and NRC
fines
(see Note 14). Net income for that quarter also included a $15 million after-tax
($0.05 per share) charge relating to prior periods as a result of a JCP&L
tax audit adjustment applicable to prior quarters in 2005 and prior years.
Management concluded that the adjustment was not material to FirstEnergy's
reported consolidated results of operations for any quarter of 2005, nor
was it
material to the consolidated balance sheets and consolidated cash flows for
any
of those quarters.
104