s6y Entergy Corp 10-Q

Entergy Corp 10-Q, filed Aug 9, 2006: Quarterly Report

__________________________________________________________________________________________

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q

(Mark One)

 

X

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF
THE SECURITIES EXCHANGE ACT OF 1934

   
 

For the Quarterly Period Ended June 30, 2006

 

OR

 

TRANSITION REPORT PURSUANT TO SECTION 13
OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

   
 

For the transition period from ____________ to ____________


Commission
File Number

Registrant, State of Incorporation, Address of
Principal Executive Offices, Telephone Number, and
IRS Employer Identification No.

 


Commission
File Number

Registrant, State of Incorporation, Address of
Principal Executive Offices, Telephone Number, and
IRS Employer Identification No.

1-11299

ENTERGY CORPORATION
(a Delaware corporation)
639 Loyola Avenue
New Orleans, LA 70113
Telephone (504) 576-4000
72-1229752

 

1-31508

ENTERGY MISSISSIPPI, INC.
(a Mississippi corporation)
308 East Pearl Street
Jackson, Mississippi 39201
Telephone (601) 368-5000
64-0205830

         

1-10764

ENTERGY ARKANSAS, INC.
(an Arkansas corporation)
425 West Capitol Avenue
Little Rock, Arkansas 72201
Telephone (501) 377-4000
71-0005900

 

0-5807

ENTERGY NEW ORLEANS, INC.
(a Louisiana corporation)
1600 Perdido Street, Building 529
New Orleans, Louisiana 70112
Telephone (504) 670-3620
72-0273040

         

1-27031

ENTERGY GULF STATES, INC.
(a Texas corporation)
350 Pine Street
Beaumont, Texas 77701
Telephone (409) 838-6631
74-0662730

 

1-9067

SYSTEM ENERGY RESOURCES, INC.
(an Arkansas corporation)
Echelon One
1340 Echelon Parkway
Jackson, Mississippi 39213
Telephone (601) 368-5000
72-0752777

         

1-32718

ENTERGY LOUISIANA, LLC
(a Texas limited liability company)
446 North Boulevard
Baton Rouge, LA 70802
Telephone (225) 381-5868
75-3206126

     
         

__________________________________________________________________________________________

Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days.

Yes

X

No

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of "accelerated filer and large accelerated filer" in Rule 12b-2 of the Exchange Act.

 

Large
accelerated
filer

 



Accelerated filer

 


Non-accelerated filer

Entergy Corporation

Ö

       

Entergy Arkansas, Inc.

       

Ö

Entergy Gulf States, Inc.

       

Ö

Entergy Louisiana, LLC

       

Ö

Entergy Mississippi, Inc.

       

Ö

Entergy New Orleans, Inc.

       

Ö

System Energy Resources, Inc.

       

Ö

Indicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Exchange Act).

Yes

No

X

Common Stock Outstanding

 

Outstanding at July 31, 2006

Entergy Corporation

($0.01 par value)

208,357,426

Entergy Corporation, Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., and System Energy Resources, Inc. separately file this combined Quarterly Report on Form 10-Q. Information contained herein relating to any individual company is filed by such company on its own behalf. Each company reports herein only as to itself and makes no other representations whatsoever as to any other company. This combined Quarterly Report on Form 10-Q supplements and updates the Annual Report on Form 10-K for the calendar year ended December 31, 2005, and the Quarterly Report on Form 10-Q for the quarter ended March 31, 2006, filed by the individual registrants with the SEC, and should be read in conjunction therewith.

 

ENTERGY CORPORATION AND SUBSIDIARIES
INDEX TO QUARTERLY REPORT ON FORM 10-Q
June 30, 2006

 

Page Number

   

Definitions

1

Entergy Corporation and Subsidiaries

 
 

Management's Financial Discussion and Analysis

 
   

Hurricane Katrina and Hurricane Rita

4

   

Results of Operations

7

   

Liquidity and Capital Resources

12

   

Significant Factors and Known Trends

15

   

Critical Accounting Estimates

22

 

Consolidated Statements of Income

23

 

Consolidated Statements of Cash Flows

24

 

Consolidated Balance Sheets

26

 

Consolidated Statements of Retained Earnings, Comprehensive Income, and
Paid-In Capital

28

 

Selected Operating Results

29

 

Notes to Consolidated Financial Statements

30

Entergy Arkansas, Inc.

 
 

Management's Financial Discussion and Analysis

 
   

Results of Operations

43

   

Liquidity and Capital Resources

45

   

Significant Factors and Known Trends

47

   

Critical Accounting Estimates

48

 

Income Statements

50

 

Statements of Cash Flows

51

 

Balance Sheets

52

 

Selected Operating Results

54

Entergy Gulf States, Inc.

 
 

Management's Financial Discussion and Analysis

 
   

Hurricane Rita and Hurricane Katrina

55

   

Results of Operations

56

   

Liquidity and Capital Resources

60

   

Significant Factors and Known Trends

61

   

Critical Accounting Estimates

63

 

Income Statements

64

 

Statements of Cash Flows

65

 

Balance Sheets

66

 

Statements of Retained Earnings and Comprehensive Income

68

 

Selected Operating Results

69

Entergy Louisiana, LLC

 
 

Management's Financial Discussion and Analysis

 
   

Hurricane Rita and Hurricane Katrina

70

   

Results of Operations

71

   

Liquidity and Capital Resources

74

   

Significant Factors and Known Trends

75

   

Critical Accounting Estimates

76

 

Income Statements

77

 

Statements of Cash Flows

79

 

Balance Sheets

80

 

Statements of Members' Equity

82

 

Selected Operating Results

83

ENTERGY CORPORATION AND SUBSIDIARIES
INDEX TO QUARTERLY REPORT ON FORM 10-Q
June 30, 2006

 

Page Number

Entergy Mississippi, Inc.

 
 

Management's Financial Discussion and Analysis

 
   

Hurricane Katrina

84

   

Results of Operations

85

 

 

Liquidity and Capital Resources

87

   

Significant Factors and Known Trends

89

Critical Accounting Estimates

90

 

Income Statements

91

 

Statements of Cash Flows

93

 

Balance Sheets

94

 

Selected Operating Results

96

Entergy New Orleans, Inc.

 
 

Management's Financial Discussion and Analysis

 
   

Hurricane Katrina

97

   

Bankruptcy Proceedings

97

   

Results of Operations

98

   

Liquidity and Capital Resources

100

   

Significant Factors and Known Trends

102

   

Critical Accounting Estimates

103

 

Income Statements

104

 

Statements of Cash Flows

105

 

Balance Sheets

106

 

Selected Operating Results

108

System Energy Resources, Inc.

 
 

Management's Financial Discussion and Analysis

 
   

Results of Operations

109

   

Liquidity and Capital Resources

109

   

Significant Factors and Known Trends

110

   

Critical Accounting Estimates

110

 

Income Statements

112

 

Statements of Cash Flows

113

 

Balance Sheets

114

Notes to Respective Financial Statements

116

Part I, Item 4. Controls and Procedures

130

Part II. Other Information

 
 

Item 1. Legal Proceedings

131

 

Item 1A. Risk Factors

132

 

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

132

 

Item 4. Submission of Matters to a Vote of Security Holders

132

 

Item 5. Other Information

134

 

Item 6. Exhibits

136

Signature

139

 

 

FORWARD-LOOKING INFORMATION

In this filing and from time to time, Entergy makes statements concerning its expectations, beliefs, plans, objectives, goals, strategies, and future events or performance. Such statements are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Although Entergy believes that these forward-looking statements and the underlying assumptions are reasonable, it cannot provide assurance that they will prove correct. Except to the extent required by the federal securities laws, Entergy undertakes no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

Forward-looking statements involve a number of risks and uncertainties, and there are factors that could cause actual results to differ materially from those expressed or implied in the statements. Some of those factors (in addition to the risk factors in the Form 10-K as well as others described elsewhere in this report and in subsequent securities filings) include:

  • resolution of pending and future rate cases and negotiations, including various performance-based rate discussions and implementation of new Texas legislation, and other regulatory proceedings, including those related to Entergy's System Agreement and Entergy's utility supply plan
  • Entergy's ability to manage its operation and maintenance costs
  • the performance of Entergy's generating plants, and particularly the capacity factors at its nuclear generating facilities
  • prices for power generated by Entergy's unregulated generating facilities, the ability to hedge, sell power forward or otherwise reduce the market price risk associated with those facilities, including the Non-Utility Nuclear plants, the ability to meet credit support requirements, and the prices and availability of power and fuel Entergy must purchase for its utility customers and operations
  • Entergy's ability to develop and execute on a point of view regarding prices of electricity, natural gas, and other energy-related commodities
  • changes in the financial markets, particularly those affecting the availability of capital and Entergy's ability to refinance existing debt, execute its share repurchase program, and fund investments and acquisitions
  • actions of rating agencies, including changes in the ratings of debt and preferred stock, changes in general corporate ratings, and changes in the rating agencies' ratings criteria
  • changes in inflation, interest rates, and foreign currency exchange rates
  • Entergy's ability to purchase and sell assets at attractive prices and on other attractive terms
  • volatility and changes in markets for electricity, natural gas, uranium, and other energy-related commodities
  • changes in utility regulation, including the beginning or end of retail and wholesale competition, the ability to recover net utility assets and other potential stranded costs, the establishment of a regional transmission organization that includes Entergy's utility service territory, and the application of market power criteria by the FERC
  • changes in regulation of nuclear generating facilities and nuclear materials and fuel, including possible shutdown of nuclear generating facilities, particularly those in the northeastern United States
  • uncertainty regarding the establishment of interim or permanent sites for spent nuclear fuel storage and disposal
  • resolution of pending or future applications for license extensions or modifications of nuclear generating facilities
  • changes in law resulting from federal energy legislation, including the effects of PUHCA repeal
  • changes in environmental, tax, and other laws, including requirements for reduced emissions of sulfur, nitrogen, carbon, mercury, and other substances
  • the economic climate, and particularly growth in Entergy's service territory
  • variations in weather and the occurrence of hurricanes and other storms and disasters, including uncertainties associated with efforts to remediate the effects of Hurricanes Katrina and Rita and recovery of costs associated with restoration including Entergy's ability to obtain financial assistance from governmental authorities in connection with these storms
  • the outcome of the Chapter 11 bankruptcy proceeding of Entergy New Orleans, and the impact of this proceeding on other Entergy companies
  • the potential effects of threatened or actual terrorism and war
  • the effects of Entergy's strategies to reduce tax payments
  • the effects of litigation and government investigations
  • changes in accounting standards, corporate governance, and securities law requirements
  • Entergy's ability to attract and retain talented management and directors

 

 

 

 

 

 

 

 

(Page left blank intentionally)

DEFINITIONS

Certain abbreviations or acronyms used in the text are defined below:

Abbreviation or Acronym

Term

AFUDC

Allowance for Funds Used During Construction

ANO 1 and 2

Units 1 and 2 of Arkansas Nuclear One Steam Electric Generating Station (nuclear), owned by Entergy Arkansas

APSC

Arkansas Public Service Commission

average contract price per MWh or

per kW per month

Price at which generation output and/or capacity is expected to be sold to third parties, given existing contract or option exercise prices based on expected dispatch or capacity

average contract revenue per MWh

Price at which the combination of generation output and capacity are expected to be sold to third parties, given existing contract or option exercise prices based on expected dispatch

Board

Board of Directors of Entergy Corporation

bundled capacity and energy contract

A contract for the sale of installed capacity and related energy, priced per megawatt-hour sold

capacity contract

For Non-Utility Nuclear, a contract for the sale of the installed capacity product in regional markets managed by ISO New England and the New York Independent System Operator; For Energy Commodity Services, a contract for the sale of capacity and related energy, in which capacity and energy are priced separately

capacity factor

Actual plant output divided by maximum potential plant output for the period

City Council or Council

Council of the City of New Orleans, Louisiana

DOE

United States Department of Energy

domestic utility companies

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans, collectively

EITF

FASB's Emerging Issues Task Force

Energy Commodity Services

Entergy's business segment that includes Entergy-Koch, LP and Entergy's non-nuclear wholesale assets business

Entergy

Entergy Corporation and its direct and indirect subsidiaries

Entergy Corporation

Entergy Corporation, a Delaware corporation

Entergy-Koch

Entergy-Koch, LP, a joint venture equally owned by subsidiaries of Entergy and Koch Industries, Inc.

EPA

United States Environmental Protection Agency

FASB

Financial Accounting Standards Board

FEMA

Federal Emergency Management Agency

FERC

Federal Energy Regulatory Commission

firm liquidated damages

Transaction that requires receipt or delivery of energy at a specified delivery point (usually at a market hub not associated with a specific asset) or settles financially on notional quantities; if a party fails to deliver or receive energy, the defaulting party must compensate the other party as specified in the contract

1

DEFINITIONS (Continued)

Abbreviation or Acronym

Term

FSP

FASB Staff Position

Grand Gulf

Unit No. 1 of Grand Gulf Steam Electric Generating Station (nuclear), 90% owned or leased by System Energy

GWh

Gigawatt-hour(s), which equals one million kilowatt-hours

Independence

Independence Steam Electric Station (coal), owned 16% by Entergy Arkansas, 25% by Entergy Mississippi, and 7% by Entergy Power

IRS

Internal Revenue Service

ISO

Independent System Operator

kV

Kilovolt

kW

Kilowatt

kWh

Kilowatt-hour(s)

LDEQ

Louisiana Department of Environmental Quality

LPSC

Louisiana Public Service Commission

Mcf

One thousand cubic feet of gas

MMBtu

One million British Thermal Units

MPSC

Mississippi Public Service Commission

MW

Megawatt(s), which equals one thousand kilowatt(s)

MWh

Megawatt-hour(s)

Nelson Unit 6

Unit No. 6 (coal) of the Nelson Steam Electric Generating Station, owned 70% by Entergy Gulf States

Net debt ratio

Gross debt less cash and cash equivalents divided by total capitalization less cash and cash equivalents

Net MW in operation

Installed capacity owned or operated

Net revenue

Operating revenue net of fuel, fuel-related, and purchased power expenses; and other regulatory credits

Non-Utility Nuclear

Entergy's business segment that owns and operates five nuclear power plants and sells electric power produced by those plants primarily to wholesale customers

NRC

Nuclear Regulatory Commission

NYPA

New York Power Authority

OASIS

Open Access Same Time Information Systems

percent of planned generation

sold forward

Percent of planned generation output sold forward under contracts, forward physical contracts, forward financial contracts, or options that may or may not require regulatory approval

planned net MW in operation

Amount of capacity to be available to generate power considering uprates planned to be completed within the calendar year

planned TWh of generation

Amount of output expected to be generated by Non-Utility Nuclear for nuclear units, or by non-nuclear wholesale assets for fossil and wind units, considering plant operating characteristics, outage schedules, and expected market conditions that impact dispatch

PPA

Purchased power agreement

PRP

Potentially responsible party (a person or entity that may be responsible for remediation of environmental contamination)

PUCT

Public Utility Commission of Texas

PUHCA 1935

Public Utility Holding Company Act of 1935, as amended

PUHCA 2005

Public Utility Holding Company Act of 2005, which repealed PUHCA 1935, among other things

2

DEFINITIONS

(Concluded)

Abbreviation or Acronym

Term

PURPA

Public Utility Regulatory Policies Act of 1978

Ritchie Unit 2

Unit 2 of the R.E. Ritchie Steam Electric Generating Station (gas/oil)

River Bend

River Bend Steam Electric Generating Station (nuclear), owned by Entergy Gulf States

SEC

Securities and Exchange Commission

SFAS

Statement of Financial Accounting Standards as promulgated by the FASB

SMEPA

South Mississippi Electric Power Agency, which owns a 10% interest in Grand Gulf

System Agreement

Agreement, effective January 1, 1983, as modified, among the domestic utility companies relating to the sharing of generating capacity and other power resources

System Energy

System Energy Resources, Inc.

System Fuels

System Fuels, Inc.

TWh

Terawatt-hour(s), which equals one billion kilowatt-hours

unit-contingent

Transaction under which power is supplied from a specific generation asset; if the asset is unavailable, the seller is not liable to the buyer for any damages

unit-contingent with
availability guarantees

Transaction under which power is supplied from a specific generation asset; if the asset is unavailable, the seller is not liable to the buyer for any damages unless the actual availability over a specified period of time is below an availability threshold specified in the contract

Unit Power Sales Agreement

Agreement, dated as of June 10, 1982, as amended and approved by FERC, among Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, relating to the sale of capacity and energy from System Energy's share of Grand Gulf

Utility

Entergy's business segment that generates, transmits, distributes, and sells electric power, with a small amount of natural gas distribution

Waterford 3

Unit No. 3 (nuclear) of the Waterford Steam Electric Generating Station, 100% owned or leased by Entergy Louisiana

weather-adjusted usage

Electric usage excluding the estimated effects of deviations from normal weather

White Bluff

White Bluff Steam Electric Generating Station, 57% owned by Entergy Arkansas

3

 

ENTERGY CORPORATION AND SUBSIDIARIES

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

Entergy operates primarily through two business segments: Utility and Non-Utility Nuclear.

  • Utility
  • generates, transmits, distributes, and sells electric power in a four-state service territory that includes portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operates a small natural gas distribution business.
  • Non-Utility Nuclear
  • owns and operates five nuclear power plants located in the northeastern United States and sells the electric power produced by those plants primarily to wholesale customers. This business also provides services to other nuclear power plant owners.

    In addition to its two primary, reportable, operating segments, Entergy also operates the Energy Commodity Services segment and the Competitive Retail Services business. Energy Commodity Services includes Entergy-Koch, LP and Entergy's non-nuclear wholesale assets business. Entergy-Koch sold its businesses in the fourth quarter of 2004 and is no longer an operating entity. In April 2006, Entergy sold the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas, and now reports this portion of the business as a discontinued operation. Entergy reports Energy Commodity Services and Competitive Retail Services as part of All Other in its segment disclosures.

    Hurricane Katrina and Hurricane Rita

    See the Form 10-K for a discussion of the effects of Hurricanes Katrina and Rita, which in August and September 2005 caused catastrophic damage to portions of the Utility's service territory in Louisiana, Mississippi, and Texas, including the effect of extensive flooding that resulted from levee breaks in and around the greater New Orleans area. Following are updates to the discussion in the Form 10-K.

    Community Development Block Grants (CDBG)

    As discussed in the Form 10-K, a federal hurricane aid package became law that includes funding for Community Development Block Grants (CDBG) that allows state and local leaders to fund individual recovery priorities. The law permits funding for infrastructure restoration. It is uncertain how much funding, if any, will be designated for utility reconstruction and the timing of such decisions is also uncertain. The U.S. Department of Housing and Urban Development has allocated approximately $10.4 billion for Louisiana, $5.1 billion for Mississippi, and $74 million for Texas, with an additional $1 billion approved by Congress but not yet allocated to the states. The states, in turn, will administer the grants. Entergy is currently preparing applications to seek CDBG funding. In March 2006, Entergy New Orleans, Entergy Louisiana, and Entergy Gulf States-Louisiana provided justification statements to state and local officials. The statements, which will be reviewed by the Louisiana Recovery Authority, include the estimated costs of Hurricanes Katrina and Rita damage, as well as for Entergy New Orleans a lost customer base component intended to help offset the need for storm-related rate increases. The statements include justification for requests for CDBG funding of $718 million by Entergy New Orleans, $472 million by Entergy Louisiana, and $164 million by Entergy Gulf States-Louisiana. As discussed further below, in June 2006 Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its Hurricane Katrina infrastructure restoration costs.

    Storm Costs Recovery Filings with Retail Regulators

    On July 31, 2006, Entergy Louisiana and Entergy Gulf States filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in the Louisiana jurisdiction and that

    4

    those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, based on a ten-year levelized rate are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Storm Cost Recovery Riders (SCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SCRRs be adjusted annually to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States. Hearings on the application are scheduled for the first quarter 2007.

    In July 2006, Entergy Gulf States filed an application with the PUCT with respect to the $393.2 million of Hurricane Rita reconstruction costs incurred in its Texas retail jurisdiction through March 31, 2006. The filing asks the PUCT to determine that $393.2 million is the amount of reasonable and necessary hurricane reconstruction costs eligible for securitization and recovery, approve the recovery of carrying costs, and approve the manner in which Entergy Gulf States-Texas allocates those costs among its retail customer classes.  If approved, Entergy Gulf States' application will ultimately affect all its retail customers in Texas. Entergy Gulf States' filing does not request recovery of costs through a specific rider on customer bills or through any other means at this time. The hearing before the PUCT on the filing is scheduled for November 2006. This is the first of two filings authorized by a law passed earlier this year in a special session of the Texas Legislature. A second filing will request securitization and recovery of the eligible costs through retail rates and tariffs. Entergy Gulf States expects to make the second filing following the conclusion of the reconstruction cost case.

    As discussed in the Form 10-K, in December 2005, Entergy Mississippi filed with the MPSC a Notice of Intent to change rates by implementing a Storm Damage Rider to recover storm damage restoration costs associated with Hurricanes Katrina and Rita totaling approximately $84 million as of November 30, 2005.  In February 2006, Entergy Mississippi filed an Application for an Accounting Order seeking certification by the MPSC of Entergy Mississippi's estimated $36 million of storm restoration costs not included in the December 2005 filing. In March 2006, the Governor signed a law that established a mechanism by which the MPSC may authorize and certify an electric utility financing order and the state may issue general obligation bonds to pay the costs of repairing damage caused by Hurricane Katrina to the systems of investor-owned electric utilities.  Because of the passage of this law and the possibility of Entergy Mississippi obtaining CDBG funds for Hurricane Katrina storm restoration costs, in March 2006, the MPSC issued an order approving a Joint Stipulation between Entergy Mississippi and the Mississippi Public Utilities Staff that provided for the review of Entergy Mississippi's total storm restoration costs in the Application for an Accounting Order proceeding.  The Stipulation stated that the procedural schedule of the December 2005 Notice of Intent filing should be suspended until the MPSC issues a final order in the Application for an Accounting Order proceeding. 

    In June 2006, the MPSC issued an order certifying Entergy Mississippi's Hurricane Katrina restoration costs incurred through March 31, 2006 of $89 million, net of estimated insurance proceeds. Two days later Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its infrastructure restoration costs. Entergy Mississippi also filed a Petition for Financing Order with the MPSC for authorization of state general obligation bond financing of $169 million for Hurricane Katrina restoration costs and future storm costs. The $169 million amount includes Hurricane Katrina restoration costs plus $80 million to build Entergy Mississippi's storm damage reserve for the future. The amount financed through the bonds will be reduced dollar for dollar by any CDBG funds that Entergy Mississippi receives. Pursuant to the legislation, the MPSC must issue a financing order by the end of October 2006.

    5

    See State and Local Rate Regulation below for a discussion of Entergy New Orleans' filings with the City Council directed at recovery of its storm costs.

    Insurance Recovery

    As discussed more fully in the Form 10-K, Entergy estimates that its net insurance recoveries for the losses caused by Hurricanes Katrina and Rita will be approximately $382 million. Entergy has received $15 million thus far on its insurance claims, as it continues working towards insurance payment of its covered losses.

    Entergy New Orleans Bankruptcy

    See the Form 10-K for a discussion of the Entergy New Orleans bankruptcy proceeding. Following is an update to the discussion in the Form 10-K. In April 2006, the bankruptcy judge extended the exclusivity period for filing a plan of reorganization by Entergy New Orleans to August 21, 2006. Entergy New Orleans has filed another motion to extend the exclusivity period for filing its plan of reorganization, requesting that the deadline be extended an additional 120 days until December 19, 2006. The court entered an order extending the August 21, 2006 date for Entergy New Orleans' exclusive right to file a plan of reorganization until the court can hear and rule on Entergy New Orleans' motion to extend, which was set for hearing on September 18, 2006. In order to file a plan of reorganization no later than December 2006, Entergy New Orleans believes that it needs resolution of its June 2006 formula rate plan and storm rider filings and commitment on timing and amount of CDBG funds. If the motion to extend is granted, Entergy New Orleans will have the exclusive right to file its plan of reorganization until December 19, 2006, and will have until February 15, 2007 to obtain acceptances of its plan by each class of impaired creditors.

    In addition, the bankruptcy judge had set a date of April 19, 2006 by which creditors with prepetition claims against Entergy New Orleans must, with certain exceptions, file their proofs of claim in the bankruptcy case. Approximately 500 claims have been filed thus far in Entergy New Orleans' bankruptcy proceeding. Entergy New Orleans is currently analyzing the accuracy and validity of the claims filed, and has begun seeking withdrawal or modification of claims or objecting to claims with which it disagrees.

    Since the filing of the bankruptcy proceedings, Entergy New Orleans has not been able to declare and pay dividends on its 4.75% preferred stock for three quarters. As discussed further in the Form 10-K, if dividends with respect to the 4.75% preferred stock are not paid for four quarters, the holders of these shares would have the right to elect a majority of the Entergy New Orleans board of directors.  Entergy New Orleans filed a motion in the bankruptcy court seeking authority to recommence paying dividends to the holders of the 4.75% preferred shares. After a hearing on the motion on May 3, 2006, the court granted Entergy New Orleans the authority to pay dividends to the holders of the 4.75% preferred shares, beginning with the dividend due on July 1, 2006, and thereafter, unless objections are filed by creditors forty-five days in advance of a dividend payment date. If any objections are filed, the matter would be heard by the bankruptcy court. Entergy New Orleans declared and paid the dividend due on July 1, 2006, and intends to declare and pay the dividends on the 4.75% preferred shares each quarter pending resolution of its plan of reorganization.

    Municipalization is one potential outcome of Entergy New Orleans' recovery effort. In June 2006 Louisiana passed a law that establishes a governance structure for a public power authority, if municipalization of Entergy New Orleans' utility business is pursued.

    As discussed in the Form 10-K, as a result of the Entergy New Orleans bankruptcy proceeding, Entergy deconsolidated Entergy New Orleans for financial reporting purposes retroactive to January 1, 2005. Because Entergy owns all of the common stock of Entergy New Orleans, this change will not affect the amount of net income Entergy records resulting from Entergy New Orleans' operations for any current or prior period, but will result in Entergy New Orleans' net income or loss being presented as "Equity in earnings of unconsolidated equity affiliates" rather than its results being included in each individual income statement line item, as is the case for periods prior to 2005.

    6

    Results of Operations

    Second Quarter 2006 Compared to Second Quarter 2005

    Following are income statement variances for Utility, Non-Utility Nuclear, Parent & Other business segments, and Entergy comparing the second quarter 2006 to the second quarter 2005 showing how much the line item increased or (decreased) in comparison to the prior period:

     


    Utility

    Non-Utility
    Nuclear

     

    Parent & Other


    Entergy

    (In Thousands)

    2nd Quarter 2005 Consolidated Net Income

    $217,260  

    $58,277  

    $17,011  

    $292,548 

    Net revenue (operating revenue less fuel
      expense, purchased power, and other
      regulatory credits - net)



    (38,406)



    17,693 



    19,697 



    (1,016)

    Other operation and maintenance expenses

    (1,957)

    10,196 

    6,260 

    14,499 

    Taxes other than income taxes

    (2,164)

    (741)

    (981)

    (3,886)

    Depreciation

    11,754 

    1,958 

    (189)

    13,523 

    Other income

    7,721 

    4,822 

    (12,672)

    (129)

    Interest charges

    10,107 

    (2,857)

    12,190 

    19,440 

    Other expenses

    610 

    2,504 

    17 

    3,131 

    Discontinued operations (net-of-tax)

    - 

    - 

    15,932 

    15,932 

    Income taxes

    (38,317)

    6,353 

    3,016 

    (28,948)

    2nd Quarter 2006 Consolidated Net Income

    $206,542  

    $63,379  

    $19,655  

    $289,576  

    Refer to "ENTERGY CORPORATION AND SUBSIDIARIES - SELECTED OPERATING RESULTS" for further information with respect to Utility operating statistics.

    Net Revenue

    Utility

    Following is an analysis of the change in net revenue, which is Entergy's measure of gross margin, comparing the second quarter of 2006 to the second quarter of 2005.

     

    Amount

     

    (In Millions)

     

     

     

    2nd Quarter 2005 net revenue

     

    $1,114.2 

    Price applied to unbilled electric sales

     

    (100.4)

    Volume/weather

     

    26.5 

    Base revenues/Attala cost deferral

     

    18.9 

    Fuel recovery

     

    15.8 

    Other

     

    0.8 

    2nd Quarter 2006 net revenue

     

    $1,075.8 

    The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation at Entergy Louisiana and the Louisiana jurisdiction at Entergy Gulf States, which is in accordance with regulatory treatment. Entergy expects that the effect of this factor will be less for its annual results for 2006. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein.

    7

    The volume/weather variance resulted primarily from more favorable weather in the second quarter of 2006 compared to the second quarter of 2005 in addition to an increase in weather-adjusted usage. Billed usage increased a total of 801 GWh in the residential and commercial sectors and decreased 87 GWh in the industrial sector. The increase was partially offset by decreased usage during the unbilled period.

    The base revenues variance resulted primarily from increases at Entergy Gulf States in the Louisiana jurisdiction effective October 2005 for the 2004 formula rate plan filing and the annual revenue requirement related to the purchase of power from the Perryville generating station, and increases at Entergy Gulf States in the Texas jurisdiction related to an incremental purchased capacity recovery rider that began in December 2005 and a transition to competition rider that began in March 2006. The Attala cost deferral variance resulted from deferred under-recovered Attala power plant costs at Entergy Mississippi that will be recovered through the power management rider. The net income effect of the Attala cost deferral is partially offset by Attala costs in other operation and maintenance expenses, depreciation expense, and taxes other than income taxes.

    The fuel recovery variance resulted primarily from the under-recovery in 2005 of fuel costs from retail customers in addition to increased fuel cost recovery in 2006 as a result of special rate contracts.

    Non-Utility Nuclear

    Net revenue increased for Non-Utility Nuclear primarily due to higher pricing in its contracts to sell power. Also contributing to the increase in revenues was increased generation in 2006 due to a power uprate completed since the second quarter of 2005, partially offset by the effect of refueling outages on available generation output. The total number of refueling days was essentially the same in the second quarter of 2006 compared to the second quarter of 2005. However, the outage in the second quarter of 2006 was at a larger unit, Indian Point 2, while most of the outage days in the second quarter of 2005 were at a smaller unit, Pilgrim. Following are key performance measures for Non-Utility Nuclear for the second quarters of 2006 and 2005:

     

    2006

     

    2005

     

     

     

     

     

    Net MW in operation at June 30

     

    4,200

     

    4,105

    Average realized price per MWh

     

    $43.93

     

    $42.63

    Generation in GWh for the quarter

     

    8,249

     

    8,156

    Capacity factor for the quarter

    90%

     

    91%

    Parent & Other

    Net revenue increased for Parent & Other primarily due to the $14.1 million gain ($8.6 million net-of-tax) realized on the sale of the non-nuclear wholesale asset business' remaining interest in a power development project.

    Other Operation and Maintenance Expenses

    Other operation and maintenance expenses increased for Non-Utility Nuclear from $145 million for the second quarter of 2005 to $155 million for the second quarter of 2006 primarily due to higher refueling outage expenses.

    Interest Charges

    Interest charges increased for the Utility and Parent & Other primarily due to additional borrowing to fund the significant storm restoration costs associated with Hurricanes Katrina and Rita.

    8

    Discontinued Operations

    Income from discontinued operations increased primarily due to the $17.1 million gain (net-of-tax) on the sale of the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas.

    Income Taxes

    The effective income tax rates for the second quarters of 2006 and 2005 were 31.0% and 33.9%, respectively. The difference in the effective income tax rate for the second quarter of 2006 versus the federal statutory rate of 35.0% is primarily due to the recognition of an income tax benefit related to ANO 1 steam generator removal cost and the favorable resolution of a tax audit issue, partially offset by state income taxes. The difference in the effective income tax rate for the second quarter of 2005 versus the federal statutory rate of 35.0% is primarily due to tax benefits from the American Jobs Creation Act of 2004 and investment tax credit amortization, partially offset by state income taxes and book and tax differences on utility plant items.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Following are income statement variances for Utility, Non-Utility Nuclear, Parent & Other business segments, and Entergy comparing the six months ended June 30, 2006 to the six months ended June 30, 2005 showing how much the line item increased or (decreased) in comparison to the prior period:

     


    Utility

    Non-Utility
    Nuclear

     

    Parent & Other


    Entergy

    (In Thousands) 

    2005 Consolidated Net Income

    $313,286 

    $136,242 

    $21,399 

    $470,927 

    Net revenue (operating revenue less fuel
      expense, purchased power, and other
      regulatory credits - net)



    27,066 



    54,883 



    29,951 



    111,900 

    Other operation and maintenance expenses

    11,147 

    17,995 

    11,147 

    40,289 

    Taxes other than income taxes

    4,643 

    4,079 

    114 

    8,836 

    Depreciation

    1,866 

    2,176 

    (651)

    3,391 

    Other income

    20,475 

    (14,898)

    (21,492)

    (15,915)

    Interest charges

    15,001 

    (3,349)

    25,008 

    36,660 

    Other expenses

    1,562 

    2,316 

    31 

    3,909 

    Discontinued operations (net-of-tax)

    - 

    - 

    15,056 

    15,056 

    Income taxes

    (6,869)

    8,102 

    (3,593)

    (2,360)

    2006 Consolidated Net Income

    $333,477 

    $144,908 

    $12,858 

    $491,243 

    Refer to "ENTERGY CORPORATION AND SUBSIDIARIES - SELECTED OPERATING RESULTS" for further information with respect to Utility operating statistics.

    9

    Net Revenue

    Utility

    Following is an analysis of the change in net revenue, which is Entergy's measure of gross margin, comparing the six months ended June 30, 2006 to the six months ended June 30, 2005.

     

    Amount

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $1,972.9 

    Base revenues/Attala cost deferral

     

    46.5 

    Fuel recovery

     

    32.7 

    Volume/weather

     

    18.0 

    Transmission revenue

     

    11.9 

    Storm cost recovery

     

     7.3 

    Price applied to unbilled electric sales

     

     (95.8)

    Other

     

     6.5 

    2006 net revenue

     

    $2,000.0 

    The base revenues variance resulted primarily from increases at Entergy Gulf States in the Louisiana jurisdiction effective October 2005 for the 2004 formula rate plan filing and the annual revenue requirement related to the purchase of power from the Perryville generating station, and increases at Entergy Gulf States in the Texas jurisdiction related to an incremental purchased capacity recovery rider that began in December 2005 and a transition to competition rider that began in March 2006. The Attala cost deferral variance resulted from deferred under-recovered Attala power plant costs at Entergy Mississippi that will be recovered through the power management rider. The net income effect of the Attala cost deferral is partially offset by Attala costs in other operation and maintenance expenses, depreciation expense, and taxes other than income taxes.

    The fuel recovery variance resulted primarily from adjustments of fuel clause recoveries in Entergy Gulf States' Louisiana jurisdiction, the under-recovery in 2005 of fuel costs from retail customers, and increased recovery in 2006 of fuel costs as a result of special rate contracts. The increase was partially offset by the Entergy Arkansas energy cost recovery true-up made in the first quarter of 2005.

    The volume/weather variance resulted primarily from increased usage, including the effect of weather on billed sales, compared to the same period in 2006. Billed usage increased a total of 657 GWh in the residential and commercial sectors and decreased 486 GWh in the industrial sector. The increase was partially offset by decreased usage during the unbilled period.

    The transmission revenue variance is primarily due to new transmission customers in 2006. Also contributing to the increase was an increase in rates effective June 2006.

    The storm cost recovery variance is due to the return earned on the interim recovery of storm-related costs at Entergy Louisiana and the Louisiana jurisdiction of Entergy Gulf States as allowed by the LPSC effective March 2006.

    The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation at Entergy Louisiana and the Louisiana jurisdiction at Entergy Gulf States, which is in accordance with regulatory treatment. Entergy expects that the effect of this factor will be less for its annual results for 2006. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein.

    10

    Non-Utility Nuclear

    Net revenue increased for Non-Utility Nuclear primarily due to higher pricing in its contracts to sell power. Also contributing to the increase in revenues was increased generation in 2006 due to power uprates at certain plants completed in 2005 and 2006 and fewer refueling outages in 2006. Following are key performance measures for Non-Utility Nuclear for the six months ended June 30, 2006 and 2005:

     

    2006

     

    2005

     

     

     

     

     

    Net MW in operation at June 30

     

    4,200

     

    4,105

    Average realized price per MWh

     

    $44.16

     

    $42.09

    Generation in GWh for the period

     

    16,990

     

    16,422

    Capacity factor for the period

    94%

     

    92%

    Parent & Other

    Net revenue increased for Parent & Other primarily due to the $14.1 million gain ($8.6 million net-of-tax) realized on the sale of the non-nuclear wholesale asset business' remaining interest in a power development project.

    Other Operation and Maintenance Expenses

    Other operation and maintenance expenses increased for the Utility from $750 million in 2005 to $761 million in 2006 primarily due to the following:

    • an increase of $11 million related to storm reserves. This increase does not include costs associated with Hurricanes Katrina and Rita;
    • an increase of $9 million in customer service support costs, including an increase in customer write-offs; and
    • an increase of $8 million in nuclear costs as a result of higher payroll costs and a non-refueling plant outage at Entergy Gulf States in February 2006.

    The increase was partially offset by a decrease of $10 million in benefits and payroll costs and a decrease of $10 million in distribution costs, including lower planned spending for vegetation maintenance.

    Other operation and maintenance expenses increased for Non-Utility Nuclear from $288 million in 2005 to $306 million in 2006 primarily due to higher refueling outage expenses.

    Other Income

    Other income increased for the Utility from $59 million in 2005 to $79 million in 2006 primarily due to an increase in interest income recorded on the deferred fuel costs balance. Other income decreased for Non-Utility Nuclear from $48 million in 2005 to $33 million in 2006 primarily due to miscellaneous income of $26 million in 2005 resulting from a reduction in the decommissioning liability for a plant in conjunction with a new decommissioning cost study. The decrease for Non-Utility Nuclear was partially offset by an increase of $5 million in interest income. The decrease in other income for Parent & Other was primarily due to a decrease in interest income and the proceeds in 2005 from the sale of SO2 allowances.

    Interest Charges

    Interest charges increased for the Utility and Parent & Other primarily due to additional borrowing to fund the significant storm restoration costs associated with Hurricanes Katrina and Rita.

    11

    Discontinued Operations

    Income from discontinued operations increased primarily due to the $17.1 million gain (net-of-tax) on the sale of the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas.

    Income Taxes

    The effective income tax rates for the six months ended June 30, 2006 and 2005 were 33.5% and 33.9%, respectively. The difference in the effective income tax rate for the six months ended June 30, 2006 versus the federal statutory rate of 35.0% is primarily due to the recognition of an income tax benefit related to ANO 1 steam generator removal cost and the favorable resolution of a tax audit issue, partially offset by state income taxes. The difference in the effective income tax rate for the six months ended June 30, 2005 versus the federal statutory rate of 35.0% is primarily due to tax benefits from the American Jobs Creation Act of 2004, investment tax credit amortization, and a downward revision in the estimate of federal income tax expense related to tax depreciation. These factors were partially offset by state income taxes and book and tax differences on utility plant items.

    Liquidity and Capital Resources

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of Entergy's capital structure, capital expenditure plans and other uses of capital, and sources of capital. Following are updates to that discussion.

    Debtor-in-Possession Credit Facility

    See the Form 10-K for a discussion of the Entergy New Orleans debtor-in-possession (DIP) credit facility between Entergy New Orleans as borrower and Entergy Corporation as lender. Following is an update to that discussion.

    As discussed in the Form 10-K, the bankruptcy court issued its order in December 2005 giving final approval for the $200 million DIP credit facility, and the indenture trustee for Entergy New Orleans' first mortgage bonds appealed the order. On March 29, 2006 the bankruptcy court approved a settlement among Entergy New Orleans, Entergy Corporation, and the indenture trustee, and the indenture trustee dismissed its appeal. As of June 30, 2006, Entergy New Orleans had approximately $40 million of outstanding borrowings under the DIP credit facility.

    As discussed in the Form 10-K, borrowings under the DIP credit facility are due in full, and the agreement will terminate, at the earliest of several times or events, including August 23, 2006. Entergy and Entergy New Orleans have agreed to an amendment to the DIP credit agreement that extends the August 23, 2006 maturity date to August 23, 2007, and this amendment is subject to bankruptcy court approval. Entergy New Orleans has filed a motion with the bankruptcy court to authorize Entergy New Orleans to enter into the amendment, which is set for hearing August 16, 2006.

    Capital Structure

    Entergy's capitalization is balanced between equity and debt, as shown in the following table.

     

     

    June 30,
    2006

     

    December 31,
    2005

     

     

     

     

     

    Net debt to net capital

     

    50.3%

     

    51.5%

    Effect of subtracting cash from debt

     

    2.1%

     

    1.6%

    Debt to capital

     

    52.4%

     

    53.1%

    12

    Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, preferred stock with sinking fund, and long-term debt, including the currently maturing portion. Capital consists of debt, common shareholders' equity, and preferred stock without sinking fund. Net capital consists of capital less cash and cash equivalents. Entergy uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy's financial condition.

    As discussed in the Form 10-K, Entergy Corporation has in place two separate revolving credit facilities, a five-year credit facility and a three-year credit facility. The five-year credit facility expires in May 2010 and the three-year facility expires in December 2008. Entergy can issue letters of credit against the total borrowing capacity of both credit facilities. Following is a summary of the borrowings outstanding and capacity available under these facilities as of June 30, 2006:


    Facility

     


    Capacity

     


    Borrowings

     

    Letters
    of Credit

     

    Capacity
    Available

       

    (In Millions)

                     

    5-Year Facility

     

    $2,000 

     

    $805 

     

    $144 

     

    $1,051

    3-Year Facility

     

    $1,500 

     

    $- 

     

    $-  

     

    $1,500

    Entergy Arkansas, Entergy Gulf States, and Entergy Mississippi each have credit facilities available as of June 30, 2006 as follows:


    Company

     


    Expiration Date

     

    Amount of
    Facility

     

    Amount Drawn as of
    June 30, 2006

     

     

     

     

     

     

     

    Entergy Arkansas

     

    April 2007

     

    $85 million

     

    -

    Entergy Gulf States

     

    February 2011

     

    $25 million (a)

     

    -

    Entergy Mississippi

     

    May 2007

     

    $30 million (b)

     

    -

    Entergy Mississippi

     

    May 2007

     

    $20 million (b)

     

    -

    (a)

    The credit facility allows Entergy Gulf States to issue letters of credit against the borrowing capacity of the facility. As of June 30, 2006, $1.4 million in letters of credit had been issued.

    (b)

    Borrowings under the Entergy Mississippi facilities may be secured by a security interest in its accounts receivable.

    See Note 4 to the consolidated financial statements for additional discussion of Entergy's credit facilities.

    Capital Expenditure Plans and Other Uses of Capital

    See the table in the Form 10-K under "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital," which sets forth the amounts of planned construction and other capital investments by operating segment for 2006 through 2008. Following is an update to that discussion:

    In July 2006, Entergy's Non-Utility Nuclear business reached an agreement to purchase Consumers Energy Company's 798 MW Palisades nuclear energy plant located near South Haven, Michigan for $380 million. Entergy's Non-Utility Nuclear business will acquire the plant, nuclear fuel, and other assets. In the near-term, Entergy intends to finance the acquisition through borrowings from Entergy Corporation's revolving credit facilities. As part of the purchase, Entergy's Non-Utility Nuclear business also executed a 15-year purchased power agreement with Consumers Energy for 100% of the plant's output. Entergy's Non-Utility Nuclear business will assume responsibility for eventual decommissioning of the plant. Consumers Energy will retain $200 million of the current $566 million Palisades decommissioning trust fund balance, and Entergy may return an additional approximately $100 million of the trust fund to Consumers Energy depending upon a pending tax ruling. Also as part of the transaction, Consumers Energy will pay Entergy's Non-Utility Nuclear business $30 million to accept responsibility for spent fuel at the

     

    13

     

     

    decommissioned Big Rock nuclear plant, which is located near Charlevoix, Michigan. Management expects to close the transaction in the first quarter 2007, pending the approvals of the NRC, the FERC, the Michigan Public Service Commission, and other regulatory agencies.

    Cash Flow Activity

    As shown in Entergy's Statements of Cash Flows, cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Millions)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $583 

     

    $620 

     

     

     

     

     

    Effect of deconsolidating Entergy New Orleans in 2005

    - 

    (8)

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

     1,480 

     

    773 

     

    Investing activities

     

    (1,054)

     

    (674)

     

    Financing activities

     

    (279)

     

    (104)

    Effect of exchange rates on cash and cash equivalents

    (1)

    - 

    Net increase (decrease) in cash and cash equivalents

     

    146 

     

    (5)

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $729 

     

    $607 

    Operating Activities

    Entergy's cash flow provided by operating activities increased by $707 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to the following activity:

    • Utility provided $1,088 million in cash from operating activities in 2006 compared to providing $539 million in 2005 primarily due to the receipt of an income tax refund (discussed below), increased collection of deferred fuel costs, and the effect in 2005 of a $90 million refund paid to customers in Louisiana, partially offset by storm restoration spending.
    • Non-Utility Nuclear provided $473 million in cash from operating activities in 2006 compared to providing $235 million in 2005 primarily due to an increase of $130 million in income tax refunds received and an increase in net revenue.
    • Parent & Other used $81 million in cash from operating activities in 2006 compared to using $1 million in 2005 primarily due to an increase in cash used of $72 million in the non-nuclear wholesale assets business primarily due to an increase in taxes paid and interest payments.

    Entergy Corporation received a $344 million income tax refund (including $71 million attributable to Entergy New Orleans) as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005, as discussed in the Form 10-K. In accordance with Entergy's intercompany tax allocation agreement, $273 million of the refund was distributed to the Utility (including Entergy New Orleans) in April 2006, with the remainder distributed primarily to Non-Utility Nuclear.

    Investing Activities

    Net cash used in investing activities increased by $380 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to the following activity:

  • Construction expenditures were $326 million higher in 2006 than in 2005, primarily due to an increase of $261 million in the Utility business because of storm restoration expenditures.
  •  

    14

     

     

    • Entergy Mississippi purchased the 480 MW Attala power plant in January 2006 for $88 million.

    The increase was partially offset by:

    • Entergy's investment in other temporary investments increased by $188 million during the six months ended June 30, 2005. Entergy had no activity in other temporary investments during the six months ended June 30, 2006.
    • Entergy Louisiana purchased the 718 MW Perryville power plant in June 2005 for $162 million.
    • The proceeds from the sale of the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas and the sale of the non-nuclear wholesale asset business' remaining interest in a power development project.

    Financing Activities

    Net cash used in financing activities increased by $175 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005. Following is a description of the significant financing activity occurring during the first six months of 2006 and 2005:

    • Entergy Louisiana Holdings, Inc. redeemed all $100.5 million of its outstanding preferred stock in June 2006.
    • Entergy Corporation increased the net borrowings on its credit facilities by $20 million during the six months ended June 30, 2006 compared to $585 million during the six months ended June 30, 2005. See Note 4 to the consolidated financial statements for a description of the Entergy Corporation credit facilities.
    • Entergy Corporation repurchased $640 million of its common stock during the six months ended June 30, 2005.

    See Note 4 to the consolidated financial statements for the details of long-term debt activity in the six months ended June 30, 2006.

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for discussions of rate regulation, federal regulation, market and credit risks, utility restructuring, and nuclear matters. Following are updates to the information provided in the Form 10-K.

    State and Local Rate Regulation

    See the Form 10-K for the chart summarizing material rate proceedings. Following are updates to that chart. See also Hurricanes Katrina and Rita above for updates regarding storm cost recovery proceedings.

    Entergy Arkansas

    In March 2006, Entergy Arkansas filed with the APSC its annual redetermination of the energy cost rate for application to the period April 2006 through March 2007. The filed energy cost rate of $0.02827 per kWh was proposed to replace the interim rate of $0.01900 per kWh that had been in place since October 2005. The interim energy cost rate is discussed in the Form 10-K, along with the investigation that the APSC commenced concerning Entergy Arkansas' interim energy cost rate. The increase in the energy cost rate is due to increases in the cost of purchased power primarily due to the natural gas cost increase and the effect that Hurricanes Katrina and Rita had on market conditions, increased demand for purchased power during the ANO 1 refueling and steam generator replacement outage in the fall of 2005, and coal plant generation curtailments during off-peak periods due to coal delivery problems.

    15

    On March 31, 2006, the APSC suspended implementation of the $0.02827 per kWh energy cost rate, and ordered that the $0.01900 per kWh interim rate remain in effect pending the APSC proceedings on the energy cost recovery filings. The APSC also extended its investigation into Entergy Arkansas' interim energy cost rate to cover the costs included in Entergy Arkansas' March 2006 filing. The extended investigation does not identify new issues in addition to the four issues listed in the Form 10-K and covers the same time period. On April 7, 2006, the APSC issued a show cause order in the investigation proceeding that ordered Entergy Arkansas to file a cost of service study by June 8, 2006. The order also directed Entergy Arkansas to file testimony to support the cost of service study, to support the $0.02827 per kWh cost rate, and to address the general topic of elimination of the energy cost recovery rider.

    Entergy Arkansas filed for rehearing of the APSC's orders, asking that the energy cost rate filed in March 2006 be implemented in May 2006 subject to refund, asserting that the APSC did not follow appropriate procedures in suspending the operation of the energy cost recovery rider, and asking the APSC to rescind its show cause order. On May 8, 2006 the APSC denied Entergy Arkansas' requests for rehearing. Entergy Arkansas appealed the APSC's decision, but later filed a motion to dismiss the appeal following the APSC's decision described below.

    In June 2006, Entergy Arkansas once again filed a motion with the APSC seeking to implement the redetermined energy cost rate of $0.02827 per kWh. After a hearing the APSC approved Entergy Arkansas' request and the redetermined rate was implemented in July 2006, subject to refund pending the outcome of the APSC energy cost recovery investigation. Because of the delay in implementing the redetermined energy cost rate, Entergy Arkansas estimated in its motion that $46 million of energy costs would remain under-recovered at December 31, 2006.

    A hearing in the APSC energy cost recovery investigation is scheduled for October 2006.

    On June 7, 2006, Entergy Arkansas filed the cost of service study ordered by the APSC. On that date Entergy Arkansas also filed notice with the APSC that it intends to file for a change in base rates within 60 to 90 days of its notice. Entergy Arkansas expects to make that filing in August 2006.

    See "System Agreement Litigation" herein for a discussion of Entergy's compliance filing in that proceeding. If the FERC approves the compliance tariff as filed, then payments under that tariff will be classified as energy costs, which would then be included in setting the retail energy cost rate as part of the normal working of the energy cost recovery rider.  As noted above the APSC has given notice that it is considering the prospective elimination of the energy cost recovery rider.  Therefore, Entergy Arkansas plans to propose an alternative to the energy cost recovery rider for recovery of the costs allocated to it as a result of the System Agreement litigation should the energy cost recovery rider be lawfully terminated by the APSC.  A separate exact recovery rider, similar to the energy cost recovery rider or a production cost allocation rider, would ensure that Entergy Arkansas' customers pay only the amount allocated by the FERC. 

    Entergy Gulf States-Louisiana

    In January 2006, Entergy Gulf States filed with the LPSC its gas rate stabilization plan. The filing showed a revenue deficiency of $4.1 million based on an ROE mid-point of 10.5%. On May 1, 2006, Entergy Gulf States implemented a $3.5 million rate increase pursuant to an uncontested agreement with the LPSC Staff.

    In March 2006, the LPSC approved an uncontested stipulated settlement in Entergy Gulf States' formula rate plan filing for the 2004 test year. The settlement includes a revenue requirement increase of $36.8 million and calls for Entergy Gulf States to apply a refund liability of $744 thousand to capacity deferrals. The refund liability pertained to the periods 2004-2005 as well as the interim period in which a $37.8 million revenue increase was in place.

    In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Gulf States' return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $7.1 million rate increase is required to recover LPSC-approved incremental

    16

    deferred and ongoing capacity requirements. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    Entergy Gulf States -Texas

    As discussed in Note 2 to the consolidated financial statements in the Form 10-K, in August 2005, Entergy Gulf States filed with the PUCT an application for recovery of its transition to competition costs. Entergy Gulf States requested recovery of $189 million in transition to competition costs through implementation of a 15-year rider to be effective no later than March 1, 2006. The $189 million represents transition to competition costs Entergy Gulf States incurred from June 1, 1999 through June 17, 2005 in preparing for competition in its service area, including attendant AFUDC, and all carrying costs projected to be incurred on the transition to competition costs through February 28, 2006. The $189 million is before any gross-up for taxes or carrying costs over the 15-year recovery period. Entergy Gulf States reached a unanimous settlement agreement on all issues with the active parties in the transition to competition cost recovery case. The agreement allows Entergy Gulf States to recover $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented interim rates based on this revenue level on March 1, 2006. The PUCT approved the settlement agreement in June 2006.

    Entergy Louisiana

    In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Louisiana's return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $121 million rate increase is required to recover LPSC-approved incremental deferred and ongoing capacity requirements. Entergy Louisiana requested recovery of the capacity deferrals over a three-year period, including carrying charges. $51 million of the rate increase is associated with these deferrals. The remaining $70 million of the rate increase is associated with ongoing capacity costs. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    Entergy Mississippi

    In March 2006, Entergy Mississippi made its annual scheduled formula rate plan filing with the MPSC.  The filing was amended by an April 2006 filing.  The amended filing showed that an increase of $3.1 million in electric revenues is warranted.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which will be implemented in August 2006.

    Entergy New Orleans

    In June 2006, Entergy New Orleans made its annual formula rate plan filings with the City Council.  The filings show various alternatives to reflect the effect of Entergy New Orleans' lost customers and decreased revenue. Entergy New Orleans' recommended alternative adjusts for lost customers and assumes that the City Council's June 2006 decision to allow recovery of all Grand Gulf costs through the fuel adjustment clause stays in place (a portion of Grand Gulf costs was previously recovered through base rates). Under that alternative, annual increases of $6.4 million in electric base rate revenues (an increase of 4.4%) and $22.8 million in gas base rate revenues (an increase of 160.9%) are warranted. The filings triggered the prescribed four-month period for review by the City Council's Advisors and other parties, and rate adjustments, if any, could be implemented as soon as the first billing cycle of November 2006.

    At the same time as it made its formula rate plan filings, Entergy New Orleans also filed with the City Council a request to implement two storm-related riders. With the first rider, Entergy New Orleans seeks to recover over a ten-year period the $114 million in electric restoration costs and the $25 million in gas restoration costs that it has actually spent through March 31, 2006. Entergy New Orleans also proposed semiannual filings to update the rider for additional restoration spending and also to consider the receipt of CDBG funds or insurance proceeds that it may

    17

    receive. With the second rider, Entergy New Orleans seeks to establish over a ten-year period a $150 million storm reserve to provide for the risk of another storm. Entergy New Orleans requested that the City Council consider the proposed riders within the same time frame as the formula rate plans, which would allow implementation as soon as the first billing cycle of November 2006.

    Federal Regulation

    System Agreement Litigation

    See the Form 10-K for a discussion of the System Agreement litigation proceedings at the FERC. In April 2006, Entergy filed with the FERC its compliance filing to implement the provisions of the FERC's decision. The filing amends the System Agreement to provide for the calculation of production costs, average production costs, and payments/receipts among the domestic utility companies to the extent required to maintain rough production cost equalization pursuant to the FERC's decision, and makes clear that all payments/receipts will be classified as energy costs. The payments/receipts would be based on calendar year 2006 production costs, with any payments/receipts among the domestic utility companies to be made in twelve equal monthly installments, commencing in June 2007.

    Motions to intervene without protest were filed by the City of New Orleans, the MPSC, the Louisiana Energy Users Group, and Occidental Chemical Corporation. Protests to the compliance filing were filed by the APSC, the LPSC, Arkansas Electric Energy Consumers, Inc. (AEEC), and the Arkansas Attorney General (Arkansas AG). Among other things, the LPSC urged the FERC: (1) to require any payments/receipts to commence in January 2007, rather than June 2007, and to require such payments to be made in a single lump sum payment, rather than in twelve equal monthly installments, or in the alternative to require a paying utility company to complete all payments within the calendar year following the year in which the disparity occurred; (2) to find that the bandwidth remedy is analogous to a "cost-of-service tariff with deferred billing," as opposed to a prospective remedy, so that a utility company could be required to make a payment based on a previous year's production costs even if such utility company has exited the System Agreement and so that interest would be due on the amount of any payment; and (3) to order interest on any payments to the extent they are not made in a single lump sum amount. In addition to the above issues, the LPSC and the other parties filing protests urged the FERC to require the bandwidth calculation to be set forth in a separate service schedule within the System Agreement, rather than the existing Service Schedule MSS-3 as proposed by Entergy. The APSC's protest urged the FERC to require that the bandwidth formula include all bandwidth payments as a production cost of the paying utility company for the year in which the payment is made, instead of excluding such costs as proposed in the compliance filing. The AEEC, among other things, urges the FERC to segregate the capacity and energy cost components of any bandwidth payments/receipts. The domestic utility companies responded to the issues raised in the protests and urged the FERC to approve the compliance filing as submitted by Entergy. The LPSC filed a reply to Entergy's response reasserting its previous positions and alleging, among other things, that Entergy was trying to delay the bandwidth payment in an effort to protect purported excess profits at Entergy Arkansas.

    Separately, in July 2006 the LPSC filed with the FERC a Motion for Summary Disposition on the same issues that the LPSC had raised in its protests to the compliance filing. The domestic utility companies filed an answer urging the FERC to reject the LPSC's Motion for Summary Disposition and asking the FERC for summary disposition of several issues in favor of the domestic utility companies' positions.

    The FERC's decision in the System Agreement proceeding is currently pending before the United States Court of Appeals for the D.C. Circuit. The parties to the proceeding reached agreement on a proposed briefing schedule that would result in the various parties submitting initial and reply briefs between August and November 2006. The proposed briefing schedule has been submitted to the Court of Appeals.

    The FERC's decision would reallocate total production costs of the domestic utility companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth. This would be accomplished by payments from domestic utility companies whose production costs are more than 11% below Entergy System average production costs to domestic utility companies whose production costs are more than the Entergy System average production cost, with payments going first to those

     

    18

     

    domestic operating utilities whose total production costs are farthest above the Entergy System average. For purposes of the Entergy Arkansas rate filings discussed above in "State and Local Rate Regulation" that are expected to be made in mid-August 2006, an assessment of the potential effects of the FERC's June 2005 order, as amended by its December 2005 order on rehearing, has been calculated on the basis of a 2006 test year, using a 2006 gas price that consists of a non-weighted average of twelve months of gas prices calculated as follows: January through May 2006 are actual, volume-weighted monthly averages of day-ahead cash prices as reported by Energy Intelligence Natural Gas Week; the June 2006 price is the First of the Month Index price as reported by Platts Inside FERC's Gas Market Report; the July 2006 price is the 5/31/06 NYMEX Henry Hub settlement price; and August through December 2006 are 30 calendar-day rolling averages as of May 31, 2006 of forward NYMEX Henry Hub gas contracts.  For example the August 2006 price is an average of all the daily NYMEX settlement prices for the August 2006 contract for each trading day from the period 5/2/06 - 5/31/06 inclusive.  A similar calculation is made using the daily settlements of the September 2006 through December 2006 NYMEX contracts to arrive at those monthly prices. This resulted in an average annual gas price of $7.49/mmBtu. If the FERC's June 2005 order, as amended by its December 2005 order on rehearing, becomes final and if an annual average gas price of $7.49/ mmBtu occurs for 2006 as assumed, the following potential annual production cost reallocation among the domestic utility companies could result:

     

    Annual Payments
    or (Receipts) (in millions)

       

    Entergy Arkansas

    $284

    Entergy Gulf States

    ($197)

    Entergy Louisiana

    ($59)

    Entergy Mississippi

    ($28)

    Entergy New Orleans

    $0

    In calculating the production costs for this purpose under the FERC's order, output from the Vidalia hydroelectric power plant does not reflect the actual Vidalia price for the year but is priced at that year's average price paid by Entergy Louisiana for the exchange of electric energy under Service Schedule MSS-3 of the System Agreement, thereby reducing the amount of Vidalia costs reflected in the comparison of the domestic utility companies' total production costs.

    APSC Complaint at the FERC

    In June 2006, the APSC filed a complaint with the FERC against Entergy Services as the representative of Entergy Corporation and the domestic utility companies, pursuant to Sections 205, 206 and 207 of the Federal Power Act. The APSC states that "The purpose of the complaint is to institute an investigation into the prudence of Entergy's practices affecting the wholesale rates that flow through its System Agreement." The complaint requests, among other things, that the FERC disallow any costs found to be imprudent, with a refund effective date to be set at the earliest possible time. Specific areas of requested investigation include:

  • The domestic utility companies' transmission expansion and planning process, including the construction, or lack thereof, of economic transmission upgrades;
  • The domestic utility companies' wholesale purchasing practices, including the potential savings due to integration of independent power producers into their economic dispatch;
  • The domestic utility companies' alleged failure to retire their aging, inefficient gas- and oil-fired generation; and
  • The alleged failure to construct or acquire coal capacity for the generation portfolio of Entergy Louisiana.
  • The complaint also requests that the FERC exercise its authority under Section 207 of the FPA to investigate the adequacy of Entergy's transmission system and direct it to make all necessary upgrades to ensure that its transmission facilities provide reliable, adequate and economic service.

    19

    On July 31, 2006, the domestic utility companies submitted their answer to the APSC complaint. In their answer, the domestic utility companies acknowledge that while the FERC is the appropriate forum to consider the issues raised in the APSC's complaint, the APSC has provided no probative evidence supporting its allegations and has not met the standards under the Federal Power Act (FPA) to have a matter set for hearing. Under the FPA standards, the APSC must create "serious doubt" as to the propriety of the challenged actions. As indicated in the domestic utility companies' answer, the APSC complaint does not raise a "serious doubt" but instead largely relies on unsupported assertions, many of which have been investigated in other proceedings. In those limited instances when the APSC complaint references "evidence" in an attempt to support its request for a hearing, the "evidence" to which it refers in fact does nothing to support its position but, rather, shows that Entergy has acted prudently. As further indicated in the domestic utility companies' answer, following the issuance of the FERC's System Agreement decision, all of the production costs of the domestic utility companies are now inputs to a formula rate that will result in bandwidth payments among the domestic utility companies in order to roughly equalize production costs. Based on well-established Supreme Court precedent, the FERC has exclusive jurisdiction over all inputs that will be included in the System Agreement bandwidth formula rates filed in compliance with the FERC's System Agreement decision and retail regulators are preempted from taking any action that disturbs the FERC's findings with respect to these production cost inputs and the FERC-determined allocation of production costs among the domestic utility companies. The domestic utility companies believe that their conduct with respect to these issues has been prudent and will vigorously defend such conduct.

    Several parties have intervened in the proceeding, including the MPSC, the LPSC, and the City Council. The LPSC's answer and comments in response to the APSC Complaint ask the FERC to investigate whether Entergy Arkansas' withdrawal from the System Agreement is fair, just, and reasonable.

    APSC System Agreement Investigation

    In 2004, the APSC commenced an investigation into whether Entergy Arkansas' continued participation in the System Agreement is in the best interests of its customers. Citing its concerns that the benefits of its continued participation in the current form of the System Agreement have been seriously eroded, in December 2005, Entergy Arkansas submitted its notice that it will terminate its participation in the current System Agreement effective 96 months from December 19, 2005 or such earlier date as authorized by the FERC. Entergy Arkansas indicated, however, that a properly structured replacement agreement could be a viable alternative. In June 2006 the APSC issued an order in its investigation requiring Entergy Arkansas President Hugh McDonald to file testimony in response to several questions involving details of what action Entergy Arkansas or Entergy has taken to insure that Entergy Arkansas' customers are protected from additional costs including those related to the following areas: construction of new generating plants located outside of Arkansas, costs of the Entergy New Orleans bankruptcy, and costs associated with restoration of facilities damaged by Hurricanes Katrina and Rita. Mr. McDonald was also directed to describe actions taken since December 19, 2005 to encourage or persuade the FERC to authorize Entergy Arkansas to exit the Entergy System Agreement sooner than 96 months, and to describe current and future actions related to development of a replacement system agreement. Responsive testimony was filed with the APSC in July 2006. A public hearing for the purpose of cross-examination of Mr. McDonald on his testimony and for questioning by the APSC was also conducted in July 2006.

    Independent Coordinator of Transmission (ICT)

    In April 2006 the FERC issued an order approving with modification Entergy's ICT proposal filed in May 2005. In its order, the FERC: (1) approved the establishment of the ICT, with modifications; (2) approved Entergy's proposed pricing policy, with modifications; (3) approved the implementation of a weekly procurement process (WPP); and (4) ordered Entergy to submit a compliance filing and an executed contract with the Southwest Power Pool (SPP), the approved ICT, within 60 days of the order. Several parties have filed requests for rehearing of the FERC order, and those requests are still pending.

    The proposed modifications include, among other things: (1) Entergy must file with the FERC the criteria used to grant and deny transmission service, including calculating available flowgate capacity; (2) the FERC extended the initial term of the ICT from two years to four years; and Entergy is precluded from terminating the ICT prior to the end of the four year period; (3) the

    20

     establishment of a transmission users group that will provide input directly to the ICT on the effectiveness of the ICT Proposal and also will propose to the FERC an appropriate means by which they could be given access to inputs in the process and models under the direction of the ICT; (4) with regard to any dispute between the ICT and Entergy concerning transmission service requests, transmission planning, and interconnection requests, the ICT's position will prevail during the pendency of the dispute resolution; and (5) the WPP must be operational within approximately 14 months of the FERC order or the FERC may reevaluate all approvals to proceed with the ICT.

    Entergy made its compliance filing with the FERC on May 24, 2006, including the executed ICT agreement with SPP. Entergy informed the FERC that, assuming it has received all required approvals, Entergy intends to install SPP as the ICT within 30 days of FERC approval of the ICT agreement. Several parties have filed protests regarding Entergy's compliance filing, and consideration of Entergy's compliance filing is pending at the FERC.

    The LPSC voted to approve the ICT proposal in July 2006.

    Market and Credit Risks

    Commodity Price Risk

    Power Generation

    As discussed more fully in the Form 10-K, the sale of electricity from the power generation plants owned by Entergy's Non-Utility Nuclear business and Energy Commodity Services business, unless otherwise contracted, is subject to the fluctuation of market power prices. Following is an updated summary of the amount of the Non-Utility Nuclear business' output that is sold forward under physical or financial contracts (2006 represents the remaining two quarters of the year):

       

    2006

     

    2007

     

    2008

     

    2009

     

    2010

    Non-Utility Nuclear:

                       

    Percent of planned generation sold forward:

                       
     

    Unit-contingent

     

    34%

     

    39%

     

    34%

     

    25%

     

    12%

     

    Unit-contingent with guarantee of availability (1)

     

    53%

     

    47%

     

    32%

     

    13%

     

    5%

     

    Firm liquidated damages

     

    4%

     

    8%

     

    0%

     

    0%

     

    0%

     

    Total

     

    91%

     

    94%

     

    66%

     

    38%

     

    17%

    Planned generation (TWh)

     

    17

     

    34

     

    34

     

    35

     

    34

    Average contracted price per MWh

     

    $41

     

    $49

     

    $53

     

    $58

     

    $46

    1. A sale of power on a unit contingent basis coupled with a guarantee of availability provides for the payment to the power purchaser of contract damages, if incurred, in the event the seller fails to deliver power as a result of the failure of the specified generation unit to generate power at or above a specified availability threshold. All of Entergy's outstanding guarantees of availability provide for dollar limits on Entergy's maximum liability under such guarantees.

    See the Form 10-K for a discussion of Non-Utility Nuclear's value sharing agreements with NYPA involving energy sales from the Fitzpatrick and Indian Point 3 power plants and a discussion of the Vermont Yankee PPA price adjustment clause.

    Some of the agreements to sell the power produced by Entergy's Non-Utility Nuclear power plants contain provisions that require an Entergy subsidiary to provide collateral to secure its obligations under the agreements. The Entergy subsidiary will be required to provide collateral based upon the difference between the current market and contracted power prices in the regions where Non-Utility Nuclear sells power. The primary form of collateral to satisfy these requirements would be an Entergy Corporation guaranty.  Cash and letters of credit are also acceptable

    21

     forms of collateral.  At June 30, 2006, based on power prices at that time, Entergy had in place as collateral $1,275 million of Entergy Corporation guarantees for wholesale transactions, including $100 million of guarantees that support letters of credit. The assurance requirement associated with Non-Utility Nuclear is estimated to increase by an amount up to $445 million if gas prices increase $1 per MMBtu in both the short- and long-term markets. In the event of a decrease in Entergy Corporation's credit rating to below investment grade, Entergy will be required to replace Entergy Corporation guarantees with cash or letters of credit under some of the agreements.

    In addition to selling the power produced by its plants, the Non-Utility Nuclear business sells installed capacity to load-serving distribution companies in order for those companies to meet requirements placed on them by the ISO in their area. Following is a summary of the amount of the Non-Utility Nuclear business' installed capacity that is currently sold forward, and the blended amount of the Non-Utility Nuclear business' planned generation output and installed capacity that is currently sold forward (2006 represents the remaining two quarters of the year):

       

    2006

     

    2007

     

    2008

     

    2009

     

    2010

    Non-Utility Nuclear:

                       

    Percent of capacity sold forward:

                       
     

    Bundled capacity and energy contracts

     

    13%

     

    12%

     

    12%

     

    12%

     

    12%

     

    Capacity contracts

     

    77%

     

    48%

     

    36%

     

    24%

     

    3%

     

    Total

     

    90%

     

    60%

     

    48%

     

    36%

     

    15%

    Planned net MW in operation

     

    4,200

     

    4,200

     

    4,200

     

    4,200

     

    4,200

    Average capacity contract price per kW per month

     

    $1.1

     

    $1.1

     

    $1.1

     

    $1.0

     

    $0.9

    Blended Capacity and Energy (based on revenues)

                       

    % of planned generation and capacity sold forward

     

    86%

     

    88%

     

    57%

     

    33%

     

    11%

    Average contract revenue per MWh

     

    $42

     

    $50

     

    $53

     

    $59

     

    $46

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy's accounting for nuclear decommissioning costs, unbilled revenue, impairment of long-lived assets, qualified pension and other postretirement benefits, and other contingencies. Following is an update to that discussion.

    Unbilled Revenue

    As discussed in Note 10 to the consolidated financial statements, effective January 1, 2006, Entergy Louisiana and the Louisiana portion of Entergy Gulf States reclassified the fuel component of unbilled accounts receivable to deferred fuel and will no longer include the fuel component in their unbilled revenue calculations, which is in accordance with regulatory treatment.

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Entergy does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    22

    ENTERGY CORPORATION AND SUBSIDIARIES
    CONSOLIDATED STATEMENTS OF INCOME
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands, Except Share Data)
    OPERATING REVENUES
    Domestic electric $2,177,710  $2,044,666  $4,270,646  $3,746,683 
    Natural gas 13,612  12,532  51,027  39,387 
    Competitive businesses 437,180  388,193  874,864  769,502 
    TOTAL 2,628,502  2,445,391  5,196,537  4,555,572 
    OPERATING EXPENSES
    Operating and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 661,619  419,360  1,501,791  918,345 
      Purchased power 577,408  608,562  1,038,778  1,040,184 
      Nuclear refueling outage expenses 42,546  39,150  84,540  78,960 
      Other operation and maintenance 573,234  558,735  1,102,664  1,062,375 
    Decommissioning 36,258  36,525  71,854  73,524 
    Taxes other than income taxes 91,130  95,016  194,468  185,632 
    Depreciation and amortization 217,943  204,420  423,332  419,941 
    Other regulatory credits - net (58,929) (31,951) (102,946) (49,971)
    TOTAL 2,141,209  1,929,817  4,314,481  3,728,990 
    OPERATING INCOME 487,293  515,574  882,056  826,582 
    OTHER INCOME
    Allowance for equity funds used during construction 8,908  10,918  24,367  23,521 
    Interest and dividend income 35,139  34,441  78,968  65,059 
    Equity in earnings of unconsolidated equity affiliates 8,483  10,291  12,070  13,593 
    Miscellaneous - net (7,965) (10,956) (14,170) 14,977 
    TOTAL 44,565  44,694  101,235  117,150 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 122,670  105,781  243,151  213,048 
    Other interest - net 15,235  13,275  32,495  24,761 
    Allowance for borrowed funds used during construction (5,405) (5,996) (14,450) (13,273)
    TOTAL 132,500  113,060  261,196  224,536 
    INCOME FROM CONTINUING OPERATIONS BEFORE INCOME TAXES 399,358  447,208  722,095  719,196 
    Income taxes 122,901  151,849  241,732  244,092 
    INCOME FROM CONTINUING OPERATIONS 276,457  295,359  480,363  475,104 
    INCOME (LOSS) FROM DISCONTINUED OPERATIONS (net of income tax
    expense (benefit) of $7,190, ($1,502), $5,986 and ($2,234) , respectively) 13,119  (2,811) 10,880  (4,177)
    CONSOLIDATED NET INCOME 289,576  292,548  491,243  470,927 
    Preferred dividend requirements and other 7,774  6,398  15,812  12,781 
    EARNINGS APPLICABLE TO
    COMMON STOCK $281,802  $286,150  $475,431  $458,146 
    Basic earnings (loss) per average common share:
      Continuing operations $1.29  $1.37  $2.24  $2.17 
      Discontinued operations $0.06  ($0.01) $0.05  ($0.02)
      Basic earnings per average common share $1.35  $1.36  $2.29  $2.15 
    Diluted earnings (loss) per average common share:
      Continuing operations $1.27  $1.34  $2.20  $2.13 
      Discontinued operations $0.06  ($0.01) $0.05  ($0.02)
      Diluted earnings per average common share $1.33  $1.33  $2.25  $2.11 
    Dividends declared per common share $0.54  $0.54  $1.08  $1.08 
    Basic average number of common shares outstanding 207,982,485  211,134,467  207,858,104  212,622,976 
    Diluted average number of common shares outstanding 211,557,985  215,568,534  211,467,674  217,091,580 
    See Notes to Consolidated Financial Statements.

    23

    ENTERGY CORPORATION AND SUBSIDIARIES
    CONSOLIDATED STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Consolidated net income $491,243  $470,927 
    Adjustments to reconcile consolidated net income to net cash flow
     provided by operating activities:
      Reserve for regulatory adjustments 41,683  (73,922)
      Other regulatory credits - net (102,946) (49,971)
      Depreciation, amortization, and decommissioning 496,632  494,458 
      Deferred income taxes and investment tax credits (84,441) 92,579 
      Equity in earnings of unconsolidated equity affiliates - net of dividends (9,896) (11,993)
      Changes in working capital:
        Receivables 318,480  (124,234)
        Fuel inventory (13,650) 9,065 
        Accounts payable (285,750) (14,685)
        Taxes accrued 535,654  68,495 
        Interest accrued (21,754) (17,715)
        Deferred fuel 272,835  (76,262)
        Other working capital accounts 103,790  (48,972)
      Provision for estimated losses and reserves 25,037  11,536 
      Changes in other regulatory assets (165,527) 21,298 
      Other (120,847) 22,548 
    Net cash flow provided by operating activities 1,480,543  773,152 
    INVESTING ACTIVITIES
    Construction/capital expenditures (942,102) (616,004)
    Allowance for equity funds used during construction 24,367  23,521 
    Nuclear fuel purchases (124,250) (184,445)
    Proceeds from sale/leaseback of nuclear fuel 41,109  125,680 
    Proceeds from sale of assets and businesses 77,159  - 
    Payment for purchase of plant (88,199) (162,075)
    Decrease in other investments 50,070  63,193 
    Purchases of other temporary investments -  (1,591,025)
    Liquidation of other temporary investments -  1,778,975 
    Proceeds from nuclear decommissioning trust fund sales 523,806  430,226 
    Investment in nuclear decommissioning trust funds (573,921) (478,753)
    Other regulatory investments (42,479) (63,800)
    Net cash flow used in investing activities (1,054,440) (674,507)
    See Notes to Consolidated Financial Statements.
    24
    ENTERGY CORPORATION AND SUBSIDIARIES
    CONSOLIDATED STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    FINANCING ACTIVITIES
    Proceeds from the issuance of:
      Long-term debt 1,237,865  1,362,424 
      Preferred stock 73,354  30,000 
      Common stock and treasury stock 15,372  89,868 
    Retirement of long-term debt (1,143,746) (701,914)
    Repurchase of common stock -  (639,820)
    Redemption of preferred stock (181,060) (2,250)
    Changes in credit line borrowings - net (40,000) (150)
    Dividends paid:
      Common stock (224,458) (229,353)
      Preferred stock (16,760) (12,779)
    Net cash flow used in financing activities (279,433) (103,974)
    Effect of exchange rates on cash and cash equivalents (556) 129 
    Net increase (decrease) in cash and cash equivalents 146,114  (5,200)
    Cash and cash equivalents at beginning of period 582,820  619,786 
    Effect of the deconsolidation of Entergy New Orleans on cash and cash equivalents -  (7,954)
    Cash and cash equivalents at end of period $728,934  $606,632 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
    Cash paid (received) during the period for:
      Interest - net of amount capitalized $282,454  $242,420 
      Income taxes ($231,325) $80,781 
    Noncash financing activities:
      Proceeds from long-term debt issued for the purpose
       of refunding other long-term debt $54,700  - 
    See Notes to Consolidated Financial Statements.

    25

    ENTERGY CORPORATION AND SUBSIDIARIES
    CONSOLIDATED BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents:
      Cash $120,273  $221,773 
      Temporary cash investments - at cost,
       which approximates market 608,661  361,047 
         Total cash and cash equivalents 728,934  582,820 
    Note receivable - Entergy New Orleans DIP loan 39,749  90,000 
    Notes receivable 1,135  3,227 
    Accounts receivable:  
      Customer 435,254  629,717 
      Allowance for doubtful accounts (24,591) (30,805)
      Other 531,553  459,152 
      Accrued unbilled revenues 279,696  477,570 
         Total receivables 1,221,912  1,535,634 
    Deferred fuel costs 246,969  543,927 
    Fuel inventory - at average cost 219,845  206,195 
    Materials and supplies - at average cost 578,557  610,932 
    Deferred nuclear refueling outage costs 131,484  157,764 
    Prepayments and other 133,389  325,795 
    TOTAL 3,301,974  4,056,294 
    OTHER PROPERTY AND INVESTMENTS
    Investment in affiliates - at equity 307,817  296,784 
    Decommissioning trust funds 2,637,784  2,606,765 
    Non-utility property - at cost (less accumulated depreciation) 219,507  228,833 
    Other 41,480  81,535 
    TOTAL 3,206,588  3,213,917 
    PROPERTY, PLANT AND EQUIPMENT
    Electric 30,225,525  29,161,027 
    Property under capital lease 724,290  727,565 
    Natural gas 88,029  86,794 
    Construction work in progress 836,016  1,524,085 
    Nuclear fuel under capital lease 273,878  271,615 
    Nuclear fuel 383,817  436,646 
    TOTAL PROPERTY, PLANT AND EQUIPMENT 32,531,555  32,207,732 
    Less - accumulated depreciation and amortization 13,223,563  13,010,687 
    PROPERTY, PLANT AND EQUIPMENT - NET 19,307,992  19,197,045 
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      SFAS 109 regulatory asset - net 730,503  735,221 
      Other regulatory assets 2,394,171  2,133,724 
      Deferred fuel costs 168,122  120,489 
    Long-term receivables 23,640  25,572 
    Goodwill 377,172  377,172 
    Other 1,053,511  991,835 
    TOTAL 4,747,119  4,384,013 
    TOTAL ASSETS $30,563,673  $30,851,269 
    See Notes to Consolidated Financial Statements.
     
    26
     
    ENTERGY CORPORATION AND SUBSIDIARIES
    CONSOLIDATED BALANCE SHEETS
    LIABILITIES AND SHAREHOLDERS' EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    Currently maturing long-term debt $108,191  $103,517 
    Notes payable 41  40,041 
    Accounts payable 984,941  1,655,787 
    Customer deposits 232,607  222,206 
    Taxes accrued 212,100  188,159 
    Accumulated deferred income taxes 101,045  143,409 
    Nuclear refueling outage costs 1,022  15,548 
    Interest accrued 133,101  154,855 
    Obligations under capital leases 136,943  130,882 
    Other 323,413  473,510 
    TOTAL 2,233,404  3,127,914 
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 5,625,264  5,279,228 
    Accumulated deferred investment tax credits 367,618  376,550 
    Obligations under capital leases 165,324  175,005 
    Other regulatory liabilities 409,041  408,667 
    Decommissioning and retirement cost liabilities 1,991,617  1,923,971 
    Transition to competition 79,098  79,101 
    Regulatory reserves 17,397  18,624 
    Accumulated provisions 566,796  556,028 
    Long-term debt 8,979,735  8,824,493 
    Preferred stock with sinking fund 11,700  13,950 
    Other 1,562,709  1,879,017 
    TOTAL 19,776,299  19,534,634 
    Commitments and Contingencies
    Preferred stock without sinking fund 344,893  445,974 
    SHAREHOLDERS' EQUITY
    Common stock, $.01 par value, authorized 500,000,000
     shares; issued 248,174,087 shares in 2006 and in 2005 2,482  2,482 
    Paid-in capital 4,817,628  4,817,637 
    Retained earnings 5,676,094  5,428,407 
    Accumulated other comprehensive loss (153,825) (343,819)
    Less - treasury stock, at cost (40,104,825 shares in 2006 and
     40,644,602 shares in 2005) 2,133,302  2,161,960 
    TOTAL 8,209,077  7,742,747 
    TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY $30,563,673  $30,851,269 
    See Notes to Consolidated Financial Statements.
    27

    ENTERGY CORPORATION AND SUBSIDIARIES
    CONSOLIDATED STATEMENTS OF RETAINED EARNINGS, COMPREHENSIVE INCOME, AND PAID-IN CAPITAL
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended
    2006 2005
    (In Thousands)
    RETAINED EARNINGS
    Retained Earnings - Beginning of period $5,509,897  $5,040,655 
      Add: Earnings applicable to common stock 281,802  $281,802  286,150  $286,150 
      Deduct:
        Dividends declared on common stock 112,295  113,820 
        Capital stock and other expenses 3,310  - 
          Total 115,605  113,820 
    Retained Earnings - End of period $5,676,094  $5,212,985 
    ACCUMULATED OTHER COMPREHENSIVE LOSS
    Balance at beginning of period
      Accumulated derivative instrument fair value changes ($201,301) ($161,446)
      Other accumulated comprehensive income items 52,295  44,649 
         Total (149,006) (116,797)
    Net derivative instrument fair value changes
     arising during the period (net of tax expense (benefit) of $11,151 and ($25,082)) 6,672  6,672  (46,621) (46,621)
    Foreign currency translation (net of tax expense (benefit) of $206 and ($46)) 383  383  (85) (85)
    Net unrealized investment gains (net of tax expense (benefit) of ($10,117) and $13,692) (11,874) (11,874) 16,496  16,496 
    Balance at end of period:
      Accumulated derivative instrument fair value changes ($194,629) ($208,067)
      Other accumulated comprehensive income items 40,804  61,060 
         Total ($153,825) ($147,007)
    Comprehensive Income $276,983  $255,940 
    PAID-IN CAPITAL
    Paid-in Capital - Beginning of period $4,816,037  $4,826,797 
      Add: Common stock issuances related to stock plans 1,591  18,240 
    Paid-in Capital - End of period $4,817,628  $4,845,037 
    Six Months Ended
    2006 2005
    (In Thousands)
    RETAINED EARNINGS
    Retained Earnings - Beginning of period $5,428,407  $4,984,302 
      Add: Earnings applicable to common stock 475,431  $475,431  458,146  $458,146 
      Deduct:
        Dividends declared on common stock 224,434  229,448 
        Capital stock and other expenses 3,310  15 
         Total 227,744  229,463 
    Retained Earnings - End of period $5,676,094  $5,212,985 
    ACCUMULATED OTHER COMPREHENSIVE LOSS
    Balance at beginning of period
      Accumulated derivative instrument fair value changes ($392,614) ($141,411)
      Other accumulated comprehensive income items 48,795  47,958 
         Total (343,819) (93,453)
    Net derivative instrument fair value changes
     arising during the period (net of tax expense (benefit) of $131,543 and ($37,692)) 197,985  197,985  (66,655) (66,655)
    Foreign currency translation (net of tax expense (benefit) of $299 and ($69)) 556  556  (129) (129)
    Minimum pension liability (net of tax benefit of ($1,344)) -  -  (2,054) (2,054)
    Net unrealized investment gains (net of tax expense (benefit) of ($7,802) and $9,445) (8,547) (8,547) 15,284  15,284 
    Balance at end of period:
      Accumulated derivative instrument fair value changes ($194,629) ($208,066)
      Other accumulated comprehensive income items 40,804  61,059 
         Total ($153,825) ($147,007)
    Comprehensive Income $665,425 $404,592 
    PAID-IN CAPITAL
    Paid-in Capital - Beginning of period $4,817,637  $4,835,375 
      Add: Common stock issuances related to stock plans (9) 9,662 
    Paid-in Capital - End of period $4,817,628  $4,845,037 
    See Notes to Consolidated Financial Statements.
     28

    ENTERGY CORPORATION AND SUBSIDIARIES
    SELECTED OPERATING RESULTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars in Millions)
    Utility Electric Operating Revenues:
      Residential $697 $569 $128  23 
      Commercial 546 440 106  24 
      Industrial 620 551 69  13 
      Governmental 36 32 4  13 
         Total retail 1,899 1,592 307  19 
      Sales for resale 161 148 13  9 
      Other 118 305 (187) (61)
         Total $2,178 $2,045 $133  7 
    Utility Billed Electric Energy
     Sales (GWh):
      Residential 7,034 6,558 476  7 
      Commercial 6,060 5,735 325  6 
      Industrial 9,561 9,648 (87) (1)
      Governmental 378 377 1  - 
         Total retail 23,033 22,318 715  3 
      Sales for resale 2,816 2,944 (128) (4)
         Total 25,849 25,262 587  2 
    Six Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars in Millions)
    Utility Electric Operating Revenues:
      Residential $1,394 $1,162 $232  20 
      Commercial 1,087 868 219  25 
      Industrial 1,287 1,100 187  17 
      Governmental 76 64 12  19 
         Total retail 3,844 3,194 650  20 
      Sales for resale 336 287 49  17 
      Other 91 266 (175) (66)
         Total $4,271 $3,747 $524  14 
    Utility Billed Electric Energy
     Sales (GWh):
      Residential 13,997 13,728 269  2 
      Commercial 11,594 11,206 388  3 
      Industrial 18,613 19,100 (487) (3)
      Governmental 760 761 (1) - 
         Total retail 44,964 44,795 169  - 
      Sales for resale 5,577 5,627 (50) (1)
         Total 50,541 50,422 119  - 

    29

     

    ENTERGY CORPORATION AND SUBSIDIARIES

    NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
    (Unaudited)

    NOTE 1. COMMITMENTS AND CONTINGENCIES

    Entergy New Orleans Bankruptcy

    See Note 9 to the consolidated financial statements for information on the Entergy New Orleans bankruptcy proceeding.

    Nuclear Insurance

    See Note 8 to the consolidated financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy's nuclear power plants

    Non-Nuclear Property Insurance

    See Note 8 to the consolidated financial statements in the Form 10-K for information on Entergy's non-nuclear property insurance program. Beginning in June 2006, the aggregation limit for all parties insured by Oil Insurance Limited (OIL) for any one occurrence was reduced to $500 million. Most of Entergy's non-nuclear excess property insurance coverage includes a $75 million drop-down feature in the event of an OIL aggregation loss to which an Entergy loss contributes.

    Nuclear Decommissioning and Other Asset Retirement Costs

    See Note 8 to the consolidated financial statements in the Form 10-K for information on nuclear decommissioning and other retirement costs.

    Employment Litigation

    Entergy Corporation and certain subsidiaries are defendants in numerous lawsuits filed by former employees asserting that they were wrongfully terminated and/or discriminated against on the basis of age, race, sex, or other protected characteristics. The defendant companies deny any liability to the plaintiffs.

     

    NOTE 2. RATE AND REGULATORY MATTERS

    Storm Costs Recovery Filings with Retail Regulators

    On July 31, 2006, Entergy Louisiana and Entergy Gulf States filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in the Louisiana jurisdiction and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, based on a ten-year levelized rate are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Storm Cost Recovery Riders (SCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SCRRs be adjusted annually to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5)

    30

    declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States. Hearings on the application are scheduled for the first quarter 2007.

    In July 2006, Entergy Gulf States filed an application with the PUCT with respect to the $393.2 million of Hurricane Rita reconstruction costs incurred in its Texas retail jurisdiction through March 31, 2006. The filing asks the PUCT to determine that $393.2 million is the amount of reasonable and necessary hurricane reconstruction costs eligible for securitization and recovery, approve the recovery of carrying costs, and approve the manner in which Entergy Gulf States-Texas allocates those costs among its retail customer classes.  If approved, Entergy Gulf States' application will ultimately affect all its retail customers in Texas. Entergy Gulf States' filing does not request recovery of costs through a specific rider on customer bills or through any other means at this time. The hearing before the PUCT on the filing is scheduled for November 2006. This is the first of two filings authorized by a law passed earlier this year in a special session of the Texas Legislature. A second filing will request securitization and recovery of the eligible costs through retail rates and tariffs. Entergy Gulf States expects to make the second filing following the conclusion of the reconstruction cost case.

    As discussed in the Form 10-K, in December 2005, Entergy Mississippi filed with the MPSC a Notice of Intent to change rates by implementing a Storm Damage Rider to recover storm damage restoration costs associated with Hurricanes Katrina and Rita totaling approximately $84 million as of November 30, 2005.   In February 2006, Entergy Mississippi filed an Application for an Accounting Order seeking certification by the MPSC of Entergy Mississippi's estimated $36 million of storm restoration costs not included in the December 2005 filing. In March 2006, the Governor signed a law that established a mechanism by which the MPSC may authorize and certify an electric utility financing order and the state may issue general obligation bonds to pay the costs of repairing damage caused by Hurricane Katrina to the systems of investor-owned electric utilities.  Because of the passage of this law and the possibility of Entergy Mississippi obtaining CDBG funds for Hurricane Katrina storm restoration costs, in March 2006, the MPSC issued an order approving a Joint Stipulation between Entergy Mississippi and the Mississippi Public Utilities Staff that provided for the review of Entergy Mississippi's total storm restoration costs in the Application for an Accounting Order proceeding.  The Stipulation stated that the procedural schedule of the December 2005 Notice of Intent filing should be suspended until the MPSC issues a final order in the Application for an Accounting Order proceeding. 

    In June 2006, the MPSC issued an order certifying Entergy Mississippi's Hurricane Katrina restoration costs incurred through March 31, 2006 of $89 million, net of estimated insurance proceeds. Two days later Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its infrastructure restoration costs. Entergy Mississippi also filed a Petition for Financing Order with the MPSC for authorization of state general obligation bond financing of $169 million for Hurricane Katrina restoration costs and future storm costs. The $169 million amount includes Hurricane Katrina restoration costs plus $80 million to build Entergy Mississippi's storm damage reserve for the future. The amount financed through the bonds will be reduced dollar for dollar by any CDBG funds that Entergy Mississippi receives. Pursuant to the legislation, the MPSC must issue a financing order by the end of October 2006.

    Deferred Fuel Costs

    See Note 2 to the consolidated financial statements in the Form 10-K for information regarding fuel proceedings involving the domestic utility companies.

    Entergy Arkansas

    In March 2006, Entergy Arkansas filed with the APSC its annual redetermination of the energy cost rate for application to the period April 2006 through March 2007. The filed energy cost rate of $0.02827 per kWh was proposed to replace the interim rate of $0.01900 per kWh that had been in place since October 2005. The interim energy cost rate is discussed in the Form

    31

    10-K, along with the investigation that the APSC commenced concerning Entergy Arkansas' interim energy cost rate. The increase in the energy cost rate is due to increases in the cost of purchased power primarily due to the natural gas cost increase and the effect that Hurricanes Katrina and Rita had on market conditions, increased demand for purchased power during the ANO 1 refueling and steam generator replacement outage in the fall of 2005, and coal plant generation curtailments during off-peak periods due to coal delivery problems.

    On March 31, 2006, the APSC suspended implementation of the $0.02827 per kWh energy cost rate, and ordered that the $0.01900 per kWh interim rate remain in effect pending the APSC proceedings on the energy cost recovery filings. The APSC also extended its investigation into Entergy Arkansas' interim energy cost rate to cover the costs included in Entergy Arkansas' March 2006 filing. The extended investigation does not identify new issues in addition to the four issues listed in the Form 10-K and covers the same time period. On April 7, 2006, the APSC issued a show cause order in the investigation proceeding that ordered Entergy Arkansas to file a cost of service study by June 8, 2006. The order also directed Entergy Arkansas to file testimony to support the cost of service study, to support the $0.02827 per kWh cost rate, and to address the general topic of elimination of the energy cost recovery rider.

    Entergy Arkansas filed for rehearing of the APSC's orders, asking that the energy cost rate filed in March 2006 be implemented in May 2006 subject to refund, asserting that the APSC did not follow appropriate procedures in suspending the operation of the energy cost recovery rider, and asking the APSC to rescind its show cause order. On May 8, 2006 the APSC denied Entergy Arkansas' requests for rehearing. Entergy Arkansas appealed the APSC's decision, but later filed a motion to dismiss the appeal following the APSC's decision described below.

    In June 2006, Entergy Arkansas once again filed a motion with the APSC seeking to implement the redetermined energy cost rate of $0.02827 per kWh. After a hearing the APSC approved Entergy Arkansas' request and the redetermined rate was implemented in July 2006, subject to refund pending the outcome of the APSC energy cost recovery investigation. Because of the delay in implementing the redetermined energy cost rate, Entergy Arkansas estimated in its motion that $46 million of energy costs would remain under-recovered at December 31, 2006.

    A hearing in the APSC energy cost recovery investigation is scheduled for October 2006.

    On June 7, 2006, Entergy Arkansas filed the cost of service study ordered by the APSC. On that date Entergy Arkansas also filed notice with the APSC that it intends to file for a change in base rates within 60 to 90 days of its notice. Entergy Arkansas expects to make that filing in August 2006.

    Entergy Gulf States

    On March 1, 2006, Entergy Gulf States filed with the PUCT an application to implement an interim fuel surcharge in connection with the under-recovery of $97 million including interest of eligible fuel costs for the period August 2005 through January 2006. This surcharge is in addition to an interim surcharge that went into effect in January 2006. Entergy Gulf States entered into a unanimous settlement that reduced the requested surcharge for actual over-collections from the months of February and March 2006, resulting in a surcharge of $78.8 million to be implemented over a twelve-month period beginning in June 2006. The PUCT approved the surcharge in June 2006. Amounts collected through the interim fuel surcharges are subject to final reconciliation in a future fuel reconciliation proceeding.

    In May 2006, Entergy Gulf States filed with the PUCT a fuel and purchased power reconciliation case covering the period September 2003 through December 2005 for costs recoverable through the Texas fixed fuel factor rate and the incremental purchased capacity recovery rider. Entergy Gulf States is reconciling $1.6 billion of fuel and purchased power costs on a Texas retail basis. Hearings are scheduled for February 2007 and a PUCT decision is expected in July 2007.

    32

    Entergy Gulf States and Entergy Louisiana

    In November 2005, the LPSC authorized its staff to initiate an expedited proceeding to audit the fuel and power procurement activities of Entergy Louisiana and Entergy Gulf States for the period January 1, 2005 through October 31, 2005. In April 2006, the LPSC accepted the LPSC Staff's audit report finding that the prices paid for natural gas and purchased power were reasonable and that given the market conditions surrounding Hurricanes Katrina and Rita, Entergy Louisiana and Entergy Gulf States acted reasonably and prudently in response to an extremely difficult environment.

    Retail Rate Proceedings

    See Note 2 to the consolidated financial statements in the Form 10-K for information regarding retail rate proceedings involving the domestic utility companies. The following are updates to the Form 10-K.

    Filings with the PUCT and Texas Cities

    As discussed in the Form 10-K, in August 2005, Entergy Gulf States filed with the PUCT an application for recovery of its transition to competition costs. Entergy Gulf States requested recovery of $189 million in transition to competition costs through implementation of a 15-year rider to be effective no later than March 1, 2006. The $189 million represents transition to competition costs Entergy Gulf States incurred from June 1, 1999 through June 17, 2005 in preparing for competition in its service area, including attendant AFUDC, and all carrying costs projected to be incurred on the transition to competition costs through February 28, 2006. The $189 million is before any gross-up for taxes or carrying costs over the 15-year recovery period. Entergy Gulf States reached a unanimous settlement agreement on all issues with the active parties in the transition to competition cost recovery case. The agreement allows Entergy Gulf States to recover $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented interim rates based on this revenue level on March 1, 2006. The PUCT approved the settlement agreement in June 2006.

    Filings with the LPSC

    Retail Rates - Electric

    (Entergy Gulf States)

    In March 2006, the LPSC approved an uncontested stipulated settlement in Entergy Gulf States' formula rate plan filing for the 2004 test year. The settlement includes a revenue requirement increase of $36.8 million and calls for Entergy Gulf States to apply a refund liability of $744 thousand to capacity deferrals. The refund liability pertained to the periods 2004-2005 as well as the interim period in which a $37.8 million revenue increase was in place.

    In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Gulf States' return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $7.1 million rate increase is required to recover LPSC-approved incremental deferred and ongoing capacity requirements. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    (Entergy Louisiana)

    In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Louisiana's return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $121 million rate increase is required to recover LPSC-approved incremental deferred and ongoing capacity requirements. Entergy Louisiana requested recovery of the capacity deferrals over a three-year period, including carrying charges. $51 million of the rate

    33

     increase is associated with these deferrals. The remaining $70 million of the rate increase is associated with ongoing capacity costs. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    Retail Rates - Gas (Entergy Gulf States)

    In January 2006, Entergy Gulf States filed with the LPSC its gas rate stabilization plan. The filing showed a revenue deficiency of $4.1 million based on an ROE mid-point of 10.5%. On May 1, 2006, Entergy Gulf States implemented a $3.5 million rate increase pursuant to an uncontested agreement with the LPSC Staff.

    Filings with the MPSC

    In March 2006, Entergy Mississippi made its annual scheduled formula rate plan filing with the MPSC.  The filing was amended by an April 2006 filing.  The amended filing showed that an increase of $3.1 million in electric revenues is warranted.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which will be implemented in August 2006.

    Filings with the City Council

    In June 2006, Entergy New Orleans made its annual formula rate plan filings with the City Council.  The filings show various alternatives to reflect the effect of Entergy New Orleans' lost customers and decreased revenue. Entergy New Orleans' recommended alternative adjusts for lost customers and assumes that the City Council's June 2006 decision to allow recovery of all Grand Gulf costs through the fuel adjustment clause stays in place (a portion of Grand Gulf costs was previously recovered through base rates). Under that alternative, annual increases of $6.4 million in electric base rate revenues (an increase of 4.4%) and $22.8 million in gas base rate revenues (an increase of 160.9%) are warranted. The filings triggered the prescribed four-month period for review by the City Council's Advisors and other parties, and rate adjustments, if any, could be implemented as soon as the first billing cycle of November 2006.

    At the same time as it made its formula rate plan filings, Entergy New Orleans also filed with the City Council a request to implement two storm-related riders. With the first rider, Entergy New Orleans seeks to recover over a ten-year period the $114 million in electric restoration costs and the $25 million in gas restoration costs that it has actually spent through March 31, 2006. Entergy New Orleans also proposed semiannual filings to update the rider for additional restoration spending and also to consider the receipt of CDBG funds or insurance proceeds that it may receive. With the second rider, Entergy New Orleans seeks to establish over a ten-year period a $150 million storm reserve to provide for the risk of another storm. Entergy New Orleans requested that the City Council consider the proposed riders within the same time frame as the formula rate plans, which would allow implementation as soon as the first billing cycle of November 2006.

     

    NOTE 3. COMMON EQUITY

    Common Stock

    Earnings per Share

    The following tables present Entergy's basic and diluted earnings per share (EPS) calculations included on the consolidated income statement:

    34

     

     

    For the Three Months Ended June 30,

     

     

    2006

     

    2005

     

     

    (In Millions, Except Per Share Data)

     

     

     

     

    $/share

     

     

     

    $/share

    Earnings applicable to common stock

     

    $281.8

     

     

     

    $286.2

     

     

     

     

     

     

     

     

     

     

     

    Average number of common shares
      outstanding - basic

     


    208.0

     


    $1.35 

     


    211.1

     


    $1.36 

    Average dilutive effect of:

     

     

     

     

     

     

     

     

     

    Stock Options

     

    3.4

     

    (0.022)

     

    4.2

     

    (0.027)

     

    Deferred Units

     

    0.2

     

    (0.001)

     

    0.2

     

    (0.001)

    Average number of common shares
      outstanding - diluted

     


    211.6

     


    $1.33 

     


    215.5

     


    $1.33 

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    For the Six Months Ended June 30,

     

     

    2006

     

    2005

     

     

    (In Millions, Except Per Share Data)

     

     

     

     

    $/share

     

     

     

    $/share

    Earnings applicable to common stock

     

    $475.4

     

     

     

    $458.1

     

     

     

     

     

     

     

     

     

     

     

    Average number of common shares
      outstanding - basic

     


    207.9

     


    $2.29 

     


    212.6

     


    $2.15 

    Average dilutive effect of:

     

     

     

     

     

     

     

     

     

    Stock Options

     

    3.4

     

    (0.037)

     

    4.3

     

    (0.042)

     

    Deferred Units

     

    0.2

     

    (0.002)

     

    0.2

     

    (0.002)

    Average number of common shares
      outstanding - diluted

     


    211.5

     


    $2.25 

     


    217.1

     


    $2.11 

     

     

     

     

     

     

     

     

     

    Entergy's stock option and other equity compensation plans are discussed in Note 7 to the consolidated financial statements in the Form 10-K.

    Treasury Stock

    During the six months ended June 30, 2006, Entergy Corporation issued 539,777 shares of its previously repurchased common stock to satisfy stock option exercises and other stock-based awards.

    Retained Earnings

    On August 4, 2006, Entergy Corporation's Board of Directors declared a common stock dividend of $0.54 per share, payable on September 1, 2006 to holders of record as of August 15, 2006.

    Accumulated Other Comprehensive Income

    Cash flow hedges with net unrealized losses of approximately $126 million net-of-tax at June 30, 2006 are scheduled to mature during the next twelve months.

     

    35

     

     

     

    NOTE 4. LINES OF CREDIT, RELATED SHORT-TERM BORROWINGS, AND LONG-TERM DEBT

    Entergy Corporation has in place two separate revolving credit facilities, a five-year credit facility and a three-year credit facility. The five-year credit facility, which expires in May 2010, has a borrowing capacity of $2 billion, of which $805 million was outstanding as of June 30, 2006. The three-year facility, which expires in December 2008, has a borrowing capacity of $1.5 billion, none of which was outstanding as of June 30, 2006. Entergy can issue letters of credit against the total borrowing capacity of both credit facilities, and letters of credit totaling $144 million had been issued against the five-year facility at June 30, 2006. The total unused capacity for these facilities as of June 30, 2006 was approximately $2.6 billion. The commitment fee for this facility is currently 0.13% per annum of the unused amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior debt ratings of the domestic utility companies.

    Entergy Arkansas, Entergy Gulf States, and Entergy Mississippi, each have credit facilities available as of June 30, 2006 as follows:


    Company

     


    Expiration Date

     

    Amount of
    Facility

     

    Amount Drawn as of
    June 30, 2006

     

     

     

     

     

     

     

    Entergy Arkansas

     

    April 2007

     

    $85 million

     

    -

    Entergy Gulf States

     

    February 2011

     

    $25 million (a)

     

    -

    Entergy Mississippi

     

    May 2007

     

    $30 million (b)

     

    -

    Entergy Mississippi

     

    May 2007

     

    $20 million (b)

     

    -

    (a)

    The credit facility allows Entergy Gulf States to issue letters of credit against the borrowing capacity of the facility. As of June 30, 2006, $1.4 million in letters of credit had been issued.

    (b)

    Borrowings under the Entergy Mississippi facilities may be secured by a security interest in its accounts receivable.

    In May 2006, Entergy Mississippi increased its $25 million credit facility to $30 million and renewed it through May 2007. Entergy Mississippi also entered into a new $20 million credit facility through May 2007.

    In August 2006, Entergy Gulf States increased the capacity of its credit facility to $50 million.

    The credit facilities have variable interest rates and the average commitment fee is 0.13%. The $85 million Entergy Arkansas credit facility requires that it maintain total shareholders' equity of at least 25% of its total assets.

    The FERC has issued an order ("FERC Short-Term Order") approving the short-term borrowing limits of the domestic utility companies (except Entergy New Orleans) and System Energy through March 31, 2008. Entergy New Orleans may rely on existing SEC PUHCA 1935 orders for its financing authority, subject to bankruptcy court approval. In addition to borrowings from commercial banks, the FERC Short-Term Order authorized the domestic utility companies (except Entergy New Orleans which is authorized by an SEC PUHCA 1935 order) and System Energy to continue as participants in the Entergy System money pool. The money pool is an inter-company borrowing arrangement designed to reduce Entergy's subsidiaries' dependence on external short-term borrowings. Borrowings from the money pool and external short-term borrowings combined may not exceed the authorized limits. As of June 30, 2006, Entergy's subsidiaries' aggregate authorized limit was $2.0 billion and the aggregate outstanding borrowing from the money pool was $200.6 million.

    36

    Long-term Debt

    The following long-term debt has been issued by Entergy in 2006:

     

    Issue Date

     

    Amount

     

     

     

    (In Thousands)

    U.S. Utility

     

     

     

    Mortgage Bonds:

     

     

     

    5.92% Series due February 2016 - Entergy Mississippi

    January 2006

     

    $100,000

    Other Long-term Debt:

     

     

     

    4.60% Series due October 2017, Jefferson County - Arkansas
      (Entergy Arkansas) (secured by a series of collateral first
      mortgage bonds)



    June 2006



    $54,700

    The following long-term debt was retired by Entergy in 2006:

     

    Retirement Date

     

    Amount

     

     

     

    (In Thousands)

    U.S. Utility

     

     

     

    Other Long-term Debt:

     

     

     

    5.95% Series due December 2023, St. Charles Parish -
      (Entergy Louisiana)

    June 2006 

    $25,000

    Grand Gulf Lease Obligation payment

    N/A

    $22,989

    Retirements after the balance sheet date:

    5.6% Series due October 2017, Jefferson County - Arkansas
    (Entergy Arkansas)

    July 2006

    $45,500

    6.3% Series due June 2018, Jefferson County -
      Arkansas (Entergy Arkansas)

    July 2006

    $9,200

    Entergy Mississippi used the proceeds from the January 2006 issuance to purchase the Attala power plant from Central Mississippi Generating Company, LLC and to repay short-term indebtedness.

    Entergy Arkansas used the proceeds from the June 2006 issuance to redeem, prior to maturity, $45.5 million of 5.6% Series of Jefferson County bonds and $9.2 million of 6.3% Series of Jefferson County bonds in July 2006. The issuance is shown as a non-cash transaction on the cash flow statement since the proceeds were placed in a trust and never held as cash by Entergy Arkansas.

     

    NOTE 5. PREFERRED STOCK

    In March 2006, Entergy Arkansas issued 3,000,000 shares of $25 par value 6.45% Series Preferred Stock, all of which were outstanding as of June 30, 2006. The dividends are cumulative and payable quarterly beginning July 1, 2006. The preferred stock is redeemable on or after April 1, 2011, at Entergy Arkansas' option, at the call price of $25 per share. In April 2006, Entergy Arkansas used the proceeds from this issuance to redeem the following preferred stock:

    Series of Entergy Arkansas Preferred Stock

     

    Redemption Price Per Share

         

    7.32% Preferred Stock, Cumulative, $100.00 par value

     

    $103.17

    7.80% Preferred Stock, Cumulative, $100.00 par value

     

    $103.25

    7.40% Preferred Stock, Cumulative, $100.00 par value

     

    $102.80

    7.88% Preferred Stock, Cumulative, $100.00 par value

     

    $103.00

    $1.96 Preferred Stock, Cumulative, $0.01 par value

     

    $ 25.00

    37

    In June 2006, Entergy Louisiana Holdings redeemed all of its preferred stock and amended its charter to eliminate authority to issue any future series of preferred stock. The redemption was made at the following respective redemption prices as provided in the Entergy Louisiana Holdings amended and restated articles of incorporation:

    Series of Entergy Louisiana Holdings Preferred Stock

     

    Redemption Price Per Share

    4.96% Preferred Stock, Cumulative, $100.00 par value

     

    $104.25

    4.16% Preferred Stock, Cumulative, $100.00 par value

     

    $104.21

    4.44% Preferred Stock, Cumulative, $100.00 par value

     

    $104.06

    5.16% Preferred Stock, Cumulative, $100.00 par value

     

    $104.18

    5.40% Preferred Stock, Cumulative, $100.00 par value

     

    $103.00

    6.44% Preferred Stock, Cumulative, $100.00 par value

     

    $102.92

    7.84% Preferred Stock, Cumulative, $100.00 par value

     

    $103.78

    7.36% Preferred Stock, Cumulative, $100.00 par value

     

    $103.36

    8% Preferred Stock, Cumulative, $25.00 par value

     

    $ 25.00

     

    NOTE 6. STOCK-BASED COMPENSATION PLANS

    Entergy grants stock options, which are described more fully in Note 7 to the consolidated financial statements in the Form 10-K. Entergy adopted SFAS 123R, "Share-Based Payment" on January 1, 2006. The impact of adoption of the standard did not materially affect Entergy's financial position, results of operations, or cash flows because Entergy adopted the fair value based method of accounting for stock options prescribed by SFAS 123, "Accounting for Stock-Based Compensation" on January 1, 2003. Prior to 2003, Entergy applied the recognition and measurement principles of APB Opinion 25, "Accounting for Stock Issued to Employees," and related Interpretations in accounting for those plans. Awards under Entergy's plans generally vest over three years. Stock-based compensation expense included in earnings applicable to common stock, net of related tax effects, for the second quarter 2006 and six months ended June 30, 2006 is $2.0 million and $3.7 million, respectively. Stock-based compensation expense included in earnings applicable to common stock, net of related tax effects, for the second quarter 2005 and six months ended June 30, 2005 is $2.0 million and $3.8 million, respectively.

     

    NOTE 7. RETIREMENT AND OTHER POSTRETIREMENT BENEFITS

    Components of Net Pension Cost

    Entergy's qualified pension cost, including amounts capitalized, for the second quarters of 2006 and 2005, included the following components:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Service cost - benefits earned during the period

     

    $23,176 

     

    $21,010 

    Interest cost on projected benefit obligation

     

    41,814 

     

    37,484 

    Expected return on assets

     

    (44,482)

     

    (38,781)

    Amortization of transition asset

     

    - 

     

    (166)

    Amortization of prior service cost

     

    1,365 

     

    1,306 

    Amortization of loss

     

    10,931 

     

    7,305 

    Net pension costs

     

    $32,804 

     

    $28,158 

    38

    Entergy's qualified pension cost, including amounts capitalized, for the six months ended June 30, 2006 and 2005, included the following components:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Service cost - benefits earned during the period

     

    $46,352 

     

    $42,020 

    Interest cost on projected benefit obligation

     

    83,628 

     

    74,968 

    Expected return on assets

     

    (88,964)

     

    (77,563)

    Amortization of transition asset

     

    - 

     

    (332)

    Amortization of prior service cost

     

    2,730 

     

    2,611 

    Amortization of loss

     

    21,862 

     

    14,612 

    Net pension costs

     

    $65,608 

     

    $56,316 

    Entergy recognized $3.9 million and $4.0 million in pension cost for its non-qualified pension plans in the second quarters of 2006 and 2005, respectively. Entergy recognized $7.8 million and $8.1 million in pension cost for its non-qualified pension plans for the six months ended June 30, 2006 and 2005, respectively.

    Components of Net Other Postretirement Benefit Cost

    Entergy's other postretirement benefit cost, including amounts capitalized, for the second quarters of 2006 and 2005, included the following components:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Service cost - benefits earned during the period

     

    $10,370 

     

    $9,208 

    Interest cost on APBO

     

    14,316 

     

    13,501 

    Expected return on assets

     

    (4,756)

     

    (4,363)

    Amortization of transition obligation

     

    542 

     

    1,340 

    Amortization of prior service cost

     

    (3,688)

     

    (1,989)

    Amortization of loss

     

    5,698 

     

    5,271 

    Net other postretirement benefit cost

     

    $22,482 

     

    $22,968 

    Entergy's other postretirement benefit cost, including amounts capitalized, for the six months ended June 30, 2006 and 2005, included the following components:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Service cost - benefits earned during the period

     

    $20,740 

     

    $18,416 

    Interest cost on APBO

     

    28,632 

     

    27,002 

    Expected return on assets

     

    (9,512)

     

    (8,726)

    Amortization of transition obligation

     

    1,084 

     

    2,680 

    Amortization of prior service cost

     

    (7,376)

     

    (3,978)

    Amortization of loss

     

    11,396 

     

    10,542 

    Net other postretirement benefit cost

     

    $44,964 

     

    $45,936 

    Employer Contributions

    Entergy expects to contribute $349 million to its qualified pension plans in 2006 (including $107 million delayed from 2005 as a result of the Katrina Emergency Tax Relief Act). As of the end of July 2006, Entergy contributed $189 million to its pension plans. Therefore, Entergy presently anticipates contributing an additional $160 million to fund its pension plans in 2006.

    39

    Medicare Prescription Drug, Improvement and Modernization Act of 2003 (Medicare Act)

    Based on actuarial analysis, the estimated impact of future Medicare subsidies reduced the December 31, 2005 Accumulated Postretirement Benefit Obligation by $176 million, and reduced the second quarter 2006 and 2005 other postretirement benefit cost by $6.9 million and $6.4 million, respectively. It reduced the six months ended June 30, 2006 and 2005 other postretirement benefit cost by $13.9 million and $12.9 million, respectively. Refer to Note 10 to the consolidated financial statements in the Form 10-K for further discussion.

     

    NOTE 8. BUSINESS SEGMENT INFORMATION

    Entergy's reportable segments as of June 30, 2006 are Utility and Non-Utility Nuclear. "All Other" includes the parent company, Entergy Corporation, and other business activity, including the Energy Commodity Services segment, the Competitive Retail Services business, and earnings on the proceeds of sales of previously-owned businesses. As a result of the Entergy New Orleans bankruptcy filing, Entergy has discontinued the consolidation of Entergy New Orleans retroactive to January 1, 2005, and is reporting Entergy New Orleans results under the equity method of accounting in the Utility segment.

    Entergy's segment financial information for the second quarters of 2006 and 2005 is as follows:

     



    Utility

     


    Non-Utility
    Nuclear*

     



    All Other*

     



    Eliminations

     



    Consolidated

    (In Thousands)

    2006

     

     

     

     

     

     

     

     

     

    Operating revenues

    $2,191,891

     

    $362,363

     

    $82,785 

     

    ($8,537)

     

    $2,628,502 

    Equity in earnings (loss) of
      unconsolidated equity affiliates


    10,682

     


    -

     


    (2,199)

     


    - 

     


    8,483 

    Income taxes (benefit)

    93,776

     

    41,331

     

    (12,206)

     

    - 

     

    122,901 

    Income from continuing operations

    206,542

    63,379

    6,619 

    (83)

    276,457 

    Income from discontinued
      operations (net of income taxes)


    -

    -

    13,119 

    -

    13,119 

    Net income

    206,542

     

    63,379

     

    19,738 

     

    (83)

     

    289,576 

     

     

     

     

     

     

     

    2005

     

     

     

     

     

     

     

     

     

    Operating revenues

    $2,057,526

     

    $347,706

     

    $59,092 

     

    ($18,933)

     

    $2,445,391 

     

     

     

     

     

     

     

     

     

     

    Equity in earnings of
      unconsolidated equity affiliates


    8,133

     


    -

     


    2,158 

     


    - 

     


    10,291 

    Income taxes (benefit)

    132,093

     

    34,978

     

    (15,222)

     

    - 

     

    151,849 

    Income from continuing operations

    217,260

    58,277

    19,795 

    27 

    295,359 

    Loss from discontinued operations
      (net of income tax benefit)


    -


    -


    (2,811)


    - 


    (2,811)

    Net income

    217,260

     

    58,277

     

    16,984 

     

    27 

     

    292,548 

    40

    Entergy's segment financial information for the six months ended June 30, 2006 and 2005 is as follows:

     



    Utility

     


    Non-Utility
    Nuclear*

     



    All Other*

     



    Eliminations

     



    Consolidated

    (In Thousands)

    2006

     

     

     

     

     

     

     

     

     

    Operating revenues

    $4,322,913 

     

    $750,372 

     

    $149,476 

     

    ($26,224)

     

    $5,196,537 

    Equity in earnings (loss) of
      unconsolidated equity affiliates


    16,325 

     


    - 

     


    (4,255)

     


    - 

     


    12,070 

    Income taxes (benefit)

    170,749 

     

    94,248 

     

    (23,265)

     

    - 

     

    241,732 

    Income from continuing operations

    333,477 

    144,908 

    2,093 

    (115)

    480,363 

    Income from discontinued
      operations (net of income taxes)


    - 


    - 


    10,880 


    - 


    10,880 

    Net income

    333,477 

     

    144,908 

     

    12,973 

     

    (115)

     

    491,243 

    Total assets

    24,763,451 

     

    5,138,175 

     

    3,127,773 

     

    (2,465,726)

     

    30,563,673 

     

     

     

     

     

     

     

     

     

     

    2005

     

     

     

     

     

     

     

     

     

    Operating revenues

    $3,786,866 

     

    $691,281 

     

    $113,418 

     

    ($35,993)

     

    $4,555,572 

    Equity in earnings (loss) of
      unconsolidated equity affiliates


    13,628 

     


    - 

     


    (35)

     


    - 

     


    13,593 

    Income taxes (benefit)

    177,618 

     

    86,146 

     

    (19,672)

     

    - 

     

    244,092 

    Income from continuing operations

    313,287 

    136,242 

    25,621 

    (46)

    475,104 

    Loss from discontinued operations
      (net of income tax benefit)


    - 


    - 


    (4,177)


    - 


    (4,177)

    Net income

    313,287 

     

    136,242 

     

    21,444 

     

    (46)

     

    470,927 

    Total assets

    22,674,291 

     

    4,733,230 

     

    3,260,502 

     

    (2,512,415)

     

    28,155,608 

    Businesses marked with * are sometimes referred to as the "competitive businesses," with the exception of the parent company, Entergy Corporation. Eliminations are primarily intersegment activity.

    In April 2006, Entergy sold the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas, and now reports this portion of the business as a discontinued operation. Entergy realized a $26.3 million gain ($17.1 million net-of-tax) on the sale.

     

    NOTE 9. ENTERGY NEW ORLEANS BANKRUPTCY PROCEEDING

    See Note 16 to the consolidated financial statements in the Form 10-K for a discussion of the Entergy New Orleans bankruptcy proceeding, and a discussion of Entergy's decision to deconsolidate its investment in Entergy New Orleans and report it under the equity method of accounting. Entergy's income statement for the three and six months ended June 30, 2006 includes $67 million and $128 million, respectively, in operating revenues and $4 million and $11 million, respectively, in purchased power expenses from transactions with Entergy New Orleans. Entergy's income statement for the three and six months ended June 30, 2005 includes $44 million and $87 million, respectively, in operating revenues and $35 million and $81 million, respectively, in purchased power from transactions with Entergy New Orleans. Entergy's balance sheet as of June 30, 2006 includes $111.4 million of accounts receivable that are payable to Entergy or its subsidiaries by Entergy New Orleans, including $64.9 million of pre-petition accounts.

    As discussed in the Form 10-K, because Entergy owns all of the common stock of Entergy New Orleans, Entergy's deconsolidation of Entergy New Orleans does not affect the amount of net income Entergy records resulting from Entergy New Orleans' operations.

    41

    NOTE 10. ACCOUNTING POLICY UPDATE

    Revenue and Fuel Costs

    Entergy recognizes revenue from electric power and gas sales when it delivers power or gas to its customers. To the extent that deliveries have occurred but a bill has not been issued, the domestic utility companies accrue an estimate of the revenues for energy delivered since the latest billings. Entergy calculates the estimate based upon several factors including billings through the last billing cycle in a month, actual generation in the month, historical line loss factors, and prices in effect in the domestic utility companies' various jurisdictions. Each month the estimated unbilled revenue amounts are recorded as revenue and unbilled accounts receivable, and the prior month's estimate is reversed. Therefore, changes in price and volume differences resulting from factors such as weather affect the calculation of unbilled revenues from one period to the next, and may result in variability in reported revenues from one period to the next as prior estimates are so recorded and reversed.

    Prior to 2006, Entergy Louisiana and the Louisiana portion of Entergy Gulf States included a component of fuel cost recovery in their unbilled revenue calculations. Effective January 1, 2006, this fuel component of unbilled accounts receivable was reclassified to deferred fuel and is no longer included in the unbilled revenue calculations for Entergy Louisiana and the Louisiana portion of Entergy Gulf States, which is in accordance with regulatory treatment.

    __________________________________

     

    In the opinion of the management of Entergy Corporation, the accompanying unaudited financial statements contain all adjustments (consisting primarily of normal recurring accruals and reclassification of previously reported amounts to conform to current classifications) necessary for a fair statement of the results for the interim periods presented. The business of the Utility segment, however, is subject to seasonal fluctuations with the peak periods occurring during the third quarter. The results for the interim periods presented should not be used as a basis for estimating results of operations for a full year.

    42

    ENTERGY ARKANSAS, INC.

    MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

     

    Results of Operations

    Net Income

    Second Quarter 2006 Compared to Second Quarter 2005

    Net income increased $7.4 million primarily due to a lower effective income tax rate, partially offset by lower net revenue, higher depreciation and amortization expenses, and lower other income.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net income increased $4.4 million primarily due to a lower effective income tax rate, partially offset by higher depreciation and amortization expenses and higher other operation and maintenance expenses.

    Net Revenue

    Second Quarter 2006 Compared to Second Quarter 2005

    Net revenue, which is Entergy Arkansas' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing the second quarter of 2006 to the second quarter of 2005.

     

     

    Amount

     

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $266.2

     

    Capacity costs

     

    (6.3)

    Volume/weather

     

    4.3 

    Other

     

    (4.4)

    2006 net revenue

     

    $259.8

     

    The capacity costs variance is primarily due to higher capacity-related costs including the revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

    The volume/weather variance is primarily due to an increase in billed electricity usage, including the effect of more favorable weather during the second quarter of 2006 compared to the second quarter of 2005, partially offset by a decrease in usage during the unbilled sales period. Billed electricity usage increased a total of 309 GWh in all sectors.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory credits

    Gross operating revenues increased primarily due to an increase of $30.3 million in fuel cost recovery revenues due to an increase in the energy cost recovery rider effective October 2005 and an increase of $25.3 million in gross wholesale revenue resulting from higher wholesale prices and volume.

    Fuel and purchased power expenses increased primarily due to increased deferred fuel expense resulting primarily from higher purchased energy costs as a result of higher natural gas prices and increased power purchases. Also contributing to the increase was a slight increase in demand.

    43

    Other regulatory credits increased primarily due to an increase of $3.6 million resulting from the under-recovery of Grand Gulf costs due to a decrease in the Grand Gulf rider effective January 2006.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net revenue, which is Entergy Arkansas' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing the six months ended June 30, 2006 to the six months ended June 30, 2005.

     

     

    Amount

     

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $489.9

     

    Net wholesale revenue

     

    10.1 

    Volume/weather

     

    9.9 

    Deferred fuel cost revisions

     

    (6.1)

    Capacity costs

     

    (11.3)

    Other

     

    (1.0)

    2006 net revenue

     

    $491.5

     

    The net wholesale revenue variance is primarily due to higher wholesale prices and improved results related to co-owner contracts.

    The volume/weather variance is primarily due to an increase in electricity usage, including the effect of more favorable weather during the six months ended June 30, 2006 compared to the six months ended June 30, 2005. Billed electricity usage increased a total of 471 GWh in all sectors.

    The deferred fuel cost revisions variance is primarily due to the 2004 energy cost recovery true-up, made in the first quarter of 2005, which increased net revenue by $4 million.

    The capacity costs variance is primarily due to higher capacity-related costs including the revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory credits

    Gross operating revenues increased primarily due to an increase of $75.2 million in fuel cost recovery revenues due to increases in the energy cost recovery rider effective April 2005 and October 2005 and an increase of $62.2 million in gross wholesale revenue resulting from higher wholesale prices and volume.

    Fuel and purchased power expenses increased primarily due to increased deferred fuel expense resulting primarily from higher purchased energy costs as a result of higher natural gas prices and increased power purchases. Also contributing to the increase was a slight increase in demand.

    Other regulatory credits increased primarily due to an increase of $8.7 million resulting from the under-recovery of Grand Gulf costs due to a decrease in the Grand Gulf rider effective January 2006.

    Other Income Statement Variances

    Second Quarter 2006 Compared to Second Quarter 2005

    Depreciation and amortization expenses increased primarily due to an increase in plant in service and a revision in 2005 of estimated depreciable lives involving certain intangible assets.

    44

    Other income decreased primarily due to:

  • a decrease in allowance for equity funds used during construction primarily due to increased construction expenditures in the second quarter of 2005 resulting from the steam generator and reactor vessel head replacement at ANO 1 completed in the fourth quarter 2005 and additional transmission work performed in 2005; and
  • a decrease of $1.6 million in interest earned on decommissioning trust funds.
  • Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Other operation and maintenance expenses increased primarily due to $4.1 million applied as a credit against bad debt expense in the first quarter of 2005 in accordance with a settlement agreement with the APSC.

    Depreciation and amortization expenses increased primarily due to an increase in plant in service and a revision in 2005 of estimated depreciable lives involving certain intangible assets.

    Income Taxes

    The effective income tax rates for the second quarters of 2006 and 2005 were 8.9% and 37.0%, respectively. The difference in the effective income tax rate for the second quarter of 2006 versus the federal statutory rate of 35.0% is primarily due to the recognition of an income tax benefit related to the steam generator removal cost and the flow through of a pension item. The difference in the effective income tax rate for the second quarter of 2005 versus the federal statutory rate of 35.0% is primarily due to state income taxes and book and tax differences related to utility plant items, partially offset by amortization of investment tax credits and book and tax differences related to the allowance for funds used during construction.

    The effective income tax rates for the six months ended June 30, 2006 and 2005 were 25.0% and 36.3%, respectively. The difference in the effective income tax rate for the six months ended June 30, 2006 versus the federal statutory rate of 35.0% is primarily due to the recognition of an income tax benefit related to the steam generator removal cost and the flow through of a pension item. The difference in the effective income tax rate for the six months ended June 30, 2005 versus the federal statutory rate of 35.0% is primarily due to state income taxes and book and tax differences related to utility plant items, partially offset by a downward revision in the estimate of federal income tax expense related to tax depreciation, the amortization of investment tax credits, and book and tax differences related to the allowance for funds used during construction.

    Liquidity and Capital Resources

    Cash Flow

    Cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $9,393 

     

    $89,744 

     

     

     

     

     

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

    225,953 

     

    210,270 

     

    Investing activities

     

    (147,364)

     

    (246,232)

     

    Financing activities

     

    (68,931)

     

    57,634 

    Net increase in cash and cash equivalents

     

    9,658 

     

    21,672 

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $19,051 

     

    $111,416 

    45

    Operating Activities

    Cash flow from operations increased $15.7 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to increased recovery of deferred fuel costs and income tax refunds of $23.5 million in 2006 compared to income tax payments of $19.5 million in 2005. These increases were partially offset by the timing of the collection of receivables from customers and the timing of payments to vendors.

    In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005, as discussed in Note 3 to the domestic utilities companies and System Energy financial statements in the Form 10-K. In accordance with Entergy's intercompany tax allocation agreement, in April 2006 Entergy Corporation distributed $12 million of the refund to Entergy Arkansas.

    Investing Activities

    Net cash flow used in investing activities decreased $98.9 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to money pool activity.

    Financing Activities

    Financing activities used $68.9 million in cash flows for the six months ended June 30, 2006 compared to providing $57.6 million in cash flows for the six months ended June 30, 2005 primarily due to the net issuance of $92.9 million of long-term debt for the six months ended June 30, 2005 in addition to money pool activity.

    See "Uses and Sources of Capital" below for the details of Entergy Arkansas' preferred stock activity in 2006.

    Capital Structure

    Entergy Arkansas' capitalization is balanced between equity and debt, as shown in the following table.

     

     

    June 30,
    2006

     

    December 31,
    2005

     

     

     

     

     

    Net debt to net capital

     

    47.9%

     

    47.4%

    Effect of subtracting cash from debt

     

    0.3%

     

    0.1%

    Debt to capital

     

    48.2%

     

    47.5%

    Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity. Net capital consists of capital less cash and cash equivalents. Entergy Arkansas uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas' financial condition.

    Uses and Sources of Capital

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of Entergy Arkansas' uses and sources of capital. Following are updates to the information provided in the Form 10-K.

    In March 2006, Entergy Arkansas issued 3,000,000 shares of $25 par value 6.45% Series Preferred Stock, all of which were outstanding as of June 30, 2006. The dividends are cumulative and payable quarterly beginning July 1, 2006. The preferred stock is redeemable on or after April 1, 2011, at Entergy Arkansas' option, at the call price of $25 per share. In April 2006, Entergy Arkansas used the proceeds from this issuance to redeem the following preferred stock:

    46

    Series of Entergy Arkansas Preferred Stock

     

    Redemption Price Per Share

         

    7.32% Preferred Stock, Cumulative, $100.00 par value

     

    $103.17

    7.80% Preferred Stock, Cumulative, $100.00 par value

     

    $103.25

    7.40% Preferred Stock, Cumulative, $100.00 par value

     

    $102.80

    7.88% Preferred Stock, Cumulative, $100.00 par value

     

    $103.00

    $1.96 Preferred Stock, Cumulative, $0.01 par value

     

    $ 25.00

    In April 2006, Entergy Arkansas renewed its $85 million credit facility through April 30, 2007. The facility is no longer subject to a combined borrowing limit with Entergy Louisiana's credit facility. There were no outstanding borrowings under the Entergy Arkansas credit facility as of June 30, 2006.

    In June 2006, Entergy Arkansas issued $54.7 million of 4.60% Series of Jefferson County bonds due October 2017. The proceeds were used to redeem, prior to maturity, $45.5 million of 5.6% Series of Jefferson County bonds and $9.2 million of 6.3% Series of Jefferson County bonds in July 2006. The issuance is shown as a non-cash transaction on the cash flow statement since the proceeds were placed in a trust and never held as cash by Entergy Arkansas.

    Entergy Arkansas' receivables from or (payables to) the money pool were as follows:

    June 30,
    2006

     

    December 31,
    2005

     

    June 30,
    2005

     

    December 31,
    2004

    (In Thousands)

     

     

     

     

     

     

     

    $15,567

     

    ($27,346)

     

    $132,315

     

    $23,561

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for a discussion of utility restructuring, federal regulation and proceedings, market and credit risks, state and local rate regulatory risks, nuclear matters, and environmental risks.

    In March 2006, Entergy Arkansas filed with the APSC its annual redetermination of the energy cost rate for application to the period April 2006 through March 2007. The filed energy cost rate of $0.02827 per kWh was proposed to replace the interim rate of $0.01900 per kWh that had been in place since October 2005. The interim energy cost rate is discussed in the Form 10-K, along with the investigation that the APSC commenced concerning Entergy Arkansas' interim energy cost rate. The increase in the energy cost rate is due to increases in the cost of purchased power primarily due to the natural gas cost increase and the effect that Hurricanes Katrina and Rita had on market conditions, increased demand for purchased power during the ANO 1 refueling and steam generator replacement outage in the fall of 2005, and coal plant generation curtailments during off-peak periods due to coal delivery problems.

    On March 31, 2006, the APSC suspended implementation of the $0.02827 per kWh energy cost rate, and ordered that the $0.01900 per kWh interim rate remain in effect pending the APSC proceedings on the energy cost recovery filings. The APSC also extended its investigation into Entergy Arkansas' interim energy cost rate to cover the costs included in Entergy Arkansas' March 2006 filing. The extended investigation does not identify new issues in addition to the four issues listed in the Form 10-K and covers the same time period. On April 7, 2006, the APSC issued a show cause order in the investigation proceeding that ordered Entergy Arkansas to file a cost of service study by June 8, 2006. The order also directed Entergy Arkansas to file testimony to support the cost of service study, to support the $0.02827 per kWh cost rate, and to address the general topic of elimination of the energy cost recovery rider.

    47

    Entergy Arkansas filed for rehearing of the APSC's orders, asking that the energy cost rate filed in March 2006 be implemented in May 2006 subject to refund, asserting that the APSC did not follow appropriate procedures in suspending the operation of the energy cost recovery rider, and asking the APSC to rescind its show cause order. On May 8, 2006 the APSC denied Entergy Arkansas' requests for rehearing. Entergy Arkansas appealed the APSC's decision, but later filed a motion to dismiss the appeal following the APSC's decision described below.

    In June 2006, Entergy Arkansas once again filed a motion with the APSC seeking to implement the redetermined energy cost rate of $0.02827 per kWh. After a hearing the APSC approved Entergy Arkansas' request and the redetermined rate was implemented in July 2006, subject to refund pending the outcome of the APSC energy cost recovery investigation. Because of the delay in implementing the redetermined energy cost rate, Entergy Arkansas estimated in its motion that $46 million of energy costs would remain under-recovered at December 31, 2006.

    A hearing in the APSC energy cost recovery investigation is scheduled for October 2006.

    On June 7, 2006, Entergy Arkansas filed the cost of service study ordered by the APSC. On that date Entergy Arkansas also filed notice with the APSC that it intends to file for a change in base rates within 60 to 90 days of its notice. Entergy Arkansas expects to make that filing in August 2006.

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation" for a discussion of Entergy's compliance filing in that proceeding. If the FERC approves the compliance tariff as filed, then payments under that tariff will be classified as energy costs, which would then be included in setting the retail energy cost rate as part of the normal working of the energy cost recovery rider.  As noted above the APSC has given notice that it is considering the prospective elimination of the energy cost recovery rider.  Therefore, Entergy Arkansas plans to propose an alternative to the energy cost recovery rider for recovery of the costs allocated to it as a result of the System Agreement litigation should the energy cost recovery rider be lawfully terminated by the APSC.  A separate exact recovery rider, similar to the energy cost recovery rider or a production cost allocation rider, would ensure that Entergy Arkansas' customers pay only the amount allocated by the FERC.

    Federal Regulation

    System Agreement Proceedings

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation, APSC Complaint filed with the FERC, and APSC System Agreement Investigation" for updates regarding proceedings involving the System Agreement.

    Independent Coordinator of Transmission (ICT)

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - Independent Coordinator of Transmission" for an update regarding Entergy's ICT proposal.

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Arkansas' accounting for nuclear decommissioning costs, unbilled revenue, and qualified pension and other postretirement benefits.

    48

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy Arkansas in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Entergy Arkansas does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    49

     

    ENTERGY ARKANSAS, INC.
    INCOME STATEMENTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands) (In Thousands)
    OPERATING REVENUES
    Domestic electric $504,223  $450,097  $951,845  $817,457 
    OPERATING EXPENSES
    Operation and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 84,806  46,612  187,277  83,415 
      Purchased power 167,981  139,899  286,911  247,531 
      Nuclear refueling outage expenses 7,371  7,019  14,726  13,336 
      Other operation and maintenance 105,895  105,727  197,650  191,556 
    Decommissioning 7,608  8,246  15,091  16,359 
    Taxes other than income taxes 8,982  10,051  18,602  19,888 
    Depreciation and amortization 54,143  48,023  106,961  99,800 
    Other regulatory credits - net (8,359) (2,589) (13,886) (3,384)
    TOTAL 428,427  362,988  813,332  668,501 
    OPERATING INCOME 75,796  87,109  138,513  148,956 
    OTHER INCOME
    Allowance for equity funds used during construction 1,916  3,491  3,818  7,450 
    Interest and dividend income 3,998  5,078  11,673  9,370 
    Miscellaneous - net (687) (47) (1,572) (679)
    TOTAL 5,227  8,522  13,919  16,141 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 19,361  19,968  38,339  40,750 
    Other interest - net 1,328   798  2,868  2,224 
    Allowance for borrowed funds used during construction (822) (1,725) (1,679) (3,736)
    TOTAL 19,867  19,041  39,528  39,238 
    INCOME BEFORE INCOME TAXES 61,156  76,590  112,904  125,859 
    Income taxes 5,421  28,300  28,246  45,638 
    NET INCOME 55,735  48,290  84,658  80,221 
    Preferred dividend requirements and other 2,085  1,944  4,123  3,888 
    EARNINGS APPLICABLE TO
    COMMON STOCK $53,650  $46,346  $80,535  $76,333 
    See Notes to Respective Financial Statements.

     

    50

     

    ENTERGY ARKANSAS, INC.
    STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Net income $84,658  $80,221 
    Adjustments to reconcile net income to net cash flow provided by operating activities:
      Reserve for regulatory adjustments 6,789  - 
      Other regulatory credits - net (13,886) (3,384)
      Depreciation, amortization, and decommissioning 122,052  116,159 
      Deferred income taxes and investment tax credits (44,980) 17,049 
      Changes in working capital:
        Receivables (41,738) 33,568 
        Fuel inventory (1,659) (773)
        Accounts payable (44,275) (13,773)
        Taxes accrued 95,543  11,418 
        Interest accrued (804) 1,196 
        Deferred fuel costs 85,047  (720)
        Other working capital accounts 8,588  (10,700)
      Provision for estimated losses and reserves (829) (3,645)
      Changes in other regulatory assets (15,484) 25,435 
      Other (13,069) (41,781)
    Net cash flow provided by operating activities 225,953  210,270 
    INVESTING ACTIVITIES
    Construction expenditures (121,269) (123,690)
    Allowance for equity funds used during construction 3,818  7,450 
    Nuclear fuel purchases -  (62,307)
    Proceeds from sale/leaseback of nuclear fuel -  62,248 
    Proceeds from nuclear decommissioning trust fund sales 74,895  111,352 
    Investment in nuclear decommissioning trust funds (79,353) (116,437)
    Change in money pool receivable - net (15,567) (108,754)
    Other regulatory investments (9,888) (16,094)
    Net cash flow used in investing activities (147,364) (246,232)
    FINANCING ACTIVITIES
    Proceeds from the issuance of long-term debt -  272,817 
    Retirement of long-term debt -  (179,895)
    Proceeds from the issuance of preferred stock 73,355  - 
    Redemption of preferred stock (75,885) - 
    Change in money pool payable - net (27,346) - 
    Dividends paid:
      Common stock (34,800) (31,400)
      Preferred stock (4,255) (3,888)
    Net cash flow provided by (used in) financing activities (68,931) 57,634 
    Net increase in cash and cash equivalents 9,658  21,672 
    Cash and cash equivalents at beginning of period 9,393  89,744 
    Cash and cash equivalents at end of period $19,051  $111,416 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
      Cash paid/(received) during the period for:
        Interest - net of amount capitalized $36,185  $37,395 
        Income taxes ($23,543) $19,476 
      Noncash financing activities:
        Proceeds from long-term debt issued for the purpose
         of refunding other long-term debt $54,700  - 
    See Notes to Respective Financial Statements.

    51

     

    ENTERGY ARKANSAS, INC.
    BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents:
      Cash $3,014  $9,393 
      Temporary cash investments - at cost,
       which approximates market 16,037  - 
         Total cash and cash equivalents 19,051  9,393 
    Accounts receivable:
      Customer 93,536  115,321 
      Allowance for doubtful accounts (13,464) (15,777)
      Associated companies 55,602  30,902 
      Other 104,335  63,702 
      Accrued unbilled revenues 79,872  68,428 
         Total accounts receivable 319,881  262,576 
    Deferred fuel costs 129,023  153,136 
    Fuel inventory - at average cost 14,001  12,342 
    Materials and supplies - at average cost 94,509  87,875 
    Deferred nuclear refueling outage costs 17,821  30,967 
    Prepayments and other 62,204  9,628 
    TOTAL 656,490  565,917 
    OTHER PROPERTY AND INVESTMENTS
    Investment in affiliates - at equity 11,206  11,206 
    Decommissioning trust funds 404,525  402,124 
    Non-utility property - at cost (less accumulated depreciation) 1,448  1,449 
    Other 2,976  2,976 
    TOTAL 420,155  417,755 
    UTILITY PLANT
    Electric 6,435,831  6,344,435 
    Property under capital lease 6,649  9,900 
    Construction work in progress 150,928  139,208 
    Nuclear fuel under capital lease 105,801  92,181 
    Nuclear fuel 19,205  22,616 
    TOTAL UTILITY PLANT 6,718,414  6,608,340 
    Less - accumulated depreciation and amortization 2,928,168  2,843,904 
    UTILITY PLANT - NET 3,790,246  3,764,436 
     
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      SFAS 109 regulatory asset - net 69,884  61,236 
      Other regulatory assets 470,283  461,015 
      Deferred fuel costs -  51,046 
    Other 48,102  46,605 
    TOTAL 588,269  619,902 
    TOTAL ASSETS $5,455,160  $5,368,010 
    See Notes to Respective Financial Statements.
     
    52
     
     
    ENTERGY ARKANSAS, INC.
    BALANCE SHEETS
    LIABILITIES AND SHAREHOLDERS' EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    Accounts payable:
      Associated companies $76,966 $135,357
      Other 103,694 120,090
    Customer deposits 47,149 45,432
    Taxes accrued 34,327 -
    Accumulated deferred income taxes 22,971 56,186
    Interest accrued 18,403 19,207
    Obligations under capital leases 48,281 46,857
    Other 21,474 21,836
    TOTAL 373,265 444,965
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 1,166,404 1,105,712
    Accumulated deferred investment tax credits 61,917 64,001
    Obligations under capital leases 64,169 55,224
    Other regulatory liabilities 74,450 76,507
    Decommissioning 457,206 442,115
    Accumulated provisions 28,244 29,073
    Long-term debt 1,356,585 1,298,238
    Other 284,502 306,034
    TOTAL 3,493,477 3,376,904
    Commitments and Contingencies
    SHAREHOLDERS' EQUITY
    Preferred stock without sinking fund 116,350 116,350
    Common stock, $0.01 par value, authorized 325,000,000
      shares; issued and outstanding 46,980,196 shares in 2006
      and 2005 470 470
    Paid-in capital 588,529 591,102
    Retained earnings 883,069 838,219
    TOTAL 1,588,418 1,546,141
    TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY $5,455,160 $5,368,010
    See Notes to Respective Financial Statements.

    53

     

    ENTERGY ARKANSAS, INC.
    SELECTED OPERATING RESULTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $ 138 $ 124 $ 14  11 
      Commercial 91 80 11  14 
      Industrial 95 84 11  13 
      Governmental 4 4 -  - 
         Total retail 328 292 36  12 
      Sales for resale
        Associated companies 106 64 42  66 
        Non-associated companies 33 50 (17) (34)
      Other 37 44 (7) (16)
         Total $ 504 $ 450 $ 54  12 
    Billed Electric Energy
     Sales (GWh):
      Residential 1,591 1,481 110  7 
      Commercial 1,391 1,305 86  7 
      Industrial 1,836 1,720 116  7 
      Governmental 63 66 (3) (5)
         Total retail 4,881 4,572 309  7 
      Sales for resale
        Associated companies 2,432 1,622 810  50 
        Non-associated companies 674 1,065 (391) (37)
         Total 7,987 7,259 728  10 
    Six Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $ 289 $ 259 $ 30  12 
      Commercial 171 149 22  15 
      Industrial 183 156 27  17 
      Governmental 9 9 -  - 
         Total retail 652 573 79  14 
      Sales for resale
        Associated companies 183 105 78  74 
        Non-associated companies 84 100 (16) (16)
      Other 33 39 (6) (15)
         Total $ 952 $ 817 $ 135  17 
    Billed Electric Energy
     Sales (GWh):
      Residential 3,501 3,371 130  4 
      Commercial 2,670 2,554 116  5 
      Industrial 3,615 3,384 231  7 
      Governmental 128 134 (6) (4)
         Total retail 9,914 9,443 471  5 
      Sales for resale
        Associated companies 4,297 2,977 1,320  44 
        Non-associated companies 1,531 2,172 (641) (30)
         Total 15,742 14,592 1,150  8 

    54

     

     

    ENTERGY GULF STATES, INC.

    MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

     

    Hurricane Rita and Hurricane Katrina

    See the Form 10-K for a discussion of the effects of Hurricanes Katrina and Rita, which hit Entergy Gulf States' service territory in the Texas and Louisiana jurisdictions in August and September 2005. The storms resulted in power outages, significant damage to electric distribution, transmission, and generation and gas infrastructure, and the loss of sales and customers due to mandatory evacuations. Following is an update to the discussion in the Form 10-K.

    Entergy Gulf States currently estimates that its total restoration costs for the repair or replacement of its electric and gas facilities damaged by Hurricanes Katrina and Rita and business continuity costs will be $633 million, the majority of which is due to Hurricane Rita.

    As discussed in the Form 10-K, a federal hurricane aid package became law that includes funding for Community Development Block Grants (CDBG) that allows state and local leaders to fund individual recovery priorities. The law permits funding for infrastructure restoration. It is uncertain how much funding, if any, will be designated for utility reconstruction and the timing of such decisions is also uncertain. The U.S. Department of Housing and Urban Development has allocated approximately $10.4 billion for Louisiana, $5.1 billion for Mississippi, and $74 million for Texas, with an additional $1 billion approved by Congress but not yet allocated to the states. The states, in turn, will administer the grants. Entergy Gulf States is currently preparing applications to seek CDBG funding. In March 2006 Entergy Gulf States provided a justification statement to state and local officials in Louisiana. The statement, which will be reviewed by the Louisiana Recovery Authority, includes the estimated costs of Hurricanes Katrina and Rita damage in the Louisiana jurisdiction. The statement includes justification for a request for $164 million in CDBG funding attributable to the Louisiana portion of Entergy Gulf States' business.

    Storm Costs Recovery Filings with Retail Regulators

    On July 31, 2006, Entergy Louisiana and Entergy Gulf States filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in the Louisiana jurisdiction and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, based on a ten-year levelized rate are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Storm Cost Recovery Riders (SCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SCRRs be adjusted annually to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States. Hearings on the application are scheduled for the first quarter 2007.

    55

    In July 2006, Entergy Gulf States filed an application with the PUCT with respect to the $393.2 million of Hurricane Rita reconstruction costs incurred in its Texas retail jurisdiction through March 31, 2006. The filing asks the PUCT to determine that $393.2 million is the amount of reasonable and necessary hurricane reconstruction costs eligible for securitization and recovery, approve the recovery of carrying costs, and approve the manner in which Entergy Gulf States-Texas allocates those costs among its retail customer classes.  If approved, Entergy Gulf States' application will ultimately affect all its retail customers in Texas. Entergy Gulf States' filing does not request recovery of costs through a specific rider on customer bills or through any other means at this time. The hearing before the PUCT on the filing is scheduled for November 2006. This is the first of two filings authorized by a law passed earlier this year in a special session of the Texas Legislature. A second filing will request securitization and recovery of the eligible costs through retail rates and tariffs. Entergy Gulf States expects to make the second filing following the conclusion of the reconstruction cost case.

    Results of Operations

    Net Income

    Second Quarter 2006 Compared to Second Quarter 2005

    Net income increased $7.4 million primarily due to higher net revenue partially offset by higher interest and other charges and higher taxes other than income taxes.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net income increased $29.1 million primarily due to higher net revenue and higher other income, partially offset by higher other operation and maintenance expenses, higher taxes other than income taxes, and higher interest and other charges.

    Net Revenue

    Second Quarter 2006 Compared to Second Quarter 2005

    Net revenue, which is Entergy Gulf States' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing the second quarter of 2006 to the second quarter of 2005.

     

     

    Amount

     

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $302.8 

    Base revenues

     

    15.8 

    Volume/weather

     

    13.3 

    Fuel recovery

     

    10.5 

    Net wholesale revenue

     

    8.7 

    Price applied to unbilled electric sales

     

    (23.8)

    Purchased power capacity

     

    (11.8)

    Other

     

    11.2 

    2006 net revenue

     

    $326.7 

    Base revenues increased due to increases in the Louisiana jurisdiction effective October 2005 for the 2004 formula rate plan filing and the annual revenue requirement related to the purchase of power from the Perryville generating station, and increases in the Texas jurisdiction related to an incremental purchased capacity recovery rider that began in December 2005 and a transition to competition rider that began in March 2006.

    56

    The volume/weather variance is primarily due to an increase in electricity usage, including the effect of more favorable weather compared to the same period in 2005. Billed electricity usage increased a total of 326 GWh in all sectors.

    The fuel recovery variance resulted primarily from the under-recovery in 2005 of fuel costs from retail customers in addition to increased fuel cost recovery in 2006 as a result of special rate contracts.

    The net wholesale revenue variance is primarily due to increased volume and higher margins on sales to municipal and co-op customers.

    The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation, which is in accordance with regulatory treatment. Entergy Gulf States expects that the effect of this factor will be an approximately $40 million decrease in its annual net revenue for 2006 compared to 2005. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein for a discussion of the accounting for unbilled revenues.

    The purchased power capacity variance is primarily due to an increase in capacity charges primarily associated with power purchases from the Perryville generating station in addition to new purchase power contracts in 2006.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

    Gross operating revenues increased primarily due to an increase in fuel cost recovery revenues of $107.1 million due to higher fuel rates. Also contributing to the increase were the base revenue and volume/weather variances discussed above.

    Fuel and purchased power expenses increased primarily due to an increase in deferred fuel expense as a result of higher fuel rates.

    Other regulatory charges increased primarily due to the deferral of under-recovered purchased power capacity costs in 2005 combined with the recovery of purchased power capacity costs in 2005. A rider was implemented in December 2005 in the Texas jurisdiction to recover incremental purchased power capacity costs. Partially offsetting the increase was a regulatory credit of $4.5 million recorded during the second quarter of 2006 as a result of Entergy Gulf States reinstating the application of regulatory accounting principles to its wholesale business. Refer to "Application of SFAS 71" in Note 7 to the domestic utility companies and System Energy financial statements for further discussion.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net revenue, which is Entergy Gulf States' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing the six months ended June 30, 2006 to the six months ended June 30, 2005.

    57

     

     

    Amount

     

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $544.5 

    Base revenues

     

    30.6 

    Fuel recovery

     

    29.7 

    Volume/weather

     

    20.5 

    Net wholesale revenue

     

    13.4 

    Price applied to unbilled electric sales

     

    (20.0)

    Purchased power capacity costs

     

    (17.5)

    Other

     

    20.4 

    2006 net revenue

     

    $621.6 

    Base revenues increased due to increases in the Louisiana jurisdiction effective October 2005 for the 2004 formula rate plan filing and the annual revenue requirement related to the purchase of power from the Perryville generating station, and increases in the Texas jurisdiction related to an incremental purchased capacity recovery rider that began in December 2005 and a transition to competition rider that began in March 2006.

    The fuel recovery variance resulted primarily from adjustments of fuel clause recoveries in Entergy Gulf States' Louisiana jurisdiction. The variance is also due to the under-recovery in 2005 of fuel costs from retail customers and increased fuel cost recovery in 2006 as a result of special rate contracts.

    The volume/weather variance is due to increased weather-adjusted usage on billed sales in addition to an increase in usage during the unbilled sales period. Billed usage increased a total of 370 GWh in the residential and commercial sectors and decreased 350 GWh in the industrial sector.

    The net wholesale revenue variance is primarily due to increased volume and higher margins on sales to municipal and co-op customers.

    The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation, which is in accordance with regulatory treatment. Entergy Gulf States expects that the effect of this factor will be an approximately $40 million decrease in its annual net revenue for 2006 compared to 2005. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein for a discussion of the accounting for unbilled revenues.

    The purchased power capacity variance is primarily due to an increase in capacity charges primarily associated with power purchases from the Perryville generating station in addition to new purchase power contracts in 2006.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

    Gross operating revenues increased primarily due to an increase of $268 million in fuel cost recovery revenues due to higher fuel rates. Also contributing to the increase were the base revenue and volume/weather variances discussed above.

    Fuel and purchased power expenses increased primarily due to an increase in deferred fuel expense in addition to increases in the market prices of natural gas and purchased power. The increase in deferred fuel expense was due to higher fuel rates.

    Other regulatory charges increased primarily due to the deferral of under-recovered purchased power capacity costs in 2005 combined with the recovery of purchased power capacity costs in 2005. A rider was implemented in December 2005 in the Texas jurisdiction to recover incremental purchased power capacity costs. Partially offsetting the increase was a regulatory credit of

    58

     $4.5 million recorded during the second quarter of 2006 as a result of Entergy Gulf States reinstating the application of regulatory accounting principles to its wholesale business. Refer to "Application of SFAS 71" in Note 7 to the domestic utility companies and System Energy financial statements for further discussion.

    Other Income Statement Variances

    Second Quarter 2006 Compared to Second Quarter 2005

    Taxes other than income taxes increased primarily due to higher Louisiana local franchise taxes primarily due to higher revenues as discussed above.

    Interest and other charges increased primarily due to the increase in long-term debt outstanding as a result of the funding of the storm restoration costs resulting from Hurricanes Katrina and Rita.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Other operation and maintenance expenses increased primarily due to:

    • an increase of $5.7 million in loss reserves for storm damages consistent with the formula rate plan rate change in October 2005;
    • an increase of $3.3 million in nuclear labor and contract costs due to a non-refueling plant outage in February 2006;
    • an increase of $2.2 million as a result of system planning spending related to current year fossil projects; and
    • an increase of $2.1 million in customer service support costs, including an increase in customer write-offs.

    Taxes other than income taxes increased primarily due to higher Louisiana local franchise taxes primarily due to higher revenues as discussed above.

    Other income increased primarily due to:

  • an increase of $4.5 million in interest income recorded on the deferred fuel balance; and
  • an increase of $1.7 million related to additional proceeds received from the radwaste settlement discussed in "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Central States Compact Claim" in the Form 10-K.
  • Interest and other charges increased primarily due to the increase in long-term debt outstanding as a result of the funding of the storm restoration costs resulting from Hurricanes Katrina and Rita.

    Income Taxes

    The effective income tax rates for the second quarters of 2006 and 2005 were 39.1% and 38%, respectively. The difference in the effective income tax rates for the second quarter of 2006 and 2005 versus the federal statutory rate of 35% is primarily due to state income taxes and book and tax differences related to utility plant items, partially offset by the amortization of investment tax credits.

    The effective income tax rates for the six months ended June 30, 2006 and 2005 were 34.2% and 32.7%, respectively. The difference in the effective income tax rate for the six months ended June 30, 2006 versus the federal statutory rate of 35% is primarily due to amortization of investment tax credits and book and tax differences related to the allowance for equity funds used during construction, partially offset by state income taxes. The difference in the effective income tax rate for the six months ended June 30, 2005 versus the federal statutory rate of 35% is primarily due to amortization of investment tax credits, book and tax differences related to the allowance for equity funds used during construction, and a downward revision in the estimate of federal income tax expense related to tax depreciation, partially offset by state income taxes and book and tax differences related to utility plant items.

     

    59

     

    Liquidity and Capital Resources

    Cash Flow

    Cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $25,373 

     

    $6,974 

     

     

     

     

     

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

    290,950 

     

    186,084 

     

    Investing activities

     

    (220,594)

     

    (175,285)

     

    Financing activities

     

    (87,268)

     

    (15,446)

    Net decrease in cash and cash equivalents

     

    (16,912)

     

    (4,647)

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $8,461 

     

    $2,327 

    Operating Activities

    Cash flow from operations increased $104.9 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to the timing of collections of receivables from customers, income tax refunds of $60.1 million for the six months ended June 30, 2006 compared to income tax payments of $14.5 million for the same period in 2005, and an increase in the recovery of deferred fuel costs, partially offset by the timing of payments to vendors.

    In the first quarter 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005, as discussed in Note 3 to the domestic utilities companies and System Energy financial statements in the Form 10-K. In accordance with Entergy's intercompany tax allocation agreement, in April 2006 Entergy Corporation distributed $23 million of the refund to Entergy Gulf States.

    Investing Activities

    Net cash used in investing activities increased $45.3 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to an increase in construction expenditures of $116.2 million due to storm-related projects, partially offset by money pool activity and a decrease in under-recovered fuel and purchased power expenses of $14.3 million in Texas that have been deferred and are expected to be collected over a period greater than twelve months.

    Financing Activities

    Net cash used in financing activities increased $71.8 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to an increase of $57.4 million in common stock dividends paid and the net issuance of $14.5 million of long-term debt in 2005.

    60

    Capital Structure

    Entergy Gulf States' capitalization is balanced between equity and debt, as shown in the following table.

     

     

    June 30,
    2006

     

    December 31,
    2005

     

     

     

     

     

     

     

    Net debt to net capital

     

    51.7%

     

    51.4%

     

    Effect of subtracting cash from debt

     

    -   

     

    0.3%

     

    Debt to capital

     

    51.7%

     

    51.7%

     

    Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, preferred stock with sinking fund, and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity. Net capital consists of capital less cash and cash equivalents. Entergy Gulf States uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Gulf States' financial condition.

    Uses and Sources of Capital

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of Entergy Gulf States' uses and sources of capital. Following are updates to the information provided in the Form 10-K.

    Entergy Gulf States' receivables from or (payables to) the money pool were as follows:

    June 30,
    2006

     

    December 31,
    2005

     

    June 30,
    2005

     

    December 31,
    2004

    (In Thousands)

     

     

     

     

     

     

     

    $2,982

     

    $64,011

     

    ($149,447)

     

    ($59,720)

    See Note 4 to the domestic utility companies and System Energy financial statements in the Form 10-K for a description of the money pool.

    In February 2006, Entergy Gulf States established a $25 million line of credit. The line of credit allows Entergy Gulf States to borrow money and to issue letters of credit. $1.4 million in letters of credit were issued under the facility at June 30, 2006, and no borrowings were outstanding. The line of credit terminates in February 2011. In August 2006, Entergy Gulf States increased the capacity of the credit facility to $50 million.

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for a discussion of transition to retail competition, state and local rate regulation, federal regulation and proceedings, the Energy Policy Act of 2005, state and local rate regulatory risk, industrial, commercial, and wholesale customers, market and credit risks, nuclear matters, environmental risks, and litigation risks. Following are updates to the information disclosed in the Form 10-K.

    Jurisdictional Separation Plan

    See the Form 10-K for a discussion of business and jurisdictional separation plans concerning Entergy Gulf States. In January 2006, the LPSC directed that Entergy Gulf States file a complete jurisdictional separation plan as soon as possible. Therefore, on April 26, 2006, Entergy Gulf States filed its plan for jurisdictional separation with the LPSC and requested that it grant approval no later than September 30, 2006.  The plan provides for Entergy Gulf States to be separated into two vertically integrated utilities, one subject solely to the retail jurisdiction of the LPSC and the other subject solely to the retail jurisdictional of the PUCT. The plan also provides that the Texas utility should own all the distribution and transmission assets located in Texas, the gas-fired

    61

    generating plants located in Texas, and undivided ownership shares of Entergy Gulf States' 70% interest in Nelson 6 and 42% interest in Big Cajun 2, Unit 3, which are coal-fired generating plants located in Louisiana. The Louisiana utility would own all of the remaining assets currently owned by Entergy Gulf States.  The Texas utility would purchase from the Louisiana utility pursuant to a life-of-the unit purchase power agreement (PPA) a share of capacity and energy of River Bend. Each separated utility also would purchase pursuant to a PPA a share of capacity and energy of the gas-fired generating plants owned by the other utility. The PPAs associated with the gas-fired generating plants would terminate when retail open access commences in the Texas utility's service territory. Until that time, each utility will participate in the System Agreement and the Entergy System generation will continue to be dispatched in the same manner as before the jurisdictional separation. Under the provisions of the System Agreement, the Texas utility will terminate its participation in the System Agreement, except for the aspects related to transmission equalization, when Texas implements retail open access for Entergy Gulf States. The plan also provides that the operation of the generating plants will not change as a result of the jurisdictional separation. A hearing is scheduled for September 25 to October 4, 2006 on the jurisdictional separation filing. Approvals of the FERC and the NRC may also be required for certain matters before any implementation of the jurisdictional separation of Entergy Gulf States. Although formal approval of the PUCT is not required for implementation of the jurisdictional separation, Entergy Gulf States will seek input from the PUCT and continue to keep it informed of the status of the proceedings.

    State and Local Rate Regulation

    As discussed in the Form 10-K, in August 2005, Entergy Gulf States filed with the PUCT an application for recovery of its transition to competition costs. Entergy Gulf States requested recovery of $189 million in transition to competition costs through implementation of a 15-year rider to be effective no later than March 1, 2006. The $189 million represents transition to competition costs Entergy Gulf States incurred from June 1, 1999 through June 17, 2005 in preparing for competition in its service area, including attendant AFUDC, and all carrying costs projected to be incurred on the transition to competition costs through February 28, 2006. The $189 million is before any gross-up for taxes or carrying costs over the 15-year recovery period. Entergy Gulf States reached a unanimous settlement agreement on all issues with the active parties in the transition to competition cost recovery case. The agreement allows Entergy Gulf States to recover $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented interim rates based on this revenue level on March 1, 2006. The PUCT approved the settlement agreement in June 2006.

    In March 2006, the LPSC approved an uncontested stipulated settlement in Entergy Gulf States' formula rate plan filing for the 2004 test year. The settlement includes a revenue requirement increase of $36.8 million and calls for Entergy Gulf States to apply a refund liability of $744 thousand to capacity deferrals. The refund liability pertained to the periods 2004-2005 as well as the interim period in which a $37.8 million revenue increase was in place.

    In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Gulf States' return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $7.1 million rate increase is required to recover LPSC-approved incremental deferred and ongoing capacity requirements. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    In January 2006, Entergy Gulf States filed with the LPSC its gas rate stabilization plan. The filing showed a revenue deficiency of $4.1 million based on an ROE mid-point of 10.5%. On May 1, 2006, Entergy Gulf States implemented a $3.5 million rate increase pursuant to an uncontested agreement with the LPSC Staff.

    Federal Regulation

    System Agreement Proceedings

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation, APSC Complaint filed with the FERC, and APSC System Agreement Investigation" for updates regarding proceedings involving the System Agreement.

    62

    Independent Coordinator of Transmission (ICT)

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - Independent Coordinator of Transmission" for an update regarding Entergy's ICT proposal.

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Gulf States' accounting for nuclear decommissioning costs, the application of SFAS 71, unbilled revenue, and qualified pension and other postretirement benefits. Following is an update to that discussion.

    Unbilled Revenue

    As discussed in Note 7 to the domestic utility companies and System Energy financial statements, effective January 1, 2006, the Louisiana portion of Entergy Gulf States reclassified the fuel component of unbilled accounts receivable to deferred fuel and will no longer include the fuel component in its unbilled revenue calculation, which is in accordance with regulatory treatment.

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy Gulf States in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Entergy Gulf States does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    63

     

     

    ENTERGY GULF STATES, INC.
    INCOME STATEMENTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands) (In Thousands)
    OPERATING REVENUES
    Domestic electric $867,504  $746,987  $1,723,294  $1,399,383 
    Natural gas 13,611  12,532  51,027  39,387 
    TOTAL 881,115  759,519  1,774,321  1,438,770 
    OPERATING EXPENSES
    Operation and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 215,255  147,889  500,130  367,845 
      Purchased power 337,834  314,372  650,926  532,108 
      Nuclear refueling outage expenses 4,427  4,525  9,101  8,596 
      Other operation and maintenance 123,996  124,428  245,553  233,121 
    Decommissioning 2,676  2,346  5,297  4,644 
    Taxes other than income taxes 31,663  28,937  67,688  59,475 
    Depreciation and amortization 52,484  50,605  101,179  99,341 
    Other regulatory charges (credits) - net 1,369  (5,581) 1,638  (5,702)
    TOTAL 769,704  667,521  1,581,512  1,299,428 
    OPERATING INCOME 111,411  91,998  192,809  139,342 
    OTHER INCOME
    Allowance for equity funds used during construction 1,755  4,207  7,801  9,006 
    Interest and dividend income 6,366  3,415  14,469  6,850 
    Miscellaneous - net 510  (24) (402) 624 
    TOTAL 8,631  7,598  21,868  16,480 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 34,339  28,214  67,992  56,438 
    Other interest - net 1,901  2,397  3,997  4,382 
    Allowance for borrowed funds used during construction (1,093) (2,499) (4,401) (5,505)
    TOTAL 35,147  28,112  67,588  55,315 
    INCOME BEFORE INCOME TAXES 84,895  71,484  147,089  100,507 
    Income taxes 33,191  27,197  50,336  32,871 
    NET INCOME 51,704  44,287  96,753  67,636 
    Preferred dividend requirements and other 1,009  1,063  2,031  2,126 
    EARNINGS APPLICABLE TO
    COMMON STOCK $50,695  $43,224  $94,722  $65,510 
    See Notes to Respective Financial Statements.

    64

     

    ENTERGY GULF STATES, INC.
    STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Net income $96,753  $67,636 
    Adjustments to reconcile net income to net cash flow provided by operating activities:
      Reserve for regulatory adjustments 5,947  (62,423)
      Other regulatory charges (credits) - net 1,638  (5,702)
      Depreciation, amortization, and decommissioning 106,476  103,985 
      Deferred income taxes and investment tax credits (5,903) 25,014 
      Changes in working capital:
        Receivables 121,874  (28,123)
        Fuel inventory (11,349) (259)
        Accounts payable (75,267) (509)
        Taxes accrued 115,690  3,395 
        Interest accrued (772) 266 
        Deferred fuel costs 55,433  (3,267)
        Other working capital accounts 16,379  5,914 
      Provision for estimated losses and reserves (2,856) 345 
      Changes in other regulatory assets (124,690) (7,960)
      Other (8,182) (1,955)
    Net cash flow provided by operating activities 291,171  96,357 
    INVESTING ACTIVITIES
    Construction expenditures (269,310) (153,136)
    Allowance for equity funds used during construction 7,801  9,006 
    Nuclear fuel purchases (38,233) (371)
    Proceeds from sale/leaseback of nuclear fuel 37,523  438 
    Proceeds from nuclear decommissioning trust fund sales 35,710  15,131 
    Investment in nuclear decommissioning trust funds (42,406) (21,076)
    Change in money pool receivable - net 61,028  - 
    Changes in other investments - net 915  2,629 
    Other regulatory investments (13,622) (27,906)
    Net cash flow used in investing activities (220,594) (175,285)
    FINANCING ACTIVITIES
    Proceeds from the issuance of long-term debt -  282,772 
    Retirement of long-term debt -  (268,229)
    Redemption of preferred stock (2,250) (2,250)
    Change in money pool payable - net -  89,727 
    Dividends paid:
      Common stock (83,000) (25,600)
      Preferred stock (2,018) (2,139)
    Net cash flow provided by (used in) financing activities (87,268) 74,281 
    Net decrease in cash and cash equivalents (16,691) (4,647)
    Cash and cash equivalents at beginning of period 25,373  6,974 
    Cash and cash equivalents at end of period $8,682  $2,327 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
      Cash paid/(received) during the period for:
        Interest - net of amount capitalized $68,007  $56,788 
        Income taxes ($60,096) $14,450 
    See Notes to Respective Financial Statements.

    65

     

     

    ENTERGY GULF STATES, INC.
    BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents:
      Cash $3,452  $7,341 
      Temporary cash investments - at cost,
       which approximates market 5,230  18,032 
         Total cash and cash equivalents 8,682  25,373 
    Accounts receivable:
      Customer 162,091  203,205 
      Allowance for doubtful accounts (2,886) (4,794)
      Associated companies 45,260  90,223 
      Other 47,608  50,445 
      Accrued unbilled revenues 90,631  186,527 
        Total accounts receivable 342,704  525,606 
    Deferred fuel costs 182,458  254,950 
    Fuel inventory - at average cost 71,545  60,196 
    Materials and supplies - at average cost 115,764  112,544 
    Prepayments and other 7,538  36,996 
    TOTAL 728,691  1,015,665 
    OTHER PROPERTY AND INVESTMENTS
    Decommissioning trust funds 316,068  310,779 
    Non-utility property - at cost (less accumulated depreciation) 99,021  91,589 
    Other 22,563  22,498 
    TOTAL 437,652  424,866 
    UTILITY PLANT
    Electric 8,844,296  8,569,073 
    Natural gas 87,610  86,375 
    Construction work in progress 157,542  526,017 
    Nuclear fuel under capital lease 77,454  55,155 
    Nuclear fuel 10,857  11,338 
    TOTAL UTILITY PLANT 9,177,759  9,247,958 
    Less - accumulated depreciation and amortization 4,103,135  4,075,724 
    UTILITY PLANT - NET 5,074,624  5,172,234 
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      SFAS 109 regulatory asset - net 473,980  459,136 
      Other regulatory assets 789,420  604,419 
      Deferred fuel costs 100,124  69,443 
    Long-term receivables 13,156  16,151 
    Other 35,810  41,195 
    TOTAL 1,412,490  1,190,344 
    TOTAL ASSETS $7,653,457  $7,803,109 
    See Notes to Respective Financial Statements.
     
    66
     
     
    ENTERGY GULF STATES, INC.
    BALANCE SHEETS
    LIABILITIES AND SHAREHOLDERS' EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    Accounts payable:
      Associated companies $101,332  $100,313 
      Other 181,490  479,232 
    Customer deposits 64,741  57,756 
    Taxes accrued 40,836  - 
    Accumulated deferred income taxes 59,905  71,196 
    Nuclear refueling outage costs 1,022  15,548 
    Interest accrued 33,566  34,338 
    Obligations under capital leases 24,935  33,516 
    Other 33,219  14,945 
    TOTAL 541,046  806,844 
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 1,700,037  1,619,890 
    Accumulated deferred investment tax credits 130,055  132,909 
    Obligations under capital leases 52,518  20,724 
    Other regulatory liabilities 41,379  37,482 
    Decommissioning and retirement cost liabilities 183,101  175,480 
    Transition to competition 79,098  79,098 
    Regulatory reserves 15,794  16,153 
    Accumulated provisions 69,384  67,747 
    Long-term debt 2,358,211  2,358,130 
    Preferred stock with sinking fund 11,700  13,950 
    Other 189,199  203,665 
    TOTAL 4,830,476  4,725,228 
    Commitments and Contingencies
    SHAREHOLDERS' EQUITY
    Preferred stock without sinking fund 47,327  47,327 
    Common stock, no par value, authorized 200,000,000
     shares; issued and outstanding 100 shares in 2006 and 2005 114,055  114,055 
    Paid-in capital 1,457,486  1,457,486 
    Retained earnings 665,300  653,578 
    Accumulated other comprehensive loss (2,233) (1,409)
    TOTAL 2,281,935  2,271,037 
    TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY $7,653,457  $7,803,109 
    See Notes to Respective Financial Statements.

    67

     

    ENTERGY GULF STATES, INC.
    STATEMENTS OF RETAINED EARNINGS AND COMPREHENSIVE INCOME
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended
    2006 2005
    (In Thousands)
    RETAINED EARNINGS
    Retained Earnings - Beginning of period $697,605  $531,068 
      Add: Net Income 51,704  $51,704  44,287  $44,287 
      Deduct:
        Dividends declared on common stock 83,000  21,200 
        Preferred dividend requirements and other 1,009  1,009  1,063  1,063 
    84,009  22,263 
    Retained Earnings - End of period $665,300  $553,092 
    ACCUMULATED OTHER COMPREHENSIVE
    INCOME (LOSS) (Net of Taxes):
    Balance at beginning of period:
     Other accumulated comprehensive income items ($1,354) $722 
    Net unrealized investment gains (879) (879) 64  64 
    Balance at end of period:
     Other accumulated comprehensive income items ($2,233) $786 
    Comprehensive Income $49,816  $43,288 
    Six Months Ended
    2006 2005
    (In Thousands)
    RETAINED EARNINGS
    Retained Earnings - Beginning of period $653,578  $513,182 
      Add: Net Income 96,753  $96,753  67,636  $67,636 
      Deduct:
        Dividends declared on common stock 83,000  25,600 
        Preferred dividend requirements and other 2,031  2,031  2,126  2,126 
    85,031  27,726 
    Retained Earnings - End of period $665,300  $553,092 
    ACCUMULATED OTHER COMPREHENSIVE
    INCOME (LOSS) (Net of Taxes):
    Balance at beginning of period:
     Other accumulated comprehensive income items ($1,409) $714 
    Net unrealized investment gains (824) (824) 72  72 
    Balance at end of period:
     Other accumulated comprehensive income items ($2,233) $786 
    Comprehensive Income $93,898  $65,582 
    See Notes to Respective Financial Statements.

    68

     

    ENTERGY GULF STATES, INC.
    SELECTED OPERATING RESULTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $258 $174 $84  48 
      Commercial 212 146 66  45 
      Industrial 284 223 61  27 
      Governmental 11 9 2  22 
         Total retail 765 552 213  39 
      Sales for resale
        Associated companies 21 21 -  - 
        Non-associated companies 48 43 5  12 
      Other 34 131 (97) (74)
         Total $868 $747 $121  16 
    Billed Electric Energy
     Sales (GWh):
      Residential 2,352 2,124 228  11 
      Commercial 2,158 2,013 145  7 
      Industrial 3,831 3,879 (48) (1)
      Governmental 110 109 1  1 
         Total retail 8,451 8,125 326  4 
      Sales for resale
        Associated companies 567 729 (162) (22)
        Non-associated companies 678 726 (48) (7)
         Total 9,696 9,580 116  1 
    Six Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $498 $370 $128  35 
      Commercial 422 305 117  38 
      Industrial 601 467 134  29 
      Governmental 24 19 5  26 
         Total retail 1,545 1,161 384  33 
      Sales for resale
        Associated companies 48 47 1  2 
        Non-associated companies 99 75 24  32 
      Other 31 116 (85) (73)
         Total $1,723 $1,399 $324  23 
    Billed Electric Energy
     Sales (GWh):
      Residential 4,448 4,279 169  4 
      Commercial 4,128 3,927 201  5 
      Industrial 7,510 7,860 (350) (4)
      Governmental 222 214 8  4 
         Total retail 16,308 16,280 28  - 
      Sales for resale
        Associated companies 1,153 1,294 (141) (11)
        Non-associated companies 1,295 1,265 30  2 
         Total 18,756 18,839 (83) - 

    69

     

     

    ENTERGY LOUISIANA, LLC

    MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

     

    Hurricane Rita and Hurricane Katrina

    See the Form 10-K for a discussion of the effects of Hurricanes Katrina and Rita, which caused catastrophic damage to Entergy Louisiana's service territory in August and September 2005, including the effect of extensive flooding that resulted from levee breaks in and around Entergy Louisiana's service territory. Following is an update to the discussion in the Form 10-K.

    Entergy Louisiana currently estimates that total restoration costs for the repair and/or replacement of its electric facilities damaged by Hurricanes Katrina and Rita and business continuity costs will be $541 million.

    As discussed in the Form 10-K, a federal hurricane aid package became law that includes funding for Community Development Block Grants (CDBG) that allows state and local leaders to fund individual recovery priorities. The law permits funding for infrastructure restoration. It is uncertain how much funding, if any, will be designated for utility reconstruction and the timing of such decisions is also uncertain. The U.S. Department of Housing and Urban Development has allocated approximately $10.4 billion for Louisiana, $5.1 billion for Mississippi, and $74 million for Texas, with an additional $1 billion approved by Congress but not yet allocated to the states. The states, in turn, will administer the grants. Entergy Louisiana is currently preparing an application to seek CDBG funding. In March 2006, Entergy Louisiana provided a justification statement to state and local officials. The statement, which will be reviewed by the Louisiana Recovery Authority, includes the estimated costs of Hurricanes Katrina and Rita damage. The statement includes justification for a request for $472 million in CDBG funding.

    Storm Costs Recovery Filing with Retail Regulator

    On July 31, 2006, Entergy Louisiana and Entergy Gulf States filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in the Louisiana jurisdiction and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, based on a ten-year levelized rate are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Storm Cost Recovery Riders (SCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SCRRs be adjusted annually to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States. Hearings on the application are scheduled for the first quarter 2007.

    70

    Results of Operations

    Net Income

    Second Quarter 2006 Compared to Second Quarter 2005

    Net income decreased $36.2 million primarily due to lower net revenue partially offset by higher other income.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net income decreased $20.6 million primarily due to lower net revenue partially offset by higher other income, lower other operation and maintenance expenses, and lower depreciation and amortization expenses.

    Net Revenue

    Second Quarter 2006 Compared to Second Quarter 2005

    Net revenue, which is Entergy Louisiana's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing the second quarter of 2006 to the second quarter of 2005.

     

     

    Amount

     

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $310.8 

    Price applied to unbilled electric sales

     

    (72.7)

    Net wholesale revenue

     

    6.1 

    Other

     

    0.8 

    2006 net revenue

     

    $245.0 

    The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation, which is in accordance with regulatory treatment. Entergy Louisiana expects that the effect of this factor will be significantly less for its annual results for 2006. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein for a discussion of the accounting for unbilled revenues.

    The net wholesale revenue variance is primarily due to the sale of 75% of the generation from the Perryville plant to Entergy Gulf States pursuant to a long-term purchased power agreement.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory credits

    Gross operating revenues decreased primarily due to:

    • a decrease of $72.7 million in the price applied to unbilled sales, as discussed above; and
    • a decrease of $47.2 million in fuel cost recovery revenues due to decreased usage and lower fuel rates.

    The decrease was partially offset by an increase of $20.9 million in gross wholesale revenue due to increased sales to affiliated systems and the sale of a portion of the generation from Perryville.

    Fuel and purchased power expenses decreased primarily due to a shift from higher priced gas and oil generation and purchased power to lower priced nuclear generation primarily as a result of a refueling outage in 2005. The decrease was partially offset by an increase in the recovery from customers of deferred fuel costs.

     

    71

     

    Other regulatory credits decreased primarily due to the LPSC order for the interim recovery of storm costs effective March 2006. Refer to "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - State and Local Regulation" in the Form 10-K for a discussion of Entergy Louisiana's filing with the LPSC regarding storm cost recovery.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net revenue, which is Entergy Louisiana's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing the six months ended June 30, 2006 to the six months ended June 30, 2005.

     

     

    Amount

     

     

    (In Millions)

     

     

     

    2005 net revenue

     

    $495.5 

    Price applied to unbilled electric sales

     

    (69.3)

    Volume/weather

     

    (21.8)

    Net wholesale revenue

     

    12.4 

    Rate refund provisions

     

    6.9 

    Storm cost recovery

     

    4.9 

    Other

     

    3.9 

    2006 net revenue

     

    $432.5 

    The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation, which is in accordance with regulatory treatment. Entergy Louisiana expects that the effect of this factor will be significantly less for its annual results for 2006. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein for a discussion of the accounting for unbilled revenues.

    The volume/weather variance is due to a decrease in usage in all sectors primarily due to load losses caused by Hurricane Katrina and decreased usage during the unbilled sales period.

    The net wholesale revenue variance is primarily due to the sale of 75% of the generation from the Perryville plant to Entergy Gulf States pursuant to a long-term purchased power agreement.

    The rate refund provisions variance is primarily due to additional provisions recorded in 2005 related to LPSC-approved settlements in March and May 2005.

    The storm cost recovery variance is due to the return earned on the interim recovery of storm-related costs as allowed by the LPSC effective March 2006.

    Gross operating revenues and fuel and purchased power expenses

    Gross operating revenues decreased primarily due to:

    • a decrease of $69.3 million in the price applied to unbilled sales, as discussed above;
    • a decrease of $31.1 million in fuel cost recovery revenues due to decreased usage and lower prices; and
    • a decrease of $21.8 million in volume/weather, as discussed above.

    72

    The decrease was substantially offset by:

    • an increase of $85.7 million in gross wholesale revenue due to increased sales to affiliated systems and the sale of a portion of the generation from Perryville; and
    • an increase of $6.9 million in rate refund provisions, as discussed above.

    Fuel and purchased power expenses increased primarily due to an increase in the recovery from customers of deferred fuel costs, partially offset by a shift from higher priced gas and oil generation and purchased power to lower priced nuclear generation primarily as a result of a refueling outage in 2005.

    Other Income Statement Variances

    Second Quarter 2006 Compared to Second Quarter 2005

    Other income increased primarily due to the write-off of $7.1 million in June 2005 of a portion of the customer care system investment and the related allowance for equity funds used during construction pursuant to an LPSC-approved settlement.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Other operation and maintenance expenses decreased primarily due to:

    • a decrease of $3.3 million due to a planned decrease in vegetation maintenance;
    • a decrease of $2.5 million due to loss provisions recorded in 2005 for the bankruptcy of CashPoint, which managed a network of payment agents for the domestic utility companies;
    • a decrease of $2.3 million due to the amortization of proceeds received in 2005 from the radwaste settlement which is discussed in "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Central States Compact Claim" in the Form 10-K;and
    • a decrease of $1.5 million in transmission overhead work.

    The decrease was offset by:

    • an increase of $3.3 million as a result of a fossil plant maintenance outage; and
    • an increase of $3.3 million in customer service support costs including an increase in customer write-offs.

    Depreciation and amortization expenses decreased primarily due to a change in the depreciation rate for Waterford 3 as approved by the LPSC effective April 2005 and a revision in 2005 of estimated depreciable lives involving certain intangible assets.

    Other income increased primarily due to:

    • the write-off of $7.1 million in June 2005 of a portion of the customer care system investment and the related allowance for equity funds used during construction pursuant to an LPSC-approved settlement; and
    • an increase in the allowance for equity funds used during construction due to an increase in construction work in progress as a result of Hurricanes Katrina and Rita.

    Income Taxes

    The effective income tax rates for the second quarters of 2006 and 2005 were 38.4% and 40.0%, respectively. The effective income tax rates for the six months ended June 30, 2006 and 2005 were 38.9% and 39.8%, respectively. The difference in the effective income tax rate for the second quarter of 2006 and the six months ended June 30, 2006 and 2005 versus the federal statutory rate of 35.0% is primarily due to book and tax differences related to utility plant and state income taxes, partially offset by book and tax differences related to the allowance for equity

    73

     funds used during construction and the amortization of investment tax credits. The difference in the effective income tax rate for the second quarter of 2005 versus the federal statutory rate of 35.0% is primarily due to state income taxes, book and tax differences related to utility plant items, and a federal tax reserve estimate revision necessary to appropriately provide for prior tax periods.

    Liquidity and Capital Resources

    Cash Flow

    Cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $105,285 

     

    $146,049 

     

     

     

     

     

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

    231,532 

     

    69,063 

     

    Investing activities

     

    (287,999)

     

    (295,005)

     

    Financing activities

     

    (45,979)

     

    82,412 

    Net decrease in cash and cash equivalents

     

    (102,446)

     

    (143,530)

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $2,839 

     

    $2,519 

    Operating Activities

    Cash flow from operations increased $162.5 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to timing of collections of receivables from customers.

    Investing Activities

    Cash flow used by investing activities decreased $7.0 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005. Following are the significant investing activities occurring during the first six months of 2006 and 2005:

    • the purchase of the Perryville plant in June 2005 for $162 million;
    • an increase in distribution construction expenditures due to Hurricanes Katrina and Rita; and
    • money pool activity.

    Financing Activities

    Entergy Louisiana used $46.0 million of cash for financing activities for the six months ended June 30, 2006 compared to providing $82.4 million for the six months ended June 30, 2005 primarily due to:

    • money pool activity;
    • payment of $40 million on a credit facility in 2006; and
    • the retirement of $25 million of long-term debt in 2006.

    Partially offsetting the above was the payment of $24.5 million of common stock dividends in 2005.

    74

    Capital Structure

    Entergy Louisiana's capitalization is balanced between equity and debt, as shown in the following table. The decrease in debt to capital for Entergy Louisiana is primarily due to an increase in members' equity due to additional equity from its parent because of a revision in the estimate of the tax liabilities allocated to Entergy Louisiana Holdings in the merger-by-division that created Entergy Louisiana, LLC.

     

     

    June 30,
    2006

    December 31,
    2005

     

     

    Net debt to net capital

     

    47.1%

    49.2%

    Effect of subtracting cash from debt

     

     0.1%

    2.1%

    Debt to capital

     

     47.2%

    51.3%

    Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and members' equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana's financial condition.

    Uses and Sources of Capital

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of Entergy Louisiana's uses and sources of capital.

    Entergy Louisiana's receivables from or (payables to) the money pool were as follows:

    June 30,
    2006

     

    December 31,
    2005

     

    June 30,
    2005

     

    December 31,
    2004

    (In Thousands)

     

     

     

     

     

     

    ($90,879)

     

    ($68,677)

     

    ($110,658)

     

    $40,549

    See Note 4 to the domestic utility companies and System Energy financial statements in the Form 10-K for a description of the money pool.

    In April 2006, Entergy Louisiana's $85 million credit facility expired and was not renewed. Also, Entergy Louisiana's $15 million credit facility expired in May 2006 and was not renewed.

    In June 2006, Entergy Louisiana redeemed, prior to maturity, $25 million of 5.95% Series of St. Charles Parish bonds.

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for a discussion of state and local rate regulation, federal regulation and proceedings, the Energy Policy Act of 2005, utility restructuring, market and credit risks, nuclear matters, environmental risks, and litigation risks.

    State and Local Rate Regulation

    In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Louisiana's return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $121 million rate increase is required to recover LPSC-approved incremental

    75

    deferred and ongoing capacity requirements. Entergy Louisiana requested recovery of the capacity deferrals over a three-year period, including carrying charges. $51 million of the rate increase is associated with these deferrals. The remaining $70 million of the rate increase is associated with ongoing capacity costs. The filing is subject to a period of LPSC Staff review.

    Federal Regulation

    System Agreement Proceedings

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation, APSC Complaint filed with the FERC, and APSC System Agreement Investigation" for updates regarding proceedings involving the System Agreement.

    Independent Coordinator of Transmission (ICT)

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - Independent Coordinator of Transmission" for an update regarding Entergy's ICT proposal.

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Louisiana's accounting for nuclear decommissioning costs, unbilled revenue, and qualified pension and other postretirement costs. Following is an update to that discussion.

    Unbilled Revenue

    As discussed in Note 7 to the domestic utility companies and System Energy financial statements, effective January 1, 2006, Entergy Louisiana reclassified the fuel component of unbilled accounts receivable to deferred fuel and will no longer include the fuel component in its unbilled revenue calculation, which is in accordance with regulatory treatment.

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy Louisiana in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Entergy Louisiana does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    76

     

    ENTERGY LOUISIANA, LLC
    INCOME STATEMENTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands) (In Thousands)
    OPERATING REVENUES
    Domestic electric $550,580  $647,748  $1,102,637  $1,128,421 
    OPERATING EXPENSES
    Operation and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 105,470  127,564  309,474  265,341 
      Purchased power 212,053  226,690  388,667  397,996 
      Nuclear refueling outage expenses 4,263  3,397  8,497  6,821 
      Other operation and maintenance 98,462  99,518  182,564  188,156 
    Decommissioning 4,271  5,155  8,467  10,872 
    Taxes other than income taxes 15,173  18,300  31,179  36,657 
    Depreciation and amortization 47,417  43,645  89,502  95,453 
    Other regulatory credits - net (11,906) (17,323) (28,044) (30,407)
    TOTAL 475,203  506,946  990,306  970,889 
    OPERATING INCOME 75,377  140,802  112,331  157,532 
    OTHER INCOME
    Allowance for equity funds used during construction 3,590  1,840  9,177  4,377 
    Interest and dividend income 3,810  5,074  9,252  8,140 
    Miscellaneous - net (620) (6,481) (1,418) (6,848)
    TOTAL 6,780  433  17,011  5,669 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 20,625  16,852  41,003  34,691 
    Other interest - net 2,623  1,804  4,331  4,823 
    Allowance for borrowed funds used during construction (2,662) (990) (6,513) (2,489)
    TOTAL 20,586  17,666  38,821  37,025 
    INCOME BEFORE INCOME TAXES 61,571  123,569  90,521  126,176 
    Income taxes 23,617  49,406  35,171  50,242 
    NET INCOME 37,954  74,163  55,350  75,934 
    Preferred dividend requirements and other 1,737  -  3,475  - 
    EARNINGS APPLICABLE TO
    COMMON EQUITY $36,217  $74,163  $51,875  $75,934 
    See Notes to Respective Financial Statements.

     

    77

     

     

     

     

     

     

     

     

     

     

     

     

     

    (Page left blank intentionally)

     

     

    78

     

     

    ENTERGY LOUISIANA, LLC
    STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Net income $55,350  $75,934 
    Adjustments to reconcile net income to net cash flow provided by operating activities:
      Reserve for regulatory adjustments 1,369  (11,724)
      Other regulatory credits - net (28,044) (30,407)
      Depreciation, amortization, and decommissioning 97,969  106,325 
      Deferred income taxes and investment tax credits 13,810  38,961 
      Changes in working capital:
        Receivables 142,012  (11,462)
        Accounts payable (24,674) 8,483 
        Taxes accrued 33,040  23,337 
        Interest accrued (4,294) (715)
        Deferred fuel costs (75,432) (80,330)
        Other working capital accounts 25,539  (22,957)
      Provision for estimated losses and reserves 5,164  2,179 
      Changes in other regulatory assets (2,634) 17,229 
      Other (7,643) (45,790)
    Net cash flow provided by operating activities 231,532  69,063 
    INVESTING ACTIVITIES
    Construction expenditures (273,527) (151,902)
    Allowance for equity funds used during construction 9,177  4,377 
    Nuclear fuel purchases -  (54,158)
    Proceeds from the sale/leaseback of nuclear fuel -  54,158 
    Payment for purchase of plant -  (162,075)
    Proceeds from nuclear decommissioning trust fund sales 11,739  12,484 
    Investment in nuclear decommissioning trust funds (16,415) (18,637)
    Change in money pool receivable - net -  40,549 
    Other regulatory investments (18,969) (19,801)
    Net cash flow used in investing activities (287,995) (295,005)
    FINANCING ACTIVITIES
    Proceeds from the issuance of long-term debt -  54,611 
    Retirement of long-term debt (25,000) (55,000)
    Change in money pool payable - net 22,202  110,658 
    Changes in short-term borrowings (40,000) - 
    Distributions paid:
      Common equity -  (24,500)
      Preferred membership interests (3,185) (3,357)
    Net cash flow provided by (used in) financing activities (45,983) 82,412 
    Net decrease in cash and cash equivalents (102,446) (143,530)
    Cash and cash equivalents at beginning of period 105,285  146,049 
    Cash and cash equivalents at end of period $2,839  $2,519 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
    Cash paid during the period for:
      Interest - net of amount capitalized $47,609  $38,574 
      Income taxes -  $11,114 
    See Notes to Respective Financial Statements.

     

    79

     

    ENTERGY LOUISIANA, LLC
    BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents $2,839  $105,285 
    Accounts receivable:
      Customer 95,335  176,169 
      Allowance for doubtful accounts (7,445) (6,141)
      Associated companies 41,245  24,453 
      Other 12,718  12,553 
      Accrued unbilled revenues 73,081  149,908 
         Total accounts receivable 214,934  356,942 
    Deferred fuel costs 29,319  21,885 
    Accumulated deferred income taxes -  3,884 
    Materials and supplies - at average cost 95,928  92,275 
    Deferred nuclear refueling outage costs 6,334  15,337 
    Prepayments and other 9,567  173,055 
    TOTAL 358,921  768,663 
    OTHER PROPERTY AND INVESTMENTS
    Decommissioning trust funds 191,274  187,101 
    Non-utility property - at cost (less accumulated depreciation) 1,761  1,852 
    Other 4  4 
    TOTAL 193,039  188,957 
    UTILITY PLANT
    Electric 6,495,427  6,233,711 
    Property under capital lease 250,610  250,610 
    Construction work in progress 220,952  415,475 
    Nuclear fuel under capital lease 40,289  58,492 
    TOTAL UTILITY PLANT 7,007,278  6,958,288 
    Less - accumulated depreciation and amortization 2,808,533  2,805,944 
    UTILITY PLANT - NET 4,198,745  4,152,344 
     
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      SFAS 109 regulatory asset - net 76,018  104,893 
      Other regulatory assets 607,328  599,451 
      Deferred fuel costs 67,998  - 
    Long-term receivables 6,557  8,222 
    Other 31,305  32,523 
    TOTAL 789,206  745,089 
    TOTAL ASSETS $5,539,911  $5,855,053 
    See Notes to Respective Financial Statements.
     

    80

     
    ENTERGY LOUISIANA, LLC
    BALANCE SHEETS
    LIABILITIES AND MEMBERS' EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    Notes payable $- $40,000
    Accounts payable:
      Associated companies 168,936 121,382
      Other 205,865 398,507
    Customer deposits 68,617 66,705
    Taxes accrued 47,037 88,548
    Accumulated deferred income taxes 21,524 -
    Interest accrued 24,148 28,442
    Obligations under capital leases 33,463 22,753
    Other 33,058 8,721
    TOTAL 602,648 775,058
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 1,860,334 2,055,083
    Accumulated deferred investment tax credits 90,841 92,439
    Obligations under capital leases 6,826 35,740
    Other regulatory liabilities 42,383 58,129
    Decommissioning 229,759 221,291
    Accumulated provisions 98,329 93,165
    Long-term debt 1,147,412 1,172,400
    Other 138,776 146,576
    TOTAL 3,614,660 3,874,823
    Commitments and Contingencies
    MEMBERS' EQUITY
    Preferred membership interests without sinking fund 100,000 100,000
    Members' equity 1,222,603 1,105,172
    TOTAL 1,322,603 1,205,172
    TOTAL LIABILITIES AND MEMBERS' EQUITY $5,539,911 $5,855,053
    See Notes to Respective Financial Statements.

    81

     

    ENTERGY LOUISIANA, LLC
    STATEMENTS OF MEMBERS' EQUITY
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended
    2006 2005
    (In Thousands)
    MEMBERS' EQUITY
    Members' Equity - Beginning of period $1,186,436 $1,029,317
      Add:
      Net income 37,954 74,163
      Deduct:
        Distributions declared:
          Common equity - 22,700
          Preferred membership interests 1,737 -
      Other 50 -
    1,787 22,700
    Members' Equity - End of period $1,222,603 $1,080,780
    Six Months Ended
    2006 2005
    (In Thousands)
    MEMBERS' EQUITY
    Members' Equity - Beginning of period $1,105,172 $1,029,346
      Add:
      Net income 55,350 75,934
      Additional equity from parent 65,703 -
    121,053 75,934
      Deduct:
        Distributions declared:
          Common equity - 24,500
          Preferred membership interests 3,475 -
        Other 147 -
    3,622 24,500
    Members' Equity - End of period $1,222,603 $1,080,780
    See Notes to Respective Financial Statements.

    82

     

    ENTERGY LOUISIANA, LLC
    SELECTED OPERATING RESULTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $163 $172 ($9) (5)
      Commercial 116 122 (6) (5)
      Industrial 177 198 (21) (11)
      Governmental 9 10 (1) (10)
         Total retail 465 502 (37) (7)
      Sales for resale
        Associated companies 53 32 21  66 
        Non-associated companies 3 3 -  - 
      Other 30 111 (81) (73)
         Total $551 $648 ($97) (15)
    Billed Electric Energy
     Sales (GWh):
      Residential 1,947 1,894 53  3 
      Commercial 1,382 1,361 21  2 
      Industrial 3,175 3,341 (166) (5)
      Governmental 105 108 (3) (3)
         Total retail 6,609 6,704 (95) (1)
      Sales for resale
        Associated companies 571 285 286  100 
        Non-associated companies 25 31 (6) (19)
         Total 7,205 7,020 185  3 
    Six Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $324 $337 ($13) (4)
      Commercial 235 237 (2) (1)
      Industrial 370 387 (17) (4)
      Governmental 19 20 (1) (5)
         Total retail 948 981 (33) (3)
      Sales for resale
        Associated companies 133 47 86  183 
        Non-associated companies 5 5 -  - 
      Other 17 95 (78) (82)
         Total $1,103 $1,128 ($25) (2)
    Billed Electric Energy
     Sales (GWh):
      Residential 3,718 3,823 (105) (3)
      Commercial 2,628 2,647 (19) (1)
      Industrial 6,069 6,457 (388) (6)
      Governmental 216 226 (10) (4)
         Total retail 12,631 13,153 (522) (4)
      Sales for resale
        Associated companies 1,295 430 865  201 
        Non-associated companies 39 45 (6) (13)
         Total 13,965 13,628 337  2 

    83

     

     

    ENTERGY MISSISSIPPI, INC.

    MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

     

    Hurricane Katrina

    See the Form 10-K for a discussion of the effects of Hurricane Katrina, which hit Entergy Mississippi's service territory in August 2005 causing power outages and significant infrastructure damage to Entergy Mississippi's distribution and transmission systems. Entergy Mississippi currently estimates that its total restoration costs for the repair and/or replacement of its electric facilities damaged by Hurricane Katrina, and business continuity costs, and a small amount of damage caused by Hurricane Rita, will be $107 million.

    As discussed in the Form 10-K, a federal hurricane aid package became law that includes funding for Community Development Block Grants (CDBG) that allows state and local leaders to fund individual recovery priorities. The law permits funding for infrastructure restoration. It is uncertain how much funding, if any, will be designated for utility reconstruction and the timing of such decisions is also uncertain. The U.S. Department of Housing and Urban Development has allocated approximately $10.4 billion for Louisiana, $5.1 billion for Mississippi, and $74 million for Texas, with an additional $1 billion approved by Congress but not yet allocated to the states. The states, in turn, will administer the grants. As discussed below, in June 2006 Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its Hurricane Katrina infrastructure restoration costs.

    As discussed in the Form 10-K, in December 2005, Entergy Mississippi filed with the MPSC a Notice of Intent to change rates by implementing a Storm Damage Rider to recover storm damage restoration costs associated with Hurricanes Katrina and Rita totaling approximately $84 million as of November 30, 2005.  In February 2006, Entergy Mississippi filed an Application for an Accounting Order seeking certification by the MPSC of Entergy Mississippi's estimated $36 million of storm restoration costs not included in the December 2005 filing. In March 2006, the Governor signed a law that established a mechanism by which the MPSC may authorize and certify an electric utility financing order and the state may issue general obligation bonds to pay the costs of repairing damage caused by Hurricane Katrina to the systems of investor-owned electric utilities.  Because of the passage of this law and the possibility of Entergy Mississippi obtaining CDBG funds for Hurricane Katrina storm restoration costs, in March 2006, the MPSC issued an order approving a Joint Stipulation between Entergy Mississippi and the Mississippi Public Utilities Staff that provided for the review of Entergy Mississippi's total storm restoration costs in the Application for an Accounting Order proceeding.  The Stipulation stated that the procedural schedule of the December 2005 Notice of Intent filing should be suspended until the MPSC issues a final order in the Application for an Accounting Order proceeding. 

    In June 2006, the MPSC issued an order certifying Entergy Mississippi's Hurricane Katrina restoration costs incurred through March 31, 2006 of $89 million, net of estimated insurance proceeds. Two days later Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its infrastructure restoration costs. Entergy Mississippi also filed a Petition for Financing Order with the MPSC for authorization of state general obligation bond financing of $169 million for Hurricane Katrina restoration costs and future storm costs. The $169 million amount includes Hurricane Katrina restoration costs plus $80 million to build Entergy Mississippi's storm damage reserve for the future. The amount financed through the bonds will be reduced dollar for dollar by any CDBG funds that Entergy Mississippi receives. Pursuant to the legislation, the MPSC must issue a financing order by the end of October 2006.

    84

    Results of Operations

    Net Income

    Second Quarter 2006 Compared to Second Quarter 2005

    Net income increased $2.0 million primarily due to higher net revenue, partially offset by higher other operation and maintenance expenses, higher depreciation and amortization expense, and higher interest expense.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net income decreased $1.9 million primarily due to higher other operation and maintenance expense, higher taxes other than income taxes, and higher interest expense, partially offset by higher net revenue.

    Net Revenue

    Second Quarter 2006 Compared to Second Quarter 2005

    Net revenue, which is Entergy Mississippi's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing the second quarter of 2006 to the second quarter of 2005.

       

    Amount

       

    (In Millions)

         

    2005 net revenue

     

    $116.4 

    Deferral of Attala costs

     

    6.6 

    Volume/weather

     

    4.3 

    Reserve equalization

     

    (2.1)

    Other

     

    (0.4)

    2006 net revenue

     

    $124.8 

    The deferral of Attala costs variance is primarily due to the under-recovery of Attala power plant costs that will be recovered through the power management rider. The net income effect of this cost deferral is partially offset by Attala costs in other operation and maintenance expenses, depreciation expense, and taxes other than income taxes.

    The volume/weather variance is primarily due to an increase in electricity usage, including the effect of more favorable weather during the second quarter of 2006 compared to the second quarter of 2005. Billed electricity usage increased a total of 173 GWh in the service territory.

    The reserve equalization variance is primarily due to changes in the Entergy System generation mix compared to the same period in 2005 and a revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory credits

    Gross operating revenues increased primarily due to an increase of $104 million in fuel cost recovery revenues due to higher fuel rates.

    Fuel and purchased power expenses increased primarily due to increased recovery of fuel and purchased power costs due to an increase in fuel rates. The increase was also due to an increase in demand.

    85

    Other regulatory credits increased primarily due to the refunding through the power management recovery rider in 2006 of over-recoveries in 2005 as a result of gains recorded on gas hedging contracts, in addition to the under-recovery of Attala costs, discussed above. There is no material effect on net income due to quarterly adjustments to the power management recovery rider.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net revenue, which is Entergy Mississippi's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing the six months ended June 30, 2006 to the six months ended June 30, 2005.

       

    Amount

       

    (In Millions)

         

    2005 net revenue

     

    $207.9 

    Deferral of Attala costs

     

    14.5 

    Reserve equalization

     

    (4.2)

    Other

     

    (3.1)

    2006 net revenue

     

    $215.1 

    The deferral of Attala costs variance is primarily due to the under-recovery of Attala power plant costs that will be recovered through the power management rider. The net income effect of this cost deferral is partially offset by Attala costs in other operation and maintenance expenses, depreciation expense, and taxes other than income taxes.

    The reserve equalization variance is primarily due to changes in the Entergy System generation mix compared to the same period in 2005 and a revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

    Gross operating revenues, fuel and purchased power expenses, and other regulatory credits

    Gross operating revenues increased primarily due to an increase of $239 million in fuel cost recovery revenues due to higher fuel rates.

    Fuel and purchased power expenses increased primarily due to increased recovery of fuel and purchased power costs due to an increase in fuel rates. The increase was also due to an increase in demand.

    Other regulatory credits increased primarily due to the refunding through the power management recovery rider in 2006 of over-recoveries in 2005 as a result of gains recorded on gas hedging contracts, in addition to the under-recovery of Attala costs, discussed above. There is no material effect on net income due to quarterly adjustments to the power management recovery rider.

    Other Income Statement Variances

    Second Quarter 2006 Compared to Second Quarter 2005

    Other operation and maintenance expense increased primarily due to:

    86

     

    The increase was partially offset by a decrease of $1.6 million in vegetation maintenance costs in 2006.

    Depreciation and amortization expense increased primarily due to an increase in plant in service.

    Interest expense increased primarily due to additional long-term debt issued to finance the Attala power plant purchase.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Other operation and maintenance expense increased primarily due to:

    • an increase of $3 million due to the reclassification of storm charges from a regulatory asset in accordance with a Joint Stipulation with the MPSC;
    • an increase of $2.0 million in customer service costs; and
    • an increase of $1.1 million in pension costs.

    The increase was partially offset by a decrease of $2.8 million in vegetation maintenance costs in 2006.

    Taxes other than income taxes increased primarily due to higher assessed values for ad valorem tax purposes as a result of the Attala plant purchase and higher franchise taxes in 2006 due to higher revenues.

    Interest expense increased primarily due to additional long-term debt issued to finance the Attala power plant purchase.

    Income Taxes

    The effective income tax rates for the second quarters of 2006 and 2005 were 35.1% and 34.9%, respectively. The effective income tax rates for the six months ended June 30, 2006 and 2005 were 31.7% and 33.5%, respectively. The difference in the effective tax rate for the six months ended June 30, 2006 versus the federal statutory rate of 35.0% is primarily due to book and tax differences related to the allowance for equity funds used during construction, the amortization of investment tax credits, and book and tax differences related to utility plant items, partially offset by state income taxes. The difference in the effective tax rate for the six months ended June 30, 2005 versus the federal statutory rate of 35% is primarily due to book and tax differences related to the allowance of equity funds used during construction and the amortization of investment tax credits, partially offset by state income taxes.

    Liquidity and Capital Resources

    Cash Flow

    Cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $4,523 

     

    $80,396 

     

     

     

     

     

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

    221,502 

     

    48,399 

     

    Investing activities

     

    (200,314)

     

    (99,320)

     

    Financing activities

     

    12,293 

     

    16,255 

    Net increase (decrease) in cash and cash equivalents

     

    33,481 

     

    (34,666)

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $38,004 

     

    $45,730 

    87

    Operating Activities

    Cash flow from operations increased $173.1 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to increased collection of deferred fuel and purchased power costs and the income tax refund discussed below, partially offset by the timing of payments to vendors.

    In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005, as discussed in Note 3 to the domestic utilities companies and System Energy financial statements in the Form 10-K. In accordance with Entergy's intercompany tax allocation agreement, in April 2006 Entergy Corporation distributed $66 million of the refund to Entergy Mississippi.

    Investing Activities

    Net cash used in investing activities increased $101 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to the purchase of the 480 MW Attala power plant for $88 million in January 2006 and also due to storm-related spending.

    Financing Activities

    Net cash provided by financing activities decreased $4 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to money pool activity and the issuance of $30 million of preferred stock in 2005, partially offset by the issuance of $100 million of first mortgage bonds during 2006 and a decrease of $10 million in common stock dividends paid.

    Capital Structure

    Entergy Mississippi's capitalization is balanced between equity and debt, as shown in the following table. The increase in the debt to capital percentage as of June 30, 2006 is primarily due to the issuance of $100 million of First Mortgage Bonds in January 2006.

     

     

    June 30,
    2006

     

    December 31,
    2005

     

     

     

     

     

     

     

    Net debt to net capital

     

    54.0%

     

    52.6%

     

    Effect of subtracting cash from debt

     

    1.3%

     

    0.1%

     

    Debt to capital

     

    55.3%

     

    52.7%

     

    Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity. Net capital consists of capital less cash and cash equivalents. Entergy Mississippi uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi's financial condition.

    Uses and Sources of Capital

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of Entergy Mississippi's uses and sources of capital. Following are updates to the information presented in the Form 10-K.

    See the table in the Form 10-K under "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYIS - Liquidity and Capital Resources - Uses of Capital" which sets forth the amounts of Entergy Mississippi's planned construction and other capital investments for 2006 through 2008. In January 2006, Entergy Mississippi purchased for $88 million the Attala power plant, a 480 MW natural gas-fired, combined-cycle generating facility owned by Central Mississippi Generating Company. Entergy Mississippi plans to invest approximately $20 million in

     

    88

     

     

     facility upgrades at the Attala plant plus $3 million in other costs, bringing the total capital cost of the project to approximately $111 million. In November 2005, the MPSC issued an order approving the acquisition of the Attala plant. In December 2005, the MPSC issued an order approving the investment cost recovery through the power management rider and limited the recovery through the rider to a period that begins with the closing date of the purchase and ends the earlier of the date costs are incorporated into base rates or December 31, 2006. Entergy Mississippi intends to make an appropriate filing with the MPSC in 2006 to extend recovery in rates beyond 2006 of Entergy Mississippi's Attala costs. The planned construction and other capital investments line includes the majority of the estimated cost of the Attala acquisition as a 2006 capital commitment.

    Entergy Mississippi's receivables from or (payables to) the money pool were as follows:

    June 30,
    2006

     

    December 31,
    2005

     

    June 30,
    2005

     

    December 31,
    2004

    (In Thousands)

     

     

     

     

     

     

     

    $30,499

     

    ($84,066)

     

    $53,488

     

    $21,584

    See Note 4 to the domestic utility companies and System Energy financial statements in the Form 10-K for a description of the money pool.

    In May 2006, Entergy Mississippi increased its $25 million credit facility to $30 million and renewed it through May 2007. Entergy Mississippi also entered into a new $20 million credit facility through May 2007. Borrowings on these credit facilities may be secured by a security interest in Entergy Mississippi's accounts receivable. No borrowings were outstanding on either facility as of June 30, 2006.

    In January 2006, Entergy Mississippi issued $100 million of 5.92% Series of First Mortgage Bonds due February 2016. Entergy Mississippi used the proceeds to purchase the Attala power plant and to repay short-term indebtedness.

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for a discussion of, state and local rate regulation, federal regulation and proceedings and the Energy Policy Act of 2005, and market and credit risks. The following are updates to the information provided in the Form 10-K.

    State and Local Rate Regulation

    In March 2006, Entergy Mississippi made its annual scheduled formula rate plan filing with the MPSC.  The filing was amended by an April 2006 filing.  The amended filing showed that an increase of $3.1 million in electric revenues is warranted.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which will be implemented in August 2006.

    Federal Regulation

    System Agreement Proceedings

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation, APSC Complaint filed with the FERC, and APSC System Agreement Investigation" for updates regarding proceedings involving the System Agreement.

    89

    Independent Coordinator of Transmission (ICT)

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - Independent Coordinator of Transmission" for an update regarding Entergy's ICT proposal.

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Mississippi's accounting for unbilled revenue and pension and other retirement costs.

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy Mississippi in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Entergy Mississippi does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    90

    ENTERGY MISSISSIPPI, INC.
    INCOME STATEMENTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands) (In Thousands)
    OPERATING REVENUES
    Domestic electric $387,849  $288,244  $761,083  $539,490 
    OPERATING EXPENSES
    Operation and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 184,001  29,924  363,158  73,291 
      Purchased power 115,334  144,226  239,760  260,284 
      Other operation and maintenance 50,047  47,750  91,012  88,731 
    Taxes other than income taxes 14,707  14,900  32,223  28,666 
    Depreciation and amortization 19,074  17,982  36,070  35,919 
    Other regulatory credits - net (36,266) (2,331) (56,908) (1,966)
    TOTAL 346,897  252,451  705,315  484,925 
    OPERATING INCOME 40,952  35,793  55,768  54,565 
    OTHER INCOME
    Allowance for equity funds used during construction 873  1,060  2,114  2,061 
    Interest and dividend income 726  690  955  1,328 
    Miscellaneous - net (470) (322) (1,032) (691)
    TOTAL 1,129  1,428  2,037  2,698 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 11,492  9,839  22,607  19,673 
    Other interest - net 757  828  2,869  1,445 
    Allowance for borrowed funds used during construction (583) (681) (1,397) (1,344)
    TOTAL 11,666  9,986  24,079  19,774 
    INCOME BEFORE INCOME TAXES 30,415  27,235  33,726  37,489 
    Income taxes 10,668  9,516  10,682  12,548 
    NET INCOME 19,747  17,719  23,044  24,941 
    Preferred dividend requirements and other 707  858  1,414  1,700 
    EARNINGS APPLICABLE TO
    COMMON STOCK $19,040  $16,861  $21,630  $23,241 
    See Notes to Respective Financial Statements.

    91

     

     

     

     

     

     

     

     

     

     

     

    (Page left blank intentionally)

    92

     

    ENTERGY MISSISSIPPI, INC.
    STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Net income $23,044  $24,941 
    Adjustments to reconcile net income to net cash flow provided by operating activities:
      Other regulatory credits - net (56,908) (1,966)
      Depreciation and amortization 36,070  35,919 
      Deferred income taxes and investment tax credits (32,541) (499)
      Changes in working capital:
        Receivables (6,727) 1,572 
        Fuel inventory (5,295) (776)
        Accounts payable (23,111) (8,553)
        Taxes accrued 76,333  (8,091)
        Interest accrued (377) 525 
        Deferred fuel costs 207,786  8,056 
        Other working capital accounts 70,785  (9)
      Provision for estimated losses and reserves (31) 319 
      Changes in other regulatory assets (36,761) (4,326)
      Other (30,765) 1,287 
    Net cash flow provided by operating activities 221,502  48,399 
    INVESTING ACTIVITIES
    Construction expenditures (82,229) (69,477)
    Payment for purchase of plant (88,199) - 
    Allowance for equity funds used during construction 2,114  2,061 
    Changes in other temporary investments - net (1,501) - 
    Change in money pool receivable - net (30,499) (31,904)
    Net cash flow used in investing activities (200,314) (99,320)
    FINANCING ACTIVITIES
    Proceeds from the issuance of long-term debt 99,173  - 
    Proceeds from the issuance of preferred stock -  29,340 
    Change in money pool payable - net (84,066) - 
    Dividends paid:
      Common stock (1,400) (11,400)
      Preferred stock (1,414) (1,685)
    Net cash flow provided by financing activities 12,293  16,255 
    Net increase (decrease) in cash and cash equivalents 33,481  (34,666)
    Cash and cash equivalents at beginning of period 4,523  80,396 
    Cash and cash equivalents at end of period $38,004  $45,730 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
    Cash paid/(received) during the period for:
      Interest - net of amount capitalized $24,777  $19,549 
      Income taxes ($52,278) $4,446 

    93

     

     

    ENTERGY MISSISSIPPI, INC.
    BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents:
      Cash $2,753  $4,523 
      Temporary cash investments - cost,
       which approximates market 35,251  - 
         Total cash and cash equivalents 38,004  $4,523 
    Accounts receivable:
      Customer 100,371  102,202 
      Allowance for doubtful accounts (797) (1,826)
      Associated companies 39,851  5,415 
      Other 10,730  9,254 
      Accrued unbilled revenues 35,828  33,712 
         Total accounts receivable 185,983  148,757 
    Deferred fuel costs -  113,956 
    Accumulated deferred income taxes 8,632  - 
    Fuel inventory - at average cost 8,382  3,087 
    Materials and supplies - at average cost 25,387  21,521 
    Prepayments and other 8,862  62,759 
    TOTAL 275,250  354,603 
    OTHER PROPERTY AND INVESTMENTS
    Investment in affiliates - at equity 5,531  5,531 
    Non-utility property - at cost (less accumulated depreciation) 6,130  6,199 
    TOTAL 11,661  11,730 
    UTILITY PLANT
    Electric 2,657,008  2,473,035 
    Property under capital lease 26  50 
    Construction work in progress 66,756  119,354 
    TOTAL UTILITY PLANT 2,723,790  2,592,439 
    Less - accumulated depreciation and amortization 901,307  886,687 
    UTILITY PLANT - NET 1,822,483  1,705,752 
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      SFAS 109 regulatory asset - net 18,234  17,073 
      Other regulatory assets 206,850  186,197 
    Long-term receivable 2,567  3,270 
    Other 32,776  32,418 
    TOTAL 260,427  238,958 
    TOTAL ASSETS $2,369,821  $2,311,043 
    See Notes to Respective Financial Statements.
     
    94
     
    ENTERGY MISSISSIPPI, INC.
    BALANCE SHEETS
    LIABILITIES AND SHAREHOLDERS' EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    Accounts payable:
      Associated companies $ 38,478  $ 158,579 
      Other 68,621  83,306 
    Customer deposits 47,848  44,025 
    Taxes accrued 30,161  33,121 
    Accumulated deferred income taxes -  13,233 
    Interest accrued 13,274  13,651 
    Deferred fuel costs 93,830  - 
    Obligations under capital leases 28  40 
    Other 19,669  2,739 
    TOTAL 311,909  348,694 
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 509,276  491,857 
    Accumulated deferred investment tax credits 11,702  12,358 
    Obligations under capital leases -  11 
    Other regulatory liabilities -  34,368 
    Retirement cost liabilities 4,133  4,016 
    Accumulated provisions 9,405  9,436 
    Long-term debt 795,150  695,146 
    Other 84,455  91,588 
    TOTAL 1,414,121  1,338,780 
    Commitments and Contingencies
    SHAREHOLDERS' EQUITY
    Preferred stock without sinking fund 50,381  50,381 
    Common stock, no par value, authorized 15,000,000
     shares; issued and outstanding 8,666,357 shares in 2006 and 2005 199,326  199,326 
    Capital stock expense and other (690) (682)
    Retained earnings 394,774  374,544 
    TOTAL 643,791  623,569 
    TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY $2,369,821  $2,311,043 
    See Notes to Respective Financial Statements.

    95

     

    ENTERGY MISSISSIPPI, INC.
    SELECTED OPERATING RESULTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $ 137 $ 99 $ 38  38 
      Commercial 128 91 37  41 
      Industrial 64 46 18  39 
      Governmental 12 9 3  33 
         Total retail 341 245 96  39 
      Sales for resale
        Associated companies 15 12 3  25 
        Non-associated companies 11 8 3  38 
      Other 21 23 (2) (9)
         Total $ 388 $ 288 $ 100  35 
    Billed Electric Energy
     Sales (GWh):
      Residential 1,144 1,060 84  8 
      Commercial 1,128 1,057 71  7 
      Industrial 720 708 12  2 
      Governmental 100 94 6  6 
         Total retail 3,092 2,919 173  6 
      Sales for resale
        Associated companies 183 104 79  76 
        Non-associated companies 114 109 5  5 
         Total 3,389 3,132 257  8 
    Six Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $ 282 $ 195 $ 87  45 
      Commercial 258 176 82  47 
      Industrial 132 90 42  47 
      Governmental 25 18 7  39 
         Total retail 697 479 218  46 
      Sales for resale
        Associated companies 23 18 5  28 
        Non-associated companies 19 17 2  12 
      Other 22 25 (3) (12)
         Total $ 761 $ 539 $ 222  41 
    Billed Electric Energy
     Sales (GWh):
      Residential 2,329 2,256 73  3 
      Commercial 2,168 2,078 90  4 
      Industrial 1,421 1,400 21  2 
      Governmental 193 186 7  4 
         Total retail 6,111 5,920 191  3 
      Sales for resale
        Associated companies 254 121 133  110 
        Non-associated companies 182 177 5  3 
         Total 6,547 6,218 329  5 

    96

    ENTERGY NEW ORLEANS, INC. (Debtor-in-possession)

    MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

     

    Hurricane Katrina

    See the Form 10-K for a discussion of the effects of Hurricane Katrina, which in August 2005 caused catastrophic damage to Entergy New Orleans' service territory, including the effect of extensive flooding that resulted from levee breaks in and around the New Orleans area. Following is an update to the discussion in the Form 10-K.

    As discussed in the Form 10-K, a federal hurricane aid package became law that includes funding for Community Development Block Grants (CDBG) that allows state and local leaders to fund individual recovery priorities. The law permits funding for infrastructure restoration. It is uncertain how much funding, if any, will be designated for utility reconstruction and the timing of such decisions is also uncertain. The U.S. Department of Housing and Urban Development has allocated approximately $10.4 billion for Louisiana, $5.1 billion for Mississippi, and $74 million for Texas, with an additional $1 billion approved by Congress but not yet allocated to the states. The states, in turn, will administer the grants. Entergy New Orleans is currently preparing an application to seek CDBG funding. In March 2006, Entergy New Orleans provided a justification statement to state and local officials. The statement, which will be reviewed by the Louisiana Recovery Authority, includes all the estimated costs of Hurricane Katrina damage, as well as a lost customer base component intended to help offset the need for storm-related rate increases. The statement includes justification for a request for $718 million in CDBG funding.

    In the first quarter 2006, Entergy New Orleans reduced its accrued accounts payable for storm restoration costs by $97.4 million, with corresponding reductions of $88.7 million in construction work in progress and $8.7 million in regulatory assets, based on a reassessment of the nature and timing of expected restoration and rebuilding costs and the obligations associated with restoring service. Although Entergy New Orleans reduced its accrual for restoration spending by these amounts, it continues to expect to incur the related costs over time and Entergy New Orleans still expects its storm restoration and business continuity costs to total approximately $275 million. As discussed further in the Form 10-K, Entergy New Orleans still expects the cost of the longer-term accelerated replacement of the gas distribution system in New Orleans to be $355 million.

    See "State and Local Rate Regulation" below for a discussion of rate filings made by Entergy New Orleans directed towards recovery of its storm losses and restoration costs.

    Bankruptcy Proceedings

    See Note 14 to the domestic utility companies and System Energy financial statements in the Form 10-K for a discussion of the Entergy New Orleans bankruptcy proceeding. Following are updates to that discussion.

    As discussed in the Form 10-K, the bankruptcy court issued its order in December 2005 giving final approval for the $200 million debtor-in-possession credit facility, and the indenture trustee for Entergy New Orleans' first mortgage bonds appealed the order. On March 29, 2006 the bankruptcy court approved a settlement among Entergy New Orleans, Entergy Corporation, and the indenture trustee, and the indenture trustee dismissed its appeal.

    In April 2006, the bankruptcy judge extended the exclusivity period for filing a plan of reorganization by Entergy New Orleans to August 21, 2006. Entergy New Orleans has filed another motion to extend the exclusivity period for filing its plan of reorganization, requesting that the deadline be extended an additional 120 days until December 19, 2006. The court entered an order extending the August 21, 2006 date for Entergy New Orleans' exclusive right to file a plan of reorganization until the court can hear and rule on Entergy New Orleans' motion to extend, which was set for hearing on September 18, 2006. In order to file a plan of reorganization no later than December 2006, Entergy New Orleans believes that it needs resolution of its June 2006 formula rate plan and storm rider filings and commitment on timing and amount of CDBG funds. If the motion to extend is granted, Entergy New Orleans will have the exclusive right to file its plan of reorganization until December 19, 2006, and will have until February 15, 2007 to obtain acceptances of its plan by each class of impaired creditors.

    97

    The bankruptcy judge set a date of April 19, 2006 by which creditors with prepetition claims against Entergy New Orleans must, with certain exceptions, file their proofs of claim in the bankruptcy case. Approximately 500 claims have been filed thus far in Entergy New Orleans' bankruptcy proceeding. Entergy New Orleans is currently analyzing the accuracy and validity of the claims filed, and has begun seeking withdrawal or modification of claims or objecting to claims with which it disagrees.

    Municipalization is one potential outcome of Entergy New Orleans' recovery effort. In June 2006 Louisiana passed a law that establishes a governance structure for a public power authority, if municipalization of Entergy New Orleans' utility business is pursued.

    Results of Operations

    Net Income

    Second Quarter 2006 Compared to Second Quarter 2005

    Net income increased $2.4 million primarily due to lower operation and maintenance expense, interest charges, and taxes other than income taxes, partially offset by lower net revenue.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net income increased $2.3 million primarily due to lower operation and maintenance expense, interest charges, and taxes other than income taxes, and higher other income, partially offset by lower net revenue.

    Net Revenue

    Second Quarter 2006 Compared to Second Quarter 2005

    Net revenue, which is Entergy New Orleans' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges. Following is an analysis of the changes in net revenue comparing the second quarter of 2006 to the second quarter of 2005.

       

    Amount

       

    (In Millions)

         

    2005 net revenue

     

    $67.8 

    Volume/weather

     

    (30.5)

    Net wholesale revenue

     

    16.0 

    Other

     

    (2.0)

    2006 net revenue

     

    $51.3 

    The volume/weather variance is due to a decrease in electricity usage in the service territory caused by customer losses following Hurricane Katrina. Billed retail electricity usage decreased a total of 494 GWh compared to the second quarter of 2005, a decline of 35%.

    The net wholesale revenue variance is due to an increase in energy available for sales for resale due to the decrease in retail usage caused by customer losses following Hurricane Katrina. The increased revenue includes the sales into the wholesale market of Entergy New Orleans' share of the output of Grand Gulf, pursuant to City Council approval of measures proposed by Entergy New Orleans to address the reduction in Entergy New Orleans' retail customer demand caused by Hurricane Katrina and provide revenue support for the costs of Entergy New Orleans' share

    98

    of Grand Gulf. Beginning July 1, 2006, the City Council approved the return of Grand Gulf output to the service of Entergy New Orleans' load. The City Council also approved the recovery of all Grand Gulf costs through Entergy New Orleans' fuel adjustment clause (a portion of Grand Gulf costs was previously recovered through base rates). The City Council may consider alternative rate treatment for non-fuel Grand Gulf costs in connection with Entergy New Orleans' June 2006 electric formula rate plan filing.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Net revenue, which is Entergy New Orleans' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges. Following is an analysis of the changes in net revenue comparing the six months ended June 30, 2006 to the six months ended June 30, 2005.

       

    Amount

       

    (In Millions)

         

    2005 net revenue

     

    $120.0 

    Volume/weather

     

    (53.2)

    Net gas revenue

     

    (7.5)

    Price applied to unbilled electric sales

     

    (3.3)

    Net wholesale revenue

     

    41.2 

    Other

     

    (5.6)

    2006 net revenue

     

    $91.6 

    The volume/weather variance is due to a decrease in electricity usage in the service territory caused by customer losses following Hurricane Katrina. Billed retail electricity usage decreased a total of 1,075 GWh compared to the six months ended June 30, 2005, a decline of 40%.

    The net gas revenue variance is due to a decrease in gas usage in the service territory caused by customer losses following Hurricane Katrina, partially offset by a revised estimate of deferred fuel costs.

    The price applied to unbilled electric sales variance is due to a decrease in the fuel cost component of the price applied to unbilled sales. The decrease in the fuel cost component is due to a decrease in the average cost of generation due to a change in the generation mix from natural gas to solid fuel resources. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K and Note 1 to the domestic utility companies and System Energy financial statements in the Form 10-K for further discussion of the accounting for unbilled revenues.

    The net wholesale revenue variance is due to an increase in energy available for sales for resale due to the decrease in retail usage caused by customer losses following Hurricane Katrina. The increased revenue includes the sales into the wholesale market of Entergy New Orleans' share of the output of Grand Gulf, pursuant to City Council approval of measures proposed by Entergy New Orleans to address the reduction in Entergy New Orleans' retail customer demand caused by Hurricane Katrina and provide revenue support for the costs of Entergy New Orleans' share of Grand Gulf. Beginning July 1, 2006, the City Council approved the return of Grand Gulf output to the service of Entergy New Orleans' load. The City Council also approved the recovery of all Grand Gulf costs through Entergy New Orleans' fuel adjustment clause (a portion of Grand Gulf costs was previously recovered through base rates). The City Council may consider alternative rate treatment for non-fuel Grand Gulf costs in connection with Entergy New Orleans' June 2006 electric formula rate plan filing.

    99

    Other Income Statement Variances

    Second Quarter 2006 Compared to Second Quarter 2005

    Other operation and maintenance expenses decreased primarily due to shifts in costs from normal operations and maintenance work to storm restoration work as a result of Hurricane Katrina.

    Taxes other than income taxes decreased primarily due to lower franchise taxes in 2006 due to lower revenues.

    Interest and other charges decreased primarily due to the cessation of interest accruals on the first mortgage bonds as a result of the bankruptcy filing, partially offset by interest accrued on the DIP credit facility.

    Six Months Ended June 30, 2006 Compared to Six Months Ended June 30, 2005

    Other operation and maintenance expenses decreased primarily due to shifts in costs from normal operations and maintenance work to storm restoration work as a result of Hurricane Katrina.

    Taxes other than income taxes decreased primarily due to lower franchise taxes in 2006 due to lower revenues.

    Interest and other charges decreased primarily due to the cessation of interest accruals on the first mortgage bonds as a result of the bankruptcy filing, partially offset by interest accrued on the DIP credit facility.

    Income Taxes

    The effective income tax rates for the second quarters of 2006 and 2005 were 38.6% and 41.9%, respectively. The effective income tax rates for the six months ended June 30, 2006 and 2005 were 38.3% and 40.4%, respectively. The differences in the effective income tax rates for the periods presented versus the federal statutory rate of 35.0% are primarily due to state income taxes and book and tax differences related to utility plant items.

    Preferred Dividends

    No preferred dividends were declared during the first quarter of 2006. Due to its bankruptcy, Entergy New Orleans did not pay the preferred stock dividends due October 1, 2005; January 1, 2006; or April 1, 2006. 

    As discussed further in the Form 10-K, if dividends with respect to the 4.75% preferred stock are not paid for four quarters, the holders of these shares would have the right to elect a majority of the Entergy New Orleans board of directors.  Entergy New Orleans filed a motion in the bankruptcy court seeking authority to recommence paying dividends to the holders of the 4.75% preferred shares. After a hearing on the motion on May 3, 2006, the court granted Entergy New Orleans the authority to pay dividends to the holders of the 4.75% preferred shares, beginning with the dividend due on July 1, 2006, and thereafter, unless objections are filed by creditors forty-five days in advance of a dividend payment date. If any objections are filed, the matter would be heard by the bankruptcy court. Entergy New Orleans declared and paid the dividend due on July 1, 2006, and intends to declare and pay the dividends on the 4.75% preferred shares each quarter pending resolution of its plan of reorganization.

    Liquidity and Capital Resources

    Debtor-in-Possession Credit Facility

    See the Form 10-K for a discussion of the Entergy New Orleans debtor-in-possession (DIP) credit facility. Following is an update to that discussion.

    100

    As discussed in the Form 10-K, the bankruptcy court issued its order in December 2005 giving final approval for the $200 million DIP credit facility, and the indenture trustee for Entergy New Orleans' first mortgage bonds appealed the order. On March 29, 2006 the bankruptcy court approved a settlement among Entergy New Orleans, Entergy Corporation, and the indenture trustee, and the indenture trustee dismissed its appeal. As of June 30, 2006, Entergy New Orleans had approximately $40 million of outstanding borrowings under the DIP credit facility. Management currently expects the bankruptcy court-authorized funding level to be sufficient to fund Entergy New Orleans' expected level of operations.

    As discussed in the Form 10-K, borrowings under the DIP credit facility are due in full, and the agreement will terminate, at the earliest of several times or events, including August 23, 2006. Entergy and Entergy New Orleans have agreed to an amendment to the DIP credit agreement that extends the August 23, 2006 maturity date to August 23, 2007, and this amendment is subject to bankruptcy court approval. Entergy New Orleans has filed a motion with the bankruptcy court to authorize Entergy New Orleans to enter into the amendment, which is set for hearing August 16, 2006.

    Cash Flow

    Cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $48,056 

     

    $7,954 

     

     

     

     

     

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

    78,453 

     

    1,864 

     

    Investing activities

     

    (47,845)

     

    (29,464)

     

    Financing activities

     

    (50,343)

     

    27,704 

    Net increase (decrease) in cash and cash equivalents

     

    (19,735)

     

    104 

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $28,321 

     

    $8,058 

    Operating Activities

    Net cash provided by operating activities increased $76.6 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to receipt of the income tax refund discussed below along with a decrease in interest paid.

    In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005, as discussed in Note 3 to the domestic utilities companies and System Energy financial statements in the Form 10-K. In accordance with Entergy's intercompany tax allocation agreement, in April 2006, Entergy Corporation distributed $71 million of the refund to Entergy New Orleans. As discussed above, Entergy New Orleans used the income tax refund to repay a portion of the borrowings outstanding under the DIP credit facility.

    Investing Activities

    Net cash used in investing activities increased $18.4 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to capital expenditure activity related to Hurricane Katrina in addition to money pool activity in 2005.

    101

    Financing Activities

    Financing activities used $50.3 million of cash for the six months ended June 30, 2006 because of the net repayment in 2006 of $50.3 million of borrowings under the DIP credit facility.

    Capital Structure

    Entergy New Orleans' capitalization is shown in the following table.

     

     

    June 30,
    2006

     

    December 31,
    2005

     

     

     

     

     

     

     

    Debt to capital

     

    60.5%

     

    66.4%

     

    Debt consists of notes payable and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity.

    Uses and Sources of Capital

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of Entergy New Orleans' uses and sources of capital. The following are updates to the Form 10-K.

    Entergy New Orleans' receivables from or (payables to) the money pool were as follows:

    June 30,
    2006

     

    December 31,
    2005

     

    June 30,
    2005

     

    December 31,
    2004

    (In Thousands)

     

     

     

     

     

     

     

    ($35,558)

     

    ($35,558)

     

    $7,758

     

    $1,413

    See Note 4 to the domestic utility companies and System Energy financial statements in the Form 10-K for a description of the money pool. Entergy New Orleans remains a participant in the money pool, but Entergy New Orleans has not made, and does not expect to make, any additional borrowings from the money pool while it is in bankruptcy proceedings. The money pool borrowings reflected on Entergy New Orleans' balance sheet as of June 30, 2006 are classified as a pre-petition obligation subject to compromise.

    In addition, Entergy New Orleans had a 364-day credit facility in the amount of $15 million which expired in May 2006. As of June 30, 2006, the full amount of the credit facility remains outstanding under bankruptcy protection. In July 2006, the bankruptcy judge authorized Entergy New Orleans to set off $15 million of its cash currently held by the lender against the outstanding debt on the credit facility.

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for a discussion of state and local rate regulation, federal regulation and proceedings, the Energy Policy Act of 2005, market and credit risks, environmental risks, and litigation risks. Following are updates to the discussion in the Form 10-K.

    State and Local Rate Regulation

    In June 2006, Entergy New Orleans made its annual formula rate plan filings with the City Council.  The filings show various alternatives to reflect the effect of Entergy New Orleans' lost customers and decreased revenue. Entergy New Orleans' recommended alternative adjusts for lost customers and assumes that the City Council's June 2006 decision to allow recovery of all Grand Gulf costs through the fuel adjustment clause stays in place (a portion of Grand Gulf costs was previously recovered through base rates). Under that alternative, annual increases of $6.4

    102

    million in electric base rate revenues (an increase of 4.4%) and $22.8 million in gas base rate revenues (an increase of 160.9%) are warranted. The filings triggered the prescribed four-month period for review by the City Council's Advisors and other parties, and rate adjustments, if any, could be implemented as soon as the first billing cycle of November 2006.

    At the same time as it made its formula rate plan filings, Entergy New Orleans also filed with the City Council a request to implement two storm-related riders. With the first rider, Entergy New Orleans seeks to recover over a ten-year period the $114 million in electric restoration costs and the $25 million in gas restoration costs that it has actually spent through March 31, 2006. Entergy New Orleans also proposed semiannual filings to update the rider for additional restoration spending and also to consider the receipt of CDBG funds or insurance proceeds that it may receive. With the second rider, Entergy New Orleans seeks to establish over a ten-year period a $150 million storm reserve to provide for the risk of another storm. Entergy New Orleans requested that the City Council consider the proposed riders within the same time frame as the formula rate plans, which would allow implementation as soon as the first billing cycle of November 2006.

    Federal Regulation

    System Agreement Proceedings

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation, APSC Complaint filed with the FERC, and APSC System Agreement Investigation" for updates regarding proceedings involving the System Agreement.

    Independent Coordinator of Transmission (ICT)

    See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - Independent Coordinator of Transmission" for an update regarding Entergy's ICT proposal.

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy New Orleans' accounting for unbilled revenue and pension and other retirement costs.

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy New Orleans in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Entergy New Orleans does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    103

    ENTERGY NEW ORLEANS, INC.
    (DEBTOR-IN-POSSESSION)
    INCOME STATEMENTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands) (In Thousands)
    OPERATING REVENUES
    Domestic electric $117,827  $158,799  $217,076  $289,971 
    Natural gas 18,128  31,128  55,140  91,223 
    TOTAL 135,955  189,927  272,216  381,194 
    OPERATING EXPENSES
    Operation and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 16,433  54,843  51,101  135,939 
      Purchased power 67,211  66,001  127,448  122,783 
      Other operation and maintenance 16,279  30,143  30,089  50,990 
    Taxes other than income taxes 8,089  10,693  16,689  21,373 
    Depreciation and amortization 8,508  9,059  15,972  17,145 
    Reorganization items 2,115  -  3,793  - 
    Other regulatory charges - net 1,037  1,254  2,080  2,509 
    TOTAL 119,672  171,993  247,172  350,739 
    OPERATING INCOME 16,283  17,934  25,044  30,455 
    OTHER INCOME
    Allowance for equity funds used during construction 909  246  1,988  528 
    Interest and dividend income 786  308  1,589  526 
    Miscellaneous - net 20  (254) (132) (377)
    TOTAL 1,715  300  3,445  677 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 185  3,518  369  7,004 
    Other interest - net 997  484  3,138  868 
    Allowance for borrowed funds used during construction (743) (185) (1,606) (417)
    TOTAL  439  3,817  1,901  7,455 
    INCOME BEFORE INCOME TAXES 17,559  14,417  26,588  23,677 
     
    Income taxes 6,785  6,043  10,171  9,567 
    NET INCOME 10,774  8,374  16,417  14,110 
    Preferred dividend requirements and other 92  241  92  482 
    EARNINGS APPLICABLE TO  
    COMMON STOCK $10,682  $8,133  $16,325  $13,628 
    See Notes to Respective Financial Statements.

    104

     

    ENTERGY NEW ORLEANS, INC.
    (DEBTOR-IN-POSSESSION)
    STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Net income $16,417  $14,110 
    Adjustments to reconcile net income to net cash flow provided by operating activities:
      Other regulatory charges - net 2,080  2,509 
      Depreciation and amortization 15,972  17,145 
      Deferred income taxes and investment tax credits 2,811  3,407 
      Changes in working capital:
        Receivables 8,438  4,130 
        Fuel inventory 6,068  4,181 
        Accounts payable (3,613) (13,223)
        Taxes accrued 64,541  6,045 
        Interest accrued 549  (403)
        Deferred fuel costs (3,022) (20,837)
        Other working capital accounts (6,911) (5,334)
      Provision for estimated losses and reserves (81) (317)
      Changes in pension liability 2,929  (9,955)
      Changes in other regulatory assets (32,658) 3,936 
      Other 4,933  (3,530)
    Net cash flow provided by operating activities 78,453  1,864 
    INVESTING ACTIVITIES  
    Construction expenditures (49,833) (23,647)
    Allowance for equity funds used during construction 1,988  528 
    Change in money pool receivable - net -  (6,345)
    Net cash flow used in investing activities (47,845) (29,464)
    FINANCING ACTIVITIES
    Proceeds from the issuance of long-term debt -  29,791 
    Retirement of long-term debt -  (5)
    Repayment of DIP credit facility (50,251) - 
    Dividends paid:
      Common stock -  (1,600)
      Preferred stock (92) (482)
    Net cash flow provided by (used in) financing activities (50,343) 27,704 
    Net increase (decrease) in cash and cash equivalents (19,735) 104 
    Cash and cash equivalents at beginning of period 48,056  7,954 
    Cash and cash equivalents at end of period $28,321  $8,058 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
    Cash paid/(received) during the period for:
      Interest - net of amount capitalized $2,589  $7,882 
      Income taxes ($59,730) - 
    See Notes to Respective Financial Statements.

    105

     

    ENTERGY NEW ORLEANS, INC.
    (DEBTOR-IN-POSSESSION)
    BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents $28,321  $48,056 
    Accounts receivable:
      Customer 69,307  82,052 
      Allowance for doubtful accounts (18,558) (25,422)
      Associated companies 10,839  17,895 
      Other 6,989  6,530 
      Accrued unbilled revenues 27,738  23,698 
         Total accounts receivable 96,315  104,753 
    Deferred fuel costs 33,615  30,593 
    Fuel inventory - at average cost 1,980  8,048 
    Materials and supplies - at average cost 7,046  8,961 
    Prepayments and other 7,485  61,581 
    TOTAL 174,762  261,992 
    OTHER PROPERTY AND INVESTMENTS
    Investment in affiliates - at equity 3,259  3,259 
    Non-utility property at cost (less accumulated depreciation) 1,107  1,107 
    TOTAL 4,366  4,366 
    UTILITY PLANT
    Electric 739,678  691,045 
    Natural gas 191,799  189,207 
    Construction work in progress 59,685  202,353 
    TOTAL UTILITY PLANT 991,162  1,082,605 
    Less - accumulated depreciation and amortization 430,333  428,053 
    UTILITY PLANT - NET 560,829  654,552 
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      Other regulatory assets 173,045  166,133 
    Long term receivables 1,090  1,812 
    Other 22,641  31,266 
    TOTAL 196,776  199,211 
    TOTAL ASSETS $936,733  $1,120,121 
    See Notes to Respective Financial Statements.
     
    106
     
    ENTERGY NEW ORLEANS, INC.
    (DEBTOR-IN-POSSESSION)
    BALANCE SHEETS
    LIABILITIES AND SHAREHOLDERS' EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    DIP credit facility $39,749 $90,000
    Notes payable 15,000 15,000
    Accounts payable:
      Associated companies 46,464 55,923
      Other 62,613 228,496
    Customer deposits 12,321 16,930
    Taxes accrued 5,510 -
    Accumulated deferred income taxes 5,017 1,898
    Interest accrued 1,744 1,195
    Other 3,200 2,018
    TOTAL CURRENT LIABILITIES NOT SUBJECT TO COMPROMISE 191,618 411,460
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 121,008 127,680
    Accumulated deferred investment tax credits 3,358 3,570
    SFAS 109 regulatory liability - net 59,053 52,229
    Other regulatory liabilities - 591
    Retirement cost liability 2,505 2,421
    Accumulated provisions 2,099 2,119
    Pension liability 38,623 35,694
    Other 5,492 5,730
    TOTAL NON-CURRENT LIABILITIES NOT SUBJECT TO COMPROMISE 232,138 230,034
    LIABILITIES SUBJECT TO COMPROMISE 326,942 308,917
    TOTAL LIABILITIES 750,698 950,411
    Commitments and Contingencies
    SHAREHOLDERS' EQUITY
    Preferred stock without sinking fund 19,780 19,780
    Common stock, $4 par value, authorized 10,000,000
     shares; issued and outstanding 8,435,900 shares in 2006
     and 2005 33,744 33,744
    Paid-in capital 36,294 36,294
    Retained earnings 96,217 79,892
    TOTAL 186,035 169,710
    TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY $936,733 $1,120,121
    See Notes to Respective Financial Statements.

    107

     

    ENTERGY NEW ORLEANS, INC.
    (DEBTOR-IN-POSSESSION)
    SELECTED OPERATING RESULTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $22 $38 ($16) (42)
      Commercial 37 40 (3) (8)
      Industrial 10 9 1  11 
      Governmental 14 17 (3) (18)
         Total retail 83 104 (21) (20)
      Sales for resale
        Associated companies 4 35 (31) (89)
        Non-associated companies 18 - 18  - 
      Other 13 20 (7) (35)
         Total $118 $159 ($41) (26)
    Billed Electric Energy
     Sales (GWh):
      Residential 206 447 (241) (54)
      Commercial 402 552 (150) (27)
      Industrial 141 162 (21) (13)
      Governmental 161 243 (82) (34)
         Total retail 910 1,404 (494) (35)
      Sales for resale
        Associated companies 6 400 (394) (99)
        Non-associated companies 369 6 363  6,050 
         Total 1,285 1,810 (525) (29)
    Six Months Ended Increase/
    Description 2006 2005 (Decrease) %
    (Dollars In Millions)
    Electric Operating Revenues:
      Residential $39 $67 ($28) (42)
      Commercial 72 74 (2) (3)
      Industrial 19 16 3  19 
      Governmental 24 29 (5) (17)
         Total retail 154 186 (32) (17)
      Sales for resale
        Associated companies 11 81 (70) (86)
        Non-associated companies 45 1 44  4,400 
      Other 7 22 (15) (68)
         Total $217 $290 ($73) (25)
    Billed Electric Energy
     Sales (GWh):
      Residential 344 847 (503) (59)
      Commercial 762 1,071 (309) (29)
      Industrial 244 306 (62) (20)
      Governmental 267 468 (201) (43)
         Total retail 1,617 2,692 (1,075) (40)
      Sales for resale
        Associated companies 126 1,006 (880) (87)
        Non-associated companies 776 10 766  7,660 
         Total 2,519 3,708 (1,189) (32)

    108

    SYSTEM ENERGY RESOURCES, INC.

    MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

     

    Results of Operations

    System Energy's principal asset consists of a 90% ownership and leasehold interest in Grand Gulf. The capacity and energy from its 90% interest is sold under the Unit Power Sales Agreement to its only four customers, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. System Energy's operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% interest in Grand Gulf pursuant to the Unit Power Sales Agreement. Payments under the Unit Power Sales Agreement are System Energy's only source of operating revenues. Net income increased by $3.7 million for the second quarter of 2006 compared to the second quarter of 2005 primarily due to an increase in rate base in 2006 resulting in higher operating income. Net income increased by $8.2 million for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 primarily due to an increase in rate base in 2006 resulting in higher operating income combined with higher interest income earned on money pool investments.

    Liquidity and Capital Resources

    Cash Flow

    Cash flows for the six months ended June 30, 2006 and 2005 were as follows:

     

     

    2006

     

    2005

     

     

    (In Thousands)

     

     

     

     

     

    Cash and cash equivalents at beginning of period

     

    $75,704 

     

    $216,355 

     

     

     

     

     

    Cash flow provided by (used in):

     

     

     

     

     

    Operating activities

     

    (83,809)

     

    120,292 

     

    Investing activities

     

    162,738 

     

    (119,859)

     

    Financing activities

     

    (92,989)

     

    (81,590)

    Net decrease in cash and cash equivalents

     

    (14,060)

     

    (81,157)

     

     

     

     

     

    Cash and cash equivalents at end of period

     

    $61,644 

     

    $135,198 

    Operating Activities

    Operating activities used $83.8 million in cash flow for the six months ended June 30, 2006 compared to providing $120.3 million in cash flow for the six months ended June 30, 2005 primarily due to an increase of $208.5 million in income tax payments.

    Investing Activities

    Investing activities provided $162.7 million in cash flow for the six months ended June 30, 2006 compared to using $119.9 million in cash flow for the six months ended June 30, 2005 primarily due to money pool activity. Partially offsetting the increase in cash provided was an increase in construction expenditures primarily resulting from capital spending on dry fuel storage.

     

    109

     

    Financing Activities

    The increase of $11.4 million in net cash used in financing activities for the six months ended June 30, 2006 compared to the six months ended June 30, 2005 was primarily due to an increase of $17.2 million in common stock dividends paid, partially offset by a decrease of $5.8 million in the January 2006 principal payment made on the Grand Gulf sale-leaseback compared to the January 2005 principal payment.

    Capital Structure

    System Energy's capitalization is balanced between equity and debt, as shown in the following table.

     

     

    June 30,
    2006

     

    December 31,
    2005

     

     

     

     

     

     

     

    Net debt to net capital

     

    48.5%

     

    49.0%

     

    Effect of subtracting cash from debt

     

    1.8%

     

    2.1%

     

    Debt to capital

     

    50.3%

     

    51.1%

     

    Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and common shareholder's equity. Net capital consists of capital less cash and cash equivalents. System Energy uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy's financial condition.

    Uses and Sources of Capital

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources" in the Form 10-K for a discussion of System Energy's uses and sources of capital. The following is an update to the Form 10-K.

    System Energy's receivables from the money pool were as follows:

    June 30,
    2006

     

    December 31,
    2005

     

    June 30,
    2005

     

    December 31,
    2004

    (In Thousands)

     

     

     

     

     

     

     

    $88,331

     

    $277,287

     

    $163,416

     

    $61,592

    See Note 4 to the domestic utility companies and System Energy financial statements in the Form 10-K for a description of the money pool.

    Significant Factors and Known Trends

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends" in the Form 10-K for a discussion of market risks, nuclear matters, litigation risks, and environmental risks.

    Critical Accounting Estimates

    See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" in the Form 10-K for a discussion of the estimates and judgments necessary in System Energy's accounting for nuclear decommissioning costs and pension and other retirement benefits.

    110

    Recently Issued Accounting Pronouncements

    FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for System Energy in the first quarter of 2007. The FASB's objective in issuing this interpretation is to increase comparability among companies in financial reporting of income taxes. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. System Energy does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.

    111

     

    SYSTEM ENERGY RESOURCES, INC.
    INCOME STATEMENTS
    For the Three and Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    Three Months Ended Six Months Ended
    2006 2005 2006 2005
    (In Thousands) (In Thousands)
    OPERATING REVENUES
    Domestic electric $129,176  $126,364  $260,830  $251,154 
    OPERATING EXPENSES
    Operation and Maintenance:
      Fuel, fuel-related expenses, and
       gas purchased for resale 10,168  10,139  21,381  19,858 
      Nuclear refueling outage expenses 3,962  3,026  7,535  6,019 
      Other operation and maintenance 26,563  27,346  49,815  50,482 
    Decommissioning 5,925  6,240  11,744  12,368 
    Taxes other than income taxes 5,817  6,322  12,006  12,371 
    Depreciation and amortization 23,811  24,158  49,488  50,702 
    Other regulatory credits - net (3,766) (4,126) (5,746) (8,511)
    TOTAL 72,480  73,105  146,223  143,289 
    OPERATING INCOME 56,696  53,259  114,607  107,865 
    OTHER INCOME
    Allowance for equity funds used during construction 775  321  1,458  627 
    Interest and dividend income 4,271  3,672  9,900  6,517 
    Miscellaneous - net (91) (108) (198) (221)
    TOTAL 4,955  3,885  11,160  6,923 
    INTEREST AND OTHER CHARGES
    Interest on long-term debt 11,996  12,812  24,529  25,668 
    Other interest - net 26  6  54  8 
    Allowance for borrowed funds used during construction (244) (102) (459) (199)
    TOTAL 11,778  12,716  24,124  25,477 
    INCOME BEFORE INCOME TAXES 49,873  44,428  101,643  89,311 
    Income taxes 20,265  18,503  41,287  37,154 
    NET INCOME $29,608  $25,925  $60,356  $52,157 
    See Notes to Respective Financial Statements.

    112

     

    SYSTEM ENERGY RESOURCES, INC.
    STATEMENTS OF CASH FLOWS
    For the Six Months Ended June 30, 2006 and 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    OPERATING ACTIVITIES
    Net income $60,356  $52,157 
    Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:
      Other regulatory credits - net (5,746) (8,511)
      Depreciation, amortization, and decommissioning 61,231  63,070 
      Deferred income taxes and investment tax credits (9,633) (12,140)
      Changes in working capital:
        Receivables 5,111  6,179 
        Accounts payable (901) (4,750)
        Taxes accrued (180,245) 28,065 
        Interest accrued (31,520) (27,831)
        Other working capital accounts (602) 153 
      Provision for estimated losses and reserves 1  50 
      Changes in other regulatory assets (9,921) (9,080)
      Other 28,060  32,930 
    Net cash flow provided by (used in) operating activities (83,809) 120,292 
    INVESTING ACTIVITIES
    Construction expenditures (14,557) (7,982)
    Allowance for equity funds used during construction 1,458  627 
    Nuclear fuel purchases (370) - 
    Proceeds from sale/leaseback of nuclear fuel 370  - 
    Proceeds from nuclear decommissioning trust fund sales 52,562  52,287 
    Investment in nuclear decommissioning trust funds (65,681) (62,967)
    Changes in money pool receivable - net 188,956  (101,824)
    Net cash flow provided by (used in) investing activities 162,738  (119,859)
    FINANCING ACTIVITIES
    Retirement of long-term debt (22,989) (28,790)
    Dividends paid:
      Common stock (70,000) (52,800)
    Net cash flow used in financing activities (92,989) (81,590)
    Net decrease in cash and cash equivalents (14,060) (81,157)
    Cash and cash equivalents at beginning of period 75,704  216,355 
    Cash and cash equivalents at end of period $61,644  $135,198 
    SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
    Cash paid during the period for:
      Interest - net of amount capitalized $53,199  $50,605 
      Income taxes $220,423  $11,914 
    See Notes to Respective Financial Statements.

    113

     

    SYSTEM ENERGY RESOURCES, INC.
    BALANCE SHEETS
    ASSETS
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT ASSETS
    Cash and cash equivalents:
      Cash $13 $204
      Temporary cash investments - at cost,
       which approximates market 61,631 75,500
         Total cash and cash equivalents 61,644 75,704
    Accounts receivable:
      Associated companies 134,078 327,454
      Other 2,594 3,285
         Total accounts receivable 136,672 330,739
    Materials and supplies - at average cost 57,315 55,183
    Deferred nuclear refueling outage costs 14,193 17,853
    Prepayments and other 3,853 1,878
    TOTAL 273,677 481,357
    OTHER PROPERTY AND INVESTMENTS
    Decommissioning trust funds 249,517 236,003
    UTILITY PLANT
    Electric 3,222,080 3,212,596
    Property under capital lease 467,005 467,005
    Construction work in progress 51,220 47,178
    Nuclear fuel under capital lease 72,048 87,500
    TOTAL UTILITY PLANT 3,812,353 3,814,279
    Less - accumulated depreciation and amortization 1,944,612 1,889,886
    UTILITY PLANT - NET 1,867,741 1,924,393
    DEFERRED DEBITS AND OTHER ASSETS
    Regulatory assets:
      SFAS 109 regulatory asset - net 92,386 92,883
      Other regulatory assets 302,492 292,968
    Other 17,071 18,435
    TOTAL 411,949 404,286
    TOTAL ASSETS $2,802,884 $3,046,039
    See Notes to Respective Financial Statements.
     
    114
     
    SYSTEM ENERGY RESOURCES, INC.
    BALANCE SHEETS
    LIABILITIES AND SHAREHOLDER'S EQUITY
    June 30, 2006 and December 31, 2005
    (Unaudited)
    2006 2005
    (In Thousands)
    CURRENT LIABILITIES
    Currently maturing long-term debt $23,335  $22,989 
    Accounts payable:
      Associated companies (745) - 
      Other 22,614  22,770 
    Taxes accrued 48,074  228,168 
    Accumulated deferred income taxes 5,276  6,678 
    Interest accrued 13,589  45,109 
    Obligations under capital leases 30,236  27,716 
    Other 1,656  1,811 
    TOTAL 144,035  355,241 
    NON-CURRENT LIABILITIES
    Accumulated deferred income taxes and taxes accrued 256,573  267,913 
    Accumulated deferred investment tax credits 70,398  72,136 
    Obligations under capital leases 41,812  63,307 
    Other regulatory liabilities 250,828  224,997 
    Decommissioning 330,670  318,927 
    Accumulated provisions 2,400  2,399 
    Long-term debt 799,872  819,642 
    Other 22,312  27,849 
    TOTAL 1,774,865  1,797,170 
    Commitments and Contingencies
    SHAREHOLDER'S EQUITY
    Common stock, no par value, authorized 1,000,000 shares;
     issued and outstanding 789,350 shares in 2006 and 2005 789,350  789,350 
    Retained earnings 94,634  104,278 
    TOTAL 883,984  893,628 
    TOTAL LIABILITIES AND SHAREHOLDER'S EQUITY $2,802,884  $3,046,039 
    See Notes to Respective Financial Statements.

    115

     

    ENTERGY ARKANSAS, ENTERGY GULF STATES, ENTERGY LOUISIANA, ENTERGY MISSISSIPPI, ENTERGY NEW ORLEANS (DEBTOR-IN-POSSESSION), AND SYSTEM ENERGY

    NOTES TO RESPECTIVE FINANCIAL STATEMENTS
    (Unaudited)

    NOTE 1. COMMITMENTS AND CONTINGENCIES

    Entergy New Orleans Bankruptcy (Entergy New Orleans)

    See Note 6 to the domestic utility companies and System Energy financial statements for information on the Entergy New Orleans bankruptcy proceeding.

    Nuclear Insurance (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy)

    See Note 8 to the domestic utility companies and System Energy financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy Arkansas', Entergy Gulf States', Entergy Louisiana's, and System Energy's nuclear power plants.

    Non-Nuclear Property Insurance (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

    See Note 8 to the domestic utility companies and System Energy financial statements in the Form 10-K for information on Entergy's non-nuclear property insurance program. Beginning in June 2006, the aggregation limit for all parties insured by Oil Insurance Limited for any one occurrence was reduced to $500 million. Most of Entergy's non-nuclear excess property insurance coverage includes a $75 million drop-down feature in the event of an OIL aggregation loss to which an Entergy loss contributes.

    Nuclear Decommissioning and Other Asset Retirement Costs (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy)

    See Note 8 to the domestic utility companies and System Energy financial statements in the Form 10-K for information on nuclear decommissioning and other retirement costs.

    CashPoint Bankruptcy (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

    See Note 8 to the domestic utility companies and System Energy financial statements in the Form 10-K for information regarding the bankruptcy of CashPoint, which managed a network of payment agents for the domestic utility companies.

    City Franchise Ordinances (Entergy New Orleans)

    Entergy New Orleans provides electric and gas service in the City of New Orleans pursuant to franchise ordinances. These ordinances contain a continuing option for the City of New Orleans to purchase Entergy New Orleans' electric and gas utility properties.

    Employment Litigation (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

    Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy are defendants in numerous lawsuits filed by former employees asserting that they were wrongfully terminated and/or discriminated against on the basis of age, race, sex, or other protected characteristics. The defendant companies deny any liability to the plaintiffs.

    116

    Asbestos and Hazardous Material Litigation (Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

    See Note 8 to the domestic utility companies and System Energy financial statements in the Form 10-K for information regarding asbestos and hazardous material litigation at Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

     

    NOTE 2. RATE AND REGULATORY MATTERS

    Storm Costs Recovery Filings with Retail Regulators

    On July 31, 2006, Entergy Louisiana and Entergy Gulf States filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in the Louisiana jurisdiction and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, based on a ten-year levelized rate are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Storm Cost Recovery Riders (SCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SCRRs be adjusted annually to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States. Hearings on the application are scheduled for the first quarter 2007.

    In July 2006, Entergy Gulf States filed an application with the PUCT with respect to the $393.2 million of Hurricane Rita reconstruction costs incurred in its Texas retail jurisdiction through March 31, 2006. The filing asks the PUCT to determine that $393.2 million is the amount of reasonable and necessary hurricane reconstruction costs eligible for securitization and recovery, approve the recovery of carrying costs, and approve the manner in which Entergy Gulf States-Texas allocates those costs among its retail customer classes.  If approved, Entergy Gulf States' application will ultimately affect all its retail customers in Texas. Entergy Gulf States' filing does not request recovery of costs through a specific rider on customer bills or through any other means at this time. The hearing before the PUCT on the filing is scheduled for November 2006. This is the first of two filings authorized by a law passed earlier this year in a special session of the Texas Legislature. A second filing will request securitization and recovery of the eligible costs through retail rates and tariffs. Entergy Gulf States expects to make the second filing following the conclusion of the reconstruction cost case.

    As discussed in the Form 10-K, in December 2005, Entergy Mississippi filed with the MPSC a Notice of Intent to change rates by implementing a Storm Damage Rider to recover storm damage restoration costs associated with Hurricanes Katrina and Rita totaling approximately $84 million as of November 30, 2005.  In February 2006, Entergy Mississippi filed an Application for an Accounting Order seeking certification by the MPSC of Entergy Mississippi's estimated $36 million of storm restoration costs not included in the December 2005 filing. In March 2006, the Governor signed a law that established a mechanism by which the MPSC may authorize and certify an electric utility financing order and the state may issue general obligation bonds to pay the costs of repairing damage caused by Hurricane Katrina to the systems of investor-owned electric utilities.  Because of the passage of this law and the possibility of Entergy Mississippi obtaining CDBG funds for Hurricane Katrina storm restoration costs, in March 2006, the MPSC issued an order approving a Joint Stipulation between Entergy Mississippi and the Mississippi

    117

    Public Utilities Staff that provided for the review of Entergy Mississippi's total storm restoration costs in the Application for an Accounting Order proceeding.  The Stipulation stated that the procedural schedule of the December 2005 Notice of Intent filing should be suspended until the MPSC issues a final order in the Application for an Accounting Order proceeding. 

    In June 2006, the MPSC issued an order certifying Entergy Mississippi's Hurricane Katrina restoration costs incurred through March 31, 2006 of $89 million, net of estimated insurance proceeds. Two days later Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its infrastructure restoration costs. Entergy Mississippi also filed a Petition for Financing Order with the MPSC for authorization of state general obligation bond financing of $169 million for Hurricane Katrina restoration costs and future storm costs. The $169 million amount includes Hurricane Katrina restoration costs plus $80 million to build Entergy Mississippi's storm damage reserve for the future. The amount financed through the bonds will be reduced dollar for dollar by any CDBG funds that Entergy Mississippi receives. Pursuant to the legislation, the MPSC must issue a financing order by the end of October 2006.

    Deferred Fuel Costs

    See Note 2 to the domestic utility companies and System Energy financial statements in the Form 10-K for information regarding fuel proceedings involving the domestic utility companies. The following are updates to the Form 10-K.

    Entergy Arkansas

    In March 2006, Entergy Arkansas filed with the APSC its annual redetermination of the energy cost rate for application to the period April 2006 through March 2007. The filed energy cost rate of $0.02827 per kWh was proposed to replace the interim rate of $0.01900 per kWh that had been in place since October 2005. The interim energy cost rate is discussed in the Form 10-K, along with the investigation that the APSC commenced concerning Entergy Arkansas' interim energy cost rate. The increase in the energy cost rate is due to increases in the cost of purchased power primarily due to the natural gas cost increase and the effect that Hurricanes Katrina and Rita had on market conditions, increased demand for purchased power during the ANO 1 refueling and steam generator replacement outage in the fall of 2005, and coal plant generation curtailments during off-peak periods due to coal delivery problems.

    On March 31, 2006, the APSC suspended implementation of the $0.02827 per kWh energy cost rate, and ordered that the $0.01900 per kWh interim rate remain in effect pending the APSC proceedings on the energy cost recovery filings. The APSC also extended its investigation into Entergy Arkansas' interim energy cost rate to cover the costs included in Entergy Arkansas' March 2006 filing. The extended investigation does not identify new issues in addition to the four issues listed in the Form 10-K and covers the same time period. On April 7, 2006, the APSC issued a show cause order in the investigation proceeding that ordered Entergy Arkansas to file a cost of service study by June 8, 2006. The order also directed Entergy Arkansas to file testimony to support the cost of service study, to support the $0.02827 per kWh cost rate, and to address the general topic of elimination of the energy cost recovery rider.

    Entergy Arkansas filed for rehearing of the APSC's orders, asking that the energy cost rate filed in March 2006 be implemented in May 2006 subject to refund, asserting that the APSC did not follow appropriate procedures in suspending the operation of the energy cost recovery rider, and asking the APSC to rescind its show cause order. On May 8, 2006 the APSC denied Entergy Arkansas' requests for rehearing. Entergy Arkansas appealed the APSC's decision, but later filed a motion to dismiss the appeal following the APSC's decision described below.

    In June 2006, Entergy Arkansas once again filed a motion with the APSC seeking to implement the redetermined energy cost rate of $0.02827 per kWh. After a hearing the APSC approved Entergy Arkansas' request and the redetermined rate was implemented in July 2006, subject to refund pending the outcome of the APSC energy cost recovery investigation. Because of the delay in implementing the redetermined energy cost rate, Entergy Arkansas estimated in its motion that $46 million of energy costs would remain under-recovered at December 31, 2006.

    118

    A hearing in the APSC energy cost recovery investigation is scheduled for October 2006.

    On June 7, 2006, Entergy Arkansas filed the cost of service study ordered by the APSC. On that date Entergy Arkansas also filed notice with the APSC that it intends to file for a change in base rates within 60 to 90 days of its notice. Entergy Arkansas expects to make that filing in August 2006.

    Entergy Gulf States

    On March 1, 2006, Entergy Gulf States filed with the PUCT an application to implement an interim fuel surcharge in connection with the under-recovery of $97 million including interest of eligible fuel costs for the period August 2005 through January 2006. This surcharge is in addition to an interim surcharge that went into effect in January 2006. Entergy Gulf States entered into a unanimous settlement that reduced the requested surcharge for actual over-collections from the months of February and March 2006, resulting in a surcharge of $78.8 million to be implemented over a twelve-month period beginning in June 2006. The PUCT approved the surcharge in June 2006. Amounts collected through the interim fuel surcharges are subject to final reconciliation in a future fuel reconciliation proceeding.

    In May 2006, Entergy Gulf States filed with the PUCT a fuel and purchased power reconciliation case covering the period September 2003 through December 2005 for costs recoverable through the Texas fixed fuel factor rate and the incremental purchased capacity recovery rider. Entergy Gulf States is reconciling $1.6 billion of fuel and purchased power costs on a Texas retail basis. Hearings are scheduled for February 2007 and a PUCT decision is expected in July 2007.

    Entergy Gulf States and Entergy Louisiana

    In November 2005, the LPSC authorized its staff to initiate an expedited proceeding to audit the fuel and power procurement activities of Entergy Louisiana and Entergy Gulf States for the period January 1, 2005 through October 31, 2005. In April 2006, the LPSC accepted the LPSC Staff's audit report finding that the prices paid for natural gas and purchased power were reasonable and that given the market conditions surrounding Hurricanes Katrina and Rita, Entergy Louisiana and Entergy Gulf States acted reasonably and prudently in response to an extremely difficult environment.

    Retail Rate Proceedings

    See Note 2 to the domestic utility companies and System Energy financial statements in the Form 10-K for information regarding retail rate proceedings involving the domestic utility companies. The following are updates to the Form 10-K.

    Filings with the APSC (Entergy Arkansas)

    As discussed above in "Deferred Fuel Costs," on June 7, 2006, Entergy Arkansas filed notice with the APSC that it intends to file for a change in base rates within 60 to 90 days of its notice. Entergy Arkansas expects to make that filing in August 2006.

    Filings with the PUCT and Texas Cities (Entergy Gulf States)

    As discussed in the Form 10-K, in August 2005, Entergy Gulf States filed with the PUCT an application for recovery of its transition to competition costs. Entergy Gulf States requested recovery of $189 million in transition to competition costs through implementation of a 15-year rider to be effective no later than March 1, 2006. The $189 million represents transition to competition costs Entergy Gulf States incurred from June 1, 1999 through June 17, 2005 in preparing for competition in its service area, including attendant AFUDC, and all carrying costs

    119

    projected to be incurred on the transition to competition costs through February 28, 2006. The $189 million is before any gross-up for taxes or carrying costs over the 15-year recovery period. Entergy Gulf States reached a unanimous settlement agreement on all issues with the active parties in the transition to competition cost recovery case. The agreement allows Entergy Gulf States to recover $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented interim rates based on this revenue level on March 1, 2006. The PUCT approved the settlement agreement in June 2006.

    Filings with the LPSC

    Retail Rates - Electric

    (Entergy Gulf States)

    In March 2006, the LPSC approved an uncontested stipulated settlement in Entergy Gulf States' formula rate plan filing for the 2004 test year. The settlement includes a revenue requirement increase of $36.8 million and calls for Entergy Gulf States to apply a refund liability of $744 thousand to capacity deferrals. The refund liability pertained to the periods 2004-2005 as well as the interim period in which a $37.8 million revenue increase was in place.

    In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Gulf States' return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $7.1 million rate increase is required to recover LPSC-approved incremental deferred and ongoing capacity requirements. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    (Entergy Louisiana)

    In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. The filing shows that Entergy Louisiana's return on equity was within the allowed bandwidth. The filing also indicates that under the formula rate plan rider for approved capacity additions, a $121 million rate increase is required to recover LPSC-approved incremental deferred and ongoing capacity requirements. Entergy Louisiana requested recovery of the capacity deferrals over a three-year period, including carrying charges. $51 million of the rate increase is associated with these deferrals. The remaining $70 million of the rate increase is associated with ongoing capacity costs. The filing is subject to a period of LPSC Staff review, and rate changes associated with the formula rate plan are scheduled to take effect with the first billing cycle of September 2006.

    Retail Rates - Gas (Entergy Gulf States)

    In January 2006, Entergy Gulf States filed with the LPSC its gas rate stabilization plan. The filing showed a revenue deficiency of $4.1 million based on an ROE mid-point of 10.5%. On May 1, 2006, Entergy Gulf States implemented a $3.5 million rate increase pursuant to an uncontested agreement with the LPSC Staff.

    Filings with the MPSC (Entergy Mississippi)

    Formula Rate Plan Filings

    In March 2006, Entergy Mississippi made its annual scheduled formula rate plan filing with the MPSC.  The filing was amended by an April 2006 filing.  The amended filing showed that an increase of $3.1 million in electric revenues is warranted.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which will be implemented in August 2006.

    120

    Filings with the City Council (Entergy New Orleans)

    In June 2006, Entergy New Orleans made its annual formula rate plan filings with the City Council.  The filings show various alternatives to reflect the effect of Entergy New Orleans' lost customers and decreased revenue. Entergy New Orleans' recommended alternative adjusts for lost customers and assumes that the City Council's June 2006 decision to allow recovery of all Grand Gulf costs through the fuel adjustment clause stays in place (a portion of Grand Gulf costs was previously recovered through base rates). Under that alternative, annual increases of $6.4 million in electric base rate revenues (an increase of 4.4%) and $22.8 million in gas base rate revenues (an increase of 160.9%) are warranted. The filings triggered the prescribed four-month period for review by the City Council's Advisors and other parties, and rate adjustments, if any, could be implemented as soon as the first billing cycle of November 2006.

    At the same time as it made its formula rate plan filings, Entergy New Orleans also filed with the City Council a request to implement two storm-related riders. With the first rider, Entergy New Orleans seeks to recover over a ten-year period the $114 million in electric restoration costs and the $25 million in gas restoration costs that it has actually spent through March 31, 2006. Entergy New Orleans also proposed semiannual filings to update the rider for additional restoration spending and also to consider the receipt of CDBG funds or insurance proceeds that it may receive. With the second rider, Entergy New Orleans seeks to establish over a ten-year period a $150 million storm reserve to provide for the risk of another storm. Entergy New Orleans requested that the City Council consider the proposed riders within the same time frame as the formula rate plans, which would allow implementation as soon as the first billing cycle of November 2006.

     

    NOTE 3. LINES OF CREDIT, RELATED SHORT-TERM BORROWINGS, AND LONG-TERM DEBT

    The short-term borrowings of the domestic utility companies (other than Entergy New Orleans) and System Energy are limited to amounts authorized by the FERC. The current FERC-authorized limits are effective through March 31, 2008. In addition to borrowing from commercial banks, these companies are authorized under a FERC order to borrow from the Entergy System money pool. The money pool is an inter-company borrowing arrangement designed to reduce Entergy's subsidiaries' dependence on external short-term borrowings. Borrowings from the money pool and external borrowings combined may not exceed the FERC authorized limits. There were no external short-term borrowings outstanding for the domestic utility companies (other than Entergy New Orleans) and System Energy as of June 30, 2006. The following are the FERC-authorized limits for short-term borrowings effective February 2006 and the outstanding short-term borrowings from the money pool for the domestic utility companies (other than Entergy New Orleans) and System Energy as of June 30, 2006:

     

     

    Authorized

     

    Borrowings

     

     

    (In Millions)

     

     

     

     

     

    Entergy Arkansas

     

    $250

     

    -

    Entergy Gulf States

     

    $350

     

    -

    Entergy Louisiana

     

    $250

     

    $90.9

    Entergy Mississippi

     

    $175

     

    -

    System Energy

     

    $200

     

    -

    Under a savings provision in PUHCA 2005, which repealed PUHCA 1935, Entergy New Orleans may continue to be a participant in the money pool to the extent authorized by its SEC PUHCA 1935 order. However, Entergy New Orleans has not, and does not expect to make, any additional money pool borrowings while it is in bankruptcy proceedings. Entergy New Orleans had $35.6 million in borrowings outstanding from the money pool as of its bankruptcy filing date, September 23, 2005. The money pool borrowings reflected on Entergy New Orleans' Balance Sheet as of June 30, 2006 are classified as a pre-petition obligation subject to compromise.

    121

    Entergy Arkansas, Entergy Gulf States, and Entergy Mississippi, each have credit facilities available as of June 30, 2006 as follows:


    Company

     


    Expiration Date

     

    Amount of
    Facility

     

    Amount Drawn as of
    June 30, 2006

     

     

     

     

     

     

     

    Entergy Arkansas

     

    April 2007

     

    $85 million

     

    -

    Entergy Gulf States

     

    February 2011

     

    $25 million (a)

     

    -

    Entergy Mississippi

     

    May 2007

     

    $30 million (b)

     

    -

    Entergy Mississippi

     

    May 2007

     

    $20 million (b)

     

    -

    (a)

    The credit facility allows Entergy Gulf States to issue letters of credit against the borrowing capacity of the facility. As of June 30, 2006, $1.4 million in letters of credit had been issued.

    (b)

    Borrowings under the Entergy Mississippi facilities may be secured by a security interest in its accounts receivable.

    In May 2006, Entergy Mississippi increased its $25 million credit facility to $30 million and renewed it through May 2007. Entergy Mississippi also entered into a new $20 million credit facility through May 2007.

    In August 2006, Entergy Gulf States increased the capacity of its credit facility to $50 million.

    In addition, Entergy New Orleans, which is currently in bankruptcy and is no longer consolidated in Entergy's financial statements, had a 364-day credit facility in the amount of $15 million which expired in May 2006. As of June 30, 2006, the full amount of the credit facility remains outstanding under bankruptcy protection. In July 2006, the bankruptcy judge authorized Entergy New Orleans to set off $15 million of its cash currently held by the lender against the outstanding debt on the credit facility.

    The credit facilities have variable interest rates and the average commitment fee is 0.13%. The $85 million Entergy Arkansas credit facility requires that it maintain total shareholders' equity of at least 25% of its total assets. In July 2005, Entergy New Orleans granted the lender a security interest in its customer accounts receivables to secure its borrowings under its facility.

    Entergy New Orleans Debtor-in-Possession Credit Facility

    See Note 4 to the domestic utility companies and System Energy financial statements in the Form 10-K for a discussion of the Entergy New Orleans $200 million debtor-in-possession (DIP) credit facility. As discussed in the Form 10-K, the bankruptcy court issued its order in December 2005 giving final approval for the credit facility, and the indenture trustee for Entergy New Orleans' first mortgage bonds appealed the order. On March 29, 2006 the bankruptcy court approved a settlement among Entergy New Orleans, Entergy Corporation, and the indenture trustee, and the indenture trustee dismissed its appeal. As of June 30, 2006, Entergy New Orleans had approximately $40 million of outstanding borrowings under the DIP credit facility.

    As discussed in the Form 10-K, borrowings under the DIP credit facility are due in full, and the agreement will terminate, at the earliest of several times or events, including August 23, 2006. Entergy and Entergy New Orleans have agreed to an amendment to the DIP credit agreement that extends the August 23, 2006 maturity date to August 23, 2007, and this amendment is subject to bankruptcy court approval. Entergy New Orleans has filed a motion with the bankruptcy court to authorize Entergy New Orleans to enter into the amendment, which is set for hearing August 16, 2006.

    The interest rate on borrowings under the DIP credit agreement will be the average interest rate of borrowings outstanding under Entergy Corporation's $2 billion revolving credit facility, which is currently approximately 5.8% per annum.

    122

    Long-term Debt

    The following long-term debt has been issued by the domestic utility companies and System Energy in 2006:

     

    Issue Date

     

    Amount

     

     

     

    (In Thousands)

    Mortgage Bonds:

     

     

     

    5.92% Series due February 2016 - Entergy Mississippi

    January 2006

     

    $100,000

    Other Long-term Debt:

     

     

     

    4.60% Series due October 2017, Jefferson County - Arkansas
      (Entergy Arkansas) (secured by a series of collateral first
      mortgage bonds)



    June 2006



    $54,700

    The following long-term debt was retired by domestic utility companies and System Energy in 2006:

     

    Retirement Date

     

    Amount

     

     

     

    (In Thousands)

    Other Long-term Debt:

     

     

     

    5.95% Series due December 2023, St. Charles Parish - (Entergy Louisiana)

    June 2006 

    $25,000

    Grand Gulf Lease Obligation payment

    N/A

    $22,989

    Retirements after the balance sheet date:

    5.6% Series due October 2017, Jefferson County - Arkansas (Entergy
      Arkansas)


    July 2006


    $45,500

    6.3% Series due June 2018, Jefferson County - Arkansas (Entergy Arkansas)

    July 2006

    $9,200

    Entergy Mississippi used the proceeds from the January 2006 issuance to purchase the Attala power plant from Central Mississippi Generating Company, LLC and to repay short-term indebtedness.

    Entergy Arkansas used the proceeds from the June 2006 issuance to redeem, prior to maturity, $45.5 million of 5.6% Series of Jefferson County bonds and $9.2 million of 6.3% Series of Jefferson County bonds in July 2006. The issuance is shown as a non-cash transaction on the cash flow statement since the proceeds were placed in a trust and never held as cash by Entergy Arkansas.

     

    NOTE 4. PREFERRED STOCK

    (Entergy Arkansas)

    In March 2006, Entergy Arkansas issued 3,000,000 shares of $25 par value 6.45% Series Preferred Stock, all of which were outstanding as of June 30, 2006. The dividends are cumulative and payable quarterly beginning July 1, 2006. The preferred stock is redeemable on or after April 1, 2011, at Entergy Arkansas' option, at the call price of $25 per share. In April 2006, Entergy Arkansas used the proceeds from this issuance to redeem the following preferred stock:

    Series of Entergy Arkansas Preferred Stock

     

    Redemption Price Per Share

         

    7.32% Preferred Stock, Cumulative, $100.00 par value

     

    $103.17

    7.80% Preferred Stock, Cumulative, $100.00 par value

     

    $103.25

    7.40% Preferred Stock, Cumulative, $100.00 par value

     

    $102.80

    7.88% Preferred Stock, Cumulative, $100.00 par value

     

    $103.00

    $1.96 Preferred Stock, Cumulative, $0.01 par value

     

    $ 25.00

    123

    (Entergy New Orleans)

    Since the filing of the bankruptcy proceedings, Entergy New Orleans has not been able to declare and pay dividends on its 4.75% preferred stock for three quarters. As discussed further in the Form 10-K, if dividends with respect to the 4.75% preferred stock are not paid for four quarters, the holders of these shares would have the right to elect a majority of the Entergy New Orleans board of directors.  Entergy New Orleans filed a motion in the bankruptcy court seeking authority to recommence paying dividends to the holders of the 4.75% preferred shares. After a hearing on the motion on May 3, 2006, the court granted Entergy New Orleans the authority to pay dividends to the holders of the 4.75% preferred shares, beginning with the dividend due on July 1, 2006, and thereafter, unless objections are filed by creditors forty-five days in advance of a dividend payment date. If any objections are filed, the matter would be heard by the bankruptcy court. Entergy New Orleans declared and paid the dividend due on July 1, 2006, and intends to declare and pay the dividends on the 4.75% preferred shares each quarter pending resolution of its plan of reorganization.

     

    NOTE 5. RETIREMENT AND OTHER POSTRETIREMENT BENEFITS

    Components of Net Pension Cost

    The domestic utility companies' and System Energy's qualified pension cost, including amounts capitalized, for the second quarters of 2006 and 2005, included the following components:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2006

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $3,626 

     

    $2,993 

     

    $2,182 

     

    $1,077 

     

    $501 

     

    $1,031 

    Interest cost on projected

     

     

     

     

     

     

     

     

     

     

     

     

      benefit obligation

     

    9,915 

     

    7,914 

     

    6,052 

     

    3,252 

     

    1,282 

     

    1,604 

    Expected return on assets

     

    (9,834)

     

    (10,176)

     

    (7,114)

     

    (3,683)

     

    (884)

     

    (1,775)

    Amortization of prior service cost

     

    415 

     

    309 

     

    141 

     

    128 

     

    56 

     

    12 

    Amortization of loss

     

    2,438 

     

    640 

     

    1,509 

     

    725 

     

    509 

     

    167 

    Net pension cost

     

    $6,560 

     

    $1,680 

     

    $2,770 

     

    $1,499 

     

    $1,464 

     

    $1,039 

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2005

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $3,329 

     

    $2,704 

     

    $1,957 

     

    $1,005 

     

    $436 

     

    $944 

    Interest cost on projected

     

     

     

     

     

     

     

     

     

     

     

     

      benefit obligation

     

    9,115 

     

    7,235 

     

    5,525 

     

    2,998 

     

    1,148 

     

    1,413 

    Expected return on assets

     

    (9,009)

     

    (9,709)

     

    (6,666)

     

    (3,566)

     

    (731)

     

    (1,324)

    Amortization of transition asset

     

    - 

     

    - 

     

    - 

     

    - 

     

    - 

     

    (69)

    Amortization of prior service cost

     

    415 

     

    378 

     

    163 

     

    128 

     

    57 

     

    17 

    Amortization of loss

     

    1,613 

     

    1,213 

     

    730 

     

    527 

     

    151 

     

    229 

    Net pension cost

     

    $5,463 

     

    $1,821 

     

    $1,709 

     

    $1,092 

     

    $1,061 

     

    $1,210 

    124

    The domestic utility companies' and System Energy's pension cost, including amounts capitalized, for the six months ended June 30, 2006 and 2005, included the following components:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2006

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $7,252 

     

    $5,986 

     

    $4,365 

     

    $2,154 

     

    $1,002 

     

    $2,062 

    Interest cost on projected

     

     

     

     

     

     

     

     

     

     

     

     

      benefit obligation

     

    19,830 

     

    15,828 

     

    12,103 

     

    6,504 

     

    2,563 

     

    3,209 

    Expected return on assets

     

    (19,668)

     

    (20,351)

     

    (14,227)

     

    (7,366)

     

    (1,767)

     

    (3,551)

    Amortization of prior service cost

     

    831 

     

    617 

     

    281 

     

    257 

     

    112 

     

    24 

    Amortization of loss

     

    4,875 

     

    1,280 

     

    3,018 

     

    1,449 

     

    1,018 

     

    334 

    Net pension cost

     

    $13,120 

     

    $3,360 

     

    $5,540 

     

    $2,998 

     

    $2,928 

     

    $2,078 

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2005

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $6,658 

     

    $5,408 

     

    $3,914 

     

    $2,010 

     

    $872 

     

    $1,888 

    Interest cost on projected

     

     

     

     

     

     

     

     

     

     

     

     

      benefit obligation

     

    18,230 

     

    14,470 

     

    11,050 

     

    5,996 

     

    2,296 

     

    2,826 

    Expected return on assets

     

    (18,018)

     

    (19,418)

     

    (13,332)

     

    (7,132)

     

    (1,462)

     

    (2,648)

    Amortization of transition asset

     

    - 

     

    - 

     

    - 

     

    - 

     

    - 

     

    (138)

    Amortization of prior service cost

     

    830 

     

    756 

     

    326 

     

    256 

     

    114 

     

    34 

    Amortization of loss

     

    3,226 

     

    2,426 

     

    1,460 

     

    1,054 

     

    302 

     

    458 

    Net pension cost

     

    $10,926 

     

    $3,642 

     

    $3,418 

     

    $2,184 

     

    $2,122 

     

    $2,420 

    The domestic utility companies recognized the following pension cost for their non-qualified pension plans in the second quarters of 2006 and 2005:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

     

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

     

     

    (In Thousands)

    Non-Qualified Pension Cost
      Second Quarter 2006

     

    $113 

     

    $220 

     

    $5 

     

    $36 

     

    $54 

     

    Non-Qualified Pension Cost
      Second Quarter 2005

     

    $101 

     

    $296 

     

    $6 

     

    $37 

     

    $51 

     

    The domestic utility companies recognized the following pension cost for their non-qualified pension plans for the six months ended June 30, 2006 and 2005:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

     

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

     

     

    (In Thousands)

    Non-Qualified Pension Cost Six
      Months Ended June 30, 2006

     

    $226 

     

    $439 

     

    $11 

     

    $73 

     

    $107 

     

    Non-Qualified Pension Cost Six
      Months Ended June 30, 2005

     

    $203 

     

    $593 

     

    $11 

     

    $75 

     

    $102 

     

    125

    Components of Net Other Postretirement Benefit Cost

    The domestic utility companies' and System Energy's other postretirement benefit cost, including amounts capitalized, for the second quarters of 2006 and 2005, included the following components:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2006

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $1,337 

     

    $1,254 

     

    $854 

     

    $419 

     

    $232 

     

    $414 

    Interest cost on APBO

     

    2,844 

     

    2,747 

     

    1,856 

     

    944 

     

    856 

     

    407 

    Expected return on assets

     

    (1,797)

     

    (1,489)

     

    - 

     

    (709)

     

    (611)

     

    (421)

    Amortization of transition obligation

     

    205 

     

    151 

     

    96 

     

    88 

     

    416 

     

    2 

    Amortization of prior service cost

     

    (408)

     

    - 

     

    (24)

     

    (137)

     

    10 

     

    (301)

    Amortization of loss

     

    1,671 

     

    1,002 

     

    893 

     

    644 

     

    343 

     

    207 

    Net other postretirement benefit cost

     

    $3,852 

     

    $3,665 

     

    $3,675 

     

    $1,249 

     

    $1,246 

     

    $308 

     

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2005

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $1,157 

     

    $1,634 

     

    $689 

     

    $363 

     

    $192 

     

    $415 

    Interest cost on APBO

     

    2,589 

     

    2,924 

     

    1,673 

     

    833 

     

    789 

     

    394 

    Expected return on assets

     

    (1,637)

     

    (1,366)

     

    - 

     

    (669)

     

    (579)

     

    (387)

    Amortization of transition obligation

     

    205 

     

    947 

     

    95 

     

    88 

     

    435 

     

    4 

    Amortization of prior service cost

     

    (173)

     

    - 

     

    18 

     

    (46)

     

    10 

     

    (139)

    Amortization of loss

     

    1,276 

     

    770 

     

    691 

     

    471 

     

    211 

     

    146 

    Net other postretirement benefit cost

     

    $3,417 

     

    $4,909 

     

    $3,166 

     

    $1,040 

     

    $1,058 

     

    $433 

    The domestic utility companies' and System Energy's other postretirement benefit cost, including amounts capitalized, for the six months ended June 30, 2006 and 2005, included the following components:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2006

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $2,674 

     

    $2,508 

     

    $1,708 

     

    $838 

     

    $464 

     

    $828 

    Interest cost on APBO

     

    5,688 

     

    5,494 

     

    3,712 

     

    1,888 

     

    1,712 

     

    814 

    Expected return on assets

     

    (3,594)

     

    (2,978)

     

    - 

     

    (1,418)

     

    (1,222)

     

    (842)

    Amortization of transition obligation

     

    410 

     

    302 

     

    192 

     

    176 

     

    832 

     

    4 

    Amortization of prior service cost

     

    (816)

     

    - 

     

    (48)

     

    (274)

     

    20 

     

    (602)

    Amortization of loss

     

    3,342 

     

    2,004 

     

    1,786 

     

    1,288 

     

    686 

     

    414 

    Net other postretirement benefit cost

     

    $7,704 

     

    $7,330 

     

    $7,350 

     

    $2,498 

     

    $2,492 

     

    $616 

    126

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

    2005

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Service cost - benefits earned

     

     

     

     

     

     

     

     

     

     

     

     

      during the period

     

    $2,314 

     

    $3,268 

     

    $1,378 

     

    $726 

     

    $384 

     

    $830 

    Interest cost on APBO

     

    5,178 

     

    5,848 

     

    3,346 

     

    1,666 

     

    1,578 

     

    788 

    Expected return on assets

     

    (3,274)

     

    (2,732)

     

    - 

     

    (1,338)

     

    (1,158)

     

    (774)

    Amortization of transition obligation

     

    410 

     

    1,894 

     

    190 

     

    176 

     

    870 

     

    8 

    Amortization of prior service cost

     

    (346)

     

    - 

     

    36 

     

    (92)

     

    20 

     

    (278)

    Amortization of loss

     

    2,552 

     

    1,540 

     

    1,382 

     

    942 

     

    422 

     

    292 

    Net other postretirement benefit cost

     

    $6,834 

     

    $9,818 

     

    $6,332 

     

    $2,080 

     

    $2,116 

     

    $866 

    Employer Contributions

    The domestic utility companies and System Energy expect to contribute the following to pension plans in 2006. A portion of these contributions were planned to be made in 2005, but were delayed until January 2006 in accordance with the Katrina Emergency Tax Relief Act. For further information on pension funding refer to Note 10 to the domestic utility companies and System Energy's financial statements in the Form 10-K.

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

     

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Expected 2006 pension contributions
      disclosed in Form 10-K

     


    $114,544

     


    $22,102

     


    $54,048

     


    $16,357

     


    $ -

     


    $13,037

    Pension contributions made through
      July 2006

     

    $48,614

     

    $13,398

     


    $20,298

     

    $7,211

     

    $ -

     

    $8,262

    Remaining estimated pension
      contributions to be made in 2006

     

    $65,930

     

    $8,704

     


    $33,750

     

    $9,146

     

    $ -

     

    $4,775

    Medicare Prescription Drug, Improvement and Modernization Act of 2003 (Medicare Act)

    Based on actuarial analysis, the estimated impact of future Medicare subsidies reduced the December 31, 2005 Accumulated Postretirement Benefit Obligation (APBO), the second quarters 2006 and 2005 other postretirement benefit cost, and the six months ended June 30, 2006 and 2005 for the domestic utility companies and System Energy as follows:

     

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    Entergy

     

    System

     

     

    Arkansas

     

    Gulf States

     

    Louisiana

     

    Mississippi

     

    New Orleans

     

    Energy

     

     

    (In Thousands)

    Reduction in 12/31/2005 APBO

     

    ($42,337)

     

    ($36,740)

     

    ($23,640)

     

    ($14,407)

     

    ($11,206)

     

    ($5,972)

    Reduction in second quarter 2006
      other postretirement benefit cost

     

    ($1,562)

     

    ($1,332)

     

    ($865)

     

    ($512)

     

    ($376)

     

    ($268)

    Reduction in second quarter 2005
      other postretirement benefit cost

     

    ($1,446)

     

    ($1,269)

     

    ($790)

     

    ($476)

     

    ($350)

     

    ($245)

    Reduction in six months ended June 30,
      2006 other postretirement benefit cost

    ($3,124)

     

    ($2,664)

     

    ($1,730)

     

    ($1,024)

     

    ($752)

     

    ($536)

    Reduction in six months ended June 30,
      2005 other postretirement benefit cost

    ($2,892)

     

    ($2,538)

     

    ($1,580)

     

    ($952)

     

    ($700)

     

    ($490)

    127

    For further information on the Medicare Act refer to Note 10 to the domestic utility companies and System Energy's financial statements in the Form 10-K.

     

    NOTE 6. ENTERGY NEW ORLEANS BANKRUPTCY PROCEEDING

    See Note 14 to the domestic utility companies and System Energy financial statements in the Form 10-K

    for a discussion of the Entergy New Orleans bankruptcy proceeding. Following are updates to that discussion.

    As discussed in the Form 10-K, the bankruptcy court issued its order in December 2005 giving final approval for the $200 million debtor-in-possession (DIP) credit facility, and the indenture trustee for Entergy New Orleans' first mortgage bonds appealed the order. On March 29, 2006 the bankruptcy court approved a settlement among Entergy New Orleans, Entergy Corporation, and the indenture trustee, and the indenture trustee dismissed its appeal.

    In April 2006, the bankruptcy judge extended the exclusivity period for filing a plan of reorganization by Entergy New Orleans to August 21, 2006. Entergy New Orleans has filed another motion to extend the exclusivity period for filing its plan of reorganization, requesting that the deadline be extended an additional 120 days until December 19, 2006. The court entered an order extending the August 21, 2006 date for Entergy New Orleans' exclusive right to file a plan of reorganization until the court can hear and rule on Entergy New Orleans' motion to extend, which was set for hearing on September 18, 2006. In order to file a plan of reorganization no later than December 2006, Entergy New Orleans believes that it needs resolution of its June 2006 formula rate plan and storm rider filings and commitment on timing and amount of CDBG funds. If the motion to extend is granted, Entergy New Orleans will have the exclusive right to file its plan of reorganization until December 19, 2006, and will have until February 15, 2007 to obtain acceptances of its plan by each class of impaired creditors.

    The bankruptcy judge set a date of April 19, 2006 by which creditors with prepetition claims against Entergy New Orleans must, with certain exceptions, file their proofs of claim in the bankruptcy case. Approximately 500 claims have been filed thus far in Entergy New Orleans' bankruptcy proceeding. Entergy New Orleans is currently analyzing the accuracy and validity of the claims filed, and has begun seeking withdrawal or modification of claims or objecting to claims with which it disagrees.

    Certain pre-petition liabilities have been classified as liabilities subject to compromise in Entergy New Orleans' Balance Sheet as of June 30, 2006 and December 31, 2005. The following table summarizes the components of liabilities subject to compromise as of June 30, 2006 and December 31, 2005:

       

    June 30, 2006

     

    December 31, 2005

       

    (In Thousands)

             

    Accounts payable - Associated companies

     

    $

    64,893
     

    $46,815

    Accounts payable - Other

     

    25,000

     

    25,000

    Interest accrued

     

    1,473

     

    1,473

    Accumulated provisions

     

    5,709

     

    5,770

    Long-term debt

     

    229,867

     

    229,859

    Total Liabilities Subject to Compromise

     

    $

    326,942
     

    $308,917

    Payment terms for the amount classified as subject to compromise will be established in connection with a plan of reorganization.

    The accompanying financial statements have been prepared on the basis that Entergy New Orleans will continue as a going concern. Entergy New Orleans' filing for protection under Chapter 11 of the United States Bankruptcy Code as a result of the liquidity issues caused by Hurricane Katrina gives rise to substantial doubt regarding Entergy New Orleans' ability to continue as a going concern for a reasonable period of time, primarily because of the loss of control inherent in the bankruptcy process. The financial statements do not include any adjustments that might

    128

    result from the outcome of this uncertainty including adjustments relating to the recoverability and classification of recorded asset amounts or to the amounts and classification of liabilities that may be necessary if Entergy New Orleans is unable to continue as a going concern. The financial statements also do not attempt to reflect liabilities at the priority or status of any claims that the holders of such liabilities will have.

    Entergy continues to work with the federal, state, and local authorities to resolve the bankruptcy in a manner that allows Entergy New Orleans' customers to be served by a financially viable entity as required by law. Key factors that will influence the timing and outcome of the Entergy New Orleans bankruptcy include:

    • The amount of insurance recovery, if any, and the timing of receipt of proceeds;
    • The amount of assistance, if any, from federal and state government, and the timing of that funding, including Entergy New Orleans' intended application for CDBG funding;
    • The level of economic recovery of New Orleans;
    • The number of customers that return to New Orleans, and the timing of their return; and
    • The amount and timing of any regulatory recovery approved by the City Council.

     

    NOTE 7. ACCOUNTING POLICY UPDATES

    Revenue and Fuel Costs

    Entergy recognizes revenue from electric power and gas sales when it delivers power or gas to its customers. To the extent that deliveries have occurred but a bill has not been issued, the domestic utility companies accrue an estimate of the revenues for energy delivered since the latest billings. Entergy calculates the estimate based upon several factors including billings through the last billing cycle in a month, actual generation in the month, historical line loss factors, and prices in effect in the domestic utility companies' various jurisdictions. Each month the estimated unbilled revenue amounts are recorded as revenue and unbilled accounts receivable, and the prior month's estimate is reversed. Therefore, changes in price and volume differences resulting from factors such as weather affect the calculation of unbilled revenues from one period to the next, and may result in variability in reported revenues from one period to the next as prior estimates are so recorded and reversed.

    Prior to 2006, Entergy Louisiana and the Louisiana portion of Entergy Gulf States included a component of fuel cost recovery in their unbilled revenue calculations. Effective January 1, 2006, this fuel component of unbilled accounts receivable was reclassified to deferred fuel and is no longer included in the unbilled revenue calculations for Entergy Louisiana and the Louisiana portion of Entergy Gulf States, which is in accordance with regulatory treatment.

    Application of SFAS 71

    During 2005 and 2006 Entergy filed notices with the FERC to withdraw its market-based rate authority for wholesale transactions in the Entergy control area and submitted new cost-based rates to the FERC for approval. During the second quarter of 2006, the FERC issued an order accepting the cost based rates filed by Entergy. As described further in Note 1 to the domestic utility companies and System Energy financial statements in the Form 10-K, the domestic utility companies and System Energy apply the provisions of SFAS 71 to operations that meet three criteria including that rates are approved by a regulator, are cost-based and can be charged to and collected from customers. As also described in Note 1 to the domestic utility companies and System Energy financial statements in the Form 10-K, Entergy Gulf States did not apply regulatory accounting principles to its wholesale jurisdiction. The FERC decision in the second quarter of 2006 results in Entergy Gulf States meeting the SFAS 71 criteria discussed above for its wholesale jurisdiction and, therefore, Entergy Gulf States reinstated the application of regulatory accounting principles to its wholesale business which resulted in a regulatory credit of approximately $4.5 million during the second quarter of 2006.

    __________________________________

    129

    In the opinion of the management of Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, the accompanying unaudited financial statements contain all adjustments (consisting primarily of normal recurring accruals and reclassification of previously reported amounts to conform to current classifications) necessary for a fair statement of the results for the interim periods presented. The business of the domestic utility companies and System Energy is subject to seasonal fluctuations, however, with the peak periods occurring during the third quarter. The results for the interim periods presented should not be used as a basis for estimating results of operations for a full year.

     

    Part I, Item 4. Controls and Procedures

    Disclosure Controls and Procedures

    As of June 30, 2006, evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy Resources (individually "Registrant" and collectively the "Registrants") management, including their respective Chief Executive Officers (CEO) and Chief Financial Officers (CFO). The evaluations assessed the effectiveness of the Registrants' disclosure controls and procedures. Based on the evaluations, each CEO and CFO has concluded that, as to the Registrant or Registrants for which they serve as CEO or CFO, the Registrant's or Registrants' disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant's or Registrants' disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant's or Registrants' management, including their respective CEOs and CFOs, as appropriate to allow timely decisions regarding required disclosure.

    130

    ENTERGY CORPORATION AND SUBSIDIARIES

    PART II. OTHER INFORMATION

    Item 1. Legal Proceedings

    See "PART I, Item 1, Litigation" in the Form 10-K for a discussion of legal proceedings affecting Entergy. Following are updates to that discussion.

    Texas Power Price Lawsuit

    See "Texas Power Price Lawsuit" in Part I, Item 1 of the Form 10-K for a discussion of the lawsuit filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States who were billed and paid for electric power from January 1, 1994 to the present. In April 2006, the Court of Appeals denied a motion for rehearing of the decision to remand the case to the district court.  In May 2006, Entergy filed a petition for discretionary review with the Texas Supreme Court.

    Entergy New Orleans Rate of Return Lawsuit and Entergy New Orleans Fuel Clause Litigation

    See "Entergy New Orleans Rate of Return Lawsuit" in Part I, Item 1 of the Form 10-K for a discussion of the lawsuit filed by a group of residential and business ratepayers against Entergy New Orleans in state court in Orleans Parish purportedly on behalf of all ratepayers in New Orleans.  In accordance with the procedural schedule, the evidentiary record and post-hearing briefs of the parties were submitted to the City Council in March 2006. In April 2006, the City Council unanimously approved a resolution dismissing with prejudice the plaintiffs' claims. The plaintiffs appealed the resolution to the Civil District Court for the Parish of Orleans. The district court has not yet issued a procedural schedule for the appeal.

    Additionally, in the Entergy New Orleans bankruptcy proceeding, the complaint filed by the named plaintiffs in the Entergy New Orleans rate of return lawsuit, together with the named plaintiffs in the Entergy New Orleans fuel clause lawsuit, asking the court to declare that Entergy New Orleans, Entergy Corporation, and Entergy Services are a single business enterprise, and as such, are liable in solido with Entergy New Orleans for any claims asserted in the Entergy New Orleans rate of return lawsuit and the Entergy New Orleans fuel clause lawsuit, was dismissed on April 26, 2006. The matter is on appeal to the U.S. District Court for the Eastern District of Louisiana. In addition, in April 2006, proofs of claim were filed by the plaintiffs in the Entergy New Orleans rate of return lawsuit and by the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation relating to both the City Council and class action proceedings. The plaintiffs in the Entergy New Orleans rate of return lawsuit and the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation also filed for class certification. In July 2006, the bankruptcy court denied the request for class certification. The individual claims of the approximately 14 individual named plaintiffs remain pending in the bankruptcy proceeding, and it is uncertain whether the bankruptcy judge will re-open the bar date for other ratepayers to file individual proofs of claim based on the allegations in the two lawsuits.

    Murphy Oil Lawsuit

    See "Murphy Oil Lawsuit" in Part I, Item 1 of the Form 10-K for a discussion of the several lawsuits filed in state court in St. Bernard Parish, Louisiana against Murphy Oil, Entergy Louisiana, and others for injuries they allegedly suffered as a result of an explosion at the refinery in June 1995. Claiborne P. Deming, who became a director of Entergy Corporation in 2002, is the President and Chief Executive Officer of Murphy Oil. Mr. Deming did not stand for re-election to the Entergy Corporation Board of Directors and his term expired in May 2006. In June 2006, the Louisiana Fourth Circuit Court of Appeal affirmed the trial court's allocation of fault against Entergy Louisiana, but reduced the amount of damages owed by Entergy Louisiana to approximately $1.2 million. Murphy Oil filed a motion for rehearing seeking to have the appellate court reverse its decision to reduce the damages.

    131

    Environmental Regulation and Proceedings

    On April 19, 2006, an environmental advocacy organization served a notice of intent to bring an environmental citizen's suit pursuant to the federal Resource Conservation and Recovery Act (RCRA) against Entergy.  Notice of suit is required by RCRA sixty days before actual filing.  The suit, if filed, will allege that Entergy violated an EPA regulation by failing formally to report a discovered release of radioactive material into the environment at Indian Point.  These allegations relate to the ongoing site investigation of radionuclides found in groundwater wells at the site.  It is expected that the environmental advocacy organization will ask the court to require Entergy formally to notify EPA of the site condition, will seek to have EPA formally involved in the ongoing site investigation and any required remediation, will seek attorney's fees under the statute, and may seek to have the judge impose statutory penalties. Entergy continues to investigate the matter.

    Item 1A. Risk Factors

    There have been no material changes to the risk factors discussed in "PART I, Item 1A, Risk Factors" in the Form 10-K.

    Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

    Issuer Purchases of Equity Securities

    In accordance with Entergy's stock-based compensation plans, Entergy periodically grants stock options to its employees that may be exercised to obtain shares of Entergy's common stock. According to the plans, these shares can be newly issued shares, treasury stock, or shares purchased on the open market. See Note 7 to the consolidated financial statements in the Form 10-K for additional discussion of the stock-based compensation plans. Entergy's management has been authorized to repurchase on the open market shares up to an amount sufficient to fund the exercise of grants under the plans, and this authorization does not have an expiration date. In August 2004, Entergy announced a program under which Entergy Corporation will repurchase up to $1.5 billion of its common stock. This repurchase program is incremental to the existing authority to repurchase shares to fund the exercise of employee stock options. As a result of Hurricanes Katrina and Rita, the $1.5 billion program was temporarily suspended, and the Board extended authorization for its completion through 2008. Entergy Corporation did not repurchase any shares of common stock during the six months ended June 30, 2006. At any point in time through 2008, Entergy Corporation may elect to repurchase shares to complete the remaining $400 million of authorization under the $1.5 billion program or to fund the exercise of grants under its employee based compensation plans.

    Item 4. Submission of Matters to a Vote of Security Holders

    Election of Board of Directors

    Entergy Corporation

    The annual meeting of stockholders of Entergy Corporation was held on May 12, 2006. The following matters were voted on and received the specified number of votes for, abstentions, votes withheld (against), and broker non-votes:

    132

  • Election of Directors:
  • Name of Nominee

     

    Votes For

     

    Votes Withheld

             

    Maureen S. Bateman

     

    181,913,615

     

    3,159,171

    W. Frank Blount

     

    177,995,619

     

    7,077,167

    Simon D. deBree

     

    181,832,243

     

    3,240,543

    Gary W. Edwards

     

    181,813,592

     

    3,259,194

    Alexis M. Herman

     

    180,732,615

     

    4,340,171

    Donald C. Hintz

     

    181,413,474

     

    3,659,312

    J. Wayne Leonard

     

    181,518,863

     

    3,553,923

    Stuart L. Levenick

     

    182,579,969

     

    2,492,817

    Robert v.d. Luft*

     

    181,366,991

     

    3,705,795

    James R. Nichols

     

    181,459,874

     

    3,612,912

    William A. Percy, II

     

    182,578,764

     

    2,494,022

    W. J. "Billy" Tauzin

     

    182,310,093

     

    2,762,693

    Steven V. Wilkinson

     

    182,683,898

     

    2,388,888

    Mr. Luft retired from the Board effective August 1, 2006.

  • Ratify the appointment of independent public accountants, Deloitte & Touche LLP for the year 2006: 182,954,456 votes for; 749,253 votes against; 1,369,075 abstentions; and 2 broker non-votes.
  • Stockholder proposal regarding Majority Election of Directors: 72,133,704 votes for; 89,908,171 votes against; 2,642,450 abstentions; and 20,388,461 broker non-votes.
  • Shareholder approval to amend the Certificate of Incorporation to eliminate supermajority vote requirement with respect to the removal of directors: 181,666,560 votes for; 1,892,364 votes against; and 1,513,862 abstentions.
  • Shareholder approval of 2007 Equity Ownership and Long Term Cash Incentive Plan: 142,784,783 votes for; 20,133,978 votes against; 1,765,565 abstentions; and 20,388,460 broker non-votes.
  • Entergy Arkansas

    A consent in lieu of a meeting of common stockholders was executed on June 22, 2006. The consent was signed on behalf of Entergy Corporation, the holder of all issued and outstanding shares of common stock. The common stockholder, by such consent, elected the following individuals to serve as directors constituting the Board of Directors of Entergy Arkansas: Hugh T. McDonald, Chairman, Leo P. Denault, Mark Savoff, and Richard J. Smith.

    Entergy Gulf States

    A consent in lieu of a meeting of common stockholders was executed on June 22, 2006. The consent was signed on behalf of Entergy Corporation, the holder of all issued and outstanding shares of common stock. The common stockholder, by such consent, elected the following individuals to serve as directors constituting the Board of Directors of Entergy Gulf States: Joseph F. Domino, Chairman, E. Renae Conley, Leo P. Denault, Mark Savoff, and Richard J. Smith.

    Entergy Louisiana

    A consent in lieu of a meeting of members was executed on June 22, 2006. The consent was signed on behalf of Entergy Louisiana Holdings, Inc., the holder of all issued and outstanding common membership interests. The holder of the common membership interests by such consent, elected the following individuals to serve as directors constituting the Board of Directors of Entergy Louisiana: E. Renae Conley, Chair, Leo P. Denault, Mark Savoff, and Richard J. Smith.

    133

    Entergy Mississippi

    A consent in lieu of a meeting of common stockholders was executed on June 22, 2006. The consent was signed on behalf of Entergy Corporation, the holder of all issued and outstanding shares of common stock. The common stockholder, by such consent, elected the following individuals to serve as directors constituting the Board of Directors of Entergy Mississippi: Carolyn C. Shanks, Chairman, Leo P. Denault, Mark Savoff, and Richard J. Smith.

    Entergy New Orleans

    A consent in lieu of a meeting of common stockholders was executed on July 31, 2006. The consent was signed on behalf of Entergy Corporation, the holder of all issued and outstanding shares of common stock. The common stockholder, by such consent, elected the following individuals to serve as directors constituting the Board of Directors of Entergy New Orleans: Daniel F. Packer, Chairman, Tracie L. Boutte, and Roderick K. West.

    System Energy

    A consent in lieu of a meeting of common stockholders was executed on June 22, 2006. The consent was signed on behalf of Entergy Corporation, the holder of all issued and outstanding shares of common stock. The common stockholder, by such consent, elected the following individuals to serve as directors constituting the Board of Directors of System Energy: Gary J. Taylor, Chairman, Steven C. McNeal, and Leo P. Denault.

     

    Item 5. Other Information

    Executive Agreements (Entergy Corporation)

    Grant of Restricted Stock Units to Chairman of the Board and Chief Executive Officer.  On August 3, 2006, the Personnel Committee of the Board of Directors of Entergy Corporation approved a grant of 100,000 restricted stock units ("Restricted Units") to Mr. J. Wayne Leonard, Entergy Corporation's Chairman of the Board and Chief Executive Officer.  The units were issued under Entergy's 1998 Equity Ownership Plan ("EOP") pursuant to a restricted unit agreement ("Restricted Unit Agreement").  Subject to Mr. Leonard's continued employment within the Entergy System, the Restricted Units will vest in equal installments on August 3, 2008 (50,000 units) and August 3, 2009 (50,000 units).  On the vesting date, Mr. Leonard will receive in cash for each vested unit the cash equivalent of a share of Entergy Corporation's common stock.  The Restricted Units do not accrue dividend equivalents.

    Under certain conditions, Mr. Leonard's Restricted Units may vest on an earlier date under the terms and conditions set forth in the Restricted Unit Agreement, Mr. Leonard's October 2000 Retention Agreement ("Retention Agreement"), or the EOP, although Mr. Leonard will receive payment for accelerated vesting of the restricted units under only one of the acceleration provisions. Under the Restricted Unit Agreement, these accelerated vesting conditions include any one of the following events, as defined under the agreement: (i) termination of employment by Mr. Leonard for Good Reason; (ii) death or Disability; or (iii) termination of Mr. Leonard's employment for any reason other than Cause. "Good Reason" is generally defined in the Restricted Unit Agreement as (i) a substantial reduction in duties or responsibilities, (ii) a five percent or greater reduction in base salary, (iii) relocation to a location other than Entergy Corporation's corporate headquarters, and/or (iv) discontinuation of participation in certain compensation and other benefit plans (other than as a result of changes similarly affecting other executive officers).  Under the Retention Agreement, among other things, the Restricted Units may vest on an earlier date if Mr. Leonard's employment is terminated on account of a Qualifying Termination or a Merger Related Termination, as those terms are defined in the Retention Agreement. Under the EOP, the Restricted Units may vest on an earlier date if Mr. Leonard's employment is terminated on account of a Qualifying Event, as that term is defined in the EOP.

    For additional information regarding Mr. Leonard's employment arrangements, see "Executive Retention Agreements- Retention Agreement with Mr. Leonard" in Entergy Corporation's proxy statement dated March 24, 2006.

    134

    Retention Agreement with Executive Vice President and Chief Financial Officer.  On August 3, 2006, the Personnel Committee of the Board of Directors approved a retention agreement to be entered into between Entergy Corporation and Leo P. Denault, its Executive Vice President and Chief Financial Officer ("Retention Agreement").  The Retention Agreement entitles Mr. Denault to receive certain benefits if his employment with a System Company is terminated under specified circumstances.  If Mr. Denault's employment should terminate prior to attainment of age 55 on account of a Termination Event, as defined in the Retention Agreement and described below, then Mr. Denault is entitled to receive, among other things, (a) 2.99 times his base salary and annual cash bonus, as described in the Retention Agreement; (b) Target LTIP Awards, described as the value of his unvested performance shares units (calculated at target payout levels) under the EOP and under the 2007 Equity Ownership and Long Term Cash Incentive Plan ("Equity Plan"), and (c) Other EOP Awards, described as the value of any unvested restricted shares, stock options, and other equity awards that may be granted under the Equity Plan.  If Mr. Denault's employment should terminate on or after attainment of age 55 on account of a Termination Event, as defined in the Retention Agreement and described below, then Mr. Denault is entitled to receive (a) SERP Credited Service and SERP Permission to Retire, as defined in the Retention Agreement; (b) Target LTIP Awards (as described above); and (c) Other EOP Awards (as described above).

    "Termination Event" is generally defined to include (i) termination of Mr. Denault's employment by Entergy for reasons other than Cause or Disability, as defined in the Retention Agreement or (ii) Mr. Denault's termination of employment for "Good Reason" (as defined in the Retention Agreement and described above in the description of Mr. Leonard's Restricted Unit Agreement).

    Should Mr. Denault, on or after attainment of 55, terminate employment for any reason other than a Termination Event, death or disability, then he shall be entitled to SERP Credited Service but not SERP Permission to Retire. If Mr. Denault should terminate employment at any time on account of death or Disability, then he or his estate shall receive (a) SERP Credited Service and SERP Permission to Retire or separate, in the case of Disability; (b) Target LTIP Awards (as described above); and (c) Other EOP Awards (as described above). 

    For additional information regarding Mr. Denault's employments arrangements, including his participation in an Entergy-sponsored executive severance plan, see "System Executive Continuity Plans" in Entergy Corporation's proxy statement dated March 24, 2006.  Cash payments otherwise payable under the Retention Agreement shall be offset, on a dollar for dollar basis, by cash payments under the System Executive Continuity Plan or any other severance program or arrangement. 

    The terms and conditions of Mr. Leonard's Restricted Unit Agreement and Mr. Denault's Retention Agreement are summaries and are qualified in their entirety by reference to the terms and conditions of the actual agreements, which are filed as Exhibits 10(a) and 10(b) to this Form 10-Q.

    Earnings Ratios (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

    The domestic utility companies and System Energy have calculated ratios of earnings to fixed charges and ratios of earnings to combined fixed charges and preferred dividends/distributions pursuant to Item 503 of Regulation S-K of the SEC as follows:

     

    Ratios of Earnings to Fixed Charges

     

    Twelve Months Ended

     

    December 31,

     

    June 30,

     

    2001

     

    2002

     

    2003

     

    2004

     

    2005

     

    2006

                           

    Entergy Arkansas

    3.29

     

    2.79

     

    3.17

     

    3.37

     

    3.75

     

    3.71

    Entergy Gulf States

    2.36

     

    2.49

     

    1.51

     

    3.04

     

    3.34

     

    3.46

    Entergy Louisiana

    2.76

     

    3.14

     

    3.93

     

    3.60

     

    3.50

     

    2.98

    Entergy Mississippi

    2.14

     

    2.48

     

    3.06

     

    3.41

     

    3.16

     

    2.89

    Entergy New Orleans

    (a)

     

    (b)

     

    1.73

     

    3.60

     

    1.22

     

    1.62

    System Energy

    2.12

     

    3.25

     

    3.66

     

    3.95

     

    3.85

     

    4.08

    135

     

    Ratios of Earnings to Combined Fixed Charges
    and Preferred Dividends/Distributions

     

    Twelve Months Ended

     

    December 31,

     

    June 30,

     

    2001

     

    2002

     

    2003

     

    2004

     

    2005

     

    2006

                           

    Entergy Arkansas

    2.99

     

    2.53

     

    2.79

     

    2.98

     

    3.34

     

    3.29

    Entergy Gulf States

    2.21

     

    2.40

     

    1.45

     

    2.90

     

    3.18

     

    3.32

    Entergy Louisiana

    2.76

     

    3.14

     

    3.93

     

    3.60

     

    3.50

     

    2.81

    Entergy Mississippi

    1.96

     

    2.27

     

    2.77

     

    3.07

     

    2.83

     

    2.64

    Entergy New Orleans

    (a)

     

    (b)

     

    1.59

     

    3.31

     

    1.12

     

    1.54

    (a)

    Earnings for the twelve months ended December 31, 2001, for Entergy New Orleans were not adequate to cover fixed charges and combined fixed charges and preferred dividends by $6.6 million and $9.5 million, respectively.

    (b)

    Earnings for the twelve months ended December 31, 2002, for Entergy New Orleans were not adequate to cover fixed charges and combined fixed charges and preferred dividends by $0.7 million and $3.4 million, respectively.

    Item 6. Exhibits *

     

    3(a) -

    Certificate of Amendment of the Certificate of Incorporation of Entergy Corporation dated June 12, 2006.

         
     

    4(a) -

    Sixty-sixth Supplemental Indenture, dated as of June 1, 2006, to Entergy Arkansas' Mortgage and Deed of Trust, dated as of October 1, 1944.

         
     

    +10(a)

    Restricted Unit Agreement between J. Wayne Leonard and Entergy Corporation.

         
     

    +10(b)

    Retention Agreement effective August 3, 2006 between Leo P. Denault and Entergy Corporation.

         
     

    31(a) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Corporation.

         
     

    31(b) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Corporation.

         
     

    31(c) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Arkansas.

         
     

    31(d) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Arkansas.

         
     

    31(e) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

         
     

    31(f) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

         
     

    31(g) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

         
     

    31(h) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Louisiana.

         
     

    31(i) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Louisiana.

         
     

    31(j) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Mississippi.

         
     

    31(k) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy Mississippi.

         
     

    31(l) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy New Orleans.

         
         
         
    136
         
         
         
     

    31(m) -

    Rule 13a-14(a)/15d-14(a) Certification for Entergy New Orleans.

         
     

    31(n) -

    Rule 13a-14(a)/15d-14(a) Certification for System Energy.

         
     

    31(o) -

    Rule 13a-14(a)/15d-14(a) Certification for System Energy.

         
     

    32(a) -

    Section 1350 Certification for Entergy Corporation.

         
     

    32(b) -

    Section 1350 Certification for Entergy Corporation.

         
     

    32(c) -

    Section 1350 Certification for Entergy Arkansas.

         
     

    32(d) -

    Section 1350 Certification for Entergy Arkansas.

         
     

    32(e) -

    Section 1350 Certification for Entergy Gulf States.

         
     

    32(f) -

    Section 1350 Certification for Entergy Gulf States.

         
     

    32(g) -

    Section 1350 Certification for Entergy Gulf States.

         
     

    32(h) -

    Section 1350 Certification for Entergy Louisiana.

         
     

    32(i) -

    Section 1350 Certification for Entergy Louisiana.

         
     

    32(j) -

    Section 1350 Certification for Entergy Mississippi.

         
     

    32(k) -

    Section 1350 Certification for Entergy Mississippi.

         
     

    32(l) -

    Section 1350 Certification for Entergy New Orleans.

         
     

    32(m) -

    Section 1350 Certification for Entergy New Orleans.

         
     

    32(n) -

    Section 1350 Certification for System Energy.

         
     

    32(o) -

    Section 1350 Certification for System Energy.

         
     

    99(a) -

    Entergy Arkansas' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Combined Fixed Charges and Preferred Dividends, as defined.

         
     

    99(b) -

    Entergy Gulf States' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Combined Fixed Charges and Preferred Dividends, as defined.

         
     

    99(c) -

    Entergy Louisiana, LLC's Computation of Ratios of Earnings to Fixed Charges and of Earnings to Combined Fixed Charges and Preferred Distributions, as defined.

         
     

    99(d) -

    Entergy Mississippi's Computation of Ratios of Earnings to Fixed Charges and of Earnings to Combined Fixed Charges and Preferred Dividends, as defined.

         
     

    99(e) -

    Entergy New Orleans' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Combined Fixed Charges and Preferred Dividends, as defined.

         
     

    99(f) -

    System Energy's Computation of Ratios of Earnings to Fixed Charges, as defined.

    ___________________________

    Pursuant to Item 601(b)(4)(iii) of Regulation S-K, Entergy Corporation agrees to furnish to the Commission upon request any instrument with respect to long-term debt that is not registered or listed herein as an Exhibit because the total amount of securities authorized under such agreement does not exceed ten percent of the total assets of Entergy Corporation and its subsidiaries on a consolidated basis.

    137

    *

    Reference is made to a duplicate list of exhibits being filed as a part of this report on Form 10-Q for the quarter ended June 30, 2006, which list, prepared in accordance with Item 102 of Regulation S-T of the SEC, immediately precedes the exhibits being filed with this report on Form 10-Q for the quarter ended June 30, 2006.

    + Management contracts or compensatory plans or arrangements.

    138

    SIGNATURE

     

    Pursuant to the requirements of the Securities Exchange Act of 1934, each registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized. The signature for each undersigned company shall be deemed to relate only to matters having reference to such company or its subsidiaries.

    ENTERGY CORPORATION
    ENTERGY ARKANSAS, INC.
    ENTERGY GULF STATES, INC.
    ENTERGY LOUISIANA, LLC
    ENTERGY MISSISSIPPI, INC.
    ENTERGY NEW ORLEANS, INC.
    SYSTEM ENERGY RESOURCES, INC.

     

    /s/ Nathan E. Langston

    Nathan E. Langston
    Senior Vice President and Chief Accounting Officer
    (For each Registrant and for each as
    Principal Accounting Officer)

     

    Date: August 8, 2006

     

    139