Coeur Mining, Inc. 425, filed Feb 13, 2013: Additional exhibit
Exhibit 99.2
Superior proposal to acquire Orko Silver
February 13, 2013
NYSE: CDE | TSX: CDM
Cautionary Statement
This presentation contains forward-looking statements within the meaning of securities legislation in the United States and Canada, including expectations regarding the enterprise value of Orko Silver Corp. (“Orko”), the value of Coeur d’Alene Mines Corporation (“Coeur”) shares and Orko shares, the consideration to be issued pursuant to the proposal, the ability of Coeur and Orko to consummate the transaction on the terms and in the manner contemplated thereby, and Coeur’s estimated production data, expected operating schedules, results of operations, mineral reserves and resources, expected capital costs and other expected operating data, share purchases and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual results, performance, achievements, production, operating schedules, results of operations, mineral reserves and resources, capital costs and permit and regulatory approvals could differ materially from those projected in the forward-looking statements. The factors that could cause actual results to differ materially from those in the forward-looking statements include: (i) the risk factors set forth in Coeur’s reports on Form 10-K and Form 10-Q; (ii) the risk that permits necessary for the planned Rochester expansion may not be obtained, (iii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions); (iv) changes in the market prices of gold and silver; (v) uncertainties inherent in Coeur’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays and disputed mining claims; (vi) any future labor disputes or work stoppages; (vii) uncertainties inherent in the estimation of gold and silver ore reserves; (vii) changes that could result from Coeur’s future acquisition of new mining properties or businesses; (ix) reliance on third parties to operate certain mines where Coeur owns silver production and reserves; (x) the loss of any third-party smelter to which Coeur markets silver and gold; (xi) effects of environmental and other governmental regulations; (xii) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries; (xiii) the worldwide economic downturn and difficult conditions in the global capital and credit markets; and (xiv) Coeur’s possible inability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Actual results, developments and timetables could vary significantly from the estimates presented. Readers are cautioned not to put undue reliance on forward-looking statements. Coeur disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise. Coeur disclaims any intent or obligation to update publicly such forward-looking statements, whether as a result of new information, future events or otherwise. Current resource estimates include disputed and undisputed claims at Rochester. While Coeur believes it holds a superior position in the ongoing claim dispute, Coeur believes an adverse legal outcome would cause it to modify resource estimates.
Donald J. Birak, Coeur’s Senior Vice President of Exploration and a qualified person under Canadian National Instrument 43-101, supervised the preparation of the scientific and technical information contained in this presentation. For a description of the key assumptions, parameters and methods used to estimate mineral reserves and resources, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant factors, please see the Technical Reports for each of Coeur’s properties, and the technical report for Orko’s La Preciosa property, as filed on SEDAR at www.sedar.com, the mineral resources estimates for the La Preciosa Property contained in this presentation are derived from the La Preciosa technical report. Donald J. Birak did not have access to, and did not verify, the data underlying the technical information respecting the La Preciosa property contained in this presentation.
NYSE: CDE | TSX: CDM
2
Cautionary Statement (Cont’d)
Cautionary Note to U.S. Investors – The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this presentation, such as “measured,” “indicated,” “inferred”, and “resources” that are recognized by Canadian regulations, but that SEC guidelines generally prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are urged to consider closely the disclosure in our most recent Form 10-K and Form 10-Q which may be obtained from us, or from the SEC’s website at http://www.sec.gov.
This document relates to Coeur d’Alene Mines Corporation’s (“Coeur”) proposed acquisition (the “Transaction”) of Orko Silver Corp. Shares of Coeur’s common stock (the “Coeur Shares”) issuable upon (i) the exercise of warrants (the “Warrants”) to acquire Coeur Shares to be issued by Coeur in connection with the proposed Transaction and (ii) the exchange of exchangeable securities (the “Exchangeable Shares”) to be issued by a subsidiary of Coeur in connection with the proposed Transaction which may be registered pursuant to a registration statement on Form S-4 to be filed with the U.S. Securities and Exchange Commission (the “SEC”) or issued pursuant to an available exemption. This document is not a substitute for any registration statement or any other document that Coeur may file with the SEC or send to its shareholders in connection with the offer and/or issuance of Coeur Shares in connection with the exercise of the Warrants and exchange of the Exchangeable Shares. Investors who may receive Warrants or Exchangeable Shares in the Transaction are urged to read Coeur’s registration statement on Form S-4, if and when filed, including the prospectus, and all other relevant documents that may be filed with the SEC as and if they become available because they will contain important information about the issuance of Coeur Shares upon the exercise of any Warrants and exchange of any Exchangeable Shares. All documents, if and when filed, will be available free of charge at the SEC’s website (www.sec.gov). You may also obtain these documents by contacting Coeur’s Investor Relations department at Coeur d’Alene Mines Corporation; Investor Relations; (208) 665-0345; wyang@coeur.com. This document does not constitute an offer to sell or the solicitation of an offer to buy any securities.
Non-U.S. GAAP Measures – We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs, operating cash flow, adjusted earnings, and Adjusted EBITDA. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe operating cash flow, adjusted earnings, and Adjusted EBITDA are important measures in assessing the Company’s overall financial performance.
NYSE: CDE | TSX: CDM
3
Transaction Highlights
Orko’s key asset, the La Preciosa project, is one of the largest undeveloped silver deposits
in the world
Attractive Long-life mine potential with compelling economics assuming open pit mine plan
Large-scale development opportunity with significant exploration upside
Mining friendly jurisdiction with well-developed local infrastructure
Further diversifies Coeur’s portfolio by jurisdiction and across a larger
platform of assets
Strategic Proven ability to develop large-scale, world class projects similar to La Preciosa
Once developed, La Preciosa is expected to deliver significant growth to all Coeur
shareholders
Accretive on an NAV and mineral resource1 per share basis
Acquisition represents just 18% of Coeur’s market cap
Disciplined Coeur’s cash flow and strong liquidity position available to support La Preciosa’s
development
Consistent with Coeur’s stated M&A strategy
Solidifies Coeur’s position as a leading growth-oriented silver producer
1. Does not include inferred resources.
4
Transaction Summary
C$2.70 per share based on the closing price of Coeur’s shares on February 12, 2013
0.0815 Coeur shares and C$0.70 cash per Orko share (total cash component of C$100 million; cash /
stock mix will be at the election of Orko shareholders, subject to pro-ration)
Offer In addition, Orko shareholders will receive 0.01118 warrants for each Orko share. Each full warrant is
exchangeable for four years at a strike price of US$30 per common share of Coeur
Represents a 25% premium to the implied value of Orko shares under the First Majestic transaction as
of February 12, 2013, and 71% to the unaffected Orko share price on December 14, 2012
Implies ~C$384 million in transaction value, including the value of warrants
74% stock / 26% cash consideration mix including warrants
Structure Utilizes C$100 million of Coeur existing cash and ~11.6 million new Coeur shares
89% CDE / 11% Orko pro forma ownership (not including warrants)
789 million oz of Ag eq reserves and M&I resources; 294 million oz of Ag eq inferred resources1
Coeur pro forma Potential for 27 million oz of combined annual pro forma silver production2
5 business days for First Majestic to match from February 13, 2013
Process and Proposed agreement subject to customary closing conditions and Orko shareholders’ vote
timing No Coeur shareholder vote required
Closing expected in 2Q 2013
Orko Board has unanimously concluded Coeur’s offer constitutes a Superior Proposal
1. See slide 7 and Appendix slides for tonnes, grade and effective date for La Preciosa mineral resources and Coeur’s mineral reserves and resources. Silver equivalents use gold and silver prices of $1,651 and $31.11 per ounce respectively; 2. For production estimates, refer to page 10.
NYSE: CDE | TSX: CDM
5
Benefits of the Transaction
Coeur Shareholders Orko Shareholders
Adds significant new production and future Superior proposal to the First Majestic stock
cash flow to Coeur’s existing profile offer
Enhances portfolio diversity over a larger Attractive consideration mix, with C$100 million
number of assets cash component providing immediate value
Improved geopolitical risk profile realization and upside participation through
Accretive to NAV and total mineral resources shares and warrants
per share1 Opportunity to participate in the upside of La
Extensive drilling has identified large resource Preciosa with potential large-scale open pit
with expansion potential mine plan
Supplements development profile and allows Highly liquid Coeur shares trading at an
Coeur to deliver growth to all shareholders attractive valuation, demonstrated by buyback
program and analysts’ price targets
Once on-line, La Preciosa would represent
Coeur’s third global top-ten silver mine as Gain exposure to a diverse set of open pit and
ranked by production underground operations located in five different
countries
Long mine life and significant cash flow
contribution are expected to support other Attractive silver / gold profile of ~75% / ~25%
forms of returning of capital to shareholders pro forma for this transaction
Coeur has the technical experience and the financial resources to successfully develop La Preciosa
1. Does not include inferred resources.
NYSE: CDE | TSX: CDM
6
Overview of La Preciosa1
Located in the Durango State of Mexico, 47 km northeast of the city of Durango and 45 minutes from an international airport
Together with adjacent mineral concessions, project covers ~32,400 hectares of contiguous mining claims
October 25, 2012: silver resource estimate of 99 million oz indicated and 140 million oz inferred (42% indicated & 58% inferred)
+99% of Indicated mineral resources within an open pit configuration1
~91% of the potential resource value is silver (based upon $31.11 / Ag ounce Ag and $1,651 / Au ounce)
Coeur envisions developing La Preciosa as a large-scale, open pit operation to maximize value
Significant infrastructure in place
Access by paved highway
8 km to national power grid
8 km to rail lines
Durango
Guanacevi
Inde
Pitarrilla Gomez Palacio/Torreon
Platosa MEXICO Velardeña Coneto Sierra de Ramirez La Cienaga El Cairo Penasquito Avino San Sebastian
La Preciosa
Project Durango La Parilla
San Martin Colorada
Legend
Orko Project Fresnillo Historic/producing mines or Ag deposits Zacatecas
Contained Metal
Tonnes Ag Grade Ag Au
(million)(g/t)(million oz)(million oz)
M&I Resources
Open-Pit 29.6 104 99.0 0.2
Underground 0.1 99 0.3 0.0
Total M&I 29.7 104 99.3 0.2
Inferred Resources
Open-Pit 47.7 86 131.9 0.2
Underground 1.9 124 7.6 0.0
Total Inferred 49.6 87 139.5 0.3
Based on information derived from the technical report entitled, “La Preciosa Silver Deposit, Updated Mineral Resource Estimate Statement, Durango, Mexico”, prepared by Mining Plus, dated November 5, 2012 as filed on SEDAR.
Located in the heart of Mexico’s prolific Sierra Madre Mining Belt, which hosts large silver deposits such as Fresnillo
NYSE: CDE | TSX: CDM
7
Mexico is a Mining-Friendly Jurisdiction
2012 ranking of countries for mining investment
Rank Total points
1 Australia 57
2 Canada 52
3 Chile 51
4 Brazil 45
5 Mexico 43
6 United States 41
7 Colombia 39
8 Botswana 37
9 Peru 36
10 Ghana 36
11 Namibia 33
12 Mongolia 32
13 Tanzania 32
14 Argentina 30
15 India 29
16 Philippines 29
17 China 28
18 Indonesia 27
19 Zambia 26
20 South Africa 25
21 Kazakhstan 22
22 Papua New Guinea 22
23 D.R. Congo 19
24 Bolivia 17
25 Russia 16
Source: Behre Dolbear’s – 2012 ranking of countries for mining investment. Note: For simplicity, rankings shown do not reflect ties.
Mexico rankings by category
Mexico rank
Economic system Tie 5
Political system Tie 6 Social issues Tie 13 Permitting delays Tie 2 Corruption 5 Currency stability Tie 7 Tax regime Tie 1
NYSE: CDE | TSX: CDM
8
La Preciosa Expected to Become One of the World’s
Leading Silver Mines
Production Benchmarking
La Preciosa future production potential of ~7-9 million oz1
Rank Mine/Country Operating Company Production (million of ozs)
1 Cannington, Australia BHP Billiton 32.2
2 Fresnillo, Mexico Fresnillo plc 30.3
3 Dukat, Russia JSC Polymetal 13.6
4 Uchucchacua, Peru Compania de Minas Buenaventura 10.1
5 Palmarejo, Mexico Coeur 9.0
6 Palancata, Peru Hochschild Mining/International Minerals 8.8
7 Gumuskoy, Turkey Eti Gumus, A.S. 8.4
8 San Bartolomé, Bolivia Coeur 7.5
9 Pirquitas, Argentina Silver Standard 7.1
10 Greens Creek, U.S. Hecla Mining 6.5
11 Arcata, Peru Hochschild Mining 6.1
12 Saucito, Mexico Fresnillo plc 5.9
13 San Jose, Argentina Hochschild Mining/McEwen Mining 5.9
14 Imiter, Morocco Societe Metallurgique d’Imiter 5.5
15 Alamo Dorado, Mexico Pan American Silver Corp. 5.3
Source: The Silver Institute, 2011.
1. For production estimates, refer to page 10.
NYSE: CDE | TSX: CDM
9
Opportunity to Develop La Preciosa as a Large-Scale,
Open Pit Mine
2011 PEA1 Highlights
Outlines an open pit/underground operation
Mine life of 12 years
Annual production of 6.8 million oz of Ag and 12,000 oz of Au
Capital costs of $270 million
5,000 tpd operation
Cash costs of $11.84/oz Ag
Base case IRR of >20%
Re-Engineering La Preciosa Project
Significant diligence conducted and re-engineering under way
Coeur believes developing La Preciosa as a large- tonnage, open pit operation will maximize value
~7-9 million oz of annual silver production2
+15 year initial mine life
Reduced mining risk
Enhance overall project economics
Coeur believes shallow dipping vein, rock mechanics, and grade issues make underground mining challenging
AMEC commenced work on a new PEA
Coeur believes developing La Preciosa as an open pit adds significant long-term value
The PEA, June 30, 2011, (“2011 PEA”) is preliminary in nature, includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the preliminary economic assessment will be realized.
7-9 million ounces contributed by La Preciosa using assumptions and parameters contained in 2011 PEA and assumption of open-pit mining with higher throughput.
NYSE: CDE | TSX: CDM
10
A Premier Americas Focused Silver Mining Company…
Operating NAV contribution by mine and jurisdiction ($bn) – Increased Focus on Mining-Friendly Jurisdictions
Palmarejo San Bartolomé Kensington Rochester Endeavor La Preciosa
Coeur Orko Pro forma
1% 100%
13% 19%
1% 34%
16%
41% 11%
13%
28% 23%
Operating NAV = ~$1.8bn Operating NAV = ~$0.4bn Operating NAV = ~$2.2bn
Mexico United States Bolivia Australia
Coeur Orko Pro forma
1% 100% 1%
28% 23%
41%
52%
24%
29%
Operating NAV = ~$1.8bn Operating NAV = ~$0.4bn Operating NAV = ~$2.2bn
Source: Select equity research.
NYSE: CDE | TSX: CDM
11
…With Increased Growth Potential
2012 Silver Production – Orko Provides Significant Growth Potential
Million ounces
45
40 ~7-9 million1
35
30 Pro forma for
~25-27 La Preciosa
25
20 18
15
10
5
0
Fresnillo Coeur Pan American Silver Coeur Hochschild Silver First Majestic Hecla Silvercorp Endeavour Fortuna
pro forma Wheaton Standard
Source: Equity research, Public disclosure, Company projections.
1. For production estimates, refer to page 10.
Note: Company information where available and equity research.
NYSE: CDE | TSX: CDM
12
Expanding Portfolio of Assets, with a Track Record of Developing, Starting-Up, and Operating Large-Scale Projects
Overview of Coeur d’Alene assets
2010 Silver Gold
Kensington Mine, Alaska Ounces Ounces
2012: 82,125 oz Au Total1,2(000s)(000s)
2013E: 108,000—114,000 oz Au
Proven & Probable 216,317 2,276
Reserves
Measured & 351,587 1,890
Indicated Resources
2011 Inferred Resources 231,021 1,183
Rochester Mine, Nevada
2012: 2.8 million oz Ag; 38,071 Note: R&R figures pro forma for La Preciosa.
oz Au
2013E: 4.5—4.9 million oz Ag;
44,000—46,000 oz Au La Preciosa, Mexico
Indicated resources:
Ag : 99 million oz
2009 Au: 0.2 million oz
Palmarejo Mine, Mexico Inferred resources:
2012: 8.2 million oz Ag; 106,038 Ag: 140 million oz
oz Au Au: 0.3 million oz
2013E: 7.7—8.3 million oz Ag;
98,000 – 105,000 oz Au
2008
San Bartolomé Mine, Bolivia
2012: 5.9 million oz Ag
2013E: 5.3—5.7 million oz Ag
Endeavor Mine, Australia
2012: 0.7 million oz Ag
2013E: 0.5 – 0.6 million oz Ag
Joaquin Silver-Gold Project1
Argentina
Operation Investment
Feasibility stage project XX Start up/re-start year
Improved portfolio
Coeur has recent experience with similar sized projects that are relevant to La Preciosa
San Bartolomé: 2008 start up; $238 million capital cost
Palmarejo: 2009 start up; $353 million capital cost
Kensington: 2010 start up; $435 million capital cost
Rochester: 2011 re-start; $27 million capital cost
La Preciosa provides Coeur with an enhanced growth profile, reduced geopolitical risk, and greater diversity in mining-friendly Mexico
1. Mineral reserves and resources effective December 31, 2011 except Endeavor effective June 30, 2011 and Joaquin effective September 21, 2012. Joaquin’s Mineral Resources reflect Coeur’s 100% ownership of the project after acquiring the remaining 49% in December 2012. See slides in the Appendix for tonnes and grade pertaining to reserves and resources; 2. Includes La Preciosa
NYSE: CDE | TSX: CDM
13
Transaction Highlights
Orko’s key asset, the La Preciosa project, is one of the largest undeveloped silver deposits
in the world
Attractive Long-life mine potential with compelling economics assuming open pit mine plan
Large-scale development opportunity with significant exploration upside
Mining friendly jurisdiction with well-developed local infrastructure
Further diversifies Coeur’s portfolio by jurisdiction and across a larger
platform of assets
Strategic Proven ability to develop large-scale, world class projects similar to La Preciosa
Once developed, La Preciosa is expected to deliver significant growth to all Coeur
shareholders
Accretive on an NAV and mineral resource1 per share basis
Acquisition represents just 18% of Coeur’s market cap
Disciplined Coeur’s cash flow and strong liquidity position available to support La Preciosa’s
development
Consistent with Coeur’s stated M&A strategy
Solidifies Coeur’s position as a leading growth-oriented silver producer
1. Based on La Preciosa indicated mineral resources only.
NYSE: CDE | TSX: CDM
14
Appendix
Substantial and Sustainable Annual Production Base (Not Including La Preciosa)
2012 Silver Production by Mine (millions of ounces) 2012 Gold Production by Mine (millions of ounces)
0.3 0.7
Palmarejo
Palmarejo
2.8 82,125 Rochester
8.2 San Bartolomé 106,038
Rochester Martha
Martha Kensington
5.9 257 38,071
Endeavor
Silver Production Gold Production
250,000-
19.1 18.0-19.5 265,000
18.0 220,382 226,491
ounces 12.0 16.9 16.8 157,062
of ounces
millions 72,112
46,115
2008 2009 2010 2011 2012 2013E 2008 2009 2010 2011 2012 2013E
NYSE: CDE | TSX: CDM
16
Palmarejo – Solid Silver and Gold Producer and Major Cash Flow Generator
Quarterly Production & Cash Operating Costs¹
Gold Silver (millions)
Cash Op Costs per Silver Ounce¹
34,108 2.7 2.5 $3.75
31,081 31,258 2.4
23,702 1.8
19,998 1.6
($0.85)
($2.13)($2.27)
4Q’11 1Q’12 2Q’12 3Q’12 4Q’12
World’s 5th largest primary silver mine. Silver-gold operation located in northern Mexico
Expect to commence initial underground production from Guadalupe satellite operation in 2013
Proven and probable reserves of 56.8 million silver oz and 688,000 gold oz²
M&I resources of 17.0 million silver oz and 205,000 gold oz and inferred resources of 27.9 million silver oz and 612,000 gold oz²
First nine months 2012 metal sales of $362.7 million
First nine months 2012 operating cash flow1 of $199.9 million
2013E: 7.7—8.3 million silver oz and 98,000 – 105,000 gold oz
1. Non-GAAP measure. Please see reconciliation tables to U.S. GAAP in appendix to this presentation. Coeur expects to report cash operating costs per ounce with financial results on or about 2/21/13.
2. At Dec. 31, 2011. See technical report entitled “Palmarejo Project, SW Chihuahua State, Mexico, Technical Report”, dated January 1, 2012 as filed on SEDAR. Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
17
San Bartolomé – Long-Lived Silver Producer
Quarterly Production & Cash Operating Costs¹
Silver (millions) Cash Op Costs per Silver Ounce¹
$12.13
$10.21 $11.05
$9.18
2.0
1.6 1.5 1.5 1.3
4Q’11 1Q’12 2Q’12 3Q’12 4Q’12
World’s 8th largest primary silver mine
100% silver operation in Bolivia
Proven and probable reserves of 118.1 million silver oz²
M&I resources of 55.0 million silver oz and inferred resources of 3.6 million silver oz²
First nine months 2012 metal sales of $141.0 million
First nine months 2012 operating cash flową of $56.8 million
2013E: 5.3 – 5.7 million silver oz
1. Non-GAAP measure. Please see reconciliation tables to U.S. GAAP in appendix to this presentation. Coeur expects to report cash operating costs per ounce with financial results on or about 2/21/13.
2. At Dec. 31, 2011. See technical report entitled “San Bartolomé, Potosi, Bolivia, Technical Report”, dated January 1, 2012 as filed on SEDAR. Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
18
Rochester – Production Continues to Rise
Quarterly Production & Cash Operating Costs¹
Gold Silver (000s)
$37.99 Cash Op Costs per Silver Ounce¹
819 12,060 828
10,120 713 10,599
$23.35
441
373 5,292
$9.83 $9.58
1,993
4Q’11 1Q’12 2Q’12 3Q’12 4Q’12
Silver-gold operation located in Nevada
In operation since 1986
Proven and probable reserves of 29.6 million silver oz and 247,000 gold oz²
M&I resources of 112.4 million silver oz and 867,000 gold oz and inferred resources of 23.6 million silver oz and 122,000 gold oz²
First nine months 2012 metal sales of $89.2 million
First nine months 2012 operating cash flową of $32.0 million
2013E production of 4.5 – 4.9 million silver oz and 44,000 – 46,000 gold oz
High return investment opportunity with planned expansion of leach pad capacity
1. Non-GAAP measure. Please see reconciliation tables to U.S. GAAP in appendix to this presentation. Coeur expects to report cash operating costs per ounce with financial results on or about 2/21/13.
2. At Dec. 31, 2011. See technical report entitled “Rochester, Nevada, USA, Technical Report”, dated January 1, 2011 as filed on SEDAR. Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
19
Kensington – Record Quarterly Production in 4Q 2012
Quarterly Production & Cash Operating Costs¹
Gold Cash Op Costs per Silver Ounce¹
$2,709
$1,807
$1,348 $1,298
28,717
21,572 24,391
13,047
7,444
4Q’11 1Q’12 2Q’12 3Q’12 4Q’12
100% gold operation located in southeast Alaska
Proven and probable reserves of 1.3 million gold oz²
M&I resources of 0.6 million gold oz and inferred resources of 0.2 million gold oz²
First nine months 2012 metal sales of $68.0 million
First nine months 2012 operating cash flową of $0.1 million; resumed full production rate in April 2012
2013E: 108,000 – 114,000 gold oz
1. Non-GAAP measure. Please see reconciliation tables to U.S. GAAP in appendix to this presentation. Coeur expects to report cash operating costs per ounce with financial results on or about 2/21/13.
2. At Dec. 31, 2011. See technical report entitled “Kensington Gold Mine, Southeast Alaska, USA”, dated January 1, 2010 as filed on SEDAR. Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
20
Pipeline Growth: Joaquin Silver-Gold Project
Advancing significant silver asset
Potential significant silver producer
Consolidated ownership by acquiring remaining 49% interest in Joaquin in December 2012
Potential to add significant silver production and cash flow with further exploration upside
Project fits Company’s stated financial and operating criteria
Measured and Indicated resources of 38.4 million silver ounces¹ and Inferred resources of 31.3 million silver ounces
Mineral resources being updated to include all drilling data subsequent to September 2012 Technical Report
Accelerating feasibility work
Positive results from initial metallurgical tests
Subsequent development decision will be based on economics and assessment of political and business environment in Argentina
Exploration upside
Doubled silver Measured and Indicated resources in September 2012¹
Continuing exploration drilling to expand and upgrade resources
The La Negra and La Morocha deposits account for less than 5% of the total 28,400 ha land package, double the size of Palmarejo
1. At Sept. 21, 2012. Please see technical report entitled “Joaquin Project, Santa Cruz, Argentina Technical Report” dated September 21, 2012. Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
21
Non-GAAP to U.S. GAAP Reconciliation
Adjusted EBITDA1
Adjusted EBITDA Reconciliation (in thousands of
US$) LTM 3Q 2012 3Q 2012 2Q 2012 1Q 2012 4Q 2011
Net income $22,491 $(15,821) $22,973 $3,975 $11,364
Income tax provision 109,163 17,475 23,862 15,436 52,390
Interest expense, net of capitalized interest 29,800 7,351 7,557 6,670 8,222
Interest and other income(9,753)(12,664) 3,221(5,007) 4,697
Fair value adjustments, net 25,687 37,648(16,039) 23,113(19,035)
Loss on debt extinguishments 3,886 – – – 3,886
Depreciation and depletion 224,626 52,844 61,024 52,592 58,166
Adjusted EBITDA $405,900 $86,833 $102,598 $96,779 $119,690
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
22
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Operating Cash Flow – Consolidated1
Operating Cash Flow Reconciliation
(in thousands of US$) 3Q 2012 2Q 2012 1Q 2012 4Q 2011 3Q 2011
Cash provided by operating activities $79,735 $113,203 $17,002 $87,412 $181,911
Changes in operating assets and liabilities
Receivables and other current assets 5,648(10,319) 2,956(8,904) 10,513
Prepaid expenses and other 2,481 2,857(4,774) 8,839 8,697
Inventories 13,762(3,097) 24,722 17,574(23,234)
Accounts payable and accrued liabilities(24,342)(14,276) 53,929(7,452)(26,930)
Operating cash flow $77,284 $88,368 $93,835 $97,469 $150,957
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
23
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Operating Cash Flow – Palmarejo1
Operating Cash Flow Reconciliation (in thousands of US$) 3Q 2012 2Q 2012 1Q 2012 4Q 2011 3Q 2011
Cash provided by operating activities $58.2 $90.5 $65.3 $70.9 $104.7
Changes in operating assets and liabilities
Receivables and other current assets(4.1)(12.5) 5.4 5.7(0.8)
Prepaid expenses and other(0.8) 0.5(1.9)(3.2) 3.4
Inventories 2.5(11.5) 4.6 9.9(16.2)
Accounts payable and accrued liabilities(0.9)(3.4) 8.0(5.9) 0.1
Operating cash flow $54.9 $63.6 $81.4 $77.4 $91.2
Operating Cash Flow – San Bartolomé1
Operating Cash Flow Reconciliation (in thousands of US$) 3Q 2012 2Q 2012 1Q 2012 4Q 2011 3Q 2011
Cash provided by operating activities $19.8 $31.0 $(27.4) $22.3 $78.1
Changes in operating assets and liabilities
Receivables and other current assets 7.1(0.7) 2.2 0.2 5.0
Prepaid expenses and other 0.8 4.4(2.8) 4.6 0.2
Inventories 5.0(3.4) 4.7 2.9(7.2)
Accounts payable and accrued liabilities(21.5)(6.5) 44.1(1.3)(26.5)
Operating cash flow $11.2 $24.8 $20.8 $28.7 $49.6
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
24
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Operating Cash Flow – Kensington1
Operating Cash Flow Reconciliation (in thousands of US$) 3Q 2012 2Q 2012 1Q 2012 4Q 2011 3Q 2011
Cash provided by operating activities $5.0 $(12.5) $1.1 $9.3 $8.6
Changes in operating assets and liabilities
Receivables and other current assets 2.3 4.6(10.3)(5.1) 5.0
Prepaid expenses and other 0.5(0.5)(1.0) 0.5 1.3
Inventories 1.8 9.9 3.3(10.1)(1.3)
Accounts payable and accrued liabilities(2.3)(0.9)(0.9) 1.3 0.9
Operating cash flow $7.3 $0.6 $(7.8) $(4.1) $14.5
Operating Cash Flow – Rochester1
Operating Cash Flow Reconciliation (in thousands of US$) 3Q 2012 2Q 2012 1Q 2012 4Q 2011 3Q 2011
Cash provided by operating activities $7.3 $10.1 $(7.1) $(11.4) $0.9
Changes in operating assets and liabilities
Receivables and other current assets 0.6(0.1) 0.3(0.2) 0.2
Prepaid expenses and other 0.2(1.0) 1.4 0.7 0.7
Inventories 6.5 3.9 11.2 14.2 5.9
Accounts payable and accrued liabilities(1.6)(1.1) 1.4 0.1(5.0)
Operating cash flow $13.0 $11.8 $7.2 $3.4 $2.7
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
25
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Three months ended September 30,2012 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $6,878 $18,504 $31,660 $7,853 $4,461 $2,241 $71,597
Royalties – 1,879 – 1,441 100 – 3,420
Production taxes – – – – – – –
Total cash costs (Non-US GAAP) $6,878 $20,383 $31,660 $9,294 $4,561 $2,241 $75,017
Add/Subtract:
Third party smelting costs – –(3,141) –(541)(605)(4,287)
By-product credit 39,034 – – 17,506 124 – 56,664
Other adjustments 424 720 2 85 798 – 2,029
Change in inventory 2,337(1,166)(1,639)(5,871) 1,539 345(4,455)
Depreciation, depletion and amortization 33,997 4,161 11,512 2,061 66 898 52,695
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $82,670 $24,098 $38,394 $23,075 $6,547 $2,879 $177,663
Production of silver (in thousand ounces) 1,833,109 1,525,725 – 819,349 92,698 140,267 4,411,148
Cash operating cost per silver ounce $3.75 $12.13 – $9.58 $48.12 $15.97 $9.05
Cash costs per silver ounce $3.75 $13.36 – $11.34 $49.20 $15.97 $9.83
Production of gold (ounces) – – 24,391 – – – 24,391
Cash operating cost per gold ounce – – $1,298 – – – $1,298
Cash cost per gold ounce – – $1,298 – – – $1,298
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
26
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Three months ended June 30,2012 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $(2,009) $16,249 $29,083 $7,008 $5,942 $4,204 $60,477
Royalties – 1,457 – 510 124 – 2,091
Production taxes – – – 641 – – 641
Total cash costs (Non-US GAAP) $(2,009) $17,706 $29,083 $8,159 $6,066 $4,204 $63,209
Add/Subtract:
Third party smelting costs – –(2,820) –(1,444)(1,449)(5,713)
By-product credit 50,363 – – 16,295 157 – 66,815
Other adjustments 124 117 7 229 26 – 503
Change in inventory 14,060 4,950(10,165)(3,931) 2,297(202) 7,009
Depreciation, depletion and amortization 42,741 4,070 9,719 2,060 631 1,592 60,813
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $105,279 $26,843 $25,824 $22,812 $7,733 $4,145 $192,636
Production of silver (in thousand ounces) 2,365,484 1,470,342 – 712,706 107,895 240,168 4,896,595
Cash operating cost per silver ounce($0.85) $11.05 – $9.83 $55.07 $17.50 $6.41
Cash costs per silver ounce($0.85) $12.04 – $11.45 $56.21 $17.50 $6.97
Production of gold (ounces) – – 24,572 – – – 24,572
Cash operating cost per gold ounce – – $1,348 – – – $1,348
Cash cost per gold ounce – – $1,348 – – – $1,348
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
27
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Three months ended March 31,2012 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $(5,643) $16,253 $20,168 $10,303 $5,708 $4,127 $50,916
Royalties – 2,036 – 609 82 – 2,727
Production taxes – – – 12 – – 12
Total cash costs (Non-US GAAP) $(5,643) $18,289 $20,168 $10,924 $5,790 $4,127 $53,655
Add/Subtract:
Third party smelting costs – –(1,083) –(1,975)(788)(3,846)
By-product credit 52,526 – – 8,957 141 – 61,624
Other adjustments 244(194) 7 87 57 – 201
Change in inventory(1,268)(4,487)(2,001)(10,403)(320)(601)(19,080)
Depreciation, depletion and amortization 37,761 4,219 6,604 1,642 520 1,644 52,390
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $83,620 $17,827 $23,695 $11,207 $4,213 $4,382 $144,944
Production of silver (ounces) 2,482,814 1,591,292 – 441,337 122,793 247,958 4,886,194
Cash operating cost per silver ounce($2.27) $10.21 – $23.35 $46.48 $16.64 $6.29
Cash costs per silver ounce($2.27) $11.49 – $24.75 $47.15 $16.64 $6.85
Production of gold (ounces) – – 7,444 – – – 7,444
Cash operating cost per gold ounce – – $2,709 – – – $2,709
Cash cost per gold ounce – – $2,709 – – – $2,709
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
28
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Three months ended December 31,2011 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $(5,730) $18,332 $24,035 $14,191 $4,386 $1,647 $56,861
Royalties – 3,279 – – 98 – 3,377
Production taxes – – – 124 – – 124
Total cash costs (Non-US GAAP) $(5,730) $21,611 $24,234 $14,315 $4,484 $1,647 $60,362
Add/Subtract:
Third party smelting costs – –(1,881) –(516(483)(2,880)
By-product credit 57,501 – – 3,344 242 – 61,068
Other adjustments 233 608 – 266 97 – 1,204
Change in inventory(5,054)(869) 9,407(13,722)(296)(112)(10,646)
Depreciation, depletion and amortization 42,646 6,021 7,016 1,152 474 750 58,059
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $89,596 $27,370 $38,577 $5,356 $4,486 $1,802 $167,187
Production of silver (ounces) 2,690,368 1,997,416 – 373,589 129,972 111,723 5,303,068
Cash operating cost per silver ounce($2.13) $9.18 – $37.99 $33.75 $14.74 $6.19
Cash costs per silver ounce($2.13) $10.82 – $38.32 $34.50 $14.74 $6.85
Production of gold (ounces) – – 13,299 – – – 13,299
Cash operating cost per gold ounce – – $1,807 – – – $1,807
Cash cost per gold ounce – – $1,807 – – – $1,807
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
29
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Three months ended September 30,2011 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $(2,607) $19,210 $25,000 $12,912 $4,660 $3,068 $62,153
Royalties – 3,217 – 827 234 – 4,278
Production taxes – – – 260 – – 260
Total cash costs (Non-US GAAP) $(2,607) $22,337 $25,000 $13,999 $4,894 $3,068 $66,691
Add/Subtract:
Third party smelting costs – –(3,096) –(566)(808)(4,470)
By-product credit 51,185 – – 2,433 198 – 53,816
Other adjustments 435 111 – 117 290 – 953
Change in inventory 15,099 7,637 2,443(5,193) 3,328 949 24,263
Depreciation, depletion and amortization 41,174 6,062 9,568 556 237 914 58,511
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $105,286 $36,147 $33,915 $11,912 $8,381 $4,123 $199,764
Production of silver (ounces) 2,250,818 2,051,426 – 351,717 118,523 137,843 4,910,327
Cash operating cost per silver ounce($1.16) $9.32 – $36.71 $39.31 $22.26 $7.57
Cash costs per silver ounce($1.16) $10.89 – $39.80 $41.29 $22.26 $8.49
Production of gold (ounces) – – 25,687 – – – 725,687
Cash operating cost per gold ounce – – $973 – – – $973
Cash cost per gold ounce – – $973 – – – $973
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
30
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Nine months ended September 30,2012 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $(774) $51,006 $80,911 $25,164 $16,110 $10,571 $182,988
Royalties – 5,372 – 1,959 305 – 7,636
Production taxes – – – 1,255 – – 1,255
Total cash costs (Non-US GAAP) $(774) $56,378 $80,911 $28,378 $16,415 $10,571 $191,879
Add/Subtract:
Third party smelting costs – –(7,044) –(3,959)(2,843)(13,846)
By-product credit 141,923 – – 42,758 422 – 185,103
Other adjustments 792 642 17 401 882 – 2,734
Change in inventory 15,129(703)(13,805)(20,206) 3,516(457)(16,526)
Depreciation, depletion and amortization 114,499 12,450 27,836 5,763 1,216 4,134 165,898
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $271,569 $68,767 $87,915 $57,094 $18,492 $11,405 $515,242
Production of silver (in thousand ounces) 6,681,407 4,587,359 – 1,973,392 323,286 628,393 14,193,197
Cash operating cost per silver ounce($0.12) $11.12 – $12.75 $49.82 $16.82 $7.19
Cash costs per silver ounce($0.12) $12.29 – $14.38 $50.76 $16.82 $7.82
Production of gold (ounces) – – 53,407 – – – 53,407
Cash operating cost per gold ounce – – $1,515 – – – $1,515
Cash cost per gold ounce – – $1,515 – – – $1,515
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
31
Non-GAAP to U.S. GAAP Reconciliation (Cont’d)
Cash Operating Costs1
(In thousands except ounces and per ounce costs) San
Nine months ended September 30,2011 Palmarejo Bartolomé Kensington Rochester Martha Endeavor Total
Total cash operating cost (Non-US GAAP) $(3,014) $49,946 $72,199 $17,787 $12,981 $9,926 $159,825
Royalties – 8,281 – 1,734 587 – 10,602
Production taxes – – – 728 – – 728
Total cash costs (Non-US GAAP) $(3,014) $58,227 $72,199 $20,249 $13,568 $9,926 $171,155
Add/Subtract:
Third party smelting costs – –(9,122) –(2,366)(2,390)(13,878)
By-product credit 139,842 – – 6,554 706 – 147,102
Other adjustments 1,208 298 19 256 462 – 2,243
Change in inventory 1,216(196) 7,015(3,005)(869) 45 4,206
Depreciation, depletion and amortization 116,584 16,387 28,823 1,655 81 2,398 165,928
Production costs applicable to sales, including
depreciation, depletion and amortization (US GAAP) $255,836 $74,716 $98,934 $25,709 $11,582 $9,979 $476,756
Production of silver (ounces) 6,351,120 5,503,951 – 1,018,844 399,630 501,638 13,755,183
Cash operating cost per silver ounce($0.47) $9.07 – $17.46 $32.48 $19.79 $6.36
Cash costs per silver ounce($0.47) $10.58 – $19.87 $33.95 $18.85 $7.18
Production of gold (ounces) – – 75,121 – – – 75,121
Cash operating cost per gold ounce – – $961 – – – $961
Cash cost per gold ounce – – $961 – – – $961
1. Coeur expects to report fourth quarter and full year 2012 audited financial results on Thursday, February 21, 2013.
NYSE: CDE | TSX: CDM
32
Reserves and Resources
Coeur’s Mineral Reserves
Grade (oz/ton) Ounces (contained)
Year end 2011 Location Short tons Silver Gold Silver Gold
Proven Reserves
Rochester Nevada, USA 31,532,400 0.59 0.006 18,680,600 178,800
Martha Argentina – – – – –
San Bartolomé Bolivia 959,000 3.01 – 2,888,250 –
Kensington Alaska, USA 1,164,100 – 0.280 – 325,920
Endeavor Australia 2,634,500 1.39 – 3,673,870 –
Palmarejo Mexico 4,915,900 5.32 0.067 26,090,800 329,950
Total Proven Reserves 41,205,900 51,333,520 834,670
Probable Reserves
Rochester Nevada, USA 15,747,300 0.69 0.004 10,892,300 68,200
Martha Argentina 52,500 12.79 0.011 671,400 580
San Bartolomé Bolivia 43,555,500 2.64 – 115,191,460 –
Kensington Alaska, USA 4,842,300 – 0.209 – 1,014,090
Endeavor Australia 2,998,300 2.50 – 7,500,770 –
Palmarejo Mexico 7,581,300 4.05 0.047 30,727,260 358,170
Total Probable Reserves 74,777,200 164,983,190 1,441,040
Proven and Probable Reserves
Rochester Nevada, USA 47,279,700 0.63 0.005 29,572,900 247,000
Martha Argentina 52,500 12.79 0.011 671,400 580
San Bartolomé Bolivia 44,514,500 2.65 – 118,079,710 –
Kensington Alaska, USA 6,006,400 – 0.223 – 1,340,010
Endeavor Australia 5,632,800 1.98 – 11,174,640 –
Palmarejo Mexico 12,497,200 4.55 0.055 56,818,060 688,120
Total Proven and Probable Reserves 115,983,100 216,316,710 2,275,710
Note: Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
33
Reserves and Resources (Cont’d)
Coeur’s Measured and Indicated Resources (excluding reserves)
Grade (oz/ton) Ounces (contained)
Year end 2011 Location Short tons Silver Gold Silver Gold
Measured Resources
Rochester Nevada, USA 131,085,400 0.46 0.004 60,586,200 500,500
Martha Argentina – – – – –
San Bartolomé Bolivia – – – – –
Kensington Alaska, USA 495,200 – 0.234 – 115,900
Endeavor Australia 10,923,900 2.67 – 29,148,800 –
Palmarejo Mexico 1,792,900 4.24 0.052 7,593,900 93,300
Joaquin (100%)¹ Argentina 1,763,000 3.01 0.003 5,500,000 5,700
Total Measured Resources 146,060,400 102,828,900 715,400
Indicated Resources
Rochester Nevada, USA 120,387,000 0.43 0.003 51,762,400 366,300
Martha Argentina 35,100 12.15 0.013 426,500 400
San Bartolomé Bolivia 21,263,600 2.59 – 54,968,400 –
Kensington Alaska, USA 2,544,200 – 0.185 – 471,400
Endeavor Australia 123,500 0.01 – 1,800 –
Palmarejo Mexico 3,268,700 2.88 0.034 9,398,900 111,300
Joaquin (100%)¹ Argentina 11,684,000 2.82 0.003 33,000,000 34,000
Total Indicated Resources 159,306,100 149,558,000 983,400
Measured and Indicated Resources
Rochester Nevada, USA 251,472,400 0.45 0.003 112,348,600 866,800
Martha Argentina 35,100 12.15 0.013 426,500 400
San Bartolomé Bolivia 21,263,600 2.59 – 54,968,400 –
Kensington Alaska, USA 3,039,400 – 0.193 – 587,300
Endeavor Australia 11,047,400 2.64 – 29,150,700 –
Palmarejo Mexico 5,061,600 3.36 0.04 16,992,800 204,500
Joaquin (100%)1 Argentina 13,448,000 2.85 0.003 38,400,000 40,000
Total Measured and Indicated Resources 305,367,500 252,287,000 1,699,000
1. Effective December 31, 2011 except Endeavor effective June 30, 2011 and Joaquin effective September 21, 2012. Joaquin’s Mineral Resources reflect Coeur’s 100% ownership of the project after acquiring the remaining 49% in December 2012; Note: Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
34
Reserves and Resources (Cont’d)
Coeur’s Mineral Inferred Resources
Grade (oz/ton) Ounces (contained)
Year end 2011 Location Short tons Silver Gold Silver Gold
Inferred Resources
Rochester Nevada, USA 40,542,600 0.58 0.003 23,618,600 122,400
Martha Argentina 259,400 4.32 0.005 1,121,300 1,200
San Bartolomé Bolivia 3,384,800 1.07 – 3,617,000 –
Kensington Alaska, USA 730,700 – 0.232 – 169,700
Endeavor Australia 3,527,400 1.09 – 3,835,600 –
Palmarejo Mexico 11,653,000 2.56 0.047 27,928,200 611,700
Joaquin (100%)¹ Argentina 8,708,000 3.61 0.002 31,300,000 19,400
Total Inferred Resources 68,805,900 91,420,700 924,400
Notes to the above Mineral Reserves and Resources.
1. Effective December 31, 2011 except Endeavor effective June 30, 2011 and Joaquin effective September 21, 2012. Joaquin’s Mineral Resources reflect Coeur’s 100% ownership of the project after acquiring the remaining 49% in December 2012.
2. Metal prices used for Mineral Reserves were $23 per ounce of silver and $1,220 per ounce of gold, except Endeavor at $2,200 per metric ton of lead, $2,200 per metric ton of zinc and $25 per ounce of silver, and Martha at $1,250 per ounce of gold and $24 per ounce of silver.
3. Metal prices used for Mineral Resources were $30 per ounce of silver and $1,500 per ounce of gold except Endeavor at $2,200 per metric ton of lead, $2,200 per metric ton of zinc and $25 per ounce of silver, Martha at $1,250 per ounce of gold and $24 per ounce of silver.
4. Mineral Resources are in addition to Mineral Reserves and have not demonstrated economic viability.
5. Palmarejo Mineral Reserves and Resources are the addition of Palmarejo, Guadalupe and La Patria.
6. Current Mineral Resources were inclusive of disputed and undisputed claims at Rochester. While the Company believes it holds a superior position in the ongoing claim dispute, the Company believes an adverse legal outcome would cause it to modify Mineral Resources.
7. Rounding of short tons and troy ounces, as required by reporting guidelines may result in apparent differences between tons, grade and contained metal content.
8. For details on the estimation of Mineral Resources and Reserves for each property, please refer to the Technical Report on file at www.sedar.com.
Note: Estimated year-end 2012 reserves and resources are expected to be issued later this week.
NYSE: CDE | TSX: CDM
35
Reserves and Resources (Cont’d)
La Preciosa Mineral Resources
Cutoff Ag Au Gold
Category g/t Ag Tonnes Grade (g/t) Silver Ounces Grade (gt) Ounces
Open Pit
Indicated 25 29,600,000 104 99,000,000 0.20 190,400
Inferred 25 47,700,000 86 132,000,000 0.16 245,400
Underground
Indicated 60 50,000 99 200,000 0.16 280
Inferred 60 1,960,000 124 7,600,000 0.21 13,200
Note: Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability; Open pit resources stated as contained within a potentially economically minable pit shell; Strip Ratio of 13:1; Pit optimization is based on assumed silver and gold prices of US$25.90/oz, US$1,465/oz, respectively, mill recoveries of 88%, 78% respectively, mining costs of US$1.45/t, and a processing costs of US$17.25/t and G&A cost of US$4.35/t; Break-even cut-off grades used were 25 g/t Ag for open pit mill material and 60 g/t Ag for underground material; Silver equivalency is based on unit values calculated from the above metal prices, and assumes 100% recovery of all metals; Mineral resource tonnage and contained metal have been rounded to reflect the accuracy of the estimate, and numbers may not add due to rounding; George Cavey, P.Geo., is the Qualified Person responsible for the preparation of the scientific and technical information related to La Preciosa that is included in this presentation.
NYSE: CDE | TSX: CDM
36
Contact Information
Head Office: Coeur d’Alene Mines Corporation
505 Front Avenue
Coeur d’Alene, Idaho 83816-0316
Main Tel:(208) 667-3511
Tickers: CDE: NYSE; CDM: TSX
Website: www.coeur.com
Mitch Krebs
President and Chief Executive Officer
Wendy Yang Mike Harrison
Vice President, Investor Relations Vice President, Business Development
(208) 665-0345(208) 651-6428
wyang@coeur.com mharrison@coeur.com
NYSE: CDE | TSX: CDM
37