Management’s Discussion and Analysis (“MD&A”)
Contents
| 30 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 34 | ||||
| 40 | ||||
| 40 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 50 | ||||
| 54 | ||||
| 55 | ||||
| 55 | ||||
| 57 | ||||
| 58 | ||||
| 59 | ||||
| 60 | ||||
| 61 | ||||
| 65 | ||||
| 73 | ||||
| 74 |
This MD&A is intended to help the reader
understand Barrick Gold Corporation (“Barrick”,
“we”, or “the Company”), our operations and our
present business environment. Unless otherwise
specified, all references in this MD&A are to
Barrick excluding the impact of the 2006 acquisition
of Placer Dome Inc. (“Placer Dome”). It includes the
following sections:
| n | Our Business — a general description of our core business; our vision and strategy; our capability to deliver results; and key economic trends in our present business environment. | |
| n | Operations Review — an analysis of our consolidated results of operations for the last three years focusing on our material operating segments and the outlook for 2006. | |
| n | Liquidity, Capital Resources and Financial Position — an analysis of cash flows; sources and uses of cash; financial instruments; off-balance sheet arrangements; contractual obligations and commitments; and our financial position. | |
| n | Critical Accounting Policies and Estimates — a discussion of accounting policies that require critical judgments and estimates. |
This MD&A, which has been prepared as of
February 22, 2006, is intended to supplement and
complement our audited consolidated financial
statements and notes thereto for the year ended
December 31, 2005 prepared in accordance with
United States generally accepted accounting
principles, or US GAAP (collectively, our
“Financial Statements”). You are encouraged to
review our Financial Statements in conjunction with
your review of this MD&A. Additional information
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 29 |
relating to our Company, including our most
recent Annual Information Form, is available on
SEDAR at www.sedar.com and on EDGAR at www.sec.gov.
For an explanation of terminology used in our MD&A
that is unique to the mining industry, readers
should refer to the glossary on page 74. All dollar
amounts in our MD&A are in US dollars, unless
otherwise specified.
For the purposes of preparing our MD&A, we
consider the materiality of information. Information
is considered material if: (i) such information
results in, or would reasonably be expected to
result in, a significant change in the market price
or value of our shares; or (ii) there is a
substantial likelihood that a reasonable investor
would consider it important in making an investment
decision; or (iii) if it would significantly alter
the total mix of information available to investors.
We evaluate materiality with reference to all
relevant circumstances, including potential market
sensitivity.
Our Business
Core Business
We are currently one of the world’s largest
gold companies in terms of market capitalization,
annual gold production and gold reserves. In early
2006, we completed the acquisition of Placer Dome,
which will result in a significant increase in the
scale of our mining operations. Details of the
acquisition can be found on page 41. Our operations
in 2005 were concentrated in these regions: North
America, Australia/Africa and South America. In
2006, we intend to divide the Australia/Africa
region into two separate regions. Each region
receives direction
from the Corporate Office, but has responsibility
for all aspects of its businesses including
strategy/ sustainability and managing all aspects
of mining operations including exploration,
development/ construction, production and
closure.
We generate revenue and cash flow from the
production and sale of gold. We sell our gold
production in the world market through three
primary distribution channels: gold bullion is sold
in the gold spot market, gold bullion is sold under
gold sales contracts between ourselves and various
third parties, or gold concentrate is sold to
independent smelting companies.
| 30 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Vision and Strategy
Our vision is to be the world’s best gold
company by finding, developing and producing quality
reserves in a profitable and socially responsible
manner.
Our goal is to create value for our
shareholders. We reinvest cash flow from our mines
in exploration, development projects and other
investments to
work towards sustainable growth in gold production
and cash flow. It can take a number of years for a
project to move from the exploration stage through
to mine construction and production. Our business
strategy reflects this long lead time, but
shorter-term priorities are also set for current
areas of focus.
| Long-term | Focus Areas | Measures | ||||||||||
| Strategy Elements | ||||||||||||
Growth in reserves
and production
|
n | Growth at existing mine sites by finding new reserves and converting mineralized material to reserves. | n | Additions to and size of reserves and mineralized material. | ||||||||
| n | Growth through successful exploration focused principally in key exploration districts (Goldstrike, Frontera, Lake Victoria and in Russia/Central Asia). | n | Consistent investment in exploration and development. | |||||||||
| n | Growth through targeted acquisitions. | n | Growth in annual gold production. | |||||||||
| n | Advance the development of Cowal, Pascua-Lama, East Archimedes and Buzwagi as well as newly acquired Placer Dome projects, including Pueblo Viejo, Cortez Hills and Donlin Creek. | n | Construction progress versus estimates. | |||||||||
| n | Continue to develop a business unit in Russia/Central Asia. | n | Actual construction costs versus estimates. | |||||||||
Operational
|
n | Control costs. | n | Total cash costs per ounce.1 | ||||||||
excellence
|
— Global supply chain management. | n | Amortization per ounce.1 | |||||||||
| — Continuous improvement initiatives. | n | Ore throughput and equipment | ||||||||||
| — Currency, interest rate and commodity hedge programs. | utilization statistics. | |||||||||||
| n | Improve productivity through continuous improvement initiatives. | n | Liquidity — operating cash flow and credit ratings. | |||||||||
| n | Effective assessment and management of risk. | n | Key balance sheet ratios. | |||||||||
| n | Effective capital allocation. | |||||||||||
| n | Secure efficient sources of funding for capital needs. | |||||||||||
Strengthen the
|
n | Workforce — identify and develop talent. | n | Talent review and performance management. | ||||||||
organization
|
n | Leadership development and succession planning. | ||||||||||
| n | Adopt best practices in corporate governance, including strengthening internal controls over financial reporting. | n | Compliance with applicable corporate governance legislation. | |||||||||
Responsible
|
n | Reinforce health and safety culture. | n | Safety leadership and other training initiatives. | ||||||||
mining
|
n | Enhance environmental performance, including use of innovative technology to protect the environment. | n | Medical aid injury frequency. | ||||||||
| n | Maintain positive community and government relations. | n | Environmental performance. | |||||||||
| n | Compliance with regulatory requirements. | |||||||||||
| 1. | For more information on total cash costs per ounce performance measures, see pages 44–45. |
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 31 |
Capability to Deliver Results
Resources and processes provide us with the
capability to execute our strategy and deliver
results. The critical ones are:
Experienced Management Team and
Skilled Workforce
We have an experienced management team that has a
proven track record in the mining industry. Strong
leadership and governance are critical to the
successful implementation of our core strategy. We
are focusing on leadership development for key
members of executive-level and senior mine
management.
A skilled workforce has a significant impact
on the efficiency and effectiveness of our
operations. The remote nature of many of our mine
sites presents challenges in maintaining a skilled
workforce. Competition for well-trained and skilled
employees is high in our industry, so we are
focusing on employee retention, recruiting skilled
employees, and positive labor relations. We
maintain training programs to develop the skills
that certain employees need to fulfill their roles
and responsibilities. Priorities for our Human
Resources group include strengthening our
workforce, developing employee leadership
skills and succession planning. We are implementing
Human Resource system solutions to enhance our
ability to analyze and manage labor costs,
productivity and other key statistics to help us
effectively manage the impact our workforce has on
our mining operations.
Environmental, Health and Safety
As part of our commitment to corporate
responsibility, we focus on continuously improving
health and safety programs, systems and resources to
help control workplace hazards. Continuous
monitoring and integration of health and safety into
decision-making enables us to operate effectively,
while also focusing on health and safety. In 2005,
we continued to focus on enhancing leadership and
personal commitment through the development of our
health and safety risk management guidelines, which were
successfully piloted at one of our mine sites;
training for all levels of supervision and
management through our “Courageous Safety
Leadership” program; and the full implementation of
processes at both corporate and regional locations
that support governance and accountability
measurements. Key areas of focus for 2006 will
include safety leadership through training and
health and safety risk management practices;
designing and enhancing processes and programs to
ensure safety requirements are met; and
communicating a safety culture as part of Barrick’s
core values.
We are subject to extensive laws and regulations
governing the protection of the environment,
endangered and protected species, waste disposal and
worker safety. We seek to continuously implement
operational improvements to enhance environmental
performance. We have environmental groups at the
corporate, regional business unit and operating site
levels to support our environmental efforts. In 2005,
we established an Environmental, Health, Safety and
Sustainability Committee to establish policy
direction for environmental performance. We became a
signatory to the International Cyanide Management
Code and committed to certification of all of our
operations. In 2005, we also became a signatory to the United
Nations (“UN”) Global Compact, which represents the
world’s largest voluntary corporate citizenship
initiative. Among its principles, the UN Global
Compact encourages businesses to support a
precautionary approach to environmental challenges,
undertake initiatives to promote greater
environmental responsibility, and encourage the
development and diffusion of environmentally friendly
technologies. To provide further guidance toward
achieving our environmental objectives, we developed
a new Environmental Management System Standard in
2005. Each year, we issue a Responsibility Report
that outlines our environmental, health and safety
and social responsibility performance for the year.
| 32 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Cost Control and Supply Sourcing
Successful cost control and supply sourcing depends
upon our ability to obtain and maintain adequate
quantities of equipment, consumables and supplies as
required by our operations at competitive prices.
Our Supply Chain group is focusing on improving
long-term cost control and sourcing strategies, for
major consumables and supplies used in our mining
activities, through global commodity purchasing
teams. It also facilitates knowledge sharing across
our global business and implementation of best
practices in procurement. We continue to develop
strategies to help us analyze and source consumables
and supplies at the lowest cost over the life of a
mine, including where appropriate, long-term
alliances with certain suppliers to ensure adequate
supply is maintained.
Maintenance represents a significant component
of operating costs at our mines and impacts the
availability of plant and equipment. Our Global
Maintenance team is working to reduce maintenance
costs and increase equipment utilization through an
internal maintenance community. Key areas of focus
include setting business process standards for
maintenance to optimize usage of mine equipment and
enable cost-effective purchasing of mine equipment.
They are implementing a global maintenance system,
based on the principles of Total Production
Maintenance, to facilitate the sharing of best
practices across the Company and to track capital
equipment statistics such as utilization,
availability and useful lives.
Information Management and Technology
Our Information Management and Technology group
provides focused and responsive support to enable
us to meet our current business objectives and
long-term strategy elements. It manages significant
risks, such as information security; risks relating
to the implementation of new applications; and the
risk of failure of critical systems. We are
implementing strategies to mitigate these risks,
including monitoring operating procedures and the
effectiveness of system controls to safeguard data,
evaluating the effective use of technology and
maintaining disaster recovery plans. Other areas of
focus include working with other functional groups
to reduce technology diversity by standardizing
system solutions, and ongoing analysis of business
needs and the potential benefits that can be gained
from system solution enhancements.
Continuous Improvement
Our Continuous Improvement (“CI”) group is focused
on instilling a continuous improvement culture
across the Company to increase shareholder value by
reducing costs, improving throughput/productivity,
and improving quality and safety. Our CI group
coordinates annual operational/business reviews to
identify and prioritize improvement opportunities.
The group also facilitates strategic planning
sessions to develop our business strategy.
Internal Controls Over Financial Reporting and Disclosure
We maintain a system of internal controls over
financial reporting designed to safeguard assets and
ensure financial information is reliable. We
undertake ongoing evaluations of the effectiveness
of internal controls over financial reporting and
implement control enhancements, where appropriate,
to improve the effectiveness of controls. In 2005,
we focused on the design, testing and assessment of
the effectiveness of internal
controls over financial reporting to enable us to
meet the certification and attestation requirements
of the Sarbanes-Oxley Act (“SOA”) for 2006. We
presently file management certifications annually
under Section 302 and Section 906 of the SOA, and
expect to comply with the reporting requirements of
Section 404 of the SOA as required by law.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 33 |
We also maintain a system of disclosure
controls and procedures designed to ensure the
reliability, completeness and timeliness of the
information we disclose in this MD&A and other
public disclosure documents. Disclosure controls and
procedures are designed to ensure that information
required to be disclosed by Barrick in reports filed
with securities regulatory agencies is recorded,
processed, summarized and reported on a timely
basis, as required by law, and is accumulated and
communicated to Barrick’s management, including our
Chief Executive Officer and Chief Financial Officer,
as appropriate, to allow timely decisions regarding
required disclosure.
Key Economic Trends
In 2005, there has been a continuation of the
trend of higher gold and silver prices which, while
benefiting gold revenues and by-product credits,
also leads to higher gold royalty expenses. A trend
of inflationary pressure on the cost of labor, other
commodities and consumables, such as oil, natural
gas and propane, has caused upward pressure on
production costs. We believe that other companies in
the gold mining industry are experiencing similar
trends. The Placer Dome acquisition will lead to a
general increase in the magnitude of the effect of
these economic factors on our business.
Gold, Silver and Copper Prices
Market gold prices have a significant impact on our
revenue. Silver prices impact total cash costs per
ounce1 of gold as silver sales are
recorded as a by-product credit. These prices are
subject to volatile price movements over short
periods of time, and are affected by numerous
industry and macroeconomic factors that are beyond
our control.
Gold prices followed an upward trend in 2005,
closing the year at $513 per ounce. This trend
continued into 2006 with gold reaching a 25-year high
of $572 per ounce in early February 2006. In contrast
to 2004, the correlation between gold prices and the
Euro has lessened, which suggests that
exchange rates have become less important in
determining gold prices. Other economic influences
such as supply and demand, oil prices, trade
deficits and US interest rates are important factors
in explaining gold price movements. Demand for gold
continues, with reports that certain central banks
are considering buying gold to add to their
reserves, and strong jewelry demand in China and
India. The prospects for gold as an investment
remain favorable, particularly in response to any
global economic/political uncertainty. The past few
years have seen a resurgence in gold as an
investment vehicle, with more readily accessible
gold investment opportunities (such as gold exchange
traded funds — “ETFs”).
Over the last three years, our realized gold
sales prices have tracked the rising market gold
price. Periods when our average realized price was
below average market prices were primarily caused
by us voluntarily choosing to deliver into gold
sales contracts at dates earlier than the final
contractual delivery date and at prices lower than
prevailing market prices to reduce outstanding gold
sales contracts.
| 1. | Total cash costs per ounce excludes amortization, see pages 44-45 for further information on this performance measure. |
| 34 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Silver rallied along with gold at the end of
2005, despite continued news that attrition in the
US photographic market would depress demand. Silver
prices have had support from industrial consumers as
technological advances continue to provide silver
with new uses, as well as robust jewelry demand from
India. The last three years have seen a decline in
our silver production, as reserves at our Eskay
Creek mine are depleted and the mine approaches the
end of its life. After Pascua-Lama begins
production, we expect that the quantities of silver
we produce will increase significantly.
The acquisition of Placer Dome will lead to copper
prices having a more significant effect on our
results due to copper production from the Zaldivar
copper mine and the Osborne gold and copper mine. In
2005, these mines combined produced 359 million
pounds of copper. Copper prices rose 67% in 2005 as
a result of supply reductions, smelter bottlenecks,
and low global copper inventory levels, combined
with ongoing high levels of copper demand. In early
February 2006, copper prices reached a high of $2.33
per pound. In 2006, we purchased put options to
protect revenue on approximately 300 million pounds
of expected 2006 copper production. These options
guarantee a minimum price of $2.00 per pound, while
allowing us to fully participate in higher spot
copper prices.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 35 |
Currency Exchange Rates
Results of our mining operations in Australia and
Canada, reported in US dollars, are affected by
exchange rates between the Australian and Canadian
dollars and the US dollar, because a portion of our
annual expenditures are based in local currencies.
Placer Dome has a mine located in South Africa that
will cause us to also have economic exposure to the
South African Rand in the future.
A weaker dollar would cause costs reported in
US dollars to increase. The Canadian dollar
outperformed most major currencies in 2005,
including the US dollar, mainly due to sustained
higher energy prices and global investor interest in
resource assets. We expect the Canadian dollar to
remain strong in 2006. The Australian dollar remains
steady, mainly due to higher commodity prices, and
the exchange rate with the US dollar was fairly
stable in 2005. The Rand has shown increased
stability against the US dollar in 2005 as compared
to previous years, mainly due to increased liquidity
and continued strong foreign direct investment in
South Africa.
| 36 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
We have a currency hedge position as part
of our strategy to control costs by mitigating the
impact of volatility in the US dollar on Canadian
and Australian dollar-based costs. Over the last
three years, our currency hedge position has
provided benefits to us in the form of hedge gains
when contract exchange rates are compared to
prevailing market exchange rates as follows: 2005 —
$100 million; 2004 — $96 million; and 2003 — $58
million. These gains are reflected in our operating
costs.
Our currency hedge position at the end of 2005
provides protection for our Canadian and Australian
dollar-based costs for a significant portion of the
next three years. The average hedge rates vary
depending on when the contracts were put in place.
For hedges in place for future years, average hedge
rates are higher because some of the contracts were
added over time as the US dollar weakened. The
average rates of currency contracts over the next
three years are $0.68 for Australian dollar
contracts and $0.76 for Canadian dollar contracts.
Beyond the next three years, most of our Canadian
and Australian dollar-based costs are subject to
market currency exchange rates, and consequently
costs reported in US dollars for our Australian
operations and our Canadian operations could
increase if currency exchange rates against the US
dollar remain at present levels.
Inflationary Cost Pressures
Our industry is experiencing significant
inflationary cost pressures for many commodities and
consumables used in the production of gold, as well
as, in some cases, constraints on supply. These
pressures have led to a trend of higher production
costs reported by many gold producers, and we have
been actively seeking ways to mitigate these cost
pressures. In the case of diesel fuel and propane,
we put in place hedge positions that have been
successful in mitigating the impact of recent price
increases to a significant extent. For other cost
pressures, we have been focusing on supply chain
management and continuous improvement initiatives to
mitigate the impact on our business.
Fuel
We consume on average about 2 million barrels of
diesel fuel and approximately 24 million gallons
of propane annually across all our mines.
Diesel fuel is refined from crude oil and is
therefore subject to the same price volatility
affecting crude oil prices. With global demand
increasing and oil supply disruptions in 2005, oil
prices rose from $43 per barrel at the start of the
year to $61 per barrel at the end of the year. To
help control the costs of fuel consumption, we have a
fuel hedge position totaling 2 million barrels, which
represents about 25% of our total estimated
consumption in each of the next four years. The fuel
hedge contracts are primarily designated for our
Goldstrike, Round Mountain, and Kalgoorlie mines. The
average hedge rate of our fuel contracts is $44 per
barrel. In 2005, we realized benefits in the form of
fuel hedge gains totaling $9 million (2004: $4
million; 2003: nil), when fuel hedge prices were
compared to market prices. These gains are reflected
in our operating costs. If the trend of high diesel
fuel prices continues, this could impact future gold
production costs.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 37 |
Propane prices rose from $0.76 per gallon
at the start of 2005 to $1.04 at the end of the year.
Propane prices have increased mainly due to a
substitution of propane for natural gas by some
consumers that caused an increase in demand for
propane. To help control the costs of propane
consumed at our mines, we have a propane hedge
position totaling 17 million gallons, which
represents about 70% of our estimated future propane
consumption through to the end of 2006, at an average
price of $0.79 per gallon. We realized hedge gains
totaling $1 million in 2005 (2004 and 2003: nil),
when market prices were compared to our propane hedge
prices. These gains are reflected in our operating
costs.
Electricity
We
purchase about 1.6–1.7 million megawatt hours of
electricity annually across all our mines. We buy
electricity from regional power utilities, and in
addition at some mines we generate our own power.
Fluctuations in electricity prices are generally
caused by local economic factors and impact costs to
produce gold. Electricity prices have generally been
rising in recent years due to increases in the price
of diesel fuel, coal and natural gas, which are used
by many power generators, as well as excess demand
for electricity. Natural gas prices rose in North
America in 2005, as Hurricane Katrina and other
factors caused a tightening of supply that has not
fully recovered yet.
To partially mitigate the impact of rising
electricity costs, we built a 115-megawatt natural
gas-fired power plant that became operational in the
fourth quarter of 2005. This power plant provides
Goldstrike with the flexibility to generate its own
power or buy cheaper power from other producers,
with the goals of minimizing the cost of power
consumed and enhancing the reliability of
electricity availability at the mine.
Consumables
With increasing demand for tires and limitations in
supply from tire manufacturers, costs have been
rising and some companies have experienced
difficulty securing tires. We have been seeking to
mitigate this cost pressure by finding ways to
extend tire lives and looking at various
alternatives for supply. In 2006, our focus will be
to complete a tire tender process and sign long-term
agreements with preferred tire suppliers to ensure
that we continue to receive an adequate supply of
tires for our mines and development projects. The
limited availability of tires has not had a
significant impact on productivity at our mines.
Prices for certain other consumables, such as
cyanide and explosives, have also been generally
increasing, which in turn leads to higher mining and
processing costs. In 2005, we benefited from contract
pricing for cyanide that was below the prevailing
market price. For 2006, we expect to procure most of
our cyanide at market prices, with price increases
due to higher costs for caustic soda and natural gas.
For explosives, we experienced price increases in
2005 because natural gas and ammonia are both used in
the production of ammonium nitrate explosives. We are
evaluating alternatives to reduce consumables costs through
supply chain and continuous improvement initiatives.
Labor Costs
With high demand for experienced miners and
relatively inflexible supply, the industry has
been facing upward pressure on labor costs, as
well as higher turnover rates in some cases, due
to the strong demand. Labor cost pressures have
been most significant in Australia.
| 38 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
US Dollar Interest Rates
Short-term US dollar interest rates rose in 2005 as
the US Federal Reserve continued its tightening
cycle. We expect long-term interest rates to rise
as the front end of the curve rises due to
inflation risks. Volatility in interest rates
mainly affects interest receipts on our cash
balances ($1 billion cash at the end of 2005), and
interest payments on variable-rate debt ($0.6
billion of variable-rate debt at the end of 2005).
Based on the relative amounts of these
variable-rate financial assets and liabilities,
rising interest rates would have an overall
positive impact on our results. The relative
amounts of variable-rate financial assets and
liabilities may change in the future depending upon
the amount of operating cash flow we generate as
well as amounts invested in capital expenditures.
In response to the volatility in interest
rates, we have used interest rate swaps to alter the
relative amounts of variable-rate financial assets
and liabilities and to mitigate the overall impact
of changes in interest rates. Management of
interest-rate risk takes into account the term
structure of variable-rate financial assets and
liabilities. On $425 million of our cash balances,
we have fixed the interest rate through 2007 at
3.63% using interest rate swaps. These interest rate
swaps generated hedge gains, when rates under the
swaps are compared to market interest rates,
totaling $6 million in 2005; $19 million in 2004;
and $18 million in 2003. In the future, we may alter
the notional amounts of interest rate swaps
outstanding as the relative amounts of variable-rate assets
and liabilities change to manage interest rate risk.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 39 |
Operations Review
Selected Annual Information
| For the years ended December 31 | ||||||||||||
| ($ millions, except per share | ||||||||||||
| and per ounce data in dollars) | 2005 | 2004 | 2003 | |||||||||
Gold production (000’s of ounces) |
5,460 | 4,958 | 5,510 | |||||||||
Gold sales |
||||||||||||
000’s of ounces |
5,320 | 4,936 | 5,554 | |||||||||
$ millions |
$ | 2,350 | $ | 1,932 | $ | 2,035 | ||||||
Market gold price1 |
444 | 409 | 363 | |||||||||
Realized gold price1 |
439 | 391 | 366 | |||||||||
Total cash costs1, 2 |
227 | 214 | 189 | |||||||||
Amortization1 |
76 | 86 | 90 | |||||||||
Total production costs1 |
303 | 300 | 279 | |||||||||
Net income |
401 | 248 | 200 | |||||||||
Net income per share |
||||||||||||
Basic |
0.75 | 0.47 | 0.37 | |||||||||
Diluted |
0.75 | 0.46 | 0.37 | |||||||||
Cash inflow (outflow) |
||||||||||||
Operating activities |
726 | 509 | 519 | |||||||||
Capital expenditures |
(1,104 | ) | (824 | ) | (322 | ) | ||||||
Other investing activities |
(76 | ) | 3 | (12 | ) | |||||||
Financing activities |
93 | 740 | (266 | ) | ||||||||
Cash position — end of year |
1,037 | 1,398 | 970 | |||||||||
Total assets |
6,862 | 6,287 | 5,345 | |||||||||
Total long-term financial liabilities |
$ | 1,780 | $ | 1,707 | $ | 789 | ||||||
Gold reserves |
||||||||||||
(millions of contained ounces)a |
88.6 | 89.1 | 85.9 | |||||||||
| 1. | Per ounce weighted average. | |
| 2. | Total cash costs per ounce statistics exclude amortization. Total cash costs per ounce is a performance measure that is used throughout this MD&A. For more information see pages 44-45. |
Executive Overview and 2006 Outlook
In 2005, we produced 5.5 million ounces of gold
at average total cash costs of $227 per ounce, in
line with our original guidance for the year. The
contribution to gold production from three new mines, Tulawaka, Lagunas Norte and Veladero, more
than offset slightly lower production from Eskay
Creek and Plutonic. Through our currency and
commodity hedge programs, and supply chain
initiatives, we were able to mitigate to some extent
the impact of inflationary cost pressures.
We had earnings of $401 million ($0.75 per
share) and generated operating cash flow of $726
million ($1.35 per share) in 2005.
Key Factors Affecting Earnings
| For the years ended December 31 | Refer | |||||||||||
| ($ millions) | to page | |||||||||||
Net income — 2004 |
$ | 248 | ||||||||||
Increase (decrease) |
||||||||||||
Higher realized gold prices |
43 | $ | 255 | |||||||||
Higher sales volumes1 |
43 | 35 | ||||||||||
Higher total cash costs |
44 | (69 | ) | |||||||||
Lower amortization rates per ounce |
50 | 53 | ||||||||||
Lower interest expense |
51 | 12 | ||||||||||
Higher income tax expense2 |
53 | (36 | ) | |||||||||
Special items3 |
41 | (111 | ) | |||||||||
Other |
52 | 14 | ||||||||||
Total increase |
$ | 153 | ||||||||||
Net income — 2005 |
$ | 401 | ||||||||||
| 1. | Impact of changing sales volumes on margin between selling prices, total cash costs and amortization. | |
| 2. | Excluding the impact of the tax effects of special items. | |
| 3. | Special items are post-tax and exclude the impact on the period of deferred stripping accounting changes. |
At year-end, on a pro forma basis, we had proven
and probable reserves, including reserves of 88.6
million ounces at our existing properties and our
acquired interest in Placer Dome reserves of 50.1
million ounces of goldb, of 138.7 million
ounces of golda, b, based on a $400 per
ounce gold price assumption and 6.15 billion pounds
of copperb, after adjusting for the
anticipated sale of certain assets to Goldcorp.
We continued to effectively support and shape
our growth profile, including a focus on Russia and
Central Asia, and to make significant progress on
the development of our new generation of mines. The
Tulawaka, Lagunas Norte and Veladero mines began production in 2005, and we expect our
fourth new mine, Cowal in Australia, to commence its
first gold production in first quarter 2006. We
continued work on advancing our other projects,
including
| a. | Calculated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes, Industry Guide 7, (under the Securities and Exchange Act of 1934), as interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve. Accordingly, for US reporting purposes, Buzwagi is classified as mineralized material. Barrick is currently assessing the implications of conditions contained in the resolution issued by Chilean regulatory authorities approving the environmental impact assessment for the Pascua-Lama project. It is possible that following the completion of such assessment, up to 1 million ounces of mineralization at the Pascua-Lama project may be reclassified from reserves to mineralized material for US reporting purposes. For a breakdown of reserves by category and additional information relating to reserves, see pages 125-129 of this Annual Report. | |
| b. | For a breakdown of Placer Dome’s reserves and resources by category and additional information relating to such reserves and resources, see Placer Dome’s press release of February 20, 2006. Such reserves and resources were calculated by employees of Placer Dome in accordance with National Instrument 43-101, as required by Canadian securities regulatory authorities, and in accordance with Placer Dome’s previously established policies and procedures, and have not been independently verified by Barrick Gold Corporation. Industry Guide 7 (under the Securities and Exchange Act of 1934), as interpreted by Staff of the SEC, applies different standards to classify mineralization as a reserve. Based on a preliminary review, Barrick does not intend to report mineralization at the Pueblo Viejo project as a reserve for US reporting purposes at this time. |
| 40 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Buzwagi and Kabanga in Tanzania, Pascua-Lama in
Chile/Argentina and East Archimedes in Nevada. We
have the capital resources to fund our development
projects without the need for any equity dilution.
In 2005, we issued $50 million of public debt in Peru and drew down $129 million under our Peru
lease and Veladero project financings. We continue
to have the gold mining industry’s only A credit
rating (A–), as rated by Standard & Poor’s.
Special Items — Effect on Earnings Increase (Decrease) ($ millions)
| 2005 | 2004 | 2003 | ||||||||||||||||||||||||||
| Refer to | ||||||||||||||||||||||||||||
| For the years ended December 31 | page | Pre-tax | Post-tax | Pre-tax | Post-tax | Pre-tax | Post-tax | |||||||||||||||||||||
Non-hedge derivative gains |
52 | $ | 6 | $ | 4 | $ | 5 | $ | 9 | $ | 71 | $ | 60 | |||||||||||||||
Gains on sale of investments, interests in
mining properties and Kabanga transaction |
52 | 37 | 35 | 42 | 31 | 40 | 32 | |||||||||||||||||||||
Impairment charges on investments, long-lived
assets and royalty interest |
52 | (16 | ) | (16 | ) | (144 | ) | (99 | ) | (16 | ) | (14 | ) | |||||||||||||||
Changes in asset retirement obligation cost
estimates at closed mines |
52 | (15 | ) | (11 | ) | (22 | ) | (17 | ) | (10 | ) | (10 | ) | |||||||||||||||
Deferred stripping accounting changes |
||||||||||||||||||||||||||||
Cumulative effect |
65 | 6 | 6 | — | — | — | — | |||||||||||||||||||||
Impact on the period compared to previous
policy |
65 | 64 | 44 | — | — | — | — | |||||||||||||||||||||
Resolution of Peruvian tax assessment |
||||||||||||||||||||||||||||
Outcome of tax uncertainties |
53 | — | — | — | 141 | — | — | |||||||||||||||||||||
Reversal of other accrued costs |
53 | — | — | 21 | 15 | — | — | |||||||||||||||||||||
Deferred tax credits |
||||||||||||||||||||||||||||
Change in Australian tax status |
53 | — | 5 | — | 81 | — | — | |||||||||||||||||||||
Release of valuation allowances |
53 | — | 32 | — | 5 | — | 62 | |||||||||||||||||||||
Total |
$ | 82 | $ | 99 | $ | (98 | ) | $ | 166 | $ | 85 | $ | 130 | |||||||||||||||
Cash Flow
In 2005, our cash position decreased by $361 million.
We generated $726 million of operating cash flow,
$217 million higher than in 2004, mainly because of
higher gold sales volumes and realized gold prices,
partly offset by higher total cash costs. Capital
expenditures were $1.1 billion, $280 million higher
than in 2004, due to the levels of construction
activity at our development projects. We received $93
million from financing activities in 2005, including
$92 million in proceeds on the exercise of stock
options and $179 million in proceeds from various
financing facilities used to fund construction at our
development projects, partly offset by $59 million of
scheduled repayments on financing facilities and
dividend payments of $118 million.
Acquisition of Placer Dome
In early 2006, we completed the acquisition of Placer
Dome. We expect that the total cost of
acquisition will be about $10.1 billion. We will
consolidate Placer Dome’s results of operations from
January 20, 2006. Placer Dome is one of the world’s
largest gold mining companies, with gold mineral
reserves of 60.4 million ounces and copper reserves
of 6.15 billion pounds at December 31, 2005. Placer
Dome produced 3.6 million ounces of gold and 359
million pounds of copper in 2005. It has 12 producing
mines based in North America, South America, Africa
and Australia/New Guinea, and three significant
projects that are in various stages of
exploration/development. Its most significant mines
are Cortez in the United States, Zaldívar in Chile,
Porgera in New Guinea, North Mara in Tanzania and
South Deep in South Africa. The most significant
projects are Cortez Hills and Donlin Creek in the
United States, and Pueblo
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 41 |
Viejo in the Dominican Republic. We plan to
sell Placer Dome’s Canadian mines to Goldcorp Inc.
(“Goldcorp”), as well as certain other interests in
mineral properties. As at February 17, 2006, Placer
Dome had a committed gold hedge position totaling
approximately 6.2 million ounces. We plan to focus
on reducing this acquired hedge position further
over time, consistent with the plans for our
existing gold hedge position.
We believe that the business combination between
Barrick and Placer Dome is a unique opportunity to
create a Canadian-based leader in the global gold
mining industry. This business combination further
strengthens our position in the industry, with
respect to reserves, production, our development
pipeline and balance sheet. We expect that the
combination will yield synergies from the combined
companies of approximately $200 million annually
beginning in 2007. We expect to realize the synergies
in the following areas:
| n | Operations — through the optimization and sharing of mining and processing infrastructure in common jurisdictions, including Nevada, Australia and Tanzania; | |
| n | Exploration — by carefully assessing our exploration spending and focusing on the most prospective areas and reducing the overall exploration spending of the combined enterprise; | |
| n | Administration — by eliminating duplication of offices and overheads; | |
| n | Procurement — through the improved purchasing power of the larger enterprise; and | |
| n | Finance and Tax — by realizing tax synergies in certain jurisdictions, opportunities for debt optimization and a lower overall cost of capital resulting from a larger balance sheet. |
Sale of Certain Placer Dome Operations to Goldcorp
Goldcorp has agreed, subject to certain
conditions, to acquire all of Placer Dome’s Canadian
operations (other than its offices in Vancouver and
Toronto), including all mining, reclamation and
exploration properties, Placer Dome’s interest in
the La Coipa mine in Chile, and a 40% interest in
the Pueblo Viejo project in the Dominican Republic,
for cash consideration of about $1.5 billion. We
expect that the sale of these operations to Goldcorp
will close in the first half of 2006. Until closing,
we expect to consolidate the results of these
operations, and we do not expect to record any
significant gain or loss on closing of the sale.
Selected Pro Forma Consolidated Financial Information (Unaudited)
| Pro forma | ||||||||||||||||
| combined | ||||||||||||||||
| As reported | Pro forma | Barrick/ | ||||||||||||||
| ($ millions, except per share data in dollars) | Barrick | Placer Dome | adjustments1 | Placer Dome | ||||||||||||
Income statement — For the year ended December 31, 2005 |
||||||||||||||||
Sales |
||||||||||||||||
Gold |
$ | 2,350 | $ | 1,458 | $ | (251 | ) | $ | 3,557 | |||||||
Copper |
— | 520 | — | 520 | ||||||||||||
Total sales |
2,350 | 1,978 | (251 | ) | 4,077 | |||||||||||
Costs and expenses |
1,853 | 1,781 | (240 | ) | 3,394 | |||||||||||
Income before income taxes and other items |
455 | 113 | (12 | ) | 580 | |||||||||||
Net income |
401 | 80 | 8 | 489 | ||||||||||||
Net income per share — basic and diluted |
0.75 | 0.18 | 0.57 | |||||||||||||
Balance sheet — As at December 31, 2005 |
||||||||||||||||
Cash |
1,037 | 880 | 308 | 2,225 | ||||||||||||
Other current assets |
711 | 769 | (31 | ) | 1,449 | |||||||||||
Non-current assets |
5,114 | 4,045 | (978 | ) | 8,181 | |||||||||||
Unallocated purchase price |
— | — | 7,221 | 7,221 | ||||||||||||
Current liabilities |
560 | 546 | 1 | 1,107 | ||||||||||||
Long-term debt |
1,721 | 1,107 | — | 2,828 | ||||||||||||
Other non-current liabilities |
731 | 801 | 998 | 2,530 | ||||||||||||
Net assets |
$ | 3,850 | $ | 3,240 | $ | 5,521 | $ | 12,611 | ||||||||
| 1. | Adjustments to reflect certain estimated effects of purchase accounting and the estimated effects of the sale of certain Placer Dome operations to Goldcorp. See note 3 to the Financial Statements for details. |
| 42 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
The pro forma information has been presented
for illustrative purposes only to show the effect of
the acquisition of 100% of Placer Dome by Barrick as
though it had occurred on January 1, 2005 for the
pro forma unaudited selected income statement
information. The unaudited selected balance sheet
information as at December 31, 2005 was prepared
using the consolidated balance sheets of Barrick and
Placer Dome as at December 31, 2005. Certain
adjustments have been reflected in this pro forma
information to illustrate the effects of harmonizing
accounting policies and purchase accounting, and to
reflect the impact of the sale of certain Placer
Dome operations to Goldcorp, where the impact could
be reasonably estimated. We will complete an
exercise to value the identifiable assets and
liabilities acquired, including any goodwill that
may arise upon the acquisition.
This unaudited pro forma consolidated financial
statement information is not intended to be
indicative of the results that would actually have
occurred, or the results expected in future periods.
Results of operations for Placer Dome could differ
materially from those recorded in 2005 due to the
effects of purchase accounting, the harmonization of
Placer Dome’s accounting policies with Barrick’s
accounting policies, and other factors such as the
key economic trends described on pages 34 to 39. As
a result of the bid process, Placer Dome’s 2005
income statement reflects approximately $21 million
of non-recurring transaction-related costs. Any
potential synergies that may be realized, and
integration costs that may be incurred, have been
excluded from the pro forma information. The information prepared is only a summary, and
more details can be found in note 3 to the Financial
Statements.
2006 Outlook
In 2006, we expect to produce between 8.6 to 8.9
million ounces of gold at total cash costs of $275
to $290 per ounce and approximately 350 million
pounds of copper at total cash costs of about $1.10
per pound including the contribution from the Placer
Dome operations after adjusting for the sale of
certain operations to Goldcorp. Copper total cash
costs per pound include the impact of purchase
accounting fair value adjustments. Excluding these
one-time, non-cash accounting adjustments, copper cash costs would be lower by approximately $0.35 per
pound. The overall average total cash costs per
ounce of Placer Dome’s gold production is higher
than the average for the existing Barrick mines, and
consequently, we expect that the overall average
total cash costs per ounce of our gold production
will increase following the acquisition. We expect
the overall amortization expense may increase
following the completion of the purchase price
allocation.
Consolidated Gold Production and Sales
By replacing gold reserves depleted by
production year over year, we can maintain
production levels over the long term. If depletion
of reserves exceeds discoveries over the long term,
then we may not be able to sustain gold production
levels. Reserves can be replaced by expanding known
ore bodies, acquiring mines or properties or
locating new deposits. Once a site with gold
mineralization is discovered, it may take several
years from the initial phases of drilling until
production is possible, during which time the
economic feasibility of production may change.
Substantial expenditures are required to establish
proven and probable reserves and to construct mining
and processing facilities. Given that gold
exploration is speculative in nature, some
exploration projects may prove unsuccessful.
Our financial performance is affected by our
ability to achieve targets for production volumes and total cash costs. We prepare estimates of future
production and total cash costs of production for our
operations. These estimates are based on mine plans
that reflect the expected method by which we will
mine reserves at each mine, and the expected costs
associated with the plans. Actual gold production and
total cash costs may vary from these estimates for a
number of reasons, including if the volume of ore
mined and ore grade differs from estimates, which
could occur because of changing mining rates; ore
dilution; metallurgical and other ore
characteristics; and short-term mining conditions
that require different sequential development of ore
bodies or mining in different areas of the mine.
Mining rates are impacted by various risks and
hazards inherent at each operation, including natural
phenomena such as inclement weather conditions,
floods, and earthquakes and unexpected labor
shortages or strikes. Total cash costs per ounce are
also affected
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 43 |
by ore metallurgy that impacts gold recovery
rates, labor costs, the cost of mining supplies and
services, foreign currency exchange rates and
stripping costs incurred during the production phase
of the mine. In the normal course of our operations,
we attempt to manage each of these risks to mitigate,
where possible, the effect they have on our operating
results.
In the first half of 2005, ounces produced and
sold were similar to the first half of 2004. In the
second half of 2005 compared to the same period in
2004, ounces produced increased by about 32%, while
ounces sold increased by 26% as production and
sales began at Lagunas Norte and increased at the
Goldstrike Open Pit while only production began at
Veladero.
In 2005, we sold most of our production at
market prices, and delivered approximately 0.8
million ounces into gold sales contracts. We
realized an average gold sales price of $439 per
ounce, $48 higher than in 2004, mainly due to
higher market gold prices. The price realized for
gold sales in 2006 and beyond will depend on market
conditions and the selling prices of any gold sales contracts into which we voluntarily
deliver, which could be below prevailing spot
market prices.
Consolidated Total Cash Costs per Ounce2
| (in dollars per ounce) | ||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | |||||||||
Cost of gold sales1 |
$ | 255 | $ | 248 | $ | 210 | ||||||
Currency/commodity hedge gains |
(21 | ) | (19 | ) | (12 | ) | ||||||
By-product credits |
(25 | ) | (30 | ) | (21 | ) | ||||||
Royalties/mining taxes |
16 | 13 | 12 | |||||||||
Accretion/other costs |
2 | 2 | 2 | |||||||||
Total cash costs2 |
$ | 227 | $ | 214 | $ | 191 | ||||||
| 1. | At market currency exchange and commodity rates. | |
| 2. | Total cash costs per ounce excludes amortization — see page 45. |
Total cash costs for 2005 were in line with the
original full-year guidance, but higher than in
2004, primarily due to inflationary cost pressures
experienced in 2005, partly offset by the start-up
of low-cost production from Lagunas Norte, the
availability of higher-grade ore at Goldstrike Open
Pit, and the impact of the change in accounting for
stripping costs (see page 65).
Total Cash Costs Performance Measures
Total cash costs include all costs absorbed into
inventory, including royalties, by-product credits,
mining taxes and accretion expense, except for
amortization. Total cash costs per ounce is
calculated by dividing the aggregate of these costs
by gold ounces sold. Total cash costs and total cash
costs per ounce are calculated on a consistent basis
for the periods presented. On our income statement we
present amortization separately from cost of sales.
Some companies include amortization in cost of sales,
which results in a different measurement of cost of
sales on the income statement. We have provided below
a reconciliation to illustrate the impact of
excluding amortization from cost of sales and total
cash costs per ounce statistics.
In managing our mining operations, we
disaggregate cost of sales between amortization and
the other components of cost of sales. We use total
cash costs per ounce statistics as a key performance
measure internally to monitor the performance of our mines. We use the statistics to assess how
well our mines are performing against internal plans,
and also to assess the overall effectiveness and
efficiency of our mining operations. We also use
amortization cost per ounce statistics to monitor
business performance. By disaggregating cost of sales
into these two components and separately monitoring
them, we are able to better identify and address key
performance trends. We believe that the presentation
of these statistics in this manner in our MD&A,
together with commentary explaining trends and
changes in the statistics, enhances the ability of
investors to assess our performance. These statistics
also enable investors to better understand
year-on-year changes in cash production costs, which
in turn affect our profitability and ability to
generate cash flow.
The principal limitation associated with total
cash costs per ounce statistics is that they do not
reflect the total costs to produce gold, which in
turn impacts the earnings of Barrick. We believe
that we have compensated for this limitation by
highlighting the fact that total cash costs exclude
amortization as well as providing details of the
financial effect. We believe that the benefits of
providing disaggregated information outweigh the
limitation in the method of presentation of total
cash costs per ounce statistics.
| 44 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Total cash costs per ounce statistics are
intended to provide additional information and
should not be considered in isolation or as a
substitute for measures of performance prepared in
accordance with US GAAP. The measures are not
necessarily indicative of operating profit or cash
flow from operations as determined under US GAAP.
Other companies may calculate these measures
differently.
Illustration of Impact of Excluding Amortization
from Total Cash Costs Per Ounce
| ($ millions, except per ounce | ||||||||
| information in dollars) | ||||||||
| For the years ended December 31 | 2005 | 2004 | ||||||
Cost of sales per Barrick income statement |
$ | 1,214 | $ | 1,047 | ||||
Amortization at producing mines |
409 | 425 | ||||||
Cost of sales including amortization |
$ | 1,623 | $ | 1,472 | ||||
Ounces sold (thousands) |
5,320 | 4,936 | ||||||
Total cash costs per ounce as reported |
$ | 227 | $ | 214 | ||||
Amortization per ounce |
76 | 86 | ||||||
Cost of sales (including amortization)
per ounce |
$ | 303 | $ | 300 | ||||
Results of Operating Segments
In our Financial Statements, we present a
measure of historical segment income that reflects
gold sales at average consolidated realized gold
prices, less segment expenses and amortization of
segment property, plant and equipment. Our segments
mainly include producing mines and development
projects. We monitor segment expenses using “total
cash costs per ounce” statistics that represent
segment cost of sales divided by ounces of gold sold
in each period. The discussion of results for
producing mines focuses on this statistic in
explaining changes in segment expenses, and should
be read in conjunction with the mine statistics
presented on pages 26-27.
Conducting mining activities in certain
countries outside North America subjects us to
various risks and uncertainties that arise from
carrying on business in foreign countries
including: uncertain political and economic
environments; war and civil disturbances; changes
in laws or fiscal policies; interpretation of
foreign taxation legislation; and tax implications on repatriation of foreign
earnings. We monitor these risks on an ongoing basis
and mitigate their effects where possible, but
events or changes in circumstances could materially
impact our results and financial condition.
For development projects, we prepare estimates
of capital expenditures, reserves and costs to
produce reserves. We also assess the likelihood of
obtaining key governmental permits, land rights and
other government approvals. Estimates of capital
expenditures are based on studies completed for each
project, which also include estimates of annual
production and production costs. Adverse changes in
any of the key assumptions in these studies or other factors could affect estimated capital
expenditures, production levels and production
costs, and also the economic feasibility of a
project. We take steps to mitigate potentially
adverse effects of changes in assumptions or other
factors. Prior to the commencement of production,
the segment results for development projects reflect
expensed mine start-up costs.
North America
In 2005, the region produced 2,863,000 ounces (2004:
2,963,000 ounces) at total cash costs of $244 per
ounce (2004: $223 per ounce). Gold production in 2005
was within full-year production guidance and slightly
lower than 2004 as higher production at Goldstrike
Open Pit was offset by slightly lower production at
Goldstrike Underground, the processing of fewer tons
at Eskay Creek in 2005 and the cessation and sale of
mining operations at Holt-McDermott in 2004. In 2005,
total cash costs per ounce increased over 2004 due to
lower production levels at Goldstrike Underground and
inflationary cost pressures, partly offset by higher
toll milling credits and the impact of the change in
accounting for stripping costs (see page 65). Total
cash costs per ounce were slightly better than the
full-year guidance as a result of higher production
at Goldstrike Open Pit, partly offset by higher costs
at Goldstrike Underground and Round Mountain.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 45 |
Goldstrike Open Pit, United States
Production was higher in 2005 than 2004 as a result
of mining in areas of the pit with higher ore
grades, on completion of the ninth west layback in
the second half of the year, partly offset by lower
tons processed in the first half of the year due to
above average rainfall that impacted mining rates,
harder ore encountered that impacted milling rates,
and higher toll milling volumes in 2005. Total cash
costs per ounce in 2005 were lower than both
guidance and 2004 due to the higher production
levels and higher toll milling credits, as well as
the impact of the change in accounting for
stripping costs (see page 65), partly offset by the
impact of inflationary cost pressures and higher
royalties due to higher market gold prices.
Goldstrike Underground, United States
In 2005, there was an increase in drift-and-fill
mining due to mine sequencing changes to compensate
for difficult ground conditions. Lower mining rates
due to the increase in drift-and-fill mining, as
well as a temporarily plugged backfill raise, were
partly offset by a drawdown of stockpiles in the
first half of 2005, resulting in lower gold
production than guidance and 2004. Lower production
levels combined with inflationary cost pressures,
higher ground support costs due to difficult ground
conditions, an increase in drift-and-fill mining,
and higher royalty costs due to higher market gold
prices, resulted in higher total cash costs per
ounce in 2005 than in 2004, and slightly higher than
the guidance for 2005.
Western 102 Power Plant in Nevada, United States
The 115-megawatt natural gas-fired power plant in
Nevada to supply our Goldstrike mine was completed
and began operating in December 2005. The
construction cost was $96 million.
Eskay Creek, Canada
As the mine approaches the end of its reserve life in
2008, lower availability of high-grade
direct-to-smelter ore resulted in the mining of more
lower-grade ore tons, leading to lower gold
production in 2005. Total cash costs per ounce in
2005 were lower than the guidance for the year, but
higher than in 2004 due to the lower production
levels and lower silver by-product credits
(volume-related), partly offset by lower smelter
costs and higher silver prices.
Round Mountain (50% Owned), United States
In 2005, higher recoveries of gold from ore placed on
the leach pad were offset by slightly lower tons
placed on the pad, resulting in slightly lower
production in 2005 over 2004. Tons processed and
recovery rates each period do not necessarily
correlate to the ounces produced in the period as
there is a time delay between placing tons on the
leach pad and producing gold. Total cash costs per ounce were slightly lower than the guidance for 2005,
although higher than 2004, mainly due to the impact
of inflationary cost pressures and the change in
accounting for stripping costs (see page 65). The
joint venture partners have agreed to proceed with a
pit expansion project, resulting in an increase in
gold reserves, and an extension of the expected mine
life from 2010 to 2015.
East Archimedes, United States
In 2004, we made a decision to proceed with the East
Archimedes project in Nevada. The project is an
open-pit, heap leach operation exploiting the East
Archimedes deposit, a deeper continuation of the ore
mined previously at Ruby Hill. Construction capital
is estimated at about $75 million over an expected
two-year construction phase. Gold production is
expected to commence by mid-2007. Project highlights
include:
| n | Construction capital costs of $35 million were incurred in 2005. | |
| n | The workforce is in place and all major equipment is in service. | |
| n | The remaining balance of the mining fleet was received in fourth quarter 2005. | |
| n | Pre-strip activities are in progress. |
| 46 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
South America
The region produced 1,234,000 ounces in 2005 (2004:
646,000 ounces) at total cash costs of $126 per
ounce (2004: $111 per ounce). After achieving
production start-up ahead of schedule in mid-June
2005, Lagunas Norte made a significant contribution
to the region’s results in the second half of 2005.
Veladero had its first gold pour in September 2005
and commenced full production in fourth quarter
2005. We expect these two mines to make a
significant contribution to production for the
region in 2006 and beyond. In 2005, gold production
exceeded guidance for the year due to higher than expected production at Pierina, while
total cash costs per ounce were within the range of
guidance provided for the year. Total cash costs per
ounce were higher than 2004 due to higher total cash
costs per ounce at Pierina.
Pierina, Peru
Although mining at Pierina occurred in higher-grade
areas of the pit in 2005, lower quantities of
run-of-mine ore were placed on the leach pad than in
2004, which led to slightly lower production in
2005. Total cash costs per ounce increased over 2004
due to the impact of inflationary cost pressures,
combined with the impact of higher equipment
maintenance, labor and ground support costs, partly
offset by higher silver by-product credits and the
positive impact of the change in accounting for
stripping costs (see page 65). Mining costs per ton
of ore were higher in 2005 as tons of waste mined
increased over 2004. Gold production and total cash
costs per ounce in 2005 were slightly higher than
guidance.
Lagunas Norte, Peru
The Lagunas Norte mine achieved start-up in June
2005, ahead of schedule, with a capital
construction cost of $323 million. Lagunas Norte
produced 550,000 ounces in 2005, at total cash
costs of $110 per ounce, with the mining of
higher-grade near-surface ore. Both gold
production and total cash costs per ounce were
within the range of guidance for the year.
Veladero, Argentina
The Veladero mine had its first gold pour, ahead of
schedule, in September 2005. Commissioning
activities are complete and the mine is ramping up
production levels. Capital construction costs for
the project were $547 million. The mine produced
56,000 ounces in 2005.
Pascua-Lama, Chile/Argentina
In 2004, we made a decision to proceed with the
development of the Pascua-Lama project in Chile/
Argentina, contingent on obtaining the necessary
permits, approvals and fiscal regimes. We recently received approval of the environmental impact
assessment from Chilean environmental regulatory
authorities and we are committed to working within
the framework of the Resolution granted to us. The
Resolution, which was issued on February 17, 2006,
imposes certain conditions in connection with the
development of the project. We are currently
assessing the implications of such conditions and it
is possible that, following completion of such
assessment, reserves for US reporting purposes could
be reduced by up to 1 million ounces. It is expected
that reserves for Canadian reporting purposes would
remain unchanged. Approval of the environmental
impact assessment by Argentine regulatory authorities
is targeted for second quarter 2006. The timing of
receipt of such approval, as well as the resolution
of some of the other external issues, such as
permitting and licensing, cross-border operating
issues and fiscal, tax and royalty issues are largely
beyond our control.
Capital and operating cost estimates for the
Pascua-Lama project were based on the cost and
commodity price environment prevailing at the time of
the updated feasibility study, which was finalized in
June 2004. The design of the project has been
optimized in the course of the permitting process to
incorporate additional operating and construction
efficiencies, additional environmental mitigation
measures, and other project improvements. We are in
the course of updating cost estimates to reflect such
changes, inflationary cost pressures and higher
commodity prices. Although such factors will result
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 47 |
in some increase in capital and operating
cost estimates, based on the current cost and
commodity price environment, and combined with
other efficiencies, we do not expect significant
changes to the overall economics of the project.
Australia/Africa
The region produced 1,332,000 ounces in 2005 (2004:
1,349,000 ounces) at total cash costs of $280 per
ounce (2004: $243 per ounce). Lower production in
2005 was mainly due to the discontinuation of open
pit mining at Plutonic in second quarter 2005 and lower production at
Kalgoorlie in the second half of the year, partly
offset by new production from Tulawaka. Total cash
costs per ounce were higher in 2005 mainly because
of inflationary cost pressures, higher exchange
rates under hedge contracts, lower tons mined and
produced at Bulyanhulu and lower production levels
at Plutonic after open-pit mining ended in second
quarter 2005.
Kalgoorlie (50% Owned), Australia
Mill throughput was higher in 2005 due to lower
maintenance downtime than in 2004; but gold
production was lower in 2005 than 2004. Lower
production was the result of mining in lower-grade
areas of the pit and lower recovery rates experienced
in the second half of 2005, partly offset by higher
mill throughput due to improved mill utilization and
the positive impact of finer ore sizes. Total cash
costs per ounce were within the range of guidance for
2005. The combined impact of lower production levels,
inflationary cost pressures and higher exchange rates
under hedge contracts, and the effect of the change
in accounting for stripping costs (see page 65),
resulted in higher total cash costs per ounce in 2005
than in 2004. We are assessing process changes,
controls and other management measures for the roaster facility to reduce mercury
emissions. Kalgoorlie has installed a first-stage
mercury scrubber on its carbon kiln and is assessing
the performance of that unit to determine what
additional steps might be appropriate. The
assessment is continuing, after which we will be
able to estimate any capital requirements and
operating cost impact associated with such measures.
Plutonic, Australia
Gold production at Plutonic was lower in 2005, as
the mine processed fewer tons of ore after open-pit
mining ended in second quarter 2005, also resulting
in a higher proportion of ore feed from the
underground, which is of a higher grade than
open-pit ore. Total cash costs per ounce were higher
in 2005 than 2004, mainly due to the combined effect
of the lower gold production levels, higher equipment maintenance, higher exchange rates under
hedge contracts and inflationary cost pressures,
partly offset by lower operating costs related to
cessation of open-pit mining and the impact of the
change in accounting for stripping costs (see page
65). Total cash costs per ounce were slightly higher
than guidance while gold production was within the
guidance range.
Bulyanhulu, Tanzania
Gold production was lower in 2005, mainly due to a
combination of lower tons mined and lower ore
grades. Tons mined were lower in 2005, mainly due to
reduced equipment availability, a hoist gearbox
failure and labor issues due to roster changes in
2005. Ore grades were also lower in 2005 as tons
were mined from lower-grade stopes. Total cash costs
per ounce in 2005 were higher than guidance and 2004
due to the lower gold production levels,
inflationary cost pressures and higher
administration and underground maintenance costs.
| 48 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Cowal, Australia
The Cowal project in Australia remains on schedule
for its first gold production in first quarter
2006. Construction costs are anticipated to be
about ten per cent over the guidance of about $305
million as a result of the impact of inflationary
cost pressures in Australia. We have been taking
steps to mitigate cost increases where possible.
Project highlights at the end of 2005 include:
| n | Capitalized costs, including capitalized interest, were $258 million in 2005. | |
| n | Construction of the systems necessary to process oxide ore were over 85% complete. | |
| n | Pre-commissioning of the process plant started in mid-December 2005 and the electrical transmission line was commissioned in January 2006. | |
| n | Plant-site concrete and buildings were 98% complete. | |
| n | About one million tons of ore have been stockpiled to date. |
Buzwagi, Tanzania
The drill program at Buzwagi is substantially
complete and the results are being compiled. A
pre-feasibility study is complete and will be used
to support a reserve of 2.4 million ounces under
Canadian reporting standards.1 The
permitting process is underway with the Tanzanian
authorities and an engineering project consultant
has been assigned to initiate a feasibility study
to support a production decision.
Kabanga (50% Owned), Tanzania
In April 2005, we entered into a joint-venture
agreement with Falconbridge Limited (“Falconbridge”)
with respect to the Kabanga nickel deposit and
related concessions in Tanzania. Falconbridge
acquired a 50% indirect interest in respect of the
Kabanga project for $15 million cash and a funding
commitment. Falconbridge will be the operator of the joint venture. In 2004, the Kabanga project
had an estimated inferred resource of 26.4 million
tonnes grading 2.6% nickel.1 This
resource is currently being updated, based on the
field work to be completed in 2006.
Over the next several years, Falconbridge has
agreed to fund and conduct a further $50 million
work plan that will include additional exploration
and infill drilling, and technical work to update
the resource model for Kabanga and bring the project
towards feasibility. Falconbridge has initiated the
establishment of a dedicated team in Tanzania to
coordinate and advance the work plan. After
expenditure of $50 million, Falconbridge will decide
on whether to proceed with the project. If
Falconbridge proceeds with the project, they will
fund the next $95 million of any project development
expenditures to advance the Kabanga project.
Thereafter, Falconbridge and Barrick will share
equally in joint-venture revenues and expenditures.
Russia/Central Asia
In 2005, we continued to focus on developing our
operations in the region. In April 2005, we spent
$50 million to increase our ownership in Highland
Gold Mining PLC (“Highland Gold”) from 14% to 20%.
Our 20% ownership interest is reflected in our
Financial Statements and production statistics on an
equity basis. We continue to work with Highland Gold
on projects where we have the option to acquire a
joint interest. We established a project office in
Moscow and appointed a Regional Vice President to
lead the development of our business in the region.
| 1. | Calculated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes, Industry Guide 7 (under the Securities Exchange Act of 1934), as interpreted by the Staff of the SEC, applies different standards in order to classify mineralization as a reserve. Accordingly, for US reporting purposes, Buzwagi is classified as mineralized material. For additional information on reserves see the tables on pages 126-129. |
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 49 |
Other Costs and Expenses
Exploration, Development and Business Development Expense
| ($ millions) | ||||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | Comments on significant trends and variances | ||||||||||
Exploration |
||||||||||||||
North America |
$ | 29 | $ | 26 | $ | 19 | 2005 vs 2004 — Higher activity at Goldstrike. 2004 vs 2003 — Higher activity at Goldstrike, Eskay Creek and Round Mountain. | |||||||
Australia/Africa |
41 | 38 | 22 | 2005 vs 2004 — Higher activity at Bulyanhulu. 2004 vs 2003 — Higher activity in Tanzania, primarily at the Buzwagi project. | ||||||||||
South America |
19 | 20 | 19 | |||||||||||
Russia/Central Asia |
6 | 5 | 4 | 2005 vs 2004 — Higher activity to support development of the new business unit. | ||||||||||
Other countries |
3 | 1 | — | |||||||||||
Mine development |
12 | 22 | 53 | 2005 vs 2004 — In 2004, we expensed Lagunas Norte development costs totaling $9 million until May 1, when the project achieved the criteria to classify mineralization as a reserve for US reporting purposes. 2004 vs 2003 — In 2003, we expensed development costs at Lagunas Norte totaling $29 million, and at Veladero totaling $18 million until October 2003 when the project achieved the criteria to classify mineralization as a reserve for US reporting purposes. | ||||||||||
Non-capitalizable project costs |
16 | 7 | — | Non-capitalizable costs mainly represent items incurred in the development/construction phase that cannot be capitalized. | ||||||||||
Business development/other |
15 | 22 | 20 | 2005 vs 2004 — Decrease in overhead costs associated with the administration of exploration and development programs. | ||||||||||
Total |
$ | 141 | $ | 141 | $ | 137 | ||||||||
Amortization Expense
| Incr. (decr.) | ||||||||||||||||||||||||||
| ($ millions, except per | due to | |||||||||||||||||||||||||
| ounce amounts in dollars) | ||||||||||||||||||||||||||
| For the years ended | 2005 | Sales | 2004 | 2005 | 2004 | |||||||||||||||||||||
| December 31 | Amount | volumes1 | Other | Amount | Per ounce | Per ounce | Comments on other variances | |||||||||||||||||||
Goldstrike Open Pit |
$ | 90 | $ | 3 | $ | 4 | $ | 83 | $ | 60 | $ | 61 | Capital additions in 2005, partly offset by an increase in reserves. | |||||||||||||
Goldstrike Underground |
60 | (6 | ) | — | 66 | 119 | 120 | Capital additions in 2005, offset by an increase in reserves. | ||||||||||||||||||
Eskay Creek |
26 | (21 | ) | (4 | ) | 51 | 153 | 176 | Writedown of book value in 2004, partly offset by an increase in amortization due to a decrease in reserves. | |||||||||||||||||
Round Mountain |
17 | — | — | 17 | 45 | 47 | Capital additions in 2005, offset by an increase in reserves. | |||||||||||||||||||
Lagunas Norte |
29 | 29 | — | — | 53 | — | ||||||||||||||||||||
Pierina |
72 | (2 | ) | (33 | ) | 107 | 115 | 165 | Increase in reserves and transfer of certain assets to Lagunas Norte in 2005. | |||||||||||||||||
Kalgoorlie |
20 | (3 | ) | 3 | 20 | 49 | 44 | Capital additions in 2005. | ||||||||||||||||||
Plutonic |
10 | (2 | ) | 1 | 11 | 39 | 34 | Capital additions in 2005. | ||||||||||||||||||
Bulyanhulu |
34 | (2 | ) | 2 | 34 | 113 | 100 | Capital additions in 2005. | ||||||||||||||||||
Other mines |
51 | 13 | 2 | 36 | 63 | 59 | ||||||||||||||||||||
Sub total |
409 | 9 | (25 | ) | 425 | |||||||||||||||||||||
Corporate assets |
18 | 27 | ||||||||||||||||||||||||
Total |
$ | 427 | $ | 452 | ||||||||||||||||||||||
| 1. | For explanation of changes in sales volumes refer to page 43. |
| 50 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Amortization Expense (cont’d)
| ($ millions, except per | Incr. (decr.) | |||||||||||||||||||||||||
| ounce amount in dollars) | due to | |||||||||||||||||||||||||
| For the years ended | ||||||||||||||||||||||||||
| December 31 | 2004 | Sales | 2003 | 2004 | 2003 | |||||||||||||||||||||
| Amount | volumes1 | Other | Amount | Per ounce | Per ounce | Comments on other variances | ||||||||||||||||||||
Goldstrike Open Pit |
$ | 83 | $ | (4 | ) | $ | — | $ | 87 | $ | 61 | $ | 53 | Capital additions in 2004, partly offset by an increase in reserves. | ||||||||||||
Goldstrike Underground |
66 | (6 | ) | (1 | ) | 73 | 120 | 122 | Increase in reserves, partly offset by capital additions in 2004. | |||||||||||||||||
Eskay Creek |
51 | (8 | ) | 12 | 47 | 176 | 132 | Decrease in reserves and capital additions in 2004. | ||||||||||||||||||
Round Mountain |
17 | — | (3 | ) | 20 | 47 | 54 | Increase in reserves, and a decrease in property, plant and equipment as amortization exceeds capital additions in the year. | ||||||||||||||||||
Pierina |
107 | (48 | ) | (11 | ) | 166 | 165 | 182 | Increase in reserves. | |||||||||||||||||
Kalgoorlie |
20 | 1 | (1 | ) | 20 | 44 | 48 | Increase in reserves. | ||||||||||||||||||
Plutonic |
11 | — | 1 | 10 | 34 | 31 | Capital additions in 2004, partly offset by an increase in reserves. | |||||||||||||||||||
Bulyanhulu |
34 | 3 | (6 | ) | 37 | 100 | 123 | |||||||||||||||||||
Other mines |
36 | (3 | ) | 2 | 37 | 59 | 57 | Capital additions at Hemlo and Marigold. | ||||||||||||||||||
Sub total |
425 | (65 | ) | (7 | ) | 497 | ||||||||||||||||||||
Corporate assets |
27 | 25 | ||||||||||||||||||||||||
Total |
$ | 452 | $ | 522 | ||||||||||||||||||||||
| 1. | For explanation of changes in sales volumes refer to page 43. |
Corporate Administration, Interest Income and Interest Expense
| ($ millions) | ||||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | Comments | ||||||||||
Corporate administration |
$ | 71 | $ | 71 | $ | 73 | 2004 vs 2003 — Severance costs of $9 million in 2003, with higher regulatory compliance costs in 2004. | |||||||
Interest income |
(38 | ) | (25 | ) | (31 | ) | 2005 vs 2004 — Increase in the average cash balance, combined with an increase in market interest rates. 2004 vs 2003 — Lower average cash balances in 2004, combined with higher gains on cash hedges in 2003. | |||||||
Interest costs |
||||||||||||||
Incurred |
125 | 60 | 49 | Increase mainly due to new financing put in place in 2004 and 2005. Average long-term debt outstanding increased from $0.8 billion in 2003 to $0.9 billion in 2004 to $1.8 billion in 2005. | ||||||||||
Capitalized |
(118 | ) | (41 | ) | (5 | ) | 2005 vs 2004 — Increased amounts were capitalized in 2005 to Pascua-Lama, Cowal, Veladero, and Lagunas Norte development projects as construction costs were incurred and capitalized. Capitalization at Lagunas Norte ceased in third quarter 2005, while capitalization at Veladero ceased in fourth quarter 2005. Average book value of these four projects was $1.3 billion in 2005 and $0.6 billion in 2004. 2004 vs 2003 — Higher amounts were capitalized at development projects due to construction costs capitalized in 2004, and capitalization at Pascua-Lama from July 1, 2004. | |||||||
Expensed |
$ | 7 | $ | 19 | $ | 44 | We expect interest expense to increase in 2006 over 2005 as Lagunas Norte and Veladero started production and ceased interest capitalization in third quarter and fourth quarter 2005, respectively. | |||||||
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 51 |
Impairment of Long-lived Assets
| ($ millions) | ||||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | Comments | ||||||||||
Impairment charge — Eskay Creek |
$ | — | $ | 58 | $ | — | In 2004, we completed an impairment test for the Eskay Creek mine, due to a downward revision to reserves, the continued weakening of the US dollar that impacts Canadian dollar operating costs, and upward revisions in asset retirement obligation costs. | |||||||
Impairment charge — Peruvian
exploration properties |
— | 67 | — | We completed an impairment test in 2004 on a group of Peruvian exploration-stage properties based on finalization of the exploration program for the year and an updated assessment of future plans for the property. | ||||||||||
Impairment charge — other |
— | 14 | 5 | 2004 includes writedown on various exploration-stage properties. | ||||||||||
Total |
$ | — | $ | 139 | $ | 5 | ||||||||
Other (Income) Expense
| ($ millions) | ||||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | Comments | ||||||||||
Non-hedge derivative gains |
$ | (6 | ) | $ | (5 | ) | $ | (71 | ) | The gains and losses arise primarily due to changes in commodity prices, currency exchange rates and interest rates. | ||||
Gains on asset sales |
(5 | ) | (36 | ) | (36 | ) | In 2005, we sold certain land positions in Australia. In 2004, we sold various mining properties, including the Holt-McDermott mine in Canada and certain land positions around our inactive mine sites in the United States. In 2003, we sold various mining properties, including several land positions around inactive mine sites in the United States, as well as the East Malartic Mill and Bousquet mine in Canada. The majority of these land positions were fully amortized in prior years and therefore any proceeds generated gains on sale, before selling costs and taxes. | |||||||
Gain on Kabanga transaction |
(15 | ) | — | — | Gain recorded in 2005 relates to the closing of a transaction with Falconbridge. | |||||||||
Gains on investment sales |
(17 | ) | (6 | ) | (4 | ) | 2005 vs 2004 — $10 million of the gains in 2005 related to the sale of investments held in a rabbi trust for a deferred compensation plan. Other gains in all years mainly relate to the sale of various other investments. | |||||||
Impairment charges on
investments |
16 | 5 | 11 | 2005 impairment charge relates to the writedown of two investments which were determined to be impaired. 2003 impairment charge relates mainly to investments under a deferred compensation plan. | ||||||||||
Changes in asset retirement
obligations at closed mines |
15 | 22 | 10 | Charges relate to revisions to cost estimates at various closed mines. | ||||||||||
Environmental remediation costs |
13 | 14 | 38 | In 2003, three North American mines shut down and two South American mines had recently shut down, and as a result the expenditures were very high in this year. | ||||||||||
Accretion expense |
10 | 7 | 7 | |||||||||||
Currency translation (gains)
losses |
(3 | ) | 1 | (2 | ) | In 2005, gains reflect the strengthening of the Canadian dollar on monetary assets. | ||||||||
Other items |
59 | 41 | 41 | Includes charges for World Gold Council fee, legal costs for major litigation and certain costs incurred at our regional business units. | ||||||||||
Total |
$ | 67 | $ | 43 | $ | (6 | ) | |||||||
| 52 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Income Taxes
| 2005 | 2004 | 2003 | ||||||||||||||||||||||||||||||||||
| For the years ended December 31 | ||||||||||||||||||||||||||||||||||||
| ($ millions, except percentages) | Income tax | Income tax | Income tax | |||||||||||||||||||||||||||||||||
| Effective income tax rates | Pre-tax | Effective | expense | Pre-tax | Effective | expense | Pre-tax | Effective | expense | |||||||||||||||||||||||||||
| on elements of income | income | tax rate | (recovery) | income | tax rate | (recovery) | income | tax rate | (recovery) | |||||||||||||||||||||||||||
Income tax expense
before elements below |
$ | 455 | 21 | % | $ | 97 | $ | 45 | 53 | % | $ | 24 | $ | 222 | 30 | % | $ | 67 | ||||||||||||||||||
Change in Australian tax status |
(5 | ) | (81 | ) | — | |||||||||||||||||||||||||||||||
Outcome of tax uncertainties |
— | (141 | ) | — | ||||||||||||||||||||||||||||||||
Release of deferred
tax valuation allowances
recorded in prior years |
(32 | ) | (5 | ) | (62 | ) | ||||||||||||||||||||||||||||||
| $ | 60 | $ | (203 | ) | $ | 5 | ||||||||||||||||||||||||||||||
Income tax expense increased in 2005 in
comparison to the tax recoveries in 2004, as the
2004 tax recoveries arose primarily with respect to
the change in Australian tax status and the outcome
of tax uncertainties. Our underlying tax rate
decreased to 21% in 2005 in part due to the impact of a lower amount of deliveries into gold sales
contracts in a low tax-rate jurisdiction at prices
below the prevailing spot market gold price than in
2004. A shift in the geographic mix of gold
production, and therefore income before taxes,
towards jurisdictions with lower tax rates also
contributed to a reduction in the underlying tax
rate.
As gold prices increase, our underlying tax rate
also increases, reaching about 29% with market prices
at or above $475 per ounce. This expected underlying
rate excludes the effect of gains and losses on
non-hedge derivatives, the effect of delivering into
gold sales contracts in a low tax-rate jurisdiction
at prices below prevailing market prices, and any
release of deferred tax valuation allowances.
We record deferred tax charges or credits if
changes in facts or circumstances affect the
estimated tax basis of assets and therefore the
amount of deferred tax assets or liabilities or
because of changes in valuation allowances
reflecting changing expectations in our ability to
realize deferred tax assets. In 2005, we released valuation allowances
totaling $32 million, of which $31 million related
to Argentina, in anticipation of higher levels of
future taxable income after production began at
Veladero, and also due to the impact of higher
market gold prices. In 2004, we recorded a tax
credit of $141 million on final resolution of a
Peruvian tax assessment in our favor, as well as the
reversal of other accrued costs totaling $21 million
($15 million post-tax). We also recorded credits of
$81 million due to a change in tax status in
Australia following an election that resulted in a
revaluation of assets for tax purposes; and also an
election to file tax returns in US dollars, rather
than Australian dollars. In 2005, we revised our
estimate of the revaluation of assets for tax
purposes due to the change in status, and recorded a
further deferred tax credit of $5 million.
The interpretation of tax regulations and
legislation and their application to our business is
complex and subject to change. We have significant
amounts of deferred tax assets, including tax loss
carry forwards, and also deferred tax liabilities.
Potential changes to any of these amounts, as well as our ability to realize deferred tax assets,
could significantly affect net income or cash flow
in future periods. For more information on tax
valuation allowances, see page 71.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 53 |
Quarterly Information
| 2005 | 2004 | |||||||||||||||||||||||||||||||
| ($ millions, except where indicated) | Q4 | Q3 | Q2 | Q1 | Q4 | Q3 | Q2 | Q1 | ||||||||||||||||||||||||
Gold sales |
$ | 776 | $ | 627 | $ | 463 | $ | 484 | $ | 501 | $ | 500 | $ | 454 | $ | 477 | ||||||||||||||||
Net income |
175 | 113 | 53 | 60 | 156 | 32 | 34 | 26 | ||||||||||||||||||||||||
Net income per share — basic (dollars) |
0.33 | 0.21 | 0.10 | 0.11 | 0.30 | 0.06 | 0.06 | 0.05 | ||||||||||||||||||||||||
Net income per share — diluted
(dollars) |
0.32 | 0.21 | 0.10 | 0.11 | 0.29 | 0.06 | 0.06 | 0.05 | ||||||||||||||||||||||||
Our financial results for the last eight
quarters reflect the following general trends:
rising spot gold prices with a corresponding rise in
prices realized from gold sales; and rising gold
production and sales volumes as our new mines began
production in 2005. These historic trends are
discussed elsewhere in this MD&A. The quarterly
trends are consistent with explanations for annual
trends over the last two years. Net income in each
quarter also reflects the timing of various special
items that are presented in the table on page 54.
Fourth Quarter Results
In fourth quarter 2005, we produced 1.65 million
ounces at total cash costs of $221 per ounce1 compared to 1.17 million ounces at total cash
costs of $223 per ounce in the prior-year quarter.
Revenue for fourth quarter 2005 was $776 million on
gold sales of 1.65 million ounces, compared to $501
million in revenue on gold sales of 1.2 million
ounces for the prior-year quarter. Sales volumes
increased due to the contribution from new mines
that began production in 2005. During the quarter,
spot gold prices averaged $486 per ounce. We
realized an average price of $467 per ounce during
the quarter compared to $417 per ounce in the
prior-year quarter mainly due to higher spot gold
prices. Earnings for fourth quarter 2005 were $175
million ($0.32 per share on a diluted basis), $19
million ($0.03 per share on a diluted basis) higher
than the prior-year quarter. The increase in earnings over the prior-year
quarter reflects higher gold sales volumes and
realized gold prices, partly offset by the impact
of special items.
Effect on Earnings Increase (Decrease)
| Three months ended December 31 | ||||||||||||||||
| 2005 | 2004 | |||||||||||||||
| ($ millions) | Pre-tax | Post-tax | Pre-tax | Post-tax | ||||||||||||
Non-hedge derivative
gains (losses) |
$ | (1 | ) | $ | (1 | ) | $ | 6 | $ | 6 | ||||||
Gains on sales of investments
and mining properties |
8 | 8 | 35 | 25 | ||||||||||||
Impairment charges on
long-lived assets
and investments |
(13 | ) | (13 | ) | (135 | ) | (93 | ) | ||||||||
Change in asset retirement
obligation estimates |
(2 | ) | (3 | ) | (19 | ) | (15 | ) | ||||||||
Deferred stripping
accounting changes |
||||||||||||||||
Impact on the period
compared to
previous policy |
35 | 24 | — | — | ||||||||||||
Resolution of Peruvian
tax assessment |
— | — | 21 | 156 | ||||||||||||
Deferred tax credits |
||||||||||||||||
Change in Australian
tax status |
— | 5 | — | 48 | ||||||||||||
Other |
— | 32 | — | — | ||||||||||||
Total |
$ | 27 | $ | 52 | $ | (92 | ) | $ | 127 | |||||||
In fourth quarter 2005, we generated operating
cash flow of $269 million compared to operating cash
flow of $123 million in the prior-year quarter.
Higher operating cash flow primarily relates to the
combined effect of higher gold sales volumes and
higher realized gold prices.
| 1. | Total cash costs per ounce excludes amortization — see pages 44-45. |
| 54 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Liquidity, Capital Resources and
Financial Position
Cash Flow
Operating Activities
Operating cash flow increased by $217 million
in 2005 to $726 million. The key factors that
contributed to the year over year decrease are
summarized in the table below.
Key Factors Affecting Operating Cash Flow
| Impact on comparative | ||||||||||||||||||||||
| operating cash flows | ||||||||||||||||||||||
| ($ millions) | ||||||||||||||||||||||
| For the years ended | 2005 vs | 2004 vs | ||||||||||||||||||||
| December 31 | 2005 | 2004 | 2003 | 2004 | 2003 | Comments on significant trends and variances | ||||||||||||||||
Gold sales volumes |
||||||||||||||||||||||
(000s oz) |
5,320 | 4,936 | 5,554 | $ | 68 | $ | (109 | ) | See page 43. | |||||||||||||
Realized gold prices |
||||||||||||||||||||||
($/oz) |
$ | 439 | $ | 391 | $ | 366 | 255 | 123 | See page 43. | |||||||||||||
Total cash costs ($/oz) |
227 | 214 | 189 | (69 | ) | (123 | ) | See page 44. | ||||||||||||||
Sub-total |
254 | (109 | ) | |||||||||||||||||||
Other inflows (outflows) |
||||||||||||||||||||||
Income tax payments |
(80 | ) | (45 | ) | (111 | ) | (35 | ) | 66 | 2005 vs 2004 — Increased payments in 2005 relate to higher gold prices and the start of Lagunas Norte production. 2004 vs 2003 — Large payment in 2003 paid to Canadian tax authorities in relation to 2002 final payment. | ||||||||||||
Increase in inventories |
(151 | ) | (51 | ) | (1 | ) | (100 | ) | (50 | ) | Due to build-up of both ore and supplies inventory at operating mines, particularly for mines that went into production in 2005. | |||||||||||
Other non-cash working capital |
68 | (65 | ) | (45 | ) | 133 | (20 | ) | 2005 vs 2004 — Increase in accounts payable in 2005 mainly due to timing of payments and for mines that began production in 2005. 2004 vs 2003 — Increase in taxes recoverable in 2004 relating to input taxes on mine construction costs. | |||||||||||||
Interest expense |
7 | 19 | 44 | 12 | 25 | See page 51. | ||||||||||||||||
Cost of Inmet settlement in 2003 |
— | — | 86 | — | 86 | |||||||||||||||||
Effect of other factors |
(47 | ) | (8 | ) | ||||||||||||||||||
Total |
$ | 217 | $ | (10 | ) | |||||||||||||||||
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 55 |
Investing Activities
| ($ millions) | ||||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | Comments | ||||||||||
Growth capital expenditures1 |
||||||||||||||
Veladero |
$ | 213 | $ | 284 | $ | 68 | Costs mainly relate to construction activity. Production start-up in fourth quarter 2005. | |||||||
Lagunas Norte |
100 | 182 | 4 | Construction activity started in second quarter 2004. Production start-up in second quarter 2005. | ||||||||||
Cowal |
258 | 73 | 24 | Construction activity started in second quarter 2004. Higher levels of activity in 2005, leading up to production start-up expected in first quarter 2006. | ||||||||||
Tulawaka |
5 | 48 | 1 | Costs mainly relate to construction activity. Production start-up in first quarter 2005. | ||||||||||
Pascua-Lama |
98 | 35 | 9 | Higher levels of activity since decision in mid-2004 to proceed with the project, as well as capitalized interest since mid-2004. | ||||||||||
Western 102 Power Plant |
80 | 18 | — | Construction activity started in first quarter 2004. Higher levels of activity in 2005 in lead-up to production start-up in the fourth quarter. | ||||||||||
East Archimedes |
35 | — | — | Construction activity started in first quarter 2005. | ||||||||||
Sub-total |
$ | 789 | $ | 640 | $ | 106 | ||||||||
Sustaining capital expenditures |
||||||||||||||
North America |
$ | 103 | $ | 86 | $ | 80 | Higher sustaining capital expenditures at Goldstrike in 2005, in particular, a 100-ton shovel purchase and higher budgeted expenditures in general. | |||||||
Australia/Africa |
90 | 83 | 115 | 2003 was higher due to a transition to owner-mining at Plutonic that resulted in equipment purchases. | ||||||||||
South America |
114 | 8 | 17 | Purchases of equipment at newly operational mines. | ||||||||||
Other |
8 | 7 | 4 | |||||||||||
Sub-total |
$ | 315 | $ | 184 | $ | 216 | ||||||||
Total |
$ | 1,104 | $ | 824 | $ | 322 | ||||||||
| 1. | Includes both construction costs and capitalized interest. |
We plan to fund the expected capital
expenditures for 2006 from a combination of our $1
billion cash position at the end of 2005, and
operating cash flow that we expect to generate in
2006. We are considering putting in place project
financing for a portion of the mine construction
costs at Pascua-Lama.
On February 14, 2006, we entered into an agreement with Antofagasta plc (“Antofagasta”)
to acquire 50% of Tethyan Copper Company’s
(“Tethyan”) Reko Diq project and associated mineral
interests in Pakistan in the event that Antofagasta
is successful in its bid to acquire Tethyan. If
Antofagasta’s bid is successfully completed, we will
reimburse Antofagasta approximately $100 million in cash for 50% of the
acquisition, including the claw-back right to be
acquired or extinguished from BHP Billiton who has a
right to claw-back a material interest in certain
Tethyan’s mineral interests.
Financing Activities
The most significant financing cash flows in 2005
were $179 million on issue of new long-term debt
obligations, $92 million received on the exercise
of employee stock options partly offset by dividend
payments made totaling $118 million. We also made
scheduled payments under our long-term debt
obligations totaling $59 million in 2005.
| 56 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Liquidity
Liquidity Management
Liquidity is managed dynamically, and factors that
could impact liquidity are regularly monitored. The
primary factors that affect liquidity include gold
production levels, realized gold sales prices, cash
production costs, future capital expenditure
requirements, scheduled repayments of long-term
debt obligations, our credit capacity and expected
future debt market conditions. Working capital
requirements have not historically had a material
effect on liquidity. Counterparties to the
financial instruments and gold sales contracts that
we hold do not have unilateral and discretionary
rights to accelerate settlement of financial
instruments or gold sales contracts, and we are not
subject to any margin calls.
Through the combination of a strong balance
sheet and positive operating cash flows, we have
been able to secure financing, as required, to fund our capital projects. We had three new mines
start in 2005, with a fourth scheduled to start
production in first quarter 2006. The costs of
construction for these projects were financed
through a combination of operating cash flows and
the issuance of long-term debt financing. While we
consider our liquidity profile to be sound with no
reasonably foreseeable trends, demands, commitments,
events or circumstances expected to prevent us from
funding the capital needed to complete our projects
and implement our strategy, no assurance can be
given that additional capital investments will not
be required to be made at these or other projects.
If we are unable to generate enough cash to finance
such additional capital expenditures through
operating cash flow and we are unable or choose not
to issue common stock, we may be required to issue
additional indebtedness. Any additional indebtedness
would increase our debt payment obligations, and may
negatively impact our results of operations.
Capital Resources
Adequate funding is in place or available for all
our development projects. We plan to put in place
project financing for a portion of the expected
construction cost of Pascua-Lama; however, if we
are unable to do so because of unforeseen political
or other challenges, we expect to be able to fund
the capital required through a combination of
existing capital resources and future operating cash flows.
We may also invest capital in Russia and Central
Asia in 2006 to acquire interests in mineral
properties as we develop our business unit there. We
expect that any capital required will be funded from
a combination of our existing cash position and
operating cash flow in 2006.
The total estimated acquisition cost of Placer
Dome is $10.1 billion of which approximately $1.3
billion is the cash portion that is funded by
drawing upon our $1 billion credit facility, with
the balance from our cash position. We expect to
close the sale of certain Placer Dome operations to
Goldcorp in the first half of 2006 and receive cash
consideration of about $1.5 billion from Goldcorp
that will be used to repay amounts borrowed, with
respect to the Placer Dome acquisition, on our $1 billion
credit facility.
Capital Resources1
| ($ millions) | ||||||||||||
| For the years ended December 31 | 2005 | 2004 | 2003 | |||||||||
Opening capital resources |
$ | 2,476 | $ | 1,970 | $ | 2,044 | ||||||
New sources |
||||||||||||
Operating cash flow |
726 | 509 | 519 | |||||||||
New and increases to
financing facilities2 |
134 | 1,056 | — | |||||||||
| 3,336 | 3,535 | 2,563 | ||||||||||
Allocations |
||||||||||||
Growth capital3 |
(789 | ) | (640 | ) | (106 | ) | ||||||
Sustaining capital3 |
(315 | ) | (184 | ) | (216 | ) | ||||||
Dividends |
(118 | ) | (118 | ) | (118 | ) | ||||||
Share buyback |
— | (95 | ) | (154 | ) | |||||||
Other |
(30 | ) | (22 | ) | 1 | |||||||
Closing capital resources |
$ | 2,084 | $ | 2,476 | $ | 1,970 | ||||||
Components of closing
capital resources |
||||||||||||
Cash and equivalents5 |
$ | 1,037 | $ | 1,398 | $ | 970 | ||||||
Unutilized credit facilities4, 5 |
1,047 | 1,078 | 1,000 | |||||||||
Total |
$ | 2,084 | $ | 2,476 | $ | 1,970 | ||||||
| 1. | Capital resources include cash balances and sources of financing that have been arranged but not utilized. | |
| 2. | In 2005, includes the $50 million Peruvian bond offering and $84 million lease facility for Lagunas Norte. In 2004, includes the $250 million Veladero project financing, $750 million bond offering, and $56 million lease facility for Lagunas Norte. | |
| 3. | Growth capital represents capital invested in new projects to bring new mines into production. Sustaining capital represents ongoing capital required at existing mining operations. Sum of growth and sustaining capital equals capital expenditures for the year. | |
| 4. | Subsequent to December 31, 2005, we drew upon our $1 billion credit facility to fund the Placer Dome acquisition. Amounts drawn will be repaid upon closure of sales of specific Placer Dome operations to Goldcorp. | |
| 5. | Excludes Placer Dome capital resources. At December 31, 2005, Placer Dome had $880 million of cash and equivalents and $873 million of undrawn bank lines of credit available of which $300 million was drawn subsequent to year end. |
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 57 |
Credit Rating
At February 10, 2006 from major rating agencies:
Standard & Poor’s (“S&P”)
|
A– | |
Moody’s
|
Baa1 | |
DBRS
|
A |
In 2006, following the acquisition of Placer
Dome, our ratings were reviewed and confirmed by
Moody’s and DBRS. S&P lowered our rating from ‘A’ to
‘A–’, reflecting Placer Dome’s lower rating. Our
ability to access unsecured debt markets and the
related cost of debt financing is, in part,
dependent upon maintaining an acceptable credit
rating. A deterioration in our credit rating would
not adversely affect existing debt securities or the
terms of gold sales contracts, but could impact
funding costs for any new debt financing. The key
factors that are important to our credit rating
include the following: our market capitalization;
the strength of our balance sheet, including the
amount of net debt and our debt-to-equity ratio; our
net cash flow, including cash generated by operating
activities and expected capital expenditure
requirements; the quantity of our gold reserves; and
our geo-political risk profile.
Financial Position
Key Balance Sheet Ratios
| As at December 31 | 2005 | 2004 | ||||||
Non-cash working capital ($ millions)1 |
$ | 151 | $ | 141 | ||||
Net debt ($ millions)2 |
$ | 764 | $ | 288 | ||||
Net debt: equity ratio3 |
0.20:1 | 0.08:1 | ||||||
Current ratio4 |
3.12:1 | 4.66:1 | ||||||
| 1. | Represents current assets, excluding cash and equivalents, less current liabilities. | |
| 2. | Represents long-term debt less cash and equivalents. | |
| 3. | Represents net debt divided by shareholders’ equity. | |
| 4. | Represents current assets divided by current liabilities. |
Non-cash working capital increased in 2005
mainly due to increases in inventory levels to
support new mines that began production. Capital
expenditures exceeded operating cash flow in 2005,
resulting in a higher net debt position at the end
of 2005. Lower cash balances, partly offset by
higher inventory balances, caused our current ratio
to decrease at the end of 2005.
Shareholders’ Equity
Outstanding Share Data
As at February 10, 2006, 827.7 million of our common
shares, one special voting share and 1.4 million
exchangeable shares (exchangeable into 0.7 million of
our common shares) were issued and outstanding. As at
February 10, 2006, options to purchase 20.2 million
common shares were outstanding under our option
plans, as well as options to purchase 0.3 million
common shares under certain option plans inherited by
us in connection with prior acquisitions. We intend
to acquire the remaining 6% interest in Placer Dome
through a compulsory acquisition procedure that would
involve the issuance of additional common shares. For
further information regarding the outstanding shares
and stock options, please refer to the Financial
Statements and our 2005 Management Information
Circular and Proxy Statement.
Dividend Policy
In each of the last four years, we paid a total cash
dividend of $0.22 per share — $0.11 in mid-June and
$0.11 in mid-December. The amount and timing of any
dividends is within the discretion of our Board of
Directors. The Board of Directors reviews the
dividend policy semi-annually based on the cash
requirements of our operating assets, exploration
and development activities, as well as potential
acquisitions, combined with our current and
projected financial position.
Comprehensive Income
Comprehensive income consists of net income or
loss, together with certain other economic gains
and losses that collectively are described as
“other comprehensive income” or “OCI”, and
excluded from the income statement.
In 2005, the other comprehensive loss of $100
million mainly included gains of $23 million on
hedge contracts designated for future periods caused
primarily by changes in currency exchange rates and
fuel prices; offset by reclassification adjustments
totaling $134 million for gains on hedge contracts designated for 2005 that were transferred to
earnings in 2005; and a $8 million unrealized
decrease in the fair value of investments.
| 58 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Included in other comprehensive income at
December 31, 2005 were unrealized pre-tax gains on
currency hedge contracts totaling $171 million,
based on December 31, 2005 market foreign exchange
rates. The related hedge contracts are designated
against operating costs and capital expenditures
primarily over the next three years, and are expected to help protect against the impact
of strengthening of the Australian and Canadian
dollar against the US dollar. The hedge gains are
expected to be recorded in earnings at the same time
as the corresponding hedged operating costs and
amortization of capital expenditures are also
recorded in earnings.
Contractual Obligations and
Commitments1
| Payments due | ||||||||||||||||||||||||||||
| ($ millions) | 2011 and | |||||||||||||||||||||||||||
| At December 31, 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | thereafter | Total | |||||||||||||||||||||
Contractual obligations |
||||||||||||||||||||||||||||
Long-term debt (1) |
||||||||||||||||||||||||||||
Repayment of principal |
$ | 62 | $ | 589 | $ | 79 | $ | 67 | $ | 28 | $ | 894 | $ | 1,719 | ||||||||||||||
Interest (1) |
102 | 79 | 56 | 51 | 49 | 696 | 1,033 | |||||||||||||||||||||
Asset retirement obligations (2) |
37 | 30 | 24 | 48 | 33 | 498 | 670 | |||||||||||||||||||||
Capital leases |
19 | 23 | 19 | 19 | 16 | 1 | 97 | |||||||||||||||||||||
Operating leases |
13 | 13 | 13 | 14 | 14 | 9 | 76 | |||||||||||||||||||||
Royalty arrangements and other
long-term liabilities (3) |
79 | 70 | 67 | 71 | 65 | 579 | 931 | |||||||||||||||||||||
Purchase obligations for supplies
and consumables |
109 | 89 | 53 | 24 | 17 | 20 | 312 | |||||||||||||||||||||
Capital commitments (4) |
85 | — | — | — | — | — | 85 | |||||||||||||||||||||
Total |
$ | 506 | $ | 893 | $ | 311 | $ | 294 | $ | 222 | $ | 2,697 | $ | 4,923 | ||||||||||||||
| 1. | Excludes any Placer Dome obligations and commitments. |
Contractual Obligations and Commitments
(1) Long-term Debt and Interest
Our debt obligations do not include any subjective acceleration clauses or other clauses that enable
the holder of the debt to call for early repayment,
except in the event that we breach any of the terms
and conditions of the debt or for other customary
events of default. The Bulyanhulu and Veladero
financings are collateralized by assets at the
Bulyanhulu and Veladero mines, respectively. Other
than this security, we are not required to post any
collateral under any debt obligations. The terms of
our debt obligations would not be affected by a
deterioration in our credit rating. Projected
interest payments on variable rate debt was based on
interest rates in effect at December 31, 2005.
Interest is calculated on our long-term debt
obligations using both fixed and variable rates.
(2) Asset Retirement Obligations
Amounts presented in the table represent the
undiscounted future payments for the expected cost
of asset retirement obligations.
(3) Royalties and Other Long-term Liabilities
Virtually all of the royalty arrangements give rise
to obligations as we produce gold. In the event that
we do not produce gold at our mining properties, we
have no payment obligation to the royalty holders.
The amounts disclosed are based on expected future
gold production, using a gold price range assumption
of $450—$475 per ounce. The most significant
royalty agreements are disclosed in note 6 to our
Financial Statements. Based on 2005 production
levels, an increase in market gold prices by $25 per
ounce would result in an annual increase in royalty
payments by approximately $8 million.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 59 |
Other long-term liabilities includes
pension and post-retirement benefits funding in 2006.
Funding beyond 2006 is not included in this table as
it cannot be reasonably estimated given variable
market conditions and actuarial assumptions. In 2006,
we expect to make contributions to pension and
post-retirement benefits plans totaling $6 million.
Other long-term liabilities include derivative
liabilities. Payments related to derivative contracts
cannot be reasonably estimated given variable market conditions. Refer to note 16c to the Financial
Statements.
(4) Capital Commitments
Purchase obligations for capital expenditures include
only those items where binding commitments have been
entered into. Commitments at the end of 2005 mainly
related to construction at our development projects.
Capital Expenditures Not Yet Committed
We expect to incur capital expenditures during the
next five years for Barrick projects, Placer Dome
acquired projects and producing mines. The primary
Barrick project is Pascua-Lama (refer to page 47 for
further details) and the significant Placer Dome
projects include Pueblo Viejo, Cortez Hills and
Donlin Creek. We are currently in the process of
reviewing the capital requirements for the acquired
Placer Dome projects and producing mines.
Payments to Maintain Land Tenure and
Mineral Property Rights
In the normal course of business, we are required to
make annual payments to maintain title to certain of
our properties and to maintain our rights to mine
gold at certain of our properties. If we choose to
abandon a property or discontinue mining operations,
the payments relating to that property can be
suspended, resulting in our rights to the property lapsing. The validity of mining claims can be
uncertain and may be contested. Although we have
attempted to acquire satisfactory title to our
properties, some risk exists that some titles,
particularly title to undeveloped properties, may be
defective.
Contingencies — Litigation
We are currently subject to various litigation as
disclosed in note 24 to the Financial Statements,
and we may be involved in disputes with other
parties in the future that may result in litigation.
If we are unable to resolve these disputes
favorably, it may have a material adverse impact on
our financial condition, cash flow and results of operations.
Financial Instruments
We use a mixture of cash and long-term debt to
maintain an efficient capital structure and ensure
adequate liquidity exists to meet the cash needs of
our business. A discussion of our liquidity and
capital structure can be found on page 55. We use
interest rate contracts to mitigate interest rate
risk that is implicit in our cash balances and
outstanding long-term debt. In the normal course of
business, we are inherently exposed to currency and
commodity price risk. We use currency and commodity
hedging instruments to mitigate these inherent
business risks. We also hold certain derivative
instruments that do not qualify for hedge accounting
treatment. These non-hedge derivatives are described
in note 16 to our Financial Statements. For a
discussion of certain risks and assumptions that
relate to the use of derivatives, including market
risk, market liquidity risk and credit risk, refer to
notes 16e and 16f to our Financial Statements. For a
discussion of the methods used to value financial
instruments, as well as any significant assumptions,
refer to note 16d to our Financial Statements.
| 60 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Summary of Financial Instruments1
As at and for the year ended December 31, 2005
| Principal/ | Amounts Not | |||||||
| Financial | Notional | Associated | Amounts Recorded | Recorded in | ||||
| Instrument | Amount | Risks | in Earnings | Earnings | ||||
Cash and equivalents
|
$1,037 million | n Interest rate n Credit |
Interest income less hedge gains on cash hedging instruments — 2005 — $32 million; 2004 — $6 million; 2003 — $13 million | Nil | ||||
Investments in available- for-sale securities |
$62 million | n Market | Other income/expense — 2005 — $1 million gain; 2004 — $1 million gain; 2003 — $7 million loss | $12 million gain in OCI | ||||
Long-term debt
|
$1,721 million | n Interest rate | Interest costs — 2005 — $7 million expensed ($118 million capitalized); 2004 — $19 million expensed ($41 million capitalized); 2003 — $44 million expensed ($5 million capitalized) | Fair value greater than carrying value by $26 million | ||||
Hedging instruments —
currency contracts
|
C$788 million A$2,213 million ARS 36 million | n Market/Liquidity n Credit |
Hedge gains in cost of sales, corporate administration and amortization — 2005 — $120 million; 2004 — $112 million; 2003 — $65 million | $171 million gain in OCI | ||||
Cash hedging instruments —
interest rate contracts
|
$425 million | n Market/Liquidity n Credit |
Hedge gains/losses in interest income — 2005 — $6 million gain; 2004 — $19 million gain; 2003 — $18 million gain | $2 million loss in OCI | ||||
Debt hedging instruments —
interest rate contracts
|
$500 million | n Market/Liquidity n Credit |
Change in fair value recorded in earnings — 2005 — $13 million loss; 2004 — $2 million gain; 2003 — $9 million gain | Nil | ||||
Hedging instruments — fuel
and propane contracts
|
Fuel — 2 million barrels Propane — 17 million gallons |
n Market/Liquidity n Credit |
Hedge gains in cost of sales — 2005 — $10 million; 2004 — $4 million; 2003 — $nil | $38 million gain in OCI | ||||
Non-hedge derivatives
|
Various | n Market/Liquidity n Credit |
Gains in other income/expense — 2005 — $6 million; 2004 — $5 million; 2003 — $71 million | Nil |
| 1. | Refer to pages 61-64 for information on gold and silver sales contracts. |
Off-Balance Sheet Arrangements
Gold and Silver Sales Contracts
We have historically used gold and silver sales
contracts as a means of selling a portion of our
annual gold and silver production. The contracting
parties are bullion banks whose business includes
entering into contracts to purchase gold or silver
from mining companies. Since 2001, we have been
focusing on reducing the level of outstanding gold
and silver sales contracts. The terms of our
fixed-price gold and silver sales contracts enable us
to deliver gold and silver whenever we choose over
the primarily ten-year term of the contracts. In
2005, we reduced our fixed-price gold sales contracts
position by
1.0 million ounces through delivery of 0.8 million
ounces of our gold production and the conversion of
0.2 million ounces to floating spot price contracts.
Project Gold Sales Contracts
In July 2004, we announced a decision to proceed with
the Pascua-Lama project (“Pascua-Lama”) subject to
receiving required permits and clarification of the
applicable fiscal regimes from the governments of
Argentina and Chile.
In anticipation of building Pascua-Lama and in
support of any related financing, we have 6.5
million ounces of existing fixed-price gold sales
contracts specifically allocated to Pascua-Lama (the
“Project
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 61 |
Gold Sales Contracts”). The allocation of these
contracts will help reduce gold price risk at
Pascua-Lama and is expected to help secure the
financing for its construction. We expect the
allocation of these contracts to eliminate any
requirement by lenders to add any incremental gold
sales contracts in the future to support the
financing of Pascua-Lama. The forward sales prices
on our Project Gold Sales Contracts have not been
fully fixed, and thus remain sensitive to long-term
interest rates. For these contracts, increasing
long-term interest rates in the fourth quarter
resulted in a higher expected realizable sales price
for these contracts. If long-term interest rates
continue to rise, we anticipate the expected
realizable sales price to increase.
As part of our Master Trading Agreements
(“MTAs”), Project Gold Sales Contracts are not
subject to any provisions regarding any financial
go-ahead decisions with construction, or any possible delay or change in the project.
Key Aspects of Pascua-Lama Gold Sales Contracts
| (as of December 31, 2005) | ||
Expected delivery dates.1 |
2009–2018, the term of the expected financing. | |
Future estimated average realizable selling price. |
$378/oz.2 | |
Mark-to-market value at December 31, 2005. |
($1,453) million.3 |
| 1. | The contract termination dates are in 2016–2019 in most cases, but we currently expect to deliver Pascua-Lama production against these contracts starting in 2009, subject to the timing of receipt of approvals of the environmental impact assessments, as well as the resolution of other external issues, both of which are largely beyond our control. Refer to page 47 for further details. | |
| 2. | Upon delivery of production from 2009–2018, the term of expected financing. Approximate estimated value based on current market US dollar interest rates and on an average lease rate assumption of 0.75%. | |
| 3. | At a spot gold price of $513 per ounce and market interest rates. |
The allocation of 6.5 million ounces of gold
sales contracts to Pascua-Lama involves: i) the
identification of contracts in quantities and for
terms that mitigate gold price risk for the project
during the term of the expected financing (contracts
were chosen where the existing termination dates are
spread between the targeted first year of production
and the expected retirement of financing for the
project); ii) the segregation of these contracts
from the remaining non-project gold sales contracts
(the “Corporate Gold Sales Contracts”); and iii) the eventual settlement of proceeds from these contracts
for the benefit of production.
Through allocation of these gold sales
contracts to Pascua-Lama, we significantly reduce
capital risk. It protects the gold price during the
term of the forecasted financing, while leaving the
remaining reserves fully levered to spot gold
prices. The contracts represent just over 35% of the
18.3 million ounces of gold reserves at Pascua-Lama.
These contracts do not impact any of the 684.7
million ounces of silver contained in gold reserves
at Pascua-Lama.
Corporate Gold Sales Contracts and
Floating Spot-Price Gold Sales Contracts
Fixed-price Corporate Gold Sales Contracts, which at
December 31, 2005 totaled 6.0 million ounces,
represent approximately one year of Barrick’s
expected future gold production (excluding Placer
Dome) and approximately 8.5% of our proven and
probable reserves, in each case excluding
Pascua-Lama and Placer Dome. At December 31, 2005,
we had floating spot-price gold sales contracts
under which we are committed to deliver 0.7 million
ounces of gold over the next ten years at spot
prices, less an average fixed-price adjustment of
$127 per ounce. These floating spot-price contracts
were previously fixed-price contracts, for which,
under the price-setting mechanisms of the MTAs, we
elected to receive a price based on the market gold
spot price at the time of delivery adjusted based on
the difference between the spot price and the
contract price at the time of such election.
Key Aspects of Corporate Gold Sales Contracts
| (as of December 31, 2005) | ||
Current termination date of contracts. |
2015 in most cases. | |
Average estimated realizable selling price in 2015. |
$458/oz.1 | |
Mark-to-market value at December 31, 2005. |
||
Corporate Gold Sales Contracts. |
($1,277) million.2 | |
Floating Spot-Price Gold Sales Contracts. |
($89) million.2 |
| 1. | Approximate estimated value based on current market US dollar interest rates and an average lease rate assumption of 0.75%. Accelerating gold deliveries would likely lead to reduced contango that would otherwise have built up over time. Barrick may choose to settle any gold sales contract in advance of this termination date at any time, at its discretion. Historically, delivery has occurred in advance of the contractual termination date. | |
| 2. | At a spot gold price of $513 per ounce, and market interest rates. |
| 62 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
In January 2006, we acquired the Pueblo Viejo
development project (“Pueblo Viejo”) as part of the
Placer Dome acquisition. Once the sale of certain
Placer Dome operations to Goldcorp closes, we will
have a 60% interest in the project. In anticipation
of financing our share of this project, subsequent
to year end we allocated 3.0 million ounces of our
Corporate Gold Sales Contracts to this project.
This allocation does not impact any of the 40%
interest in Pueblo Viejo to be owned by Goldcorp.
We have an obligation to deliver gold by the
termination date (currently 2015 in most cases).
However, because we typically fix the price of gold
under our gold sales contracts to a date that is
earlier than the termination date of the contract
(referred to as the “interim price-setting date”),
the actual realized price on the contract termination
date depends upon the actual gold market forward
premium (“contango”) between the interim
price-setting date and the termination date.
Therefore, the $458/oz price estimate could change
over time due to a number of factors, including but
not limited to: US dollar interest rates, gold lease
rates, spot gold prices, and extensions of the
termination date. This price, which is an average for
the total Corporate Gold Sales Contract position, is
not necessarily representative of the prices that may
be realized each quarter for actual deliveries into
gold sales contracts, in particular, if we choose to
settle any gold sales contract in advance of the
termination date (which we have the right to do at
our discretion). If we choose to accelerate gold
deliveries, this would likely lead to reduced
contango that would otherwise have built up over time
(and therefore a lower realized price).
The gold market forward premium, or contango, is
typically closely correlated with the difference
between US dollar interest rates and gold lease
rates. An increase or decrease in US dollar interest
rates would generally lead to a corresponding increase
or decrease in contango, and therefore an increase or
decrease in the estimated future price of the
contract at the termination date. Furthermore, the
greater the time period between the interim
price-setting date and the termination date, the
greater the sensitivity of the final realized price
to US dollar interest rates.
A short-term spike in gold lease rates would
not have a material negative impact on us because we
are not significantly exposed under our fixed-price
gold sales contracts to short-term gold lease rate
variations. A prolonged rise in gold lease rates
could result in lower contango (or negative
contango, i.e. “backwardation”). Gold lease rates
have historically tended to be low, and any spikes
short-lived, because of the large amount of gold
available for lending relative to demand.
As a result of the Placer Dome acquisition,
Barrick’s gold sales contracts increased to 20
million ounces on a pro forma basis as at December
31, 2005. Since year end, Placer Dome’s gold hedge
program has been reduced and simplified with all
outstanding sold call options eliminated. As of
February 22, 2006, the combined gold sales contracts
totaled 18.5 million ounces, a reduction of 1.5
million ounces since year-end 2005. Of this total,
9.5 million ounces are allocated as Project Gold
Sales Contracts in support of the Pascua-Lama and
Pueblo Viejo development projects. The remaining 9.0
million ounces of Corporate Gold Sales Contracts
represent 8% of total reserves excluding Pascua-Lama
and Pueblo Viejo. Further reductions may be expected
as we remain committed to reducing our gold sales
contracts in this favorable gold price environment.
Fixed-Price Silver Sales Contracts
| (as of December 31, 2005) | ||
Millions of silver ounces. |
15 | |
Current termination date of silver sales contracts. |
2015 in most cases. | |
Average estimated realizable selling price at 2015 termination date. |
$7.40/oz.1 | |
Mark-to-market value at December 31, 2005. |
($43) million.2 |
| 1. | Approximate estimated value based on current market contango of 2.5%. Accelerating silver deliveries could potentially lead to reduced contango that would otherwise have built up over time. Barrick may choose to settle any silver sales contract in advance of this termination date at any time, at its discretion. Historically, delivery has occurred in advance of the contractual termination date. | |
| 2. | At a spot silver price of $8.83 per ounce. |
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 63 |
We also have floating spot-price silver sales
contracts under which we are committed to deliver 7.5
million ounces of silver over the next ten years at
spot prices, less an average fixed-price adjustment
of $1.25 per ounce. These floating spot-price
contracts were previously fixed-price contracts, for
which, under the price-setting mechanisms of the
MTAs, we elected to receive a price based on the
market silver spot price at the time of delivery
adjusted by the difference between the spot price and
the contract price at the time of such election.
Key Terms of Gold and Silver Sales Contracts
In all of our MTAs, which govern the terms of gold
and silver sales contracts with our 19
counterparties, the following applies:
| n | The counterparties do not have unilateral and discretionary “right to break” provisions. | |
| n | There are no credit downgrade provisions. | |
| n | We are not subject to any margin calls — regardless of the price of gold or silver. | |
| n | We have the right to settle our gold and silver sales contracts on two days notice at any time during the life of the contracts, or keep these forward gold and silver sales contracts outstanding for up to 15 years. | |
| n | At our option, we can sell gold or silver at the market price or the contract price, whichever is higher, up to the termination date of the contracts (currently 2015 in most cases). |
The MTAs with our counterparties do provide for early
close out of certain transactions in the event of a
material adverse change in our ability or our
principal hedging subsidiary’s ability to perform our or its gold and silver delivery and other obligations
under the trading agreements and related parent
guarantees or a lack of gold or silver market, and
for customary events of default such as covenant
breaches, insolvency or bankruptcy. The principal
financial covenants are:
| n | We must maintain a minimum consolidated net worth of at least $2 billion; it was $3.9 billion at year end. The MTAs exclude unrealized mark-to-market valuations in the calculation of consolidated net worth. | |
| n | We must maintain a maximum long-term debt to consolidated net worth ratio of 2:1; it was 0.5:1 at year end. |
In most cases, under the terms of the MTAs, the
period over which we are required to deliver gold is
extended annually by one year, or kept “evergreen”,
regardless of the intended delivery dates, unless
otherwise notified by the counterparty. This means
that, with each year that passes, the termination
date of most MTAs is extended into the future by one
year.
As spot gold prices increase or decrease, the
value of our gold mineral reserves and amount of
potential operating cash inflows generally increases
or decreases. The unrealized mark-to-market loss on
our fixed-price forward gold sales contracts also
increases or decreases. The mark-to-market value
represents the cancellation value of these contracts
based on current market levels, and does not
represent an immediate economic obligation for
payment by us. Our obligations under the gold
forward sales contracts are to deliver an agreed
upon quantity of gold at a contracted price by the
termination date of the contracts (currently 2015 in
most cases). Gold sales contracts are not recorded
on our balance sheet. The economic impact of these
contracts is reflected in our Financial Statements
within gold sales based on selling prices under the
contracts at the time we record revenue from the
physical delivery of gold and silver under the
contracts.
Fair Value of Derivative Positions
| ($ millions) | Unrealized | |||
| As at December 31, 2005 | Gain/(Loss) | |||
Corporate Gold Sales Contracts |
$ | (1,277 | ) | |
Pascua-Lama Gold Sales Contracts |
(1,453 | ) | ||
Floating Spot-Price Gold Sales Contracts |
(89 | ) | ||
Silver Sales Contracts |
(43 | ) | ||
Floating Spot-Price Silver Sales Contracts |
(9 | ) | ||
Foreign currency contracts |
128 | |||
Interest rate contracts |
30 | |||
Fuel contracts |
42 | |||
| $ | (2,671 | ) | ||
| 64 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Critical Accounting Policies and Estimates
Management has discussed the development and
selection of our critical accounting estimates with
the Audit Committee of the Board of Directors, and
the Audit Committee has reviewed the disclosure
relating to such estimates in conjunction with its
review of this MD&A. The accounting policies and
methods we utilize determine how we report our
financial condition and results of operations, and
they may require management to make estimates or
rely on assumptions about matters that are
inherently uncertain.
Our financial condition and results of
operations are reported using accounting policies and
methods prescribed by US GAAP. In certain cases, US
GAAP allows accounting policies and methods to be
selected from two or more alternatives, any of which
might be reasonable yet result in our reporting
materially different amounts. We exercise judgment in
selecting and applying our accounting policies and
methods to ensure that, while US GAAP compliant, they
reflect our judgment of an appropriate manner in
which to record and report our financial condition
and results of operations.
Accounting Policy Changes in 2005
This section includes a discussion of
accounting changes that were adopted in our 2005
Financial Statements.
Emerging Issues Task Force Issue No. 04-6,
Accounting for Stripping Costs Incurred During
Production in the Mining Industry (“EITF 04-6”)
In 2005, we adopted EITF 04-6, which relates to the
accounting for stripping costs in the production
stage at a mine. The new accounting rules require
the actual stripping costs incurred each period be
reflected in the cost of ore mined for the same
period, and will likely lead to greater
period-to-period volatility in total cash costs.
Previously, stripping costs were deferred and
amortized based on a life-of-mine stripping ratio
that smoothed the costs over time. Results for
periods prior to 2005 were not restated in
accordance with the transition rules of EITF 04-6.
Cost of sales and related total cash costs per ounce
statistics for 2004 and prior periods have not been
restated, and are therefore not comparable to current-year amounts. The impact of
this change in comparison to 2004 was to increase net
income for 2005 by $44 million ($0.08 per share) and
decrease cost of sales for 2005 by $64 million ($12
per ounce lower total cash costs). Results for 2005
also include a $6 million post-tax credit ($0.01 per
share) to reflect the cumulative effect of the policy
for periods prior to January 1, 2005.
Impact of EITF 04-6 on Total Cash Costs
Per Ounce Statistics
| Three months ended | Year ended | |||||||
| December 31, 2005 | December 31, 2005 | |||||||
| (dollars per ounce) | Increase (decrease) | Increase (decrease) | ||||||
Goldstrike Open Pit |
$ | (12 | ) | $ | (12 | ) | ||
Round Mountain |
1 | 16 | ||||||
Hemlo |
19 | 11 | ||||||
Pierina |
(45 | ) | (37 | ) | ||||
Lagunas Norte |
(96 | ) | (66 | ) | ||||
Kalgoorlie |
67 | 9 | ||||||
Plutonic |
— | (17 | ) | |||||
Lawlers |
9 | 8 | ||||||
Tulawaka |
11 | 48 | ||||||
Total cash costs
per ounce |
$ | (22 | ) | $ | (12 | ) | ||
Future Accounting Policy Changes
This section includes a discussion of future
accounting changes that may have a significant impact
on our Financial Statements. On January 1, 2006, we
adopted FASB Interpretation No. 47, Accounting for
Conditional Asset Retirement Obligations (“FIN 47”)
and FASB No. 151, Inventory Costs (“FAS 151”). We do
not expect that the adoption of FIN 47 or FAS 151
will have a material effect on our Financial
Statements, and therefore a detailed discussion of
these accounting changes has not been included.
FAS 123R, Share-Based Payment, a Revision to
FAS 123 and a Replacement of APB 25 and FAS
148
FAS 123R includes in its scope our stock options,
Restricted Share Units (RSUs) and Deferred Share
Units (DSUs). The adoption of FAS 123R will not
significantly change how we account for RSUs and
DSUs. Historically we accounted for stock options
granted to employees using an intrinsic value
method. We recorded compensation cost for stock
options based on the excess of the market price of
the stock option at the grant date of an award
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 65 |
over the exercise price. Historically, the
exercise price for stock options has equaled the
market price of stock at the grant date, resulting
in no compensation cost. FAS 123R requires the cost
of all share-based payment transactions with
employees be recognized as an expense starting in
our 2006 fiscal year.
FAS 123R permits two possible transition
methods: modified prospective or modified
retrospective. Under both methods the cost of
share-based payments will be recorded in 2006, but
the modified retrospective method requires
restatement of prior year comparative amounts,
whereas the modified prospective method does not.
Under either method, we expect to record an expense
of about $25 million in 2006 for unvested stock
options granted through December 31, 2005. Under the
modified retrospective method we would restate our
income statement for prior periods to reflect a compensation expense of $29 million in 2004 and
$26 million in 2005 and an adjustment to opening
2004 retained earnings of $183 million for years
prior to 2004.
Exposure Draft,
Accounting for Uncertain Tax Positions
On July 14, 2005, the Financial Accounting Standards
Board (“FASB”) issued an exposure draft and later
issued some amendments of a proposed Interpretation,
Accounting for Uncertain Tax Positions – an
Interpretation of FASB Statement No. 109. The
proposed Interpretation would require companies to
recognize the best estimate of an uncertain tax
position only if it is more likely than not of being
sustained on audit by the taxation authorities.
Subsequently, the tax benefit would be derecognized
(by either recording a tax liability or decreasing a
tax asset) when the more likely than not threshold
is no longer met and it is more likely than not that
the tax position will not be sustained.
The proposed interpretation would be effective
starting in 2007 and treated as a change in
accounting policy. It would require companies to
assess all uncertain tax positions and only those
meeting the more likely than not threshold at the
transition date would continue to be recognized. The
difference between the amount previously recognized
and the amount recognized after applying the
proposed Interpretation would be recorded as a
cumulative-effect adjustment in the 2007 income
statement (restatement is not permitted). The
comment period ended on September 12, 2005. Subsequent to this date
FASB has issued and continues to issue
redeliberations of certain aspects of the exposure
draft. We are presently evaluating the impact of
this exposure draft on our Financial Statements.
Critical Accounting Estimates and Judgments
Certain accounting estimates have been
identified as being “critical” to the presentation of
our financial condition and results of operations
because they require us to make subjective and/or
complex judgments about matters that are inherently uncertain; where there is a reasonable likelihood
that materially different amounts could be reported
under different conditions or using different
assumptions and estimates.
Reserve Estimates Used to Measure Amortization of
Property, Plant and Equipment
We record amortization expense based on the
estimated useful economic lives of long-lived
assets. Changes in reserve estimates are generally
calculated at the end of each year and cause
amortization expense to increase or decrease
prospectively. The estimate that most significantly
affects the measurement of amortization is
quantities of proven and probable gold reserves,
because we amortize a large portion of property,
plant and equipment using the units-of-production
method. The estimation of quantities of gold
reserves, in accordance with the principles in
Industry Guide No. 7, issued by the US Securities
and Exchange Commission (“SEC”) is complex,
requiring significant subjective assumptions that
arise from the evaluation of geological,
geophysical, engineering and economic data for a
given ore body. This data could change over time as
a result of numerous factors, including new
information gained from development activities,
evolving production history and a reassessment of
the viability of production under different economic
conditions. Changes in data and/or assumptions could
cause reserve estimates to substantially change from
period to period. Actual gold production could
differ from expected gold production based on
reserves, and an adverse change in gold or silver
prices could make a reserve uneconomic to mine.
Variations could also occur in actual ore grade and
gold and silver recovery rates from estimates.
| 66 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
A key trend that could reasonably impact
reserve estimates is rising market gold prices,
because the gold price assumption is closely related
to the trailing three-year average market price. As
this assumption rises, this could result in an
upward revision to reserve estimates as material not
previously classified as a reserve becomes economic
at higher gold prices. Following the recent trend in market gold prices over the last three years,
the gold price assumption used to measure reserves
has also been rising. The gold price assumption was
$400 per ounce in 2005 (2004: $375 per ounce; 2003:
$325 per ounce).
The impact of a change in reserve estimates is
generally more significant for mines near the end
of the mine life because the overall impact on amortization is spread over a shorter time
period. Also, amortization expense is more
significantly impacted by changes in reserve
estimates at underground mines than open-pit
mines due to the following factors:
| n | Underground development costs incurred to access ore at underground mines are significant and amortized using the units-of-production method; and | |
| n | Reserves at underground mines are often more sensitive to gold price assumptions and changes in production costs. Production costs at underground mines are impacted by factors such as dilution, which can significantly impact mining and processing costs per ounce. |
Impact of Historic Changes in Reserve Estimates on Amortization
| 2005 | 2004 | |||||||||||||||
| For the years ended December 31 | Reserves | Amortization | Reserves | Amortization | ||||||||||||
| ($ millions, except reserves in | increase | increase | increase | increase | ||||||||||||
| millions of contained oz) | (decrease)1 | (decrease) | (decrease)1 | (decrease) | ||||||||||||
Goldstrike Open Pit |
2.1 | $ | (5 | ) | 1.5 | $ | (3 | ) | ||||||||
Goldstrike Underground |
0.1 | (4 | ) | 0.2 | (4 | ) | ||||||||||
Round Mountain |
0.4 | (1 | ) | 0.2 | (1 | ) | ||||||||||
Lawlers |
0.1 | (2 | ) | — | — | |||||||||||
Eskay Creek |
(0.1 | ) | 6 | (0.1 | ) | 5 | ||||||||||
Pierina |
0.3 | (22 | ) | 0.3 | (10 | ) | ||||||||||
Hemlo |
(0.2 | ) | 2 | (0.1 | ) | 1 | ||||||||||
Plutonic |
0.2 | (1 | ) | 0.5 | (2 | ) | ||||||||||
Kalgoorlie |
(0.2 | ) | — | 0.9 | (1 | ) | ||||||||||
Darlot |
0.1 | — | — | — | ||||||||||||
Marigold |
0.1 | (1 | ) | 0.1 | (1 | ) | ||||||||||
Bulyanhulu |
0.1 | — | (0.4 | ) | 1 | |||||||||||
Total |
3.0 | $ | (28 | ) | 3.1 | $ | (15 | ) | ||||||||
| 1. | Each year we update our reserve estimates as at the end of the year as part of our normal business cycle. Reserve changes presented were calculated at the beginning of the applicable fiscal year and are in millions of contained ounces. |
Impairment Assessments of Investments
Each reporting period we review all
available-for-sale securities whose fair value at the
end of period is below cost to determine whether an
other-than-temporary impairment has occurred. We
consider all relevant facts or circumstances in this
assessment, particularly: the length of time and
extent to which fair value has been less than the
carrying amount; the financial condition and near
term prospects of the investee, including any
specific events that have impacted its fair value;
both positive and negative evidence that the carrying
amount is recoverable within a reasonable period of
time; and our ability and intent to hold the investment for a reasonable
period of time sufficient for an expected recovery
of the fair value up to or beyond the carrying
amount. Changes in the values of these investments
are caused by market factors beyond our control and
could be significant, and the amount of any
impairment charges could materially impact earnings.
In 2005, we reviewed two investments that were
impaired, and after concluding that the impairments
were other-than-temporary, we recorded an impairment
charge of $16 million (2004: $5 million, 2003: $11
million).
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 67 |
Impairment Assessments of Operating Mines,
Development Projects and Exploration Stage
Properties
We review and test the carrying amounts of assets
when events or changes in circumstances suggest that
the carrying amount may not be recoverable. We group
assets at the lowest level for which identifiable
cash flows are largely independent of the cash flows
of other assets and liabilities. We review each mine
and development project for recoverability by
comparing the total carrying value of the assets of
that mine or project to the expected future cash
flows associated with that mine or project. If there
are indications that an impairment
may have occurred, we prepare estimates of expected
future cash flows for each group of assets. Expected
future cash flows are based on a
probability-weighted approach applied to potential
outcomes. Estimates of expected future cash flow
reflect:
| n | Estimated sales proceeds from the production and sale of recoverable ounces of gold contained in proven and probable reserves; | |
| n | Expected future commodity prices and currency exchange rates (considering historical and current prices, price trends and related factors); | |
| n | Expected future operating costs and capital expenditures to produce proven and probable gold reserves based on mine plans that assume current plant capacity, but exclude the impact of inflation; | |
| n | Expected cash flows associated with value beyond proven and probable reserves, which includes the expected cash outflows required to develop and extract the value beyond proven and probable reserves; and | |
| n | Environmental remediation costs excluded from the measurement of asset retirement obligations. |
We record a reduction of a group of assets to fair
value as a charge to earnings if the discounted
expected future cash flows are less than the
carrying amount. We generally estimate fair value by
discounting the expected future cash flows using a
discount factor that reflects the risk-free rate of
interest for a term consistent with the period of
expected cash flows.
Expected future cash flows are inherently
uncertain and could materially change over time. They
are significantly affected by reserve estimates,
together with economic factors such as gold and
silver prices, other commodity and consumables costs
and currency exchange rates, estimates of costs to
produce reserves and future sustaining capital. If a
significant adverse change in the market gold price
occurred that caused us to revise the price
assumptions downwards, the conclusions on the
impairment tests could change, subject to the effect
of changes in other factors and assumptions. The
assessment and measurement of impairment
excludes the impact of derivatives designated in a
cash flow hedge relationship for future cash flows
arising from operating mines and development
projects.
Because of the significant capital investment
that is required at many mines, if an impairment
occurs, it could materially impact earnings. Due to
the long-life nature of many mines, the difference
between total estimated undiscounted net cash flows
and fair value can be substantial. Therefore,
although the value of a mine may decline gradually
over multiple reporting periods, the application of
impairment accounting rules could lead to recognition
of the full amount of the decline in value in one
period. Due to the highly uncertain nature of future
cash flows, the determination of when to record an
impairment charge can be very subjective. We make
this determination using available evidence taking
into account current expectations for each mining
property.
For acquired exploration-stage properties, the
purchase price is capitalized, but post-acquisition
exploration expenditures are expensed. The future
economic viability of exploration-stage properties
largely depends upon the outcome of exploration
activity, which can take a number of years to
complete for large properties. We monitor the
results of exploration activity over time to assess
whether an impairment may have occurred. The
measurement of any impairment is made more difficult
because there is not an active market for
exploration properties, and because it is not
possible to use discounted cash flow techniques due
to the very limited information that is available to
accurately model future
| 68 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
cash flows. In general, if an impairment occurs
at an exploration-stage property, it would probably
have minimal value and most of the acquisition cost
may have to be written down. Impairment charges are
recorded in other income/expense and impact earnings
in the year they are recorded. Prospectively, the
impairment could also impact the calculation of
amortization of an asset.
In 2004, we completed impairment tests for the
Cowal project, the Eskay Creek mine and various
Peruvian exploration-stage properties. For Cowal, an
impairment test was completed, incorporating upward
revisions to estimated capital and operating costs
for the project and the impact of the US dollar
exchange rate on Australian dollar expenditures,
measured at market prices. On completion of this
test in 2004, we concluded that the project was not
impaired. On completion of the impairment test for
Eskay Creek, we concluded that the mine was
impaired, and we recorded a pre-tax impairment
charge of $58 million. On completion of the
exploration program for 2005 and updating
assessments of future plans, we concluded that a
group of Peru-vian exploration-stage properties were
impaired at the end of 2004 and we recorded a
pre-tax impairment charge of $67 million. Throughout
2005, we updated our impairment assessments for the
Eskay Creek mine and Cowal project and we concluded
that they were not impaired at the end of 2005.
Production Start Date
We assess each mine construction project to
determine when a mine moves into production stage.
The criteria used to assess the start date are
determined based on the unique nature of each mine
construction project such as the complexity of a
plant or its location. We consider various relevant
criteria to assess when the mine is substantially
complete and ready for its intended use and moved
into production stage. Some of the criteria
considered would include, but, are not limited to,
the following:
| n | The level of capital expenditures compared to construction cost estimates | |
| n | Completion of a reasonable period of testing of mine plant and equipment | |
| n | Ability to produce gold in saleable form (within specifications) | |
| n | Ability to sustain ongoing production of gold |
In 2005, we determined the production start dates
for three new mines: Tulawaka, Lagunas Norte and
Veladero. When a mine construction project moves
into the production stage, the capitalization of
certain mine construction costs ceases and costs
are either capitalized to inventory or expensed,
except for capitalizable costs related to property,
plant and equipment additions or improvements,
underground mine development or reserve
development.
Fair Value of Asset Retirement Obligations (AROs)
AROs arise from the acquisition, development,
construction and normal operation of mining
property, plant and equipment, due to government
controls and regulations that protect the
environment and public safety on the closure and
reclamation of mining properties. We record the fair
value of an ARO in our Financial Statements when it
is incurred and capitalize this amount as an
increase in the carrying amount of the related
asset. At operating mines, the increase in an ARO is
recorded as an adjustment to the corresponding asset
carrying amount and results in a prospective
increase in amortization expense. At closed mines,
any adjustment to an ARO is charged directly to
earnings.
The fair values of AROs are measured by
discounting the expected cash flows using a discount
factor that reflects the credit-adjusted risk-free
rate of interest. We prepare estimates of the timing
and amounts of expected cash flows when an ARO is
incurred, which are updated to reflect changes in
facts and circumstances, or if we are required to
submit updated mine closure plans to regulatory
authorities. In the future, changes in regulations
or laws or enforcement could adversely affect our
operations; and any instances of noncompliance with
laws or regulations that result in fines or
injunctions or delays in projects, or any unforeseen
environmental contamination at, or related to, our
mining properties could result in us suffering
significant costs. We mitigate these risks through
environmental
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 69 |
and health and safety programs under which we
monitor compliance with laws and regulations and
take steps to reduce the risk of environmental
contamination occurring. We maintain insurance for
some environmental risks, however, for some risks
coverage cannot be purchased at a reasonable cost.
Our coverage may not provide full recovery for all
possible causes of loss. The principal factors that
can cause expected cash flows to change are: the
construction of new processing facilities; changes
in the quantities of material in reserves and a
corresponding change in the life of mine plan;
changing ore characteristics that ultimately impact
the environment; changes in water quality that
impact the extent of water treatment required; and
changes in laws and regulations governing the
protection of the environment. In general, as the
end of the mine life becomes nearer, the reliability
of expected cash flows increases, but earlier in the
mine life, the estimation of an ARO is inherently
more subjective. Significant judgments and estimates
are made when estimating the fair value of AROs.
Expected cash flows relating to AROs could occur
over periods up to 40 years and the assessment of
the extent of environmental remediation work is
highly subjective. Considering all of these factors
that go into the determination of an ARO, the fair
value of AROs can materially change over time.
At our operating mines, we continued to record
AROs based on disturbance of the environment over
time. It is reasonably possible that circumstances
could arise during or by the end of the mine life
that will require material revisions to AROs. In
particular, the extent of water treatment can have a
material effect on the fair value of AROs, and the
expected water quality at the end of the mine life,
which is the primary driver of the extent of water
treatment, can change significantly. We periodically
prepare updated studies for our mines, following
which it may be necessary to adjust the fair value of
AROs. The period of time over which we have assumed that
water quality monitoring and treatment will be
required has a significant impact on AROs at closed
mines. The amount of AROs recorded reflects the
expected cost, taking into account the probability
of particular scenarios. The difference between the
upper end of the range of these assumptions and the
lower end of the range can be significant, and
consequently changes in these assumptions could
have a material effect on the fair value of AROs and
future earnings in a period of change.
At one closed mine, the principal uncertainty
that could impact the fair value of the ARO is the
manner in which a tailings facility will need to be
remediated. In measuring the ARO, we have concluded
that there are two possible methods that could be
used. We have recorded the ARO using the more
costly method until such time that the less costly
method can be proven as technically feasible and
approved.
In 2005, we recorded increases in ARO estimates
of $91 million (2004: $68 million; 2003: $10
million) of which $47 million of this increase
(2004: $14 million; 2003: nil) related to new AROs
at development projects and mines that commenced
production during 2005. A further $29 million (2004:
$32 million; 2003: nil) relates to updates of the
assessment of the extent of water treatment and
other assumptions at our operating mines. We
recorded increases in AROs of $15 million at our
closed mines, which were charged to earnings (2004:
$22 million; 2003: $10 million).
AROs at December 31, 2005
| ($ millions) | ||||
Operating mines |
$ | 280 | ||
Closed mines |
154 | |||
Development projects |
12 | |||
Total |
$ | 446 | ||
| 70 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Deferred Tax Assets and Liabilities
Measurement of Temporary Differences
We are periodically required to estimate the tax
basis of assets and liabilities. Where applicable
tax laws and regulations are either unclear or
subject to varying interpretations, it is possible
that changes in these estimates could occur that
materially affect the amounts of deferred income tax
assets and liabilities recorded in our Financial
Statements. Changes in deferred tax assets and
liabilities generally have a direct impact on
earnings in the period of changes.
The most significant such estimate is the tax basis
of certain Australian assets following elections in
2004 under new tax regimes in Australia. These
elections resulted in the revaluation of certain
assets in Australia for income tax purposes. Part of
the revalued tax basis of these assets was estimated
based on a valuation completed for tax purposes.
This valuation is under review by the Australian Tax
Office (“ATO”) and the amount finally accepted by
the ATO may differ from the assumption used to
measure deferred tax balances at the end of 2004.
Valuation Allowances
Each period, we evaluate the likelihood of whether
some portion or all of each deferred tax asset will
not be realized. This evaluation is based on historic
and future expected levels of taxable income, the
pattern and timing of reversals of taxable temporary
timing differences that give rise to deferred tax
liabilities, and tax planning initiatives. Levels of
future taxable income are affected by, among other
things, market gold prices, production costs,
quantities of proven and probable gold reserves,
interest rates and foreign currency exchange rates.
If we determine that it is more likely than not (a
likelihood of more than 50%) that all or some portion
of a deferred tax asset will not be realized, then we
record a valuation allowance against the amount we do
not expect to realize. Changes in valuation
allowances are recorded as a component of income tax
expense or recovery for each period. The most
significant recent trend impacting expected levels of
future taxable and valuation allowances has been
rising gold prices. A continuation of this trend could lead to the
release of some of the valuation allowances
recorded, with a corresponding effect on earnings in
the period of release.
In 2005, we released valuation allowances
totaling $32 million, which mainly included amounts
totaling $31 million in Argentina, relating to the
effect of the higher gold price environment and
start-up of production at Veladero in 2005. We
released valuation allowances totaling $5 million
in 2004 and $62 million in 2003. In 2004, the
release was as a consequence of an election to
consolidate
our Australian operations into one tax group. Valuation allowances released in 2003 mainly
included: $21 million in North America following a
corporate reorganization of certain subsidiaries
that enabled us to utilize certain previously
unrecognized tax assets; $16 million in Australia
realized in 2003 due to an increase in taxable
income from higher gold prices; and $15 million in
Argentina after the approval to begin construction
of our new Veladero mine and classification of
mineralization as a proven and probable reserve.
The Placer Dome acquisition may cause us to
reconsider that some of our deferred tax assets, to
which valuation allowances have been applied, are
now more likely than not to be realized. If we
determine that, as a direct result of the Placer
Dome acquisition, some or all of the valuation
allowances can be released, any amounts that we
release may be reflected as an adjustment to
goodwill in the purchase price allocation.
Valuation allowances at December 31
| ($ millions) | 2005 | 2004 | ||||||
United States |
$ | 209 | $ | 195 | ||||
Chile |
124 | 129 | ||||||
Argentina |
46 | 75 | ||||||
Canada |
63 | 73 | ||||||
Tanzania |
204 | 146 | ||||||
Australia |
2 | 3 | ||||||
Other |
8 | 8 | ||||||
| $ | 656 | $ | 629 | |||||
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 71 |
United States: most of the valuation
allowances relate to the full amount of Alternative
Minimum Tax credits, which have an unlimited
carry-forward period. Increasing levels of future
taxable income due to higher gold selling prices
and other factors and circumstances may result in
our becoming a regular taxpayer under the US
regime, which may cause us to release some, or all,
of the valuation allowance on the Alternative
Minimum Tax credits.
Chile and Argentina: the valuation
allowances relate to the full amount of tax assets
in subsidiaries that do not have any present sources
of gold production or taxable income. In the event
that these subsidiaries have sources of taxable
income in the future, we may release some or all of
the allowances.
Canada: substantially all of the
valuation allowances relate to capital losses that
will only be utilized if any capital gains are
realized.
Tanzania: considering the local fiscal
regime applicable to mining companies and expected
levels of future taxable income from the Bulyanhulu
and Tulawaka mines, a valuation allowance exists
against a portion of the deferred tax assets. If we
conclude that expected levels of future taxable
income from Bulyanhulu and Tulawaka will be higher,
we may release some or all of the valuation
allowance.
Stock-Based Compensation
We calculate and disclose in our Financial
Statements pro forma compensation expense for
employee stock options. Commencing in first quarter
2006, we will record compensation expense in
earnings for employee stock options, based on the
estimated fair market value of employee stock
options on their grant date. The most significant
assumptions involving judgment that affect a stock
option’s fair value include, but are not limited to:
expected volatility, expected term and expected
exercise behavior of option holders.
We determine expected future volatility by
taking into consideration both historical volatility
of our US dollar share price and the implied
volatility of our US dollar market traded stock
options. Under the Black-Scholes valuation model,
the term assumption takes into consideration
expected rates of employee turnover and represents
the estimated average length of time stock options
remain outstanding before they are either exercised
or forfeited. Under the Lattice valuation model, the
expected term assumption is derived from the option
valuation model and is in part based on expected
exercise behavior of option holders based on
multiple share price paths. When reviewing the
historical behavior of option holders, we
segregate the population into groups with similar
characteristics.
Stock option expense is impacted by estimated
forfeiture rates for stock options. We estimate
forfeiture rates by considering trends in historical
forfeiture rates. If actual forfeiture rates differ
from estimated rates, we adjust our stock option
expense to reflect revised expectations. For
assumptions used in stock option valuation, we apply
any updated assumptions to the valuation of future
grants. Our option fair value has changed at each
grant date as we update our historical data used to
calculate specific assumptions, namely; the expected
volatility and expected term of the option. With
each grant date, we incorporate the current market
stock price and interest rates into our valuation
model, both of these assumptions change on an
ongoing basis.
| 72 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
Cautionary Statement on
Forward-Looking Information
Certain information contained or incorporated by
reference in this Annual Report 2005, including any
information as to our future financial or operating
performance, constitutes “forward-looking
statements”. All statements, other than statements of
historical fact, are forward-looking statements. The
words “believe”, “expect”, “anticipate”,
“contemplate”, “target”, “plan”, “intends”,
“continue”, “budget”, “estimate”, “may”, “will”,
“schedule” and similar expressions identify
forward-looking statements. Forward-looking
statements are necessarily based upon a number of
estimates and assumptions that, while considered
reasonable by us, are inherently subject to
significant business, economic and competitive
uncertainties and contingencies. Known and unknown
factors could cause actual results to differ
materially from those projected in the
forward-looking statements. Such factors include, but
are not limited to: fluctuations in the currency
markets (such as the Canadian and Australian dollars
versus the US dollar); fluctuations in the spot and
forward price of gold or certain other commodities
(such as silver, copper, diesel fuel and
electricity); changes in US dollar interest rates or
gold lease rates that could impact the mark-to-market
value of outstanding derivative instruments and
ongoing payments/receipts under interest rate swaps
and variable rate debt obligations; risks arising
from holding derivative instruments (such as credit
risk, market liquidity risk and mark-to-market risk);
changes in national and local government legislation,
taxation, controls, regulations and political or
economic developments in Canada, the United States,
Dominican Republic, Australia, Papua New Guinea,
Chile, Peru, Argentina, South Africa, Tanzania,
Russia or Barbados or other countries in which we do
or may carry on business
in the future; business opportunities that may be
presented to, or pursued by, us; our ability to
successfully integrate acquisitions, including our
recent acquisition of Placer Dome; operating or
technical difficulties in connection with mining or
development activities; the speculative nature of
gold exploration and development, including the
risks of obtaining necessary licenses and permits;
diminishing quantities or grades of reserves;
adverse changes in our credit rating; and contests
over title to properties, particularly title to
undeveloped properties. In addition, there are risks
and hazards associated with the business of gold
exploration, development and mining, including
environmental hazards, industrial accidents, unusual
or unexpected formations, pressures, cave-ins,
flooding and gold bullion losses (and the risk of
inadequate insurance, or inability to obtain
insurance, to cover these risks). Many of these
uncertainties and contingencies can affect our
actual results and could cause actual results to
differ materially from those expressed or implied in
any forward-looking statements made by, or on behalf
of, us. Readers are cautioned that forward-looking
statements are not guarantees of future performance.
All of the forward-looking statements made in this
Annual Report 2005 are qualified by these cautionary
statements. Specific reference is made to Barrick’s
most recent Form 40-F/Annual Information Form on
file with the SEC and Canadian provincial securities
regulatory authorities for a discussion of some of
the factors underlying forward-looking statements.
We disclaim any intention or obligation to
update or revise any forward-looking statements
whether as a result of new information, future
events or otherwise, except to the extent
required by applicable laws.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 73 |
Glossary of Technical Terms
AUTOCLAVE: Oxidation process in which
high temperatures and pressures are applied to
convert refractory sulphide mineralization into
amenable oxide ore.
BACKFILL: Primarily waste sand or rock
used to support the roof or walls after removal
of ore from a stope.
BY-PRODUCT: A secondary metal or
mineral product recovered in the milling process
such as copper and silver.
CONCENTRATE: A very fine, powder-like
product containing the valuable ore mineral
from which most of the waste mineral has been
eliminated.
CONTAINED OUNCES: Represents ounces in
the ground before reduction of ounces not able to
be recovered by the applicable metallurgical
process.
CONTANGO: The positive difference between
the spot market gold price and the forward market
gold price. It is often expressed as an interest
rate quoted with reference to the difference between
inter-bank deposit rates and gold lease rates.
DEVELOPMENT: Work carried out for the
purpose of opening up a mineral deposit. In an
underground mine this includes shaft sinking,
crosscutting, drifting and raising. In an open pit
mine, development includes the removal of
overburden.
DILUTION: The effect of waste or
low-grade ore which is unavoidably included in
the mined ore, lowering the recovered grade.
DORÉ: Unrefined gold and silver
bullion bars usually consisting of
approximately 90 percent
precious metals that will be further refined to
almost pure metal.
EXPLORATION: Prospecting, sampling,
mapping, diamond-drilling and other work
involved in searching for ore.
GRADE: The amount of metal in each ton of
ore, expressed as troy ounces per ton or grams per
tonne for precious metals and as a percentage for
most other metals.
Cut-off grade: the minimum metal grade at
which an orebody can be economically mined
(used in the calculation of ore reserves).
Mill-head grade: metal content of mined ore
going into a mill for processing.
Recovered grade: actual metal content of ore
determined after processing.
Reserve grade: estimated metal content of an
orebody, based on reserve calculations.
HEAP LEACHING: A process whereby gold is
extracted by “heaping” broken ore on sloping
impermeable pads and continually applying to the
heaps a weak cyanide solution which dissolves the
contained gold. The gold-laden solution is then
collected for gold recovery.
HEAP LEACH PAD: A large impermeable
foundation or pad used as a base for ore during heap
leaching.
LIBOR: The London Inter-Bank
Offered Rate for deposits.
| 74 n Management’s Discussion and Analysis | Barrick Annual Report 2005 |
MILL: A processing facility where ore is
finely ground and thereafter undergoes physical or
chemical treatment to extract the valuable metals.
MINERAL RESERVE: See page 125 — “Gold
Mineral Reserves and Mineral Resources.”
MINERAL RESOURCE: See page 125 — “Gold
Mineral Reserves and Mineral Resources.”
MINING CLAIM: That portion of applicable
mineral lands that a party has staked or marked
out in accordance with applicable mining laws to
acquire the right to explore for and exploit the
minerals under the surface.
MINING RATE: Tons of ore mined per day
or even specified time period.
OPEN PIT: A mine where the minerals
are mined entirely from the surface.
ORE: Rock, generally containing
metallic or non-metallic minerals, which can be
mined and processed at a profit.
ORE BODY: A sufficiently large amount of
ore that can be mined economically.
OUNCES: Troy ounces of a fineness of
999.9 parts per 1,000 parts.
RECLAMATION: The process by which lands
disturbed as a result of mining activity are
modified to support beneficial land use. Reclamation
activity may include the removal of buildings,
equipment, machinery and other physical remnants of
mining, closure of tailings storage facilities,
leach pads and other mine features, and contouring,
covering and re-vegetation of waste rock and other
disturbed areas.
RECOVERY RATE: A term used in process
metallurgy to indicate the proportion of valuable
material physically recovered in the processing of
ore. It is generally stated as a percentage of the
material recovered compared to the total material
originally present.
REFINING: The final stage of metal
production in which impurities are removed from the
molten metal.
ROASTING: The treatment of ore by heat and
air, or oxygen enriched air, in order to remove
sulphur, carbon, antimony or arsenic.
STRIPPING: Removal of overburden or waste
rock overlying an ore body in preparation for mining by
open pit methods. Expressed as the total number of
tons mined or to be mined for each ounce of gold.
TAILINGS: The material that remains
after all economically and technically
recoverable precious metals have been removed
from the ore during processing.
| Barrick Annual Report 2005 | Management’s Discussion and Analysis n 75 |
Key Statistics
| Three months ended | Year ended | |||||||||||||||
| (in United States dollars) | December 31, | December 31, | ||||||||||||||
| (Unaudited) | 2005 | 2004 | 2005 | 2004 | ||||||||||||
Operating Results |
||||||||||||||||
Gold production (thousands of ounces)1 |
1,648 | 1,169 | 5,460 | 4,958 | ||||||||||||
Gold sold (thousands of ounces) |
1,650 | 1,200 | 5,320 | 4,936 | ||||||||||||
Per Ounce Data |
||||||||||||||||
Average spot gold price |
$ | 486 | $ | 434 | $ | 444 | $ | 409 | ||||||||
Average realized gold price |
467 | 417 | 439 | 391 | ||||||||||||
Total cash costs2 |
221 | 223 | 227 | 214 | ||||||||||||
Amortization3 |
74 | 76 | 76 | 86 | ||||||||||||
Total production costs |
295 | 299 | 303 | 300 | ||||||||||||
Financial Results (millions) |
||||||||||||||||
Gold sales |
$ | 776 | $ | 501 | $ | 2,350 | $ | 1,932 | ||||||||
Net income |
175 | 156 | 401 | 248 | ||||||||||||
Operating cash flow |
269 | 123 | 726 | 509 | ||||||||||||
Per Share Data (dollars) |
||||||||||||||||
Net income (basic) |
0.33 | 0.30 | 0.75 | 0.47 | ||||||||||||
Net income (diluted) |
0.32 | 0.29 | 0.75 | 0.46 | ||||||||||||
Operating cash flow (basic and diluted) |
0.50 | 0.23 | 1.35 | 0.95 | ||||||||||||
Weighted average common shares outstanding (millions)4 |
541 | 534 | 538 | 534 | ||||||||||||
| As at | As at | |||||||
| December 31, | December 31, | |||||||
| 2005 | 2004 | |||||||
Financial Position (millions) |
||||||||
Cash and equivalents |
$ | 1,037 | $ | 1,398 | ||||
Non-cash working capital |
151 | 141 | ||||||
Long-term debt5 |
1,721 | 1,655 | ||||||
Shareholders’ equity6 |
3,850 | 3,574 | ||||||
| 1 | Includes equity ounces in Highland Gold. | |
| 2 | Represents cost of goods sold plus royalties, production taxes and accretion expense, less by-product revenues, divided by ounces of gold sold. For further information on this performance measure, refer to page 17. | |
| 3 | Represents amortization expense at the Company’s producing mines divided by ounces of gold sold. | |
| 4 | Fully diluted, includes shares issuable upon exchange of BGI (Barrick Gold Inc.) exchangeable shares. | |
| 5 | We drew down $1 billion under our credit agreement subsequent to December 31, 2005 to pay for the cash component of the Placer acquisition. We expect to repay the amounts borrowed with proceeds realized on closing of the Goldcorp agreement. | |
| 6 | Shareholders’ equity increased subsequent to December 31, 2005, in connection with the Placer Dome acquisition, refer to note 3 to the Financial Statements. |
| Barrick Year-End 2005 | Summary Information n 5 |
Production and Cost Summary
| Production (attributable ounces) (000’s) | Total Cash Costs (US$/oz)1 | |||||||||||||||||||||||||||||||
| Three months ended | Year ended | Three months ended | Year ended | |||||||||||||||||||||||||||||
| December 31, | December 31, | December 31, | December 31, | |||||||||||||||||||||||||||||
| (Unaudited) | 2005 | 2004 | 2005 | 2004 | 2005 | 2004 | 2005 | 2004 | ||||||||||||||||||||||||
North America |
||||||||||||||||||||||||||||||||
Open Pit |
495 | 373 | 1,514 | 1,381 | $ | 217 | $ | 230 | $ | 235 | $ | 249 | ||||||||||||||||||||
Underground |
127 | 134 | 510 | 562 | 345 | 233 | 314 | 255 | ||||||||||||||||||||||||
Goldstrike Property Total |
622 | 507 | 2,024 | 1,943 | 242 | 231 | 255 | 250 | ||||||||||||||||||||||||
Eskay Creek |
25 | 73 | 172 | 290 | 15 | 7 | 49 | 32 | ||||||||||||||||||||||||
Round Mountain (50%) |
78 | 84 | 368 | 381 | 291 | 267 | 246 | 225 | ||||||||||||||||||||||||
Hemlo (50%) |
51 | 66 | 230 | 247 | 317 | 232 | 288 | 241 | ||||||||||||||||||||||||
Holt-McDermott2 |
— | — | — | 55 | — | — | — | 197 | ||||||||||||||||||||||||
Marigold (33%) |
19 | 15 | 69 | 47 | 213 | 194 | 219 | 198 | ||||||||||||||||||||||||
| 795 | 745 | 2,863 | 2,963 | 245 | 212 | 244 | 223 | |||||||||||||||||||||||||
South America |
||||||||||||||||||||||||||||||||
Pierina |
174 | 94 | 628 | 646 | 165 | 155 | 139 | 111 | ||||||||||||||||||||||||
Lagunas Norte |
298 | — | 550 | — | 102 | — | 110 | — | ||||||||||||||||||||||||
Veladero |
51 | — | 56 | — | n/a | — | n/a | — | ||||||||||||||||||||||||
| 523 | 94 | 1,234 | 646 | 126 | 155 | 126 | 111 | |||||||||||||||||||||||||
Australia/Africa |
||||||||||||||||||||||||||||||||
Plutonic |
57 | 74 | 251 | 305 | 293 | 251 | 263 | 223 | ||||||||||||||||||||||||
Darlot |
39 | 28 | 135 | 140 | 237 | 255 | 259 | 210 | ||||||||||||||||||||||||
Lawlers |
38 | 29 | 131 | 110 | 231 | 249 | 271 | 246 | ||||||||||||||||||||||||
Kalgoorlie (50%) |
81 | 110 | 417 | 444 | 331 | 241 | 248 | 234 | ||||||||||||||||||||||||
| 215 | 241 | 934 | 999 | 291 | 247 | 257 | 229 | |||||||||||||||||||||||||
Bulyanhulu |
72 | 89 | 311 | 350 | 401 | 323 | 358 | 284 | ||||||||||||||||||||||||
Tulawaka (70%) |
33 | — | 87 | — | 217 | — | 253 | — | ||||||||||||||||||||||||
| 320 | 330 | 1,332 | 1,349 | 303 | 265 | 280 | 243 | |||||||||||||||||||||||||
Highland equity portion |
10 | — | 31 | — | 314 | n/a | 303 | n/a | ||||||||||||||||||||||||
Total |
1,648 | 1,169 | 5,460 | 4,958 | $ | 221 | $ | 223 | $ | 227 | $ | 214 | ||||||||||||||||||||
| Total Production Costs (US$/oz) | ||||||||||||||||
| Three months ended | Year ended | |||||||||||||||
| December 31, | December 31, | |||||||||||||||
| (Unaudited) | 2005 | 2004 | 2005 | 2004 | ||||||||||||
Direct mining costs3 |
$ | 237 | $ | 265 | $ | 255 | $ | 248 | ||||||||
Hedge gains4 |
(16 | ) | (24 | ) | (21 | ) | (19 | ) | ||||||||
By-product credits |
(19 | ) | (35 | ) | (25 | ) | (30 | ) | ||||||||
Cash operating costs |
202 | 206 | 209 | 199 | ||||||||||||
Royalties |
12 | 13 | 12 | 11 | ||||||||||||
Production taxes |
5 | 2 | 4 | 2 | ||||||||||||
Accretion and other costs |
2 | 2 | 2 | 2 | ||||||||||||
Total cash costs |
221 | 223 | 227 | 214 | ||||||||||||
Amortization |
74 | 76 | 76 | 86 | ||||||||||||
Total production costs |
$ | 295 | $ | 299 | $ | 303 | $ | 300 | ||||||||
| 1 | Total cash costs per ounce statistics for 2005 and 2004 are not comparable due to the change in accounting for deferred stripping costs. Refer to page 34 for further details. For further information on this performance measure, refer to page 17. | |
| 2 | Holt-McDermott ceased production in fourth quarter 2004. | |
| 3 | At market currency exchange rates and commodity prices. | |
| 4 | From currency and commodity hedge contracts. |