Minefinders Corp Ltd. 6-K, filed Jul 8, 2010: Minefinders Reports La Bolsa Project Economics and Reserves
Exhibit 99.1
|
MINEFINDERS
CORPORATION
LTD.
TSX
: MFL
NYSE
AMEX : MFN
|
Suite
2288-1177 West Hastings St.
Vancouver,
BC V6E 2K3
Tel.
(604) 687-6263
Fax
(604) 687-6267
www.minefinders.com
|
NEWS
RELEASE
MINEFINDERS
REPORTS LA BOLSA PROJECT ECONOMICS AND RESERVES
(All
figures are in United States dollars unless otherwise stated)
Vancouver,
British Columbia - July 7, 2010 - Minefinders Corporation Ltd. today reported
the results of an independently prepared pre-feasibility study (the “study”) for
its La Bolsa gold and silver project in Sonora, Mexico. The property is located
27 kilometres west-northwest of the city of Nogales, near the Sonora/Arizona
border.
The study
contemplates conventional open-pit mining methods at La Bolsa with low-cost
heap-leach processing. Throughput is projected at 8,500 tonnes of ore per day
with two-stage crushing and gold and silver recovery achieved through a carbon
absorption recovery system. The minable reserve, using prices of $825 per ounce
of gold and $14 per ounce of silver contains 316,135 ounces of gold and 4.5
million ounces of silver. Assuming average recoveries of 72% for gold
and 7% for silver, the total production from La Bolsa is estimated at 227,600
ounces of gold and 315,100 ounces of silver over a six year mine life. The life
of mine reserve strip ratio is estimated at 1.9 to 1 waste to ore and the
operating strip ratio is estimated at 1.5 to 1 waste to ore, net of capitalized
pre-stripping.
“The La
Bolsa project has several favourable characteristics, including a low
waste-to-ore ratio, amenability to heap-leach processing, and close proximity to
infrastructure,” said Mark Bailey, President and Chief Executive Officer. “We
consider the results of the pre-feasibility study a positive step toward
advancing the La Bolsa gold deposit to a production decision. Over the next
several months we will consider our options to realize value from La
Bolsa.”
La
Bolsa Mine Economics
Base case
metal price assumptions of $850 per ounce of gold and $14 per ounce of silver
were used in the economic analysis. The initial capital cost is $31.4
million, which includes $7.0 million of initial working capital with life of
mine sustaining capital costs of $12.5 million or $2.3 million net of $10.2
million of capital recoveries. A comparison showing gross revenues,
net present values, and internal rates of return for both the base case and at
approximate recent spot prices for gold and silver are as follows:
|
Base
Case
|
Spot
Case
|
|
|
Gold
|
$
850
|
$
1,200
|
|
Silver
|
$
14
|
$
18
|
|
Life
of mine gold production (ounces)
|
227,600
|
227,600
|
|
Life
of mine silver production (ounces)
|
315,100
|
315,100
|
|
Gross
revenues (includes silver)
|
$
197.9 million
|
$
278.8 million
|
|
Total
cash cost per ounce, silver by-product
|
$516
|
$510
|
|
NPV
0% discount – pre-tax
|
$
42.3 million
|
$
123.2 million
|
|
NPV
5% discount – pre-tax
|
$
28.2 million
|
$ 91.3
million
|
|
IRR
– pre-tax
|
34%
|
95%
|
La
Bolsa Reserves
Proven
and probable reserves have been estimated as of June 10, 2010 in accordance with
definitions adopted by the Canadian Institute of Mining, Metallurgy and
Petroleum on November 14, 2004. Ms. Xochitl Valenzuela, an independent
mining consultant, prepared the estimates as reported below:
La
Bolsa Project - Proven and Probable Reserve Estimate – June, 2010
|
Reserves
|
Tonnes
|
Gold
Grade
(gpt)
|
Gold
Ounces
Contained
|
Silver
Grade
(gpt)
|
Silver
Ounces
Contained
|
|
Proven
|
9.461,535
|
0.667
|
203,045
|
10.1
|
3,079,309
|
|
Probable
|
6,169,633
|
0.570
|
113,090
|
7.2
|
1,422,228
|
|
Total
Proven & Probable
|
15,631,168
|
0.629
|
316,135
|
9.0
|
4,501,537
|
The La
Bolsa reserve has been estimated using recent drill data and the previously
audited resource model reported by the Company in a news release dated September
14, 2009 and a National Instrument 43-101 (“NI 43-101”) technical report filed
on SEDAR on October 21, 2009. The NI 43-101 resource estimate was completed by
Minefinders and was audited by Messrs. David Linebarger and Ralph Sacrison of
Sacrison Engineering who are Independent Qualified Persons as defined by NI
43‐101. An
updated measured and indicated resource estimation incorporating additional
infill drilling was completed in March of 2010 and was used to determine the
final reserve estimation. The measured and indicated mineral resource used in
the study at a 0.25 grams per tonne (“gpt”) cutoff grade totals 18.73 million
tonnes as reported below:
La
Bolsa Project - Resource (0.25 gpt Au cutoff) – March, 2010
|
Classification
|
Tonnes
|
Gold
Grade
(gpt)
|
Gold
Ounces
Contained
|
Silver
Grade
(gpt)
|
Silver
Ounces
Contained
|
|
Measured
|
9,705,479
|
0.751
|
234,464
|
10.8
|
3,383,952
|
|
Indicated
|
9,028,438
|
0.596
|
172,866
|
8.6
|
2,483,960
|
|
Total
Measured and Indicated
|
18,733,917
|
0.676
|
407,330
|
9.7
|
5,867,912
|
Qualified
Person
Mark
Bailey MSc., P.Geo., is the "qualified person" with overall responsibility for
the La Bolsa Project and is responsible for the contents of this news release.
Mr. Anthony E.W. Crews, P.E., principal of The MINES Group, Inc. is the
“qualified person” responsible for the contents of the study. An independently
prepared NI 43-101 compliant technical report providing details of the reserve
and economic model contemplated in the study will be filed on SEDAR within 45
days.
About
Minefinders
Minefinders
is a precious metals mining and exploration company and operates the
multi-million ounce Dolores gold and silver mine in Mexico. The Company
continues its exploration efforts on other prospective projects in
Mexico.
Investor
contacts:
Jonathan
Hackshaw
Director
of Corporate Communications
Mike
Wills
Investors
Relations Representative
Toll
Free: (866) 687-6263
Forward
Looking Statements
This
release contains certain "forward-looking statements" and "forward-looking
information" as defined under applicable Canadian and U.S. securities laws.
Forward-looking statements generally can be identified by the use of
forward-looking terminology such as "may," "will," "expect," "intend,"
"estimate," "anticipate," "believe," "continue" or similar terminology.
Forward-looking statements are based on forecasts of future results, estimates
of amounts not yet determinable and assumptions that, while believed by
management to be reasonable, are inherently subject to significant business,
economic and competitive uncertainties and contingencies. Certain of the
statements made herein by Minefinders are forward-looking and subject to
important risk factors and uncertainties, both known and unknown, many of which
are beyond the Company’s ability to control or predict. Known and unknown
factors could cause actual results to differ materially from those projected in
the forward-looking statements. Those factors are described or referred to under
the heading "Risk Factors" in Minefinders' Annual Information Form for the year
ended December 31, 2009 and under the heading "Risks and Uncertainties" in
Minefinders' Management’s Discussion and Analysis for the quarter ended March
31, 2010, both of which are incorporated by reference herein and are available
on SEDAR at www.sedar.com. Although the Company has attempted to identify
important factors that could cause actual actions, events or results to differ
materially from those described in forward-looking statements, there may be
other factors that cause actions, events or results not to be as anticipated,
estimated or intended. There can be no assurance that forward-looking statements
will prove to be accurate, as actual results and future events could differ
materially from those anticipated in such statements. Accordingly, readers
should not place undue reliance on forward-looking statements. Minefinders does
not undertake to update any forward looking statements that are incorporated by
reference, except in accordance with applicable securities
laws.