Review of the period |
|
Following his appointment as Chief Executive of Corus in May 2003, Philippe Varin launched a number of key initiatives, known as the Restoring Success programme. This programme was focused on introducing new leadership and instilling a new corporate culture across the Group, aligning the financial resources available to the Group with its future strategic needs, and returning all parts of the Group to acceptable levels of profitability. The latter was to be accomplished by building on existing cost reduction programmes, implementing restructuring proposals for the UK asset base and initiating Group-wide efficiency measures, as described below. The Group’s aim is to close the competitive gap that existed between Corus and its European peer group. Corus estimates that this gap in 2004 was some 3.5% at the EBITDA margin level (i.e. EBITDA to turnover) when measured against the average of its European competitors, as compared with some 6% in 2003. Full implementation of the Restoring Success programme described below is designed to close the current competitive gap by the end of 2006. In brief, financial benefits from the Restoring Success programme are expected to deliver an improvement of £680m per annum by the end of 2006 from a base of June 2003 and are being generated in three broad areas. |
Existing ongoing initiatives (totalling £210m per annum by the end of 2006): A number of cost reduction and efficiency programmes were already underway and have been incorporated in the Restoring Success programme. These include:
|
UK restructuring (totalling £120m per annum by the end of 2006): In April 2003 Corus outlined the conclusion of a review of the Group’s UK asset base, which was to size the business to the available market and create an internationally competitive cost base for the UK businesses. Steelmaking in the UK was to be concentrated on three sites; for strip products at Port Talbot in South Wales, for long products at Scunthorpe in North Lincolnshire and for engineering steels at Rotherham in South Yorkshire. As part of the UK restructuring programme, Teesside’s steelmaking capacity becomes surplus to the Group’s internal requirements. Teesside has, therefore, been refocused as a slab exporter and has entered into an agreement effective from 2 January 2005 with a consortium of re-rolling companies (Duferco, Marcegaglia, Imsa and Dongkuk) to supply slab under a ten year off-take contract. Under this agreement the consortium will take at cost slab production in 2005 and 2006 that is surplus to Corus’ internal requirements, and approximately 78% of output thereafter. The consortium will pay Corus US$157m (US$73m in 2005/06 and US$84m in deferred payments over the life of the contract) and will contribute approximately 76% of the expected capital expenditure requirements (US$100m) of Teesside Cast Products to enable identified improvements to be implemented.
|
|
Corus Report & Accounts 2004 9 |
||||
|
|
|
|||
Review of the period |
| With steelmaking for strip products in the UK concentrated at Port Talbot, this plant will supply the mills and coating line at Llanwern. With steel production and primary rolling for engineering steels concentrated at Rotherham, the closure of steelmaking and hot rolling at Stocksbridge in South Yorkshire will take place in 2005. Finishing facilities for aerospace steels and engineering billets/rounds will remain at the Stocksbridge site. At Rotherham, the Thrybergh bar mill is being enhanced to roll coiled bar, following which the Roundwood coiled bar mill will be closed. The finishing facilities at Tipton in the West Midlands are in the process of being relocated to Rotherham. As a result of the above the Group’s UK steelmaking requirements for the core strip products, long products and engineering steels businesses (i.e. excluding Teesside) will reduce to 10.5mt per annum, largely focused on satisfying UK market demand. Approximately 1,150 jobs will be directly affected by these closures and rationalisation measures. The development projects at Port Talbot and Rotherham are well underway, and both are progressing on time and within approved budget cost.
|
New initiatives (totalling £350m per annum by the end of 2006): The Restoring Success programme includes, in addition to the existing ongoing cost reduction programmes and UK restructuring, a series of new initiatives to improve Group performance. A review in the second half of 2003 identified cost savings and profit improvement opportunities to be achieved by the end of 2006, as follows:
|
The Group’s capital expenditure increased in 2004 in support of these initiatives, including UK restructuring. Management estimates that Restoring Success had achieved improvements by the end of 2004 that were running at an annual rate of some £335m. Benefits achieved in 2004 compared with the base of June 2003 are estimated at some £300m and contributed to the year-on-year improvement in the Group’s operating result. Benefits achieved by the end of 2004 do not yet include the impact of UK restructuring, which will be realised progressively from mid 2005, nor from capital expenditure projects currently underway to improve the Group’s product and customer mix towards premium end-markets. Management remains confident that the targeted improvement by the end of 2006 will be achieved. |
| 10 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
| Corus Report & Accounts 2004 11 |
||||
|
|
|
|||
Review of the period |
| prices and to enhance margins, as global demand for steel remained strong. The Group also benefited from the Restoring Success programme launched in 2003, which is discussed on pages 9 to 10. Operating costs in 2004 were £8,750m (2003: £8,161m) and included a net charge of £45m in respect of restructuring and impairment costs (2003: £142m). Excluding the restructuring and impairment costs, which are explained above, operating costs increased by 9% overall compared with a turnover increase of 17%. In particular, the Group saw its overall raw material costs increase by 18% in 2004, with notably large increases in coking coal, iron ore and scrap. The Corus share of results of joint ventures and associated undertakings amounted to a profit of £30m in 2004 (2003: £9m). The increase from 2003 was attributable to a general improvement in performance across the Group’s joint venture and associated undertakings, reflecting the improved conditions in the steel market that also benefited the Group’s result. |
The net profit on the disposal of fixed assets and of Group undertakings amounted to £68m in 2004 (2003: £45m). In 2004 the profit arose from the sale of non-core assets and businesses, including the sale of surplus land at Llanwern and Bryngwyn, the Group’s piling commercial operations in the UK, the Tuscaloosa mini-mill in the USA and the North American service centres. In 2003 the profit consisted primarily of the sale of surplus land and property, and of redundant equipment. The Group’s net interest payable in 2004 of £118m (2003: £98m) reflected the average net debt for the period of £1,113m, with the net debt at 1 January 2005 being £854m (2003: £1,013m). The increase in interest from 2003, in spite of the reduced level of net debt, reflected an early redemption premium on the repurchase of the €400m Guaranteed Bonds due 2006 at a price of 103.5% (see ‘Financial review’), the amortisation of issue costs on the syndicated bank facility and higher interest rates. The Group’s net interest for the period comprised interest earned of £13m on average deposits and loans of £363m less interest incurred of £131m on average borrowings and leases of £1,476m. |
After net interest and the Group’s share of the results of joint ventures and associated undertakings, there was a profit before tax for the period of £559m (2003: loss of £255m), a profit after tax for the period of £440m (2003: loss of £308m), and a basic earnings per share of 10.05p (2003: loss of 9.25p). Capital expenditure amounted to £377m in 2004 (2003: £163m). The increase from 2003 reflected the impact of planned capital expenditure associated with UK restructuring, progress on major schemes approved in 2003 (such as the reline of no. 7 blast furnace at IJmuiden and the aircraft capacity and capability scheme at Koblenz), and a generally higher level of scheme approvals in 2004 in support of the Restoring Success programme. The UK accounted for 67%, the Netherlands 17%, the rest of Europe 15% and North America 1% of capital expenditure in 2004. Capital expenditure is generally met by cash flow provided by operating activities, cash balances and borrowing facilities. In addition, the Group undertook a Placing and Open Offer of new ordinary shares in December 2003 to raise funds enabling the immediate launch of the UK restructuring programme and to underpin the Restoring Success programme.
|
12 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
| Group
reporting structure Prior to 2004, Corus reported sales volume on the basis of deliveries of Corus sourced material i.e. excluding deliveries from its distribution and further processing operations that were sourced from other steel companies. However, with the new segmental structure, sales volume is now reported on the basis of all deliveries, whether Corus sourced or otherwise. The consequence is that sales volumes for 2003 have been represented and this also has an effect on average revenue figures quoted.
|
Customarily, the Corus review comprised narrative explaining two years of comparative data. However, because of the above change and lack of comparable physical delivery data for 2002, the main section of this year’s review of the period includes only a comparison between 2004 and 2003. A separate section has been included in the review dealing with the comparison between 2003 and 2002 based on the previously reported segments. Carbon
steel market Steel is a capital intensive industry and changes in demand in one region often lead to a rapid change in geographical sales pattern as producers seek to maintain high capacity utilisation. As a result, changes in the global market for steel also influence the financial performance of Corus and its constituent divisions. |
Economic
climate The biggest contributors to the expansion of the global economy were the USA and China, with USA growth at 4.9% year on year in the first half of 2004. Household consumption was strong and business investment recovered on the back of improved corporate profit levels. This led to the US Federal Reserve tightening monetary policy with four separate interest rate rises in the second half. Economic growth then moderated to the more sustainable level of 4% per annum. |
| Corus Report & Accounts 2004 13 |
||||
|
|
|
|||
Review of the period |
In China, growth in the first half of 2004 averaged 9.7%. Investment spending expanded 21%, after having grown by 24% in 2003. In the second half of 2004 the Chinese authorities implemented a number of measures aimed at bringing economic growth, particularly investment spending, under control. Interest rates were increased for the first time in seven years, banks were subjected to tighter controls on lending and some industries, including the steel industry, had their access to finance severely curtailed. In the final quarter of 2004 growth in investment spending fell to an estimated 15% and overall growth to 9.3%. In the UK, growth in the first half of 2004 averaged around 3.2%. This was broadly based with the majority of sectors contributing. Government consumption grew around 5% over the same period, investment spending expanded by 6.5% and household consumption grew by 3%. Monetary policy moved towards a more neutral setting in the second half and this had a marked effect. House price inflation fell, consumers began to curb spending and Christmas retail sales were at their lowest in a decade. As a result, economic growth moderated from 3.2% in the first half to an estimated 2.9% in the second half, a level still above trend.
|
In contrast, the euro-zone’s performance in 2004 was more subdued. Economic growth in the first half was below trend at 1.7% and there was only a slight improvement in the second half, when growth increased to 2%. Furthermore, most of the growth was in response to external demand with euro-zone exports growing 6% during the year. The domestic economy was much weaker, job creation was stagnant, wage growth was modest, consumer confidence was weak and, as a result, consumer spending growth was limited to 1%. Investment spending also failed to pick up to the extent expected in 2004 and business confidence indicators were very volatile. Exchange
rates |
In general, strengthening of sterling adversely affects Corus’ results in three ways. First, it directly reduces the sterling value of export revenues from the UK. This exposure is substantially hedged by forward currency sales to the extent of the Group’s contractual commitments, but such a hedge is effective for only that defined time. Second, it improves the relative competitiveness of steel producers in countries with weaker currencies enabling them to discount prices in the UK market. It is not practicable for any significant period to hedge this competitive exposure. Third, it exposes UK customers to similar pressures leading to a reduction in demand for steel in the UK. The average spot sterling to euro exchange rate during the period was €1.47 (2003: €1.45), the average spot sterling to US dollar exchange rate was US$1.83 (2003: US$1.64) and the average spot euro to US dollar exchange rate was US$1.25 (2003: US$1.13). The year was characterised by the weakness of the US dollar, caused by a massive US current account deficit. |
|
14 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
Global
steel market Overall global supply and demand remains heavily influenced by China. In 2004, China accounted for around 28% of total global steel demand and 26% of total global crude steel production. Any change in Chinese domestic production or demand can, therefore, have a material effect on the global supply/demand balance. This balance improved significantly in 2004 with steel demand growth strong, largely due to China, but also with significant growth in other regions. On the supply side, total installed capacity rose more slowly than crude steel production and it is estimated that global effective steelmaking capacity utilisation increased from 91% in 2003 to 94% in 2004, with surplus capacity at historically low levels. |
As well as limited available capacity, production of crude steel in 2004 is thought to have been limited by physical shortages of raw materials in some locations. Supplies of key raw materials were diverted to feed the domestic Chinese industry, creating a very tight global market for iron ore, coal, coke and bulk shipping. Supplies of steel scrap also tightened. This improvement in the supply/ demand balance provided a positive climate for pricing of steel products. Having fallen to a low point in 2001, world steel prices expressed in US dollars staged a gradual recovery through 2002 and 2003. Moving into 2004, restricted raw material availability and historically low levels of spare steelmaking capacity shifted the balance in favour of more rapid price rises, though actual rates of increase varied across regions. In the first three quarters of 2004, market prices in the USA rose more rapidly than elsewhere. A favourable supply/demand balance was assisted by demand growth that was stronger than in many other developed regions, including the EU and Japan. As the year progressed, however, these relatively high prices led to a build up in imports and, with a seasonal slowdown in activity in the last quarter, were sufficient to play a part in reversing some of the price gains seen previously. In the EU, although production increases were modest, weaker demand growth meant that prices did not rise as quickly as in
|
the USA in the first half of 2004. EU prices in US dollar terms rose more quickly in the second half however and, with the price falls seen latterly in the USA, ended the year at around the same level as those in the USA for some products. Further strong upward pressure on prices resulted from steelmakers’ generally successful attempts to recover large increases in the prices of raw materials in their steel selling prices. In all regions, increased plant utilisation rates are also likely to have assisted steelmakers in improving profitability, through improving operational efficiency levels and reducing unit costs. UK
market |
|
Corus Report & Accounts 2004 15 |
||||
|
|
|
|||
Review of the period |
The UK construction market remained strong through 2004, with activity levels up by an estimated 8%. In the automotive sector, UK car production was flat for the year but commercial vehicle output grew by 11%. Steel stock levels increased significantly during the year, particularly for strip products, as end-users and merchants sought to rebuild stocks that had been run down during 2003. The build up in stocks contributed to the general slowdown in demand in the latter part of the year. Corus carbon steel deliveries to the UK market in 2004 totalled 6.3mt, of which approximately 5.6mt were from Corus produced material and 0.7mt from material sourced from other steel producers. Deliveries in the first half of 2004 were 3.4mt, but reduced in the second half to 2.9mt, due to reduced market activity, seasonal factors and the aforementioned stock build up. The total for 2004 was unchanged from 2003. The Group’s estimated UK market share in 2004 for main carbon steel products was 51% (2003: 52%). In the first half, the downward trend in imports seen during 2003 continued, resulting in an improvement in market share to 53%. However, this trend was reversed in the second half, when a sharp increase in imports coupled with higher deliveries from other UK producers pushed market share down to an estimated 49%. |
Other
European markets The performance of steel using industries was mixed, with activity levels in the first half generally stronger than the second half. Construction output continued to be depressed by weak demand in Germany, but engineering sectors performed better, benefiting in particular from export growth. Stock levels increased significantly fed by imports that began to increase during the second half from a relatively low level in the first half. Corus carbon steel deliveries in and to mainland Europe amounted to 10.5mt in the period, representing an increase of 11% from 2003. This reflected the generally improved demand picture and indicated a slight improvement in EU market share to
|
approximately 7%. The Group’s EU customers sought increased volumes from Corus due to the reduced availability of import material as a result of strong demand growth in markets outside Europe, especially during the first half of the year. Corus’ deliveries in the first half were 5.4mt, falling to 5.1mt in the second half as demand softened and imports increased. Other
markets |
|
16 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
Corus carbon steel deliveries to markets outside Europe amounted to 4.1mt in the period, down from 5.1mt in 2003. The situation varied by product; some benefited from improved demand and the removal of US Section 201 import restrictions. Others saw deliveries fall, largely reflecting improvements in Corus’ core European markets and sharply rising transport costs that made exports outside Europe less attractive. The rationalisation of the Group’s US operations, including the disposal of Tuscaloosa in July 2004, also had an impact. Deliveries to other markets in the first half were 2.1mt, reducing to 2.0mt in the second half. Raw
materials |
The purchase price for these materials is subject to market forces largely beyond Corus’ control and is impacted by demand from other steel producers, supply capacity and freight costs, among other factors. Steel scrap prices are generally based on spot market prices. Corus enters into supply contracts lasting typically between three and ten years for certain raw materials for steel production, although in many instances the prices within these contracts are agreed on an annual basis. For these raw materials, the arrangements account for roughly 80% of Corus’ requirements, with the remainder purchased through one year contracts and options, based on market rates, which provides flexibility and commercial leverage. Recently, the growth of steel demand and production in China has contributed to significantly increased raw material and freight prices for steel production globally. In 2004, crude steel demand in China grew by 13% or 34mt compared with 2003. Chinese crude steel production increased by more than this however; up 24% or 52mt. To support this production, iron ore imports increased by 36%. As a result, coal, iron ore and coke were in tight supply in 2004, and reference grade price settlements were 19% up for iron ore and around 25% up for coal. Coke spot prices also rose to record levels in 2004. Corus secured its requirements
|
through a combination of its long term supply relationships and the development of new sources of supply. A networked supplies organisation, embedded in the businesses of the Group, continues to deliver benefits through a single face approach to the various procurement markets. As part of the Restoring Success initiative, the supplies organisation continued to work with businesses on the identification and delivery of savings opportunities. |
|
Corus Report & Accounts 2004 17 |
||||
|
|
|
|||
|
18 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period
|
Corus produces steel tubes for a variety of industrial uses, including for lighting columns, transmission poles for electrical services, ships’ masts and derricks, oil, gas, water and air mains, and scaffolding tubes. Structural hollow sections, both circular and rectangular, are used in the construction, mechanical handling, agricultural and general engineering fields. Strategy
Turnover,
deliveries and prices
|
Strong demand in China, the Far East and the USA had a positive effect on mainland European manufacturing exports, and European strip steel demand levels are estimated to be some 8% higher in 2004 than 2003. This growth in demand was achieved despite only modest improvements in activity levels in the major end-user sectors and reflected a significant recovery in steel stock levels. Underlying consumption of strip steel in the UK market grew by around 3% in 2004, with strong growth in construction activity, compensating for slower growth in vehicle output and engineering. By contrast, the overall supply of the division’s main products to the UK market grew by 10% in 2004, reflecting not only the improvement in industry activity and business confidence, but also moves by service centre and end user customers to rebuild stocks. The main build up of stocks occurred in the first half, with a correction underway towards the end of the year. After improving in the first half, the division’s UK market share for its main products slipped back in the second half as imports rose and customer attempts to reduce stocks focused primarily on the domestic supplier. UK share in 2004 as a whole is estimated at 49% compared with 50% in 2003. |
Gross deliveries in the year were 12.1mt, compared with 11.6mt in 2003. Of that total, intra-group sales accounted for 2.5mt (2003: 2.9mt), leaving external market sales at 9.6mt, 0.9mt higher than 2003. Average revenue per tonne for the period amounted to £392 compared with £338 in 2003. Average revenue per tonne in the first half of 2004 amounted to £360 increasing to £424 in the second half. The shortage of steelmaking raw materials led to an unprecedented surge in US spot market strip steel selling prices to levels in 2004 that were 70-90% above their previous peaks in 2002. Although US prices fell back during the fourth quarter, they remained very high relative to historical trends. Spot prices in Far East markets had also risen 40% above the 2003 peak by March 2004, but have since fallen back to around 20% above that peak. Northern European prices that are negotiated quarterly improved more gradually than other regional markets in the first half, but the rate of increase accelerated in the second half. The share of the EU market taken by imports fell in the first half of 2004 and, whilst import volumes increased in the second half, they did not undermine domestic EU prices. |
|
Corus Report & Accounts 2004 19 |
||||
|
|
|
|||
Review of the period
|
Average prices in the automotive and packaging sectors, where prices are negotiated annually, improved only modestly in 2004. However, based on the 2005 price negotiations already concluded, it is clear that automotive and packaging sector prices will increase significantly in 2005. Operating
costs
|
Maintenance costs rose as a result of increased volumes, inflation and an increased focus in this area during 2004. There was also an increase in revenue expenditure associated with major capital projects. Higher energy costs were experienced, especially in the UK and mainland Europe where global oil prices fed through to inflated gas and electricity prices. Operating
result |
The improvement was however dominated by the effect of significant increases in selling prices, partially offset by the unprecedented rise in raw material prices during the year. Operational performance was generally good, particularly in iron and steelmaking at IJmuiden, other than the adverse impact in the UK mentioned above, from having to use varying quality imported coke because of the tight raw material market. The benefits from UK restructuring arising from the expansion in liquid steel outputs will start in 2005. The operating profit in the first half of 2004 was £111m, improving to £255m in the second half. |
|
20 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period
|
| Major capital projects | |||||
| Capital | Completion | ||||
| In progress at end December 2004 | cost £m | date | |||
| Port Talbot – heavy end development (UK restructuring) | 79 | Q1 05 | |||
| IJmuiden – reline of no. 7 blast furnace | 60 | Q4 06 | |||
| Port Talbot – refurbishment Morfa coke ovens and related plant | 43 | Q3 05 | |||
| IJmuiden – Paul Wurth top for no. 7 blast furnace | 21 | Q4 06 | |||
| IJmuiden – replacement control system for the hot rolling mill | 17 | Q1 07 | |||
| IJmuiden – increase in organic coated steel capacity | 11 | Q1 06 |
Investment The condition of no. 7 blast furnace at IJmuiden has allowed the completion of its reline, which was approved in 2003, to be delayed for a year until the fourth quarter of 2006. The scheme to refurbish the Morfa coke ovens at Port Talbot has been extended in scope following a further review of the condition of the ovens, and is now planned for completion in the third quarter of 2005.
|
Three other major schemes have been approved and are in progress at IJmuiden. The replacement of the bell top of no. 7 blast furnace by a Paul Wurth top is scheduled for completion at the same time as the reline in the fourth quarter of 2006. This project will increase ironmaking capacity by 0.2mt per annum, and will lower operating costs and improve environmental performance. The computer control system for the hot strip mill will be replaced during 2006. The current system has been in operation for nearly twenty years and has reached the limit of its estimated lifespan. The installation of an organic coating section to the existing galvanising line will improve the position of the business in the growing organic coating market. The project comprises a pre-treatment and one-coat painting section with an infra-red furnace. |
|
Corus Report & Accounts 2004 21 |
||||
|
|
|
|||
Review of the period
|
| 22 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Review of the period
|
|
Strategy
Turnover, deliveries and prices Gross turnover for the period was £2,605m (2003: £2,149m) of which £750m (2003: £613m) was intragroup. The increase in gross turnover of 21% was achieved in spite of a small reduction in overall deliveries, with good levels of demand and restricted steel availability enabling the division to be more selective in choosing the markets it services and to effectively exit from less profitable ones. Considerable progress was also made in improving the product mix through an increased proportion of higher value added products, such as aerospace and tyre cord. These measures, together with price increases discussed below, enabled average revenue per tonne to rise from £262 to £319, an increase of 22% year on year.
|
Gross turnover in the second half increased by 4% from £1,275m to £1,330m, notwithstanding a lower level of deliveries (down 5%) due to seasonal plant shutdown effects and the disposal of Tuscaloosa. The increase was a result of higher selling prices, with average revenue per tonne in the first half amounting to £305, increasing to £333 in the second half. This reflected a combination of continuation of the price movements discussed below and an increased proportion of external, market price slab sales from Teesside Cast Products rather than internal transfers at cost. In the UK, demand for the division’s main products grew by some 3% in 2004, reflecting the continued strength of the construction market and increased investment spending in offshore and renewable energy. Similar demand increases were experienced in the earthmoving sector and in engineering steels, in part influenced by shortages. The division’s UK market share for its main products fell slightly to an estimated 53% in 2004 from 54% in 2003, due to an increase in imports and a rise in deliveries by other UK producers. Stock levels for some products also increased during the year. |
In mainland Europe the situation was more mixed, with construction activity remaining subdued, but other sectors benefiting from export growth and increased investment spending. Overall demand from North America was strong in selected markets that remain important for the division, most notably the earth-moving and engineering steels sectors. Gross deliveries in the year were unchanged compared with 2003 at 8.2mt. Of that total, intra-group sales accounted for 3.1mt (2003: 2.9mt), leaving external market sales at 5.1mt, 0.2mt lower than 2003. A series of selling price increases was announced and implemented in spot markets through the year reflecting strong demand across the product range, both domestically and internationally, and the need to offset the impact of significantly increased raw material costs. Selling price increases in longer term contracts were also applied as and when the terms allowed, together with a supplementary charge that was widely applied from the start of the year to recover some of the raw material cost increases. Engineering Steels and Tuscaloosa (which was sold in July 2004) are the division’s electric arc route producers using scrap as feedstock, and these businesses applied a comprehensive surcharge mechanism to reflect the highly volatile movement in scrap prices, which reached unprecedentedly high levels during 2004. |
| Corus Report & Accounts 2004 23 |
||||
|
|
|
|||
| Review of the period
|
| Operating
costs |
Operating
result The operating profit in the first half of 2004 was £24m, improving to £191m in the second half, which included the reversal of the existing impairment provision in respect of Teesside fixed assets. The trend improvement in margins net of raw material cost increases continued throughout the year and combined with a higher proportion of profitable external slab sales from Teesside in the second half. In part this was offset by the disposal of Tuscaloosa and the seasonal effect of plant shutdowns in August and December. Looking forward into 2005, as a result of the ten year off-take contract, the opportunity to take profit on other external slab sales from Teesside will not be repeated. |
Investment
The UK restructuring plan scheme for Rotherham is explained in detail on pages 8 to 10. The scheme is progressing on schedule for completion in the third quarter of 2005. The reline of the Queen Victoria blast furnace at Scunthorpe follows the end of a period of sixteen years in production. In parallel with, and for six months following, the reline in the fourth quarter of 2005, three of the four hot blast stoves serving the furnace will be rebuilt. The reline is expected to enable the furnace to operate until around 2015. The premium rod strategy is a project to enable the business to exploit opportunities to secure a significant increase in its sales of premium grade rod. To achieve the strategic objectives the rod finishing end at Scunthorpe will be developed to improve consistency of size and shape, and particularly to make significant improvements in surface quality. The project is scheduled for completion at the end of 2006.
|
| 24 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period
|
| Major capital projects | ||
| In progress at end December 2004 | Capital cost £m |
Completion date |
| Rotherham – UK restructuring plan | 68 | Q3 05 |
| Scunthorpe – reline of Queen Victoria blast furnace | 19 | Q1 06 |
| Scunthorpe – premium rod strategy | 13 | Q4 06 |
| Scunthorpe – installation of a third ladle furnace | 10 | Q2 05 |
| Scunthorpe – second vacuum degasser | 7 | Q4 05 |
| Other projects, aimed at enhancing the steel making capability at Scunthorpe through installation of a third ladle furnace and a second vacuum degasser, are progressing to plan. | Following the end of the financial year, Corus announced on 17 February 2005 that it would be making a further major investment of £130m at Scunthorpe. The investment builds on the Group’s Restoring Success programme and includes:
As a consequence, rail production will be transferred to Scunthorpe from its current UK manufacturing facility at Workington in 2006.
|
|
Corus Report & Accounts 2004 25 |
||||
|
|
|
|||
Review of the period
|
| 26 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Review of the period
|
Corus International forms part of the division and consists of two major business streams, namely Trading and Projects, and is responsible for managing Corus’ network of sales offices throughout the world. Trading operates on a global basis buying and selling steel both internally and externally. Projects also operates globally and is responsible for sourcing multi-metal requirements on major construction projects. Strategy
|
Turnover,
deliveries and prices Gross turnover for the period was £2,606m (2003: £2,272m) of which £72m (2003: £42m) was intra-group. The increase in gross turnover of 15% was attributable to an increase of 25% in average revenue per tonne, partially offset by a reduction in total deliveries of 9%. Turnover in the second half of 2004 increased to £1,381m from £1,225m in the first half, as a result of the full impact of first half selling price increases and further rises during the second half. Gross deliveries in the year were 6.3mt, compared with 6.9mt in 2003, with the vast bulk of sales being to the external market. Trading business volumes fell in 2004, as 2003 had included exceptionally high levels of slab supply into Asia and, in particular, into China. Underlying distribution and building products sales remained broadly in line with 2003. |
Average revenue per tonne for the period amounted to £411 compared with £327 in 2003. Unprecedented selling price increases were achieved during 2004 on the back of supplying mill price increases. Markets across Europe were similarly affected by the price increases as the rise in steel makers’ input costs, fuelled by demand in China, fed through into finished product prices. Average revenue per tonne in the first half of 2004 amounted to £382 increasing to £440 in the second half, reflecting the full impact of first half selling price rises and further rises in the second half. Operating
costs |
| Corus Report & Accounts 2004 27 |
||||
|
|
|
|||
Review of the period
|
| Major capital projects | ||
| In progress at end December 2004 | Capital cost £m | Completion date |
| Layde – pickling line optimisation and service centre development | 5 | Q3 06 |
Operating
result
|
Investment
|
| 28 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
|
Corus Report & Accounts 2004 29 |
||||
|
|
|
|||
|
Review of the period |
of aircraft plate in the world, supplying major aircraft manufacturers and their respective subcontractors. Corus is highly ranked in Europe in terms of volume of commercial plate, which is used predominantly in the transport and engineering sectors. It is also one of the major suppliers of automotive sheet in Europe. Corus is one of the world’s leading producers of clad sheet and fins for the heat exchanger market, which is used predominantly in the automotive industry and related component suppliers. Corus does not concentrate on supplying the packaging sector, which is a major application area for aluminium products, but focuses on customer specific products in the transport, engineering, construction and household application sectors. Extrusions
|
Corus sells 90% of its finished products direct to end users, sales to distributors and service centres, including the distribution businesses of Corus, counting for less than 10% of total sales. The transport sector (especially aerospace and automotive) is the largest market for downstream aluminium businesses, accounting for approximately 40% of Corus’ rolled products sales and approximately 35% of its extrusions sales. The construction industry is also a key market for the extrusions business, accounting for approximately 35% of turnover. Strategy
|
Dynamics
of the business Demand
|
|
30 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
LME
price The revenue of the primary smelters is directly linked to the LME, but their input costs are only partly related. These units, therefore, experience a change in profitability in direct relationship to the movement in the LME. In contrast, the rolled and extruded products businesses experience swings in their material costs in line with the LME movement. However, this is largely passed through into revenue by operation of the commercial customer terms unless the metal price is fixed by hedges for long term contracts. Exchange
rates
|
Turnover,
deliveries and prices Gross deliveries in the year were 0.7mt, compared with 0.6mt in 2003, with the bulk of sales being to the external market. European
markets |
Deliveries of rolled and extruded products to European markets amounted to 0.42mt in the period compared with 0.38mt in 2003. Other
markets Asian markets also showed high growth rates in 2004. After several years of stagnation, the Japanese market recovered with 4% growth, while Chinese consumption increased by some 16%. Deliveries of rolled and extruded products to markets outside Europe amounted to 0.13mt, compared with 0.11mt in 2003. Prices |
|
Corus Report & Accounts 2004 31 |
||||
|
|
|
|||
|
Review of the period |
Whilst the improved performance of the Duffel site contributed to the improvement in the operating result before restructuring and impairment costs, the relatively lower value of their sales mix compared with Koblenz contributed to the reduction in average revenue per tonne year on year. In addition, with some exceptions, product price developments in Europe were not able to absorb the increased metal prices compared with 2003. Nevertheless, the division did improve margins through positive product mix changes. Another negative impact on the average revenue per tonne was that margins over metal for the division’s Canadian operation came under pressure due to the weakening of the US dollar. Operating
costs
|
The raw material requirements for the aluminium businesses are obtained in part by importing alumina for the production of primary aluminium and in part by buying slabs, billets and aluminium scrap. These materials are purchased by Corus from third party suppliers under competitively priced supply contracts or bidding arrangements. Due to LME price increases and increased sales and production, raw material costs increased substantially compared with 2003. These increases were partially offset by more efficient usage of raw materials. Operating
result The smelters in Delfzijl and in Voerde improved productivity and cost performance, and increased output to record level, although remaining affected by the impact of electricity costs. After two years of negative impact related to the modernisation of the hot rolling mill in Duffel, the
|
mill increased output by 20% in 2004. Deliveries of automotive sheet also continued to grow following the recent investment in a continuous annealing line. At Koblenz, investments related to the Restoring Success programme allowed output to be increased, especially of aerospace products. Cap-de-la-Madeleine continued to improve its productivity, but experienced decreasing margins caused by the weaker US dollar against the Canadian dollar. The rationalisation plan for the Bonn operation has now been completed with resulting benefits. With new dedicated finishing equipment, the Vogt operation also successfully increased its output for the automotive component industry. The operating profit in the first half of 2004 was £26m, worsening to a loss of £17m in the second half due to restructuring and impairment costs. |
|
32 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Review of the period |
Investment |
Schemes for the upgrading of two slab preheating furnaces at Duffel were approved, aimed at improving reliability and temperature tolerances. The first renewed furnace will be available after the summer break in 2005, with full scheme completion in the second quarter of 2006. A new high voltage capable connection has also been approved for Delfzijl, which will contribute to reducing electricity costs. The project will complete when the present energy contract expires at the end of 2005. |
| Major capital projects | ||||||
| Completed in the period | Capital cost £m |
Completion date |
||||
| Duffel – revamp of cast house | 4 | Dec 04 | ||||
| Delfzijl – two additional rectifiers | 3 | Mar 04 | ||||
| In progress at end December 2004 | Capital cost £m |
Completion date |
||||
| Koblenz – aircraft capacity and capability | 29 | Q3 05 | ||||
| Delfzijl – 220kV high voltage cable | 7 | Q4 05 | ||||
| Duffel – revamp of two slab preheating furnaces | 5 | Q2 05 |
|
Corus Report & Accounts 2004 33 |
||||
|
|
|
|||
| Review of the period |
34 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
Corus Report & Accounts 2004 35 |
||||
|
|
|
|||
| Review of the period |
| 2003 | 2002 | Operating costs in 2003 were £8,161m (2002: £7,634m) and included a net charge of £142m in respect of restructuring and impairment costs (2002: £53m), and non-recurring items discussed below. Excluding the restructuring and impairment costs, which are explained above, operating costs increased by 6% overall with carbon steel segment costs 6% higher compared with a turnover increase of 12%, and aluminium segment costs 2% higher broadly in line with turnover. In addition to the restructuring and impairment costs, operating costs for 2003 included one-off items in respect of the cost of the Pechiney break fee (£14m); costs associated with the syndicated bank facility (£23m); the impact of a conveyor fire at Scunthorpe works (£20m in total, including revenue effect); and the final insurance settlement in respect of the Port Talbot blast furnace (credit of £23m). The net impact of non-recurring items on the operating result was a loss of £44m, of which £37m was in the second half. The only significant one-off items in 2002 were transaction costs of £23m, principally in respect of the intended aluminium sale and the terminated merger with CSN. On 8 November 2001 an explosion occurred in no. 5 blast furnace at Port Talbot. The explosion made the furnace inoperable and plans |
||||||
| Turnover (£m) | ||||||||
| UK | 2,148 | 2,071 | ||||||
| Rest of Europe | 4,153 | 3,658 | ||||||
| Rest of World | 1,652 | 1,459 | ||||||
| 7,953 | 7,188 | |||||||
| Operating costs (£m) | 8,161 | 7,634 | ||||||
| Operating result (£m) | (208 | ) | (446 | ) | ||||
| Restructuring and impairment costs charged against operating costs (£m) | (142 | ) | (53 | ) | ||||
| Operating result (pre restructuring and impairment costs) (£m) | (66 | ) | (393 | ) | ||||
| Deliveries (mt) | ||||||||
| Carbon steel | 17.8 | 16.6 | ||||||
| Aluminium | 0.6 | 0.6 | ||||||
| 18.4 | 17.2 | |||||||
| depreciation of £37m to recognise an impairment to the value in use of fixed assets arising from the continuing losses. The underlying operating loss (i.e. excluding restructuring and impairment costs) in 2003 of £66m compared with an equivalent figure of £393m in 2002 (see below). The improvement was entirely attributable to the carbon steel segment reflecting the improvement in selling prices and volumes, a more stable plant configuration including the successful resumption of a two blast furnace operation at Port Talbot, increased output at IJmuiden, and ongoing cost efficiency measures. These were to some extent offset by increases in raw material and energy prices, and inflationary pressures on other conversion costs, including employment. |
The
loss in the first half of 2002 amounted to £207m, increasing to
£239m in the second half. However, restructuring and impairment
costs in the operating result amounted to a net credit of £45m in
the first half and a net charge of £98m in the second half. Excluding
restructuring and impairment costs the loss in the first half amounted
to £252m, reducing to £141m in the second half, with a marked
reduction in the loss arising in the carbon steel segment as European
prices improved from their trough in the first quarter of 2002. The restructuring
and impairment costs related to changes in cost estimates for environmental
and contractual liabilities for site closures and for manpower productivity
and restructuring programmes, an impairment to the value in use of fixed
assets, and an impairment of goodwill in respect of the Group’s investment
in Kienle & Spiess.
|
|||||||
| 36 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
| were announced to rebuild it at an estimated cost of £75m. The rebuild and the consequential losses associated with the furnace being out of operation were the subject of an insurance claim. Significant additional operating costs were incurred in 2002, particularly in purchasing slab as a substitute for output lost from the furnace. These costs were in part offset by insurance settlements. With effect from 22 January 2001 the stainless steel business Avesta Sheffield ceased to be a subsidiary of Corus and, from the same date, AvestaPolarit became an associated undertaking. The Corus share in AvestaPolarit was subsequently sold to Outokumpu on 1 July 2002. Consequently, the share of results of joint ventures and associated undertakings fell in the second half of 2002 following the disposal of AvestaPolarit. The Corus share of results of joint ventures and associated undertakings amounted to a profit of £9m in 2003 (2002: £21m). The reduction from 2002 was a result of the sale of the Corus share in AvestaPolarit, which was included in joint ventures and associated undertakings for six months in 2002 prior to the sale. The profit on the disposal of fixed assets and of businesses, subsidiaries and associated undertakings amounted to £45m in 2003 (2002: £115m). In 2003 the profit |
consisted primarily of the sale of surplus land and property, and of redundant equipment. In 2002 the sale of the Corus share in AvestaPolarit resulted in a loss on disposal of £48m, including a goodwill transfer from reserves of £33m. Corus also sold its 20% interest in the Aluminerie Alouette aluminium smelter resulting in a profit on disposal of £60m. There was a profit of £96m on the disposal of fixed assets, which included £65m in respect of the insurance settlement related to the rebuilding of the Port Talbot no. 5 blast furnace. The Group’s net interest payable in 2003 of £98m (2002: £92m) reflected the average net debt for the period of £1,414m, with the net debt at 3 January 2004 being £1,013m (2002: £1,236m). The increase in interest payments from 2002 in spite of the reduced level of net debt reflected the higher interest rate payable under the new syndicated bank facility. The Group’s net interest for the period comprised interest earned of £13m on average deposits and loans of £282m less interest incurred of £111m on average borrowings and leases of £1,696m. After net interest and the Group’s share of the results of joint ventures and associated undertakings, there was a loss before tax for the period of £255m (2002: £404m) and the loss per share was 9.25p (2002 restated: 14.23p). The prior year’s loss per |
share has been restated following the Placing and Open Offer. Capital expenditure amounted to £163m in 2003 (2002: £188m). The reduction from 2002 reflected the fact that the Port Talbot no. 5 blast furnace rebuild was completed early in 2003 and further major schemes, including those related to the restructuring of the UK asset base, were not approved until the latter part of the year. The expenditure during the year was, therefore, restricted to essential replacements. The UK accounted for 40%, the Netherlands 32%, the rest of Europe 23%, North America 4% and the rest of the world 1% of capital expenditure in 2003. Capital expenditure is generally met by cash flow provided by operating activities, cash balances and borrowing facilities. Carbon
steel |
||
| Corus Report & Accounts 2004 37 |
||||
|
|
|
|||
| Review of the period |
| Turnover in the first half of 2003 of £3,513m fell by 2% in the second half to £3,459m, reflecting a reduction in distribution and further processing of 4% and some slight easing of average revenue by 1% as price rises in the first half flattened out. Sales volume was unchanged between the first and second half in spite of the seasonal impact of holiday and maintenance shutdowns, and a fire in a conveyor at Scunthorpe works during the latter period. UK
market |
Corus deliveries to the UK market in 2003 totalled 6.1mt, of which 5.5mt were in the Group’s main carbon steel products. Deliveries in the first half were 3.1mt, reducing slightly to 3.0mt in the second half, largely due to seasonal factors. The total for 2003 compared with 5.9mt in 2002. The Group’s UK market share in 2003 rose slightly to 51% (2002: 50%), with an improving trend through the year largely due to improved delivery performance and a reduction in imports. Market share was 52% in the second half. Other
European markets There was some indication that this prolonged slump had reached its nadir. With support from the global recovery, business and consumer indicators turned positive in the last quarter of 2003 and order books for German manufacturing, a key sector |
in assessing European growth prospects, began to improve. Against this generally weak demand background, Corus deliveries in and to mainland Europe amounted to 8.5mt in the period, representing an increase of 4% from 2002 (8.1mt) and indicating an improvement in market share. Deliveries in the first half were 4.5mt, falling to 4.0mt in the second half. Other
markets Corus deliveries to markets outside Europe amounted to 3.2mt in the period, an increase from 2.6mt in 2002. The increase largely reflected the strong demand from China and other Asian export markets that more than offset the reduction in sales to the USA resulting from weak demand and the Section 201 import restrictions introduced in March 2002, which remained in place through most of 2003. Deliveries in the first half were 1.3mt and increased to 1.9mt in the second half. |
||
| 38 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
|
Prices Global steel selling prices had been extremely volatile for the previous few years due to a variety of factors. Changes in industrial output and exchange rates coupled with a series of trade actions such as the Section 201 Safeguard measures had been destabilising factors. The steel market was over-supplied in 2001 with the result that prices fell to extremely low levels, reaching a trough in the first quarter of 2002. In the EU and North America these low prices led to some reduction in supply that, together with modest recovery in demand and in the US the impact of Section 201, restored some stability to the market. Through 2003, world average prices overall were little changed, but this apparent stability masked significant variations in regional prices. EU prices reached a modest peak in early to mid 2003 before falling back, while US prices gradually recovered from the trough seen at the start of the year. Pacific Rim prices were especially volatile, being influenced most |
strongly by over-supply, market weakness, SARS and the Iraq war in the first half. Towards the end of 2003 prices began to recover as China’s effect on the world steel market became more pronounced. The rapid demand growth in China forced up freight rates and the price of key raw materials, and steel prices were pushed up as companies sought to protect profit margins. By the end of 2003 and into 2004, prices in all regions were increasing strongly in response to rising demand, production constraints and raw material costs. The average spot sterling to euro exchange rate during the period was €1.45 (2002: €1.59) and the average spot sterling to US dollar exchange rate was US$1.64 (2002: US$1.50). The year was characterised by the weakness of the US dollar as a result of escalating US trade and fiscal deficits that, together with low interest rates, sapped confidence in US securities. Operating
costs |
plant configuration including the successful resumption of two blast furnace operation at Port Talbot, increased output at IJmuiden, and ongoing cost efficiency measures. These were to some extent offset by increases in raw material and energy prices, and inflationary pressures on other conversion costs, including employment. Following the explosion at Port Talbot, the rebuild and the consequential losses associated with the furnace being out of operation were the subject of an insurance claim. The operating costs for 2002 were affected by the consequences of the explosion and included the cost of buying replacement slab, additional costs of processing bought in rather than manufactured slab, and additional costs of increasing throughput based on the remaining furnace at Port Talbot. In addition, the business suffered lost contribution during the period in which external slab supplies were being established, through delayed Russian supplies and from increased second choice material associated with purchased slab. These costs were largely covered by the insurance claim previously mentioned. Global
steel market
|
|
Corus Report & Accounts 2004 39 |
||||
|
|
|
|||
Review of the period |
the rest of the world capacity declined by 6mt. With steel production increasing by 61mt (and by 23mt outside China) the supply/demand position improved marginally. This change was supportive of price increases, especially towards the end of 2003. Corus estimated that there was still a surplus of around 100mt of effective capacity, of which around 18mt was in the EU. However, this surplus was the lowest seen since the late 1980s, indicating unusually tight market conditions that were likely to persist as long as Chinese demand continued to grow strongly. In March 2002, President Bush took action to impose additional Section 201 Safeguard measures on US imports of a number of steel products. These measures, which mostly took the form of additional import tariffs of up to 30%, were due to remain in place until March 2005. At the same time, a process was implemented to enable suppliers and their US customers to obtain exclusions from the measures for material unable to be adequately sourced from domestic US sources. While sales to the US of certain of Corus’ products, most notably flat rolled steel, were affected by the Section 201 measures, the exclusions secured covering around one third of Corus’ US sales originally subject to the measures, the sales of products outside the scope of the measures, and the sharp price rises that were experienced in some product areas, helped to mitigate temporarily the impact of the measures. |
Major capital projects (carbon steel) | |||||
| Completed in the period | Capital cost £m |
Completion date |
||||
| Port Talbot – rebuild no. 5 blast furnace | 65 | Jan 03 | ||||
| IJmuiden – refurbish slabyard cranes and track | 6 | Mar 03 | ||||
| Port Talbot – cold mill link remotoring stands | 6 | Aug 03 | ||||
In November 2003, the WTO Appellate Body ruled the US Section 201 measures to be inconsistent with WTO rules. On 4 December 2003, President Bush issued a statement ending the US Section 201 measures with effect from 5 December 2003. From that date, all imports into the US, including Corus sales, have been free from any additional Section 201 duties or restrictions. Investment The rebuild of no. 5 blast furnace at Port Talbot following the explosion that destroyed the furnace in November 2001 was completed in less than twelve months and the rebuilt furnace was lit on 2 January 2003. Smaller schemes to refurbish cranes and track in the slabyard at IJmuiden and to remotor stands on the cold mill link at Port Talbot were also completed during 2003. Preparation for the reline of no. 7 blast furnace at IJmuiden commenced in 2002 and steady progress was made.
|
Preliminary projects were undertaken prior to the main reline without disturbing daily operations. The blast furnace is now expected to come out of production in 2006 to allow the reline to be completed. In the last quarter of 2003 a number of major capital expenditure projects were approved, largely related to the announced UK restructuring programme. The heavy end development plan at Port Talbot to install equipment in the blast furnace, steel plant and continuous casting areas; the restructuring plan for Engineering Steels focused at Rotherham, which will be developed to provide direct cast feedstock into a combination bar mill, rolling both straight bar and coiled bar; the refurbishment of the Morfa coke oven batteries at Port Talbot to allow the site to return to a coke making capacity of 0.9mt per annum; and the installation of a third ladle furnace at Scunthorpe designed to meet the projected future requirements from Corus businesses for high quality semi-finished products, and to enable liquid steel to be scheduled more efficiently through the complex steelmaking and casting production process. |
|||||
|
40 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
Aluminium Turnover,
deliveries and prices Total deliveries stayed at the same level of 0.56mt in 2003 as in 2002. However, aluminium trading activities reduced during the year and, in spite of a continuing weak global environment, deliveries excluding trading increased by 5%. Deliveries of rolled products to the aircraft and automotive industries particularly improved, by 10% and 23% respectively, and sales of heat exchanger material increased by 3%. Extruded products also increased in volume, notably within hard alloys, in spite of difficult market conditions in its main German market, as did external deliveries of primary aluminium. There was a decrease in turnover of 8% between the first and second half of 2003, mainly reflecting the seasonal effect of customer shutdowns in the summer and over Christmas. European
markets
|
2003, but then remained flat through the remainder of the year. Overall demand increased by about 2% on 2002. Demand for rolled products developed slightly more strongly than demand for extrusions. The rolled products market continued to benefit from increasing penetration into the automotive industry, while growth in extrusions was held back by the continuing slump in the European construction market. Deliveries to European markets amounted to 0.43mt in the period compared with 0.44mt in 2002, which was mainly a result of lower trading activities. Other
markets Deliveries to markets outside Europe amounted to 0.13mt in the period compared with 0.12mt in 2002. Prices |
weaker sterling exchange rate against the euro. Excluding trading activities, the average revenue per tonne amounted to £1,803, representing an increase of 1% in spite of a lower LME price for aluminium by £47 per tonne. This was achieved by a change of mix, with more higher added value products such as aircraft and automotive products. Between the first and second half of 2003, prices decreased from £1,801 to £1,731 per tonne, as a result of a decrease in the LME aluminium price, a stronger Canadian dollar against sterling (affecting the Group’s Canadian operation) and higher sales of primary aluminium. Pricing of aluminium products is heavily influenced by the price of metal traded on the LME in US dollars, and the euro/US dollar exchange rate. In the period the underlying LME aluminium price for Corus averaged $1,388 per tonne, which compared with $1,360 per tonne in 2002. On the same basis, the first half averaged $1,376 per tonne with the second half at $1,400 per tonne. However, the moderate increase of the US dollar metal price was offset by the weakening of the US dollar against other currencies. Combining the metal price and exchange rate movements gave a further fall of 5% between 2002 and 2003 in the underlying sterling price of aluminium. Rolled and extruded product prices in Europe dropped, following the metal price decrease in euros. For
|
|
Corus Report & Accounts 2004 41 |
||||
|
|
|
|||
Review of the period |
| Major capital projects (aluminium) | At the Cap-de-la-Madeleine rolling mill a significant improvement in productivity was achieved as a result of investments and operational improvement measures in recent years. Investment The scheme for modernisation of drive regulation on the hot mill at Duffel was completed to plan in June 2003. However, completion of two other projects, expenditure on the cast house at Duffel and two new rectifiers for the smelter at Delfzijl, was delayed into 2004. The delays resulted in part from reviews of the developments arising out of the negotiations for the proposed sale of the Group’s aluminium activities, but had no effect on current operations. The principal project approved in 2003 was the ‘AirCap’ project at Koblenz at a cost of £29m, with the purpose of increasing aircraft plate and sheet capacities and capabilities, in order to meet the requirements of the market. The investment aimed to eliminate existing bottlenecks for the production of aircraft products and to increase capacity by approximately 25%. |
||||||
| Completed in the period | Capital cost £m |
Completion date |
|||||
| Duffel – modernisation of drive regulation at hot mill | 4 | Jun 03 | |||||
rolled products the margin over metal was maintained, but for extrusions there was a margin squeeze. In the US, prices for rolled and extruded products were relatively stable and were able to follow the dollar metal price increase at the end of the year. The upturn of the aluminium price in 2003 in US dollar terms reflected the improved supply and demand situation, and the better prospects for 2004. Operating
costs |
Global
aluminium market Operational
performance
|
||||||
|
42 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
|
Corus Report & Accounts 2004 43 |
||||
|
|
|
|||
Review of the period |
|
44 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
back to CO2 emitting sites. Sites have permission to emit CO2 up to the value of their rights allocation, and any surplus can be sold and any deficit purchased on the emission rights market. The initial phase 1 period of the EU ETS covers 2005 to 2007, with usage of rights being reconciled and externally verified annually. Failure to possess adequate rights to match missions is penalised at €40 per tonne of CO2 in phase 1. The Dutch National Allocation Plan (NAP) for phase 1 has been finalised and the Corus IJmuiden site is projected to be short of CO2 rights over the period. The total cost of the net shortfall over three years at a trading price of €8 per tonne is estimated at €8m. The UK NAP for sector and site allocations for EU ETS phase 1 was published on 14 February 2005. The UK NAP has not yet been approved and discussions are continuing with the European Commission. Nevertheless, the UK Government’s intention is to give industry certainty on the published numbers and it is its intention that any allocation below the level in the NAP will be achieved by further reducing the number of allowances assigned to the power station sector. As a result, the allocation for all other sectors will be unaffected by any reduction in the overall total below the proposed NAP. |
Corus’ allocation under the UK NAP broadly reflects its needs through the first phase of the scheme. The targets are challenging but achievable and Corus will strive to ensure it meets its environmental obligations. Increasing attention is being focused on developing products that have a better environmental profile or that have inherent environmental advantages. To help vehicle manufacturers develop emission-free fuel tanks that meet future environmental legislation and recycling targets for end of life vehicles, Corus has developed Neotec™. A lead-free metallic (tin/zinc alloy) coated steel, Neotec™ has a number of advantages over permeable plastic fuel tanks. Notably it is significantly easier and less expensive to recycle, particularly when plastic is impregnated with fuel. Corus aims to contribute positively to the communities around or near to its operations. As well as providing employment for many thousands of people, Corus actively participates in community initiatives and encourages biodiversity and nature conservation. In the Netherlands, the Group’s product and process innovation, research centre and continuing education of workers makes a valuable contribution to the knowledge economy. Moreover, after restructuring and intensifying the use of the IJmuiden site, Corus has been able to devote about one hundred acres of the site to provide a new
|
boost to regional economic development. A wide range of companies has now established themselves in the IJmond Business Park. In the UK, Corus has continued to finance local community projects contributing towards a number of initiatives; for example £19,500 for community sports facilities at Redcar Soccer and Belton playing fields, and £60,000 to a variety of schemes in Wales through the Arena Network. Corus has also made a corporate donation of £100,000 to provide appropriate aid to victims of the Asian tsunami, through the Disasters Emergency Committee. In addition, Corus employees and business units have raised further funds of approximately £150,000. Corus will publish its second combined health, safety and environment report in May 2005 (the Corporate Responsibility Report) detailing the performance and progress made in 2004 and this will be available by viewing the Group’s website www.corusgroup.com |
|
Corus Report & Accounts 2004 45 |
||||
|
|
|
|||
Review of the period |
|
46 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
those of traditional hot rolled and cold rolled material. It can be produced in thinner gauges than previously possible in conventional hot rolled steel and significant yield improvement is possible due to the tight dimensional tolerances that are comparable to those of cold rolled steel. Ymagine™ is mainly aimed at thin gauge drawing and high strength low alloy applications, such as building components, radiators, drums and structural inner parts for cars. In product development, new coatings and new coating processes have been a focus area for several years. A variety of materials and technologies can be applied to obtain coatings with different properties, and tailoring these properties to the requirements of specific markets is a way to add customer value. For the packaging sector, much effort is being spent on the development of polymer coated steels and on tailoring the composition of the coating to specific applications. Customers are now adopting the results of these developments and several have entered new products made from Corus material into product competitions such as the ‘Can of the Year Awards’. Awards were achieved in 2004 for a tapered salmon can made from Protact material with a specially designed coating to which the fish does not stick; the so-called eco-can, a beer and beverage can also made from polymer-coated material but with a totally different type of polymer that obviates several stages of the |
conventional can making process; and a paint can that can easily be reclosed. Building and construction is the largest market sector for Corus, and product development and enhancement for this sector is therefore a key priority. Construction in western Europe is predicted to grow between 1.5-2% per annum in coming years, while the construction market in the UK is forecast to grow by 30% by 2012. Having secured high market share in commercial and industrial construction, product development is now focusing on sectors that show real long-term growth potential such as health, education and residential. Partnerships have been set up to improve market knowledge and increase supply chain efficiency. For example, Framing Solutions, a joint venture with Redrow, has pioneered light steel framed residential construction and, early in 2004, Corus Living Solutions completed the installation of a range of new manufacturing equipment at Shotton works, which provides a substantial change to the volume of modular accommodation available in the UK market. Modular houses can be erected within a very short time compared to standard building methods and are particularly suited to sectors where there is a need for affordable housing, as well as the hotel market. May 2004 also saw the first installation of Corefast™, a new off-site construction system for lift and stairway cores developed by Corus.
|
Corefast™ is suitable for multi-storey buildings, and allows lift and stair cores to be erected in just 15% of the time it takes to erect a traditional core. The Corefast™ system uses Corus’ Bi-Steel product and concrete panels, and the cores are delivered to site as pre-fabricated components ready to lift into position. Corus continued to strengthen its automotive technology development and to improve customer focus in the way newly developed technologies are deployed. A major step was made by the relocation of its Automotive Sector Unit (ASU) to the International Automotive Research Centre on the campus of Warwick University at the beginning of 2004. This is leading to closer collaboration between Corus and the University in a number of areas, including the use of advanced high strength steels in car body structures. Corus has developed a new technique for improving the speed and accuracy of design optimisation, called F2C (Forming to Crash), aimed at achieving improved material utilisation in vehicle body structures. Advanced high-speed crash analysis techniques have also been developed at ASU allowing Corus to offer products meeting the new bridge and safety fence standard, and to be a supplier for new and replacement highway safety systems. As well as growing and improving in existing markets, Corus is also seeking to exploit available technological knowledge to penetrate new markets. |
|
Corus Report & Accounts 2004 47 |
||||
|
|
|
|||
Review of the period |
|
48 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
|
Corus Report & Accounts 2004 49 |
||||
|
|
|
|||
|
Review of the period |
|
50 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
Each of these areas of judgement relies upon a number of estimates and is subject to uncertainties. These can vary between different countries in which the Group operates and there is a large degree of interdependency between them. As a result no analysis is given here of a change in any one particular assumption. However, all of these factors are considered at least annually and, where reassessment or changing circumstances lead to material changes, this is discussed in the relevant review of the period and disclosed fully in the notes to the accounts. During 2004, Corus adopted UITF Abstract 38 ‘Accounting for ESOP trusts’ and related amendments to Abstract 17 ‘Employee share schemes’. In particular, UITF 38 changed the balance sheet presentation of Corus’ own shares held in ESOP trusts from recognising them as assets to deducting them in arriving at shareholders’ funds. This change in accounting policy had no impact on profit and loss accounts previously reported, but reduced net assets by £1m. The comparative balance sheets have been restated for this effect. |
‘Earnings per Share’, FRS 23 ‘The Effects of Changes in Foreign Exchange Rates’, FRS 24 ‘Financial Reporting in Hyperinflationary Economies’, FRS 25 ‘Financial Instruments: Disclosure and Presentation’, FRS 26 ‘Financial Instruments: Measurement’, and FRS 27 ‘Life Assurance’. These standards are only applicable for accounting periods beginning on or after 1 January 2005, and are part of the programme of convergence between UK accounting practice and international accounting policies, as discussed below. Given these facts, Corus has chosen not to adopt any of these changes early for the Report & Accounts 2004. Although FRS 17 ‘Retirement Benefits’ was issued in November 2000, its full requirements also do not need to be met until accounting periods beginning on or after 1 January 2005 (delayed from 22 June 2003 under the original ASB proposals). The full requirements of the standard have not yet been adopted by Corus but the required transitional disclosures have been made since 2001. FRS 17 requires any surplus or deficit on the Group’s pension schemes to be recognised in the balance sheet. |
The four principal pension schemes that Corus operates remain in a net surplus, which at 1 January 2005 is estimated to be £66m. However, after taking account of other schemes within the Group and all associated deferred tax balances, this is reduced to a net liability of £30m. It should be noted that each scheme’s ongoing funding arrangements are not affected by the FRS 17 disclosure requirements or other accounting standards. On 15 September 2004, Corus agreed amendments to its securitisation programme in the UK that was originally launched on 18 April 2002. These amendments increased the amount that may be advanced as purchase price to £275m and extended the maturity date of the programme to April 2009. Under the programme Corus may from time to time offer to assign all of its rights, title and interest in certain eligible trade receivables to a third party financing vehicle, which funds the cash purchase price of any original receivables ultimately in the USA and other commercial paper markets. That purchase price takes into account, inter alia, the risks that may be attached to individual debtors and the expected collection period. |
||||
| In addition to this change, there have been eight new UK standards issued by the Accounting Standards Board since the last Report & Accounts. These were FRS 20 ‘Share Based Payments’, FRS 21 ‘Events after the Balance Sheet Date’, FRS 22 | Securitised trade debtors | £m | ||||
| Securitised gross trade debtors | 406 | |||||
| Less non-returnable proceeds | (275 | ) | ||||
| Net securitised trade debtors | 131 | |||||
| Other trade debtors | 1,070 | |||||
| Total trade debtors | 1,201 | |||||
|
Corus Report & Accounts 2004 51 |
||||
|
|
|
|||
|
Review of the period |
|
52 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Review of the period |
|
Corus Report & Accounts 2004 53 |
||||
|
|
|
|||
|
Profit
for the financial period ended 1 January 2005, total recognised gains
and losses and shareholders’ perspective Shareholders’ funds increased by £462m to £3,258m, (representing 73p per share), and reflecting the profit for the period, the transfer of goodwill from reserves in respect of the Tuscaloosa disposal, the issue of new shares and conditional share awards. The Company’s share price fluctuated within the range of 29.50p to 56.25p during the period, with a price at the end of the period of 50.50p and stock market capitalisation of £2,240m. Capital
structure and treasury policy |
The treasury policies summarised below applied throughout the period and are consistent with the prior year. At 1 January 2005, the Group had £1,991m in committed borrowing facilities, of which £572m was unutilised. On 31 July 2003, Corus signed a €1,200m banking facility, to replace an existing facility, which was due to expire at the end of January 2004. The new amortising syndicated facility had a final maturity date of 30 June 2006, and provided committed bank financing for Corus’ working capital requirements. The principal terms of the facility, which were normal for a facility of this type, included:
|
|
|
54 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Financial review |
|
On 8 November 2004, following the receipt of proceeds from the issue of €800m 7.5% Senior notes (see below), the commitment under the facility was reduced by voluntary cancellation to €800m. Subsequent to the year end this facility has been replaced (see below). On 23 September 2004, Corus issued €600m of 7.5% Senior notes due 2011 at par, proceeds of which were received on 30 September 2004. The notes are guaranteed on a senior basis by Corus UK Limited. At the same time Corus made a tender offer to repurchase all of the €400m 5.375% Guaranteed bonds due 2006 at a price of 103.5%. At the expiry of the tender offer, acceptances had been received in respect of €380m of the Guaranteed bonds. Following the successful issue of the above notes, Corus offered a further €200m of Senior notes in the same series as the 7.5% Senior notes due 2011 at a price of 105.5%, equivalent to a yield of circa 6.4%. Proceeds of these notes were received on 30 October 2004. In addition Corus repaid the NLG 200m 6.75% Bond, which matured on 18 October 2004.
|
Total borrowings at 1 January 2005 were £1,454m (2003: £1,393m; 2002: £1,506m). These included:
As a result of the successful €800m Senior note issue, together with the repayment of bonds maturing in 2004 and 2006, the average maturity of Corus’ bonds increased from 4.5 years at the end of 2003 to 5.4 years at the end of 2004. Other borrowings included £32m principally in Canadian dollars, euros and sterling under long-term bank facilities with maturities of up to three years, bank overdrafts of £32m and finance lease obligations totalling £41m. Of the total borrowings, £27m of bank borrowings carries interest on variable rate terms, which ranged at period end between 2.94% and 7.75% with a weighted average of 5.6%.
|
Subsequent to the year end, Corus announced on 24 February 2005 that it had signed a new €800m banking facility with a consortium of relationship banks, replacing the existing facility on more favourable terms and with a reduced security package. The new revolving facility has a final maturity date of 31 December 2008 and provides committed bank financing for general corporate purposes and working capital requirements. The principal terms of the new syndicated facility include:
|
|
Corus Report & Accounts 2004 55 |
||||
|
|
|
|||
Financial review |
|
Foreign
exchange risk management It is the Group’s policy that substantially all of the net currency transaction exposure arising from contracted sales and purchases is hedged by selling or purchasing foreign currency forward. At 1 January 2005 the Group held forward currency sales of principally euros amounting to £645m (period end value £629m) and forward currency purchases of
|
principally US dollars amounting to £722m (period end value £685m). These amounts represented substantially 100% of the contracted transaction exposure in these currencies at 1 January 2005. Foreign exchange contracts do not generally extend beyond twelve months other than for certain long term contracts principally in the aluminium businesses, which may extend up to four years. Commodity
risk management |
|
56 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Financial review |
|
Interest
rate risk management None of the above instruments are used by Corus for the purposes of speculation. Further details of the use of financial instruments are included in Notes 23 and 24 to the Accounts. In the normal course of business, the Group also faces risks that are non-financial or non-quantifiable. Such risks principally include country risk, credit risk and legal risk. Sensitivity
analysis |
At 1 January 2005 the Group had net funds of £356m exposed to floating interest rates. A 1% movement in average interest rates would have an impact of £4m on annual future earnings before tax. Taxation Funds
from operating activities and other cash flows There was a net cash inflow from operating activities of £568m |
reflecting, in the main, a total operating profit of £582m and non-cash charges of £339m in respect of depreciation, amortisation and rationalisation costs, partially offset by an increase in working capital of £340m and the cash cost of restructuring and rationalisation measures of £49m. There was a net cash outflow on investments and servicing of finance of £110m reflecting the average level of net debt during the period. There was also a cash outflow on capital expenditure and financial investment of £282m, after the sale of tangible fixed assets of £37m. The cash inflow from acquisitions and disposals of £81m mainly arose from receipts of £95m in respect of the disposals of Tuscaloosa and the North American service centres, and the Group’s sheet piling commercial operations. There were also tax payments totalling £93m. Gross borrowings rose by £54m. Minority
interests |
||
|
Corus Report & Accounts 2004 57 |
||||
|
|
|
|||
|
The directors present their report and the audited accounts for the financial period ended 1 January 2005. Principal
activities and review of the business A review of the Group’s performance during the year, its prospects and future developments is given in the Review of the period on pages 8 to 57. This is the first year the review covers the four operating divisions within Corus. Results
and dividend |
Impact
of IFRS Substantial
shareholdings Employees |
international exchange of information and consultation. Further consultation takes place at division, business, site and local level where appropriate. The Company recognises its responsibilities towards disabled people and employs them where suitable work can be found. Every effort is made to find appropriate alternative jobs for those who become disabled while working for the Company. The Company has operated a sharesave scheme and a share ownership plan for all UK employees for a number of years. During 2004, a newly established international sharesave scheme was launched for employees in the Netherlands and Germany. Further information on employee share schemes is given in the Report on remuneration and in Note 26 to the Accounts on pages 113 to 116. |
||
No dividend was paid during the year and the directors do not recommend the payment of a final dividend (2003: nil; 2002: nil). However, as explained in the Chairman’s statement, it is the Board’s current intention to recommence dividend payments for 2005. Share
capital Fixed
assets Post
balance sheet events |
Number of shares | % held | |||||
| Substantial shareholdings | 2004 | 2004 | 2003 | 2002 | |||
| Shareholdings other than interests notified in accordance with Section 208(5) of the Companies Act | |||||||
| Material | |||||||
| Legal & General Group plc | 174,179,033 | 3.92 | 3.92 | 3.32 | |||
| Standard Life Investments | 139,132,229 | 3.14 | 3.99 | – | |||
| Gallagher Holdings Limited† | 130,000,000 | 2.93 | 11.03 | – | |||
| CSFB Group of Companies | 11,080,861 | 0.02 | – | – | |||
| Aviva plc | – | – | – | 3.73 | |||
| Non-material | |||||||
| Brandes Investment Partners, LP | 481,838,150 | 10.9 | 15.20 | 14.90 | |||
| Deutsche Bank AG | 139,869,235 | 3.15 | – | – | |||
| The Capital Group Companies, Inc | 103,585,231 | 2.34 | 2.34 | 7.89 | |||
| Notifications of interests in accordance with Section 208(5) of the Companies Act(i) | |||||||
| CSFB Group of Companies | 649,252,618 | ||||||
| Credit Suisse | 584,826,632 | ||||||
| Gallagher Holdings Limited† | 454,826,632 | ||||||
| (i) | A person is taken to have an interest in shares under Section 208(5) of the Companies Act where he has a right to call for delivery of shares to himself or to his order or where he has a right to acquire an interest in shares or is under an obligation to take an interest in shares. It is therefore possible for more than one person to have disclosure interests under Section 208(5) arising out of the same transactions or series of transactions and for there to be multiple disclosures which relate to the same underlying shareholdings (or indeed, which relate to no particular underlying shares). The interests above are mainly in respect of stock lending or redelivery. | ||
| † | Mr Alisher Usmanov is the registered holder of all of the shares in Gallagher Holdings Limited and therefore holds an interest in all of these shares. | ||
|
58 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Directors’ report |
|
Social
responsibility
Corus believes that the incorporation of environmental and social factors as well as economic factors, within its business planning and reporting, adds to the sustainability of its business products and services, through effective management of risks, improved stakeholder confidence and brand positioning. More information on the Company’s involvement with environmental and community issues, including the Corporate Responsibility Report to be published in May 2005, is given on pages 43 to 45 of the Review of the period. Community
involvement |
The Company does not make any donations to political parties and none were made during the year. However, authority was granted to the Company at the last Annual General Meeting to make political donations to EU Political Organisations and incur EU Political Expenditure, pursuant to the Companies Act 1985, as amended by the Political Parties, Elections and Referendums Act 2000 (the ‘Act’), up to a maximum of £50,000. The resolution was intended to ensure that normal expenditure which, as a result of the wide definitions under the Act, could be construed as political expenditure or a donation to a political organisation was authorised provided that such expenditure was disclosed in the Report & Accounts. Accordingly, it is reported that the Group incurred such expenditure amounting to £33,523 (2003: £30,405) in connection with employees being allowed time off with pay for attending to trade union business and carrying out civic duties. Suppliers The Company had nil days’ purchases outstanding at 1 January 2005 (2003: nil; 2002: nil), based on the average daily amount invoiced by suppliers during the year. |
Research
and development Auditors Annual
General Meeting Details of the business to be considered at the Annual General Meeting will be set out in the Notice of Meeting which will be sent to shareholders on 10 May 2005. Tax
status |
||
|
Corus Report & Accounts 2004 59 |
||||
|
|
|
|||
Directors’ report |
|
The Board Mr Jacques Schraven joined the Board as a non-executive director and Deputy Chairman on 1 December 2004. Mr Rauke Henstra also joined the Board as an executive director on 1 October 2004. Mr Henk Vrins, an executive director, retired on 1 March 2004 and Mr Richard Turner, a non-executive director, retired on 31 December 2004. Mr Stuart Pettifor and Mr Maarten van Veen will be retiring on 31 May 2005. The Board regards all the current non-executive directors as being independent. Dr Anthony Hayward was the nominated Senior Independent Director during the year. During the latter part of 2003 there was a comprehensive review of the Board, its membership and its operations carried out in conjunction with external advisers, Whitehead Mann. Following this review new terms of reference were prepared for all Board committees, being Nominations, Audit, Remuneration and Health, Safety and Environment committees. During the year a full review of the effectiveness of the Board, its committees, the Chairman and other members was undertaken in conjunction with Mercer Delta Consulting. The conclusions of this review were that significant |
progress had been made in improving the Board’s effectiveness, in particular providing greater clarity as to the roles and responsibilities of the Board, its committees, the Chairman, the Senior Independent Director and the Chief Executive. In addition, the Chairman conducted an evaluation of each director’s performance and contribution to the Board during the year, and the Senior Independent Director carried out a similar evaluation of the Chairman. The terms of reference of the Board committees may be found on the Company’s website www.corusgroup.com or hard copies may be obtained from the Company. All directors have been kept informed and updated on changes in governance and regulatory and legislative requirements through the year by the Company Secretary. New directors have received introductory training with regard to the Company and its activities and, as appropriate, their roles and responsibilities as directors of a listed company. It is intended to continue this programme during 2005 with regular briefings and seminars on relevant matters. Attendance at meetings by directors is set out in the schedule opposite. The Board has a formal schedule of matters reserved to it, and a detailed programme of items for discussion and review at its meetings. These include reviews on a regular basis of the financial results and forecasts of the Company, the approval of annual plans and capital expenditure proposals, appointments to the Board and its committees, the |
appointment of external professional advisers, the Company’s risk management process and annual risk review, communications with shareholders and the approval of the Report & Accounts. The Board has delegated authority within certain financial limits for the management of the Company’s operations to the Chief Executive and he in turn is authorised to sub-delegate authority to other executive directors and senior managers within the Company. All directors have had full and timely access to relevant information relating to the Company’s affairs which may be needed to enable them to discharge properly their duties and responsibilities. There is a procedure in place for directors to obtain independent professional advice at the Company’s expense in connection with their duties. During the year directors collectively were advised by the Company’s professional advisers, although no director availed himself of separate advice. All directors have access to the advice and services of the Company Secretary and other executives within the Company. The biographies of the current Board of directors are set out on pages 66 and 67. Non-executive directors are appointed for terms of three years subject to the normal re-election by the shareholders in general meeting. All directors, both executive and non-executive are reelected on a rotational basis, and no director will serve for more than three years without having been re-elected by the shareholders. |
||
|
60 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Directors’ report |
| Directors holding office during the year | |||||||||||
| Date
of appointment |
Board meetings |
Nomination committee meetings |
Audit committee meetings |
Remuneration committee meetings |
HSE committee meetings |
||||||
| or *retirement | number | attended | number | attended | number | attended | number | attended | number | attended | |
| Mr J W Leng | 12
June 2001 |
14 | 14 | 5 | 5 | na | na | 2 | 2 | na | na |
| Mr P Varin | 1 May 2003 | 14 | 14 | na | na | na | na | na | na | na | na |
| Mr J H Schraven | 1 December 2004 | 1 | 1 | na | na | na | na | na | na | na | na |
| Mr E A van Amerongen | 27 April 2001 | 14 | 10 | 3 | 2 | 5 | 3 | 7 | 5 | 3 | 2 |
| Dr A B Hayward | 22 April 2002 | 14 | 11 | 5 | 5 | 5 | 5 | na | na | 3 | 1 |
| Mr R Henstra | 1 October 2004 | 3 | 3 | na | na | na | na | na | na | na | na |
| Dr K J Lauk | 10 June 2003 | 14 | 10 | 5 | 5 | na | na | na | na | na | na |
| Mr D M Lloyd | 1 February 2001 | 14† | 12 | na | na | na | na | na | na | na | na |
| Mr S I Pettifor | 1 September 2001 | 14 | 13 | na | na | na | na | na | na | na | na |
| Mr A M Robb | 1 August 2003 | 14 | 14 | na | na | 5 | 5 | 5 | 5 | na | na |
| Mr M C van Veen | 6 October 1999 | 14 | 14 | na | na | na | na | 7 | 6 | 3 | 3 |
| Mr R T Turner | 31 December 2004* | 14 | 14 | na | na | 5 | 5 | 2 | 2 | na | na |
| Mr H A M Vrins | 1 March 2004* | 2 | 2 | na | na | na | na | na | na | na | na |
| na Individuals not a member of the committee. | |||||||||||
| † Includes two non-scheduled meetings when attendance was not possible. | |||||||||||
|
Board
committees Audit
committee The role of the Audit committee is to assist Board oversight of the integrity of the Company’s financial statements, reviewing significant financial reporting issues and judgments; compliance with legal and regulatory requirements, the |
Company’s financial control and risk management systems, significant risk exposures and the process of identifying, monitoring and controlling them; the external auditors’ qualifications, independence and remuneration and their performance; and the internal audit function. During the year the committee met on five occasions with the executive management, internal audit and the external auditors present. Attendance at these meetings by the committee members is set out in the schedule above. The committee has also met with the external auditors without management being in attendance. The committee has a schedule of matters to be considered during the year and specifically at the time of the announcement of the interim and annual results. The detailed terms of reference set out those matters which fall within the remit of the committee. There is a formal procedure in place whereby the use of the external |
auditors for non-audit work is considered and, where appropriate, approved. This procedure is reviewed annually, and is such that the objectivity and independence of the auditors is not threatened or compromised. Remuneration
committee The role of the Remuneration committee is to determine and agree with the Board the broad policy for the remuneration of the Chairman, the executive directors, the Company Secretary and other members of senior management within the principles and guidelines laid down in the Combined Code. |
||
|
Corus Report & Accounts 2004 61 |
||||
|
|
|
|||
Directors’ report |
|
The committee met on seven occasions during the year. Attendance at meetings by members is set out in the schedule on page 61. Further information on the activities of this committee is included in the Report on remuneration. Nominations
committee The role of the Nominations committee is to identify and nominate candidates to the Board to fill vacancies on the Board, both executive and non-executive, as and when they arise and to ensure processes are in place with regard to succession planning for Board appointments and other senior management roles. The Nominations committee has met formally on five occasions during the year. Attendance at meetings by members is set out in the schedule on page 61. To assist in the search for new directors, the committee has used specialist consultants to provide a short list of potential candidates. The practice has been for individual members of the committee to meet separately with candidates, and then for members to communicate between themselves. Thereafter the views of all directors are sought and, if requested, meetings are held between them and candidates. Finally the full Board is requested to approve the appointment. |
The Chairman, Mr Jim Leng, holds a number of non-executive directorships of other unrelated companies, details of which are set out on page 66. The Nominations committee considered his external appointments at the time of his appointment as Chairman of Corus and, as with all directors, considers any new appointments to ensure there is no conflict of interest and that sufficient time will continue to be devoted to Corus business. Mr Leng has been appointed chairman of IMI plc on an interim basis. Health,
Safety and Environment committee The role of the Health, Safety and Environment committee is to approve the Company’s policies with regard to health, safety and environment matters and to review the performance in relation to these matters. The committee met on three occasions in 2004. Attendance at meetings by members is set out in the schedule on page 61. |
Directors Since the year end, the Company has announced that Mr Stuart Pettifor will be retiring from the Board with effect from 31 May 2005. Mr Jacques Schraven and Mr Rauke Henstra, having been appointed since the last Annual General Meeting, will retire and offer themselves for re-election. The directors retiring by rotation are Mr David Lloyd and Dr Anthony Hayward who, being eligible, offer themselves for re-election. Mr Maarten van Veen is also retiring and is not seeking re-election. The service contracts for Mr Rauke Henstra and Mr David Lloyd provide for a rolling six month and rolling 12 month period of notice respectively. Neither Dr Anthony Hayward nor Mr Jacques Schraven, who are non-executive directors, have service contracts with the Company. There were no contracts of significance subsisting during the year between the Company or any of its subsidiary undertakings and any substantial shareholder or director. |
||
|
62 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Directors’ report</font> |
|
Corporate
governance The Board is of the view that the 2003 Combined Code requires companies to comply or to explain non-compliance with the Code, and in explaining non-compliance the Company is in fact meeting the requirements of the Code. Those areas of non-compliance throughout the period are set out below:
With regard to the compliance requirements of the US Sarbanes-Oxley Act, the Company has undertaken work to ensure that it will be in a position to comply with these requirements as and when they become applicable. |
A code of ethics was adopted in June 2004, as required under the US Sarbanes-Oxley Act. Prior to its introduction the Company’s principal executive and financial officers were bound by a code of conduct that was an integral part of their conditions of employment. The code of ethics is made available on the website www.corusgroup.com Internal
control The Group’s system of internal control has been designed in order to provide the directors with reasonable assurance that its assets are safeguarded, that transactions are authorised and properly recorded and that material errors and irregularities are either prevented or would be detected within a timely period. However, no system of internal control can eliminate the risk of failure to achieve business objectives or provide absolute assurance against material misstatement or loss. The process accords with the guidance contained in the document ‘Internal Control Guidance for directors on the Combined Code’ as issued by the ICAEW and the Turnbull guidance as incorporated into the 2003 Combined Code. The key elements of the control system in operation are:
|
|
||
|
Corus Report & Accounts 2004 63 |
||||
|
|
|
|||
Directors’ report
|
The Board receives regular reports from all committees. The Audit committee has during the period reviewed the effectiveness of the system of internal control as described above. The directors confirm that the Board has reviewed the effectiveness of the system of internal control as described above during the period. Day
to day management Corus Group plc is the parent company of Corus UK Limited and Corus Nederland BV, both of which are wholly owned subsidiaries. Corus UK Limited is a trading company and manages the businesses formerly owned by British Steel plc. Corus Nederland BV, previously Koninklijke Hoogovens NV, is a holding company for the businesses owned by Koninklijke Hoogovens prior to its merger with British Steel to form Corus. The Board of Corus UK and the Management Board of Corus Nederland are responsible for the day to day management of their respective businesses in accordance with the strategy laid down by Corus Group plc. In addition to these two boards, Corus Nederland is required by the Dutch statutory mitigated structure regime to have a Supervisory Board to advise the Management Board of Corus Nederland.
|
That Supervisory Board is also responsible for supervising the policies of the Management Board of Corus Nederland and the general course of business of the Company. When exercising its duties, it must act in the best interests of Corus Nederland and its business enterprise. Certain decisions of the Management Board of Corus Nederland are reserved for approval by the Supervisory Board, including the issue of shares, the entering into or termination of long term co-operation arrangements with third parties, the alteration of the articles of Corus Nederland and certain significant acquisitions and disposals. The Supervisory Board may extend the decisions of the Management Board that are subject to its approval. The Supervisory Board may suspend members of the Management Board. On 1 October 2004 certain amendments to Dutch Company law came into force. Under the new rules, the powers of shareholders in companies subject to the mitigated structure regime will be enhanced. Under the new law, the general meeting of shareholders will appoint the members of the Supervisory Board, subject to the following procedure. On the basis of eligibility criteria drawn up by the Supervisory Board, the Supervisory Board is entitled to make nominations for the appointment of supervisory directors. A nomination can be overturned by the general meeting. If the general meeting has overturned a nomination, the Supervisory Board is entitled to make a new nomination. The Works Council will have an enhanced right of recommendation in respect of one third of the number of supervisory directors. |
Relations
with shareholders The full Board is fully and promptly updated on significant matters after meetings with institutional or major shareholders. Additionally, an annual shareholder survey is carried out by an independent specialist, the findings of which are reported to the Board. Meetings have also taken place with the bodies representing shareholder interests, including the Association of British Insurers and RREV (formerly National Association of Pension Funds and the Institutional Shareholder Services). Full use is made of the Company’s Annual General Meeting to inform shareholders of current developments and there is an opportunity for individual shareholders to ask questions both within the meeting itself and also before and after when directors are available for this purpose. Information on Corus is also made available on the website www.corusgroup.com |
| 64 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Directors’ report
|
|
Accountability
and audit Recognising the differing requirements of shareholders for information, the Company produces a full annual report including all the financial information which it is required to make available to shareholders, in addition to a shorter form report which is sent to the overwhelming majority of shareholders. Any shareholder may request a copy of the full version at no charge, and contact details are provided for this purpose in the short form report. A half-year interim report is also sent to all shareholders and from June 2005 reporting will be on a quarterly basis. The Company will publish its 2005 Corporate Responsibility Report in May 2005. It will be made available on request, free of charge, and on the website www.corusgroup.com Going
concern By order of the Board Richard
Reeves
|
|
Corus Report & Accounts 2004 65 |
||||
|
|
|
|||
| Mr
James Leng Mr
Jacques Schraven |
Mr
Philippe Varin Mr
Eric van Amerongen Dr
Anthony Hayward |
Mr
Rauke Henstra Dr
Kurt Lauk Mr
David Lloyd
|
| 66 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
The Board
|
| Mr
Stuart Pettifor Mr
Andrew Robb
|
Mr
Maarten van Veen Mr
Richard Reeves |
Audit
committee Remuneration
committee Nominations
committee Health,
Safety and Environment committee |
|
Corus Report & Accounts 2004 67 |
||||
|
|
|
|||
| The day to day management of the Company is conducted through the Executive committee. The structure and responsibilities at the date of this report are as follows: Philippe
Varin Gerhard
Buddenbaum He is President of the German Fabricated Aluminium Association (Fachverband Aluminiumhalbzeug), Chairman of the German Aluminium Association, Board member of the German Metal Association, Executive Committee member of the European Aluminium Association and Honorary Consul of the Netherlands in Germany. Rauke
Henstra |
David
Lloyd Paul
Lormor Formerly a Chief Executive of Caparo Steel Products and a Director of Caparo Industries, he continues to serve on the board of Caparo Merchant Bar (a joint venture between Caparo and Corus). Scott
MacDonald |
Stuart
Pettifor* Richard
Reeves* Staf
Wouters He joined the Company on 1 February 2004 from PepsiCo Inc where he was Vice President Human Resources for a snack foods division. For the purposes of the Report & Accounts 2004 on Form 20-F, all of the members of the Executive committee are considered senior officers of the Company. Biographies of Messrs Varin, Henstra, Lloyd, Pettifor and Reeves are set out on pages 66 and 67. |
|||
With
responsibility for Corus
Strip Products IJmuiden and
UK,
Corus
Packaging Plus, Corus Colors,
Corus
Special Strip and
Corus
Tubes.
|
Previously the Chief Operating Officer of Kloeckner & Co, Germany. Age 52. |
* | Mr Stuart Pettifor retires on 31 May 2005 and Mr Richard Reeves retires on 16 June 2005. | ||
|
68 Corus Report & Accounts 2004 |
||||
|
|
|
|||
The Executive committee |
|
The principal divisional activities are as follows: Strip Products Division Corus
Strip Products IJmuiden and Corus Strip Products UK Corus
Packaging Plus Corus
Tubes Corus
Colors Corus
Special Strip Cogent
Power |
Long Products Division Corus
Construction & Industrial Corus
Engineering Steels Corus
Rail Long
Products Downstream Businesses Teesside
Cast Products
|
Distribution & Building Systems Division Corus
Distribution and Building Systems Corus
International Corus
Consulting Aluminium Division Corus
Primary Aluminium Corus
Aluminium Rolled Products Corus
Aluminium Extrusions
|
| Corus Report & Accounts 2004 69 |
||||
|
|
|
|||
Introduction The
Report on remuneration is presented for the year ended 1 January 2005.
The report’s purpose is to define for shareholders the strategy for
Board and senior executive remuneration, describe the elements of remuneration
and how they are determined and detail in full the remuneration for each
director in the year under review. The report comprises the following:
|
The Remuneration committee The following directors were members of the Remuneration committee during the year: Mr Eric van Amerongen (chairman) Mr Andrew Robb (from February 2004) Mr Maarten van Veen Mr Jim Leng (until February 2004) Mr Richard Turner (until February 2004) All current members are regarded as independent. The committee met seven times during the year. The Chairman and the Chief Executive were invited to some of the meetings and the Company Secretary, who acts as secretary of the committee, also attends the meetings. No one is involved in Remuneration committee meetings or decisions relating to their own remuneration or terms and conditions of employment. The committee’s responsibilities are:
|
During the year external advice was provided by the following specialist independent advisers:
|
|
70 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Report on remuneration |
Advice was also given by the Company’s Human Resources Director, the Director Compensation and Benefits and the Company Secretary. Remuneration policy The Group’s remuneration policy is formulated to attract, retain and engage high calibre employees and to motivate them to develop the business in line with the Company’s strategy to be a world class, customer-focused supplier with sustained high levels of performance throughout the economic cycle. In order to achieve this, the executive remuneration policy is based on the following core principles:
|
Elements of remuneration Base pay The Remuneration committee takes into account relevant information from independent consultants to position base pay at competitive levels, when compared to similar roles with similar responsibilities in other companies. Salaries are usually reviewed annually against a number of factors to ensure they remain competitive and reflect individual performance and business success; more comprehensive market reviews take place every second or third year to ensure salaries remain |
competitive and positioned appropriately with the wider market to ensure the Company is able to recruit, retain and motivate senior executives. Base salaries for executive directors are reported in the table on page 76. Base salaries for other Executive committee members are in the range £210,000 to £375,000. Annual bonus scheme There is a non-contractual, non-pensionable annual bonus scheme that comprises a balance of Group and, where relevant, divisional financial performance and quantifiable personal objectives. Three-quarters of maximum potential bonus is derived from financial measures. All individual personal objectives for the executive directors and other Executive committee members and the financial targets for senior managers throughout the Group are agreed and approved by the Remuneration committee. Targets are typically those contained in the Company’s annual plan, which is considered stretching and is subject to review and approval by the Board. For executive directors and Executive committee members, it is mandatory that half of any bonus is deferred in the form of Company shares which are held in an employee benefit trust which vest on the third anniversary. The 2004 bonus scheme comprised a mix of Group financial and individual targets, plus, in the case of the executives heading up operating divisions, relevant divisional financial targets. The Group financial targets related to the achievement of EBITDA margin relative to EU competitors, operating profit, cash generation, net debt position, and in the case of |
| Corus Report & Accounts 2004 71 |
||||
|
|
|
|||
| Report on remuneration |
division directors, divisional operating result and working capital ratios. Bonus payments for these elements were at or close to maximum. Individual targets were based on quantifiable, key deliverables within the individual areas of responsibility. Total bonus payments for the year were between 52% and 59% out of the maximum possible of 60%. From 2005, the maximum potential annual bonus is to be increased to 80% for executive directors and other members of the Executive committee, and to 100% for the Chief Executive. This is to reinforce the performance culture being developed within the Company and, given the mandatory deferral of half of bonus into shares, to improve the retentive element of remuneration for senior executives in an increasingly competitive international environment. This change does not alter the quantum or structure of the LEAP (see ‘Long-term incentives’) which was introduced last year. Targets in 2005 continue to be stretching. Shareholding requirements Executive directors and other members of the Executive committee are encouraged to accumulate, over a period of four years and then retain, |
a shareholding in the shares of the Company. In the case of the Chief Executive, the target shareholding is two million shares; for other members of the Executive committee the target is between 350,000 and 500,000 shares. Long-term incentives In 2004 the Company introduced a new share-based, long-term incentive arrangement known as the Leveraged Equity Acquisition Plan (LEAP), which was approved at the 2004 Annual General Meeting. Its objective is to create a very strong link between business performance, senior executives’ reward and shareholders’ interests over the medium term. It provides the opportunity for executive directors and Executive committee members to invest in the Company’s shares and, as previously stated, in respect of half of annual bonus, such investment is mandatory. After three years, subject to performance, a matching award of shares may be made. Senior executives may also be selected to receive an award of conditional shares of up to 25% of annual base salary; these are also subject to performance conditions. |
Executive directors and other Executive committee members have the opportunity to contribute further shares from their own resources. Notwithstanding the increase in the maximum annual bonus, the maximum amount that may be committed to the LEAP will not change: it remains 60% of an executive’s annual base salary in any year. The performance condition for the 2004 awards is the measurement of the Company’s total shareholder return (‘TSR’) over the three year period 2004-2006 compared with the TSR of companies comprising the FTSE 250 at the date of award (but excluding those companies in the finance sector). Executive directors and other members of the Executive committee were awarded in 2004 conditional shares equivalent to 25% of their base salary. These shares will vest, provided the Company’s TSR is at or above the 50th percentile of the comparator group at the end of the three year performance period. In addition, matching shares may be awarded: the number of potential matching shares is determined by reference to the same performance condition, namely the Company’s TSR relative to the comparator group, in accordance with the table below. Matching shares may be applicable to conditional shares, shares acquired by bonus deferral and other shares purchased and transferred to the LEAP from the executive’s own resources. The number of conditional shares awarded and the number of shares acquired through bonus deferral are shown in the tables on page 78. |
|||
| |
|
||||
| LEAP TSR Performance | |||||
| relative to comparator group | Matching awards | ||||
| |
|
||||
| Below | 50th percentile | Nil | |||
| 50th | One half of the shares in LEAP | ||||
| 51st to 66th | Pro rata between one half and one times the shares in LEAP | ||||
| 67th | One times the shares in LEAP | ||||
| 68th to 74th | Pro rata between one and two times the shares in LEAP | ||||
| 75th | Two times the shares in LEAP | ||||
| 76th to 89th | Pro rata between two and and three times the shares in LEAP | ||||
| 90th and above | Three times the shares in LEAP | ||||
| |
|||||
|
72 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Report on remuneration |
No changes are planned for the operation of the LEAP scheme in 2005. Executive share option scheme The executive share option scheme was approved by shareholders in September 1999. Outstanding options granted to executive directors are set out in the table on page 79 and scheme details are described on page 78. No further options were granted during the year and it is the intention not to grant any further options under this scheme. Sharesave scheme The Company has operated a Sharesave scheme within the UK for many years. In 2004, the scheme was re-launched and internationalised with invitations made in the UK, the Netherlands and Germany. Take-up was excellent in the UK and Netherlands but lower in Germany. Consideration will be given in 2005 to extending this scheme to other countries where the Company employs sufficient employees to warrant the establishment of such a scheme and also where local tax considerations make it an attractive proposition for employees. Options are exercisable for a period of six months upon completion of a three year savings contract. The rules permit savings between £10 and £250 per month (or equivalent thereof for the international scheme). |
Performance graph – Corus Group TSR vs FTSE 100 and 250 Indices ![]() This graph shows the performance of the Company against the performance of the FTSE 100 and the FTSE 250 Indices, chosen as representing relevant equity market indices. It has been assumed that all dividends paid have been reinvested. This graph has been produced in the above form in order to comply with the relevant legislation and to clearly represent comparative TSR performance. |
|||
| Other
long-term incentives On joining the company Mr Philippe Varin was awarded 1.1m shares conditional on his purchasing and retaining 1.1m shares. The shares awarded vest on the third anniversary of the date of the award. In the event of leaving service before that date, the award is forfeited. |
||||
| Corus Report & Accounts 2004 73 |
||||
|
|
|
|||
Report on remuneration |
|
Pensions UK |
It is separately funded and subject to Inland Revenue rules. Normal pension age for directors in the scheme is 60 and additional credits have been granted to achieve 40 years pensionable service at 60 for both executives. Bonuses and benefits in kind are not included in pensionable earnings for directors. Mr Philippe Varin is not a member of the British Steel Pension Scheme. In accordance with his contract of employment, he is paid a pension allowance of 30% of his salary. Mr Varin receives a life assurance benefit broadly equivalent to that |
provided under the British Steel Pension Scheme. Netherlands The scheme places a limit on pensionable earnings (€209,035 at 1 January 2005) and arrangements |
||
| Pension benefits earned by directors – UK | |||||||
| Director’s age at year end |
Director’s pension contributions during year |
Increase
in accrued pension during year |
Accumulated total accrued pension at year end |
||||
| As required by the Listing Rules of the UK Listing Authority | £ | £ p.a. | £ p.a. | ||||
| D M Lloyd | 41 | 18,750 | 26,367 | 119,615 | |||
| S I Pettifor | 59 | 20,750 | 44,448 | 225,257 | |||
| Notes: | |
| (i) | The pension entitlement shown is the accumulated pension that would be paid each year on retirement at normal pension age, based on service to 1 January 2005. |
| (ii) | The details shown have been calculated as at 3 January 2004 and 1 January 2005 and exclude the amount and value of any additional voluntary contributions paid by the director. The increases in accrued pension during the year ended 1 January 2005 have been adjusted to take account of inflation on the accumulated total accrued pension. |
| (iii) | Normal pension age for directors is 60. |
| (iv) | The pension for a surviving widow is two thirds of the director’s pension. |
| (v) | An immediate pension is payable on early retirement on or after age 50 if retirement is at the request of the Company. |
| (vi) | In accordance with the pension scheme rules, pensions are increased annually after retirement by reference to increases in the Retail Prices Index. |
| (vii) | No discretionary benefits are applicable in the calculation of transfer values on leaving service. Any transfer value would be calculated on the basis of actuarial advice in accordance with Actuarial Guidance Note GN11. |
| Increase in accrued pension during year |
Total accrued entitlement at year end |
Transfer value as at year end |
Transfer value as at beginning of year |
Increase in transfer value during year less director’s contributions |
|||||
| As required by the Directors’ Remuneration Regulations 2002 | £ | £ p.a. | £ | £ | £ | ||||
| D M Lloyd | 28,730 | 119,615 | 848,640 | 610,058 | 219,832 | ||||
| S I Pettifor | 49,030 | 225,257 | 4,753,844 | 3,286,085 | 1,447,009 | ||||
| Notes: | ||
| (i) | The increase in accrued pension during the year in accordance with the above regulations differs from the UKLA listing rules requirements because there is no inflation adjustment in the disclosure. | |
| (ii) | The details shown exclude the amount and value of any additional voluntary contributions paid by the director. | |
| (iii) | The value placed on accrued benefits in calculating transfer values increases each year to reflect the increasing age of each director. | |
| (iv) | The increase in transfer values during the year has been influenced by factors other than the direct increase in pension benefits: | |
| (a) | a market value adjustment is applied in the transfer calculation and an increase in the market value adjustment over the year resulted in increased transfer values; | |
| (b) | from age 50, the transfer value assumptions made each year for the investments required to match the liabilities progressively move from a combination of equities and gilts towards a position of 100% gilts at normal pension age. | |
| Restating the beginning of year transfer values to adjust for the effects of (iii) and (iv) above shows increases arising from increases in pension benefit as follows: | |||||
| Transfer value as at year end |
Transfer value as at beginning of year |
Increase in transfer value during year less director’s contributions |
|||
| £ | £ | £ | |||
| D M Lloyd | 848,640 | 644,808 | 185,082 | ||
| S I Pettifor | 4,753,844 | 3,719,110 | 1,013,984 | ||
|
74 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Report on remuneration |
| have been made by the Company to provide additional pension benefits on a defined benefit basis. For Mr Vrins, this is in respect of his earnings in excess of the limit. For Mr Henstra the Company provides for defined pension benefits on earnings between the limit and €300,000 (subject to annual review in line with the normal rules of the scheme) plus an allowance of 15% of his earnings between €300,000 and his actual base salary. Mr Henk Vrins retired early from the Company on 1 March 2004 and will become eligible for an early retirement pension with effect from |
1 March 2005. As reported in last year’s Report & Accounts, the Company made a payment to the SPH Scheme of €1,332,306 to provide for early retirement benefits. Excess
retirement benefits The total amount set aside by the Group during 2004 to provide |
pension, retirement or similar benefits for all current directors was £238,672 (2003: £202,085). Benefits |
||
| Pension benefits earned by directors – Netherlands | |||||||
| Director’s age at year end |
Director’s pension contributions during year |
Increase
in accrued pension during year |
Accumulated total accrued pension at year end |
||||
| As required by the Listing Rules of the UK Listing Authority | € | € p.a. | € p.a. | ||||
| H A M Vrins | 60 | ||||||
| Accrued Early Retirement Pension (from age 60 to 65) | – | 10,554 | 323,270 | ||||
| Accrued Pension (from age 65) | – | 1,491 | 291,640 | ||||
| R Henstra | 58 | ||||||
| Accrued Bridging Pension (from age 62 to 65) | 109 | 4,475 | 101,720 | ||||
| Accrued Pension (from age 62) | 7,340 | 1,563 | 231,325 | ||||
| Notes: | |||||||
| (i) | The pension entitlement shown is the accumulated pension that would be paid each year based on service at 1 January 2005. |
| (ii) | The details shown have been calculated as at 1 January 2005 and exclude the amount and value of any additional voluntary contributions paid by the director. |
| (iii) | The increases in accrued pension during the period are ordinarily offset to take account of inflation on the accumulated total accrued pension, however no inflationary increase was applied to pensions in 2004 and so no adjustment to the value of accrued pensions has been made. |
| (iv) | The pension entitlement for Mr Vrins’ surviving widow is 75% of the director’s pension at normal pension age (65). |
| (v) | During Mr Henstra’s active membership, the contingent widow’s pension is automatically 70% of his reduced pension at normal pension age. Following retirement, the pension entitlement for Mr Henstra has no automatic provision for a widow’s pension, but scheme rules permit the election at retirement of the reduced member’s pension and a contingent widow’s pension of 70% of his adjusted pension. |
| (vi) | In accordance with the scheme rules, pensions may be increased annually after retirement by the SPH Board, subject to scheme funding, by reference to a Dutch general index of retail prices. |
| (vii) | No discretionary benefits are applicable in the calculation of transfer values on leaving service. Any transfer value would be calculated in accordance with Dutch legislation. |
| Increase in accrued pension during year |
Total accrued entitlement at year end |
Transfer value as at year end |
Transfer value as at beginning of year |
Increase in transfer value during year less director’s contributions |
|||||
| As required by the Directors’ Remuneration Regulations 2002 | € | € p.a. | € | € | € | ||||
| H A M Vrins | |||||||||
| Early Retirement Pension (from age 60 to 65) | 10,554 | 323,270 | 813,994 | 780,851 | 33,143 | ||||
| Normal Pension (from age 65) | 1,491 | 291,640 | 3,254,484 | 3,216,085 | 38,399 | ||||
| R Henstra | |||||||||
| Bridging Pension (from age 62 to 65) | 4,475 | 101,720 | 253,079 | 239,125 | 13,845 | ||||
| Normal Pension (from age 62) | 1,563 | 231,325 | 2,455,284 | 2,409,974 | 37,970 | ||||
|
Corus Report & Accounts 2004 75 |
||||
|
|
|
|||
Report on remuneration |
Directors’ emoluments
The emoluments of the directors are as follows:
| Analysis of executive directors’ emoluments | ||||||||||||||
| Basic
salary and fees |
Annual bonus† |
Taxable benefits |
Other payments |
Termination payments |
Total | |||||||||
| 2004 | 2004 | 2004 | 2004 | 2004 | 2004 | 2003 | ||||||||
| £ | £ | £ | £ | £ | £ | £ | ||||||||
| P Varin (i) | 712,123 | 414,282 | 271,514 | 35,925 | – | 1,433,844 | 1,200,463 | |||||||
| R Henstra (ii) | 78,333 | 146,163 | 8,246 | – | – | 232,742 | – | |||||||
| D M Lloyd (iii) | 375,000 | 211,874 | 64,416 | – | – | 651,290 | 482,916 | |||||||
| S I Pettifor (iv) | 415,000 | 242,775 | 25,616 | – | – | 683,391 | 493,331 | |||||||
| H A M Vrins (v) | 53,333 | – | 40,621 | – | 403,600 | 497,554 | 473,793 | |||||||
| A P Pedder | – | – | – | – | – | – | 693,849 | |||||||
| Sub total | 1,633,789 | 1,015,094 | 410,413 | 35,925 | 403,600 | 3,498,821 | 3,344,352 | |||||||
| Analysis of non-executive directors’ emoluments | ||||||||||||||
| J W Leng (vi) | 275,000 | – | 21,465 | – | – | 296,465 | 191,921 | * | ||||||
| J Schraven (vii) | 5,417 | – | – | – | – | 5,417 | – | |||||||
| A B Hayward | 50,000 | – | – | – | – | 50,000 | 35,000 | |||||||
| E A van Amerongen | 52,500 | – | – | – | – | 52,500 | 40,000 | |||||||
| K J Lauk | 42,500 | – | – | – | – | 42,500 | 23,333 | * | ||||||
| A M Robb | 52,500 | – | – | – | – | 52,500 | 18,750* | |||||||
| R T Turner | 42,500 | – | – | – | – | 42,500 | 35,000 | |||||||
| M C van Veen | 50,000 | – | – | – | – | 50,000 | 40,000 | |||||||
| Sir Brian Moffat | – | – | – | – | – | – | 177,738 | * | ||||||
| Sub total | 570,417 | – | 21,465 | – | – | 591,882 | 561,742 | |||||||
| Grand total | 2,204,206 | 1,015,094 | 431,878 | 35,925 | 403,600 | 4,090,703 | 3,906,094 | |||||||
| † | Half the bonus is payable in cash and half in deferred shares. |
| * | Remuneration for certain non-executive directors related to part of the year in 2003. |
| Notes: | |
| (i) | Mr Philippe Varin received relocation assistance of £35,925 following his move to the UK. Under his contract the Company is required to pay an allowance in lieu of pension equal to 30% of his base salary. Taxable benefits include payment of this allowance back-dated to his date of joining. |
| (ii) | Mr Rauke Henstra was appointed to the Board with effect from 1 October 2004. Salary and benefits relate from that date and include a pension supplement; the bonus relates to the full year. |
| (iii) | Mr David Lloyd’s taxable benefits include mortgage assistance of £45,564 in connection with his relocation at the Company’s request at the time of his appointment. This will be paid for one more year. |
| (iv) | Mr Stuart Pettifor is due to retire in May 2005. |
| (v) | Mr Henk Vrins retired on 1 March 2004. Taxable benefits include £12,500 for accommodation, travel allowance and a company car for the full year. Termination payments include one year’s salary and benefits, and tax advice on termination. |
| (vi) | Mr Jim Leng was appointed Chairman on 1 June 2003. |
| (vii) | Mr Jacques Schraven was appointed a director on 1 December 2004. |
|
External
appointments |
Directors’ service
contracts The service contracts for Mr David Lloyd and Mr Stuart Pettifor provide for a rolling 12 month period of notice. Mr Rauke Henstra’s service contract provides for a rolling 6 month period of notice. |
At the end of the financial year the unexpired terms were 16 months in respect of the Chief Executive and 12 months for Mr Lloyd and Mr Pettifor and 6 months for Mr Henstra. The contracts provide that other than for cause the Company may terminate the employment on payment of a sum equal to salary and pension contributions, but not bonus, for the period the agreement would otherwise have continued. |
||
|
76 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Report on remuneration |
Non-executive
directors The Chairman and the non-executive directors do not have service contracts with the Company. Non-executive directors are encouraged to hold a minimum shareholding of 50,000 shares in the Company. Details of current directors’ contracts or letters of appointment are set out in the table on the right. Loans
to directors At the beginning of the year this loan amounted to €38,118 which was the highest amount outstanding during the year. During the year €908 was repaid in accordance with the loan conditions leaving a balance at the year end of €37,210. The loan is repayable by 2030. |
Emoluments of directors | ||||||
| 2004 | 2003 | ||||||
| £ | £ | ||||||
| Executive directors: | |||||||
| Salaries and related benefits | 2,044,202 | 1,827,201 | |||||
| Performance related earnings | 1,015,094 | 368,072 | |||||
| Payment on joining and relocation assistance | 35,925 | 572,533 | |||||
| Non-executive directors: | |||||||
| Fees and related benefits | 591,882 | 561,742 | |||||
| Former directors: | |||||||
| Compensation to directors for loss of office | 403,600 | 576,546 | |||||
| 4,090,703 | 3,906,094 | ||||||
| Date
of contract or letter of appointment |
Notice
period 1 January 2005 |
||||||
| Executive directors: | |||||||
| P Varin (i) | 1 May 2003 | 16 months | |||||
| D M Lloyd | 1 February 2001 | 12 months | |||||
| S I Pettifor | 1 September 2001 | 12 months | |||||
| R Henstra | 1 October 2004 | 6 months | |||||
| Non-executive directors: (ii) | |||||||
|
J W Leng |
9 May 2003 | None | |||||
| J H Schraven | 12 October 2004 | None | |||||
| A B Hayward | 15 February 2002 | None | |||||
| E A van Amerongen | 22 February 2001 | None | |||||
| K J Lauk | 13 May 2003 | None | |||||
| A M Robb | 4 July 2003 | None | |||||
| R T Turner | 23 July 1999 | None | |||||
| M C van Veen | 23 July 1999 | None | |||||
| Notes: | |||||||
| (i) | Mr Varin’s contract provides for notice reducing progressively to 12 months by 1 May 2005. | ||||||
| (ii) | As non-executive directors do not have service contracts, their unexpired term of appointment is determined in accordance with the articles of association which requires them to be re-appointed by shareholders at least every three years. | ||||||
As previously reported, Mr Van der Velden, a former director of Hoogovens, has a loan outstanding relating to relocation. This loan is due to be repaid by 2010. At the beginning of the year this loan amounted to €26,471. During the year €3,781 was repaid, leaving a balance of €22,690. Sums
paid to a third party in respect of a director’s service |
was (while a director of the Company) a director by virtue of the Company’s nomination, or otherwise in connection with the management of the Company or any such other undertaking during the year to 1 January 2005. Directors’
interests None of the directors or their families had any interests in the shares of any subsidiary company. |
||||||
|
Corus Report & Accounts 2004 77 |
||||
|
|
|
|||
Report
on remuneration |
Executive
Share Options The options granted to the Chief Executive are subject to special performance conditions, as reported last year. All other options under this scheme except for those granted prior to 1996 are subject to performance measures relating to both TSR and a target relating to the return on shareholder funds. These performance criteria were chosen to reflect corporate performance relative to companies with similar characteristics and subject to similar market conditions, as well as to demonstrate the minimum return to shareholders required to justify the use of executive share options. To meet the minimum TSR target, the Company must rank no lower than the median position when measured against a group of comparator companies (see page 80). The performance period for the TSR target is any 36 month period ending within four years of the start of the financial year in which the option is granted. The minimum return on shareholder funds is 4% per annum (as stated in the accounts). The performance period relating to the return on shareholders’ funds is any period of three consecutive financial years beginning not earlier than the financial year in which the option was granted. |
Directors’ interests in shares of the Company | ||||||||||||
| Ordinary shares of 10p | 1
Jan 2005 Number |
3
Jan 2004 Number |
|||||||||||
| J W Leng | 141,666 | 141,666 | |||||||||||
| J Schraven | 50,000 | 50,000 | † | ||||||||||
| P Varin | 1,655,328 | 1,558,333 | |||||||||||
| E A van Amerongen | 50,000 | – | |||||||||||
| A B Hayward | 52,776 | 18,691 | |||||||||||
| R Henstra | – | – | † | ||||||||||
| K J Lauk | – | – | |||||||||||
| D M Lloyd | 82,881 | 16,974 | |||||||||||
| S I Pettifor | 28,333 | 28,333 | |||||||||||
| A M Robb | 50,000 | 20,000 | |||||||||||
| M C van Veen | 18,559 | 18,559 | |||||||||||
| † | Interests held in shares at the date of appointment. | ||||||||||||
| Notes: | |||||||||||||
| (i) | None of the directors held non-beneficial interests at any time during the year. | ||||||||||||
| (ii) | During the period from the year end to 17 March 2005 Mr D M Lloyd acquired 447 partnership shares under the employee share ownership plan. | ||||||||||||
| Leveraged Equity Acquisition Plan (LEAP) | |||||||||||||
| Ordinary shares of 10p | Award
held 3 Jan 2004 |
Granted during year |
Lapsed during the year |
Award held 1 Jan 2005 |
Vesting date |
||||||||
| Conditional share awards | |||||||||||||
| P Varin | – | 435,788 | – | 435,788 | Apr 2007 | ||||||||
| D M Lloyd | – | 231,481 | – | 231,481 | Apr 2007 | ||||||||
| S I Pettifor | – | 256,173 | – | 256,173 | Apr 2007 | ||||||||
| R Henstra | – | 165,370 | – | 165,370 | Apr 2007 | ||||||||
| Deferred bonus share awards | |||||||||||||
| P Varin | – | 177,375 | – | 177,375 | Apr 2007 | ||||||||
| D M Lloyd | – | 87,289 | – | 87,289 | Apr 2007 | ||||||||
| S I Pettifor | – | 97,831 | – | 97,831 | Apr 2007 | ||||||||
| R Henstra | – | – | – | – | Apr 2007 | ||||||||
The exercise period is seven years starting from the third anniversary of the date of grant. Once either target has been met for any 36 month period, there need not be any further testing of that target in respect of that particular grant of options. For the purposes of calculating TSR, it is assumed that dividends are reinvested. TSR data is compiled by Towers Perrin and reported on half yearly. The Remuneration committee may amend the composition of the comparator group if circumstances make this necessary (for example as a result of takeovers or mergers). |
Performance criteria remain in place during the participant’s employment, but cease to apply in certain circumstances (for example, ill health or redundancy) on termination. | ||||||||||||
|
78 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Report on remuneration |
| Directors’
share options The interests of the directors in share options and movements during the year are shown below. |
| Executive share option schemes | 3 Jan 2004 | Movement during the period | 1 Jan 2005 | ||||||||||||||
| Ordinary
shares of 10p |
Date of grant |
Option price |
Number | Granted Number |
Exercised Number | Lapsed/ cancelled Number |
Number | Exercise Period | |||||||||
| From | To | ||||||||||||||||
| P Varin | (c) | 2003 | 16 | p | 1,133,984 | – | – | – | 1,133,984 | 14 May 2006 | 14 May 2013 | ||||||
| (c) | 2003 | 16 | p | 1,133,984 | – | – | – | 1,133,984 | 14 May 2007 | 14 May 2013 | |||||||
| (c) | 2003 | 16 | p | 1,133,985 | – | – | – | 1,133,985 | 14 May 2008 | 14 May 2013 | |||||||
| (d) | 3,401,953 | – | – | – | 3,401,953 | ||||||||||||
| D M Lloyd | (a) | 1994 | 104 | p | 12,113 | – | – | 12,113 | – | 30 Jun 1997 | 30 Jun 2004 | ||||||
| (a) | 1995 | 126 | p | 10,928 | – | – | – | 10,928 | 30 Jun 1998 | 30 Jun 2005 | |||||||
| (a)(e) | 1996 | 134 | p | 2,632 | – | – | – | 2,632 | 30 Jul 1999 | 30 Jul 2006 | |||||||
| (b)(e) | 1996 | 134 | p | 8,953 | – | – | – | 8,953 | 30 Jul 1999 | 30 Jul 2006 | |||||||
| (b)(e) | 1997 | 118 | p | 15,933 | – | – | – | 15,933 | 24 Jul 2000 | 24 Jul 2007 | |||||||
| (b)(e) | 1999 | 125 | p | 54,514 | – | – | – | 54,514 | 30 Jun 2002 | 30 Jun 2009 | |||||||
| (c)(e) | 2000 | 117 | p | 81,340 | – | – | – | 81,340 | 4 Feb 2003 | 4 Feb 2010 | |||||||
| (c)(e) | 2001 | 54 | p | 512,577 | – | – | – | 512,577 | 28 Mar 2004 | 28 Mar 2011 | |||||||
| (d) | 698,990 | – | – | 12,113 | 686,877 | ||||||||||||
| S I Pettifor | (b)(e) | 1996 | 134 | p | 42,006 | – | – | – | 42,006 | 30 Jul 1999 | 30 Jul 2006 | ||||||
| (c)(e) | 2001 | 49 | p | 659,793 | – | – | – | 659,793 | 28 Mar 2004 | 28 Mar 2011 | |||||||
| (d) | 701,799 | – | – | – | 701,799 | ||||||||||||
| R Henstra | (c)(e) | 2000 | 117 | p | 106,597 | – | – | – | 106,597 | 4 Feb 2003 | 4 Feb 2010 | ||||||
| (c)(e) | 2001 | 54 | p | 158,659 | – | – | – | 158,659 | 28 Mar 2004 | 28 Mar 2011 | |||||||
| 265,256 | † | – | – | – | 265,256 | ||||||||||||
| † | At
date of appointment, 1 October 2004. |
| (a) | Options granted under the Corus UK Executive Share Option Scheme (a former British Steel scheme). Options can no longer be granted under this scheme. |
| (b) | Options granted under the Corus Overseas Executive Share Option Scheme (a former British Steel scheme). Options can no longer be granted under this scheme. |
| (c) | Options granted under the Corus Executive Scheme. |
| (d) | Following an independent accountants’ valuation in respect of the placing and open offer in December 2003 the aggregate number of options outstanding as at 3 January 2004 have been restated to reflect minor rounding adjustments. As a result Mr Varin’s option holding has been reduced by 83 shares and Messrs Lloyd and Pettifor’s have been increased by 1 share and 4 shares respectively. |
| (e) | Options are subject to performance criteria which have not been met. These options would only be exercisable in certain circumstances on leaving the Company. |
Notes: |
|
| (i) | No executive options were granted or lapsed other than those stated above. |
| (ii) | No options were exercised during the financial years ended 3 January 2004 and 1 January 2005. |
| (iii) | The market price of the Company’s shares at 1 January 2005 was 51p (3 January 2004: 32p) and the range during the year to that date was 29p to 56p (3 January 2004: 4p to 38p). |
| (iv) | Options granted to Mr Philippe Varin are not subject to performance criteria. |
| (v) | There were no changes in executive options between the year end and 17 March 2005. |
Sharesave option schemes |
| 3 Jan 2004 | Movement during the period | 1 Jan 2005 | ||||||||||||||
| Ordinary
shares of 10p |
Date
of grant |
Option price |
Number | Granted Number |
Exercised Number |
Lapsed/ cancelled Number |
Number | Exercise Period | ||||||||
| From | To | |||||||||||||||
| P Varin | 2004 | 42 | p | – | 22,294 | – | – | 22,294 | 1 Jan 2008 | 31 Jul 2008 | ||||||
| – | 22,294 | – | – | 22,294 | ||||||||||||
| S I Pettifor | 2004 | 42 | p | – | 22,294 | – | – | 22,294 | 1 Jan 2008 | 31 Jul 2008 | ||||||
| – | 22,294 | – | – | 22,294 | ||||||||||||
| D M Lloyd | 2001 | 50 | p | 13,419 | – | – | 13,419 | – | ||||||||
| 2004 | 42 | p | – | 22,294 | – | – | 22,294 | 1 Jan 2008 | 31 Jul 2008 | |||||||
| 13,419 | 22,294 | – | 13,419 | 22,294 | ||||||||||||
| Notes: | |
| (i) | No sharesave options are held by executive directors other than those shown above. |
| (ii) | No options held by executive directors were granted or lapsed during the year other than those shown above. |
| (iii) | No options held by executive directors were exercised during the financial years ended 3 January 2004 and 1 January 2005. |
| (iv) | The market price of the Company’s shares at 1 January 2005 was 51p (3 January 2004: 32p) and the range during the year to that date was 29p to 56p (3 January 2004: 4p to 38p). |
| (v) | There were no changes to sharesave options between the year end and 17 March 2005. |
| (vi) | Following an independent accountants’ valuation in respect of the placing and open offer in December 2003 the aggregate number of options outstanding as at 3 January 2004 have been restated to reflect minor rounding adjustments. As a result Mr Lloyd’s option holding has been reduced by 1 share. |
|
Corus Report & Accounts 2004 79 |
||||
|
|
|
|||
Report on remuneration |
|
| ABB | CIBA Specialty Chemicals | HOLCIM ‘B’ | PSA-Peugeot Citroen SA | Solvay |
| Air Liquide | Clariant | ICI | Renault | Suez |
| Akzo Nobel | CRH | Invensys | Rolls Royce | Thales |
| Alstom | Daimler Chrysler | Lafarge | RWE | ThyssenKrupp |
| Atlas Copco ‘A’ | Degussa | Lagardere | Saint Gobain | TUI |
| BAE Systems | Edison | Legrand | Sandvik | Valeo |
| BASF | E.ON | Linde | Scania ‘A’ | Vivendi Universal |
| Bayer | Fiat | MAN | Schneider | Volkswagen |
| BMW | GKN | Michelin | Siemens | Volvo ‘B’ |
| BOC Group | Hanson | Philips | Skanska | Wolsey |
| Bouygues | Heidelbergcement | Pirelli | Smiths Group |
| Share
dilution through the operation of share plans Where shares are issued to satisfy incentives, the aggregate dilution resulting from executive incentives will not exceed 5% in any ten year period, and that resulting from all incentives, including all-employee incentives, will not exceed 10% in any ten year period. On behalf of the Board
Richard
Reeves |
Auditable
sections of the Report on remuneration
|
|
80 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
|
|
Corus Report & Accounts 2004 81 |
||||
|
|
|
|||
|
|
|
82 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
|
|
|
Corus Report & Accounts 2004 83 |
||||
|
|
|
|||
|
84 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| P Varin |
| D M Lloyd |
17 March 2005
|
Notes and related statements forming part of these accounts appear on pages 89 to 139.
|
|
Corus Report & Accounts 2004 85 |
||||
|
|
|
|||
|
86 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Corus Report & Accounts 2004 87 |
||||
|
|
|
|||
|
|
||||||||||||||||||||
2002 £m |
Cash flow £m |
Exchange rate changes £m |
Other non cash changes £m |
2003 £m |
Cash flow £m |
Acquisitions (excluding cash and overdrafts) £m |
Exchange rate changes £m |
Other non cash changes £m |
2004 £m |
|||||||||||
| Cash at bank and in hand | 230 | 8 | 4 | – | 242 | 139 | – | 2 | – | 383 | ||||||||||
| Bank overdrafts | (36 | ) | 2 | – | – | (34 | ) | 2 | – | – | – | (32 | ) | |||||||
| Cash less bank overdrafts | 194 | 10 | 4 | – | 208 | 141 | – | 2 | – | 351 | ||||||||||
| Short term investments: | ||||||||||||||||||||
Deposits
within 3 months of maturity
when acquired |
39 | 91 | 2 | – | 132 | 77 | – | (3 | ) | – | 206 | |||||||||
| Other short term deposits | 1 | 5 | – | – | 6 | 5 | – | – | – | 11 | ||||||||||
| Liquid resources | 40 | 96 | 2 | – | 138 | 82 | – | (3 | ) | – | 217 | |||||||||
| Long term borrowings | (1,386 | ) | 133 | (45 | ) | 59 | (1,239 | ) | (109 | ) | 5 | (13 | ) | (11 | ) | (1,367 | ) | |||
| Other loans | (41 | ) | 25 | (2 | ) | (60 | ) | (78 | ) | 61 | (2 | ) | 5 | – | (14 | ) | ||||
| Obligations under finance leases | (43 | ) | 1 | – | – | (42 | ) | 1 | – | – | – | (41 | ) | |||||||
Total
debt excluding bank
overdrafts |
(1,470 | ) | 159 | (47 | ) | (1 | ) | (1,359 | ) | (47 | ) | 3 | (8 | ) | (11 | ) | (1,422 | ) | ||
| (1,236 | ) | 265 | (41 | ) | (1 | ) | (1,013 | ) | 176 | 3 | (9 | ) | (11 | ) | (854 | ) | ||||
Notes and related statements forming part of these accounts appear on pages 89 to 139.
|
||||||||||||||||||||
|
88 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| (i) |
reported amounts of assets and liabilities; |
| (ii) |
disclosure of contingent assets and liabilities at the date of the accounts; and |
| (iii) | reported amounts of income and expenses during the reporting period. |
| Actual results could differ from those estimates. The most significant techniques for estimation are described in the accounting policies below. II
Basis of consolidation On the acquisition of a subsidiary, joint venture or associated undertaking, fair values are attributed to the net assets acquired. Any difference between the purchase consideration and these fair values is treated as goodwill. Until 28 March 1998 all goodwill was written off or credited to reserves immediately. As from the financial year ended 3 April 1999, positive goodwill is capitalised and amortised over its estimated useful economic life up to a maximum of 20 years. Negative goodwill is recognised in the profit and loss account in line with the periods in which the assets acquired are depreciated. Any goodwill that was written off or credited immediately to reserves up until 28 March 1998 has not been reinstated. However, it is transferred from reserves to the profit and loss account on any subsequent disposal of the net assets to which it related. Corus Group plc acquired Corus UK Limited in 1999 under a Scheme of Arrangement of Corus UK Limited within section 425 of the Companies Act 1985 (the ‘Act’). This was accounted for under the principles of merger accounting, although it did not satisfy all the conditions required by Schedule 4 of the Act. In the opinion of the directors, the Scheme of Arrangement was a Group restructuring rather than an acquisition since the shareholders of Corus Group plc were the same as the former shareholders of Corus UK Limited and the relative rights of each shareholder were unchanged. So, the directors consider if merger accounting had not been used these accounts would not give a true and fair view of the Group’s results and financial position as demanded by section 227(6) of the Act and have accordingly adopted a true and fair override. It is not considered practical to quantify the effect of the departure from the requirement of Schedule 4A. III
Turnover IV
Rationalisation and related measures and environmental remediation
V
Research and development VI
Government grants VII
Insurance
|
|
Corus Report & Accounts 2004 89 |
||||
|
|
|
|||
Presentation of accounts and accounting policies
|
| year at which time any profits or losses arising are recognised; in the interim, the level of insurance provisions is kept under review and, where appropriate, adjustments are made. Insurance premiums in respect of insurance placed with third parties are charged to the profit and loss account in the period to which they relate. VIII
Interest IX
Deferred taxation X
Foreign currencies Exchange differences on the retranslation of the opening net investment in foreign enterprises and the retranslation of profit and loss account items from average rate to closing rate are recorded as movements on reserves. Exchange gains or losses on foreign currency borrowings and forward exchange contracts used to finance an equity investment in a foreign enterprise are offset against the exchange difference arising on the retranslation of the net investment. Exchange gains and losses on settled forward exchange contracts used to manage exposure to fluctuations in foreign currency with respect to transactions, together with all other exchange gains and losses on settlement, are included in arriving at the result for the period. XI
Derivative financial instruments The Group uses forward contracts and commodity futures, where appropriate, to hedge the cash flow risk of contracted sales and purchase transactions. Net sales and purchases covered by these contracts or options are translated into sterling at contract rates. No account is taken of the potential but unrealised profits or losses on open forward contracts or options which are intended as a hedge against future contracted transactions; such profits and losses are accounted for so as to match the exchange or price differences arising on the underlying contracted transactions. If a derivative instrument ceases to meet the criteria for deferral or settlement accounting, any subsequent gains or losses are recognised at that time in the profit and loss account. If a transaction does not occur, the hedge is terminated and any gains or losses are recognised in the profit and loss account. XII
Stocks XIII
Tangible fixed assets
|
|
90 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Presentation of accounts and accounting policies
|
Included in tangible fixed assets are loose plant and tools which are stated at cost less amounts written off related to their expected useful lives and estimated scrap value and also spares, against which provisions are made where necessary to cover slow moving and obsolescent items. Repairs and renewals are charged to the profit and loss account as incurred. XIV
Depreciation and impairment of tangible and intangible fixed assets
|
| The estimated useful lives for the main categories of fixed assets are: | ||
| Freehold and long leasehold buildings which house plant, and other works buildings | 25 years | |
| Other freehold and long leasehold buildings | 50 years | |
| Plant and machinery: | ||
| Iron and steelmaking | maximum | 25 years |
| IT equipment | maximum | 8 years |
| Office equipment and furniture | 10 years | |
| Motor vehicles | 4 years | |
| Other | maximum | 15 years |
| Goodwill | maximum | 20 years |
| Patents and trademarks | 4 years |
| Tangible and intangible fixed assets are reviewed for impairment if events or changes in circumstances indicate that the carrying amount may not be recoverable. These reviews assess the recoverable amount by reference to the net present value of expected future cash flows of the relevant income generating unit, or disposal value if higher, resulting in accelerated depreciation or amortisation as appropriate. The discount rate applied in the period, of 9.5%, was based upon the Group’s long term weighted average cost of capital with appropriate adjustments for the risks associated with the relevant units. XV
Fixed asset investments In the Company’s balance sheet, investments are stated at cost except for the investment in Corus UK Limited. This investment, as permitted by section 133 of the Companies Act 1985, is recorded as the aggregate of the nominal value of shares issued to acquire the investment and fair value of other consideration given. Provisions are made against investments if events or circumstances indicate that the carrying amount may not be recoverable. Income from fixed asset investments comprises dividends declared up to the balance sheet date and, where relevant, is shown before deduction of overseas withholding taxes. XVI
Own shares held under trust XVII
Pensions Differences between the amounts funded and amounts charged to the profit and loss account are treated as either provisions or prepayments in the balance sheet. This accounting policy follows the principles of SSAP 24. As indicated on page 51 of the Review of the period, the measurement criteria of FRS 17 have not been adopted early, although the transitional disclosure requirements have been made.
|
|
Corus Report & Accounts 2004 91 |
||||
|
|
|
|||
1. Segmental analysis 1.1 Operating division analysis Towards the end of 2003 Corus reorganised into a structure that comprises four main operating divisions – Strip Products, Long Products, Distribution & Building Systems and Aluminium. The following analysis reflects this new divisional structure and all comparatives have been restated on this basis. Segment assets are operational assets used in normal day to day activities. They include attributable goodwill, property, plant and equipment, inventories and operational receivables. They do not include cash, short term investments, tax assets and other non-current financial assets. Segment liabilities are also those resulting from the normal activities of the division, excluding tax liabilities and indebtedness. Net interest and investment income is managed centrally for the Group as a whole and so is not directly attributable to individual business segments. |
| 2004 (Figures in £million, unless otherwise stated) |
Strip Products |
Long Products |
Distribution & Building Systems |
Aluminium | Central & other |
Eliminations | Total | ||||||||
| Profit and loss account key data | |||||||||||||||
| Joint venture turnover | 115 | 61 | 117 | – | – | – | 293 | ||||||||
| Gross turnover | 4,724 | 2,605 | 2,606 | 1,092 | 67 | (1,762 | ) | 9,332 | |||||||
| Inter-segment sales | (841 | ) | (750 | ) | (72 | ) | (40 | ) | (59 | ) | 1,762 | – | |||
| Group turnover | 3,883 | 1,855 | 2,534 | 1,052 | 8 | – | 9,332 | ||||||||
| Depreciation (net of grants released) | (172 | ) | (61 | ) | (22 | ) | (37 | ) | (5 | ) | – | (297 | ) | ||
| Amortisation | (4 | ) | (2 | ) | (2 | ) | (2 | ) | – | – | (10 | ) | |||
| Operating profit/(loss) before restructuring | |||||||||||||||
| and impairment costs | 386 | 177 | 83 | 50 | (69 | ) | – | 627 | |||||||
| Restructuring and impairment costs: | |||||||||||||||
| Redundancy and related costs | (8 | ) | (6 | ) | (4 | ) | (2 | ) | (6 | ) | – | (26 | ) | ||
| Accelerated depreciation | (3 | ) | 67 | (8 | ) | (37 | ) | – | – | 19 | |||||
| Accelerated amortisation | (9 | ) | (9 | ) | – | (2 | ) | – | – | (20 | ) | ||||
| Other asset write downs | – | (13 | ) | – | – | – | – | (13 | ) | ||||||
| Other rationalisation costs | – | (1 | ) | (4 | ) | – | – | – | (5 | ) | |||||
| Operating profit/(loss) after restructuring | |||||||||||||||
| and impairment costs | 366 | 215 | 67 | 9 | (75 | ) | – | 582 | |||||||
| Share of operating results of joint ventures | |||||||||||||||
| and associated undertakings | 14 | 7 | 9 | – | – | – | 30 | ||||||||
| Profit on disposal of fixed assets | 27 | 5 | 2 | – | – | – | 34 | ||||||||
| Profit on disposal of group undertakings (Note 35) | – | 33 | 1 | – | – | – | 34 | ||||||||
| Profit/(loss) on ordinary activities before interest | 407 | 260 | 79 | 9 | (75 | ) | – | 680 | |||||||
| Balance sheet key data | |||||||||||||||
| Tangible fixed assets | 1,661 | 601 | 148 | 346 | 55 | – | 2,811 | ||||||||
| Interests in joint ventures and | |||||||||||||||
| associated undertakings | 69 | 14 | 25 | 1 | – | – | 109 | ||||||||
| Other segment assets | 1,664 | 908 | 845 | 391 | 458 | (517 | ) | 3,749 | |||||||
| Total segment assets | 3,394 | 1,523 | 1,018 | 738 | 513 | (517 | ) | 6,669 | |||||||
| Cash and short term investments | – | – | – | – | 600 | – | 600 | ||||||||
| Total assets | 3,394 | 1,523 | 1,018 | 738 | 1,113 | (517 | ) | 7,269 | |||||||
| Total segment liabilities | (1,116 | ) | (564 | ) | (575 | ) | (245 | ) | (532 | ) | 517 | (2,515 | ) | ||
| Borrowings | – | – | – | – | (1,454 | ) | – | (1,454 | ) | ||||||
| Total liabilities | (1,116 | ) | (564 | ) | (575 | ) | (245 | ) | (1,986 | ) | 517 | (3,969 | ) | ||
| Net assets/(liabilities) | 2,278 | 959 | 443 | 493 | (873 | ) | – | 3,300 | |||||||
| Other information | |||||||||||||||
| Capital expenditure | 209 | 106 | 14 | 43 | 5 | – | 377 | ||||||||
| Average weekly number of employees | 22,500 | 13,300 | 5,800 | 5,700 | 1,300 | – | 48,600 | ||||||||
|
92 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Notes to the accounts
|
1. Segmental analysis continued 1.1 Operating division analysis continued |
| 2003 (Figures in £million, unless otherwise stated) |
Strip Products |
Long Products |
Distribution & Building Systems |
Aluminium | Central & other |
Eliminations | Total | ||||||||
| Profit and loss account key data | |||||||||||||||
| Joint venture turnover | 108 | 49 | 93 | – | – | – | 250 | ||||||||
| Gross turnover | 3,916 | 2,149 | 2,272 | 1,028 | 63 | (1,475 | ) | 7,953 | |||||||
| Inter-segment sales | (734 | ) | (613 | ) | (42 | ) | (36 | ) | (50 | ) | 1,475 | – | |||
| Group turnover | 3,182 | 1,536 | 2,230 | 992 | 13 | – | 7,953 | ||||||||
| Depreciation (net of grants released) | (189 | ) | (60 | ) | (23 | ) | (42 | ) | 6 | – | (308 | ) | |||
| Amortisation | (3 | ) | (2 | ) | – | (1 | ) | (2 | ) | – | (8 | ) | |||
| Operating profit/(loss) before restructuring | |||||||||||||||
| and impairment costs | 47 | (47 | ) | (1 | ) | 31 | (96 | ) | – | (66 | ) | ||||
| Restructuring and impairment costs: | |||||||||||||||
| Redundancy and related costs | (5 | ) | (35 | ) | (7 | ) | (3 | ) | (1 | ) | – | (51 | ) | ||
| Accelerated depreciation | (26 | ) | (20 | ) | – | – | (1 | ) | – | (47 | ) | ||||
| Accelerated amortisation | – | – | – | – | (1 | ) | – | (1 | ) | ||||||
| Other asset write downs | (4 | ) | (11 | ) | – | – | – | – | (15 | ) | |||||
| Other rationalisation costs | 13 | (25 | ) | (12 | ) | (2 | ) | (2 | ) | – | (28 | ) | |||
| Operating profit/(loss) after restructuring | |||||||||||||||
| and impairment costs | 25 | (138 | ) | (20 | ) | 26 | (101 | ) | – | (208 | ) | ||||
| Share of operating results of joint ventures | |||||||||||||||
| and associated undertakings | 5 | 4 | – | – | – | – | 9 | ||||||||
| Profit/(loss) on disposal of fixed assets | 15 | 4 | 22 | (1 | ) | 7 | – | 47 | |||||||
| Loss on disposal of group undertakings | – | – | – | – | (2 | ) | – | (2 | ) | ||||||
| Profit/(loss) on ordinary activities before interest | 45 | (130 | ) | 2 | 25 | (96 | ) | – | (154 | ) | |||||
| Balance sheet key data | |||||||||||||||
| Tangible fixed assets | 1,607 | 518 | 167 | 377 | 60 | – | 2,729 | ||||||||
| Interests in joint ventures and | |||||||||||||||
| associated undertakings | 66 | 11 | 21 | 1 | – | – | 99 | ||||||||
| Other segment assets | 1,357 | 729 | 631 | 377 | 454 | (377 | ) | 3,171 | |||||||
| Total segment assets | 3,030 | 1,258 | 819 | 755 | 514 | (377 | ) | 5,999 | |||||||
| Cash and short term investments | – | – | – | – | 380 | – | 380 | ||||||||
| Total assets | 3,030 | 1,258 | 819 | 755 | 894 | (377 | ) | 6,379 | |||||||
| Total segment liabilities | (965 | ) | (465 | ) | (429 | ) | (219 | ) | (442 | ) | 377 | (2,143 | ) | ||
| Borrowings | – | – | – | – | (1,393 | ) | – | (1,393 | ) | ||||||
| Total liabilities | (965 | ) | (465 | ) | (429 | ) | (219 | ) | (1,835 | ) | 377 | (3,536 | ) | ||
| Net assets/(liabilities) | 2,065 | 793 | 390 | 536 | (941 | ) | – | 2,843 | |||||||
| Other information | |||||||||||||||
| Capital expenditure | 88 | 13 | 22 | 31 | 9 | – | 163 | ||||||||
| Average weekly number of employees | 23,700 | 13,600 | 6,000 | 5,700 | 1,300 | – | 50,300 | ||||||||
|
Corus Report & Accounts 2004 93 |
||||
|
|
|
|||
|
Notes to the accounts |
1 Segmental analysis continued |
||||||||||||||
| 1.1 Operating division analysis continued | ||||||||||||||
|
2002
(Figures
in £million, unless otherwise stated) |
Strip
Products |
Long
Products |
Distribution
&
Building
Systems |
Aluminium |
Central
&
other |
Eliminations |
Total |
|||||||
| Profit and loss account key data | ||||||||||||||
| Joint venture turnover | 84 | 47 | 86 | – | 2 | – | 219 | |||||||
| Gross turnover | 3,455 | 2,002 | 1,945 | 1,022 | 78 | (1,314 | ) | 7,188 | ||||||
| Inter-segment sales | (540 | ) | (547 | ) | (117 | ) | (56 | ) | (54 | ) | 1,314 | – | ||
| Group turnover | 2,915 | 1,455 | 1,828 | 966 | 24 | – | 7,188 | |||||||
| Depreciation (net of grants released) | (192 | ) | (83 | ) | (23 | ) | (38 | ) | 6 | – | (330 | ) | ||
| Amortisation | (7 | ) | (1 | ) | (1 | ) | (2 | ) | – | – | (11 | ) | ||
| Operating (loss)/profit before restructuring and impairment costs | (209 | ) | (171 | ) | 3 | 27 | (43 | ) | – | (393 | ) | |||
| Restructuring and impairment costs: | ||||||||||||||
| Redundancy and related costs | 3 | 12 | (2 | ) | – | 1 | – | 14 | ||||||
| Accelerated depreciation | 6 | (83 | ) | (2 | ) | (3 | ) | – | – | (82 | ) | |||
| Accelerated amortisation | (20 | ) | – | – | (3 | ) | – | – | (23 | ) | ||||
| Other asset write downs | 3 | – | – | – | – | – | 3 | |||||||
| Other rationalisation costs | 35 | – | 1 | – | (1 | ) | – | 35 | ||||||
| Operating (loss)/profit after restructuring and impairment costs | (182 | ) | (242 | ) | – | 21 | (43 | ) | – | (446 | ) | |||
Share
of operating results of joint ventures and
associated undertakings |
1 | 3 | 2 | – | 15 | – | 21 | |||||||
| Profit on disposal of fixed assets | 69 | 5 | 20 | – | 2 | – | 96 | |||||||
| Profit/(loss) on disposal of group undertakings | 8 | (1 | ) | (1 | ) | 60 | (47 | ) | – | 19 | ||||
| (Loss)/profit on ordinary activities before interest | (104 | ) | (235 | ) | 21 | 81 | (73 | ) | – | (310 | ) | |||
| Balance sheet key data | ||||||||||||||
| Tangible fixed assets | 1,692 | 609 | 167 | 361 | 42 | – | 2,871 | |||||||
| Interests in joint ventures and associated undertakings | 53 | 10 | 25 | 1 | 2 | – | 91 | |||||||
| Other segment assets | 1,377 | 679 | 641 | 357 | 525 | (380 | ) | 3,199 | ||||||
| Total segment assets | 3,122 | 1,298 | 833 | 719 | 569 | (380 | ) | 6,161 | ||||||
| Cash and short term investments | – | – | – | – | 270 | – | 270 | |||||||
| Total assets | 3,122 | 1,298 | 833 | 719 | 839 | (380 | ) | 6,431 | ||||||
| Total segment liabilities | (995 | ) | (457 | ) | (415 | ) | (196 | ) | (473 | ) | 380 | (2,156 | ) | |
| Borrowings | – | – | – | – | (1,506 | ) | – | (1,506 | ) | |||||
| Total liabilities | (995 | ) | (457 | ) | (415 | ) | (196 | ) | (1,979 | ) | 380 | (3,662 | ) | |
| Net assets/(liabilities) | 2,127 | 841 | 418 | 523 | (1,140 | ) | – | 2,769 | ||||||
| Other information | ||||||||||||||
| Capital expenditure | 135 | 9 | 10 | 30 | 4 | – | 188 | |||||||
| Average weekly number of employees | 25,000 | 13,500 | 5,900 | 5,800 | 1,400 | – | 51,600 | |||||||
| During 2002, the share of operating results of joint ventures and associated undertakings, and disposals of group undertakings, included amounts relating to the investment in AvestaPolarit Oyj Abp. These results have been included in the Central & other segment above. | ||||||||||||||
|
94 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts |
| 1 Segmental analysis continued | ||||||||||||||||||
| 1.2 Geographical analysis | ||||||||||||||||||
Analyses of the operating results and balance sheets by geographical sectors are set out below, representing Corus’ most significant regional markets. Segment assets are operational assets employed in each region and include items such as tax and pension balances that are specific to a country. They also include attributable goodwill but exclude cash and short term investments. Segment liabilities are those arising within each region, excluding indebtedness. As a result of the expansion of the European Union during 2004, the current period segmental information for the EU includes information for the full EU(25) group of countries. Group turnover to the new entrants was £74m during 2004, but all other impacts of this change are not considered material. Prior period turnover by destination has not been restated. |
||||||||||||||||||
2004
(Figures
in £million, unless otherwise stated) |
UK |
EU
(excl
UK) |
Europe
(excl
EU) |
North
America |
Asia |
Rest
of
World |
Net
Debt |
Eliminations |
Total |
|||||||||
| Profit and loss account key data | ||||||||||||||||||
| By destination: | ||||||||||||||||||
| Joint venture turnover | 64 | 146 | 82 | – | 1 | – | – | – | 293 | |||||||||
| Group turnover | 2,614 | 4,645 | 338 | 923 | 594 | 218 | – | – | 9,332 | |||||||||
| Included above: | ||||||||||||||||||
| Exports from the United Kingdom | 1,881 | – | – | – | – | – | – | – | 1,881 | |||||||||
| Sales to joint ventures and associated undertakings | 79 | 95 | 2 | – | – | – | – | – | 176 | |||||||||
| By location of Group entity: | ||||||||||||||||||
| Joint venture turnover | 70 | 140 | 82 | – | 1 | – | – | – | 293 | |||||||||
| Gross turnover | 4,547 | 4,585 | 139 | 554 | 338 | 25 | – | (856 | ) | 9,332 | ||||||||
| Inter-segment sales | (559 | ) | (282 | ) | (10 | ) | (1 | ) | (4 | ) | – | – | 856 | – | ||||
| Group turnover | 3,988 | 4,303 | 129 | 553 | 334 | 25 | – | – | 9,332 | |||||||||
| Depreciation (net of grants released) | (133 | ) | (146 | ) | (4 | ) | (13 | ) | (1 | ) | – | – | – | (297 | ) | |||
| Amortisation | – | (10 | ) | – | – | – | – | – | – | (10 | ) | |||||||
| Restructuring and impairment costs: | ||||||||||||||||||
| Redundancy and related costs | (18 | ) | (7 | ) | – | (1 | ) | – | – | – | – | (26 | ) | |||||
| Accelerated depreciation | 58 | (38 | ) | – | (1 | ) | – | – | – | – | 19 | |||||||
| Accelerated amortisation | – | (20 | ) | – | – | – | – | – | – | (20 | ) | |||||||
| Other asset write downs | (13 | ) | – | – | – | – | – | – | – | (13 | ) | |||||||
| Other rationalisation costs | (2 | ) | (3 | ) | – | – | – | – | – | – | (5 | ) | ||||||
| Operating profit | 142 | 396 | 8 | 26 | 8 | 2 | – | – | 582 | |||||||||
Share
of operating results of joint ventures and
associated undertakings |
7 | 16 | 7 | – | – | – | – | – | 30 | |||||||||
| Profit on disposal of fixed assets | 34 | – | – | – | – | – | – | – | 34 | |||||||||
Profit
on disposal of group undertakings (Note 35) |
25 | – | – | 9 | – | – | – | – | 34 | |||||||||
Profit
on ordinary activities before interest |
208 | 412 | 15 | 35 | 8 | 2 | – | – | 680 | |||||||||
| Balance sheet key data | ||||||||||||||||||
| Tangible fixed assets | 1,334 | 1,342 | 23 | 103 | 9 | – | – | – | 2,811 | |||||||||
|
Interests
in joint ventures and associated
undertakings |
28 | 67 | 12 | – | 2 | – | – | – | 109 | |||||||||
| Other segment assets | 1,761 | 2,080 | 45 | 178 | 51 | 18 | – | (384 | ) | 3,749 | ||||||||
| Total segment assets | 3,123 | 3,489 | 80 | 281 | 62 | 18 | – | (384 | ) | 6,669 | ||||||||
| Cash and short term investments | – | – | – | – | – | – | 600 | – | 600 | |||||||||
| Total assets | 3,123 | 3,489 | 80 | 281 | 62 | 18 | 600 | (384 | ) | 7,269 | ||||||||
| Total segment liabilities | (1,225 | ) | (1,442 | ) | (33 | ) | (135 | ) | (57 | ) | (7 | ) | – | 384 | (2,515 | ) | ||
| Borrowings | – | – | – | – | – | – | (1,454 | ) | – | (1,454 | ) | |||||||
| Total liabilities | (1,225 | ) | (1,442 | ) | (33 | ) | (135 | ) | (57 | ) | (7 | ) | (1,454 | ) | 384 | (3,969 | ) | |
| Net assets/(liabilities) | 1,898 | 2,047 | 47 | 146 | 5 | 11 | (854 | ) | – | 3,300 | ||||||||
| Other information | ||||||||||||||||||
| Capital expenditure | 253 | 116 | 2 | 5 | 1 | – | – | – | 377 | |||||||||
| Average weekly number of employees | 24,500 | 21,400 | 500 | 1,800 | 300 | 100 | – | – | 48,600 | |||||||||
|
Corus
Report & Accounts 2004 95 |
||||
|
|
|
|||
|
Notes to the accounts |
| 1 Segmental analysis continued | ||||||||||||||||||
| 1.2 Geographical analysis continued | ||||||||||||||||||
2003
(Figures
in £million, unless otherwise stated) |
UK |
EU
(excl
UK) |
Europe
(excl
EU) |
North
America |
Asia |
Rest
of
World |
Net
Debt |
Eliminations |
Total |
|||||||||
| Profit and loss account key data | ||||||||||||||||||
| By destination: | ||||||||||||||||||
| Joint venture turnover | 54 | 134 | 61 | – | 1 | – | – | – | 250 | |||||||||
| Group turnover | 2,148 | 3,790 | 363 | 781 | 669 | 202 | – | – | 7,953 | |||||||||
| Included above: | ||||||||||||||||||
| Exports from the United Kingdom | 1,566 | – | – | – | – | – | – | – | 1,566 | |||||||||
| Sales to joint ventures and associated undertakings | 71 | 70 | 2 | – | – | – | – | – | 143 | |||||||||
| By location of Group entity: | ||||||||||||||||||
| Joint venture turnover | 58 | 130 | 61 | – | 1 | – | – | – | 250 | |||||||||
| Gross turnover | 3,633 | 3,911 | 115 | 592 | 402 | 20 | – | (720 | ) | 7,953 | ||||||||
| Inter-segment sales | (426 | ) | (284 | ) | (8 | ) | – | (2 | ) | – | – | 720 | – | |||||
| Group turnover | 3,207 | 3,627 | 107 | 592 | 400 | 20 | – | – | 7,953 | |||||||||
| Depreciation (net of grants released) | (127 | ) | (155 | ) | (3 | ) | (22 | ) | (1 | ) | – | – | – | (308 | ) | |||
| Amortisation | – | (8 | ) | – | – | – | – | – | – | (8 | ) | |||||||
| Restructuring and impairment costs: | ||||||||||||||||||
| Redundancy and related costs | (34 | ) | (15 | ) | – | (2 | ) | – | – | – | – | (51 | ) | |||||
| Accelerated depreciation | (23 | ) | (1 | ) | – | (23 | ) | – | – | – | – | (47 | ) | |||||
| Accelerated amortisation | – | (1 | ) | – | – | – | – | – | – | (1 | ) | |||||||
| Other asset write downs | (14 | ) | (1 | ) | – | – | – | – | – | – | (15 | ) | ||||||
| Other rationalisation costs | (12 | ) | (16 | ) | – | – | – | – | – | – | (28 | ) | ||||||
| Operating (loss)/profit | (290 | ) | 103 | 5 | (34 | ) | 6 | 2 | – | – | (208 | ) | ||||||
Share
of operating results of joint ventures and
associated undertakings |
3 | 6 | – | – | – | – | – | – | 9 | |||||||||
| Profit on disposal of fixed assets | 34 | 13 | – | – | – | – | – | – | 47 | |||||||||
| Loss on disposal of group undertakings | – | – | – | (2 | ) | – | – | – | – | (2 | ) | |||||||
(Loss)/profit
on ordinary activities before interest |
(253 | ) | 122 | 5 | (36 | ) | 6 | 2 | – | – | (154 | ) | ||||||
| Balance sheet key data | ||||||||||||||||||
| Tangible fixed assets | 1,184 | 1,383 | 24 | 128 | 9 | 1 | – | – | 2,729 | |||||||||
Interests
in joint ventures and associated
undertakings |
26 | 64 | 7 | – | 2 | – | – | – | 99 | |||||||||
| Other segment assets | 1,420 | 1,792 | 35 | 191 | 42 | 10 | – | (319 | ) | 3,171 | ||||||||
| Total segment assets | 2,630 | 3,239 | 66 | 319 | 53 | 11 | – | (319 | ) | 5,999 | ||||||||
| Cash and short term investments | – | – | – | – | – | – | 380 | – | 380 | |||||||||
| Total assets | 2,630 | 3,239 | 66 | 319 | 53 | 11 | 380 | (319 | ) | 6,379 | ||||||||
| Total segment liabilities | (994 | ) | (1,271 | ) | (23 | ) | (128 | ) | (40 | ) | (6 | ) | – | 319 | (2,143 | ) | ||
| Borrowings | – | – | – | – | – | – | (1,393 | ) | – | (1,393 | ) | |||||||
| Total liabilities | (994 | ) | (1,271 | ) | (23 | ) | (128 | ) | (40 | ) | (6 | ) | (1,393 | ) | 319 | (3,536 | ) | |
| Net assets/(liabilities) | 1,636 | 1,968 | 43 | 191 | 13 | 5 | (1,013 | ) | – | 2,843 | ||||||||
| Other information | ||||||||||||||||||
| Capital expenditure | 64 | 89 | 2 | 7 | 1 | – | – | – | 163 | |||||||||
| Average weekly number of employees | 25,100 | 21,700 | 900 | 2,300 | 200 | 100 | – | – | 50,300 | |||||||||
|
96 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts |
| 1 Segmental analysis continued | ||||||||||||||||||
| 1.2 Geographical analysis continued | ||||||||||||||||||
2002
(Figures
in £million, unless otherwise stated) |
UK |
EU
(excl
UK) |
Europe
(excl
EU) |
North
America |
Asia |
Rest
of
World |
Net
Debt |
Eliminations |
Total |
|||||||||
| Profit and loss account key data | ||||||||||||||||||
| By destination: | ||||||||||||||||||
| Joint venture turnover | 53 | 105 | 61 | – | – | – | – | – | 219 | |||||||||
| Group turnover | 2,071 | 3,337 | 321 | 881 | 429 | 149 | – | – | 7,188 | |||||||||
| Included above: | ||||||||||||||||||
| Exports from the United Kingdom | 1,304 | – | – | – | – | – | – | – | 1,304 | |||||||||
| Sales to joint ventures and associated undertakings | 79 | 52 | 3 | – | 1 | – | – | – | 135 | |||||||||
| By location of Group entity: | ||||||||||||||||||
| Joint venture turnover | 50 | 108 | 61 | – | – | – | – | – | 219 | |||||||||
| Gross turnover | 3,267 | 3,511 | 100 | 671 | 228 | 13 | – | (602 | ) | 7,188 | ||||||||
| Inter-segment sales | (286 | ) | (277 | ) | (8 | ) | (30 | ) | (1 | ) | – | – | 602 | – | ||||
| Group turnover | 2,981 | 3,234 | 92 | 641 | 227 | 13 | – | – | 7,188 | |||||||||
| Depreciation (net of grants released) | (153 | ) | (149 | ) | (4 | ) | (23 | ) | (1 | ) | – | – | – | (330 | ) | |||
| Amortisation | – | (11 | ) | – | – | – | – | – | – | (11 | ) | |||||||
| Restructuring and impairment costs: | ||||||||||||||||||
| Redundancy and related costs | 17 | (3 | ) | – | – | – | – | – | – | 14 | ||||||||
| Accelerated depreciation | (76 | ) | (6 | ) | – | – | – | – | – | – | (82 | ) | ||||||
| Accelerated amortisation | – | (23 | ) | – | – | – | – | – | – | (23 | ) | |||||||
| Other asset write downs | – | 3 | – | – | – | – | – | – | 3 | |||||||||
| Other rationalisation costs | 40 | (5 | ) | – | – | – | – | – | – | 35 | ||||||||
| Operating (loss)/profit | (474 | ) | 8 | (1 | ) | 16 | 4 | 1 | – | – | (446 | ) | ||||||
Share
of operating results of joint ventures and
associated undertakings |
5 | 15 | 1 | – | – | – | – | – | 21 | |||||||||
| Profit on disposal of fixed assets | 96 | – | – | – | – | – | – | – | 96 | |||||||||
(Loss)/profit
on disposal of group undertakings |
– | (41 | ) | – | 60 | – | – | – | – | 19 | ||||||||
| (Loss)/profit
on ordinary activities before interest |
(373 | ) | (18 | ) | – | 76 | 4 | 1 | – | – | (310 | ) | ||||||
| Balance sheet key data | ||||||||||||||||||
| Tangible fixed assets | 1,313 | 1,346 | 28 | 174 | 10 | – | – | – | 2,871 | |||||||||
|
Interests
in joint ventures and associated
undertakings |
26 | 53 | 7 | 3 | 2 | – | – | – | 91 | |||||||||
| Other segment assets | 1,485 | 1,762 | 30 | 210 | 25 | 7 | – | (320 | ) | 3,199 | ||||||||
| Total segment assets | 2,824 | 3,161 | 65 | 387 | 37 | 7 | – | (320 | ) | 6,161 | ||||||||
| Cash and short term investments | – | – | – | – | – | – | 270 | – | 270 | |||||||||
| Total assets | 2,824 | 3,161 | 65 | 387 | 37 | 7 | 270 | (320 | ) | 6,431 | ||||||||
| Total segment liabilities | (1,088 | ) | (1,197 | ) | (25 | ) | (140 | ) | (23 | ) | (3 | ) | – | 320 | (2,156 | ) | ||
| Borrowings | – | – | – | – | – | – | (1,506 | ) | – | (1,506 | ) | |||||||
| Total liabilities | (1,088 | ) | (1,197 | ) | (25 | ) | (140 | ) | (23 | ) | (3 | ) | (1,506 | ) | 320 | (3,662 | ) | |
| Net assets/(liabilities) | 1,736 | 1,964 | 40 | 247 | 14 | 4 | (1,236 | ) | – | 2,769 | ||||||||
| Other information | ||||||||||||||||||
| Capital expenditure | 81 | 97 | 2 | 7 | 1 | – | – | – | 188 | |||||||||
| Average weekly number of employees | 25,900 | 22,300 | 700 | 2,400 | 200 | 100 | – | – | 51,600 | |||||||||
|
Corus
Report & Accounts 2004 97 |
||||
|
|
|
|||
|
Notes to the accounts |
| 2. Operating costs | ||||||
2004
£m |
2003
£m |
2002
£m |
||||
| Costs by type: | ||||||
| Raw materials and consumables | 4,178 | 3,516 | 3,339 | |||
| Maintenance costs (excluding own labour) | 808 | 696 | 682 | |||
| Other external charges (including fuels and utilities, hire charges and carriage costs) | 1,343 | 1,296 | 1,209 | |||
| Employment costs (Note 4) | 1,780 | 1,745 | 1,568 | |||
| Depreciation and amortisation | 314 | 371 | 452 | |||
| Regional development and other grants released | (6 | ) | (7 | ) | (7 | ) |
| Other operating costs (including rents, rates, insurance and general expenses) | 565 | 559 | 436 | |||
| Changes in stock of finished goods and work in progress | (213 | ) | 3 | (34 | ) | |
| Own work capitalised | (19 | ) | (18 | ) | (11 | ) |
| 8,750 | 8,161 | 7,634 | ||||
| Costs by function: | ||||||
| Costs of goods sold | 7,952 | 7,305 | 6,925 | |||
| Selling, general and administrative expenses | 753 | 714 | 656 | |||
| Restructuring and impairment costs (Note 3) | 45 | 142 | 53 | |||
| 8,750 | 8,161 | 7,634 | ||||
| Restructuring and impairment costs principally relate to costs of goods sold. | ||||||
|
Operating
costs
before
restructuring
and
impairment costs
£m |
Restructuring
and
impairment
costs
(Note 3)
£m |
Total
£m |
||||
| The above costs in the 12 months to 1 January 2005 include: | ||||||
| Raw materials and consumables | 4,178 | – | 4,178 | |||
| Maintenance costs (excluding own labour) | 808 | – | 808 | |||
| Other external charges (including fuels and utilities, hire charges and carriage costs) | 1,343 | – | 1,343 | |||
| Employment costs (Note 4) | 1,754 | 26 | 1,780 | |||
| Depreciation and amortisation | 313 | 1 | 314 | |||
| Regional development and other grants released | (6 | ) | – | (6 | ) | |
| Other operating costs (including rents, rates, insurance and general expenses) | 547 | 18 | 565 | |||
| Changes in stock of finished goods and work in progress | (213 | ) | – | (213 | ) | |
| Own work capitalised | (19 | ) | – | (19 | ) | |
| 8,705 | 45 | 8,750 | ||||
2004 £m |
2003 £m |
2002 £m |
||||
| The above costs are stated after including: | ||||||
| Purchases from joint ventures and associated undertakings | 93 | 66 | 40 | |||
| Amortisation of intangible fixed assets | 30 | 9 | 34 | |||
| Depreciation of owned assets | 302 | 313 | 334 | |||
| Accelerated depreciation of owned assets (see Note 3) | (19 | ) | 47 | 82 | ||
| Depreciation of assets held under finance leases | 1 | 2 | 2 | |||
| Operating leases: | ||||||
| Plant and machinery | 54 | 54 | 53 | |||
| Leasehold property | 33 | 38 | 29 | |||
| Costs of research and development (gross) | 69 | 69 | 71 | |||
| Recoveries on research and development | (6 | ) | (7 | ) | (6 | ) |
| Provision for doubtful debts | 11 | 8 | 4 | |||
| Transaction costs of merger and disposal activities | – | – | 23 | |||
| Break fee payable to Pechiney SA | – | 14 | – | |||
| Costs of renegotiating the syndicated bank facility | – | 23 | – | |||
| Final insurance settlement for Port Talbot blast furnace | – | (23 | ) | – | ||
| The 2003 operating result was stated after including a net charge of £20m in relation to the impact of costs and lost contribution associated with the conveyor fire at Scunthorpe works. | ||||||
|
98 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 2. Operating costs continued | ||||||
| Remuneration of Group’s auditors | ||||||
| 2004 £000 |
2003 £000 |
2002 £000 |
||||
| In respect of the audit: | ||||||
| Corus Group plc | 11 | 10 | 10 | |||
| Subsidiary undertakings: | ||||||
| Corus UK Limited | 1,092 | 867 | 781 | |||
| Other subsidiary undertakings: Group auditors | 2,037 | 2,017 | 1,966 | |||
| 3,140 | 2,894 | 2,757 | ||||
| Amounts paid to Group auditors in respect of other work: | ||||||
| Audit related | 1,673 | 2,653 | 2,390 | |||
| Tax | 866 | 1,046 | 1,237 | |||
| Other | 26 | 67 | 181 | |||
| 2,565 | 3,766 | 3,808 | ||||
| 5,705 | 6,660 | 6,565 |
Audit related fees consist of fees billed for assurance and related services that are traditionally performed by the external auditor. These fees for 2004 include work in connection with the issue of Senior notes, the transition to international accounting policies, acquisition and disposal related services and other consultation in relation to financial accounts and reporting standards. Tax fees include fees billed for corporate tax compliance services, tax advisory services and expatriate tax compliance and advisory services. Other fees relate to training and other one-off projects. Further details on the Group’s policy for the appointment of external auditors for non-audit services is provided in the Audit committee section of the Directors’ report on page 61. |
| 3. Restructuring and impairment costs | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Provision for restructuring and related measures: | ||||||
| Redundancy and related costs | 30 | 58 | 8 | |||
| Accelerated depreciation | 59 | 59 | 96 | |||
| Accelerated amortisation | 20 | 1 | 23 | |||
| Other asset write downs | 13 | 16 | 2 | |||
| Other rationalisation costs | 9 | 44 | 10 | |||
| 131 | 178 | 139 | ||||
| Credits for restructuring and related measures: | ||||||
| Redundancy and related costs | (4 | ) | (7 | ) | (22 | ) |
| Accelerated depreciation | (78 | ) | (12 | ) | (14 | ) |
| Other asset write downs | – | (1 | ) | (5 | ) | |
| Other rationalisation costs | (4 | ) | (16 | ) | (45 | ) |
| (86 | ) | (36 | ) | (86 | ) | |
| 45 | 142 | 53 |
For the current period, the redundancy and related costs mainly relate to the announced closure of the heavy section mill at Scunthorpe and other ongoing efficiency measures across Corus. Within the net impairment charge, the Group has reassessed the value in use of the fixed assets at Teesside based on the ten year off-take contract entered into (see Note 36) and, as a result, has made a reversal of the existing impairment provision of £65m. Offsetting this, the Group has recognised an impairment in the value in use of the fixed assets associated with its aluminium smelting operations in Europe, following continued losses associated at least in part with high energy costs. Lesser charges have also been taken against fixed assets, largely in the UK, that have or are to come out of use. In addition, the balance of goodwill on previous acquisitions of Kienle & Spiess and Sogerail (now Corus Rail France) has been written off following impairment reviews.
|
| Corus Report & Accounts 2004 99 |
||||
|
|
|
|||
|
Notes to the accounts |
| 4. Employees | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| The total employment costs of all employees (including directors) in the Group were: | ||||||
| Wages and salaries | 1,496 | 1,453 | 1,370 | |||
| Social security costs | 175 | 176 | 165 | |||
| Other pension costs (Note 32) | 83 | 65 | 47 | |||
| Redundancy and related costs (Note 3) | 26 | 51 | (14 | ) | ||
| 1,780 | 1,745 | 1,568 |
| Related average employee numbers are presented in Note 1. |
| 5. Share of results of joint ventures and associated undertakings | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Continuing operations: | ||||||
| Share of operating results: | ||||||
| Joint ventures | 26 | 7 | 5 | |||
| Associated undertakings | 4 | 2 | (1 | ) | ||
| 30 | 9 | 4 | ||||
| Discontinued operations: | ||||||
| Share of operating results: | ||||||
| Associated undertakings | – | – | 20 | |||
| Amortisation of goodwill: | ||||||
| Associated undertakings | – | – | (3 | ) | ||
| Total net share of operating results | 30 | 9 | 21 | |||
| Net interest payable: | ||||||
| Joint ventures | (2 | ) | (2 | ) | (1 | ) |
| Associated undertakings | (1 | ) | (1 | ) | (1 | ) |
| Share of results before taxation | 27 | 6 | 19 | |||
| Taxation (Note 7) | (6 | ) | (1 | ) | (6 | ) |
| Share of results after taxation | 21 | 5 | 13 | |||
| Receivable in dividends: | ||||||
| Subsidiary undertakings | (4 | ) | (4 | ) | (8 | ) |
| Shares of results in period retained (Note 13) | 17 | 1 | 5 |
| The results shown under discontinued operations relate to the Group’s 23% share of the results of AvestaPolarit Oyj Abp. This investment was disposed of during 2002. |
| 6. Net interest and investment income | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Interest receivable | 13 | 13 | 17 | |||
| 13 | 13 | 17 | ||||
| Interest payable and similar charges: | ||||||
| Bank loans and overdrafts | (26 | ) | (29 | ) | (26 | ) |
| Other interest payable | (92 | ) | (80 | ) | (82 | ) |
| Charges arising on redemption of 5.375% Eurobond 2006 | (11 | ) | – | – | ||
| (129 | ) | (109 | ) | (108 | ) | |
| Finance leases | (2 | ) | (2 | ) | (1 | ) |
| (131 | ) | (111 | ) | (109 | ) | |
| Net interest and investment income | (118 | ) | (98 | ) | (92 | ) |
On 16 September 2004, the Company launched a tender offer for the repurchase of any or all of the €400m 5.375% Eurobond due 2006. The tender offer was based on two redemption dates: on 30 September 94.8% of the bond holders took up the offer at 103.5% of the principal amount, and on 19 October a further 0.2% took up the offer at 102.5% of the principal amount. The redemption premiums paid have been charged to the profit and loss account for the period. Charges on the redemption of the bond also include the unwinding of the unamortised element of the original discount and the writing off of unamortised issue costs.
|
100 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 7. Taxation | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Taxation based on profit/(loss) on ordinary activities for the period: | ||||||
| The Group: | ||||||
| UK corporation tax at 30% | 55 | 3 | 2 | |||
| Double tax relief | (55 | ) | (3 | ) | (2 | ) |
| UK prior year credit | – | (3 | ) | (3 | ) | |
| Overseas taxes | 106 | 38 | 15 | |||
| Overseas prior year (credit)/charge | (1 | ) | 8 | 19 | ||
| Current tax | 105 | 43 | 31 | |||
| Origination and reversal of timing differences | 13 | (9 | ) | (31 | ) | |
| Reassessment of opening asset | – | – | 73 | |||
| (Increase)/decrease in discount | (13 | ) | 9 | (2 | ) | |
| UK deferred tax | – | – | 40 | |||
| Origination and reversal of timing differences | 8 | 15 | (29 | ) | ||
| (Increase)/decrease in discount | – | (6 | ) | 13 | ||
| Overseas deferred tax | 8 | 9 | (16 | ) | ||
| 113 | 52 | 55 | ||||
| Joint ventures (Note 5) | 6 | 1 | 2 | |||
| Associated undertakings (Note 5) | – | – | 4 | |||
| 119 | 53 | 61 | ||||
| The current tax charge reconciles with the standard rate of UK corporation tax as follows: | ||||||
| Tax on Group result before results of joint ventures and associated undertakings at standard rate 30% | 160 | (78 | ) | (127 | ) | |
| Temporary differences between taxable and accounting profit: | ||||||
| Accelerated capital allowances | (47 | ) | 25 | 39 | ||
| Other timing differences | (16 | ) | 3 | (7 | ) | |
| Prior year (credit)/charge | (1 | ) | 5 | 16 | ||
| Permanent differences | 9 | 88 | 110 | |||
| 105 | 43 | 31 |
| On 14 December 2004 the Dutch Parliament enacted a new tax regime to reduce the corporation tax rate within the Netherlands from 34.5% to 30% in stages, over the period to 2007. Deferred tax liabilities for this fiscal region have been reassessed to the prevailing rate at which the timing differences are expected to reverse. The deferred tax charge for the year includes a credit of £21m for the effect of this rate change. Total taxation charges in future periods will continue to be influenced by a number of factors including similar changes to the corporation tax rates in force in the countries in which the Group operates. In addition current tax charges will also be affected by changes in the excess of tax depreciation over book depreciation of tangible fixed assets. The deferred tax charge will also be subject to the value of deferred tax assets recognised for tax losses recoverable against future taxable profits within time horizons that are considered more likely than not to occur (see Note 15). There is no tax effect of the exceptional items relating to the profit on sale of fixed assets and the profit on disposal of Group undertakings as shown on the face of the profit and loss account. |
| 8. Result of the Company |
| The Company recorded a profit of £110m (2003: loss of £31m; 2002: loss of £19m) and has taken advantage of the exemption under section 230 of the Companies Act 1985 allowing it not to present its own profit and loss account. |
| 9. Dividends | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| On ordinary shares: | ||||||
| Interim dividend of nil (2003: nil; 2002: nil) per share | – | – | – | |||
| Proposed final dividend of nil (2003: nil; 2002: nil) per share | – | – | – | |||
| – | – | – | ||||
| Corus Report & Accounts 2004 101 |
||||
|
|
|
|||
| Notes to the accounts |
| 10. Earnings per ordinary share | ||||||
| The earnings per share has been calculated by dividing the profit/(loss) attributable to shareholders by the weighted average number of ordinary shares outstanding during the period. | ||||||
| 2004 No. m |
2003 No. m |
2002 No. m |
||||
| Weighted average number of shares in issue during the period and used to calculate: | ||||||
| Basic earnings per share | 4,436 |
3,297 |
3,218 |
|||
| Dilutive effects of share options | 3 | 1 | 21 | |||
| Conditional share awards | 23 | – | – | |||
| Dilutive effects of convertible debentures (see Note 26) | 331 | 331 | 331 | |||
| Diluted earnings per share | 4,793 | 3,629 | 3,570 | |||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Profit/(loss) during the period and used to calculate: | ||||||
| Basic earnings per share | 446 | (305 | ) | (458 | ) | |
| Finance costs of convertible debentures | 9 | 11 | 10 | |||
| Taxation effect of the dilutions | (4 | ) | (3 | ) | (3 | ) |
| Diluted earnings per share | 451 | (297 | ) | (451 | ) |
| The Trustee of the Qualifying Employee Share Ownership Trust (QUEST) has waived all but a nominal amount of the dividend on the trust’s holding of shares in the Company, and therefore these shares are not included in the calculation of earnings per share. |
| 11. Intangible fixed assets | ||||||
| The Group | ||||||
| Patents
and trademarks £m |
Goodwill £m |
Total £m |
||||
| Cost at beginning of period | 6 |
158 |
164 |
|||
| Additions | 1 | 6 | 7 | |||
| Cost at end of period | 7 | 164 | 171 | |||
| Amortisation at beginning of period | 5 | 63 | 68 | |||
| Charge for the period | 2 | 8 | 10 | |||
| Accelerated amortisation (Note 3) | – | 20 | 20 | |||
| Amortisation at end of period | 7 | 91 | 98 | |||
| Net book value at 1 January 2005 | – | 73 | 73 | |||
| Net book value at 3 January 2004 | 1 | 95 | 96 | |||
| Goodwill arising in the period is discussed in Note 34. | ||||||
The goodwill arising on the acquisition of Corus Nederland BV is being amortised on a straight line basis over 15 years. Goodwill in respect of other acquisitions made is being amortised on a straight line basis of up to 20 years. These are the periods over which the values of the businesses acquired are expected to exceed the value of their underlying assets.
|
||||||
|
102 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 12. Tangible fixed assets | ||||||||
| The Group | ||||||||
| Land
and buildings £m |
Plant
and machinery £m |
Assets
in course of construction £m |
Total £m |
|||||
| Cost at beginning of period | 1,132 | 7,335 | 134 | 8,601 | ||||
| Additions | 6 | 47 | 324 | 377 | ||||
| Acquisitions | 4 | 17 | – | 21 | ||||
| Disposals | (47 | ) | (500 | ) | (1 | ) | (548 | ) |
| Exchange translation differences | – | – | 2 | 2 | ||||
| Transfers and other movements | 4 | 63 | (67 | ) | – | |||
| Cost at end of period | 1,099 | 6,962 | 392 | 8,453 | ||||
| Depreciation at beginning of period | 666 | 5,449 | – | 6,115 | ||||
| Charge for the period | 34 | 269 | – | 303 | ||||
| Accelerated depreciation (Note 3) | 2 | (21 | ) | – | (19 | ) | ||
| Disposals | (33 | ) | (499 | ) | – | (532 | ) | |
| Depreciation at end of period | 669 | 5,198 | – | 5,867 | ||||
| Net book value at 1 January 2005 | 430 | 1,764 | 392 | 2,586 | ||||
| Loose plant, tools and spares (net book value) | 225 | |||||||
| 2,811 | ||||||||
| Net book value at 3 January 2004 | 466 | 1,886 | 134 | 2,486 | ||||
| Loose plant, tools and spares (net book value) | 243 | |||||||
| 2,729 | ||||||||
| (i) | Included above are fully depreciated assets with an original cost of £1,764m (2003: £1,977m) which are still in use. In addition, there are fully depreciated assets with an original cost of £498m (2003: £294m) which are permanently out of use and pending disposal, demolition or reapplication elsewhere within the Group. | ||||
| 2004 £m |
2003 £m |
||||
| (ii) | The net book value of land and buildings comprises: | ||||
| Freehold | 407 |
443 |
|||
| Long leasehold (over 50 years unexpired) | 7 | 6 | |||
| Short leasehold | 16 | 17 | |||
| 430 | 466 | ||||
| Which may be further analysed as: | |||||
| Assets held under finance leases: | |||||
| Cost | 42 | 42 | |||
| Accumulated depreciation | (7 | ) | (6 | ) | |
| 35 | 36 | ||||
| Owned assets | 395 | 430 | |||
| 430 | 466 | ||||
| (iii) | The net book value of plant and machinery comprises: | ||||
| Assets held under finance leases: | |||||
| Cost | 29 | 29 | |||
| Accumulated depreciation | (28 | ) | (28 | ) | |
| 1 | 1 | ||||
| Owned assets | 1,763 | 1,885 | |||
| 1,764 | 1,886 | ||||
| (iv) | The net book value of loose plant, tools and spares comprises: | ||||
| Cost | 568 | 587 | |||
| Accumulated depreciation and provisions | (343 | ) | (344 | ) | |
| 225 | 243 |
Loose plant, tools and spares are shown at net book value. Due to the substantial number of items involved, and the many variations in their estimated useful lives, it is impracticable to give the details of movements normally disclosed in respect of tangible fixed assets. |
|||||
| Corus Report & Accounts 2004 103 |
||||
|
|
|
|||
Notes to the accounts
13. Fixed asset investments
| The Company | |||||||
| Shares
in subsidiary undertakings £m |
Loans
to subsidiary undertakings £m |
Total £m |
|||||
| Cost at beginning of period | 3,167 | 112 | 3,279 | ||||
| Additions | 500 | 319 | 819 | ||||
| Exchange translation differences | – | 1 | 1 | ||||
| Cost and net book value at 1 January 2005 | 3,667 | 432 | 4,099 | ||||
| Cost and net book value at 3 January 2004 | 3,167 | 112 | 3,279 | ||||
| The Group | |||||||||||
| Interests
in joint ventures and associated undertakings £m |
Loans
to joint ventures and associated undertakings (Note 21) £m |
Other investments (Note 21) £m |
Other loans (Note 21) £m |
Total £m |
|||||||
| Cost at beginning of period | 96 | 5 | 50 | 5 | 156 | ||||||
| Additions and transfers | 5 | 1 | 12 | – | 18 | ||||||
| Disposals | (6 | ) | (5 | ) | (1 | ) | (2 | ) | (14 | ) | |
| Consolidation as subsidiary undertaking (Note 34) | (12 | ) | – | – | – | (12 | ) | ||||
| Exchange translation differences | 1 | 1 | – | – | 2 | ||||||
| Cost at end of period | 84 | 2 | 61 | 3 | 150 | ||||||
| Share of post acquisition reserves at beginning of period | 8 | – | – | – | 8 | ||||||
| Share of results in period retained | 17 | – | – | – | 17 | ||||||
| Consolidation as subsidiary undertaking (Note 34) | 1 | – | – | – | 1 | ||||||
| Exchange translation differences | – | – | – | – | – | ||||||
| Share of post acquisition reserves at end of period | 26 | – | – | – | 26 | ||||||
| Provisions at beginning of period | 5 | – | – | – | 5 | ||||||
| Disposals | (4 | ) | – | – | – | (4 | ) | ||||
| Provisions at end of period | 1 | – | – | – | 1 | ||||||
| Net book value at 1 January 2005 | 109 | 2 | 61 | 3 | 175 | ||||||
| Net book value at 3 January 2004 | 99 | 5 | 50 | 5 | 159 | ||||||
| (i) | Included within both the opening cost of interests in joint ventures and associated undertakings and the 2004 consolidation as subsidiary undertaking is £3m of goodwill arising from the acquisition of additional shares in Segal SA during 2003. |
| (ii) | The Company’s main subsidiaries and investments are listed in Note 37. |
14. Stocks
| The Group | ||||
| 2004 £m |
2003 £m |
|||
| Raw materials and consumables | 652 | 511 | ||
| Work in progress | 483 | 410 | ||
| Finished goods and goods for resale | 597 | 483 | ||
| 1,732 | 1,404 | |||
| 104 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 15. Debtors: amounts falling due after more than one year |
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
2003 £m |
||||||
| Deferred tax assets | 3 | 3 | 150 | 143 | |||||
| Prepaid pension costs (Note 32) | – | – | 335 | 336 | |||||
| 3 | 3 | 485 | 479 | ||||||
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
2003 £m |
||||||
| The movement on the deferred tax assets is as follows: | |||||||||
| At beginning of period | 3 | 3 | 143 | 137 | |||||
| Profit and loss account | – | – | 7 | 3 | |||||
| Exchange translation differences | – | – | – | 2 | |||||
| Reclassifications from provisions | – | – | – | 1 | |||||
| At end of period | 3 | 3 | 150 | 143 | |||||
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
2003 £m |
||||||
| The deferred tax assets arise as follows: | |||||||||
| Pension prepayment | – | – | (23 | ) | (24 | ) | |||
| Accelerated capital allowances | – | – | (121 | ) | (107 | ) | |||
| Tax losses | 3 | 3 | 238 | 216 | |||||
| Other timing differences | – | – | 46 | 62 | |||||
| 3 | 3 | 140 | 147 | ||||||
| Discount | – | – | 10 | (4 | ) | ||||
| 3 | 3 | 150 | 143 | ||||||
| The deferred tax assets of £150m (2003: £143m), which mainly arise in the UK, are recoverable against future forecast taxable profits within a time horizon that the directors consider to be more likely than not to occur. Deferred tax assets have not been recognised in respect of total tax losses with a value of £1,706m (2003: £1,749m). These include UK losses of £1,218m (2003: £1,197m). | |||||||||
16. Debtors: amounts falling due within one year
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
Restated 2003 £m |
||||||
| Trade debtors | – | – | 1,252 | 1,020 | |||||
| Less allowances for doubtful debts | – | – | (51 | ) | (50 | ) | |||
| – | – | 1,201 | 970 | ||||||
| Amounts owed by joint ventures | – | – | 28 | 29 | |||||
| Amounts owed by associated undertakings | – | – | 4 | 3 | |||||
| UK corporation tax | – | – | 5 | 5 | |||||
| Overseas taxation | – | – | 14 | 8 | |||||
| Other debtors | – | – | 141 | 117 | |||||
| Dividends due from subsidiary undertakings | – | 4 | – | – | |||||
| – | 4 | 1,393 | 1,132 | ||||||
|
Corus Report & Accounts 2004 105 |
||||
|
|
|
|||
Notes to the accounts
| 16. Debtors: amounts falling due within one year continued |
| On 18 April 2002, Corus launched a revolving period securitisation programme under which it may offer to assign all of its rights, title and interest in a pool of invoiced trade debtors to a third party which is funded ultimately in the commercial paper markets. During the period the Group successfully secured an extension of this programme increasing proceeds to a total of £275m from October 2004 and extending the final maturity by a further two years to 14 April 2009. |
| Cash advanced, as non-returnable proceeds, against this pool takes into account, inter alia, the risks that may be attached to the debtors and the expected collection period. Under FRS 5 ‘Reporting the substance of transactions’ the cash advanced has been offset against the assigned trade debtors in a linked presentation on the face of the balance sheet. Included within debtors due within one year are the following amounts: |
| The Group | |||||
| 2004 £m |
2003 £m |
||||
| Securitised gross trade debtors | 406 | 338 | |||
| Less non-returnable proceeds | (275 | ) | (215 | ) | |
| Net securitised trade debtors | 131 | 123 | |||
| Other trade debtors | 1,070 | 847 | |||
| Total trade debtors | 1,201 | 970 | |||
| The Group is not obliged, and does not intend, to support any losses arising from the assigned debtors against which cash has been advanced. In the event of default in payment by a debtor, the providers of the finance will seek repayment of cash advanced, as to both principal and interest, only from the remainder of the pool of debtors in which they hold an interest. Repayment will not be sought from the Group in any other way. | |||||
| 17. Short term investments | |||||
| The Group | |||||
| 2004 £m |
2003 £m |
||||
| Short term investments consist of: | |||||
| Deposits within 3 months of maturity when acquired | 206 | 132 | |||
| Other short term deposits | 11 | 6 | |||
| 217 | 138 | ||||
| 18. Creditors: amounts falling due within one year | |||||||||
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
2003 £m |
||||||
| Bank overdrafts (Note 20) | – | – | 32 | 34 | |||||
| 6.75% Debenture stock 2004 (Note 20) | – | – | – | 64 | |||||
| Other loans (Note 20) | 3 | 3 | 14 | 14 | |||||
| Obligations under finance leases (Note 20) | – | – | 1 | 1 | |||||
| Trade creditors | – | – | 1,188 | 986 | |||||
| Amounts owed to subsidiary undertakings | 85 | 70 | – | – | |||||
| Amounts owed to joint ventures | – | – | 2 | 4 | |||||
| Amounts owed to associated undertakings | – | – | 4 | 2 | |||||
| Overseas taxes | – | – | 117 | 94 | |||||
| Other taxation and social security | – | – | 47 | 43 | |||||
| Other creditors | 19 | 9 | 478 | 341 | |||||
| 107 | 82 | 1,883 | 1,583 | ||||||
Amounts owed to subsidiary undertakings represent short term loans. In 2003 there were loans of £164m drawn down under syndicated facilities extending to 2006 included in the Group value of Creditors: amounts falling due after more than one year, as amounts borrowed for short term periods were effectively renewed at the Company’s option. Interest had been charged at rates varying between 2.8% and 8.0% on those loans during the year. As at 1 January 2005 there were no amounts outstanding on these facilities. Other creditors include amounts provided in respect of interest, capital expenditure, insurances, holiday pay, other employment costs and sundry other items. |
|||||||||
| 106 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts
|
19. Creditors: amounts falling due after more than one year
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
2003 £m |
||||||
| Borrowings (Note 20): | |||||||||
| 5.375% Eurobond 2006 | – | – | 14 | 279 | |||||
| 3% Unsubordinated convertible bond 2007 (Note 26) | 216 | 213 | 216 | 213 | |||||
| 4.625% Subordinated convertible debenture loan 2007 (Note 26) | – | – | 116 | 119 | |||||
| 5.625% Debenture stock 2008 | – | – | 96 | 95 | |||||
| 6.75% Bonds 2008 | – | – | 199 | 198 | |||||
| 7.5% Senior notes 2011 | 558 | – | 558 | – | |||||
| 11.5% Debenture stock 2016 | – | – | 150 | 150 | |||||
| Bank and other loans | – | – | 18 | 185 | |||||
| Obligations under finance leases | – | – | 40 | 41 | |||||
| 774 | 213 | 1,407 | 1,280 | ||||||
| Amounts owed to subsidiary undertakings | 114 | – | – | – | |||||
| Other creditors | – | – | 26 | 28 | |||||
| 888 | 213 | 1,433 | 1,308 | ||||||
| Amounts owed to subsidiary undertakings by the Company represent loans with no fixed repayment date. | ||||
| The Group | ||||
| 2004 £m |
2003 £m |
|||
| An analysis of other creditors by currency is set out below: | ||||
| Sterling | 24 | 25 | ||
| Euros | 1 | 1 | ||
| US Dollars | – | 1 | ||
| Other | 1 | 1 | ||
| 26 | 28 | |||
| These other creditors are due for repayment after five years and are not subject to interest. |
| 20. Borrowings and finance leases | |
| (i) | The currency and interest exposure of gross borrowings of the Group at 1 January 2005 is as follows: |
| 2004 | 2003 | |||||||||||||||||
| Fixed
rate borrowings £m |
Floating
rate borrowings £m |
Zero
rate borrowings £m |
Total £m |
Fixed
rate borrowings £m |
Floating
rate borrowings £m |
Zero
rate borrowings £m |
Total £m |
|||||||||||
| Sterling | 378 | 13 | – | 391 | 377 | 19 | – | 396 | ||||||||||
| Euros | 1,018 | 12 | 5 | 1,035 | 791 | 17 | 9 | 817 | ||||||||||
| US Dollars | 1 | – | – | 1 | – | 159 | – | 159 | ||||||||||
| Other | 25 | 2 | – | 27 | 16 | 5 | – | 21 | ||||||||||
| 1,422 | 27 | 5 | 1,454 | 1,184 | 200 | 9 | 1,393 | |||||||||||
| 2004 | 2003 | ||||||||
| Weighted average fixed interest rate % |
Weighted average time for which rate is fixed Years |
Weighted average fixed interest rate % |
Weighted average time for which rate is fixed Years |
||||||
| Sterling | 8.8 | 7.4 | 8.8 | 8.4 | |||||
| Euros | 6.0 | 4.7 | 4.8 | 2.8 | |||||
| US Dollars | 5.0 | 0.1 | – | – | |||||
| Other | 5.3 | 1.7 | 4.3 | 0.9 | |||||
| The majority of floating rate borrowings are bank borrowings bearing interest rates based on LIBOR or official local rates. These rates are fixed for periods of up to six months. The zero rate borrowings have a weighted average maturity of 0.5 years (2003: 1.5 years). | |||||||||
| The weighted average interest rate on short term borrowings was 3.8% (2003: 4.1%) and on long term borrowings was 6.6% (2003: 5.7%). | |||||||||
|
Corus Report & Accounts 2004 107 |
||||
|
|
|
|||
Notes to the accounts
| 20. Borrowings and finance leases continued | |
| (ii) | The maturity of borrowings is as follows: |
| The Company | The Group | ||||||||
| 2004 £m |
2003 £m |
2004 £m |
2003 £m |
||||||
| In one year or less or on demand | 88 | 73 | 50 | 116 | |||||
| Between one and two years | – | – | 17 | 16 | |||||
| Between two and three years | 216 | – | 352 | 447 | |||||
| Between three and four years | – | 213 | 298 | 337 | |||||
| Between four and five years | – | – | 4 | 299 | |||||
| More than five years | 672 | – | 762 | 210 | |||||
| 976 | 286 | 1,483 | 1,425 | ||||||
| Less: amounts representing interest in future minimum lease payments | – | – | (29 | ) | (32 | ) | |||
| 976 | 286 | 1,454 | 1,393 | ||||||
| Amounts falling due within one year | 88 | 73 | 47 | 113 | |||||
| Amounts falling due after more than one year | 888 | 213 | 1,407 | 1,280 | |||||
| (iii) | The maturity of undrawn committed borrowing facilities of the Group is as follows: | ||||||||
| 2004 £m |
2003 £m |
||||
| In one year or less (see (iv) below) | 145 | 3 | |||
| Between one and two years | 425 | 292 | |||
| More than two years | 2 | 246 | |||
| 572 | 541 | ||||
| Total unutilised bank facilities at 1 January 2005 were £723m (2003: £674m). | |||||
| (iv) | On 31 July 2003, the Company signed a new €1,200m banking facility. This amortising syndicated facility has a final maturity date of 30 June 2006, and provides committed bank financing for Corus’ working capital requirements. The principal covenants (after allowing for impairment/restructuring costs) within the facility are: | ||
| – | Group EBITDA/net interest cover shall not be less than: 2.0 until the end of December 2003; 2.5 until the end of June 2004; 3.0 until the end of December 2004; 3.5 until the end of December 2005; and 4.0 until the end of June 2006. | ||
| – | Group net tangible worth shall not be less than £2,500m. | ||
| – | Dividends of up to 30% of net distributable earnings from ordinary activities are permitted, subject to a Group EBITDA/net interest cover of at least seven times. | ||
| – | Group gearing (net debt/net tangible worth) shall not exceed: 75% until the end of June 2004; 65% until the end of June 2005; and 60% until the end of June 2006. | ||
| – | Corus Nederland BV net consolidated tangible worth shall not be less than €2,000m, and Corus Nederland BV cumulative consolidated net EBITDA shall not be below €150m for the six months to the end of December 2003, plus €75m for each quarter thereafter. | ||
| On 8 November 2004, following receipt of monies under the issue of the Senior notes (see (viii)), Corus voluntarily cancelled €200m of the committed funding available under the facility which was due to be reduced under the terms of the facility on 30 June 2005. The present commitment under the facility is €800m. | |||
| On 24 February 2005 Corus announced that it had signed a new €800m banking facility, replacing the above facility. Further details are given in Note 36. | |||
| (v) | The 11.5% Debenture stock 2016 (see Note 19) is secured by a floating charge over the assets of Corus UK Limited. The Debenture stock contains various covenants, the most onerous of which is that the aggregate value of tangible assets of Corus UK Limited situated in the UK shall not be less than £2,000m. |
| (vi) | The other Bonds, Eurobond and other Debenture stock (see Notes 18 and 19) are unsecured and contain no financial covenants. Under the terms of the 6.75% Bonds 2008 the Company has agreed that no further charges will be created over the assets of Corus UK Limited to support bond debt other than the Debenture stock described in (v) above. |
| (vii) | The €307m 3% Guaranteed convertible unsubordinated bonds due 2007, issued by the Company, are unconditionally and irrevocably guaranteed by Corus UK Limited. |
| (viii) | On 23 September 2004, €600m 7.5% Senior notes due 2011 were issued by the Company. On 20 October 2004, a further €200m of these notes were issued. The second issue being at a premium of 5.5%, equivalent to £8m. The notes are unsecured and are guaranteed on a senior basis by Corus UK Limited, and contain no financial covenants. The proceeds from this issue were used to finance a tender offer for the 5.375% Eurobond 2006, of which there was a 95% take up, and the repayment of other existing borrowings. |
| 108 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 21. Currency and interest rate profile of financial assets and liabilities | |||||||||||||
| (i) | The currency and interest exposure of current financial assets of the Group at 1 January 2005 is as follows: | ||||||||||||
|
Cash
£m |
Short
term
investments
(Note
17)
£m |
2004
Total
£m |
Cash
£m |
Short
term
investments
(Note
17)
£m |
2003
Total
£m |
||||||||
| Sterling |
81 |
205 |
286 |
85 |
38 |
123 |
|||||||
| Euros | 223 | 11 | 234 | 89 | 98 | 187 | |||||||
| US Dollars | 36 | – | 36 | 32 | 1 | 33 | |||||||
| Other currencies | 43 | 1 | 44 | 36 | 1 | 37 | |||||||
| 383 | 217 | 600 | 242 | 138 | 380 | ||||||||
| Floating interest rate | 383 | – | 383 | 242 | – | 242 | |||||||
| Fixed interest rate | – | 217 | 217 | – | 138 | 138 | |||||||
| Short term investments are deposits for periods not exceeding one year and the weighted average interest rate was 4.2% (2003: 3.2%). During each of the periods above cash earned interest at a floating rate based on LIBOR or other official local rates. | |||||||||||||
| (ii) | The currency and interest exposure of long term financial assets (Note 13) of the Group as at 1 January 2005 is as follows: | ||||||||||||
| 2004 | 2003 | ||||||||||||||||
|
Fixed
rate
long
term
financial
assets
£m |
Floating
rate
long
term
financial
assets
£m |
Zero
rate
long
term
financial
assets
£m |
Total
£m |
Fixed
rate
long
term
financial
assets
£m |
Floating
rate
long
term
financial
assets
£m |
Zero
rate
long
term
financial
assets
£m |
Total
£m |
||||||||||
| Sterling | 46 | – | – | 46 | 26 | 5 | – | 31 | |||||||||
| Euros | 12 | 3 | 2 | 17 | 7 | 8 | 3 | 18 | |||||||||
| US Dollars | – | – | – | – | 1 | 1 | – | 2 | |||||||||
| Other | 3 | – | – | 3 | 9 | – | – | 9 | |||||||||
| 61 | 3 | 2 | 66 | 43 | 14 | 3 | 60 | ||||||||||
| Loans in fixed asset investments | – | 3 | 2 | 5 | – | 7 | 3 | 10 | |||||||||
| Other fixed asset investments | 61 | – | – | 61 | 43 | 7 | – | 50 | |||||||||
2004
|
2003
|
||||||||
Weighted
average
fixed
interest
rate
%
|
Weighted
average
time
for
which
rate
is fixed
Years
|
Weighted
average
fixed
interest
rate
%
|
Weighted
average
time
for
which
rate
is fixed
Years
|
||||||
| Sterling | 3.7 | 0.3 | 3.9 | 0.6 | |||||
| Euros | 4.0 | 6.7 | 4.4 | 8.1 | |||||
| US Dollars | – | – | 5.6 | 17.2 | |||||
| Other | 2.3 | 8.7 | 3.0 | 6.4 | |||||
| (iii) | Of the other fixed asset investments of £61m above, the following amounts are held by Crucible Insurance Company Limited and Hoogovens Verzekeringsmaatschappij NV to fund insurance liabilities of the Group: | ||||||||
2004 |
2003
|
||||||||
Book
value
£m |
Market
value
£m |
Book
value
£m |
Market
value
£m |
||||||
| UK listed investments | 37 | 37 | 26 | 26 | |||||
| Overseas listed investments | 14 | 14 | 17 | 17 | |||||
| Other investments | 7 | 7 | 5 | 5 | |||||
| 58 | 58 | 48 | 48 | ||||||
| (iv) | Contractual maturities of other fixed asset investments are as follows: | ||||
| 2004 £m |
2003 £m |
||||
| Within one year | 44 | 25 | |||
| Between two and five years | 10 | 5 | |||
| Greater than five years | 4 | 12 | |||
| The remaining instruments do not have contractual maturity dates. The fixed interest rates for investments range from a zero rate to 8.0% (2003: zero to 8.0%). | |||||
| (v) | Details of financial liabilities are contained in Notes 20 and 25. | ||||
| Corus Report & Accounts 2004 109 |
||||
|
|
|
|||
| Notes to the accounts |
| 22. Currency analysis of net assets | ||||||||||||||||
| The Group’s net assets by principal currencies at 1 January 2005 are: | ||||||||||||||||
| 2004 |
Restated
2003 |
|||||||||||||||
| Operational
net
assets by
currency
of
operations
£m |
Cash
and
short
term
investments
£m |
Gross
borrowings
£m |
Net
assets
£m |
Operational
net
assets by
currency
of
operations
£m |
Cash
and
short
term
investments
£m |
Gross
borrowings
£m |
Net
assets
£m |
|||||||||
| Sterling | 2,006 | 286 | (391 | ) | 1,901 | 1,774 | 123 | (396 | ) | 1,501 | ||||||
| Euros | 1,917 | 234 | (1,035 | ) | 1,116 | 1,810 | 187 | (817 | ) | 1,180 | ||||||
| US Dollars | 60 | 36 | (1 | ) | 95 | 85 | 33 | (159 | ) | (41 | ) | |||||
| Other | 171 | 44 | (27 | ) | 188 | 187 | 37 | (21 | ) | 203 | ||||||
| 4,154 | 600 | (1,454 | ) | 3,300 | 3,856 | 380 | (1,393 | ) | 2,843 | |||||||
The Group’s policy is to protect the value following translation of assets denominated in foreign currency and therefore to hedge a proportion of material overseas investments with foreign currency borrowings consistent with maintaining a prudent approach to the value of currency liabilities when translated back to sterling. In the case of the investment in Corus Nederland BV, where the risk tends to be balanced over time by the contra-effect of exchange rate movements on its competitiveness and profitability, only a partial hedge is undertaken. The period end position was compatible with the Group’s policy and strategy which was applied consistently throughout the period. The Group hedges substantially 100% of its contracted currency transaction exposure by way of forward currency exchange contracts and options. In this respect, no material gains or losses are recognised in the profit and loss account. 23. Financial instruments In the ordinary course of business Corus uses certain financial instruments to reduce business risks which arise from its exposure to foreign exchange, base metal prices and interest rate fluctuations. The instruments are confined principally to forward foreign exchange contracts, forward rate agreements, options and London Metal Exchange contracts. These inevitably involve elements of credit and market rate risk in excess of the amounts required to be recognised in the accounts. Credit risk arises from the possible failure of counter-parties to meet their obligations under the instruments. However counter-parties are established banks and financial institutions with high credit ratings and Corus continually monitors each institution’s credit quality and limits as a matter of policy the amount of credit exposure to any one of them. The Group’s theoretical risk is the cost of replacement at current market prices of these transactions in the event of default by counter-parties. Management believes that the risk of incurring such losses is remote. Underlying principal amounts are not at risk. Market risk arises as a consequence of fluctuations in foreign exchange rates, interest rates and commodity prices. The market risk associated with financial instruments is controlled by means of trading limits and monitoring systems. The instruments detailed below are employed as hedges of transactions included in the accounts or for firm contractual commitments. These contracts do not generally extend beyond 12 months other than for certain long term contracts principally in the Aluminium division, which may extend up to four years. The total value, being the sum of both sales and purchase contracts, of financial instruments with off-balance sheet risk are as follows: |
2004
£m |
2003
£m |
|||
| Foreign exchange contracts | 1,367 | 810 | ||
| Commodity futures and contracts | 368 | 347 | ||
| The contract or notional amounts of these instruments reflect the volume of activity in particular classes of financial instrument. They do not represent the considerably lower amount of credit and market risk to which the Group is exposed. Corus does not believe it is exposed to any material concentrations of credit risk. The fair market value of these instruments are presented in Note 24. Details of guarantees are given in Note 30. | ||||
| 110 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
24. Fair values of the Group’s financial instruments |
| The major financial risks facing the Group and the objectives and policies for holding financial instruments are discussed in the Financial review on pages 56 and 57. Short term debtors and creditors have been excluded from all financial instruments disclosures. |
| 2004 |
2003 |
|||||||
Book
value
£m |
Fair
value
£m |
Book
value
£m |
Fair
value
£m |
|||||
| Financial assets: | ||||||||
| Cash and short term investments (i) (Note 17) | 600 | 600 | 380 | 380 | ||||
| Loans to joint ventures and associated undertakings (ii) (Note 13) | 2 | 2 | 5 | 5 | ||||
| Other loans (ii) (Note 13) | 3 | 3 | 5 | 5 | ||||
| Other investments (iii) (Note 13) | 61 | 61 | 50 | 50 | ||||
| Financial liabilities: | ||||||||
| Short term borrowings (i) (Note 18) | (47 | ) | (47 | ) | (113 | ) | (113 | ) |
| Long term borrowings (iv) (Note 19) | (1,407 | ) | (1,580 | ) | (1,280 | ) | (1,162 | ) |
| Unrecognised financial instruments: | ||||||||
| Foreign exchange contracts (v) | – | (14 | ) | – | 4 | |||
| Commodity futures (v) | – | 40 | – | 39 | ||||
| (788 | ) | (935 | ) | (953 | ) | (792 | ) | |
| The following notes summarise the principal methods and assumptions that are used in estimating the fair values of financial instruments. | |
| Other investments and long term borrowings are valued at market prices. The fair values of derivatives generally reflect the estimated amounts that the Group would receive or pay to terminate the contracts at 1 January 2005, thereby taking into account the current unrealised gains or losses of open contracts. Market rates are available for all of the Group’s derivatives. | |
| (i) | The fair values of cash, short term investments and short term borrowings approximate to their book values due to their short term nature. |
| (ii) | For those loan investments bearing either no interest or a floating rate of interest it is deemed that the carrying amount approximates to the fair value. For those bearing a fixed rate of interest, unless there is a significant difference between the fixed rate and the rate at which the Group could make a similar loan in current conditions, it is deemed the carrying amount approximates to the fair value. |
| (iii) | Fair values of other investments are provided by independent fund managers, and are based on quoted market prices or dealer quotes. |
| (iv) | £27m (2003: £200m) of borrowings are with variable rate terms, for which the carrying amount approximates to fair value because of the frequency of re-pricing at market value. The remaining £1,427m (2003: £1,193m) of borrowings are fixed. For these, fair values are based on quoted market values where appropriate, or are estimated by discounting future cash flows using rates currently available to the Group for borrowings with similar terms |
| (v) | The fair value of forward foreign exchange contracts and commodity futures is the net amount that the Group would receive or pay, after settlement of transactions already recorded in the balance sheet. |
| (vi) | Both short term and long term debtors and trade or other creditors, as well as provisions have fair values which approximate to their book values and are therefore excluded from the table. |
| The Group does not use any of the instruments mentioned above for the purposes of speculation. | |
| The following table shows the maturity profile of unrecognised gains and losses on hedges: | |
Gains
2004
£m |
Losses
2004
£m |
Net
total
2004
£m |
Net
total
2003
£m |
|||||
| Unrecognised gains/(losses) on hedges at beginning of period | 43 | – | 43 | (2 | ) | |||
| (Gains)/losses arising in previous years recognised in the period | (43 | ) | – | (43 | ) | 2 | ||
| Gains/(losses) arising before start of period not recognised in the period | – | – | – | – | ||||
| Unrecognised gains arising during the year | 40 | – | 40 | 43 | ||||
| Unrecognised losses arising during the year | – | (14 | ) | (14 | ) | – | ||
| Unrecognised gains/(losses) on hedges at end of period | 40 | (14 | ) | 26 | 43 | |||
| Gains/(losses) expected to be recognised in following period | 40 | (14 | ) | 26 | 43 | |||
| Corus Report & Accounts 2004 111 |
||||
|
|
|
|||
| Notes to the accounts |
| 25.
Provisions for liabilities and charges |
||||||||||||||
|
Rationalisation
costs
£m |
Deferred
tax
£m |
Insurance
(Accounting
policy
note vii)
£m |
The
Group
Pensions
and
post
retirement
benefits
£m |
Other
£m |
Total
2004
£m |
Total
2003
£m |
||||||||
| At beginning of period | 153 | 163 | 19 | 223 | 47 | 605 | 522 | |||||||
| Exchange translation differences | (1 | ) | 1 | – | – | – | – | 30 | ||||||
| Charges to profit and loss account | 39 | 15 | 22 | 15 | 18 | 109 | 137 | |||||||
| Releases to profit and loss account | (8 | ) | – | – | (9 | ) | (5 | ) | (22 | ) | (23 | ) | ||
| Reclassifications | – | – | – | – | – | – | 1 | |||||||
| Utilised in period | (49 | ) | – | – | (15 | ) | (8 | ) | (72 | ) | (62 | ) | ||
| At end of period | 134 | 179 | 41 | 214 | 52 | 620 | 605 | |||||||
| (i) | Rationalisation costs include redundancy provisions as follows: |
| By
value |
Related
employee numbers |
||||||||
| 2004
£m |
2003
£m |
2004
No. |
2003
No. |
||||||
| At beginning of period | 59 | 32 | 2,179 | 1,284 | |||||
| Exchange translation differences | – | 1 | – | – | |||||
| Group charge for redundancies (across manufacturing, | |||||||||
| selling, distribution and administration) | 30 | 58 | 1,023 | 2,187 | |||||
| Released to profit and loss account | (4 | ) | (7 | ) | (166 | ) | (201 | ) | |
| Utilised during the period | (27 | ) | (25 | ) | (936 | ) | (1,091 | ) | |
| At end of period | 58 | 59 | 2,100 | 2,179 | |||||
2004
£m |
2003
£m |
||||
| Other rationalisation provisions arise as follows: | |||||
| Onerous lease payments relating to unutilised premises | 7 | 9 | |||
| Environmental and other remediation costs | 32 | 32 | |||
| Pension and other charges associated with redundancies | 21 | 23 | |||
| Other | 16 | 30 | |||
| 76 | 94 | ||||
| Although the precise timing in respect of rationalisation provisions including redundancy is not known, the majority is expected to be incurred within two years. | |||||
| (ii) | Rationalisation provisions include £3m (2003: £3m) of financial liabilities due within one year, £2m (2003: £2m) in one to two years, £2m (2003: £3m) in two to five years and £nil (2003: £1m) in over five years. These amounts are principally denominated in sterling and bear no interest. | ||||
| (iii) | Deferred tax provisions arise as follows: | ||||
The
Group |
|||||
2004
£m |
2003
£m |
||||
| Pension prepayment | 60 | 66 | |||
| Accelerated capital allowances | 84 | 65 | |||
| Tax losses carried forward | (13 | ) | (15 | ) | |
| Other timing differences | 57 | 57 | |||
| Undiscounted provision for deferred tax | 188 | 173 | |||
| Discount | (9 | ) | (10 | ) | |
| Discounted provision for deferred tax | 179 | 163 | |||
| (iv) | The insurance provisions relate to Crucible Insurance Company Limited which underwrites marine cargo, employers’ liability, public liability and retrospective hearing impairment policies for the Group. These provisions are subject to regular review and are adjusted as appropriate; the value of final insurance settlements is uncertain and so is the timing of expenditure. |
| (v) | Other provisions include £6m (2003: £10m) for product warranty claims. During the period there were charges to the profit and loss account of £3m (2003: £3m) and cash settlements of £7m (2003: £2m) against these claims. The other provisions also include environmental provisions for which the timing of any potential expenditure is uncertain. |
| 112 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 26. Share capital | ||||
| 26.1 Share capital of the Company | ||||
| The share capital of the Company is shown below: | ||||
|
Authorised |
2004
£m |
2003
£m |
||
| 9,978,327,388 ordinary shares of 10p each | 998 | 998 | ||
| 3,130,418,153 deferred shares of 40p each | 1,252 | 1,252 | ||
| 2,250 | 2,250 |
|
Allotted,
called up and fully paid |
2004
£m |
2003
£m |
||
| 4,438,832,877 (2003: 4,434,759,050) ordinary shares of 10p each | 444 | 444 | ||
| 3,130,418,153 deferred shares of 40p each | 1,252 | 1,252 | ||
| 1,696 | 1,696 |
| The movements in share capital during the period are set out below: | ||||||||
|
Authorised |
Deferred
shares |
Ordinary
shares |
||||||
| No.
of shares |
£m |
No.
of shares |
£m |
|||||
| At 28 December 2002 – ordinary shares of 50p each | – | – | 4,400,099,998 | 2,200 | ||||
| At 8 December 2003 – share capital subdivision and conversion (ii) | 3,130,418,153 | 1,252 | 9,478,827,378 | 948 | ||||
| Increase on 8 December 2003 | – | – | 499,500,010 | 50 | ||||
| At 3 January 2004 and 1 January 2005 | ||||||||
| – deferred shares of 40p each | 3,130,418,153 | 1,252 | – | – | ||||
| – ordinary shares of 10p each | – | – | 9,978,327,388 | 998 | ||||
Deferred
shares |
Ordinary
shares |
|||||||
|
Issued |
No.
of shares |
£m |
No.
of shares |
£m |
||||
| At 28 December 2002 – ordinary shares of 50p each | – | – | 3,130,418,053 | 1,565 | ||||
| Exercise of share options (i) | – | – | 100 | – | ||||
| At 8 December 2003 – share capital subdivision and conversion (ii) | 3,130,418,153 | 1,252 | 3,130,418,153 | 313 | ||||
| Shares issued under placing and open offer on 8 December 2003 | – | – | 1,304,340,897 | 131 | ||||
| At 3 January 2004 | 3,130,418,153 | 1,252 | 4,434,759,050 | 444 | ||||
| Exercise of share options (i) | – | – | 1,033,943 | – | ||||
| Awards of shares under employee share ownership plan (i) | – | – | 3,039,884 | – | ||||
| At 1 January 2005 | ||||||||
| – deferred shares of 40p each | 3,130,418,153 | 1,252 | – | – | ||||
| – ordinary shares of 10p each | – | – | 4,438,832,877 | 444 | ||||
| (i) | Share options were exercised at 50p (2003: 107p). Shares were awarded under the employee share ownership plan at prices ranging between 42p and 53p (2003: £nil). The consideration received was £1m (2003: £nil). |
| (ii) | Ordinary shareholders of the Company on the register at the close of business on 7 November 2003 were offered, by way of a placing and open offer, 1,304m new ordinary shares on the basis of five new ordinary shares of 10p each per 12 existing ordinary shares of 50p held. These shares were fully subscribed, resulting in total proceeds on issue of £291m received on 11 December 2003. These proceeds were net of share issue expenses of £16m, which were written off to the share premium account. |
| Prior to the placing and open offer, the nominal value of 50p of each existing ordinary share exceeded the proposed issue price of 23.5p per new share. As a matter of company law, it was not possible for the Company to issue shares at less than their nominal value and therefore in order to effect the placing and open offer the existing issued ordinary shares were subdivided and converted from one existing ordinary share of 50p into one ordinary share of 10p and one deferred share of 40p and each existing unissued ordinary share was converted into five ordinary shares of 10p. This resulted in 9,479m authorised ordinary shares (of which 3,130m were in issue) and 3,130m deferred shares being created under a share capital reorganisation. | |
| Each ordinary share of 10p has the same rights (including voting rights and dividend rights and rights on a return of capital) as each ordinary share of 50p did prior to the share capital reorganisation. The rights attached to the deferred shares, which are not listed, renders them effectively worthless and it is intended that they will be cancelled and an appropriate reserve created in due course. The share capital reorganisation did not affect the Company’s or the Group’s net assets. | |
| Corus Report & Accounts 2004 113 |
||||
|
|
|
|||
Notes to the accounts
|
| 26. Share capital continued | ||
| 26.2 Rights to subscribe for shares | ||
| Share options | ||
| Corus had six share option schemes in operation during the year: | ||
| Executive scheme name | Sharesave scheme name | |
| Former British Steel schemes: | Corus UK Executive | Corus UK Sharesave |
| Corus Overseas Executive | ||
| Corus schemes: | Corus Executive | Corus Sharesave |
| Corus International Sharesave | ||
| The former British Steel Schemes are no longer capable of being used for granting options because their rules only permit options to be granted over British Steel shares. Options outstanding on 6 October 1999, when British Steel plc merged with Koninklinkje Hoogovens NV to form Corus Group plc, were converted from options over British Steel shares into options over Corus shares whilst maintaining the exercisable value. These schemes continue to operate in all respects other than in connection with granting of options and are described in more detail in the Report on remuneration. |
| On 8 December 2003 all options outstanding were adjusted, in accordance with an independent accountants’ opinion, for the consequence of the placing and open offer with the exercisable value of the option being maintained but at a revised price over a revised number of shares. |
| Sharesave schemes | |
| (i) | Corus
UK Sharesave During the year all options outstanding under the Corus UK Sharesave Scheme lapsed and that Scheme is no longer in operation. |
| (ii) | Corus
Sharesave Scheme and Corus International Sharesave Scheme The Corus International Sharesave Scheme was introduced, after receiving shareholder approval at the Annual General Meeting in April 2004, with employees in the Netherlands and Germany being invited to apply for options in September 2004. The scheme rules are based, to such extent as practically possible, on the rules of the Corus Sharesave Scheme. |
| On 15 October 2004 options were granted under the two schemes, linked to a three year savings contract, at an exercise price of 42p per share in accordance with the rules of the respective schemes. The majority of employees in the UK, the Netherlands and Germany were eligible to apply for options under one or other of the Sharesave Schemes. Previous years grants of options (under the Corus Sharesave Scheme) were linked to a three or five year savings contract at the choice of the employee. Options are granted at a price not less than 80% of the average of the market value of an ordinary share on the London Stock Exchange on three consecutive dealing days immediately preceding the date of invitation and within 30 days of date of grant. | |
| Executive Schemes | |
| No options were granted during the year. Options under all executive schemes are normally exercisable between the third and tenth anniversary of the date of grant. Options are granted at a price which is the average of the market value of an ordinary share on the London Stock Exchange on the three consecutive dealing days immediately preceding the date of grant. | |
| Options outstanding together with their exercise prices and dates of exercise are set out below: |
|
| Ordinary shares of 10p | ||||||||
| Price per share |
At
1 Jan 2005 No. of shares |
At
3 Jan 2004 No. of shares* |
Normal datesof exercise | |||||
| Corus UK Sharesave Scheme | 86 | p | – | 9,647 | 2004 | |||
| Corus Sharesave Scheme | 50 | p | 544,398 | 25,237,751 | 2005 | |||
| 50 | p | 30,944,648 | 36,208,041 | 2006 | ||||
| 42 | p | 80,995,367 | – | 2008 | ||||
| Corus International Sharesave Scheme | 42 | p | 35,869,601 | – | 2008 | |||
| Corus UK Executive Share Option Scheme | 104 | p | – | 1,495,184 | 1997-2004 | |||
| 126 | p | 1,059,012 | 1,574,292 | 1998-2005 | ||||
| 134 | p | 327,712 | 421,460 | 1999-2006 | ||||
| 118 | p | 1,205,106 | 1,568,272 | 2000-2007 | ||||
| 125 | p | 1,785,713 | 2,101,843 | 2002-2009 | ||||
| Corus Overseas Executive Share Option Scheme | 126 | p | 8,690 | 8,690 | 1998-2005 | |||
| 134 | p | 1,211,009 | 1,847,541 | 1999-2006 | ||||
| 118 | p | 1,935,790 | 2,570,877 | 2000-2007 | ||||
| 125 | p | 6,161,690 | 7,725,293 | 2002-2009 | ||||
| Corus Executive Share Option Scheme | 117 | p | 20,820,741 | 24,422,056 | 2003-2010 | |||
| 103 | p | 117,113 | 117,113 | 2003-2010 | ||||
| 54 | p | 29,031,058 | 29,373,632 | 2004-2011 | ||||
| 49 | p | 820,617 | 820,617 | 2004-2011 | ||||
| 16 | p | 3,401,953 | 3,401,953 | 2006-2013 | ||||
| 114 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts
|
|
26. Share capital continued 26.2 Rights to subscribe for shares continued Movements in ordinary shares under option schemes are set out below: |
| Corus
UK Sharesave No. of shares 000s |
Corus Sharesave No. of shares 000s |
Corus International Sharesave No. of shares 000s |
Weighted average price |
Corus
UK Executive No. of shares 000s |
Corus
Overseas Executive No. of shares 000s |
Corus Executive No. of shares 000s |
Weighted average price |
|||||||||
| At 29 December 2001 | 18,795 | 89,727 | – | 58 | p | 10,043 | 14,849 | 57,752 | 97 | p | ||||||
| Exercised | – | (287 | ) | – | 51 | p | (1 | ) | – | (297 | ) | 56 | p | |||
| Expired or lapsed | (2,309 | ) | (8,739 | ) | – | 59 | p | (326 | ) | (1,260 | ) | (2,215 | ) | 102 | p | |
| At 28 December 2002 | 16,486 | 80,701 | – | 58 | p | 9,716 | 13,589 | 55,240 | 97 | p | ||||||
| Granted | – | – | – | – | – | – | 3,300 | 16 | p | |||||||
| Expired or lapsed | (16,440 | ) | (20,684 | ) | – | 68 | p | (2,333 | ) | (1,730 | ) | (1,839 | ) | 110 | p | |
| At 8 December 2003 | ||||||||||||||||
| prior to adjustment | ||||||||||||||||
| for placing and open offer | 46 | 60,017 | – | 52 | p | 7,383 | 11,859 | 56,701 | 92 | p | ||||||
| At 8 December 2003 | ||||||||||||||||
| after adjustment | ||||||||||||||||
| for placing and open offer* | 47 | 61,862 | – | 50 | p | 7,611 | 12,225 | 58,454 | 89 | p | ||||||
| Expired or lapsed | (37 | ) | (416 | ) | – | 53 | p | (450 | ) | (73 | ) | (318 | ) | 101 | p | |
| At 3 January 2004* | 10 | 61,446 | – | 50 | p | 7,161 | 12,152 | 58,136 | 89 | p | ||||||
| Granted | – | 81,162 | 35,870 | 42 | p | – | – | – | – | |||||||
| Exercised | – | (1,034 | ) | – | 50 | p | – | – | – | – | ||||||
| Forfeited | – | (455 | ) | – | 50 | p | (94 | ) | (122 | ) | (509 | ) | 94 | p | ||
| Expired or lapsed | (10 | ) | (28,635 | ) | – | 50 | p | (2,689 | ) | (2,713 | ) | (3,435 | ) | 118 | p | |
| At 1 January 2005 | – | 112,484 | 35,870 | 45 | p | 4,378 | 9,317 | 54,192 | 85 | p | ||||||
| * | Following an independent accountants’ valuation in respect of the placing and open offer in December 2003, options outstanding at 3 January 2004 have been restated to reflect minor rounding adjustments. As a result the aggregate number of options outstanding over all grants decreased by 10,948 shares. |
| Options were exercisable as set out below: | ||||||||||||||||
| Corus
UK Sharesave No. of shares 000s |
Corus Sharesave No. of shares 000s |
Corus |
Weighted average price |
Corus
UK Executive No. of shares 000s |
Corus
Overseas Executive No. of shares 000s |
Corus |
Weighted average price |
|||||||||
| At 28 December 2002 | – | – | – | – | 6,093 | 5,291 | 8,372 | 112 | p | |||||||
| At 3 January 2004 | 10 | 587 | – | 51 | p | 3,913 | 5,623 | 14,528 | 102 | p | ||||||
| At 1 January 2005 | – | 721 | – | 50 | p | 1,625 | 3,955 | 16,728 | 95 | p | ||||||
| Options were granted under the Corus Sharesave Scheme and the Corus International Sharesave Scheme (2003: Corus Executive Share Option Scheme) on 15 October 2004 at an exercise price of 42p per share (2003: 14 May 2003 at 16p per share). The option price was equivalent to 80% of the market value of the options at the date of invitation. |
|
| ||||
| Corus Report & Accounts 2004 115 |
||||
|
|
|
|||
| Notes to the accounts
|
26. Share capital continued 26.2 Rights to subscribe for shares continued |
| Other rights | |
| (i) | The employee share ownership plan was introduced in 2001 with an offer of free and partnership shares in accordance with the rules of the scheme. Eligible employees are allowed to make contributions from pre-tax salary to buy Corus shares, which are held in trust (partnership shares). Shares are issued to satisfy awards of free and partnership shares at the market value of an ordinary share on the London Stock Exchange on the day prior to award. Only partnership shares were awarded and issued to the trust during the year. |
| (ii) | The Leveraged Equity Acquisition Plan (LEAP) was introduced in 2004 with the first grant of awards made on 22 April 2004. Executive committee members may contribute shares to the LEAP by means of deferred bonus shares, annual bonus cash and investment shares. Awards of shares can also be made under the LEAP rules to Executive committee members and some senior managers based on a percentage of salary (conditional shares). |
| Contributions to the LEAP by means of deferred bonus shares and annual bonus cash are made in accordance with the rules of the annual bonus scheme. Under this scheme one half of an Executive committee member’s annual bonus is paid in shares (deferred bonus shares) and the other half paid in cash. The cash element of the bonus can be used to purchase shares in the LEAP (annual bonus cash shares). | |
| Further details of the scheme as it applies to Executive committee members are given in the Report on remuneration with shares vesting and being matched, subject to performance conditions having been met, after three years. | |
| Other members of the scheme receive awards of only conditional shares vesting after three years in varying proportions subject to the level of performance achieved by the Company. |
| Shares were awarded/contributed during the year as detailed below: | |||||||
| Type of award/contribution | Date of grant | No. of shares | Price per share | ||||
| Conditional share award | 22 April 2004 | 1,944,474 | 40 | p | |||
| Conditional share award | 11 May 2004 | 12,545,778 | 32 | p | |||
| Deferred bonus shares | 28 May 2004 | 467,074 | 34 | p | |||
| Annual bonus cash shares | 28 May 2004 | 716,553 | 34 | p | |||
| Annual bonus cash shares | 17 September 2004 | 28,333 | 53 | p | |||
| Shares issued to satisfy awards are based on market value of an ordinary share on the London Stock Exchange on the day prior to the award. | |
| 159,475 conditional shares were forfeited prior to 1 January 2005, 43,411 conditional shares were exercisable at this date and all other LEAP awards were still outstanding but not exercisable at this date. | |
| (iii) | Holders of convertible debt can exercise their conversion rights throughout the unexpired term of the loans and be issued with Corus Group plc ordinary shares of 10p each as set out below: |
| Corus Nederland BV 4.625% Subordinated convertible debenture loan 2007 | Nominal amount €m |
No. of shares to be issued |
Period
during which right is exercisable |
Consideration to be received |
|||||
| At 3 January 2004 | 152 | 96,693,438 | 2000-2007 | £107 | m | ||||
| At 1 January 2005 | 152 | 96,693,438 | 2000-2007 | £108 | m |
| Corus Group plc €307m 3% Unsubordinated convertible bond 2007 | Nominal amount €m |
No. of shares to be issued |
Period
during which right is exercisable |
||||
| At 3 January 2004 | 307 | 234,351,152 | 2002-2007 | ||||
| At 1 January 2005 | 307 | 234,351,152 | 2002-2007 | ||||
| 116 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts
|
| 27. Reconciliation of movements in share capital and reserves | ||||||||||||||
| Share capital £m |
Share premium account £m |
Statutory reserve £m |
Other reserves £m |
Profit and loss account | Total £m |
|||||||||
| Profit and loss reserves £m |
Joint ventures and associated undertakings reserves £m |
|||||||||||||
| The Company | ||||||||||||||
| At 28 December 2002 | 1,565 | 7 | – | 796 | 363 | – | 2,731 | |||||||
| Loss retained | – | – | – | – | (31 | ) | – | (31 | ) | |||||
| New shares issued | 131 | 176 | – | – | – | – | 307 | |||||||
| Share issue expenses | – | (16 | ) | – | – | – | – | (16 | ) | |||||
| At 3 January 2004 | 1,696 | 167 | – | 796 | 332 | – | 2,991 | |||||||
| Profit retained | – | – | – | – | 110 | – | 110 | |||||||
| New shares issued | – | 1 | – | – | – | – | 1 | |||||||
| Issue of conditional share awards | – | – | – | – | 5 | – | 5 | |||||||
| At 1 January 2005 | 1,696 | 168 | – | 796 | 447 | – | 3,107 | |||||||
| The Group | ||||||||||||||
| At 28 December 2002 | 1,565 | 7 | 2,338 | 201 | (1,399 | ) | 10 | 2,722 | ||||||
| (Loss)/profit retained | – | – | – | – | (306 | ) | 1 | (305 | ) | |||||
| Exchange translation differences on | ||||||||||||||
| foreign currency net investments | – | – | – | – | 90 | (1 | ) | 89 | ||||||
| Transfers and disposals | – | – | – | – | 2 | (2 | ) | – | ||||||
| New shares issued | 131 | 176 | – | – | – | – | 307 | |||||||
| Share issue expenses | – | (16 | ) | – | – | – | – | (16 | ) | |||||
| At 3 January 2004 as previously stated | 1,696 | 167 | 2,338 | 201 | (1,613 | ) | 8 | 2,797 | ||||||
| Accounting policy change | – | – | – | – | (1 | ) | – | (1 | ) | |||||
| At 3 January 2004 restated | 1,696 | 167 | 2,338 | 201 | (1,614 | ) | 8 | 2,796 | ||||||
| Profit retained | – | – | – | – | 429 | 17 | 446 | |||||||
| Exchange translation differences on | ||||||||||||||
| foreign currency net investments | – | – | – | – | – | – | – | |||||||
| New shares issued | – | 1 | – | – | – | – | 1 | |||||||
| Transfer of goodwill (Note 35) | – | – | – | – | 10 | – | 10 | |||||||
| Issue of conditional share awards | – | – | – | – | 5 | – | 5 | |||||||
| Transfers and disposals | – | – | – | – | (1 | ) | 1 | – | ||||||
| At 1 January 2005 | 1,696 | 168 | 2,338 | 201 | (1,171 | ) | 26 | 3,258 | ||||||
| (i) | The statutory reserve of £2,338m arises in Corus UK Limited under section 7(1) of the British Steel Act 1988. £381m of the statutory reserves are available for distribution; the balance of £1,957m are restricted reserves which may only be applied in paying up unissued shares to be allotted to members as fully paid bonus shares. |
| (ii) | Distributable retained profits of subsidiaries, joint ventures and associated undertakings attributable to the Group include £665m (2003: £501m) retained overseas. Deferred tax has not been provided on earnings retained overseas as it is not intended to remit earnings which would give rise to significant UK tax liabilities after taking account of any related double tax relief. |
| (iii) | Retained profits of subsidiary undertakings include £6m (2003: £14m) which is not available for distribution. |
| (iv) | As at 1 January 2005, the cumulative net goodwill written off to Group reserves resulting from acquisitions prior to 28 March 1998 amounts to £242m (2003: £252m) (see Presentation of accounts and accounting policies Note II). |
| (v) | There was a foreign exchange loss of £10m (2003: £20m) arising on certain foreign currency borrowings. This has been set off against exchange differences on foreign currency investments and deposits. The cumulative effect of exchange translation differences on foreign currency borrowings is to reduce shareholders’ funds by £134m (2003: £124m). |
| (vi) | The application of merger accounting principles to the Group reconstruction (see Presentation of accounts and accounting policies Note II) gave rise to a merger adjustment which is included within other reserves. The balances shown above under other reserves include the effect of merger accounting for the creation of the Company. The difference between the fair value of shares issued for the acquisition of Corus Nederland BV and the nominal value of those shares was credited to other reserves, as section 131 of the Companies Act 1985 gives relief from this amount being recognised as share premium. |
| (vii) | The adoption of UITF 38 (see Presentation of accounts and accounting policies Note XVI) gave rise to Corus’ own shares held in ESOP trusts being recognised not as assets but as deductions in arriving at shareholders’ funds. As a result, the profit and loss reserve as at 3 January 2004 has been restated. At 1 January 2005 4.4m shares, with a market value at that date of £2m, were held in trust pending the exercise of share options. The original cost of acquisition of those shares gave rise to the accounting policy change above and reduces the profit available for distribution. |
| Corus Report & Accounts 2004 117 |
||||
|
|
|
|||
Notes to the accounts
|
| 28. Future capital expenditure | ||||
| The Group | ||||
| 2004 | 2003 | |||
| £m | £m | |||
| Contracted but not provided for | 99 | 60 | ||
| Authorised but contracts not yet placed | 53 | 164 | ||
| As described in Note 36, consortium members will contribute approximately 76% of the expected US$100m capital expenditure of the Teesside Cast Products (TCP) business over the 10 year agreement to supply slab. The balance of the requirement will be met by Corus, but these amounts are not included above. | ||||
| 29. Operating leases | ||||
| The Group | ||||
| 2004 | 2003 | |||
| £m | £m | |||
| Committed amounts payable for the next year are: | ||||
| Leases of land and buildings expiring: | ||||
| Within one year | 1 | 1 | ||
| In years two to five | 4 | 3 | ||
| After more than five years | 8 | 9 | ||
| 13 | 13 | |||
| Other leases (principally for plant and machinery) expiring: | ||||
| Within one year | 10 | 5 | ||
| In years two to five | 51 | 23 | ||
| After more than five years | 14 | 15 | ||
| 75 | 43 | |||
| Future minimum lease payments for the Group at 1 January 2005 are: | ||||
| In one year | 88 | 56 | ||
| Between one and two years | 71 | 49 | ||
| Between two and three years | 39 | 39 | ||
| Between three and four years | 26 | 25 | ||
| Between four and five years | 24 | 22 | ||
| More than five years | 136 | 141 | ||
| 118 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Notes to the accounts |
| 30. Contingencies | ||||
| The Group | ||||
| 2004 £m |
2003 £ m |
|||
| Guarantees given under trade agreements | 52 | 53 | ||
| Others | 42 | 30 | ||
There are also contingent liabilities in the ordinary course of business in connection with the completion of contractual arrangements. Within the EU there has historically been close co-operation between the steel industry, the European Commission and governments. Eurofer is the trade association to which all major European steel producers including Corus belong, either directly or through national trade associations. Eurofer, through its main committees, supplies and co-ordinates advice and information to its members and in turn represents them to, amongst others, the European Commission. These representations cover a wide range of issues where there is a need for a common industry voice, and include international trade policies, social and environmental control issues, research and development matters, market conditions and various aspects of the sale and marketing of steel products. They relate to most major steel products. Corus is also a member of other trade associations and other industry groups in respect of its other products and activities, for example, the European Aluminium Association. On 8 November 2001 an explosion occurred at the no. 5 blast furnace at Port Talbot works, which led to three employee fatalities, several employees suffering severe burns and the total loss of the blast furnace. Some contractors’ employees also suffered injuries. The accident was initially investigated by the police but the investigation is now led by the Health & Safety Executive. The Company considers it unlikely that a corporate manslaughter charge will be brought. It is more likely that Corus will be charged with offences under the Health & Safety at Work Act. Any convictions are likely to result in substantial fines being levied. There is also a possibility of charges against individual employees. Corus has admitted its civil liability for the incident. Twenty six civil claims for death and personal injury have been made against the Company. Should all the relevant claimants succeed in their claims, Corus’ liability could amount to several million pounds, although Corus has insurance cover in place that it expects will be able to meet these claims in full. |
| 31. Reconciliation of operating profit/(loss) to net cash inflow from operating activities |
| 2004 £m |
2003 £m |
2002 £m |
||||
| Operating profit/(loss) | 582 | (208 | ) | (446 | ) | |
| Depreciation and amortisation (net of grants released) | 308 | 364 | 445 | |||
| Change in pension prepayments and provisions | (9 | ) | 11 | 10 | ||
| Increase/(decrease) in provisions for doubtful debts | 1 | 3 | (2 | ) | ||
| Increase/(decrease) in insurance and other provisions | 26 | 8 | (16 | ) | ||
| Decrease/(increase) in loose plant, tools and spares | 18 | 21 | (6 | ) | ||
| (Increase)/decrease in stocks | (357 | ) | (18 | ) | 27 | |
| Inflow from securitisation of trade debtors (Note 16) | 60 | 34 | 181 | |||
| Other (increase)/decrease in debtors | (333 | ) | 61 | 37 | ||
| Increase/(decrease) in creditors | 290 | (87 | ) | (83 | ) | |
| Rationalisation costs provided/(released) | 31 | 79 | (49 | ) | ||
| Utilisation of rationalisation provisions | (49 | ) | (44 | ) | (57 | ) |
| Net cash inflow from operating activities | 568 | 224 | 41 | |||
|
Corus Report & Accounts 2004 119 |
||||
|
|
|
|||
Notes to the accounts |
| 32. Pensions and post retirement benefits |
| Background |
The Group operates a number of defined benefit pension schemes throughout the world, covering the majority of employees. Benefits offered are largely based on final pay and service at retirement. With the exception of plans in Germany, France and certain unfunded arrangements in the UK, the assets of these schemes are held in separate independently administered funds. The main pension scheme of the Group is the British Steel Pension Scheme (the ‘BS Scheme’). Up until 31 March 2003, employees of Corus Engineering Steels were active members of the Corus Engineering Steels Pension Scheme (‘CES Scheme’). However, active members of the CES Scheme were offered membership of the BS Scheme for future service, with effect from 1 April 2003. Most employees of the subsidiary Corus Nederland BV group are members of either the Stichting Pensioenfonds Hoogovens Scheme (the ‘SPH Scheme’) or the collective German Schemes (the ‘CNG Schemes’). The Group continues to account for pension costs in accordance with UK Statement of Standard Accounting Practice No. 24 ‘Pension Costs’ (SSAP 24). In addition, disclosures are presented below in accordance with the UK Financial Reporting Standard No. 17 ‘Retirement Benefits’ (FRS 17). However, the ongoing funding arrangements of each scheme, in place to meet their long term pension liabilities, are governed by the individual scheme documentation and national legislation. The accounting and disclosure requirements of SSAP 24 and FRS 17 do not affect these funding arrangements. UK
GAAP – SSAP 24 ‘Accounting for Pension Costs’ |
| 2004 £m |
2003 £m |
2002 £m |
||||
| BS, CES, SPH and CNG Schemes: | ||||||
| Regular cost | 116 | 110 | 125 | |||
| Variation due to spreading of identified surplus | (42 | ) | (37 | ) | (74 | ) |
| Interest | (16 | ) | (16 | ) | (13 | ) |
| BS, CES, SPH and CNG pension costs | 58 | 57 | 38 | |||
| Other schemes’ net pension cost | 25 | 8 | 9 | |||
| Total pension costs of the Group (Note 4) | 83 | 65 | 47 | |||
| The following amounts are included in debtors, representing the excess of amounts funded over the pension charges in previous years: | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Falling due within one year: | ||||||
| BS Scheme | 11 | 9 | 9 | |||
| Other schemes | 3 | 3 | 3 | |||
| 14 | 12 | 12 | ||||
| Falling due after more than one year: | ||||||
| BS Scheme | 83 | 94 | 98 | |||
| SPH Scheme | 237 | 225 | 205 | |||
| Other schemes | 15 | 17 | 17 | |||
| 335 | 336 | 320 | ||||
| The following amounts are included in provisions for liabilities and charges: | ||||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| CES Scheme | 8 | 11 | 11 | |||
| CNG Schemes | 102 | 101 | 88 | |||
| Other schemes | 80 | 72 | 100 | |||
| 190 | 184 | 199 | ||||
|
120 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Notes to the accounts |
32. Pensions and post retirement benefits continued The results of the most recent actuarial valuations of the principal schemes, which were carried out by independent qualified actuaries and used to determine the pension cost under SSAP 24, were as follows: |
| BS Scheme | CES Scheme | ||||
| Date of last formal valuation | 31 March 2002 |
5 April 2002 |
|||
| Actuarial method used | Projected unit | Projected unit | |||
| Market value of assets at last valuation date | £m | 8,168 | 551 | ||
| Level of funding, being the actuarial value of assets expressed as a | |||||
| percentage of the actuarial value of the accrued benefits after | |||||
| allowing for expected future increases in pay and pension | % | 111.0 | 85.0 | ||
| Main assumptions | |||||
| Wages and salaries increases p.a. | % | 4.25 | 4.25 | ||
| Return on investments pre-retirement | % | 6.50 | 7.00 | ||
| Return on investments post-retirement | % | 6.50 | 5.75 | ||
| Pension increases p.a. | % | 2.50 | 2.75 | ||
| Dividends increases | % | 3.00 | not applicable | ||
| Next formal valuation to be carried out as at | 31 March 2005 | 5 April 2005 |
| The SSAP 24 pension costs for the CES Scheme were calculated using a wages and salaries increase assumption of 3.75%. This 1% real pay growth assumption was deemed to be more appropriate. For the SPH and CNG Schemes, the local funding valuations or calculation of provisions are not appropriate for SSAP 24. For these schemes the local actuaries recalculated, as at 28 December 2002, the valuation results on bases appropriate for SSAP 24. These results are detailed below: |
| SPH
Scheme |
CNG
Schemes |
||||
| Actuarial method used | Projected
unit |
Projected
unit |
|||
| Market value of assets at last valuation date | £m | 2,565 |
unfunded |
||
| Level of funding, being the actuarial value of assets expressed as a | |||||
| percentage of the actuarial value of the accrued benefits after | |||||
| allowing for expected future increases in pay and pension | % | 105.0 |
unfunded |
||
| Main assumptions | |||||
| Wages and salaries increases p.a. | % | 2.75 |
3.00 |
||
| Return on investments/discount rate | % | 6.40 |
5.50 |
||
| Pension increases p.a. | % | 2.50 |
1.80 |
||
| Dividends increases | % | not
applicable |
not
applicable |
||
| Next formal valuation to be carried out as at | not
applicable |
not
applicable |
|||
UK
GAAP – FRS 17 ‘Retirement benefits’ For purposes of presentation, the disclosures are seperated between the Group’s four principal schemes and the combined other defined benefit arrangements. The majority of these other schemes are located within central Europe, where they are generally unfunded, or North America, where separate funding is most common. |
|||||
|
Corus Report & Accounts 2004 121 |
||||
|
|
|
|||
Notes to the accounts |
| 32.
Pensions and post retirement benefits continued Principal schemes Principal schemes: Assumptions and investment portfolios |
||||||||||||
| 2004 BS Scheme % |
2004 CES, SPH and CNG Schemes % |
2003 BS Scheme % |
2003 CES, SPH and CNG Schemes % |
2002 BS Scheme % |
2002 CES, SPH and CNG Schemes % |
|||||||
| The major assumptions used by the actuaries were: | ||||||||||||
| Rate of increase in pensionable salaries | 4.30 | 2.50 to 3.60 | 4.25 | 2.50 to 3.50 | 4.00 | 2.75 to 3.25 | ||||||
| Rate of increase in pension payment | 2.60 | 1.80 to 2.60 | 2.50 | 1.80 to 2.50 | 2.25 | 2.00 to 2.50 | ||||||
| Discount rate | 5.40 | 4.75 to 5.40 | 5.50 | 5.50 | 5.50 | 5.50 | ||||||
| Inflation assumption | 2.60 | 2.00 to 2.60 | 2.50 | 2.00 to 2.50 | 2.25 | 2.00 to 2.50 | ||||||
| Pensions in payment and deferred pensions for the SPH Scheme have been valued at a net 2.75% discount rate (2003: 3.50%;2002: 4.00%). | ||||||||||||
| 2004 BS Scheme % |
2004 CES and SPH Schemes % |
2003 BS Scheme % |
2003 CES and SPH Schemes % |
2002 BS Scheme % |
2002 CES and SPH Schemes % |
|||||||
| The expected long term rates of return were: | ||||||||||||
| Equities | 8.00 | 6.90 to 7.50 | 8.00 | 7.20 to 7.75 | 8.00 | 7.00 to 8.00 | ||||||
| Bonds | 4.70 | 4.50 | 4.70 | 4.75 to 4.80 | 4.70 | 4.50 to 5.00 | ||||||
| Property | 6.50 | 6.00 to 6.90 | 6.50 | 6.00 to 7.20 | 6.50 | 6.00 to 7.00 | ||||||
| Other | 3.50 | 6.00 | 3.50 | 6.00 | 3.80 | 7.00 | ||||||
| 2004 BS Scheme £m |
2004 CES and SPH Schemes £m |
2003 BS Scheme £m |
2003 CES and SPH Schemes £m |
2002 BS Scheme £m |
2002 CES and SPH Schemes £m |
|||||||
| The market values of investments in the schemes were: | ||||||||||||
| Equities | 3,333 | 1,126 | 3,188 | 1,313 | 2,669 | 1,224 | ||||||
| Bonds | 4,084 | 2,187 | 4,122 | 1,568 | 4,078 | 1,368 | ||||||
| Property | 385 | 323 | 389 | 316 | 389 | 302 | ||||||
| Other | 241 | 269 | 126 | 299 | 244 | 121 | ||||||
| 8,043 | 3,905 | 7,825 | 3,496 | 7,380 | 3,015 | |||||||
| 2004 BS Scheme % |
2004 CES and SPH Schemes % |
2003 BS Scheme % |
2003 CES and SPH Schemes % |
2002 BS Scheme % |
2002 CES and SPH Schemes % |
|||||||
| The percentage of total plan assets for each major category of plan assets was: | ||||||||||||
| Equities | 41.4 | 28.8 | 40.7 | 37.6 | 36.2 | 40.6 | ||||||
| Bonds | 50.8 | 56.0 | 52.7 | 44.9 | 55.2 | 45.4 | ||||||
| Property | 4.8 | 8.3 | 5.0 | 9.0 | 5.3 | 10.0 | ||||||
| Others | 3.0 | 6.9 | 1.6 | 8.5 | 3.3 | 4.0 | ||||||
| 100.0 | 100.0 | 100.0 | 100.0 | 100.0 | 100.0 | |||||||
| Principal schemes: Profit and loss account note under FRS 17 | ||||
| 2004 £m |
2003 £m |
|||
| Analysis of the amount to be charged to operating profit for the year under FRS 17: | ||||
| Current service cost | 148 | 135 | ||
| Curtailment loss | – | 1 | ||
| Total operating charge | 148 | 136 | ||
| 2004 £m |
2003 £m |
|||
| Analysis of the amount to be credited to other finance income for the year: | ||||
| Expected return on pension scheme assets | 672 | 630 | ||
| Interest cost on pension scheme liabilities | (598 | ) | (563 | ) |
| Net return | 74 | 67 | ||
|
122 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Notes to the accounts |
| 32.
Pensions and post retirement benefits continued Principal schemes: Balance sheet note under FRS 17 |
| 2004 BS Scheme £m |
2004 CES, SPH and CNG Schemes £m |
2003 BS Scheme £m |
2003 CES, SPH and CNG Schemes £m |
2002 BS Scheme £m |
2002 |
|||||||
| The following amounts were measured at the year end in accordance with the requirements of FRS 17: | ||||||||||||
| Total market value of assets | 8,043 | 3,905 | 7,825 | 3,496 | 7,380 | 3,015 | ||||||
| Present value of scheme liabilities | (7,768 | ) | (4,114 | ) | (7,493 | ) | (3,710 | ) | (7,020 | ) | (3,287 | ) |
| Surplus/(deficit) in the scheme | 275 | (209 | ) | 332 | (214 | ) | 360 | (272 | ) | |||
| Related deferred tax (liability)/asset | (83 | ) | 71 | (100 | ) | 68 | (108 | ) | 88 | |||
| Net pension asset/(liability) | 192 | (138 | ) | 232 | (146 | ) | 252 | (184 | ) | |||
Of the CES, SPH and CNG Schemes net pension liability above, £70m (2003: £56m; 2002: £28m) relates to schemes in surplus and £208m (2003: £202m; 2002: £212m) relates to schemes in deficit. |
||||||||||||
| Principal schemes: Movement in net surplus during the year under FRS 17 | ||||
| 2004 £m |
2003 £m |
|||
| Net surplus in schemes at beginning of the year | 118 | 88 | ||
| Movement in year: | ||||
| Current service cost | (148 | ) | (135 | ) |
| Contributions | 62 | 57 | ||
| Curtailment loss | – | (1 | ) | |
| Other finance income | 74 | 67 | ||
| Actuarial (loss)/gain | (39 | ) | 45 | |
| Exchange rate movements | (1 | ) | (3 | ) |
| Net surplus in schemes at end of the year | 66 | 118 | ||
Employer contributions to the CES Scheme in the period 1 January to 31 March 2003 were at the rate of 14.2% of pensionable earnings (2002: 12%). Active members of the CES Scheme joined the acquisition section of the BS Scheme for future service with effect from 1 April 2003. Past service benefits for all members of the CES Scheme have been retained in that scheme to be paid from and funded under those arrangements. Monthly payments of £1m are being made to the CES Scheme in respect of past service funding requirements, subject to review at future actuarial valuations. Additional payments will also be made to the CES Scheme, where necessary, to address any funding strains resulting from early retirements. The expected funding strain on the CES Scheme, arising as a direct consequence of the UK restructuring programme announced in April 2003, is £17m as measured on the FRS 17 assumptions. This amount was provided in the 2003 consolidated profit and loss account as a restructuring and impairment cost and has not been shown as a curtailment loss under FRS 17. The full cost of the funding strain is being met by Corus. In 2004, contributions of €85m (2003: €65m; 2002: €51m) were paid to the SPH Scheme of which €52m (2003: €42m; 2002: €38m) were paid by the employer, with the balance being met by employees. The estimated employer contributions for 2005 are €52m. Principal schemes: Amounts to be recognised in the statement of total recognised gains and losses (STRGL) under FRS 17 |
||||
| 2004 £m |
2003 £m |
2002 £m |
||||
| Actual return less expected return on pension scheme assets | 541 | 566 | (1,236 | ) | ||
| Experience gains and losses arising on the scheme liabilities | (46 | ) | (108 | ) | (42 | ) |
| Changes in assumptions underlying the present value of the scheme liabilities | (534 | ) | (413 | ) | (378 | ) |
| Past service costs extinguished by non recoverable surplus | – | – | (19 | ) | ||
| Actuarial (loss)/gain | (39 | ) | 45 | (1,675 | ) | |
| Non recoverable surplus at beginning of year | – | – | 503 | |||
| Actuarial (loss)/gain recognised in STRGL | (39 | ) | 45 | (1,172 | ) | |
|
Corus Report & Accounts 2004 123 |
||||
|
|
|
|||
|
Notes to the accounts |
| 32. Pensions and post retirement benefits continued |
| Principal schemes: History of experience gains and losses under FRS 17 | |||||||
| 2004 | 2003 | 2002 | |||||
| Difference between the expected and actual return on scheme assets: | |||||||
| Amounts (£m) | 541 | 566 | (1,236 | ) | |||
| Percentage of scheme assets (%) | 4.5 | 5.0 | (11.9 | ) | |||
| Experience gains and losses on scheme liabilities: | |||||||
| Amount (£m) | (46 | ) | (108 | ) | (42 | ) | |
| Percentage of the present value of the scheme liabilities (%) | 0.4 | 1.0 | 0.4 | ||||
| Total amount recognised in statement of total recognised gains and losses: | |||||||
| Amount (£m) | (39 | ) | 45 | (1,172 | ) | ||
| Percentage of the present value of the scheme liabilities (%) | 0.3 | 0.4 | 11.4 | ||||
| Other schemes | |||||
| Other schemes: Assumptions and investment portfolios | |||||
| 2004 % |
2003 % |
||||
| The major assumptions used by the actuaries were: | |||||
| Rate of increase in pensionable salaries | 2.00 to 4.30 | 2.50 to 4.25 | |||
| Rate of increase in pension payment | 1.50 to 4.00 | 1.50 to 4.00 | |||
| Discount rate | 4.75 to 6.25 | 5.25 to 6.75 | |||
| Inflation assumption | 2.00 to 3.00 | 2.00 to 3.00 | |||
| Equities | Bonds | Property | Other | Total | |||||||
| 2004 | |||||||||||
| Expected long term rates of return (%) | 7.50 to 9.70 | 3.82 to 7.50 | 5.00 to 6.50 | 2.50 to 6.50 | n/a | ||||||
| Market values of investments in the schemes (£m) | 155 | 45 | 3 | 22 | 225 | ||||||
| As a percentage of total plan assets (%) | 68.9 | 20.0 | 1.3 | 9.8 | 100.0 | ||||||
| 2003 | |||||||||||
| Expected long term rates of return (%) | 6.00 to 9.90 | 4.41 to 7.50 | 4.70 to 6.50 | 2.50 to 7.00 | n/a | ||||||
| Market values of investments in the schemes (£m) | 144 | 49 | 4 | 11 | 208 | ||||||
| As a percentage of total plan assets (%) | 69.2 | 23.6 | 1.9 | 5.3 | 100.0 | ||||||
| Other schemes: Profit and loss account note under FRS 17 | |||||
| 2004 £m |
2003 £m |
||||
| Analysis of the amount to be charged to operating profit for the year under FRS 17: | |||||
| Current service cost | 4 | 4 | |||
| Total operating charge | 4 | 4 | |||
| 2004 £m |
2003 £m |
||||
| Analysis of the amount to be charged to other finance income for the year: | |||||
| Expected return on pension scheme assets | 15 | 14 | |||
| Interest cost on pension scheme liabilities | (19 | ) | (19 | ) | |
| Net expense | (4 | ) | (5 | ) | |
| 124 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts |
| 32. Pensions and post retirement benefits continued |
| Other schemes: Balance sheet note under FRS 17 | |||||
| 2004 £m |
2003 £m |
||||
| The following amounts were measured at the year end in accordance with the requirements of FRS 17: | |||||
| Total market value of assets | 225 | 208 | |||
| Present value of scheme liabilities | (356 | ) | (339 | ) | |
| Deficit in the schemes | (131 | ) | (131 | ) | |
| Related deferred tax asset | 47 | 47 | |||
| Net pension liability | (84 | ) | (84 | ) | |
| Of the above net pension liability, £1m (2003: £1m) relates to schemes in surplus and £85m (2003: £85m) relates to schemes in deficit. | |||||
| Other schemes: Movement in net deficit during the year under FRS 17 | |||||
| 2004 £m |
2003 £m |
||||
| Net deficit in schemes at beginning of the year | (131 | ) | (135 | ) | |
| Movement in year: | |||||
| Current service cost | (4 | ) | (4 | ) | |
| Contributions | 15 | 13 | |||
| Other finance expense | (4 | ) | (5 | ) | |
| Actuarial (loss)/gain | (6 | ) | 6 | ||
| Exchange rate movements | (1 | ) | (6 | ) | |
| Net deficit in schemes at end of the year | (131 | ) | (131 | ) | |
| For the ‘other’ schemes the amounts to be recognised in the statement of total recognised gains and losses under FRS 17 were not considered to be material. | |||||
| Principal and other schemes: Combined balance sheet disclosures under FRS 17 | |||||
| 2004 £m |
Restated 2003 £m |
||||
| Net assets | 3,300 | 2,843 | |||
| Adjust for: | |||||
| SSAP 24 prepayments net of deferred tax | (245 | ) | (232 | ) | |
| SSAP 24 provisions net of deferred tax | 117 | 113 | |||
| Net assets excluding SSAP 24 pension assets/liabilities | 3,172 | 2,724 | |||
| FRS 17 net pension (liability)/asset | (30 | ) | 2 | ||
| Net assets including net FRS 17 pension asset | 3,142 | 2,726 | |||
| Profit and loss account reserve | (1,145 | ) | (1,606 | ) | |
| Adjust for: | |||||
| SSAP 24 prepayments net of deferred tax | (245 | ) | (232 | ) | |
| SSAP 24 provisions net of deferred tax | 117 | 113 | |||
| Profit and loss account reserve excluding SSAP 24 pension assets/liabilities | (1,273 | ) | (1,725 | ) | |
| FRS 17 pension reserve | (30 | ) | 2 | ||
| Profit and loss account reserve including FRS 17 pension reserve | (1,303 | ) | (1,723 | ) | |
| US GAAP – BSPS | |||||
| For the purpose of determining annual or periodic pension costs in accordance with US GAAP the Group adopts US Statements of Financial Accounting Standards SFAS 87 ‘Employers’ Accounting for Pensions’ and SFAS 88 ‘Employers’ Accounting for Settlements and Curtailments of Defined Benefit Pension Plans and for Termination Benefits’. For disclosure purposes, the Group adopts SFAS 132 (Revised 2003) ‘Employers’ Disclosures about Pensions and other Post Retirement Benefits’. This statement standardises the disclosure requirements and has no impact upon pensions measurements and recognition. | |||||
|
Corus Report & Accounts 2004 125 |
||||
|
|
|
|||
|
Notes to the accounts |
| 32. Pensions and post retirement benefits continued |
| The components of the BS Scheme’s pension cost under SFAS 87 and SFAS 88 are as follows: | |||||||
| 2004 £m |
2003 £m |
2002 £m |
|||||
| Service cost | 116 | 108 | 139 | ||||
| Interest cost | 403 | 377 | 370 | ||||
| Expected return on scheme assets | (462 | ) | (461 | ) | (560 | ) | |
| Amortisation of gains | – | – | (32 | ) | |||
| Amortisation of prior service cost | 14 | 14 | 14 | ||||
| Amortisation of transition asset | – | – | (2 | ) | |||
| Net benefit cost/(credit) under SFAS 87 and SFAS 88 | 71 | 38 | (71 | ) | |||
| The pension costs for the BS Scheme were determined using the following assumptions: | |||||||
| 2004 | 2003 | 2002 | |||||
| Discount rate | % | 5.50 | 5.50 | 5.00 | |||
| Rate of future pensionable salary increases | % | 4.25 | 4.00 | 4.25 | |||
| Rate of future pension increases | % | 2.50 | 2.25 | 2.50 | |||
| Expected long term rate of return on scheme assets | % | 6.00 | 6.00 | 6.25 | |||
| The defined benefit obligations at the end of the period for the BS Scheme were determined using the following assumptions: | |||||||
| 2004 | 2003 | 2002 | |||||
| Discount rate | % | 5.40 | 5.50 | 5.50 | |||
| Rate of future pensionable salary increases | % | 4.30 | 4.25 | 4.00 | |||
| Rate of future pension increases | % | 2.60 | 2.50 | 2.25 | |||
| Expected long term rate of return on scheme assets | % | 6.00 | 6.00 | 6.00 | |||
| For the BS Scheme the overall expected rate of return on assets is a weighted average of the returns expected from the individual asset categories. The latter are based upon economic and market expectations. | |||||||
| The disclosure requirements for the BS Scheme under SFAS 132 (Revised 2003), as calculated under SFAS 87 and SFAS 88 and measured at the period end date, are as follows: | |||||||
| 2004 £m |
2003 £m |
2002 £m |
|||||
| Change in benefit obligation: | |||||||
| Benefit obligation at beginning of period | 7,532 | 7,056 | 7,591 | ||||
| Service cost | 116 | 108 | 139 | ||||
| Interest cost | 403 | 377 | 370 | ||||
| Employee contributions | 35 | 33 | 29 | ||||
| Actuarial movement | 296 | 378 | (716 | ) | |||
| Scheme amendments | – | – | 19 | ||||
| Benefits paid | (426 | ) | (420 | ) | (376 | ) | |
| Bulk transfer payment | (130 | ) | – | – | |||
| Benefit obligation at end of period | 7,826 | 7,532 | 7,056 | ||||
| Change in scheme assets: | |||||||
| Fair value of scheme assets at beginning of period | 7,825 | 7,380 | 8,071 | ||||
| Actual return on scheme assets | 727 | 820 | (357 | ) | |||
| Employer contributions | 12 | 12 | 13 | ||||
| Employee contributions | 35 | 33 | 29 | ||||
| Benefits paid | (426 | ) | (420 | ) | (376 | ) | |
| Bulk transfer payment | (130 | ) | – | – | |||
| Fair value of scheme assets at end of period | 8,043 | 7,825 | 7,380 | ||||
| Reconciliation of funded status: | |||||||
| Fair value of scheme assets at end of period | 8,043 | 7,825 | 7,380 | ||||
| Projected benefit obligation | (7,826 | ) | (7,532 | ) | (7,056 | ) | |
| Funded status | 217 | 293 | 324 | ||||
| Unrecognised prior service cost | 97 | 111 | 125 | ||||
| Other unrecognised net loss | 64 | 33 | 14 | ||||
| Net amount recognised | 378 | 437 | 463 | ||||
|
126 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts |
| 32.
Pensions and post retirement benefits continued On
adoption of SFAS 87 there was a transition asset of £64m
representing the excess of the market value of the BS Scheme’s
investments over its liabilities in respect of past service (with
full allowance for future salary increases), the projected benefit
obligation. This amount has now been fully recognised. The
BS Scheme’s assets are invested in equities, fixed interest
and index-linked securities and property. The BS Scheme has specifically
invested in a bond portfolio that seeks to match the cash flow
of pension liabilities. The balance of its assets are invested
with the aim of achieving a higher return than that available
from fixed interest investments. |
| US GAAP – CES, SPH and CNG Schemes | |||||||
| The combined components of the CES, SPH and CNG Schemes’ pension cost under SFAS 87 and SFAS 88 are as follows: | |||||||
| 2004 £m |
2003 £m |
2002 £m |
|||||
| Service cost | 34 | 34 | 40 | ||||
| Termination benefit | – | 1 | 21 | ||||
| Interest cost | 193 | 187 | 163 | ||||
| Expected return on scheme assets | (207 | ) | (208 | ) | (199 | ) | |
| Amortisation of gains | – | – | (17 | ) | |||
| Amortisation of prior service cost | 5 | 5 | 4 | ||||
| Amortisation of transition liability | 2 | 2 | 2 | ||||
| Net benefit cost under SFAS 87 and SFAS 88 | 27 | 21 | 14 | ||||
| The pension costs for the CES, SPH and CNG Schemes were determined using the following assumptions: | |||||||
| 2004 | 2003 | 2002 | |||||
| Discount rate | % | 5.50 | 5.50 | 5.00 to 6.00 | |||
| Rate of future pensionable salary increases | % | 2.50 to 3.50 | 2.75 to 3.25 | 2.00 to 4.25 | |||
| Rate of future pension increases | % | 1.80 to 2.50 | 2.00 to 2.50 | 2.00 to 2.50 | |||
| Expected long term rate of return on scheme assets | % | 6.00 to 6.43 | 6.25 to 6.30 | 6.00 to 6.25 | |||
Pensions in payment and deferred pensions for the SPH Scheme have been valued at a net 3.50% discount rate (2003: 4.0%; 2002: 4.0%). For the CES and SPH Schemes the overall expected long term rate of return on assets is a weighted average of the returns expected from the individual asset categories. The latter are based upon economic and market expectations. The combined defined benefit obligations at the end of the period for the CES, SPH and CNG Schemes were determined using the following assumptions: |
| 2004 | 2003 | 2002 | |||||
| Discount rate | % | 4.75 to 5.40 | 5.50 | 5.50 | |||
| Rate of future pensionable salary increases | % | 2.50 to 3.60 | 2.50 to 3.50 | 2.75 to 3.25 | |||
| Rate of future pension increases | % | 1.80 to 2.60 | 1.80 to 2.50 | 2.00 to 2.50 | |||
| Expected long term rate of return on scheme assets | % | 5.50 to 6.16 | 6.00 to 6.43 | 6.25 to 6.30 |
Pensions in payment and deferred pensions for the SPH Scheme have been valued at a net 2.75% discount rate (2003: 3.5%; 2002: 4.00%). The expected funding strain on the CES Scheme, arising as a direct consequence of the UK restructuring programme announced in April 2003, is £17m as measured on the SFAS 87 and SFAS 88 assumptions. This amount was provided in the 2003 consolidated profit and loss account (under UK GAAP this was treated as a restructuring and impairment cost in the prior period) and has not been shown as a termination benefit under SFAS 87 and SFAS 88. The full cost of the funding strain is being met by Corus. |
|
Corus Report & Accounts 2004 127 |
||||
|
|
|
|||
|
Notes to the accounts |
32. Pensions and post retirement benefits continued The disclosure requirements for the CES, SPH and CNG Schemes under SFAS 132 (Revised 2003), as calculated under SFAS 87 and SFAS 88 and measured at the period end date, are as follows: |
2004 £m |
2003 £m |
2002 £m |
||||
| Change in benefit obligation: | ||||||
| Benefit obligation at beginning of period | 3,659 | 3,263 | 2,900 | |||
| Service cost | 34 | 34 | 40 | |||
| Termination benefit | – | 1 | 21 | |||
| Interest cost | 193 | 187 | 163 | |||
| Employee contributions | 23 | 16 | 11 | |||
| Actuarial movement | 296 | 114 | 125 | |||
| Exchange rate movements | 31 | 218 | 154 | |||
| Benefits paid | (180 | ) | (174 | ) | (151 | ) |
| Benefit obligation at end of period | 4,056 | 3,659 | 3,263 | |||
| Change in scheme assets: | ||||||
| Fair value of scheme assets at beginning of period | 3,496 | 3,015 | 3,184 | |||
| Actual return on scheme assets | 485 | 376 | (230 | ) | ||
| Employer contributions | 50 | 45 | 33 | |||
| Employee contributions | 23 | 16 | 11 | |||
| Exchange rate movements | 31 | 218 | 168 | |||
| Benefits paid | (180 | ) | (174 | ) | (151 | ) |
| Fair value of scheme assets at end of period | 3,905 | 3,496 | 3,015 | |||
| Reconciliation of funded status: | ||||||
| Fair value of scheme assets at end of period | 3,905 | 3,496 | 3,015 | |||
| Projected benefit obligation | (4,056 | ) | (3,659 | ) | (3,263 | ) |
| Funded status | (151 | ) | (163 | ) | (248 | ) |
| Unrecognised net loss at date of initial application of SFAS 87 | 7 | 9 | 11 | |||
| Unrecognised prior service cost | 53 | 57 | 57 | |||
| Other unrecognised net loss | 169 | 151 | 198 | |||
| Net amount recognised | 78 | 54 | 18 | |||
| Of which: | ||||||
| Prepaid pension cost | 277 | 255 | 215 | |||
| Accrued benefit liability (excluding additional minimum liability) | (199 | ) | (201 | ) | (197 | ) |
| Net amount recognised | 78 | 54 | 18 | |||
| Amounts recognised in the statement of financial position consist of: | ||||||
| Accrued benefit liability (including additional minimum liability) | (259 | ) | (258 | ) | (275 | ) |
| Intangible asset | 7 | 9 | 11 | |||
| Accumulated other comprehensive income | 53 | 48 | 67 | |||
| Accrued benefit liability (excluding additional minimum liability) | (199 | ) | (201 | ) | (197 | ) |
For the CES, SPH and CNG Schemes the end of period ABO totalled £3,747m (2003: £3,361m; 2002: £2,945m). The CES Scheme represented £692m of this balance, exceeding the fair value of plan assets of this scheme, which were £538m (2003: £504m; 2002: £450m). In each of the years presented above Corus has recognised a minimum pension liability. US GAAP requires the employer to recognise an additional minimum pension liability to the extent that the ABO exceeds the fair value of the plan assets and this shortfall is not covered by the pension liability already recognised in the balance sheet. This results in a charge to other accumulated comprehensive income equal to the additional minimum pension liability but adjusted to take account of the intangible asset, which represents the unrecognised transition obligation. Investment strategies for the CES and SPH Schemes are generally set by their respective trustees, after taking advice from their investment advisers. The strategies are reviewed periodically and reflect the funding position of the schemes, and an assessment of the risks inherent over the long term in various asset classes. In order to reduce risk, the assets of the schemes are diversified by asset class and by geography. |
||||||
128 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Notes to the accounts |
| 32. Pensions and post retirement benefits continued |
| The benefit payments relating to the BSPS, CES, SPH and CNG Schemes, which reflect future service as appropriate, are expected to be paid as follows: |
| £m | ||
| 2005 | 642 | |
| 2006 | 641 | |
| 2007 | 656 | |
| 2008 | 673 | |
| 2009 | 693 | |
| 2010-2014 | 3,722 |
33. Emoluments of directors Details of directors’ emoluments and share options are given in the auditable sections of the Report on remuneration as defined on page 80. 34. Acquisitions On 16 December 2004, the Group acquired the remaining 50% share in the joint venture Segal SA for €25m (approximately £17m). All consideration, which was for settlement in cash and unconditional, was paid in the period. Only the increase in stake has been accounted for using acquisition accounting principles (see Presentation of accounts and accounting policies Note II). This is allowable under FRS 2 ‘Subsidiary undertakings’ and considered appropriate to give a true and fair view since the original tranche of investment was made prior to the formation of Corus. After taking account of a fair value increase to the carrying value of tangible fixed assets of £6m, total goodwill arising was £6m. This included a net book value of £3m reclassified from interests in joint ventures and associated undertakings during the period. The acquisition did not have a material impact on the results or operational cash flow for the period. 35. Disposals During the period Corus sold two North American service centre businesses, Corus Coil Products and Corus Metals, along with the downstream manufacturing business Corus Metal Profiles. These comprised the trade and assets of Corus CIC Inc and Corus Metals Inc. The sale of Corus Metal Profiles was completed on 9 January 2004 for CAD$23m (approximately £10m) and the sale of Corus Coil Products, Corus Metals and Corus Metals Inc was completed on 12 March 2004 for CAD$44m (approximately £20m). In addition Corus concluded the sale of the main trade and assets of Tuscaloosa Steel Corporation Inc, a US mini-mill producer of a wide range of plate products, to Nucor Corporation on 17 July 2004 for a gross consideration of US$90m (approximately £49m). Furthermore, on 30 April 2004 Corus completed the sale of its sheet piling commercial operations to Arcelor for proceeds of £26m, leading to its withdrawal from that product range. The results of these businesses during the period were not considered to be material to the Group. |
| £m | ||
| The net assets disposed of were as follows: | ||
| Tangible fixed assets | 13 | |
| Stocks | 34 | |
| Debtors | 34 | |
| Creditors | (24 | ) |
| Net assets disposed of | 57 | |
| Goodwill reinstated on disposal | 10 | |
| Profit on disposal | 34 | |
| Consideration | 101 | |
| Consideration satisfied by: | ||
| Cash | 99 | |
| Transaction fees | (4 | ) |
| Net cash received in period | 95 | |
| Deferred cash consideration | 6 | |
| 101 | ||
| The deferred cash consideration is due to be received in April 2005. |
| Corus Report & Accounts 2004 129 |
||||
|
|
|
|||
| Notes to the accounts |
| 36. Post balance sheet events | ||
| (i) | On 16 December 2004, Corus announced that it had signed a 10 year off-take agreement to supply slab from the Teesside Cast Products (TCP) business to a consortium of re-rolling companies. The consortium includes Duferco International Investment Holdings (Guernsey) Limited, Marcegaglia SpA, Grupo Imsa SA and also Dongkuk Steel Co, who subsequently took up its option to join the consortium on 5 January 2005. | |
| The agreement is effective from 2 January 2005 and under its terms the consortium will take, at cost, slab production from TCP in 2005 and 2006 that is surplus to Corus’ internal requirements, and approximately 78% of output thereafter. As consideration, Corus will receive US$157m (approximately £82m), comprising of a US$73m upfront payment in 2005/06 with a further US$84m in deferred payments over the life of the contract. In addition, the consortium members will contribute approximately 76% of the expected capital expenditure requirements of TCP to enable identified improvements to be implemented. | ||
| (ii) | On 17 February 2005 Corus announced a major investment of £130m at Scunthorpe, one of its main steelmaking sites in the UK. This strategic investment will strengthen the Company’s competitive position in the structural sections, rail and wire rod markets by improving operational efficiency, product range and customer service. The investment is expected to be fully complete by August 2007 and includes: | |
| • | Installing a new steel casting machine to replace an existing caster and intermediate rolling mill, with associated quality and efficiency improvements. | |
| • | Establishing a world class rail production facility at the existing section mill, and an on-site service centre to improve customer service and offer longer rail lengths, up to 120 metres, in response to market demands. | |
| • | Developing the rod and section mills to enhance rolling capability, flexibility, quality and service to customers. | |
| After investigating a number of options, including investment to produce longer rail at Workington, it was concluded that the Scunthorpe development represented the solution that would maximise business potential in this sector. As a consequence, Corus proposes to transfer rail production from its current UK manufacturing facility at Workington in 2006. During the consultation period with Trade Unions, Corus will examine alternative long term options for the site. | ||
| (iii) | On 24 February 2005 Corus announced that it had signed a new €800m banking facility with a consortium of relationship banks, replacing the existing facility (see Note 20) on more favourable terms and with a reduced security package. The new revolving facility has a final maturity date of 31 December 2008 and provides committed bank financing for general corporate purposes and working capital requirements. The principal terms of the new syndicated facility include: | |
| • | The facility has two tranches (a €700m facility available to Corus and Corus Nederland BV, and a further €100m for Corus Nederland BV only). | |
| • | The €700m facility will reduce by an amount up to €100m on 1 January 2008, less any prior reductions, and will not be required to be reduced below €550m. | |
| • | Fixed security over shares in Corus Nederland BV and its UK holding companies and a floating charge over the assets of Corus Group plc (but excluding its shares in Corus UK Limited). Unlike the existing facility, the banks participating in the new facility will not have any security over the shares and assets of Corus UK Limited or Corus Finance plc. | |
| Covenants (under existing GAAP): | ||
| • | Group EBITDA/net interest cover and Corus Nederland Group EBITDA/Corus Nederland Group net interest cover shall not be less than: 3.5 times until the end of December 2006; 4 times until the end of 2007; and, 4.5 times until the end of December 2008. | |
| • | Group consolidated net tangible worth (after allowing for impairment/restructuring costs) shall not be less than £2,500m until the end of 2006; £2,750m until the end of 2007; and £3,000m until the end of 2008. Corus Nederland Group consolidated net tangible worth shall not be less than €2,000m. | |
| • | Dividends of up to 50% of consolidated net income (prior to exceptional items) are permitted, subject to Group EBITDA/net interest cover of at least 4.5 times. | |
| • | Group gearing (net debt/net tangible worth, after allowing for impairment/restructuring costs) shall not exceed 65% until the end of June 2005; 60% until the end of December 2007; and 55% until the end of December 2008. Corus Nederland Group gearing shall not exceed 35% until the end of December 2008. | |
|
130 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts |
| 37. Main subsidiaries and investments |
The most important subsidiary undertakings, joint ventures and associated undertakings of the Group at 1 January 2005 are set out below. A complete list of subsidiary undertakings, joint ventures and associated undertakings will be attached to the Annual Return to the Registrar of Companies. Country names are countries of incorporation. Undertakings operate principally in their country of incorporation except where otherwise stated. Subsidiary undertakings Steel and aluminium producing, further processing or related activities: |
| England
and Wales Austria Belgium Canada China Czech
Republic Denmark Finland France Germany |
Hong
Kong Hungary Ireland
(Republic of) Italy Japan Latvia Netherlands New
Zealand Norway Poland Portugal |
|
| Corus Report & Accounts 2004 131 |
||||
|
|
|
|||
|
Notes to the accounts |
| 37. Main subsidiaries and investments continued | ||
Singapore Spain
Sweden
Switzerland
Thailand
Turkey
United
Arab Emirates |
USA Apollo Metals Limited Corus America Inc Rafferty-Brown North Carolina Co Thomas Steel Strip Corp Insurance
underwriting for certain risks of the Group: Other
undertakings:
|
| Joint ventures | |||
| Steel processing or related activities: | |||
| Issued
capital Number of shares |
% held |
||
| England and Wales | |||
| Caparo Merchant Bar plc (b) | ordinary shares of £1 | 2,466,667 | 25 |
| GrantRail Limited (b) | ordinary shares of £1 | 4,000,000 | 50 |
| Netherlands | |||
| HKS Scrap Metals BV (b) | shares of €454 | 40,000 | 50 |
| Laura Metaal Holding BV (b) | shares of €454 | 5,600 | 49 |
| Norway | |||
| Norsk Stål AS | shares of NOK1,000 | 63,500 | 50 |
| Norsk Stål Tynnplater AS | shares of NOK1,000 | 26,500 | 50 |
| Portugal | |||
| Lusosider Projectos Siderúrgicos SA (b) | shares of €5 | 3,500,000 | 50 |
| Turkey | |||
| Corus Celik Ticaret AS | shares of YTL1 | 80,000 | 50 |
Unless indicated otherwise, subsidiary undertakings are wholly owned within the Group, and the Group holding comprises ordinary shares and 100% of the voting rights. |
| (a) | The Company only owns shares directly in those marked (a) (Corus UK Limited 100%). All other undertakings are owned by other subsidiaries of the Company. |
| (b) | Accounts of undertakings marked (b) are not audited by PricewaterhouseCoopers LLP. |
| (c) | Corus Nederland BV and each of its subsidiaries have prepared accounts to 31 December 2004 for inclusion in these Group accounts, in accordance with their local statutory requirements. Where appropriate adjustments have been made on consolidation for any material differences arising in the period between 31 December 2004 and 1 January 2005. |
|
132 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
Notes to the accounts |
38. Supplementary information for North American investors The Group prepares its accounts in accordance with generally accepted accounting principles (GAAP) applicable in the UK which differ in certain significant respects from those applicable in the USA. These differences and the adjustments necessary to restate the profit/(loss) for the financial period and shareholders’ equity in accordance with US GAAP are shown in the tables set out below. |
| 2004 £m |
2003 £m |
2002 £m |
||||
| Profit/(loss) for financial period | ||||||
| Profit/(loss) attributable to shareholders – UK GAAP | 446 | (305 | ) | (458 | ) | |
| Adjustments: | ||||||
| Amortisation of goodwill (i), (vi) | 4 | 7 | 9 | |||
| Impairment of US GAAP goodwill on adoption of SFAS 142 | ||||||
| (net of release of negative goodwill) (i), (xiii) | – | – | (22 | ) | ||
| Interest costs capitalised (ii) | 23 | 8 | 6 | |||
| Depreciation of capitalised interest (ii) | (19 | ) | (26 | ) | (18 | ) |
| Software costs (iii) | 18 | – | – | |||
| Pension costs (iv) | (40 | ) | (2 | ) | 95 | |
| Stock-based employee compensation awards (v) | (4 | ) | (13 | ) | (15 | ) |
| Disposal of group undertakings (vii) | 10 | – | 123 | |||
| Deferred taxation (viii) | 4 | (7 | ) | 29 | ||
| Accelerated depreciation (ix) | (72 | ) | (57 | ) | (151 | ) |
| Profit on commodity derivatives (x) | 1 | 42 | 22 | |||
| (Loss)/profit on foreign currency derivatives (x) | (18 | ) | 3 | 5 | ||
| Profit on disposal of fixed assets (xi) | 2 | (6 | ) | (23 | ) | |
| Debt issue costs (xiv) | (11 | ) | 11 | – | ||
| Profit/(loss) for financial period – US GAAP | 344 | (345 | ) | (398 | ) | |
| Profit/(loss) for financial period arising from: | ||||||
| Continuing operations | 293 | (242 | ) | (391 | ) | |
| Discontinued operations | 51 | (103 | ) | (7 | ) | |
| 344 | (345 | ) | (398 | ) | ||
| Basic earnings per ADS in accordance with US GAAP: | ||||||
| Continuing operations | £0.66 | £(0.74 | ) | £(1.15 | ) | |
| Discontinued operations | £0.11 | £(0.31 | ) | £(0.02 | ) | |
| Cumulative effect of adoption of SFAS 142, net of tax | – | – | £(0.07 | ) | ||
| £0.77 | £(1.05 | ) | £(1.24 | ) | ||
| Diluted earnings per ADS in accordance with US GAAP: | ||||||
| Continuing operations | £0.61 | £(0.74 | ) | £(1.15 | ) | |
| Discontinued operations | £0.11 | £(0.31 | ) | £(0.02 | ) | |
| Cumulative effect of adoption of SFAS 142, net of tax | – | – | £(0.07 | ) | ||
| £0.72 | £(1.05 | ) | £(1.24 | ) | ||
| No. m | No. m | No. m | ||||
| Weighted average number of ADSs in issue | 444 | 330 | 322 | |||
| Effect of potential conversion of convertible bonds (Note 10) | 33 | 33 | 33 | |||
| Effect of unamortised cost under SFAS 123 | 5 | – | – | |||
| Number of ADSs as basis of calculation of diluted earnings per ADS | 482 | 363 | 355 |
During 2004 options over 96m Corus Group plc ordinary shares (2003: 131m; 2002: 65m) were anti-dilutive and have been excluded from the calculation of diluted earnings per ADS. |
| Corus Report & Accounts 2004 133 |
||||
|
|
|
|||
Notes to the accounts |
| 38. Supplementary information for North American investors continued | ||||
2004 £m |
Restated 2003 £m |
|||
| Shareholders’ equity | ||||
| Shareholders’ equity – UK GAAP | 3,258 | 2,796 | ||
| Adjustments: | ||||
| Additional goodwill under US GAAP (i) | 16 | 13 | ||
| Interest costs capitalised (net of depreciation) (ii) | 102 | 98 | ||
| Software costs (iii) | 18 | – | ||
| Pension costs (iv) | 267 | 312 | ||
| Purchase consideration (vi) | (25 | ) | (26 | ) |
| Deferred taxation (viii) | (136 | ) | (142 | ) |
| Accelerated depreciation (ix) | 26 | 98 | ||
| Assets for derivatives (x) | 26 | 43 | ||
| Deferred profits on fixed asset disposals (xi) | (27 | ) | (29 | ) |
| Debt issue costs (xiv) | – | 11 | ||
| Shareholders’ equity in accordance with US GAAP | 3,525 | 3,174 | ||
| Shareholders’ equity relating to: | ||||
| Continuing operations | 3,525 | 3,105 | ||
| Discontinued operations | – | 69 | ||
| 3,525 | 3,174 | |||
| Consolidated statement of cash flows | ||||
| Under UK GAAP, cash flows are classified under operating activities, returns on investments and servicing of finance, tax paid, capital expenditure and financial investment, acquisitions and disposals, equity dividends paid, management of liquid resources and financing. Under US GAAP, cash flows are classified under operating activities, investing activities and financing activities. Under UK GAAP, cash is defined as cash in hand and deposits repayable on demand, less overdrafts repayable on demand. Under US GAAP, cash and cash equivalents are defined as cash and investments with original maturities of three months or less. The statement below shows the adjustments to be made to the UK GAAP cash flow statement to reclassify it to comply with US GAAP. | ||||
2004
£m |
2003
£m |
2002
£m |
||||
| Net cash inflow from operating activities in accordance with UK GAAP | 568 | 224 | 41 | |||
| Proceeds from securitisation (Note 16) (xii) | (60 | ) | (34 | ) | (181 | ) |
| Dividends from joint ventures and associated undertakings | 4 | 4 | 8 | |||
| Returns on investments and servicing of finance, net of issue costs | (95 | ) | (103 | ) | (83 | ) |
| Tax paid | (93 | ) | (50 | ) | (14 | ) |
| Net cash provided by/(used in) operating activities in accordance with US GAAP | 324 | 41 | (229 | ) | ||
| Capital expenditure and financial investment | (282 | ) | (81 | ) | (57 | ) |
| Acquisitions and disposals | 81 | (20 | ) | 445 | ||
| Net (purchase)/sale of other short term investments | (5 | ) | (5 | ) | 7 | |
| Net cash (used in)/provided by investing activities | (206 | ) | (106 | ) | 395 | |
| Net cash inflow/(outflow) from financing activities | 55 | 148 | (263 | ) | ||
| Proceeds from securitisation (Note 16) (xii) | 60 | 34 | 181 | |||
| (Decrease)/increase in short term borrowings | (2 | ) | (2 | ) | 9 | |
| Issue costs of new loans | (15 | ) | (16 | ) | (4 | ) |
| Equity dividends paid | – | – | – | |||
| Net cash provided by/(used) in financing activities in accordance with US GAAP | 98 | 164 | (77 | ) | ||
| Exchange translation effects | (1 | ) | 6 | 3 | ||
| Net increase in cash and cash equivalents in accordance with US GAAP | 215 | 105 | 92 | |||
| Cash and cash equivalents at beginning of period | 374 | 269 | 177 | |||
| Cash and cash equivalents at end of period | 589 | 374 | 269 | |||
| Cash and cash equivalents are: | ||||||
| Cash at bank and in hand | 383 | 242 | 230 | |||
| Deposits within 3 months of maturity when acquired (Note 17) | 206 | 132 | 39 | |||
| 589 | 374 | 269 | ||||
|
134 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Notes to the accounts |
38.
Supplementary information for North American investors continued Use of estimates The preparation of financial statements to conform with generally accepted accounting principles requires management to make significant estimates and assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. The most significant techniques for estimation are discussed in the Presentation of accounts and accounting policies on pages 89 to 91. Comprehensive income In June 1997, the US Financial Accounting Standards Board issued SFAS 130 ‘Reporting Comprehensive Income’. The standard establishes requirements for the reporting of comprehensive income and its components (revenue, expenses, gains and losses) in a full set of general purpose financial statements. Components of comprehensive income for the Group include profit/(loss) for the financial year and foreign currency translation gains and losses. Information regarding the Group’s foreign currency translation gains and losses is included in the statement of total recognised gains and losses under UK GAAP on page 86. |
| Summary of differences between UK and US generally accepted accounting principles | |
| (i) | Goodwill |
| Under UK GAAP, on all acquisitions completed prior to 1 April 1998, Corus immediately wrote off any positive or negative goodwill to retained earnings. This goodwill is reflected in the income statement of the period of any subsequent divestment, as part of the calculation of the profit or loss on disposal. From 1 April 1998, goodwill on acquisitions is held as an intangible asset in the balance sheet and amortised over its estimated useful life. Only the unamortised portion is included in the gain or loss recognised in the period of disposal. | |
| However Corus applies SFAS 142 ‘Goodwill and Other Intangible Fixed Assets’ for US GAAP purposes. This standard does not allow the amortisation of goodwill. Instead, impairment reviews must be carried out at least annually to assess the recoverability of indefinite-lived intangible assets and goodwill. At the date of transition to SFAS 142, being 30 December 2001, all goodwill in the US GAAP balance sheet was reviewed for impairment. This gave rise to a charge of £99m which is shown as a cumulative effect upon adoption of the standard in 2002. The charge largely related to the original acquisition of C Walker & Sons (Holdings) Limited, which is now integrated as part of the Corus distribution and stockholding business. From 30 December 2001 any goodwill amortisation charged under UK GAAP is added back to arrive at US GAAP earnings. However, any impairments would reflect the higher carrying value of goodwill in the US GAAP balance sheet. During 2004, reducing the goodwill amortisation charge increases US GAAP earnings by £8m (2003: £7m). But impairment charges were £5m higher (2003: £nil). | |
| During the 2002 period Corus charged £28m to earnings under US GAAP, for impairments of goodwill, mainly on its investment in Kienle & Spiess. A further charge of £1m was made in 2003, to reflect impairment of goodwill on certain distribution businesses within central Europe. In the current period a number of further impairments have been made, as follows: | |
|
|
| All of these charges have been based on discounted cash flows for the businesses involved, after a review of trading conditions in which they are operating. | |
Strip
Products
£m |
Long
Products
£m |
Distribution
&
Building
Systems
£m |
Aluminium
£m |
Total
£m |
|||||||
| The movements in the net book value of goodwill, by division, are: | |||||||||||
| Net book value at 28 December 2002 | 41 | 11 | 19 | 12 | 83 | ||||||
| Impairments in year | – | – | (1 | ) | – | (1 | ) | ||||
| Net book value at 3 January 2004 | 41 | 11 | 18 | 12 | 82 | ||||||
| Additions during year (Note 11) | 6 | – | – | – | 6 | ||||||
| Impairments in year | (11 | ) | (11 | ) | – | (2 | ) | (24 | ) | ||
| Net book value at 1 January 2005 | 36 | – | 18 | 10 | 64 | ||||||
| Represented by: | |||||||||||
| Goodwill under UK GAAP (Note 11) | 73 | ||||||||||
| Amortisation not charged under US GAAP | 16 | ||||||||||
| Purchase consideration (vi) | (25 | ) | |||||||||
| 64 | |||||||||||
|
Corus Report & Accounts 2004 135 |
||||
|
|
|
|||
Notes to the accounts |
| 38. Supplementary information for North American investors continued | |
| (ii) | Capitalisation of interest costs |
| Under UK GAAP, Corus does not capitalise interest in its financial statements. However, for US GAAP reporting, the estimated amount of interest incurred in connection with the financing of expenditure for major capital projects is included within fixed assets. This interest is then depreciated over the lives of the related assets. | |
| (iii) | Software costs |
| Under UK GAAP as applied by Corus, certain costs relating to the development and purchase of software for internal use are expensed when incurred. Whereas under US GAAP these costs are capitalised and subsequently amortised over the estimated useful life of the software in line with Statement of Financial Position 98-1 ‘Accounting for the Costs of Computer Software Developed or Obtained for Internal Use’. During 2004 several IT projects met the criteria for capitalisation under US GAAP. | |
| (iv) | Pension costs |
| Under both UK GAAP and US GAAP pension costs are charged to earnings so as to reflect the provision for future pension liabilities. There are differences in the method of calculating these charges and the valuation of any pension asset or liability to be included in the balance sheet. Therefore, a reconciling item from UK to US GAAP earnings is necessary to reflect these differences. | |
| In detail, under UK GAAP the expected cost of providing pension benefits is charged to earnings so as to spread the cost over the expected average remaining service lives of employees. Under US GAAP the pension charge is based on the estimated cost of benefits accruing in the period (as adjusted to reflect any surplus or deficit in the scheme at the date of adopting SFAS 87). However this charge is adjusted to reflect the cost of benefit improvements and any surplus or deficit that emerges as a result of actuarial assumptions being different from actual values. Only those surpluses or deficits falling outside a 10% ‘corridor’ are recognised. | |
| In 2004 and 2003, Corus has recognised a minimum pension liability within US GAAP shareholders’ equity. US GAAP requires the employer to recognise an additional minimum pension liability to the extent that the accumulated benefit obligation exceeds the fair value of the plan assets and this shortfall is not covered by the pension liability already recorded in the balance sheet. This results in a charge to other comprehensive income equal to the minimum pension liability but adjusted to take account of an intangible asset which represents the unrecognised transition obligation. | |
| (v) | Stock-based employee compensation awards |
| Under UK GAAP Corus only recognises the compensation cost of employee share option schemes where the grant price is different to the fair value of the shares at the date of the grant. Corus has elected to adopt the provisions of SFAS 123 in accounting for its stock-based employee compensation awards. SFAS 123 requires a fair value based method of accounting for stock-based employee awards for transactions entered into after 15 December 1994. For the purpose of compliance with US GAAP the fair value of employee share option awards has been estimated using the Black-Scholes option pricing model and the following weighted average assumptions were used: | |
| 2004 | 2003 | 2002 | |||||
| Risk free interest rate | 4.6 | % |
3.8 | % |
n/a | ||
| Expected life | 3 years | 4 years | n/a | ||||
| Expected volatility | 46 | % |
60 | % |
n/a | ||
| Dividend yield | 4.45 | % |
4.45 | % |
n/a | ||
| Weighted average fair values of options granted in the period | £ 0.16 | £ 0.06 | n/a | ||||
| In 2004 the Company introduced a new share based, long term incentive arrangement known as the Leveraged Equity Acquisition Plan (LEAP). The fair value of LEAP awards has been estimated using a model which incorporates the impact of the Total Shareholder Return performance condition, including the dependency between the number of awards vesting (equivalent to the Company’s Total Shareholder Return against its comparator group) and the share price at date of vesting. The following assumptions were used: | |||||||
2004 |
|||
| Risk free interest rate | 4.8 |
% | |
| Expected life | 3
years |
||
| Expected volatility | 53 |
% | |
| Expected correlation between each pair of shares in the comparator group | 11.1 |
% | |
| Dividend yield | 4.45 |
% | |
| Weighted average fair value of awards granted in the period | £
0.46 |
||
|
136 Corus Report & Accounts 2004 |
||||
|
|
|
|||
Notes to the accounts |
| 38. Supplementary information for North American investors continued | ||
| (vi) | Purchase consideration | |
| Under UK GAAP the fair value of the shares offered as consideration for the acquisition of Corus Nederland BV was determined by reference to the market price of the Group shares on the date the offer became unconditional, 6 October 1999. Under US GAAP the fair value of these shares was based on the market price of the shares when the principal terms of the acquisition were announced, 7 June 1999. This difference resulted in a lower purchase consideration under US GAAP which means the recognised capital issued and goodwill on the Corus Nederland BV acquisition is lower. During the period £1m of this balance has been amortised to reflect impairment to the goodwill attributable to the European smelter operations (see (ix)). |
||
| (vii) | Disposal of group undertakings | |
| On 23 January 2001, AvestaPolarit Oyj Abp was created by the merger of the Corus subsidiary Avesta Sheffield AB (publ) and the stainless steel activities of Outokumpu Oyj. Under UK GAAP this combination was treated as an exchange of shares, with AvestaPolarit Oyj Abp becoming an associated undertaking. Under US GAAP the transaction would have been treated as a disposal of a subsidiary followed by a separate acquisition of an associate. | ||
| During 2002 the investment in AvestaPolarit Oyj Abp was sold. Under UK GAAP the unamortised element of any goodwill arising on the formation of the associate was charged against earnings as part of the loss on disposal. In addition any goodwill previously written off directly to reserves in respect of the investment in AvestaPolarit Oyj Abp was also charged against the loss on disposal. Under US GAAP these balances of goodwill had previously been dealt with as part of the original disposal of the subsidiary investment in Avesta Sheffield AB (publ). Therefore they were added back to UK GAAP earnings in 2002 as part of the US GAAP reconciliation. | ||
| During the current period Corus sold the trade and assets of its mini-mill operation in Tuscaloosa (see Note 35). Under UK GAAP goodwill of £10m was charged against the disposal proceeds, representing amounts previously written off to reserves prior to 1 April 1998 (see (i)). Under US GAAP this goodwill has previously been amortised through earnings and therefore would not have been charged against the disposal. | ||
| (viii) | Deferred taxation | |
| Following the adoption of FRS 19 ‘Deferred Tax’ under UK GAAP by Corus in the period to 29 December 2001, the treatment of deferred tax under UK and US GAAP is more similar than in prior periods. However Corus has chosen to discount deferred tax balances under UK GAAP. Discounting is prohibited for US reporting. The remaining differences on deferred taxation mainly relate to the taxation effects of all the other US GAAP adjustments. | ||
| (ix) | Accelerated depreciation | |
| Under UK GAAP if there is an indication of impairment then relevant assets should be tested for impairment and if necessary written down to their value in use. The value in use is calculated based on discounted future pre-tax cash flows related to the asset or the income-generating unit to which the asset belongs. US GAAP assesses whether impairment is necessary based on undiscounted cash flows. An impairment loss exists if the sum of these cash flows is less than the carrying value of the assets. The impairment loss is measured as the difference between fair value based on discounted cash flows and carrying value of the assets. | ||
| During the period to 30 December 2000 the Group made a number of significant impairments in their UK GAAP results. These impairments arose following a strategic review by Corus of its UK carbon steel activities. This review proposed a reduction of over 3mt per annum in UK flat products. In determining the impairment charges, future cash flows for the income-generating units holding these assets were discounted at the Group’s weighted average cost of capital as adjusted for specific risks of the income-generating units. The cash flows used covered a period equivalent to the average remaining lives of the fixed assets to provide an estimate of their value in use. Certain of these impairment charges did not meet the undiscounted cash flow test required by US GAAP. Therefore the impairments would not be recognised in the US GAAP shareholders’ equity. However, additional depreciation of £4m (2003: £8m; 2002: £20m) on these assets would continue to be charged to US GAAP earnings. | ||
| The impairments made in 2000 that were allowed under US GAAP totalled £263m and were largely related to the following carbon steel assets at the UK locations shown: | ||
| • | Llanwern: the closure of the iron and steelmaking operations, the closure of the annealing and tempering facilities and a reduction in activity at the hot strip mill and cold mill operations; |
|
| • | Ebbw Vale: site closure; | |
| • | Shotton: the closure of the pickle line, cold mill and one electro-zinc line; | |
| • | Teesside: the closure of the coil plate mill; and | |
| • | Bryngwyn: site closure. | |
| In addition to the impairment charges for UK assets, at December 2000 the Group provided £67m of accelerated depreciation for the write down of direct reduced iron facilities in Mobile, USA, following a decision to mothball the plant. | ||
| Following the 2000 impairments, reviews of the value in use of fixed assets of the UK steel production and processing related income-generating units affected by this restructuring have been performed annually, to comply with the requirements of UK GAAP. Continuing losses meant that the impairment reviews in 2002 gave rise to additional charges of £206m under US GAAP, of which £89m had been recognised under UK GAAP in 2002 and £117m as at 30 December 2000. Subsequently in 2003 impairment reviews gave rise to a charge of £81m in respect of the Group’s mini-mill operation in Tuscaloosa, USA. Of this | ||
|
Corus Report & Accounts 2003 137 |
||||
|
|
|
|||
Notes to the accounts |
| 38. Supplementary information for North American investors continued | |
| charge £23m was recognised under UK GAAP in 2003 and £58m as at December 2000. This mini-mill operation was sold on 17 July 2004, and the impairment provisions released against the disposal proceeds for the related assets. | |
| During the current period, the Group has recognised an impairment in use of £38m for the fixed assets associated with its aluminium smelting operations in Europe, following losses associated at least in part with high energy costs. Furthermore charges of £14m have been made against those assets affected by the transfer of UK rail production to Scunthorpe from its current manufacturing facility at Workington (see Note 36). | |
| UK GAAP allows the reversal of an impairment loss where the recoverable amount increases due to a change in economic conditions or in the expected use of an asset. Such reversals are prohibited under US GAAP. In the current period £68m (2003: £4m; 2002: £14m) of previously recognised impairment charges have been credited to UK GAAP earnings. This credit has been reversed in the US GAAP reconciliation. During the current period the UK GAAP credit included a reversal of the existing impairment provisions of £65m against the fixed assets at Teesside. | |
| The adjustment in arriving at the US GAAP shareholders’ equity may be analysed as follows: | |
2004 £m |
2003 £m |
||||
| UK GAAP impairment provisions not meeting the undiscounted criteria | 137 | 137 | |||
| Additional depreciation under US GAAP on these assets | (25 | ) | (21 | ) | |
| Reversal of prior period impairment losses, not allowed under US GAAP | (86 | ) | (18 | ) | |
| 26 | 98 |
| (x) | Derivatives |
| SFAS 133 ‘Accounting for Derivative Instrument and Hedging Activities’ establishes accounting and reporting standards for derivative instruments and hedging activities. In general, SFAS 133 requires that companies recognise all derivatives as either assets or liabilities on the balance sheet and measure those instruments at fair value. Corus adopted SFAS 133, for US reporting purposes, on 1 January 2001. Upon adoption of SFAS 133, derivative liabilities of approximately £4m in respect of commodity contracts and derivative assets of £4m in respect of currency contracts were recognised on the balance sheet with an equivalent offset to the income statement. Future changes in fair value are recorded in the net income statement for US reporting purposes. Under UK GAAP no account is taken of unrealised profits or losses on open commodity or exchange contracts that are intended as a hedge. Such profits or losses are accounted for at the time that the underlying transaction is completed. | |
| (xi) | Profit on disposal of fixed assets |
| Under UK GAAP any profit or loss arising on the sale and operating leaseback of fixed assets may generally be taken to the profit and loss account immediately in the period in which the sale takes place. However for US GAAP purposes, under SFAS 28 ‘Accounting for Sales with Leasebacks’ any such gain or loss must be deferred and amortised over the contract lease period. | |
| (xii) | Securitisation of trade receivables |
| As discussed in Note 16, the Group launched a revolving period debtors securitisation programme during 2002. For US GAAP there is no equivalent of the linked presentation adopted for UK reporting purposes to reflect this programme. Under the terms of this programme SFAS 140 ‘Accounting for Transfers and Servicing of Financial Assets and Extinguishments of Liabilities’ would require the consolidation of the third party to whom the pool of debtors are initially assigned. Therefore cash advanced under this arrangement would be treated as a borrowing under US GAAP, but this has no impact on the shareholders’ equity. | |
| (xiii) | Fixed assets |
| For US GAAP, the fair value of the shares offered as purchase consideration for the stake in AvestaPolarit Oyj Abp was less than the fair value of the share of net assets acquired by Corus in the new company. This difference, or negative goodwill, was treated as a deduction from the carrying value of fixed assets in the reconciliation of US GAAP equity. It was then being amortised over a period of 15 years. During 2002 as part of the adoption of SFAS 141 ‘Business Combinations’, the Group wrote off the negative goodwill associated with AvestaPolarit Oyj Abp of £77m as a cumulative change in accounting principle. | |
| (xiv) | Debt issue costs |
| Under UK GAAP the cost of renegotiating the bank facilities with lenders could not be deferred. Whereas under US GAAP they were deferred and were to be amortised through the profit and loss account over the life of the debt facility. As discussed in Note 36 this existing facility was replaced shortly after the year end. In anticipation of this the unamortised element of these charges were expensed against US GAAP earnings during the period. | |
| New US accounting standards | |
| Recently issued accounting pronouncements implemented during the year | |
| In May 2003, the FASB issued SFAS 150 ‘Accounting for Certain Financial Instruments with Characteristics of both Liabilities and Equity’. SFAS 150 establishes standards for how a company classifies and measures certain financial instruments with characteristics of both liabilities and equity. The provisions of SFAS 150 are effective for all financial instruments entered into or modified after 31 May 2003. The adoption of SFAS 150 has not had a material impact on the financial statements. | |
|
138 Corus Report & Accounts 2003 |
||||
|
|
|
|||
| Notes to the accounts |
38. Supplementary information for North American investors continued In December 2003, the FASB released SFAS 132 (Revised 2003) ‘Employers’ Disclosures about Pensions and Other Postretirement Benefits’. The revised standard provides required disclosures for pensions and other postretirement benefit plans and is designed to improve disclosure transparency in financial statements. As disclosed in Note 32, the Company has adopted SFAS 132 (Revised 2003) for its principal pension plans for the year ended 1 January 2005. In December 2003, the FASB revised FIN 46 ‘Consolidation of Variable Interest Entities’. This interpretation clarifies the application of Accounting Research Bulletin No. 51 ‘Consolidated Financial Statements’ by requiring that certain entities known as Variable Interest Entities (‘VIEs’) must be consolidated by the primary beneficiary of the entity. The Company has adopted the revised FIN 46 for special purpose entities created before 1 February 2003 with effect as from 4 January 2004. The Company has also applied the revised FIN 46 for VIEs not considered to be special purpose entities before 1 February 2003 with effect from 30 June 2004. The adoption of FIN 46(R) has not had a material impact on the Company’s financial statements. EITF Issue No. 00-21 ‘Accounting for Revenue Arrangements with Multiple Deliverables’ addresses the issues of (1) how to determine whether an arrangement involving multiple deliverables contains more than one unit of accounting; and (2) how arrangement consideration should be measured and allocated to the separate units of accounting in the arrangement. EITF 00-21 does not change otherwise applicable revenue recognition criteria. EITF 00-21 is effective for revenue arrangements entered into in fiscal periods beginning after 15 June 2003. This consensus has not had a material impact on the financial statements. In December 2003, the SEC issued Staff Accounting Bulletin 104 (SAB 104), ‘Revenue Recognition’, which supersedes SAB 101. SAB 104’s primary purposes is to consolidate developments in accounting guidance in relation to revenue recognition, in particular EITF 00-21. There was no impact in the Group’s consolidated financial position as a result of SAB 104. In May 2003, the EITF reached a final consensus on Issue No. 01-08 ‘Determining Whether an Arrangement is a Lease’. The Task Force concluded that the evaluation of whether an arrangement contains a lease within the scope of SFAS 13 should be based on the substance of the arrangement using specific guidance detailed in Issue 01-08. The consensus is effective for any arrangements agreed or committed to, modified, or acquired in business combinations initiated after 1 January 2004. This consensus has not had a material impact on the financial statements. Recently
issued accounting pronouncements not yet implemented In December 2004, the FASB issued SFAS 152, ‘Accounting for Real Estate Time-Sharing Transactions, an amendment of SFAS 66 and 67’. This Statement amends SFAS 66, ‘Accounting for Sales of Real Estate’, to reference the financial accounting and reporting guidance for real estate time-sharing transactions that is provided in AICPA Statement of Position (SOP) 04-2, ‘Accounting for Real Estate Time-Sharing Transactions’. This Statement also amends SFAS 67, ‘Accounting for Costs and Initial Rental Operations of Real Estate Projects’, to state that the guidance for (a) incidental operations and (b) costs incurred to sell real estate projects, does not apply to real estate time-sharing transactions. This Statement is effective for fiscal years beginning after 15 June 2005. The Company does not expect this standard to have a material impact on the financial statements. In December 2004, the FASB issued SFAS 153, ‘Exchanges of Nonmonetary Assets, an amendment of APB Opinion 29’. The guidance in APB Opinion 29, ‘Accounting for Nonmonetary Transactions’, is based on the principle that exchanges of nonmonetary assets should be measured based on the fair value of the assets exchanged. The guidance in that Opinion, however, included certain exceptions to that principle. This Statement amends Opinion 29 to eliminate the exception for nonmonetary exchanges of similar productive assets and replaces it with a general exception for exchanges of nonmonetary assets that do not have commercial substance. A nonmonetary exchange has commercial substance if the future cash flows of the entity are expected to change significantly as a result of the exchange. This Statement is effective for nonmonetary asset exchanges occurring in fiscal periods beginning after 15 June 2005. The Company does not expect this standard to have a material impact on the financial statements. In December 2004 the FASB issued SFAS 123(R), ‘Share Based Payment’, which is a revision of SFAS 123, ‘Accounting for Stock-Based Compensation’, as amended by SFAS 148. SFAS 123(R) is effective for public companies for interim or annual periods beginning after 15 June 2005. SFAS 123(R) requires all share-based payments to employees, including grants of stock options, to be recognised in the statement of operations based on their fair values. The impact of this standard is being assessed. However, as stock-based awards are accounted for at fair value in accordance with SFAS 123, the Company does not expect the adoption of SFAS 123(R) to have a material impact on the financial statements. |
| Corus Report & Accounts 2004 139 |
||||
|
|
|
|||
| Profit and loss account | ||||||||||
Period
ended |
||||||||||
| 15
months to
30
Dec 2000
£m |
12
months to
29
Dec 2001
£m |
12
months to
28
Dec 2002
£m |
12
months to
3
Jan 2004
£m |
12
months to
1
Jan 2005
£m |
||||||
| Group turnover | ||||||||||
| Continuing operations | ||||||||||
| United Kingdom | 3,073 | 2,282 | 2,071 | 2,148 | 2,614 | |||||
| Other European | 4,880 | 3,846 | 3,658 | 4,153 | 4,983 | |||||
| North America | 1,389 | 877 | 881 | 781 | 923 | |||||
| Other areas | 610 | 614 | 578 | 871 | 812 | |||||
| 9,952 | 7,619 | 7,188 | 7,953 | 9,332 | ||||||
| Discontinued operations | 1,746 | 80 | – | – | – | |||||
| 11,698 | 7,699 | 7,188 | 7,953 | 9,332 | ||||||
| Group operating (loss)/profit | ||||||||||
| Continuing operations | (1,306 | ) | (388 | ) | (446 | ) | (208 | ) | 582 | |
| Discontinued operations | 150 | 3 | – | – | – | |||||
| (1,156 | ) | (385 | ) | (446 | ) | (208 | ) | 582 | ||
| Share of operating results of joint ventures | ||||||||||
| and associated undertakings | ||||||||||
| Continuing operations | – | 10 | 4 | 9 | 30 | |||||
| Discontinued operations | – | 2 | 17 | – | – | |||||
| – | 12 | 21 | 9 | 30 | ||||||
| Operating (loss)/profit | (1,156 | ) | (373 | ) | (425 | ) | (199 | ) | 612 | |
| Profit on disposal of fixed assets and group undertakings | 5 | 19 | 115 | 45 | 68 | |||||
| (Loss)/profit before interest | (1,151 | ) | (354 | ) | (310 | ) | (154 | ) | 680 | |
| Net interest and investment income | (124 | ) | (108 | ) | (94 | ) | (101 | ) | (121 | ) |
| (Loss)/profit on ordinary activities before taxation | (1,275 | ) | (462 | ) | (404 | ) | (255 | ) | 559 | |
| Taxation | 286 | 43 | (61 | ) | (53 | ) | (119 | ) | ||
| Minority interests | (53 | ) | – | 7 | 3 | 6 | ||||
| (Loss)/profit for financial period | (1,042 | ) | (419 | ) | (458 | ) | (305 | ) | 446 | |
| Dividends | (31 | ) | – | – | – | – | ||||
| (Loss)/profit retained for the period | (1,073 | ) | (419 | ) | (458 | ) | (305 | ) | 446 | |
| Basic earnings per ordinary share in pence | (32.56 | ) | (13.04 | ) | (14.23 | ) | (9.25 | ) | 10.05 | |
| Dividend per ordinary share in pence | 1.0 | – | – | – | – | |||||
| Basic earnings per ADS in £ | (3.26 | ) | (1.30 | ) | (1.42 | ) | (0.93 | ) | 1.01 | |
| Dividend per ADS in £ | 0.10 | – | – | – | – | |||||
| Amounts in accordance with US GAAP: | ||||||||||
| Operating (loss)/profit | (880 | ) | (543 | ) | (419 | ) | (204 | ) | 521 | |
| Net (loss)/profit for financial period | (770 | ) | (570 | ) | (398 | ) | (345 | ) | 344 | |
| Basic (loss)/profit per ADS in £ | (2.48 | ) | (1.77 | ) | (1.24 | ) | (1.05 | ) | 0.77 | |
| Discontinued operations relate to the results of AvestaPolarit Oyj Abp and the predecessor, Avesta Sheffield AB. | ||||||||||
| Balance sheet | As
at |
|||||||||
|
30
Dec 2000
£m |
29
Dec 2001
£m |
28
Dec 2002
£m |
Restated
3
Jan 2004
£m |
1
Jan 2005
£m |
||||||
| Fixed assets | 4,143 | 3,750 | 3,126 | 2,984 | 3,059 | |||||
| Current assets | 4,255 | 3,368 | 3,305 | 3,395 | 4,210 | |||||
| Total assets | 8,398 | 7,118 | 6,431 | 6,379 | 7,269 | |||||
| Long term borrowings | (1,766 | ) | (1,612 | ) | (1,428 | ) | (1,280 | ) | (1,407 | ) |
| Creditors, provisions and minority interests | (3,137 | ) | (2,445 | ) | (2,281 | ) | (2,303 | ) | (2,604 | ) |
| Shareholders’ funds | 3,495 | 3,061 | 2,722 | 2,796 | 3,258 | |||||
| Shareholders’ funds in accordance with US GAAP: | ||||||||||
| Capital stock | 1,566 | 1,569 | 1,572 | 1,863 | 1,864 | |||||
| Other reserves | 2,474 | 1,855 | 1,528 | 1,311 | 1,661 | |||||
| 4,040 | 3,424 | 3,100 | 3,174 | 3,525 | ||||||
| 140 Corus Report & Accounts 2004 |
||||
|
|
|
|||
|
|
| Corus Report & Accounts 2004 141 |
||||
|
|
|
|||
|
|
| 142 Corus Report & Accounts 2004 |
||||
|
|
|
|||
| Term used in report and accounts | US
equivalent or definition |
| Accounts | Financial statements |
| Advance corporation tax (ACT) | Tax payable on company distributions recoverable from |
| UK taxes due on income | |
| Joint ventures and associated undertakings | Equity investees |
| Trade creditors | Accounts payable |
| Creditors: amounts falling due within one year | Current liabilities |
| Creditors: amounts falling due after more than one year | Long term liabilities |
| Debtors: amounts falling due after more than one year | Other non-current assets |
| Employment costs | Payroll costs |
| Finance lease | Capital lease |
| Fixed asset investments | Non-current investments |
| Interests in joint ventures and associated undertakings | Securities of related parties |
| Loans to joint ventures and associated undertakings | Indebtedness of related parties not current |
| Other debtors | Other current assets |
| Profit | Income |
| Profit and loss account (statement) | Income statement |
| Profit and loss account (under ‘Capital and reserves’ in Balance sheet) | Retained earnings |
| Profit on sale of fixed assets | Gain on disposal of non-current assets |
| Profit for financial year | Net income |
| Secured | Pledged as collateral |
| Shareholders’ funds | Shareholders’ equity |
| Stocks | Inventories |
| Tangible fixed assets | Property, plant and equipment |
| Trade debtors | Accounts receivable (net) |
| Turnover or revenue | Sales |
| Corus Report & Accounts 2004 143 |
||||
|
|
|
|||
Shareholder enquiries Ordinary
shares Lloyds
TSB Registrars Shareholders can obtain details of their shareholdings via a web-based enquiry service: www.shareview.co.uk – you will need your eight digit shareholder reference number. American
Depositary Receipts (ADRs) Each ADS is equivalent to 10 ordinary shares. Enquiries regarding ADR holders’ accounts and payment of dividends should be directed to the Depositary: The
Bank of New York Toll
Free telephone # for International
callers can call: Email: shareowners@bankofny.com Website for shareholder inquiries www.stockbny.com The Bank of New York’s ADR website www.adrbny.com
|
Other
enquiries UK Netherlands |
Annual
General Meeting Details of the business to be considered at the Annual General Meeting will be sent out in the Notice of Meeting which will be sent to shareholders on 10 May 2005 with the proxy card. Voting
for overseas shareholders Holders
of shares traded on Euronext can request a proxy form from the ABN
AMRO Servicedesk. Share
price information Website Dividend As explained in the Chairman’s statement, however, it is the Board’s current intention to recommence dividend payments for 2005. Form
20-F |
|
144 Corus Report & Accounts 2004 |
||||
|
|
|
|||
www.corusgroup.com
Corus
Group plc Registered in England No. 3811373 |
||||