Cleveland Electric Illuminating Co 8-K, filed Jun 7, 2007: Exhibit 99.1 - Investor Letter
Exhibit
99.1
Ronald E. Seeholzer
Vice
President
Investor
Relations
FirstEnergy
Corp.
76
S. Main Street
Akron,
Ohio 44308
Tel
330-384-5783
June
7, 2007
TO
THE
INVESTMENT COMMUNITY:1
Today,
FirstEnergy
Corp.’s Ohio utility subsidiaries Ohio Edison Company (OE), The Cleveland
Electric Illuminating Company (CEI), and The Toledo Edison Company (TE),
(collectively, the Ohio Companies) filed with the Public Utilities Commission
of
Ohio (PUCO) the details of their base distribution rate increase request and
supporting testimony (Case No.07-551-EL-AIR). A PUCO decision is
expected early next year. The new rates would be effective January 1,
2009, for OE and TE customers, and are expected to be effective in May 2009
for
CEI customers. This letter provides additional details about today’s filings as
well as some supplemental information.
Overview
of Distribution Rate Cases
In
their Application
for Increase in Rates (Application), the Ohio Companies are requesting an
increase in annualized distribution revenues totaling $340 million to recover
expenses related to distribution operations ($217 million) and the costs
deferred under previously approved rate plans described below ($123
million). As filed, the requested distribution rates would produce
$162 million, or 8%, in additional annualized revenue for OE; $107 million,
or
6%, in additional annualized revenue for CEI; and $71 million, or 9% for
TE.
Included
in this
filing is a request for the following accounting modifications to be implemented
concurrently with the effective date of the Application:
|
1.
|
Updating
the
depreciation rates for each
company;
|
|
2.
|
Deferral
of
any storm related costs in excess of those contained in the Test
Year
expense levels.
|
Although
not part of the Application, the Ohio Companies will reduce or eliminate
their
Regulatory Transition Charge (RTC) rates concurrent with the effective dates
of
the proposed distribution rate increases. For OE and TE, the RTC rates will
be
eliminated and for CEI there will be a reduction of about 30% in the RTC
rate.
The RTC for CEI will continue at this reduced level through 2010 and then
cease.
——————————
1
As
summarized below, the combined effect of the requested distribution rate
increases and RTC rate reduction or eliminations is expected to be a
net reduction of $254 million on the regulated portion of customer
bills. The Application does not request any changes to the generation
or transmission charges contained in the Ohio Companies’ tariffs.
|
Table
1
Proposed
Changes in Revenues
|
||||
|
($
in
Millions)
|
||||
|
OE
|
CEI
|
TE
|
Total
OHIO
|
|
|
Current
“Distribution” Revenues
|
$516
|
$446
|
$157
|
$1,119
|
|
Proposed
Increase:
Associated
with RCP Fuel Expense Deferrals
Associated
with RCP Infrastructure Expense Deferrals
Associated
with RCP DSM Deferrals (through a rider)
Associated
with ETP & Ohio Line Extension Deferrals
“Base”
revenue requirement increases
Total
Proposed
Increase to “Distribution”
|
18
18
2
33
91
$162
|
12
16
2
5
72
$107
|
5
7
1
4
54
$71
|
35
41
5
42
217
$340
|
|
Proposed
“Distribution” Revenues
|
$678
|
$553
|
$228
|
$1,459
|
|
%
Increase to
“Distribution” Revenues
|
31%
|
24%
|
45%
|
30%
|
|
Total
current
“Retail Operating” Revenues*
|
$2,091
|
$1,726
|
$773
|
$4,590
|
|
%
Increase to
Total “Retail Operating” Revenues*
|
8%
|
6%
|
9%
|
7%
|
|
Offsetting
RTC
Decrease
|
$(262)
|
$(140)
|
$(192)
|
$(594)
|
|
Net
Decrease,
including Offsets*
|
$(100)
|
$(33)
|
$(121)
|
$(254)
|
|
%
Decrease,
including offsets to Total Current Revenues*
|
(4.8)%
|
(1.9)%
|
(15.7)%
|
(5.5)%
|
*Assumes current Generation & Transmission rates
Basis
for
the Distribution Rate Increase
The
rate-making
process for a change in base distribution rates in Ohio uses the Date Certain
and Test Year concepts to measure rate base and operating income, respectively.
In its May 30, 2007 Entry, the Commission accepted the Ohio Companies’ requested
Date Certain of May 31, 2007, and Test Year of 12 months ended February 29,
2008.
The
distribution
rate increase request was made primarily for the following four
reasons:
|
1.
|
To
provide for
a return on and of deferrals established in the Ohio Companies’ Rate
Certainty Plan (RCP) Case (Case No.
05-1125-EL-ATA).
|
|
·
|
Recovery
on
and of the RCP-related regulatory assets, uses a projected balance
as of
December 31, 2008, as the basis to develop the required revenue
increase. The return on these regulatory assets is based on
each company’s embedded cost of long-term debt contained in the
filing. The PUCO Order authorizing the RCP deferrals adopted
the use of the long-term debt cost as the basis for a return and
specified
a 25-year amortization period.
|
|
2.
|
To
provide for
a return on and of deferrals established in the Ohio Companies’ Electric
Transition Plan (ETP) Case (Case No. 99-1212-EL-ETP) and Ohio Line
Extension Case (Case No.
01-2708-EL-COI).
|
2
|
3.
|
To
recover
changes in revenue requirements for the distribution business, reflecting
all changes in operation and maintenance
expenses,
depreciation, taxes, investment in rate base assets and revenues
from
electric sales since the last rate
increase.
|
The
revenue increase
for both the ETP transition tax deferrals and the Ohio line extension deferrals
reflect Date Certain regulatory asset balances as well as a full return on
the
balances (including equity), amortized over a period of 5 years.
The
estimated RCP,
ETP and Line Extension regulatory asset balances are summarized
below.
|
Table
2
Estimated
RCP & ETP Regulatory Asset Balances
|
||||
|
($
in
Millions)
|
||||
|
OE
|
CEI
|
TE
|
Total
OHIO
|
|
|
Regulatory
Asset Balances:
Associated
with RCP Fuel Expense Deferrals (12/31/08)
Associated
with RCP Infrastructure Expense Deferrals (12/31/08)
Associated
with RCP DSM Deferrals (5/31/07)
Associated
with ETP & Ohio Line Extension Deferrals (5/31/07)
Total
Regulatory Asset Balances
|
$215
222
1
110
$548
|
$145
195
1
14
$355
|
$62
80
1
13
$156
|
$422
497
3
137
$1,059
|
Requested
Rate of Return and Rate Base
The
Application contains a blended capital structure for the Ohio Companies as
the basis for calculating the required rate of return. The resulting
capital structure is 51% long-term debt and 49% common equity. (The
Ohio Companies have no preferred stock outstanding.) The requested
return on equity is 11.75%. The long-term debt rate (as of March 31,
2007), is 6.47% for OE, 6.65% for CEI, and 6.26% for TE. The overall
requested rate of return is 9.06% for OE, 9.15% for CEI, and 8.95% for
TE.
The
estimated rate
base for each of the Ohio Companies is depicted in the table below.
|
Table
3
Estimated
Rate Base*
|
||||
|
($
in
Millions)
|
||||
|
OE
|
CEI
|
TE
|
Total
OHIO
|
|
|
Rate
Base
(Excluding RCP related Regulatory Assets)
RCP
Regulatory
Assets
Total
Rate Base
|
$1,340
288
$1,628
|
$1,085
219
$1,304
|
$438
93
$531
|
$2,863
600
$3,463
|
*Amounts
shown net of
accumulated deferred income taxes
3
Rate
Design
The
Ohio Companies
are proposing the following changes to their tariff designs:
|
1.
|
Adjustment
of
the tariffs, including the Electric Service Regulations, to be reflective
of current costs and to achieve consistency among the three
companies;
|
|
2.
|
Consolidation
of the tariffs and a reduction in the number of tariff
schedules;
|
|
3.
|
Availability
of general service (business) tariff schedules based on the customers’
voltage levels rather than usage;
and
|
|
4.
|
Taking
steps
toward elimination of discounted distribution rates for heating load
(space heating, water heating and process heating) and load management
for
residential and general service
customers.
|
These
changes will
result in a single tariff schedule for the residential customers of each
company.
Update
Filing and Rate Case Hearing Process
The
Ohio Companies
will update the information in today’s Initial Filing in an Update Filing to the
PUCO no later than August 6, 2007. The Update Filing will contain
three months of actual results for the Test Year (March 1, 2007 through May
31,
2007), nine months of forecasted data and actual plant balances as of May 31,
2007, to establish the test period data used to establish future
rates.
It
is estimated the
PUCO Staff will issue its Report in the case in the fourth quarter of
2007. Between the issuance of the Staff Report and the evidentiary
hearings, all the parties to the case will have the opportunity to submit
written testimony. Hearings in the case are expected in late
2007. The briefing period is expected to extend into the early 2008
time frame, with a PUCO decision to follow.
The
PUCO is required
to issue an order in the case 275 days after the Initial Filing, which would
be
March 9, 2008. However, the Ohio Companies have agreed pursuant to
previously approved rate plans not to put the proposed rates into effect for
OE
and TE until January 1, 2009 and approximately May 2009 for CEI.
Summary
Today’s
filing
represents a request to increase annual distribution revenues by $340 million
beginning in 2009 to recover expenses related to distribution operations and
costs deferred under previously approved rate plans. Although not
part of these filings, there also will be a reduction or elimination of RTC
rates concurrent with the effective dates of the distribution rate
increases. The combined annual effect of the proposed distribution
rate increases and RTC rate changes is expected to be a decrease for customers
of $254 million on the regulated portion of their bills. Please refer
to the May 8, 2007, Letter to the Investment Community for details regarding
potential impacts on typical customer bills associated with these rate
changes.
4
The
Ohio Companies
currently expect to make an Ohio Generation Procurement Plan filing this summer
requesting approval for a competitive bid process to provide generation service
to customers beginning January 1, 2009, as provided under Ohio’s electric choice
law.
Supplemental
Information
The
last adjustments
to base distribution rates were in 1990 for OE and 1996 for CEI and TE. Since
those proceedings, the Ohio Companies have been granted the authority to defer
and capitalize for future recovery certain costs
for transition taxes,
line extensions, electric system
infrastructure and reliability, fuel costs, and energy efficiency programs
as
described below.
On
July 19, 2000,
the PUCO approved a comprehensive transition plan (ETP Stipulation and
Recommendation) allowing the Ohio Companies to defer the amount by which
customer rates would have increased above existing rate levels due to tax
changes in Senate Bill No. 3. These transition tax deferrals include
capitalized interest based upon each operating company’s embedded cost of
long-term debt. In February 2003, the transition tax deferral ceased,
however, capitalized interest continues to accrue each month on the deferred
balance. These deferrals are proposed to be recovered over a five-year period
beginning January 1, 2009, for OE and TE and approximately May 2009 for
CEI.
On
December 19,
2002, the PUCO approved the Ohio Companies’ Stipulation and Recommendation in
Case No. 01-2708-EL-COI allowing the creation of regulatory assets to recover
certain new line extension costs not otherwise recovered from customers
beginning January 1, 2001. These deferrals are proposed to be recovered over
a
five-year period beginning January 1, 2009 for OE and TE and approximately
May
2009 for CEI.
To
address concerns
of the PUCO regarding rising power prices in an underdeveloped competitive
electricity marketplace, the Ohio Companies filed the Rate Stabilization Plan
(RSP) on October 21, 2003. This provided customers with generation
price and supply stability through 2008. Under the RSP, the Ohio
Companies maintain the obligation to provide full service to customers through
2008. The RSP also provided for the continuation of certain rate
discounts that would have otherwise expired, implemented various regulatory
accounting practices, contained provisions to support customer shopping, and
granted the Ohio Companies the opportunity to seek recovery of increased fuel
costs. The Ohio Companies accepted the RSP as approved on August 5,
2004.
On
September 9,
2005, to provide increased rate stability, the Ohio Companies proposed the
RCP
as a supplement to the RSP. The RCP was intended to provide customers
with lower, more certain rate levels through 2008 than would otherwise be
available under the RSP. It also provided the Ohio Companies the
opportunity to produce financial results generally comparable to those under
the
RSP.
On
November 4, 2005,
the Ohio Companies filed a supplemental stipulation with the PUCO, which
constituted an additional component of the original RCP filing. On January
4,
2006, the PUCO approved the RCP with modifications. On January 31,
2007 the Companies filed a Stipulation (in Case No. 04-1932-EL-ATA) that
modified the expected timing of demand side management (DSM) program
expenditures under the supplemental stipulation, which was approved by the
PUCO
on February 14, 2007.
5
Major
provisions of
the RCP include:
|
·
|
Distribution
Rates– maintenance of existing base distribution rates through
December 31, 2008, for OE and TE, and through approximately May
2009 for
CEI.
|
|
·
|
Infrastructure
Expense Deferrals– provided for the deferral and capitalization
of distribution infrastructure and reliability costs during the
period of
January 1, 2006, through December 31, 2008, not to exceed $150
million
annually. The amounts deferred will be included in distribution
rate base
(earning a return at the Ohio Companies’ respective embedded cost of
long-term debt) and recovered in rates over a 25-year period beginning
with distribution rates first effective on January 1, 2009, for
OE and TE
and approximately May 2009 for
CEI.
|
|
·
|
RTC
and Extended RTC Recovery Periods and Rate Levels - the RTC and
Extended RTC recovery periods and rate levels were adjusted so that
full
recovery of authorized costs will be complete as of December 31,
2008, for
OE and TE, and December 31, 2010 for
CEI.
|
|
-
|
OE’s
and TE’s
recovery of Extended RTC amounts through the RTC rate component began
on
January 1, 2006, rather than following the end of the recovery of
regulatory transition costs (as is the case with CEI). The
amortization of Extended RTC amounts matches the revenue received,
consistent with the RSP. The amortization of the regulatory transition
costs uses the effective interest method taking into account an extended
amortization schedule through December 31,
2008.
|
|
-
|
CEI's
RTC rate
remains at current levels until the original regulatory transition
costs
are recovered, currently expected to occur in May 2009. At that
time, an Extended RTC rate will be established to recover the deferred
shopping credit incentives, a rate expected to be approximately 30%
lower
than the RTC rate, to match the amortization expense so that full
recovery
of Extended RTC amounts occurs by December 31,
2010.
|
|
·
|
Deferred
Shopping Incentive Balances - OE, TE, and CEI reduced their
deferred shopping incentive balances as of January 1, 2006, by $75
million, $45 million, and $85 million, respectively. These reductions
were
made possible by accelerating the application of (or reducing) each
respective company's accumulated cost of removal regulatory
liability. This action reduced the amount of deferred shopping
incentives and carrying charges to be recovered through the RTC as
the
cost of removal regulatory liability was reduced by the amounts credited
to the deferred shopping incentive
balance.
|
|
·
|
Fuel
Recovery Mechanism - the first $75 million, $77 million, and $79
million in 2006, 2007 and 2008, respectively, of increased fuel costs
are
currently to be recovered from OE and TE non-shopping customers through
a
fuel recovery mechanism. The fuel recovery mechanism was set at
a rate approximately equal to the reduction in the RTC rate level
that was
made possible by the extension of the RTC amortization period and
the
reduction in the deferred shopping incentive balance discussed
above. If during this time, actual increased fuel costs are
greater than the fuel recovery mechanism revenues, the excess costs
are
authorized to be deferred (Fuel Expense Deferrals) by the Ohio Companies
and recovered in distribution rates commencing with rates first effective
on or after January 1, 2009.
|
|
·
|
Carrying
Charges– carrying charges at the Ohio Companies’ respective
embedded costs of long-term debt will be capitalized on the fuel
deferrals
and distribution deferrals. The carrying charges relating to
the infrastructure expense deferrals will not count toward the
$150
million annual deferral
limitation.
|
6
The
Supplemental
Stipulation with various parties included:
|
·
|
Demand
Side Management Deferrals - the Ohio Companies agreed to
implement a DSM program with expenditures for the years 2007 and 2008
at an aggregate level of $25 million ($9.5 million in 2007, and $15.5
million in 2008). These energy efficiency program costs,
including administrative costs, will be deferred. The deferred
balance will include an accrued carrying cost at a rate equal to
the
companies' respective cost of long-term debt. Beginning in
2009, the deferred balance will be amortized over a three-year period
and
collected through a rider on residential customers’
bills. Additional DSM funding in the amount of approximately $3
million was provided under the
stipulation.
|
Upcoming
FirstEnergy Investor Events
Lehman
Brothers’
2007 Fall CEO Energy/ Power Conference
September
4-6,
2007
New
York,
NY
Merrill
Lynch
Global Power and Gas Leaders Conference
September
25-26,
2007
New
York,
NY
Edison
Electric
Institute (EEI) Financial Conference
November
4-7,
2007
Orlando,
FL
FirstEnergy
Annual Analyst Meeting
December
6,
2007
New
York,
NY
If
you have any
questions concerning information in this update, please call Kurt Turosky,
Director of Investor Relations, at (330) 384-5500, or me at (330)
384-5783.
Sincerely,
Ronald
E. Seeholzer
Vice
President – Investor
Relations
7
Forward-Looking
Statements
This
investor letter
includes forward-looking statements based on information currently available
to
management. Such statements are subject to certain risks and uncertainties.
These statements typically contain, but are not limited to, the terms
“anticipate,” “potential,” “expect,” “believe,” “estimate” and similar words.
Actual results may differ materially due to the speed and nature of increased
competition and deregulation in the electric utility industry, economic or
weather conditions affecting future sales and margins, changes in markets for
energy services, changing energy and commodity market prices, replacement power
costs being higher than anticipated or inadequately hedged, the continued
ability of FirstEnergy’s regulated utilities to collect transition and other
charges or to recover increased transmission costs, maintenance costs being
higher than anticipated, legislative and regulatory changes (including revised
environmental requirements), and the legal and regulatory changes resulting
from
the implementation of the EPACT (including, but not limited to, the repeal
of
the PUHCA), the uncertainty of the timing and amounts of the capital
expenditures needed to, among other things, implement the Air Quality Compliance
Plan (including that such amounts could be higher than anticipated) or levels
of
emission reductions related to the Consent Decree resolving the New Source
Review litigation, adverse regulatory or legal decisions and outcomes
(including, but not limited to, the revocation of necessary licenses or
operating permits and oversight) by the NRC (including,
but not limited
to, the Demand for Information issued to FENOC on May 14, 2007) and the
various state public utility commissions as disclosed in FirstEnergy’s SEC
filings, the timing and outcome of various proceedings before the PUCO
(including, but not limited to, the Distribution Rate Cases for the Ohio
Companies and the successful resolution of the issues remanded to the PUCO
by
the Ohio Supreme Court regarding the Rate Stablization Plan) and the PPUC
(including the transition rate plan filings for Met-Ed and Penelec and Penn’s
Default Service Plan filing), the continuing availability and operation of
generating units, the ability of generating units to continue to operate at,
or
near full capacity, the inability to accomplish or realize anticipated benefits
from strategic goals (including employee workforce initiatives), the anticipated
benefits from voluntary pension plan contributions, the ability to improve
electric commodity margins and to experience growth in the distribution
business, the ability to access the public securities and other capital markets
and the cost of such capital, the outcome, cost and other effects of present
and
potential legal and administrative proceedings and claims related to the August
14, 2003 regional power outage, the successful structuring and completion of
a
potential sale and leaseback transaction for Bruce Mansfield Unit 1 currently
under consideration by management, any purchase price adjustment under the
accelerated share repurchase program announced March 2, 2007, the risks and
other factors discussed from time to time in FirstEnergy’s SEC filings, and
other similar factors. FirstEnergy expressly disclaims any current
intention to update any forward-looking statements contained herein as a result
of new information, future events, or otherwise.
8