Executive Summary
2

STRONGMARKET OUTLOOK Wave of electric vehicles coming to market36% annual growth projected for lithium
hydroxideLarge investments in US and Europe battery supply chain IDEALPROJECT LOCATION World-class Carolina Tin-Spodumene Belt (“TSB”)60+ years of lithium processing on TSBAbundant infrastructure and lithium talent pool LOWOPERATING
COSTS Large local labor force – no camp costsLow power and transportation costsLow royalties and income taxes POSITIVEESG PROFILE EVs reduce emissions by 67% vs. ICEs (Wood Mackenzie)Hard rock preferred by major OEMs for improved
sustainabilityPLL supply chain potentially 98% shorter than current routes UNIQUESTRATEGIC ASSET USA’s only conventional lithium projectUSA’s only spodumene-to-hydroxide projectLocated in USA’s ‘Auto Alley’ SUBSTANTIALVALUATION UPSIDE Lithium
equities recovering from 2-year lowsPiedmont trading at ~5% of Project NPVKidman deal implies huge upside for PLL Why Piedmont Lithium? 3
3

Lithium Demand Driven by Growth in Electric Vehicle Sales 4 Source: Green Car Reports Source: EV
Reports.com
4

It’s Not Just Tesla… 5 Hyundai Ionic Audi e-tron Ford F-150 VW ID.3 Porsche Taycan Mercedes
EQC Jaguar I-Pace Mini Cooper EV Rivian SUV Porsche Taycan
5

…and It’s Not Just Cars 6 Rivian Trucks Proterra Buses Xos Semis Ampere Ferries
6

Hydroxide Taking Share and Supply Deficits are Looming 7 Source: Rodney Hooper / RK Equity
forecasts. Carbonate Hydroxide Lithium hydroxide is required for the high-nickel cathode used in more energy-dense, longer-range batteries“Lithium extracted from mining for the future-relevant product ‘lithium hydroxide’ is commercially more
attractive (there is one less production step as compared to salar production), more stable to extract, easier to scale and generally more sustainable.” – Volkswagen – April 2019“BMW signs contract with Ganfeng for sustainable lithium from mines
in Australia” – BMW – November 2019 Hydroxide Carbonate
7

Piedmont Ideally Located in North Carolina… # 1 State for Business 0%State Mining
Royalties 23%Corporate Tax Rate ~100%Past Lithium Production 8
8

9 …in the Heart of ‘Auto Alley’ Location drives lower costs and more sustainable supply chain
9

10 Location Drives Low Production Costs
10

US$298 M(A$438 M)Run-rate EBITDA US$1.45 B(A$2.13 B)After-tax NPV 34%After-tax IRR 25Year Mine Life Low
Costs Underpin Strong Project Economics 11 Source: Updated Scoping Study. Refer to the announcement dated August 7, 2019. Enlarged Mineral Resource Drives Improved Economics
11

Technical Consultants Highly-Experienced Leadership Team Management Team Keith
PhillipsManaging Director & CEO30+ Years Wall Street experience with JPMorgan, Merrill Lynch and Dahlman Rose Patrick BrindleVP – Project Management20+ years US and global engineering, procurement and construction experience Lamont
LeathermanVP – Chief Geologist25+ years as an exploration geologist, senior positions in BHP & Noranda in the Carolinas Taso ArimaFounder and Director12+ years natural resource visionary executive; founder of multiple natural resource
companies David Buckley VP – Process Engineering25+ years lithium extraction and conversion expert, ex-FMC and Albemarle Tim McKennaAdvisor – Government Relations30+ years government & investor relations, including with Rockwood
Lithium 12
12

13 Hitting Milestones Should Drive Re-Rating in 2020 First-mover land package 55,000m drilling
Large high-grade resource Robust scoping study Section 404 permit Hydroxide testwork Prefeasibility study Offtake agreements Definitive feasibility study Financing and construction Market Cap –
US$mm
13

Corporate Snapshot Piedmont Lithium Limited Shares / ADRs (1 ADR = 100 Shares) 824.3 mm 8.24
mm Price (@ 2/7/20) A$0.13 US$8.25 Market Cap (@ 2/7/20) A$107 mm US$69 mm Cash (@ 12/31/19) A$17.1 mm US$11.4 mm Key Shareholders Australian Super 13.1% Fidelity 9.0% BNY Mellon (ADRs) 7.5% Officers and
Directors 10.4% Research Coverage 14 Share Price Performance - Last 3 Months Board of Directors Ian Middlemas Australia Chairman Keith D. Phillips USA CEO Anastasios Arima USA Director Jeff
Armstrong USA Director Jorge Beristain USA Director Levi Mochkin Australia Director
14

Lithium Markets
15

EV Mega-Trend is Building Momentum Source: Bloomberg New Energy Finance 16 World-leader VW all-in on
EVsFocus on LiOH from spodumene“Mining is considered the future-proof solution, both commercially and in terms of sustainabilityEU CO2 penalties a catalystUS$39B exposure in 2021Mass market vehicles comingFord to produce electric F-150 “before
2022”VW ID.3 launching in 2020Technology leaders positioningGoogle / WaymoApple / TitanAmazon / RivianSony introduced EV at CES Ford F-150 EV (2021)
16

Economics are the Key Driver of EV Demand Tesla Model 3 Tesla Model 3 Source: Clean Technica and OEM
websitesReflects New Jersey waiver of 6.625% state sales tax 17 TESLA MODEL 3 AUDI S4 CATEGORY Luxury sport sedan Luxury sport sedan 0-60 MPH 3.9 seconds 4.4 seconds RANGE 322 miles 420 miles PURCHASE
PRICE $50,990 $58,145 5-YEAR FUEL1 $2,549 $10,194 5-YEAR MAINTENANCE1 $3,018 $9,551 5-YEAR INSURANCE1 $4,430 $4,513 TAX INCENTIVE $3,378 $0 5-YEAR TCO2 $57,609 $82,403 EVs are superior cars – they are smoother, quieter and
fasterEVs reduce greenhouse gas emissions by 67% vs. ICEs (“Wood Mackenzie”)EVs offer lower ‘total cost of ownership’ (“TCO”)Far less expensive to fuelFar less expensive to maintainEV:ICE purchase price parity is approaching; Tesla has already
achieved this with the Model 3 Source: ARK Innovation – Big Ideas 2020 250 Mile Range EV Toyota Camry MSRP
17

EU CO2 Emissions Penalties Spurring EV Development 18 Source: Orocobre
18

Supply Curtailments Support Positive Market Outlook 19 Wodgina on care and maintenance; Kemerton
delayed 9 months Mt. Holland deferred at least one year Stage 2 and 3 expansions deferred indefinitely Mt. Cattlin mine shutdown; Sal de Vida downsized Bald Hill on care and maintenance La Corne on care and maintenance Kwinana Phase 2
deferred Construction halted pending financing for cost overruns
19

USA is Favorable Jurisdiction vs. Leading Producers 40% royalties / social unrest / ‘war for water’
Kirchnerist politics / hyperinflation / export taxes High cost power and transport / labor shortages Imported raw materials / 16% VAT on re-exports Low costs and taxes / large market / critical material 20
20

Recent Developments in the US Electric Vehicle Space 21 Nevada battery capacity to increase to 57 GWh
and ‘Giga-Texas’ is rumored as next project Investing $600M to produce XC90 e-SUV and battery packs at Ridgeville, SC plant Joint venture to build $2.3B battery plant in Lordstown, OH Investing $2.7B to build 20 GWh battery plant in Commerce,
GA Investing $12.5B to build EVs including the Mustang Mach-E and the electric F-150 Converting Detroit-Hamtramck plant to all-EV; reintroducing the Hummer as an EV brand To produce delivery trucks for Amazon and an SUV for Lincoln Investing
$800M to expand Chattanooga, TN plant to make EVs and assemble batteries
21

Piedmont Positioned as a Domestic Supplier to the US EV
Sector 22 Cathode Batteries Vehicles RawMaterials LithiumChemicals USA Import
22

Spodumene’s Hydroxide Cost Advantage 23 Source: McKinsey & Co., costs represent indicative 2025 costs
for typical South American brine operations and typical Western Australian spodumene operations. Brine is typically lower cost for carbonate… …but spodumene is typically lower cost for hydroxide “Spodumene is ~15% more cost-effective to
produce lithium hydroxide than salt brine” – McKinsey & Co.
23

Project Background Materials
24

High-Grade Mineral Resource 27.9 Mt @ 1.11% Li2O764,000 tonnes of contained LCE100% of the lithium is
attributable to spodumene mineralizationShallow open pits – 74% of resource within 100m of surface and 97% within 150mOpen along strike and at depth 25 One of North America’s Largest Hard-Rock Lithium Resources
25

Vast Exploration Upside 26 Large Areas of the Carolina Tin-Spodumene Belt Remain Unexplored Current
Exploration Target Core Property Tonnes (Mt) Grade (Li2O%) 4.0-4.5 1.0-1.2 Central Property Tonnes (Mt) Grade (Li2O%) 2.0-2.5 1.1-1.3 Total Tonnes (Mt) Grade (Li2O%) 6.0-7.0 1.0-1.3 *The potential quantity and grade of the
Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
26

Unique “Spodumene-Only” Mineralogy 27 “The first question an investor should ask a hard-rock lithium CEO
is “how much of the lithium reports to spodumene?” – Jon Hykawy , PhD – President, Stormcrow Capital XRD analysis confirms pure spodumene nature of Piedmont’s ore bodyAbsence of petalite and lepidolite in pegmatites expected to lead to high
lithium recovery
27

Strong Metallurgical Recoveries Recovered Grade 28 Resource Grade of 1.11% Li2O+ Exceptional
Metallurgical Recoveries‘Spodumene-only’ mineralogyAbundant clean process water50+ years of precedent on TSBBench scale testwork results= Leading ‘Recovered Grade’Bench-Scale LiOH Testwork in Progress
28

Quartz Solar Panel Glass Quartz Composites Technical Glass Feldspar Architectural
Glass Industrial Ceramics Coatings Mica Cosmetics Automotive Paints Welding Rods By-Product Industrial Minerals Provide Strong Credit 29
29

Disclaimers Cautionary Statements and Important InformationThis presentation does not constitute or form
part of any offer to sell, or solicitation of any offer to buy, any securities in the United States or any other country. This presentation may not form the basis of any contract or commitment whatsoever with any person. Distribution of this
presentation may be restricted by applicable law. This presentation has been prepared by Piedmont Lithium Limited (“Piedmont”) as a summary only, and does not contain all information about Piedmont’s assets and liabilities, financial position and
performance, profits and losses, prospects, and the rights and liabilities attaching to Piedmont’s securities. Any investment in Piedmont should be considered speculative and there is no guarantee that they will make a return on capital invested,
that dividends would be paid, or that there will be an increase in the value of the investment in the future. Piedmont does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or
needs of any recipient of this presentation. Recipients of this presentation should carefully consider whether the securities issued by Piedmont are an appropriate investment for them in light of their personal circumstances, including their
financial and taxation position. Forward Looking StatementsThis presentation contains forward-looking statements within the meaning of securities legislation in Australia and the United States, including statements regarding exploration and
development activities; plans for Piedmont’s mineral projects; projections of market demand and lithium prices; statements about the timing and amount of resource declarations; and statements about the timing and ability to complete scoping
studies and feasibility studies. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual events, results, performance or achievements to be materially different from events, results,
performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the risk that we will be unable to commercially extract mineral deposits, that our properties may not contain expected
reserves, risks and hazards inherent in the mining business (including risks inherent in developing mining projects, environmental hazards, industrial accidents, weather or geologically related conditions), uncertainty about our ability to obtain
required capital to execute our business plan, our ability to hire and retain required personnel, changes in the market prices of lithium, changes in technology or the development of substitute products, the uncertainties inherent in exploratory,
developmental and production activities, including risks relating to permitting and regulatory delays, uncertainties inherent in the estimation of lithium resources, risks related to competition, as well as other uncertainties and risk factors
set out in filings made from time to time with the Australian Stock Exchange and the U.S. Securities and Exchange Commission, including our most recent Form 20-F. Actual events, results, performance and achievements could vary significantly from
the estimates presented in this presentation. Readers are cautioned not to put undue reliance on forward-looking statements. We disclaim any intent or obligation to update publicly such forward-looking statements, whether as a result of new
information, future events or otherwise. Additionally, we undertake no obligation to comment on analyses, expectations or statements made by third parties in respect of Piedmont, its financial or operating results or its securities.Cautionary
Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred ResourcesThe information contained in this presentation has been prepared in accordance with the requirements of the securities laws in effect in Australia,
which differ from the requirements of U.S. securities laws. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are Australian terms defined in accordance with the 2012 Edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). However, these terms are not defined in Industry Guide 7 ("SEC Industry Guide 7") under the U.S. Securities Act of 1933, as
amended (the "U.S. Securities Act"), and are normally not permitted to be used in reports and filings with the U.S. Securities and Exchange Commission (“SEC”). Accordingly, information contained herein that describes Piedmont’s mineral deposits
may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder. U.S. investors are urged to consider
closely the disclosure in Piedmont’s Form 20-F, a copy of which may be obtained from Piedmont or from the EDGAR system on the SEC’s website at http://www.sec.gov/.Competent Persons StatementsThe information in this presentation that relates to
Exploration Results, Exploration Targets, Mineral Resources, Metallurgical Testwork Results, Process Design, Process Plant Capital Costs, and Process Plant Operating Costs, Mining Engineering and Mining Schedule was extracted from our ASX
announcement dated August 7, 2019 entitled “Updated Scoping Study Extends Project Life and Enhances Exceptional Economics” which is available to view on the Company’s website at www.piedmontlithium.com.website at www.piedmontlithium.com. Piedmont
confirms that: a) it is not aware of any new information or data that materially affects the information included in the original ASX announcements; b) all material assumptions and technical parameters underpinning Mineral Resources, Exploration
Targets, Production Targets, and related forecast financial information derived from Production Targets included in the original ASX announcements continue to apply and have not materially changed; and c) the form and context in which the
relevant Competent Persons’ findings are presented in this report have not been materially modified from the original ASX announcements.Exploration TargetThe Exploration Target is based on the actual results of Piedmont’s previous drill programs.
To determine potential tonnage and grade ranges at the deposit, Li2O assay values and density values from drilling have been applied to the volume estimates. A density value of 2.71 g/cm3 is applied to derive tonnage values. Using this
methodology an Exploration Target of between 4.0 to 4.5 million tonnes at a grade of between 1.10% and 1.20% Li2O is approximated for the Core property and an Exploration Target of between 2.0 to 2.5 million tonnes at a grade of between 1.1% and
1.3% Li2O is approximated for the Central property. The potential quantity and grade of this Exploration Target is conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. 30
30

A Clean Energy Company Piedmont Lithium Limited Corporate Presentation – February 2020 Keith D. Phillips
– President and CEO +1 973 809 0505 kphillips@piedmontlithium.com Exploration Office5706 Dallas-Cherryville Hwy. 279 | Bessemer City | NC 28016| USA www.piedmontlithium.com Registered Office28 The Esplanade | 9th Floor | Perth | WA 6000 |
Australia Head Office32 North Main Street |Suite 100 | Belmont | NC 28012 | USA This presentation has been authorised for release by the Company’s President & CEO, Keith D. Phillips
31
32