2.2.0.25falsefalse0218 - Disclosure - Commitments and Contingenciestruefalsefalse1falsefalseUSDfalsefalse1/1/2010 - 12/31/2010
USD ($)
USD ($) / shares
$TwelveMonthsEnded_31Dec2010http://www.sec.gov/CIK0000783325duration2010-01-01T00:00:002010-12-31T00:00:00USDStandardhttp://www.xbrl.org/2003/iso4217USDiso42170PureStandardhttp://www.xbrl.org/2003/instancepurexbrli0USDEPSDividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instancesharesxbrli0SharesStandardhttp://www.xbrl.org/2003/instancesharesxbrli0USDUSD$2true0wec_CommitmentsAndContingenciesAbstractwecfalsenadurationCommitments and Contingencies.falsefalsefalsefalsefalsefalsefalsefalsefalsefalse1falsefalsefalse00falsefalsefalsefalsefalseOtherxbrli:stringItemTypestringCommitments and Contingencies.falsefalse3false0us-gaap_CommitmentsAndContingenciesDisclosureTextBlockus-gaaptruenadurationNo definition available.falsefalsefalsefalsefalsefalsefalsefalsefalsefalseverboselabel1falsefalsefalse00
<!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" -->
<!-- Begin Block Tagged Note 18 - us-gaap:CommitmentsAndContingenciesDisclosureTextBlock-->
<div style="font-family: Helvetica,Arial,sans-serif">
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b>R — COMMITMENTS AND CONTINGENCIES</b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Capital Expenditures: </i></b>We have made certain commitments in connection with 2010 capital
expenditures. During 2011, we estimate that total capital expenditures will be approximately
$951.2 million.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Operating Leases: </i></b>We enter into long-term purchase power contracts to meet a portion of our
anticipated increase in future electric energy supply needs. These contracts expire at various
times through 2018. Certain of these contracts were deemed to qualify as operating leases. In
addition, we have various other operating leases including leases for coal cars.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Future minimum payments for the next five years and thereafter for our operating lease contracts
are as follows:
</div>
<div align="center">
<table style="font-size: 10pt; text-align: left" cellspacing="0" border="0" cellpadding="0" width="100%">
<!-- Begin Table Head -->
<tr valign="bottom">
<td width="88%"> </td>
<td width="5%"> </td>
<td width="1%"> </td>
<td width="5%"> </td>
<td width="1%"> </td>
</tr>
<tr style="font-size: 8pt" valign="bottom">
<td> </td>
<td> </td>
<td align="center" colspan="2" style="border-bottom: 1px solid #000000" nowrap="nowrap">(Millions of Dollars)</td>
<td> </td>
</tr>
<!-- End Table Head -->
<!-- Begin Table Body -->
<tr valign="bottom" style="background: #cceeff">
<td>
<div style="margin-left:30px; text-indent:-15px">2011
</div></td>
<td> </td>
<td align="left">$</td>
<td align="right">22.8</td>
<td> </td>
</tr>
<tr valign="bottom">
<td>
<div style="margin-left:30px; text-indent:-15px">2012
</div></td>
<td> </td>
<td> </td>
<td align="right">16.3</td>
<td> </td>
</tr>
<tr valign="bottom" style="background: #cceeff">
<td>
<div style="margin-left:30px; text-indent:-15px">2013
</div></td>
<td> </td>
<td> </td>
<td align="right">6.5</td>
<td> </td>
</tr>
<tr valign="bottom">
<td>
<div style="margin-left:30px; text-indent:-15px">2014
</div></td>
<td> </td>
<td> </td>
<td align="right">3.9</td>
<td> </td>
</tr>
<tr valign="bottom" style="background: #cceeff">
<td>
<div style="margin-left:30px; text-indent:-15px">2015
</div></td>
<td> </td>
<td> </td>
<td align="right">4.0</td>
<td> </td>
</tr>
<tr valign="bottom">
<td>
<div style="margin-left:15px; text-indent:-15px">Thereafter
</div></td>
<td> </td>
<td> </td>
<td align="right">32.7</td>
<td> </td>
</tr>
<tr style="font-size: 1px">
<td>
<div style="margin-left:30px; text-indent:-15px"> 
</div></td>
<td> </td>
<td nowrap="nowrap" colspan="2" align="right" style="border-top: 1px solid #000000"> </td>
<td> </td>
</tr>
<tr valign="bottom" style="background: #cceeff">
<td>
<div style="margin-left:30px; text-indent:-15px">Total
</div></td>
<td> </td>
<td align="left">$</td>
<td align="right">86.2</td>
<td> </td>
</tr>
<tr style="font-size: 1px">
<td>
<div style="margin-left:30px; text-indent:-15px"> 
</div></td>
<td> </td>
<td nowrap="nowrap" colspan="2" align="right" style="border-top: 3px double #000000"> </td>
<td> </td>
</tr>
<!-- End Table Body -->
</table>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Divested Assets: </i></b>Pursuant to the sale of Point Beach, we have agreed to indemnification
provisions customary to transactions involving the sale of nuclear assets.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Pursuant to the terms of the sales agreement for the manufacturing business, Wisconsin Energy
agreed to customary indemnification provisions related to certain environmental, asbestos, and
product liability matters. In addition, the amount of cash taxes and future deferred income tax
benefits are subject to a number of factors including appraisals of the fair value of Wisconsin Gas
assets and applicable tax laws. Any changes in the estimates of taxes and indemnification matters
will be recorded as an adjustment to the gain on sale and reported in discontinued operations in
the period the adjustment is determined. We have established reserves related to these customary
indemnification and tax matters.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Environmental Matters: </i></b>We periodically review our exposure for environmental remediation costs as
evidence becomes available indicating that our liability has changed. Given current information,
including the following, we believe that future costs in excess of the amounts accrued and/or
disclosed on all
presently known and quantifiable environmental contingencies will not be material to our financial
position or results of operations.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">We have a program of comprehensive environmental remediation planning for former manufactured gas
plant sites and coal combustion product disposal sites. We perform ongoing assessments of
manufactured gas plant sites and related disposal sites used by Wisconsin Electric and Wisconsin
Gas, and coal combustion product disposal/landfill sites used by Wisconsin Electric, as discussed
below. We are working with the WDNR in our investigation and remediation planning. At this time,
we cannot estimate future remediation costs associated with these sites beyond those described
below.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Manufactured Gas Plant Sites: </i></b>We have identified several sites at which Wisconsin Electric,
Wisconsin Gas, or a predecessor company historically owned or operated a manufactured gas plant.
These sites have been substantially remediated or are at various stages of investigation,
monitoring and remediation. We have also identified other sites that may have been impacted by
historical manufactured gas plant activities. Based upon on-going analysis, we estimate that the
future costs for detailed site investigation and future remediation costs may range from $35
million to $65 million over the next ten years. This estimate is dependent upon several variables
including, among other things, the extent of remediation, changes in technology and changes in
regulation. As of December 31, 2010, we have established reserves of $45.1 million related to
future remediation costs.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The PSCW has allowed Wisconsin utilities, including Wisconsin Electric and Wisconsin Gas, to defer
the costs spent on the remediation of manufactured gas plant sites, and has allowed for these costs
to be recovered in rates over five years. Accordingly, we have recorded a regulatory asset for
remediation costs.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Coal Combustion Product Landfill Sites: </i></b>Wisconsin Electric aggressively seeks environmentally
acceptable, beneficial uses for its coal combustion products. However, some coal combustion
products have been, and to a small degree continue to be, managed in company-owned, licensed
landfills. Some early designed and constructed landfills have at times required various levels of
monitoring or remediation. Where Wisconsin Electric has become aware of these conditions, efforts
have been made to define the nature and extent of any release, and work has been performed to
address these conditions. During 2010, 2009 and 2008, Wisconsin Electric incurred $0.4 million,
$0.3 million and $1.3 million respectively, in landfill remediation expenses. As of December 31,
2010, we have no reserves established related to coal combustion product landfill sites.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>EPA — Consent Decree: </i></b>In April 2003, Wisconsin Electric reached a Consent Decree with the EPA, in
which it agreed to significantly reduce air emissions from its coal-fired generating facilities.
In July 2003, the Consent Decree was amended to include the state of Michigan, and in October 2007,
the U.S. District Court for the Eastern District of Wisconsin approved and entered the amended
Consent Decree. The reductions are expected to be achieved by 2013 through a combination of
installing new pollution control equipment, upgrading existing equipment and retiring certain older
units. Through December 31, 2010, we have spent approximately $901 million associated with the
installation of air quality controls and have retired four coal units as part of our plan under the
Consent Decree. The total cost of implementing this agreement is estimated to be $1.2 billion over
the 10 year period ending 2013.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Oak Creek Construction Contract: </i></b>Bechtel, the contractor of the Oak Creek expansion under a fixed
price contract, submitted claims to us on December 22, 2008 for cost and schedule relief related to
the delay of the in-service dates for OC 1 and OC 2. These claims were asserted against ERS, the
project manager for the construction of the Oak Creek expansion and agent for the joint owners of
OC 1 and OC 2. On October 30, 2009, Bechtel amended its claim to increase its request for cost
relief and schedule relief. In its amended claim, Bechtel requested cost relief totaling
approximately $517.5 million and schedule relief that would have resulted in approximately seven
months of relief from liquidated damages beyond the guaranteed in-service date of September 29,
2009 for OC 1 and approximately four months of relief from liquidated damages beyond the guaranteed
in-service date of September 29, 2010 for OC 2.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Bechtel’s first claim was based on the alleged impact of severe weather and certain labor-related
matters. Pursuant to its amended claim, Bechtel was requesting approximately $445.5 million in
costs related to
changed weather and labor conditions. Bechtel’s second claim of approximately $72
million sought cost
and schedule relief for the alleged effects of ERS-directed changes and delays allegedly caused by
ERS prior to the issuance of the Full Notice to Proceed in July 2005. These claims, as well as
claims submitted by ERS related to the rights of the parties under the construction contract and
ERS counterclaims, had been submitted to binding arbitration.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Effective December 16, 2009, ERS and Bechtel entered into the Settlement Agreement that settled the
claims between them regarding OC 1 and OC 2. Pursuant to the terms of this Settlement Agreement,
ERS will pay to Bechtel $72 million to settle these claims payable upon the achievement of specific
project milestones. As of December 31, 2010, Bechtel has received $57.5 million of the $72 million
total settlement. The remaining milestone payments are tied to turnover of OC 2 and final
acceptance of the units. In addition, Bechtel received 120 days of schedule relief for OC 1 and 60
days for OC 2. Therefore, the guaranteed in-service date of September 29, 2009 for OC 1 was
extended to January 27, 2010, and the guaranteed in-service date of September 29, 2010 for OC 2 was
extended to November 28, 2010. Bechtel subsequently received an additional 21 days of schedule
relief for OC 2 as part of a change order signed concurrent with the turnover of OC 2. Therefore,
the total schedule relief granted to Bechtel was 120 days for OC 1 and 81 days for OC 2.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">We are responsible for approximately 85% of amounts paid under the Settlement Agreement, consistent
with our ownership share of the Oak Creek expansion. The other joint owners are responsible for
the remainder.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Cash Balance Pension Plan: </i></b>On June 30, 2009, a lawsuit was filed by Alan M. Downes, a former
employee, against the Plan in the U.S. District Court for the Eastern District of Wisconsin.
Counsel representing the plaintiff is attempting to seek class certification for other similarly
situated plaintiffs. The complaint alleges that Plan participants who received a lump sum
distribution under the Plan prior to their normal retirement age did not receive the full benefit
to which they were entitled in violation of the Employee Retirement Income Security Act of 1974
(ERISA) and are owed additional benefits, because the Plan failed to apply the correct interest
crediting rate to project the cash balance account to their normal retirement age. On September 6,
2010, the plaintiff filed a First Amended Class Action Complaint alleging additional claims under
ERISA and adding Wisconsin Energy Corporation as a defendant. The plaintiff has not specified the
amount of relief he is seeking. An adverse outcome of this lawsuit could have a material adverse
effect on Plan funding and expense and our results of operations. Although we are currently unable
to predict the final outcome or impact of this litigation, we are aware that courts in two similar
lawsuits filed in Wisconsin found that the interest crediting rates applied by pension plans
involved in those cases were not in compliance with ERISA.
</div>
</div>
<!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" -->
<!-- Begin Block Tagged NotefalsefalsefalsefalsefalseOtherus-types:textBlockItemTypestringIncludes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables.Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name FASB Interpretation (FIN)
-Number 14
-Paragraph 3
Reference 2: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name Statement of Financial Accounting Standard (FAS)
-Number 5
-Paragraph 9, 10, 11, 12
falsefalse12Commitments and ContingenciesUnKnownUnKnownUnKnownUnKnownfalsetrue