2.0.0.10falseCosts in Excess of Billings115 - Disclosure - Costs in Excess of Billingstruefalsefalsefalse1usd$falsefalseiso4217_USDStandardhttp://www.xbrl.org/2003/iso4217USDiso42170iso4217_USD_per_sharesDividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instanceshares0sharesStandardhttp://www.xbrl.org/2003/instanceshares053sd_CostsInExcessOfBillingsAndBillingsInExcessOfCostsIncurredTextBlocksdfalsenadurationstringDisclosure related to costs in excess of billings and billings in excess of costs incurred.falsefalsefalsefalsefalsefalsefalsefalsefalsefalsefalseverboselabelfalse1falsefalsefalsefalse00<div>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; TEXT-INDENT: 4%">
</p>
<p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>8. Costs in Excess
of Billings</b></font></p>
<p style="MARGIN-TOP: 6px; MARGIN-BOTTOM: 0px; PADDING-BOTTOM: 0px; TEXT-INDENT: 4%">
<font style="FONT-FAMILY: Times New Roman" size="2">In June 2008,
the Company entered into an agreement with a subsidiary of
Occidental Petroleum Corporation (“Occidental”) to
construct a CO</font><font style="FONT-FAMILY: Times New Roman" size="1"><sub style="VERTICAL-ALIGN: baseline; POSITION: relative; TOP: 0.4ex">2</sub></font>
<font style="FONT-FAMILY: Times New Roman" size="2">treating plant
in Pecos County, Texas (the “Century Plant”) and
associated compression and pipeline facilities for
$800.0 million. Under this agreement, the Company will
construct the Century Plant and Occidental will pay a minimum of
100% of the contract price, plus any subsequent agreed-upon
revisions, to the Company through periodic cost reimbursements
based upon the percentage of the project completed by the Company.
The Century Plant is expected to be completed in two phases with
the start-up of Phase I expected in mid 2010. Upon start-up, the
Century Plant will be owned and operated by Occidental for the
purpose of separating and removing CO</font><font style="FONT-FAMILY: Times New Roman" size="1"><sub style="VERTICAL-ALIGN: baseline; POSITION: relative; TOP: 0.4ex">2</sub></font>
<font style="FONT-FAMILY: Times New Roman" size="2">from natural
gas delivered by the Company. Pursuant to a 30-year treating
agreement executed simultaneously with the construction agreement,
Occidental will remove CO</font><font style="FONT-FAMILY: Times New Roman" size="1"><sub style="VERTICAL-ALIGN: baseline; POSITION: relative; TOP: 0.4ex">2</sub></font>
<font style="FONT-FAMILY: Times New Roman" size="2">from the
Company’s delivered production volumes. The Company will
retain all methane gas from the Century Plant.</font></p>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; TEXT-INDENT: 4%">
<font style="FONT-FAMILY: Times New Roman" size="2">The Company
accounts for construction of the Century Plant using the
completed-contract method, under which contract revenues and costs
are recognized when work under the contract is completed or
substantially completed. In the interim, costs incurred on and
billings related to contracts in process are accumulated on the
balance sheet. Contract gains or losses will be recorded, as
development costs within the Company’s oil and natural gas
properties as part of the full cost pool, when it is determined
that a gain or loss will be incurred. At March 31, 2010 and
December 31, 2009, no amounts had been recorded to the full
cost pool in anticipation of probable and estimable gains or
losses. Costs in excess of billings were $32.0 million and
$12.3 million and are reported as a current asset in the
accompanying condensed consolidated balance sheets at
March 31, 2010 and December 31, 2009,
respectively.</font></p>
</div>8. Costs in Excess
of Billings
In June 2008,
the Company entered into an agreement with a subsidiary of
Occidental Petroleum CorporationfalsefalsefalseDisclosure related to costs in excess of billings and billings in excess of costs incurred.No authoritative reference available.falsefalse11falseUnKnownUnKnownUnKnownfalsetrue