2.0.0.10 false Costs in Excess of Billings 115 - Disclosure - Costs in Excess of Billings true false false false 1 usd $ false false iso4217_USD Standard http://www.xbrl.org/2003/iso4217 USD iso4217 0 iso4217_USD_per_shares Divide http://www.xbrl.org/2003/iso4217 USD iso4217 http://www.xbrl.org/2003/instance shares 0 shares Standard http://www.xbrl.org/2003/instance shares 0 5 3 sd_CostsInExcessOfBillingsAndBillingsInExcessOfCostsIncurredTextBlock sd false na duration string Disclosure related to costs in excess of billings and billings in excess of costs incurred. false false false false false false false false false false false verboselabel false 1 false false false false 0 0 <div> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; TEXT-INDENT: 4%"> </p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>8.&#xA0;Costs in Excess of Billings</b></font></p> <p style="MARGIN-TOP: 6px; MARGIN-BOTTOM: 0px; PADDING-BOTTOM: 0px; TEXT-INDENT: 4%"> <font style="FONT-FAMILY: Times New Roman" size="2">In June 2008, the Company entered into an agreement with a subsidiary of Occidental Petroleum Corporation (&#x201C;Occidental&#x201D;) to construct a CO</font><font style="FONT-FAMILY: Times New Roman" size="1"><sub style="VERTICAL-ALIGN: baseline; POSITION: relative; TOP: 0.4ex">2</sub></font> <font style="FONT-FAMILY: Times New Roman" size="2">treating plant in Pecos County, Texas (the &#x201C;Century Plant&#x201D;) and associated compression and pipeline facilities for $800.0&#xA0;million. Under this agreement, the Company will construct the Century Plant and Occidental will pay a minimum of 100% of the contract price, plus any subsequent agreed-upon revisions, to the Company through periodic cost reimbursements based upon the percentage of the project completed by the Company. The Century Plant is expected to be completed in two phases with the start-up of Phase I expected in mid 2010. Upon start-up, the Century Plant will be owned and operated by Occidental for the purpose of separating and removing CO</font><font style="FONT-FAMILY: Times New Roman" size="1"><sub style="VERTICAL-ALIGN: baseline; POSITION: relative; TOP: 0.4ex">2</sub></font> <font style="FONT-FAMILY: Times New Roman" size="2">from natural gas delivered by the Company. Pursuant to a 30-year treating agreement executed simultaneously with the construction agreement, Occidental will remove CO</font><font style="FONT-FAMILY: Times New Roman" size="1"><sub style="VERTICAL-ALIGN: baseline; POSITION: relative; TOP: 0.4ex">2</sub></font> <font style="FONT-FAMILY: Times New Roman" size="2">from the Company&#x2019;s delivered production volumes. The Company will retain all methane gas from the Century Plant.</font></p> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; TEXT-INDENT: 4%"> <font style="FONT-FAMILY: Times New Roman" size="2">The Company accounts for construction of the Century Plant using the completed-contract method, under which contract revenues and costs are recognized when work under the contract is completed or substantially completed. In the interim, costs incurred on and billings related to contracts in process are accumulated on the balance sheet. Contract gains or losses will be recorded, as development costs within the Company&#x2019;s oil and natural gas properties as part of the full cost pool, when it is determined that a gain or loss will be incurred. At March&#xA0;31, 2010 and December&#xA0;31, 2009, no amounts had been recorded to the full cost pool in anticipation of probable and estimable gains or losses. Costs in excess of billings were $32.0 million and $12.3&#xA0;million and are reported as a current asset in the accompanying condensed consolidated balance sheets at March&#xA0;31, 2010 and December&#xA0;31, 2009, respectively.</font></p> </div> 8.&#xA0;Costs in Excess of Billings In June 2008, the Company entered into an agreement with a subsidiary of Occidental Petroleum Corporation false false false Disclosure related to costs in excess of billings and billings in excess of costs incurred. No authoritative reference available. false false 1 1 false UnKnown UnKnown UnKnown false true