2.2.0.25falsefalse10801 - Disclosure - Commitments and Contingent Liabilitiestruefalsefalse1falsefalseUSDfalsefalse1/1/2011 - 3/31/2011 USD ($) / shares USD ($) $Duration_1_1_2011_To_3_31_2011http://www.sec.gov/CIK0000788784duration2011-01-01T00:00:002011-03-31T00:00:00Unit18Dividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instancesharesxbrli0Unit12Standardhttp://www.xbrl.org/2003/iso4217USDiso42170Unit17Standardhttp://xbrl.us/us-types/2009-01-31galxbrlus0Unit13Standardhttp://www.xbrl.org/2003/instancepurexbrli0Unit1Standardhttp://www.xbrl.org/2003/instancesharesxbrli0USDUSD$2true0peg_CommitmentsAndContingentLiabilitiesAbstractpegfalsenadurationCommitments and Contingent Liabilities [Abstract]falsefalsefalsefalsefalsefalsefalsefalsefalsefalse1falsefalsefalse00falsefalsefalsefalsefalseOtherxbrli:stringItemTypestringCommitments and Contingent Liabilities [Abstract]falsefalse3false0us-gaap_CommitmentsAndContingenciesDisclosureTextBlockus-gaaptruenadurationNo definition available.falsefalsefalsefalsefalsefalsefalsefalsefalsefalseterselabel1falsefalsefalse00<div> <p style="margin-top: 18px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="4"><b><a name="rom168673_14"> </a>Note 8. Commitments and Contingent Liabilities </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Guaranteed Obligations </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power's activities primarily involve the purchase and sale of energy and related products under transportation, physical, financial and forward contracts at fixed and variable prices. These transactions are with numerous counterparties and brokers that may require cash, cash-related instruments or guarantees. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power has unconditionally guaranteed payments to counterparties by its subsidiaries in commodity-related transactions in order to </font></p> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2"><font style="font-family: Times New Roman;" class="_mt" size="3">&bull;</font></font></td> <td valign="top" width="1%"><font class="_mt" size="1">&nbsp;</font></td> <td valign="top" align="left"> <p align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">support current exposure, interest and other costs on sums due and payable in the ordinary course of business, and </font></p></td></tr></table> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2"><font style="font-family: Times New Roman;" class="_mt" size="3">&bull;</font></font></td> <td valign="top" width="1%"><font class="_mt" size="1">&nbsp;</font></td> <td valign="top" align="left"> <p align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">obtain credit. </font></p></td></tr></table> <p style="margin-top: 6px; margin-bottom: 0px; font-size: 1px;">&nbsp;</p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Under these agreements, guarantees cover lines of credit between entities and are often reciprocal in nature. The exposure between counterparties can move in either direction. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In order for Power to incur a liability for the face value of the outstanding guarantees, its subsidiaries would have&nbsp;to </font></p> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2"><font style="font-family: Times New Roman;" class="_mt" size="3">&bull;</font></font></td> <td valign="top" width="1%"><font class="_mt" size="1">&nbsp;</font></td> <td valign="top" align="left"> <p align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">fully utilize the credit granted to them by every counterparty to whom Power has provided a guarantee, and </font></p></td></tr></table> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2"><font style="font-family: Times New Roman;" class="_mt" size="3">&bull;</font></font></td> <td valign="top" width="1%"><font class="_mt" size="1">&nbsp;</font></td> <td valign="top" align="left"> <p align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">all of the related contracts would have to be "out-of-the-money" (if the contracts are terminated, Power would owe money to the counterparties). </font></p></td></tr></table> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power believes the probability of this result is unlikely. For this reason, Power believes that the current exposure at any point in time is a more meaningful representation of the potential liability under these guarantees. This current exposure consists of the net of accounts receivable and accounts payable and the forward value on open positions, less any collateral posted. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power is subject to </font></p> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2"><font style="font-family: Times New Roman;" class="_mt" size="3">&bull;</font></font></td> <td valign="top" width="1%"><font class="_mt" size="1">&nbsp;</font></td> <td valign="top" align="left"> <p align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">counterparty collateral calls related to commodity contracts, and </font></p></td></tr></table> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2"><font style="font-family: Times New Roman;" class="_mt" size="3">&bull;</font></font></td> <td valign="top" width="1%"><font class="_mt" size="1">&nbsp;</font></td> <td valign="top" align="left"> <p align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">certain creditworthiness standards as guarantor under performance guarantees of its subsidiaries. </font></p></td></tr></table> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Changes in commodity prices can have a material impact on collateral requirements under such contracts, which are posted and received primarily in the form of cash and letters of credit. Power also routinely enters into futures and options transactions for electricity and natural gas as part of its operations. These futures contracts usually require a cash margin deposit with brokers, which can change based on market movement and in accordance with exchange rules. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The face value of outstanding guarantees, current exposure and margin positions as of March&nbsp;31, 2011 and December&nbsp;31, 2010 are shown below: </font></p> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 12px;">&nbsp;</p> <table border="0" cellspacing="0" cellpadding="0" width="96%" align="center"> <tr><td width="70%"> </td> <td valign="bottom" width="10%"> </td> <td> </td> <td> </td> <td> </td> <td valign="bottom" width="10%"> </td> <td> </td> <td> </td> <td> </td></tr> <tr><td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="margin-top: 0px; margin-bottom: 0px;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>As of<br />March&nbsp;31,</b></font></p> <p style="border-bottom: #000000 1px solid; margin-top: 0px; width: 20pt; margin-bottom: 1px;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>2011</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="margin-top: 0px; margin-bottom: 0px;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>As of<br />December&nbsp;31,</b></font></p> <p style="border-bottom: #000000 1px solid; margin-top: 0px; width: 20pt; margin-bottom: 1px;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>2010</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td></tr> <tr><td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="6" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2">Millions</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Face Value of Outstanding Guarantees</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">1,998</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">1,936</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Exposure under Current Guarantees</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">297</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">330</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Letters of Credit Margin Posted</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">199</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">137</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Letters of Credit Margin Received</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">64</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">109</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td height="8"> </td> <td height="8" colspan="4"> </td> <td height="8" colspan="4"> </td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Cash Deposited and Received</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 2em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Counterparty Cash Margin Deposited</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">0</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">0</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 2em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Counterparty Cash Margin Received</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">(4</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">)&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">(2</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">)&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 2em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Net Broker Balance Received</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">(3</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">)&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">(28</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">)&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">In the event Power were to lose its investment grade rating:</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 2em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Additional Collateral that could be Required</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">772</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">828</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Liquidity Available under PSEG's and Power's Credit Facilities to Post Collateral</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">2,752</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">2,750</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Additional Amounts Posted</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 2em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Other Letters of Credit</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">98</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">98</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr></table> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power nets receivables and payables with the corresponding net energy contract balances. See Note 10. Financial Risk Management Activities for further discussion. The remaining balance of net cash (received) deposited is primarily included in Accounts Payable. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; font-size: 1px;">&nbsp;</p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In the event of a deterioration of Power's credit rating to below investment grade, which would represent a two level downgrade from its current ratings, many of these agreements allow the counterparty to demand further performance assurance. See table above. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In addition to amounts for outstanding guarantees, current exposure and margin positions, Power had posted letters of credit to support various other non-energy contractual and environmental obligations. See table above. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Environmental Matters </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Passaic River </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Historic operations by PSEG companies and the operations of hundreds of other companies along the Passaic and Hackensack Rivers are alleged by Federal and State agencies to have discharged substantial contamination into the Passaic River/Newark Bay Complex. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b><i>Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) </i></b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The U.S. Environmental Protection Agency (EPA) has determined that an <font class="_mt">eight</font>-mile stretch of the Passaic River in the area of Newark, New Jersey is a "facility" within the meaning of that term under CERCLA. The EPA has determined the need to perform a study of the entire <font class="_mt">17</font>-mile tidal reach of the lower Passaic River. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSE&amp;G and certain of its predecessors conducted operations at properties in this area on or adjacent to the Passaic River. The properties included&nbsp;<font class="_mt">one</font> operating electric generating station (Essex Site), which was transferred to Power,&nbsp;<font class="_mt">one</font> former generating station and&nbsp;<font class="_mt">four</font> former manufactured gas plant (MGP) sites. When the Essex Site was transferred from PSE&amp;G to Power, PSE&amp;G obtained releases and indemnities for liabilities arising out of the former Essex generating station and Power assumed any environmental liabilities. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The EPA believes that hazardous substances were released from the Essex Site and&nbsp;<font class="_mt">one</font> of PSE&amp;G's former MGP locations (Harrison Site). In 2006, the EPA notified the potentially responsible parties (PRPs) that the cost of its study would greatly exceed the original estimated cost of $<font class="_mt">20</font> million.&nbsp;<font class="_mt">73</font> PRPs, including Power and PSE&amp;G, agreed to assume responsibility for the study and to divide the associated costs according to a mutually agreed upon formula. The PRP group, currently&nbsp;<font class="_mt">69</font> members, is presently executing the study. Approximately&nbsp;<font class="_mt">five</font> percent of the study costs are attributable to PSE&amp;G's former MGP sites and approximately&nbsp;<font class="_mt">one</font> percent to Power's generating stations. Power has provided notice to insurers concerning this potential claim. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In 2007, the EPA released a draft "Focused Feasibility Study" that proposed six options to address the contamination cleanup of the lower&nbsp;<font class="_mt">eight</font> miles of the Passaic River. The estimated costs for the proposed remedy range from $<font class="_mt">1.3</font> billion to $<font class="_mt">3.7</font> billion. The work contemplated by the study is not subject to the cost sharing agreement discussed above. A revised focused feasibility study may be released as early as the second quarter of 2011. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In June 2008, an agreement was announced between the EPA and two PRPs for removal of a portion of the contaminated sediment in the Passaic River at an estimated cost of $<font class="_mt">80</font> million. The two PRPs have reserved their rights to seek contribution for the removal costs from the other PRPs, including Power and PSE&amp;G. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b><i>New Jersey Spill Compensation and Control Act (Spill Act) </i></b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In 2005, the New Jersey Department of Environmental Protection (NJDEP) filed suit against a PRP and its related companies in the New Jersey Superior Court seeking damages and reimbursement for costs expended by the State of New Jersey to address the effects of the PRP's discharge of hazardous substances into both the Passaic River and the balance of the Newark Bay Complex. Power and PSE&amp;G are alleged to have owned, operated or contributed hazardous substances to a total of 11 sites or facilities that impacted these water bodies. In February 2009, third party complaints were filed against some&nbsp;<font class="_mt">320</font> third party defendants, including Power and PSE&amp;G, claiming that each of the third party defendants is responsible for its proportionate share of the clean-up costs for the hazardous substances they allegedly discharged into the Passaic River and the Newark Bay Complex. The third party complaints seek statutory contribution and contribution under the Spill Act to recover past and future removal costs and damages. Power and PSE&amp;G filed answers to the complaint in June 2010. A special master for discovery has been appointed by the court. Power and PSE&amp;G believe they have good and valid defenses to the allegations contained in the third party complaints and will vigorously assert those defenses. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b><i>Natural Resource Damage Claims </i></b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In 2003, the NJDEP directed PSEG, PSE&amp;G and&nbsp;<font class="_mt">56</font> other PRPs to arrange for a natural resource damage assessment and interim compensatory restoration of natural resource injuries along the lower Passaic River and its tributaries pursuant to the Spill Act. The NJDEP alleged that hazardous substances had been discharged from the Essex Site and the Harrison Site. The NJDEP estimated the cost of interim natural resource injury restoration activities along the lower Passaic River at approximately $<font class="_mt">950</font> million. In 2007, agencies of the United States Department of Commerce and the United States Department of the Interior sent letters to PSE&amp;G and other PRPs inviting participation in an assessment of injuries to natural resources that the agencies intended to perform. In 2008, PSEG and a number of other PRPs agreed to share certain immaterial costs the trustees have incurred and will incur going forward, and to work with the trustees to explore whether some or all of the trustees' claims can be resolved in a cooperative fashion. That effort is continuing. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b><i>Newark Bay Study Area </i></b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The EPA has established the Newark Bay Study Area, which it defines as Newark Bay and portions of the Hackensack River, the Arthur Kill and the Kill Van Kull. In August 2006, the EPA sent PSEG and&nbsp;<font class="_mt">11</font> other entities notices that it considered each of the entities to be a PRP with respect to contamination in the Study Area. The notice letter requested that the PRPs fund an EPA-approved study in the Newark Bay Study Area and encouraged the PRPs to contact Occidental Chemical Corporation (OCC) to discuss participating in the Remedial Investigation/Feasibility Study that OCC was conducting. The notice stated the EPA's belief that hazardous substances were released from sites owned by PSEG companies and located on the Hackensack River, including&nbsp;<font class="_mt">two</font> operating electric generating stations (Hudson and Kearny sites) and&nbsp;<font class="_mt">one</font> former MGP site. PSEG is participating in and partially funding this study. Notices to fund the next phase of the study have been received but it is uncertain at this time whether the PSEG companies will consent to fund the next phase. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSEG, Power and PSE&amp;G cannot predict what further actions, if any, or the costs or the timing thereof, may be required with respect to the Passaic River, the NJDEP Litigation, the Newark Bay Study Area or with respect to natural resource damages claims; however, such costs could be material. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>MGP Remediation Program </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSE&amp;G is working with the NJDEP to assess, investigate and remediate environmental conditions at PSE&amp;G's former MGP sites. To date,&nbsp;<font class="_mt">38</font> sites requiring some level of remedial action have been identified. The NJDEP has also announced initiatives to accelerate the investigation and subsequent remediation of the riverbeds underlying surface water bodies that have been impacted by hazardous substances from adjoining sites. In 2005, the NJDEP initiated a program on the Delaware River aimed at identifying the ten most significant sites for cleanup.&nbsp;<font class="_mt">One</font> of the sites identified was PSE&amp;G's former Camden Coke facility. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">During the third quarter of 2010, PSE&amp;G updated the estimated cost to remediate all MGP sites to completion and determined that the cost to completion could range between $<font class="_mt">668</font> million and $<font class="_mt">774</font> million from September&nbsp;30, 2010 through 2021. Since no amount within the range was considered to be most likely, PSE&amp;G reflected a liability of $<font class="_mt">668</font> million on its Condensed Consolidated Balance Sheet as of September&nbsp;30, 2010. Since September&nbsp;30, 2010, PSE&amp;G had $<font class="_mt">10</font> million of expenditures, reducing the liability to $<font class="_mt">658</font> million as of March&nbsp;31, 2011. Of this amount, $<font class="_mt">59</font> million was recorded in Other Current Liabilities and $<font class="_mt">599</font> million was reflected as Environmental Costs in Noncurrent Liabilities. PSE&amp;G has recorded a $<font class="_mt">658</font> million Regulatory Asset with respect to these costs. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; font-size: 1px;">&nbsp;</p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Prevention of Significant Deterioration (PSD)/New Source Review (NSR) </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The PSD/NSR regulations, promulgated under the Clean Air Act, require major sources of certain air pollutants to obtain permits, install pollution control technology and obtain offsets, in some circumstances, when those sources undergo a "major modification," as defined in the regulations. The federal government may order companies that are not in compliance with the PSD/NSR regulations to install the best available control technology at the affected plants and to pay monetary penalties ranging from $<font class="_mt">25,000</font> to $<font class="_mt">37,500</font> per day for each violation, depending upon when the alleged violation occurred. </font></p> <p style="padding-bottom: 0px; margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In November 2006, Power reached an agreement with the EPA and the NJDEP to achieve emissions reductions targets at certain of Power's generating stations. Under this agreement, Power was required to undertake a number of technology projects, plant modifications and operating procedure changes at the Hudson and Mercer facilities designed to meet targeted reductions in emissions of sulfur dioxide (SO</font><font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">2</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2">), nitrogen oxide (NO</font><font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">x</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2">), particulate matter and mercury. Power completed the construction of all plant modifications by the end of 2010 at a cost of $<font class="_mt">1.3</font> billion. Performance testing to validate the agreed-upon emission reductions is ongoing. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In January 2009, the EPA issued a notice of violation to Power and the other owners of the Keystone coal fired plant in Pennsylvania, alleging, among other things, that various capital improvement projects were completed at the plant which are considered modifications (or major modifications) causing significant net emission increases of PSD/NSR air pollutants, beginning in 1985 for Keystone Unit 1 and in 1984 for Keystone Unit 2. The notice of violation states that none of these modifications underwent PSD/NSR permitting process prior to being put into service, which the EPA alleges was required under the Clean Air Act. The notice of violation states that the EPA may issue an order requiring compliance with the relevant Clean Air Act provisions and may seek injunctive relief and/or civil penalties. Power owns approximately <font class="_mt">23</font>% of the plant. Power cannot predict the outcome of this matter. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Hazardous Air Pollutants Regulation </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In accordance with a court ruling, the EPA proposed a Maximum Achievable Control Technology (MACT) regulation in March 2011 which is expected to be finalized by November 2011. This regulation includes reduction of mercury and other hazardous air pollutants pursuant to the Clean Air Act. Until the final rule is adopted, the impact cannot be determined; however, if the rule is adopted as proposed, Power believes the back end technology environmental controls recently installed at its Hudson and Mercer coal facilities should meet the rule's requirements. At Power's Connecticut and some of the other New Jersey facilities, some additional controls could be necessary, pending engineering evaluation. The impact to Power's jointly owned coal fired generating facilities in Pennsylvania is under evaluation. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">New Jersey regulations required coal fired electric generating units to meet certain emissions limits or reduce mercury emissions by approximately <font class="_mt">90</font>% by December&nbsp;15, 2007. Companies that are parties to multi-pollutant reduction agreements, such as Power, have been permitted to postpone such reductions on half of their coal fired electric generating capacity until December&nbsp;15, 2012. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">With its newly installed controls in New Jersey, Power is expected to achieve the required mercury reductions that are part of Power's multi-pollutant reduction agreement that resolved issues arising out of the PSD/NSR air pollution control programs discussed above. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In 2007, Pennsylvania finalized its "state-specific" requirements to reduce mercury emissions from coal fired electric generating units. In 2009, the Commonwealth Court of Pennsylvania struck down the state rule, indicating that the rule violated Pennsylvania law because it was inconsistent with the Clean Air Act. This decision was affirmed by the Supreme Court of Pennsylvania. </font></p> <p style="padding-bottom: 0px; margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>NO<font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">x</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2"> Regulation </font></b></font></p> <p style="padding-bottom: 0px; margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In April 2009, the NJDEP finalized revisions to NO</font><font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">x</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2"> emission control regulations that impose new NO</font><font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">x</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2"> emission reduction requirements and limits for New Jersey fossil fuel fired electric generating units. The rule has a significant impact on Power's generation fleet, as it imposes NO</font><font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">x</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2"> emissions limits that will require significant capital investment for controls or the retirement of up to&nbsp;<font class="_mt">102</font> combustion turbines (approximately&nbsp;<font class="_mt">2,000</font> MW) and&nbsp;<font class="_mt">five</font> older New Jersey steam electric generating units (approximately&nbsp;<font class="_mt">800</font> MW) by April&nbsp;30, 2015. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power has been working with the NJDEP throughout the development of this rulemaking to minimize financial impact and to provide for transitional lead time to address the retirement of electric generating units. Power cannot predict the financial impact resulting from compliance with this rulemaking. </font></p> <p style="padding-bottom: 0px; margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Under current Connecticut regulations, Power's Bridgeport and New Haven facilities have been utilizing Discrete Emission Reduction Credits (DERCs) to comply with certain NO</font><font style="font-family: Times New Roman;" class="_mt" size="1"><sub style="position: relative; vertical-align: baseline; top: 0.4ex;">x</sub></font><font style="font-family: Times New Roman;" class="_mt" size="2"> emission limitations that were incorporated into the facilities' operating permits. On April&nbsp;30, 2010, Power negotiated new agreements with the State of Connecticut extending the continued use of DERCs for certain emission units and equipment until May&nbsp;31, 2014. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>New Jersey Industrial Site Recovery Act (ISRA) </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Potential environmental liabilities related to the alleged discharge of hazardous substances at certain generating stations have been identified. In the second quarter of 1999, in anticipation of the transfer of PSE&amp;G's generation-related assets to Power, a study was conducted pursuant to ISRA, which applied to the sale of certain assets. Power had a $<font class="_mt">50</font> million liability related to these obligations, which was included in Environmental Costs on Power's and PSEG's Condensed Consolidated Balance Sheets as of March&nbsp;31, 2011 and December&nbsp;31, 2010. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Clean Water Act Permit Renewals </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Pursuant to the Federal Water Pollution Control Act (FWPCA), New Jersey Pollutant Discharge Elimination System (NJPDES) permits expire within five years of their effective date. In order to renew these permits, but allow a plant to continue to operate, an owner or operator must file a permit application no later than six months prior to expiration of the permit. Power has filed or will be filing applications for permits in a variety of states. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">One of the most significant NJPDES permits governing cooling water intake structures at Power is for Salem. In 2001, the NJDEP issued a renewed NJPDES permit for Salem, expiring in July 2006, allowing for the continued operation of Salem with its existing cooling water intake system. In February 2006, Power filed with the NJDEP a renewal application allowing Salem to continue operating under its existing NJPDES permit until a new permit is issued. Power prepared its renewal application in accordance with the FWPCA Section&nbsp;316(b) and the 316(b) rules published in 2004. Those rules did not mandate the use of cooling towers at large existing generating plants. Rather, the rules provided alternatives for compliance with 316(b), including the use of restoration efforts to mitigate for the potential effects of cooling water intake structures, as well as the use of site-specific analysis to determine the best technology available for minimizing adverse impact based upon a cost-benefit test. Power has used restoration and/or a site-specific cost-benefit test in applications filed to renew the permits at its once-through cooled plants, including Salem, Hudson and Mercer. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">As a result of several challenges to the 2004 316(b) rule by certain northeast states, environmentalists and industry groups, the rule has been suspended and has been returned to the EPA to be consistent with a January 2007 U.S. Court of Appeals for the Second Circuit decision, as modified by an April 2009 United States Supreme Court decision. In sum, the Second Circuit issued a decision that remanded major portions of the regulations and determined that Section&nbsp;316(b) of the FWPCA does not support the use of restoration and the site-specific cost-benefit test. In April&nbsp;2009, the U.S. Supreme Court reversed the Second Circuit's opinion concerning the cost-benefit test, concluding that the EPA could rely upon cost-benefit analysis in setting the national performance standards and in providing for cost-benefit variances from those standards as part of the Phase II regulations. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In late 2010, the EPA entered into a settlement agreement with environmental groups that established a schedule to develop a new 316(b) rule. On April&nbsp;20, 2011, the EPA published the proposed rule and comments are due 90 days thereafter. The proposed rule would establish certain standards for existing cooling water intake structures with a design flow of more than&nbsp;<font class="_mt">2</font>&nbsp;million gallons per day. If the rule were to be adopted as proposed, the majority of Power's electric generating facilities would be affected as they employ once-through cooling utilizing tidal river and tidal waters. Power is reviewing the proposed rule and assessing the potential impact on its generating facilities. Power is unable to predict the outcome of this proposed rulemaking, the final form that the proposed regulations may take and the effect, if any, that they may have on its future capital requirements, financial condition or results of operations which could be material. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The results of further proceedings on this matter could have a material impact on Power's ability to renew permits at its larger once-through cooled plants, including Salem, Hudson, Mercer, Bridgeport and possibly Sewaren and New Haven, without making significant upgrades to existing intake structures and cooling systems. The costs of those upgrades to one or more of Power's once-through cooled plants could be material, and would require economic review to determine whether to continue operations at these facilities. For example, in Power's application to renew its Salem permit, filed with the NJDEP in February 2006, the estimated costs for adding cooling towers for Salem were approximately $<font class="_mt">1</font> billion, of which Power's share would have been approximately $<font class="_mt">575</font> million. These cost estimates have not been updated. Currently, potential costs associated with any closed cycle cooling requirements are not included in Power's forecasted capital expenditures. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In addition to the EPA rulemaking, several states, including California and New York, have begun setting policies that may require closed cycle cooling. It is unknown how these policies will ultimately impact the EPA's rulemaking. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In January 2010, the NJDEP issued a draft NJPDES permit to another company which would require the installation of closed cycle cooling at that company's nuclear generating station located in New Jersey. In December 2010, NJDEP and that company entered into an Administrative Consent Order (ACO) which would require the company to cease operations at the nuclear generating station no later than 2019. In the ACO, the NJDEP agreed that closed cycle cooling is not the best technology available for that facility and agreed to issue a new draft NJPDES permit for that facility without a requirement for construction of cooling towers or other closed cycle cooling facilities. The new draft NJPDES permit will be issued in substitution for the draft NJPDES permit issued in January 2010. We cannot predict at this time the final outcome of the NJDEP decision and the impact, if any, such a decision would have on any of Power's once-through cooled generating stations. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Stormwater </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In October 2008, the NJDEP notified Power that it must apply for an individual stormwater discharge permit for its Hudson generating station. Hudson stores its coal in an open air pile and, as a result, it is exposed to precipitation. Discharge of stormwater from Hudson has been regulated pursuant to a Basic Industrial Stormwater General Permit, authorization of which has been previously approved by the NJDEP. The NJDEP has determined that Hudson is no longer eligible to utilize this general permit. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In December 2010, the NJDEP issued a draft renewal NJPDES permit to Power which, among other things, proposed conditions regarding stormwater runoff from the Hudson coal pile. The NJDEP authorized a new discharge of stormwater runoff without further requirement to construct technologies preventing the discharge of stormwater to surface water or groundwater. The draft permit is subject to public comment. It is unclear when the NJDEP will issue a final NJPDES permit. To the extent the NJDEP reverses course and requires elimination of the exposure of coal to stormwater, or requires new technologies to prevent the discharge of stormwater to surface or groundwater, those costs could be material. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>New Generation and Development </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Nuclear </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power has approved the expenditure of approximately $<font class="_mt">192</font> million for a steam path retrofit and related upgrades at its co-owned Peach Bottom Units 2 and 3. Completion of these upgrades is expected to result in an increase of Power's share of nominal capacity by approximately&nbsp;<font class="_mt">32</font> MW (<font class="_mt">14</font> MW at Unit 3 in 2011 and&nbsp;<font class="_mt">18</font> MW at Unit 2 in 2012). Total expenditures through March&nbsp;31, 2011 were $<font class="_mt">57</font> million and are expected to continue through 2012. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power has begun expenditures in pursuit of additional output through an extended power uprate of the Peach Bottom nuclear units. The uprate is expected to be in service in 2015 for Unit 2 and 2016 for Unit 3. Power's share of the increased capacity is expected to be approximately&nbsp;<font class="_mt">133</font> MW with an anticipated cost of approximately $<font class="_mt">400</font> million. Total expenditures through March&nbsp;31, 2011 were $<font class="_mt">22</font> million and are expected to continue through 2016. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Connecticut </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power has been selected by the Connecticut Department of Public Utility Control in a regulatory process to build&nbsp;<font class="_mt">130</font> MW of gas fired peaking capacity. Final approval has been received and construction is expected to commence in the second quarter of 2011. The project is expected to be in service by June 2012. Power estimates the cost of these generating units to be $<font class="_mt">130</font> million to $<font class="_mt">140</font> million. Total capitalized expenditures through March&nbsp;31, 2011 were $<font class="_mt">60</font> million, which are included in Property, Plant and Equipment on the Condensed Consolidated Balance Sheets of PSEG and Power. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>PJM Interconnection L.L.C. (PJM) </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power plans to construct gas fired peaking facilities at its Kearny site. Capacity in the amount of&nbsp;<font class="_mt">178</font> MW was bid into and cleared the PJM Reliability Pricing Model (RPM) base residual capacity auction for the 2012-2013 period. Final approval has been received and construction is expected to commence in the second quarter of 2011. The project is expected to be in service by June 2012. In addition, capacity in the amount of&nbsp;<font class="_mt">89</font> MW was bid into and cleared the PJM RPM base residual capacity auction for the 2013-2014 period. Final approval has been received, and the project is expected to be in service by June 2012. Power estimates the cost of these generating units to be $<font class="_mt">250</font> million to $<font class="_mt">300</font> million. Total capitalized expenditures through March&nbsp;31, 2011 were $<font class="_mt">64</font> million which are included in Property, Plant and Equipment on Power's and PSEG's Condensed Consolidated Balance Sheets. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>PSE&amp;G&#8212;Solar </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">As part of the BPU-approved Solar 4 All Program, PSE&amp;G is installing up to&nbsp;<font class="_mt">40</font> MW of solar generation on existing utility poles within its service territory. PSE&amp;G has entered into an agreement to purchase solar units for this program. PSE&amp;G's commitments under this agreement are contingent upon, among other things, the availability of suitable utility poles for installation of the units.&nbsp;Approximately&nbsp;<font class="_mt">18</font> MW have been installed as of March&nbsp;31, 2011. PSE&amp;G's cumulative investments for these solar units were approximately $<font class="_mt">130</font> million, with additional purchases to be made on a quarterly basis during the remaining two-year term of the purchase agreement. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Another aspect of the Solar 4 All program is the installation of another&nbsp;<font class="_mt">40</font> MW of solar systems on land and buildings owned by PSE&amp;G and third parties. Through March&nbsp;31, 2011,&nbsp;<font class="_mt">19</font> MW representing 13 projects were placed into service with an investment of approximately $<font class="_mt">100</font> million. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Basic Generation Service (BGS) and Basic Gas Supply Service (BGSS) </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSE&amp;G obtains its electric supply requirements for customers who do not purchase electric supply from third party suppliers through the annual New Jersey BGS auctions. Pursuant to applicable BPU rules, PSE&amp;G enters into the Supplier Master Agreement (SMA) with the winners of these BGS auctions following the BPU's approval of the auction results. PSE&amp;G has entered into contracts with Power, as well as with other winning BGS suppliers, to purchase BGS for PSE&amp;G's load requirements. The winners of the auction (including Power) are responsible for fulfilling all the requirements of a PJM Load Serving Entity including the provision of capacity, energy, ancillary services, transmission and any other services required by PJM. BGS suppliers assume all volume risk and customer migration risk and must satisfy New Jersey's renewable portfolio standards. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; font-size: 1px;">&nbsp;</p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power seeks to mitigate volatility in its results by contracting in advance for the sale of most of its anticipated electric output as well as its anticipated fuel needs. As part of its objective, Power has entered into contracts to directly supply PSE&amp;G and other New Jersey electric distribution companies (EDCs) with a portion of their respective BGS requirements through the New Jersey BGS auction process, described above. In addition to the BGS-related contracts, Power also enters into firm supply contracts with EDCs, as well as other firm sales and commitments. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSE&amp;G has contracted for its anticipated BGS-Fixed Price eligible load, as follows: </font></p> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 12px;">&nbsp;</p> <table border="0" cellspacing="0" cellpadding="0" width="96%" align="center"> <tr><td width="58%"> </td> <td valign="bottom" width="3%"> </td> <td> </td> <td> </td> <td> </td> <td valign="bottom" width="3%"> </td> <td> </td> <td> </td> <td> </td> <td valign="bottom" width="3%"> </td> <td> </td> <td> </td> <td> </td> <td valign="bottom" width="3%"> </td> <td> </td> <td> </td> <td> </td></tr> <tr><td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td style="border-bottom: #000000 1px solid;" valign="bottom" colspan="14" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Auction Year</b></font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td></tr> <tr><td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="border-bottom: #000000 1px solid; width: 20pt;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>2008</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="border-bottom: #000000 1px solid; width: 20pt;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>2009</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="border-bottom: #000000 1px solid; width: 20pt;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>2010</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="border-bottom: #000000 1px solid; width: 20pt;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>2011</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">36-Month Terms Ending</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">May&nbsp;2011</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">May&nbsp;2012</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">May&nbsp;2013</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">May&nbsp;2014</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">(A)&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Load (MW)</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">2,800</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">2,900</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">2,800</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">2,800</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">$ per kWh</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">0.11150</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">0.10372</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">0.09577</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">0.09430</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr></table> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 6px;">&nbsp;</p> <table style="border-collapse: collapse;" class="MetaData" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr><td valign="top" width="6%" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">(A)</font></td> <td class="MetaData" valign="top" align="left"><font style="font-family: Times New Roman;" class="_mt" size="2">Prices set in the 2011 BGS auction will become effective on June&nbsp;1, 2011 when the 2008 BGS auction agreements expire. </font></td></tr></table> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSE&amp;G has a full requirements contract with Power to meet the gas supply requirements of PSE&amp;G's gas customers. The contract extends through March&nbsp;31, 2012, and year-to-year thereafter. Power has entered into hedges for a portion of these anticipated BGSS obligations, as permitted by the BPU. The BPU permits PSE&amp;G to recover the cost of gas hedging up to&nbsp;<font class="_mt">115</font> billion cubic feet or <font class="_mt">80</font>% of its residential gas supply annual requirements through the BGSS tariff. For additional information, see Note 17. Related-Party Transactions. Current plans call for Power to hedge on behalf of PSE&amp;G approximately&nbsp;<font class="_mt">70</font> billion cubic feet or <font class="_mt">50</font>% of its residential gas supply annual requirements. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Minimum Fuel Purchase Requirements </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power has various long-term fuel purchase commitments for coal and oil to support its fossil generation stations and for supply of nuclear fuel for the Salem and Hope Creek nuclear generating stations and for firm transportation and storage capacity for natural gas. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power's various multi-year contracts for firm transportation and storage capacity for natural gas are primarily used to meet its gas supply obligations to PSE&amp;G. These purchase obligations are consistent with Power's strategy to enter into contracts for its fuel supply in comparable volumes to its sales contracts. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Power's strategy is to maintain certain levels of uranium in inventory and to make periodic purchases to support such levels. As such, the commitments referred to below may include estimated quantities to be purchased that deviate from contractual nominal quantities. Power's nuclear fuel commitments cover approximately <font class="_mt">100</font>% of its estimated uranium, enrichment and fabrication requirements through 2012 and a portion for 2013, 2014 and 2015 at Salem, Hope Creek and Peach Bottom. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">As of March&nbsp;31, 2011, the total minimum purchase requirements included in these commitments were as follows: </font></p> <p style="margin-top: 0px; margin-bottom: 0px; font-size: 12px;">&nbsp;</p> <table border="0" cellspacing="0" cellpadding="0" width="96%" align="center"> <tr><td width="79%"> </td> <td valign="bottom" width="15%"> </td> <td> </td> <td> </td> <td> </td></tr> <tr><td valign="bottom" nowrap="nowrap"> <p style="border-bottom: #000000 1px solid; width: 43pt;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Fuel Type</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom" colspan="2" align="center"> <p style="border-bottom: #000000 1px solid; width: 62pt;" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Commitments<br />through 2015<br />Power's&nbsp;Share</b></font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;</font></td></tr> <tr><td valign="top"> </td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;</font></td> <td valign="bottom" align="center"><font style="font-family: Times New Roman;" class="_mt" size="2">Millions</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Nuclear Fuel</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"> </td> <td valign="bottom"> </td> <td valign="bottom"> </td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 3em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Uranium</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">414</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 3em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Enrichment</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">351</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 3em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Fabrication</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">128</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Natural Gas</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">803</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr> <tr bgcolor="#e5e5e5"><td valign="top"> <p style="text-indent: -1em; margin-left: 1em;"><font style="font-family: Times New Roman;" class="_mt" size="2">Coal</font></p></td> <td valign="bottom"><font class="_mt" size="1">&nbsp;&nbsp;</font></td> <td valign="bottom"><font style="font-family: Times New Roman;" class="_mt" size="2">$</font></td> <td valign="bottom" align="right"><font style="font-family: Times New Roman;" class="_mt" size="2">1,196</font></td> <td valign="bottom" nowrap="nowrap"><font style="font-family: Times New Roman;" class="_mt" size="2">&nbsp;&nbsp;</font></td></tr></table> <p style="margin-top: 6px; margin-bottom: 0px; font-size: 1px;">&nbsp;</p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Included in the $<font class="_mt">1,196</font> million commitment for coal is $<font class="_mt">723</font> million related to a certain coal contract under which Power can cancel contractual deliveries at minimal cost. In 2011, Power has not cancelled any coal shipments. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Regulatory Proceedings </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Electric Discount and Energy Competition Act (Competition Act) </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In April 2007, PSE&amp;G and Transition Funding were served with a purported class action complaint (Complaint) in New Jersey Superior Court challenging the constitutional validity of certain stranded cost recovery provisions of the Competition Act, seeking injunctive relief against continued collection from PSE&amp;G's electric customers of the Transition Bond Charge (TBC) of Transition Funding, as well as recovery of TBC amounts previously collected. Under New Jersey law, the Competition Act, enacted in 1999, is presumed constitutional. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In July 2007, the plaintiff filed an amended Complaint to also seek injunctive relief from continued collection of related taxes as well as recovery of such taxes previously collected. In July 2007, PSE&amp;G filed a motion to dismiss the amended Complaint, which was granted in October 2007. In November 2007, the plaintiff filed a notice of appeal with the Appellate Division of the New Jersey Superior Court. In February 2009, the New Jersey Appellate Division affirmed the decision of the lower court dismissing the case. In May 2009, the New Jersey Supreme Court denied a request from the plaintiff to review the Appellate Division's decision. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In July 2007, the same plaintiff also filed a petition with the BPU requesting review and adjustment to PSE&amp;G's recovery of the same stranded cost charges. In September 2007, PSE&amp;G filed a motion with the BPU to dismiss the petition. In June 2010, the BPU granted PSE&amp;G's motion to dismiss. In April 2011, the BPU issued a written order memorializing this decision. The petitioner had previously stated that it would appeal the BPU's written order to the New Jersey Appellate Division and has until June&nbsp;6, 2011 to do so. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>New Jersey Clean Energy Program </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In 2008, the BPU approved funding requirements for each New Jersey utility applicable to its Renewable Energy and Energy Efficiency programs for the years 2009 to 2012. The aggregate funding amount is $<font class="_mt">1.2</font> billion for all years. PSE&amp;G's share is $<font class="_mt">705</font> million. PSE&amp;G has recorded a discounted liability of $<font class="_mt">385</font> million as of March&nbsp;31, 2011. Of this amount, $<font class="_mt">211</font> million was recorded as a current liability and $<font class="_mt">174</font> million as a noncurrent liability. The liability has been recorded with an offsetting Regulatory Asset, since the costs associated with this program are expected to be recovered from PSE&amp;G ratepayers through the societal benefits charge. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Long-Term Capacity Agreement Pilot Program (LCAPP) </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">In January&nbsp;2011, New Jersey enacted the LCAPP Act directing the BPU to conduct a process to procure and subsidize up to&nbsp;<font class="_mt">2,000</font> megawatts of baseload or mid-merit electric power generation. In March 2011 the BPU issued a written order approving a form of agreement and selecting three generators to build a total of approximately&nbsp;<font class="_mt">1,949</font> MWs of new combined-cycle generating facilities located in New Jersey. Each of the New Jersey EDCs, including PSE&amp;G, executed standard offer capacity agreements (SOCA) with each of the three selected generators in compliance with the BPU's directive, but did so under protest preserving its legal rights. The SOCA requires that the generator bid in and clear the PJM RPM base residual auction in each year of the SOCA term.&nbsp;The SOCA provides for the EDCs to make capacity payments to, or receive capacity payments from, the generators as calculated based on the difference between the RPM clearing price for each year of the term and the price bid and accepted for that generator in the BPU process. The LCAPP Act and the BPU order provide that, once the SOCAs are executed and approved by the BPU, they will be irrevocable and the EDCs will be entitled to full rate recovery of the prudently incurred costs. On April 27, 2011, the BPU approved the executed contracts and also announced that it will convene a proceeding to consider whether current mechanisms are adequate to incent needed generation construction in New Jersey. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; font-size: 1px;">&nbsp;</p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Leveraged Lease Investments </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">The IRS has issued reports with respect to its audits of PSEG's consolidated federal corporate income tax returns for tax years 1997 through 2003, which disallowed all deductions associated with certain lease transactions. The IRS reports also proposed a <font class="_mt">20</font>% penalty for substantial understatement of tax liability. PSEG has filed protests of these findings with the Office of Appeals of the IRS. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSEG believes its tax position related to these transactions was proper based on applicable statutes, regulations and case law in effect at the time that the deductions were taken. There are several pending tax cases involving other taxpayers with similar leveraged lease investments. <font class="_mt"><font style="font-family: Times New Roman;" class="_mt" size="2">To date, six cases have been decided at the trial court level, four of which were decided in favor of the government. The appeals of two of these decisions were affirmed, both in favor of the government. The fifth case involves a jury verdict that was challenged by both parties on inconsistency grounds but was later settled by the parties. One case, involving an investment in an energy transaction by a utility, was decided in favor of the taxpayer. </font></font></font><font style="font-family: Times New Roman;" class="_mt" size="2">In order to reduce the cash tax exposure related to these leases, Energy Holdings pursued opportunities to terminate international leases with lessees that were willing to meet certain economic thresholds. As of December&nbsp;31, 2010, Energy Holdings had terminated all of these leasing transactions and reduced the related cash tax exposure by $<font class="_mt">1.1</font> billion. PSEG has completely eliminated its gross investment in such transactions. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Cash Impact </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">As of March&nbsp;31, 2011, an aggregate of approximately $<font class="_mt">263</font> million would become currently payable if PSEG conceded all deductions taken through that date. PSEG has deposited $<font class="_mt">320</font> million with the IRS to defray potential interest costs associated with this disputed tax liability, eliminating its cash exposure completely. In the event PSEG is successful in defense of its position, the deposit is fully refundable with interest. Penalties of $<font class="_mt">150</font> million would also become payable if the IRS successfully asserted and litigated a case against PSEG. PSEG has not established a reserve for penalties because it believes it has strong defenses to the assertion of penalties under applicable law. Interest and penalty exposure will grow at an average rate of $<font class="_mt">2</font> million per quarter during 2011. If the IRS is successful in a litigated case consistent with the positions it has taken in the generic settlement offer recently proposed, an additional $<font class="_mt">20</font> million to $<font class="_mt">40</font> million of tax would be due for tax positions through March&nbsp;31, 2011. </font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">Unless this matter is resolved with the IRS, PSEG currently anticipates that it may be required to pay between $<font class="_mt">110</font> million and $<font class="_mt">300</font> million in tax, interest and penalties for the tax years 1997-2000 during 2011 and subsequently commence litigation to recover those amounts. It is possible that an additional payment of between $<font class="_mt">220</font> million and $<font class="_mt">540</font> million could be required during 2011 for tax years 2001-2003 followed by further litigation to recover those amounts. The amounts that may be required to litigate differ from the potential net cash exposure noted above, as the former amounts include all potential deficiencies for only contested tax years 1997 through 2003. These litigation amounts also include penalties which are not included in the computation of potential net cash exposure as PSEG believes it has strong defenses. These amounts also exclude an offset for taxes paid on lease terminations, which is netted in the potential net cash exposure as PSEG would be entitled to a refund of such amounts under a loss scenario. Any potential claims PSEG would make to recover such amounts would include the deposit noted above. </font></p> <p style="margin-top: 6px; margin-bottom: 0px; margin-left: 7%;"><font style="font-family: Times New Roman;" class="_mt" size="2"><b>Earnings Impact </b></font></p> <p style="margin-top: 6px; margin-bottom: 0px;"><font style="font-family: Times New Roman;" class="_mt" size="2">PSEG's current reserve position represents its view of the earnings impact that could result from a settlement related to these transactions, although a total loss, consistent with the broad settlement offer proposed by the IRS, would result in an additional earnings charge of $<font class="_mt">120</font> million to $<font class="_mt">140</font> million. </font></p> </div>Note 8. Commitments and Contingent Liabilities Guaranteed Obligations Power's activities primarily involve the purchase and sale of energy and relatedfalsefalsefalsefalsefalseOtherus-types:textBlockItemTypestringIncludes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables.Reference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher FASB -Name FASB Interpretation (FIN) -Number 14 -Paragraph 3 Reference 2: http://www.xbrl.org/2003/role/presentationRef -Publisher FASB -Name Statement of Financial Accounting Standard (FAS) -Number 5 -Paragraph 9, 10, 11, 12 falsefalse12Commitments and Contingent LiabilitiesUnKnownUnKnownUnKnownUnKnownfalsetrue