# Ormat Technologies, Inc. S-1 filed Jul 21, 2004: Engineering, Procurement and Construction Contract

- Company: Ormat Technologies, Inc. (ORA)
- Filing: Form S-1 (General form of registration statement for all companies including face-amount certificate companies), filed Jul 21, 2004
- Document: Engineering, Procurement and Construction Contract (file084.htm)
- Page for people: https://s6y.io/c/ora/S-1-20040721/file084.htm
- Original at the SEC, the official copy: https://www.sec.gov/Archives/edgar/data/1296445/000095013604002269/file084.htm
- The document is about 32,300 words long, too long to read at once, so it is served in parts. This page is its outline; the text is at the addresses below.
- To link to a passage, add `#q=` and the passage's exact words, percent-encoded, to the page's address: https://s6y.io/c/ora/S-1-20040721/file084.htm#q=the%20exact%20words
- To check a quote first: https://s6y.io/quote?path=/c/ora/S-1-20040721/file084.htm&q=the%20exact%20words

---

## Parts

- Part 1: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=1 (begins “Exhibit 10.5.3”)
- Part 2: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=2 (begins “(r) Not less than six (6) months prior to the Scheduled…”)
- Part 3: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=3 (begins “(e) Accept the Geothermal Fluid for return to the…”)
- Part 4: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=4 (begins “(iii) if the Parties agree that the Binary Plant can not…”)
- Part 5: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=5 (begins “(i) it has knowledge of all of the legal requirements…”)
- Part 6: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=6 (begins “Contractor shall provide the following insurance no later…”)
- Part 7: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=7 (begins “less any amounts previously paid to Contractor for such…”)

The whole document at once: https://s6y.io/c/ora/S-1-20040721/file084.htm.md?part=all
