What this report says

The opening of each item, in the filer's own words, from the report.

Item 1.01 Entry Into a Material Definitive Agreement.

Additional ZAR 1.5 billion RMB Facility

On September 26, 2018, Net 1 UEPS Technologies, Inc. (“Net1”), through one of its subsidiaries, Net1 Applied Technologies South Africa Proprietary Limited (“Net1 SA”), entered into a Second Amendment & Restatement Agreement, which includes an Amended and Restated Common Terms Agreement, and a Senior Facility E Agreement (collectively, the “RMB Loan Documents”) with FirstRand Bank Limited, acting through its Rand Merchant Bank division (“RMB”) and certain other parties, pursuant to which, among other things, Net1 SA may borrow up to ZAR 1.5 billion to fund Net1 SA’s ATMs. Net1 agreed to guarantee the obligations of Net1 SA to RMB.

The material terms and conditions of the RMB Loan Documents are more fully discussed in Item 2.03 below.

On September 26, 2018, the USD/ZAR exchange rate was $1.00 / ZAR 14.25.

Read it in the report

Item 2.03 Creation of a Direct Financial Obligation or an Obligation under an Off-Balance Sheet Arrangement of a Registrant.

Additional ZAR1.5 billion RMB Facility

The RMB Loan Documents provide for a Facility E overdraft facility of up to ZAR 1.5 billion.

Interest on the overdraft facility is payable on the last day of each month and on the final maturity date based on the Johannesburg Interbank Agreed Rate in effect from time to time plus a margin of 1.00% . The JIBAR rate was 7.0% on September 26, 2018.

The overdraft facility matures on September 26, 2019.

The overdraft facility amount utilized must be repaid in full within one month of utilization and at least 90% of the amount utilized must be repaid with 25 days.

The overdraft facility is secured by a pledge by Net1 SA of, among other things, cash and certain bank accounts utilized in Net1 SA’s ATM funding process, the cession of an insurance policy with Senate Transit Underwriters Managers Proprietary Limited, and any rights and claims Net1 SA has against Grindrod Bank Limited.

This item goes on. Read the rest in the report

Documents

  1. Current report filing 8-K

Exhibits

  1. 10.95 Material contract EX-10.95
  2. 10.96 Material contract EX-10.96
  3. 10.97 Material contract EX-10.97
  4. 10.98 Material contract EX-10.98

On sec.gov