PROPERTY, PLANT AND EQUIPMENT |
12 Months Ended | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dec. 31, 2015 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PROPERTY, PLANT AND EQUIPMENT [Text Block] | NOTE 4 - PROPERTY, PLANT AND EQUIPMENT During the year ended December 31, 2015, the Company focused development activities on the San Emidio Phase II; Guatemala, Crescent Valley and WGP Geysers projects with development. Drilling and testing costs of approximately $665,000 were incurred on the San Emidio Phase II. Drilling costs exceeded $1,526,000 in Guatemala. Drilling costs of approximately $1,096,000 were incurred on the first production well at Crescent Valley. Costs were incurred at WGP Geysers for site preparation, an interconnection study and well field testing that totaled approximately $1,551,000. In September 2015, the Company disposed of the fully depreciated old power plant located in San Emidio, Nevada at its historical cost of $2,275,475. In November 2015, the Company purchased all of the long lead equipment for the construction of three binary geothermal power plants for $1.5 million. During the year ended December, 2014, the Company engaged in development activities for San Emidio, Nevada and the Guatemala projects. Two new exploration wells for the San Emidio Phase II project were drilled, and one other well drilled in 2013 was placed into production during the year for approximately $2.03 million. A portion of the drilling and development costs were offset by grant proceeds of $632,210. The new production well was connected to the existing Phase I power plant and is producing fluid to the plant as part of a long term test of the South Zone reservoir. During the year, costs that exceeded $924,000 were incurred at Guatemala for the construction of nine temperature gradient wells. On December 12, 2014, the Company completed an acquisition of Earth Power Resources Inc. After acquisition, the Company incurred approximately $133,000 on the drilling of a new production well (see note 15 for details). Effective April 22, 2014, the Company acquired a group of companies (The Geysers, California) that included long-term assets that totaled $7.8 million (land of $1.6 million, wells and other construction in progress of $6.2 million). After acquisition, the Company incurred development costs of approximately $259,000 for design and study work for a new power plant, transmission line and well field (see note 15 for details). Property, plant and equipment, at cost, are summarized as follows:
Depreciation expense charged to plant operations and administrative costs for the years ended December 31, 2015 and 2014, was $6,228,133 and $6,186,132 ; respectively. Changes in construction in progress are summarized as follows:
Constructions in Progress, at cost, consisting of the following projects/assets by location are as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||