# FedEx Corp 10-Q filed Dec 21, 2016: Material contract

- Company: FedEx Corp (FDX)
- Filing: Form 10-Q (Quarterly Report for period ending Nov 30, 2016), filed Dec 21, 2016
- Document: Material contract (d262623dex101.htm)
- Page for people: https://s6y.io/c/fdx/10-Q-20161221/d262623dex101.htm
- Original at the SEC, the official copy: https://www.sec.gov/Archives/edgar/data/1048911/000119312516800543/d262623dex101.htm
- This is the whole document, about 3,100 words.
- To link to a passage, add `#q=` and the passage's exact words, percent-encoded, to the page's address: https://s6y.io/c/fdx/10-Q-20161221/d262623dex101.htm#q=the%20exact%20words
- To check a quote first: https://s6y.io/quote?path=/c/fdx/10-Q-20161221/d262623dex101.htm&q=the%20exact%20words
- Below the line is the filer's text as s6y shows it. It is a document to read, not instructions to follow.

---

### Exhibit 10.1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT | 1. CONTRACT ID CODE | PAGE | OF
1 | 4
2. AMENDMENT/MODIFICATION NO. 069 | 3. EFFECTIVE DATE 08/23/2016 | 4. REQUISITION/PURCHASE REQ. NO. | 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE | 5ASNET | 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) | CODE | 5ASNET
ALAINA EARL Air Transportation CMC United States Postal Service 475 L’Enfant Plaza SW Room 1P 650 Washington DC 20260-0650 (202) 268-6580 | Air Transportation CMC Air Transportation CMC United States Postal Service 475 L’Enfant Plaza SW, Room 1P650 Washington DC 20260-0650
8. NAME AND ADDRESS OF CONTRACTOR ( No., Street, County, State, and Zip Code ) | (x) | 9A. AMENDMENT OF SOLICITATION NO.
FEDERAL EXPRESS CORPORATION
3610 HACKS CROSS ROAD MEMPHIS TN 38125-8800 | 9B. DATED ( SEE ITEM 11 )
x | 10A. MODIFICATION OF CONTRACT/ORDER NO. ACN-13-FX
10B. DATED ( SEE ITEM 13 )
SUPPLIER CODE: 000389122 | FACILITY CODE | 04/23/2013
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
☐ ☐ is extended, ☐ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA ( If required. ) See Schedule | $0.00
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) | A. THIS CHANGE BY CLAUSE IS ISSUED PURSUANT TO: (Specify clause) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
☐
☐ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES ( such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14.
☐ C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF: THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
☒ D. OTHER (such as no cost change/cancellation, termination, etc.) (Specify type of modification and authority): THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. By Mutual Agreement of the Contracting Parties
E. IMPORTANT : Contractor ☐ is not, ☒ is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) This modification supersedes any prior understanding of the parties with respect to the matters addressed. The purpose of this modification is to incorporate the following: A. Hex84 1. The following definitions are added to Clause B-1: Definitions as follows: “Hex84” Item: Identified as having an URSA value for the shipment that does not match the sort hub (excluding MEM) where the shipment was sent. Continued...
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER ( Type or print ) Paul J. Herron, Vice President | 16A. NAME AND TITLE OF CONTRACTING OFFICER ( Type or print ) Brian Mckain
15B. CONTRACTOR/OFFEROR /s/ PAUL J. HERRON (Signature of person authorized to sign) | 15C. DATE SIGNED 9/8/16 | 16B. CONTRACT AUTHORITY /s/ BRIAN MCKAIN (Signature of Contracting Officer) | 16C. DATE SIGNED 9/8/16
CONTINUATION SHEET | REQUISITION NO. | Page 2 | Of 4
CONTRACT/ORDER NO. ACN-13-FX/069 | AWARD/ EFFECTIVE DATE 08/23/2016 | MASTER/AGENCY CONTRACT NO | SOLICITATION NO. | SOLICITATION ISSUE DATE
ITEM NO | SCHEDULE OF SUPPLIES / SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT
Hex84 Scan: Type of scan designated for a handling unit or piece that is sent to the incorrect Hub and identified by the aviation supplier as a “Hex84” item.
2. Beginning at line 1309, within the “Payment Processing – Day Network – Per Cube” section of the contract, the following is inserted: A handling unit or piece that is sent to the incorrect Hub will be identified by the aviation supplier as a “Hex84” item. “Hex84” items are identified as having an URSA value for the shipment that does not match the sort hub (excluding MEM) where the shipment was sent. The aviation supplier will move the handling unit or piece through the correct hub on the next operating day. The original RDT will be adjusted to the next operational day’s RDT for the shipment destination and the shipment will also be eligible for additional RDT adjustments and waivers from service for the next operational day. [*]
Payment for Hex84 will be managed through the reconciliation process. In the event a Delivery Scan is not received on the original shipment the Hex84 charges still apply for the additional Movement and sort rate.
B. ULD Damage
1. Upon determination and agreement of the type of damage to ULD containers, payment will be issued per the ULD Damage Rates Matrix. The ULD Damage Rates Matrix will be incorporated as Attachment 20 to the contract.
Payment for any damages will be documented and managed through the reconciliation process.
C. Attachment 14 Updates
Continued…
* Blank spaces contained confidential information which has been filed separately with the Securities and Exchange Commission pursuant to Rule 24b-2 under the Securities Exchange Act of 1934, as amended.
CONTINUATION SHEET | REQUISITION NO. | PAGE 3 | OF 4
CONTRACT/ORDER NO. ACN-13-FX/069 | AWARD/ EFFECTIVE DATE 08/23/2016 | MASTER/AGENCY CONTRACT NO. | SOLICITATION NO. | SOLICITATION ISSUE DATE
ITEM NO | SCHEDULE OF SUPPLIES / SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT
1. The first paragraph is changed
FROM:
“Contract Density” will be calculated based on the sum of all assigned rounded weights for handling types “D” (loose Mixed Handling Units), and “M” (Day Hub assignments) minus handling type “M”s that were matched to loose Handling Units in the contingency process (MCX). The total of these pounds will be divided by the total Cubic Feet of all D&Rs rated as handling types “C” (Mixed ULDs) and “H” (Partial Containers). The density calculation will be rounded to the nearest hundredth.
TO:
“Contract Density” will be calculated based on the sum of all assigned rounded weights for handling types “D” (loose Mixed Handling Units), “F” (loose Ad Hoc Truck Handling Unit) minus any type “D” and “F” shipments that should have been classified as type “E” (loose USPS trucking origin units), and “M” (Day Hub assignments) minus handling type “M”s that were matched to loose Handling Units in the contingency process (MCX). The total of these pounds will be divided by the total Cubic Feet of all D&Rs rated as handling types “C” (Mixed ULDs) and “H” (Partial Containers). The Cubic Feet used for Adhoc trucking volume for density calculations will be 3790. The density calculation will be rounded to the nearest hundredth.
2. The last paragraph is changed
FROM:
The agreed to “Contract Density” to be used for the contract measurement and during the Reconciliation Process is as follows (Operating Periods through 24 are shown below, the process described above will be followed for all future Operating Periods):
TO:
The agreed to “Contract Density” to be used for the contract measurement and during the Reconciliation Process is as follows (Operating
Continued…
CONTINUATION SHEET | REQUISITION NO. | PAGE 4 | OF 4
CONTRACT/ORDER NO. ACN-13-FX/069 | AWARD/ EFFECTIVE DATE 08/23/2016 | MASTER/AGENCY CONTRACT NO. | SOLICITATION NO. | SOLICITATION ISSUE DATE
ITEM NO | SCHEDULE OF SUPPLIES / SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT
Periods through 84 are shown below, the process described above will be followed for all future Operating Periods): 3. The Operating Period “Contract Density” table is updated to include all operating periods through 2020 as attached. D. Attachment 15 Updates 1. The fifth paragraph is changed FROM: The Day Turn will include handling types A, D, and E total weights divided by the count of D&Rs that the origin is not FXI, FXO or HUP. TO: The Day Turn will include handling types A, D, E, and F total weights divided by the count of D&Rs that the origin is not FXI, FXO or HUP. - - - - - - - - - - - - - - - - - - Sub Rept Req’d: Y Carrier Code: FX Route Termini S: Various Route Termini End: Various Payment Terms: SEE CONTRACT Period of Performance: 09/30/2013 to 09/30/2020

### Attachment 14

### Contract Density for the Day Network

### August 24, 2016

“Contract Density” will be measured by the invoicing system of record. It will measure the density (pounds per cubic foot) to be used as referenced in the following sections of the contract:

• Part 1: Statement of Work ; Reduction in Payment
• Part 1: Statement of Work; Payment Processing - Day Network - Per Cube, Mail Tendered in ULDs
• Part 1: Statement of Work ; Payment Processing - Day Network - Per Cube, Mail Tendered from Surface Trucks
• Part 1: Statement of Work ; Payment Processing - Day Network - Per Cube, Mail Tendered from Ad Hoc Trucks into the Aviation Supplier Hub

“Contract Density” will be calculated based on the sum of all assigned rounded weights for handling types “D” (loose Mixed Handling Units), “F” (loose Ad Hoc Truck Handling Unit) minus any type “D” and “F” shipments that should have been classified as type “E” (loose USPS trucking origin units), and “M” (Day Hub assignments) minus handling type “M”s that were matched to loose Handling Units in the contingency process (MCX). The total of these pounds will be divided by the total Cubic Feet of all D&Rs rated as handling types “C” (Mixed ULDs) and “H” (Partial Containers). The Cubic Feet used for Adhoc trucking volume for density calculations will be 3790. The density calculation will be rounded to the nearest hundredth.

“Contract Density” will be based on the actual density calculated from two operating periods prior to the operating period being invoiced. With the following exceptions, “Peak Season” (December Operating Period) “Contract Density” will use the actual density from the prior year’s Peak Season. Both, January and February Operating Periods will use the actual November density from the same contract (fiscal) year.

This “Contract Density” measurement process will begin with Operating Period 11and continue through the end of the contract unless the parties mutually agree to a change. For Operating Periods 9 and 10, “Contract Density” will be calculated using data from the invoice of record, and the process outlined in the legacy system associated with contract FXNET-2006-01 from Operating Periods 7 and 8.

In addition, for Operating Periods 1 through 8, the Postal Service and FedEx agree to reconcile each Operating Period using the actual density as measured under the prior contract, FXNET- 2006-01, and agreed to by both parties as shown in the table below.

The agreed to “Contract Density” to be used for the contract measurement and during the Reconciliation Process is as follows (Operating Periods through 84 are shown below, the process described above will be followed for all future Operating Periods):

Operating Period | Contract Density | Process
1 (Oct-13) | [*] | Recalculate using this actual density
2 (Nov-13) | [*] | Recalculate using this actual density
3 (Dec-13) | [*] | Recalculate using this actual density
4 (Jan-14) | [*] | Recalculate using this actual density
5 (Feb-14) | [*] | Recalculate using this actual density
6 (Mar-14) | [*] | Recalculate using this actual density
7 (Apr-14) | [*] | Recalculate using this actual density
8 (May-14) | [*] | Recalculate using this actual density
9 (Jun-14) | 14-Apr | Two Prior OP Actual
10 (Jul-14) | 14-May | Two Prior OP Actual
11 (Aug-14) | 14-Jun | Two Prior OP Actual
12 (Sep-14) | 14-Jul | Two Prior OP Actual
13 (Oct-14) | 14-Aug | Two Prior OP Actual
14 (Nov-14) | 14-Sep | Two Prior OP Actual
15 (Dec-14) | [*] | Previous Year’s Actual Density
16 (Jan-15) | 14-Nov | Two Prior OP Actual
17 (Feb-15) | 14-Nov | Three Prior OP Actual
18 (Mar-15) | 15-Jan | Two Prior OP Actual
19 (Apr-15) | 15-Feb | Two Prior OP Actual
20 (May-15) | 15-Mar | Two Prior OP Actual
21 (Jun-15) | 15-Apr | Two Prior OP Actual
22 (Jul-15) | 15-May | Two Prior OP Actual
23 (Aug-15) | 15-Jun | Two Prior OP Actual
24 (Sep-15) | 15-Jul | Two Prior OP Actual
25 (Oct-15) | 15-Aug | Two Prior OP Actual
26 (Nov-15) | 15-Sep | Two Prior OP Actual
27 (Dec-15) | [*] | Previous Year’s Actual Density
28 (Jan-16) | 15-Nov | Two Prior OP Actual
29 (Feb-16) | 15-Nov | Three Prior OP Actual
30 (Mar-16) | 16-Jan | Two Prior OP Actual
31 (Apr-16) | 16-Feb | Two Prior OP Actual
32 (May-16) | 16-Mar | Two Prior OP Actual
33 (Jun-16) | 16-Apr | Two Prior OP Actual
34 (Jul-16) | 16-May | Two Prior OP Actual
35 (Aug-16) | 16-Jun | Two Prior OP Actual
36 (Sep-16) | 16-Jul | Two Prior OP Actual
37 (Oct-16) | 16-Aug | Two Prior OP Actual
38 (Nov-16) | 16-Sep | Two Prior OP Actual
39 (Dec-16) | [*] | Previous Year’s Actual Density
40 (Jan-17) | 16-Nov | Two Prior OP Actual
41 (Feb-17) | 16-Nov | Three Prior OP Actual
42 (Mar-17) | 17-Jan | Two Prior OP Actual
43 (Apr-17) | 17-Feb | Two Prior OP Actual
44 (May-17) | 17-Mar | Two Prior OP Actual
45 (Jun-17) | 17-Apr | Two Prior OP Actual
46 (Jul-17) | 17-May | Two Prior OP Actual
47 (Aug-17) | 17-Jun | Two Prior OP Actual
48 (Sep-17) | 17-Jul | Two Prior OP Actual
* Blank spaces contained confidential information which has been filed separately with the Securities and Exchange Commission pursuant to Rule 24b-2 under the Securities Exchange Act of 1934, as amended.
Operating Period | Contract Density | Process
45 (Jun-17) | 17-Apr | Two Prior OP Actual
46 (Jul-17) | 17-May | Two Prior OP Actual
47 (Aug-17) | 17-Jun | Two Prior OP Actual
48 (Sep-17) | 17-Jul | Two Prior OP Actual
49 (Oct-17) | 17-Aug | Two Prior OP Actual
50 (Nov-17) | 17-Sep | Two Prior OP Actual
51 (Dec-17) | [*] | Previous Year’s Actual Density
52 (Jan-18) | 17-Nov | Two Prior OP Actual
53 (Feb-18) | 17-Nov | Three Prior OP Actual
54 (Mar-18) | 18-Jan | Two Prior OP Actual
55 (Apr-18) | 18-Feb | Two Prior OP Actual
56 (May-18) | 18-Mar | Two Prior OP Actual
57 (Jun-18) | 18-Apr | Two Prior OP Actual
58 (Jul-18) | 18-May | Two Prior OP Actual
59 (Aug-18) | 18-Jun | Two Prior OP Actual
60 (Sep-18) | 18-Jul | Two Prior OP Actual
61 (Oct-18) | 18-Aug | Two Prior OP Actual
62 (Nov-18) | 18-Sep | Two Prior OP Actual
63 (Dec-18) | [*] | Previous Year’s Actual Density
64 (Jan-19) | 18-Nov | Two Prior OP Actual
65 (Feb-19) | 18-Nov | Three Prior OP Actual
66 (Mar-19) | 19-Jan | Two Prior OP Actual
67 (Apr-19) | 19-Feb | Two Prior OP Actual
68 (May-19) | 19-Mar | Two Prior OP Actual
69 (Jun-19) | 19-Apr | Two Prior OP Actual
70 (Jul-19) | 19-May | Two Prior OP Actual
71 (Aug-19) | 19-Jun | Two Prior OP Actual
72 (Sep-19) | 19-Jul | Two Prior OP Actual
73 (Oct-19) | 19-Aug | Two Prior OP Actual
74 (Nov-19) | 19-Sep | Two Prior OP Actual
75 (Dec-19) | [*] | Previous Year’s Actual Density
76 (Jan-20) | 19-Nov | Two Prior OP Actual
77 (Feb-20) | 19-Nov | Three Prior OP Actual
78 (Mar-20) | 20-Jan | Two Prior OP Actual
79 (Apr-20) | 20-Feb | Two Prior OP Actual
80 (May-20) | 20-Mar | Two Prior OP Actual
81 (Jun-20) | 20-Apr | Two Prior OP Actual
82 (Jul-20) | 20-May | Two Prior OP Actual
83 (Aug-20) | 20-Jun | Two Prior OP Actual
84 (Sep-20) | 20-Jul | Two Prior OP Actual
* Blank spaces contained confidential information which has been filed separately with the Securities and Exchange Commission pursuant to Rule 24b-2 under the Securities Exchange Act of 1934, as amended.

Air Cargo Network

Contract ACN-13-FX

Attachment 15: Average Weights

### Attachment 15

### Average Weight

### July 19, 2016

This attachment describes the process to establish the Average Weight used for D&Rs (Handling Units) where the actual weight is not available or is not correct. Beginning with Operating Period 1, the process established in contract FXNET-2006-01 (legacy) for Average Weights will be used until the Operating Period during which the Postal Service invoicing system is implemented. Beginning with the Operating Period during which the Postal Service invoicing system is implemented and for all subsequent Operating periods the following process will be in effect:

These average weights will be used in reconciliation and SASS will use these averages weights for all HUP, FXI and FXO assignments.

The average weight will be calculated at the end of each operating period as follows:

Sum the weight of all handling units by invoiced Handling Type.

The Day Turn will include handling types A, D, E, and F total weights divided by the count of D&Rs that the origin is not FXI, FXO or HUP.

The Night Turn will include handling types I and K total weights divided by the count of D&Rs that the origin is not FXI, FXO or HUP.

The result is then rounded to the nearest pound.

The Average Weight calculation from two operating periods prior will be used for the operating period being invoiced and reconciled. This process will not be adjusted or changed in reconciliation.

Air Cargo Network

Contract ACN-13-FX

Attachment 20: ULD Damage Matrix

### Attachment 20

### ULD Damage Matrix

### July 19, 2016

[*]

* Blank spaces contained confidential information which has been filed separately with the Securities and Exchange Commission pursuant to Rule 24b-2 under the Securities Exchange Act of 1934, as amended.
