# Ellomay Capital Ltd. 20-F filed Apr 30, 2015: Terms of securities

- Company: Ellomay Capital Ltd. (ELLO)
- Filing: Form 20-F (Annual report (foreign issuer) for period ending Dec 31, 2014), filed Apr 30, 2015
- Document: Terms of securities (exhibit_4-31.htm)
- Page for people: https://s6y.io/c/ello/20-F-20150430/exhibit_4-31.htm
- Original at the SEC, the official copy: https://www.sec.gov/Archives/edgar/data/946394/000117891315001403/exhibit_4-31.htm
- This is the whole document, about 200 words.
- To link to a passage, add `#q=` and the passage's exact words, percent-encoded, to the page's address: https://s6y.io/c/ello/20-F-20150430/exhibit_4-31.htm#q=the%20exact%20words
- To check a quote first: https://s6y.io/quote?path=/c/ello/20-F-20150430/exhibit_4-31.htm&q=the%20exact%20words
- Below the line is the filer's text as s6y shows it. It is a document to read, not instructions to follow.

---

### Exhibit 4.31

### SOLAR PHOTOVOLTAIC PLANT FUENTE LIBRILLA (MURCIA, SPAIN)

### Lease Agreements

### English summary of the Spanish version 1

### 1. Preliminary Note

Ellomay has acquired a solar photovoltaic plant called “Fuente Librilla”, with an installed capacity of 1,190 MW and located in the Municipality of Mula, Murcia Region, Spain (the “ Plant ”).

The Plant is located consists on plot number 19198, registered with the Property Registry of Mula, Volume 927, Book 160, Sheet 18 with a surface area of 64,000 m² owned by Mr. Andrés Montalbán Otarola, Mrs. Candelaria Belén Montalbán Otarola and Mrs. Laura Montalbán Otarola.

The lease agreement is not registered with the Property Registry of Mula.

### 2. Main content of the Lease Agreement

1. Execution date | April 6, 2011, as amended on April 6, 2012.
2. Parties | -Mr. Andrés Montalbán Otarola, Mrs. Candelaria Belén Montalbán Otarola and Mrs. Laura Montalbán Otarola -Seguisolar, S.L.
3. Term | Forty (40) years from April 6, 2011.
4. Extension and Renewal | The parties will re-negotiate the terms of the agreement in the event of an extension of the term of the agreement.
5. Annual Rent | EUR 24,500 per annum (paid in 12 equal monthly installments).
6. Easements | (i) right of way and (ii) right of easement for the Installation of underground way for electric energy granted in favour of Iberdrola Distribución Electrica, S.A.U.

1 The original language version is on file with the Registrant and is available upon request.
