2.2.0.7falseCommitments and Contingencies1060 - Disclosure - Commitments and Contingenciestruefalsefalsefalse1USDfalsefalsePureStandardhttp://www.xbrl.org/2003/instancepurexbrli0USDStandardhttp://www.xbrl.org/2003/iso4217USDiso42170SharesStandardhttp://www.xbrl.org/2003/instancesharesxbrli0USDPerShareDividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instancesharesxbrli0$20eix_CommitmentsAndContingenciesDisclosureAbstracteixfalsenadurationNo definition available.falsefalsefalsefalsefalsetruefalsefalsefalsefalsefalsefalse1falsefalsefalsefalse00falsefalsefalsexbrli:stringItemTypestringNo definition available.false31us-gaap_CommitmentsAndContingenciesDisclosureTextBlockus-gaaptruenadurationNo definition available.falsefalsefalsefalsefalsefalsefalsefalsefalsefalsefalseterselabelfalse1falsefalsefalsefalse00<table style="font-size:10pt; font-family:'Times New Roman',times,serif;">
<tr>
<td>
<p style="FONT-FAMILY: times"><font size="2"><b>Note 6. Commitments and Contingencies <br /></b></font></p>
<p style="FONT-FAMILY: times"><font size="2"><b><i>Lease Commitments <br /></i></b></font></p>
<p style="FONT-FAMILY: times"><font size="2">SCE entered into two 20-year power purchase contracts which are classified as capital leases and are expected to be recorded on the consolidated balance sheets upon commencement of the contracts in 2012 and 2013. SCE's commitments upon commencement are estimated to be: $38 million in 2012, $98 million in 2013, $120 million in 2014, and $2.1 billion for the period remaining thereafter (amounts representing executory costs and interest are $490 million and $911 million, respectively). </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><b><i>Other Commitments <br /></i></b></font></p>
<p style="FONT-FAMILY: times"><font size="2">At September 30, 2010, SCE had power purchase contracts with additional commitments estimated to be: $30 million for the remainder of 2010, $94 million in 2011, $77 million in 2012, $53 million in 2013, $49 million in 2014, and $1 billion for the period remaining thereafter. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In October 2010, SCE completed its 2010 annual request for offers and entered into new power purchase contracts with commitments estimated to be: $35 million in 2011, $122 million in 2012, $163 million in 2013, and $69 million in 2014. </font></p>
<p style="FONT-FAMILY: times"><font size="2">At September 30, 2010, EMG's subsidiaries had firm commitments to spend approximately $199 million during the remainder of 2010 and $79 million in 2011 on capital and construction expenditures. These expenditures primarily relate to the construction of wind projects. EMG intends to fund these expenditures through project-level and turbine vendor financing, U.S. Treasury grants, cash on hand and cash generated from operations. </font></p>
<p style="FONT-FAMILY: times"><font size="2">EME has entered into various turbine supply agreements with vendors to support its wind development efforts. As of September 30, 2010, EME had commitments, excluding turbines subject to the legal dispute described below, to purchase 46 wind turbines (69 MW) and had 2 wind turbines (6 MW) in storage to be used for future wind projects. EME has payment commitments related to wind turbines of $82 million due in 2011.</font></p>
<p style="FONT-FAMILY: times"><font size="2">Excluded from the turbine commitments referred to above are commitments under a turbine supply agreement between Mitsubishi Power Systems Americas, Inc. and EME, which was subject to a legal dispute as of September 30, 2010. On October 8, 2010, EME and the Mitsubishi entities entered into a settlement agreement with respect to the dispute. As a result of the settlement agreement, EME's $68 million deposit previously paid under the original contract will be applied to the purchase price for 23 wind turbines (55 MW). Within the next three years, EME may elect to deploy 60 additional wind turbines (144 MW). EME may be obligated to make a payment of up to $30 million following the end of the three-year period if it has not elected to deploy the additional turbines and if certain other criteria apply. EME further agreed to payments of up to $40 million for settlement of remaining disputes on turbines purchased. </font></p>
<p style="FONT-FAMILY: times"><font size="2">At September 30, 2010, Midwest Generation and Homer City had fuel purchase commitments with various third-party suppliers for the purchase of coal. Based on the contract provisions, which consist of fixed prices, subject to adjustment clauses, these minimum commitments are estimated to aggregate $883 million, summarized as follows: $136 million for the remainder of 2010, $461 million in 2011, $253 million in 2012, and $33 million in 2013. </font></p>
<p style="FONT-FAMILY: times"><font size="2">At September 30, 2010, Midwest Generation and Homer City each had contractual agreements for the transport of coal to their respective facilities. The commitments under these contracts are based on either actual coal purchases or minimum quantities. Accordingly, contractual obligations for transportation based on actual coal purchases are derived from committed coal volumes set forth in fuel supply contracts. The minimum commitments under these contracts are estimated to aggregate $300 million, summarized as follows: $75 million for the remainder of 2010, and $225 million in 2011. </font></p>
<p style="FONT-FAMILY: times"><font size="2">SCE and EME have letters of credit outstanding under their credit facilities. For further discussion, see Note 3. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><b><i>Guarantees and Indemnities <br /></i></b></font></p>
<p style="FONT-FAMILY: times"><font size="2">Edison International's subsidiaries have various financial and performance guarantees and indemnifications which are issued in the normal course of business. As discussed below, these contracts include performance guarantees, guarantees of debt and indemnifications.</font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Environmental Indemnities Related to the Midwest Generation Plants<br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">In connection with the acquisition of the Midwest Generation plants, EME agreed to indemnify Commonwealth Edison with respect to specified environmental liabilities before and after December 15, 1999, the date of sale. The indemnification claims are reduced by any insurance proceeds and tax benefits related to such claims and are subject to a requirement that Commonwealth Edison takes all reasonable steps to mitigate losses related to any such indemnification claim. This indemnification for environmental liabilities is not limited in term and would be triggered by a valid claim from Commonwealth Edison. Also, in connection with the sale-leaseback transaction related to the Powerton and Joliet Stations in Illinois, EME agreed to indemnify the lessors for specified environmental liabilities. Due to the nature of the obligations under these indemnities, a maximum potential liability cannot be determined. Commonwealth Edison has advised EME that Commonwealth Edison believes it is entitled to indemnification for all liabilities, costs, and expenses that it may be required to bear as a result of the litigation discussed below under "—Contingencies—Midwest Generation New Source Review Lawsuit." The sale-leaseback participants have requested similar indemnification. Except as discussed below, EME has not recorded a liability related to these environmental indemnities. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Midwest Generation entered into a supplemental agreement with Commonwealth Edison and Exelon Generation Company LLC on February 20, 2003 to resolve a dispute regarding interpretation of its reimbursement obligation for asbestos claims under the environmental indemnities set forth in the Asset Sale Agreement. Under this supplemental agreement, Midwest Generation agreed to reimburse Commonwealth Edison and Exelon Generation for 50% of specific asbestos claims pending as of February 2003 and related expenses less recovery of insurance costs, and agreed to a sharing arrangement for liabilities and expenses associated with future asbestos-related claims as specified in the agreement. As a general matter, Commonwealth Edison and Midwest Generation apportion responsibility for future asbestos-related claims based upon the number of exposure sites that are Commonwealth Edison locations or Midwest Generation locations. The obligations under this agreement are not subject to a maximum liability. The supplemental agreement had an initial five-year term with an automatic renewal provision for subsequent one-year terms (subject to the right of either party to terminate); pursuant to the automatic renewal provision, it has been extended until February 2011. There were approximately 220 cases for which Midwest Generation was potentially liable and that had not been settled and dismissed at September 30, 2010. Midwest Generation had recorded a $57 million liability at September 30, 2010 for previous, pending and future claims.</font></p>
<p style="FONT-FAMILY: times"><font size="2">The amounts recorded by Midwest Generation for the asbestos-related liability are based upon a number of assumptions. Future events, such as the number of new claims to be filed each year, the average cost of disposing of claims, as well as the numerous uncertainties surrounding asbestos litigation in the United States, could cause the actual costs to be higher or lower than projected. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Environmental Indemnity Related to the Homer City Facilities<br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">In connection with the acquisition of the Homer City facilities, Homer City agreed to indemnify the sellers with respect to specified environmental liabilities before and after the date of sale. Payments would be triggered under this indemnity by a valid claim from the sellers. EME guaranteed this obligation of Homer City. Also, in connection with the sale-leaseback transaction related to the Homer City facilities, Homer City agreed to indemnify the lessors for specified environmental liabilities. Due to the nature of the obligation under this indemnity provision, it is not subject to a maximum potential liability and does not have an expiration date. For discussion of the NOV received by Homer City and associated indemnity claims, see "—Contingencies—Homer City New Source Review Notice of Violation." EME has not recorded a liability related to this indemnity. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Indemnities Provided under Asset Sale and Sale-Leaseback Agreements<br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">The asset sale agreements for the sale of EME's international assets contain indemnities from EME to the purchasers, including indemnification for taxes imposed with respect to operations of the assets prior to the sale and for pre-closing environmental liabilities. Not all indemnities under the asset sale agreements have specific expiration dates. Payments would be triggered under these indemnities by valid claims from the sellers or purchasers, as the case may be. At September 30, 2010, EME had recorded a liability of $42 million related to these matters.</font></p>
<p style="FONT-FAMILY: times"><font size="2">In connection with the sale of various domestic assets, EME has from time to time provided indemnities to the purchasers for taxes imposed with respect to operations of the asset prior to the sale. EME has also provided indemnities to purchasers for items specified in each agreement (for example, specific pre-existing litigation matters and/or environmental conditions). Due to the nature of the obligations under these indemnity agreements, a maximum potential liability cannot be determined.</font></p>
<p style="FONT-FAMILY: times"><font size="2">Not all indemnities under the asset sale agreements have specific expiration dates. Payments would be triggered under these indemnities by valid claims from the sellers or purchasers, as the case may be. No significant amounts are recorded as a liability for these matters. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In connection with the sale-leaseback transactions related to the Homer City facilities in Pennsylvania, the Powerton and Joliet Stations in Illinois and, previously, the Collins Station in Illinois, EME and several of its subsidiaries entered into tax indemnity agreements. Although the Collins Station lease terminated in April 2004, Midwest Generation's tax indemnity agreement with the former lease equity investor is still in effect. Under these tax indemnity agreements, these entities agreed to indemnify the lessors in the sale-leaseback transactions for specified adverse tax consequences that could result in certain situations set forth in each tax indemnity agreement, including specified defaults under the respective leases. The potential indemnity obligations under these tax indemnity agreements could be significant. Due to the nature of these potential obligations, EME cannot determine a maximum potential liability which would be triggered by a valid claim from the lessors. No significant amounts are recorded as a liability for these matters. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Indemnity Provided as Part of the Acquisition of Mountainview <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">In connection with the acquisition of the Mountainview power plant, SCE agreed to indemnify the seller with respect to specific environmental claims related to SCE's previously owned San Bernardino Generating Station, divested by SCE in 1998 and reacquired as part of the Mountainview acquisition. SCE retained certain responsibilities with respect to environmental claims as part of the original divestiture of the station. The aggregate liability for either party to the purchase agreement for damages and other amounts is a maximum of $60 million. This indemnification for environmental liabilities expires on or before March 12, 2033. SCE has not recorded a liability related to this indemnity. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Mountainview Filter Cake Indemnity <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">The Mountainview power plant utilizes water from on-site groundwater wells and City of Redlands ("City") recycled water for cooling purposes. Unrelated to the operation of the plant, the groundwater contains perchlorate. The pumping of the water removes perchlorate from the aquifer beneath the plant and concentrates it in the plant's wastewater treatment "filter cake." Use of this impacted groundwater for cooling purposes was mandated by Mountainview's California Energy Commission permit. SCE has indemnified the City for cleanup or associated actions related to groundwater contaminated by perchlorate due to the disposal of filter cake at the City's solid waste landfill. The obligations under this agreement are not limited to a specific time period or subject to a maximum liability. SCE has not recorded a liability related to this indemnity. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Other Edison International Indemnities <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">SCE provides other indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, and specified environmental indemnities and income taxes with respect to assets sold. SCE's obligations under these agreements may be limited in terms of time and/or amount, and in some instances SCE may have recourse against third parties for certain indemnities. The obligated amounts of these indemnifications often are not explicitly stated, and the overall maximum amount of the obligation under these indemnifications cannot be reasonably estimated. SCE has not recorded a liability related to these indemnities.</font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><b><i>Contingencies <br /></i></b></font></p>
<p style="FONT-FAMILY: times"><font size="2">In addition to the matters disclosed in these Notes, Edison International is involved in other legal, tax and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Environmental Developments <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Edison International is subject to numerous environmental laws and regulations, which typically require a lengthy and complex process for obtaining licenses, permits and approvals and require it to incur substantial costs to operate existing facilities, construct and operate new facilities, and mitigate or remove the effect of past operations on the environment. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Possible developments, such as the enactment of more stringent environmental laws and regulations, proceedings that may be initiated by environmental and other regulatory authorities, cases in which new theories of liability are recognized, and settlements agreed to by other companies that establish precedent or expectations for the power industry, could affect the costs and the manner in which business is conducted, and could cause substantial additional capital expenditures or operational expenditures or the ceasing of operations at certain facilities. There is no assurance that any additional costs arising from such developments would be recovered from customers or that Edison International's financial position, results of operations and cash flows would not be materially affected by these developments. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Midwest Generation Environmental Compliance Plans and Costs <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">During the third quarter of 2010, Midwest Generation continued its permitting and planning activities for NO<sub>x</sub> and SO<sub>2</sub> controls to meet the requirements of the CPS. Midwest Generation has received all necessary permits from the Illinois EPA allowing the installation of selective non-catalytic reduction (SNCR) technology on multiple units to meet the NO<sub>x</sub> portion of the CPS, and is engaged with the Illinois EPA with respect to permitting the installation of equipment to meet required reductions for SO<sub>2</sub>. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Work continued on the possible use of flue gas desulfurization (FGD) technology using dry scrubbing with sodium-based sorbents as a method to comply with the SO<sub>2</sub> portion of the CPS. Testing of this technology demonstrated significant reductions in SO<sub>2</sub> emissions when using the type of coal used by Midwest Generation. Use of this technology in combination with the type of coal employed by Midwest Generation is expected to require substantially less capital and installation time than the spray dryer absorber technology originally contemplated, but would likely result in higher ongoing operating costs and may consequently result in lower dispatch rates and competitiveness of Midwest Generation's plants, depending on competitors' costs. Also, the use of dry scrubbing with sodium-based sorbents to meet environmental regulations will likely require Midwest Generation to incur the costs of upgrading its particulate removal systems. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Based on the work to date, Midwest Generation estimates the cost of retrofitting all units, using dry scrubbing with sodium-based sorbents to comply with CPS requirements for SO<sub>2</sub> emissions, and associated upgrading of particulate removal systems, would be approximately $1.2 billion in 2010 dollars. If completed, these expenditures would be incurred over multiple years. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Decisions regarding whether or not to proceed with the above projects or other approaches to compliance remain subject to a number of factors, such as market conditions, regulatory and legislative developments, and forecasted commodity prices and capital and operating costs applicable at the time decisions are required or made. Midwest Generation could also elect to shut down units, instead of installing controls, to be in compliance with the CPS. Therefore, decisions about any particular combination of retrofits and shutdowns it may ultimately employ also remain subject to conditions applicable at the time decisions are required or made. Due to existing uncertainties about these factors, Midwest Generation may defer final decisions about particular units for the maximum time available. Accordingly, final decisions on whether to install controls, to install particular kinds of controls, and to actually expend capital that is budgeted may not occur until 2012 for some of the units and potentially later for others. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Homer City Environmental Issues and Capital Resource Limitations <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">Homer City operates selective catalytic reduction equipment on all three units to reduce NO<sub>x</sub> emissions, operates FGD equipment on Unit 3 to reduce SO<sub>2</sub> emissions, and uses coal-cleaning equipment on site to reduce the ash and sulfur content of raw coal to meet both combustion and environmental requirements. Homer City may be required to install additional environmental equipment on Unit 1 and Unit 2 to comply with environmental regulations for future operations. For further information, see "—Transport Rule" and "—Homer City New Source Review Notice of Violation." Restrictions under the agreements entered into as part of Homer City's 2001 sale-leaseback transaction could affect, and in some cases significantly limit or prohibit, Homer City's ability to incur indebtedness or make capital expenditures. Homer City will have limited ability to obtain additional outside capital for such projects without amending its lease and related agreements. EME is under no contractual obligation to provide funding to Homer City. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Greenhouse Gas Regulation<br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In June 2010, the US EPA finalized the Prevention of Significant Deterioration ("PSD") and Title V GHG tailoring rule. The effective date of the final rule is August 2, 2010. The emissions thresholds for CO<sub>2</sub> equivalents in the final rule are as follows: </font></p>
<div style="PADDING-RIGHT: 0pt; PADDING-LEFT: 0pt; PADDING-BOTTOM: 0pt; MARGIN-LEFT: 0%; WIDTH: 100%; PADDING-TOP: 0pt; POSITION: relative">
<p style="FONT-FAMILY: times"><font size="2"><!-- COMMAND=ADD_TABLEWIDTH,"100%" --></font></p>
<!-- User-specified TAGGED TABLE -->
<div align="center">
<table cellspacing="0" cellpadding="0" width="100%" border="0">
<tr style="HEIGHT: 0px"><!-- TABLE COLUMN WIDTHS SET -->
<td style="FONT-FAMILY: times" align="left" width="134"></td>
<td style="FONT-FAMILY: times" width="12"></td>
<td style="FONT-FAMILY: times" align="left"></td><!-- TABLE COLUMN WIDTHS END --></tr>
<tr style="FONT-SIZE: 1.5pt; HEIGHT: 0px" valign="top">
<td style="BORDER-BOTTOM: #000000 1pt solid; FONT-FAMILY: times" colspan="3"> </td></tr>
<tr style="HEIGHT: 0px" valign="top">
<td style="FONT-FAMILY: times"><font size="2">January – June 2011</font></td>
<td style="FONT-FAMILY: times"><font size="2"> </font></td>
<td style="FONT-FAMILY: times"><font size="2">75,000 tons per year for new and modified sources already subject to PSD for pollutants other than GHGs</font></td></tr>
<tr style="HEIGHT: 0px" valign="top">
<td style="FONT-FAMILY: times"><br />
<font size="2">July 2011 – June 2013</font></td>
<td style="FONT-FAMILY: times"><font size="2"><br />
</font></td>
<td style="FONT-FAMILY: times"><br />
<font size="2">100,000 tons per year for new sources, and 75,000 tons per year for modified sources </font></td></tr>
<tr style="FONT-SIZE: 1.5pt; HEIGHT: 0px" valign="top">
<td style="BORDER-BOTTOM: #000000 1pt solid; FONT-FAMILY: times" colspan="3"> </td></tr></table></div>
<!-- end of user-specified TAGGED TABLE --></div>
<p style="FONT-FAMILY: times"><font size="2">Numerous legal challenges to the greenhouse gas tailoring rule have been filed. As written, the rule applies to all sources meeting the thresholds that are built or modified after January 1, 2011. If controls are required to be installed at the facilities of Edison International subsidiaries in the future in order to reduce greenhouse gas emissions pursuant to regulations issued by the US EPA or others, the potential impact will depend on the nature of the controls applied, which remains uncertain. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Transport Rule <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In July 2010, the US EPA issued a Notice of Proposed Rulemaking for a proposed rule, known as the Transport Rule, which would require 31 eastern states (including Pennsylvania and Illinois) and the District of Columbia to reduce power plant emissions of NO<sub>x</sub> and SO<sub>2</sub> substantially, starting in 2012, with additional reductions in 2014. The Transport Rule would replace the Clean Air Interstate Rule, which had been remanded to the US EPA in 2008 for revision. </font></p>
<p style="FONT-FAMILY: times"><font size="2">The US EPA has proposed three possible approaches to emissions allowance trading. Under its preferred approach, a pollution limit would be set for each state, intrastate trading would be permitted among power plants, and limited interstate trading would also be permitted consistent with the requirement that each state meet its own pollution control obligations. Under the first alternative, a pollution limit would be set for each state, and only intrastate trading of allowances would be permitted. Under the second alternative, a pollution limit would be set for each state, an emissions limit would be set for each power plant, and limited emissions averaging would be permitted among affected units. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Under the Transport Rule, each covered state would initially be subject to a federal implementation plan designed to reduce pollution that significantly contributed to nonattainment of, or interferes with the maintenance of, NAAQS in other states. States would be able to choose to develop state implementation plans to replace the federal implementation plans. </font></p>
<p style="FONT-FAMILY: times"><font size="2">The Transport Rule is scheduled to be finalized in 2011. The Clean Air Interstate Rule will remain in place until that time. EME believes that the US EPA's preferred approach to emissions allowance trading would provide allowance allocations which are adequate for the Midwest Generation plants based on projected emissions using the Illinois CPS allowable emission rates. If adopted as proposed, the Transport Rule may require the installation of additional environmental equipment to reduce SO<sub>2</sub> emissions at Units 1 and 2 of the Homer City facilities. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
National Ambient Air Quality Standard for Sulfur Dioxide <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In June 2010, the US EPA finalized the primary NAAQS for SO<sub>2</sub> by establishing a new one-hour standard at a level of 75 parts per billion. The final standard is in line with EME's expectations and is being taken into account in EME's environmental compliance strategy. Revisions to state implementation plans to achieve compliance with the new standard are due to be submitted to the US EPA by February 2014. The US EPA anticipates that the deadline for attainment with the SO<sub>2</sub> NAAQS will be August 2017 (five years after the US EPA intends to finalize initial determinations as to the areas of the country that are and are not in attainment with the primary SO<sub>2</sub> NAAQS).</font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Hazardous Substances and Hazardous Waste Laws <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In June 2010, the US EPA published proposed regulations relating to coal combustion wastes. Two different proposed approaches are under consideration. The first approach, under which the US EPA would list these wastes as special wastes subject to regulation under Subtitle C of the Resource Conservation and Recovery Act (the section for hazardous wastes), could require EME to incur additional capital and operating costs. The second approach, under which the US EPA would regulate these wastes under Subtitle D of the Resource Conservation and Recovery Act (the section for nonhazardous wastes), is substantially similar to the requirements of existing regulations. Comments on the proposed regulations are due November 19, 2010. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
California Renewable Energy Developments <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In September 2010, CARB voted to adopt a Renewable Electricity Standard regulation, which would require most retail sellers of electricity in California to procure 33% of their electricity from eligible renewable energy resources by 2020. The potential impact of the Standard will depend on provisions, which have not yet been finalized, and therefore remains uncertain. SCE believes that achieving a 33% renewables portfolio standard in this timeframe will be highly ambitious, given the magnitude of the infrastructure build-out required and the slow pace of transmission permitting and approvals. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Once-Through Cooling<br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In May 2010, the California State Water Resources Board issued a final policy, which establishes closed-cycle wet cooling as required technology for retrofitting existing once-through cooled plants like San Onofre and many of the existing fossil-fueled power plants along the California coast. The final policy requires an independent engineering study to be completed prior to the fourth quarter of 2013 regarding the feasibility of compliance by California's two coastal nuclear power plants. Depending on the results of the study, the required compliance may result in significant capital expenditures at San Onofre and may affect its operations. The policy may also significantly impact SCE's ability to procure generating capacity from fossil-fueled plants that use ocean water in once-through cooling systems, system reliability and the cost of electricity to the extent other coastal power plants in California are forced to shut down or limit operations. The policy has the potential to adversely affect California's nineteen once-through cooled power plants, which provide over 21,000 MW of combined, in-state generation capacity, including over 9,100 MW of capacity interconnected within SCE's service territory. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Environmental Remediation <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Edison International records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. Edison International reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operations and maintenance, monitoring and site closure. Unless there is a probable amount, Edison International records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts. </font></p>
<p style="FONT-FAMILY: times"><font size="2">As of September 30, 2010, Edison International's recorded estimated minimum liability to remediate its 29 identified sites at SCE (23 sites) and EME (6 sites primarily related to Midwest Generation) was $42 million, of which $38 million was related to SCE. Edison International's other subsidiaries have no identified remediation sites. The ultimate costs to clean up Edison International's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. Edison International believes that, due to these uncertainties, it is reasonably possible that cleanup costs at these identified sites could exceed its recorded liability by up to $228 million, all of which is related to SCE. The upper limit of this range of costs was estimated using assumptions least favorable to Edison International among a range of reasonably possible outcomes. In addition to its identified sites (sites in which the upper end of the range of costs is at least $1 million), SCE also has 34 immaterial sites for which total liability ranges from $5 million (the recorded minimum liability) to $10 million. </font></p>
<p style="FONT-FAMILY: times"><font size="2">The CPUC allows SCE to recover 90% of its environmental remediation costs at certain sites, representing $34 million of its recorded liability, through an incentive mechanism (SCE may request to include additional sites). Under this mechanism, SCE will recover 90% of cleanup costs through customer rates; shareholders fund the remaining 10%, with the opportunity to recover these costs from insurance carriers and other third parties. SCE has successfully settled insurance claims with all responsible carriers. SCE expects to recover costs incurred at its remaining sites through customer rates. SCE has recorded a regulatory asset of $39 million for its estimated minimum environmental cleanup costs expected to be recovered through customer rates. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Edison International's identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that Edison International may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites. </font></p>
<p style="FONT-FAMILY: times"><font size="2">SCE expects to clean up its identified sites over a period of up to 30 years. Remediation costs in each of the next several years are expected to range from $3 million to $18 million. Recorded costs were $3 million and $2 million for the three months ended September 30, 2010 and 2009, respectively, and were $7 million for both the nine months ended September 30, 2010 and 2009.</font></p>
<p style="FONT-FAMILY: times"><font size="2">Based on currently available information, Edison International believes it is unlikely that it will incur amounts in excess of the upper limit of the estimated range for its identified sites and, based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, Edison International believes that costs ultimately recorded will not materially affect its results of operations, financial position or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to such estimates. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Federal and State Income Taxes <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Edison International's federal income tax returns are currently under examination by the IRS for tax years 2003 through 2006 and are subject to examination through tax year 2009. Edison International's combined California state franchise tax returns are subject to examination for tax years 1991 through 2009. For further discussion, see Note 4. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>2010 FERC Rate Case <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">In September 2009, the FERC issued an order allowing SCE to implement its proposed 2010 rates effective March 1, 2010, subject to refund. The proposed rates would increase SCE's FERC revenue requirement by $107 million, or 24%, over the 2009 FERC revenue requirement primarily due to an increase in transmission rate base, and would result in an approximate 1% increase to SCE's overall system average rate. SCE has terminated settlement negotiations and begun the litigation process for the proposed 2010 rates. A final decision is expected in the second half of 2011. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>FERC Transmission Incentives and CWIP Proceedings <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">In November 2007, the FERC issued an order granting ROE incentive adders, recovery of the ROE and incentive adders in the CWIP proceedings, and 100% recovery of abandoned plant costs (if any) for three of SCE's transmission projects. The current ROE incentive adders are: 100 basis point adder for DCR, 125 basis point adder for Tehachapi, and 75 basis point adder for Rancho Vista. The CPUC filed an appeal of the November order, which had been stayed pending final resolution by the FERC of the 2008 CWIP proceeding. In April 2010, the FERC issued an order on SCE's 2008 CWIP proceeding. The order sets SCE's 2008 base ROE (before incentives) at 9.54% and establishes a methodology for determining the base ROE for 2009 and 2010 CWIP incentives. In May 2010, SCE filed an application for rehearing with the FERC. The order did not have a material impact on SCE's earnings or cash flows. The collected 2008 through 2010 CWIP revenue requirements are subject to refund, pending a final FERC order on these matters. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Homer City New Source Review Notice of Violation <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Recent Developments <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In May 2010, Homer City received an NOV from the US EPA. The new NOV alleges claims similar to those in the 2008 NOV, but it adds nonattainment New Source Review requirements to the alleged PSD violations. It also adds two prior owners of the Homer City facilities as parties. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In July 2010, Homer City received a 60-day Notice of Intent to Sue signed by the State of New York and the Pennsylvania Department of Environmental Protection (PADEP), stating their intent to file a citizen suit based on the same or similar theories advanced by the US EPA in the NOV. The Notice of Intent to Sue also named the sale-leaseback owner participants of the Homer City facilities, Homer City's general partner and limited partner, and two prior owners of the Homer City facilities. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Background <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In June 2008, Homer City received an NOV from the US EPA alleging that, beginning in 1988, Homer City (or former owners of the Homer City facilities) performed repair or replacement projects at Homer City Units 1 and 2 without first obtaining construction permits as required by the PSD requirements of the CAA. The US EPA also alleges that Homer City has failed to file timely and complete Title V permits. The NOV does not specify the penalties or other relief that the US EPA seeks for the alleged violations. On June 30, 2009 and January 2, 2010, the US EPA issued requests for information to Homer City under Section 114 of the CAA. Homer City is working on a response to the requests. Homer City has met with the US EPA and has expressed its intent to explore the possibility of a settlement. If no settlement is reached and the U.S. Department of Justice files suit, litigation could take many years to resolve the issues alleged in the NOV. EME cannot predict the outcome of this matter or estimate the impact on its facilities, its results of operations, financial position or cash flows.</font></p>
<p style="FONT-FAMILY: times"><font size="2">Homer City has sought indemnification for liability and defense costs associated with the NOV from the sellers under the asset purchase agreement pursuant to which Homer City acquired the Homer City facilities. The sellers responded by denying the indemnity obligation, but accepting a portion of defense costs related to the claims. </font></p>
<p style="FONT-FAMILY: times"><font size="2">Homer City notified the sale-leaseback owner participants of the Homer City facilities of the NOV under the operative indemnity provisions of the sale-leaseback documents. The owner participants of the Homer City facilities, in turn, sought indemnification and defense from Homer City for costs and liabilities associated with the Homer City NOV. Homer City responded by recognizing its indemnity obligation and defense of the claims on terms consistent with its contractual obligations. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Midwest Generation New Source Review Lawsuit <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Recent Developments <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In March 2010, the Federal District Court for the Northern District of Illinois dismissed nine of the ten counts related to PSD requirements in the complaint filed by the US EPA and the State of Illinois against Midwest Generation, holding that, as a subsequent owner, Midwest Generation could not be held liable under the PSD provisions for modifications allegedly made by Commonwealth Edison, the prior owner of the Midwest Generation plants. The Court also dismissed the tenth count to the extent it sought civil penalties under the CAA, as barred by the applicable statute of limitations. The decision did not address (i) other counts in the complaint that allege violations of opacity and particulate matter limitations under the Illinois State Implementation Plan and Title V of the CAA, or (ii) the complaint in intervention filed by a group of Chicago-based environmental action groups, which also alleges opacity and particulate matter violations. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In April 2010, the US EPA formally issued to EME the same NOV that was issued to Midwest Generation in 2007. The transmittal letter stated that the action was based on a review of the asset purchase agreement for the Midwest Generation plants and that the NOV was being issued to EME as a successor in interest to Commonwealth Edison. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In June 2010, the US EPA, the State of Illinois, and several environmental groups filed amended complaints in the New Source Review litigation. The amended complaints are similar to the prior complaints, but seek to add Commonwealth Edison and EME as defendants and introduce new legal theories to impose liability on Midwest Generation and EME. Midwest Generation and EME have filed a motion to dismiss the amended complaints, and a status hearing has been scheduled for February 2011.</font></p>
<p style="FONT-FAMILY: times"><font size="2"><br />
Background <br /></font></p>
<p style="FONT-FAMILY: times"><font size="2">In August 2007, Midwest Generation received an NOV from the US EPA alleging that, beginning in the early 1990s and into 2003, Midwest Generation or Commonwealth Edison performed repair or replacement projects at six Illinois coal-fired electric generating stations in violation of the PSD requirements and of the New Source Performance Standards of the CAA, including alleged requirements to obtain a construction permit and to install controls sufficient to meet best available control technology (BACT) emissions rates. The US EPA also alleged that Midwest Generation and Commonwealth Edison violated certain operating permit requirements under Title V of the CAA. Finally, the US EPA alleged violations of certain opacity and particulate matter standards at the Midwest Generation plants. At approximately the same time, Commonwealth Edison received an NOV substantially similar to the Midwest Generation NOV. Midwest Generation, Commonwealth Edison, the US EPA, and the U.S. Department of Justice, along with several Chicago-based environmental action groups, had discussions designed to explore the possibility of a settlement but no settlement resulted. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In August 2009, the US EPA and the State of Illinois filed a complaint in the Northern District of Illinois against Midwest Generation, but not Commonwealth Edison, alleging claims substantially similar to those in the NOV. In addition to seeking penalties ranging from $25,000 to $37,500 per violation, per day, the complaint calls for an injunction ordering Midwest Generation to install controls sufficient to meet BACT emissions rates at all units subject to the complaint; to obtain new PSD or New Source Review permits for those units; to amend its applications under Title V of the CAA; to conduct audits of its operations to determine whether any additional modifications have occurred; and to offset and mitigate the harm to public health and the environment caused by the alleged CAA violations. The remedies sought by the plaintiffs in the lawsuit could go well beyond those required under the CPS. By order dated January 19, 2010, the Court allowed a group of Chicago-based environmental action groups to intervene in the case.</font></p>
<p style="FONT-FAMILY: times"><font size="2">The owner participants of the Powerton and Joliet Stations have sought indemnification and defense from Midwest Generation and/or EME for costs and liabilities associated with these matters. EME responded by recognizing its indemnity obligation and defense of the claims on terms consistent with its contractual obligations. </font></p>
<p style="FONT-FAMILY: times"><font size="2">An adverse decision could involve penalties and remedial actions that could have a material adverse impact on the financial condition and results of operations of EME at such time. EME cannot predict the outcome of these matters or estimate the impact on its facilities, its results of operations, financial position or cash flows. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Navajo Nation Litigation <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">The Navajo Nation filed a complaint in June 1999 against SCE, among other defendants, arising out of the coal supply agreement for Mohave. Subsequently, the Hopi Tribe was added as an additional plaintiff. As amended in April 2010, the Navajo Nation's complaint asserts claims for, among other things, interference with fiduciary duties and contractual relations, fraudulent misrepresentations by nondisclosure, and various contract-related claims. The complaint claims that the defendants' actions prevented the Navajo Nation from obtaining the full value in royalty rates for the coal supplied to Mohave. The complaint seeks damages of not less than $600 million, plus interest thereon, and punitive damages of not less than $1 billion. No trial date has been set for this litigation. In April 2009, in a related case filed in December 1993 against the U.S. Government, the U.S. Supreme Court found that the Navajo Nation did not have a claim for compensation. In September 2010, the Hopi Tribe settled all of its claims and the remaining parties agreed to engage in mediation. SCE cannot predict the outcome of the Navajo Nation's complaint against SCE. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Nuclear Insurance <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Federal law limits public liability claims from a nuclear incident to the amount of available financial protection, which is currently approximately $12.6 billion. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available ($375 million). The balance is covered by a loss sharing program among nuclear reactor licensees. If a nuclear incident at any licensed reactor in the United States results in claims and/or costs which exceed the primary insurance at that plant site, all nuclear reactor licensees could be required to contribute their share of the liability in the form of a deferred premium.</font></p>
<p style="FONT-FAMILY: times"><font size="2">Based on its ownership interests, SCE could be required to pay a maximum of approximately $235 million per nuclear incident. However, it would have to pay no more than approximately $35 million per incident in any one year. If the public liability limit above is insufficient, federal law contemplates that additional funds may be appropriated by Congress. This could include an additional assessment on all licensed reactor operators as a measure for raising further federal revenue.</font></p>
<p style="FONT-FAMILY: times"><font size="2">Property damage insurance covers losses up to $500 million, including decontamination costs, at San Onofre and Palo Verde. Decontamination liability and property damage coverage exceeding the primary $500 million also has been purchased in amounts greater than federal requirements. Additional insurance covers part of replacement power expenses during an accident-related nuclear unit outage. A mutual insurance company owned by entities with nuclear facilities issues these policies. If losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $43 million per year. Insurance premiums are charged to operating expense. </font></p>
<p style="FONT-FAMILY: times"><font size="2"><br /></font><font size="2"><i>Spent Nuclear Fuel <br /></i></font></p>
<p style="FONT-FAMILY: times"><font size="2">Under federal law, the DOE is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE did not meet its contractual obligation to begin acceptance of spent nuclear fuel by January 31, 1998. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues. Currently, both San Onofre and Palo Verde have interim storage for spent nuclear fuel on site sufficient for the current license period. </font></p>
<p style="FONT-FAMILY: times"><font size="2">In January 2004, SCE, as operating agent of San Onofre, filed a complaint against the DOE in the United States Court of Federal Claims seeking damages for the DOE's failure to meet its obligation to begin accepting spent nuclear fuel from San Onofre. In June 2010, the United States Court of Federal Claims issued a decision granting SCE damages of approximately $142 million to recover costs incurred through December 31, 2005, which has been appealed by the DOE. Additional legal action would be necessary to recover damages incurred after that date. Any damages recovered would be returned to SCE ratepayers or used to offset past or future fuel decommissioning or storage costs for the benefit of the ratepayer.</font></p></td></tr></table>
Note 6. Commitments and Contingencies
Lease Commitments
SCE entered into two 20-year power purchase contracts which are classified as capital leases andfalsefalsefalseus-types:textBlockItemTypetextblockIncludes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables.Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name FASB Interpretation (FIN)
-Number 14
-Paragraph 3
Reference 2: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name Statement of Financial Accounting Standard (FAS)
-Number 5
-Paragraph 9, 10, 11, 12
false12falseUnKnownUnKnownUnKnownfalsetrue