2.2.0.7falseRegulatory Matters0207 - Disclosure - Regulatory Matterstruefalsefalsefalse1USDfalsefalseUSDStandardhttp://www.xbrl.org/2003/iso4217USDiso42170PureStandardhttp://www.xbrl.org/2003/instancepurexbrli0SharesStandardhttp://www.xbrl.org/2003/instancesharesxbrli0USDEPSDividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instancesharesxbrli0$20us-gaap_PublicUtilitiesGeneralDisclosuresAbstractus-gaaptruenadurationNo definition available.falsefalsefalsefalsefalsetruefalsefalsefalsefalsefalsefalse1falsefalsefalsefalse00falsefalsefalsexbrli:stringItemTypestringNo definition available.false31us-gaap_PublicUtilitiesDisclosureTextBlockus-gaaptruenadurationNo definition available.falsefalsefalsefalsefalsefalsefalsefalsefalsefalsefalseverboselabelfalse1falsefalsefalsefalse00<!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" -->
<!-- Begin Block Tagged Note 7 - us-gaap:PublicUtilitiesDisclosureTextBlock-->
<div style="font-family: 'Times New Roman',Times,serif">
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b>NOTE 7 — REGULATORY MATTERS</b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>2010 Electric Rate Case Filing</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison filed a rate case on October 29, 2010 based on a projected twelve-month period
ending March 31, 2012. The filing with the MPSC requested a $443 million increase in base rates
that is required to recover higher costs associated with environmental compliance, operation and
maintenance of the Company’s electric distribution system and generation plants, inflation, the
capital costs of plant additions, the reduction in territory sales,
the impact from the expiration of certain wholesale for resale contracts
and the increased migration of
customers to the electric Customer Choice program. Detroit Edison also proposed certain adjustments
which could reduce the
net impact on the required increase in rates
by approximately $190 million. These adjustments relate
to electric Customer Choice migration, pension and other postretirement benefits expenses and the
Nuclear Decommissioning surcharge.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Detroit Edison Uncollectible Expense True-Up Mechanism (UETM)</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">In March 2010, Detroit Edison filed an application with the MPSC for approval of its UETM for 2009
requesting recovery of approximately $4.5 million consisting of costs related to 2009 uncollectible
expense and associated carrying charges. In August 2010, the MPSC determined that the UETM was
effective with its January 2010 order in Detroit Edison’s rate case and dismissed the request for
UETM expenses for 2009.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Power Supply Cost Recovery Proceedings</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The PSCR process is designed to allow Detroit Edison to recover all of its power supply costs if
incurred under reasonable and prudent policies and practices. Detroit Edison’s power supply costs
include fuel costs, purchased and net interchange power costs, nitrogen oxide and sulfur dioxide
emission allowances costs, urea costs, transmission costs and MISO costs. The MPSC reviews these
costs, policies and practices for prudence in annual plan and reconciliation filings.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>2011 Plan Year </i>– In September 2010, Detroit Edison filed its 2011 PSCR plan case seeking approval
of a levelized PSCR factor of 2.98 mills/kWh below the amount included in base rates for all PSCR
customers. The filing supports a total power supply expense forecast of $1.2 billion. The plan
also includes approximately $36 million for the recovery of its projected 2010 PSCR under-recovery.
</div>
<!-- Folio -->
<!-- /Folio -->
</div>
<!-- PAGEBREAK -->
<div style="font-family: 'Times New Roman',Times,serif">
<div align="left" style="font-size: 10pt; margin-top: 6pt">The following table summarizes Detroit Edison’s PSCR reconciliation filing currently pending with
the MPSC:
</div>
<div align="center">
<table style="font-size: 10pt; text-align: left" cellspacing="0" border="0" cellpadding="0" width="100%">
<!-- Begin Table Head -->
<tr valign="bottom">
<td width="64%"> </td>
<td width="5%"> </td>
<td width="3%"> </td>
<td width="1%"> </td>
<td width="3%"> </td>
<td width="5%"> </td>
<td width="3%"> </td>
<td width="1%"> </td>
<td width="3%"> </td>
<td width="5%"> </td>
<td width="3%"> </td>
<td width="1%"> </td>
<td width="3%"> </td>
</tr>
<tr style="font-size: 8pt" valign="bottom">
<td> </td>
<td> </td>
<td> </td>
<td> </td>
<td> </td>
<td> </td>
<td nowrap="nowrap" align="center" colspan="3"><b>Net Over-recovery,</b></td>
<td> </td>
<td nowrap="nowrap" align="center" colspan="3"><b>PSCR Cost of</b></td>
</tr>
<tr style="font-size: 8pt" valign="bottom">
<td nowrap="nowrap" align="left" style="border-bottom: 1px solid #000000"><b>PSCR Year</b></td>
<td> </td>
<td nowrap="nowrap" align="center" colspan="3" style="border-bottom: 1px solid #000000"><b>Date Filed</b></td>
<td> </td>
<td nowrap="nowrap" align="center" colspan="3" style="border-bottom: 1px solid #000000"><b>including interest</b></td>
<td> </td>
<td nowrap="nowrap" align="center" colspan="3" style="border-bottom: 1px solid #000000"><b>Power Sold</b></td>
</tr>
<!-- End Table Head -->
<!-- Begin Table Body -->
<tr valign="bottom">
<td>
<div style="margin-left:15px; text-indent:-15px">2009
</div></td>
<td> </td>
<td colspan="3" align="center" nowrap="nowrap">March 2010</td>
<td> </td>
<td colspan="3" align="center">$15.6 million</td>
<td> </td>
<td colspan="3" align="center">$1.1 billion</td>
</tr>
<!-- End Table Body -->
</table>
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>2009 Gas Rate Case Order</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">On June 3, 2010, the MPSC issued an order in MichCon’s June 9, 2009 rate case filing. The MPSC
approved an annual revenue increase of $119 million. Since the final rate relief ordered was less
than the Company’s self-implemented rate increase of $170 million effective on January 1, 2010, the
MPSC ordered refunds for the period the self-implemented rates were in effect. In September 2010,
MichCon filed a refund plan with the MPSC. MichCon has a refund liability of approximately $15
million at September 30, 2010, representing the estimated amount due customers, including interest.
In addition, the order provided for recovery of the regulatory unamortized balance of CTA. In June
2010, MichCon deferred and recognized in income approximately $32 million ($20 million after-tax)
of previously expensed CTA. The non-pension component of CTA of approximately $21 million is
included in Regulatory assets. The pension component of CTA of approximately $11 million is
included in Regulatory liabilities.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>2010 Gas Rate Case Filing</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">MichCon filed a rate case on July 27, 2010 based on a fully projected 2011 test year. The filing
with the MPSC requested a $51 million increase in revenues that is required to recover higher costs
associated with increased investments in net plant, the impact of sales reductions due to customer
conservation and the economic conditions in Michigan, lower projected midstream revenues resulting
from reduced storage capacity and MichCon’s shift to a lower risk predominantly long-term storage
contract portfolio from a higher risk predominantly short-term storage contract portfolio, and
increasing operating costs.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Gas Cost Recovery Proceedings</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The GCR process is designed to allow MichCon to recover all of its gas supply costs if incurred
under reasonable and prudent policies and practices. The MPSC reviews these costs, policies and
practices for prudence in annual plan and reconciliation filings.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>2010-2011 Plan Year </i>- In December 2009, MichCon filed its GCR plan case for the 2010-2011 GCR plan
year. The MPSC issued an order in this case in September 2010 authorizing MichCon to charge a
maximum of $7.06 per Mcf, adjustable monthly by a contingent factor. The MPSC also approved
MichCon’s proposed fixed price gas purchasing program and provided clarification regarding
treatment of certain affiliate purchases.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The following table summarizes MichCon’s GCR reconciliation filing currently pending with the MPSC:
</div>
<div align="center">
<table style="font-size: 10pt; text-align: left" cellspacing="0" border="0" cellpadding="0" width="100%">
<!-- Begin Table Head -->
<tr valign="bottom">
<td width="64%"> </td>
<td width="5%"> </td>
<td width="7%"> </td>
<td width="5%"> </td>
<td width="7%"> </td>
<td width="5%"> </td>
<td width="7%"> </td>
</tr>
<tr style="font-size: 8pt" valign="bottom">
<td> </td>
<td> </td>
<td> </td>
<td> </td>
<td nowrap="nowrap" align="center"><b>Net Over-recovery,</b></td>
<td> </td>
<td nowrap="nowrap" align="center"> </td>
</tr>
<tr style="font-size: 8pt" valign="bottom">
<td nowrap="nowrap" align="left" style="border-bottom: 1px solid #000000"><b>GCR Year</b></td>
<td> </td>
<td nowrap="nowrap" align="center" style="border-bottom: 1px solid #000000"><b>Date Filed</b></td>
<td> </td>
<td nowrap="nowrap" align="center" style="border-bottom: 1px solid #000000"><b>including interest</b></td>
<td> </td>
<td nowrap="nowrap" align="center" style="border-bottom: 1px solid #000000"><b>GCR Cost of Gas Sold</b></td>
</tr>
<!-- End Table Head -->
<!-- Begin Table Body -->
<tr valign="bottom">
<td valign="top">
<div style="margin-left:0px; text-indent:-0px">2009-2010
</div></td>
<td> </td>
<td align="left" valign="top">June 2010
</td>
<td> </td>
<td align="left" valign="top">$5.9 million
</td>
<td> </td>
<td align="left" valign="top">$1.0 billion</td>
</tr>
<!-- End Table Body -->
</table>
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Gas Main Renewal and Gas Meter Move Out Programs</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The June 3, 2010 MPSC gas rate case order required MichCon to make filings related to gas main
renewal and meter move-out programs. In a July 30, 2010 filing, MichCon proposed to implement a
10-year gas main renewal program beginning in 2012 which would require capital expenditures of
approximately $17 million per year for renewing gas distribution mains, retiring gas mains, and
where appropriate and when related to the gas main renewal or retirement activity, relocate inside
meters to outside locations and renew service lines.
</div>
<!-- Folio -->
<!-- /Folio -->
</div>
<!-- PAGEBREAK -->
<div style="font-family: 'Times New Roman',Times,serif">
<div align="left" style="font-size: 10pt; margin-top: 6pt">In a
September 30, 2010 filing, MichCon proposed to implement a 10-year gas meter move out program
beginning in 2012 which would require capital expenditures of approximately $22 million per year
primarily for relocation of inside meters to the outside of residents’ houses. Recovery of costs
associated with these two programs is expected to be provided through future MichCon rate cases.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Other</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company is unable to predict the outcome of the unresolved regulatory matters discussed herein.
Resolution of these matters is dependent upon future MPSC orders and appeals, which may materially
impact the financial position, results of operations and cash flows of the Company.
</div>
</div>
<!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" -->
<!-- Begin Block Tagged Notefalsefalsefalseus-types:textBlockItemTypetextblockThis element can be used to encapsulate the entire disclosure for public utilities (including data and tables).Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name Statement of Financial Accounting Standard (FAS)
-Number 71
false12falseUnKnownUnKnownUnKnownfalsetrue