2.0.0.10 false Commitments and Contingencies 0212 - Disclosure - Commitments and Contingencies true false false false 1 usd $ false false Shares Standard http://www.xbrl.org/2003/instance shares xbrli 0 USD Standard http://www.xbrl.org/2003/iso4217 USD iso4217 0 USDEPS Divide http://www.xbrl.org/2003/iso4217 USD iso4217 http://www.xbrl.org/2003/instance shares xbrli 0 2 0 dte_CommitmentsAndContingenciesAbstract dte false na duration string Commitments And Contingencies. false false false false false true false false false false false false 1 false false false false 0 0 false false false Commitments And Contingencies. false 3 1 us-gaap_CommitmentsAndContingenciesDisclosureTextBlock us-gaap true na duration string No definition available. false false false false false false false false false false false verboselabel false 1 false false false false 0 0 <!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" --> <!-- Begin Block Tagged Note 12 - us-gaap:CommitmentsAndContingenciesDisclosureTextBlock--> <div style="font-family: 'Times New Roman',Times,serif"> <div align="left" style="font-size: 10pt; margin-top: 12pt"><font style="font-variant: small-caps"><b>NOTE 12 &#8212; COMMITMENTS AND CONTINGENCIES</b></font> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Environmental</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Electric Utility</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Air </i>&#8212; Detroit Edison is subject to EPA ozone transport and acid rain regulations that limit power plant emissions of sulfur dioxide and nitrogen oxides. Since 2005, EPA and the State of Michigan have issued additional emission reduction regulations relating to ozone, fine particulate, regional haze and mercury air pollution. The new rules will lead to additional controls on fossil-fueled power plants to reduce nitrogen oxide, sulfur dioxide and mercury emissions. To comply with these requirements, Detroit Edison has spent approximately $1.5&#160;billion through 2009. The Company estimates Detroit Edison will make future undiscounted capital expenditures of up to $73&#160;million in 2010 and up to $2.2&#160;billion of additional capital expenditures through 2019 based on current regulations. Further, additional rulemakings are expected over the next few years which could require additional controls for sulfur dioxide, nitrogen oxides and hazardous air pollutants. It is not possible to quantify the impact of those expected rulemakings at this time. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">In July&#160;2009, DTE Energy received a Notice of Violation/Finding of Violation (NOV/FOV) from the EPA alleging, among other things, that five Detroit Edison power plants violated New Source Performance standards, Prevention of Significant Deterioration requirements, and Title V operating permit requirements under the Clean Air Act. We believe that the plants identified by the EPA have complied with applicable regulations. Depending upon the outcome of our discussions with the EPA regarding the NOV/FOV, the EPA could bring legal action against Detroit Edison. We could also be required to install additional pollution control equipment at some or all of the power plants in question, engage in Supplemental Environmental Programs, and/or pay fines. We cannot predict the financial impact or outcome of this matter, or the timing of its resolution. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Water </i>&#8212; In response to an EPA regulation, Detroit Edison is required to examine alternatives for reducing the environmental impacts of the cooling water intake structures at several of its facilities. Based on the results of completed studies and expected future studies, Detroit Edison may be required to install additional control technologies to reduce the impacts of the water intakes. Initially, it was estimated that Detroit Edison could incur up to approximately $55&#160;million over the four to six years subsequent to 2008 in additional capital expenditures to comply with these requirements. However, a January&#160;2007 circuit court decision remanded back to the EPA several provisions of the federal regulation that has resulted in a delay in compliance dates. The decision also raised the possibility that Detroit Edison may have to install cooling towers at some facilities at a cost substantially greater than was initially estimated for other mitigative technologies. In 2008, the Supreme Court agreed to review the remanded cost-benefit analysis provision of the rule and in April&#160;2009 upheld EPA&#8217;s use of this provision in determining best technology available for reducing environmental impacts. Concurrently, the EPA continues to develop a revised rule, a draft of which is expected to be published by summer 2010. The EPA has also proposed an information collection request to begin a review of steam electric effluent guidelines. It is not possible at this time to quantify the impacts of these developing requirements. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Contaminated Sites </i>&#8212; Detroit Edison conducted remedial investigations at contaminated sites, including three former manufactured gas plant (MGP)&#160;sites. The investigations have revealed contamination related to the by-products of gas manufacturing at each site. In addition to the MGP sites, the Company is also in the process of cleaning up other contaminated sites, including the area surrounding an ash landfill, electrical distribution substations, and underground and aboveground storage tank locations. The findings of these investigations indicated that the estimated cost to remediate these sites is expected to be incurred over the next several years. At March&#160;31, 2010 and December&#160;31, 2009, the Company had $9&#160;million accrued for remediation. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Landfill</i>&#8212; Detroit Edison owns and operates a permitted engineered ash storage facility at the Monroe Power Plant to dispose of fly ash from the coal fired power plant. Detroit Edison performed an engineering analysis in 2009 and identified the need for embankment side slope repairs and reconstruction. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Gas Utility</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Contaminated Sites </i>&#8212; Prior to the construction of major interstate natural gas pipelines, gas for heating and other uses was manufactured locally from processes involving coal, coke or oil. Gas Utility owns, or previously owned, 15 such former MGP sites. Investigations have revealed contamination related to the by-products of gas manufacturing at each site. In addition to the MGP sites, the Company is also in the process of cleaning up other contaminated sites. Cleanup activities associated with these sites will be conducted over the next several years. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The MPSC has established a cost deferral and rate recovery mechanism for investigation and remediation costs incurred at former MGP sites. Accordingly, Gas Utility recognizes a liability and corresponding regulatory asset for estimated investigation and remediation costs at former MGP sites. During 2009, the Company spent approximately $1&#160;million investigating and remediating these former MGP sites. As of March&#160;31, 2010 and December&#160;31, 2009, the Company had $35&#160;million and $36&#160;million, respectively, accrued for remediation. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">Any significant change in assumptions, such as remediation techniques, nature and extent of contamination and regulatory requirements, could impact the estimate of remedial action costs for the sites and affect the Company&#8217;s financial position and cash flows. However, the Company anticipates the cost deferral and rate recovery mechanism approved by the MPSC will prevent environmental costs from having a material adverse impact on our results of operations. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Non-Utility</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company&#8217;s non-utility affiliates are subject to a number of environmental laws and regulations dealing with the protection of the environment from various pollutants. The Michigan coke battery facility received and responded to information requests from the EPA resulting in the issuance of a notice of violation in June of 2007 regarding potential maximum achievable control technologies and new source review violations. The EPA is in the process of reviewing the Company&#8217;s position of demonstrated compliance and has not initiated escalated enforcement. At this time, the Company cannot predict the impact of this issue. Furthermore, the Company is in the process of settling historical air violations at its coke battery facility located in Pennsylvania. More recently, the EPA expressed their intention for the settlement to also include outstanding historical water violations. At this time, we cannot predict the impact of this settlement. The Company is investigating wastewater treatment technology upgrades such as a biological treatment for the coke battery facility located in Pennsylvania. This investigation may result in capital expenditures of approximately $5&#160;million to $6&#160;million be incurred over the next two years to meet future regulatory requirements. The Company&#8217;s non-utility affiliates are substantially in compliance with all environmental requirements, other than as noted above. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Other</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">In February&#160;2008, DTE Energy was named as one of approximately 24 defendant oil, power and coal companies in a lawsuit filed in a United States District Court. DTE Energy was served with process in March&#160;2008. The plaintiffs, the Native Village of Kivalina and City of Kivalina, which are home to approximately 400 people in Alaska, claim that the defendants&#8217; business activities have contributed to global warming and, as a result, higher temperatures are damaging the local economy and leaving the island more vulnerable to storm activity in the fall and winter. As a result, the plaintiffs are seeking damages of up to $400&#160;million for relocation costs associated with moving the village to a safer location, as well as unspecified attorney&#8217;s fees and expenses. On October&#160;15, 2009, the U.S. District Court granted defendants&#8217; motions dismissing all of plaintiffs&#8217; federal claims in the case on two independent grounds: (1)&#160;the court lacks subject matter jurisdiction to hear the claims because of the political question doctrine; and (2)&#160;plaintiffs lack standing to bring their claims. The court also dismissed plaintiffs&#8217; state law claims because the court lacked supplemental jurisdiction over them after it dismissed the federal claims; the dismissal of the state law claims was without prejudice. The plaintiffs have appealed to the U.S. Court of Appeals for the Ninth Circuit. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Nuclear Operations</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Property Insurance</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison maintains several different types of property insurance policies specifically for the Fermi 2 plant. These policies cover such items as replacement power and property damage. The Nuclear Electric Insurance Limited (NEIL)&#160;is the primary supplier of the insurance policies. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison maintains a policy for extra expenses, including replacement power costs necessitated by Fermi 2&#8217;s unavailability due to an insured event. This policy has a 12-week waiting period and provides an aggregate $490&#160;million of coverage over a three-year period. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison has $500&#160;million in primary coverage and $2.25&#160;billion of excess coverage for stabilization, decontamination, debris removal, repair and/or replacement of property and decommissioning. The combined coverage limit for total property damage is $2.75&#160;billion. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">In 2007, the Terrorism Risk Insurance Extension Act of 2005 (TRIA)&#160;was extended through December&#160;31, 2014. A major change in the extension is the inclusion of &#8220;domestic&#8221; acts of terrorism in the definition of covered or &#8220;certified&#8221; acts. For multiple terrorism losses caused by acts of terrorism not covered under the TRIA occurring within one year after the first loss from terrorism, the NEIL policies would make available to all insured entities up to $3.2&#160;billion, plus any amounts recovered from reinsurance, government indemnity, or other sources to cover losses. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">Under the NEIL policies, Detroit Edison could be liable for maximum assessments of up to approximately $28&#160;million per event if the loss associated with any one event at any nuclear plant in the United States should exceed the accumulated funds available to NEIL. </div> <!-- Folio --> <!-- /Folio --> </div> <!-- PAGEBREAK --> <div style="font-family: 'Times New Roman',Times,serif"> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Public Liability Insurance</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">As of January&#160;1, 2010, as required by federal law, Detroit Edison maintains $375&#160;million of public liability insurance for a nuclear incident. For liabilities arising from a terrorist act outside the scope of TRIA, the policy is subject to one industry aggregate limit of $300&#160;million. Further, under the Price-Anderson Amendments Act of 2005, deferred premium charges up to $117.5&#160;million could be levied against each licensed nuclear facility, but not more than $17.5&#160;million per year per facility. Thus, deferred premium charges could be levied against all owners of licensed nuclear facilities in the event of a nuclear incident at any of these facilities. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Nuclear Fuel Disposal Costs</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">In accordance with the Federal Nuclear Waste Policy Act of 1982, Detroit Edison has a contract with the U.S. Department of Energy (DOE)&#160;for the future storage and disposal of spent nuclear fuel from Fermi 2. Detroit Edison is obligated to pay the DOE a fee of 1 mill per kWh of Fermi 2 electricity generated and sold. The fee is a component of nuclear fuel expense. Delays have occurred in the DOE&#8217;s program for the acceptance and disposal of spent nuclear fuel at a permanent repository and the proposed fiscal year 2011 federal budget recommends termination of funding for completion of the government&#8217;s long-term storage facility. Detroit Edison is a party in the litigation against the DOE for both past and future costs associated with the DOE&#8217;s failure to accept spent nuclear fuel under the timetable set forth in the Federal Nuclear Waste Policy Act of 1982. Detroit Edison currently employs a spent nuclear fuel storage strategy utilizing a fuel pool. We have begun work on an on-site dry cask storage facility which is expected to provide sufficient storage capability for the life of the plant as defined by the original operating license. Issues relating to long- term waste disposal policy and to the disposition of funds contributed by Detroit Edison ratepayers to the federal waste fund await future governmental action. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Guarantees</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">In certain limited circumstances, the Company enters into contractual guarantees. The Company may guarantee another entity&#8217;s obligation in the event it fails to perform. The Company may provide guarantees in certain indemnification agreements. Finally, the Company may provide indirect guarantees for the indebtedness of others. Below are the details of specific material guarantees the Company currently provides. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Millennium Pipeline Project Guarantee</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company owns a 26&#160;percent equity interest in the Millennium Pipeline Project (Millennium). Millennium is accounted for under the equity method. Millennium began commercial operations in December&#160;2008. On August&#160;29, 2007, Millennium entered into a borrowing facility to finance the construction costs of the project. The total facility amounts to $800&#160;million and is guaranteed by the project partners, based upon their respective ownership percentages. The facility expires on August&#160;29, 2010 and was fully drawn as of March&#160;31, 2010. Millennium anticipates refinancing its $800&#160;million borrowing facility with a long-term financing non-recourse to the Company. The Company expects to make an additional equity contribution to Millennium in conjunction with the refinancing. The actual amount of the Company&#8217;s equity contribution will depend on the amount of the net proceeds from the long-term financing. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company has agreed to guarantee 26&#160;percent of the borrowing facility and in the event of default by Millennium the maximum potential amount of future payments under this guarantee is approximately $210&#160;million. The guarantee includes DTE Energy&#8217;s revolving credit facility&#8217;s covenant and default provisions by reference. Related to this facility, the Company has also agreed to guarantee 26&#160;percent of Millennium&#8217;s forward-starting interest rate swaps with a notional amount of $420&#160;million. The Company&#8217;s exposure on the forward-starting interest rate swaps varies with changes in Treasury rates and credit swap spreads and was approximately $12&#160;million at March&#160;31, 2010. Because the Company is unable to accurately anticipate changes in Treasury rates and credit swap spreads, it is unable to estimate its maximum exposure under its share of Millennium&#8217;s forward-starting interest rate swaps. An incremental 0.25&#160;percent decrease in the forward interest rate swap rates will increase its exposure by approximately $3&#160;million. There are no recourse provisions or collateral that would enable the Company to recover any amounts paid under the guarantees, other than its share of project assets. </div> <!-- Folio --> <!-- /Folio --> </div> <!-- PAGEBREAK --> <div style="font-family: 'Times New Roman',Times,serif"> <div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Other Guarantees</i> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison has guaranteed a bank term loan of $11&#160;million related to the sale of its steam heating business to Thermal Ventures II, L.P. At March&#160;31, 2010, the Company has reserves for the entire amount of the bank loan guarantee. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company&#8217;s other guarantees are not individually material with maximum potential payments totaling $10&#160;million at March&#160;31, 2010. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company is periodically required to obtain performance surety bonds in support of obligations to various governmental entities and other companies in connection with its operations. As of March&#160;31, 2010, the Company had approximately $13&#160;million of performance bonds outstanding. In the event that such bonds are called for nonperformance, the Company would be obligated to reimburse the issuer of the performance bond. The Company is released from the performance bonds as the contractual performance is completed and does not believe that a material amount of any currently outstanding performance bonds will be called. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Labor Contracts</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">There are several bargaining units for the Company&#8217;s union employees. The majority of our union employees are under contracts that expire in June and October&#160;2010 and August&#160;2012. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Purchase Commitments</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">As of March&#160;31, 2010, the Company was party to numerous long-term purchase commitments relating to a variety of goods and services required for the Company&#8217;s business. These agreements primarily consist of fuel supply commitments and energy trading contracts. The Company estimates that these commitments will be approximately $5&#160;billion from 2010 through 2051. The Company also estimates that 2010 capital expenditures will be approximately $1.4&#160;billion. The Company has made certain commitments in connection with expected capital expenditures. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Bankruptcies</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company purchases and sells electricity, gas, coal, coke and other energy products from and to numerous companies operating in the steel, automotive, energy, retail, financial and other industries. Certain of its customers have filed for bankruptcy protection under Chapter&#160;11 of the U.S. Bankruptcy Code. The Company regularly reviews contingent matters relating to these customers and its purchase and sale contracts and records provisions for amounts considered at risk of probable loss. The Company believes its accrued amounts are adequate for probable loss. The final resolution of these matters may have a material effect on its consolidated financial statements. </div> <div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Other Contingencies</i></b> </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">The Company is involved in certain other legal, regulatory, administrative and environmental proceedings before various courts, arbitration panels and governmental agencies concerning claims arising in the ordinary course of business. These proceedings include certain contract disputes, additional environmental reviews and investigations, audits, inquiries from various regulators, and pending judicial matters. The Company cannot predict the final disposition of such proceedings. The Company regularly reviews legal matters and records provisions for claims that it can estimate and are considered probable of loss. The resolution of these pending proceedings is not expected to have a material effect on the Company&#8217;s operations or financial statements in the periods they are resolved. </div> <div align="left" style="font-size: 10pt; margin-top: 6pt">See Notes 5 and 7 for a discussion of contingencies related to derivatives and regulatory matters<b>.</b> </div> <!-- Folio --> <!-- /Folio --> </div> <!-- PAGEBREAK --> <div style="font-family: 'Times New Roman',Times,serif"> </div> <!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" --> <!-- Begin Block Tagged Note false false false Includes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables. Reference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher FASB -Name FASB Interpretation (FIN) -Number 14 -Paragraph 3 Reference 2: http://www.xbrl.org/2003/role/presentationRef -Publisher FASB -Name Statement of Financial Accounting Standard (FAS) -Number 5 -Paragraph 9, 10, 11, 12 false false 1 2 false UnKnown UnKnown UnKnown false true