2.0.0.10falseCommitments and Contingencies0212 - Disclosure - Commitments and Contingenciestruefalsefalsefalse1usd$falsefalseSharesStandardhttp://www.xbrl.org/2003/instancesharesxbrli0USDStandardhttp://www.xbrl.org/2003/iso4217USDiso42170USDEPSDividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instancesharesxbrli020dte_CommitmentsAndContingenciesAbstractdtefalsenadurationstringCommitments And Contingencies.falsefalsefalsefalsefalsetruefalsefalsefalsefalsefalsefalse1falsefalsefalsefalse00falsefalsefalseCommitments And Contingencies.false31us-gaap_CommitmentsAndContingenciesDisclosureTextBlockus-gaaptruenadurationstringNo definition available.falsefalsefalsefalsefalsefalsefalsefalsefalsefalsefalseverboselabelfalse1falsefalsefalsefalse00<!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" -->
<!-- Begin Block Tagged Note 12 - us-gaap:CommitmentsAndContingenciesDisclosureTextBlock-->
<div style="font-family: 'Times New Roman',Times,serif">
<div align="left" style="font-size: 10pt; margin-top: 12pt"><font style="font-variant: small-caps"><b>NOTE 12 — COMMITMENTS AND CONTINGENCIES</b></font>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><b><i>Environmental</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Electric Utility</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Air </i>— Detroit Edison is subject to EPA ozone transport and acid rain regulations that limit power
plant emissions of sulfur dioxide and nitrogen oxides. Since 2005, EPA and the State of Michigan
have issued additional emission reduction regulations relating to ozone, fine particulate, regional
haze and mercury air pollution. The new rules will lead to additional controls on fossil-fueled
power plants to reduce nitrogen oxide, sulfur dioxide and mercury emissions. To comply with these
requirements, Detroit Edison has spent approximately $1.5 billion through 2009. The Company
estimates Detroit Edison will make future undiscounted capital expenditures of up to $73 million in
2010 and up to $2.2 billion of additional capital expenditures through 2019 based on current
regulations. Further, additional rulemakings are expected over the next few years which could
require additional controls for sulfur dioxide, nitrogen oxides and hazardous air pollutants. It is
not possible to quantify the impact of those expected rulemakings at this time.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">In July 2009, DTE Energy received a Notice of Violation/Finding of Violation (NOV/FOV) from the EPA
alleging, among other things, that five Detroit Edison power plants violated New Source Performance
standards, Prevention of Significant Deterioration requirements, and Title V operating permit
requirements under the Clean Air Act. We believe that the plants identified by the EPA have
complied with applicable regulations. Depending upon the
outcome of our discussions with the EPA regarding the NOV/FOV, the EPA could bring legal action
against Detroit Edison. We could also be required to install additional pollution control equipment
at some or all of the power plants in question, engage in Supplemental Environmental Programs,
and/or pay fines. We cannot predict the financial impact or outcome of this matter, or the timing
of its resolution.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Water </i>— In response to an EPA regulation, Detroit Edison is required to examine alternatives for
reducing the environmental impacts of the cooling water intake structures at several of its
facilities. Based on the results of completed studies and expected future studies, Detroit Edison
may be required to install additional control technologies to reduce the impacts of the water
intakes. Initially, it was estimated that Detroit Edison could incur up to approximately
$55 million over the four to six years subsequent to 2008 in additional capital expenditures to
comply with these requirements. However, a January 2007 circuit court decision remanded back to the
EPA several provisions of the federal regulation that has resulted in a delay in compliance dates.
The decision also raised the possibility that Detroit Edison may have to install cooling towers at
some facilities at a cost substantially greater than was initially estimated for other mitigative
technologies. In 2008, the Supreme Court agreed to review the remanded cost-benefit analysis
provision of the rule and in April 2009 upheld EPA’s use of this provision in determining best
technology available for reducing environmental impacts. Concurrently, the EPA continues to develop
a revised rule, a draft of which is expected to be published by summer 2010. The EPA has also
proposed an information collection request to begin a review of steam electric effluent guidelines.
It is not possible at this time to quantify the impacts of these developing requirements.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Contaminated Sites </i>— Detroit Edison conducted remedial investigations at contaminated sites,
including three former manufactured gas plant (MGP) sites. The investigations have revealed
contamination related to the by-products of gas manufacturing at each site. In addition to the MGP
sites, the Company is also in the process of cleaning up other contaminated sites, including the
area surrounding an ash landfill, electrical distribution substations, and underground and
aboveground storage tank locations. The findings of these investigations indicated that the
estimated cost to remediate these sites is expected to be incurred over the next several years. At
March 31, 2010 and December 31, 2009, the Company had $9 million accrued for remediation.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Landfill</i>— Detroit Edison owns and operates a permitted engineered ash storage facility at the
Monroe Power Plant to dispose of fly ash from the coal fired power plant. Detroit Edison performed
an engineering analysis in 2009 and identified the need for embankment side slope repairs and
reconstruction.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Gas Utility</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Contaminated Sites </i>— Prior to the construction of major interstate natural gas pipelines, gas for
heating and other uses was manufactured locally from processes involving coal, coke or oil. Gas
Utility owns, or previously owned, 15 such former MGP sites. Investigations have revealed
contamination related to the by-products of gas manufacturing at each site. In addition to the MGP
sites, the Company is also in the process of cleaning up other contaminated sites. Cleanup
activities associated with these sites will be conducted over the next several years.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The MPSC has established a cost deferral and rate recovery mechanism for investigation and
remediation costs incurred at former MGP sites. Accordingly, Gas Utility recognizes a liability and
corresponding regulatory asset for estimated investigation and remediation costs at former MGP
sites. During 2009, the Company spent approximately $1 million investigating and remediating these
former MGP sites. As of March 31, 2010 and December 31, 2009, the Company had $35 million and
$36 million, respectively, accrued for remediation.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Any significant change in assumptions, such as remediation techniques, nature and extent of
contamination and regulatory requirements, could impact the estimate of remedial action costs for
the sites and affect the Company’s financial position and cash flows. However, the Company
anticipates the cost deferral and rate recovery mechanism approved by the MPSC will prevent
environmental costs from having a material adverse impact on our results of operations.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Non-Utility</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company’s non-utility affiliates are subject to a number of environmental laws and regulations
dealing with the protection of the environment from various pollutants. The Michigan coke battery
facility received and responded to
information requests from the EPA resulting in the issuance of a notice of violation in June of
2007 regarding potential maximum achievable control technologies and new source review violations.
The EPA is in the process of reviewing the Company’s position of demonstrated compliance and has
not initiated escalated enforcement. At this time, the Company cannot predict the impact of this
issue. Furthermore, the Company is in the process of settling historical air violations at its coke
battery facility located in Pennsylvania. More recently, the EPA expressed their intention for the
settlement to also include outstanding historical water violations. At this time, we cannot
predict the impact of this settlement. The Company is investigating wastewater treatment technology
upgrades such as a biological treatment for the coke battery facility located in Pennsylvania. This
investigation may result in capital expenditures of approximately $5 million to $6 million be
incurred over the next two years to meet future regulatory requirements. The Company’s non-utility
affiliates are substantially in compliance with all environmental requirements, other than as noted
above.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Other</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">In February 2008, DTE Energy was named as one of approximately 24 defendant oil, power and coal
companies in a lawsuit filed in a United States District Court. DTE Energy was served with process
in March 2008. The plaintiffs, the Native Village of Kivalina and City of Kivalina, which are home
to approximately 400 people in Alaska, claim that the defendants’ business activities have
contributed to global warming and, as a result, higher temperatures are damaging the local economy
and leaving the island more vulnerable to storm activity in the fall and winter. As a result, the
plaintiffs are seeking damages of up to $400 million for relocation costs associated with moving
the village to a safer location, as well as unspecified attorney’s fees and expenses. On
October 15, 2009, the U.S. District Court granted defendants’ motions dismissing all of plaintiffs’
federal claims in the case on two independent grounds: (1) the court lacks subject matter
jurisdiction to hear the claims because of the political question doctrine; and (2) plaintiffs lack
standing to bring their claims. The court also dismissed plaintiffs’ state law claims because the
court lacked supplemental jurisdiction over them after it dismissed the federal claims; the
dismissal of the state law claims was without prejudice. The plaintiffs have appealed to the
U.S. Court of Appeals for the Ninth Circuit.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Nuclear Operations</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt"><i>Property Insurance</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison maintains several different types of property insurance policies specifically for
the Fermi 2 plant. These policies cover such items as replacement power and property damage. The
Nuclear Electric Insurance Limited (NEIL) is the primary supplier of the insurance policies.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison maintains a policy for extra expenses, including replacement power costs
necessitated by Fermi 2’s unavailability due to an insured event. This policy has a 12-week waiting
period and provides an aggregate $490 million of coverage over a three-year period.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison has $500 million in primary coverage and $2.25 billion of excess coverage for
stabilization, decontamination, debris removal, repair and/or replacement of property and
decommissioning. The combined coverage limit for total property damage is $2.75 billion.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">In 2007, the Terrorism Risk Insurance Extension Act of 2005 (TRIA) was extended through
December 31, 2014. A major change in the extension is the inclusion of “domestic” acts of terrorism
in the definition of covered or “certified” acts. For multiple terrorism losses caused by acts of
terrorism not covered under the TRIA occurring within one year after the first loss from terrorism,
the NEIL policies would make available to all insured entities up to $3.2 billion, plus any amounts
recovered from reinsurance, government indemnity, or other sources to cover losses.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Under the NEIL policies, Detroit Edison could be liable for maximum assessments of up to
approximately $28 million per event if the loss associated with any one event at any nuclear plant
in the United States should exceed the accumulated funds available to NEIL.
</div>
<!-- Folio -->
<!-- /Folio -->
</div>
<!-- PAGEBREAK -->
<div style="font-family: 'Times New Roman',Times,serif">
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Public Liability Insurance</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">As of January 1, 2010, as required by federal law, Detroit Edison maintains $375 million of public
liability insurance for a nuclear incident. For liabilities arising from a terrorist act outside
the scope of TRIA, the policy is subject to one industry aggregate limit of $300 million. Further,
under the Price-Anderson Amendments Act of 2005, deferred premium charges up to $117.5 million
could be levied against each licensed nuclear facility, but not more than $17.5 million per year
per facility. Thus, deferred premium charges could be levied against all owners of licensed nuclear
facilities in the event of a nuclear incident at any of these facilities.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Nuclear Fuel Disposal Costs</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">In accordance with the Federal Nuclear Waste Policy Act of 1982, Detroit Edison has a contract with
the U.S. Department of Energy (DOE) for the future storage and disposal of spent nuclear fuel from
Fermi 2. Detroit Edison is obligated to pay the DOE a fee of 1 mill per kWh of Fermi 2 electricity
generated and sold. The fee is a component of nuclear fuel expense. Delays have occurred in the
DOE’s program for the acceptance and disposal of spent nuclear fuel at a permanent repository and
the proposed fiscal year 2011 federal budget recommends termination of funding for completion of
the government’s long-term storage facility. Detroit Edison is a party in the litigation against
the DOE for both past and future costs associated with the DOE’s failure to accept spent nuclear
fuel under the timetable set forth in the Federal Nuclear Waste Policy Act of 1982. Detroit Edison
currently employs a spent nuclear fuel storage strategy utilizing a fuel pool. We have begun work
on an on-site dry cask storage facility which is expected to provide sufficient storage capability
for the life of the plant as defined by the original operating license. Issues relating to long-
term waste disposal policy and to the disposition of funds contributed by Detroit Edison ratepayers
to the federal waste fund await future governmental action.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Guarantees</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">In certain limited circumstances, the Company enters into contractual guarantees. The Company may
guarantee another entity’s obligation in the event it fails to perform. The Company may provide
guarantees in certain indemnification agreements. Finally, the Company may provide indirect
guarantees for the indebtedness of others. Below are the details of specific material guarantees
the Company currently provides.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Millennium Pipeline Project Guarantee</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company owns a 26 percent equity interest in the Millennium Pipeline Project (Millennium).
Millennium is accounted for under the equity method. Millennium began commercial operations in
December 2008. On August 29, 2007, Millennium entered into a borrowing facility to finance the
construction costs of the project. The total facility amounts to $800 million and is guaranteed by
the project partners, based upon their respective ownership percentages. The facility expires on
August 29, 2010 and was fully drawn as of March 31, 2010. Millennium anticipates refinancing its
$800 million borrowing facility with a long-term financing non-recourse to the Company. The Company
expects to make an additional equity contribution to Millennium in conjunction with the
refinancing. The actual amount of the Company’s equity contribution will depend on the amount of
the net proceeds from the long-term financing.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company has agreed to guarantee 26 percent of the borrowing facility and in the event of
default by Millennium the maximum potential amount of future payments under this guarantee is
approximately $210 million. The guarantee includes DTE Energy’s revolving credit facility’s
covenant and default provisions by reference. Related to this facility, the Company has also agreed
to guarantee 26 percent of Millennium’s forward-starting interest rate swaps with a notional amount
of $420 million. The Company’s exposure on the forward-starting interest rate swaps varies with
changes in Treasury rates and credit swap spreads and was approximately $12 million at March 31,
2010. Because the Company is unable to accurately anticipate changes in Treasury rates and credit
swap spreads, it is unable to estimate its maximum exposure under its share of Millennium’s
forward-starting interest rate swaps. An incremental 0.25 percent decrease in the forward interest
rate swap rates will increase its exposure by approximately $3 million. There are no recourse
provisions or collateral that would enable the Company to recover any amounts paid under the
guarantees, other than its share of project assets.
</div>
<!-- Folio -->
<!-- /Folio -->
</div>
<!-- PAGEBREAK -->
<div style="font-family: 'Times New Roman',Times,serif">
<div align="left" style="font-size: 10pt; margin-top: 12pt"><i>Other Guarantees</i>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">Detroit Edison has guaranteed a bank term loan of $11 million related to the sale of its steam
heating business to Thermal Ventures II, L.P. At March 31, 2010, the Company has reserves for the
entire amount of the bank loan guarantee.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company’s other guarantees are not individually material with maximum potential payments
totaling $10 million at March 31, 2010.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company is periodically required to obtain performance surety bonds in support of obligations
to various governmental entities and other companies in connection with its operations. As of
March 31, 2010, the Company had approximately $13 million of performance bonds outstanding. In the
event that such bonds are called for nonperformance, the Company would be obligated to reimburse
the issuer of the performance bond. The Company is released from the performance bonds as the
contractual performance is completed and does not believe that a material amount of any currently
outstanding performance bonds will be called.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Labor Contracts</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">There are several bargaining units for the Company’s union employees. The majority of our union
employees are under contracts that expire in June and October 2010 and August 2012.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Purchase Commitments</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">As of March 31, 2010, the Company was party to numerous long-term purchase commitments relating to
a variety of goods and services required for the Company’s business. These agreements primarily
consist of fuel supply commitments and energy trading contracts. The Company estimates that these
commitments will be approximately $5 billion from 2010 through 2051. The Company also estimates
that 2010 capital expenditures will be approximately $1.4 billion. The Company has made certain
commitments in connection with expected capital expenditures.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Bankruptcies</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company purchases and sells electricity, gas, coal, coke and other energy products from and to
numerous companies operating in the steel, automotive, energy, retail, financial and other
industries. Certain of its customers have filed for bankruptcy protection under Chapter 11 of the
U.S. Bankruptcy Code. The Company regularly reviews contingent matters relating to these customers
and its purchase and sale contracts and records provisions for amounts considered at risk of
probable loss. The Company believes its accrued amounts are adequate for probable loss. The final
resolution of these matters may have a material effect on its consolidated financial statements.
</div>
<div align="left" style="font-size: 10pt; margin-top: 12pt"><b><i>Other Contingencies</i></b>
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">The Company is involved in certain other legal, regulatory, administrative and environmental
proceedings before various courts, arbitration panels and governmental agencies concerning claims
arising in the ordinary course of business. These proceedings include certain contract disputes,
additional environmental reviews and investigations, audits, inquiries from various regulators, and
pending judicial matters. The Company cannot predict the final disposition of such proceedings. The
Company regularly reviews legal matters and records provisions for claims that it can estimate and
are considered probable of loss. The resolution of these pending proceedings is not expected to
have a material effect on the Company’s operations or financial statements in the periods they are
resolved.
</div>
<div align="left" style="font-size: 10pt; margin-top: 6pt">See Notes 5 and 7 for a discussion of contingencies related to derivatives and regulatory matters<b>.</b>
</div>
<!-- Folio -->
<!-- /Folio -->
</div>
<!-- PAGEBREAK -->
<div style="font-family: 'Times New Roman',Times,serif">
</div>
<!--DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd" -->
<!-- Begin Block Tagged NotefalsefalsefalseIncludes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables.Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name FASB Interpretation (FIN)
-Number 14
-Paragraph 3
Reference 2: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name Statement of Financial Accounting Standard (FAS)
-Number 5
-Paragraph 9, 10, 11, 12
falsefalse12falseUnKnownUnKnownUnKnownfalsetrue