2.2.0.7 false COMMITMENTS AND CONTINGENCIES 125 - Disclosure - COMMITMENTS AND CONTINGENCIES true false false false 1 USD false false iso4217_USD Standard http://www.xbrl.org/2003/iso4217 USD iso4217 0 iso4217_USD_per_shares Divide http://www.xbrl.org/2003/iso4217 USD iso4217 http://www.xbrl.org/2003/instance shares 0 shares Standard http://www.xbrl.org/2003/instance shares 0 $ 5 3 us-gaap_CommitmentsAndContingenciesDisclosureTextBlock us-gaap true na duration No definition available. false false false false false false false false false false false verboselabel false 1 false false false false 0 0 <div> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><b>NOTE 19 &#x2013; COMMITMENTS AND CONTINGENCIES</b></font></p> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><u>Purchase Commitments</u></font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">During the third quarter of 2010, our Board of Directors approved a capital project at our Koolyanobbing Operation&#xA0;in Western Australia.&#xA0;The project is expected to increase the production capacity at the Koolyanobbing Operation to approximately 11&#xA0;million tonnes annually.&#xA0;The improvements consist of enhancements to the existing rail infrastructure and upgrades to various other existing operational constraints.&#xA0;The expansion project requires a capital investment of approximately $234 million, of which approximately $34 million has been committed, that will be required to meet the timing of the proposed expansion.&#xA0;As of September&#xA0;30, 2010, $4 million in capital expenditures had been expended related to this commitment.&#xA0;Of the committed capital, expenditures of approximately $15 million are scheduled to be made in both 2011 and 2012, respectively.</font></p> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; FONT-SIZE: 1px"> &#xA0;</p> <p style="MARGIN-TOP: 0px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">In the third quarter of 2010, we incurred capital commitments related to an expansion project at our Empire and Tilden mines in Michigan&#x2019;s Upper Peninsula. As of September&#xA0;30, 2010, the project has been approved for capital investments on equipment of approximately $111 million, of which $72 million has been committed, and is expected to allow the Empire mine to produce at three million tons annually through 2014 and increase Tilden mine production by an additional two million tons annually. As of September&#xA0;30, 2010, no capital expenditures had yet been made related to this project. Of the committed capital, expenditures of approximately $4 million and $68 million are scheduled to be made in 2010 and 2011, respectively.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">In 2010, we incurred a capital commitment for the construction of a new portal closer to the coal face at our Oak Grove mine in Alabama. The portal, which requires a capital investment of approximately $29 million, of which $20 million has been committed, will significantly decrease transit time to and from the coal face, resulting in among other things, improved safety, greater operational efficiency, increased productivity, lower employment costs and improved employee morale. As of September&#xA0;30, 2010, capital expenditures related to this purchase were approximately $7 million. Remaining committed expenditures of $13 million are scheduled to be made throughout the remainder of 2010.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">In 2008, we incurred a capital commitment for the purchase of a new longwall plow system for our Pinnacle mine in West Virginia. The system, which requires a capital investment of approximately $90 million, will replace the current longwall plow system in an effort to reduce maintenance costs and increase production at the mine. As of September&#xA0;30, 2010, capital expenditures related to this purchase were approximately $55 million. Remaining expenditures of approximately $17 million and $18 million are scheduled to be made in 2010 and 2011, respectively.</font></p> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><u>Contingencies</u></font></p> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><i>Litigation</i></font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">We are currently a party to various claims and legal proceedings incidental to our operations. If management believes that a loss arising from these matters is probable and can reasonably be estimated, we record the amount of the loss, or the minimum estimated liability when the loss is estimated using a range, and no point within the range is more probable than another. As additional information becomes available, any potential liability related to these matters is assessed and the estimates are revised, if necessary. Based on currently available information, management believes that the ultimate outcome of these matters, individually and in the aggregate, will not have a material adverse effect on our financial position or results of operations. However, litigation is subject to inherent uncertainties, and unfavorable rulings could occur. An unfavorable ruling could include monetary damages or an injunction. If an unfavorable ruling were to occur, there exists the possibility of a material adverse impact on the financial position and results of operations of the period in which the ruling occurs, or future periods. However, we believe that any pending litigation will not result in a material liability in relation to our consolidated financial statements.</font></p> <p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; FONT-SIZE: 1px"> &#xA0;</p> </div> NOTE 19 &#x2013; COMMITMENTS AND CONTINGENCIES Purchase Commitments During the third quarter of 2010, our Board of Directors approved a capital project at our false false false us-types:textBlockItemType textblock Includes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables. Reference 1: http://www.xbrl.org/2003/role/presentationRef -Publisher FASB -Name FASB Interpretation (FIN) -Number 14 -Paragraph 3 Reference 2: http://www.xbrl.org/2003/role/presentationRef -Publisher FASB -Name Statement of Financial Accounting Standard (FAS) -Number 5 -Paragraph 9, 10, 11, 12 false 1 1 false UnKnown UnKnown UnKnown false true