2.2.0.7falseCOMMITMENTS AND CONTINGENCIES125 - Disclosure - COMMITMENTS AND CONTINGENCIEStruefalsefalsefalse1USDfalsefalseiso4217_USDStandardhttp://www.xbrl.org/2003/iso4217USDiso42170iso4217_USD_per_sharesDividehttp://www.xbrl.org/2003/iso4217USDiso4217http://www.xbrl.org/2003/instanceshares0sharesStandardhttp://www.xbrl.org/2003/instanceshares0$53us-gaap_CommitmentsAndContingenciesDisclosureTextBlockus-gaaptruenadurationNo definition available.falsefalsefalsefalsefalsefalsefalsefalsefalsefalsefalseverboselabelfalse1falsefalsefalsefalse00<div>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><b>NOTE 19 – COMMITMENTS AND
CONTINGENCIES</b></font></p>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><u>Purchase
Commitments</u></font></p>
<p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">During
the third quarter of 2010, our Board of Directors approved a
capital project at our Koolyanobbing Operation in Western
Australia. The project is expected to increase the production
capacity at the Koolyanobbing Operation to approximately
11 million tonnes annually. The improvements consist of
enhancements to the existing rail infrastructure and upgrades to
various other existing operational constraints. The expansion
project requires a capital investment of approximately $234
million, of which approximately $34 million has been committed,
that will be required to meet the timing of the proposed
expansion. As of September 30, 2010, $4 million in
capital expenditures had been expended related to this
commitment. Of the committed capital, expenditures of
approximately $15 million are scheduled to be made in both 2011 and
2012, respectively.</font></p>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; FONT-SIZE: 1px">
 </p>
<p style="MARGIN-TOP: 0px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">In the
third quarter of 2010, we incurred capital commitments related to
an expansion project at our Empire and Tilden mines in
Michigan’s Upper Peninsula. As of September 30, 2010,
the project has been approved for capital investments on equipment
of approximately $111 million, of which $72 million has been
committed, and is expected to allow the Empire mine to produce at
three million tons annually through 2014 and increase Tilden mine
production by an additional two million tons annually. As of
September 30, 2010, no capital expenditures had yet been made
related to this project. Of the committed capital, expenditures of
approximately $4 million and $68 million are scheduled to be made
in 2010 and 2011, respectively.</font></p>
<p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">In 2010,
we incurred a capital commitment for the construction of a new
portal closer to the coal face at our Oak Grove mine in Alabama.
The portal, which requires a capital investment of approximately
$29 million, of which $20 million has been committed, will
significantly decrease transit time to and from the coal face,
resulting in among other things, improved safety, greater
operational efficiency, increased productivity, lower employment
costs and improved employee morale. As of September 30, 2010,
capital expenditures related to this purchase were approximately $7
million. Remaining committed expenditures of $13 million are
scheduled to be made throughout the remainder of 2010.</font></p>
<p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">In 2008,
we incurred a capital commitment for the purchase of a new longwall
plow system for our Pinnacle mine in West Virginia. The system,
which requires a capital investment of approximately $90 million,
will replace the current longwall plow system in an effort to
reduce maintenance costs and increase production at the mine. As of
September 30, 2010, capital expenditures related to this
purchase were approximately $55 million. Remaining expenditures of
approximately $17 million and $18 million are scheduled to be made
in 2010 and 2011, respectively.</font></p>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><u>Contingencies</u></font></p>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: ARIAL" size="3"><i>Litigation</i></font></p>
<p style="MARGIN-TOP: 12px; TEXT-INDENT: 7%; MARGIN-BOTTOM: 0px" align="justify"><font style="FONT-FAMILY: ARIAL" size="3">We are
currently a party to various claims and legal proceedings
incidental to our operations. If management believes that a loss
arising from these matters is probable and can reasonably be
estimated, we record the amount of the loss, or the minimum
estimated liability when the loss is estimated using a range, and
no point within the range is more probable than another. As
additional information becomes available, any potential liability
related to these matters is assessed and the estimates are revised,
if necessary. Based on currently available information, management
believes that the ultimate outcome of these matters, individually
and in the aggregate, will not have a material adverse effect on
our financial position or results of operations. However,
litigation is subject to inherent uncertainties, and unfavorable
rulings could occur. An unfavorable ruling could include monetary
damages or an injunction. If an unfavorable ruling were to occur,
there exists the possibility of a material adverse impact on the
financial position and results of operations of the period in which
the ruling occurs, or future periods. However, we believe that any
pending litigation will not result in a material liability in
relation to our consolidated financial statements.</font></p>
<p style="MARGIN-TOP: 12px; MARGIN-BOTTOM: 0px; FONT-SIZE: 1px">
 </p>
</div>NOTE 19 – COMMITMENTS AND
CONTINGENCIES
Purchase
Commitments
During
the third quarter of 2010, our Board of Directors approved a
capital project at ourfalsefalsefalseus-types:textBlockItemTypetextblockIncludes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables.Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name FASB Interpretation (FIN)
-Number 14
-Paragraph 3
Reference 2: http://www.xbrl.org/2003/role/presentationRef
-Publisher FASB
-Name Statement of Financial Accounting Standard (FAS)
-Number 5
-Paragraph 9, 10, 11, 12
false11falseUnKnownUnKnownUnKnownfalsetrue