Hycroft Mining Corp 8-K, filed Mar 10, 2015: Press release or other material
Exhibit 99.2
|
|
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Confidential
Allied Nevada – Project Aztec
Discussion Materials
February 2015
|
|
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
SUBJECT TO F.R.E. 408 Disclaimer SUBJECT TO SUBSTANTIAL REVISION
The information contained in this presentation is being supplied and communicated to you on a confidential basis by Allied Nevada Gold Corp. (the
“Company”) solely for your information and is subject to the confidentiality agreement that you have entered into with the Company. The information herein may not be reproduced, further distributed to any other person or published, in whole or in part, for any purpose whatsoever.
This presentation and the information contained in it is not an offer of, invitation to apply for, or solicitation for the purchase or sale of any securities of the Company. Any investment decision must me made solely on the basis of definitive offering documentation to be issued by the Company, and any such offer will not be made in any jurisdiction where it is unlawful, where the person making the offer is not qualified to do so, or to any person who cannot legally be offered the securities.
This presentation contains summaries believed to be accurate with respect to certain documents, but reference is made to the actual documents for complete information. All such summaries are qualified in their entirety by such reference. Copies of documents referred to herein will be made available to prospective investors upon request to the Company. Certain information in this presentation has been derived from publicly available sources that have not been independently verified. No representation or warranty, express or implied, is made as to the accuracy, completeness or reliability of such information.
In addition to historical information, this presentation and the documents incorporated by reference in this presentation and other written reports and oral statements made from time to time by us may contain forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and the Private Securities Litigation Reform Act of 1995 (the “PSLRA”) or in releases made by the SEC, all as may be amended from time to time, as well as forward-looking information within the meaning of the applicable Canadian securities laws. All statements, other than statements of historical fact, included herein or incorporated by reference, that address activities, events or developments that we expect or anticipate will or may occur in the future, are forward-looking statements.
The words “estimate”, “plan”, “anticipate”, “expect”, “intend”, “believe”, “project”, “target”, “budget”, “may”, “will”, “would”, “could”, “seeks”, or “scheduled to”, or other similar words, or negatives of these terms or other variations of these terms or comparable language or any discussion of strategy or intentions identify forward-looking statements. These cautionary statements are being made pursuant to the Securities Act, the Exchange Act, the PSLRA and applicable Canadian securities laws with the intention of obtaining the benefit of the “safe harbor” provisions of, or similar protections under, such laws. These statements involve known and unknown risks, uncertainties, assumptions and other factors many of which are beyond the Company’s control which may cause the Company’s actual results, performance or achievements to be materially different from any results, performances or achievements expressed or implied by such forward-looking statements. For more detail on these risks, you should refer to the section entitled “Risk Factors” in the Company’s Prospectus Supplement dated December 9, 2014 to the Prospectus dated November 25, 2014, filed with the U.S. Securities and Exchange Commission pursuant to Rule 424(b)(2), and the sections of the Company’s annual report on Form 10-K for the year ended December 31, 2013 and quarterly report on Form 10-Q for the quarter ended September 30, 2014 entitled “Cautionary Note Regarding
Forward-Looking Statements” and “Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
1
|
|
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Presenting Today
Name & Title Biography
Randy Buffington
President & CEO
Joined Allied Nevada in February 2013
Has over 28 years of management, operations, engineering and construction experience, which he attained through his various management positions at globally focused mid-tier and senior mining companies Most recently from Coeur d’Alene Mines Corporation, where he was Senior Vice President, Operations Prior to that, he served in a variety of operations management roles with Barrick Gold Corporation including; General Manager of Barrick’s Goldstrike mining complex; and General Manager of their Ruby Hill and Bald Mountain mines in Nevada. Randy has a Masters degree in Civil Engineering
Joined Allied Nevada in March 2012
Prior to joining Allied he was most recently President, CFO and Director of EPM Mining Ventures Inc.
Previously Senior Vice President and Chief Financial Officer for Katanga Mining where he successfully raised approximately $300 million through various debt financing instruments Has held various positions at Freeport McMoran Copper and Gold including Senior Vice President & CFO
Steve Jones
Executive Vice President & CFO
2
|
|
1. Background and Overview of Current Operations
Today’s Agenda
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
3
|
|
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
Allied Nevada Overview
Allied Nevada Overview Hycroft
Allied Nevada is a US-based gold and silver producer, focused on growth in Nevada Flagship operation, Hycroft Mine, is one of North
America’s largest heap leach operations
The 2015 budget was based upon expected production of 230,000-250,000 oz of gold and 1.4 million – 1.6 million oz of silver1 Operating in a region where infrastructure is established and mining parameters are well known reduces execution risk Long-life asset with significant reserves of 10.6 million ozs Au and 465.3 million ozs Ag (at 12/31/14) Total reserve and resource base at Hycroft is in excess of 43.4 million ozs AuEq2 (at 12/31/14)
Large portfolio of exploration properties in Nevada Exceptionally low political risk with all Nevada focus Board and management have extensive construction, development and mine operating experience on large projects and operations globally
Hycroft is currently operating as an open pit, heap leach operation
24/7 operation (process)
Mining takes place 6 days a week moving ~270,000 tons per day Average daily fleet consists of: 2 x wire rope shovels, 1 x hydraulic shovel, 23 x 320-ton haul trucks and associated support vehicles (two back-up hydraulic shovels available) Plan to have under 400 people employed at the mine in 2015
Merrill-Crowe plant up and running at nameplate capacity (21,500 gpm) Crusher 100% mechanically complete
Primary crusher operational; Secondary and Tertiary crushers were initially found to have engineering defects associated with the new design Temporary fix completed in July 2014 Recast crushers using previous proven design were expected to be installed by end of 2015
1. The 2015 budget has been prepared on a going concern basis and assumes the necessary financing is in place to deliver the mine plan
2. Gold equivalent resources comprised of proven, probable, measured, indicated and inferred gold ounces plus silver ounces (converted to gold equivalent at a ratio of 60:1).
4
|
|
STRICTLY CONFIDENTIAL
1. Background and Overview of Current Operations PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
Hycroft has Significant Infrastructure in PlaceSUBJECT TO SUBSTANTIAL REVISION
Hycroft – 2009 Hycroft – 2014 Substantial footprint
North MC Brimstone plant MC plant and refinery
Crusher
Leach pads
Offices and maintenance
Large landholding
27 patented mining claims that comprise 1,814 acres 3,248 unpatented mining claims comprise 68,759 acres
5
|
|
1. Background and Overview of Current Operations
Hycroft Growth
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Since 2009, Hycroft has a CAGR of gold and silver sales of 39% and 103%, respectively
First year of full production (2009) sales of 42,358 ounces of gold and 53,125 ounces of silver
Investment in Merrill-Crowe expansion in 2013 significantly increased production capacity and silver recoveries
2014 sales of 216,937 ounces of gold and 1,841,737 ounces of silver
300 3,000
)
262 ilv S (000s 246 er 200 217 2,000 ld o un O S 182 s ce Ounces 100 115 1,000 Sold
1,842
102 1,541 1,586 old 88 (00 G 858 0s 696 )
42 372
238
— —2009 2010 2011 2012 2013 2014 2015B 2016E
Gold Ounces Sold (000s) Silver Ounces Sold (000s)
6
|
|
1. Background and Overview of Current Operations
Rivals Other World-Class Deposits on Scale
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Top 10 Nevada Deposits
50.0 oz) Reserves (AuEq) Resources (AuEq)
( ce s 40.0 our 30.0 27.5 Res 15.5 18.3 t 20.0 len 19.0 4.9 2.9 va 10.0 17.9 18.3
1.8 2.2 12.3 15.1
2.5 2.7 9.4 7.8 Equi 2.5 3.4 4.9 5.2 0.0 old Round Twin Creeks Marigold Bald Phoenix Goldstrike Turquoise Carlin Cortez Hycroft G Mountain Mountain Ridge (Newmount Deposits Deposits)
Global Deposits
Gold Equivalent Ounces (millions)
0 20 40 60 80 100 Phoenix 14 Goldstrike 15 Tasiast 16 Moab Khotsong 16 Vasilkovskoje 16 Bulyanhulu 18 Ahafo 18 Obuasi 18 Los Filos 18 Joel 18 Kibali 19 Telfer 20 Livengood 21 Carlin Deposits 22 Boddington 22 Paracatu 25 Blyvooruitzicht 26 Turquoise Ridge 27 Free State 28 Evander 31 Cortez Deposits 33 Cerro Casale 34 Buffelsfontein 35 Mponeng 39 Cadia East 39 Donlin Gold 40 Pascua Lama 41
Penasquito 41 Pueblo Viejo 44 Hycroft 46 Olimpiada 47 Muruntau 48 Natalka 60 Lihir Island 65 Kloof/Driefontein 66 Cibaliung 66 South Deep 79
Note: As of 12/31/13
7
|
|
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
2. Review of FY 2014
Today’s Agenda
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
8
|
|
2. Review of FY 2014
Historical Financial Performance
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Gold Sold and Average Realized Price Revenue
250 217 $2,000 $400 $1,681 Av $1,577 ) s $310 oz) 200 182 $1,500 erage $300 $268 of $1,230 lion il
150 $1,365 m $215 115 $1,269 ( $ (000s 103 $1,000 Realiz $200
88 ed e $152 100 enu $131 $275
Sales $248 $500 Pric $100 $193
50e Rev
Gold $ ( tal $126 $139
) /oz To
2010 2011 2012 2013 2014 2010 2011 2012 2013 2014 Gold Sales (000s of oz) Average Realized Price ($/oz) Gold Revenue Silver Revenue
Adjusted Operating Costs Per Ounce of Gold1 EBITDA and EBITDA Margin2
$1,200 $120 45% 50% $1,064
(including inventory oz write-down)1 $100
$1,000 $84 40% $855 $252 32%
old (including inventory (addback for inventory G write-down)1 lions) $80 write-down)1
$800 il
22% 30% m 24% per $60 $55 EBITDA $ ( t $600
$96 20%
Cos $40 9% $400 $802 $812 Margin $60
$638 (excluding (excluding EBITDA $49 $29 10% $516 $488 inventory inventory $20 (including Cash $200 write-down)1 write-down)1 $31 inventory — write-down)1 —
— 2010 2011 2012 2013 2014 2010 2011 2012 2013 2014 EBITDA ($ millions) EBITDA Margin
1. Write-down of value of WIP on leach pads in 2013 and 2014 due to decreased metal prices and increased production costs
9
|
|
2. Review of FY 2014
Historical Financial Performance (cont’d)
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The Company has been in growth phase since 2010, investing to ramp-up operations. However, capital expenditure for a heap leach only operation is expected to be minimal from 2015 onwards
Capex Free Cash Flow1
$400 —
)
$328 ns ($ 6)
o
li ($32)
s) $300 l ($50)
$262 mi
$ ($ 100)
illion (
m
$ $200
( Flow
sh ($ 200) ($166)
Capex $100 $ 82 $ 79 Ca
e
$ 37 Fre
— ($ 300) ($268)
2010 2011 2012 2013 2014 2010 2011 2012 2013 2014
1. Free Cash Flow defined as EBITDA including Inventory write-downs less Capital Expenditures
10
|
|
3. Current Operations – 2015 Budget Overview
Today’s Agenda
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
11
|
|
3. Current Operations – 2015 Budget Overview
2015 Budget Overview
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Overview
Allied Nevada has created a budget plan for the financial performance of the Hycroft mine in 2015. The budget is forecasted based on historical trends as well as future expectations including gold and silver prices The budget is constructed from a detailed review of the operations of the Hycroft plan including:
Updated mine plan
Tons mined and ounces recovered Production and operating expenses
Corporate general & administrative and exploration / land-holding costs
The budget has been prepared on a going concern basis and assumes the necessary financing is in place to deliver the mine plan The Company has adapted its operational plan throughout the years to maximize operational and financial performance
In 2013, the Company integrated a mobile dispatch system to improve mining costs
In 2014, the Company focused on improving efficiency of the larger mining fleet using the data from the dispatch system In January 2015, the Company reduced the crew schedule to 10-hour days, 6 days a week with the off hours and day dedicated to maintenance. This enables the Company to:
Maintain required ore tonnage onto pad Focus mining in higher grade areas Reduce waste and strip mining
The Company was also planning on an expansion of its heap leach pad in June 2015
12
|
|
3. Current Operations – 2015 Budget Overview
Mining Progress
Q1 2015 Q4 2015
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Mining in Brimstone and Porter Ore placed on North Pad Waste placed in South Dump
Mining rate of ~6.6 million tons per month (220K tpd)
Based on Santa Fe/Lone Tree 3x10-hr crews Maintenance and blasting is planned
Production Fleet:
2 – CAT 7495 Electric shovels (73 cyd)
23 – 320 ton haul trucks
1 – Hitachi 5500 Hydraulic shovel
13
|
|
3. Current Operations – 2015 Budget Overview
Key Assumptions
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Cost assumptions in the 2015 Budget are in line with 2014 actuals
2014A 2015B 2014A 2015B
Gold Price ($/oz) $1,269 $1,200 World fuel price (per barrel) $93 $80
Silver Price ($/oz) $19 $16 Diesel fuel price (per gallon) 3.08 3.00
Silver to gold ratio 8.5:1 6:3:1 Total fuel consumption (million gallons) 11.5 9.3
Total employment—mine 294 226 Lime cost per pound $0.098 $0.100
Total employment—process 102 101 Lime consumption per ton of ore 7.3 5.8
Total employment—administration 35 37 Total lime consumed—tons 122k 146k
Availability Utilization Cynaide cost per pound $1.00 $1.06
Production drills 80% 75% 8 8 Cynaide consumption per ton of 0.60 0.47
Rope shovels 95% 95% 2 2 Total Cyanide consumed—tons 15.6k 13.0k
Hydraulic shovels 90% 85% 3 1 Power cost per kilowatt hour (avg.) $0.067 $0.075
Trucks 95% 95% 27 23 Total power consumed—kwh’s 109M 72M
Operating trucks 24 21 Solution flow to Pad in GPM 26,201 28,500
Bench height 50 ft 50 ft Solution flow through MC Plant GPM 19,932 24,500
Blast hole spacing 20 ft 20 ft
Hole diameter 7.875 in 7.875 in
Powder factor 0.56 0.57
Whittle Shell based on:
Mining Cost – $1.50/ton (plus $0.02/ton per bench below 4500’ elevation)
Metal Prices
- Gold – $700/oz, $900/oz, and $1,100/oz Phased Approach
- Silver – $15/oz
Pit wall angle – 41 to 45 degrees Road width – 120’
Note: Restructuring costs have not been included in the 2015 budget
14
|
|
3. Current Operations – 2015 Budget Overview
Hycroft Mine Plan
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Gold sales are expected to increase post Q1 2015 due to improved heap leach kinetics
Q1 2015B Q2 2015B Q3 2015B Q4 2015B Total 2015B
Ore tons placed 11,339,864 13,546,838 13,770,184 11,378,110 50,034,995
AuFA oz/ton 0.007 0.007 0.008 0.010 0.008
AuFa oz 75,106 97,484 105,151 114,048 391,789
AuCN oz/ton 0.004 0.005 0.005 0.006 0.005
AuCN oz 50,413 68,103 70,875 73,284 262,675
AgFA oz/ton 0.269 0.236 0.253 0.284 0.259
AgFA oz 3,056,066 3,193,223 3,483,604 3,233,323 12,966,216
AuCN/AuFA Ratio 0.67 0.70 0.67 0.64 0.67
Mill Stockpile Tons 3,324,703 2,113,221 1,950,910 1,020,246 8,409,080
Waste tons 9,058,160 5,944,258 4,078,906 7,401,644 26,482,968
Total tons 23,722,727 21,604,317 19,800,000 19,800,000 84,927,043
Rec Oz Placed 34,051 46,558 45,151 42,932 168,691
Recovery rates 68% 68% 64% 59% 64%
Strip ratio 0.80 0.44 0.30 0.65 0.53
Oz Recovered 46,879 65,566 62,777 70,927 246,150
15
|
|
3. Current Operations – 2015 Budget Overview
Production & Processing Assumptions
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Tons Mined
10,000 Waste tons Mill stockpile tons Ore tons
8,000 7,887 8,000 7,835 7,600 7,404
6,600 6,600 6,600 6,600 6,600 6,600 6,600
s) 6,000 3,430 3,044 2,584 2,071 1,291 794 649
918 506 1,880
t on 691 690 2,583 2,636 1,112 3,029 2,493
s 4,000 973 1,661 505 333 535 215
(000 270
2,000 3,484 3,295 4,560 4,840 5,195 3,512 3,631 5,300 4,839 4,185 3,301 3,891
—
Jan-15B Feb-15B Mar-15B Apr-15B May-15B Jun-15B Jul-15B Aug-15B Sep-15B Oct-15B Nov-15B Dec-15B
Strip Ratio 0.77 0.61 0.49 0.37 0.21 0.64 0.67 0.14 0.11 0.40 0.85 0.61
Ounces Sold
40,000 Silver (gold equivalent ounces) Gold
30,000 28,475 27,770
22,170 25,351 24,656 22,983 22,625 22,319 1,686 1,982
20,000 21,164 1,461 1,918 2,139 2,554 2,004 1,710 1,436 19,715
13,996 15,476 1,363
996 1,300 26,789 25,787
10,000 19,702 20,252 23,213 22,102 20,979 20,915 20,883 18,351
13,000 14,176
—
Silver to Jan-15B Feb-15B Mar-15B Apr-15B May-15B Jun-15B Jul-15B Aug-15B Sep-15B Oct-15B Nov-15B Dec-15B
Gold Ratio 5.7 6.9 5.6 7.1 6.9 8.7 7.2 6.1 5.2 4.7 5.8 5.6
1. Silver revenue at $16/oz price converted into gold equivalent ounces using $1,200/oz gold price
16
|
|
3. Current Operations – 2015 Budget Overview
Operating & All-In Sustaining Costs
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
All-in sustaining costs in 2015 are expected to yield ample margin given current gold prices
Adjusted Operating Costs / Ounce
$1,400
$1,200 $976 $996 $973 $968 $986 $1,064
$868 $881 $902 $871 $915 $923
$1,000 $823 $826 (addback inventory for
write-down)1
oz ) $800
/
$
( $600
$812
$400
$200
—
Jan-15B Feb-15B Mar-15B Apr-15B May-15B Jun-15B Jul-15B Aug-15B Sep-15B Oct-15B Nov-15B Dec-15B 2014A 2015B
All-In Sustaining Costs / Ounce
$1,400
$1,202
$1,200 $1,062 $1,057 $1,033 $1,049 $1,070 $1,033 $1,028 $1,071 $1,025
$955 $945 $953 $991
$1,000
z) $800
/o
( $ $600
$400
$200
—
Jan-15B Feb-15B Mar-15B Apr-15B May-15B Jun-15B Jul-15B Aug-15B Sep-15B Oct-15B Nov-15B Dec-15B 2014A 2015B
1. Write-down of value of WIP on leach pads in 2014 due to decreased metal prices and increased production costs
17
|
|
3. Current Operations – 2015 Budget Overview
EBITDA & Free Cash Flow
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
EBITDA is expected to increase by ~52% in 2015 with significantly increased Free Cash Flow
EBITDA (Cumulative)
$50 $45 $45
$42
$40 $38
$35
ns) $32
o $29 $29
l li $30 $25
mi $20
( $ $20
$15
$11
$10 $6
$2
—
Jan-15B Feb-15B Mar-15B Apr-15B May-15B Jun-15B Jul-15B Aug-15B Sep-15B Oct-15B Nov-15B Dec-15B 2014A 2015B
Free Cash Flow (Cumulative)1
$50
$33 $35 $35
$30 $21
) $10
lions $10 $4 $4
l
mi
$ ($2)
( ($10)
($8)
($14)
($16) ($20) ($18) ($18)
($30)
Jan-15B Feb-15B Mar-15B Apr-15B May-15B Jun-15B Jul-15B Aug-15B Sep-15B Oct-15B Nov-15B Dec-15B 2014A 2015B
1. Free Cash Flow calculated as EBITDA plus Non-Cash Expenses less changes in Net Working Capital, Sustaining Capex and Other Investing Activities
18
|
|
3. Current Operations – 2015 Budget Overview
2015 Budget – Quarterly Liquidity
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
($ millions) Q1-15 B Q2-15 B Q3-15 B Q4-15 B 2015B
Operating Assumptions
Gold Price ($ / ounce) $1,200 $1,200 $1,200 $1,200 $1,200
Gold Ounces Sold (oz ‘000s) 47 66 63 71 246
EBITDA $10.7 $14.7 $9.1 $10.1 $44.6
Plus: Non-Cash Expenses 1.6 1.6 1.6 1.6 6.4
Less: WIP Adjustment and Other (11.3) 10.1 12.5 21.0 32.4
Less: Change in NWC (7.1) 1.5 (0.0) (0.0) (5.7)
Less: Sustaining Capital Expenditures (0.5) (6.4) (0.3) (0.3) (7.4)
Less: Other Investing Activities (11.0) (12.0) (5.0) (7.0) (35.0)
Unlevered Free Cash Flow ($17.6) $9.5 $17.9 $25.5 $35.3
Cum. Unlevered Free Cash Flow (17.6) (8.1) 9.8 35.3 35.3
Less: RCF and Capital Lease Interest Expense (2.7) (2.6) (2.5) (2.4) (10.2)
Less: Capital Lease Principal Repayments (12.0) (12.1) (12.1) (12.2) (48.3)
Free Cash Flow Available for Unsecured Debt Service ($32.2) ($5.2) $3.3 $11.0 ($23.2)
Cum. Free Cash Flow Available for Unsecured Debt Service (32.2) (37.4) (34.2) (23.2) (23.2)
Less: Unsecured Bond Interest Expense — (16.8) — (16.8) (33.5)
Less: Unsecured Bond Repayment —
Levered Free Cash Flow ($32.2) ($22.0) $3.3 ($5.8) ($56.7)
Cum. Levered Free Cash Flow Available (32.2) (54.2) (50.9) (56.7) (56.7)
Beginning Cash Balance 33.1 5.5 (16.5) (13.2) 33.1
Net Cash Increase / (Decrease) (32.2) (22.0) 3.3 (5.8) (56.7)
Revolver Draw / (Repayment) 4.6 — — — 4.6
Ending Cash Balance 5.5 (16.5) (13.2) (19.0) (19.0)
Beginning Revolver Balance 56.5 56.5 56.5
Draw / (Repayment) — — —
Ending Revolver Balance 56.5 56.5 56.5 56.5 56.5
Revolver Availability 0.0 0.0 0.0 0.0 0.0
Cash Balance 5.5 (16.5) (13.2) (19.0) (19.0)
Total Liquidity $5.5 ($16.4) ($13.2) ($18.9) ($18.9)
Total Liquidity w/out Unsecured Bond Interest & Principal $5.5 $0.3 $3.6 $14.6 $14.6
19
|
|
3. Current Operations – 2015 Budget Overview
Work in Progress
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Although $214 million of cash costs are expected to be added during 2015, the WIP balance is projected to decrease from $327 million to $282 million due to the sale of previously placed ounces
Q4 2014 – Q4 2015 Work in Progress
$400
$54.5
$38.7 $68.3
$54.1 $52.8
$350
$342.0 $69.9
$52.8
) $ 326.6 $328.2
illions $81.5
m $311.1
$
(
$300
$282.4
$250
Q4 2014A Cash Non-Cash Q1 2015B Cash Non-Cash Q2 2015B Cash Non-Cash Q3 2015B Cash Non-Cash Q4 2015B
Costs Movement Costs Movement Costs Movement Costs Movement
WIP Balance Non-Cash Movements Cash Costs Added
20
|
|
4. Oxide Life of Mine Plan
Today’s Agenda
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
21
|
|
4. Oxide Life of Mine Plan
Mine Plan Overview
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Allied Nevada and its Board have approved the implementation of the 2015 Budget plan
The heap leach only life-of-mine plan is based on similar metrics to those assumed in the 2015 Budget
Gold prices of $1,200 / oz and silver prices of $16 / oz
Operating costs assumed to be consistent with the 2015 Budget Mining rate of 79.2 million tons per year
22
|
|
4. Oxide Life of Mine Plan
Key Performance Indicators – Production
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Tons Mined
100,000 Waste tons Mill stockpile tons Ore tons
84,927
79,200 79,200 79,200
80,000
26,483
tons) 60,000 30,134 37,130 31,944
8,409 42,525
40,000 9,562 12,893
(000s 17,084 17,145
20,000 50,035 39,504 6,664
34,363
24,986 18,716 — —
2015B 2016E 2017E 2018E 2019E 2020E 2021E
Strip Ratio 0.45 0.61 0.88 0.68 0.68 — —
Gold Ounces Sold and Pricing
) 350 $ 1,500
oz
300
0s $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $ 1,200
( 00 250 Gold
200 246 262 Pr
Sold $ 1,000 ic
150 182 e
es 162 (
$
100 128 /o
Ounc 50 27 z)
9
old 0 $ 500
G 2015B 2016E 2017E 2018E 2019E 2020E 2021E
Gold Ounces Sold (000s oz) Gold Price ($/oz)
Note: Mining ceases in 2019 under the current mine plan
23
|
|
4. Oxide Life of Mine Plan
Key Performance Indicators – Costs
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Adjusted Operating Costs / Ounce
$1,400
$1,200 $1,127
$1,054
$1,000 $923 $880 $821
/oz) $800
( $ $600
$400
$200
NM1 NM1
—
2015B 2016E 2017E 2018E 2019E 2020E 2021E
All-in Sustaining Costs / Ounce
$1,400 $1,291
$1,200 $1,152
$1,025
$1,000 $952 $938
z) $800
/o
( $ $600
$400
$200
NM1 NM1
—
2015B 2016E 2017E 2018E 2019E 2020E 2021E
1. Mining ceases in 2019 under the current mine plan. Ounces sold in 2020 and 2021 are the residual ounces produced from the leach pad
24
|
|
4. Oxide Life of Mine Plan
Capital Expenditures
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Minimal sustaining capital expenditures through 2018
Other investing activities largely driven by additions to stockpile inventory
($000s) 2015B 2016E 2017E 2018E 2019E 2020E
Sustaining Capex
Processing1 $6,150 — $3,211 — — —
Other 1,273 1,000 — 1,000 — —
Sustaining Capex $7,423 $1,000 $3,211 $1,000 — —
Expansion Capex
Mill Equipment $11,513 $6,308 — — — —
Other Expansion Capex 883 1,200 — — — —
Expansion Capex $12,397 $7,508 — — — —
Other Investing Activities
Additions to stockpile inventory $19,854 $22,059 $46,634 $31,333 $16,191 —
Capitalized interest 2,892 3,000 — — — —
AMRs and other investing activities (174) (174) — — — —
Other Investing Activities $22,572 $24,885 $46,634 $31,333 $16,191 —
Total Investing Activities $42,392 $33,393 $49,845 $32,333 $16,191 —
1. Investment in heap leach pad expansion
25
|
|
4. Oxide Life of Mine Plan
Summary P&L
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
($ millions) 2015B 2016E 2017E 2018E 2019E 2020E 2021E
Pricing Assumptions
Gold Price ($ / ounce) $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200
Silver Price ($ / ounce) $16 $16 $16 $16 $16 $16 $16
Ounces Sold
Gold Ounces Sold (oz ‘000s) 246 262 128 162 182 27 9
Silver Ounces Sold (oz ‘000s) 1,541 1,586 838 2,186 1,153 306 187
Revenue
Gold Revenue $295.4 $314.5 $154.1 $194.6 $218.3 $32.0 $10.4
Silver Revenue 24.7 25.4 13.4 35.0 18.4 4.9 3.0
Total Revenue $320.0 $339.8 $167.5 $229.5 $236.7 $36.9 $13.3
Operating Costs (251.7) (255.9) (158.2) (168.1) (210.1) (39.0) (14.6)
Gross Profit $68.3 $83.9 $9.4 $61.4 $26.6 ($2.1) ($1.2)
Gross Margin 21.3% 24.7% 5.6% 26.7% 11.2% (5.8%) (9.2%)
Exploration Expense (2.7) (2.7) (2.7) (2.7) (2.7) (2.7) (2.7)
Corporate G&A (20.9) (17.4) (17.4) (17.4) (17.4) (17.4) (17.4)
EBITDA $44.6 $63.8 ($10.8) $41.2 $6.4 ($22.3) ($21.4)
EBITDA Margin 13.9% 18.8% (6.4%) 18.0% 2.7% (60.5%) (160.3%)
Depreciation and Amortization (82.9) (81.2) (53.6) (65.3) (45.0) (13.1) (1.5)
EBIT ($38.3) ($17.4) ($64.4) ($24.1) ($38.6) ($35.4) ($22.9)
EBIT Margin (12.0%) (5.1%) (38.4%) (10.5%) (16.3%) (96.1%) (171.9%)
Other Income / (Expenses) — — — — — — 100.0
Interest Income / (Expenses) (43.9) (41.8) (42.2) (40.3) (20.5) (5.1) (4.0)
Profit Before Taxes ($82.2) ($59.2) ($106.6) ($64.4) ($59.1) ($40.5) $73.0
Income Tax (Expense) / Benefit — — — — — — —
Net Income ($82.2) ($59.2) ($106.6) ($64.4) ($59.1) ($40.5) $73.0
Net Income Margin (25.7%) (17.4%) (63.6%) (28.0%) (25.0%) (109.9%) 547.3%
26
|
|
4. Oxide Life of Mine Plan
Summary Liquidity
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
($ millions) 2015B 2016E 2017E 2018E 2019E 2020E 2021E
EBITDA $44.6 $63.8 ($10.8) $41.2 $6.4 ($22.3) ($21.4)
Plus: Non-Cash Expenses 6.4 6.4 4.6 4.6 4.6 4.6 4.6
Less: WIP Adjustment and Other 32.4 52.9 18.5 (8.0) 103.8 30.2 9.8
Less: Change in NWC (5.7) 2.4 (5.3) (5.3) (3.1) (4.6) (2.6)
Less: Sustaining Capital Expenditures (7.4) (1.0) (3.2) (1.0) — — —
Less: Other Investing Activities (35.0) (32.4) (46.6) (31.3) (16.2) — —
Unlevered Free Cash Flow $35.3 $92.1 ($42.8) $0.3 $95.6 $7.9 $90.4
Cum. Unlevered Free Cash Flow 35.3 127.4 84.6 84.9 180.4 188.4 278.8
Less: RCF and Capital Lease Interest Expense (10.2) (8.1) (8.0) (6.1) (5.2) (5.1) (4.0)
Less: Capital Lease Principal Repayments (48.3) (43.6) (31.3) (23.2) (14.8) (4.8) (0.1)
Free Cash Flow Available for Unsecured Debt Service ($23.2) $40.3 ($82.0) ($29.0) $75.6 ($1.9) $86.3
Cum. Free Cash Flow Available for Unsecured Debt Service (23.2) 17.2 (64.9) (93.9) (18.3) (20.2) 66.1
Less: Unsecured Bond Interest Expense (33.5) (33.5) (33.5) (33.5) (16.8) — —
Less: Unsecured Bond Repayment — — — — (400.4) — —
Levered Free Cash Flow ($56.7) $6.8 ($115.5) ($62.5) ($341.5) ($1.9) $86.3
Cum. Levered Free Cash Flow Available (56.7) (49.8) (165.4) (227.9) (569.4) (571.4) (485.1)
Beginning Cash Balance 33.1 (19.0) (12.1) (127.7) (190.2) (531.7) (533.7)
Net Cash Increase / (Decrease) (56.7) 6.8 (115.5) (62.5) (341.5) (1.9) 86.3
Revolver Draw / (Repayment) 4.6 — — — — — —
Ending Cash Balance (19.0) (12.1) (127.7) (190.2) (531.7) (533.7) (447.3)
Beginning Revolver Balance 56.5 56.5 56.5 56.5 56.5 56.5
Draw / (Repayment) — — — — — —
Ending Revolver Balance 56.5 56.5 56.5 56.5 56.5 56.5 56.5
Revolver Availability 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cash Balance (19.0) (12.1) (127.7) (190.2) (531.7) (533.7) (447.3)
Total Liquidity ($18.9) ($12.1) ($127.6) ($190.1) ($531.7) ($533.6) ($447.3)
Total Liquidity w/out Unsecured Bond Interest & Principal $14.6 $54.9 ($27.1) ($56.1) $19.5 $17.5 $103.9
Note: Does not include restructuring fees; assumes revolver refinanced and swap put is not exercised
27
|
|
4. Oxide Life of Mine Plan
Upside to Mine Plan
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Gold price – price may increase from changes in macroeconomic indicators and capital markets activity
Crushing opportunity (at higher metal prices) – anticipate 60%+ recovery rate for gold and 25% for silver from crushed material (compared with ROM recovery rates of ~50% for gold and ~12% for silver)
Active management of lime application – a 10% reduction of lime in the Brimstone ore has a value of ~$3 million
Haul route improvements – improving the ramp on the North pad, improved access out of the bottom of Brimstone and additional haulage routes from Porter have the potential to eliminate the need for 2 haul trucks; value of ~$4 million
Zone mining / improvements on track equipment – equipment including large hydraulic shovels are frequently moved; minimize equipment movement
Blasting improvement (mine to process) – large shovels currently average over 1,000 tph less than standards largely due to blasting; improved fragmentation could improve production by 2,000 tph
Continued optimized 2017 & 2018 mine plan – the Company is currently reviewing additional opportunities in the mine plan to optimize the pit design and extraction of oxide
28
|
|
5. Financing Needs and Timing
Today’s Agenda
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
29
|
|
5. Financing Needs and Timing
Funding Need
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Based on the 2015 Budget and Life of Mine Plan, Allied Nevada needs approximately $130 million in additional capital to bridge through June 2016
$0
)
ons ($20)
l
i li ($40)
m
$ ($60)
(
e
($80)
alanc ($100)
B
Cash ($120)
($140)
Total Funding (Need) Total Funding Need without Bond Interest
($ millions) Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16
Beginning Cash $17 $6 $2 ($7) ($9) ($27) ($27) ($28) ($32) ($25) ($18) ($38) ($39) ($46) ($52) ($62) ($65) ($86) ($81) ($66) ($46) ($29) ($21)
Net Cash Increase / (Decrease) (9) (3) (5) (1) (16) 2 0 1 6 8 (20) (2) (7) (6) (10) (2) (21) 5 15 20 17 8 (9)
Less: Financial and Legal Fees (2) (2) (3) (2) (2) (2) (2) (5) — — — — — — — — — — — — — — —
Revolver Draw / (Repayment) — — — — — — — — — — — — — — — — — — — — — — —
Ending Cash $6 $2 ($7) ($9) ($27) ($27) ($28) ($32) ($25) ($18) ($38) ($39) ($46) ($52) ($62) ($65) ($86) ($81) ($66) ($46) ($29) ($21) ($31)
Revolver Availability — — — — — — — — — — — — — — — — — — — — — — —
Total Liquidity $6 $2 ($7) ($9) ($27) ($27) ($28) ($32) ($25) ($18) ($38) ($39) ($46) ($52) ($62) ($65) ($86) ($81) ($66) ($46) ($29) ($21) ($31)
Less: Minimum Liquidity (Need) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40) (40)
Total Funding (Need) ($34) ($38) ($47) ($49) ($67) ($67) ($68) ($72) ($65) ($58) ($78) ($79) ($86) ($92) ($102) ($105) ($126) ($121) ($106) ($86) ($69) ($61) ($71)
Unsecured Bond Interest — — — — 17 — — — — — 17 — — — — — 17 — — — — — 17
Total Funding Need without Bond Int. ($34) ($38) ($47) ($49) ($50) ($50) ($51) ($55) ($49) ($41) ($44) ($46) ($52) ($59) ($69) ($71) ($76) ($71) ($56) ($35) ($19) ($11) ($4)
Note: Assumes RCF is rolled-over after its maturity in April 2016 and that the mutual put provision in the cross currency swap agreement is not exercised. Does not include cost of new financing or MIP / KEIP payments
30
|
|
5. Financing Needs and Timing
2015 Monthly Liquidity
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The Company is expected to generate $51 million in Unlevered Free Cash Flow for the remainder of 2015…
($ millions) Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 TOTAL
Operating Assumptions
Gold Price ($ / ounce) $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200
Gold Ounces Sold (oz ‘000s) 14 20 20 23 22 21 21 21 27 26 18 246
EBITDA $3.6 $4.9 $3.9 $5.2 $5.6 $3.4 $3.1 $2.6 $3.5 $4.3 $2.3 $42.3
Less: Other Income / (Expenses) — — — — — — — — — — — —
Less: Taxes — — — — — — — — — — — —
Plus: Non-Cash Expenses 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 5.9
Less: WIP Adjustment and Other (2.9) (0.4) 0.7 4.4 4.9 4.0 3.2 5.3 9.9 10.0 1.2 40.3
Less: Change in NWC 0.5 (0.1) 0.5 0.5 0.5 (0.0) (0.0) (0.0) (0.0) (0.0) (0.0) 1.8
Less: Sustaining Capital Expenditures (0.1) (0.2) (2.2) (2.1) (2.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (7.2)
Less: Other Investing Activities (5.7) (2.3) (4.0) (4.2) (3.8) (1.3) (1.4) (2.4) (2.6) (2.3) (2.0) (32.0)
Unlevered Free Cash Flow ($4.2) $2.4 ($0.5) $4.3 $5.7 $6.6 $5.3 $6.0 $11.2 $12.5 $1.9 $51.1
Cum. Unlevered Free Cash Flow (4.2) (1.8) (2.3) 2.0 7.7 14.2 19.6 25.6 36.7 49.2 51.1
Less: RCF and Capital Lease Interest Expense (0.9) (0.9) (0.9) (0.9) (0.9) (0.8) (0.8) (0.8) (0.8) (0.8) (0.8) (9.3)
Less: Capital Lease Principal Repayments (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.1) (4.1) (4.0) (44.3)
Free Cash Flow Available for Unsecured Debt Service ($9.1) ($2.5) ($5.4) ($0.6) $0.8 $1.7 $0.4 $1.1 $6.3 $7.6 ($3.0) ($2.5)
Cum. Free Cash Flow Available for Unsecured Debt Service (9.1) (11.6) (17.0) (17.6) (16.8) (15.1) (14.7) (13.5) (7.2) 0.4 (2.5)
Less: Unsecured Bond Interest Expense — — — — (16.8) — — — — — (16.8) (33.5)
Less: Unsecured Bond Repayment
Levered Free Cash Flow ($9.1) ($2.5) ($5.4) ($0.6) ($16.0) $1.7 $0.4 $1.1 $6.3 $7.6 ($19.7) ($36.1)
Cum. Levered Free Cash Flow Available (9.1) (11.6) (17.0) (17.6) (33.6) (31.9) (31.4) (30.3) (24.0) (16.3) (36.1)
Beginning Cash Balance 17.1 8.0 5.5 0.1 (0.5) (16.5) (14.8) (14.4) (13.2) (6.9) 0.7
Net Cash Increase / (Decrease) (9.1) (2.5) (5.4) (0.6) (16.0) 1.7 0.4 1.1 6.3 7.6 (19.7)
Revolver Draw / (Repayment) — — — — — — — — — — —
Ending Cash Balance 8.0 5.5 0.1 (0.5) (16.5) (14.8) (14.4) (13.2) (6.9) 0.7 (19.0)
Beginning Revolver Balance 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5
Draw / (Repayment) — — — — — — — — — — —
Ending Revolver Balance 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5
Revolver Availability 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cash Balance 8.0 5.5 0.1 (0.5) (16.5) (14.8) (14.4) (13.2) (6.9) 0.7 (19.0)
Total Liquidity $8.1 $5.5 $0.2 ($0.4) ($16.4) ($14.7) ($14.3) ($13.2) ($6.8) $0.8 ($18.9)
Total Liquidity w/out Unsecured Bond Interest & Principal $8.1 $5.5 $0.2 ($0.4) $0.3 $2.0 $2.5 $3.6 $9.9 $17.6 $14.6
Note: Assumes RCF is rolled-over after its maturity in April 2016 and that the mutual put provision in the cross currency swap agreement is not exercised. Does not include cost of new financing or any MIP / KEIP payments. Does not include restructuring fees or DIP financing fees
31
|
|
5. Financing Needs and Timing
2016 Monthly Liquidity
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
… With positive Levered Free Cash Flow generation in 2016
($ millions) Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 TOTAL
Operating Assumptions
Gold Price ($ / ounce) $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200
Gold Ounces Sold (oz ‘000s) 19 15 16 15 18 17 22 30 33 32 24 20 262
EBITDA $2.2 $2.0 $2.7 $3.5 $5.2 $4.7 $6.1 $8.3 $8.9 $8.5 $6.7 $5.2 $63.8
Less: Other Income / (Expenses) — — — — — — — — — — — — —
Less: Taxes — — — — — — — — — — — — —
Plus: Non-Cash Expenses 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 6.4
Less: WIP Adjustment and Other 0.6 (3.6) (3.6) (4.1) (3.6) (3.8) 4.9 13.2 21.3 17.3 7.4 6.8 52.9
Less: Change in NWC 0.5 0.5 (0.1) 0.5 0.5 0.5 (0.0) (0.0) (0.0) (0.0) (0.0) (0.0) 2.4
Less: Sustaining Capital Expenditures (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (1.0)
Less: Other Investing Activities (0.7) (1.4) (1.2) (6.0) (0.6) (1.7) (2.2) (2.8) (6.2) (5.5) (3.0) (1.0) (32.4)
Unlevered Free Cash Flow $3.0 ($2.1) ($1.7) ($5.7) $1.9 $0.2 $9.2 $19.1 $24.4 $20.7 $11.5 $11.4 $92.1
Cum. Unlevered Free Cash Flow 3.0 0.9 (0.8) (6.5) (4.6) (4.4) 4.8 23.9 48.4 69.1 80.6 92.1
Less: RCF and Capital Lease Interest Expense (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.6) (0.6) (0.6) (8.1)
Less: Capital Lease Principal Repayments (3.9) (3.9) (3.9) (3.7) (3.7) (3.7) (3.6) (3.6) (3.6) (3.4) (3.4) (3.4) (43.6)
Free Cash Flow Available for Unsecured Debt Service ($1.6) ($6.7) ($6.4) ($10.1) ($2.5) ($4.2) $5.0 $14.9 $20.2 $16.7 $7.5 $7.4 $40.3
Cum. Free Cash Flow Available for Unsecured Debt Service (1.6) (8.3) (14.7) (24.8) (27.3) (31.5) (26.5) (11.6) 8.6 25.4 32.9 40.3
Less: Unsecured Bond Interest Expense — — — — — (16.8) — — — — — (16.8) (33.5)
Less: Unsecured Bond Repayment
Levered Free Cash Flow ($1.6) ($6.7) ($6.4) ($10.1) ($2.5) ($21.0) $5.0 $14.9 $20.2 $16.7 $7.5 ($9.3) $6.8
Cum. Levered Free Cash Flow Available (1.6) (8.3) (14.7) (24.8) (27.3) (48.3) (43.3) (28.4) (8.1) 8.6 16.1 6.8
Beginning Cash Balance (19.0) (20.6) (27.3) (33.7) (43.8) (46.3) (67.3) (62.3) (47.4) (27.1) (10.4) (2.9)
Net Cash Increase / (Decrease) (1.6) (6.7) (6.4) (10.1) (2.5) (21.0) 5.0 14.9 20.2 16.7 7.5 (9.3)
Revolver Draw / (Repayment) — — — — — — — — — — — —
Ending Cash Balance (20.6) (27.3) (33.7) (43.8) (46.3) (67.3) (62.3) (47.4) (27.1) (10.4) (2.9) (12.2)
Beginning Revolver Balance 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5
Draw / (Repayment) — — — — — — — — — — — —
Ending Revolver Balance 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5 56.5
Revolver Availability 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cash Balance (20.6) (27.3) (33.7) (43.8) (46.3) (67.3) (62.3) (47.4) (27.1) (10.4) (2.9) (12.2)
Total Liquidity ($20.6) ($27.3) ($33.6) ($43.8) ($46.3) ($67.2) ($62.2) ($47.3) ($27.1) ($10.3) ($2.8) ($12.2)
Total Liquidity w/out Unsecured Bond Interest & Principal $13.0 $6.3 ($0.1) ($10.2) ($12.7) ($16.9) ($11.9) $3.0 $23.2 $40.0 $47.5 $54.9
Note: Assumes RCF is rolled-over after its maturity in April 2016 and that the mutual put provision in the cross currency swap agreement is not exercised. Does not include cost of new financing or any MIP / KEIP payments. Does not include restructuring fees or DIP financing fees
32
|
|
5. Financing Needs and Timing
Financial Summary
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The operations are expected to generate $48 million and $99 million of cash in 2015 and 2016, respectively
($ millions) Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 2015B
Cash Flow from Mine Operations¹ (15.9) (2.8) 3.0 3.9 8.7 10.0 6.9 5.6 6.3 12.5 13.8 3.2 $55.1
Less: Sustaining Capex (0.2) (0.1) (0.2) (2.2) (2.1) (2.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (7.4)
Cash Flow from Ongoing Operations ($16.1) ($3.0) $2.8 $1.7 $6.5 $7.9 $6.8 $5.5 $6.2 $12.4 $13.7 $3.1 $47.7
Less: Mill Expansion Capex 0.3 (1.2) (0.4) (2.2) (2.2) (2.2) (0.2) (0.2) (0.2) (1.3) (1.3) (1.3) (12.4)
Less: RCF & Capital Lease Interest (0.9) (0.9) (0.9) (0.9) (0.9) (0.9) (0.8) (0.8) (0.8) (0.8) (0.8) (0.8) (10.2)
Less: Equipment Financing Repayment (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.0) (4.1) (4.1) (4.0) (48.3)
Net Cash Flow ($20.6) ($9.1) ($2.5) ($5.4) ($0.6) $0.8 $1.7 $0.4 $1.1 $6.3 $7.6 ($3.0) ($23.2)
Less: Unsecured Bond Interest Expense — — — — — (16.8) — — — — — (16.8) (33.5)
Net Cash Flow with Bond Interest ($20.6) ($9.1) ($2.5) ($5.4) ($0.6) ($16.0) $1.7 $0.4 $1.1 $6.3 $7.6 ($19.7) ($56.7)
($ millions) Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 2016E
Cash Flow from Mine Operations¹ 3.3 (1.8) (1.5) (1.5) 2.2 0.5 9.5 19.4 24.7 22.2 11.8 11.7 $100.6
Less: Sustaining Capex (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (0.1) (1.0)
Cash Flow from Ongoing Operations $3.2 ($1.9) ($1.5) ($1.5) $2.1 $0.4 $9.4 $19.3 $24.6 $22.1 $11.7 $11.6 $99.6
Less: Mill Expansion Capex (0.2) (0.2) (0.2) (4.2) (0.2) (0.2) (0.2) (0.2) (0.2) (1.4) (0.2) (0.2) (7.5)
Less: RCF & Capital Lease Interest (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.7) (0.6) (0.6) (0.6) (8.1)
Less: Equipment Financing Repayment (3.9) (3.9) (3.9) (3.7) (3.7) (3.7) (3.6) (3.6) (3.6) (3.4) (3.4) (3.4) (43.6)
Net Cash Flow ($1.6) ($6.7) ($6.4) ($10.1) ($2.5) ($4.2) $5.0 $14.9 $20.2 $16.7 $7.5 $7.4 $40.3
Less: Unsecured Bond Interest Expense — — — — — (16.8) — — — — — (16.8) (33.5)
Net Cash Flow with Bond Interest ($1.6) ($6.7) ($6.4) ($10.1) ($2.5) ($21.0) $5.0 $14.9 $20.2 $16.7 $7.5 ($9.3) $6.8
1. Cash Flow from Mine Operations calculated as EBITDA plus Non-Cash Expenses + /—WIP adjustment + /—Change in Net Working Capital less additions to Stockpile Inventory
33
|
|
5. Financing Needs and Timing
17-Week Cash Flow
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The 17-Week Cash Flow has been prepared on a different basis to the 2015 Budget and mine plan. To be conservative, it assumes a lower level of gold sales
($000s)
Week Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Week Beginning 2-Feb 9-Feb 16-Feb 23-Feb 2-Mar 9-Mar 16-Mar 23-Mar 30-Mar 6-Apr 13-Apr 20-Apr 27-Apr 4-May 11-May 18-May 25-May TOTAL
Ounces Sold
Gold 2,095 3,010 3,185 3,185 3,395 3,395 3,535 3,605 3,605 3,605 3,605 3,675 3,675 3,885 3,885 3,885 3,885 59,110
Silver 12,900 19,950 19,110 19,110 20,370 20,370 21,210 21,630 21,630 21,630 21,630 22,050 22,050 23,310 23,310 23,310 23,310 356,880
$ / Ounce
Gold $1,273 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,250 $1,251
Silver $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17 $17
Receipts
Gold $2,668 $3,763 $3,981 $3,981 $4,244 $4,244 $4,419 $4,506 $4,506 $4,506 $4,506 $4,594 $4,594 $4,856 $4,856 $4,856 $4,856 $73,936
Silver 222 339 325 325 346 346 361 368 368 368 368 375 375 396 396 396 396 6,069
Misc. 698 — — — — — — — — — — — — — — — — 698
Total Receipts $3,587 $4,102 $4,306 $4,306 $4,590 $4,590 $4,779 $4,874 $4,874 $4,874 $4,874 $4,969 $4,969 $5,253 $5,253 $5,253 $5,253 $80,704
Disbursements
Fuels (Al Parks) 350 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 7,550
Explosives (Wesco) 100 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 4,100
Cyanide (Cyanco) 425 610 610 610 610 610 610 610 610 610 610 610 610 610 610 610 610 10,185
Lime (Graymont Capital) 300 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 7,500
Equipment (various) 525 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 13,325
NV Energy — — 500 — — — 500 — — — 500 — — — 500 — — 2,000
Other AP 1,300 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 21,300
AP Checks 525 225 225 225 525 225 225 225 525 225 225 225 225 225 225 225 225 4,725
Cigna, PBS & 401K 168 210 168 210 168 168 168 168 168 168 168 168 168 168 168 168 168 2,940
Unusual Items 651 — 998 — 679 — 1,000 — 2,570 — — — 2,350 — 998 — — 9,246
Revolver (Draw)/Repay — — — — — — — — — — — — — — — — — —
MTM Call 1,260 — — — — — — — — — — — — — — — — 1,260
MTM Recall (560) — — — — — — — — — — — — — — — — (560)
Int. and Fee Pmts 80 — 16 — 36 — 16 — 275 — — 226 158 270 — 16 — 1,091
Lease Payments 1,621 926 928 854 1,657 926 928 829 1,351 1,009 638 1,078 1,535 902 661 1,013 782 17,638
Corporate Payroll — 180 — 180 800 180 — — 180 — 180 — 180 — 180 — 180 2,240
Hycroft Payroll (Hourly) 1,100 — 1,100 — 1,100 — 1,100 — 1,100 — 1,100 — 1,100 — 1,100 — 1,100 9,900
Hycroft Payroll (Salary) — 365 — 365 — 365 — — 365 — 365 — 365 — 365 — 365 2,920
Professional Fees — 1,625 — — 2,250 — — — 3,125 — — — — 1,675 — — — 8,675
Other — — — — — — — — — — — — — — — — — —
Total Disbursements $7,845 $7,341 $7,744 $5,644 $11,025 $5,674 $7,746 $5,032 $13,469 $5,212 $6,986 $5,507 $9,891 $7,049 $8,007 $5,232 $6,630 $126,035
Net Cash Flow ($4,258) ($3,239) ($3,438) ($1,338) ($6,435) ($1,084) ($2,967) ($158) ($8,595) ($338) ($2,112) ($539) ($4,922) ($1,797) ($2,755) $20 ($1,377) ($45,331)
Cash
Beginning Cash 17,083 12,826 9,587 6,148 4,810 (1,625) (2,708) (5,675) (5,834) (14,429) (14,767) (16,879) (17,418) (22,340) (24,136) (26,891) (26,871) 17,083
Net Cash (4,258) (3,239) (3,438) (1,338) (6,435) (1,084) (2,967) (158) (8,595) (338) (2,112) (539) (4,922) (1,797) (2,755) 20 (1,377) (45,331)
Ending Cash 12,826 9,587 6,148 4,810 (1,625) (2,708) (5,675) (5,834) (14,429) (14,767) (16,879) (17,418) (22,340) (24,136) (26,891) (26,871) (28,248) (28,248)
Revolver
Beginning Balance 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500
Draw / (Repayment) — — — — — — — — — — — — — — — — — —
Ending Revolver Balance 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500 56,500
Less: LC’s 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450 18,450
Revolver Availablility 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Ending Liquidity $12,876 $9,637 $6,198 $4,860 ($1,575) ($2,658) ($5,625) ($5,784) ($14,379) ($14,717) ($16,829) ($17,368) ($22,290) ($24,086) ($26,841) ($26,821) ($28,198) ($28,198)
Note: 17-week cash forecast does not include MIP / KEIP payments or DIP financing fees
34
|
|
5. Financing Needs and Timing
Borrowing Base
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The Company’s revolver capacity is limited to the lesser of:
Borrowing base minus $25 million; and Maximum facility size of $75 million
The borrowing base as of December 31, 2014 was $135 million
At inventory levels as of December 31, 2014, the Company maintains revolver capacity of $75 million at gold prices above $1,118/oz Borrowing base erodes significantly with a depreciating CAD and declining diesel fuel prices
Borrowing Base Calculation
($000s)
Borrowing Base Calculation 12/31/2014
Actual Pro Forma
CAD/USD Exchange Rate 0.889 0.808
Total recoverable and inventory gold (oz) 266,303 266,303
Gold Price ($/oz) $1,189 $1,189
Gross value of Gold $316,693 $316,693
Plus: Gross value of Silver 25,134 25,134
Less: Processing, selling and NV tax costs (69,020) (69,020)
Preliminary Borrowing Base (@ 80%) $218,245 $218,245
Less: Mark-to-Market of Cross-Currency & Other Derivatives (58,691) (78,804)
Less: Other 1 (24,839) (24,839)
Borrowing Base $134,715 $114,603
1. Other includes $19.6 million of non-cash collateral and surety bonds and $5.2 million of other reserves
35
|
|
5. Financing Needs and Timing
Cross Currency Swap
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The Company has a C$400 million swap that was entered into in connection with the issuance of its senior unsecured notes
The notional value of the cross currency swap is $400.4 million with an interest rate fixed at 8.375%
The Company is required to fully collateralize any mark-to-market liability position of ~22% (C$90 million) of the cross currency swap either in the form of Letters of Credit (“LCs”) or cash
A 1% depreciation in the CAD/USD exchange results in ~$1 million increase in LCs or cash required to be posted as collateral
Swap agreement includes a mutual put provision exercisable on June 1, 2016
Upon maturity the Company will pay $400.4 million to the counterparty and receive C$400.0 million, which will be used to satisfy the face amount of the issuance A summary of exposure of the counterparties to the swap is as follows:
Letters of Credit Out-of-Money
Counterparty Notional Amount Cash Posted1
Posted1 Exposure1
Scotiabank C$310.0 million N/A N/A $72.7 million
National Bank of Canada C$50.0 million $10.2 million $ 1.8 million $12.0 million
Société Générale C$40.0 million $8.3 million $ 1.4 million $9.7 million
TOTAL C400.0 million $18.5 million $ 3.3 million $94.4 million
Note:XXLThe Company also has an outstanding diesel swap with Scotiabank with an out-of-money exposure of $5.5mm as of February 5, 2015
1. As of February 5, 2015
36
|
|
5. Financing Needs and Timing
Maturity Profile
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
The RCF matures in April 2016, the swap is puttable in June 2016 and the Notes are repayable in June 2019
$ 500.0
$ 400.0
$ 339.7
ions) $ 300.0
l
l
i
m $191.3
n $ 200.0
$ i 1 $ 324.92
( $72.7
$ 100.0
$ 48.3 $75.0
$31.3 $ 23.2 $ 22.9
$ 48.3 $43.6 $ 18.0
—
2015 2016 2017 2018 2019 Thereafter
Capital lease and term loan obligations 8.750% senior notes
Revolving credit agreement Term and security deposit loan
Put of Scotiabank swap
1. Mark-to-market of Scotiabank swap as of February 5, 2015
2. Repayment of borrowings of C$400.0 million translated into USD at 4-year forward exchange rate as of February 5, 2015
37
|
|
6. Hycroft Expansion Plan
Today’s Agenda
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
38
|
|
6. Hycroft Expansion Plan
Key Takeaways on Hycroft Expansion Plan
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
| 1 |
|
Ore body easily accessible and can be developed at low cost |
Significant silver by-product and low strip ratio
Large-scale low cost operation similar to copper operations with equivalent grades to 0.5% Cu Ore body very consistent with several mining faces providing flexibility in mining Significant Measured and Indicated Mineral Resources not included in economics
| 2 |
|
Considerable infrastructure in place and consulting engineers have strong track record |
Brownfield expansion; infrastructure and mining equipment largely in place
No “unique” and / or long lead-time items
Crusher already in place
| 2 |
|
SAG mills, 3 ball mills, one regrind mill and related motors and drives already acquired |
Construction timing confirmed by both M3 Engineering and Fluor
M3 has a proven track record in controlling costs and maintaining schedule with big capital projects
Ability to phase the build with initial production capacity of a nominal 60,000 tpd and up to 70,000 tpd depending on the ore hardness for a cost of approximately $767 million
| 3 |
|
AAO successfully used in mining operations and pilot plant test results have been positive |
Atmospheric oxidation has been successfully applied to a number of other mining operations globally, including:
Jerritt Canyon (pre-2004) used atmospheric chlorination as an oxidation process prior to installing a roaster
Joutel (Agnico Eagle) concentrates were reground and preoxidized using lime and lead nitrate to passivate reactive sulfides Lead (Homestake) used atmospheric oxidation in the slime circuit East Driefontein (Gold Fields) used atmospheric preparation to oxidize minor pyrrhotite in the feed
Pilot plant testing has been extensive and results have been positive
39
|
|
STRICTLY CONFIDENTIAL
6. Hycroft Expansion Plan PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
Key Takeaways on Hycroft Expansion Plan (cont’d) SUBJECT TO SUBSTANTIAL REVISION
| 4 |
|
Trona works as well as other reagents at 1/2 the cost |
Works as well as other typically used pH controlling reagents (lime, limestone, sodium bicarbonate, potassium
carbonate, sodium silicate)
At $0.05/lb, approximately half the cost of lime
Trona, a natural form of sodium sesquicarbonate, has been successful in removing acid gas for a variety of
applications in other industries. The physical characteristics of trona are an important factor to the capture of SO2 .
At the Newmont refractory ore treatment roaster facility, trona is added in the roaster feed to control SO2 in the
roaster off gas. Laboratory roasting tests confirmed that the effectiveness of trona in roaster feed for SO2 fixation is
greater than that with addition of lime or soda ash.
Ready access to hundreds of years of trona supply (Green River, WY) through a rail line infrastructure that passes
right by the mine will support requirements
| 5 |
|
Majority of permitting in place with remaining permits on a clear timeline |
Permitting in place to run the heap leach operations for the next 5 years
BLM determined that a Supplemental Environmental Impact Statement (SEIS) will be required for mining below the
water table and operation of the large northeast tailings management facility, which is estimated to require 2 years to
complete
Federal Register Notice of Intent to prepare the SEIS was posted December 30, 2014
—Public scoping period begins in January 2015
Permits to construct and operate mill are in place (which includes a potential short-term tails facility should there be
any delay in receiving the SEIS)
40
|
|
6. Hycroft Expansion Plan
Mill Expansion Summary
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
While the original feasibility study envisioned a two phase 120K mill project, the Company plans to first roll out a single phase at a cost of ~$770 million
Phase 1
Capacity of 60,000 tpd
Originally expected to start detailed engineering in Q4 2014, pending completion of financing Scheduled to be completed within 24 months Includes 1 SAG mill, 2 ball mills, partial flotation circuit, partial AAO circuit, oxygen plant, rail spur and trona handling, power line and tails impoundment
Phase 2
Adds 60,000 tpd, doubling plant capacity Expected to start construction six months before commissioning Phase I
Scheduled to be constructed in 12 months
- Foundation and concrete works will be completed during Phase 1 Twin grinding lines will increase reliability and flexibility with maintenance and inventory
60K TPD Analysis
A feasibility study level capital and operating cost estimate and associated economics have been completed Nameplate (Design) capacity is 60K tpd with a planned throughput of nominally 70K tpd due to ore hardness This first phase would be built in such a way as to allow for a relatively straightforward second phase expansion All production comes from heap leach and mill AAO (no mill whole ore or tails leach)
41
|
|
STRICTLY CONFIDENTIAL
6. Hycroft Expansion Plan PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
Significant Changes: 120K to 60K Feasibility SUBJECT TO SUBSTANTIAL REVISION
Feasibility Feasibility Notes:
60K TPD 120K TPD
Key dates: Detailed engineering: Jun 1, 2015 September 2014 Original schedule assumed September 2014 start
Construction: Jan 1, 2016 January 1, 2015 date for detailed engineering
Operation: Jul 1, 2017 July 1, 2017 Reduced time required for detailed engineering
and construction, maintain start date for operation
Capital cost: $767 million $1,388 billion Major changes include:
Decreased initial capital for tailings construction
Removal of Whole Ore & Tailing Leach
Simplified Trona unloading and storage
Facilities do not consider 2nd Phase expansion but
real estate remains for expansion and Tails Leach
Removed truck shop expansion, lab and
administration facilities
AAO retention: 20 hrs AAO retention 24 hrs Reduced size of and number of tanks
AAO retention
Operating stats: Production: 315,700 ozs Au 426,700 oz Au Average annual operating stats for the first 5 years
(2018-2022) 15,288,300 ozs Ag 17,238,500 ozs Ag of operation (2018-2022)
Cash cost: $652 $478
LOM Opex: $12.0 billion $ 11.8 billion Opex reflects increased tonnage through AAO,
however, economics are also improved overall
NPV (5%) $1.36 billion $1.81 billion
IRR 55.8% 28.6%
42
|
|
6. Hycroft Expansion Plan
Capital Overview
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Feasibility 60K TPD Variance
Direct Costs: $ 881,374,497 $ 449,772,984 $ 431,601,513
Indirect Costs:
Contingency $ 156,877,655 $ 80,309,423 $ 76,568,232
EPCM, commissioning and other costs $ 179,215,436 $ 95,891,404 $ 83,324,032
Sales tax $ 33,061,786 $ 15,895,637 $ 17,166,149
Total EPCM Capital Cost: $ 1,250,529,374 $ 641,869,448 $ 608,659,926
Owner’s Cost $ 137,213,695 $ 125,000,000 $ 12,213,695
TOTAL CAPITAL COST: $ 1,387,743,069 $ 766,869,448 $ 620,873,621
Note: This is go-forward capital and does not include equipment already purchased (mills) or sunk capital
43
|
|
6. Hycroft Expansion Plan
Summary Production
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
LOM Gold Production
500,000 5-Yr Annual Average –
400,000 315,700 ozs Au Mining ceases in 2038
and processing of
Au 300,000 stockpiles continues
Ounces 200,000 until 2043
100,000
—
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043
Gold Sold—Heap Leach Gold Sold—Mill
LOM Silver Production LOM Annual Ore Tons Mined
30,000 Silver Sold—Mill 60,000 Tons Mill
Silver Sold—Heap Leach Tons Heap Leach
25,000 5-Yr Annual Average – 50,000
15,288,300 ozs Au
(000s) 20,000 000s 40,000
Ag 15,000 —30,000
10,000 20,000 Mill averages 71,000
Ounces Tons TPD through LOM
5,000 10,000
0 0
2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037
44
|
|
6. Hycroft Expansion Plan
Major Consumables
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Consumable Status/Availability
Power: NV Energy has confirmed their ability to supply power for the milling facilities
Substation upgrade and power line required – included in capital budget
Cyanide: Cyanco has confirmed that capacity is not an issue
Recently expanded plant in Winnemucca
Lime: Graymont has confirmed that they will be able to continue to meet Hycroft’s lime
requirements for the combined heap leach and mill operations
Lime is currently brought in by rail to Golconda and then trucked to Hycroft. With the rail
siding built, lime can be railed directly into the site
Trona: In discussions with Natronx (a joint venture with FMC, Tata and Church and Dwight) and
Solvay
Each have confirmed their ability and desire to supply the required Trona
Oxygen: To be produced onsite
In discussions with three oxygen vendors for over-the-fence supply of oxygen
45
|
|
6. Hycroft Expansion Plan
Mining Equipment
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Quantity Currently Planned
In Use
Loading Units
Caterpillar 7495 Electric Shovels 2 3
Hitachi EX5500 Hydraulic Shovels 3 3
Large Front End Loader 1 1
Drills
Atlas Copco 271 Pit Viper Drills 7 9
Haul Trucks
Caterpillar 795 Haul Trucks 2 0
Komatsu 930E Haul Trucks 27 46
Mine Services and Support Equipment
Caterpillar D11 Class Dozers 3 5
Caterpillar 16M Motor Graders 3 4
Komatsu 785E Water Trucks – 20,000 gal 2 3
Caterpillar 834H Rubber Tired Dozers 3 3
Komatsu D475 Track Dozers 2 2
Komatsu D375-A Track Dozers 2 2
Caterpillar D10R/T Track Dozers 2 2
Komatsu WA900 Front End Loader 1 1
Volvo 350F Front End Loaders 2 2
Volvo A40D/E Fuel and Lube Trucks 2 2
Mining equipment is based on a typical year and represents the majority of mining years
Two additional wire rope shovels and 19 trucks are added throughout the life of mining to support the increasing mining rate
46
|
|
6. Hycroft Expansion Plan
Merrill-Crowe Processing Plants
Capabilities and impending upgrades
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
ANV currently operates two Merrill-Crowe processing plants with total capacity of 26,500 gpm + 6,000 gpm for CIC
Plants will be upgraded during Phase 1 to process leach solutions from both the mill and heap leach operations
- A pregnant solution enrichment scheme will be designed to maximize the capacity of the plant and optimize water management
- Additional equipment including a filter press, clarifier and full refinery will be added to the plants to accommodate increased metal production
47
|
|
6. Hycroft Expansion Plan
M3 Expertise
Overview Special capabilities
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Formed in 1986, M3 has worked on projects domestically and internationally Considerable experience on projects ranging from $500,000 to
$1.6 billion
M3 incorporates proper contingencies based on project scope definition Strong track record of completing projects on time and on budget Solid and experienced technical team, which has been retained throughout the different economical cycles
Power distribution Instrumentation Plant operation Complex piping systems Cold climates Remote civil projects
Selected projects
($ in millions)
Project Description Approximate cost Design to
start-up
Goldcorp Peñasquito, Zacatecas, Mexico Greenfield plant, polymetallic $1,020 2006 – 2010
Grupo Mexico Buenavista del Cobre, Mexico Brownfield, copper $1,600 2011 – 2015
Tahoe Resources Escobal, Guatemala Greenfields, lead/zinc $235 2011 – 2013
Goldcorp, Cerro Negro, Argentina Greenfield, precious metal $750 2011 – 2014
Romarco Haile Gold, South Carolina Brownfield, precious metal $300 2011 – 2016
Rio Tinto Resolution, Arizona Surface facilities—studies $2,000 2008 – 2014
48
|
|
6. Hycroft Expansion Plan
Feasibility Economics
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Mining Costs Per Ton
Feasibility 60K TPD Variance
Mining ($/t mined) $1.37 $1.43 $0.06
Heap Leach ($/heap leach ore t) $2.45 $2.44 $(0.01)
Processing ($/ore t) $9.14 $9.93 $0.79
G&A ($/ore t) $0.32 $0.55 $0.23
Treatment Charges/Transportation ($/mill ore t) $0.28 $0.27 $(0.01)
Net Proceeds Tax ($/mill ore t) $0.20 $0.13 $(0.07)
Total Operating Cost ($/ ore t) $11.87 $12.58 $0.71
Financial Indicators
Feasibility 60K TPD Variance
NPV @ 0% $3,222,093 $2,650,718 $(571,375)
NPV @ 5% $1,807,961 $1,363,111 $(444,850)
NPV @ 10% $1,017,763 $775,786 $(241,977)
IRR 28.6% 55.8% 27.2%
Payback (years) 5.5 4.1 (1.5)
49
|
|
STRICTLY CONFIDENTIAL
6. Hycroft Expansion Plan PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
Substantial Mineral Reserve & Low Strip RatioSUBJECT TO SUBSTANTIAL REVISION
Proven and Probable Reserves as of 12/31/14
Tons Grades (opt) Contained Ounces (000s)
(000s) Au Ag AuEq Au Ag AuEq
Proven Heap Leach 134,369 0.009 0.24 0.012 1,150 31,696 1,679
Probable Heap Leach 36,680 0.007 0.20 0.010 246 7,486 371
Total Proven & Probable Heap Leach 171,050 0.008 0.23 0.012 1,397 39,182 2,050
Proven Mill 620,392 0.012 0.57 0.021 7,432 352,974 13,315
Probable Mill 157,760 0.011 0.46 0.019 1,722 73,119 2,940
Total Proven & Probable Mill 778,151 0.012 0.55 0.021 9,153 426,093 16,255
TOTAL PROVEN & PROBABLE MINERAL RESERVES 949,201 0.011 0.49 0.019 10,550 465,275 18,305
Waste 1,427,214
Total Tons 2,376,415
Strip Ratio 1.5
Measured and Indicated Resources (Exclusive of Reserves) as of 12/31/14
Tons Grades (opt) Contained Ounces (000s)
(000s) Au Ag AuEq Au Ag AuEq
Measured Heap Leach 337,113 0.006 0.20 0.009 2,051 69,060 3,202
Indicated Heap Leach 243,723 0.006 0.19 0.009 1,417 46,700 2,195
Total Measured & Indicated Heap Leach 580,836 0.006 0.20 0.009 3,468 115,760 5,397
Measured Mill 411,165 0.010 0.30 0.015 4,000 121,978 6,033
Indicated Mill 365,063 0.010 0.24 0.014 3,589 86,513 5,031
Total Measured & Indicated Mill 776,228 0.010 0.27 0.014 7,589 208,491 11,064
TOTAL MEASURED & INDICATED MINERAL 1,357,064 0.008 0.24 0.012 11,057 324,251 16,461
RESOURCES
Note: Inferred mineral resources total 620.1 million tons grading 0.01 opt Au and 0.26 opt Ag (0.014 AuEq)
50
|
|
STRICTLY CONFIDENTIAL
6. Hycroft Expansion Plan PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
Substantial Low-cost Upside to Resource BaseSUBJECT TO SUBSTANTIAL REVISION
Additional drilling can potentially increase reserves
Upgrading Inferred to Measured & Indicated
Within Pre-feasibility Study pit
25-30% conversion with additional drilling
Lack of drill spacing
Lower conversion rate due to accessibility / high wall / active mining areas prevent access for drilling
Outside Pre-feasibility Study pit
70-75% conversion with additional drilling
Bulk of Inferred outside pit is due to drill spacing and open ended mineralization
Additional drilling would likely convert to the Measured & Indicated categories
Loss is generally where drilling encounters lower than modeled grade
Estimated cost to drill
— $25-30M to drill out current Inferred resources (does not guarantee economics or change to pit designs)
Primary target areas
— West Central (conversion of Inferred resources provides opportunity to move west wall 2,500 ft)
— Brimstone (inclusion would improve pit economics, currently hard to drill, as is an active mine area)
In-Pit Inferred material
Material Type Tons (Mt) Au Grade Ag Grade AuEq Contained Contained Contained
(opt) (opt) Grade Au Koz Ag Moz AuEq Koz
Inferred Heap Leach 30.1 0.009 0.36 0.015 271 10.84 451
Inferred Mill 72.9 0.012 0.39 0.018 875 28.43 1,312
51
|
|
6. Hycroft Expansion Plan
Hycroft Mine Area – Permitting
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Access
Union Pacific rail line
Jungo Road – Winnemucca to Gerlach
Land
Private land – white
BLM managed public lands – yellow
Humboldt and Pershing counties
2008 plan boundary – red
8,858 total acres
1,752 private
7,105 public
2014 plan boundary – blue
14,752 total acres
1,752 private
13,000 public
Black Rock Desert BLM National Conservation Area –
diagonal hatch
52
|
|
6. Hycroft Expansion Plan
Key points on Permitting
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
All operating and environmental permits, approved by the Bureau of Land Management (“BLM”) and Nevada Division of
Environmental Protection (“NDEP”), are in good standing for mining operations at Hycroft
- Permitting for the heap leach expansion includes expanded heap leach, open pits, and waste rock facilities; the permitting was completed in August 2012 with the BLM and NDEP authorizing the proposed actions
- The permits required to construct and operate the crushing system and to begin mill construction were also received from the BLM and NDEP in 2012
The Hycroft Mine operates under permit authorizations from the BLM, NDEP, and the Nevada Bureau of Mining Regulation & Reclamation
- During the second half of 2013, the Company continued remediation efforts of the Lewis leach pad and received permits which allowed ANV to begin introducing solution into wells that have been drilled into dry areas of the pad
- In 2013, ANV also received the permits necessary to operate a mill once constructed
Studies supporting permitting of a long-term tailing management facility (TMF), and a deeper open pit, such as groundwater characterization, waste rock characterization, and archaeological and biological surveys, began in late 2009
- The applicable study information was included in a Plan of Operations that was submitted to the BLM in April 2014, requiring a supplemental EIS. Approvals are anticipated to be received in 2016
53
|
|
STRICTLY CONFIDENTIAL
6. Hycroft Expansion Plan PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
Track Record of Receiving Required Authorizations SUBJECT TO SUBSTANTIAL REVISION
2008 authorizations 2012 oxide expansion 2013 mill authorizations 2014 authorizations
Total disturbance: Total disturbance: South Process Complex Hycroft Mine components
2,851 acres 5,235 acres NDEP, BLM: reconfigured Rail spur facility
- 6 open pits — 4 open pits heap leach used as tails dam South tailings storage facility
- 3 heap leach pads — 3 heap leach pads Tailing area Open pit expansion above
- Pit backfill — Crofoot heap (in closure) NDEP, BLM: mill buildings water table
- 3 waste rock areas — Merrill-Crowe plants NDEP air quality permits: mill
- Roads, yards, exploration — Refinery & crusher components
— Two crushers
— Pit backfill
— Class III waivered landfill
— Roads, yards, exploration,
buildings
54
|
|
6. Hycroft Expansion Plan
2014 Permit Authorizations – Other
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
NV Energy power line Hycroft well field
New and upgraded 120kV line from Oreana through Dun Glen to Hycroft
3,900 acre project area Up to 11 production wells Water rights secured
55
|
|
6. Hycroft Expansion Plan
Supplemental EIS Permitting
Overview
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
A Plan of Operations for the TMF and mining below the water table was submitted to the BLM in April 2014 The BLM determined that a Supplemental Environmental Impact Statement is required
- SEIS permitting process could take two years to complete
Preliminary baseline work required for this permitting, such as groundwater characterization, waste rock characterization, pit lake study and archaeological and biological surveys, began in late 2009
- The majority of the fieldwork has been completed
ANV anticipates continued support for the project from the neighboring towns of Winnemucca, Gerlach, and Lovelock; from Humboldt and Pershing counties; and continued cooperation from the BLM
ANV is utilizing recognized experts in the fields of groundwater hydrology and pit lake geochemistry
The BLM has been satisfied with the groundwater and pit lake geochemistry modeling protocols and results to date
56
|
|
7. Exploration Properties Overview
Today’s Agenda
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
1. Background and Overview of Current Operations
2. Review of FY 2014
3. Current Operations – 2015 Budget Overview
4. Oxide Life of Mine Plan
5. Financing Needs and Timing
6. Hycroft Expansion Plan
7. Exploration Properties Overview
57
|
|
7. Exploration Properties Overview
Exploration Properties Overview
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Overview
Allied Nevada controls 42 exploration properties throughout Nevada
- 10,118 Claims, 204,870 acres
- Most properties located on, or near world class trends and mines
Allied Nevada also owns or has interest in 144 patents totaling 2,540 acres
Well developed pipeline of projects from an operating mine, through advanced stage, mid-stage and grass roots
Several properties with royalty streams
- Seven Royalty/Leased Properties
- Four JV Properties, Including 25% ownership of Hasbrouck/Three Hills
58
|
|
7. Exploration Properties Overview
Exploration Properties Overview (cont’d)
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Project Pipeline
Mid-Stage
Mine Advanced Stage Gross-Roots
Late Early
Hycroft Hasbrouck Silver Cloud Toy 26 Properties
Mountain Rock Creek Sno
Wildcat Pony Creek Santa Renia
Mountain View Illipah Mountain Springs
Three Hills Golden Cloud
Maverick Spring Elephant
(JV with Silver Elder Creek
Standard) Eden
Cobb Creek
59
|
|
7. Exploration Properties Overview
Exploration Properties Map
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
60
|
|
7. Exploration Properties Overview
Exploration Properties – Resources
STRICTLY CONFIDENTIAL
PREPARED AT THE REQUEST OF COUNSEL
SUBJECT TO F.R.E. 408
SUBJECT TO SUBSTANTIAL REVISION
Tons Au Grade Ag Grade Au Ag Comments
Property (Mt) (opt) (opt) Ounces Ounces
Hasbrouck indicated 21.59 0.021 0.39 453,411 8,398,897 0.010 Cutoff
Hasbrouck inferred 18.40 0.018 0.32 323,760 5,934,372 0.010 Cutoff
Wildcat indicated 38.11 0.018 0.16 685,949 6,097,328 0.010 Cutoff
Wildcat inferred 28.35 0.015 425,319 0.010 Cutoff
Mountain View indicated 12.86 0.017 218,603 0.010 Cutoff
Mountain View inferred 3.24 0.051 165,138 0.010 Cutoff
Three Hills indicated 6.29 0.023 144,578 0.010 Cutoff
Three Hills inferred 0.02 0.015 296 0.010 Cutoff
Maverick Spring indicated 69.63 0.010 1.00 696,300 0.010 cutoff, 45/55JV
with Silver Standard,
ANV is gold only
Maverick Spring inferred 85.55 0.008 1.50 684,400 128,325,000 0.010 cutoff, 45/55JV
with Silver Standard,
ANV is gold only
Pony Creek indicated 0
Pony Creek inferred 32.41 0.044 1,426,000 0.010 cutoff, geologic
resource
Total Indicated 148.47 0.015 0.65 2,198,841 84,126,225
Total Inferred 117.97 0.018 1.29 3,024,913 134,259,372
61