1.0.0.3 false TRANSMISSION EXPANSION false 1 $ false false iso4217_USD Standard http://www.xbrl.org/2003/iso4217 USD iso4217 0 iso4217_USD_per_shares Divide http://www.xbrl.org/2003/iso4217 USD iso4217 http://www.xbrl.org/2003/instance shares 0 shares Standard http://www.xbrl.org/2003/instance shares 0 5 3 aye_TransmissionExpansionTextBlock aye false na duration string Provides a description of the various transmission expansion projects with which Allegheny is involved along with Federal and... false false false false false false false false false 1 false false 0 0 <div> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>NOTE 5:&#xA0;&#xA0;TRANSMISSION EXPANSION</b></font></p> <p style="MARGIN-TOP: 6px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>Trans-Allegheny Interstate Line</b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">In June 2006, the board of directors of PJM approved a new transmission line extending from southwestern Pennsylvania through West Virginia into northern Virginia, and designated Allegheny to build the Allegheny Power Zone (the &#x201C;AP Zone&#x201D;) portion of the line. PJM, which is a regional transmission operator, is responsible for the operation of, and reliability planning for, the transmission network in the PJM region and included the new line in its 2006 regional transmission expansion plan. In October 2006, Allegheny formed TrAIL Company as the entity responsible for financing, constructing, owning, operating and maintaining the new line, which is named the Trans-Allegheny Interstate Line, or &#x201C;TrAIL.&#x201D; TrAIL is a 500 kV high voltage line that currently is to extend from southwestern Pennsylvania through West Virginia to a point of interconnection with Virginia Electric and Power Company (&#x201C;Dominion&#x201D;) in northern Virginia. In addition, TrAIL Company and Dominion will jointly own an approximately 30-mile 500 kV line segment that Dominion will construct in Virginia. In addition to the TrAIL Line, other TrAIL Company projects include a new static volt-ampere reactive power compensator at the Black Oak substation, upgrades and/or replacements of transformers and/or buses at six other substations and the construction of a new transmission operations center to be located in West Virginia.</font></p> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px"><font size="1">&#xA0;</font></p> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>Potomac-Appalachian Transmission Highline</b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">In June 2007, the board of PJM directed the construction of PATH, a high-voltage transmission line project. In September 2007, Allegheny and AEP formed PATH, LLC to construct and operate PATH. PATH, LLC is a series limited liability company. The &#x201C;West Virginia Series&#x201D; (PATH-WV) is owned equally by Allegheny and a subsidiary of AEP. The &#x201C;Allegheny Series&#x201D; (PATH-Allegheny) is 100% owned by Allegheny. PATH will consist of a single 765 kV line from the AEP substation near St. Albans, West Virginia to a new substation near Kemptown, Maryland and include a new midpoint substation in West Virginia in the vicinity of eastern Grant County, northern Hardy County, or southern Hampshire County.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">PJM has confirmed that the reconfigured project addresses its reliability concerns, however in December 2009 PJM suggested that the project does not need to be in service in 2014 to resolve reliability problems on the electric grid, as previously expected. This data from PJM is preliminary and not sufficient to identify a specific in-service date for the project. PJM is in the process of preparing its comprehensive 2010 Regional Transmission Expansion Plan, which will identify an in-service date for PATH.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">The accounts of PATH, LLC and its operating subsidiaries are included in Allegheny&#x2019;s Consolidated Financial Statements. See Note 23, &#x201C;Variable Interest Entities,&#x201D; for additional information.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>Federal Regulation and Rate Matters</b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>TrAIL Project.</i>&#xA0;&#xA0;TrAIL Company earns its revenues through a FERC approved formula rate mechanism that provides for recovery of expenses and a return on investment. TrAIL Company&#x2019;s formula tariff rate, which includes, among other things, an incentive return on equity for TrAIL and a static volt-ampere reactive power compensator at the Black Oak substation (the &#x201C;Black Oak SVC&#x201D;) is 12.7 percent and a return on equity is 11.7 percent for non-incentive projects.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>PATH Project.&#xA0;&#xA0;</i>PATH, LLC earns its revenues through a FERC approved formula rate mechanism that provides for recovery of expenses and a return on investment. PATH, LLC&#x2019;s formula tariff rate includes, among other things, an incentive return on equity of 14.3 percent.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">FERC set for hearing the cost of service formula rate granted in the February&#xA0;29, 2008 order that are being used to calculate the annual revenue requirements for the project. In December 2008, PATH submitted to FERC a settlement of the formula rate and protocols with the active parties. FERC approval of the settlement is pending. Rehearing of the February&#xA0;29, 2008 order with respect to a return on equity remains pending before the FERC.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>State Regulation Matters</b></font></p> <p style="MARGIN-TOP: 6px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>Pennsylvania</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">By order entered on December&#xA0;12, 2008, the Pennsylvania PUC authorized TrAIL Company to construct a 1.2 mile portion of the TrAIL Project in Pennsylvania from the proposed 502 Junction Substation in Greene County to the Pennsylvania-West Virginia state line. This portion of TrAIL will connect with portions of the TrAIL Project approved in West Virginia and Virginia. In the same order, the Pennsylvania PUC also approved an agreement entered into among TrAIL Company, West Penn and Greene County, Pennsylvania in which, among other provisions, TrAIL Company agreed to engage in a collaborative process to identify possible solutions to reliability problems in the Washington County, Pennsylvania area in lieu of the Prexy Facilities that had been a part of the original TrAIL proposal. In addition, West Penn agreed to release certain easements that would have been used by TrAIL Company for the Prexy Facilities, and Greene County agreed that the Pennsylvania PUC should authorize construction of the 1.2 mile portion of TrAIL from 502 Junction Substation to the Pennsylvania-West Virginia state line. An intervenor has initiated judicial review of the order by the Commonwealth Court of Pennsylvania. A proposed settlement and an amendment to the application based on a consensus of participants in the collaborative process are pending before the Pennsylvania PUC for approval.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>West Virginia</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On May&#xA0;15, 2009, PATH-WV, PATH-Allegheny and certain other related entities (the &#x201C;PATH Entities&#x201D;) filed an application with the West Virginia PSC for certificates of public convenience and necessity to construct portions of the PATH Project in West Virginia. The procedural schedule established by the West Virginia PSC provides for an evidentiary hearing in this case in February 2010 and a final commission decision by June&#xA0;21, 2010. On October&#xA0;28, 2009, the Staff of the West Virginia PSC filed a motion to dismiss the application on the basis that, because there was no application pending at that time before any regulatory agency for approval of the Maryland portion of the PATH Project, there is no identified eastern terminus of the project. Other parties filed similar motions or statements in support of the Staff motion. The PATH Entities filed responses in which they opposed the Staff motion but agreed to toll the statutory decision due date in West Virginia until February&#xA0;24, 2011, if the West Virginia PSC extended its current procedural schedule in the manner proposed by the PATH Entities. The West Virginia PSC denied the motions to dismiss and established a revised procedural schedule providing for an evidentiary hearing commencing in October 2010 and a final commission decision by February&#xA0;24, 2011. The PATH Entities expect to supplement their pre-filed testimony on June&#xA0;29, 2010 to reflect a new in-service date for the PATH Project based on PJM&#x2019;s 2010 Regional Transmission Expansion Plan analysis.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>Maryland</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On May&#xA0;19, 2009, Potomac Edison on behalf of PATH-Allegheny filed an application with the Maryland PSC for a certificate of public convenience and necessity to construct portions of the PATH Project in Maryland. The Maryland PSC requested briefs on certain preliminary legal issues and heard oral argument on the issues. On September&#xA0;9, 2009, the Maryland PSC issued an order determining that Potomac Edison could not file an application for a certificate of public convenience and necessity on behalf of PATH-Allegheny but could file such an application on behalf of itself and directed Potomac Edison to advise the Maryland PSC of its decision to file such an application within 30 days. On October&#xA0;9, 2009, Potomac Edison advised the Maryland PSC that it continued to consider its filing options, including whether to re-file an application with the Maryland PSC, and intended to inform the Maryland PSC of its decision as soon as possible. On December&#xA0;21, 2009 the Potomac Edison Company, an Allegheny affiliate, submitted a new application to the Maryland Public Service Commission requesting authorization to construct the Maryland segment of the PATH Project. Potomac Edison has also agreed not to file an application with FERC pursuant to Section&#xA0;216(b)(1) with the FPA prior to June&#xA0;29, 2011 to construct the PATH Project in Maryland.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>Virginia</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On October&#xA0;7, 2008, the Virginia SCC issued an order authorizing construction of the TrAIL project in Virginia, and on November&#xA0;5, 2009, the Virginia Supreme Court affirmed the Virginia SCC&#x2019;s order.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On May&#xA0;19, 2009, PATH-VA filed an application with the Virginia SCC for a certificate of public convenience and necessity to construct portions of the PATH Project in Virginia. The Virginia SCC established a procedural schedule that provided for an evidentiary hearing commencing on January&#xA0;19, 2010. On December&#xA0;21, 2009, PATH-VA filed a motion (as amended on December&#xA0;29, 2009) to withdraw its application on the basis that certain sensitivity analyses conducted by PJM as directed by the Hearing Examiner suggested that the PATH Project appears not to be needed in June 2014 as a result of a reduction in the scope and severity of observed NERC reliability violations. PATH-VA further stated that, consistent with PJM processes, the PATH Project will be considered by PJM in its 2010 RTEP analysis to determine when it will be needed to resolve NERC reliability violations and that PATH-VA did not expect to file a new application prior to the third quarter of 2010. The Hearing Examiner suspended the procedural schedule and issued a report to the Virginia SCC recommending that the motion to withdraw be granted. On January&#xA0;27, 2010, the Virginia SCC granted the motion to withdraw, and the application is no longer pending.</font></p> </div> NOTE 5:&#xA0;&#xA0;TRANSMISSION EXPANSION Trans-Allegheny Interstate Line In June 2006, the board of directors of PJM approved a new transmission false false Provides a description of the various transmission expansion projects with which Allegheny is involved along with Federal and State regulatory developments pertaining to these transmission expansion projects. No authoritative reference available. false false 1 1 false UnKnown UnKnown UnKnown false true