1.0.0.3 false RATES AND REGULATION false 1 $ false false iso4217_USD Standard http://www.xbrl.org/2003/iso4217 USD iso4217 0 iso4217_USD_per_shares Divide http://www.xbrl.org/2003/iso4217 USD iso4217 http://www.xbrl.org/2003/instance shares 0 shares Standard http://www.xbrl.org/2003/instance shares 0 5 3 aye_RateMattersDisclosureTextBlock aye false na duration string Describes all of the specific events that have or may impact rates and amortization of regulatory assets and liabilities (for... false false false false false false false false false 1 false false 0 0 <div> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b>NOTE 4: &#xA0;&#xA0;RATES AND REGULATION</b></font></p> <p style="MARGIN-TOP: 6px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>Pennsylvania</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Rates.</i>&#xA0;&#xA0;Rate caps on transmission services in Pennsylvania expired on December&#xA0;31, 2005. Distribution rate caps were also scheduled to expire on December&#xA0;31, 2005 and generation rate caps were scheduled to expire on December&#xA0;31, 2008. By order entered May&#xA0;11, 2005, the Pennsylvania Public Utility Commission (the &#x201C;Pennsylvania PUC&#x201D;) approved an extension of generation rate caps for West Penn customers from 2008 to 2010 and provided for increases in generation rates in 2007, 2009 and 2010, in addition to previously approved rate cap increases for 2006 and 2008. The order also extended distribution rate caps from 2005 to 2007, with an additional rate cap in place for 2009 at the rate in effect on January&#xA0;1, 2009. The intent of this transition plan is to gradually move generation rates closer to market prices. T&amp;D rates for all customers are subject to traditional regulated utility ratemaking (i.e., cost-based rates).</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Advanced Metering and Demand Side Management Initiatives</i>.&#xA0;&#xA0;In October 2008, Pennsylvania adopted Act 129, which includes a number of measures relating to conservation, demand-side management and power procurement processes. Act 129 requires each electric distribution company (&#x201C;EDC&#x201D;) with more than 100,000 customers to adopt a plan, approved by the Pennsylvania PUC, to reduce, by May&#xA0;31, 2011, electric consumption by at least one percent of its expected consumption for June&#xA0;1, 2009 through May&#xA0;31, 2010. By May&#xA0;31, 2013, the total annual weather-normalized consumption is to be reduced by a minimum of three percent, and peak demand is to be reduced by a minimum of four and one-half percent of the EDC&#x2019;s annual system peak demand. Act 129 also:</font></p> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px; FONT-SIZE: 6px"> &#xA0;</p> <table style="BORDER-COLLAPSE: collapse" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr> <td width="4%"><font size="1">&#xA0;</font></td> <td valign="top" width="2%" align="left"><font style="FONT-FAMILY: Times New Roman" size="2">&#x2022;</font></td> <td valign="top" width="1%"><font size="1">&#xA0;</font></td> <td valign="top" align="left"> <p align="left"><font style="FONT-FAMILY: Times New Roman" size="2">directed the Pennsylvania PUC to adopt an energy conservation and efficiency program to require EDCs to develop and file, by July&#xA0;1, 2009, plans to reduce energy demand and consumption; and</font></p> </td> </tr> </table> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px; FONT-SIZE: 6px"> &#xA0;</p> <table style="BORDER-COLLAPSE: collapse" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr> <td width="4%"><font size="1">&#xA0;</font></td> <td valign="top" width="2%" align="left"><font style="FONT-FAMILY: Times New Roman" size="2">&#x2022;</font></td> <td valign="top" width="1%"><font size="1">&#xA0;</font></td> <td valign="top" align="left"> <p align="left"><font style="FONT-FAMILY: Times New Roman" size="2">required EDCs to file a plan for &#x201C;smart meter&#x201D; technology procurement and installation in August 2009.</font></p> </td> </tr> </table> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">West Penn expects to incur significant capital expenditures in 2010 and beyond to comply with these requirements.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">Act 129 also requires EDCs to obtain energy through a prudent mix of contracts, with an emphasis on competitive procurement. The Act includes a &#x201C;grandfather&#x201D; provision for West Penn&#x2019;s procurement and rate mitigation plan, which was previously approved by the Pennsylvania PUC.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On June&#xA0;30, 2009 West Penn filed its Energy Efficiency and Conservation Plan containing 22 programs to meet its Act 129 demand and consumption reduction obligations. The proposed programs cover most energy-consuming devices of residential, commercial and industrial customers. The Plan also proposes a reconcilable surcharge mechanism to obtain full and current cost recovery of the Plan costs as provided in Act 129. The Plan projected an aggregated cost of the energy efficiency measures in the amount of approximately $94.3 million through mid-2013. A hearing concerning West Penn&#x2019;s Energy Efficiency and Conservation Plan was held August&#xA0;19, 2009. The Pennsylvania PUC approved West Penn&#x2019;s Energy Efficiency and Conservation Plan, in large part, by Opinion and Order entered October&#xA0;23, 2009. The Pennsylvania PUC also approved West Penn&#x2019;s proposal to recover its Energy Efficiency and Conservation Plan costs on a full and current basis via an automatic surcharge to customers&#x2019; bills, subject to an annual reconciliation mechanism.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">The Pennsylvania PUC declined to approve West Penn&#x2019;s proposed distributed generation program and West Penn&#x2019;s proposed contract demand response program and encouraged West Penn to submit revisions to both programs. On December&#xA0;21, 2009, West Penn filed an Amended Energy Efficiency and Conservation Plan as previously directed by the Pennsylvania PUC in which it added a new customer resources demand response program intended to replace the previously proposed distributed generation and contract demand programs. The Pennsylvania PUC reviewed Allegheny&#x2019;s amended plan at its public meeting on February 11, 2010 and ordered Allegheny to file an amended plan within 60 days to include additional detail on the costs associated with the previously approved customer load response program and the new customer resources demand response program.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On August&#xA0;14, 2009, West Penn filed its Smart Meter Technology Procurement and Installation Plan. The Plan, as originally proposed, would provide for extensive deployment of smart meter infrastructure with replacement of all of West Penn&#x2019;s approximately 725,000 meters by the end of 2014. To support two-way communications with the new meters West Penn proposes to build a new and secure telecommunications network. To support time of use and real time pricing as required by Act 129, West Penn proposes to purchase and install a new customer information system. A hearing on West Penn&#x2019;s smart meter Plan was held on November&#xA0;8, 2009. On December&#xA0;18, 2009, West Penn filed a motion to reopen the evidentiary record to submit an alternative smart meter plan proposing, among other things, a less rapid deployment of smart meters. On January&#xA0;13, 2010, the Pennsylvania PUC granted the motion to reopen the record and remanded the proceeding to the ALJ. The Pennsylvania PUC also waived the late January 2010 deadline by which the ALJ&#x2019;s recommended decision would have been required. On January&#xA0;26, 2010, the ALJ set a hearing and briefing schedule for the reopened record, with a target deadline for the ALJ&#x2019;s recommended decision of April&#xA0;23, 2010.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">West Penn estimates that the total cost of implementing smart metering infrastructure as proposed in the Plan as originally filed would be approximately $620 million; however, West Penn&#x2019;s actual cost to implement smart meter infrastructure may vary from that estimate as a result of changes in its procurement and installation plan as ultimately approved by the Pennsylvania PUC and the timing on that approval among other factors. In accordance with Act 129, West Penn&#x2019;s Plan requests a cost recovery surcharge for the full and current recovery of these expenditures from customers.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>West Virginia</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Rates.&#xA0;&#xA0;</i>Rates in West Virginia are subject to traditional regulated utility ratemaking (i.e., cost-based rates).</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Rate Case.&#xA0;&#xA0;</i>On August&#xA0;13, 2009, Monongahela and Potomac Edison filed with the West Virginia PSC a request to increase retail rates by approximately $122.1 million annually, effective June&#xA0;10, 2010. On January&#xA0;12, 2010, Monongahela and Potomac Edison filed supplemental testimony discussing a tax treatment change that would result in a revenue requirement that is approximately $7.7 million lower than the requirement included in the original filing. In addition, in December 2009, subsidiaries of Monongahela and Potomac Edison completed a securitization transaction to finance certain costs associated with the installation of Scrubbers at the Fort Martin generating facility, which costs would otherwise have been included in the request for rate recovery. Consequently, Monongahela and Potomac Edison now are requesting to increase retail rates by approximately $106 million, rather than $122.1 million, annually. An evidentiary hearing on this matter is scheduled to begin on April&#xA0;5, 2010.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Annual Adjustment of Fuel and Purchased Power Cost Rates.&#xA0;&#xA0;</i>On September&#xA0;1, 2009, Monongahela and Potomac Edison filed their annual fuel adjustment request with the West Virginia PSC, requesting a rate increase of $143.2 million to reflect increases in their unrecovered balances of fuel and purchased power costs that have accrued through June 2009 and projected increases through June 2010. The new rates were submitted pursuant to the schedule for annual fuel and purchased power cost reviews. On December&#xA0;2, 2009, the parties to the proceeding filed a Joint Stipulation, providing that Monongahela and Potomac Edison would receive an increase of $118 million, effective January&#xA0;1, 2010, plus deferred recovery of an additional $23.1 million effective January&#xA0;1, 2011, with carrying charges of 6% on the deferred amount. This amount, as well as interest on the deferral, will be included in the company&#x2019;s third-quarter 2010 fuel and purchased power filing for recovery in 2011. The West Virginia PSC approved the Joint Stipulation on December&#xA0;29, 2009.</font></p> <p style="MARGIN-TOP: 18px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>Maryland</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Rates.</i>&#xA0;&#xA0;In 1999, Maryland adopted electric industry restructuring legislation, which gave Potomac Edison&#x2019;s Maryland retail electric customers the right to choose their electricity generation supplier. In 2000, Potomac Edison transferred its Maryland generation assets to AE Supply but remained obligated to provide standard offer generation service, or &#x201C;SOS,&#x201D; at capped rates to residential and non-residential customers for various periods. The longest such period, for residential customers, expired on December&#xA0;31, 2008. As discussed below, Potomac Edison has implemented a rate stabilization plan to transition customers from capped generation rates to rates based on market prices. T&amp;D rates for all customers are subject to traditional regulated utility ratemaking (i.e., cost-based rates).</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Rate Stabilization Plan.</i>&#xA0;&#xA0;In December 2006, Potomac Edison proposed a rate stabilization and market transition plan (the &#x201C;Transition Plan&#x201D;) for its Maryland residential customers, in accordance with a bill passed by the Maryland legislature in 2006. The Maryland Public Service Commission (the &#x201C;Maryland PSC&#x201D;) approved the Transition Plan on March&#xA0;30, 2007. The Transition Plan provides for a gradual transition of Potomac Edison&#x2019;s residential customers from capped generation rates to market-based generation rates, while at the same time preserving for customers the benefit of rate caps.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">Under the Transition Plan, Potomac Edison&#x2019;s customers who did not opt out of the Transition Plan began paying a non-bypassable surcharge (the &#x201C;Rate Stabilization Surcharge&#x201D;) in June 2007, which resulted in an overall rate increase of approximately 15%, after taking into account the expiration of a prior customer choice rate credit with the initiation of the new surcharge. On January&#xA0;1, 2008, the surcharge increased residential rates an additional 15%.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">Beginning January&#xA0;1, 2009, coincident with the expiration of the residential generation rate cap and implementation of market-based generation pricing, the Rate Stabilization Surcharge converted from a charge to a credit on customers&#x2019; bills. Funds collected through the Rate Stabilization Surcharge during 2007 and 2008, plus interest, are being returned to customers as a credit on their electric bills, thereby reducing the impact of the rate cap expiration. The credit will continue, with adjustments, to maintain rate stability until approximately December&#xA0;31, 2010.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">The Rate Stabilization Surcharge was recorded as a regulatory liability as it was billed to customers. In addition, interest on amounts collected from customers is recognized as a component of the regulatory liability for future refund to customers. This interest is recorded as interest expense on the Consolidated Statements of Income. As amounts are returned to customers, these customer credits are being charged directly to the regulatory liability.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Advanced Metering and Demand Side Management Initiatives.</i>&#xA0;&#xA0;On June&#xA0;8, 2007, the Maryland PSC established a new case to consider advanced meters and demand side management programs. The Staff of the Maryland PSC filed its report on these matters on July&#xA0;6, 2007. On September&#xA0;28, 2007, the Maryland PSC issued an order in this case that required the utilities to file detailed plans for how they will meet a proposal-&#x201C;EmPOWER Maryland&#x201D;-that electric usage in Maryland be reduced by 15% by 2015. The Maryland legislature in 2008 adopted a statute codifying the EmPOWER Maryland goals and setting a deadline of September&#xA0;1, 2008 for the utilities to file comprehensive plans for attempting to achieve those goals. Potomac Edison filed its proposals on August&#xA0;29, 2008, asking the Maryland PSC to approve seven programs for residential customers, five programs for commercial, industrial, and governmental customers, a customer education program, and a pilot deployment of Advanced Utility Infrastructure (&#x201C;AUI&#x201D;) that Allegheny has previously been testing in West Virginia.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On December&#xA0;31, 2008, the Maryland PSC issued an order approving some of Potomac Edison&#x2019;s programs and directing that others be redesigned. Potomac Edison filed its revised programs on March&#xA0;31, 2009, with new cost and benefit information. The Maryland PSC approved the programs on August&#xA0;6, 2009, and approved cost recovery for the programs on October&#xA0;6, 2009. Expenditures are expected to be approximately $101 million and are expected to be recovered over the next five to ten years, pending Maryland PSC approval. Meanwhile, the AUI pilot is being examined on a separate track and is currently under discussion with the Staff of the Maryland PSC.</font></p> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px"><font size="1">&#xA0;</font></p> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px"><font style="FONT-FAMILY: Times New Roman" size="2"><b><i>Virginia</i></b></font></p> <p style="MARGIN-TOP: 6px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2"><i>Rates.&#xA0;&#xA0;</i>Until July&#xA0;1, 2007, Potomac Edison had a power purchase agreement with AE Supply to provide Potomac Edison with the power necessary to serve its retail customers in Virginia at rates that were consistent with generation rate caps in effect pursuant to the Virginia Electric Utility Restructuring Act of 1999 (the &#x201C;Restructuring Act&#x201D;). Effective with the expiration of that power purchase agreement on July&#xA0;1, 2007, Potomac Edison began to purchase the power necessary to serve its Virginia customers through the wholesale market at market prices, through a competitive wholesale bidding process. In April 2007 and again in March 2008, Potomac Edison conducted a competitive bidding process to purchase power requirements from the wholesale market for its retail customer service in Virginia and AE Supply was the successful bidder with respect to a substantial portion of these requirements.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">The Restructuring Act initially capped generation rates until July&#xA0;1, 2007. In 2004, it was amended to extend capped rates to 2010, but also provided that Virginia utilities that had divested their generation, such as Potomac Edison, could begin to recover purchased power costs on July&#xA0;1, 2007. In 2007, the law was revised again to provide for generation rate caps to end on December&#xA0;31, 2008. The market prices at which Potomac Edison has purchased power since the expiration in 2007 of its power purchase agreement with AE Supply were significantly higher than the capped generation rates initially set under the Restructuring Act.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">Although the Restructuring Act does provide for generation rate caps through December&#xA0;31, 2008, it was amended to provide, among other things, that Virginia utilities, such as Potomac Edison, could begin to recover purchased power costs, such that the rates a utility would be permitted to charge Virginia customers beginning on July&#xA0;1, 2007 would be based on the utility&#x2019;s cost of purchased power.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">In an April 2007 filing with the Virginia SCC, Potomac Edison requested to adjust its fuel factor and to implement a rate stabilization plan, including an increase in retail rates of approximately $103 million to be phased in over three years beginning July&#xA0;1, 2007, to offset the impact of increased purchased power costs. In June 2007, the Virginia SCC issued an order that denied Potomac Edison&#x2019;s application and motion to establish interim rates, cancelled evidentiary hearings and dismissed the case, ruling that recovery was barred by a Memorandum of Understanding (the &#x201C;MOU&#x201D;) that Potomac Edison entered into with the Staff of the Virginia SCC in 2000 in connection with the transfer of its Virginia generating assets to AE Supply. Under the MOU, Potomac Edison agreed to forego fuel cost adjustments otherwise permitted under the Restructuring Act during the capped rate period, which, at the time that the MOU was entered into, was scheduled to expire as of July&#xA0;1, 2007.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On December&#xA0;20, 2007, the Virginia SCC granted Potomac Edison partial ($9.5 million) recovery of increased purchased power costs, following a second application by Potomac Edison for rate recovery of $42.3 million. On May&#xA0;15, 2008, following a third application by Potomac Edison, the Virginia SCC issued an order allowing Potomac Edison to increase its rates effective July&#xA0;1, 2008, on an interim basis subject to refund, to collect $73 million of purchased power costs. Revenues were recognized based on the method under which the rates were developed and not the amounts collected. As a result, a portion of the amounts collected from July&#xA0;1, 2008 to December&#xA0;31, 2008 was deferred as a regulatory liability and was recognized as revenue from January through June 2009.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On July&#xA0;18, 2008, the Virginia SCC issued an order finding that the rate making provisions of the MOU would expire on December&#xA0;31, 2008. On November&#xA0;18, 2008, Potomac Edison filed with the Virginia SCC a comprehensive rate settlement agreed to with the Staff of the Virginia SCC, the Consumers Counsel of the Virginia Office of the Attorney General and a group of Potomac Edison&#x2019;s industrial customers that transitions all customers to rates that allow for full recovery of purchased power costs no later than July&#xA0;1, 2011. The Virginia SCC held a hearing on the settlement on November&#xA0;18, 2008 and approved it without alteration or condition on November&#xA0;26, 2008. Key provisions of the settlement include:</font></p> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px; FONT-SIZE: 6px"> &#xA0;</p> <table style="BORDER-COLLAPSE: collapse" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr> <td width="4%"><font size="1">&#xA0;</font></td> <td valign="top" width="2%" align="left"><font style="FONT-FAMILY: Times New Roman" size="2">&#x2022;</font></td> <td valign="top" width="1%"><font size="1">&#xA0;</font></td> <td valign="top" align="left"> <p align="left"><font style="FONT-FAMILY: Times New Roman" size="2">the $73 million rate increase approved on a temporary basis on May&#xA0;15, 2008 will remain in effect through June&#xA0;30, 2009;</font></p> </td> </tr> </table> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px; FONT-SIZE: 6px"> &#xA0;</p> <table style="BORDER-COLLAPSE: collapse" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr> <td width="4%"><font size="1">&#xA0;</font></td> <td valign="top" width="2%" align="left"><font style="FONT-FAMILY: Times New Roman" size="2">&#x2022;</font></td> <td valign="top" width="1%"><font size="1">&#xA0;</font></td> <td valign="top" align="left"> <p align="left"><font style="FONT-FAMILY: Times New Roman" size="2">for the period from July&#xA0;1, 2009 through December&#xA0;31, 2009, half of any further increase in purchased power costs for service to large non-residential customers will be forgone, up to $15 million;</font></p> </td> </tr> </table> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px; FONT-SIZE: 6px"> &#xA0;</p> <table style="BORDER-COLLAPSE: collapse" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr> <td width="4%"><font size="1">&#xA0;</font></td> <td valign="top" width="2%" align="left"><font style="FONT-FAMILY: Times New Roman" size="2">&#x2022;</font></td> <td valign="top" width="1%"><font size="1">&#xA0;</font></td> <td valign="top" align="left"> <p align="left"><font style="FONT-FAMILY: Times New Roman" size="2">for the period from July&#xA0;1, 2009 through June&#xA0;30, 2010, the total rate increase for all other customers will be capped at 15%; and</font></p> </td> </tr> </table> <p style="MARGIN-TOP: 0px; MARGIN-BOTTOM: 0px; FONT-SIZE: 6px"> &#xA0;</p> <table style="BORDER-COLLAPSE: collapse" border="0" cellspacing="0" cellpadding="0" width="100%"> <tr> <td width="4%"><font size="1">&#xA0;</font></td> <td valign="top" width="2%" align="left"><font style="FONT-FAMILY: Times New Roman" size="2">&#x2022;</font></td> <td valign="top" width="1%"><font size="1">&#xA0;</font></td> <td valign="top" align="left"> <p align="left"><font style="FONT-FAMILY: Times New Roman" size="2">during the period from July&#xA0;1, 2009 through June&#xA0;30, 2011, 100 MW of the power procured by Potomac Edison will be deemed for rate purposes to have been procured at the lesser of actual cost or $55 per MWh.</font></p> </td> </tr> </table> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">Potomac Edison successfully procured power in December 2008 to cover load for the settlement period through 2011, and AE Supply was the successful bidder with respect to a substantial portion of these requirements.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On June&#xA0;5, 2009, Potomac Edison filed a request for a transmission rate adjustment clause to collect $1.0 million of third-party transmission costs that it expects to incur between January&#xA0;1, 2009 and August&#xA0;31, 2010, as permitted by the settlement. Potomac Edison has proposed to recover this amount from its retail customers over the rate period from September&#xA0;1, 2009 through August&#xA0;31, 2010. The Virginia SCC approved recovery of all but an insignificant portion of this amount in an order issued on August&#xA0;28, 2009.</font></p> <p style="MARGIN-TOP: 12px; TEXT-INDENT: 4%; MARGIN-BOTTOM: 0px"> <font style="FONT-FAMILY: Times New Roman" size="2">On May&#xA0;15, 2009, the Virginia SCC issued an order concerning a request by Potomac Edison to recover purchased power costs to serve its Virginia customers. The Virginia SCC&#x2019;s order granted an interim rate increase of approximately $19.4 million, subject to refund, effective July&#xA0;1, 2009. In October 2009, Potomac Edison and the Staff of the Virginia SCC filed a joint stipulation, pursuant to which the rate increase would be reduced by $3.2 million to approximately $16.2 million. On October&#xA0;30, 2009, the Virginia SCC issued an order that approved the joint stipulation.</font></p> </div> NOTE 4: &#xA0;&#xA0;RATES AND REGULATION Pennsylvania Rates.&#xA0;&#xA0;Rate caps on transmission services in Pennsylvania expired on December&#xA0;31, 2005. false false Describes all of the specific events that have or may impact rates and amortization of regulatory assets and liabilities (for example, pending or recently concluded regulatory proceedings, environmental requirements). Specifics may include quantifications related to rates, costs, and earnings. Events may relate to rate moratoriums or price caps. No authoritative reference available. false false 1 1 false UnKnown UnKnown UnKnown false true