# Tahoe Resources Inc. 40-F filed Mar 10, 2017: Additional exhibit

- Company: Tahoe Resources Inc.
- Filing: Form 40-F (Annual report (Canadian issuer) for period ending Dec 31, 2016), filed Mar 10, 2017
- Document: Additional exhibit (exhibit99-1.htm)
- Page for people: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm
- Original at the SEC, the official copy: https://www.sec.gov/Archives/edgar/data/1510400/000106299317001299/exhibit99-1.htm
- The document is about 63,600 words long, too long to read at once, so it is served in parts. This page is its outline; the text is at the addresses below.
- To link to a passage, add `#q=` and the passage's exact words, percent-encoded, to the page's address: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm#q=the%20exact%20words
- To check a quote first: https://s6y.io/quote?path=/c/1510400/40-F-20170310/exhibit99-1.htm&q=the%20exact%20words

---

## Parts

- Part 1: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=1 (ANNUAL INFORMATION FORM; OVERVIEW; ESCOBAL MINE; …)
- Part 2: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=2 (LAKE SHORE ASSETS; NEW DIRECTOR; LA ARENA PHASE II SULFIDE PROJECT IN PERU; …)
- Part 3: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=3 (SUSTAINABILITY; MINING IN GUATEMALA; MINING IN PERU; …)
- Part 4: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=4 (FOREIGN INVESTMENT; TAXATION; LA CUCHILLA; …)
- Part 5: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=5 (RISK FACTORS RELATING TO OUR SHARES; RECENT ACTIVITIES AT THE ESCOBAL MINE; PROJECT SETTING, LOCATION, ACCESS AND INFRASTRUCTURE; …)
- Part 6: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=6 (MINING; TAILINGS AND WASTE ROCK FACILITY; TRANSPORTATION AND LOGISTICS; …)
- Part 7: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=7 (RECENT ACTIVITIES AT THE LA ARENA MINE; PROPERTY DESCRIPTION; LA ARENA FEASIBILITY STUDIES; …)
- Part 8: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=8 (ECONOMIC ANALYSIS; Net Cash Flow; INTERPRETATION AND CONCLUSIONS; …)
- Part 9: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=9 (DATA VERIFICATION; MINERAL PROCESSING AND METALLURGICAL TESTING; MINERAL RESOURCE ESTIMATE; …)
- Part 10: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=10 (GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT TYPES; Bell Creek Surface and Underground Exploration; SAMPLING, ANALYSIS AND DATA VERIFICATION; …)
- Part 11: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=11 (BELL CREEK MINE MATERIAL PROCESSED IN 2016; TAILINGS FACILITY; INFRASTRUCTURE, PERMITTING AND COMPLIANCE ACTIVITIES; …)
- Part 12: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=12 (TABLE 1.1: TIMMINS WEST MINE MINERAL RESOURCE ESTIMATE…; TABLE 1.2: TIMMINS WEST MINE ESTIMATED PROBABLE MINERAL…; MINING OPERATIONS; …)
- Part 13: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=13 (begins “Tanya Jakusconek, Director . Ms. Jakusconek is a Senior…”)

The whole document at once: https://s6y.io/c/1510400/40-F-20170310/exhibit99-1.htm.md?part=all
